Name: | ARBEN CONTRACTING OF NEW YORK, INC |
Jurisdiction: | New York |
Legal type: | DOMESTIC BUSINESS CORPORATION |
Status: | Active |
Date of registration: | 09 Sep 2015 (9 years ago) |
Entity Number: | 4817438 |
ZIP code: | 10461 |
County: | Bronx |
Place of Formation: | New York |
Address: | 3028 E. TREMONT AVENUE, SUITE B, BRONX, NY, United States, 10461 |
Shares Details
Shares issued 200
Share Par Value 0
Type NO PAR VALUE
Name | Role | Address |
---|---|---|
ARBEN CONTRACTING OF NEW YORK, INC | DOS Process Agent | 3028 E. TREMONT AVENUE, SUITE B, BRONX, NY, United States, 10461 |
Number | Date | End date | Type | Address |
---|---|---|---|---|
B012024320C83 | 2024-11-15 | 2024-11-29 | REPAIR WATER - PROTECTED | GLENMORE AVENUE, BROOKLYN, FROM STREET CHRISTOPHER AVENUE TO STREET MOTHER GASTON BOULEVARD |
B012024319A09 | 2024-11-14 | 2024-12-12 | REPAIR SEWER | HERKIMER STREET, BROOKLYN, FROM STREET ALBANY AVENUE TO STREET KINGSTON AVENUE |
X012024317E15 | 2024-11-12 | 2024-12-06 | REPAIR WATER - SEWER | WASHINGTON AVENUE, BRONX, FROM STREET EAST 175 STREET TO STREET EAST 176 STREET |
M002024317A23 | 2024-11-12 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
X012024317E32 | 2024-11-12 | 2024-12-06 | REPAIR WATER - SEWER | LONGWOOD AVENUE, BRONX, FROM STREET HEWITT PLACE TO STREET PROSPECT AVENUE |
X012024317E25 | 2024-11-12 | 2024-12-04 | REPAIR WATER - SEWER | TOPPING AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 175 STREET |
M152024313A07 | 2024-11-08 | 2024-12-13 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | EAST 53 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
X012024311C39 | 2024-11-06 | 2024-11-22 | REPAIR SEWER | BOONE AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET |
X012024311C38 | 2024-11-06 | 2024-12-03 | REPAIR WATER - SEWER | FURMAN AVENUE, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
M012024310A17 | 2024-11-05 | 2024-12-01 | REPAIR SEWER | EAST 77 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012024306B46 | 2024-11-01 | 2024-11-14 | REPAIR WATER | 3 AVENUE, MANHATTAN, FROM STREET EAST 38 STREET TO STREET EAST 39 STREET |
B012024306C06 | 2024-11-01 | 2024-11-15 | REPAIR SEWER - PROTECTED | GLENMORE AVENUE, BROOKLYN, FROM STREET CHRISTOPHER AVENUE TO STREET MOTHER GASTON BOULEVARD |
X012024306D44 | 2024-11-01 | 2024-12-01 | REPAIR SEWER | FAIRMOUNT PLACE, BRONX, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE |
M012024305A48 | 2024-10-31 | 2024-11-23 | REPAIR SEWER | 5 AVENUE, MANHATTAN, FROM STREET EAST 52 STREET TO STREET EAST 53 STREET |
M012024305A67 | 2024-10-31 | 2024-11-14 | REPAIR SEWER | 5 AVENUE, MANHATTAN, FROM STREET EAST 52 STREET TO STREET EAST 53 STREET |
M012024304A73 | 2024-10-30 | 2024-11-01 | REPAIR SEWER | EAST 77 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
B012024304C02 | 2024-10-30 | 2024-11-01 | REPAIR SEWER - PROTECTED | GLENMORE AVENUE, BROOKLYN, FROM STREET CHRISTOPHER AVENUE TO STREET MOTHER GASTON BOULEVARD |
M002024302A17 | 2024-10-28 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
X012024302A61 | 2024-10-28 | 2024-11-08 | REPAIR SEWER | BOONE AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET |
M012024302B83 | 2024-10-28 | 2024-11-08 | REPAIR SEWER | EAST HOUSTON STREET, MANHATTAN, FROM STREET AVENUE B TO STREET SUFFOLK STREET |
B012024302D97 | 2024-10-28 | 2024-11-24 | REPAIR WATER - SEWER | HERKIMER STREET, BROOKLYN, FROM STREET ALBANY AVENUE TO STREET KINGSTON AVENUE |
M002024302A07 | 2024-10-28 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
M012024300A00 | 2024-10-26 | 2024-11-14 | REPAIR WATER - SEWER - PROTECTED | EAST 38 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET QNS MDTWN TNNL EXIT |
M192024299A10 | 2024-10-25 | 2024-12-31 | PLACE TEMPORARY PLATES | EAST 53 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M012024298B88 | 2024-10-24 | 2024-11-22 | REPAIR SEWER | PERRY STREET, MANHATTAN, FROM STREET WAVERLY PLACE TO STREET WEST 4 STREET |
M012024290A64 | 2024-10-16 | 2024-11-01 | REPAIR WATER - SEWER - PROTECTED | EAST 38 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET QNS MDTWN TNNL EXIT |
B012024290A90 | 2024-10-16 | 2024-11-01 | C.A.R. RESTORATION | TROUTMAN STREET, BROOKLYN, FROM STREET SCOTT AVENUE TO STREET WYCKOFF AVENUE |
M192024290A13 | 2024-10-16 | 2024-12-31 | PLACE TEMPORARY PLATES | WEST 59 STREET, MANHATTAN, FROM STREET 10 AVENUE TO STREET 11 AVENUE |
M012024289A60 | 2024-10-15 | 2024-10-15 | REPAIR WATER - SEWER | MADISON AVENUE, MANHATTAN, FROM STREET EAST 58 STREET TO STREET EAST 59 STREET |
X012024289E41 | 2024-10-15 | 2024-10-25 | REPAIR SEWER | BOONE AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET |
X012024289E27 | 2024-10-15 | 2024-11-01 | REPAIR SEWER | FAIRMOUNT PLACE, BRONX, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE |
B012024289B14 | 2024-10-15 | 2024-10-29 | REPAIR WATER - SEWER | HERKIMER STREET, BROOKLYN, FROM STREET ALBANY AVENUE TO STREET KINGSTON AVENUE |
M012024289A62 | 2024-10-15 | 2024-11-01 | REPAIR SEWER | 5 AVENUE, MANHATTAN, FROM STREET EAST 52 STREET TO STREET EAST 53 STREET |
M012024289A61 | 2024-10-15 | 2024-10-29 | REPAIR SEWER | EAST HOUSTON STREET, MANHATTAN, FROM STREET AVENUE B TO STREET SUFFOLK STREET |
M012024284A36 | 2024-10-10 | 2024-10-21 | REPAIR SEWER | EAST 53 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M012024284A37 | 2024-10-10 | 2024-11-01 | REPAIR WATER - SEWER | EAST 59 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
M012024280A04 | 2024-10-06 | 2024-10-15 | REPAIR SEWER | EAST HOUSTON STREET, MANHATTAN, FROM STREET AVENUE B TO STREET SUFFOLK STREET |
M012024277B48 | 2024-10-03 | 2024-11-01 | REPAIR WATER - SEWER | 3 AVENUE, MANHATTAN, FROM STREET EAST 38 STREET TO STREET EAST 39 STREET |
M012024277C19 | 2024-10-03 | 2024-10-13 | REPAIR WATER - SEWER | MADISON AVENUE, MANHATTAN, FROM STREET EAST 58 STREET TO STREET EAST 59 STREET |
M012024275A21 | 2024-10-01 | 2024-10-20 | REPAIR SEWER | 5 AVENUE, MANHATTAN, FROM STREET EAST 52 STREET TO STREET EAST 53 STREET |
M152024274A05 | 2024-09-30 | 2024-11-01 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | EAST 77 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
B012024273A03 | 2024-09-29 | 2024-10-24 | REPAIR SEWER - PROTECTED | HART STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
M192024271A04 | 2024-09-27 | 2024-11-01 | PLACE TEMPORARY PLATES | WEST 59 STREET, MANHATTAN, FROM STREET 10 AVENUE TO STREET 11 AVENUE |
M012024270A27 | 2024-09-26 | 2024-10-15 | REPAIR SEWER | EAST HOUSTON STREET, MANHATTAN, FROM STREET AVENUE B TO STREET SUFFOLK STREET |
M012024270A64 | 2024-09-26 | 2024-10-20 | REPAIR WATER - SEWER - PROTECTED | EAST 38 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET QNS MDTWN TNNL EXIT |
X012024267B09 | 2024-09-23 | 2024-10-22 | REPAIR WATER - SEWER | EAST 218 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD |
X012024267B10 | 2024-09-23 | 2024-10-22 | REPAIR WATER - SEWER | CARPENTER AVENUE, BRONX, FROM STREET BRONX BOULEVARD TO STREET EAST 220 STREET |
M012024264A53 | 2024-09-20 | 2024-10-17 | REPAIR SEWER | 5 AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET |
X012024256A92 | 2024-09-12 | 2024-10-13 | REPAIR SEWER | WILLIAMSBRIDGE ROAD, BRONX, FROM STREET ALLERTON AVENUE TO STREET RADCLIFF AVENUE |
X012024256A91 | 2024-09-12 | 2024-10-11 | REPAIR SEWER | BOONE AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET |
Q012024255C12 | 2024-09-11 | 2024-10-03 | REPAIR SEWER | 24 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 44 ROAD |
M012024253B78 | 2024-09-09 | 2024-10-07 | REPAIR SEWER | EAST 53 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M012024253B85 | 2024-09-09 | 2024-09-29 | REPAIR WATER | WEST 59 STREET, MANHATTAN, FROM STREET 10 AVENUE TO STREET 11 AVENUE |
X012024250A65 | 2024-09-06 | 2024-09-13 | REPAIR SEWER | WILLIAMSBRIDGE ROAD, BRONX, FROM STREET ALLERTON AVENUE TO STREET RADCLIFF AVENUE |
M192024247A08 | 2024-09-03 | 2024-11-01 | PLACE TEMPORARY PLATES | WEST 59 STREET, MANHATTAN, FROM STREET 10 AVENUE TO STREET 11 AVENUE |
M012024247A68 | 2024-09-03 | 2024-09-17 | REPAIR WATER | PARK ROW, MANHATTAN, FROM STREET BEND TO STREET BEND |
X012024247A42 | 2024-09-03 | 2024-09-26 | REPAIR SEWER | CRUGER AVENUE, BRONX, FROM STREET BARTHOLDI STREET TO STREET MAGENTA STREET |
B012024247B71 | 2024-09-03 | 2024-10-03 | REPAIR SEWER | HERKIMER STREET, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET SUYDAM PLACE |
M012024242A83 | 2024-08-29 | 2024-09-03 | REPAIR WATER | PARK ROW, MANHATTAN, FROM STREET BEND TO STREET BEND |
B012024241B99 | 2024-08-28 | 2024-09-20 | REPAIR SEWER | MOTHER GASTON BOULEVARD, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE |
B012024236A01 | 2024-08-23 | 2024-09-05 | REPAIR WATER | CHESTER STREET, BROOKLYN, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE |
M012024234B30 | 2024-08-21 | 2024-09-07 | REPAIR SEWER | EAST 53 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
B012024234B94 | 2024-08-21 | 2024-08-22 | REPAIR SEWER | MOTHER GASTON BOULEVARD, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE |
X012024231A00 | 2024-08-18 | 2024-09-14 | REPAIR SEWER | ST LAWRENCE AVENUE, BRONX, FROM STREET DEAD END TO STREET SOUNDVIEW AVENUE |
M012024231A08 | 2024-08-18 | 2024-08-24 | REPAIR SEWER | EAST 53 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
X012024231A02 | 2024-08-18 | 2024-09-12 | REPAIR WATER | BARTHOLDI STREET, BRONX, FROM STREET CRUGER AVENUE TO STREET WHITE PLAINS ROAD |
X012024231A01 | 2024-08-18 | 2024-09-12 | REPAIR SEWER - PROTECTED | EAST 177 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET WALTON AVENUE |
M012024227A00 | 2024-08-14 | 2024-09-12 | REPAIR WATER | 5 AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET |
X012024225A90 | 2024-08-12 | 2024-08-25 | REPAIR SEWER | TIEBOUT AVENUE, BRONX, FROM STREET EAST 184 STREET TO STREET EAST 187 STREET |
M012024225A49 | 2024-08-12 | 2024-09-04 | REPAIR WATER - PROTECTED | EAST 76 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
X012024221A39 | 2024-08-08 | 2024-09-10 | REPAIR WATER - SEWER | LONGFELLOW AVENUE, BRONX, FROM STREET RODMAN PLACE |
M012024215B21 | 2024-08-02 | 2024-08-17 | REPAIR SEWER | EAST 53 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
B012024214A54 | 2024-08-01 | 2024-08-22 | REPAIR WATER | CHESTER STREET, BROOKLYN, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE |
X012024208A32 | 2024-07-26 | 2024-08-12 | REPAIR SEWER | TIEBOUT AVENUE, BRONX, FROM STREET EAST 184 STREET TO STREET EAST 187 STREET |
B012024206C00 | 2024-07-24 | 2024-08-22 | C.A.R. RESTORATION - PROTECTED | JEFFERSON STREET, BROOKLYN, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE |
M012024205A49 | 2024-07-23 | 2024-08-19 | REPAIR WATER | ANN STREET, MANHATTAN, FROM STREET BROADWAY TO STREET THEATRE ALLEY |
M012024204B67 | 2024-07-22 | 2024-08-17 | REPAIR SEWER | WEST 59 STREET, MANHATTAN, FROM STREET 10 AVENUE TO STREET 11 AVENUE |
X012024201A54 | 2024-07-19 | 2024-07-29 | REPAIR SEWER | TIEBOUT AVENUE, BRONX, FROM STREET EAST 184 STREET TO STREET EAST 187 STREET |
X012024197A01 | 2024-07-19 | 2024-07-15 | REPAIR SEWER - PROTECTED | WEST MOSHOLU PARKWAY NORTH, BRONX, FROM STREET GATES PLACE TO STREET WEST GUN HILL ROAD |
B192024198A04 | 2024-07-16 | 2024-08-30 | PLACE TEMPORARY PLATES | HERKIMER STREET, BROOKLYN, FROM STREET ALBANY AVENUE TO STREET KINGSTON AVENUE |
M192024198A04 | 2024-07-16 | 2024-09-30 | PLACE TEMPORARY PLATES | ANN STREET, MANHATTAN, FROM STREET BROADWAY TO STREET THEATRE ALLEY |
X012024197B87 | 2024-07-15 | 2024-08-05 | REPAIR SEWER | 3 AVENUE, BRONX, FROM STREET BOSTON ROAD TO STREET EAST 164 STREET |
X012024193A43 | 2024-07-11 | 2024-08-08 | REPAIR WATER - SEWER | EAST 163 STREET, BRONX, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE |
X012024192A53 | 2024-07-10 | 2024-08-07 | REPAIR SEWER | CHATTERTON AVENUE, BRONX, FROM STREET OLMSTEAD AVENUE TO STREET PUGSLEY AVENUE |
X012024191A79 | 2024-07-09 | 2024-08-07 | REPAIR WATER - SEWER | EAST 198 STREET, BRONX, FROM STREET DECATUR AVENUE TO STREET WEBSTER AVENUE |
M012024190A43 | 2024-07-08 | 2024-08-03 | REPAIR SEWER | EAST 53 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
X012024187A01 | 2024-07-05 | 2024-08-01 | REPAIR WATER - SEWER | BRONX PARK EAST, BRONX, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE |
X012024187A00 | 2024-07-05 | 2024-07-09 | REPAIR WATER - SEWER | SHAKESPEARE AVENUE, BRONX, FROM STREET WEST 169 STREET TO STREET WEST 170 STREET |
X012024184A95 | 2024-07-02 | 2024-07-16 | REPAIR SEWER | TIEBOUT AVENUE, BRONX, FROM STREET EAST 184 STREET TO STREET EAST 187 STREET |
B012024183B01 | 2024-07-01 | 2024-07-15 | REPAIR SEWER | HERKIMER STREET, BROOKLYN, FROM STREET ALBANY AVENUE TO STREET KINGSTON AVENUE |
B012024183A89 | 2024-07-01 | 2024-07-30 | REPAIR WATER - SEWER | EAST 92 STREET, BROOKLYN, FROM STREET DITMAS AVENUE TO STREET LIRR BAY RIDGE DIV |
M012024180A54 | 2024-06-28 | 2024-07-21 | REPAIR SEWER | WEST 59 STREET, MANHATTAN, FROM STREET 10 AVENUE TO STREET 11 AVENUE |
M192024180A06 | 2024-06-28 | 2024-08-30 | PLACE TEMPORARY PLATES | ANN STREET, MANHATTAN, FROM STREET BROADWAY TO STREET THEATRE ALLEY |
M152024180A06 | 2024-06-28 | 2024-08-03 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | EAST 53 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M012024178B29 | 2024-06-26 | 2024-07-22 | REPAIR SEWER | EAST 83 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
X012024178A84 | 2024-06-26 | 2024-07-06 | REPAIR WATER - SEWER | CHATTERTON AVENUE, BRONX, FROM STREET CASTLE HILL AVENUE TO STREET OLMSTEAD AVENUE |
X012024178A85 | 2024-06-26 | 2024-07-17 | REPAIR WATER - SEWER - PROTECTED | CRESTON AVENUE, BRONX, FROM STREET EAST 196 STREET TO STREET EAST 197 STREET |
B012024170B36 | 2024-06-18 | 2024-07-17 | REPAIR SEWER | FLATLANDS AVENUE, BROOKLYN, FROM STREET GEORGIA AVENUE TO STREET SHEFFIELD AVENUE |
X012024164B04 | 2024-06-12 | 2024-07-11 | REPAIR WATER - SEWER | BRONX PARK EAST, BRONX, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE |
B012024163C26 | 2024-06-11 | 2024-07-01 | REPAIR SEWER | HERKIMER STREET, BROOKLYN, FROM STREET ALBANY AVENUE TO STREET KINGSTON AVENUE |
M012024161A03 | 2024-06-09 | 2024-06-22 | REPAIR SEWER | EAST 83 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
X012024161A02 | 2024-06-09 | 2024-07-04 | REPAIR SEWER | WEST 251 STREET, BRONX, FROM STREET BROADWAY TO STREET OLD ALBANY POST ROAD |
M012024159A56 | 2024-06-07 | 2024-06-08 | REPAIR SEWER | EAST 83 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012024158C24 | 2024-06-06 | 2024-06-28 | REPAIR WATER - SEWER | EAST 53 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
B012024156A95 | 2024-06-04 | 2024-06-25 | REPAIR WATER - PROTECTED | LOGAN STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
B012024156C20 | 2024-06-04 | 2024-06-18 | REPAIR SEWER | FLATLANDS AVENUE, BROOKLYN, FROM STREET GEORGIA AVENUE TO STREET SHEFFIELD AVENUE |
X012024155B27 | 2024-06-03 | 2024-07-02 | REPAIR SEWER | TIEBOUT AVENUE, BRONX, FROM STREET EAST 184 STREET TO STREET EAST 187 STREET |
X012024155B28 | 2024-06-03 | 2024-06-28 | REPAIR SEWER | RYER AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST BURNSIDE AVENUE |
X012024152A00 | 2024-05-31 | 2024-06-22 | REPAIR WATER - SEWER | CHATTERTON AVENUE, BRONX, FROM STREET CASTLE HILL AVENUE TO STREET OLMSTEAD AVENUE |
X012024152A17 | 2024-05-31 | 2024-06-26 | REPAIR WATER | FURMAN AVENUE, BRONX, FROM STREET EAST 240 STREET TO STREET EAST 241 STREET |
M012024150A22 | 2024-05-29 | 2024-06-08 | REPAIR SEWER | EAST 83 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012024144A70 | 2024-05-23 | 2024-06-06 | REPAIR WATER | WEST 15 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012024137A23 | 2024-05-22 | 2024-06-14 | REPAIR WATER | WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012024142A73 | 2024-05-21 | 2024-06-04 | REPAIR SEWER | FLATLANDS AVENUE, BROOKLYN, FROM STREET GEORGIA AVENUE TO STREET SHEFFIELD AVENUE |
B012024141A37 | 2024-05-20 | 2024-06-02 | REPAIR WATER - PROTECTED | JEFFERSON STREET, BROOKLYN, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE |
M012024138B22 | 2024-05-17 | 2024-05-30 | REPAIR SEWER - PROTECTED | EAST 76 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
Q012024138B50 | 2024-05-17 | 2024-06-11 | REPAIR WATER - SEWER | 25 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH |
M152024138A15 | 2024-05-17 | 2024-06-20 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | EAST 53 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
B192024137A01 | 2024-05-16 | 2024-06-24 | PLACE TEMPORARY PLATES | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE Z TO STREET MURDOCK COURT |
M012024132A01 | 2024-05-15 | 2024-06-09 | REPAIR WATER | MADISON AVENUE, MANHATTAN, FROM STREET EAST 56 STREET TO STREET EAST 57 STREET |
M012024133A04 | 2024-05-12 | 2024-05-26 | REPAIR SEWER | EAST 83 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
B012024131B62 | 2024-05-10 | 2024-05-19 | REPAIR WATER - PROTECTED | JEFFERSON STREET, BROOKLYN, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE |
M192024130A02 | 2024-05-09 | 2024-07-01 | PLACE TEMPORARY PLATES | ANN STREET, MANHATTAN, FROM STREET BROADWAY TO STREET THEATRE ALLEY |
M012024129B73 | 2024-05-08 | 2024-05-23 | REPAIR WATER | WEST 15 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012024129A41 | 2024-05-08 | 2024-05-12 | REPAIR SEWER | EAST 83 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
B012024129B17 | 2024-05-08 | 2024-06-04 | REPAIR SEWER | FLATLANDS AVENUE, BROOKLYN, FROM STREET GEORGIA AVENUE TO STREET SHEFFIELD AVENUE |
B192024124A13 | 2024-05-03 | 2024-05-31 | PLACE TEMPORARY PLATES | JEFFERSON STREET, BROOKLYN, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE |
B012024124C40 | 2024-05-03 | 2024-06-03 | REPAIR SEWER | DUPONT STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET FRANKLIN STREET |
B192024124A14 | 2024-05-03 | 2024-05-31 | PLACE TEMPORARY PLATES | TROUTMAN STREET, BROOKLYN, FROM STREET SCOTT AVENUE TO STREET WYCKOFF AVENUE |
M192024124A04 | 2024-05-03 | 2024-06-10 | PLACE TEMPORARY PLATES | ANN STREET, MANHATTAN, FROM STREET BROADWAY TO STREET THEATRE ALLEY |
B012024124C39 | 2024-05-03 | 2024-05-17 | REPAIR SEWER - PROTECTED | NOSTRAND AVENUE, BROOKLYN, FROM STREET MONTGOMERY STREET TO STREET SULLIVAN PLACE |
X012024123C08 | 2024-05-02 | 2024-05-26 | REPAIR SEWER | WALTON AVENUE, BRONX, FROM STREET CAMERON PLACE TO STREET EAST 182 STREET |
Q012024123B47 | 2024-05-02 | 2024-06-04 | REPAIR SEWER | 24 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 44 ROAD |
X012024121B33 | 2024-04-30 | 2024-05-30 | REPAIR SEWER | RYER AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST BURNSIDE AVENUE |
B012024120C08 | 2024-04-29 | 2024-05-04 | REPAIR SEWER | DUPONT STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET FRANKLIN STREET |
X192024119A00 | 2024-04-28 | 2024-05-31 | PLACE TEMPORARY PLATES | WALTON AVENUE, BRONX, FROM STREET CAMERON PLACE TO STREET EAST 182 STREET |
B012024119A05 | 2024-04-28 | 2024-05-21 | REPAIR WATER - PROTECTED | LOGAN STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
M012024117A85 | 2024-04-26 | 2024-05-16 | REPAIR SEWER - PROTECTED | EAST 76 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
B012024117E53 | 2024-04-26 | 2024-05-06 | REPAIR WATER - SEWER | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE Z TO STREET MURDOCK COURT |
B012024116C77 | 2024-04-25 | 2024-05-18 | REPAIR WATER - PROTECTED | 6 AVENUE, BROOKLYN, FROM STREET CARROLL STREET TO STREET GARFIELD PLACE |
X012024113B42 | 2024-04-22 | 2024-05-18 | REPAIR WATER - SEWER | BRONX PARK EAST, BRONX, FROM STREET THWAITES PLACE TO STREET WARING AVENUE |
Q022024112A01 | 2024-04-21 | 2024-05-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | 27 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH |
Q022024112A00 | 2024-04-21 | 2024-05-04 | OCCUPANCY OF ROADWAY AS STIPULATED | 27 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH |
Q012024112A02 | 2024-04-21 | 2024-05-04 | REPAIR WATER - PROTECTED | 27 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH |
B012024110B21 | 2024-04-19 | 2024-05-03 | REPAIR WATER - PROTECTED | JEFFERSON STREET, BROOKLYN, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE |
B012024110B20 | 2024-04-19 | 2024-04-20 | REPAIR SEWER | DUPONT STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET FRANKLIN STREET |
B012024110B19 | 2024-04-19 | 2024-05-03 | REPAIR WATER | TROUTMAN STREET, BROOKLYN, FROM STREET SCOTT AVENUE TO STREET WYCKOFF AVENUE |
M012024110A69 | 2024-04-19 | 2024-05-02 | REPAIR WATER | ANN STREET, MANHATTAN, FROM STREET BROADWAY TO STREET THEATRE ALLEY |
B012024108B38 | 2024-04-17 | 2024-05-15 | REPAIR WATER | CARROLL STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET DENTON PLACE |
B012024105A02 | 2024-04-14 | 2024-05-13 | REPAIR SEWER | ERSKINE STREET, BROOKLYN, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE |
B012024105A01 | 2024-04-14 | 2024-04-26 | REPAIR WATER - SEWER | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE Z TO STREET MURDOCK COURT |
B012024103B44 | 2024-04-12 | 2024-04-26 | REPAIR WATER - PROTECTED | COLUMBIA STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET |
M012024103A95 | 2024-04-12 | 2024-05-05 | REPAIR WATER | CLAREMONT AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 116 STREET |
Q012024102B60 | 2024-04-11 | 2024-05-04 | REPAIR WATER - PROTECTED | 27 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH |
Q152024101A00 | 2024-04-10 | 2024-05-04 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | 27 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH |
B012024094B76 | 2024-04-03 | 2024-04-18 | REPAIR SEWER - PROTECTED | MASPETH AVENUE, BROOKLYN, FROM STREET DEBEVOISE AVENUE TO STREET MORGAN AVENUE |
S012024094B47 | 2024-04-03 | 2024-04-17 | REPAIR SEWER | BAY STREET, STATEN ISLAND, FROM STREET BOROUGH PLACE TO STREET BEND |
Q012024094C00 | 2024-04-03 | 2024-04-30 | REPAIR WATER | 72 STREET, QUEENS, FROM STREET 60 AVENUE TO STREET ELIOT AVENUE |
X012024094A78 | 2024-04-03 | 2024-04-29 | REPAIR SEWER | UNDERHILL AVENUE, BRONX, FROM STREET LACOMBE AVENUE TO STREET SOUNDVIEW AVENUE |
B012024094B77 | 2024-04-03 | 2024-05-03 | REPAIR SEWER - PROTECTED | NOSTRAND AVENUE, BROOKLYN, FROM STREET MONTGOMERY STREET TO STREET SULLIVAN PLACE |
B012024089A16 | 2024-04-02 | 2024-04-12 | REPAIR WATER - PROTECTED | COLUMBIA STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET |
X012024093B01 | 2024-04-02 | 2024-04-26 | REPAIR SEWER | WALTON AVENUE, BRONX, FROM STREET CAMERON PLACE TO STREET EAST 182 STREET |
B012024092B32 | 2024-04-01 | 2024-04-13 | REPAIR SEWER | ERSKINE STREET, BROOKLYN, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE |
B012024092E55 | 2024-04-01 | 2024-04-12 | REPAIR WATER - SEWER | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE Z TO STREET MURDOCK COURT |
B012024092E88 | 2024-04-01 | 2024-04-01 | REPAIR WATER | CARROLL STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET DENTON PLACE |
B012024092E89 | 2024-04-01 | 2024-04-15 | REPAIR WATER | CARROLL STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET DENTON PLACE |
Q012024088E44 | 2024-03-28 | 2024-04-11 | REPAIR WATER - PROTECTED | 27 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH |
B012024084A05 | 2024-03-24 | 2024-04-04 | REPAIR SEWER - PROTECTED | NOSTRAND AVENUE, BROOKLYN, FROM STREET MONTGOMERY STREET TO STREET SULLIVAN PLACE |
M012024080B66 | 2024-03-20 | 2024-04-18 | REPAIR WATER | ANN STREET, MANHATTAN, FROM STREET BROADWAY TO STREET THEATRE ALLEY |
B012024080C02 | 2024-03-20 | 2024-04-19 | REPAIR WATER - PROTECTED | JEFFERSON STREET, BROOKLYN, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE |
B012024080B60 | 2024-03-20 | 2024-04-19 | REPAIR WATER | TROUTMAN STREET, BROOKLYN, FROM STREET SCOTT AVENUE TO STREET WYCKOFF AVENUE |
B012024079C05 | 2024-03-19 | 2024-03-30 | REPAIR SEWER | ERSKINE STREET, BROOKLYN, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE |
Q152024075A00 | 2024-03-15 | 2024-04-20 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | 27 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH |
B012024075B30 | 2024-03-15 | 2024-03-29 | REPAIR SEWER - PROTECTED | IRVING PLACE, BROOKLYN, FROM STREET GATES AVENUE TO STREET PUTNAM AVENUE |
M152024074A12 | 2024-03-14 | 2024-04-16 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | ANN STREET, MANHATTAN, FROM STREET BROADWAY TO STREET THEATRE ALLEY |
Q012024070A06 | 2024-03-10 | 2024-04-06 | REPAIR WATER - PROTECTED | NEWTOWN AVENUE, QUEENS, FROM STREET 25 STREET TO STREET 27 STREET |
B012024070A04 | 2024-03-10 | 2024-04-04 | REPAIR SEWER - PROTECTED | MASPETH AVENUE, BROOKLYN, FROM STREET DEBEVOISE AVENUE TO STREET MORGAN AVENUE |
X012024070A01 | 2024-03-10 | 2024-04-03 | REPAIR SEWER | UNDERHILL AVENUE, BRONX, FROM STREET LACOMBE AVENUE TO STREET SOUNDVIEW AVENUE |
M012024070A05 | 2024-03-10 | 2024-04-10 | REPAIR WATER | CLAREMONT AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 116 STREET |
Q012024068A88 | 2024-03-08 | 2024-03-28 | REPAIR WATER - PROTECTED | 27 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH |
S012024066B59 | 2024-03-06 | 2024-04-03 | REPAIR SEWER | BAY STREET, STATEN ISLAND, FROM STREET BOROUGH PLACE TO STREET BEND |
B012024063A08 | 2024-03-03 | 2024-04-02 | REPAIR SEWER | DUPONT STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET FRANKLIN STREET |
M012024061A35 | 2024-03-01 | 2024-03-31 | REPAIR WATER - PROTECTED | EAST 58 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
B012024055A01 | 2024-02-28 | 2024-03-24 | REPAIR WATER - PROTECTED | DE KALB AVENUE, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
M012024058A77 | 2024-02-27 | 2024-03-26 | REPAIR WATER - PROTECTED | WARREN STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WEST BROADWAY |
B012024057C93 | 2024-02-26 | 2024-03-15 | REPAIR SEWER - PROTECTED | IRVING PLACE, BROOKLYN, FROM STREET GATES AVENUE TO STREET PUTNAM AVENUE |
B012024056A02 | 2024-02-25 | 2024-03-10 | REPAIR WATER - PROTECTED | DEBEVOISE AVENUE, BROOKLYN, FROM STREET JACKSON STREET TO STREET MASPETH AVENUE |
B012024056A03 | 2024-02-25 | 2024-03-21 | REPAIR SEWER - PROTECTED | DEBEVOISE AVENUE, BROOKLYN, FROM STREET JACKSON STREET TO STREET MASPETH AVENUE |
X012024056A01 | 2024-02-25 | 2024-03-22 | REPAIR WATER - SEWER | BOGART AVENUE, BRONX, FROM STREET BRADY AVENUE TO STREET NYCTA SUBWAY |
M012024053A68 | 2024-02-22 | 2024-03-17 | REPAIR WATER - PROTECTED | 5 AVENUE, MANHATTAN, FROM STREET EAST 52 STREET TO STREET EAST 53 STREET |
M012024053A69 | 2024-02-22 | 2024-03-11 | REPAIR WATER | CLAREMONT AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 116 STREET |
M192024052A15 | 2024-02-21 | 2024-03-25 | PLACE TEMPORARY PLATES | WARREN STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WEST BROADWAY |
X012024052A74 | 2024-02-21 | 2024-03-21 | REPAIR WATER - SEWER | ANDERSON AVENUE, BRONX, FROM STREET WEST 165 STREET TO STREET WEST 166 STREET |
M012024051B44 | 2024-02-20 | 2024-02-26 | REPAIR WATER | CLAREMONT AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 116 STREET |
S012024051A63 | 2024-02-20 | 2024-03-04 | REPAIR SEWER | BAY STREET, STATEN ISLAND, FROM STREET BOROUGH PLACE TO STREET BEND |
M012024051C33 | 2024-02-20 | 2024-03-20 | REPAIR SEWER - PROTECTED | EAST 78 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
S012024050A07 | 2024-02-19 | 2024-02-19 | REPAIR SEWER | BAY STREET, STATEN ISLAND, FROM STREET BOROUGH PLACE TO STREET BEND |
M012024046B29 | 2024-02-15 | 2024-03-13 | REPAIR WATER | EAST 41 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET TUDOR CITY PLACE |
M012024043B75 | 2024-02-15 | 2024-03-12 | REPAIR WATER - PROTECTED | WEST 31 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET BROADWAY |
M012024044B54 | 2024-02-13 | 2024-03-12 | REPAIR WATER | IRVING PLACE, MANHATTAN, FROM STREET EAST 19 STREET TO STREET GRAMERCY PARK |
B012024040D51 | 2024-02-09 | 2024-02-25 | REPAIR WATER - PROTECTED | DEBEVOISE AVENUE, BROOKLYN, FROM STREET JACKSON STREET TO STREET MASPETH AVENUE |
M012024038A43 | 2024-02-07 | 2024-02-14 | REPAIR WATER | EAST 41 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET TUDOR CITY PLACE |
M012024038A82 | 2024-02-07 | 2024-02-22 | REPAIR WATER - PROTECTED | 5 AVENUE, MANHATTAN, FROM STREET EAST 52 STREET TO STREET EAST 53 STREET |
M012024038A83 | 2024-02-07 | 2024-02-21 | REPAIR SEWER - PROTECTED | WARREN STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WEST BROADWAY |
Q012024037A79 | 2024-02-06 | 2024-02-26 | REPAIR SEWER - PROTECTED | 27 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH |
S012024033B09 | 2024-02-02 | 2024-02-16 | REPAIR SEWER | BAY STREET, STATEN ISLAND, FROM STREET BOROUGH PLACE TO STREET BEND |
X012024031B28 | 2024-01-31 | 2024-02-29 | REPAIR WATER - PROTECTED | EAST 152 STREET, BRONX, FROM STREET TINTON AVENUE TO STREET WALES AVENUE |
Q012024031D70 | 2024-01-31 | 2024-02-10 | REPAIR SEWER | BEACH 35 STREET, QUEENS, FROM STREET BEACH CHANNEL DRIVE TO STREET ROCKAWAY BEACH BOULEVARD |
X012024028A02 | 2024-01-28 | 2024-02-20 | REPAIR WATER - SEWER - PROTECTED | HARRISON AVENUE, BRONX, FROM STREET WEST 180 STREET TO STREET WEST 181 STREET |
Q012024026C08 | 2024-01-26 | 2024-01-27 | REPAIR SEWER | BEACH 35 STREET, QUEENS, FROM STREET BEACH CHANNEL DRIVE TO STREET ROCKAWAY BEACH BOULEVARD |
B012024026C05 | 2024-01-26 | 2024-02-09 | REPAIR WATER - PROTECTED | DEBEVOISE AVENUE, BROOKLYN, FROM STREET JACKSON STREET TO STREET MASPETH AVENUE |
M012024026B87 | 2024-01-26 | 2024-02-10 | REPAIR SEWER | ANN STREET, MANHATTAN, FROM STREET BROADWAY TO STREET THEATRE ALLEY |
M012024025A41 | 2024-01-25 | 2024-02-21 | REPAIR WATER - PROTECTED | EAST 78 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012024023A64 | 2024-01-23 | 2024-02-08 | REPAIR WATER - PROTECTED | 5 AVENUE, MANHATTAN, FROM STREET EAST 52 STREET TO STREET EAST 53 STREET |
M012024022B09 | 2024-01-22 | 2024-02-01 | REPAIR WATER | CLAREMONT AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 116 STREET |
M012024019A95 | 2024-01-19 | 2024-02-07 | REPAIR SEWER - PROTECTED | WARREN STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WEST BROADWAY |
M012024018B47 | 2024-01-18 | 2024-02-16 | REPAIR SEWER | EAST 45 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012024014A03 | 2024-01-14 | 2024-02-01 | REPAIR SEWER | WEST 9 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET BEND |
X012024014A02 | 2024-01-14 | 2024-02-10 | REPAIR WATER - SEWER - PROTECTED | BUCHANAN PLACE, BRONX, FROM STREET AQUEDUCT AVENUE TO STREET GRAND AVENUE |
B012024008C43 | 2024-01-08 | 2024-02-01 | REPAIR WATER - PROTECTED | NOSTRAND AVENUE, BROOKLYN, FROM STREET MONTGOMERY STREET TO STREET SULLIVAN PLACE |
X012024005C02 | 2024-01-05 | 2024-01-25 | REPAIR WATER - SEWER | ANDREWS AVENUE, BRONX, FROM STREET WEST 183 STREET TO STREET WEST FORDHAM ROAD |
X012024004B78 | 2024-01-04 | 2024-02-03 | REPAIR WATER - SEWER | BEACH AVENUE, BRONX, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE |
X012024004A53 | 2024-01-04 | 2024-01-14 | REPAIR SEWER - PROTECTED | BUCHANAN PLACE, BRONX, FROM STREET AQUEDUCT AVENUE TO STREET GRAND AVENUE |
S012024004A90 | 2024-01-04 | 2024-02-02 | REPAIR SEWER | BAY STREET, STATEN ISLAND, FROM STREET BOROUGH PLACE TO STREET BEND |
X012024002B28 | 2024-01-02 | 2024-02-01 | REPAIR SEWER | MC GRAW AVENUE, BRONX, FROM STREET BEND TO STREET PUGSLEY AVENUE |
X192024001A00 | 2024-01-01 | 2024-01-31 | PLACE TEMPORARY PLATES | BUCHANAN PLACE, BRONX, FROM STREET AQUEDUCT AVENUE TO STREET GRAND AVENUE |
Q012023363B09 | 2023-12-29 | 2024-01-14 | REPAIR SEWER | BEACH CHANNEL DRIVE, QUEENS, FROM STREET BEACH 35 STREET TO STREET BEACH 36 STREET |
X012023363A50 | 2023-12-29 | 2024-01-27 | REPAIR SEWER | EAST 176 STREET, BRONX, FROM STREET BELMONT AVENUE TO STREET CROTONA AVENUE |
M012023362B26 | 2023-12-28 | 2024-01-27 | REPAIR SEWER | ANN STREET, MANHATTAN, FROM STREET BROADWAY TO STREET THEATRE ALLEY |
B012023362B26 | 2023-12-28 | 2024-01-26 | REPAIR WATER - PROTECTED | DEBEVOISE AVENUE, BROOKLYN, FROM STREET JACKSON STREET TO STREET MASPETH AVENUE |
Q012023360A80 | 2023-12-26 | 2023-12-31 | REPAIR SEWER | BEACH CHANNEL DRIVE, QUEENS, FROM STREET BEACH 35 STREET TO STREET BEACH 36 STREET |
B012023352C94 | 2023-12-18 | 2024-01-17 | REPAIR SEWER | CARROLL STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET DENTON PLACE |
X012023348A00 | 2023-12-14 | 2023-12-31 | REPAIR SEWER - PROTECTED | BUCHANAN PLACE, BRONX, FROM STREET AQUEDUCT AVENUE TO STREET GRAND AVENUE |
M012023347B17 | 2023-12-13 | 2023-12-28 | REPAIR SEWER | ANN STREET, MANHATTAN, FROM STREET BROADWAY TO STREET THEATRE ALLEY |
X012023345A31 | 2023-12-11 | 2023-12-23 | REPAIR WATER - SEWER | GUERLAIN STREET, BRONX, FROM STREET LELAND AVENUE TO STREET THIERIOT AVENUE |
M012023345A65 | 2023-12-11 | 2023-12-31 | REPAIR SEWER | 5 AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET |
M012023340A37 | 2023-12-06 | 2023-12-20 | REPAIR WATER - PROTECTED | 5 AVENUE, MANHATTAN, FROM STREET EAST 52 STREET TO STREET EAST 53 STREET |
X012023338B35 | 2023-12-04 | 2023-12-31 | REPAIR SEWER | EAST 176 STREET, BRONX, FROM STREET BELMONT AVENUE TO STREET CROTONA AVENUE |
S002023334A00 | 2023-11-30 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
B012023333B13 | 2023-11-29 | 2023-12-28 | REPAIR SEWER | WEST STREET, BROOKLYN, FROM STREET EAGLE STREET TO STREET FREEMAN STREET |
M012023332B45 | 2023-11-28 | 2023-12-26 | REPAIR SEWER | 1 AVENUE, MANHATTAN, FROM STREET EAST 77 STREET TO STREET EAST 78 STREET |
S012023332A52 | 2023-11-28 | 2023-12-01 | REPAIR SEWER | BAY STREET, STATEN ISLAND, FROM STREET BOROUGH PLACE TO STREET BEND |
X012023331A29 | 2023-11-27 | 2023-12-22 | REPAIR WATER | EAST GUN HILL ROAD, BRONX, FROM STREET LACONIA AVENUE TO STREET LURTING AVENUE |
X012023329A00 | 2023-11-25 | 2023-12-07 | REPAIR WATER - SEWER | GUERLAIN STREET, BRONX, FROM STREET LELAND AVENUE TO STREET THIERIOT AVENUE |
M012023325A49 | 2023-11-21 | 2023-12-03 | REPAIR SEWER | 2 AVENUE, MANHATTAN, FROM STREET EAST 82 STREET TO STREET EAST 83 STREET |
X012023325A34 | 2023-11-21 | 2023-11-23 | REPAIR WATER | EAST GUN HILL ROAD, BRONX, FROM STREET LACONIA AVENUE TO STREET LURTING AVENUE |
M012023325A71 | 2023-11-21 | 2023-12-06 | REPAIR WATER - PROTECTED | 5 AVENUE, MANHATTAN, FROM STREET EAST 52 STREET TO STREET EAST 53 STREET |
X012023323A00 | 2023-11-19 | 2023-12-12 | REPAIR WATER - SEWER - PROTECTED | EAST 184 STREET, BRONX, FROM STREET CRESTON AVENUE TO STREET MORRIS AVENUE |
M192023323A03 | 2023-11-19 | 2023-12-31 | PLACE TEMPORARY PLATES | EAST 45 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
B012023320A30 | 2023-11-16 | 2023-11-30 | REPAIR WATER - SEWER - PROTECTED | LOGAN STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
S012023320A26 | 2023-11-16 | 2023-11-17 | REPAIR SEWER | BAY STREET, STATEN ISLAND, FROM STREET BOROUGH PLACE TO STREET BEND |
B012023320A31 | 2023-11-16 | 2023-11-30 | REPAIR SEWER | FOUNTAIN AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET WELLS STREET |
S002023318A00 | 2023-11-14 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
M002023317A27 | 2023-11-13 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
M012023317B03 | 2023-11-13 | 2023-12-14 | REPAIR SEWER | ANN STREET, MANHATTAN, FROM STREET BROADWAY TO STREET THEATRE ALLEY |
M042023314A00 | 2023-11-10 | 2023-12-07 | REPAIR SIDEWALK | EAST 10 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE |
M012023311A30 | 2023-11-07 | 2023-12-07 | REPAIR WATER | 1 AVENUE, MANHATTAN, FROM STREET EAST 77 STREET TO STREET EAST 78 STREET |
B002023311A11 | 2023-11-07 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
B012023310A29 | 2023-11-06 | 2023-11-30 | REPAIR SEWER | ERSKINE STREET, BROOKLYN, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE |
S012023306A23 | 2023-11-02 | 2023-11-14 | REPAIR SEWER | BAY STREET, STATEN ISLAND, FROM STREET BOROUGH PLACE TO STREET BEND |
B012023306A70 | 2023-11-02 | 2023-11-15 | REPAIR SEWER | FOUNTAIN AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET WELLS STREET |
B012023306A68 | 2023-11-02 | 2023-11-15 | REPAIR WATER - SEWER - PROTECTED | LOGAN STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
X012023306C24 | 2023-11-02 | 2023-11-15 | REPAIR SEWER - PROTECTED | SEDGWICK AVENUE, BRONX, FROM STREET BEND TO STREET GILES PLACE |
M012023306A68 | 2023-11-02 | 2023-11-14 | REPAIR WATER - SEWER | EAST 45 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
B012023306A74 | 2023-11-02 | 2023-12-01 | REPAIR SEWER | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
M012023304B52 | 2023-10-31 | 2023-11-26 | REPAIR SEWER - PROTECTED | WASHINGTON STREET, MANHATTAN, FROM STREET CARLISLE STREET TO STREET RECTOR STREET |
M002023303A86 | 2023-10-30 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
M002023303A33 | 2023-10-30 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
M002023303A87 | 2023-10-30 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
M002023303A88 | 2023-10-30 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
B002023302A00 | 2023-10-29 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
M012023299B79 | 2023-10-26 | 2023-11-19 | REPAIR SEWER | 2 AVENUE, MANHATTAN, FROM STREET EAST 82 STREET TO STREET EAST 83 STREET |
X012023299A89 | 2023-10-26 | 2023-11-23 | REPAIR WATER - SEWER | GUERLAIN STREET, BRONX, FROM STREET LELAND AVENUE TO STREET THIERIOT AVENUE |
B012023299D50 | 2023-10-26 | 2023-11-01 | REPAIR SEWER | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
M012023298B22 | 2023-10-25 | 2023-11-14 | REPAIR SEWER | ANN STREET, MANHATTAN, FROM STREET BROADWAY TO STREET THEATRE ALLEY |
S002023296A02 | 2023-10-23 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
X012023293A79 | 2023-10-20 | 2023-11-01 | REPAIR WATER - SEWER | WEEKS AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
M012023293B02 | 2023-10-20 | 2023-11-07 | REPAIR WATER | 1 AVENUE, MANHATTAN, FROM STREET EAST 77 STREET TO STREET EAST 78 STREET |
B012023291B61 | 2023-10-18 | 2023-11-01 | REPAIR WATER - SEWER - PROTECTED | LOGAN STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
S012023291B08 | 2023-10-18 | 2023-11-01 | REPAIR SEWER | BAY STREET, STATEN ISLAND, FROM STREET BOROUGH PLACE TO STREET BEND |
B012023291B60 | 2023-10-18 | 2023-11-01 | REPAIR SEWER | FOUNTAIN AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET WELLS STREET |
Q012023288A02 | 2023-10-15 | 2023-11-01 | REPAIR WATER - SEWER - PROTECTED | NORTHERN BOULEVARD, QUEENS, FROM STREET 104 STREET TO STREET 105 STREET |
Q012023284B71 | 2023-10-11 | 2023-11-01 | REPAIR WATER | CORONA AVENUE, QUEENS, FROM STREET 55 AVENUE TO STREET OTIS AVENUE |
X012023284C02 | 2023-10-11 | 2023-10-24 | REPAIR WATER - SEWER | BRONX PARK EAST, BRONX, FROM STREET MACE AVENUE TO STREET WARING AVENUE |
X012023284C03 | 2023-10-11 | 2023-11-01 | REPAIR SEWER - PROTECTED | SEDGWICK AVENUE, BRONX, FROM STREET BEND TO STREET GILES PLACE |
Q012023279B16 | 2023-10-06 | 2023-10-26 | REPAIR SEWER - PROTECTED | 27 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH |
M012023279C11 | 2023-10-06 | 2023-10-25 | REPAIR SEWER | 2 AVENUE, MANHATTAN, FROM STREET EAST 82 STREET TO STREET EAST 83 STREET |
M012023279A98 | 2023-10-06 | 2023-10-31 | REPAIR SEWER - PROTECTED | WASHINGTON STREET, MANHATTAN, FROM STREET CARLISLE STREET TO STREET RECTOR STREET |
M012023275A66 | 2023-10-02 | 2023-10-24 | REPAIR WATER | 1 AVENUE, MANHATTAN, FROM STREET EAST 77 STREET TO STREET EAST 78 STREET |
Q012023271C94 | 2023-09-28 | 2023-10-27 | REPAIR WATER | BEACH CHANNEL DRIVE, QUEENS, FROM STREET BEACH 35 STREET TO STREET BEACH 36 STREET |
S012023269A08 | 2023-09-26 | 2023-10-18 | REPAIR SEWER | BAY STREET, STATEN ISLAND, FROM STREET BOROUGH PLACE TO STREET BEND |
X012023268A34 | 2023-09-25 | 2023-10-19 | REPAIR SEWER - PROTECTED | LAFAYETTE AVENUE, BRONX, FROM STREET NEWMAN AVENUE TO STREET WHITE PLAINS ROAD |
X012023267A01 | 2023-09-24 | 2023-10-24 | REPAIR WATER - PROTECTED | EAST 179 STREET, BRONX, FROM STREET BOSTON ROAD TO STREET BRONX STREET |
Q012023265B65 | 2023-09-22 | 2023-09-22 | REPAIR WATER | BEACH CHANNEL DRIVE, QUEENS, FROM STREET BEACH 35 STREET TO STREET BEACH 36 STREET |
Q012023263C41 | 2023-09-20 | 2023-10-07 | REPAIR WATER | QUEENS PLAZA NORTH, QUEENS, FROM STREET 25 STREET TO STREET 27 STREET |
Q012023259A02 | 2023-09-19 | 2023-10-15 | REPAIR SEWER | 77 AVENUE, QUEENS, FROM STREET 138 STREET TO STREET 141 STREET |
M012023262A54 | 2023-09-19 | 2023-10-14 | REPAIR SEWER - PROTECTED | EAST 126 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
X012023260A00 | 2023-09-17 | 2023-10-10 | REPAIR WATER - SEWER | BRONX PARK EAST, BRONX, FROM STREET MACE AVENUE TO STREET WARING AVENUE |
M012023254B78 | 2023-09-11 | 2023-09-22 | REPAIR WATER - SEWER | ST LUKES PLACE, MANHATTAN, FROM STREET HUDSON STREET TO STREET LEROY STREET |
X012023254B08 | 2023-09-11 | 2023-10-10 | REPAIR WATER - SEWER | BRONX PARK EAST, BRONX, FROM STREET MACE AVENUE TO STREET WARING AVENUE |
X012023254B10 | 2023-09-11 | 2023-09-24 | REPAIR WATER - PROTECTED | EAST 179 STREET, BRONX, FROM STREET BOSTON ROAD TO STREET BRONX STREET |
M012023254B77 | 2023-09-11 | 2023-09-22 | REPAIR WATER - SEWER - PROTECTED | WEST 140 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
X012023253A01 | 2023-09-10 | 2023-10-06 | REPAIR SEWER | LYVERE STREET, BRONX, FROM STREET BEND TO STREET ZEREGA AVENUE |
X012023250D53 | 2023-09-07 | 2023-09-20 | REPAIR WATER | CROTONA AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 176 STREET |
M012023244A74 | 2023-09-01 | 2023-10-01 | REPAIR WATER | 2 AVENUE, MANHATTAN, FROM STREET EAST 82 STREET TO STREET EAST 83 STREET |
Q012023244D55 | 2023-09-01 | 2023-09-28 | REPAIR WATER - SEWER | 43 AVENUE, QUEENS, FROM STREET 10 STREET TO STREET 11 STREET |
X012023243A88 | 2023-08-31 | 2023-09-17 | REPAIR SEWER | HONEYWELL AVENUE, BRONX, FROM STREET EAST 179 STREET TO STREET EAST 180 STREET |
M012023240B48 | 2023-08-28 | 2023-09-20 | REPAIR WATER | EAST 67 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M012023239A02 | 2023-08-27 | 2023-09-08 | REPAIR WATER - SEWER | ST LUKES PLACE, MANHATTAN, FROM STREET HUDSON STREET TO STREET LEROY STREET |
X012023239A01 | 2023-08-27 | 2023-09-10 | REPAIR WATER - PROTECTED | EAST 179 STREET, BRONX, FROM STREET BOSTON ROAD TO STREET BRONX STREET |
X012023237A01 | 2023-08-25 | 2023-09-20 | REPAIR WATER - SEWER - PROTECTED | CRESTON AVENUE, BRONX, FROM STREET EAST 196 STREET TO STREET EAST 197 STREET |
B012023236C53 | 2023-08-24 | 2023-09-02 | REPAIR WATER | PRESIDENT STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
M012023233B37 | 2023-08-21 | 2023-09-02 | REPAIR WATER | 2 AVENUE, MANHATTAN, FROM STREET EAST 82 STREET TO STREET EAST 83 STREET |
X012023233A46 | 2023-08-21 | 2023-09-03 | REPAIR SEWER | HONEYWELL AVENUE, BRONX, FROM STREET EAST 179 STREET TO STREET EAST 180 STREET |
X012023229A10 | 2023-08-17 | 2023-08-29 | REPAIR WATER - SEWER | BARKER AVENUE, BRONX, FROM STREET MACE AVENUE TO STREET WARING AVENUE |
M012023229B32 | 2023-08-17 | 2023-09-06 | REPAIR WATER - SEWER - PROTECTED | WEST 140 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M012023229B33 | 2023-08-17 | 2023-08-19 | REPAIR WATER | 2 AVENUE, MANHATTAN, FROM STREET EAST 82 STREET TO STREET EAST 83 STREET |
B012023224A00 | 2023-08-12 | 2023-08-27 | REPAIR WATER | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
X012023224A00 | 2023-08-12 | 2023-08-25 | REPAIR WATER - PROTECTED | EAST 179 STREET, BRONX, FROM STREET BOSTON ROAD TO STREET BRONX STREET |
M012023223B40 | 2023-08-11 | 2023-08-19 | REPAIR WATER - PROTECTED | WEST 31 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
X012023222A72 | 2023-08-11 | 2023-08-23 | REPAIR WATER | MERRITT AVENUE, BRONX, FROM STREET BOROUGH BOUNDARY TO STREET EAST 233 STREET |
X012023221B00 | 2023-08-09 | 2023-09-06 | REPAIR WATER | CROTONA AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 176 STREET |
X012023220A87 | 2023-08-08 | 2023-09-02 | REPAIR SEWER | WILLIAMSBRIDGE ROAD, BRONX, FROM STREET ALLERTON AVENUE TO STREET RADCLIFF AVENUE |
M012023220A17 | 2023-08-08 | 2023-08-25 | REPAIR WATER - SEWER | ST LUKES PLACE, MANHATTAN, FROM STREET HUDSON STREET TO STREET LEROY STREET |
M012023218A08 | 2023-08-06 | 2023-08-20 | REPAIR WATER | WEST 57 STREET, MANHATTAN, FROM STREET 6 1/2 AVENUE TO STREET AVENUE OF THE AMERICAS |
M012023216A87 | 2023-08-04 | 2023-08-26 | REPAIR WATER - PROTECTED | WEST 31 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
M012023210A00 | 2023-08-03 | 2023-08-02 | REPAIR WATER - PROTECTED | WEST 31 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
M012023214A01 | 2023-08-02 | 2023-08-26 | REPAIR WATER - PROTECTED | WEST 31 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B012023213C21 | 2023-08-01 | 2023-08-29 | REPAIR WATER | FORBELL STREET, BROOKLYN, FROM STREET COZINE AVENUE TO STREET FLATLANDS AVENUE |
X012023212B09 | 2023-07-31 | 2023-08-30 | REPAIR WATER - SEWER | SEDGWICK AVENUE, BRONX, FROM STREET WEST 197 STREET TO STREET WEST 229 STREET |
X012023212B08 | 2023-07-31 | 2023-08-25 | REPAIR WATER - SEWER | CARPENTER AVENUE, BRONX, FROM STREET EAST 220 STREET TO STREET EAST 221 STREET |
B012023208B06 | 2023-07-27 | 2023-08-11 | REPAIR WATER | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
M012023208B70 | 2023-07-27 | 2023-08-07 | REPAIR WATER - SEWER | ST LUKES PLACE, MANHATTAN, FROM STREET HUDSON STREET TO STREET LEROY STREET |
B012023205B93 | 2023-07-24 | 2023-08-19 | REPAIR WATER | PRESIDENT STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
S012023205A62 | 2023-07-24 | 2023-08-22 | REPAIR SEWER | BAY STREET, STATEN ISLAND, FROM STREET BOROUGH PLACE TO STREET BEND |
M012023202B03 | 2023-07-21 | 2023-08-19 | REPAIR WATER - PROTECTED | EAST 83 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
B012023200B91 | 2023-07-19 | 2023-08-17 | REPAIR SEWER | 7 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M012023199C26 | 2023-07-18 | 2023-08-01 | REPAIR WATER - SEWER | ST LUKES PLACE, MANHATTAN, FROM STREET HUDSON STREET TO STREET LEROY STREET |
X012023198A74 | 2023-07-17 | 2023-07-29 | REPAIR WATER - SEWER - PROTECTED | CROSBY AVENUE, BRONX, FROM STREET DANIEL STREET TO STREET MIDDLETOWN ROAD |
M012023198A17 | 2023-07-17 | 2023-08-06 | REPAIR WATER | WEST 57 STREET, MANHATTAN, FROM STREET 6 1/2 AVENUE TO STREET AVENUE OF THE AMERICAS |
X012023197A00 | 2023-07-16 | 2023-08-15 | REPAIR WATER - SEWER | BARKER AVENUE, BRONX, FROM STREET MACE AVENUE TO STREET WARING AVENUE |
B012023197A01 | 2023-07-16 | 2023-07-26 | REPAIR WATER | DUPONT STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET FRANKLIN STREET |
X192023197A00 | 2023-07-16 | 2023-09-04 | PLACE TEMPORARY PLATES | SEDGWICK AVENUE, BRONX, FROM STREET WEST 197 STREET TO STREET WEST 229 STREET |
S192023197A01 | 2023-07-16 | 2023-08-31 | PLACE TEMPORARY PLATES | BAY STREET, STATEN ISLAND, FROM STREET BOROUGH PLACE TO STREET BEND |
B022023193B33 | 2023-07-12 | 2023-07-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B012023193B04 | 2023-07-12 | 2023-07-28 | REPAIR WATER | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
X012023193A54 | 2023-07-12 | 2023-07-19 | REPAIR SEWER | WILLIAMSBRIDGE ROAD, BRONX, FROM STREET ALLERTON AVENUE TO STREET RADCLIFF AVENUE |
B022023193B32 | 2023-07-12 | 2023-07-28 | TEMPORARY PEDESTRIAN WALK | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
X012023193B36 | 2023-07-12 | 2023-08-11 | REPAIR WATER - PROTECTED | EAST 179 STREET, BRONX, FROM STREET BOSTON ROAD TO STREET BRONX STREET |
S192023193A00 | 2023-07-12 | 2023-08-31 | PLACE TEMPORARY PLATES | BAY STREET, STATEN ISLAND, FROM STREET BOROUGH PLACE TO STREET BEND |
M012023190A01 | 2023-07-09 | 2023-07-22 | REPAIR SEWER - PROTECTED | EAST 83 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
X012023190A00 | 2023-07-09 | 2023-08-04 | REPAIR WATER - PROTECTED | CROSBY AVENUE, BRONX, FROM STREET DANIEL STREET TO STREET MIDDLETOWN ROAD |
M152023188A36 | 2023-07-07 | 2023-07-23 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | EAST 83 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
X012023186A72 | 2023-07-05 | 2023-08-04 | REPAIR WATER - SEWER | BEACH AVENUE, BRONX, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE |
X012023186A73 | 2023-07-05 | 2023-08-04 | REPAIR WATER - SEWER | BEACH AVENUE, BRONX, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE |
M012023185A04 | 2023-07-04 | 2023-08-03 | REPAIR WATER - PROTECTED | EAST 126 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
X192023184A02 | 2023-07-03 | 2023-07-31 | PLACE TEMPORARY PLATES | CROSBY AVENUE, BRONX, FROM STREET DANIEL STREET TO STREET MIDDLETOWN ROAD |
Q012023184A28 | 2023-07-03 | 2023-07-16 | REPAIR SEWER | 23 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 44 AVENUE |
S012023184A17 | 2023-07-03 | 2023-07-15 | REPAIR SEWER | BAY STREET, STATEN ISLAND, FROM STREET BOROUGH PLACE TO STREET BEND |
X012023184A00 | 2023-07-03 | 2023-07-13 | REPAIR WATER - SEWER - PROTECTED | MORRIS AVENUE, BRONX, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE |
M012023184A46 | 2023-07-03 | 2023-07-15 | REPAIR WATER - SEWER | EAST 10 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE |
X012023180B05 | 2023-06-29 | 2023-07-13 | REPAIR WATER - SEWER | SHAKESPEARE AVENUE, BRONX, FROM STREET DEAD END TO STREET WEST 172 STREET |
Q012023177E04 | 2023-06-26 | 2023-07-27 | REPAIR WATER | 44 ROAD, QUEENS, FROM STREET 24 STREET TO STREET 25 STREET |
Q012023175A00 | 2023-06-24 | 2023-07-02 | REPAIR SEWER | 23 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 44 AVENUE |
M012023173A00 | 2023-06-22 | 2023-07-08 | REPAIR SEWER - PROTECTED | EAST 83 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012023173A01 | 2023-06-22 | 2023-07-18 | REPAIR WATER - SEWER | ST LUKES PLACE, MANHATTAN, FROM STREET HUDSON STREET TO STREET LEROY STREET |
X012023173B46 | 2023-06-22 | 2023-07-06 | REPAIR WATER - SEWER | SEDGWICK AVENUE, BRONX, FROM STREET WEST 197 STREET TO STREET WEST 229 STREET |
B012023173A00 | 2023-06-22 | 2023-07-01 | REPAIR WATER | PRESIDENT STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
S012023167A49 | 2023-06-16 | 2023-07-01 | REPAIR SEWER | BAY STREET, STATEN ISLAND, FROM STREET BOROUGH PLACE TO STREET BEND |
M012023165B11 | 2023-06-14 | 2023-06-26 | REPAIR WATER - PROTECTED | WASHINGTON STREET, MANHATTAN, FROM STREET BANK STREET TO STREET BETHUNE STREET |
Q012023164C58 | 2023-06-13 | 2023-06-27 | REPAIR SEWER | 23 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 44 AVENUE |
M012023164A86 | 2023-06-13 | 2023-06-22 | REPAIR SEWER - PROTECTED | EAST 83 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
X012023164A84 | 2023-06-13 | 2023-07-11 | REPAIR WATER | 3 AVENUE, BRONX, FROM STREET EAST 162 STREET TO STREET EAST 163 STREET |
M012023163B21 | 2023-06-12 | 2023-06-14 | REPAIR WATER - PROTECTED | WASHINGTON STREET, MANHATTAN, FROM STREET BANK STREET TO STREET BETHUNE STREET |
X012023163B58 | 2023-06-12 | 2023-06-30 | REPAIR WATER - SEWER - PROTECTED | EAST 163 STREET, BRONX, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE |
B012023163C00 | 2023-06-12 | 2023-07-12 | REPAIR WATER | DUPONT STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET FRANKLIN STREET |
X192023160A00 | 2023-06-09 | 2023-07-31 | PLACE TEMPORARY PLATES | EAST 163 STREET, BRONX, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE |
M012023159B52 | 2023-06-08 | 2023-07-09 | REPAIR SEWER - PROTECTED | BROAD STREET, MANHATTAN, FROM STREET SOUTH STREET TO STREET WATER STREET |
Q012023156C92 | 2023-06-05 | 2023-07-06 | REPAIR SEWER | QUEENS PLAZA NORTH, QUEENS, FROM STREET 25 STREET TO STREET 27 STREET |
M012023156B38 | 2023-06-05 | 2023-06-17 | REPAIR SEWER | WEST 57 STREET, MANHATTAN, FROM STREET 6 1/2 AVENUE TO STREET AVENUE OF THE AMERICAS |
X012023153A41 | 2023-06-02 | 2023-06-29 | REPAIR SEWER | SHAKESPEARE AVENUE, BRONX, FROM STREET DEAD END TO STREET WEST 172 STREET |
M012023153B12 | 2023-06-02 | 2023-07-01 | REPAIR WATER - SEWER | EAST 10 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE |
X012023153A40 | 2023-06-02 | 2023-06-29 | REPAIR WATER - SEWER | SHAKESPEARE AVENUE, BRONX, FROM STREET DEAD END TO STREET WEST 172 STREET |
B012023151C59 | 2023-05-31 | 2023-06-15 | REPAIR WATER | PRESIDENT STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
M012023151B21 | 2023-05-31 | 2023-06-14 | REPAIR WATER - PROTECTED | WASHINGTON STREET, MANHATTAN, FROM STREET BANK STREET TO STREET BETHUNE STREET |
S012023151B32 | 2023-05-31 | 2023-06-15 | REPAIR SEWER | BAY STREET, STATEN ISLAND, FROM STREET BOROUGH PLACE TO STREET BEND |
X012023149A03 | 2023-05-29 | 2023-06-22 | REPAIR WATER - SEWER | SEDGWICK AVENUE, BRONX, FROM STREET WEST 197 STREET TO STREET WEST 229 STREET |
X012023146C20 | 2023-05-26 | 2023-06-09 | REPAIR WATER - SEWER - PROTECTED | EAST 163 STREET, BRONX, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE |
X012023144B31 | 2023-05-24 | 2023-05-26 | REPAIR WATER - SEWER - PROTECTED | EAST 163 STREET, BRONX, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE |
X012023144B32 | 2023-05-24 | 2023-06-06 | REPAIR WATER - SEWER | ARTHUR AVENUE, BRONX, FROM STREET BEND TO STREET OAK TREE PLACE |
X192023144A00 | 2023-05-24 | 2023-06-30 | PLACE TEMPORARY PLATES | CROSBY AVENUE, BRONX, FROM STREET DANIEL STREET TO STREET MIDDLETOWN ROAD |
X012023138B00 | 2023-05-18 | 2023-06-02 | REPAIR WATER | 3 AVENUE, BRONX, FROM STREET EAST 162 STREET TO STREET EAST 163 STREET |
X192023134A00 | 2023-05-14 | 2023-07-31 | PLACE TEMPORARY PLATES | CROSBY AVENUE, BRONX, FROM STREET DANIEL STREET TO STREET MIDDLETOWN ROAD |
Q012023131A16 | 2023-05-11 | 2023-06-13 | REPAIR SEWER | 44 ROAD, QUEENS, FROM STREET 23 STREET TO STREET 24 STREET |
B012023131B90 | 2023-05-11 | 2023-06-10 | REPAIR WATER | PLYMOUTH STREET, BROOKLYN, FROM STREET BRIDGE STREET TO STREET JAY STREET |
Q012023131A25 | 2023-05-11 | 2023-06-13 | REPAIR SEWER | 23 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 44 AVENUE |
M012023129C54 | 2023-05-09 | 2023-06-03 | REPAIR SEWER | WEST 57 STREET, MANHATTAN, FROM STREET 6 1/2 AVENUE TO STREET AVENUE OF THE AMERICAS |
B012023129C24 | 2023-05-09 | 2023-06-01 | REPAIR WATER | PRESIDENT STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
M012023129C53 | 2023-05-09 | 2023-06-08 | REPAIR SEWER - PROTECTED | EAST 83 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
X012023129A94 | 2023-05-09 | 2023-06-08 | REPAIR WATER - SEWER | PARKER STREET, BRONX, FROM STREET BEND TO STREET MACLAY AVENUE |
X192023128A00 | 2023-05-08 | 2023-06-30 | PLACE TEMPORARY PLATES | CROSBY AVENUE, BRONX, FROM STREET DANIEL STREET TO STREET MIDDLETOWN ROAD |
M012023127A03 | 2023-05-07 | 2023-05-31 | REPAIR WATER - PROTECTED | WASHINGTON STREET, MANHATTAN, FROM STREET BANK STREET TO STREET BETHUNE STREET |
X012023125A31 | 2023-05-05 | 2023-06-02 | REPAIR SEWER | 3 AVENUE, BRONX, FROM STREET BOSTON ROAD TO STREET EAST 164 STREET |
X012023125A59 | 2023-05-05 | 2023-05-18 | REPAIR WATER - SEWER - PROTECTED | EAST 163 STREET, BRONX, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE |
S012023123A34 | 2023-05-03 | 2023-06-01 | REPAIR SEWER | BAY STREET, STATEN ISLAND, FROM STREET BOROUGH PLACE TO STREET BEND |
X012023123A50 | 2023-05-03 | 2023-05-30 | REPAIR SEWER | MATTHEWS AVENUE, BRONX, FROM STREET BRADY AVENUE TO STREET LYDIG AVENUE |
B012023122B83 | 2023-05-02 | 2023-05-20 | REPAIR WATER | PRESIDENT STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B012023120A03 | 2023-04-30 | 2023-05-26 | REPAIR WATER | EMERALD STREET, BROOKLYN, FROM STREET LINDEN BOULEVARD TO STREET LORING AVENUE |
M012023117B67 | 2023-04-27 | 2023-05-24 | REPAIR WATER | NASSAU STREET, MANHATTAN, FROM STREET ANN STREET TO STREET BEEKMAN STREET |
M012023117B66 | 2023-04-27 | 2023-05-24 | REPAIR WATER | BEEKMAN STREET, MANHATTAN, FROM STREET NASSAU STREET TO STREET WILLIAM STREET |
B012023117D29 | 2023-04-27 | 2023-05-11 | REPAIR WATER | PLYMOUTH STREET, BROOKLYN, FROM STREET BRIDGE STREET TO STREET JAY STREET |
M012023115C03 | 2023-04-25 | 2023-05-09 | REPAIR SEWER - PROTECTED | EAST 83 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
X012023115A00 | 2023-04-25 | 2023-05-23 | REPAIR WATER - SEWER | ARTHUR AVENUE, BRONX, FROM STREET BEND TO STREET OAK TREE PLACE |
M192023115A21 | 2023-04-25 | 2023-05-31 | PLACE TEMPORARY PLATES | BEEKMAN STREET, MANHATTAN, FROM STREET NASSAU STREET TO STREET WILLIAM STREET |
M192023115A20 | 2023-04-25 | 2023-05-31 | PLACE TEMPORARY PLATES | NASSAU STREET, MANHATTAN, FROM STREET ANN STREET TO STREET BEEKMAN STREET |
M192023115A19 | 2023-04-25 | 2023-05-31 | PLACE TEMPORARY PLATES | WEST 57 STREET, MANHATTAN, FROM STREET 6 1/2 AVENUE TO STREET AVENUE OF THE AMERICAS |
M012023113A01 | 2023-04-23 | 2023-05-19 | REPAIR WATER - SEWER | EAST 111 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012023105A02 | 2023-04-21 | 2023-05-14 | REPAIR WATER | GREENE STREET, MANHATTAN, FROM STREET PRINCE STREET TO STREET WEST HOUSTON STREET |
S012023109B14 | 2023-04-19 | 2023-05-02 | REPAIR SEWER | BAY STREET, STATEN ISLAND, FROM STREET BOROUGH PLACE TO STREET BEND |
X012023109D47 | 2023-04-19 | 2023-05-19 | REPAIR WATER | 3 AVENUE, BRONX, FROM STREET EAST 162 STREET TO STREET EAST 163 STREET |
X012023106A00 | 2023-04-16 | 2023-05-04 | REPAIR WATER - SEWER - PROTECTED | EAST 163 STREET, BRONX, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE |
B152023102A01 | 2023-04-12 | 2023-05-07 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | PLYMOUTH STREET, BROOKLYN, FROM STREET BRIDGE STREET TO STREET JAY STREET |
X012023100A00 | 2023-04-10 | 2023-05-05 | REPAIR WATER - SEWER | EAST 224 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD |
M012023097B53 | 2023-04-07 | 2023-04-25 | REPAIR SEWER | WEST 57 STREET, MANHATTAN, FROM STREET 6 1/2 AVENUE TO STREET AVENUE OF THE AMERICAS |
X012023097B15 | 2023-04-07 | 2023-04-21 | REPAIR SEWER | GRAND CONCOURSE, BRONX, FROM STREET EAST 201 STREET TO STREET EAST 202 STREET |
M012023097B51 | 2023-04-07 | 2023-04-24 | REPAIR WATER | BEEKMAN STREET, MANHATTAN, FROM STREET NASSAU STREET TO STREET WILLIAM STREET |
M012023097B52 | 2023-04-07 | 2023-04-24 | REPAIR WATER | NASSAU STREET, MANHATTAN, FROM STREET ANN STREET TO STREET BEEKMAN STREET |
M012023096A00 | 2023-04-06 | 2023-04-29 | REPAIR WATER - SEWER - PROTECTED | WEST 135 STREET, MANHATTAN, FROM STREET LENOX AVENUE TO STREET LENOX TERRACE PLACE |
B012023094B50 | 2023-04-04 | 2023-04-27 | REPAIR WATER | PLYMOUTH STREET, BROOKLYN, FROM STREET BRIDGE STREET TO STREET JAY STREET |
X012023093A18 | 2023-04-03 | 2023-04-07 | REPAIR SEWER | GRAND CONCOURSE, BRONX, FROM STREET EAST 201 STREET TO STREET EAST 202 STREET |
B012023092A01 | 2023-04-02 | 2023-04-28 | REPAIR WATER | ERSKINE STREET, BROOKLYN, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE |
X192023090A02 | 2023-03-31 | 2023-05-01 | PLACE TEMPORARY PLATES | CROSBY AVENUE, BRONX, FROM STREET DANIEL STREET TO STREET MIDDLETOWN ROAD |
M012023089B91 | 2023-03-30 | 2023-04-25 | REPAIR SEWER - PROTECTED | EAST 83 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
X012023088A86 | 2023-03-29 | 2023-04-27 | REPAIR WATER | ANTHONY AVENUE, BRONX, FROM STREET EAST 176 STREET TO STREET MT HOPE PLACE |
M012023087A88 | 2023-03-28 | 2023-04-27 | REPAIR WATER - PROTECTED | WASHINGTON STREET, MANHATTAN, FROM STREET BATTERY PLACE TO STREET PEDESTRIAN OVERPASS |
M012023087C05 | 2023-03-28 | 2023-04-10 | REPAIR WATER | NASSAU STREET, MANHATTAN, FROM STREET ANN STREET TO STREET BEEKMAN STREET |
M012023086A70 | 2023-03-27 | 2023-04-23 | REPAIR WATER | CENTRE STREET, MANHATTAN, FROM STREET GRAND STREET TO STREET HOWARD STREET |
M012023083C26 | 2023-03-24 | 2023-04-10 | REPAIR WATER | BEEKMAN STREET, MANHATTAN, FROM STREET NASSAU STREET TO STREET WILLIAM STREET |
M012023082A34 | 2023-03-24 | 2023-04-21 | REPAIR WATER | EAST 59 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M012023083C27 | 2023-03-24 | 2023-04-10 | REPAIR WATER | BEEKMAN STREET, MANHATTAN, FROM STREET NASSAU STREET TO STREET WILLIAM STREET |
B012023083E26 | 2023-03-24 | 2023-04-21 | REPAIR WATER | PRESIDENT STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
X012023076A07 | 2023-03-23 | 2023-03-27 | REPAIR WATER | EAST 223 STREET, BRONX, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD |
X012023081A03 | 2023-03-23 | 2023-04-20 | REPAIR WATER - PROTECTED | ZULETTE AVENUE, BRONX, FROM STREET ERICSON PLACE TO STREET MAYFLOWER AVENUE |
X012023081A05 | 2023-03-22 | 2023-03-24 | REPAIR WATER - PROTECTED | ZULETTE AVENUE, BRONX, FROM STREET ERICSON PLACE TO STREET MAYFLOWER AVENUE |
X012023080A34 | 2023-03-21 | 2023-04-20 | REPAIR WATER | ARNOW AVENUE, BRONX, FROM STREET CRUGER AVENUE TO STREET WHITE PLAINS ROAD |
M012023080B37 | 2023-03-21 | 2023-04-02 | REPAIR WATER - PROTECTED | WEST 11 STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
S012023079A86 | 2023-03-20 | 2023-04-18 | REPAIR SEWER | BAY STREET, STATEN ISLAND, FROM STREET BOROUGH PLACE TO STREET BEND |
Q012023078A03 | 2023-03-19 | 2023-04-12 | REPAIR WATER | 34 AVENUE, QUEENS, FROM STREET 126 PLACE TO STREET 127 STREET |
M012023078A04 | 2023-03-19 | 2023-04-02 | REPAIR WATER | EAST 73 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M012023076B16 | 2023-03-17 | 2023-03-19 | REPAIR WATER | EAST 73 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
X012023073D04 | 2023-03-14 | 2023-04-12 | REPAIR WATER - SEWER - PROTECTED | CROTONA AVENUE, BRONX, FROM STREET EAST 178 STREET TO STREET EAST TREMONT AVENUE |
X012023073D33 | 2023-03-14 | 2023-03-28 | REPAIR SEWER | GRAND CONCOURSE, BRONX, FROM STREET EAST 201 STREET TO STREET EAST 202 STREET |
M012023072A93 | 2023-03-13 | 2023-04-11 | REPAIR SEWER | WEST 57 STREET, MANHATTAN, FROM STREET 6 1/2 AVENUE TO STREET AVENUE OF THE AMERICAS |
X012023072C56 | 2023-03-13 | 2023-04-11 | REPAIR SEWER | CRUGER AVENUE, BRONX, FROM STREET ARNOW AVENUE TO STREET WILLIAMSBRIDGE ROAD |
M012023069B67 | 2023-03-10 | 2023-04-02 | REPAIR WATER | WEST 35 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
X192023069A02 | 2023-03-10 | 2023-03-31 | PLACE TEMPORARY PLATES | CROSBY AVENUE, BRONX, FROM STREET DANIEL STREET TO STREET MIDDLETOWN ROAD |
X192023069A01 | 2023-03-10 | 2023-03-31 | PLACE TEMPORARY PLATES | CRUGER AVENUE, BRONX, FROM STREET ARNOW AVENUE TO STREET WILLIAMSBRIDGE ROAD |
B012023069C78 | 2023-03-10 | 2023-04-11 | REPAIR WATER - PROTECTED | GREENE AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
M012023069B65 | 2023-03-10 | 2023-03-24 | REPAIR WATER | BEEKMAN STREET, MANHATTAN, FROM STREET NASSAU STREET TO STREET WILLIAM STREET |
M012023069B66 | 2023-03-10 | 2023-03-24 | REPAIR WATER | NASSAU STREET, MANHATTAN, FROM STREET ANN STREET TO STREET BEEKMAN STREET |
M012023067A58 | 2023-03-08 | 2023-03-21 | REPAIR WATER - PROTECTED | WEST 11 STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
X012023064A00 | 2023-03-05 | 2023-04-04 | REPAIR WATER - SEWER | EAST 184 STREET, BRONX, FROM STREET BEND TO STREET BEND |
X012023064A01 | 2023-03-05 | 2023-04-04 | REPAIR SEWER - PROTECTED | WHITE PLAINS ROAD, BRONX, FROM STREET ARCHER STREET TO STREET GUERLAIN STREET |
X012023064A02 | 2023-03-05 | 2023-03-19 | REPAIR SEWER - PROTECTED | BRYANT AVENUE, BRONX, FROM STREET GARRISON AVENUE TO STREET SENECA AVENUE |
M012023064A01 | 2023-03-05 | 2023-03-17 | REPAIR SEWER | EAST 73 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
X012023058B39 | 2023-02-27 | 2023-03-24 | REPAIR WATER | EAST 194 STREET, BRONX, FROM STREET CONTINENTAL AVENUE TO STREET HOBART AVENUE |
X012023058B37 | 2023-02-27 | 2023-03-12 | REPAIR WATER - SEWER | CRUGER AVENUE, BRONX, FROM STREET ARNOW AVENUE TO STREET WILLIAMSBRIDGE ROAD |
X012023058B40 | 2023-02-27 | 2023-03-23 | REPAIR SEWER | WESTCHESTER AVENUE, BRONX, FROM STREET CONTINENTAL AVENUE TO STREET WILKINSON AVENUE |
X012023058B38 | 2023-02-27 | 2023-03-12 | REPAIR WATER - SEWER - PROTECTED | CROSBY AVENUE, BRONX, FROM STREET DANIEL STREET TO STREET MIDDLETOWN ROAD |
M012023058B28 | 2023-02-27 | 2023-03-03 | REPAIR SEWER | EAST 73 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
B012023055C56 | 2023-02-24 | 2023-03-23 | REPAIR WATER | JAY STREET, BROOKLYN, FROM STREET JOHN STREET TO STREET PLYMOUTH STREET |
X012023055C46 | 2023-02-24 | 2023-03-08 | REPAIR WATER - SEWER | CARPENTER AVENUE, BRONX, FROM STREET EAST 220 STREET TO STREET EAST 221 STREET |
M012023055B24 | 2023-02-24 | 2023-03-10 | REPAIR WATER | NASSAU STREET, MANHATTAN, FROM STREET ANN STREET TO STREET BEEKMAN STREET |
B012023054B52 | 2023-02-23 | 2023-03-21 | REPAIR WATER - SEWER - PROTECTED | GATES AVENUE, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
M012023053B37 | 2023-02-22 | 2023-03-10 | REPAIR WATER | BEEKMAN STREET, MANHATTAN, FROM STREET NASSAU STREET TO STREET WILLIAM STREET |
M012023053B38 | 2023-02-22 | 2023-03-12 | REPAIR SEWER | WEST 57 STREET, MANHATTAN, FROM STREET 6 1/2 AVENUE TO STREET AVENUE OF THE AMERICAS |
X012023047A12 | 2023-02-16 | 2023-03-15 | REPAIR SEWER | MORRIS AVENUE, BRONX, FROM STREET CAMERON PLACE TO STREET EAST 182 STREET |
X012023046A67 | 2023-02-15 | 2023-03-14 | REPAIR SEWER | GRAND CONCOURSE, BRONX, FROM STREET EAST 201 STREET TO STREET EAST 202 STREET |
Q012023046B32 | 2023-02-15 | 2023-02-28 | REPAIR WATER | 24 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 44 ROAD |
X012023045A63 | 2023-02-14 | 2023-03-16 | REPAIR SEWER | BRUCKNER BOULEVARD, BRONX, FROM STREET BRE WESTBOUND ENTRANCE BUHRE AVE TO STREET ROBERTS AVENUE |
B192023043A02 | 2023-02-12 | 2023-03-27 | PLACE TEMPORARY PLATES | JAY STREET, BROOKLYN, FROM STREET JOHN STREET TO STREET PLYMOUTH STREET |
M012023043A01 | 2023-02-12 | 2023-02-25 | REPAIR WATER | BEEKMAN STREET, MANHATTAN, FROM STREET NASSAU STREET TO STREET WILLIAM STREET |
M012023043A00 | 2023-02-12 | 2023-03-07 | REPAIR WATER - PROTECTED | WEST 11 STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
M012023041B09 | 2023-02-10 | 2023-02-23 | REPAIR WATER | NASSAU STREET, MANHATTAN, FROM STREET ANN STREET TO STREET BEEKMAN STREET |
M002023041A00 | 2023-02-10 | No data | MISCELLANEOUS - MINOR SALES | No data |
B012023038B27 | 2023-02-07 | 2023-03-09 | REPAIR WATER | STANLEY AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
X012023036A02 | 2023-02-05 | 2023-03-05 | REPAIR SEWER - PROTECTED | BRYANT AVENUE, BRONX, FROM STREET GARRISON AVENUE TO STREET SENECA AVENUE |
M012023036A12 | 2023-02-05 | 2023-02-17 | REPAIR SEWER | EAST 73 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M012023032B30 | 2023-02-01 | 2023-02-14 | REPAIR WATER | EAST 64 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
Q012023031B99 | 2023-01-31 | 2023-02-14 | REPAIR WATER | 24 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 44 ROAD |
X012023029A04 | 2023-01-29 | 2023-02-22 | REPAIR WATER - SEWER | CARPENTER AVENUE, BRONX, FROM STREET EAST 220 STREET TO STREET EAST 221 STREET |
X012023029A02 | 2023-01-29 | 2023-02-26 | REPAIR WATER - SEWER - PROTECTED | CROSBY AVENUE, BRONX, FROM STREET DANIEL STREET TO STREET MIDDLETOWN ROAD |
X012023029A03 | 2023-01-29 | 2023-02-26 | REPAIR WATER - SEWER | CRUGER AVENUE, BRONX, FROM STREET ARNOW AVENUE TO STREET WILLIAMSBRIDGE ROAD |
M012023027A82 | 2023-01-27 | 2023-02-26 | REPAIR SEWER | WEST 57 STREET, MANHATTAN, FROM STREET 6 1/2 AVENUE TO STREET AVENUE OF THE AMERICAS |
X012023026A55 | 2023-01-26 | 2023-02-23 | REPAIR WATER - SEWER | ST LAWRENCE AVENUE, BRONX, FROM STREET DEAD END TO STREET SOUNDVIEW AVENUE |
M012023026C05 | 2023-01-26 | 2023-02-24 | REPAIR WATER - SEWER | WEST 12 STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
M012023024B71 | 2023-01-24 | 2023-01-31 | REPAIR WATER | EAST 64 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
B012023022A04 | 2023-01-22 | 2023-02-07 | REPAIR WATER | JAY STREET, BROOKLYN, FROM STREET JOHN STREET TO STREET PLYMOUTH STREET |
X012023018A15 | 2023-01-18 | 2023-02-16 | REPAIR WATER | TURNBULL AVENUE, BRONX, FROM STREET PUGSLEY AVENUE TO STREET WHITE PLAINS ROAD |
M192023018A04 | 2023-01-18 | 2023-02-28 | PLACE TEMPORARY PLATES | WEST 12 STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
X012023015A00 | 2023-01-15 | 2023-02-07 | REPAIR WATER - SEWER | EAST 222 STREET, BRONX, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD |
M012023013B77 | 2023-01-13 | 2023-02-03 | REPAIR SEWER | EAST 73 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
X012023012B36 | 2023-01-12 | 2023-01-27 | REPAIR WATER - SEWER | CRUGER AVENUE, BRONX, FROM STREET ARNOW AVENUE TO STREET WILLIAMSBRIDGE ROAD |
M012023012B28 | 2023-01-12 | 2023-02-11 | REPAIR WATER | BEEKMAN STREET, MANHATTAN, FROM STREET NASSAU STREET TO STREET WILLIAM STREET |
M012023012B27 | 2023-01-12 | 2023-02-09 | REPAIR WATER | NASSAU STREET, MANHATTAN, FROM STREET ANN STREET TO STREET BEEKMAN STREET |
X012023012B38 | 2023-01-12 | 2023-01-27 | REPAIR WATER - SEWER - PROTECTED | CROSBY AVENUE, BRONX, FROM STREET DANIEL STREET TO STREET MIDDLETOWN ROAD |
X012023012B08 | 2023-01-12 | 2023-02-04 | REPAIR WATER - SEWER | RYER AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST BURNSIDE AVENUE |
X012023012B37 | 2023-01-12 | 2023-02-04 | REPAIR WATER - SEWER | EAST 223 STREET, BRONX, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD |
M012023011A97 | 2023-01-11 | 2023-01-27 | REPAIR SEWER - PROTECTED | BROOME STREET, MANHATTAN, FROM STREET NORFOLK STREET TO STREET SUFFOLK STREET |
X012023003B15 | 2023-01-03 | 2023-02-01 | REPAIR WATER - SEWER | BRONX PARK EAST, BRONX, FROM STREET THWAITES PLACE TO STREET WARING AVENUE |
B012023003C59 | 2023-01-03 | 2023-01-24 | REPAIR WATER | JAY STREET, BROOKLYN, FROM STREET JOHN STREET TO STREET PLYMOUTH STREET |
M012022364A86 | 2022-12-30 | 2023-01-14 | REPAIR SEWER - PROTECTED | BROOME STREET, MANHATTAN, FROM STREET CLINTON STREET TO STREET SUFFOLK STREET |
X012022364A88 | 2022-12-30 | 2023-01-14 | REPAIR WATER - SEWER | CRUGER AVENUE, BRONX, FROM STREET ARNOW AVENUE TO STREET WILLIAMSBRIDGE ROAD |
X012022364A87 | 2022-12-30 | 2023-01-14 | REPAIR WATER - SEWER | EAST 223 STREET, BRONX, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD |
X012022364A31 | 2022-12-30 | 2023-01-13 | REPAIR SEWER - PROTECTED | ROSEDALE AVENUE, BRONX, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE |
B012022364A09 | 2022-12-30 | 2023-01-12 | REPAIR WATER - PROTECTED | NEWPORT STREET, BROOKLYN, FROM STREET ROCKAWAY AVENUE TO STREET THATFORD AVENUE |
M192022364A13 | 2022-12-30 | 2023-01-31 | PLACE TEMPORARY PLATES | NASSAU STREET, MANHATTAN, FROM STREET ANN STREET TO STREET BEEKMAN STREET |
M012022364A81 | 2022-12-30 | 2023-01-14 | REPAIR WATER | EAST 11 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE |
M012022364A82 | 2022-12-30 | 2023-01-14 | REPAIR SEWER | EAST 73 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M012022364A83 | 2022-12-30 | 2023-01-14 | REPAIR WATER - SEWER | WEST 12 STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
M012022364A84 | 2022-12-30 | 2023-01-12 | REPAIR WATER | BEEKMAN STREET, MANHATTAN, FROM STREET NASSAU STREET TO STREET WILLIAM STREET |
M012022364A85 | 2022-12-30 | 2022-12-31 | REPAIR SEWER - PROTECTED | BROOME STREET, MANHATTAN, FROM STREET CLINTON STREET TO STREET SUFFOLK STREET |
X012022364A89 | 2022-12-30 | 2023-01-14 | REPAIR WATER - SEWER - PROTECTED | CROSBY AVENUE, BRONX, FROM STREET DANIEL STREET TO STREET MIDDLETOWN ROAD |
X012022361A27 | 2022-12-27 | 2023-01-12 | REPAIR SEWER - PROTECTED | EAST 168 STREET, BRONX, FROM STREET FULTON AVENUE TO STREET 3 AVENUE |
X012022360A05 | 2022-12-26 | 2022-12-31 | REPAIR WATER - SEWER | EAST 223 STREET, BRONX, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD |
M002022354A00 | 2022-12-20 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
M012022354B04 | 2022-12-20 | 2022-12-31 | REPAIR WATER | EAST 11 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE |
M012022352A09 | 2022-12-18 | 2022-12-31 | REPAIR SEWER | EAST 73 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M012022352A10 | 2022-12-18 | 2022-12-31 | REPAIR WATER - SEWER | WEST 12 STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
M192022348A29 | 2022-12-14 | 2022-12-31 | PLACE TEMPORARY PLATES | NASSAU STREET, MANHATTAN, FROM STREET ANN STREET TO STREET BEEKMAN STREET |
X012022348A46 | 2022-12-14 | 2022-12-31 | REPAIR WATER - SEWER | CARPENTER AVENUE, BRONX, FROM STREET EAST 220 STREET TO STREET EAST 221 STREET |
M012022346A76 | 2022-12-12 | 2022-12-26 | REPAIR WATER | BEEKMAN STREET, MANHATTAN, FROM STREET NASSAU STREET TO STREET WILLIAM STREET |
B012022345A02 | 2022-12-11 | 2022-12-24 | REPAIR WATER | JAY STREET, BROOKLYN, FROM STREET JOHN STREET TO STREET PLYMOUTH STREET |
X012022345A01 | 2022-12-11 | 2022-12-26 | REPAIR SEWER - PROTECTED | EAST 168 STREET, BRONX, FROM STREET FULTON AVENUE TO STREET 3 AVENUE |
X012022345A02 | 2022-12-11 | 2022-12-31 | REPAIR WATER - SEWER - PROTECTED | CROSBY AVENUE, BRONX, FROM STREET DANIEL STREET TO STREET MIDDLETOWN ROAD |
M012022345A04 | 2022-12-11 | 2022-12-24 | REPAIR SEWER - PROTECTED | WASHINGTON STREET, MANHATTAN, FROM STREET JANE STREET TO STREET WEST 12 STREET |
X012022341A77 | 2022-12-07 | 2022-12-31 | REPAIR WATER - SEWER | CRUGER AVENUE, BRONX, FROM STREET ARNOW AVENUE TO STREET WILLIAMSBRIDGE ROAD |
X012022337A00 | 2022-12-03 | 2022-12-12 | REPAIR SEWER - PROTECTED | EAST 168 STREET, BRONX, FROM STREET FULTON AVENUE TO STREET 3 AVENUE |
X012022334A68 | 2022-11-30 | 2022-12-29 | REPAIR SEWER - PROTECTED | ROSEDALE AVENUE, BRONX, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE |
M012022334B07 | 2022-11-30 | 2022-12-14 | REPAIR WATER | NASSAU STREET, MANHATTAN, FROM STREET ANN STREET TO STREET BEEKMAN STREET |
B012022334B64 | 2022-11-30 | 2022-12-29 | REPAIR WATER - PROTECTED | NEWPORT STREET, BROOKLYN, FROM STREET ROCKAWAY AVENUE TO STREET THATFORD AVENUE |
X012022333A23 | 2022-11-29 | 2022-12-25 | REPAIR SEWER - PROTECTED | EAST 179 STREET, BRONX, FROM STREET BOSTON ROAD TO STREET BRONX STREET |
M012022332A39 | 2022-11-28 | 2022-12-12 | REPAIR WATER | BEEKMAN STREET, MANHATTAN, FROM STREET NASSAU STREET TO STREET WILLIAM STREET |
M012022332A40 | 2022-11-28 | 2022-12-10 | REPAIR SEWER - PROTECTED | WASHINGTON STREET, MANHATTAN, FROM STREET JANE STREET TO STREET WEST 12 STREET |
X012022325A42 | 2022-11-21 | 2022-12-04 | REPAIR SEWER - PROTECTED | EAST 168 STREET, BRONX, FROM STREET FULTON AVENUE TO STREET 3 AVENUE |
B012022325E91 | 2022-11-21 | 2022-12-12 | REPAIR WATER | ROCKAWAY AVENUE, BROOKLYN, FROM STREET NEWPORT STREET TO STREET RIVERDALE AVENUE |
X012022324A00 | 2022-11-20 | 2022-12-14 | REPAIR WATER - SEWER | GRAND AVENUE, BRONX, FROM STREET WEST 190 STREET TO STREET WEST 192 STREET |
X012022321A18 | 2022-11-17 | 2022-12-16 | REPAIR SEWER | WILLIAMSBRIDGE ROAD, BRONX, FROM STREET ALLERTON AVENUE TO STREET RADCLIFF AVENUE |
X012022320A43 | 2022-11-16 | 2022-11-25 | REPAIR SEWER - PROTECTED | EAST 179 STREET, BRONX, FROM STREET BOSTON ROAD TO STREET BRONX STREET |
X012022318A57 | 2022-11-14 | 2022-11-30 | REPAIR WATER - SEWER | LACONIA AVENUE, BRONX, FROM STREET EAST 212 STREET TO STREET EAST 213 STREET |
X012022318A56 | 2022-11-14 | 2022-11-26 | REPAIR WATER - SEWER | ROGERS PLACE, BRONX, FROM STREET BEND TO STREET EAST 165 STREET |
B012022314B86 | 2022-11-10 | 2022-11-29 | REPAIR WATER | JAY STREET, BROOKLYN, FROM STREET JOHN STREET TO STREET PLYMOUTH STREET |
X012022313B32 | 2022-11-09 | 2022-11-20 | REPAIR SEWER - PROTECTED | EAST 168 STREET, BRONX, FROM STREET FULTON AVENUE TO STREET 3 AVENUE |
M012022313B12 | 2022-11-09 | 2022-11-30 | REPAIR WATER | NASSAU STREET, MANHATTAN, FROM STREET ANN STREET TO STREET BEEKMAN STREET |
M012022307B33 | 2022-11-03 | 2022-11-27 | REPAIR WATER | BEEKMAN STREET, MANHATTAN, FROM STREET NASSAU STREET TO STREET WILLIAM STREET |
M012022306E21 | 2022-11-02 | 2022-11-26 | REPAIR SEWER - PROTECTED | WASHINGTON STREET, MANHATTAN, FROM STREET JANE STREET TO STREET WEST 12 STREET |
B012022305B98 | 2022-11-01 | 2022-11-15 | REPAIR WATER - SEWER | PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET NEVINS STREET |
X012022305A60 | 2022-11-01 | 2022-11-15 | REPAIR WATER - SEWER | ROGERS PLACE, BRONX, FROM STREET BEND TO STREET EAST 165 STREET |
X012022305A77 | 2022-11-01 | 2022-11-16 | REPAIR SEWER | WILLIAMSBRIDGE ROAD, BRONX, FROM STREET ALLERTON AVENUE TO STREET RADCLIFF AVENUE |
X012022304B09 | 2022-10-31 | 2022-11-02 | REPAIR SEWER | WILLIAMSBRIDGE ROAD, BRONX, FROM STREET ALLERTON AVENUE TO STREET RADCLIFF AVENUE |
M002022304A60 | 2022-10-31 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
M152022304A02 | 2022-10-31 | 2022-11-30 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | NASSAU STREET, MANHATTAN, FROM STREET ANN STREET TO STREET BEEKMAN STREET |
X012022303A03 | 2022-10-30 | 2022-11-24 | REPAIR SEWER - PROTECTED | EAST 179 STREET, BRONX, FROM STREET CRESTON AVENUE TO STREET MORRIS AVENUE |
X012022303A04 | 2022-10-30 | 2022-11-13 | REPAIR WATER - SEWER | LACONIA AVENUE, BRONX, FROM STREET EAST 212 STREET TO STREET EAST 213 STREET |
M012022301A48 | 2022-10-28 | 2022-11-14 | REPAIR SEWER | WEST 32 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
M012022301A55 | 2022-10-28 | 2022-11-14 | REPAIR WATER - SEWER | WEST 57 STREET, MANHATTAN, FROM STREET 6 1/2 AVENUE TO STREET AVENUE OF THE AMERICAS |
X012022300A40 | 2022-10-27 | 2022-11-11 | REPAIR WATER - SEWER | EAST 167 STREET, BRONX, FROM STREET HALL PLACE TO STREET REV JAMES POLITE AVENUE |
X012022298A22 | 2022-10-25 | 2022-11-15 | REPAIR SEWER - PROTECTED | EAST 179 STREET, BRONX, FROM STREET BOSTON ROAD TO STREET BRONX STREET |
M012022298A65 | 2022-10-25 | 2022-11-22 | REPAIR SEWER | WEST 150 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET BRADHURST AVENUE |
M002022298A20 | 2022-10-25 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
X012022293A92 | 2022-10-20 | 2022-10-30 | REPAIR WATER - SEWER | LACONIA AVENUE, BRONX, FROM STREET EAST 212 STREET TO STREET EAST 213 STREET |
M002022293A30 | 2022-10-20 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
X012022292A81 | 2022-10-19 | 2022-11-01 | REPAIR SEWER | EAST 179 STREET, BRONX, FROM STREET BOSTON ROAD TO STREET BRONX STREET |
X012022291A50 | 2022-10-18 | 2022-11-01 | REPAIR SEWER | WILLIAMSBRIDGE ROAD, BRONX, FROM STREET ALLERTON AVENUE TO STREET RADCLIFF AVENUE |
B012022289A07 | 2022-10-16 | 2022-11-01 | REPAIR WATER - SEWER | PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET NEVINS STREET |
M022022287B34 | 2022-10-14 | 2022-10-14 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 32 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
B012022287A46 | 2022-10-14 | 2022-11-01 | REPAIR WATER | ROCKAWAY AVENUE, BROOKLYN, FROM STREET NEWPORT STREET TO STREET RIVERDALE AVENUE |
M022022287B35 | 2022-10-14 | 2022-10-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 32 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
M012022287A76 | 2022-10-14 | 2022-10-14 | REPAIR SEWER - PROTECTED | WEST 32 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
X012022285A88 | 2022-10-12 | 2022-10-26 | REPAIR WATER - SEWER | EAST 167 STREET, BRONX, FROM STREET HALL PLACE TO STREET REV JAMES POLITE AVENUE |
M012022285B43 | 2022-10-12 | 2022-11-01 | REPAIR WATER | EAST 111 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
M012022285B44 | 2022-10-12 | 2022-11-01 | REPAIR WATER | EAST 111 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
X012022284A53 | 2022-10-11 | 2022-11-01 | REPAIR WATER - SEWER | ROGERS PLACE, BRONX, FROM STREET BEND TO STREET EAST 165 STREET |
M012022284B15 | 2022-10-11 | 2022-10-28 | REPAIR SEWER | WEST 32 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
M012022278B23 | 2022-10-05 | 2022-10-23 | REPAIR SEWER - PROTECTED | WEST 32 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
M022022278C96 | 2022-10-05 | 2022-10-23 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 32 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
X012022278A00 | 2022-10-05 | 2022-10-19 | REPAIR WATER - SEWER | LACONIA AVENUE, BRONX, FROM STREET EAST 212 STREET TO STREET EAST 213 STREET |
X012022278A32 | 2022-10-05 | 2022-10-27 | REPAIR WATER - SEWER | AQUEDUCT AVENUE, BRONX, FROM STREET BUCHANAN PLACE TO STREET WEST 182 STREET |
M022022278C97 | 2022-10-05 | 2022-10-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 32 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
M012022277A12 | 2022-10-04 | 2022-10-30 | REPAIR WATER - SEWER | WEST 57 STREET, MANHATTAN, FROM STREET 6 1/2 AVENUE TO STREET AVENUE OF THE AMERICAS |
X012022266A32 | 2022-09-23 | 2022-10-10 | REPAIR WATER | EAST 146 STREET, BRONX, FROM STREET BROOK AVENUE TO STREET WILLIS AVENUE |
M152022266A03 | 2022-09-23 | 2022-10-23 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | WEST 32 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
X012022263A31 | 2022-09-20 | 2022-10-18 | REPAIR SEWER | WILLIAMSBRIDGE ROAD, BRONX, FROM STREET ALLERTON AVENUE TO STREET RADCLIFF AVENUE |
M012022262A56 | 2022-09-19 | 2022-10-15 | REPAIR WATER - SEWER - PROTECTED | 10 AVENUE, MANHATTAN, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET |
B012022261A07 | 2022-09-18 | 2022-10-13 | REPAIR WATER | ROCKAWAY AVENUE, BROOKLYN, FROM STREET NEWPORT STREET TO STREET RIVERDALE AVENUE |
X012022261A02 | 2022-09-18 | 2022-10-12 | REPAIR WATER - SEWER | EAST 167 STREET, BRONX, FROM STREET HALL PLACE TO STREET REV JAMES POLITE AVENUE |
X012022254A00 | 2022-09-11 | 2022-10-05 | REPAIR WATER - SEWER | LACONIA AVENUE, BRONX, FROM STREET EAST 212 STREET TO STREET EAST 213 STREET |
M012022252A83 | 2022-09-09 | 2022-10-09 | REPAIR SEWER | WEST 37 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012022251B55 | 2022-09-08 | 2022-09-22 | REPAIR WATER - SEWER | EUCLID AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET PITKIN AVENUE |
X012022250A65 | 2022-09-07 | 2022-09-20 | REPAIR WATER - SEWER | GRAND CONCOURSE, BRONX, FROM STREET EAST 201 STREET TO STREET EAST 202 STREET |
M012022245A26 | 2022-09-02 | 2022-09-15 | REPAIR WATER - PROTECTED | WEST END AVENUE, MANHATTAN, FROM STREET WEST 65 STREET TO STREET WEST 66 STREET |
M012022244B91 | 2022-09-01 | 2022-09-20 | REPAIR WATER - SEWER - PROTECTED | 10 AVENUE, MANHATTAN, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET |
X012022242A95 | 2022-08-30 | 2022-09-21 | REPAIR WATER - SEWER | BARTHOLDI STREET, BRONX, FROM STREET CRUGER AVENUE TO STREET WHITE PLAINS ROAD |
M012022241A08 | 2022-08-29 | 2022-09-27 | REPAIR WATER - SEWER | EAST 69 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
X012022236A90 | 2022-08-24 | 2022-09-21 | REPAIR WATER | EAST 146 STREET, BRONX, FROM STREET BROOK AVENUE TO STREET WILLIS AVENUE |
X012022235A85 | 2022-08-23 | 2022-09-09 | REPAIR WATER - SEWER | CARPENTER AVENUE, BRONX, FROM STREET BRONX BOULEVARD TO STREET EAST 220 STREET |
M012022234A53 | 2022-08-22 | 2022-09-06 | REPAIR WATER - SEWER - PROTECTED | 10 AVENUE, MANHATTAN, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET |
X012022226A00 | 2022-08-14 | 2022-09-06 | REPAIR WATER - SEWER | GRAND CONCOURSE, BRONX, FROM STREET EAST 201 STREET TO STREET EAST 202 STREET |
B012022222B41 | 2022-08-10 | 2022-09-08 | REPAIR WATER - SEWER | EUCLID AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET PITKIN AVENUE |
X012022213A89 | 2022-08-01 | 2022-08-30 | REPAIR WATER - SEWER | SHAKESPEARE AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET FEATHERBED LANE |
M012022210B43 | 2022-07-29 | 2022-08-12 | REPAIR SEWER | EAST 11 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE |
B012022208B13 | 2022-07-27 | 2022-08-24 | REPAIR WATER | EMERALD STREET, BROOKLYN, FROM STREET LINDEN BOULEVARD TO STREET LORING AVENUE |
M012022208A99 | 2022-07-27 | 2022-08-23 | REPAIR WATER - SEWER - PROTECTED | 10 AVENUE, MANHATTAN, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET |
M012022200B44 | 2022-07-19 | 2022-08-02 | REPAIR WATER - PROTECTED | WEST END AVENUE, MANHATTAN, FROM STREET WEST 65 STREET TO STREET WEST 66 STREET |
Q012022196D10 | 2022-07-15 | 2022-08-11 | REPAIR SEWER | 88 AVENUE, QUEENS, FROM STREET 153 STREET TO STREET PARSONS BOULEVARD |
B012022196A98 | 2022-07-15 | 2022-08-16 | REPAIR SEWER | ROCKAWAY AVENUE, BROOKLYN, FROM STREET NEWPORT STREET TO STREET RIVERDALE AVENUE |
X012022188B16 | 2022-07-07 | 2022-07-26 | REPAIR WATER - PROTECTED | THIERIOT AVENUE, BRONX, FROM STREET DEAD END TO STREET WATSON AVENUE |
M012022187A58 | 2022-07-06 | 2022-07-29 | REPAIR SEWER | EAST 11 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE |
X012022182A76 | 2022-07-01 | 2022-07-29 | REPAIR WATER - SEWER | SEDGWICK AVENUE, BRONX, FROM STREET BAILEY AVENUE TO STREET BEND |
Q152022180A06 | 2022-06-29 | 2022-08-07 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | 88 AVENUE, QUEENS, FROM STREET 153 STREET TO STREET PARSONS BOULEVARD |
M012022179C68 | 2022-06-28 | 2022-07-19 | REPAIR WATER - PROTECTED | WEST END AVENUE, MANHATTAN, FROM STREET WEST 65 STREET TO STREET WEST 66 STREET |
M012022179C67 | 2022-06-28 | 2022-07-22 | REPAIR SEWER - PROTECTED | WEST 66 STREET, MANHATTAN, FROM STREET FREEDOM PLACE TO STREET WEST END AVENUE |
X012022166A76 | 2022-06-15 | 2022-07-13 | REPAIR WATER - SEWER - PROTECTED | COLDEN AVENUE, BRONX, FROM STREET NEILL AVENUE TO STREET RHINELANDER AVENUE |
M012022164B06 | 2022-06-13 | 2022-06-27 | REPAIR WATER - SEWER - PROTECTED | WEST 66 STREET, MANHATTAN, FROM STREET FREEDOM PLACE TO STREET WEST END AVENUE |
X012022161A92 | 2022-06-10 | 2022-07-05 | REPAIR SEWER | CARPENTER AVENUE, BRONX, FROM STREET EAST 220 STREET TO STREET EAST 221 STREET |
X012022157A40 | 2022-06-06 | 2022-06-23 | REPAIR WATER - SEWER - PROTECTED | HUGHES AVENUE, BRONX, FROM STREET EAST 182 STREET TO STREET OAK TREE PLACE |
X012022157A41 | 2022-06-06 | 2022-07-05 | REPAIR SEWER - PROTECTED | THROGMORTON AVENUE, BRONX, FROM STREET BARKLEY AVENUE TO STREET LAYTON AVENUE |
Q042022152A00 | 2022-06-01 | 2022-06-23 | REPAIR SIDEWALK | 91 AVENUE, QUEENS, FROM STREET 90 STREET TO STREET 91 STREET |
M012022144A62 | 2022-05-24 | 2022-06-20 | REPAIR WATER | 3 AVENUE, MANHATTAN, FROM STREET EAST 22 STREET TO STREET EAST 23 STREET |
Q152022143A37 | 2022-05-23 | 2022-06-14 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | 88 AVENUE, QUEENS, FROM STREET 153 STREET TO STREET PARSONS BOULEVARD |
X012022138A05 | 2022-05-18 | 2022-06-08 | REPAIR WATER | EAST 180 STREET, BRONX, FROM STREET BOSTON ROAD TO STREET BODY OF WATER |
M012022135A05 | 2022-05-15 | 2022-06-13 | REPAIR WATER - SEWER - PROTECTED | WEST 66 STREET, MANHATTAN, FROM STREET FREEDOM PLACE TO STREET WEST END AVENUE |
Q012022133C27 | 2022-05-13 | 2022-06-11 | REPAIR WATER - SEWER - PROTECTED | 153 STREET, QUEENS, FROM STREET 88 AVENUE TO STREET 89 AVENUE |
X012022132A06 | 2022-05-12 | 2022-06-10 | REPAIR WATER | BAY VIEW AVENUE, BRONX, FROM STREET AMPERE AVENUE TO STREET GRISWOLD AVENUE |
B012022131B66 | 2022-05-11 | 2022-06-03 | REPAIR WATER - PROTECTED | EAST 59 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET FLATLANDS AVENUE |
M012022130B02 | 2022-05-10 | 2022-05-14 | REPAIR WATER - SEWER - PROTECTED | WEST 66 STREET, MANHATTAN, FROM STREET FREEDOM PLACE TO STREET WEST END AVENUE |
X012022128A00 | 2022-05-08 | 2022-05-31 | REPAIR WATER - SEWER | EAST 232 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD |
M012022117B02 | 2022-04-27 | 2022-05-10 | REPAIR WATER - PROTECTED | WEST 66 STREET, MANHATTAN, FROM STREET FREEDOM PLACE TO STREET WEST END AVENUE |
X012022116A73 | 2022-04-26 | 2022-05-26 | REPAIR WATER - SEWER | ANTHONY AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST BURNSIDE AVENUE |
B012022115C55 | 2022-04-25 | 2022-05-24 | REPAIR SEWER | GREENE AVENUE, BROOKLYN, FROM STREET CAMBRIDGE PLACE TO STREET ST JAMES PLACE |
Q012022110B21 | 2022-04-20 | 2022-05-18 | REPAIR WATER - SEWER - PROTECTED | 153 STREET, QUEENS, FROM STREET 88 AVENUE TO STREET 89 AVENUE |
B012022110B61 | 2022-04-20 | 2022-05-13 | REPAIR SEWER | GREENE AVENUE, BROOKLYN, FROM STREET CAMBRIDGE PLACE TO STREET ST JAMES PLACE |
B012022110A19 | 2022-04-20 | 2022-05-03 | REPAIR WATER - SEWER - PROTECTED | CHESTNUT STREET, BROOKLYN, FROM STREET DINSMORE PLACE TO STREET FULTON STREET |
M012022110B24 | 2022-04-20 | 2022-05-21 | REPAIR WATER | 3 AVENUE, MANHATTAN, FROM STREET EAST 22 STREET TO STREET EAST 23 STREET |
X012022107A01 | 2022-04-17 | 2022-05-01 | REPAIR WATER | BERGEN AVENUE, BRONX, FROM STREET EAST 152 STREET TO STREET WESTCHESTER AVENUE |
M012022103A41 | 2022-04-13 | 2022-05-12 | REPAIR WATER | 5 AVENUE, MANHATTAN, FROM STREET EAST 28 STREET TO STREET EAST 29 STREET |
Q152022102A01 | 2022-04-12 | 2022-05-20 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | 153 STREET, QUEENS, FROM STREET 88 AVENUE TO STREET 89 AVENUE |
M012022096A40 | 2022-04-06 | 2022-05-04 | REPAIR SEWER - PROTECTED | EAST 112 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
M012022096A39 | 2022-04-06 | 2022-04-10 | REPAIR WATER - SEWER - PROTECTED | EAST 61 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
X012022096A15 | 2022-04-06 | 2022-04-17 | REPAIR WATER | BERGEN AVENUE, BRONX, FROM STREET EAST 152 STREET TO STREET WESTCHESTER AVENUE |
M012022094B26 | 2022-04-04 | 2022-04-26 | REPAIR WATER - PROTECTED | WEST 66 STREET, MANHATTAN, FROM STREET FREEDOM PLACE TO STREET WEST END AVENUE |
X012022090A59 | 2022-03-31 | 2022-04-28 | REPAIR WATER - SEWER | SOUTHERN BOULEVARD, BRONX, FROM STREET JENNINGS STREET TO STREET LOUIS NINE BOULEVARD |
X012022089A37 | 2022-03-30 | 2022-04-28 | REPAIR WATER - SEWER | GRAND AVENUE, BRONX, FROM STREET WEST 190 STREET TO STREET WEST 192 STREET |
X012022086A01 | 2022-03-27 | 2022-04-23 | REPAIR WATER - SEWER - PROTECTED | CROSBY AVENUE, BRONX, FROM STREET DANIEL STREET TO STREET MIDDLETOWN ROAD |
M012022084C35 | 2022-03-25 | 2022-04-24 | REPAIR WATER | 3 AVENUE, MANHATTAN, FROM STREET EAST 22 STREET TO STREET EAST 23 STREET |
M012022083A88 | 2022-03-24 | 2022-04-06 | REPAIR SEWER - PROTECTED | EAST 112 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
M012022082A79 | 2022-03-23 | 2022-04-08 | REPAIR WATER - SEWER - PROTECTED | EAST 61 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M012022082A93 | 2022-03-23 | 2022-04-12 | REPAIR WATER | 5 AVENUE, MANHATTAN, FROM STREET EAST 28 STREET TO STREET EAST 29 STREET |
Q012022080A79 | 2022-03-21 | 2022-03-31 | REPAIR WATER - SEWER | QUEENS STREET, QUEENS, FROM STREET DEAD END TO STREET JACKSON AVENUE |
M012022079A05 | 2022-03-20 | 2022-04-03 | REPAIR WATER | WEST 28 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET BROADWAY |
B012022079A02 | 2022-03-20 | 2022-04-12 | REPAIR WATER - SEWER - PROTECTED | ALABAMA AVENUE, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE |
B012022079A01 | 2022-03-20 | 2022-04-19 | REPAIR WATER - SEWER - PROTECTED | CHESTNUT STREET, BROOKLYN, FROM STREET DINSMORE PLACE TO STREET FULTON STREET |
M012022074A51 | 2022-03-15 | 2022-03-26 | REPAIR WATER - PROTECTED | EAST 55 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M012022072A02 | 2022-03-13 | 2022-03-25 | REPAIR WATER - SEWER - PROTECTED | EAST 61 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M012022069B21 | 2022-03-10 | 2022-03-27 | REPAIR WATER | WEST 24 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
X012022069A80 | 2022-03-10 | 2022-04-07 | REPAIR SEWER | EAST 146 STREET, BRONX, FROM STREET BROOK AVENUE TO STREET WILLIS AVENUE |
B012022066A00 | 2022-03-07 | 2022-03-29 | REPAIR SEWER - PROTECTED | EUCLID AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET |
Q012022066D36 | 2022-03-07 | 2022-03-17 | REPAIR WATER - SEWER | QUEENS STREET, QUEENS, FROM STREET DEAD END TO STREET JACKSON AVENUE |
Q012022065A08 | 2022-03-06 | 2022-03-12 | REPAIR WATER - SEWER | ORCHARD STREET, QUEENS, FROM STREET DEAD END TO STREET JACKSON AVENUE |
M042022063A10 | 2022-03-04 | 2022-03-30 | REPAIR SIDEWALK | WARREN STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WEST BROADWAY |
M012022062A69 | 2022-03-03 | 2022-03-12 | REPAIR WATER - PROTECTED | EAST 55 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
X012022060A86 | 2022-03-01 | 2022-03-30 | REPAIR WATER - SEWER | CARPENTER AVENUE, BRONX, FROM STREET EAST 223 STREET TO STREET EAST 224 STREET |
X012022059C80 | 2022-02-28 | 2022-03-29 | REPAIR WATER - SEWER - PROTECTED | EAST MOSHOLU PARKWAY SOUTH, BRONX, FROM STREET MARION AVENUE TO STREET PERRY AVENUE |
M012022056A82 | 2022-02-25 | 2022-03-11 | REPAIR WATER - SEWER - PROTECTED | EAST 61 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M012022053A50 | 2022-02-22 | 2022-03-23 | REPAIR SEWER - PROTECTED | EAST 112 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
M012022052A07 | 2022-02-21 | 2022-03-05 | REPAIR WATER - SEWER | WEST 57 STREET, MANHATTAN, FROM STREET 6 1/2 AVENUE TO STREET AVENUE OF THE AMERICAS |
X012022049A90 | 2022-02-18 | 2022-03-11 | REPAIR SEWER | WESTCHESTER AVENUE, BRONX, FROM STREET BERGEN AVENUE TO STREET EAST 150 STREET |
M012022049B08 | 2022-02-18 | 2022-03-20 | REPAIR WATER | WEST 28 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET BROADWAY |
X012022048A28 | 2022-02-17 | 2022-02-22 | REPAIR WATER - SEWER - PROTECTED | EAGLE AVENUE, BRONX, FROM STREET EAST 161 STREET TO STREET EAST 163 STREET |
M192022045A04 | 2022-02-14 | 2022-03-07 | PLACE TEMPORARY PLATES | WARREN STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WEST BROADWAY |
X012022044A03 | 2022-02-13 | 2022-03-09 | REPAIR SEWER | EAST 156 STREET, BRONX, FROM STREET BROOK AVENUE TO STREET HEGNEY PLACE |
M012022041A47 | 2022-02-10 | 2022-02-25 | REPAIR WATER - SEWER - PROTECTED | EAST 61 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M012022037A10 | 2022-02-06 | 2022-02-19 | REPAIR SEWER | WEST 60 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET COLUMBUS AVENUE |
M012022034B21 | 2022-02-03 | 2022-02-17 | REPAIR SEWER | EAST 111 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR |
B012022034A83 | 2022-02-03 | 2022-02-18 | REPAIR WATER - PROTECTED | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
X012022034A68 | 2022-02-03 | 2022-03-02 | REPAIR WATER - SEWER | CRESTON AVENUE, BRONX, FROM STREET EAST 196 STREET TO STREET EAST 197 STREET |
X012022033B06 | 2022-02-02 | 2022-03-02 | REPAIR WATER - SEWER | BRUCKNER BOULEVARD, BRONX, FROM STREET BRE WESTBOUND ENTRANCE BUHRE AVE TO STREET ROBERTS AVENUE |
X012022032A80 | 2022-02-01 | 2022-02-20 | REPAIR WATER - SEWER | BRITTON STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET OLINVILLE AVENUE |
X012022032A92 | 2022-02-01 | 2022-03-01 | REPAIR WATER - SEWER | UNIVERSITY AVENUE, BRONX, FROM STREET RESERVOIR AVENUE TO STREET WEST 197 STREET |
M022022032B70 | 2022-02-01 | 2022-02-17 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 111 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR |
M012022031B28 | 2022-01-31 | 2022-02-14 | REPAIR SEWER - PROTECTED | WARREN STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WEST BROADWAY |
X012022031A60 | 2022-01-31 | 2022-03-01 | REPAIR WATER - SEWER | HOME STREET, BRONX, FROM STREET EAST 169 STREET TO STREET REV JAMES POLITE AVENUE |
X012022021A19 | 2022-01-31 | 2022-02-19 | REPAIR WATER | COLONIAL AVENUE, BRONX, FROM STREET EAST 196 STREET TO STREET WESTCHESTER AVENUE |
M012022026A52 | 2022-01-26 | 2022-02-19 | REPAIR WATER - SEWER | WEST 57 STREET, MANHATTAN, FROM STREET 6 1/2 AVENUE TO STREET AVENUE OF THE AMERICAS |
X012022026A75 | 2022-01-26 | 2022-02-18 | REPAIR WATER - SEWER | CRESTON AVENUE, BRONX, FROM STREET EAST 196 STREET TO STREET EAST 197 STREET |
M152022025A06 | 2022-01-25 | 2022-02-17 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | EAST 111 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR |
X012022023A01 | 2022-01-23 | 2022-02-17 | REPAIR SEWER | WESTCHESTER AVENUE, BRONX, FROM STREET BERGEN AVENUE TO STREET EAST 150 STREET |
B012022021B67 | 2022-01-21 | 2022-02-02 | REPAIR WATER - PROTECTED | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
M012022019C32 | 2022-01-19 | 2022-02-17 | REPAIR SEWER | EAST 111 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR |
X012022019A72 | 2022-01-19 | 2022-02-17 | REPAIR WATER - PROTECTED | BROOK AVENUE, BRONX, FROM STREET EAST 156 STREET TO STREET EAST 157 STREET |
M012022018B03 | 2022-01-18 | 2022-01-18 | REPAIR SEWER | EAST 111 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR |
M012022018B01 | 2022-01-18 | 2022-02-17 | REPAIR SEWER - PROTECTED | EAST 112 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
M012022018B02 | 2022-01-18 | 2022-01-31 | REPAIR SEWER - PROTECTED | WARREN STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WEST BROADWAY |
X012022017A00 | 2022-01-17 | 2022-02-08 | REPAIR WATER - SEWER - PROTECTED | EAGLE AVENUE, BRONX, FROM STREET EAST 161 STREET TO STREET EAST 163 STREET |
M012022013A88 | 2022-01-13 | 2022-02-13 | REPAIR SEWER | WEST 28 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET BROADWAY |
X012022013A78 | 2022-01-13 | 2022-02-03 | REPAIR WATER - SEWER - PROTECTED | HARRISON AVENUE, BRONX, FROM STREET WEST 180 STREET TO STREET WEST 181 STREET |
X012022012A96 | 2022-01-12 | 2022-01-31 | REPAIR SEWER | RIVER AVENUE, BRONX, FROM STREET EAST 167 STREET TO STREET MC CLELLAN STREET |
B012022012A12 | 2022-01-12 | 2022-01-19 | REPAIR WATER - PROTECTED | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
M152022010A00 | 2022-01-10 | 2022-01-18 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | EAST 111 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR |
M012022007B36 | 2022-01-07 | 2022-02-05 | REPAIR SEWER | WEST 60 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET COLUMBUS AVENUE |
M012022005A53 | 2022-01-05 | 2022-01-18 | REPAIR SEWER - PROTECTED | EAST 112 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
X012022003A31 | 2022-01-03 | 2022-01-30 | REPAIR WATER - SEWER | ANDREWS AVENUE, BRONX, FROM STREET WEST 183 STREET TO STREET WEST FORDHAM ROAD |
M152022003A10 | 2022-01-03 | 2022-01-18 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | EAST 112 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
M012022002A02 | 2022-01-02 | 2022-01-14 | REPAIR SEWER - PROTECTED | WARREN STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WEST BROADWAY |
X012022002A01 | 2022-01-02 | 2022-01-14 | REPAIR SEWER | RIVER AVENUE, BRONX, FROM STREET EAST 167 STREET TO STREET MC CLELLAN STREET |
X012022002A02 | 2022-01-02 | 2022-01-27 | REPAIR WATER - SEWER | EVELYN PLACE, BRONX, FROM STREET DAVIDSON AVENUE TO STREET GRAND AVENUE |
M192022002A01 | 2022-01-02 | 2022-02-02 | PLACE TEMPORARY PLATES | EAST 112 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
X012022002A03 | 2022-01-02 | 2022-01-27 | REPAIR WATER - SEWER | BRITTON STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET OLINVILLE AVENUE |
M012022002A03 | 2022-01-02 | 2022-01-14 | REPAIR SEWER - PROTECTED | EAST 10 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE |
X012021360A01 | 2021-12-26 | 2021-12-31 | REPAIR SEWER | RIVER AVENUE, BRONX, FROM STREET EAST 167 STREET TO STREET MC CLELLAN STREET |
M012021354B43 | 2021-12-20 | 2021-12-31 | REPAIR SEWER - PROTECTED | EAST 10 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE |
Q012021353A02 | 2021-12-19 | 2021-12-31 | REPAIR WATER - SEWER | ORCHARD STREET, QUEENS, FROM STREET DEAD END TO STREET JACKSON AVENUE |
X012021353A00 | 2021-12-19 | 2021-12-31 | REPAIR WATER - SEWER | ANDREWS AVENUE, BRONX, FROM STREET WEST 183 STREET TO STREET WEST FORDHAM ROAD |
M012021351A89 | 2021-12-17 | 2021-12-31 | REPAIR SEWER - PROTECTED | WARREN STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WEST BROADWAY |
M152021351A02 | 2021-12-17 | 2021-12-31 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | EAST 111 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR |
Q012021350B28 | 2021-12-16 | 2021-12-31 | REPAIR WATER - SEWER | QUEENS STREET, QUEENS, FROM STREET DEAD END TO STREET JACKSON AVENUE |
M012021349A20 | 2021-12-15 | 2021-12-31 | REPAIR SEWER - PROTECTED | EAST 112 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
M152021341A02 | 2021-12-07 | 2021-12-31 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | EAST 112 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
M012021320B44 | 2021-11-16 | 2021-12-15 | REPAIR SEWER - PROTECTED | WARREN STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WEST BROADWAY |
M012021309A74 | 2021-11-05 | 2021-11-14 | REPAIR WATER | 6 AVENUE, MANHATTAN, FROM STREET WEST 14 STREET TO STREET WEST 15 STREET |
X012021306A21 | 2021-11-02 | 2021-11-15 | REPAIR WATER - PROTECTED | TIFFANY STREET, BRONX, FROM STREET BARRY STREET TO STREET BURNETT PLACE |
X012021304A02 | 2021-10-31 | 2021-11-14 | REPAIR WATER | WESTCHESTER AVENUE, BRONX, FROM STREET BERGEN AVENUE TO STREET EAST 150 STREET |
B012021301B06 | 2021-10-28 | 2021-11-09 | REPAIR WATER - SEWER | SCHERMERHORN STREET, BROOKLYN, FROM STREET BOERUM PLACE TO STREET COURT STREET |
M012021301A84 | 2021-10-28 | 2021-11-01 | REPAIR WATER | 6 AVENUE, MANHATTAN, FROM STREET WEST 14 STREET TO STREET WEST 15 STREET |
X012021300A07 | 2021-10-27 | 2021-11-01 | REPAIR WATER - SEWER | WESTCHESTER AVENUE, BRONX, FROM STREET BERGEN AVENUE TO STREET EAST 150 STREET |
B012021298B38 | 2021-10-25 | 2021-11-01 | REPAIR SEWER | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
M012021294A53 | 2021-10-21 | 2021-11-01 | REPAIR SEWER - PROTECTED | 2 AVENUE, MANHATTAN, FROM STREET EAST 40 STREET TO STREET EAST 41 STREET |
X012021292A83 | 2021-10-19 | 2021-10-19 | REPAIR WATER - SEWER | WESTCHESTER AVENUE, BRONX, FROM STREET BERGEN AVENUE TO STREET EAST 150 STREET |
X012021292A84 | 2021-10-19 | 2021-10-19 | REPAIR WATER - SEWER | BERGEN AVENUE, BRONX, FROM STREET EAST 152 STREET TO STREET WESTCHESTER AVENUE |
M012021291B59 | 2021-10-18 | 2021-10-25 | REPAIR WATER | 6 AVENUE, MANHATTAN, FROM STREET WEST 14 STREET TO STREET WEST 15 STREET |
M012021287A64 | 2021-10-14 | 2021-10-31 | REPAIR WATER | 8 AVENUE, MANHATTAN, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET |
X012021285B07 | 2021-10-12 | 2021-11-01 | REPAIR SEWER | ANTHONY AVENUE, BRONX, FROM STREET BUSH STREET TO STREET EAST 179 STREET |
X012021285B08 | 2021-10-12 | 2021-11-01 | REPAIR WATER | RIVER AVENUE, BRONX, FROM STREET EAST 167 STREET TO STREET MC CLELLAN STREET |
M012021281B40 | 2021-10-08 | 2021-10-17 | REPAIR WATER | 6 AVENUE, MANHATTAN, FROM STREET WEST 14 STREET TO STREET WEST 15 STREET |
B012021281A17 | 2021-10-08 | 2021-11-01 | REPAIR WATER - PROTECTED | CHESTNUT STREET, BROOKLYN, FROM STREET DINSMORE PLACE TO STREET FULTON STREET |
B012021279A64 | 2021-10-06 | 2021-10-20 | REPAIR SEWER | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
X012021273A60 | 2021-09-30 | 2021-10-12 | REPAIR SEWER | ANTHONY AVENUE, BRONX, FROM STREET BUSH STREET TO STREET EAST 179 STREET |
B012021271A46 | 2021-09-28 | 2021-10-26 | REPAIR WATER - SEWER | SCHERMERHORN STREET, BROOKLYN, FROM STREET BOERUM PLACE TO STREET COURT STREET |
M012021271B22 | 2021-09-28 | 2021-10-13 | REPAIR SEWER | NORFOLK STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET GRAND STREET |
M012021267B52 | 2021-09-24 | 2021-10-07 | REPAIR WATER | 6 AVENUE, MANHATTAN, FROM STREET WEST 14 STREET TO STREET WEST 15 STREET |
X012021265B68 | 2021-09-22 | 2021-10-06 | REPAIR WATER - SEWER | EAST 212 STREET, BRONX, FROM STREET HOLLAND AVENUE TO STREET WHITE PLAINS ROAD |
X012021265B08 | 2021-09-22 | 2021-10-07 | REPAIR SEWER | 3 AVENUE, BRONX, FROM STREET EAST 166 STREET TO STREET EAST 167 STREET |
X012021264A87 | 2021-09-21 | 2021-10-13 | REPAIR WATER | PURDY STREET, BRONX, FROM STREET STARLING AVENUE TO STREET WESTCHESTER AVENUE |
M012021262A03 | 2021-09-19 | 2021-09-26 | REPAIR SEWER | NORFOLK STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET GRAND STREET |
M012021260A92 | 2021-09-17 | 2021-10-16 | REPAIR WATER | CLAREMONT AVENUE, MANHATTAN, FROM STREET WEST 120 STREET TO STREET WEST 122 STREET |
Q012021260B70 | 2021-09-17 | 2021-10-17 | REPAIR WATER | 54 AVENUE, QUEENS, FROM STREET 2 STREET TO STREET 5 STREET |
M012021259A96 | 2021-09-16 | 2021-10-01 | REPAIR SEWER | WEST 85 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
B012021255A09 | 2021-09-12 | 2021-10-06 | REPAIR SEWER | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
X012021253B21 | 2021-09-10 | 2021-09-28 | REPAIR WATER - SEWER | SAXON AVENUE, BRONX, FROM STREET BEND TO STREET VAN CORTLANDT PARK SOUTH |
M012021253B70 | 2021-09-10 | 2021-10-08 | REPAIR WATER | GREENWICH STREET, MANHATTAN, FROM STREET DESBROSSES STREET TO STREET WATTS STREET |
X012021253B02 | 2021-09-10 | 2021-09-14 | REPAIR WATER - SEWER | SAXON AVENUE, BRONX, FROM STREET BEND TO STREET VAN CORTLANDT PARK SOUTH |
M012021253B15 | 2021-09-10 | 2021-09-25 | REPAIR SEWER - PROTECTED | CLAREMONT AVENUE, MANHATTAN, FROM STREET WEST 120 STREET TO STREET WEST 122 STREET |
X012021246A08 | 2021-09-03 | 2021-09-28 | REPAIR WATER | EAST KINGSBRIDGE ROAD, BRONX, FROM STREET BEND TO STREET VALENTINE AVENUE |
X012021244A08 | 2021-09-01 | 2021-09-28 | REPAIR SEWER | ANTHONY AVENUE, BRONX, FROM STREET BUSH STREET TO STREET EAST 179 STREET |
M012021244B41 | 2021-09-01 | 2021-09-17 | REPAIR SEWER | WEST 85 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M012021244B19 | 2021-09-01 | 2021-09-15 | REPAIR WATER - PROTECTED | EAST 112 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
X012021244A37 | 2021-09-01 | 2021-09-23 | REPAIR SEWER | 3 AVENUE, BRONX, FROM STREET EAST 166 STREET TO STREET EAST 167 STREET |
Q012021232A61 | 2021-08-31 | 2021-09-16 | REPAIR WATER | 54 AVENUE, QUEENS, FROM STREET 2 STREET TO STREET 5 STREET |
M012021243A68 | 2021-08-31 | 2021-09-11 | REPAIR SEWER - PROTECTED | CLAREMONT AVENUE, MANHATTAN, FROM STREET WEST 120 STREET TO STREET WEST 122 STREET |
X012021241A00 | 2021-08-29 | 2021-09-16 | REPAIR SEWER - PROTECTED | RODMAN PLACE, BRONX, FROM STREET LONGFELLOW AVENUE TO STREET WEST FARMS ROAD |
X012021238A55 | 2021-08-26 | 2021-09-25 | REPAIR WATER - SEWER - PROTECTED | TIEBOUT AVENUE, BRONX, FROM STREET EAST 184 STREET TO STREET EAST 187 STREET |
M012021238A56 | 2021-08-26 | 2021-09-23 | REPAIR WATER | BEEKMAN STREET, MANHATTAN, FROM STREET NASSAU STREET TO STREET WILLIAM STREET |
X012021236A59 | 2021-08-24 | 2021-09-19 | REPAIR WATER - SEWER | WALTON AVENUE, BRONX, FROM STREET CAMERON PLACE TO STREET EAST 182 STREET |
X012021236A58 | 2021-08-24 | 2021-09-22 | REPAIR WATER | RIVER AVENUE, BRONX, FROM STREET EAST 167 STREET TO STREET MC CLELLAN STREET |
X012021236A22 | 2021-08-24 | 2021-09-06 | REPAIR SEWER | PURDY STREET, BRONX, FROM STREET STARLING AVENUE TO STREET WESTCHESTER AVENUE |
M012021236A54 | 2021-08-24 | 2021-09-22 | REPAIR WATER | ST NICHOLAS AVENUE, MANHATTAN, FROM STREET WEST 150 STREET TO STREET WEST 151 STREET |
Q012021232B87 | 2021-08-20 | 2021-09-23 | REPAIR SEWER - PROTECTED | 24 STREET, QUEENS, FROM STREET 40 AVENUE TO STREET 41 AVENUE |
M012021230A09 | 2021-08-18 | 2021-09-02 | REPAIR WATER - PROTECTED | EAST 112 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
X012021228A00 | 2021-08-16 | 2021-09-10 | REPAIR WATER - SEWER | MORRIS AVENUE, BRONX, FROM STREET CAMERON PLACE TO STREET EAST 182 STREET |
M012021228A00 | 2021-08-16 | 2021-08-22 | REPAIR WATER | SUFFOLK STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET GRAND STREET |
M012021222C71 | 2021-08-10 | 2021-08-24 | REPAIR WATER - PROTECTED | EAST 69 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
X012021222B87 | 2021-08-10 | 2021-09-07 | REPAIR WATER - SEWER - PROTECTED | WHITE PLAINS ROAD, BRONX, FROM STREET ARCHER STREET TO STREET GUERLAIN STREET |
X012021222B86 | 2021-08-10 | 2021-09-04 | REPAIR WATER - SEWER - PROTECTED | WHITE PLAINS ROAD, BRONX, FROM STREET ARCHER STREET TO STREET GUERLAIN STREET |
X012021222B85 | 2021-08-10 | 2021-08-24 | REPAIR SEWER | RIVER AVENUE, BRONX, FROM STREET EAST 167 STREET TO STREET MC CLELLAN STREET |
X012021221A00 | 2021-08-09 | 2021-08-23 | REPAIR SEWER | PURDY STREET, BRONX, FROM STREET STARLING AVENUE TO STREET WESTCHESTER AVENUE |
M012021221B09 | 2021-08-09 | 2021-09-04 | REPAIR SEWER | WEST 159 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
B012021221A52 | 2021-08-09 | 2021-09-02 | REPAIR WATER - SEWER | 14 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
X012021217A72 | 2021-08-05 | 2021-09-04 | REPAIR WATER - SEWER | MORRIS AVENUE, BRONX, FROM STREET CAMERON PLACE TO STREET EAST 182 STREET |
X012021217A65 | 2021-08-05 | 2021-08-20 | REPAIR WATER - SEWER | WALTON AVENUE, BRONX, FROM STREET CAMERON PLACE TO STREET EAST 182 STREET |
X012021217A69 | 2021-08-05 | 2021-09-04 | REPAIR WATER - SEWER | MORRIS AVENUE, BRONX, FROM STREET CAMERON PLACE TO STREET EAST 182 STREET |
X012021216A58 | 2021-08-04 | 2021-09-02 | REPAIR WATER - SEWER - PROTECTED | WHITE PLAINS ROAD, BRONX, FROM STREET ARCHER STREET TO STREET GUERLAIN STREET |
X012021216A08 | 2021-08-04 | 2021-08-31 | REPAIR WATER | 3 AVENUE, BRONX, FROM STREET EAST 166 STREET TO STREET EAST 167 STREET |
X012021216A46 | 2021-08-04 | 2021-08-18 | REPAIR WATER - SEWER - PROTECTED | WOODYCREST AVENUE, BRONX, FROM STREET WEST 165 STREET TO STREET WEST 166 STREET |
M012021214C07 | 2021-08-02 | 2021-08-10 | REPAIR WATER - PROTECTED | EAST 69 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
X012021214A00 | 2021-08-02 | 2021-08-31 | REPAIR WATER | WEST FARMS ROAD, BRONX, FROM STREET BEND TO STREET RODMAN PLACE |
M012021210A67 | 2021-07-29 | 2021-08-28 | REPAIR SEWER - PROTECTED | CLAREMONT AVENUE, MANHATTAN, FROM STREET WEST 120 STREET TO STREET WEST 122 STREET |
X012021209B10 | 2021-07-28 | 2021-08-20 | REPAIR WATER - SEWER - PROTECTED | SOUNDVIEW AVENUE, BRONX, FROM STREET LELAND AVENUE TO STREET UNDERHILL AVENUE |
B012021209D99 | 2021-07-28 | 2021-08-27 | REPAIR WATER | JAVA STREET, BROOKLYN, FROM STREET BODY OF WATER TO STREET WEST STREET |
M012021207A18 | 2021-07-26 | 2021-08-17 | REPAIR WATER - PROTECTED | BROOME STREET, MANHATTAN, FROM STREET NORFOLK STREET TO STREET SUFFOLK STREET |
X012021203B06 | 2021-07-22 | 2021-07-31 | REPAIR WATER - SEWER | RIVER AVENUE, BRONX, FROM STREET EAST 167 STREET TO STREET MC CLELLAN STREET |
X012021201A88 | 2021-07-20 | 2021-08-04 | REPAIR WATER - SEWER | CARPENTER AVENUE, BRONX, FROM STREET EAST 220 STREET TO STREET EAST 221 STREET |
M012021201B61 | 2021-07-20 | 2021-08-03 | REPAIR SEWER | SUFFOLK STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET GRAND STREET |
M012021197A48 | 2021-07-16 | 2021-07-29 | REPAIR WATER - SEWER | EAST 84 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M012021197A47 | 2021-07-16 | 2021-07-29 | REPAIR SEWER - PROTECTED | CLAREMONT AVENUE, MANHATTAN, FROM STREET WEST 120 STREET TO STREET WEST 122 STREET |
M012021195B14 | 2021-07-14 | 2021-07-15 | REPAIR WATER - SEWER | EAST 84 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
X012021195A51 | 2021-07-14 | 2021-08-10 | REPAIR SEWER | RIVER AVENUE, BRONX, FROM STREET EAST 167 STREET TO STREET MC CLELLAN STREET |
X012021194A00 | 2021-07-13 | 2021-08-05 | REPAIR WATER - SEWER | EAST 214 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET HOLLAND AVENUE |
X012021194B43 | 2021-07-13 | 2021-08-04 | REPAIR WATER - SEWER - PROTECTED | WOODYCREST AVENUE, BRONX, FROM STREET WEST 165 STREET TO STREET WEST 166 STREET |
X012021194B42 | 2021-07-13 | 2021-08-07 | REPAIR WATER - SEWER | EAST 211 STREET, BRONX, FROM STREET HOLLAND AVENUE TO STREET WHITE PLAINS ROAD |
X012021194B32 | 2021-07-13 | 2021-07-21 | REPAIR WATER - SEWER | CARPENTER AVENUE, BRONX, FROM STREET EAST 220 STREET TO STREET EAST 221 STREET |
M012021192A09 | 2021-07-11 | 2021-08-05 | REPAIR WATER | EAST 128 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
X012021189A44 | 2021-07-08 | 2021-08-03 | REPAIR WATER - SEWER | MT HOPE PLACE, BRONX, FROM STREET GRAND CONCOURSE TO STREET MORRIS AVENUE |
Q012021189B03 | 2021-07-08 | 2021-07-16 | REPAIR SEWER | 54 AVENUE, QUEENS, FROM STREET 2 STREET TO STREET 5 STREET |
X012021187A07 | 2021-07-06 | 2021-07-10 | REPAIR WATER - SEWER | CARPENTER AVENUE, BRONX, FROM STREET EAST 220 STREET TO STREET EAST 221 STREET |
M012021183B27 | 2021-07-02 | 2021-07-17 | REPAIR SEWER | WEST 27 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
Q012021183A02 | 2021-07-02 | 2021-07-16 | REPAIR SEWER | 2 STREET, QUEENS, FROM STREET 54 AVENUE TO STREET BODY OF WATER |
M012021183B24 | 2021-07-02 | 2021-07-14 | REPAIR WATER - SEWER | EAST 84 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M012021183B26 | 2021-07-02 | 2021-07-17 | REPAIR SEWER | WEST 28 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
M012021183B25 | 2021-07-02 | 2021-07-17 | REPAIR SEWER | WEST 28 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
S012021181A46 | 2021-06-30 | 2021-07-29 | REPAIR WATER - PROTECTED | CASTLETON AVENUE, STATEN ISLAND, FROM STREET PORT RICHMOND AVENUE TO STREET PARK AVENUE |
M012021181B28 | 2021-06-30 | 2021-07-15 | REPAIR SEWER - PROTECTED | CLAREMONT AVENUE, MANHATTAN, FROM STREET WEST 120 STREET TO STREET WEST 122 STREET |
X012021181A96 | 2021-06-30 | 2021-07-14 | REPAIR WATER - SEWER | RIVER AVENUE, BRONX, FROM STREET EAST 167 STREET TO STREET MC CLELLAN STREET |
X012021181A97 | 2021-06-30 | 2021-07-27 | REPAIR WATER - SEWER | MATTHEWS AVENUE, BRONX, FROM STREET LYDIG AVENUE TO STREET PELHAM PARKWAY |
M012021179C90 | 2021-06-28 | 2021-07-20 | REPAIR SEWER | SUFFOLK STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET GRAND STREET |
M012021179C89 | 2021-06-28 | 2021-06-30 | REPAIR WATER - SEWER | EAST 84 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
X012021179B58 | 2021-06-28 | 2021-07-27 | REPAIR WATER - SEWER | CARPENTER AVENUE, BRONX, FROM STREET EAST 220 STREET TO STREET EAST 221 STREET |
M012021176A66 | 2021-06-25 | 2021-07-03 | REPAIR SEWER | WEST 28 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
M012021176A65 | 2021-06-25 | 2021-07-03 | REPAIR SEWER | WEST 28 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
M012021171A01 | 2021-06-20 | 2021-07-03 | REPAIR SEWER | WEST 27 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
S012021171A00 | 2021-06-20 | 2021-07-12 | REPAIR SEWER | PORT RICHMOND AVENUE, STATEN ISLAND, FROM STREET ANDERSON AVENUE TO STREET CASTLETON AVENUE |
X012021171A00 | 2021-06-20 | 2021-07-17 | REPAIR WATER - SEWER | RIVER AVENUE, BRONX, FROM STREET EAST 167 STREET TO STREET MC CLELLAN STREET |
X012021171A01 | 2021-06-20 | 2021-06-30 | REPAIR SEWER | CAULDWELL AVENUE, BRONX, FROM STREET EAST 161 STREET TO STREET EAST 163 STREET |
M012021171A00 | 2021-06-20 | 2021-07-03 | REPAIR WATER - PROTECTED | BROOME STREET, MANHATTAN, FROM STREET NORFOLK STREET TO STREET SUFFOLK STREET |
X012021167A87 | 2021-06-16 | 2021-06-27 | REPAIR WATER - SEWER | CARPENTER AVENUE, BRONX, FROM STREET EAST 220 STREET TO STREET EAST 221 STREET |
M012021166B00 | 2021-06-15 | 2021-06-29 | REPAIR SEWER - PROTECTED | CLAREMONT AVENUE, MANHATTAN, FROM STREET WEST 120 STREET TO STREET WEST 122 STREET |
X012021164A01 | 2021-06-13 | 2021-06-26 | REPAIR WATER - SEWER | GUERLAIN STREET, BRONX, FROM STREET LELAND AVENUE TO STREET THIERIOT AVENUE |
X012021162A85 | 2021-06-11 | 2021-06-12 | REPAIR WATER - SEWER | GUERLAIN STREET, BRONX, FROM STREET LELAND AVENUE TO STREET THIERIOT AVENUE |
M012021161A25 | 2021-06-10 | 2021-06-22 | REPAIR WATER | MADISON AVENUE, MANHATTAN, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET |
Q012021161B10 | 2021-06-10 | 2021-07-02 | REPAIR SEWER | 54 AVENUE, QUEENS, FROM STREET 2 STREET TO STREET 5 STREET |
X012021159A15 | 2021-06-08 | 2021-06-18 | REPAIR SEWER | CAULDWELL AVENUE, BRONX, FROM STREET EAST 161 STREET TO STREET EAST 163 STREET |
X012021159A16 | 2021-06-08 | 2021-06-30 | REPAIR WATER - SEWER | RIVER AVENUE, BRONX, FROM STREET EAST 167 STREET TO STREET MC CLELLAN STREET |
M012021154B25 | 2021-06-03 | 2021-07-02 | REPAIR WATER - SEWER - PROTECTED | EAST 55 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
X012021152A95 | 2021-06-01 | 2021-06-17 | REPAIR WATER - SEWER | RIVER AVENUE, BRONX, FROM STREET EAST 167 STREET TO STREET MC CLELLAN STREET |
M012021148A46 | 2021-05-28 | 2021-06-26 | REPAIR WATER - SEWER | EAST 84 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M012021148A47 | 2021-05-28 | 2021-06-15 | REPAIR SEWER - PROTECTED | CLAREMONT AVENUE, MANHATTAN, FROM STREET WEST 120 STREET TO STREET WEST 122 STREET |
X012021147A74 | 2021-05-27 | 2021-06-25 | REPAIR WATER - SEWER - PROTECTED | CROSBY AVENUE, BRONX, FROM STREET DANIEL STREET TO STREET MIDDLETOWN ROAD |
M012021141A57 | 2021-05-21 | 2021-06-08 | REPAIR WATER | MADISON AVENUE, MANHATTAN, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET |
M012021141A49 | 2021-05-21 | 2021-06-19 | REPAIR WATER - PROTECTED | BROOME STREET, MANHATTAN, FROM STREET NORFOLK STREET TO STREET SUFFOLK STREET |
M012021136A00 | 2021-05-16 | 2021-05-31 | REPAIR WATER | WEST 85 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M012021136A01 | 2021-05-16 | 2021-06-12 | REPAIR SEWER | WEST 27 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
X012021136A00 | 2021-05-16 | 2021-06-04 | REPAIR SEWER | CAULDWELL AVENUE, BRONX, FROM STREET EAST 161 STREET TO STREET EAST 163 STREET |
M012021134A75 | 2021-05-14 | 2021-05-29 | REPAIR SEWER - PROTECTED | CLAREMONT AVENUE, MANHATTAN, FROM STREET WEST 120 STREET TO STREET WEST 122 STREET |
M012021133B16 | 2021-05-13 | 2021-05-25 | REPAIR SEWER | WEST 28 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
X012021132A00 | 2021-05-12 | 2021-06-08 | REPAIR WATER - SEWER - PROTECTED | WALTON AVENUE, BRONX, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE |
X012021129A01 | 2021-05-09 | 2021-06-03 | REPAIR WATER - SEWER | RIVER AVENUE, BRONX, FROM STREET EAST 167 STREET TO STREET MC CLELLAN STREET |
M012021127B27 | 2021-05-07 | 2021-05-11 | REPAIR SEWER | WEST 28 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
M012021126B12 | 2021-05-06 | 2021-05-20 | REPAIR WATER - PROTECTED | BROOME STREET, MANHATTAN, FROM STREET NORFOLK STREET TO STREET SUFFOLK STREET |
B012021126B25 | 2021-05-06 | 2021-06-04 | REPAIR WATER - SEWER - PROTECTED | WEST STREET, BROOKLYN, FROM STREET INDIA STREET TO STREET JAVA STREET |
B012021122A05 | 2021-05-02 | 2021-05-15 | REPAIR WATER - SEWER - PROTECTED | MOTHER GASTON BOULEVARD, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE |
M012021120A60 | 2021-04-30 | 2021-05-29 | REPAIR SEWER - PROTECTED | CLAREMONT AVENUE, MANHATTAN, FROM STREET WEST 120 STREET TO STREET WEST 122 STREET |
M012021118B73 | 2021-04-28 | 2021-05-27 | REPAIR WATER - SEWER | EAST 84 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
X012021118A87 | 2021-04-28 | 2021-05-27 | REPAIR WATER - SEWER | BARKER AVENUE, BRONX, FROM STREET MACE AVENUE TO STREET WARING AVENUE |
X012021118A88 | 2021-04-28 | 2021-05-27 | REPAIR WATER - SEWER | BARKER AVENUE, BRONX, FROM STREET MACE AVENUE TO STREET WARING AVENUE |
M012021117A06 | 2021-04-27 | 2021-05-11 | REPAIR SEWER - PROTECTED | 11 AVENUE, MANHATTAN, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET |
M012021111B88 | 2021-04-21 | 2021-05-18 | REPAIR WATER - SEWER | WEST 43 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
X012021110B30 | 2021-04-20 | 2021-05-18 | REPAIR WATER - PROTECTED | TRYON AVENUE, BRONX, FROM STREET EAST 211 STREET TO STREET EAST GUN HILL ROAD |
X012021110A62 | 2021-04-20 | 2021-05-11 | REPAIR WATER - SEWER - PROTECTED | BRONX PARK EAST, BRONX, FROM STREET MACE AVENUE TO STREET WARING AVENUE |
B012021109C88 | 2021-04-19 | 2021-05-11 | REPAIR WATER - PROTECTED | CARROLL STREET, BROOKLYN, FROM STREET FISKE PLACE TO STREET POLHEMUS PLACE |
M012021107A02 | 2021-04-17 | 2021-05-15 | REPAIR SEWER | WEST 27 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
X012021104A73 | 2021-04-14 | 2021-04-26 | REPAIR SEWER | ROSEDALE AVENUE, BRONX, FROM STREET GLEASON AVENUE TO STREET WATSON AVENUE |
M012021104A34 | 2021-04-14 | 2021-05-14 | REPAIR SEWER | WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012021099A08 | 2021-04-09 | 2021-04-30 | REPAIR WATER | 29 STREET, BROOKLYN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
B012021098B53 | 2021-04-08 | 2021-05-08 | REPAIR WATER - SEWER - PROTECTED | MOTHER GASTON BOULEVARD, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE |
M012021098A34 | 2021-04-08 | 2021-04-20 | REPAIR WATER - SEWER - PROTECTED | EAST 70 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
B012021096C12 | 2021-04-06 | 2021-05-01 | REPAIR WATER - SEWER - PROTECTED | MOTHER GASTON BOULEVARD, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE |
M012021096B18 | 2021-04-06 | 2021-05-06 | REPAIR WATER - PROTECTED | BROOME STREET, MANHATTAN, FROM STREET NORFOLK STREET TO STREET SUFFOLK STREET |
X012021095A28 | 2021-04-05 | 2021-04-17 | REPAIR WATER - SEWER | PARKSIDE PLACE, BRONX, FROM STREET EAST 209 STREET TO STREET WEBSTER AVENUE |
M012021095A26 | 2021-04-05 | 2021-04-22 | REPAIR WATER | BROADWAY, MANHATTAN, FROM STREET WEST 84 STREET TO STREET WEST 85 STREET |
M012021092A84 | 2021-04-02 | 2021-04-06 | REPAIR WATER - SEWER - PROTECTED | EAST 70 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
X012021090A26 | 2021-03-31 | 2021-04-08 | REPAIR WATER - SEWER - PROTECTED | EAST 163 STREET, BRONX, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE |
M012021090B88 | 2021-03-31 | 2021-04-14 | REPAIR SEWER | WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
M012021089C60 | 2021-03-30 | 2021-04-16 | REPAIR WATER - PROTECTED | WASHINGTON STREET, MANHATTAN, FROM STREET DESBROSSES STREET TO STREET WATTS STREET |
X012021087A00 | 2021-03-28 | 2021-04-02 | REPAIR WATER - SEWER | GRAND CONCOURSE, BRONX, FROM STREET EAST 201 STREET TO STREET EAST 202 STREET |
M012021087A02 | 2021-03-28 | 2021-04-15 | REPAIR SEWER - PROTECTED | CLAREMONT AVENUE, MANHATTAN, FROM STREET WEST 120 STREET TO STREET WEST 122 STREET |
X012021084B04 | 2021-03-25 | 2021-04-22 | REPAIR WATER - SEWER | HULL AVENUE, BRONX, FROM STREET EAST 204 STREET TO STREET EAST MOSHOLU PARKWAY NORTH |
M012021084A33 | 2021-03-25 | 2021-03-31 | REPAIR SEWER | WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
X012021084A00 | 2021-03-25 | 2021-04-10 | REPAIR WATER - SEWER | EAST 165 STREET, BRONX, FROM STREET PROSPECT AVENUE TO STREET UNION AVENUE |
X012021084B03 | 2021-03-25 | 2021-04-09 | REPAIR SEWER | ROSEDALE AVENUE, BRONX, FROM STREET GLEASON AVENUE TO STREET WATSON AVENUE |
M012021083B37 | 2021-03-24 | 2021-04-15 | REPAIR WATER - PROTECTED | WASHINGTON STREET, MANHATTAN, FROM STREET DESBROSSES STREET TO STREET WATTS STREET |
M012021083C20 | 2021-03-24 | 2021-04-16 | REPAIR WATER - PROTECTED | WASHINGTON STREET, MANHATTAN, FROM STREET DESBROSSES STREET TO STREET WATTS STREET |
X012021082B51 | 2021-03-23 | 2021-04-17 | REPAIR WATER - SEWER | BOSTON ROAD, BRONX, FROM STREET NYCTA SUBWAY TO STREET THWAITES PLACE |
X012021081A36 | 2021-03-22 | 2021-04-04 | REPAIR WATER - SEWER | PARKSIDE PLACE, BRONX, FROM STREET EAST 209 STREET TO STREET WEBSTER AVENUE |
B012021076B86 | 2021-03-17 | 2021-04-08 | REPAIR WATER - SEWER - PROTECTED | MOTHER GASTON BOULEVARD, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE |
M012021076B19 | 2021-03-17 | 2021-04-08 | REPAIR WATER | BROADWAY, MANHATTAN, FROM STREET WEST 84 STREET TO STREET WEST 85 STREET |
X012021074A57 | 2021-03-15 | 2021-04-13 | REPAIR WATER - SEWER - PROTECTED | BRONX PARK EAST, BRONX, FROM STREET THWAITES PLACE TO STREET WARING AVENUE |
M012021074C64 | 2021-03-15 | 2021-03-31 | REPAIR SEWER | WEST 56 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
X012021069A69 | 2021-03-10 | 2021-03-25 | REPAIR WATER - SEWER - PROTECTED | EAST 163 STREET, BRONX, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE |
M012021069B09 | 2021-03-10 | 2021-03-21 | REPAIR WATER | SUFFOLK STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET GRAND STREET |
X012021069A87 | 2021-03-10 | 2021-03-23 | REPAIR WATER - SEWER | BOSTON ROAD, BRONX, FROM STREET NYCTA SUBWAY TO STREET THWAITES PLACE |
M012021066A06 | 2021-03-07 | 2021-04-06 | REPAIR SEWER | DESBROSSES STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
M012021062A95 | 2021-03-03 | 2021-03-16 | REPAIR WATER - SEWER - PROTECTED | EAST 70 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
B012021059A08 | 2021-02-28 | 2021-03-15 | REPAIR WATER - SEWER - PROTECTED | MOTHER GASTON BOULEVARD, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE |
X012021059A02 | 2021-02-28 | 2021-03-21 | REPAIR WATER - SEWER | PARKSIDE PLACE, BRONX, FROM STREET EAST 209 STREET TO STREET WEBSTER AVENUE |
M012021057A71 | 2021-02-26 | 2021-03-13 | REPAIR SEWER | WEST 56 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
X012021056A96 | 2021-02-25 | 2021-03-26 | REPAIR SEWER | ROSEDALE AVENUE, BRONX, FROM STREET GLEASON AVENUE TO STREET WATSON AVENUE |
X012021056A97 | 2021-02-25 | 2021-03-12 | REPAIR WATER | ARTHUR AVENUE, BRONX, FROM STREET EAST 178 STREET TO STREET EAST 179 STREET |
M012021055A87 | 2021-02-24 | 2021-03-09 | REPAIR WATER | SUFFOLK STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET GRAND STREET |
Q012021054C53 | 2021-02-23 | 2021-03-17 | REPAIR WATER | 32 STREET, QUEENS, FROM STREET DEAD END TO STREET DITMARS BOULEVARD |
M012021054B19 | 2021-02-23 | 2021-03-25 | REPAIR SEWER | WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
M012021049A53 | 2021-02-18 | 2021-03-04 | REPAIR WATER | GRAND STREET, MANHATTAN, FROM STREET NORFOLK STREET TO STREET SUFFOLK STREET |
X012021048A08 | 2021-02-17 | 2021-03-18 | REPAIR WATER - SEWER | EAST 198 STREET, BRONX, FROM STREET CRESTON AVENUE TO STREET JEROME AVENUE |
M012021048A85 | 2021-02-17 | 2021-03-02 | REPAIR SEWER | WEST 85 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
X012021045A02 | 2021-02-14 | 2021-02-24 | REPAIR SEWER | ROSEDALE AVENUE, BRONX, FROM STREET GLEASON AVENUE TO STREET WATSON AVENUE |
M012021045A03 | 2021-02-14 | 2021-02-27 | REPAIR SEWER | WEST 56 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012021041B33 | 2021-02-10 | 2021-03-01 | REPAIR WATER - SEWER - PROTECTED | MOTHER GASTON BOULEVARD, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE |
B012021040A24 | 2021-02-09 | 2021-03-01 | REPAIR SEWER | WEST 20 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
M012021040A94 | 2021-02-09 | 2021-02-23 | REPAIR SEWER | WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
X012021039B11 | 2021-02-08 | 2021-02-28 | REPAIR WATER - PROTECTED | EAST 205 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET LISBON PLACE |
M012021038A03 | 2021-02-07 | 2021-03-02 | REPAIR WATER - SEWER - PROTECTED | EAST 70 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
M012021035A20 | 2021-02-04 | 2021-02-23 | REPAIR WATER | SUFFOLK STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET GRAND STREET |
M012021033A46 | 2021-02-02 | 2021-02-14 | REPAIR SEWER | WEST 56 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012021027C56 | 2021-01-27 | 2021-02-09 | REPAIR WATER - SEWER | HINSDALE STREET, BROOKLYN, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE |
X012021027A60 | 2021-01-27 | 2021-02-10 | REPAIR SEWER - PROTECTED | EAST 205 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET LISBON PLACE |
B012021027C57 | 2021-01-27 | 2021-02-09 | REPAIR WATER - SEWER | HINSDALE STREET, BROOKLYN, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE |
M012021025B36 | 2021-01-25 | 2021-02-18 | REPAIR WATER | GRAND STREET, MANHATTAN, FROM STREET NORFOLK STREET TO STREET SUFFOLK STREET |
X012021024A01 | 2021-01-24 | 2021-02-23 | REPAIR WATER - SEWER - PROTECTED | WALTON AVENUE, BRONX, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE |
X012021018A02 | 2021-01-21 | 2021-01-25 | REPAIR WATER | INWOOD AVENUE, BRONX, FROM STREET CLARKE PLACE WEST TO STREET WEST 169 STREET |
M012021019A46 | 2021-01-19 | 2021-02-16 | REPAIR SEWER | WEST 85 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M012021019A47 | 2021-01-19 | 2021-02-16 | REPAIR SEWER | WEST 85 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
X012021017A00 | 2021-01-17 | 2021-02-10 | REPAIR SEWER - PROTECTED | SEYMOUR AVENUE, BRONX, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE |
M012021015B93 | 2021-01-15 | 2021-02-09 | REPAIR SEWER | WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
M012021013C98 | 2021-01-13 | 2021-02-09 | REPAIR SEWER - PROTECTED | EAST 112 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
X012021007A29 | 2021-01-07 | 2021-02-04 | REPAIR WATER - SEWER | CARPENTER AVENUE, BRONX, FROM STREET EAST 220 STREET TO STREET EAST 221 STREET |
X012021007A30 | 2021-01-07 | 2021-02-04 | REPAIR WATER - SEWER | CRUGER AVENUE, BRONX, FROM STREET ARNOW AVENUE TO STREET WILLIAMSBRIDGE ROAD |
X012021004A12 | 2021-01-04 | 2021-01-14 | REPAIR SEWER | EAST 219 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD |
X012021004A10 | 2021-01-04 | 2021-01-15 | REPAIR SEWER - PROTECTED | TRYON AVENUE, BRONX, FROM STREET EAST 211 STREET TO STREET EAST GUN HILL ROAD |
M012020365B17 | 2020-12-30 | 2021-01-13 | REPAIR WATER - PROTECTED | VANDAM STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
B012020365C68 | 2020-12-30 | 2021-01-17 | REPAIR SEWER | ATLANTIC AVENUE, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET SHERLOCK PLACE |
M012020365B18 | 2020-12-30 | 2021-01-14 | REPAIR SEWER - PROTECTED | WEST 135 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE |
B012020364D53 | 2020-12-29 | 2021-01-19 | REPAIR SEWER | WEST 19 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
X012020364B59 | 2020-12-29 | 2021-01-27 | REPAIR SEWER - PROTECTED | EAST 205 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET LISBON PLACE |
X012020364B58 | 2020-12-29 | 2021-01-12 | REPAIR SEWER | COMMONWEALTH AVENUE, BRONX, FROM STREET GLEASON AVENUE TO STREET WATSON AVENUE |
B012020362A01 | 2020-12-27 | 2021-01-26 | REPAIR WATER - SEWER | HINSDALE STREET, BROOKLYN, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE |
B012020362A02 | 2020-12-27 | 2021-01-26 | REPAIR WATER - SEWER | HINSDALE STREET, BROOKLYN, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE |
X012020357B28 | 2020-12-22 | 2021-01-19 | REPAIR SEWER | BRUCKNER BOULEVARD, BRONX, FROM STREET BRE WESTBOUND ENTRANCE BUHRE AVE TO STREET ROBERTS AVENUE |
B012020357B23 | 2020-12-22 | 2021-01-05 | REPAIR WATER - SEWER - PROTECTED | CHRISTOPHER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE |
X012020357B29 | 2020-12-22 | 2021-01-01 | REPAIR SEWER - PROTECTED | TRYON AVENUE, BRONX, FROM STREET EAST 211 STREET TO STREET EAST GUN HILL ROAD |
X012020355A03 | 2020-12-20 | 2020-12-31 | REPAIR WATER - PROTECTED | EAST 205 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET LISBON PLACE |
B012020353B74 | 2020-12-18 | 2021-01-01 | REPAIR SEWER | ATLANTIC AVENUE, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET SHERLOCK PLACE |
B012020350A43 | 2020-12-15 | 2020-12-18 | REPAIR SEWER | ATLANTIC AVENUE, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET SHERLOCK PLACE |
X012020348A00 | 2020-12-13 | 2020-12-29 | REPAIR SEWER | COMMONWEALTH AVENUE, BRONX, FROM STREET GLEASON AVENUE TO STREET WATSON AVENUE |
X012020343B17 | 2020-12-08 | 2020-12-31 | REPAIR SEWER | EAST 219 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD |
M012020343A92 | 2020-12-08 | 2020-12-30 | REPAIR WATER - PROTECTED | VANDAM STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
X012020342A07 | 2020-12-07 | 2020-12-19 | REPAIR WATER - PROTECTED | EAST 205 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET LISBON PLACE |
M012020340A04 | 2020-12-05 | 2020-12-31 | REPAIR SEWER - PROTECTED | WEST 135 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE |
X012020338A25 | 2020-12-03 | 2020-12-18 | REPAIR WATER - PROTECTED | ARNOW AVENUE, BRONX, FROM STREET DEWITT PLACE TO STREET SEYMOUR AVENUE |
B012020338C21 | 2020-12-03 | 2020-12-22 | REPAIR WATER - SEWER - PROTECTED | CHRISTOPHER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE |
B012020335A61 | 2020-11-30 | 2020-12-12 | REPAIR SEWER | ATLANTIC AVENUE, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET SHERLOCK PLACE |
X012020331A00 | 2020-11-26 | 2020-12-05 | REPAIR WATER - PROTECTED | EAST 205 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET LISBON PLACE |
M012020331A03 | 2020-11-26 | 2020-12-10 | REPAIR WATER - PROTECTED | WEST 135 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE |
M012020329A76 | 2020-11-24 | 2020-12-19 | REPAIR SEWER - PROTECTED | WASHINGTON STREET, MANHATTAN, FROM STREET JANE STREET TO STREET WEST 12 STREET |
X012020329A75 | 2020-11-24 | 2020-12-07 | REPAIR WATER - SEWER | EAST 213 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET CARLISLE PLACE |
B012020327A21 | 2020-11-22 | 2020-12-06 | REPAIR WATER - SEWER - PROTECTED | CHRISTOPHER AVENUE, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET LIBERTY AVENUE |
B012020322B94 | 2020-11-17 | 2020-11-22 | REPAIR WATER - SEWER - PROTECTED | CHRISTOPHER AVENUE, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET LIBERTY AVENUE |
M012020321B64 | 2020-11-16 | 2020-12-06 | REPAIR SEWER | WEST 85 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
X012020320A01 | 2020-11-15 | 2020-11-24 | REPAIR WATER - SEWER | EAST 213 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET CARLISLE PLACE |
X012020320A00 | 2020-11-15 | 2020-12-08 | REPAIR SEWER | EAST 219 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD |
X012020320A02 | 2020-11-15 | 2020-11-18 | REPAIR WATER - SEWER - PROTECTED | ARNOW AVENUE, BRONX, FROM STREET DEWITT PLACE TO STREET SEYMOUR AVENUE |
B012020310B96 | 2020-11-05 | 2020-11-15 | REPAIR SEWER | COFFEY STREET, BROOKLYN, FROM STREET CONOVER STREET TO STREET FERRIS STREET |
B012020310A53 | 2020-11-05 | 2020-12-01 | REPAIR SEWER | FULTON STREET, BROOKLYN, FROM STREET ADAMS STREET TO STREET PEARL STREET |
M012020309B28 | 2020-11-04 | 2020-11-23 | REPAIR WATER - PROTECTED | ELIZABETH STREET, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET |
M012020309B32 | 2020-11-04 | 2020-11-20 | REPAIR WATER - PROTECTED | ELIZABETH STREET, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET |
B012020307B48 | 2020-11-02 | 2020-11-23 | REPAIR SEWER - PROTECTED | CHESTER STREET, BROOKLYN, FROM STREET NEWPORT STREET TO STREET RIVERDALE AVENUE |
B012020307B65 | 2020-11-02 | 2020-11-15 | REPAIR SEWER | LINDEN BOULEVARD, BROOKLYN, FROM STREET HINSDALE STREET TO STREET SNEDIKER AVENUE |
M012020307B84 | 2020-11-02 | 2020-11-23 | REPAIR SEWER | WEST 56 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012020306A02 | 2020-11-01 | 2020-11-15 | REPAIR WATER - SEWER - PROTECTED | BRISTOL STREET, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE |
M012020306A17 | 2020-11-01 | 2020-11-23 | REPAIR WATER - PROTECTED | MADISON AVENUE, MANHATTAN, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET |
M012020306A18 | 2020-11-01 | 2020-11-26 | REPAIR WATER - PROTECTED | WEST 135 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE |
M012020306A19 | 2020-11-01 | 2020-11-15 | REPAIR WATER - PROTECTED | WEST 105 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
X012020306A01 | 2020-11-01 | 2020-11-15 | REPAIR SEWER | PARKSIDE PLACE, BRONX, FROM STREET EAST 209 STREET TO STREET WEBSTER AVENUE |
B012020306A01 | 2020-11-01 | 2020-11-15 | REPAIR SEWER - PROTECTED | HOPKINSON AVENUE, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE |
B012020304C97 | 2020-10-30 | 2020-11-01 | REPAIR SEWER | COFFEY STREET, BROOKLYN, FROM STREET CONOVER STREET TO STREET FERRIS STREET |
B012020302D80 | 2020-10-28 | 2020-11-01 | REPAIR SEWER | FULTON STREET, BROOKLYN, FROM STREET ADAMS STREET TO STREET PEARL STREET |
X012020302A94 | 2020-10-28 | 2020-11-01 | REPAIR SEWER - PROTECTED | TIFFANY STREET, BRONX, FROM STREET BARRY STREET TO STREET BURNETT PLACE |
B012020302D82 | 2020-10-28 | 2020-11-01 | REPAIR SEWER - PROTECTED | CHESTER STREET, BROOKLYN, FROM STREET NEWPORT STREET TO STREET RIVERDALE AVENUE |
M012020297B54 | 2020-10-23 | 2020-11-01 | REPAIR WATER - PROTECTED | MADISON AVENUE, MANHATTAN, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET |
B012020294C99 | 2020-10-20 | 2020-11-01 | REPAIR SEWER | LINDEN BOULEVARD, BROOKLYN, FROM STREET HINSDALE STREET TO STREET SNEDIKER AVENUE |
B012020293A45 | 2020-10-19 | 2020-11-01 | REPAIR WATER - SEWER - PROTECTED | BRISTOL STREET, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE |
Q012020290C54 | 2020-10-16 | 2020-10-29 | REPAIR WATER - PROTECTED | 24 STREET, QUEENS, FROM STREET 40 AVENUE TO STREET 41 AVENUE |
M012020290B41 | 2020-10-16 | 2020-11-01 | REPAIR WATER - PROTECTED | WEST 105 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
B012020288A65 | 2020-10-14 | 2020-10-27 | REPAIR SEWER - PROTECTED | CHESTER STREET, BROOKLYN, FROM STREET NEWPORT STREET TO STREET RIVERDALE AVENUE |
X012020283A83 | 2020-10-09 | 2020-10-23 | REPAIR SEWER - PROTECTED | TIFFANY STREET, BRONX, FROM STREET BARRY STREET TO STREET BURNETT PLACE |
B012020283C07 | 2020-10-09 | 2020-11-01 | REPAIR SEWER - PROTECTED | HOPKINSON AVENUE, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE |
X012020281A91 | 2020-10-07 | 2020-11-01 | REPAIR SEWER | PARKSIDE PLACE, BRONX, FROM STREET EAST 209 STREET TO STREET WEBSTER AVENUE |
M012020276A23 | 2020-10-02 | 2020-10-29 | REPAIR SEWER - PROTECTED | ELIZABETH STREET, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET |
X012020276A44 | 2020-10-02 | 2020-10-27 | REPAIR SEWER | SEDGWICK AVENUE, BRONX, FROM STREET BEND TO STREET GILES PLACE |
M012020276A22 | 2020-10-02 | 2020-10-29 | REPAIR SEWER - PROTECTED | ELIZABETH STREET, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET |
Q012020272E23 | 2020-09-28 | 2020-10-15 | REPAIR WATER - PROTECTED | 24 STREET, QUEENS, FROM STREET 40 AVENUE TO STREET 41 AVENUE |
B012020271A02 | 2020-09-27 | 2020-10-27 | REPAIR SEWER - PROTECTED | BRISTOL STREET, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE |
M012020267C11 | 2020-09-23 | 2020-10-13 | REPAIR SEWER - PROTECTED | WEST 135 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE |
B012020266B32 | 2020-09-22 | 2020-10-06 | REPAIR SEWER | SNEDIKER AVENUE, BROOKLYN, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE |
B012020266B31 | 2020-09-22 | 2020-10-12 | REPAIR WATER | SNEDIKER AVENUE, BROOKLYN, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE |
X012020264A03 | 2020-09-20 | 2020-10-20 | REPAIR WATER - SEWER | GARRISON AVENUE, BRONX, FROM STREET EDGEWATER ROAD TO STREET WHITTIER STREET |
B012020262A70 | 2020-09-18 | 2020-10-09 | REPAIR SEWER - PROTECTED | HOPKINSON AVENUE, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE |
B012020262A76 | 2020-09-18 | 2020-09-28 | REPAIR WATER | SNEDIKER AVENUE, BROOKLYN, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE |
B012020262A73 | 2020-09-18 | 2020-10-15 | REPAIR WATER - SEWER | PLYMOUTH STREET, BROOKLYN, FROM STREET JAY STREET TO STREET PEARL STREET |
M012020262A28 | 2020-09-18 | 2020-10-01 | REPAIR SEWER - PROTECTED | ELIZABETH STREET, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET |
M012020262A27 | 2020-09-18 | 2020-10-01 | REPAIR SEWER - PROTECTED | ELIZABETH STREET, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET |
X012020258B80 | 2020-09-14 | 2020-10-09 | REPAIR SEWER - PROTECTED | TIFFANY STREET, BRONX, FROM STREET BARRY STREET TO STREET BURNETT PLACE |
M012020255C06 | 2020-09-11 | 2020-10-07 | REPAIR WATER - PROTECTED | WEST 11 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012020254B62 | 2020-09-10 | 2020-09-24 | REPAIR SEWER | HINSDALE STREET, BROOKLYN, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE |
M012020251A10 | 2020-09-07 | 2020-10-06 | REPAIR SEWER | EAST 11 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET UNIVERSITY PLACE |
M012020251A08 | 2020-09-07 | 2020-09-17 | REPAIR SEWER - PROTECTED | ELIZABETH STREET, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET |
B012020247C58 | 2020-09-03 | 2020-09-16 | REPAIR WATER - SEWER | JAY STREET, BROOKLYN, FROM STREET JOHN STREET TO STREET PLYMOUTH STREET |
X012020247A42 | 2020-09-03 | 2020-10-01 | REPAIR WATER - SEWER | ELSMERE PLACE, BRONX, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE |
B012020246D15 | 2020-09-02 | 2020-09-16 | REPAIR WATER - SEWER | SNEDIKER AVENUE, BROOKLYN, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE |
B012020239B78 | 2020-08-26 | 2020-09-10 | REPAIR SEWER | HINSDALE STREET, BROOKLYN, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE |
X012020239A48 | 2020-08-26 | 2020-09-10 | REPAIR WATER - SEWER | BLACKROCK AVENUE, BRONX, FROM STREET CASTLE HILL AVENUE TO STREET CROSS BRONX EXPRESSWAY |
B012020236A01 | 2020-08-23 | 2020-09-22 | REPAIR SEWER | SNEDIKER AVENUE, BROOKLYN, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE |
M012020236A01 | 2020-08-23 | 2020-09-06 | REPAIR SEWER | EAST 11 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET UNIVERSITY PLACE |
B012020236A02 | 2020-08-23 | 2020-09-17 | REPAIR SEWER - PROTECTED | HOPKINSON AVENUE, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE |
S012020236A00 | 2020-08-23 | 2020-09-14 | REPAIR WATER | BAY STREET, STATEN ISLAND, FROM STREET GRANT STREET TO STREET ST JULIAN PLACE |
X012020229A10 | 2020-08-16 | 2020-09-10 | REPAIR SEWER | CARLISLE PLACE, BRONX, FROM STREET EAST 211 STREET TO STREET EAST 213 STREET |
M012020226A85 | 2020-08-13 | 2020-09-10 | REPAIR WATER - PROTECTED | WEST 126 STREET, MANHATTAN, FROM STREET BEND TO STREET WEST 127 STREET |
X012020223B41 | 2020-08-10 | 2020-08-28 | REPAIR WATER | EAST 144 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET WALTON AVENUE |
M012020223A22 | 2020-08-10 | 2020-08-24 | REPAIR SEWER - PROTECTED | MADISON AVENUE, MANHATTAN, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET |
B012020223A72 | 2020-08-10 | 2020-08-24 | REPAIR SEWER | HINSDALE STREET, BROOKLYN, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE |
B012020222A00 | 2020-08-09 | 2020-09-02 | REPAIR WATER - SEWER | SNEDIKER AVENUE, BROOKLYN, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE |
X012020219A48 | 2020-08-06 | 2020-09-08 | REPAIR WATER - SEWER | CARPENTER AVENUE, BRONX, FROM STREET EAST 220 STREET TO STREET EAST 221 STREET |
X012020218A17 | 2020-08-05 | 2020-08-10 | REPAIR SEWER - PROTECTED | WALTON AVENUE, BRONX, FROM STREET EAST 144 STREET TO STREET EAST 146 STREET |
X012020215A00 | 2020-08-02 | 2020-08-27 | REPAIR WATER - SEWER | BLACKROCK AVENUE, BRONX, FROM STREET CASTLE HILL AVENUE TO STREET CROSS BRONX EXPRESSWAY |
B012020208A05 | 2020-07-26 | 2020-08-10 | REPAIR SEWER | HINSDALE STREET, BROOKLYN, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE |
S012020208A01 | 2020-07-26 | 2020-08-20 | REPAIR WATER | BAY STREET, STATEN ISLAND, FROM STREET GRANT STREET TO STREET ST JULIAN PLACE |
X012020203A50 | 2020-07-21 | 2020-08-04 | REPAIR SEWER | GRAND CONCOURSE, BRONX, FROM STREET EAST 144 STREET TO STREET EAST 149 STREET |
X012020203A42 | 2020-07-21 | 2020-08-04 | REPAIR SEWER - PROTECTED | WALTON AVENUE, BRONX, FROM STREET EAST 144 STREET TO STREET EAST 146 STREET |
M012020198B15 | 2020-07-16 | 2020-08-10 | REPAIR SEWER - PROTECTED | MADISON AVENUE, MANHATTAN, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET |
S012020183A06 | 2020-07-15 | 2020-07-14 | REPAIR WATER | PORT RICHMOND AVENUE, STATEN ISLAND, FROM STREET HOOKER PLACE TO STREET WALKER STREET |
Q012020197C01 | 2020-07-15 | 2020-08-13 | REPAIR WATER | VAN WYCK EXPRESSWAY, QUEENS, FROM STREET 138 STREET TO STREET BEND |
X012020195A13 | 2020-07-13 | 2020-07-24 | REPAIR WATER - SEWER - PROTECTED | BRONX PARK EAST, BRONX, FROM STREET THWAITES PLACE TO STREET WARING AVENUE |
Q012020187A00 | 2020-07-05 | 2020-07-28 | REPAIR WATER - SEWER | CENTRAL AVENUE, QUEENS, FROM STREET BAYPORT PLACE TO STREET FOAM PLACE |
X012020181B02 | 2020-06-29 | 2020-07-11 | REPAIR SEWER | EAST 165 STREET, BRONX, FROM STREET BRYANT AVENUE TO STREET FAILE STREET |
B012020181D03 | 2020-06-29 | 2020-07-28 | REPAIR WATER | VANDALIA AVENUE, BROOKLYN, FROM STREET ERSKINE STREET TO STREET FOUNTAIN AVENUE |
X012020173A00 | 2020-06-21 | 2020-07-21 | REPAIR SEWER - PROTECTED | WALTON AVENUE, BRONX, FROM STREET EAST 144 STREET TO STREET EAST 146 STREET |
X012020173A01 | 2020-06-21 | 2020-07-21 | REPAIR SEWER | GRAND CONCOURSE, BRONX, FROM STREET EAST 144 STREET TO STREET EAST 149 STREET |
X012020170A38 | 2020-06-18 | 2020-06-30 | REPAIR WATER - SEWER - PROTECTED | BRONX PARK EAST, BRONX, FROM STREET THWAITES PLACE TO STREET WARING AVENUE |
B012020168B58 | 2020-06-16 | 2020-07-14 | REPAIR SEWER - PROTECTED | SURF AVENUE, BROOKLYN, FROM STREET JONES WALK TO STREET WEST 12 STREET |
X012020166A01 | 2020-06-14 | 2020-07-10 | REPAIR WATER | ARTHUR AVENUE, BRONX, FROM STREET EAST 178 STREET TO STREET EAST 179 STREET |
X012020162A24 | 2020-06-10 | 2020-06-21 | REPAIR SEWER - PROTECTED | CROTONA AVENUE, BRONX, FROM STREET EAST 176 STREET TO STREET FAIRMOUNT PLACE |
X012020162A29 | 2020-06-10 | 2020-06-24 | REPAIR WATER - SEWER - PROTECTED | ROSEDALE AVENUE, BRONX, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE |
M012020160A76 | 2020-06-08 | 2020-06-20 | REPAIR WATER - PROTECTED | BROADWAY, MANHATTAN, FROM STREET EAST 10 STREET TO STREET EAST 11 STREET |
X012020155A12 | 2020-06-03 | 2020-06-27 | REPAIR SEWER | EAST 165 STREET, BRONX, FROM STREET BRYANT AVENUE TO STREET FAILE STREET |
X012020148A32 | 2020-05-27 | 2020-06-24 | REPAIR WATER - SEWER | GARRISON AVENUE, BRONX, FROM STREET EDGEWATER ROAD TO STREET WHITTIER STREET |
X012020142A61 | 2020-05-21 | 2020-06-16 | REPAIR WATER - SEWER - PROTECTED | BRONX PARK EAST, BRONX, FROM STREET THWAITES PLACE TO STREET WARING AVENUE |
M012020135A21 | 2020-05-14 | 2020-06-06 | REPAIR WATER - PROTECTED | BROADWAY, MANHATTAN, FROM STREET EAST 10 STREET TO STREET EAST 11 STREET |
X012020124A00 | 2020-05-03 | 2020-06-02 | REPAIR SEWER | EASTCHESTER ROAD, BRONX, FROM STREET CHESTER STREET TO STREET HICKS STREET |
X012020121B04 | 2020-04-30 | 2020-06-02 | REPAIR SEWER | EAST 165 STREET, BRONX, FROM STREET BRYANT AVENUE TO STREET FAILE STREET |
X012020112A40 | 2020-04-21 | 2020-05-05 | REPAIR SEWER | WESTCHESTER AVENUE, BRONX, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE |
X012020110A00 | 2020-04-19 | 2020-04-21 | REPAIR SEWER | WESTCHESTER AVENUE, BRONX, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE |
M012020106A83 | 2020-04-15 | 2020-04-29 | REPAIR SEWER - PROTECTED | EAST 46 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
X012020100A59 | 2020-04-09 | 2020-04-19 | REPAIR WATER - SEWER | EAST 165 STREET, BRONX, FROM STREET BRYANT AVENUE TO STREET FAILE STREET |
B012020100B24 | 2020-04-09 | 2020-04-19 | REPAIR SEWER | PEARL STREET, BROOKLYN, FROM STREET BEND TO STREET FULTON STREET |
X012020084B05 | 2020-03-24 | 2020-04-05 | REPAIR WATER - SEWER | EAST 165 STREET, BRONX, FROM STREET BRYANT AVENUE TO STREET FAILE STREET |
X012020083A37 | 2020-03-23 | 2020-04-05 | REPAIR SEWER | WESTCHESTER AVENUE, BRONX, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE |
M012020080D30 | 2020-03-20 | 2020-04-15 | REPAIR SEWER - PROTECTED | EAST 46 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012020069B08 | 2020-03-09 | 2020-03-22 | REPAIR SEWER - PROTECTED | EAST 46 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
B012020069C09 | 2020-03-09 | 2020-04-05 | REPAIR SEWER | PEARL STREET, BROOKLYN, FROM STREET BEND TO STREET FULTON STREET |
X012020063B33 | 2020-03-03 | 2020-03-31 | REPAIR WATER - SEWER - PROTECTED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
M012020058A93 | 2020-02-27 | 2020-03-27 | REPAIR WATER - SEWER | WEST 29 STREET, MANHATTAN, FROM STREET HIGH LINE TO STREET 11 AVENUE |
X012020058A48 | 2020-02-27 | 2020-03-22 | REPAIR SEWER | WESTCHESTER AVENUE, BRONX, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE |
X012020054A00 | 2020-02-23 | 2020-03-19 | REPAIR WATER - SEWER | EAST 165 STREET, BRONX, FROM STREET BRYANT AVENUE TO STREET FAILE STREET |
X012020049A15 | 2020-02-18 | 2020-03-11 | REPAIR WATER - SEWER | WEST 251 STREET, BRONX, FROM STREET BROADWAY TO STREET OLD ALBANY POST ROAD |
X012020049B00 | 2020-02-18 | 2020-03-12 | REPAIR SEWER - PROTECTED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
M012020043A31 | 2020-02-12 | 2020-02-14 | REPAIR WATER - PROTECTED | WEST 126 STREET, MANHATTAN, FROM STREET BEND TO STREET WEST 127 STREET |
M012020043A30 | 2020-02-12 | 2020-03-09 | REPAIR SEWER | EAST 11 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET UNIVERSITY PLACE |
M012020043A29 | 2020-02-12 | 2020-02-27 | REPAIR WATER | WASHINGTON STREET, MANHATTAN, FROM STREET BATTERY PLACE TO STREET PEDESTRIAN OVERPASS |
X012020041B54 | 2020-02-10 | 2020-03-06 | REPAIR WATER - SEWER | BROADWAY, BRONX, FROM STREET WEST 251 STREET TO STREET WEST 252 STREET |
M012020035B49 | 2020-02-04 | 2020-02-27 | REPAIR WATER - SEWER - PROTECTED | WEST 11 STREET, MANHATTAN, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET |
X012020035B13 | 2020-02-04 | 2020-02-27 | REPAIR SEWER - PROTECTED | EAST 222 STREET, BRONX, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD |
X012020035B12 | 2020-02-04 | 2020-02-29 | REPAIR WATER - PROTECTED | REV JAMES POLITE AVENUE, BRONX, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET |
X012020034A60 | 2020-02-03 | 2020-02-29 | REPAIR WATER - PROTECTED | REV JAMES POLITE AVENUE, BRONX, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET |
M012020032A04 | 2020-02-01 | 2020-02-13 | REPAIR WATER | WASHINGTON STREET, MANHATTAN, FROM STREET BATTERY PLACE TO STREET PEDESTRIAN OVERPASS |
M012020028A45 | 2020-01-28 | 2020-02-11 | REPAIR WATER - PROTECTED | EAST 46 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
B012020028E27 | 2020-01-28 | 2020-02-27 | REPAIR WATER - SEWER - PROTECTED | HEGEMAN AVENUE, BROOKLYN, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD |
M012020028A44 | 2020-01-28 | 2020-02-11 | REPAIR SEWER | EAST 11 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET UNIVERSITY PLACE |
X012020027A13 | 2020-01-27 | 2020-02-25 | REPAIR SEWER - PROTECTED | REV JAMES POLITE AVENUE, BRONX, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET |
B012020021C16 | 2020-01-21 | 2020-02-18 | REPAIR WATER - SEWER | SCHOLES STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET LORIMER STREET |
M012020019A02 | 2020-01-19 | 2020-02-02 | REPAIR WATER | WASHINGTON STREET, MANHATTAN, FROM STREET BATTERY PLACE TO STREET PEDESTRIAN OVERPASS |
X012020016A37 | 2020-01-16 | 2020-01-22 | REPAIR WATER - SEWER | BARNES AVENUE, BRONX, FROM STREET EAST 213 STREET TO STREET EAST 214 STREET |
M012020015A63 | 2020-01-15 | 2020-01-28 | REPAIR SEWER | EAST 11 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET UNIVERSITY PLACE |
M012020014A99 | 2020-01-14 | 2020-01-28 | REPAIR WATER - PROTECTED | EAST 46 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
X012020014A86 | 2020-01-14 | 2020-02-11 | REPAIR SEWER - PROTECTED | AUSTIN PLACE, BRONX, FROM STREET EAST 144 STREET TO STREET EAST 147 STREET |
X012020013A01 | 2020-01-13 | 2020-02-07 | REPAIR WATER - SEWER - PROTECTED | CRESTON AVENUE, BRONX, FROM STREET BUSH STREET TO STREET EAST 179 STREET |
Q012020013D71 | 2020-01-13 | 2020-02-07 | REPAIR SEWER | 31 STREET, QUEENS, FROM STREET 21 AVENUE TO STREET DITMARS BOULEVARD |
B012020013B67 | 2020-01-13 | 2020-02-14 | REPAIR WATER | PEARL STREET, BROOKLYN, FROM STREET BEND TO STREET FULTON STREET |
X012020010A78 | 2020-01-10 | 2020-02-07 | REPAIR WATER - SEWER - PROTECTED | EAST 179 STREET, BRONX, FROM STREET CRESTON AVENUE TO STREET MORRIS AVENUE |
M012020010C92 | 2020-01-10 | 2020-01-19 | REPAIR WATER | WASHINGTON STREET, MANHATTAN, FROM STREET BATTERY PLACE TO STREET PEDESTRIAN OVERPASS |
M012020009B06 | 2020-01-09 | 2020-02-04 | REPAIR WATER - PROTECTED | HUDSON STREET, MANHATTAN, FROM STREET SPRING STREET TO STREET VANDAM STREET |
M012020009B07 | 2020-01-09 | 2020-01-29 | REPAIR WATER | SPRING STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
X012020009B28 | 2020-01-09 | 2020-02-07 | REPAIR WATER - SEWER | MC GRAW AVENUE, BRONX, FROM STREET BEND TO STREET PUGSLEY AVENUE |
M012020008B03 | 2020-01-08 | 2020-01-22 | REPAIR SEWER - PROTECTED | VANDAM STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M012020003B87 | 2020-01-03 | 2020-01-31 | REPAIR WATER - PROTECTED | WEST 126 STREET, MANHATTAN, FROM STREET BEND TO STREET WEST 127 STREET |
M012020001A03 | 2020-01-01 | 2020-01-15 | REPAIR WATER | CLARKSON STREET, MANHATTAN, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET |
X012020001A01 | 2020-01-01 | 2020-01-15 | REPAIR WATER - PROTECTED | AUSTIN PLACE, BRONX, FROM STREET EAST 147 STREET TO STREET EAST 149 STREET |
X012019365A97 | 2019-12-31 | 2020-01-14 | REPAIR SEWER | ST ANNS AVENUE, BRONX, FROM STREET EAST 141 STREET TO STREET EAST 142 STREET |
M012019365B33 | 2019-12-31 | 2020-01-15 | REPAIR WATER - PROTECTED | EAST 46 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012019365B34 | 2019-12-31 | 2020-01-15 | REPAIR SEWER - PROTECTED | PARK AVENUE, MANHATTAN, FROM STREET EAST 111 STREET TO STREET EAST 112 STREET |
M012019365B12 | 2019-12-31 | 2020-01-08 | REPAIR SEWER - PROTECTED | VANDAM STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
X012019365A98 | 2019-12-31 | 2020-01-15 | REPAIR WATER - SEWER | BARNES AVENUE, BRONX, FROM STREET EAST 213 STREET TO STREET EAST 214 STREET |
M012019364A85 | 2019-12-30 | 2020-01-01 | REPAIR WATER | CLARKSON STREET, MANHATTAN, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET |
X012019363A00 | 2019-12-29 | 2020-01-01 | REPAIR WATER - PROTECTED | AUSTIN PLACE, BRONX, FROM STREET EAST 147 STREET TO STREET EAST 149 STREET |
M012019353A50 | 2019-12-19 | 2020-01-01 | REPAIR SEWER - PROTECTED | PARK AVENUE, MANHATTAN, FROM STREET EAST 111 STREET TO STREET EAST 112 STREET |
M012019350A59 | 2019-12-16 | 2020-01-01 | REPAIR WATER - PROTECTED | EAST 46 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
X012019349A01 | 2019-12-15 | 2020-01-01 | REPAIR WATER - SEWER | BARNES AVENUE, BRONX, FROM STREET EAST 213 STREET TO STREET EAST 214 STREET |
M012019346B64 | 2019-12-12 | 2019-12-26 | REPAIR SEWER - PROTECTED | VANDAM STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M012019346B65 | 2019-12-12 | 2019-12-28 | REPAIR WATER - PROTECTED | WEST 126 STREET, MANHATTAN, FROM STREET BEND TO STREET WEST 127 STREET |
X012019345A26 | 2019-12-11 | 2020-01-01 | REPAIR SEWER | WESTCHESTER AVENUE, BRONX, FROM STREET BERGEN AVENUE TO STREET EAST 150 STREET |
X012019344B13 | 2019-12-10 | 2020-01-01 | REPAIR WATER - SEWER | EAST 223 STREET, BRONX, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD |
X012019340A54 | 2019-12-06 | 2019-12-31 | REPAIR SEWER | ST ANNS AVENUE, BRONX, FROM STREET EAST 141 STREET TO STREET EAST 142 STREET |
B012019338B42 | 2019-12-04 | 2019-12-31 | REPAIR SEWER - PROTECTED | ERSKINE STREET, BROOKLYN, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE |
X012019337A82 | 2019-12-03 | 2019-12-18 | REPAIR WATER - SEWER | HORNADAY PLACE, BRONX, FROM STREET CROTONA PARKWAY TO STREET MOHEGAN AVENUE |
X012019337A81 | 2019-12-03 | 2019-12-17 | REPAIR SEWER | EAST 180 STREET, BRONX, FROM STREET BRYANT AVENUE TO STREET VYSE AVENUE |
X012019332A01 | 2019-11-28 | 2019-12-24 | REPAIR WATER - SEWER | EAST 223 STREET, BRONX, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD |
M012019332A02 | 2019-11-28 | 2019-12-10 | REPAIR WATER - PROTECTED | WEST 126 STREET, MANHATTAN, FROM STREET BEND TO STREET WEST 127 STREET |
B012019323C60 | 2019-11-19 | 2019-12-07 | REPAIR WATER | BERGEN STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
X012019322B21 | 2019-11-18 | 2019-12-04 | REPAIR WATER - SEWER | HORNADAY PLACE, BRONX, FROM STREET CROTONA PARKWAY TO STREET MOHEGAN AVENUE |
B012019322B43 | 2019-11-18 | 2019-12-04 | REPAIR SEWER - PROTECTED | ERSKINE STREET, BROOKLYN, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE |
M012019318B36 | 2019-11-14 | 2019-12-12 | REPAIR SEWER - PROTECTED | VANDAM STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
X012019315A05 | 2019-11-11 | 2019-12-03 | REPAIR SEWER | EAST 180 STREET, BRONX, FROM STREET BRYANT AVENUE TO STREET VYSE AVENUE |
M012019311A74 | 2019-11-07 | 2019-11-29 | REPAIR WATER | WASHINGTON STREET, MANHATTAN, FROM STREET SPRING STREET TO STREET WEST HOUSTON STREET |
M012019311A76 | 2019-11-07 | 2019-11-17 | REPAIR SEWER | WEST HOUSTON STREET, MANHATTAN, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET |
X012019305A45 | 2019-11-07 | 2019-11-30 | REPAIR WATER | MURDOCK AVENUE, BRONX, FROM STREET NEREID AVENUE TO STREET PITMAN AVENUE |
Q012019308A55 | 2019-11-04 | 2019-11-15 | REPAIR WATER | 33 STREET, QUEENS, FROM STREET AMTRAK RAILROAD TO STREET DITMARS BOULEVARD |
M012019308A19 | 2019-11-04 | 2019-11-17 | REPAIR WATER - SEWER - PROTECTED | VANDAM STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M012019308A18 | 2019-11-04 | 2019-11-17 | REPAIR WATER | SPRING STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
X012019305A61 | 2019-11-01 | 2019-11-22 | REPAIR WATER - SEWER - PROTECTED | CRESTON AVENUE, BRONX, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET |
X012019305A91 | 2019-11-01 | 2019-12-03 | REPAIR SEWER | BRUCKNER BOULEVARD, BRONX, FROM STREET BRUCKNER EXPRESSWAY EXIT 46 EB TO STREET BARRETTO STREET |
X012019305A60 | 2019-11-01 | 2019-11-26 | REPAIR WATER - SEWER - PROTECTED | CRUGER AVENUE, BRONX, FROM STREET BURKE AVENUE TO STREET SOUTH OAK DRIVE |
X012019305A63 | 2019-11-01 | 2019-11-04 | REPAIR SEWER | EAST 218 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE |
X012019305A62 | 2019-11-01 | 2019-12-01 | REPAIR WATER - PROTECTED | EAST 142 STREET, BRONX, FROM STREET BROOK AVENUE TO STREET ST ANNS AVENUE |
M012019305A80 | 2019-11-01 | 2019-11-14 | REPAIR WATER - PROTECTED | EAST 45 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
B012019305C43 | 2019-11-01 | 2019-11-15 | REPAIR SEWER - PROTECTED | ERSKINE STREET, BROOKLYN, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE |
M012019304B06 | 2019-10-31 | 2019-11-17 | REPAIR SEWER - PROTECTED | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M012019303B19 | 2019-10-30 | 2019-11-03 | REPAIR WATER - SEWER - PROTECTED | VANDAM STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M012019303B23 | 2019-10-30 | 2019-11-03 | REPAIR WATER | SPRING STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
X012019301A08 | 2019-10-30 | 2019-11-26 | REPAIR WATER - PROTECTED | EAST 172 STREET, BRONX, FROM STREET CROES AVENUE TO STREET FTELEY AVENUE |
M012019302C11 | 2019-10-29 | 2019-11-01 | REPAIR WATER - PROTECTED | EAST 46 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
X012019302C03 | 2019-10-29 | 2019-11-13 | REPAIR WATER - SEWER | BARNES AVENUE, BRONX, FROM STREET ADEE AVENUE TO STREET WILLIAMSBRIDGE ROAD |
M012019301B50 | 2019-10-28 | 2019-11-26 | REPAIR WATER - PROTECTED | WEST 126 STREET, MANHATTAN, FROM STREET BEND TO STREET WEST 127 STREET |
X012019301A39 | 2019-10-28 | 2019-11-01 | REPAIR WATER - SEWER | EASTCHESTER ROAD, BRONX, FROM STREET CHESTER STREET TO STREET HICKS STREET |
B012019297C13 | 2019-10-24 | 2019-11-01 | REPAIR WATER | 4 AVENUE, BROOKLYN, FROM STREET 14 STREET TO STREET 15 STREET |
B012019297C14 | 2019-10-24 | 2019-11-01 | REPAIR SEWER | 14 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
X012019296B61 | 2019-10-23 | 2019-11-01 | REPAIR SEWER | EAST 218 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE |
X012019295A57 | 2019-10-22 | 2019-11-01 | REPAIR WATER - SEWER | EAST 224 STREET, BRONX, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD |
M012019287A01 | 2019-10-14 | 2019-10-27 | REPAIR WATER - PROTECTED | WEST 126 STREET, MANHATTAN, FROM STREET BEND TO STREET WEST 127 STREET |
B012019284C18 | 2019-10-11 | 2019-10-24 | REPAIR SEWER | 14 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
X012019284A99 | 2019-10-11 | 2019-10-30 | REPAIR WATER - SEWER | BARNES AVENUE, BRONX, FROM STREET ADEE AVENUE TO STREET WILLIAMSBRIDGE ROAD |
B012019284C17 | 2019-10-11 | 2019-10-24 | REPAIR WATER | 4 AVENUE, BROOKLYN, FROM STREET 14 STREET TO STREET 15 STREET |
X012019284A98 | 2019-10-11 | 2019-10-22 | REPAIR WATER - SEWER | BARNES AVENUE, BRONX, FROM STREET EAST 218 STREET TO STREET EAST 219 STREET |
Q012019281E05 | 2019-10-08 | 2019-11-01 | REPAIR WATER | 33 STREET, QUEENS, FROM STREET AMTRAK RAILROAD TO STREET DITMARS BOULEVARD |
M012019280B10 | 2019-10-07 | 2019-10-20 | REPAIR WATER - SEWER - PROTECTED | WEST 95 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
B012019280A89 | 2019-10-07 | 2019-10-20 | REPAIR SEWER - PROTECTED | ERSKINE STREET, BROOKLYN, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE |
B012019280B69 | 2019-10-07 | 2019-10-22 | REPAIR SEWER - PROTECTED | ERSKINE STREET, BROOKLYN, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE |
X012019278A00 | 2019-10-05 | 2019-11-01 | REPAIR WATER - SEWER | EAST 204 STREET, BRONX, FROM STREET JEROME AVENUE TO STREET VILLA AVENUE |
X012019274A58 | 2019-10-01 | 2019-10-31 | REPAIR WATER - SEWER - PROTECTED | KINGSLAND AVENUE, BRONX, FROM STREET ASTOR AVENUE TO STREET WARING AVENUE |
M012019272A01 | 2019-09-29 | 2019-10-24 | REPAIR WATER - SEWER - PROTECTED | GREENWICH STREET, MANHATTAN, FROM STREET CHARLTON STREET TO STREET KING STREET |
X012019267A53 | 2019-09-24 | 2019-10-22 | REPAIR SEWER | EAST 218 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE |
Q012019264A00 | 2019-09-21 | 2019-10-17 | REPAIR WATER - SEWER - PROTECTED | GRAND AVENUE, QUEENS, FROM STREET 56 STREET TO STREET 57 STREET |
X012019263A85 | 2019-09-20 | 2019-10-05 | REPAIR WATER - SEWER | EAST 204 STREET, BRONX, FROM STREET JEROME AVENUE TO STREET VILLA AVENUE |
M012019262B06 | 2019-09-19 | 2019-10-06 | REPAIR WATER - SEWER | VARICK STREET, MANHATTAN, FROM STREET SPRING STREET TO STREET VANDAM STREET |
M012019262A84 | 2019-09-19 | 2019-10-06 | REPAIR WATER - PROTECTED | VANDAM STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
B012019261A24 | 2019-09-18 | 2019-10-10 | REPAIR WATER | 4 AVENUE, BROOKLYN, FROM STREET 14 STREET TO STREET 15 STREET |
B012019261A22 | 2019-09-18 | 2019-10-10 | REPAIR SEWER | 14 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
Q012019255E34 | 2019-09-12 | 2019-10-11 | REPAIR WATER - PROTECTED | GRAND AVENUE, QUEENS, FROM STREET 55 STREET TO STREET 56 STREET |
X012019255A33 | 2019-09-12 | 2019-09-26 | REPAIR WATER - SEWER - PROTECTED | ANDREWS AVENUE, BRONX, FROM STREET WEST 183 STREET TO STREET WEST FORDHAM ROAD |
Q012019255B88 | 2019-09-12 | 2019-10-11 | REPAIR WATER - PROTECTED | GRAND AVENUE, QUEENS, FROM STREET 55 STREET TO STREET 56 STREET |
M012019255D17 | 2019-09-12 | 2019-09-26 | REPAIR WATER - SEWER - PROTECTED | VANDAM STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
X012019255A32 | 2019-09-12 | 2019-09-26 | REPAIR WATER - SEWER | EAST 214 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET HOLLAND AVENUE |
X012019253A95 | 2019-09-10 | 2019-10-09 | REPAIR WATER - SEWER | BARNES AVENUE, BRONX, FROM STREET EAST 218 STREET TO STREET EAST 219 STREET |
X012019252A42 | 2019-09-09 | 2019-09-12 | REPAIR WATER - SEWER | EAST 214 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET HOLLAND AVENUE |
X012019251A01 | 2019-09-08 | 2019-09-26 | REPAIR WATER - PROTECTED | TIEBOUT AVENUE, BRONX, FROM STREET EAST 184 STREET TO STREET EAST 187 STREET |
X012019248A29 | 2019-09-05 | 2019-09-12 | REPAIR WATER - SEWER - PROTECTED | ANDREWS AVENUE, BRONX, FROM STREET WEST 183 STREET TO STREET WEST FORDHAM ROAD |
X012019248A00 | 2019-09-05 | 2019-09-21 | REPAIR WATER - SEWER | EAST 204 STREET, BRONX, FROM STREET JEROME AVENUE TO STREET VILLA AVENUE |
M012019248A68 | 2019-09-05 | 2019-09-12 | REPAIR WATER - SEWER - PROTECTED | VANDAM STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
X012019246A59 | 2019-09-03 | 2019-09-24 | REPAIR WATER - SEWER | JACKSON AVENUE, BRONX, FROM STREET EAST 151 STREET TO STREET PONTIAC PLACE |
M012019242B34 | 2019-08-30 | 2019-09-19 | FINAL RESTORATION ONLY | WEST 118 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET LENOX AVENUE |
M012019241A78 | 2019-08-29 | 2019-09-25 | FINAL RESTORATION ONLY - PROTECTED | GRAND STREET, MANHATTAN, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET |
X012019240B43 | 2019-08-28 | 2019-09-14 | REPAIR SEWER | ELTON AVENUE, BRONX, FROM STREET EAST 156 STREET TO STREET EAST 157 STREET |
X012019240B44 | 2019-08-28 | 2019-09-11 | REPAIR WATER - SEWER | BUCHANAN PLACE, BRONX, FROM STREET DAVIDSON AVENUE TO STREET GRAND AVENUE |
X012019239B53 | 2019-08-27 | 2019-09-26 | REPAIR WATER - SEWER | MANIDA STREET, BRONX, FROM STREET BEND TO STREET SPOFFORD AVENUE |
M012019239A64 | 2019-08-27 | 2019-09-23 | REPAIR WATER - SEWER - PROTECTED | WEST 95 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
X012019234B32 | 2019-08-22 | 2019-09-21 | PRIVATE SEWER | BARNES AVENUE, BRONX, FROM STREET ADEE AVENUE TO STREET WILLIAMSBRIDGE ROAD |
B012019233C65 | 2019-08-21 | 2019-09-19 | REPAIR WATER - SEWER | DEBEVOISE STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET |
B012019233B94 | 2019-08-21 | 2019-09-04 | REPAIR SEWER | SEAVIEW AVENUE, BROOKLYN, FROM STREET BEND TO STREET ERSKINE STREET |
X012019233B14 | 2019-08-21 | 2019-09-04 | REPAIR WATER - SEWER | EAST 204 STREET, BRONX, FROM STREET JEROME AVENUE TO STREET VILLA AVENUE |
M012019230A07 | 2019-08-18 | 2019-09-01 | REPAIR SEWER - PROTECTED | EAST 46 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012019228B27 | 2019-08-16 | 2019-09-13 | REPAIR WATER | VARICK STREET, MANHATTAN, FROM STREET SPRING STREET TO STREET VANDAM STREET |
M012019227B25 | 2019-08-15 | 2019-09-12 | REPAIR WATER - SEWER | SPRING STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
B012019225B43 | 2019-08-13 | 2019-08-21 | REPAIR SEWER | SEAVIEW AVENUE, BROOKLYN, FROM STREET BEND TO STREET ERSKINE STREET |
X012019224B17 | 2019-08-12 | 2019-08-21 | REPAIR WATER - SEWER | EAST 204 STREET, BRONX, FROM STREET JEROME AVENUE TO STREET VILLA AVENUE |
M012019222A03 | 2019-08-10 | 2019-08-24 | REPAIR WATER - SEWER - PROTECTED | WEST 95 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
B012019220C51 | 2019-08-08 | 2019-09-06 | REPAIR SEWER - PROTECTED | ERSKINE STREET, BROOKLYN, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE |
X012019220A31 | 2019-08-08 | 2019-08-22 | PRIVATE SEWER | BARNES AVENUE, BRONX, FROM STREET ADEE AVENUE TO STREET WILLIAMSBRIDGE ROAD |
M012019218A43 | 2019-08-06 | 2019-08-24 | REPAIR WATER - PROTECTED | EAST 45 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
B012019218B11 | 2019-08-06 | 2019-08-20 | REPAIR WATER - SEWER | DEBEVOISE STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET |
B012019218B05 | 2019-08-06 | 2019-08-17 | REPAIR WATER - SEWER - PROTECTED | CONOVER STREET, BROOKLYN, FROM STREET KING STREET TO STREET SULLIVAN STREET |
X012019214B49 | 2019-08-02 | 2019-08-31 | REPAIR SEWER | ELTON AVENUE, BRONX, FROM STREET EAST 156 STREET TO STREET EAST 157 STREET |
B012019213A00 | 2019-08-01 | 2019-08-03 | REPAIR WATER - SEWER - PROTECTED | CONOVER STREET, BROOKLYN, FROM STREET KING STREET TO STREET SULLIVAN STREET |
Q012019211C71 | 2019-07-30 | 2019-08-21 | REPAIR SEWER - PROTECTED | ROCKAWAY BEACH BOULEVARD, QUEENS, FROM STREET BEACH 45 STREET TO STREET BEACH 46 STREET |
X012019210A12 | 2019-07-29 | 2019-08-28 | REPAIR WATER - SEWER | BUCHANAN PLACE, BRONX, FROM STREET DAVIDSON AVENUE TO STREET GRAND AVENUE |
B012019207C66 | 2019-07-26 | 2019-08-20 | REPAIR WATER - PROTECTED | DEAN STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET |
B012019207C96 | 2019-07-26 | 2019-08-08 | REPAIR WATER | BERGEN STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
M012019207B79 | 2019-07-26 | 2019-08-24 | REPAIR WATER | WEST 14 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
M012019207B89 | 2019-07-26 | 2019-08-24 | REPAIR WATER | WEST 14 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
Q012019204D84 | 2019-07-23 | 2019-08-05 | REPAIR WATER - SEWER | 27 STREET, QUEENS, FROM STREET 40 AVENUE TO STREET 41 AVENUE |
M012019200A89 | 2019-07-19 | 2019-08-10 | REPAIR WATER - SEWER - PROTECTED | WEST 95 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M012019200A88 | 2019-07-19 | 2019-08-18 | REPAIR SEWER - PROTECTED | EAST 46 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012019199A79 | 2019-07-18 | 2019-08-04 | REPAIR WATER - PROTECTED | EAST 45 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
X012019199A37 | 2019-07-18 | 2019-08-01 | REPAIR SEWER | ELTON AVENUE, BRONX, FROM STREET EAST 156 STREET TO STREET EAST 157 STREET |
Q012019198A51 | 2019-07-17 | 2019-07-23 | REPAIR WATER - SEWER | 27 STREET, QUEENS, FROM STREET 40 AVENUE TO STREET 41 AVENUE |
B012019197C07 | 2019-07-16 | 2019-07-25 | REPAIR WATER | BERGEN STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
X012019195A01 | 2019-07-14 | 2019-07-25 | REPAIR WATER - SEWER | BRUCKNER BOULEVARD, BRONX, FROM STREET BRUCKNER EXPRESSWAY EXIT 46 EB TO STREET BARRETTO STREET |
B012019190B72 | 2019-07-09 | 2019-08-07 | REPAIR SEWER - PROTECTED | ERSKINE STREET, BROOKLYN, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE |
X012019190A58 | 2019-07-09 | 2019-08-08 | PRIVATE SEWER | BARNES AVENUE, BRONX, FROM STREET ADEE AVENUE TO STREET WILLIAMSBRIDGE ROAD |
M012019189A01 | 2019-07-08 | 2019-07-20 | REPAIR WATER - SEWER | EAST 86 STREET, MANHATTAN, FROM STREET HENDERSON PLACE TO STREET YORK AVENUE |
X012019189A00 | 2019-07-08 | 2019-07-29 | REPAIR WATER - SEWER | BUCHANAN PLACE, BRONX, FROM STREET DAVIDSON AVENUE TO STREET GRAND AVENUE |
B012019189A02 | 2019-07-08 | 2019-08-06 | REPAIR WATER - SEWER | DEBEVOISE STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET |
B012019186B14 | 2019-07-05 | 2019-07-23 | REPAIR WATER - SEWER | LIVONIA AVENUE, BROOKLYN, FROM STREET PEDESTRIAN OVERPASS TO STREET SNEDIKER AVENUE |
M012019184A24 | 2019-07-03 | 2019-07-06 | REPAIR WATER - SEWER | EAST 86 STREET, MANHATTAN, FROM STREET HENDERSON PLACE TO STREET YORK AVENUE |
B012019183B22 | 2019-07-02 | 2019-07-15 | REPAIR WATER - SEWER | CORTELYOU ROAD, BROOKLYN, FROM STREET EAST 19 STREET TO STREET OCEAN AVENUE |
M012019179B59 | 2019-06-28 | 2019-07-16 | REPAIR WATER - SEWER | BOWERY, MANHATTAN, FROM STREET PRINCE STREET TO STREET RIVINGTON STREET |
M012019179B55 | 2019-06-28 | 2019-07-28 | REPAIR WATER - SEWER - PROTECTED | WEST 126 STREET, MANHATTAN, FROM STREET BEND TO STREET WEST 127 STREET |
X012019179D21 | 2019-06-28 | 2019-07-28 | REPAIR SEWER | TILDEN STREET, BRONX, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE |
B012019175C63 | 2019-06-24 | 2019-07-04 | REPAIR WATER - SEWER | LIVONIA AVENUE, BROOKLYN, FROM STREET PEDESTRIAN OVERPASS TO STREET SNEDIKER AVENUE |
X012019172A94 | 2019-06-21 | 2019-07-18 | REPAIR SEWER | ELTON AVENUE, BRONX, FROM STREET EAST 156 STREET TO STREET EAST 157 STREET |
M012019172B64 | 2019-06-21 | 2019-07-21 | REPAIR WATER - PROTECTED | EAST 45 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
B012019171C65 | 2019-06-20 | 2019-07-21 | REPAIR WATER - PROTECTED | BOERUM PLACE, BROOKLYN, FROM STREET ADAMS STREET TO STREET LIVINGSTON STREET |
B012019169B63 | 2019-06-18 | 2019-07-02 | REPAIR WATER - SEWER | CORTELYOU ROAD, BROOKLYN, FROM STREET EAST 19 STREET TO STREET OCEAN AVENUE |
M012019169B29 | 2019-06-18 | 2019-07-02 | REPAIR WATER - SEWER - PROTECTED | EAST 70 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
B012019169A55 | 2019-06-18 | 2019-07-15 | REPAIR WATER - PROTECTED | OCEAN AVENUE, BROOKLYN, FROM STREET BEVERLY ROAD TO STREET CORTELYOU ROAD |
B012019169B62 | 2019-06-18 | 2019-07-02 | REPAIR WATER - SEWER - PROTECTED | SURF AVENUE, BROOKLYN, FROM STREET JONES WALK TO STREET WEST 12 STREET |
M012019169A77 | 2019-06-18 | 2019-07-02 | REPAIR WATER - SEWER | EAST 86 STREET, MANHATTAN, FROM STREET HENDERSON PLACE TO STREET YORK AVENUE |
X012019168A34 | 2019-06-17 | 2019-06-22 | REPAIR SEWER | CRUGER AVENUE, BRONX, FROM STREET BARTHOLDI STREET TO STREET MAGENTA STREET |
M012019168C27 | 2019-06-17 | 2019-06-28 | REPAIR WATER - SEWER | BOWERY, MANHATTAN, FROM STREET PRINCE STREET TO STREET RIVINGTON STREET |
B012019165C17 | 2019-06-14 | 2019-07-07 | REPAIR WATER - SEWER | DEBEVOISE STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET |
X012019163C50 | 2019-06-12 | 2019-07-09 | PRIVATE SEWER | BARNES AVENUE, BRONX, FROM STREET ADEE AVENUE TO STREET WILLIAMSBRIDGE ROAD |
X012019162B14 | 2019-06-11 | 2019-07-11 | REPAIR WATER - SEWER | BRUCKNER BOULEVARD, BRONX, FROM STREET BRUCKNER EXPRESSWAY EXIT 46 EB TO STREET BARRETTO STREET |
X012019162B62 | 2019-06-11 | 2019-06-19 | REPAIR SEWER | ELTON AVENUE, BRONX, FROM STREET EAST 156 STREET TO STREET EAST 157 STREET |
X012019157A10 | 2019-06-06 | 2019-07-04 | REPAIR WATER - SEWER - PROTECTED | HUGHES AVENUE, BRONX, FROM STREET EAST 188 STREET TO STREET EAST 189 STREET |
B012019156D88 | 2019-06-05 | 2019-06-20 | REPAIR WATER - SEWER | LIVONIA AVENUE, BROOKLYN, FROM STREET PEDESTRIAN OVERPASS TO STREET SNEDIKER AVENUE |
X012019155B43 | 2019-06-04 | 2019-06-27 | REPAIR WATER - SEWER - PROTECTED | CRUGER AVENUE, BRONX, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE |
M012019154A00 | 2019-06-03 | 2019-06-18 | REPAIR WATER - SEWER | EAST 86 STREET, MANHATTAN, FROM STREET HENDERSON PLACE TO STREET YORK AVENUE |
M012019154B65 | 2019-06-03 | 2019-06-18 | REPAIR WATER - SEWER - PROTECTED | EAST 70 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
X012019151A88 | 2019-05-31 | 2019-06-28 | REPAIR WATER | TILDEN STREET, BRONX, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE |
M012019151B88 | 2019-05-31 | 2019-06-15 | REPAIR WATER - PROTECTED | JANE STREET, MANHATTAN, FROM STREET GREENWICH AVENUE TO STREET WEST 4 STREET |
B012019150C13 | 2019-05-30 | 2019-06-13 | REPAIR WATER - SEWER | DEBEVOISE STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET |
X012019150A37 | 2019-05-30 | 2019-06-13 | REPAIR SEWER | CRUGER AVENUE, BRONX, FROM STREET BARTHOLDI STREET TO STREET MAGENTA STREET |
Q012019150B54 | 2019-05-30 | 2019-06-25 | REPAIR WATER - SEWER | 38 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET QUEENS BOULEVARD |
M012019150A83 | 2019-05-30 | 2019-06-14 | REPAIR SEWER | WEST 23 STREET, MANHATTAN, FROM STREET HIGH LINE TO STREET 11 AVENUE |
M012019150A74 | 2019-05-30 | 2019-06-14 | REPAIR WATER - SEWER | BOWERY, MANHATTAN, FROM STREET PRINCE STREET TO STREET RIVINGTON STREET |
B012019148C51 | 2019-05-28 | 2019-06-16 | REPAIR WATER - PROTECTED | OCEAN AVENUE, BROOKLYN, FROM STREET BEVERLY ROAD TO STREET CORTELYOU ROAD |
B012019143B03 | 2019-05-23 | 2019-06-18 | REPAIR WATER - SEWER | CORTELYOU ROAD, BROOKLYN, FROM STREET EAST 19 STREET TO STREET OCEAN AVENUE |
M012019142A04 | 2019-05-22 | 2019-06-06 | REPAIR WATER | 5 AVENUE, MANHATTAN, FROM STREET EAST 106 STREET TO STREET EAST 107 STREET |
X012019140A50 | 2019-05-20 | 2019-06-02 | REPAIR WATER - SEWER - PROTECTED | BELMONT AVENUE, BRONX, FROM STREET EAST 179 STREET TO STREET EAST TREMONT AVENUE |
X012019136A96 | 2019-05-16 | 2019-05-30 | REPAIR WATER | WESTCHESTER AVENUE, BRONX, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE |
B012019136B19 | 2019-05-16 | 2019-06-18 | REPAIR WATER - SEWER - PROTECTED | SURF AVENUE, BROOKLYN, FROM STREET JONES WALK TO STREET WEST 12 STREET |
X012019136A95 | 2019-05-16 | 2019-05-30 | REPAIR WATER - SEWER - PROTECTED | VYSE AVENUE, BRONX, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET |
X012019135A28 | 2019-05-15 | 2019-06-04 | REPAIR WATER - SEWER | WALTON AVENUE, BRONX, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE |
M012019135B37 | 2019-05-15 | 2019-05-28 | REPAIR WATER - SEWER | BOWERY, MANHATTAN, FROM STREET PRINCE STREET TO STREET RIVINGTON STREET |
B012019128D06 | 2019-05-08 | 2019-06-07 | REPAIR SEWER - PROTECTED | ERSKINE STREET, BROOKLYN, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE |
X012019127A73 | 2019-05-07 | 2019-05-21 | REPAIR WATER - SEWER | KINGSBRIDGE TERRACE, BRONX, FROM STREET WEST 229 STREET TO STREET WEST KINGSBRIDGE ROAD |
M012019127C15 | 2019-05-07 | 2019-05-31 | REPAIR SEWER | WEST 23 STREET, MANHATTAN, FROM STREET HIGH LINE TO STREET 11 AVENUE |
M012019125A01 | 2019-05-05 | 2019-05-19 | REPAIR SEWER - PROTECTED | EAST 46 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012019122A94 | 2019-05-02 | 2019-06-01 | REPAIR WATER - PROTECTED | JANE STREET, MANHATTAN, FROM STREET GREENWICH AVENUE TO STREET WEST 4 STREET |
X012019122A22 | 2019-05-02 | 2019-05-30 | REPAIR SEWER | CRUGER AVENUE, BRONX, FROM STREET BARTHOLDI STREET TO STREET MAGENTA STREET |
B012019122A74 | 2019-05-02 | 2019-05-30 | REPAIR WATER - SEWER | DEBEVOISE STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET |
X012019119B89 | 2019-04-29 | 2019-05-28 | REPAIR WATER | TILDEN STREET, BRONX, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE |
M012019118A07 | 2019-04-28 | 2019-05-12 | REPAIR WATER - PROTECTED | EAST 83 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
X012019118A00 | 2019-04-28 | 2019-05-19 | REPAIR WATER - SEWER - PROTECTED | BELMONT AVENUE, BRONX, FROM STREET EAST 179 STREET TO STREET EAST TREMONT AVENUE |
M012019118A06 | 2019-04-28 | 2019-05-14 | REPAIR WATER - SEWER | BOWERY, MANHATTAN, FROM STREET PRINCE STREET TO STREET RIVINGTON STREET |
B012019111A03 | 2019-04-21 | 2019-05-21 | REPAIR WATER - PROTECTED | OCEAN AVENUE, BROOKLYN, FROM STREET BEVERLY ROAD TO STREET CORTELYOU ROAD |
M012019108B72 | 2019-04-18 | 2019-05-02 | REPAIR WATER - PROTECTED | JANE STREET, MANHATTAN, FROM STREET GREENWICH AVENUE TO STREET WEST 4 STREET |
X012019107B13 | 2019-04-17 | 2019-05-16 | REPAIR WATER | WESTCHESTER AVENUE, BRONX, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE |
M012019106B84 | 2019-04-16 | 2019-05-09 | REPAIR SEWER - PROTECTED | EAST 10 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
X012019106B12 | 2019-04-16 | 2019-05-16 | REPAIR WATER - SEWER - PROTECTED | VYSE AVENUE, BRONX, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET |
X012019106B13 | 2019-04-16 | 2019-05-07 | REPAIR WATER - SEWER | CARLISLE PLACE, BRONX, FROM STREET EAST 211 STREET TO STREET EAST 213 STREET |
X012019105A63 | 2019-04-15 | 2019-04-25 | REPAIR WATER - SEWER | EAST MOSHOLU PARKWAY SOUTH, BRONX, FROM STREET MARION AVENUE TO STREET PERRY AVENUE |
B012019101B61 | 2019-04-11 | 2019-05-07 | REPAIR WATER - SEWER | 4 AVENUE, BROOKLYN, FROM STREET 63 STREET TO STREET 64 STREET |
M012019101B15 | 2019-04-11 | 2019-04-18 | REPAIR WATER - PROTECTED | JANE STREET, MANHATTAN, FROM STREET GREENWICH AVENUE TO STREET WEST 4 STREET |
M012019101B14 | 2019-04-11 | 2019-04-30 | REPAIR WATER - SEWER - PROTECTED | EAST 14 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET IRVING PLACE |
X012019101A57 | 2019-04-11 | 2019-04-11 | REPAIR WATER - SEWER | EAST MOSHOLU PARKWAY SOUTH, BRONX, FROM STREET MARION AVENUE TO STREET PERRY AVENUE |
M012019101C54 | 2019-04-11 | 2019-04-25 | REPAIR WATER - SEWER - PROTECTED | WEST 104 STREET, MANHATTAN, FROM STREET COLUMBUS AVENUE TO STREET MANHATTAN AVENUE |
B012019098C01 | 2019-04-08 | 2019-04-08 | REPAIR WATER - SEWER | 4 AVENUE, BROOKLYN, FROM STREET 63 STREET TO STREET 64 STREET |
M012019098B08 | 2019-04-08 | 2019-05-05 | REPAIR WATER - SEWER | WEST 56 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
X012019094A25 | 2019-04-04 | 2019-04-11 | REPAIR WATER - SEWER | PERRY AVENUE, BRONX, FROM STREET EAST 201 STREET TO STREET EAST MOSHOLU PARKWAY SOUTH |
M012019094A71 | 2019-04-04 | 2019-05-05 | REPAIR SEWER - PROTECTED | EAST 46 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012019094A70 | 2019-04-04 | 2019-04-11 | REPAIR WATER - SEWER - PROTECTED | WEST 104 STREET, MANHATTAN, FROM STREET COLUMBUS AVENUE TO STREET MANHATTAN AVENUE |
X012019094A26 | 2019-04-04 | 2019-04-11 | REPAIR WATER - SEWER | WALTON AVENUE, BRONX, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE |
M012019088C77 | 2019-03-29 | 2019-04-05 | REPAIR SEWER - PROTECTED | EAST 46 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012019087C48 | 2019-03-28 | 2019-04-28 | REPAIR WATER - PROTECTED | EAST 83 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
X012019085A99 | 2019-03-26 | 2019-04-23 | REPAIR SEWER | BEACH AVENUE, BRONX, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE |
M012019085B47 | 2019-03-26 | 2019-04-18 | REPAIR WATER - SEWER - PROTECTED | BROADWAY, MANHATTAN, FROM STREET WEST 181 STREET TO STREET WEST 182 STREET |
M012019083A04 | 2019-03-24 | 2019-04-07 | REPAIR WATER - SEWER | WEST 56 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
B012019083A01 | 2019-03-24 | 2019-04-16 | REPAIR WATER - SEWER | HULL STREET, BROOKLYN, FROM STREET BROADWAY TO STREET MOTHER GASTON BOULEVARD |
X012019081A85 | 2019-03-22 | 2019-04-20 | REPAIR WATER - SEWER - PROTECTED | FRANKLIN AVENUE, BRONX, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET |
M012019081A39 | 2019-03-22 | 2019-04-05 | REPAIR SEWER - PROTECTED | EAST 46 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012019081A35 | 2019-03-22 | 2019-04-04 | REPAIR WATER - SEWER - PROTECTED | WEST 104 STREET, MANHATTAN, FROM STREET COLUMBUS AVENUE TO STREET MANHATTAN AVENUE |
M012019073B03 | 2019-03-14 | 2019-03-29 | REPAIR WATER - PROTECTED | EAST 83 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
M012019073B02 | 2019-03-14 | 2019-03-24 | REPAIR WATER - SEWER | WEST 56 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
B012019070A92 | 2019-03-11 | 2019-03-26 | REPAIR WATER | WEST 20 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
M012019070B22 | 2019-03-11 | 2019-03-22 | REPAIR SEWER - PROTECTED | EAST 46 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012019063A86 | 2019-03-04 | 2019-03-30 | REPAIR WATER | WEST 38 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
X012019059A79 | 2019-02-28 | 2019-03-29 | REPAIR WATER - SEWER | TELLER AVENUE, BRONX, FROM STREET EAST 162 STREET TO STREET PARK AVENUE |
M012019059A73 | 2019-02-28 | 2019-03-12 | REPAIR SEWER - PROTECTED | EAST 46 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
Q012019059C10 | 2019-02-28 | 2019-03-28 | REPAIR SEWER - PROTECTED | ROCKAWAY BEACH BOULEVARD, QUEENS, FROM STREET BEACH 45 STREET TO STREET BEACH 46 STREET |
M012019059A74 | 2019-02-28 | 2019-03-15 | REPAIR WATER - PROTECTED | EAST 83 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
X012019050B56 | 2019-02-19 | 2019-03-05 | REPAIR WATER - SEWER | WALTON AVENUE, BRONX, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE |
B012019049A28 | 2019-02-18 | 2019-03-19 | REPAIR WATER - PROTECTED | CARROLL STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
M012019045A89 | 2019-02-14 | 2019-02-28 | REPAIR WATER | WEST 38 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
M012019044A48 | 2019-02-13 | 2019-02-28 | REPAIR WATER - PROTECTED | EAST 83 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
B012019044B25 | 2019-02-13 | 2019-03-12 | REPAIR WATER | WEST 20 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
X012019044B14 | 2019-02-13 | 2019-03-14 | REPAIR WATER | ELTON AVENUE, BRONX, FROM STREET BROOK AVENUE TO STREET EAST 161 STREET |
M012019037B02 | 2019-02-06 | 2019-03-06 | REPAIR WATER - SEWER | WEST 124 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET LENOX AVENUE |
M012019036A22 | 2019-02-05 | 2019-02-05 | REPAIR WATER - SEWER | WEST 125 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET LENOX AVENUE |
X012019035B49 | 2019-02-04 | 2019-03-06 | REPAIR WATER - SEWER | ARTHUR AVENUE, BRONX, FROM STREET BEND TO STREET OAK TREE PLACE |
X012019035B50 | 2019-02-04 | 2019-03-06 | REPAIR WATER | HOLT PLACE, BRONX, FROM STREET PERRY AVENUE TO STREET RESERVOIR OVAL |
Q012019032D81 | 2019-02-01 | 2019-02-20 | REPAIR SEWER - PROTECTED | ROCKAWAY BEACH BOULEVARD, QUEENS, FROM STREET BEACH 45 STREET TO STREET BEACH 46 STREET |
X012019032B47 | 2019-02-01 | 2019-02-18 | REPAIR SEWER | JENNINGS STREET, BRONX, FROM STREET MINFORD PLACE TO STREET SOUTHERN BOULEVARD |
X012019032B48 | 2019-02-01 | 2019-03-01 | REPAIR WATER | RESERVOIR OVAL, BRONX, FROM STREET BEND TO STREET HOLT PLACE |
Q012019032D82 | 2019-02-01 | 2019-02-19 | REPAIR WATER - SEWER - PROTECTED | GRAND AVENUE, QUEENS, FROM STREET 55 STREET TO STREET 56 STREET |
M012019031B10 | 2019-01-31 | 2019-02-17 | REPAIR WATER - SEWER | WEST 125 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET LENOX AVENUE |
M012019031B09 | 2019-01-31 | 2019-02-13 | REPAIR WATER | WEST 38 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
X012019030A48 | 2019-01-30 | 2019-02-04 | REPAIR SEWER | JENNINGS STREET, BRONX, FROM STREET MINFORD PLACE TO STREET SOUTHERN BOULEVARD |
X012019030A49 | 2019-01-30 | 2019-02-07 | REPAIR WATER - SEWER | WALTON AVENUE, BRONX, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE |
M012019028C50 | 2019-01-28 | 2019-02-26 | REPAIR SEWER - PROTECTED | EAST 46 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012019021A05 | 2019-01-21 | 2019-02-14 | REPAIR WATER - PROTECTED | EAST 83 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
X012019017A53 | 2019-01-17 | 2019-02-14 | REPAIR WATER - PROTECTED | STORY AVENUE, BRONX, FROM STREET BOYNTON AVENUE TO STREET ELDER AVENUE |
X012019015A00 | 2019-01-15 | 2019-02-09 | REPAIR SEWER | HOBART AVENUE, BRONX, FROM STREET ST THERESA AVENUE TO STREET WILKINSON AVENUE |
X012019015A17 | 2019-01-15 | 2019-01-28 | REPAIR SEWER | JENNINGS STREET, BRONX, FROM STREET MINFORD PLACE TO STREET SOUTHERN BOULEVARD |
X012019014B81 | 2019-01-14 | 2019-02-12 | REPAIR WATER | EAST 162 STREET, BRONX, FROM STREET DEAD END TO STREET MELROSE AVENUE |
M012019014B63 | 2019-01-14 | 2019-02-12 | REPAIR WATER - SEWER | EAST 78 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M012019010A51 | 2019-01-10 | 2019-01-30 | REPAIR WATER | WEST 38 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
X012019010A91 | 2019-01-10 | 2019-02-08 | REPAIR WATER - SEWER | EAST 229 STREET, BRONX, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE |
X012019008A17 | 2019-01-08 | 2019-02-05 | REPAIR WATER - SEWER | OGDEN AVENUE, BRONX, FROM STREET WEST 165 STREET TO STREET WEST 166 STREET |
X012019003A17 | 2019-01-03 | 2019-02-01 | REPAIR WATER - SEWER | BRUCKNER BOULEVARD, BRONX, FROM STREET BRE WESTBOUND ENTRANCE BUHRE AVE TO STREET ROBERTS AVENUE |
X012019003A29 | 2019-01-03 | 2019-02-01 | REPAIR WATER | ARNOW AVENUE, BRONX, FROM STREET BRONXWOOD AVENUE TO STREET WILLIAMSBRIDGE ROAD |
X012019002A52 | 2019-01-02 | 2019-01-31 | REPAIR WATER - SEWER | BRONXWOOD AVENUE, BRONX, FROM STREET BOSTON ROAD TO STREET WILLIAMSBRIDGE ROAD |
X012019002A03 | 2019-01-02 | 2019-01-14 | REPAIR SEWER | JENNINGS STREET, BRONX, FROM STREET MINFORD PLACE TO STREET SOUTHERN BOULEVARD |
X012019002A09 | 2019-01-02 | 2019-01-31 | REPAIR WATER | THIERIOT AVENUE, BRONX, FROM STREET BEND TO STREET LACOMBE AVENUE |
M012018364A02 | 2018-12-30 | 2019-01-13 | REPAIR WATER - SEWER | EAST 78 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
X012018364A00 | 2018-12-30 | 2019-01-12 | REPAIR SEWER | LACOMBE AVENUE, BRONX, FROM STREET TAYLOR AVENUE TO STREET THIERIOT AVENUE |
B012018361E53 | 2018-12-27 | 2019-01-25 | REPAIR SEWER | LINWOOD STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
B012018361E54 | 2018-12-27 | 2019-01-25 | REPAIR WATER | MONROE STREET, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
M012018360A47 | 2018-12-26 | 2019-01-11 | REPAIR WATER - PROTECTED | EAST 10 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
M012018360A45 | 2018-12-26 | 2019-01-16 | REPAIR WATER - SEWER | ATTORNEY STREET, MANHATTAN, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET |
B012018353E13 | 2018-12-19 | 2018-12-31 | REPAIR WATER | ATLANTIC AVENUE, BROOKLYN, FROM STREET ESSEX STREET TO STREET LINWOOD STREET |
Q012018348D92 | 2018-12-14 | 2018-12-31 | REPAIR SEWER - PROTECTED | ROCKAWAY BEACH BOULEVARD, QUEENS, FROM STREET BEACH 45 STREET TO STREET BEACH 46 STREET |
B012018346C81 | 2018-12-12 | 2018-12-31 | REPAIR WATER | MONROE STREET, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
X012018343A05 | 2018-12-09 | 2018-12-31 | REPAIR SEWER | JENNINGS STREET, BRONX, FROM STREET MINFORD PLACE TO STREET SOUTHERN BOULEVARD |
M012018341B19 | 2018-12-07 | 2018-12-23 | REPAIR WATER - PROTECTED | EAST 10 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
X012018340A80 | 2018-12-06 | 2018-12-20 | REPAIR WATER - SEWER - PROTECTED | REV JAMES POLITE AVENUE, BRONX, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET |
X012018338A00 | 2018-12-04 | 2018-12-31 | REPAIR SEWER | THIERIOT AVENUE, BRONX, FROM STREET BEND TO STREET LACOMBE AVENUE |
X012018331A04 | 2018-11-27 | 2018-12-06 | REPAIR WATER - SEWER - PROTECTED | REV JAMES POLITE AVENUE, BRONX, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET |
X012018319B69 | 2018-11-15 | 2018-12-10 | REPAIR SEWER - PROTECTED | EAST 148 STREET, BRONX, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE |
M012018317B33 | 2018-11-13 | 2018-12-09 | REPAIR WATER - PROTECTED | EAST 10 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
M012018305B16 | 2018-11-01 | 2018-11-14 | REPAIR SEWER - PROTECTED | WEST 44 STREET, MANHATTAN, FROM STREET 10 AVENUE TO STREET AMTRAK RR |
X012018305A40 | 2018-11-01 | 2018-11-15 | REPAIR WATER - SEWER - PROTECTED | REV JAMES POLITE AVENUE, BRONX, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET |
X012018305A39 | 2018-11-01 | 2018-11-15 | REPAIR SEWER - PROTECTED | EAST 148 STREET, BRONX, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE |
M012018302E15 | 2018-10-29 | 2018-11-01 | REPAIR WATER - SEWER - PROTECTED | WEST 163 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET EDGECOMBE AVENUE |
X012018289A59 | 2018-10-16 | 2018-11-01 | REPAIR WATER - SEWER - PROTECTED | REV JAMES POLITE AVENUE, BRONX, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET |
X012018288A56 | 2018-10-15 | 2018-11-01 | REPAIR SEWER - PROTECTED | EAST 148 STREET, BRONX, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE |
M012018288B38 | 2018-10-15 | 2018-10-28 | REPAIR WATER - SEWER - PROTECTED | WEST 163 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET EDGECOMBE AVENUE |
M012018250B17 | 2018-09-07 | 2018-09-21 | REPAIR WATER - SEWER - PROTECTED | WEST 163 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET EDGECOMBE AVENUE |
Q012018248C74 | 2018-09-05 | 2018-09-20 | REPAIR WATER - SEWER - PROTECTED | 35 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET BROADWAY |
Q012018233G13 | 2018-08-21 | 2018-09-04 | REPAIR WATER - SEWER - PROTECTED | 35 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET BROADWAY |
M012018232A00 | 2018-08-20 | 2018-09-04 | REPAIR WATER - PROTECTED | LAFAYETTE STREET, MANHATTAN, FROM STREET BOND STREET TO STREET GREAT JONES STREET |
M012018232A01 | 2018-08-20 | 2018-09-04 | REPAIR WATER - SEWER - PROTECTED | EAST 11 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
M012018226A90 | 2018-08-14 | 2018-09-07 | REPAIR WATER - SEWER - PROTECTED | WEST 163 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET EDGECOMBE AVENUE |
M012018217A03 | 2018-08-05 | 2018-08-28 | REPAIR SEWER - PROTECTED | EAST 107 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
M012018212C44 | 2018-07-31 | 2018-08-14 | REPAIR WATER - SEWER - PROTECTED | ELIZABETH STREET, MANHATTAN, FROM STREET EAST HOUSTON STREET TO STREET PRINCE STREET |
Q012018212D28 | 2018-07-31 | 2018-08-21 | REPAIR WATER - SEWER - PROTECTED | 35 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET BROADWAY |
M012018208B68 | 2018-07-27 | 2018-08-21 | REPAIR WATER - PROTECTED | LAFAYETTE STREET, MANHATTAN, FROM STREET BOND STREET TO STREET GREAT JONES STREET |
M012018205B99 | 2018-07-24 | 2018-08-21 | REPAIR WATER - SEWER - PROTECTED | EAST 11 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B012018205D78 | 2018-07-24 | 2018-08-17 | REPAIR SEWER - PROTECTED | ERSKINE STREET, BROOKLYN, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE |
M012018183C65 | 2018-07-02 | 2018-07-31 | REPAIR WATER - SEWER - PROTECTED | ELIZABETH STREET, MANHATTAN, FROM STREET EAST HOUSTON STREET TO STREET PRINCE STREET |
X012018180B79 | 2018-06-29 | 2018-07-29 | REPAIR WATER - SEWER | PARKSIDE PLACE, BRONX, FROM STREET EAST 207 STREET TO STREET WEBSTER AVENUE |
X012018178A00 | 2018-06-27 | 2018-07-16 | REPAIR SEWER - PROTECTED | STORY AVENUE, BRONX, FROM STREET BOYNTON AVENUE TO STREET ELDER AVENUE |
B012018156B80 | 2018-06-05 | 2018-07-05 | REPAIR WATER - PROTECTED | ERSKINE STREET, BROOKLYN, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE |
X012018155A17 | 2018-06-04 | 2018-06-13 | REPAIR WATER - SEWER - PROTECTED | FOX STREET, BRONX, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE |
X012018152B18 | 2018-06-01 | 2018-06-14 | REPAIR SEWER - PROTECTED | STORY AVENUE, BRONX, FROM STREET BOYNTON AVENUE TO STREET ELDER AVENUE |
X012018144A27 | 2018-05-24 | 2018-06-09 | REPAIR SEWER | WEST FARMS ROAD, BRONX, FROM STREET CROSS BRONX EXPWY NB ET 4 A TO STREET EAST 174 STREET |
X012018142B33 | 2018-05-22 | 2018-06-04 | REPAIR WATER - SEWER - PROTECTED | FOX STREET, BRONX, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE |
M012018142B81 | 2018-05-22 | 2018-06-03 | REPAIR WATER - SEWER | EAST 81 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
X012018114A19 | 2018-04-24 | 2018-05-21 | REPAIR WATER - SEWER - PROTECTED | FOX STREET, BRONX, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE |
X012018095B25 | 2018-04-05 | 2018-04-21 | REPAIR WATER - SEWER - PROTECTED | FOX STREET, BRONX, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE |
X012018088A89 | 2018-03-29 | 2018-04-07 | REPAIR WATER - SEWER - PROTECTED | FOX STREET, BRONX, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE |
X012018059A08 | 2018-02-28 | 2018-03-30 | REPAIR WATER - SEWER - PROTECTED | FOX STREET, BRONX, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE |
X012018029B37 | 2018-01-29 | 2018-02-28 | REPAIR WATER - SEWER - PROTECTED | FOX STREET, BRONX, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE |
X012018016A14 | 2018-01-16 | 2018-01-29 | REPAIR WATER - SEWER - PROTECTED | FOX STREET, BRONX, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE |
X012017352A75 | 2017-12-18 | 2018-01-15 | REPAIR WATER - SEWER - PROTECTED | FOX STREET, BRONX, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE |
X012017337A04 | 2017-12-03 | 2017-12-15 | REPAIR WATER - SEWER - PROTECTED | FOX STREET, BRONX, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE |
X012017304A92 | 2017-10-31 | 2017-12-01 | REPAIR WATER - SEWER - PROTECTED | FOX STREET, BRONX, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE |
X012017297A87 | 2017-10-24 | 2017-11-01 | REPAIR WATER - SEWER - PROTECTED | FOX STREET, BRONX, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE |
B012017283C83 | 2017-10-10 | 2017-10-21 | REPAIR WATER - SEWER - PROTECTED | NORTH 9 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B012017263A67 | 2017-09-20 | 2017-10-08 | REPAIR WATER - SEWER - PROTECTED | NORTH 9 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B012017230B50 | 2017-08-18 | 2017-09-16 | REPAIR WATER - SEWER - PROTECTED | NORTH 9 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
Start date | End date | Type | Value |
---|---|---|---|
2024-07-18 | 2024-07-29 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-07-16 | 2024-07-18 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-07-10 | 2024-07-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-06-27 | 2024-07-10 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-06-05 | 2024-06-27 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-05-10 | 2024-05-10 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-05-10 | 2024-06-05 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-05-01 | 2024-05-10 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-04-16 | 2024-05-01 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-03-28 | 2024-04-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-03-13 | 2024-03-28 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-02-29 | 2024-03-13 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-02-26 | 2024-02-29 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-02-06 | 2024-02-26 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-12-12 | 2024-02-06 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-08-02 | 2023-12-12 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-08-02 | 2023-08-02 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-07-24 | 2023-08-02 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-07-13 | 2023-07-24 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-07-11 | 2023-07-13 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-07-11 | 2023-07-11 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-06-17 | 2023-07-11 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-04-05 | 2023-06-17 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-01-23 | 2023-04-05 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-11-10 | 2023-01-23 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-11-09 | 2022-11-10 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-11-09 | 2022-11-09 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-09-27 | 2022-11-09 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-09-27 | 2022-09-27 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-09-08 | 2022-09-08 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-09-08 | 2022-09-27 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-05 | 2022-09-08 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-05 | 2022-08-05 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-04-21 | 2022-08-05 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-03-28 | 2022-04-21 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-03-24 | 2022-03-28 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-03-01 | 2022-03-24 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-03-01 | 2022-03-01 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-02-28 | 2022-02-28 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-02-28 | 2022-03-01 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-02-16 | 2022-02-28 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-02-11 | 2022-02-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-02-07 | 2022-02-11 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-01-03 | 2022-02-07 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-11-20 | 2022-01-03 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-11-18 | 2021-11-18 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-11-18 | 2021-11-20 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-11-17 | 2021-11-18 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-11-16 | 2021-11-17 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-10-26 | 2021-11-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-09-28 | 2021-10-26 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-07-28 | 2021-09-28 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-07-12 | 2021-07-28 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-07-08 | 2021-07-12 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-07-03 | 2021-07-08 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2015-09-09 | 2021-07-03 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
150909010363 | 2015-09-09 | CERTIFICATE OF INCORPORATION | 2015-09-09 |
Date | Inspection Object | Address | Grade | Type | Institution | Desctiption |
---|---|---|---|---|---|---|
2024-10-31 | No data | EAST 184 STREET, FROM STREET CRESTON AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent plumber’s restoration in roadway |
2024-10-31 | No data | WASHINGTON STREET, FROM STREET CARLISLE STREET TO STREET RECTOR STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street found resurfaced. |
2024-10-29 | No data | CRESTON AVENUE, FROM STREET EAST 196 STREET TO STREET EAST 197 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway.I/F/O 2731 |
2024-10-23 | No data | BOONE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work started steel,plates in roadway in compliance |
2024-10-22 | No data | EAST 78 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to properly inspect due to actrive B.O.-M022024274D04 |
2024-10-21 | No data | WILLIAMSBRIDGE ROAD, FROM STREET ALLERTON AVENUE TO STREET RADCLIFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sewer work done at New Building |
2024-10-21 | No data | MADISON AVENUE, FROM STREET EAST 56 STREET TO STREET EAST 57 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER: R/W is milled |
2024-10-19 | No data | EAST HOUSTON STREET, FROM STREET AVENUE B TO STREET SUFFOLK STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plates marked “ARBEN” across roadway improperly secured to roadway |
2024-10-18 | No data | BOONE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work started crew on site, has active permit on file X012024289E41 |
2024-10-17 | No data | IRVING PLACE, FROM STREET GATES AVENUE TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints are sealed. |
2024-10-17 | No data | TROUTMAN STREET, FROM STREET SCOTT AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm restoration in the driving lane IFO property #427. B012024290A90 |
2024-10-17 | No data | ANN STREET, FROM STREET BROADWAY TO STREET THEATRE ALLEY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done and in compliance. |
2024-10-12 | No data | BRUCKNER BOULEVARD, FROM STREET BRE WESTBOUND ENTRANCE BUHRE AVE TO STREET ROBERTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paved over work |
2024-10-12 | No data | HERKIMER STREET, FROM STREET ALBANY AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed a plated excavation in the roadway without a permit to do so. Respondent failed to obtain a valid DOT permit while making use of the roadway, respondent ID by cited permit and “Arben” written on plates. |
2024-10-11 | No data | ANDERSON AVENUE, FROM STREET WEST 165 STREET TO STREET WEST 166 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut at 1081 |
2024-10-11 | No data | BARKER AVENUE, FROM STREET MACE AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paved over work |
2024-10-11 | No data | TROUTMAN STREET, FROM STREET SCOTT AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed a temporary restoration in the driving lane overdue for final. CAR #20247720294 issued 5/27/2024 to permit B012024110B19 expired 5/3/2024. Respondent failed to permanently restore cut within the required time. Cited permit used for ID. |
2024-10-09 | No data | TIEBOUT AVENUE, FROM STREET EAST 184 STREET TO STREET EAST 187 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found newly repaved |
2024-10-06 | No data | HERKIMER STREET, FROM STREET BUFFALO AVENUE TO STREET SUYDAM PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED EXCAVATION IN THE ROADWAY. EXCAVATION IS NOT FULLY CUT BACK TO THE CURB I WILL COME BACK AND TALK TO CONTRACTOR ANOUT FULLY TRENCHING. NEW PERMIT AWAITING IN NYC STREETS |
2024-10-05 | No data | HERKIMER STREET, FROM STREET ALBANY AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed a plated excavation in the roadway without a permit to do so. Respondent failed to obtain a valid DOT permit while making use of the roadway, respondent ID by cited permit and “Arben” written on plates. |
2024-10-05 | No data | CRUGER AVENUE, FROM STREET BARTHOLDI STREET TO STREET MAGENTA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in the roadway and sidewalk |
2024-10-05 | No data | EAST 38 STREET, FROM STREET 3 AVENUE TO STREET QNS MDTWN TNNL EXIT | No data | Street Construction Inspections: LL14 | Department of Transportation | I/F/O # 211, 213, & 215. LL14 Backfill passed for all 3 Restorations. Cut # 1 I/F/O # 211 L 3’ & W 2’ 8” Cut # 2 I/F/O # 213 L 3’ 8” & W 3’ 4” Cut # 3 I/F/O # 215 L 3’ 4” & W 3’. No Sidewalk work for 211 & 213. 1 Sidewalk Flag for 215. |
2024-10-05 | No data | EAST 38 STREET, FROM STREET 3 AVENUE TO STREET QNS MDTWN TNNL EXIT | No data | Street Construction Inspections: Pick-Up | Department of Transportation | NOV issued for the Respondent excavating a protected Street, in the parking lane at location stated, with no NYC DOT permit on file to so for this segment. Permit # M012024129A55 is 3 Avenue a different segment. |
2024-10-04 | No data | EAST 168 STREET, FROM STREET FULTON AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the driving lane of the roadway. |
2024-10-03 | No data | LAFAYETTE AVENUE, FROM STREET NEWMAN AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway and new concrete sidewalk flag installed in compliance |
2024-10-02 | No data | MOTHER GASTON BOULEVARD, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway driving lane extending to curb for construction site 117 |
2024-10-02 | No data | CHESTER STREET, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plates in the roadway over due for final @ construction site 305 |
2024-10-01 | No data | UNDERHILL AVENUE, FROM STREET LACOMBE AVENUE TO STREET SOUNDVIEW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in compliance |
2024-10-01 | No data | EAST 83 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M152024250A14 |
2024-10-01 | No data | IRVING PLACE, FROM STREET GATES AVENUE TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | At My Time Of Re-Inspection I Observed Condition Not Corrected Expansion Joint Not Sealed, However Wood Forms Were Removed CAR Failed. |
2024-09-30 | No data | BRONX PARK EAST, FROM STREET MACE AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paved over work |
2024-09-28 | No data | WILLIAMSBRIDGE ROAD, FROM STREET ALLERTON AVENUE TO STREET RADCLIFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sewer work made final in the roadway |
2024-09-28 | No data | CHATTERTON AVENUE, FROM STREET OLMSTEAD AVENUE TO STREET PUGSLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Multiple cuts in roadway in compliance |
2024-09-28 | No data | BRONX PARK EAST, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in the roadway. i.f.o. 2520-2522 |
2024-09-27 | No data | ST LAWRENCE AVENUE, FROM STREET DEAD END TO STREET SOUNDVIEW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway in compliance |
2024-09-26 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer cut at 875 in compliance |
2024-09-26 | No data | NEWPORT STREET, FROM STREET ROCKAWAY AVENUE TO STREET THATFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway parking lane and driving lane ifo NB 203 |
2024-09-26 | No data | CARPENTER AVENUE, FROM STREET BRONX BOULEVARD TO STREET EAST 220 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sewer work in progress |
2024-09-26 | No data | 5 AVENUE, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to fully inspect due to ongoing building operation. |
2024-09-24 | No data | FORBELL STREET, FROM STREET COZINE AVENUE TO STREET FLATLANDS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2024-09-22 | No data | WEST 251 STREET, FROM STREET BROADWAY TO STREET OLD ALBANY POST ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | st cut pass |
2024-09-21 | No data | JEFFERSON STREET, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMANENT RESTORATION IN THE CENTER OF THE ROADWAY |
2024-09-21 | No data | TROUTMAN STREET, FROM STREET SCOTT AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | OVER DUE FOR FINAL CUT IN THE ROADWAY |
2024-09-21 | No data | JEFFERSON STREET, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERM RESTORATION IN THE MIDDLE OF THE ROADWAY CAR PERMIT B012024206C00 WAS TAKEN OUT FOR FINALIZATION |
2024-09-20 | No data | BARTHOLDI STREET, FROM STREET CRUGER AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway and sidewalk |
2024-09-18 | No data | EMERALD STREET, FROM STREET LINDEN BOULEVARD TO STREET LORING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in driving lane sealed and in compliance |
2024-09-17 | No data | WILLIAMSBRIDGE ROAD, FROM STREET ALLERTON AVENUE TO STREET RADCLIFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sewer work in progress, signs posted, flaggers on site. |
2024-09-17 | No data | WILLIAMSBRIDGE ROAD, FROM STREET ALLERTON AVENUE TO STREET RADCLIFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sewer work started, updated permit on file |
2024-09-15 | No data | 5 AVENUE, FROM STREET EAST 52 STREET TO STREET EAST 53 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a permanent restoration extending from the East parking lane into the driving lanes that is flush to grade. |
2024-09-14 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm cut has been sealed |
2024-09-13 | No data | CRUGER AVENUE, FROM STREET BARTHOLDI STREET TO STREET MAGENTA STREET | No data | Street Construction Inspections: Active | Department of Transportation | active permit sewer work in progress, 3 plated with marked Arben covering the trench in the roadway and 2 Arben plates covering the sidewalk. in compliance |
2024-09-01 | No data | WEST 15 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Found no steel plate within the south parking lane of the roadway |
2024-08-30 | No data | EAST 83 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active BO at location |
2024-08-28 | No data | CARROLL STREET, FROM STREET 4 AVENUE TO STREET DENTON PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the r/w behind jersey barriers |
2024-08-28 | No data | NORTHERN BOULEVARD, FROM STREET 104 STREET TO STREET 105 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restorations in front of 104-10 to grade in the roadway. |
2024-08-24 | No data | MOTHER GASTON BOULEVARD, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done |
2024-08-24 | No data | CHESTER STREET, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation in roadway in compliance, new permit in file B012024236A01 |
2024-08-10 | No data | 5 AVENUE, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Current building operation under permit M022024137A02 |
2024-08-10 | No data | EAST 25 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #223-permanent water Restoration in the driving and parking lanes are flush to grade. |
2024-08-10 | No data | TROUTMAN STREET, FROM STREET SCOTT AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed a temporary restoration in the driving lane in front of property #427 overdue for final. Permit #B012024110B19 expired 5/3/2024. CAR #20247720294 issued 5/27/2024. Respondent failed to permanently restore cut within required time. Cited |
2024-08-09 | No data | EAST 45 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | patchwork on sidewalk in front of 215 east 45th street needs to be restored. |
2024-08-08 | No data | EAST GUN HILL ROAD, FROM STREET LACONIA AVENUE TO STREET LURTING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Long water restoration in the roadway |
2024-08-06 | No data | EAST 92 STREET, FROM STREET DITMAS AVENUE TO STREET LIRR BAY RIDGE DIV | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm restorations in the roadway opposite of property |
2024-08-06 | No data | FLATLANDS AVENUE, FROM STREET GEORGIA AVENUE TO STREET SHEFFIELD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench curb to curb for new building going up |
2024-08-05 | No data | COLUMBIA STREET, FROM STREET DE GRAW STREET TO STREET SACKETT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass perm restoration on the RW in compliance I/F/O 203 |
2024-08-05 | No data | WILLIAMSBRIDGE ROAD, FROM STREET HOLLAND AVENUE TO STREET WALLACE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2024-08-05 | No data | FLATLANDS AVENUE, FROM STREET SHEFFIELD AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | PERM RESTORATIONS ON BOTH SIDES OF MEDAIN |
2024-08-03 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RESTORATION NOT SEALED |
2024-08-01 | No data | EAST 58 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Coring conducted IFO 110 East 58 Street. WC 2 1/2" & Base 12 1/2" with protective steel plate. Existing WC 3 1/2" & base 2 1/2" with protective steel plate. coring passed. |
2024-07-27 | No data | EAST 126 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2033 5 ave water restoration in compliance |
2024-07-27 | No data | EAST 11 STREET, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Found active permit M012024172C08 on file for Major gas installation over the 2 water restoration |
2024-07-27 | No data | CHATTERTON AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET OLMSTEAD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TWO WATER CUTS ON CHATTERTON AVENUE. AKA 1017. |
2024-07-25 | No data | JEFFERSON STREET, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | L4ft, W3ft, D3ft cut in the driving lane. |
2024-07-23 | No data | WILLIAMSBRIDGE ROAD, FROM STREET ALLERTON AVENUE TO STREET RADCLIFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sewer work done on the roadway.. restoration flush to grade |
2024-07-20 | No data | LACONIA AVENUE, FROM STREET EAST 212 STREET TO STREET EAST 213 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp paved over plumber work |
2024-07-20 | No data | WEST 15 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Closer to 9th Ave ( south parking lane ), please remove one ( 1 ) "ARBEN NY" marked steel plate left behind after completion of nearby permanent restoration. |
2024-07-15 | No data | WEST MOSHOLU PARKWAY NORTH, FROM STREET GATES PLACE TO STREET WEST GUN HILL ROAD | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic sanitary sewer cracked in sidewalk,(visibly confirmed) one excavation made on sidewalk at time of inspection |
2024-07-15 | No data | JEFFERSON STREET, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired on 6/2/2024. |
2024-07-15 | No data | EAST 112 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW and roadway incompliance at time of inspection. |
2024-07-14 | No data | EAST 92 STREET, FROM STREET DITMAS AVENUE TO STREET LIRR BAY RIDGE DIV | No data | Street Construction Inspections: Active | Department of Transportation | Two perm plumbing restorations in the driving lane |
2024-07-13 | No data | CROSBY AVENUE, FROM STREET DANIEL STREET TO STREET MIDDLETOWN ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | street joints resealed |
2024-07-13 | No data | TIEBOUT AVENUE, FROM STREET EAST 184 STREET TO STREET EAST 187 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation |
2024-07-13 | No data | BRONX PARK EAST, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway and sidewalk |
2024-07-12 | No data | NOSTRAND AVENUE, FROM STREET MONTGOMERY STREET TO STREET SULLIVAN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway @ Sullivan place sealed in compliance 1 sidewalk flag ifo 975 construction site |
2024-07-12 | No data | DEBEVOISE AVENUE, FROM STREET JACKSON STREET TO STREET MASPETH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flushed to grade |
2024-07-09 | No data | EAST 83 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active BO |
2024-07-09 | No data | DUPONT STREET, FROM STREET COMMERCIAL STREET TO STREET FRANKLIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2024-07-09 | No data | WEST STREET, FROM STREET EAGLE STREET TO STREET FREEMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2024-07-08 | No data | FLATLANDS AVENUE, FROM STREET GEORGIA AVENUE TO STREET SHEFFIELD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm trench within the roadway curb to curb. Flushed and sealed. |
2024-07-08 | No data | EAST 83 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012024161A03 Latest permit on file |
2024-07-08 | No data | FURMAN AVENUE, FROM STREET EAST 240 STREET TO STREET EAST 241 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the parking lane, at New Building |
2024-07-06 | No data | FLATLANDS AVENUE, FROM STREET SHEFFIELD AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the respondent with a permanent restoration cut in the intersection without a DOT permit on file. Respondent failed to apply for a permit to start work. Permittee IBM color code in restoration used for ID |
2024-07-06 | No data | IRVING PLACE, FROM STREET GATES AVENUE TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failed to seal expansion joint |
2024-07-03 | No data | CRUGER AVENUE, FROM STREET ARNOW AVENUE TO STREET WILLIAMSBRIDGE ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paved over work.. refer to latest permit X012023058B37 |
2024-07-02 | No data | LOGAN STREET, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PEEM RESTORATION IN THE PARKING LANE UNDERNEATH SIDE WALK SHED |
2024-07-02 | No data | EAST 41 STREET, FROM STREET 2 AVENUE TO STREET TUDOR CITY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done, permit expired. (AKA 300 East 41st Street location was checked for water repair cuts, and none were found). |
2024-07-02 | No data | ANN STREET, FROM STREET BROADWAY TO STREET THEATRE ALLEY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit #M012024026B87 on file. |
2024-06-30 | No data | TROUTMAN STREET, FROM STREET SCOTT AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to permanently restore temporary cut within required time. CAR#(20247720294) was issued on the 5/27/2024. Permit# B012024110B19 was used for ID. |
2024-06-29 | No data | WARREN STREET, FROM STREET GREENWICH STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Found sidewalk flags with 2 water valve boxes with in having expansion joints sealed in kind. |
2024-06-29 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RESTORATION NOT COMPLETELY SEALED |
2024-06-28 | No data | NOSTRAND AVENUE, FROM STREET MONTGOMERY STREET TO STREET SULLIVAN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration extending from curb to curb sealed in compliance ifo 975 |
2024-06-26 | No data | CARROLL STREET, FROM STREET 4 AVENUE TO STREET DENTON PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cant inspect cut due to green fence with barriers extended onto the r/w |
2024-06-25 | No data | 77 AVENUE, FROM STREET 138 STREET TO STREET 141 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the parking/driving lane. |
2024-06-18 | No data | HARRISON AVENUE, FROM STREET WEST 180 STREET TO STREET WEST 181 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway work resurfaced by BPPSw flags resurfaced by NB sidewalk redo |
2024-06-17 | No data | FLATLANDS AVENUE, FROM STREET GEORGIA AVENUE TO STREET SHEFFIELD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | crew at site, active permit on file |
2024-06-17 | No data | FLATLANDS AVENUE, FROM STREET GEORGIA AVENUE TO STREET SHEFFIELD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site actively working |
2024-06-17 | No data | WEST 31 STREET, FROM STREET 5 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please disregard the previous inspection due to an error. I found a permanent restoration flush to grade in the parking lane with another plumber's cut that partially overlaps it. |
2024-06-17 | No data | FLATLANDS AVENUE, FROM STREET SHEFFIELD AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the respondent with a steel plate on the intersection covering an excavation without a permit on file. Respondent failed to apply for a permit in order to do so. Steel plate with permitte name used for ID |
2024-06-16 | No data | CLAREMONT AVENUE, FROM STREET WEST 120 STREET TO STREET WEST 122 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Latest Permit# M012021253B15 |
2024-06-16 | No data | WEST 27 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newer permit on file, refer to permit #M012021183B27 |
2024-06-16 | No data | CLAREMONT AVENUE, FROM STREET BEND TO STREET WEST 116 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found Roadway resurfaced refer to Permit# M152024120A25 for paving information. |
2024-06-15 | No data | EAST 11 STREET, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | IFO 25, NOV for two permanent Water repair cuts measuring 4'4" apart. Respondent notified via CAR# 20235810020 on 4/24/2023 and failed to comply with DOT Standard Detail Drawing 1042D Note#9, as per 34 RCNY 2-11 (e)(12)(iv). |
2024-06-13 | No data | GREENWICH STREET, FROM STREET DESBROSSES STREET TO STREET WATTS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #456 found portion of permanent restoration has been resurfaced by BPP in cobblestone roadway. |
2024-06-10 | No data | 6 AVENUE, FROM STREET WEST 14 STREET TO STREET WEST 15 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found cut resurfaced. |
2024-06-08 | No data | SCHERMERHORN STREET, FROM STREET BOERUM PLACE TO STREET COURT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Scaffolding is currently over the sidewalk IFO property #59. |
2024-06-08 | No data | BEACH 35 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET ROCKAWAY BEACH BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found one permanent roadway color coded. |
2024-06-07 | No data | IRVING PLACE, FROM STREET GATES AVENUE TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut along with Swk flags in compliance |
2024-06-06 | No data | 27 STREET, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade within the driving lane |
2024-06-05 | No data | CLAREMONT AVENUE, FROM STREET WEST 120 STREET TO STREET WEST 122 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started. |
2024-06-05 | No data | CROSBY AVENUE, FROM STREET DANIEL STREET TO STREET MIDDLETOWN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration needs to be re-sealed |
2024-06-04 | No data | 6 AVENUE, FROM STREET CARROLL STREET TO STREET GARFIELD PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 new flag installed ifo property 265 in compliance |
2024-06-01 | No data | BEACH 35 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET ROCKAWAY BEACH BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | at time of my inspection found one permanent roadway restoration color coded and sealed .Unable to see sidewalk while fence is up. |
2024-06-01 | No data | BEACH CHANNEL DRIVE, FROM STREET BEACH 35 STREET TO STREET BEACH 36 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk behind fence unable too see . Permanent roadway restoration in good condition color coded and sealed. |
2024-06-01 | No data | LOGAN STREET, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PEEM RESTORATION IN THE PARKING LANE UNDERNEATH SIDE WALK SHED |
2024-05-31 | No data | EAST 224 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in the roadway |
2024-05-28 | No data | WEST 15 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newer permit on file, refer to permit #M012024144A70 |
2024-05-28 | No data | WEST 15 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | On west 15th within the adjacent the south curb line next to T-Mobile found a plated restoration within the parking lane |
2024-05-27 | No data | TROUTMAN STREET, FROM STREET SCOTT AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The temporary restoration in the driving lane IFO property #427 is overdue for final. |
2024-05-27 | No data | JEFFERSON STREET, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit on file B012024141A37. |
2024-05-27 | No data | MASPETH AVENUE, FROM STREET DEBEVOISE AVENUE TO STREET MORGAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found |
2024-05-25 | No data | IRVING PLACE, FROM STREET GATES AVENUE TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failed to seal expansion joints |
2024-05-24 | No data | BRONX PARK EAST, FROM STREET THWAITES PLACE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in the roadway |
2024-05-23 | No data | CLAREMONT AVENUE, FROM STREET WEST 120 STREET TO STREET WEST 122 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Latest Permit# M012021253B15 |
2024-05-23 | No data | 27 STREET, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade within the driving lane |
2024-05-23 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work curb to curb, CAR will be issued to current permit |
2024-05-22 | No data | WARREN STREET, FROM STREET GREENWICH STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #86, Found permanent water restoration mostly resurfaced by BBP. |
2024-05-22 | No data | EAST 211 STREET, FROM STREET HOLLAND AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paved over work |
2024-05-22 | No data | EAST 212 STREET, FROM STREET HOLLAND AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paved over work |
2024-05-21 | No data | CARPENTER AVENUE, FROM STREET EAST 220 STREET TO STREET EAST 221 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP Paved over plumber restoration |
2024-05-21 | No data | CARROLL STREET, FROM STREET 4 AVENUE TO STREET DENTON PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water repair behind construction fence. |
2024-05-20 | No data | 72 STREET, FROM STREET 60 AVENUE TO STREET ELIOT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm r/w and s/w flags restore to grade. |
2024-05-20 | No data | EAST 222 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in the grass area of the sidewalk, BPP paved over restoration in the roadway |
2024-05-19 | No data | DE KALB AVENUE, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane. |
2024-05-18 | No data | EAST 112 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 60 east 112 steer water restoration in compliance |
2024-05-18 | No data | EAST 128 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration flushed to grade PL. |
2024-05-17 | No data | EAST 112 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No defects at time of inspection. |
2024-05-17 | No data | WEST 57 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew alleged for cutting a conduit. Further investigation will be done. |
2024-05-17 | No data | LOGAN STREET, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASSED (L)6FT X (W)5FT 10IN X (D)2FT 10IN TEST 97.0 ARRIVED 8:20am BACK FILL COMPLETED 10:00am |
2024-05-17 | No data | LOGAN STREET, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED EXCAVATION IN THE PARKING LANE UNDERNEATH SIDE WALK SHED |
2024-05-16 | No data | OCEAN PARKWAY, FROM STREET AVENUE Z TO STREET MURDOCK COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sewer repair in compliance |
2024-05-16 | No data | WEST 57 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, excavating s/w & rwy. ifo #50, water repair, 3day |
2024-05-15 | No data | FLATLANDS AVENUE, FROM STREET GEORGIA AVENUE TO STREET SHEFFIELD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | steel plate in driving lane |
2024-05-12 | No data | CLAREMONT AVENUE, FROM STREET BEND TO STREET WEST 116 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found roadway resurfaced refer to Permit# M152024120A25 for paving information. |
2024-05-11 | No data | MADISON AVENUE, FROM STREET EAST 56 STREET TO STREET EAST 57 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Heavy Domestic Water Service Leak in the Sidewalk.Contractor currently Making Repairs. Building Superintendent on site |
2024-05-08 | No data | NOSTRAND AVENUE, FROM STREET MONTGOMERY STREET TO STREET SULLIVAN PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site open sewer trench in the roadway parking /driving lane ifo 975 construction site 8’x4’x9’ |
2024-05-08 | No data | NOSTRAND AVENUE, FROM STREET MONTGOMERY STREET TO STREET SULLIVAN PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | Ifo 975 Construction site roadway parking /driving lane sewer cut 8’x4’x9’ moisture (8.7) compaction BT. 96.8 TT. 98.4 |
2024-05-07 | No data | WALTON AVENUE, FROM STREET CAMERON PLACE TO STREET EAST 182 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation nearest Cameron |
2024-05-07 | No data | WALTON AVENUE, FROM STREET CAMERON PLACE TO STREET EAST 182 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated plumbers cut under active permit |
2024-05-06 | No data | COLUMBIA STREET, FROM STREET DE GRAW STREET TO STREET SACKETT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New flag around water valve IFO property #203. |
2024-05-05 | No data | BRONX PARK EAST, FROM STREET MACE AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street resurfaced , new building |
2024-05-05 | No data | EAST 146 STREET, FROM STREET BROOK AVENUE TO STREET WILLIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut is resurfaced by new b/o |
2024-05-05 | No data | BARKER AVENUE, FROM STREET MACE AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street resurfaced, New building |
2024-05-04 | No data | EAST 11 STREET, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | IFO 25, NOV for two permanent Water repair cuts measuring 4'4" apart. Respondent notified via CAR# 20235810020 on 4/24/2023 and failed to comply with DOT Standard Detail Drawing 1042D Note#9, as per 34 RCNY 2-11 (e)(12)(iv). |
2024-05-04 | No data | EAST 223 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found resurfaced BPP restoration. |
2024-05-04 | No data | MERRITT AVENUE, FROM STREET BOROUGH BOUNDARY TO STREET EAST 233 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in the roadway and sidewalk |
2024-05-03 | No data | WEST 31 STREET, FROM STREET 5 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The work was completed by a new plumber named Authentic Plumbing Corp under permit #M012024122A32. |
2024-05-01 | No data | WARREN STREET, FROM STREET GREENWICH STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit #M012024038A83 on file. |
2024-04-30 | No data | STANLEY AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in compliance at this time |
2024-04-29 | No data | EAST 10 STREET, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I/F/O 22 found all found sidewalk flags restored to to grade, as well as expansion joints installed and sealed to grade. |
2024-04-27 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 95 east 111 st water restoration in compliance |
2024-04-27 | No data | OCEAN PARKWAY, FROM STREET AVENUE Z TO STREET MURDOCK COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to ascertain. |
2024-04-26 | No data | 27 STREET, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH | No data | Street Construction Inspections: LL14 | Department of Transportation | 7’x3’x4’8” , 7’x3’x5’5” 4’8”x3’8”x5’, Foreman Manuel. Edguardo Joel tolentino , exclusive testing lab, Sandcone was used, blend material, wet:120.3, Dry114.3,Max 119.1 & moisture 5.3 |
2024-04-26 | No data | BROOME STREET, FROM STREET NORFOLK STREET TO STREET SUFFOLK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced. |
2024-04-24 | No data | NOSTRAND AVENUE, FROM STREET MONTGOMERY STREET TO STREET SULLIVAN PLACE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in the r/w at Sullivan Pl |
2024-04-23 | No data | WEST 9 STREET, FROM STREET 5 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a permanent flush to grade restoration within the middle of the roadway. Lane markings restored |
2024-04-22 | No data | 27 STREET, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH | No data | Street Construction Inspections: LL14 | Department of Transportation | 23’x3’6”x3’6” Foreman Manuel. ETL Melo. Wet 125.1 dry 118.8 max 124.5 moisture 5.3 BottomTest 96.8 TopTest 97.5 CleanFill JumpingJack SandCone. Cut driving lane, 30’ from Queens Plaza North. Plumber also has roadway closure permit. Cutback not done. |
2024-04-20 | No data | BAY STREET, FROM STREET BOROUGH PLACE TO STREET BEND | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The color code and lane marking was restored |
2024-04-19 | No data | BAY STREET, FROM STREET BOROUGH PLACE TO STREET BEND | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The sign was removed |
2024-04-17 | No data | 27 STREET, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B summons issued. No confirmation number. Plumber work started in driving lane closer to Queens Plaza. Ifo b.o. corner property. Updated valid permit on file. Arben also has roadway closure permit. |
2024-04-17 | No data | IRVING PLACE, FROM STREET GATES AVENUE TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Flag, not sealed, and Wood left in tree pit in front of property 25 |
2024-04-12 | No data | 72 STREET, FROM STREET 60 AVENUE TO STREET ELIOT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Permanent restoration in parking lane. One sidewalk flag restored. Expansion joints need to be sealed, permit is still valid. |
2024-04-12 | No data | WEST 85 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut seems to be resurfaced |
2024-04-09 | No data | UNDERHILL AVENUE, FROM STREET LACOMBE AVENUE TO STREET SOUNDVIEW AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation in the roadway in compliance |
2024-04-06 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation in the roadway at this time |
2024-04-05 | No data | MASPETH AVENUE, FROM STREET DEBEVOISE AVENUE TO STREET MORGAN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass in compliance for construction site 19 Debevoise Av on Maspeth Av dimension 10’x9’x9.6’ actuall moisture 6.4 (CF) ACTUAL MOISTURE 8.7(SAND) top test (96.8) bottom test (97.3) departing backfill 1:30pm |
2024-04-05 | No data | MASPETH AVENUE, FROM STREET DEBEVOISE AVENUE TO STREET MORGAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site upon arrival open excavation in the roadway driving /parking lane for construction site 19 Debevoise Av. On Maspeth Av. Dimensions 10’x9’x9.6’ |
2024-04-01 | No data | SOUNDVIEW AVENUE, FROM STREET LELAND AVENUE TO STREET UNDERHILL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2024-03-29 | No data | COLUMBIA STREET, FROM STREET DE GRAW STREET TO STREET SACKETT STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, water leak repair, ifo # |
2024-03-27 | No data | 44 ROAD, FROM STREET 24 STREET TO STREET 25 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration cut curb to curb. |
2024-03-25 | No data | 44 ROAD, FROM STREET 23 STREET TO STREET 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration cut in the parking lane in front of 23-15. |
2024-03-25 | No data | 24 STREET, FROM STREET 43 AVENUE TO STREET 44 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration cut in the roadway towards 24th Street. |
2024-03-24 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 45 STREET TO STREET BEACH 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permit out of guarantee |
2024-03-22 | No data | WEST 150 STREET, FROM STREET 8 AVENUE TO STREET BRADHURST AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in compliance |
2024-03-21 | No data | IRVING PLACE, FROM STREET EAST 19 STREET TO STREET GRAMERCY PARK | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a permanent Restoration leading to the Curb, however area within Restoration is plated for Con Edison repair Gas work. |
2024-03-21 | No data | EAST 59 STREET, FROM STREET AVENUE J TO STREET FLATLANDS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration behind building opp. house 960 |
2024-03-21 | No data | EAST 111 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w okay |
2024-03-18 | No data | UNDERHILL AVENUE, FROM STREET LACOMBE AVENUE TO STREET SOUNDVIEW AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working in compliance |
2024-03-16 | No data | EAST 176 STREET, FROM STREET BELMONT AVENUE TO STREET CROTONA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2024-03-15 | No data | IRVING PLACE, FROM STREET GATES AVENUE TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Material failed ACTUAL MOISTURE 12.1 |
2024-03-15 | No data | NEWTOWN AVENUE, FROM STREET 25 STREET TO STREET 27 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | F/O 25-02 Newtown Ave. One perm s/w cut, 3'00" x 2'10" x 4'06" over the double yellow lines. |
2024-03-14 | No data | NEWTOWN AVENUE, FROM STREET 25 STREET TO STREET 27 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill has to be rescheduled. tester with mobile testing failed the compaction material. |
2024-03-13 | No data | 27 STREET, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH | No data | Street Construction Inspections: Complaint | Department of Transportation | Arben water main work in driving lane. Arben cannot maintain travel lane due to water main located at curb driving lane and B.O. scaffold. Summons issued on 311 complaint. Spoke with Arben crew on site. Plated excavation in driving lane. |
2024-03-09 | No data | ANDREWS AVENUE, FROM STREET WEST 183 STREET TO STREET WEST FORDHAM ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2024-03-08 | No data | FORBELL STREET, FROM STREET COZINE AVENUE TO STREET FLATLANDS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in compliance |
2024-03-08 | No data | WARREN STREET, FROM STREET GREENWICH STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL: L:23'9" W:6'9" D:3' ONE SIDE OF THE CUT WAS DEEPER THAN THE OTHER SIDE SO 3 TESTS WERE COMPLETED. 6" CUT BACKS WAS COMPLETED. |
2024-03-08 | No data | NOSTRAND AVENUE, FROM STREET MONTGOMERY STREET TO STREET SULLIVAN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve on s/w & perm trench along the r/w |
2024-03-06 | No data | WARREN STREET, FROM STREET GREENWICH STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | IFO 86, NOV: 5 "ARBEN" marked countersunk steel plates in the roadway with a "Raise Plow" sign posted at location of the plates. Respondent failed to post cited sign 5' prior to the plates as per rule. Winter Moratorium which commenced on 12/1/2023. |
2024-03-04 | No data | DEBEVOISE AVENUE, FROM STREET JACKSON STREET TO STREET MASPETH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site upon arrival sewer cut in the roadway driving lane extending to the curb ifo construction site 19 dimensions 16’x4’x11.6’ |
2024-03-04 | No data | DEBEVOISE AVENUE, FROM STREET JACKSON STREET TO STREET MASPETH AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass in compliance for construction site 19. Roadway driving lane extending to the curb dimensions 16’x4’x11.6’ actual moisture (7.5) bottom test(97.6) Bottom Test (95.7) departing 12:21 |
2024-03-02 | No data | 5 AVENUE, FROM STREET EAST 52 STREET TO STREET EAST 53 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Cutbacks made, 14’x5’x1 and 12’6’’x9’3’’x1’, area will be plated for curing. |
2024-03-01 | No data | EAST GUN HILL ROAD, FROM STREET LACONIA AVENUE TO STREET LURTING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber cut made permanent |
2024-02-27 | No data | BRONX PARK EAST, FROM STREET THWAITES PLACE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paved over plumber restoration |
2024-02-25 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 45 STREET TO STREET BEACH 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permit out of guarantee |
2024-02-24 | No data | DE KALB AVENUE, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Existing Domestic Water Service was Damaged by inside Construction Activity. Site Super on Location. Water currently coming up from Roadway Contractor making Repairs in the Roadway. |
2024-02-24 | No data | 5 AVENUE, FROM STREET EAST 52 STREET TO STREET EAST 53 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill complete, no cutbacks were done 6”-12” cutbacks were marked out |
2024-02-24 | No data | EAST 25 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a permanent Restoration in the driving and parking lanes. |
2024-02-23 | No data | ANDERSON AVENUE, FROM STREET WEST 165 STREET TO STREET WEST 166 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Rw maintained. 1 lane, crew on site. |
2024-02-22 | No data | IRVING PLACE, FROM STREET EAST 19 STREET TO STREET GRAMERCY PARK | No data | Street Construction Inspections: Active | Department of Transportation | Contractor was on site backfilling Restoration partially under car. A 5’ void was observed under the car leading towards the Curb. Crew was advised to stop working get the Car to remove then cut out the void to the Curb. |
2024-02-22 | No data | EAST 78 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Wearing course complete |
2024-02-21 | No data | EAST 78 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Monitored Backfill. Backfill pass & complete. Arrival: 9:30AM Departure: 1:30PM |
2024-02-21 | No data | BAY STREET, FROM STREET BOROUGH PLACE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED WERE REMOVED -PLEASE REMOVE ARBEN CONTRACTING OF NY, INC #50011 "RAISE PLOW SIGN" AT 35A BAY STREET. |
2024-02-20 | No data | EAST 55 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Resurfaced by BPP. |
2024-02-20 | No data | 27 STREET, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH | No data | Street Construction Inspections: LL14 | Department of Transportation | Base cutbacks 10'x6'2"x9" completed & acceptable within the roadway on the 27th Street side of 25-01 Queens Plaza North. |
2024-02-17 | No data | WEST 31 STREET, FROM STREET 5 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | LL14 Backfill passed with work performed on the Sidewalk. Restoration located in the parking lane. Found other Utility pipes and electric ducts within hole. 3 voids were removed. L 7’ 10” and W 6’. |
2024-02-16 | No data | WEST 43 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration acceptable no defects |
2024-02-14 | No data | WEST 31 STREET, FROM STREET 5 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Complaint | Department of Transportation | At time of inspection ARBEN CONTRACTING OF NEW YORK, INC have an active emergency permit. Permit#M012024043B75 that expires 2/14/24. There's a plate countersunk in the parking lane and sidewalk. Raise plow sign is posted. |
2024-02-14 | No data | WARREN STREET, FROM STREET GREENWICH STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | IFO #86 within the driving lane, there are multiple “ARBEN” marked steel plates counter-sunken within the roadway. |
2024-02-14 | No data | CROSBY AVENUE, FROM STREET DANIEL STREET TO STREET MIDDLETOWN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in the roadway |
2024-02-12 | No data | EAST 152 STREET, FROM STREET TINTON AVENUE TO STREET WALES AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill passed and completed. Witnessed 6” cutbacks. (37’ x 4’10 x 4’). Arrived late due to last minute placement for backfill. |
2024-02-12 | No data | 27 STREET, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH | No data | Street Construction Inspections: Active | Department of Transportation | Cut is 100’ from Queens Plaza North. Possible gas or electric cut from B.O. is abutting plumbers work. Also, Gas line is within plumber’s cut. Cutbacks were marked but not done. |
2024-02-12 | No data | 27 STREET, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH | No data | Street Construction Inspections: LL14 | Department of Transportation | 10’x5’x9’ Plumber Foreman Manuel P/L under scaffold behind B.O. jersey barriers and fence. WET 124.2 Dry 114.3 Max 120.5 Moisture 8.7 BottomTest 98.1 TopTest 98.6 ETL Denise SandCone Jumping Jack. Cutbacks marked out but not done. Concrete Base R/W. |
2024-02-11 | No data | 11 AVENUE, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a permanent restoration flush to grade in the parking lane behind the barricades. |
2024-02-07 | No data | EAST 84 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in compliance |
2024-02-06 | No data | WARREN STREET, FROM STREET GREENWICH STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | The parking lane was restored with 2 inches of permanent asphalt. Some areas were 1 1/2 inches due to the adjacent concrete base being slightly higher than the respondent base. |
2024-02-05 | No data | BEACH AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway sidewalk in compliance |
2024-02-05 | No data | HARRISON AVENUE, FROM STREET WEST 180 STREET TO STREET WEST 181 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BF partially done. Backfilled 6’ out of 10’. |
2024-02-01 | No data | BAY STREET, FROM STREET BOROUGH PLACE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATES IN ROADWAY BOTH SIDES OF MEDIAN- EXP 2/2/24 |
2024-01-31 | No data | CASTLETON AVENUE, FROM STREET PORT RICHMOND AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in driving lane acceptable. |
2024-01-25 | No data | BUCHANAN PLACE, FROM STREET AQUEDUCT AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Remaining 4.5 ft Backfilled, 9x4x4.5 cut size, |
2024-01-25 | No data | 5 AVENUE, FROM STREET EAST 52 STREET TO STREET EAST 53 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued to the above respondent for having a permanent repair water restoration in the driving lane, backfilled on a protected street, but failed to obtain a confirmation number. Permit# M012023340A37 expired 12/20/2023. |
2024-01-24 | No data | NOSTRAND AVENUE, FROM STREET MONTGOMERY STREET TO STREET SULLIVAN PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrived: 09:17, Cut-1- L: 7’ W: 4’ D: 5’, Cut-2 L: 30’ W: 6’6” D: 5’4”, 6” Base cutback marked out and saw cut at this time. Departed:12:37 |
2024-01-23 | No data | BUCHANAN PLACE, FROM STREET AQUEDUCT AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BF partially done. 9x4x4 in driving lane. Depth of 4’6” remains not done. |
2024-01-23 | No data | BAY STREET, FROM STREET BOROUGH PLACE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | crew re-tamping temp around steel plates - crew given warning to start at 9 am |
2024-01-22 | No data | HINSDALE STREET, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration covered by BPP |
2024-01-20 | No data | BUCHANAN PLACE, FROM STREET AQUEDUCT AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plates are counter sunk |
2024-01-19 | No data | BAY STREET, FROM STREET BOROUGH PLACE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | steel plates countersunk across road -with signs posted |
2024-01-19 | No data | BEACH CHANNEL DRIVE, FROM STREET BEACH 35 STREET TO STREET BEACH 36 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent trench to grade |
2024-01-12 | No data | BROADWAY, FROM STREET WEST 84 STREET TO STREET WEST 85 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk newly paved |
2024-01-12 | No data | WEST 85 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut resurfaced |
2024-01-12 | No data | LOGAN STREET, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE D/L ... IN COMPLIANCE |
2024-01-12 | No data | BAY STREET, FROM STREET BOROUGH PLACE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR open under permit S012023306A23 |
2024-01-12 | No data | BAY STREET, FROM STREET BOROUGH PLACE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | Complaint referred to NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION: I observed 1 out of 2 counter sunken steel plates marked “ARBEN NY” found on roadway in front of 35A Bay street between Borough place and Bend bouncing causing plates to make noise |
2024-01-11 | No data | PRESIDENT STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water valve on s/w & perm trench along the r/w |
2024-01-10 | No data | THROOP AVENUE, FROM STREET ELLERY STREET TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration extending across the roadway sealed in compliance for property 171 |
2024-01-09 | No data | FOUNTAIN AVENUE, FROM STREET ATLANTIC AVENUE TO STREET WELLS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut perm .. in compliance (r/w not too visable due to weather) |
2024-01-09 | No data | 31 STREET, FROM STREET 21 AVENUE TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber work was resurfaced by BPP. |
2024-01-08 | No data | BAY STREET, FROM STREET BOROUGH PLACE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | crew saw cutting rwy at building operation |
2024-01-07 | No data | ST LAWRENCE AVENUE, FROM STREET DEAD END TO STREET SOUNDVIEW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass work done |
2024-01-06 | No data | BEACH AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Has plywood on sidewalk for concrete curing I/f/o 710 temp cut in roadway |
2024-01-06 | No data | ROSEDALE AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done. BPP paved over partial cut |
2024-01-06 | No data | 5 AVENUE, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to inspect due to active B.O. |
2024-01-06 | No data | EAST 126 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut okay |
2024-01-06 | No data | EMERALD STREET, FROM STREET LINDEN BOULEVARD TO STREET LORING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane in compliance |
2024-01-06 | No data | CARPENTER AVENUE, FROM STREET BRONX BOULEVARD TO STREET EAST 220 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Partially resurfaced by 2023 con Ed permanent restoration. |
2024-01-06 | No data | CARPENTER AVENUE, FROM STREET EAST 220 STREET TO STREET EAST 221 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Resurfaced by BPP restoration. |
2024-01-05 | No data | DEBEVOISE AVENUE, FROM STREET JACKSON STREET TO STREET MASPETH AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | L7FT, W5FT, D2FT CUT IN THE PARKING LANE IFO PROPERTY #19. |
2023-12-31 | No data | TURNBULL AVENUE, FROM STREET PUGSLEY AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway. |
2023-12-30 | No data | WILLIAMSBRIDGE ROAD, FROM STREET ALLERTON AVENUE TO STREET RADCLIFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done |
2023-12-29 | No data | 2 AVENUE, FROM STREET EAST 82 STREET TO STREET EAST 83 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #1595 AKA 250 East 83 Street (2) Repair water restoration in travel lane is flushed and sealed to grade. |
2023-12-29 | No data | CHESTNUT STREET, FROM STREET DINSMORE PLACE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in rw sealed and in compliance |
2023-12-28 | No data | EAST 179 STREET, FROM STREET BOSTON ROAD TO STREET BRONX STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the roadway IFO 1077. |
2023-12-27 | No data | GUERLAIN STREET, FROM STREET LELAND AVENUE TO STREET THIERIOT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent sewer restoration across the roadway IFO 1848. |
2023-12-26 | No data | LACONIA AVENUE, FROM STREET EAST 212 STREET TO STREET EAST 213 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Half plus 5 over cut in roadway in compliance |
2023-12-24 | No data | WEST 57 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit secured for this work. |
2023-12-22 | No data | 2 AVENUE, FROM STREET EAST 82 STREET TO STREET EAST 83 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #1595 repair Sewer restoration in travel lane is flushed and sealed to grade leading into building is flushed sealed to grade. |
2023-12-21 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in Roadway extending from curb to curb. sealed in compliance IFO 875. |
2023-12-21 | No data | WHITE PLAINS ROAD, FROM STREET ARCHER STREET TO STREET GUERLAIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the parking lane of the roadway. |
2023-12-20 | No data | CARROLL STREET, FROM STREET 4 AVENUE TO STREET DENTON PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation in the r/w close to 4 avenue |
2023-12-19 | No data | WEST 135 STREET, FROM STREET LENOX AVENUE TO STREET LENOX TERRACE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a permanent restoration flush to grade in the parking lane opposite 58 |
2023-12-18 | No data | BAY STREET, FROM STREET BOROUGH PLACE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration in compliance. |
2023-12-17 | No data | WHITE PLAINS ROAD, FROM STREET ARCHER STREET TO STREET GUERLAIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the parking lane of the roadway. |
2023-12-15 | No data | CRESTON AVENUE, FROM STREET EAST 196 STREET TO STREET EAST 197 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has a perm trench in the driving, parking lanes I/F/O 2754 Creston Ave. Con Ed has a open excavation on top of the trench in the p/l with a Con Ed steel plate. Spoke to the owner of the B/O to confirm. |
2023-12-14 | No data | EUCLID AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2023-12-14 | No data | 1 AVENUE, FROM STREET EAST 77 STREET TO STREET EAST 78 STREET | No data | Street Construction Inspections: Active | Department of Transportation | F/O #1487-area has been finalized in asphalt -building operations (Carmel construction) will take responsibility in restoring area in-kind (concrete panels), BPP (1/2 + 5) as per 1st avenue Restoration requirements- |
2023-12-13 | No data | THROOP AVENUE, FROM STREET ELLERY STREET TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-12-11 | No data | EAST GUN HILL ROAD, FROM STREET LACONIA AVENUE TO STREET LURTING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work in progress has active permit on file X012023331A29 |
2023-12-11 | No data | 1 AVENUE, FROM STREET EAST 77 STREET TO STREET EAST 78 STREET | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O #1487-crew on site working within open excavation-building operations (Carmel construction) will take responsibility in restoring area in-kind (concrete panels) (1/2 + 5) as per 1st avenue Restoration requirements- |
2023-12-11 | No data | ANN STREET, FROM STREET BROADWAY TO STREET THEATRE ALLEY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found the roadway and sidewalk plated with an updated permit, M012023317B03, on file. |
2023-12-11 | No data | 1 AVENUE, FROM STREET EAST 77 STREET TO STREET EAST 78 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water sewer trench with ARBEN marked steel plates that are countersunk extending from building Operation into middle travel lanes active Permit M012023332B45 on file at this time. |
2023-12-10 | No data | GUERLAIN STREET, FROM STREET LELAND AVENUE TO STREET THIERIOT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Nov issued for use of the street without valid permit on file. |
2023-12-09 | No data | WEST 31 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Opposite #142 (Fire Department) within the parking/driving lane, there is a permanent restoration flush to grade. |
2023-12-09 | No data | WEST 32 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO #11 Penn Plaza within the driving/parking lane, there is a permanent restoration flush to grade with a 22’ color code marker applied. |
2023-12-09 | No data | RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST BURNSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2023-12-08 | No data | EAST 67 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water restoration in d/l is ok |
2023-12-07 | No data | 3 AVENUE, FROM STREET EAST 22 STREET TO STREET EAST 23 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found entire segment of 3 Avenue roadway resurfaced. |
2023-12-07 | No data | 1 AVENUE, FROM STREET EAST 77 STREET TO STREET EAST 78 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Multiple countersunk steel plates in the driving lane present, raise plow signs posted, Permit remains active. |
2023-12-06 | No data | BRISTOL STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced by bpp new sidewalk ifo property 367 |
2023-12-06 | No data | EAST 184 STREET, FROM STREET CRESTON AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill not monitored, & done before arrival. Foreman Edwardo, tester Denise, exclusive testing lab. Top test monitored. Cut 1 8x3’ 94.3% cut 2 3x3’ 98.5% |
2023-12-05 | No data | CHRISTOPHER AVENUE, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found resurfaced by bpp for property 38 |
2023-12-05 | No data | SHAKESPEARE AVENUE, FROM STREET DEAD END TO STREET WEST 172 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work in roadway found resurfaced by BPP |
2023-12-04 | No data | GUERLAIN STREET, FROM STREET LELAND AVENUE TO STREET THIERIOT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Crew on site working in the roadway at time of inspection. Active permit on file(X012023329A00) |
2023-12-04 | No data | EAST 179 STREET, FROM STREET CRESTON AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2023-12-04 | No data | MORRIS AVENUE, FROM STREET CAMERON PLACE TO STREET EAST 182 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2023-12-04 | No data | BRISTOL STREET, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found resurfaced by bpp for new building 376 |
2023-12-04 | No data | EAST 184 STREET, FROM STREET CRESTON AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sewer and water work in progress, Spoke to foreman Eduardo in regards to countersinking of the plates and post raise plow signs |
2023-12-03 | No data | LOGAN STREET, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plated excavation okay |
2023-12-03 | No data | WHITE PLAINS ROAD, FROM STREET ARCHER STREET TO STREET GUERLAIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration in the parking lane IFO 1546. |
2023-12-02 | No data | WALTON AVENUE, FROM STREET CAMERON PLACE TO STREET EAST 182 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway |
2023-12-02 | No data | WEST 35 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO #42 (The Gregorian Hotel) there is a permanent restoration (trench) flush to grade extending curb to curb leading to multiple sidewalk flag restorations around a water valve box. |
2023-12-02 | No data | TIEBOUT AVENUE, FROM STREET EAST 184 STREET TO STREET EAST 187 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the roadway |
2023-12-01 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Permanent restoration in Roadway extending from curb to curb. sealed in compliance IFO 875. |
2023-12-01 | No data | 1 AVENUE, FROM STREET EAST 77 STREET TO STREET EAST 78 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew onsite working in the roadway within stipulated works. |
2023-11-30 | No data | GREENE STREET, FROM STREET PRINCE STREET TO STREET WEST HOUSTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | OPP#148- Water cobblestone restoration in west parking lane near W Houston St remains acceptable. |
2023-11-30 | No data | PURDY STREET, FROM STREET STARLING AVENUE TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP found over old cuts at time of inspection. |
2023-11-29 | No data | ANTHONY AVENUE, FROM STREET BUSH STREET TO STREET EAST 179 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done |
2023-11-28 | No data | EAST GUN HILL ROAD, FROM STREET LACONIA AVENUE TO STREET LURTING AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working in bus lane |
2023-11-26 | No data | BRONX PARK EAST, FROM STREET MACE AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER |
2023-11-24 | No data | BEACH CHANNEL DRIVE, FROM STREET BEACH 35 STREET TO STREET BEACH 36 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not identifiable. Sidewalk a and parking lane closed off at location by construction fence and barriers due to active B/O. |
2023-11-22 | No data | FOUNTAIN AVENUE, FROM STREET ATLANTIC AVENUE TO STREET WELLS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plated excavation new permits on file |
2023-11-19 | No data | COMMONWEALTH AVENUE, FROM STREET GLEASON AVENUE TO STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found Resurfaced |
2023-11-19 | No data | CHESTNUT STREET, FROM STREET DINSMORE PLACE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in driving lane okay |
2023-11-17 | No data | CORONA AVENUE, FROM STREET 55 AVENUE TO STREET OTIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway and sidewalk restored in kind |
2023-11-16 | No data | WOODYCREST AVENUE, FROM STREET WEST 165 STREET TO STREET WEST 166 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in roadway found resurfaced by newly paved roadway |
2023-11-15 | No data | SEDGWICK AVENUE, FROM STREET BEND TO STREET GILES PLACE | No data | Street Construction Inspections: Active | Department of Transportation | ARBEN on site waiting to install the W.C in the p/l I/F/O 3377 Sedgwick Ave. |
2023-11-15 | No data | BAY STREET, FROM STREET BOROUGH PLACE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | PLEASE INSTALL MISSING COLOR CODE IN PERMANENT RESTORATION IN ROADWAY -IN FRONT OF 35A BAY STREET & PROPERLY RESTORE WHITE LANE MARKING OVER NEW PERMANENT RESTORATION ON ROADWAY OPPOSITE 35A BAY STREET. |
2023-11-14 | No data | LOGAN STREET, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass and compliance for construction site 265 Logan St. dimensions 10‘ x 4‘ x 10‘ Total compaction (B 97.4) (T 98.0) cut re-plated. |
2023-11-14 | No data | LOGAN STREET, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site upon arrival plated excavation in in roadway northbound lane for new sewer installation for construction site 265 |
2023-11-12 | No data | LOGAN STREET, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plated cut in rw new permit on file |
2023-11-09 | No data | BAY STREET, FROM STREET BOROUGH PLACE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | crew installing concrete base on NORTH SIDE OF BASE STREET |
2023-11-08 | No data | 1 AVENUE, FROM STREET EAST 77 STREET TO STREET EAST 78 STREET | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O #1485- crew onsite , Removal of fire Hydrant, 5’ to 6’ from original spot, (3) steel plates on the sidewalk. |
2023-11-08 | No data | EMERALD STREET, FROM STREET LINDEN BOULEVARD TO STREET LORING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sewer, cut extending across the roadway no color, cold marker in front of property, 573 |
2023-11-08 | No data | WEEKS AVENUE, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water repair restoration in roadway |
2023-11-07 | No data | WASHINGTON STREET, FROM STREET CARLISLE STREET TO STREET RECTOR STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The restoration remains plated behind the construction fence. |
2023-11-06 | No data | WASHINGTON STREET, FROM STREET DESBROSSES STREET TO STREET WATTS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found resurfaced. |
2023-11-06 | No data | SEDGWICK AVENUE, FROM STREET BEND TO STREET GILES PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut size 6'x4'x5'.... Shaquille lab tester from exclusive lab testing, lifts done, wet 128.1 Dry 120.4 max 125.5 actual 6.4% cut in parking lane. Two test done. |
2023-11-04 | No data | WASHINGTON STREET, FROM STREET CARLISLE STREET TO STREET RECTOR STREET | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O #111-backfill completed plumbers cut in the parking lane, (L)7’(W)4’4”(D)5’, (1) cut on the sidewalk was also done. |
2023-11-04 | No data | WASHINGTON STREET, FROM STREET CARLISLE STREET TO STREET RECTOR STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | I/F/O #111-backfill completed plumbers cut in the parking lane, (L)7’(W)4’4”(D)5’, (1) cut on the sidewalk was also done. |
2023-11-04 | No data | BAY STREET, FROM STREET BOROUGH PLACE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | I OBSERVED RESPONDENT HAD BLOCK/OCCUPIED 17 FEET X 7 FEET OF ROADWAY AT UNATTENDED SITE ON SATURDAY(BARRICADES FOR PROTECTED WALKWAY ON ROADWAY WORK HOURS)-FAILED TO KEEP WIDTH OF ROADWAY OPEN&FAILED TO ADHERE TO TERMS&CONDITIONS OF STIPULATION 078 |
2023-11-01 | No data | SEDGWICK AVENUE, FROM STREET BEND TO STREET GILES PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | Shaquile Lab tech on site, one test done for covering sewer pipe. Moose is the foreman from Arben. Wet 122.1 dry 114.8 max 117.5 actual 6.4%Will get another confirmation number for water pipe installation. |
2023-10-30 | No data | NORTHERN BOULEVARD, FROM STREET 104 STREET TO STREET 105 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Base completed. 25' x 5' x 12'' within the driving lane. |
2023-10-30 | No data | WEST 140 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found area resurfaced due to new building. |
2023-10-28 | No data | CROSBY AVENUE, FROM STREET DANIEL STREET TO STREET MIDDLETOWN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Duplicate permit on file |
2023-10-27 | No data | NORTHERN BOULEVARD, FROM STREET 104 STREET TO STREET 105 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed. Cut size 25'x4'x4' |
2023-10-27 | No data | LYVERE STREET, FROM STREET BEND TO STREET ZEREGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench at 2422. Sw not scored properly, But ifo New building. |
2023-10-26 | No data | CARPENTER AVENUE, FROM STREET EAST 220 STREET TO STREET EAST 221 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway in compliance |
2023-10-25 | No data | ROCKAWAY AVENUE, FROM STREET NEWPORT STREET TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway driving/parking lane for construction site 803 |
2023-10-24 | No data | EAST 223 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass work done |
2023-10-24 | No data | EAST 222 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass work done BPP paved over some of the cut |
2023-10-24 | No data | ARNOW AVENUE, FROM STREET CRUGER AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER |
2023-10-24 | No data | LACONIA AVENUE, FROM STREET EAST 212 STREET TO STREET EAST 213 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done , BPP covering. Cut in roadway , sidewalk in compliance |
2023-10-24 | No data | EUCLID AVENUE, FROM STREET GLENMORE AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in rw okay |
2023-10-24 | No data | BRONX PARK EAST, FROM STREET MACE AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working site |
2023-10-24 | No data | BRONX PARK EAST, FROM STREET MACE AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Crew on the site working |
2023-10-22 | No data | BEACH CHANNEL DRIVE, FROM STREET BEACH 35 STREET TO STREET BEACH 36 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT IN THE ROADWAY |
2023-10-19 | No data | NORTHERN BOULEVARD, FROM STREET 104 STREET TO STREET 105 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL COMPLETE ON 4 ' OF THE EXCAVATION. WIIL CONTINUE AFTER WATER LINE INSTALLED. NO TEMP DEPTH. PLATED AFTER. BACKFILL INCOMPLETE |
2023-10-19 | No data | SEDGWICK AVENUE, FROM STREET WEST 197 STREET TO STREET WEST 229 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in the driving lane. I/F/O 2809. |
2023-10-19 | No data | BAY STREET, FROM STREET BOROUGH PLACE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | steel plated rwy-ok |
2023-10-19 | No data | WEST 31 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired on 8/2/2023. |
2023-10-18 | No data | ANDREWS AVENUE, FROM STREET WEST 183 STREET TO STREET WEST FORDHAM ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paved over plumber work |
2023-10-18 | No data | EAST 61 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in driving lane is ok |
2023-10-17 | No data | CENTRE STREET, FROM STREET GRAND STREET TO STREET HOWARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER: Cut is located opposite #220 |
2023-10-17 | No data | BAY STREET, FROM STREET BOROUGH PLACE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED RWY AND SWK -PERMIT EXPIRES 10/18/23 |
2023-10-16 | No data | EAST 179 STREET, FROM STREET BOSTON ROAD TO STREET BRONX STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ATPO I observed the above respondent has a permanent restoration, repair water work backfilled on a protected street but failed to obtain a confirmation number. Permit number X012023193B36 expired 8/11/2023. |
2023-10-16 | No data | EAST 83 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1J issued. |
2023-10-15 | No data | EAST 11 STREET, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO the respondent has 2 permanent restorations in the roadway that are less than 10ft apart , Respondent failed to restore both cuts into 1 restoration as per H 1042D 34 RCNY 2-11(e)(12)(iv) A CAR #20235810020 issued on 4/23/2023. |
2023-10-12 | No data | EAST 163 STREET, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work in roadway found resurfaced by newly paved BPP work for new building |
2023-10-10 | No data | BAY STREET, FROM STREET BOROUGH PLACE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | I OBSERVED RESPONDENT HAD CLOSED 75 FEET OF ENTIRE SIDEWALK & FAILED TO MAINTAIN A PROTECTED WALKWAY ON ROADWAY-PROTECTED BY TIMBER BARRIER, WATER-FILLED BARRIER OR CONCRETE JERSEY BARRIER-FAILED TO ADHERE TO TERMS&CONDITIONS OF STIPULATION OCMC97 |
2023-10-10 | No data | EAST 179 STREET, FROM STREET BOSTON ROAD TO STREET BRONX STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway with updated permit. X012023267A01 |
2023-10-08 | No data | EAST 10 STREET, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO the respondent has patchwork done within two sidewalk flags. Patchwork is not permitted, full flag restoration is required.A CAR #20226720353 was issued on 9/3/2022. |
2023-10-08 | No data | 3 AVENUE, FROM STREET BOSTON ROAD TO STREET EAST 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water repair restoration in driving lane |
2023-10-08 | No data | LAFAYETTE AVENUE, FROM STREET NEWMAN AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Storage in parking lane restricting parking in compliance |
2023-10-08 | No data | CROTONA AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 176 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut i/f/o new building |
2023-10-07 | No data | 7 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 278 is not on this block. Wrong location. |
2023-10-07 | No data | HONEYWELL AVENUE, FROM STREET EAST 179 STREET TO STREET EAST 180 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm I/F/O 2070 |
2023-10-04 | No data | ANTHONY AVENUE, FROM STREET BUSH STREET TO STREET EAST 179 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2023-10-04 | No data | ANDREWS AVENUE, FROM STREET WEST 183 STREET TO STREET WEST FORDHAM ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2023-10-04 | No data | BAY STREET, FROM STREET BOROUGH PLACE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | Permit check- crew working within plated areas along opposite driving / bike lanes- flagger posted directing traffic & signs posted |
2023-10-03 | No data | ROCKAWAY AVENUE, FROM STREET NEWPORT STREET TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway parking lane sealed in compliance behind Jersey barriers for construction site 203 Newport st |
2023-10-02 | No data | CROTONA AVENUE, FROM STREET EAST 178 STREET TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in the roadway |
2023-10-02 | No data | EAST 184 STREET, FROM STREET BEND TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP Paved over plumber work |
2023-10-02 | No data | BAY STREET, FROM STREET BOROUGH PLACE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | CREW PLATED ROADWAY WAS LEAVING WORKSITE AT 305 PM- OPPOSITE 35 A BAY STREET -OK |
2023-09-30 | No data | STANLEY AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | White lane markers have been placed |
2023-09-30 | No data | EAST 64 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 170 East 64 st water restoration in compliance |
2023-09-30 | No data | EAST 83 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 250 East 83 st water restoration in compliance |
2023-09-28 | No data | EAST 172 STREET, FROM STREET CROES AVENUE TO STREET FTELEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumbers permanent restoration in driving in front of 1687-E. |
2023-09-28 | No data | NEWPORT STREET, FROM STREET ROCKAWAY AVENUE TO STREET THATFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway driving lane sealed in compliance ifo construction site 203 |
2023-09-26 | No data | EAST 224 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass work done in compliance |
2023-09-26 | No data | EAST 126 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Sewer excavation crossing driving lane and bike lane about 40’ from 5th Avenue. Work started after 9:30am due to compaction person stuck in traffic. All shoring removed during backfill.15’ X 4’ X 8’.5” |
2023-09-25 | No data | MERRITT AVENUE, FROM STREET BOROUGH BOUNDARY TO STREET EAST 233 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass perm in roadway in compliance |
2023-09-23 | No data | MORRIS AVENUE, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2023-09-23 | No data | MORRIS AVENUE, FROM STREET CAMERON PLACE TO STREET EAST 182 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2023-09-21 | No data | LYVERE STREET, FROM STREET BEND TO STREET ZEREGA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NOV issued to ARBEN NY for obstruction of the catch basin. |
2023-09-21 | No data | CARPENTER AVENUE, FROM STREET EAST 220 STREET TO STREET EAST 221 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway new b/o in progress |
2023-09-21 | No data | WEST 31 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I was unable to locate the cut. Permit expired. |
2023-09-20 | No data | THIERIOT AVENUE, FROM STREET DEAD END TO STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Possible work done behind construction fence occupying roadway. Unable to inspect behind fence. Also, new building BPP will resurface roadway and sidewalk. |
2023-09-20 | No data | WESTCHESTER AVENUE, FROM STREET CONTINENTAL AVENUE TO STREET WILKINSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection. |
2023-09-20 | No data | SEDGWICK AVENUE, FROM STREET BAILEY AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway |
2023-09-20 | No data | EAST 194 STREET, FROM STREET CONTINENTAL AVENUE TO STREET HOBART AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 permanent restorations adjacent to “DWS” access cover in the roadway. |
2023-09-19 | No data | WEST 20 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sewer repair in compliance |
2023-09-18 | No data | HOPKINSON AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found resurfaced by bpp no sidewalk work found for new building |
2023-09-17 | No data | CROTONA AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 176 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water repair restoration in roadway |
2023-09-16 | No data | BEACH AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints sealed |
2023-09-16 | No data | 77 AVENUE, FROM STREET 138 STREET TO STREET 141 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site excavating the sidewalk due to a sewer leak in the basement of property 138- 36. |
2023-09-16 | No data | PRESIDENT STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joint sealed |
2023-09-16 | No data | 77 AVENUE, FROM STREET 138 STREET TO STREET 141 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic sanitary sewer backing up into basement ( confirmed with homeowner),one excavation made on roadway and one excavation made in grass area , crew on site to repair. |
2023-09-15 | No data | WEST 140 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | WC Pass; 2 cuts in r/w corrected into one. 20'x18'x3" |
2023-09-13 | No data | MADISON AVENUE, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY SEGMENT HAS BEN FOUND RESURFACED PERMIT M152023136A16 DOT IN HOUSE PAVING ISSUED 5/16/2023 REPAIR SIDEWALK INSTALLATION IN FRONT PROPERTY. |
2023-09-12 | No data | WEST 140 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Re-dig: Sent email with form & photos. |
2023-09-12 | No data | NASSAU STREET, FROM STREET ANN STREET TO STREET BEEKMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found the roadway repaved by the builder's pavement plan. |
2023-09-11 | No data | WEST 140 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | No one arrived on site, cut made previously made final. Arrival: 3:10PM Departure: 4PM |
2023-09-09 | No data | MOTHER GASTON BOULEVARD, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found resurfaced by bpp milling |
2023-09-08 | No data | HONEYWELL AVENUE, FROM STREET EAST 179 STREET TO STREET EAST 180 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Updated permit on file. |
2023-09-08 | No data | CRESTON AVENUE, FROM STREET EAST 196 STREET TO STREET EAST 197 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Upon inspection, I found plumber working in the street and maintaining 1-11 lane for traffic, flaggers at site. in compliance |
2023-09-08 | No data | ST NICHOLAS AVENUE, FROM STREET WEST 150 STREET TO STREET WEST 151 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012023202A94-r/w resurfaced |
2023-09-06 | No data | ARTHUR AVENUE, FROM STREET BEND TO STREET OAK TREE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the roadway |
2023-09-06 | No data | EAST 112 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced from bpp |
2023-09-06 | No data | EAST 10 STREET, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration acceptable |
2023-09-06 | No data | WEST 150 STREET, FROM STREET 8 AVENUE TO STREET BRADHURST AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Not able to fully inspect area due to crane and on-going BO. |
2023-09-06 | No data | WILLIAMSBRIDGE ROAD, FROM STREET ALLERTON AVENUE TO STREET RADCLIFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway in compliance |
2023-09-06 | No data | PRESIDENT STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane, new flags IFO property #786. |
2023-09-05 | No data | WEST 135 STREET, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in compliance |
2023-09-05 | No data | CRESTON AVENUE, FROM STREET EAST 196 STREET TO STREET EAST 197 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plumber cut plated in the roadway and sidewalk |
2023-09-05 | No data | FORBELL STREET, FROM STREET COZINE AVENUE TO STREET FLATLANDS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway parking lane sealed in compliance on side of 922 Flatlands btwn forebell and Eldert Ln. |
2023-09-03 | No data | THROOP AVENUE, FROM STREET ELLERY STREET TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane IFO property #171. |
2023-09-03 | No data | EAST 11 STREET, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO the respondent has 2 permanent restorations in the roadway that are less than 10ft apart , Respondent failed to restore both cuts into 1 restoration as per H 1042D 34 RCNY 2-11(e)(12)(iv) Note #9. A CAR #20235810020 issued on 4/23/2023. |
2023-09-02 | No data | SEDGWICK AVENUE, FROM STREET WEST 197 STREET TO STREET WEST 229 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has perm trench in the r/w. |
2023-09-02 | No data | EAST 111 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | s/w joints sealed. |
2023-09-02 | No data | ARNOW AVENUE, FROM STREET DEWITT PLACE TO STREET SEYMOUR AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Street joints resealed |
2023-09-01 | No data | WEST 140 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Monitored Backfill. Backfill pass and complete cut 12'x5'x32" |
2023-09-01 | No data | ANTHONY AVENUE, FROM STREET EAST 180 STREET TO STREET EAST BURNSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in the roadway |
2023-08-31 | No data | EAST 59 STREET, FROM STREET AVENUE J TO STREET FLATLANDS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane OPP 9 |
2023-08-29 | No data | SEDGWICK AVENUE, FROM STREET WEST 197 STREET TO STREET WEST 229 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway lane markings restored.. patch work on sidewalk due to new b/o 2809 |
2023-08-28 | No data | WEST 140 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Monitored Backfill. Backfill pass & complete. 14'8"x7'4"x4'9" Arrival: 11:05AM Departure: 1:35PM |
2023-08-26 | No data | BARKER AVENUE, FROM STREET MACE AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm cut in rw. |
2023-08-21 | No data | WEST 126 STREET, FROM STREET BEND TO STREET WEST 127 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found resurfaced under permit M152022133A08. |
2023-08-20 | No data | WASHINGTON STREET, FROM STREET BANK STREET TO STREET BETHUNE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO #745 unable to inspection restoration due to active building operation occupying the roadway. |
2023-08-19 | No data | CLAREMONT AVENUE, FROM STREET WEST 120 STREET TO STREET WEST 122 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Portion of perm sewer restoration viewed in north bound driving lane. (Other half is paved over by another restoration) |
2023-08-18 | No data | SAXON AVENUE, FROM STREET BEND TO STREET VAN CORTLANDT PARK SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass perm in roadway in compliance |
2023-08-17 | No data | SEDGWICK AVENUE, FROM STREET BEND TO STREET GILES PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to locate |
2023-08-16 | No data | ROSEDALE AVENUE, FROM STREET GLEASON AVENUE TO STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paved over plumber work |
2023-08-16 | No data | CRUGER AVENUE, FROM STREET ARNOW AVENUE TO STREET WILLIAMSBRIDGE ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP covered any water restoration. |
2023-08-14 | No data | SUFFOLK STREET, FROM STREET BROOME STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The BPP restoration has resurfaced the plumber's restoration. |
2023-08-13 | No data | SCHERMERHORN STREET, FROM STREET BOERUM PLACE TO STREET COURT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Scaffolding is currently over the sidewalk IFO property #59. |
2023-08-11 | No data | STANLEY AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failed to restore white lane marking |
2023-08-09 | No data | PLYMOUTH STREET, FROM STREET BRIDGE STREET TO STREET JAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut behind green construction fence on Plymouth st aka29 jay st |
2023-08-09 | No data | ST LUKES PLACE, FROM STREET HUDSON STREET TO STREET LEROY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO #9 the work has started, with a plated excavation located on the sidewalk and driving lane, however work has not been completed at this time. Contractor does have an active permit number on file: M012023220A17 |
2023-08-09 | No data | 3 AVENUE, FROM STREET EAST 162 STREET TO STREET EAST 163 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water repair restoration crossing roadway |
2023-08-09 | No data | BARKER AVENUE, FROM STREET MACE AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | No vehicle, blocking. Active sewer repairs. Crew on site. |
2023-08-09 | No data | BROOME STREET, FROM STREET NORFOLK STREET TO STREET SUFFOLK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found the roadway resurfaced. |
2023-08-08 | No data | SCHERMERHORN STREET, FROM STREET BOERUM PLACE TO STREET COURT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | At this time tri-borough has erected scaffolding over defective sidewalks flags obstructing final restoration. Please restore sidewalk patch work as soon as tir-Borough finalize construction. |
2023-08-08 | No data | BEACH AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joint needs to be fully sealed between the sidewalk flag and curb IFO 708. |
2023-08-08 | No data | SCHERMERHORN STREET, FROM STREET BOERUM PLACE TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At this time tri-borough has erected scaffolding over defective sidewalks flags obstructing final restoration. Please restore sidewalk patch work as soon as tir-Borough finalize construction. |
2023-08-08 | No data | BEEKMAN STREET, FROM STREET NASSAU STREET TO STREET WILLIAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 15 beekman behind fenced off BO on going work, in compliance. |
2023-08-07 | No data | BLACKROCK AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET CROSS BRONX EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done on sidewalk, roadway paved by DOT |
2023-08-04 | No data | WEST 31 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed prior, 13’ X 7’6”X 13” after cutback observed. |
2023-08-03 | No data | WEST 159 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a cut flush to grade in the roadway I/F/O 510 |
2023-08-03 | No data | DUPONT STREET, FROM STREET COMMERCIAL STREET TO STREET FRANKLIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway parking/driving lane sealed in compliance ifo property 16 adjacent to park side curb |
2023-08-02 | No data | ST LUKES PLACE, FROM STREET HUDSON STREET TO STREET LEROY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO #9 work has started however has not been completed. There is a steel plate marked “ARBEN” in the parking lane. Active permit number M012023208B70 on file. |
2023-08-02 | No data | EAST 205 STREET, FROM STREET GRAND CONCOURSE TO STREET LISBON PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done |
2023-08-02 | No data | GRAND CONCOURSE, FROM STREET EAST 201 STREET TO STREET EAST 202 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass work done on sidewalk |
2023-08-02 | No data | WEST 31 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Confirmed, no work has been done on location. – 142-146 W 31st St. |
2023-08-02 | No data | HULL AVENUE, FROM STREET EAST 204 STREET TO STREET EAST MOSHOLU PARKWAY NORTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done |
2023-08-02 | No data | ARTHUR AVENUE, FROM STREET EAST 178 STREET TO STREET EAST 179 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the driving lane I/F/O 2001. |
2023-07-31 | No data | PARKER STREET, FROM STREET BEND TO STREET MACLAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration was resurfaced by BPP. |
2023-07-31 | No data | EAST 83 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | I/F/O #250 WITHIN Building Operations L 13’ xW4’ xD 2”Wearing completed membrane applied concrete tact coat applied and sealed restoration made flush and sealed to grade. |
2023-07-31 | No data | THROOP AVENUE, FROM STREET ELLERY STREET TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No visible work done. Active permit on file B012023208B06. |
2023-07-30 | No data | EAST 10 STREET, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | IFO #22 there are two(2) sidewalk flags with patchwork that have not been restored. CAR re-inspection failed, NOV issued. |
2023-07-29 | No data | PRESIDENT STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed unsealed expansion joints in the sidewalk. Respondent failed to seal expansion joint upon completion of restoration. CAR 20237440173 issued 6/7/23. Cited permit used for ID. |
2023-07-29 | No data | SCHERMERHORN STREET, FROM STREET BOERUM PLACE TO STREET COURT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to repair Corrective Action Request #20238400044 issued on 4/11/2023. Respondent failed to fully replace a patched sidewalk flag. Respondent ID permit #B012021301B06. |
2023-07-29 | No data | EAST 11 STREET, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | IFO #25 the respondent failed to restore both cuts into one final restoration. NOV has been issued. |
2023-07-29 | No data | WEST 31 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Water leaking into Con Ed vault. Three day notice applied. However. Due to work having to be done in the roadway. Fire dept. won’t let them dig in front of their fire house. |
2023-07-29 | No data | BROAD STREET, FROM STREET SOUTH STREET TO STREET WATER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued for the above Respondent obtained a Street opening permit on a protected Street but failed to obtain a Confirmation number prior to the expiration of such permit as required. Permit expired on 7/9/2023. |
2023-07-28 | No data | WASHINGTON STREET, FROM STREET BANK STREET TO STREET BETHUNE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued for the above Respondent obtained a Street opening permit on a protected Street but failed to obtain a Confirmation number prior to the expiration of such permit as required. Permit expired on 6/14/2023. |
2023-07-27 | No data | EAST 83 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B issued. |
2023-07-26 | No data | BAY STREET, FROM STREET GRANT STREET TO STREET ST JULIAN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | LONG PERMANENT RESTORATION ACROSS ROADWAY AT 309 BAY STREET - AT NYPD OR OPPOSITE WENDY'S - NEW SWK FLAGS -OK |
2023-07-25 | No data | EAST 163 STREET, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has a permanent restoration,sewer repair backfilled on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit # x012023146c20 expired |
2023-07-25 | No data | DESBROSSES STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | This area has been resurfaced as part of BPP done by Etna at this time. |
2023-07-24 | No data | BARKER AVENUE, FROM STREET MACE AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated trench crossing rw. |
2023-07-24 | No data | EAST 111 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags expansion joint need to be sealed at the curb line. |
2023-07-22 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-07-21 | No data | DUPONT STREET, FROM STREET COMMERCIAL STREET TO STREET FRANKLIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Crew on site removing shoring from excavation in roadway and sidewalk ifo 16 DuPont construction site |
2023-07-20 | No data | WEST 12 STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O AKA 775 Washington one sewer and one water cobblestone restoration are finalized. Sidewalk patched, at this time leading to building. No CAR issued at this time due to ongoing building operation. |
2023-07-20 | No data | PRESIDENT STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent has a plated excavation marked "ARBEN NY" in the roadway without a valid dot permit on file. Respondent ID by B012023173A00 expired on 7/1/2023. |
2023-07-19 | No data | RODMAN PLACE, FROM STREET LONGFELLOW AVENUE TO STREET WEST FARMS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2023-07-19 | No data | 2 AVENUE, FROM STREET EAST 40 STREET TO STREET EAST 41 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit # M012021306A42 on file. |
2023-07-19 | No data | SUFFOLK STREET, FROM STREET BROOME STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The BPP restoration resurfaced most of the roadway in front of 55. |
2023-07-18 | No data | BAY STREET, FROM STREET BOROUGH PLACE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATES COUNTERSUNK IN ROADWAY OPPOSITE BUILDING OPERATION 35A (LARGE BUILDING ON WATERSIDE) - PERMITTEE TOOK OUT NEW PERMIT#S192023197A01 TO PLACE PLATES IN/ON STREET-EXPIRES 8/31/23-OK |
2023-07-12 | No data | MATTHEWS AVENUE, FROM STREET BRADY AVENUE TO STREET LYDIG AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The permittee Arden Contracting of New York Inc Block/Lot: 04293/ 0046 I/F/O 2093 description of work: Repair sewer for existing water service |
2023-07-11 | No data | PLYMOUTH STREET, FROM STREET BRIDGE STREET TO STREET JAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not found |
2023-07-09 | No data | NASSAU STREET, FROM STREET ANN STREET TO STREET BEEKMAN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Steel plates has been removed |
2023-07-07 | No data | BAY STREET, FROM STREET BOROUGH PLACE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plated rwy at bend/turn-NP#S012023184A17 |
2023-07-07 | No data | BAY STREET, FROM STREET BOROUGH PLACE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | steel plated rwy at bend/turn-NP#S012023184A17 |
2023-07-05 | No data | SHAKESPEARE AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET FEATHERBED LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumbers work was resurfaced by SCARA BPP at corner property. |
2023-07-05 | No data | SEDGWICK AVENUE, FROM STREET WEST 197 STREET TO STREET WEST 229 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plates in roadway |
2023-07-05 | No data | ELIZABETH STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a permanent restoration extending from the parking lane into the driving lane. |
2023-07-05 | No data | EAST 11 STREET, FROM STREET BROADWAY TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to identify one of the two water restorations located IFO AKA #799 Broadway. (Color code marker is faded) |
2023-07-03 | No data | SEDGWICK AVENUE, FROM STREET WEST 197 STREET TO STREET WEST 229 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass had plated excavation in roadway updated permit on file X012023173B46… expired 7/6/23 |
2023-07-03 | No data | NASSAU STREET, FROM STREET ANN STREET TO STREET BEEKMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration acceptable |
2023-07-02 | No data | GATES AVENUE, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to a grade |
2023-07-02 | No data | RIVER AVENUE, FROM STREET EAST 167 STREET TO STREET MC CLELLAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance under new building construction |
2023-07-01 | No data | ARNOW AVENUE, FROM STREET DEWITT PLACE TO STREET SEYMOUR AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO I observed the permanent water restoration not sealed in the roadway. Respondent failed to properly seal and maintain the wearing course. CAR 20238300064 was issued 3/11/2023. I identify by X012020338A25. |
2023-07-01 | No data | STANLEY AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESTORE LANE MARKINGS MISSING DUE TO PERM CUT OVERLAPPING . RESTORE LANE MARKINGS |
2023-06-29 | No data | CROSBY AVENUE, FROM STREET DANIEL STREET TO STREET MIDDLETOWN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The permittee Arben Contracting I/F/O 1616 description of work: Repair sewer for existing water service. Research shows a update DOT permit number X012020195A53 status expired under guarantee on July 26,2024 |
2023-06-29 | No data | WASHINGTON STREET, FROM STREET BATTERY PLACE TO STREET PEDESTRIAN OVERPASS | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a permanent curb to curb restoration flush to grade in the roadway. |
2023-06-29 | No data | CROSBY AVENUE, FROM STREET DANIEL STREET TO STREET MIDDLETOWN ROAD | No data | Street Construction Inspections: Active | Department of Transportation | The permittee Arden Contracting Of New York Block/Lot I/F/O 1616 steel plate. |
2023-06-29 | No data | WEST 126 STREET, FROM STREET BEND TO STREET WEST 127 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to locate work at Time of inspection. |
2023-06-28 | No data | BRYANT AVENUE, FROM STREET GARRISON AVENUE TO STREET SENECA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the roadway |
2023-06-27 | No data | TURNBULL AVENUE, FROM STREET PUGSLEY AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the roadway |
2023-06-27 | No data | EAST 205 STREET, FROM STREET GRAND CONCOURSE TO STREET LISBON PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass half plus 5 over cut |
2023-06-27 | No data | GRAND CONCOURSE, FROM STREET EAST 201 STREET TO STREET EAST 202 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to locate due to materials and equipment in roadway |
2023-06-27 | No data | BAY STREET, FROM STREET BOROUGH PLACE TO STREET BEND | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The raise plow sign was removed. |
2023-06-26 | No data | CROSBY AVENUE, FROM STREET DANIEL STREET TO STREET MIDDLETOWN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The permittee Arden Contracting Of New York Block/Lot I/F/O 1618 description of work: Repair sewer for existing water service. Research shows a update DOT permit number X012020195A53 status expired under guarantee on July 26,2025kkkkkk |
2023-06-25 | No data | WESTCHESTER AVENUE, FROM STREET BERGEN AVENUE TO STREET EAST 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in roadway found resurfaced by newly paved roadway |
2023-06-24 | No data | EAST 10 STREET, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | IFO #22 there are two (2) sidewalk flags that have not been restored in kind, as well as not having the expansion joints sealed. Respondent failed to address CAR. NOV will be issued. |
2023-06-23 | No data | WEST 12 STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O AKA 775 Washington one sewer and one water cobblestone restoration are finalized. Sidewalk patched at this time leading to building (active BO). |
2023-06-22 | No data | COFFEY STREET, FROM STREET CONOVER STREET TO STREET FERRIS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to ascertain |
2023-06-22 | No data | EAST 73 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In front of 128 I found a water cat permanently restored. |
2023-06-22 | No data | COMMONWEALTH AVENUE, FROM STREET GLEASON AVENUE TO STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paved over plumber work |
2023-06-21 | No data | EAST 180 STREET, FROM STREET BOSTON ROAD TO STREET BODY OF WATER | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2023-06-21 | No data | EAST 179 STREET, FROM STREET BOSTON ROAD TO STREET BRONX STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2023-06-21 | No data | EAST MOSHOLU PARKWAY SOUTH, FROM STREET MARION AVENUE TO STREET PERRY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced by bpp |
2023-06-21 | No data | WEST END AVENUE, FROM STREET WEST 65 STREET TO STREET WEST 66 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - PROTECTED RESTORATION IN SOUTH BOUND SIDE OF THE ROADWAY IN CROSSWALK FREE OF DEFECTS AND IN COMPLIANCE |
2023-06-21 | No data | CROSBY AVENUE, FROM STREET DANIEL STREET TO STREET MIDDLETOWN ROAD | No data | Street Construction Inspections: Active | Department of Transportation | The permittee Arben Contracting Of New York Inc has 3 three countersunk temporary steel plates. There is with Arben N.Y. markings in the parking lane |
2023-06-20 | No data | 10 AVENUE, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced. |
2023-06-18 | No data | EAST 11 STREET, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | IFO #25 there are two (2) final restorations less than 10” apart. Respondent failed to make cuts one permanent restoration. NOV will be issued. |
2023-06-17 | No data | SCHERMERHORN STREET, FROM STREET BOERUM PLACE TO STREET COURT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to repair Corrective Action Request #20238400044 issued on 4/11/2023. Respondent failed to fully replace a patched sidewalk flag. Respondent ID permit #B012021301B06 |
2023-06-16 | No data | CRUGER AVENUE, FROM STREET ARNOW AVENUE TO STREET WILLIAMSBRIDGE ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in rw and sw in compliance |
2023-06-15 | No data | 11 AVENUE, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #261 Perm plumbers cut in the driving lane is flush to grade. |
2023-06-15 | No data | EAST 55 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found resurfaced by BPP. |
2023-06-13 | No data | WASHINGTON STREET, FROM STREET JANE STREET TO STREET WEST 12 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D.O.T milled and paved the roadway; permit number M152021274A38 |
2023-06-12 | No data | ROSEDALE AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Portion of plumber restoration paved over by BPP |
2023-06-12 | No data | WEST 28 STREET, FROM STREET 5 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found (2) Perm cuts in the pedestrian walkway, within active B/O, that are flush to grade. |
2023-06-12 | No data | GARRISON AVENUE, FROM STREET EDGEWATER ROAD TO STREET WHITTIER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no plumber restoration found |
2023-06-11 | No data | ZULETTE AVENUE, FROM STREET ERICSON PLACE TO STREET MAYFLOWER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The permittee Arden Contracting Of New York Block/Lot I/F/O 2801 Zulette Ave description of work: Repair sewer for existing water service |
2023-06-09 | No data | WEST 135 STREET, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway and sidewalk in compliance. |
2023-06-09 | No data | PARKSIDE PLACE, FROM STREET EAST 207 STREET TO STREET WEBSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Out of guarantee |
2023-06-08 | No data | GREENE STREET, FROM STREET PRINCE STREET TO STREET WEST HOUSTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 141 ( oppo. 148 ), cobblestone "long water" repair restoration restored in kind and stones are flush to grade / free of any visible defects at this time. |
2023-06-08 | No data | BEEKMAN STREET, FROM STREET NASSAU STREET TO STREET WILLIAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work complete at Fire hydrant near Nassau st. |
2023-06-08 | No data | TRYON AVENUE, FROM STREET EAST 211 STREET TO STREET EAST GUN HILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2023-06-07 | No data | NORFOLK STREET, FROM STREET BROOME STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The BPP restoration has resurfaced the plumber's work. |
2023-06-07 | No data | SUFFOLK STREET, FROM STREET BROOME STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The Plumber's work has been resurfaced by the BPP restoration in front of 55. |
2023-06-07 | No data | PRESIDENT STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in the r/w |
2023-06-07 | No data | PRESIDENT STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve on s/w & perm trench along the r/w |
2023-06-07 | No data | 37 STREET, FROM STREET 30 AVENUE TO STREET 31 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut within driving lane |
2023-06-06 | No data | BLACKROCK AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET CROSS BRONX EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done on sidewalk, DOT Paved roadway |
2023-06-05 | No data | WEST 23 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #278 perm water cut in the parking lane is flush to grade. |
2023-06-05 | No data | GREENE STREET, FROM STREET PRINCE STREET TO STREET WEST HOUSTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cobblestone restoration in west parking lane near W Houston St is acceptable. |
2023-06-05 | No data | BAY STREET, FROM STREET BOROUGH PLACE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED RWY -OPPOSITE BUILDING OPERATION |
2023-06-05 | No data | WEST 27 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cobblestone restoration in the parking /driving lane is in compliance. |
2023-06-04 | No data | EAST 194 STREET, FROM STREET CONTINENTAL AVENUE TO STREET HOBART AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cuts in d/l to grade |
2023-06-02 | No data | SEDGWICK AVENUE, FROM STREET WEST 197 STREET TO STREET WEST 229 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site in compliance |
2023-06-01 | No data | EMERALD STREET, FROM STREET LINDEN BOULEVARD TO STREET LORING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm long water cut in rw okay |
2023-05-31 | No data | EAST 112 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work seen at time of inspection . |
2023-05-31 | No data | NASSAU STREET, FROM STREET ANN STREET TO STREET BEEKMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a permanent restoration that is flush to grade in the driving lane. |
2023-05-31 | No data | WILLIAMSBRIDGE ROAD, FROM STREET ALLERTON AVENUE TO STREET RADCLIFF AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Street joints resealed. |
2023-05-30 | No data | WASHINGTON STREET, FROM STREET BANK STREET TO STREET BETHUNE STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | I/F/O #745 CONCRETE BASE COMPLETED 6" CUT-BACKS DONE , AREA MADE SAFE ,AND TO BE PLATED. |
2023-05-27 | No data | ST LAWRENCE AVENUE, FROM STREET DEAD END TO STREET SOUNDVIEW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in the roadway |
2023-05-27 | No data | NASSAU STREET, FROM STREET ANN STREET TO STREET BEEKMAN STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | 1out 3 steel plates marked SCE loose and noisy they are currently countersunk and has to be reset |
2023-05-25 | No data | WASHINGTON STREET, FROM STREET BANK STREET TO STREET BETHUNE STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | IFO #745 backfill completed in the driving lane with 6" cut backs performed. Cut backs will be done to the curb line. Clean fill used with two compactions done. L'0" W4'0" D2'8" Top Test 98.3. |
2023-05-25 | No data | 5 AVENUE, FROM STREET EAST 28 STREET TO STREET EAST 29 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #250 Perm water cut in the driving lane is flush to grade. |
2023-05-24 | No data | 35 STREET, FROM STREET 34 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired - refer to latest permit Q012018248C74. |
2023-05-23 | No data | BEEKMAN STREET, FROM STREET NASSAU STREET TO STREET WILLIAM STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Steel plate was reset and temporary asphalt was applied made safe |
2023-05-23 | No data | ARNOW AVENUE, FROM STREET DEWITT PLACE TO STREET SEYMOUR AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Street joints not sealed, NOV issued. |
2023-05-23 | No data | HINSDALE STREET, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in rw sealed and in compliance |
2023-05-22 | No data | BEEKMAN STREET, FROM STREET NASSAU STREET TO STREET WILLIAM STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Steel plate shifted 3”. Steel plate marked “ARBEN NY” making noise due to not secured. |
2023-05-22 | No data | HINSDALE STREET, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in rw sealed and in compliance |
2023-05-20 | No data | WEST 11 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO #37 in the driving lane, there is a permanent restoration flush to grade opposite a gas valve box located within two (2) newly restored sidewalk flags. (Asphalt sealer showing wear and tear but not CAR worthy at this time) |
2023-05-19 | No data | BAY STREET, FROM STREET BOROUGH PLACE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | plated roadway excavation in compliance |
2023-05-19 | No data | PLYMOUTH STREET, FROM STREET BRIDGE STREET TO STREET JAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavations in roadway extending into construction site corner of Plymouth st and jay st new permit on file |
2023-05-18 | No data | EAST 10 STREET, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO #22 in the parking lane there is a permanent restoration flush to grade extending to the sidewalk around a water valve. |
2023-05-17 | No data | EAST 11 STREET, FROM STREET BROADWAY TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO AKA #799 Broadway, due to the BPP there roadway and sidewalk have both been resurfaced. |
2023-05-17 | No data | EAST 10 STREET, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | IFO #22 there are two (2) sidewalk flags with patchwork that have failed to be restored in kind. NOV has been issued. |
2023-05-15 | No data | WEST 12 STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O AKA 775 Washington one sewer and one water cobblestone restoration are finalized. Sidewalk patched at this time leading to building. No CAR issued at this time due to ongoing building operation. |
2023-05-15 | No data | BEEKMAN STREET, FROM STREET NASSAU STREET TO STREET WILLIAM STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plates labeled “Arben NY” in the parking lane in front of 15. |
2023-05-13 | No data | EAST 84 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 7 found 2 concrete sidewalk flags fully replaced around a water valve. Unable to see restoration in parking lane due to parked cars. |
2023-05-11 | No data | CHESTNUT STREET, FROM STREET DINSMORE PLACE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM SEWER CUTS IN THE DRIVING LANE IN COMPLIANCE |
2023-05-10 | No data | ROGERS PLACE, FROM STREET BEND TO STREET EAST 165 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumbers work found resurfaced by building paving plan and new sidewalk I/F/O # 950-954 |
2023-05-10 | No data | GREENE STREET, FROM STREET PRINCE STREET TO STREET WEST HOUSTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Water cobblestone restoration in west parking lane is acceptable at this time. Permit remains active. |
2023-05-09 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done |
2023-05-09 | No data | TIFFANY STREET, FROM STREET BARRY STREET TO STREET BURNETT PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paved over most of plumber cut |
2023-05-09 | No data | PORT RICHMOND AVENUE, FROM STREET HOOKER PLACE TO STREET WALKER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk restored in front of Denino's Pizzeria |
2023-05-09 | No data | EAST 179 STREET, FROM STREET BOSTON ROAD TO STREET BRONX STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ATPO I observe patchwork on the sidewalk adjacent to 2022 permanent water restoration in the roadway. Respondent failed to fully restore defective sidewalk flag. I identify by expired permit X012022333A23. |
2023-05-06 | No data | EMERALD STREET, FROM STREET LINDEN BOULEVARD TO STREET LORING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plates excavation, new permit on file |
2023-05-06 | No data | JAY STREET, FROM STREET JOHN STREET TO STREET PLYMOUTH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway driving lane sealed in compliance for 29 jay water repair |
2023-05-06 | No data | WALTON AVENUE, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New B/O cut was resurfaced. |
2023-05-06 | No data | CRESTON AVENUE, FROM STREET BUSH STREET TO STREET EAST 179 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the driving lane, new B/O. |
2023-05-06 | No data | EAST 73 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not visible due to container stored |
2023-05-05 | No data | EAST 73 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit has expired no work has been done at this time |
2023-05-04 | No data | MORRIS AVENUE, FROM STREET CAMERON PLACE TO STREET EAST 182 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in the parking, driving lanes. |
2023-05-03 | No data | WALTON AVENUE, FROM STREET CAMERON PLACE TO STREET EAST 182 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the driving lane I/F/O 2180. |
2023-05-03 | No data | GREENE STREET, FROM STREET PRINCE STREET TO STREET WEST HOUSTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Monitored restoration from 9:20-10:20a. 3'x2'8" water restoration finalized in the parking lane opposite 148. Cones left for curing purposes. Photos taken. Permit active. |
2023-05-01 | No data | WEST 135 STREET, FROM STREET LENOX AVENUE TO STREET LENOX TERRACE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway near bus stop. |
2023-04-30 | No data | WASHINGTON STREET, FROM STREET JANE STREET TO STREET WEST 12 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #775 Perm water cut in the bike/driving lane /lane marking restored , and flush to grade. |
2023-04-29 | No data | ANTHONY AVENUE, FROM STREET EAST 176 STREET TO STREET MT HOPE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done. |
2023-04-29 | No data | EAST 224 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Plumber cut plated in the roadway |
2023-04-28 | No data | WHITE PLAINS ROAD, FROM STREET ARCHER STREET TO STREET GUERLAIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ATPO I observed the above respondent has a permanent restoration, sewer repair work backfilled on a protected street but failed to obtain a confirmation number. Permit number expired 4/4/2023. |
2023-04-28 | No data | CROSBY AVENUE, FROM STREET DANIEL STREET TO STREET MIDDLETOWN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ATPO I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration. |
2023-04-27 | No data | HINSDALE STREET, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer restoration flush to grade in the roadway extending into the parking lane in front of property #642 HINSDALE STREET in compliance |
2023-04-27 | No data | PRESIDENT STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Use/opening of street without D.O.T. permit |
2023-04-26 | No data | EAST 59 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO AKA 650 Madison, in the parking lane there is a permanent restoration flush to grade leading to multiple sidewalk flag restorations around a WSNY shut off valve and fire hydrant. |
2023-04-26 | No data | WEST 11 STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #319 Perm water cut in the driving lane is flush to grade. |
2023-04-24 | No data | GREENE STREET, FROM STREET PRINCE STREET TO STREET WEST HOUSTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O 141 in driving/parking lane, a temporary water restoration is present. |
2023-04-23 | No data | EAST 11 STREET, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Your permanent water restorations (2) in the roadway are not restored in accordance with DOT Standard Detail Drawing 1042D, as per 34 RCNY 2-11 (e)(12)(iv). Cuts must be restore as one when street opening are less than 10' apart. Full IBM ID# require |
2023-04-22 | No data | EAST 223 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paved over plumber cut |
2023-04-22 | No data | WEST 135 STREET, FROM STREET LENOX AVENUE TO STREET LENOX TERRACE PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | Monitored Wearing Course. WC pass & complete. 5'2"x5'2"x2" Arrival: 12:36PM Departure: 1:15PM |
2023-04-21 | No data | COLDEN AVENUE, FROM STREET NEILL AVENUE TO STREET RHINELANDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumbers permanent restoration in driving lane. |
2023-04-20 | No data | WEST 11 STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV for the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. LL14's under M012023043A00 (BAC) & M012023080B37 (BSE+WC). |
2023-04-19 | No data | BAY STREET, FROM STREET BOROUGH PLACE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | I OBSERVED RESPONDENT HAD STEEL PLATES IN ROADWAY AT 7:04 AM ON 4/19/23 OVER STREET OPENING DOWN 1 FOOT-WITHOUT A VALID DOT PERMIT THAT WAS PAID FOR. STEEL PLATED STREET OPENING-NO PERMIT. STEEL PLATED MARKED "ARBEN" & EXPIRED |
2023-04-19 | No data | 6 AVENUE, FROM STREET WEST 14 STREET TO STREET WEST 15 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found active B.O. on site with fence and barricades on sidewalk and roadway, REPAIR WATER: Behind fence. |
2023-04-18 | No data | GREENE AVENUE, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp cut in the roadway |
2023-04-18 | No data | SCHERMERHORN STREET, FROM STREET BOERUM PLACE TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found resurfaced by dot in house milling |
2023-04-18 | No data | SEYMOUR AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permanent sewer repair restoration sealed, minor cracks in street joints |
2023-04-17 | No data | BAY STREET, FROM STREET BOROUGH PLACE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | steel plates in rwy permit expired 4/18/23 |
2023-04-17 | No data | ARNOW AVENUE, FROM STREET DEWITT PLACE TO STREET SEYMOUR AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | D5A issued for failure to properly seal and maintain the wearing course |
2023-04-17 | No data | EUCLID AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY ABOUT 150FT FROM FULTON CORNER |
2023-04-17 | No data | GREENE STREET, FROM STREET PRINCE STREET TO STREET WEST HOUSTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O 141 in driving/parking lane, a temporary water restoration is present. Photos taken. |
2023-04-15 | No data | GREENE STREET, FROM STREET PRINCE STREET TO STREET WEST HOUSTON STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Heavy Domestic Water Service Leak in the Basement. Contractor currently making Repairs in the Roadway. Building owner on site |
2023-04-14 | No data | BAY STREET, FROM STREET BOROUGH PLACE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | steel plated across roadway exp 4/18/23- still no repair water permit for second set of steel plated street opening over city water main |
2023-04-11 | No data | SCHERMERHORN STREET, FROM STREET BOERUM PLACE TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Patch work is unacceptable.Permittee failed to restore 2 full flags in kind . Please restore both flags in kind Ifo property 59 |
2023-04-11 | No data | BAY STREET, FROM STREET BOROUGH PLACE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | PLEASE REMOVED 2 ARBEN "RAISE PLOW" SIGNS POSTED AT OPPOSITE 35A BAY STREET BETWEEN BEND & BOROUGH PLACE. WINTER MORATURIUM ENDED 3/31/23. |
2023-04-10 | No data | WILLIAMSBRIDGE ROAD, FROM STREET ALLERTON AVENUE TO STREET RADCLIFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent sewer repair restoration needs to be resealed in driving lane |
2023-04-06 | No data | CROSBY AVENUE, FROM STREET DANIEL STREET TO STREET MIDDLETOWN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 5 Arben NY marked plates in use, 3 in parking lane, 2 in sidewalk. Has temporary place plates permit on file. Will need new valid permit to complete plumbers work. |
2023-04-06 | No data | BAY STREET, FROM STREET BOROUGH PLACE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | 2 DIFFERENT STREET OPENINGS OPPOSITE 35A STEEL PLATES COUNTERSUNK IN ROADWAY- ONE SEWER & ONE MUST BE WATER- NO VALID DOT PERMIT FOR WATER-NOV WAS ISSUED TO GENERAL CONTRACTOR |
2023-04-06 | No data | CROSBY AVENUE, FROM STREET DANIEL STREET TO STREET MIDDLETOWN ROAD | No data | Street Construction Inspections: Active | Department of Transportation | 5 steel plates with Arben NY markings. 3 in roadway countersunk, 2 on sidewalk, Ramped. I/F/O # 1616. |
2023-04-05 | No data | HINSDALE STREET, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane sealed and flush. |
2023-04-04 | No data | HOPKINSON AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Resurfaced by bpp |
2023-04-01 | No data | EAST 146 STREET, FROM STREET BROOK AVENUE TO STREET WILLIS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cut made temp new BPP |
2023-04-01 | No data | BAY STREET, FROM STREET BOROUGH PLACE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED STREET OPENING OPPOSITE 35A BAY STREET BUILDING OVER CITY SEWER MAIN LEADS TO NEWER CONCRETE SIDEWALK FLAG OVER ENTRANCE TO SEWER LINE TO NEW BUILDING-OK |
2023-03-31 | No data | WASHINGTON STREET, FROM STREET BATTERY PLACE TO STREET PEDESTRIAN OVERPASS | No data | Street Construction Inspections: LL14 | Department of Transportation | I/F/O #21 WASHINGTON STREET 6” CUT-BACKS DONE/ (L)18’(W)8’(D)2’ BACK-FILL COMPLETED. |
2023-03-31 | No data | EAST 184 STREET, FROM STREET BEND TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | Has a perm trench in the driving lanes, new building. |
2023-03-31 | No data | TIEBOUT AVENUE, FROM STREET EAST 184 STREET TO STREET EAST 187 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in the driving lane, new building. |
2023-03-31 | No data | EAST 146 STREET, FROM STREET BROOK AVENUE TO STREET WILLIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut made temp to grade new BBP .. |
2023-03-30 | No data | WEST 11 STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | I/F/O #319 PLUMBERS CUT IN THE DRIVING LANE WEARING COURSE COMPLETED/FINALIZED/AREA MADE SAFE.(L)8’1”(W)5’1”(D)3” |
2023-03-30 | No data | LACONIA AVENUE, FROM STREET EAST 212 STREET TO STREET EAST 213 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water/sewer trench in driving lane partially resurfaced by more recent gas work in roadway |
2023-03-29 | No data | WASHINGTON STREET, FROM STREET BATTERY PLACE TO STREET PEDESTRIAN OVERPASS | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK-FILL TO BE RE-SCHEDULED AS PER SUPERVISOR ON SITE (SUBER) DUE TO 12’ TO 14’ existing void in the roadway. |
2023-03-27 | No data | WEST 11 STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | I/F/O #319, LL14 base completed. L : 4’ 5” W : 4’2”. |
2023-03-27 | No data | BAY STREET, FROM STREET BOROUGH PLACE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | AT 950 AM (DASH DOWN) PLUMBER CREW WAS SETTIING UP WORKZONE - FOR REPAIR SEWER WORK - STEEL PLATED RWY AT DECLINING ROADWAY OFF STYVESANT PLACE - NO SIDEWALK HAS BEGUN AS OF YET- WORK BEING DONE FOR LARGE BUILDING OPERATION ACROSS STREET/ROADWAY |
2023-03-27 | No data | WEST 37 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found several sidewalk flags flushed to grade with expansion joints sealed. |
2023-03-27 | No data | GREENE AVENUE, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill complete Arrived: 10:45 Departure: 12:15pmCut1: L2ft5inxW2ftxD2ft6in 1st test: 97.3%Cut2: L6tfxW4ftxD2ft6in 1st test: 96.6% |
2023-03-24 | No data | GRAND CONCOURSE, FROM STREET EAST 201 STREET TO STREET EAST 202 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work observed on site, BO underway. |
2023-03-24 | No data | GRAND CONCOURSE, FROM STREET EAST 201 STREET TO STREET EAST 202 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated cut on sw. Awaiting DEp inspection. |
2023-03-23 | No data | WEST 12 STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O AKA 775 Washington one sewer and one water cobblestone restoration are finalized. Sidewalk patched at this time leading to building. No CAR issued at this time due to ongoing building operation. |
2023-03-23 | No data | EAST 59 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, excavating s/w & parking lane, ifo #8, DEP shut-off, 3day. Confirmed. |
2023-03-22 | No data | ZULETTE AVENUE, FROM STREET ERICSON PLACE TO STREET MAYFLOWER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Permittee on-site |
2023-03-22 | No data | TURNBULL AVENUE, FROM STREET PUGSLEY AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ATPO I observe a backhoe with ARBEN CONTRACTING markings stored in the parking lane without a DOT permit. I identify by expired permit X012023018A15. |
2023-03-22 | No data | ZULETTE AVENUE, FROM STREET ERICSON PLACE TO STREET MAYFLOWER AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | water leaking at the goose neck, shut off by DEP, this is for building 1534 Erickson but cut is in front of 2801 Zulette ave (one cut) |
2023-03-21 | No data | BRISTOL STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway driving lane sealed and flush. |
2023-03-21 | No data | EAST 219 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work in roadway found resurfaced |
2023-03-21 | No data | CHRISTOPHER AVENUE, FROM STREET EAST NEW YORK AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags restored in kind DDC takeover in roadway. |
2023-03-20 | No data | MOTHER GASTON BOULEVARD, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Resurfaced by BPP B012022193B05 |
2023-03-20 | No data | CARPENTER AVENUE, FROM STREET EAST 220 STREET TO STREET EAST 221 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water repair restoration in driving lane |
2023-03-20 | No data | CHESTER STREET, FROM STREET NEWPORT STREET TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration resurfaced by BPP B012022013A82. |
2023-03-19 | No data | CHRISTOPHER AVENUE, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in roadway parking lane. |
2023-03-18 | No data | EAST 223 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: E-Number | Department of Transportation | One Temporary roadway and one sidewalk cut flush with surrounding area |
2023-03-18 | No data | WEST END AVENUE, FROM STREET WEST 65 STREET TO STREET WEST 66 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the Crosswalk at 65 street. |
2023-03-17 | No data | EAST 222 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water repair trench in driving & parking lane |
2023-03-17 | No data | GATES AVENUE, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | L3FT, W2FT, D3FT CUT IN THE DRIVING LANE IFO PROPERTY #906. |
2023-03-16 | No data | CROTONA AVENUE, FROM STREET EAST 178 STREET TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Sidewalk cuts I/f/o 1968/1972 two roadway cuts I/f/o 1967... wet 127.4 dry 115.8 max 119.2 actual 9.9% 2'x2'x4 97.4 97.2 |
2023-03-16 | No data | STANLEY AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane sealed and flsuh. |
2023-03-15 | No data | CLAREMONT AVENUE, FROM STREET WEST 120 STREET TO STREET WEST 122 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | okay |
2023-03-14 | No data | GATES AVENUE, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | Crew did not show up. |
2023-03-14 | No data | EAST 168 STREET, FROM STREET FULTON AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm. In roadway lane markings restored in compliance |
2023-03-13 | No data | HOPKINSON AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway driving lane sealed and flush. |
2023-03-11 | No data | ARNOW AVENUE, FROM STREET DEWITT PLACE TO STREET SEYMOUR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water repair trench crossing roadway needs to be resealed IFO building #1362 |
2023-03-11 | No data | SEYMOUR AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water repair restoration needs to be resealed in driving lane adjacent to house #2761 |
2023-03-10 | No data | WEST 24 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced M152022158A56. |
2023-03-10 | No data | ALABAMA AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY FOUND RESURFACED BY BPP |
2023-03-08 | No data | EAST 73 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Plate in roadway in good standing |
2023-03-03 | No data | WEST 12 STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O AKA 775 Washington one sewer and one water cobblestone restoration are finalized. Sidewalk patched at this time leading to building. No CAR issued at this time due to ongoing building operation. |
2023-03-03 | No data | EAST 11 STREET, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sidewalk expansion joints have been sealed. |
2023-03-02 | No data | CARPENTER AVENUE, FROM STREET EAST 220 STREET TO STREET EAST 221 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water repair restoration in parking lane opposite 3836 |
2023-02-28 | No data | BRUCKNER BOULEVARD, FROM STREET BRE WESTBOUND ENTRANCE BUHRE AVE TO STREET ROBERTS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O… Arben NY markings in use on roadway I/F/O#3525, 1 of which was smooth to the touch and its resistance was not equal to or greater than the adjacent roadway surface. Permit #X012023045A63 and Arben NY markings on steel plate used for ID. |
2023-02-27 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | tape has been removed around sidewalk flag |
2023-02-26 | No data | GRAND CONCOURSE, FROM STREET EAST 144 STREET TO STREET EAST 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2023-02-26 | No data | EAST 144 STREET, FROM STREET GRAND CONCOURSE TO STREET WALTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass resurfaced |
2023-02-25 | No data | MORRIS AVENUE, FROM STREET CAMERON PLACE TO STREET EAST 182 STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent has steel plates countersunk in the driving lane. Failed to install raise plow signs during the winter moratorium policy. 12/31/23-3/31/23 Was I.D by permit. |
2023-02-25 | No data | MORRIS AVENUE, FROM STREET CAMERON PLACE TO STREET EAST 182 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the driving lane. |
2023-02-24 | No data | BOSTON ROAD, FROM STREET NYCTA SUBWAY TO STREET THWAITES PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in roadway found resurfaced by major reconstruction work done |
2023-02-23 | No data | LINDEN BOULEVARD, FROM STREET HINSDALE STREET TO STREET SNEDIKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Resurfaced by BPP cut no longer visible. |
2023-02-23 | No data | WEST 12 STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumbers cut on cobblestone roadway in parking within BO (near Washington St)near barricades/sidewalk work around water valve. |
2023-02-22 | No data | EAST 223 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber cut made permanent |
2023-02-22 | No data | EAST 179 STREET, FROM STREET CRESTON AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in the driving lane, parking lane. |
2023-02-22 | No data | GREENE AVENUE, FROM STREET CAMBRIDGE PLACE TO STREET ST JAMES PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-02-22 | No data | BRONX PARK EAST, FROM STREET THWAITES PLACE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water repair restoration in roadway |
2023-02-21 | No data | EAST 112 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP in r/w |
2023-02-21 | No data | CARPENTER AVENUE, FROM STREET EAST 220 STREET TO STREET EAST 221 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active permit, work being done on sidewalk & in roadway |
2023-02-19 | No data | WEST 32 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found permanently repaired sewer restoration in roadway. |
2023-02-19 | No data | 35 STREET, FROM STREET 34 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags restored around water valve. No roadway wor visible due to BPP. |
2023-02-19 | No data | HINSDALE STREET, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Resurfaced by BPP |
2023-02-19 | No data | BROOME STREET, FROM STREET CLINTON STREET TO STREET SUFFOLK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration acceptable in the parking lane |
2023-02-19 | No data | BROOME STREET, FROM STREET NORFOLK STREET TO STREET SUFFOLK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration acceptable |
2023-02-18 | No data | WEST 105 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway |
2023-02-18 | No data | WALTON AVENUE, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cuts was resurfaced, new building. |
2023-02-16 | No data | WEST 11 STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | I/F/O #317 temp to grade plumbers cut in the driving lane no 6" cut backs done .(L)3’5”(W)3’5”(D) 3’8”. |
2023-02-13 | No data | 35 STREET, FROM STREET 34 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work covered by BPP. |
2023-02-13 | No data | WEST 12 STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | IFO AKA 775 Washington Street in the parking/driving lane there are two permanent cobblestone restorations that has been restored in kind. Sidewalk patched at this time & other flags are acceptable. |
2023-02-13 | No data | CRUGER AVENUE, FROM STREET ARNOW AVENUE TO STREET WILLIAMSBRIDGE ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work being done in parking lane adjacent to crosswalk |
2023-02-11 | No data | AQUEDUCT AVENUE, FROM STREET BUCHANAN PLACE TO STREET WEST 182 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cuts in the driving lane. |
2023-02-10 | No data | STANLEY AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Active | Department of Transportation | TWO OPEN EXCAVATIONS 1 ON SIDEWALK UNDER SCAFFOLDING 1 IN ROADWAY DRIVING LANE WB OPPOSITE PROPERTY 580 STANLEY AVENUE CREW ON SIGHT WORKING |
2023-02-10 | No data | WEST 135 STREET, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | concrete panel okay |
2023-02-08 | No data | WEST 12 STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Monitored water cobblestone restoration I/F/O AKA 775 Washington St 9a-12:15p. 13'x4' water restoration finalized in parking/driving lane. Plates to be added in driving lane to allow curing. Permit active. |
2023-02-08 | No data | BROOME STREET, FROM STREET NORFOLK STREET TO STREET SUFFOLK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration acceptable |
2023-02-08 | No data | BROOME STREET, FROM STREET CLINTON STREET TO STREET SUFFOLK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work was done at this location contractor applied for this permit in error |
2023-02-07 | No data | EAST 223 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber permanent restoration in the roadway |
2023-02-06 | No data | BRONXWOOD AVENUE, FROM STREET BOSTON ROAD TO STREET WILLIAMSBRIDGE ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work in roadway found resurfaced by recently paved roadway for new building |
2023-02-06 | No data | CRUGER AVENUE, FROM STREET ARNOW AVENUE TO STREET WILLIAMSBRIDGE ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Foreman edwardo & crew on site for water repair work being done on sidewalk & in parking lane adjacent to crosswalk closer to Cruger avenue |
2023-02-05 | No data | JEROME AVENUE, FROM STREET EAST 190 STREET TO STREET WEST 192 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance new building |
2023-02-04 | No data | MADISON AVENUE, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Opposite building # stated, found a permanent Restoration. |
2023-02-04 | No data | TURNBULL AVENUE, FROM STREET PUGSLEY AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Permanent restoration in the roadway. |
2023-01-30 | No data | BRONX PARK EAST, FROM STREET THWAITES PLACE TO STREET WARING AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Permanent water repair restoration in parking lane |
2023-01-28 | No data | 8 AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced under M152022228A85. |
2023-01-27 | No data | WEST 12 STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Monitored restoration 9a-11:10a. 8'x5' sewer restoration in the parking lane within the barricades are acceptable. Plates to be added to allow curing. |
2023-01-27 | No data | CROSBY AVENUE, FROM STREET DANIEL STREET TO STREET MIDDLETOWN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ATPO I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration. |
2023-01-25 | No data | WASHINGTON STREET, FROM STREET JANE STREET TO STREET WEST 12 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired on 11/26/2022. Continuity broken. |
2023-01-25 | No data | WEST 12 STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | I/FO/ AKA 775 Washington street, found two plates in barricaded area and one plate on sidewalk. |
2023-01-21 | No data | EAST 168 STREET, FROM STREET FULTON AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ATPO I observed the above respondent has a permanent restoration, sewer repair work backfilled on a protected street but failed to obtain a confirmation number. Permit number expired 12/4/2022. |
2023-01-20 | No data | WARREN STREET, FROM STREET GREENWICH STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 86, ongoing B/O ( M022023003E54 ) in location and work not visible at this time. This permit has expired. |
2023-01-19 | No data | EAST 222 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Active permit, crew on site for water repair being done in parking lane |
2023-01-18 | No data | 24 STREET, FROM STREET 40 AVENUE TO STREET 41 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work visible due to BPP. |
2023-01-17 | No data | EAST 168 STREET, FROM STREET FULTON AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway , color code added lane markings added . In compliance |
2023-01-17 | No data | 3 AVENUE, FROM STREET EAST 166 STREET TO STREET EAST 167 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Resurfaced street |
2023-01-17 | No data | BROOME STREET, FROM STREET NORFOLK STREET TO STREET SUFFOLK STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | WC complète/ permanent water restoration in the parking lane |
2023-01-17 | No data | EAST 146 STREET, FROM STREET BROOK AVENUE TO STREET WILLIS AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Temp cut sunken in driving lane. I/f/o 409 over due for final |
2023-01-17 | No data | WEST 12 STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O AKA 775 Washington, two Arben marked steel plates over concrete base and one plate on sidewalk without a valid permit on file or application at this time. |
2023-01-17 | No data | VANDAM STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found resurfaced Permit#M152022070A11 |
2023-01-16 | No data | NEWPORT STREET, FROM STREET ROCKAWAY AVENUE TO STREET THATFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane sealed and flush |
2023-01-13 | No data | WASHINGTON STREET, FROM STREET DESBROSSES STREET TO STREET WATTS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O aka 456 Greenwich St on Washington St, previous plumber work has been paved over by newer BPP ( M012022174A19 ) restoration. Work is no longer visible at this time. Permit has expired. |
2023-01-13 | No data | EAST 223 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Active water repair work |
2023-01-12 | No data | EAST 168 STREET, FROM STREET FULTON AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | In compliance has flagger on site , paving cut in roadway in compliance |
2023-01-12 | No data | BROOME STREET, FROM STREET NORFOLK STREET TO STREET SUFFOLK STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | The base passed, and the cutbacks were made; the measurements are as follows the length is 18’, the width is 5’, and the depth is 1’.2”. Also, the restoration was left plated in the parking/driving lane near the crosswalk of Suffolk street. |
2023-01-11 | No data | BROOME STREET, FROM STREET CLINTON STREET TO STREET SUFFOLK STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Contractor has the wrong permit location for backfill, contractor now trying to obtain correct permit for the location of the backfill |
2023-01-11 | No data | EAST 168 STREET, FROM STREET FULTON AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | steel plated recessed raise plow signs posted and skid resistant plates used |
2023-01-11 | No data | BROOME STREET, FROM STREET NORFOLK STREET TO STREET SUFFOLK STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill complete no cutbacks were done, 6 inches and 12 inches cut back were marked out |
2023-01-10 | No data | EAST 128 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water restoration in r/w and s/w ok |
2023-01-09 | No data | CROSBY AVENUE, FROM STREET DANIEL STREET TO STREET MIDDLETOWN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The permittee Arden Contracting Of New York INC I/F/O 1616 active work, excavation left plated in roadway, plates counter. Sunk. Research shows a update DOT permit number X012022364A89 |
2023-01-07 | No data | THROGMORTON AVENUE, FROM STREET BARKLEY AVENUE TO STREET LAYTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumbers permanent restoration in the driving lane. |
2023-01-07 | No data | EAST 168 STREET, FROM STREET FULTON AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Wet 120.6 /121.2 Dry 113.4 /113.9 Max 116.5 / 117.5 Moist 6.4 6.4 compaction 97.6 |
2023-01-06 | No data | WEST 27 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Near fenced off area near 12 Ave, sewer cobblestone restoration is acceptable at this time. |
2023-01-06 | No data | ROSEDALE AVENUE, FROM STREET GLEASON AVENUE TO STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced. |
2023-01-05 | No data | ROSEDALE AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has updated permit # X012022364A31. |
2023-01-05 | No data | ROSEDALE AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Has steel plates counter sunken with Arben markings in the driving, parking lanes, skid resistance, raise plow sign posted. 2 Fiberglass plates on the s/w ramped. |
2023-01-04 | No data | CRUGER AVENUE, FROM STREET ARNOW AVENUE TO STREET WILLIAMSBRIDGE ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in parking lane, counter sunken plate |
2023-01-04 | No data | EAST 128 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water restoration in p/l is ok |
2023-01-03 | No data | GRAND AVENUE, FROM STREET WEST 190 STREET TO STREET WEST 192 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in the roadway |
2023-01-03 | No data | WEST 12 STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Arben marked steel plate in parking lane within BO Washington St near barricades and plates on sidewalk at this time. Permit remains active. |
2023-01-01 | No data | NEWPORT STREET, FROM STREET ROCKAWAY AVENUE TO STREET THATFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2022-12-31 | No data | PARKSIDE PLACE, FROM STREET EAST 209 STREET TO STREET WEBSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2022-12-30 | No data | EAST 59 STREET, FROM STREET AVENUE J TO STREET FLATLANDS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the parking lane opp 960 e 59th st |
2022-12-30 | No data | EAST 11 STREET, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plates on previous cut refer to permit # M012022354B04. |
2022-12-30 | No data | WEST 32 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK NOT DONE PERMIT EXPIRED NO 2022 SEWER WORK FOND ON SEGMENT AT TIME OF INSPECTION. |
2022-12-30 | No data | WEST 12 STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Arben steel plate in parking within BO (near Washington St)near barricades and plates on sidewalk at this time. Permit remains active. |
2022-12-30 | No data | EAST 11 STREET, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Plate ramped on Sidewalk and countersunk in Roadway. |
2022-12-29 | No data | NEWPORT STREET, FROM STREET ROCKAWAY AVENUE TO STREET THATFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | RESPONDENT HAS AN OPEN EXCAVATION IN THE ROADWAY FOR INSTALLATION OF A NEW SEWER CLOSER TO THATFORD CORNER. RESPONDENT HAS FAILED TO EXCAVATE TO THE CURB SO BACK FILL WILL BE RESCHEDULED UNTIL ROADWAY IS CUT TO THE CURB |
2022-12-29 | No data | NEWPORT STREET, FROM STREET ROCKAWAY AVENUE TO STREET THATFORD AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL RESCHEDULED DUE TO CONTRACTOR NOT FULLY CUTTING BACK TO THE CURB FOR INSTALLATION OF A NEW SEWER. RESPONDENT IS ATTEMPTING TO RECTIFY SITUATION NOW. AND BACK WILL BE DONE AT A LATER DATE |
2022-12-23 | No data | CRESTON AVENUE, FROM STREET EAST 196 STREET TO STREET EAST 197 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work was done on property |
2022-12-22 | No data | CROSBY AVENUE, FROM STREET DANIEL STREET TO STREET MIDDLETOWN ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Active work, excavation left plated in roadway, plate is counter sunk |
2022-12-22 | No data | WEST 12 STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Spoke with Zameer with crew on site. Crew working in parking lane. Cobblestone excavated. Steel plates present on sidewalk. Permit remains active. |
2022-12-21 | No data | EAST 168 STREET, FROM STREET FULTON AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Partial BF from bottom to water pipe 25x7x4 only Backfilled and 5ft remaining. Site left incomplete |
2022-12-21 | No data | COLONIAL AVENUE, FROM STREET EAST 196 STREET TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in roadway found resurfaced by recent milled & paved roadway |
2022-12-21 | No data | CLARKSON STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In south parking/driving lane water cobblestone restoration remains acceptable near hydrant. |
2022-12-20 | No data | JAY STREET, FROM STREET JOHN STREET TO STREET PLYMOUTH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at this time active construction site |
2022-12-19 | No data | NASSAU STREET, FROM STREET ANN STREET TO STREET BEEKMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | On going work active Permit#M192022348A29 on file. |
2022-12-18 | No data | ROCKAWAY AVENUE, FROM STREET NEWPORT STREET TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut near thatford in compliance |
2022-12-16 | No data | PRESIDENT STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on the roadway |
2022-12-15 | No data | WASHINGTON STREET, FROM STREET JANE STREET TO STREET WEST 12 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | I/F/O #775 wearing course completed lane marking restored/area made safe. |
2022-12-15 | No data | THIERIOT AVENUE, FROM STREET DEAD END TO STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut Behind the fence. |
2022-12-15 | No data | PORT RICHMOND AVENUE, FROM STREET ANDERSON AVENUE TO STREET CASTLETON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The roadway was resurfaced by DOT. |
2022-12-12 | No data | 88 AVENUE, FROM STREET 153 STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER CUT IN THE DRIVING LANE |
2022-12-12 | No data | 153 STREET, FROM STREET 88 AVENUE TO STREET 89 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER CUT IN THE P/L |
2022-12-10 | No data | EAST 167 STREET, FROM STREET HALL PLACE TO STREET REV JAMES POLITE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2022-12-10 | No data | BEEKMAN STREET, FROM STREET NASSAU STREET TO STREET WILLIAM STREET | No data | Street Construction Inspections: Active | Department of Transportation | 25' E of Nassau St, 1 "ARBEN NY" countersunk steel plate in the roadway. "Raise Plow" sign posted prior to plate on green plywood fence for ongoing B/O at 15 Beekman St. Permit is active. |
2022-12-10 | No data | NASSAU STREET, FROM STREET ANN STREET TO STREET BEEKMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | 40' S of Beekman St, 1 "ARBEN NY" countersunk steel plate in the roadway. "Raise Plow" sign posted prior to plate on green plywood fence for ongoing B/O of aka 15 Beekman St. Permit is active. |
2022-12-09 | No data | VANDALIA AVENUE, FROM STREET ERSKINE STREET TO STREET FOUNTAIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY CUT FOUND RESURFACED BY BPP |
2022-12-08 | No data | WASHINGTON STREET, FROM STREET JANE STREET TO STREET WEST 12 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | I/F/O 775, sewer repair trench ( 16'8"L x 4'W x 6'D ) from driving to east parking lane backfilled and left 1' down for concrete / wearing course. No base cutbacks performed at this time and crew working on sidewalk at time of departure: 11:21am. |
2022-12-07 | No data | ROSEDALE AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the respondent has 3 steel plates on the driving lane with ARBEN NY on them which were smooth to the touch, it's resistance was not equal to or greater than the adjacent roadway surface. Was I.D by permit. No one on site working. |
2022-12-07 | No data | NEWPORT STREET, FROM STREET ROCKAWAY AVENUE TO STREET THATFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Awaiting backfill |
2022-12-07 | No data | NEWPORT STREET, FROM STREET ROCKAWAY AVENUE TO STREET THATFORD AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL PASS |
2022-12-06 | No data | WEST 150 STREET, FROM STREET 8 AVENUE TO STREET BRADHURST AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flushed to grade in the DL. |
2022-12-05 | No data | LACONIA AVENUE, FROM STREET EAST 212 STREET TO STREET EAST 213 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO #3573, theres concrete patchwork on sidewalk surrounding water valve. Please restore and make two full concrete sidewalk flags. |
2022-11-26 | No data | EAST 222 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please reseal permanent restoration in the roadway ifo #629. |
2022-11-25 | No data | EAST 179 STREET, FROM STREET BOSTON ROAD TO STREET BRONX STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 48x4x4.5 cut in dead end area. 6 inch cutbacks witnessed. |
2022-11-25 | No data | WILLIAMSBRIDGE ROAD, FROM STREET ALLERTON AVENUE TO STREET RADCLIFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plates in roadway. Sewer line installment |
2022-11-22 | No data | LACONIA AVENUE, FROM STREET EAST 212 STREET TO STREET EAST 213 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water repair restoration made permanent in the roadway. Roadway markings restored. |
2022-11-17 | No data | WEST 85 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in driving lane at this time for corner property of 2330 Broadway. |
2022-11-17 | No data | PRESIDENT STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on the roadway |
2022-11-17 | No data | EAST 180 STREET, FROM STREET BRYANT AVENUE TO STREET VYSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work found resurfaced by recently paved roadway done by Monadnock Construction INC for building #988 |
2022-11-16 | No data | MOTHER GASTON BOULEVARD, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in compliance |
2022-11-16 | No data | EAST 179 STREET, FROM STREET CRESTON AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Partially BFilled from sewer pipe to water pipe. 12’down. Only 5 ft of excavation remains, Will be completed later date. 11.5x4.5x12’. |
2022-11-14 | No data | HORNADAY PLACE, FROM STREET CROTONA PARKWAY TO STREET MOHEGAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work found resurfaced by BPP |
2022-11-13 | No data | ROCKAWAY AVENUE, FROM STREET NEWPORT STREET TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway northbound lane near Newport street ok |
2022-11-13 | No data | EAST 179 STREET, FROM STREET CRESTON AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in the r/w |
2022-11-10 | No data | WILLIAMSBRIDGE ROAD, FROM STREET ALLERTON AVENUE TO STREET RADCLIFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Pass. Maintain two lanes for traffic. Engineer Jamie on site regarding sewer work in street. |
2022-11-09 | No data | EAST 179 STREET, FROM STREET BOSTON ROAD TO STREET BRONX STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work found at this time, active permit |
2022-11-09 | No data | EAST 179 STREET, FROM STREET BOSTON ROAD TO STREET BRONX STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found, active permit on file |
2022-11-07 | No data | CRUGER AVENUE, FROM STREET BURKE AVENUE TO STREET SOUTH OAK DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paved over most of plumber restoration. i.f.o. 3214 |
2022-11-07 | No data | WILLIAMSBRIDGE ROAD, FROM STREET ALLERTON AVENUE TO STREET RADCLIFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plumber on site, sewer work in progress |
2022-11-07 | No data | WILLIAMSBRIDGE ROAD, FROM STREET ALLERTON AVENUE TO STREET RADCLIFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumbing work in progress, updated permit on file |
2022-11-07 | No data | EAST 179 STREET, FROM STREET CRESTON AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working on sw and rw, |
2022-11-07 | No data | BARNES AVENUE, FROM STREET ADEE AVENUE TO STREET WILLIAMSBRIDGE ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done |
2022-11-06 | No data | WEST 32 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 0114 - REPAIR SEWER RESTORATION I/F/O AKA STARBUCKS IS FLUSHED AND SEALED TO GRADE . |
2022-11-06 | No data | WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found roadway resurfaced. |
2022-11-03 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active building Opp I/F/O 95. I’m unable to properly inspect. |
2022-11-02 | No data | WEST 126 STREET, FROM STREET BEND TO STREET WEST 127 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway repaved BPP |
2022-10-29 | No data | EAST 112 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R/W trench sewer repair for 60 E 112 St. |
2022-10-28 | No data | UNIVERSITY AVENUE, FROM STREET RESERVOIR AVENUE TO STREET WEST 197 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found resurfaced. Plumbers work resurfaced by building paving plan I/F/O #2851 |
2022-10-24 | No data | WEST END AVENUE, FROM STREET WEST 65 STREET TO STREET WEST 66 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired on 9/15/2022. |
2022-10-21 | No data | EAST 11 STREET, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued for the Respondent failed to seal Expansion Joints at the Curb area. CAR # 20226390627 was issued prior on 9/12/2022 to correct this condition. |
2022-10-21 | No data | GREENWICH STREET, FROM STREET DESBROSSES STREET TO STREET WATTS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 456 portion of this has been resurfaced as part of BPP in this isolated area. Restoration is acceptable. |
2022-10-20 | No data | LACONIA AVENUE, FROM STREET EAST 212 STREET TO STREET EAST 213 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon inspection I spoke to foreman Mousafa, & Roal regarding tracking number on file shows permittee applied for renewal permit on 10/18/22. Work site in compliance |
2022-10-18 | No data | EAST 25 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a permanent Restoration in the driving / parking lanes. |
2022-10-18 | No data | WEST 32 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | work not started |
2022-10-18 | No data | EUCLID AVENUE, FROM STREET GLENMORE AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the R flushed to grade |
2022-10-17 | No data | EMERALD STREET, FROM STREET LINDEN BOULEVARD TO STREET LORING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH ACROSS THE ROADWAY |
2022-10-14 | No data | EAST 10 STREET, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued for the Respondent failed to remove patch work and restore full 5 x 5 Sidewalk Flags as required. CAR # 20226720353 was issued prior on 9/3/2022 to correct this condition. |
2022-10-12 | No data | DESBROSSES STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1/2+5 BPP has resurfaced this restoration and sidewalk restoration. |
2022-10-09 | No data | TIFFANY STREET, FROM STREET BARRY STREET TO STREET BURNETT PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2022-10-09 | No data | WEST 57 STREET, FROM STREET 6 1/2 AVENUE TO STREET AVENUE OF THE AMERICAS | No data | Street Construction Inspections: Active | Department of Transportation | Site safely enclosed. |
2022-10-09 | No data | PORT RICHMOND AVENUE, FROM STREET HOOKER PLACE TO STREET WALKER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w restored |
2022-10-08 | No data | WEST 28 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to fully inspect inspect due to Active B.O. |
2022-10-07 | No data | PARK AVENUE, FROM STREET EAST 111 STREET TO STREET EAST 112 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit M012022269B42 on file for Private Sewer Installation. Roadway is closed off due to ongoing work. |
2022-10-03 | No data | CARPENTER AVENUE, FROM STREET EAST 223 STREET TO STREET EAST 224 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | V & D Paving working under DOT permit number X012022076B91 paved 1 1/2 plus 5 ( 63 feet X 22 feet) of the roadway BPP 240310702 |
2022-10-02 | No data | ROCKAWAY AVENUE, FROM STREET NEWPORT STREET TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Area has been made in compliance with temporary asphalt |
2022-10-02 | No data | ROCKAWAY AVENUE, FROM STREET NEWPORT STREET TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp asphalt around steel plate down 3 inches. Located in the temporary pedestrian walkway. |
2022-10-01 | No data | TIFFANY STREET, FROM STREET BARRY STREET TO STREET BURNETT PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2022-10-01 | No data | WEST 251 STREET, FROM STREET BROADWAY TO STREET OLD ALBANY POST ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | on sidewalk behind fence, BO |
2022-09-30 | No data | HINSDALE STREET, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY |
2022-09-29 | No data | WILLIAMSBRIDGE ROAD, FROM STREET ALLERTON AVENUE TO STREET RADCLIFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Foreman Zymer & crew working on site, new sewer line, adjustments were made to maintain 2 lane traffic |
2022-09-29 | No data | LACONIA AVENUE, FROM STREET EAST 212 STREET TO STREET EAST 213 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Unable to ascertain due to construction site. |
2022-09-27 | No data | 10 AVENUE, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Concrete Base Course Completed On 2 Excavations In Parking/Driving Lane Cuts Replated |
2022-09-26 | No data | HINSDALE STREET, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY |
2022-09-25 | No data | ROCKAWAY AVENUE, FROM STREET NEWPORT STREET TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Excavation in the Roadway Steel Plated in Compliance |
2022-09-21 | No data | CARPENTER AVENUE, FROM STREET BRONX BOULEVARD TO STREET EAST 220 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the parking lane, one new concrete s/w flag. Expansion joints sealed. |
2022-09-14 | No data | EAST 46 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - REPAIR WATER -: REFSURFACED BY BPP |
2022-09-13 | No data | EAST 156 STREET, FROM STREET BROOK AVENUE TO STREET HEGNEY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM IN COMPLIANCE I/F/O 740 |
2022-09-13 | No data | BROOK AVENUE, FROM STREET EAST 156 STREET TO STREET EAST 157 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM IN ROADWAY I/F/O 740 |
2022-09-13 | No data | EAGLE AVENUE, FROM STREET EAST 161 STREET TO STREET EAST 163 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY AND SIDEWALK IN COMPLIANCE. |
2022-09-12 | No data | EAST 11 STREET, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints must be sealed along curb line. In front of 25. CAR issued during cleanup project. |
2022-09-12 | No data | EAST 11 STREET, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joints must be sealed along curb line. In front of 25. CAR issued during cleanup project. |
2022-09-11 | No data | WEST 37 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | OBSERVED CREW ON SITE EXCAVATING ON SIDEWALK WITH BACKHOE AT TIME OF INSPECTION CREW IN COM OF WORK STIPULATIONS |
2022-09-10 | No data | BAY VIEW AVENUE, FROM STREET AMPERE AVENUE TO STREET GRISWOLD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Long water cut , opposite side parking lane |
2022-09-09 | No data | VANDAM STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced under M152022070A11. |
2022-09-09 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2022-09-08 | No data | DESBROSSES STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | This area has been resurfaced as part of BPP done by Etna at this time. |
2022-09-08 | No data | EAST 25 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a perm trench flush to grade within the parking/driving lane. |
2022-09-07 | No data | WASHINGTON STREET, FROM STREET BATTERY PLACE TO STREET PEDESTRIAN OVERPASS | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water restoration in the parking lane, and 2 sidewalk flags have been restored and in compliance. |
2022-09-03 | No data | EAST 10 STREET, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 22, sewer work on the sidewalk has patchwork within 1 flag and defective concrete during curing within 2 flags. Full flag restoration required. Also, expansion joint along curb needs to be recessed ½" and sealed. CAR cleanup - pass to re-issue. |
2022-09-03 | No data | EAST 10 STREET, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I/F/O 22, sewer work on the sidewalk has patchwork within 1 flag and defective concrete during curing within 2 flags. Full flag restoration required. Also, expansion joint along curb needs to be recessed ½" and sealed. CAR cleanup - pass to re-issue. |
2022-09-02 | No data | EAST 69 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent ARBEN CONTRACTING failed to comply with terms & conditions of stipulation #023, maintain ONE 11 FOOT lane for all ongoing vehicular traffic. Nov issued foreman has informed me there is no other option here has to close!! |
2022-09-02 | No data | WESTCHESTER AVENUE, FROM STREET BERGEN AVENUE TO STREET EAST 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway and sidewalk in compliance with updated permit. #X012022049A90 |
2022-09-02 | No data | BERGEN AVENUE, FROM STREET EAST 152 STREET TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced and sidewalk in compliance. |
2022-09-01 | No data | MURDOCK AVENUE, FROM STREET NEREID AVENUE TO STREET PITMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done behind property line |
2022-08-31 | No data | WEST STREET, FROM STREET INDIA STREET TO STREET JAVA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in parking lane is flush to grade |
2022-08-30 | No data | EAST 232 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber cut perm in the roadway |
2022-08-30 | No data | 33 STREET, FROM STREET AMTRAK RAILROAD TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water trench flush to grade across the roadway i/f/o 22-21. |
2022-08-28 | No data | SPRING STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to fully inspect inspect due to active BO. |
2022-08-27 | No data | WEST 159 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway open up for parking cant locate restoration due to parking |
2022-08-24 | No data | ROCKAWAY AVENUE, FROM STREET NEWPORT STREET TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH IN THE ROADWAY FOR NEW BUILDING |
2022-08-21 | No data | HOME STREET, FROM STREET EAST 169 STREET TO STREET REV JAMES POLITE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | resurfaced by BPP |
2022-08-20 | No data | 3 AVENUE, FROM STREET EAST 22 STREET TO STREET EAST 23 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a permanent Restoration in the driving / parking lane on the East side closet to East 23 Street Crosswalk. However unable to view parking lane portion. |
2022-08-18 | No data | GREENWICH STREET, FROM STREET CHARLTON STREET TO STREET KING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found permanent water restoration in compliance. |
2022-08-18 | No data | WEST HOUSTON STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found roadway resurfaced. |
2022-08-17 | No data | SPRING STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to fully inspect due to active BO. |
2022-08-15 | No data | EAST 61 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 107 permanent water restoration in the roadway and sidewalk is in compliance |
2022-08-15 | No data | EAST 11 STREET, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 0114 - REPAIR SEWER RESTORATION WITHIN THE PL / DR IS FLUSHED AND SEALED TO GRADE. |
2022-08-10 | No data | SHAKESPEARE AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET FEATHERBED LANE | No data | Street Construction Inspections: Active | Department of Transportation | Pass. Full r/w closure. Was told to open up and complied. Incompliance |
2022-08-08 | No data | VANDAM STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found roadway resurfaced. |
2022-08-07 | No data | VANDAM STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found roadway resurfaced. |
2022-07-31 | No data | WEST 66 STREET, FROM STREET FREEDOM PLACE TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a perm curb to curb restoration flush to grade in the roadway near the crosswalk of West End Avenue. |
2022-07-31 | No data | 5 AVENUE, FROM STREET EAST 28 STREET TO STREET EAST 29 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the driving lane and within an active B.O.'s pedestrian walkway, restoration is flush to grade, I/F/O 250 |
2022-07-28 | No data | WEST END AVENUE, FROM STREET WEST 65 STREET TO STREET WEST 66 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | wearing course to be rescheduled |
2022-07-27 | No data | WEST 105 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration flush to grade |
2022-07-27 | No data | WEST END AVENUE, FROM STREET WEST 65 STREET TO STREET WEST 66 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | The base passed, & there are 3 cuts in the Roadway, 2 of which will be combined into 1 cut. The trench is near the crosswalk of W 66 street, & the other 2 cuts are next to the crosswalk of W 65 street, and they will be combined into 1 restoration. |
2022-07-20 | No data | WEST END AVENUE, FROM STREET WEST 65 STREET TO STREET WEST 66 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | The respondent backfill passed, and the trench extended from the West curb into the turning lane near the crosswalk of West 66 Street, and it was left plated for concrete curing. |
2022-07-19 | No data | BARNES AVENUE, FROM STREET ADEE AVENUE TO STREET WILLIAMSBRIDGE ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway was resurfaced , sidewalk in compliance. I/F/O 2953 |
2022-07-18 | No data | SNEDIKER AVENUE, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SEGMENT FOUND RESURFACED DUE TO BPP FOR NEW BUILDING |
2022-07-17 | No data | SOUTHERN BOULEVARD, FROM STREET JENNINGS STREET TO STREET LOUIS NINE BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no sewer work |
2022-07-15 | No data | WEST END AVENUE, FROM STREET WEST 65 STREET TO STREET WEST 66 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed in the crosswalk of west 65th street. 2 restorations passed and plated off. No cutbacks made. |
2022-07-14 | No data | SURF AVENUE, FROM STREET JONES WALK TO STREET WEST 12 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags where water repair was made. |
2022-07-11 | No data | CARPENTER AVENUE, FROM STREET EAST 220 STREET TO STREET EAST 221 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in roadway, sealed. |
2022-07-10 | No data | BROADWAY, FROM STREET WEST 251 STREET TO STREET WEST 252 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | st. cut pass |
2022-07-09 | No data | HUGHES AVENUE, FROM STREET EAST 182 STREET TO STREET OAK TREE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2022-07-07 | No data | WEST 20 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags where sewer repair was made. |
2022-07-06 | No data | COLDEN AVENUE, FROM STREET NEILL AVENUE TO STREET RHINELANDER AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 14x 4 down 4 ifo 1963. 6” cutback witnessed. Second cut ifo 1961 previously BF. |
2022-07-03 | No data | WEST 126 STREET, FROM STREET BEND TO STREET WEST 127 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 450 west 126 st roadway restoration in compliance |
2022-06-30 | No data | 3 AVENUE, FROM STREET EAST 22 STREET TO STREET EAST 23 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a permanent Restoration in the driving / parking lane on the East side closet to East 23 Street Crosswalk. |
2022-06-29 | No data | MOTHER GASTON BOULEVARD, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY AND SIDE WALK FLAGS INSTALLED |
2022-06-27 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut resurfaced by BPP |
2022-06-25 | No data | WEST 116 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH GOING ACROSS THE ROADWAY IN COMPLIANCE |
2022-06-23 | No data | EAST 59 STREET, FROM STREET AVENUE J TO STREET FLATLANDS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the parking lane opp 960 e 59th st |
2022-06-23 | No data | CLARKSON STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cobblestone restoration in south portion of segment driving lane remains acceptable. |
2022-06-23 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the RW flushed to grade |
2022-06-23 | No data | COLDEN AVENUE, FROM STREET NEILL AVENUE TO STREET RHINELANDER AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Sewer job opp 1960. 12x4 down 10’. Only 6’ BF today and remaining 4 ft will be rescheduled. |
2022-06-21 | No data | THROGMORTON AVENUE, FROM STREET BARKLEY AVENUE TO STREET LAYTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew is on site |
2022-06-21 | No data | THROGMORTON AVENUE, FROM STREET BARKLEY AVENUE TO STREET LAYTON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass |
2022-06-16 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut pass |
2022-06-14 | No data | WEST 66 STREET, FROM STREET FREEDOM PLACE TO STREET WEST END AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | WEARING COURSE: L:11' D:10' W:2" |
2022-06-13 | No data | WEST 66 STREET, FROM STREET FREEDOM PLACE TO STREET WEST END AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Opposite # 303 LL14 Backfill pass with 18” cut backs marked out around Restoration in the driving lane. L 7’ W 5’. |
2022-06-12 | No data | EAST 10 STREET, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Patch work failed to fully restore sidewalk flags |
2022-06-11 | No data | WEST 85 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration flush to grade |
2022-06-10 | No data | BARKER AVENUE, FROM STREET MACE AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut I/F/O 2423 |
2022-06-08 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work found |
2022-06-08 | No data | ALABAMA AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, perm .... new building ... |
2022-06-08 | No data | EAST 112 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in drivng parking lane |
2022-06-07 | No data | BRONX PARK EAST, FROM STREET THWAITES PLACE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER PERM IN ROADWAY |
2022-06-07 | No data | BRONX PARK EAST, FROM STREET MACE AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER I/F/O 2428 in roadway |
2022-06-07 | No data | RIVER AVENUE, FROM STREET EAST 167 STREET TO STREET MC CLELLAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done however, unable to properly inspect due to active b.o's along segment |
2022-06-06 | No data | WEST 66 STREET, FROM STREET FREEDOM PLACE TO STREET WEST END AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | base going from curb to curb adjacent to the West End Ave crosswalk is in compliance |
2022-06-04 | No data | GREENE AVENUE, FROM STREET CAMBRIDGE PLACE TO STREET ST JAMES PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | trench in the roadway |
2022-06-03 | No data | RIVER AVENUE, FROM STREET EAST 167 STREET TO STREET MC CLELLAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restoration in front of building operation |
2022-05-27 | No data | QUEENS STREET, FROM STREET DEAD END TO STREET JACKSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Three permanent water restorations to grade in the driving lane towards dead end. |
2022-05-26 | No data | EAST 180 STREET, FROM STREET BOSTON ROAD TO STREET BODY OF WATER | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent has violated stip # 27. Has only 1 lane for traffic on a 2 way street. With a open excavation in the roadway and backhoe machine. |
2022-05-26 | No data | WEST 66 STREET, FROM STREET FREEDOM PLACE TO STREET WEST END AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | This is a sewer job, and the entire depth of the excavation is 11'; however, the contractor is only backfilling 4' from the bottom of the pit to the bottom of the pipe so that DEP can commence their inspection. Also, the Backfill passed. |
2022-05-25 | No data | CLARKSON STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in driving lane remains acceptable at this time. |
2022-05-25 | No data | 4 AVENUE, FROM STREET 14 STREET TO STREET 15 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water work done on sidewalk in front of address - 2 water valves |
2022-05-24 | No data | EAST 232 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Steel plates covering concrete base. Roadway newly paved, permit showing non protected. Spoke to plumber Moos he said the permit shows not protected. |
2022-05-21 | No data | VANDALIA AVENUE, FROM STREET ERSKINE STREET TO STREET FOUNTAIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the roadway, in compliance |
2022-05-21 | No data | EAST 45 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration was covered over by permittee IBM 50087 NEW YORK WATER curb to curb. |
2022-05-21 | No data | HARRISON AVENUE, FROM STREET WEST 180 STREET TO STREET WEST 181 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the driving lane. |
2022-05-20 | No data | CHESTNUT STREET, FROM STREET DINSMORE PLACE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, opp 234 euclid st ...../09 |
2022-05-18 | No data | EAST 59 STREET, FROM STREET AVENUE J TO STREET FLATLANDS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrival 11:10 Departing 1:50 1 cut in the parking lane opposite of 960 East 59th street. 3’9x3’4x3’0 compaction 97.3 |
2022-05-15 | No data | GREENE AVENUE, FROM STREET CAMBRIDGE PLACE TO STREET ST JAMES PLACE | No data | Street Construction Inspections: Active | Department of Transportation | plated r.w |
2022-05-15 | No data | EAST 146 STREET, FROM STREET BROOK AVENUE TO STREET WILLIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | in front of construction site |
2022-05-15 | No data | WEST 66 STREET, FROM STREET FREEDOM PLACE TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The Eastbound travel lane remains plated near the crosswalk of West End Ave with an updated permit on file. |
2022-05-14 | No data | GRAND AVENUE, FROM STREET WEST 190 STREET TO STREET WEST 192 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the p/l Opposite new D.O.B. |
2022-05-13 | No data | ELIZABETH STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #208 water cut in the driving lane Partly observed due to active BO on site. |
2022-05-13 | No data | WEST 118 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Rdwy incompliance. |
2022-05-12 | No data | EAST 46 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced B.P.P |
2022-05-12 | No data | WEST 95 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP repaved |
2022-05-08 | No data | CLARKSON STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in compliance. |
2022-05-08 | No data | GREENWICH STREET, FROM STREET DESBROSSES STREET TO STREET WATTS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cobblestone roadway has been restored in front of 456 |
2022-05-07 | No data | WEST FARMS ROAD, FROM STREET BEND TO STREET RODMAN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the roadway |
2022-05-02 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | replace 2021 color codes to a 2022 color codes |
2022-05-02 | No data | SOUNDVIEW AVENUE, FROM STREET LELAND AVENUE TO STREET UNDERHILL AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The houses was removed due demolition in progress anticipated completion spring 2022 For addition information 917-561-6594 |
2022-04-28 | No data | EAST 61 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired on 3/11/2022. Backfill was done under M012022082A79. |
2022-04-27 | No data | JAY STREET, FROM STREET JOHN STREET TO STREET PLYMOUTH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2022-04-27 | No data | EAST 112 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired on 1/18/2022. Backfill completed under M012022096A40. |
2022-04-26 | No data | 14 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw paved |
2022-04-26 | No data | WARREN STREET, FROM STREET GREENWICH STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired on 1/14/2022. |
2022-04-25 | No data | EAST 165 STREET, FROM STREET BRYANT AVENUE TO STREET FAILE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway is paved 1/2 plus 5 of the roadway under DOT permit number X022021288A82 |
2022-04-25 | No data | EAST 112 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Monitored Wearing Course. Wearing Course pass & complete. Final cut size: 20'8"x12'6" Arrival: 9:30AM Departure: 11:20AM |
2022-04-25 | No data | 14 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R\W PAVED |
2022-04-23 | No data | BRUCKNER BOULEVARD, FROM STREET BRE WESTBOUND ENTRANCE BUHRE AVE TO STREET ROBERTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PASS PERM TO GRADE IN P/L AND S/W CUT RESTORE |
2022-04-23 | No data | 2 AVENUE, FROM STREET EAST 40 STREET TO STREET EAST 41 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a permanent Restoration in the Bike / driving lanes, however unable to view Bike lane portion due to active construction site. |
2022-04-22 | No data | GRAND AVENUE, FROM STREET 55 STREET TO STREET 56 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm water restorations flush to grade in the roadway of the driving lanes in front of property #55-15 GRAND AVENUE in compliance |
2022-04-22 | No data | GRAND AVENUE, FROM STREET 56 STREET TO STREET 57 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection in front of property #56-05 GRAND AVENUE |
2022-04-20 | No data | PORT RICHMOND AVENUE, FROM STREET ANDERSON AVENUE TO STREET CASTLETON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | DOUBLE YELLOW LANE MARKING WAS RESTORED -OK OFF CASTLETON AVE |
2022-04-19 | No data | EAST 112 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 12INCH MAIN. 18'.8" X 8' X 9' TESTED 98.0 96.8 |
2022-04-15 | No data | CHESTNUT STREET, FROM STREET DINSMORE PLACE TO STREET FULTON STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | L: 14ft W: 4ft D: 8ft WD 117.9 DD 110.8 MD 114.6 AM 6.4 2 test #1 98.4 #2 97.6 |
2022-04-15 | No data | CHESTNUT STREET, FROM STREET DINSMORE PLACE TO STREET FULTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site with open excavation in the PL extending into RW |
2022-04-13 | No data | EAST 10 STREET, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I/F/O 22, NOV for 2 patched SW flags from previous Sewer work. Patchwork is not permitted, full flag restoration is required. Respondent notified via CAR# 20226720033 on 1/19/2022. Note: SW joint still not sealed either. |
2022-04-12 | No data | WEST 85 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration has been sealed. However small amount has broken out check sealer on next inspection. |
2022-04-06 | No data | 5 AVENUE, FROM STREET EAST 28 STREET TO STREET EAST 29 STREET | No data | Street Construction Inspections: Active | Department of Transportation | The roadway is plated. |
2022-04-04 | No data | WEST 28 STREET, FROM STREET 5 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | I found two perm cuts within a Temporary pedestrian walkway in the Street. |
2022-04-04 | No data | ALABAMA AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Pass, backfill completed .... 12x4x5 a continuance from earlier backfill..03/29/2022.... |
2022-04-04 | No data | CHESTNUT STREET, FROM STREET DINSMORE PLACE TO STREET FULTON STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASSED VISIBLE VOIDS OBSERVED AFTER SHORING TAKEN OUT. MADE THE CUT BIGGER (L16FT X (W)6FT X (D)2FT 6IN TEST 96.9 ARRIVED 9:40 BACK FILL COMPLETE 11:40 STAYING FOR BASE |
2022-04-04 | No data | CHESTNUT STREET, FROM STREET DINSMORE PLACE TO STREET FULTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | OPEN EXCAVATION IN THE ROADWAY FOR NEW SEWER COMBO FOR NEW BUILDING ABOUT 70FT FROM THE CORNER OF FULTON |
2022-04-02 | No data | EAST 46 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration acceptable |
2022-04-02 | No data | EAST 61 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Sidewalk Plated had to removed 2 voids 18” cut backs were marked around Restoration located in the driving / parking lanes. L 13’ 6” and W 4’ 2” |
2022-04-02 | No data | EAST 45 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration acceptable |
2022-04-01 | No data | DEBEVOISE STREET, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | trench in the roadway |
2022-03-30 | No data | GRAND STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit was to fix CAR under out of guarantee permit M012017254C75. |
2022-03-29 | No data | ALABAMA AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | pass, 1st lift preformed remainder of job to be reschuled due dep , not showing for wet connection ...12x4x10 replated .. |
2022-03-29 | No data | CROSBY AVENUE, FROM STREET DANIEL STREET TO STREET MIDDLETOWN ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrived at 10:25am. Got backfill late was on a 311 complaint. Didn't witness the backfill. Only the last test 97.1. 6'' was cut was done on the Base. Opp 1618 Crosby Ave. Eric from Mobile Testing Lab. Moose supervisor. cut 3'x'3'x4' |
2022-03-29 | No data | CHESTNUT STREET, FROM STREET DINSMORE PLACE TO STREET FULTON STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BKFILL NOTES: (L) 13' (W) 4' (D) 10' ..ACTUAL START TIME 1:18 PM ... COMPACTION: 97.6% / 97.4 % |
2022-03-23 | No data | PORT RICHMOND AVENUE, FROM STREET HOOKER PLACE TO STREET WALKER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w around hydrant acceptable. |
2022-03-23 | No data | WEST 20 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flags. |
2022-03-22 | No data | GRAND AVENUE, FROM STREET 55 STREET TO STREET 56 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm water restorations flush to grade in the roadway of the driving lanes in front of building #55-15 GRAND AVENUE in compliance |
2022-03-22 | No data | EAST 61 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plates marked ARBEN on sidewalk to mid road in front of 107 |
2022-03-22 | No data | CLARKSON STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cobblestone restoration and sidewalk has been restored in kind on south portion of the street. |
2022-03-21 | No data | GRAND STREET, FROM STREET NORFOLK STREET TO STREET SUFFOLK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced under permit M152021068B18. |
2022-03-21 | No data | WEST 24 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm Cut within the travel lane. |
2022-03-21 | No data | ORCHARD STREET, FROM STREET DEAD END TO STREET JACKSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found on roadway at location. Patch work on sidewalk. Active B/O with fence on sidewalk at location. |
2022-03-20 | No data | WEST 28 STREET, FROM STREET 5 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | The roadway is plated within a Temporary walkway for the pedestrians, and an updated permit is also on file. |
2022-03-19 | No data | EAST 55 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | AKA 417 Park Avenue on East 55 Street, LL14 pass with no work performed on the Sidewalk. 18” cut backs were marked out around 3 sidewalk of Restoration due to concrete Barriers located in the driving lane. L 3’ 6” W 3’ 5”. |
2022-03-18 | No data | 51 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration aka 5108 4th Ave. |
2022-03-18 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration in compliance in the parking lane. |
2022-03-16 | No data | EUCLID AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BKFILL NOTES: 1 CUT IN THR D/L ... (L) 10' (W) 4' (D) 9' ..ACTUAL START TIME 12:49 PM .. COMPACTION: 98.2% / 97.6% |
2022-03-14 | No data | EAST MOSHOLU PARKWAY SOUTH, FROM STREET MARION AVENUE TO STREET PERRY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Mous, Jumping Jack, 9' x 4' depth 4' Lab Exclusive testing, Steven, sand cone, Blend, (W)120.9 (D)111.2 (MD)116.5 (AM) 8.7 test 98.4/ 96.6. Backfill accepted . Cut plated, base will be done at a later date |
2022-03-14 | No data | CARPENTER AVENUE, FROM STREET EAST 223 STREET TO STREET EAST 224 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sewer work in progress. Flagger on site |
2022-03-13 | No data | WEST 60 STREET, FROM STREET BROADWAY TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit secured for this work. |
2022-03-12 | No data | EAST 55 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Countersunk steel plate on driving lane IFO concrete barriers. No impaction to bike lane. |
2022-03-11 | No data | EAGLE AVENUE, FROM STREET EAST 161 STREET TO STREET EAST 163 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Results recorded on most recent permit# X012022048A28 |
2022-03-10 | No data | 54 AVENUE, FROM STREET 2 STREET TO STREET 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade sewer restoration in the driving lane at location. No work done on sidewalk. |
2022-03-10 | No data | DEBEVOISE STREET, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway |
2022-03-10 | No data | WEST 19 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced by Con Edison cut. |
2022-03-09 | No data | WARREN STREET, FROM STREET GREENWICH STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | Work is still in progress, however half of the sidewalk is completed on the segment but remaining half is covered by a active BO.will inspect at later time. |
2022-03-08 | No data | 25 STREET, FROM STREET 30 AVENUE TO STREET 30 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway behind construction fence, concrete patchwork on sidewalk, sidewalk shed still overhead for building op. |
2022-03-05 | No data | EAST 55 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site excavating on driving lane IFO concrete barriers. Correct bike lane signs posted. |
2022-03-03 | No data | DEBEVOISE STREET, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway |
2022-03-01 | No data | ORCHARD STREET, FROM STREET DEAD END TO STREET JACKSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found at location for permittee. |
2022-03-01 | No data | EAST 61 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No water cut for property. Bike lane is clear. |
2022-02-26 | No data | WEST 135 STREET, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in compliance |
2022-02-25 | No data | CASTLETON AVENUE, FROM STREET PORT RICHMOND AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY OFF BUILDING OPERATION-OPP 1543 |
2022-02-20 | No data | BEACH AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER |
2022-02-20 | No data | EAST 45 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration acceptable |
2022-02-19 | No data | EAST 14 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 124, ongoing New Building operation at this time with roadway occupied to Bus Lane ( M022021355G27 ) and unable to view any work performed at this time. |
2022-02-19 | No data | WARREN STREET, FROM STREET GREENWICH STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to fully inspect inspect due to active B.O and work zone in area on roadway/ sidewalk. |
2022-02-19 | No data | FOX STREET, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the roadway. |
2022-02-18 | No data | RESERVOIR OVAL, FROM STREET BEND TO STREET HOLT PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work was done on Holt Pl, new concrete s/w flag. |
2022-02-17 | No data | WEST 163 STREET, FROM STREET AMSTERDAM AVENUE TO STREET EDGECOMBE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags remain in acceptable condition. No defects to report. |
2022-02-16 | No data | EAST 45 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration acceptable |
2022-02-15 | No data | WEST 28 STREET, FROM STREET 5 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the roadway within the Temporary pedestrian walkway. |
2022-02-13 | No data | 32 STREET, FROM STREET DEAD END TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to fully inspect due to snow on top of the sidewalk & roadway at this time. |
2022-02-12 | No data | EVELYN PLACE, FROM STREET DAVIDSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2022-02-12 | No data | EAST 107 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water repair in the driving lane is flush to grade. |
2022-02-11 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Active | Department of Transportation | Roadway in compliance |
2022-02-10 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation on bike lane, closest to curb. Closer to 51 St. Temp bikeway is clear. |
2022-02-10 | No data | NORTH 9 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration flush and sealed |
2022-02-09 | No data | QUEENS STREET, FROM STREET DEAD END TO STREET JACKSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found for permittee in segment. |
2022-02-08 | No data | EAST 86 STREET, FROM STREET HENDERSON PLACE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced. |
2022-02-08 | No data | CRUGER AVENUE, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway and sidewalk |
2022-02-05 | No data | CRUGER AVENUE, FROM STREET BARTHOLDI STREET TO STREET MAGENTA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New BPP Paved over plumber restoration |
2022-01-27 | No data | VYSE AVENUE, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in the P/D lane IFO 1424 (New Building ) Flush and sealed. |
2022-01-27 | No data | CHESTNUT STREET, FROM STREET DINSMORE PLACE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the d/l in compliance |
2022-01-25 | No data | EAST 46 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sewer repair acceptable |
2022-01-25 | No data | 25 STREET, FROM STREET 30 AVENUE TO STREET 30 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway, enclosed within concrete barrier and fence for building op. |
2022-01-25 | No data | WILLIAMSBRIDGE ROAD, FROM STREET HOLLAND AVENUE TO STREET WALLACE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done |
2022-01-24 | No data | WARREN STREET, FROM STREET GREENWICH STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | Fence placed down in front, can’t tell what work has been done at this time. |
2022-01-21 | No data | ANDREWS AVENUE, FROM STREET WEST 183 STREET TO STREET WEST FORDHAM ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restoration in compliance in front of building op |
2022-01-21 | No data | COLONIAL AVENUE, FROM STREET EAST 196 STREET TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | water was off, one cut on roadway work being done by O'grady |
2022-01-21 | No data | CLARKSON STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Closer to Washington St ( South parking lane ), Cobblestones near Hydrant are restored in kind and are flush to grade at this time. |
2022-01-19 | No data | WARREN STREET, FROM STREET GREENWICH STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired on 12/31/2021. |
2022-01-19 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Arben crew on site, working in open excavation on parking lane, closer to 51 street. Also, one cut on swk. Had BO crew open up swk to not have peds walk on bike lane. |
2022-01-19 | No data | EAST 112 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 12 / 31 / 21. |
2022-01-19 | No data | HARRISON AVENUE, FROM STREET WEST 180 STREET TO STREET WEST 181 STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent violated stip #072 WORK 9AM-4PM, MONDAY TO FRIDAY . Has a open excavation in the driving lane, started working at 8:20am. Started digging excavation in the driving lane at 8:20am. Was I.D by permit. |
2022-01-19 | No data | HARRISON AVENUE, FROM STREET WEST 180 STREET TO STREET WEST 181 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | AS PER Kelvin do not stay for the concrete base. leaving site heading to the office to write paper NOV. |
2022-01-19 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Back fill pass. 1 roadway cut. The cut size is 5’L x 4’6”W x 5’Down. Test: 95.9% & 96.6%. Eduardo from Arben Contracting in charge. Shaquille from Exclusive Testing Labs doing the Proctor. Arrival time 11:40am. Departure time 1:10pm |
2022-01-18 | No data | DEBEVOISE STREET, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway |
2022-01-18 | No data | 2 AVENUE, FROM STREET EAST 40 STREET TO STREET EAST 41 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired on 11/1/2021. |
2022-01-15 | No data | EAST 10 STREET, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O 22, sewer work on the sidewalk has patchwork within 1 flag and defective concrete during curing within 2 flags. Full flag restoration is required for defects. Also expansion joint along curb needs to be recessed ½" and permanently sealed. |
2022-01-13 | No data | WARREN STREET, FROM STREET GREENWICH STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | Two Arben steel plates ramped on sidewalk under shed and fence. Possible other cuts in street, but cannot see because of work zone area enclosed in roadway with concrete barriers and fence for temp ped walkway on sidewalk. |
2022-01-13 | No data | WEST STREET, FROM STREET INDIA STREET TO STREET JAVA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed in the parking lane ifo “The Naked Dog” |
2022-01-11 | No data | JANE STREET, FROM STREET GREENWICH AVENUE TO STREET WEST 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Observed roadway has been resurfaced ( M152021068B92 ) and work is no longer visible at this time. Full width of sidewalk replaced ( M042020210A06 ) by ongoing B/O. |
2022-01-10 | No data | WEST 23 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration within the parking/driving lane. |
2022-01-06 | No data | RIVER AVENUE, FROM STREET EAST 167 STREET TO STREET MC CLELLAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plates in the driving lane. Active permit on file. |
2022-01-06 | No data | RIVER AVENUE, FROM STREET EAST 167 STREET TO STREET MC CLELLAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | ATPO I observe one of three steel plates with subcontractor ARBEN markings not counter sunk during the winter moratorium beginning 12/1/2021 to 3/31/2022. I identify by permit X012022002A01. |
2022-01-04 | No data | WEST 85 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flushed to grade , DL. |
2022-01-04 | No data | CHRISTOPHER AVENUE, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, perm .... |
2022-01-03 | No data | EAST 10 STREET, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | The respondent performed the wearing course and sealed the Street opening joints on the permanent restoration, and they applied the lane markings and a 2022 color code marker. |
2021-12-31 | No data | EAST 10 STREET, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | Completed. Site will be plated for concrete curing |
2021-12-30 | No data | EAST 10 STREET, FROM STREET 5 AVENUE TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | IFO 22 backfill is in compliance |
2021-12-28 | No data | WEST 43 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in driving lane, and new flags around water valve on sidewalk (near hydrant) opposite of #311 Hakkasan entrance. |
2021-12-27 | No data | 6 AVENUE, FROM STREET WEST 14 STREET TO STREET WEST 15 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER: Behind fence of active B.O. |
2021-12-26 | No data | ANTHONY AVENUE, FROM STREET BUSH STREET TO STREET EAST 179 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New Building water cut in compliance |
2021-12-24 | No data | CHRISTOPHER AVENUE, FROM STREET EAST NEW YORK AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on the roadway |
2021-12-23 | No data | MOTHER GASTON BOULEVARD, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on the roadway |
2021-12-22 | No data | OCEAN AVENUE, FROM STREET BEVERLY ROAD TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the parking lane is flush to grade |
2021-12-22 | No data | EAST 84 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active BO not able to full inspect |
2021-12-22 | No data | 25 STREET, FROM STREET 30 AVENUE TO STREET 30 ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed & acceptable within the parking / driving lane in front of 30-14 25th (Crescent) Street. Dimensions: 8'x7'x1'9" cut-1 5'x2'2"x2' cut-2. Base to follow. |
2021-12-18 | No data | 25 STREET, FROM STREET 30 AVENUE TO STREET 30 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Occupancy of sidewalk in compliance. |
2021-12-17 | No data | WHITE PLAINS ROAD, FROM STREET ARCHER STREET TO STREET GUERLAIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM IN ROADWAY AND ONE FLAG ON SIDEWALK |
2021-12-16 | No data | EAST 55 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not visible because of construction fence and shed. |
2021-12-15 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration (r/w & s/w) found to be in compliance |
2021-12-13 | No data | SNEDIKER AVENUE, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, 09/55 ...bbp.' |
2021-12-11 | No data | WEST 56 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to fully inspect active B.O on site. |
2021-12-11 | No data | PURDY STREET, FROM STREET STARLING AVENUE TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway and sidewalk in compliance. |
2021-12-11 | No data | WALTON AVENUE, FROM STREET CAMERON PLACE TO STREET EAST 182 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work |
2021-12-11 | No data | 25 STREET, FROM STREET 30 AVENUE TO STREET 30 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Closure Chart- roadway opened. Multiple Steel plates on roadway countersunk. In compliance. |
2021-12-10 | No data | ANDREWS AVENUE, FROM STREET WEST 183 STREET TO STREET WEST FORDHAM ROAD | No data | Street Construction Inspections: Active | Department of Transportation | steel plate recessed and raise plow sign posted in compliance |
2021-12-10 | No data | WEST 23 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER |
2021-12-10 | No data | WEST 20 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r.w has been resurfaced since 2019 permit |
2021-12-10 | No data | RIVER AVENUE, FROM STREET EAST 167 STREET TO STREET MC CLELLAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the roadway |
2021-12-09 | No data | WEST 124 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Water cut Near #144 in DL flushed and sealed to grade. |
2021-12-07 | No data | JANE STREET, FROM STREET GREENWICH AVENUE TO STREET WEST 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The Street was resurfaced. |
2021-12-07 | No data | WEST 56 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to see cuts in rdwy because on ongoing building work with work zone in rdwy with jersey barriers -storing equipment and materials, and too dusty to see. |
2021-12-07 | No data | EAST 70 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work complete. |
2021-12-06 | No data | 25 STREET, FROM STREET 30 AVENUE TO STREET 30 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Rw partially occupied |
2021-12-03 | No data | GRAND STREET, FROM STREET NORFOLK STREET TO STREET SUFFOLK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk ifo corner building #374 in good condition. Grand St rdwy appears repaved. |
2021-12-02 | No data | WEST 85 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in compliance corner property broadway |
2021-12-02 | No data | 25 STREET, FROM STREET 30 AVENUE TO STREET 30 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No water cut made IFO property. Opp 2-way protected bike lane is clear. |
2021-12-02 | No data | BROADWAY, FROM STREET EAST 10 STREET TO STREET EAST 11 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a permanent restoration flushed to grade in the parking lane. |
2021-12-02 | No data | 25 STREET, FROM STREET 30 AVENUE TO STREET 30 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | No water cut made IFO property. Opp 2-way protected bike lane is clear. |
2021-11-30 | No data | PORT RICHMOND AVENUE, FROM STREET ANDERSON AVENUE TO STREET CASTLETON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I found the respondent failed to restore yellow lane marking in kind to their permanent trench in the roadway. Previously notified by CAR #20214511151 on 10/16/2021 to correct the condition. |
2021-11-30 | No data | JEROME AVENUE, FROM STREET EAST 190 STREET TO STREET WEST 192 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Multiple Steel plates counter sunk initials (ARBEN NY) across entire rwy IFO & opp. # 2520. |
2021-11-30 | No data | OCEAN AVENUE, FROM STREET BEVERLY ROAD TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the parking lane is flush to grade IFO #1921 |
2021-11-29 | No data | BRONXWOOD AVENUE, FROM STREET BOSTON ROAD TO STREET WILLIAMSBRIDGE ROAD | No data | Street Construction Inspections: Active | Department of Transportation | No work done. |
2021-11-29 | No data | EAST 69 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Repair water / Plated excavation on roadway |
2021-11-29 | No data | WEST 85 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Car issued for no sealer on more recent permit not to far forom broadway around nyc sewer manhole |
2021-11-27 | No data | EAST 69 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Curb to curb backfill. Two cuts in the roadway (1) L-27' W-4' 6'' D-3' (2) L-3' W-3' D-3' |
2021-11-24 | No data | SCHERMERHORN STREET, FROM STREET BOERUM PLACE TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway & on the sidewalk is in compliance |
2021-11-23 | No data | MT HOPE PLACE, FROM STREET GRAND CONCOURSE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to properly inspect due to active building operation |
2021-11-23 | No data | WARREN STREET, FROM STREET GREENWICH STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | Unable to ascertain due to fence and barricades. |
2021-11-22 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY HAVE BEEN RESURFACED |
2021-11-22 | No data | CLAREMONT AVENUE, FROM STREET WEST 120 STREET TO STREET WEST 122 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O Building Operation Repair water restoration in the middle of the roadway is flushed an sealed to grade At time of inspection. |
2021-11-22 | No data | SCHOLES STREET, FROM STREET LEONARD STREET TO STREET LORIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane IFO property #64. |
2021-11-21 | No data | SNEDIKER AVENUE, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass/0955 due to bpp |
2021-11-20 | No data | WEST 56 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to fully inspect active B.O on site. |
2021-11-19 | No data | DESBROSSES STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | In north parking lane within BO 50' w of Greenwich, 10'x 4' water restoration monitored from 1:00-2:20pm is completed. Crew to plate to allow curing. Photos taken. |
2021-11-16 | No data | EAST KINGSBRIDGE ROAD, FROM STREET BEND TO STREET VALENTINE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | One flag I/F/O 229 |
2021-11-15 | No data | 2 AVENUE, FROM STREET EAST 40 STREET TO STREET EAST 41 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Final Restoration On RWY ifo #766 AKA 300 E. 41ST STREET. |
2021-11-11 | No data | SCHERMERHORN STREET, FROM STREET BOERUM PLACE TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | L Shaped final restoration on RWY. |
2021-11-09 | No data | GREENWICH STREET, FROM STREET DESBROSSES STREET TO STREET WATTS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 456, grout is cracked and broken out in large portion of restoration. Excess cold patch left around restoration. |
2021-11-09 | No data | JANE STREET, FROM STREET GREENWICH AVENUE TO STREET WEST 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The Street was resurfaced. |
2021-11-08 | No data | VANDALIA AVENUE, FROM STREET ERSKINE STREET TO STREET FOUNTAIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in RW corner of Milford street, water valve in dirt area. |
2021-11-07 | No data | CLAREMONT AVENUE, FROM STREET WEST 120 STREET TO STREET WEST 122 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B/D1J Project-D1J issued. |
2021-11-06 | No data | TIFFANY STREET, FROM STREET BARRY STREET TO STREET BURNETT PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | Concrete poured and plated |
2021-11-06 | No data | WEST 23 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER : crew is on site. 278 8 Ave aka is West 23 St b/t 8 Ave and 7 Ave. The location on permit is 8 Ave & 9 Ave, there is a discrepancy on the permit. |
2021-11-06 | No data | WESTCHESTER AVENUE, FROM STREET BERGEN AVENUE TO STREET EAST 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber cut plated. Researching for updated permit |
2021-11-06 | No data | 2 AVENUE, FROM STREET EAST 40 STREET TO STREET EAST 41 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | I/F/O #766 Back-fill completed, (L)29’(w)4’7”(D)10’6” (2nd) proctor done arrival of new material, Multiple utilities found within trench, crew still on site doing base . Bottom test 98.0 top test 96.8. |
2021-11-06 | No data | BERGEN AVENUE, FROM STREET EAST 152 STREET TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber work started, cut on Westchester Avenue |
2021-11-06 | No data | WESTCHESTER AVENUE, FROM STREET BERGEN AVENUE TO STREET EAST 150 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plumber cut plated in the roadway and sidewalk |
2021-11-05 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B/D1J Project-D1B issued |
2021-11-03 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 45 STREET TO STREET BEACH 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent trench to grade |
2021-11-01 | No data | 8 AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work not done, permit expired. |
2021-10-31 | No data | 6 AVENUE, FROM STREET WEST 14 STREET TO STREET WEST 15 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Final Restoration In RWY. |
2021-10-30 | No data | MOTHER GASTON BOULEVARD, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints sealed |
2021-10-27 | No data | 6 AVENUE, FROM STREET WEST 14 STREET TO STREET WEST 15 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work has been done. Can’t tell what has or hasn’t been done behind green fence. Permit expired 10/17/21. |
2021-10-26 | No data | MOTHER GASTON BOULEVARD, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on the roadway |
2021-10-25 | No data | BRONX PARK EAST, FROM STREET THWAITES PLACE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP Paved over plumber restoration |
2021-10-24 | No data | SAXON AVENUE, FROM STREET BEND TO STREET VAN CORTLANDT PARK SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compkiace |
2021-10-24 | No data | SNEDIKER AVENUE, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass, resurfaced due to bpp |
2021-10-24 | No data | CLAREMONT AVENUE, FROM STREET WEST 120 STREET TO STREET WEST 122 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Water restoration in DL / PL In front of Building operation is flushed and sealed to grade. |
2021-10-23 | No data | MOTHER GASTON BOULEVARD, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on the roadway |
2021-10-22 | No data | 25 STREET, FROM STREET 30 AVENUE TO STREET 30 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | No evidence of work done. |
2021-10-22 | No data | WEST 56 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to fully inspect active B.O on site. |
2021-10-21 | No data | JANE STREET, FROM STREET GREENWICH AVENUE TO STREET WEST 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The Street was resurfaced. |
2021-10-21 | No data | 3 AVENUE, FROM STREET EAST 166 STREET TO STREET EAST 167 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER |
2021-10-21 | No data | ATLANTIC AVENUE, FROM STREET ESSEX STREET TO STREET LINWOOD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway cut in compliance. |
2021-10-20 | No data | INWOOD AVENUE, FROM STREET CLARKE PLACE WEST TO STREET WEST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Re cuts in compliance |
2021-10-20 | No data | 2 AVENUE, FROM STREET EAST 40 STREET TO STREET EAST 41 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 766, NOV for the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired on 8/8/2021. |
2021-10-20 | No data | BRONXWOOD AVENUE, FROM STREET BOSTON ROAD TO STREET WILLIAMSBRIDGE ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2021-10-19 | No data | HULL STREET, FROM STREET BROADWAY TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced by B.P.P |
2021-10-19 | No data | CHESTNUT STREET, FROM STREET DINSMORE PLACE TO STREET FULTON STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill - Pass(L): 6ft (W): 3ft 6in (D): 4ftTest Results: 97.3%; 97.8%Located in P/L ~ 85ft from Fulton St.Base cutbacks made.Arrival: 9:30AMDeparture: 11:40AM |
2021-10-06 | No data | JAVA STREET, FROM STREET BODY OF WATER TO STREET WEST STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work seen on site. |
2021-10-05 | No data | ANTHONY AVENUE, FROM STREET BUSH STREET TO STREET EAST 179 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | updated permit X012021273A60 |
2021-10-05 | No data | ANTHONY AVENUE, FROM STREET BUSH STREET TO STREET EAST 179 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in roadway in compliance |
2021-10-01 | No data | 24 STREET, FROM STREET 40 AVENUE TO STREET 41 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration cut against the curb, currently behind jersey barrier fence in the roadway for building op. |
2021-10-01 | No data | 14 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | DOT RRM crew currently on site re-paving block segment. Cyclists still able to go through. |
2021-09-30 | No data | NORFOLK STREET, FROM STREET BROOME STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working on sewer |
2021-09-29 | No data | EAST 70 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in roadway in perm in compliance how ever cut on sidewalk has foam joints and is patched. But permit for open sidewalk foundation is on file and will most likely be reconstructed. M012021214B54 Taconic Builders. |
2021-09-29 | No data | GREENWICH STREET, FROM STREET DESBROSSES STREET TO STREET WATTS STREET | No data | Street Construction Inspections: Active | Department of Transportation | Near 456, multiple Arben steel plates remain present in roadway. Permit remains active. |
2021-09-29 | No data | EAST 46 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced by BPP. |
2021-09-29 | No data | EAST 70 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration |
2021-09-25 | No data | BAY STREET, FROM STREET GRANT STREET TO STREET ST JULIAN PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | SEAL IS OK - PERMIT IS FOR 331 - LOCATION 309 BAY STREET- DEPT OF BUILDINGS LIST 2 SEPARATE ADDRESS NOW - WORK DONE WHEN A BUILDING OPERATION WAS ON GOING? |
2021-09-24 | No data | ATLANTIC AVENUE, FROM STREET ESSEX STREET TO STREET LINWOOD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY FOUND RESURFACED BY BPP |
2021-09-23 | No data | LINWOOD STREET, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CUT COVERED BY BPP |
2021-09-21 | No data | EAST 218 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2021-09-21 | No data | MONROE STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, water ....install |
2021-09-21 | No data | SUFFOLK STREET, FROM STREET BROOME STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Due to active construction site unable to locate work. |
2021-09-20 | No data | 3 AVENUE, FROM STREET EAST 166 STREET TO STREET EAST 167 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated cut |
2021-09-20 | No data | GREENWICH STREET, FROM STREET DESBROSSES STREET TO STREET WATTS STREET | No data | Street Construction Inspections: Active | Department of Transportation | Multiple marked Arben steel plates on roadway at this time. Permit remains active. |
2021-09-18 | No data | SOUNDVIEW AVENUE, FROM STREET LELAND AVENUE TO STREET UNDERHILL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | YOUR CUT ON THE SIDEWALK HAS PATCH WORK FULL FLAG IS NEEDED AND IT HAS AN UNDERMINE CONDITION RESTORE. |
2021-09-18 | No data | MATTHEWS AVENUE, FROM STREET LYDIG AVENUE TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut opposite #2136 |
2021-09-18 | No data | MORRIS AVENUE, FROM STREET CAMERON PLACE TO STREET EAST 182 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2021-09-18 | No data | CLAREMONT AVENUE, FROM STREET WEST 120 STREET TO STREET WEST 122 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | LL14 Backfill pass and complete IFO 100. Measurements: L- 27ft, W- 7ft 1in, D- 5ft 1in. Test: 96.6 & 97.6. |
2021-09-17 | No data | 24 STREET, FROM STREET 40 AVENUE TO STREET 41 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut 1: 11’x 4’x 8’8”i/f/o 40-36 within the d/p/l. |
2021-09-17 | No data | TIEBOUT AVENUE, FROM STREET EAST 184 STREET TO STREET EAST 187 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restoration in compliance |
2021-09-16 | No data | ST NICHOLAS AVENUE, FROM STREET WEST 150 STREET TO STREET WEST 151 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work complete. |
2021-09-16 | No data | EAST 69 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut running north south in co,plain e no defects |
2021-09-15 | No data | RODMAN PLACE, FROM STREET LONGFELLOW AVENUE TO STREET WEST FARMS ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | Wet 124.2Dry 113.0Max 117.5Moisture 9.7First Cut 97.4/96.9Second Cut 97.6/97.3 |
2021-09-15 | No data | WOODYCREST AVENUE, FROM STREET WEST 165 STREET TO STREET WEST 166 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair WATER - SEWER |
2021-09-15 | No data | TIEBOUT AVENUE, FROM STREET EAST 184 STREET TO STREET EAST 187 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 6'' saw cut on the base, Base was canceled. |
2021-09-13 | No data | GREENWICH STREET, FROM STREET DESBROSSES STREET TO STREET WATTS STREET | No data | Street Construction Inspections: Active | Department of Transportation | Near 456 in driving lane, three "Arben" marked steel plates are present. Permit remains active. |
2021-09-13 | No data | CHRISTOPHER AVENUE, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in thep/l ifo 38 |
2021-09-12 | No data | MORRIS AVENUE, FROM STREET CAMERON PLACE TO STREET EAST 182 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2021-09-12 | No data | WALTON AVENUE, FROM STREET CAMERON PLACE TO STREET EAST 182 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2021-09-11 | No data | MOTHER GASTON BOULEVARD, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO SEAL THE EXPANSION JOINTS AT THE CURB ON THE SIDEWALK AS PER SUB SECTION 2-09(4)(v), CAR# 20217380980 ISSUED ON 8/6/21 |
2021-09-11 | No data | PURDY STREET, FROM STREET STARLING AVENUE TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent with three plate with Arben NY failed to maintain street opening permit. Permit #X012021236A22 Expired 9/6/2021. |
2021-09-11 | No data | EAST 224 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2021-09-09 | No data | 3 AVENUE, FROM STREET EAST 166 STREET TO STREET EAST 167 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated cut |
2021-09-09 | No data | 37 STREET, FROM STREET 30 AVENUE TO STREET 31 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill Completed: Start: 8:26 End 10:45. Cut Size: 11' x 5'4" x 3" |
2021-09-01 | No data | EAST 112 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | REPAIR WATER : Back fill: L:19' W:10' D:6' 6" cut back completed. |
2021-09-01 | No data | EAST 112 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | REPAIR WATER: Back fill rescheduled due to wrong location on the permit. Cut is in the segment not the intersection. |
2021-08-31 | No data | 25 STREET, FROM STREET 40 AVENUE TO STREET 41 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced |
2021-08-31 | No data | 2 AVENUE, FROM STREET EAST 40 STREET TO STREET EAST 41 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Yellow steel plates across half the roadway from manhole to construction site. Crosses path of the temporary bike lane. Active permit on file. |
2021-08-30 | No data | 24 STREET, FROM STREET 40 AVENUE TO STREET 41 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 3 Steel plates with asphalt in the parking , ID marking ARBEN. In front of 4036 |
2021-08-30 | No data | BEEKMAN STREET, FROM STREET NASSAU STREET TO STREET WILLIAM STREET | No data | Street Construction Inspections: Active | Department of Transportation | Digging around the fire hydrant by and behind Gate 2 for corner property at Nassau St. |
2021-08-24 | No data | HOPKINSON AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the driving lane & parking lane |
2021-08-23 | No data | WEST 159 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | ATPO the respondent failed to comply with the terms and conditions of DOT stipulation 078 by having barricaded wooden planks stored on the roadway when site is unattended at 6:30pm. Full width of the roadway isnt open to vehicles. |
2021-08-23 | No data | EAST 229 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on sidewalk. Roadway newly paved |
2021-08-21 | No data | CARPENTER AVENUE, FROM STREET EAST 220 STREET TO STREET EAST 221 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut made perm |
2021-08-21 | No data | EAST 214 STREET, FROM STREET BARNES AVENUE TO STREET HOLLAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway and sidewalk |
2021-08-21 | No data | EAST 211 STREET, FROM STREET HOLLAND AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber cut made perm |
2021-08-20 | No data | 54 AVENUE, FROM STREET 2 STREET TO STREET 5 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | A/T/P/O I observed the Respondent was Performing Non Emergency Work. Crew was Shutting Off Water Service into Vacant Property because it was going to be Demolished. Respondent Should of Obtained an Regular Permit. |
2021-08-20 | No data | EAST 69 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 24 x 4.6 x 4.2 tested 97.2 97.4 |
2021-08-20 | No data | EAST 69 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Backfill in progress with Al training on backfill Everything in compliance. IFO house 50. |
2021-08-18 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER & SEWER CUT IN THE ROADWAY |
2021-08-18 | No data | CHESTER STREET, FROM STREET NEWPORT STREET TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm sewer cut in the roadway |
2021-08-18 | No data | CARROLL STREET, FROM STREET FISKE PLACE TO STREET POLHEMUS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration found in the roadway. |
2021-08-18 | No data | BRISTOL STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2021-08-17 | No data | CLARKSON STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER: All cobble stone in tact |
2021-08-14 | No data | ELIZABETH STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a permanent Restoration in the driving / parking lanes, however unable to view parking lane portion due to active construction site. |
2021-08-13 | No data | MADISON AVENUE, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Long water cut in the DL flushed to grade. |
2021-08-11 | No data | EAST 84 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in PL/ DL unable to see color cade marker due to BO. |
2021-08-10 | No data | 14 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation on r/w |
2021-08-10 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work done. |
2021-08-09 | No data | SUFFOLK STREET, FROM STREET BROOME STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to view work due to active Construction site |
2021-08-06 | No data | WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #27 found roadway resurfaced. |
2021-08-06 | No data | MOTHER GASTON BOULEVARD, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Sidewalk expansion joints need to be sealedplease seal expansion joints in between the curb in front of property #273 MOTHER GASTON BOULEVARD, in a timely fashion. CAR issued |
2021-08-03 | No data | BRINKERHOFF AVENUE, FROM STREET 179 PLACE TO STREET 180 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 12' x 8' perm r/w cut maintain to grade in d/p/l. |
2021-08-03 | No data | BRINKERHOFF AVENUE, FROM STREET 179 PLACE TO STREET 179 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm r/w rest. maintain to grade. |
2021-08-03 | No data | WEST 28 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At time of inspection at specific location could not find work. |
2021-08-03 | No data | WEST 27 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At time of inspection work located within active BO. |
2021-07-30 | No data | 29 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sw cut ok |
2021-07-29 | No data | WEST 22 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O Building #242 Plumbers restoration in the driving lane/ partly covered over 2019 Con Edison work is in compliance. |
2021-07-29 | No data | WASHINGTON STREET, FROM STREET DESBROSSES STREET TO STREET WATTS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The respondent made a permanent restoration in the roadway, extending from the pedestrian walkway into the driving lane. |
2021-07-29 | No data | PORT RICHMOND AVENUE, FROM STREET ANDERSON AVENUE TO STREET CASTLETON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in r/w to grade |
2021-07-28 | No data | 2 STREET, FROM STREET 54 AVENUE TO STREET BODY OF WATER | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent to grade cut on bike lane |
2021-07-28 | No data | ATTORNEY STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 148 permanent water restoration in the perking lane is in compliance |
2021-07-28 | No data | RIVER AVENUE, FROM STREET EAST 167 STREET TO STREET MC CLELLAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER |
2021-07-28 | No data | 2 AVENUE, FROM STREET EAST 40 STREET TO STREET EAST 41 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work has been started at this time. Active job site, can’t tell what work has or hasn’t been started. |
2021-07-28 | No data | WEST 22 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O Building #242 Plumbers restoration in the driving/ parking lane is in compliance, has been partially gone over with 2019 con Edison work. |
2021-07-27 | No data | BROOME STREET, FROM STREET NORFOLK STREET TO STREET SUFFOLK STREET | No data | Street Construction Inspections: Active | Department of Transportation | South side new Building, found 2 Restorations Backfill was completed, I taught the Backfill had rescheduled for 12:30pm error on my park. Base was 12:30pm and Backfill 10am. This Back fill was not monitored due to my error |
2021-07-27 | No data | BROOME STREET, FROM STREET NORFOLK STREET TO STREET SUFFOLK STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | I/F/O # 203, new building going up, work done on Sidewalk adjacent to 2 Restorations in the driving / parking lanes. Cut # 1 L 8' and W 8' cut # 2 L 7' 5" and 6' 4" |
2021-07-26 | No data | WEST 22 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O Building #242 Plumbers restoration in the driving/ parking lane is in compliance, has been partially gone over with 2019 con Edison work. |
2021-07-25 | No data | BROADWAY, FROM STREET WEST 251 STREET TO STREET WEST 252 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass |
2021-07-23 | No data | CASTLETON AVENUE, FROM STREET PORT RICHMOND AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 17’x4’6 cut backfilled for 2 compaction rates over 95% |
2021-07-22 | No data | CLAREMONT AVENUE, FROM STREET WEST 120 STREET TO STREET WEST 122 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B/D1J Prject-D1B issued |
2021-07-20 | No data | BROOME STREET, FROM STREET NORFOLK STREET TO STREET SUFFOLK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Nov issued to the respondent for obtaining a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired [7/3/2021]. |
2021-07-20 | No data | EAST 128 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work is ongoing and within permit stipulations. |
2021-07-19 | No data | COFFEY STREET, FROM STREET CONOVER STREET TO STREET FERRIS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work in compliance |
2021-07-19 | No data | CLAREMONT AVENUE, FROM STREET WEST 120 STREET TO STREET WEST 122 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to properly inspect due to ongoing new building construction and equipment on the roadway |
2021-07-19 | No data | CARPENTER AVENUE, FROM STREET EAST 220 STREET TO STREET EAST 221 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plumber on site, spoke to Moose about id signs at site |
2021-07-16 | No data | 2 AVENUE, FROM STREET EAST 40 STREET TO STREET EAST 41 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work hasn’t been started at this time. Active job site, can’t tell what ore has or hasn’t been done. |
2021-07-13 | No data | WEST 44 STREET, FROM STREET 10 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I/F/O 505 found roadway resurfaced due to BPP project. |
2021-07-13 | No data | LINDEN BOULEVARD, FROM STREET HINSDALE STREET TO STREET SNEDIKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESURFACED BY B.P.P |
2021-07-12 | No data | CARPENTER AVENUE, FROM STREET EAST 220 STREET TO STREET EAST 221 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration in the roadway. Researching for updated permit plumber on site with another excavation. |
2021-07-10 | No data | WEST STREET, FROM STREET INDIA STREET TO STREET JAVA STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Water restoration has been made permanent, flush and sealed |
2021-07-06 | No data | CAULDWELL AVENUE, FROM STREET EAST 161 STREET TO STREET EAST 163 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2021-07-06 | No data | EAST 84 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plates on roadway at time o0f inspection , active permit on file M012021183B34. |
2021-07-06 | No data | EAST 84 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plates on roadway in the driving lane , incompliance. |
2021-07-04 | No data | WEST STREET, FROM STREET INDIA STREET TO STREET JAVA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY |
2021-07-02 | No data | GUERLAIN STREET, FROM STREET LELAND AVENUE TO STREET THIERIOT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM IN ROADWAY IN COMPLIANCE. |
2021-07-01 | No data | BRISTOL STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE D/ L IN COMPLIANCE |
2021-07-01 | No data | BRISTOL STREET, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IFO LOCATION .. WRONG CROSS STREET ON PERMIT |
2021-07-01 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done |
2021-06-24 | No data | EDISON AVENUE, FROM STREET ST THERESA AVENUE TO STREET BUHRE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER |
2021-06-23 | No data | WEST 56 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done. |
2021-06-22 | No data | SURF AVENUE, FROM STREET JONES WALK TO STREET WEST 12 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent sidewalk restoration |
2021-06-18 | No data | SURF AVENUE, FROM STREET JONES WALK TO STREET WEST 12 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk restoration in compliance |
2021-06-17 | No data | EAST 142 STREET, FROM STREET BROOK AVENUE TO STREET ST ANNS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | strip paved DEP contract |
2021-06-17 | No data | CLARKSON STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cobblestone restoration adjacent to hydrant remains acceptable. Some stones loose to restoration but not part of water restoration. |
2021-06-16 | No data | 31 STREET, FROM STREET 21 AVENUE TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut across r/w (e/s). |
2021-06-16 | No data | EAST 25 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | I/F/O 223 East 25 Street permanent plumber's restoration completed in the parking/ driving lane. L 19' W7' D 3". |
2021-06-16 | No data | WEST 28 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Closer to 11 Avenue southside permanent sewer repair is flush to grade in the parking lane. |
2021-06-15 | No data | EAST 25 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill complete in front of 223 driving & parking lane. Length 14ft Width 3.8ft. Cut backs being done in front of Inspector for 1pm base. |
2021-06-15 | No data | WEST 135 STREET, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012020365B18-latest permit |
2021-06-15 | No data | GUERLAIN STREET, FROM STREET LELAND AVENUE TO STREET THIERIOT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM IN ROADWAYI/F/O 1848 WITH ACTIVE PERMIT. |
2021-06-15 | No data | WEST 44 STREET, FROM STREET 10 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced by BPP. |
2021-06-13 | No data | BARKER AVENUE, FROM STREET MACE AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER |
2021-06-12 | No data | EAST 55 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | I/F/O aka 425 Park Ave, Water cut ( 4'3"L x 3'9"W ) backfilled / base being saw-cut. Work within South sidewalk ( 1 flag ) prior to this backfill. Note: expansion joint seal missing - no CAR at this time. Arrived: 8:25am - tablet lost connection. |
2021-06-11 | No data | WEST 27 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Monitored from 10:20-11:35. 12'4"x 5' sewer restoration made just east of crosswalk near north sidewalk. Restoration starts 1' off curb. Restoration to be plated to cure. Photos taken. |
2021-06-10 | No data | CROSBY AVENUE, FROM STREET DANIEL STREET TO STREET MIDDLETOWN ROAD | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - SEWER |
2021-06-10 | No data | CLAREMONT AVENUE, FROM STREET WEST 120 STREET TO STREET WEST 122 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012021148A47-updated permit |
2021-06-09 | No data | BROADWAY, FROM STREET WEST 84 STREET TO STREET WEST 85 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to properly inspect due to work located on sidewalk inside active Building Operation . |
2021-06-09 | No data | EAST 23 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 139 permanent water restoration is in compliance |
2021-06-08 | No data | CAULDWELL AVENUE, FROM STREET EAST 161 STREET TO STREET EAST 163 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2021-06-06 | No data | LINDEN BOULEVARD, FROM STREET HINSDALE STREET TO STREET SNEDIKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer restoration flush to grade in the roadway extending into the parking lane west bound service lane in front of property #1745 LINDEN BOULEVARD in compliance |
2021-06-06 | No data | SNEDIKER AVENUE, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking and driving lane ifo 666/668. Color code installed. |
2021-06-06 | No data | WASHINGTON STREET, FROM STREET BATTERY PLACE TO STREET PEDESTRIAN OVERPASS | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a permanent restoration flushed to grade in the parking lane, and 2 sidewalk flags have been restored. |
2021-06-05 | No data | EAST 55 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Chart - crew on site excavating in swk right adjacent to protected bike lane & IFO building ops, south swk. No obstruction to bike line |
2021-06-02 | No data | MOTHER GASTON BOULEVARD, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer restoration flush to grade in the roadway extending into the parking lane in front of building #281 MOTHER GASTON BOULEVARD bicycle lane marker restored in kind in compliance |
2021-06-02 | No data | CONOVER STREET, FROM STREET KING STREET TO STREET SULLIVAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut flushed to grade in the R/W of the P/L IFO HOUSE #137 .B/L clear. |
2021-05-31 | No data | WEST STREET, FROM STREET INDIA STREET TO STREET JAVA STREET | No data | Street Construction Inspections: Active | Department of Transportation | TEMP RESTORATION REMAINS |
2021-05-30 | No data | BROOME STREET, FROM STREET NORFOLK STREET TO STREET SUFFOLK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit has been updated M012021141A49 |
2021-05-30 | No data | BROOME STREET, FROM STREET NORFOLK STREET TO STREET SUFFOLK STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated water excavation |
2021-05-29 | No data | MOTHER GASTON BOULEVARD, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, water connection sewer ... cut ... paved |
2021-05-27 | No data | WEST 20 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The roadway was resurfaced |
2021-05-26 | No data | CHRISTOPHER AVENUE, FROM STREET EAST NEW YORK AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass...perm .. west side of street . |
2021-05-26 | No data | ELTON AVENUE, FROM STREET EAST 156 STREET TO STREET EAST 157 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2021-05-25 | No data | WALTON AVENUE, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Wet: 119.4Dry: 112.2Max: 115.5Moisture: 6.4First Lift: 96.3Last Lift: 96.5 |
2021-05-24 | No data | WEST STREET, FROM STREET INDIA STREET TO STREET JAVA STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | L.4'5"W.3'4"D.2'3"Wet density:119.4Dry density:109.6Max dry density:114.2Actual moisture:8.9%First lift:96.8% |
2021-05-23 | No data | EAST 223 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PASS PERM TO GRADE |
2021-05-21 | No data | RIVER AVENUE, FROM STREET EAST 167 STREET TO STREET MC CLELLAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site working |
2021-05-19 | No data | BRONX PARK EAST, FROM STREET MACE AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER - PROTECTED 5’ x 5’ final restoration in the parking lane |
2021-05-19 | No data | ELSMERE PLACE, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to inspect due to steel plates on the roadway from work being done |
2021-05-19 | No data | EAST 23 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 139 permanent water restoration is in compliance |
2021-05-18 | No data | WEST STREET, FROM STREET INDIA STREET TO STREET JAVA STREET | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR TEMPORARY RESTORATION IN THE PARKING LANE ON THE SIDE OF #47 JAVA ST. TEMPORARY RESTORATION IS 3 INCHES UNDER GRADE. |
2021-05-16 | No data | BAY STREET, FROM STREET GRANT STREET TO STREET ST JULIAN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE RE-SEAL PERMANENT RESTORATION AND ALSO FILL AND SEAL 2 PIN HOLES ALL LOCATED IN FRONT OF MTA POLICE DEPT DISTRICT 9. |
2021-05-14 | No data | PARKSIDE PLACE, FROM STREET EAST 209 STREET TO STREET WEBSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the driving lane. New s/w flags. |
2021-05-13 | No data | WEST STREET, FROM STREET INDIA STREET TO STREET JAVA STREET | No data | Street Construction Inspections: Active | Department of Transportation | Temporary repair water restoration in pk lane on side of 47 Java Street "Naked Dog" |
2021-05-13 | No data | WEST 43 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Permanent cut in the roadway in front of 310 west 43rd st.. 3ft by 3ft. Contractor color code 50011. Bike lane clear |
2021-05-12 | No data | WEST 87 STREET, FROM STREET RIVERSIDE DRIVE TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been milled and resurfaced. |
2021-05-12 | No data | EAST 11 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O Building #112 found frontage sidewalk fully repaired /around water valve and in compliance. |
2021-05-11 | No data | WEST STREET, FROM STREET INDIA STREET TO STREET JAVA STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work not started, entire sidewalk behind fence, bike lane and pedestrian walkway pushed out into the roadway with dividers and concrete barrier. |
2021-05-10 | No data | BROOME STREET, FROM STREET NORFOLK STREET TO STREET SUFFOLK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit has been updated M012021126B12 |
2021-05-10 | No data | ST ANNS AVENUE, FROM STREET EAST 141 STREET TO STREET EAST 142 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to inspect due to BO |
2021-05-09 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 45 STREET TO STREET BEACH 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Opp. 45-19 perm. cut to grade(visible),f/o 45-19 area p/d/l paved to grade by the builder - BPP. |
2021-05-06 | No data | EAST 108 STREET, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No defects observed on roadway at time of inspection . |
2021-05-06 | No data | EAST 70 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in d/l ok |
2021-05-06 | No data | MOTHER GASTON BOULEVARD, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | pass, sewer relay ....now perm ... |
2021-05-05 | No data | 11 AVENUE, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Wearing course is in compliance, tack coat used to sealed the joints, color code and white line marking applied. |
2021-05-05 | No data | EAST 213 STREET, FROM STREET BARNES AVENUE TO STREET CARLISLE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER In the parking lane |
2021-05-04 | No data | CHRISTOPHER AVENUE, FROM STREET EAST NEW YORK AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass,,perm sewer relay ... |
2021-05-04 | No data | 11 AVENUE, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | I/F/O #261 in the driving/parking lane,6'' saw cut and dig out. L-25' W-4' D-6' 6'' |
2021-05-01 | No data | HULL AVENUE, FROM STREET EAST 204 STREET TO STREET EAST MOSHOLU PARKWAY NORTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2021-04-30 | No data | EAST 70 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | a permanent restoration,(Repair Water-Sewer) backfilled on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit # (M012021076A33)expired [3-19-2021]. |
2021-04-30 | No data | MOTHER GASTON BOULEVARD, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut 1: 22'2x4'0x5'2. Backfill monitored by 774 with no access to DASH. |
2021-04-29 | No data | 3 AVENUE, FROM STREET EAST 20 STREET TO STREET EAST 21 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to properly inspect due to barricades in the roadway |
2021-04-28 | No data | TRYON AVENUE, FROM STREET EAST 211 STREET TO STREET EAST GUN HILL ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | Edwardo, jumping jack, 17'4' X 3' DEPTH 3'8" Clean fill Mobil Testing, Joe, sand cone (w)122.7(d)112.9 (md)119.0(am) 8.7. Test 97.2 & 97.8 Backfill Accepted |
2021-04-28 | No data | 11 AVENUE, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plates in roadway. Perm still active in front of building operations. |
2021-04-28 | No data | WEST 43 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work being done, bike lane is cleared. |
2021-04-28 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration found in the roadway in front of 1090. |
2021-04-27 | No data | TRYON AVENUE, FROM STREET EAST 211 STREET TO STREET EAST GUN HILL ROAD | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Arben contracting foreman Edwardo and field workers doing plumbing works without a Dot protected street permit. |
2021-04-27 | No data | SNEDIKER AVENUE, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway parking lane sealed and flush. |
2021-04-27 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done |
2021-04-26 | No data | WEST 27 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work done by 619. Permit is for near 645. Cob restoration partially monitored from 10:40-12:20. 14'x 6' Water cut in p/l and driving lane. Roadway has curve in existing rows of stones. Crew remains on site to finish restoration. |
2021-04-24 | No data | WEST 27 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Excavation behind green fence, plated with ARBEN lettering. Both intersection corners have signs directing peds to opposite sidewalk. |
2021-04-23 | No data | CARROLL STREET, FROM STREET FISKE PLACE TO STREET POLHEMUS PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill Completed Cut1: L11ft3inxW4ft3inxD3ft2in1st lift : 98.1 2nd: 98.3 |
2021-04-22 | No data | LAFAYETTE STREET, FROM STREET BOND STREET TO STREET GREAT JONES STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - REPAIR WATER |
2021-04-22 | No data | MOTHER GASTON BOULEVARD, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ARBEN CONTRACTING OF NEW YORK, INC failed to obtain a confirmation number at least 2 hours prior to the commencement of the backfill on a protected street. Nov issued |
2021-04-21 | No data | BERGEN STREET, FROM STREET BOERUM PLACE TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water cut flush and sealed in the parking lane opp 20 |
2021-04-21 | No data | WEST 27 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Near 619, mark-outs are present behind fenced off area. No work has been started at this time. |
2021-04-21 | No data | EAST 163 STREET, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in parking lane in compliance |
2021-04-20 | No data | MOTHER GASTON BOULEVARD, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, sewer cut ....perm ..... |
2021-04-19 | No data | GRAND CONCOURSE, FROM STREET EAST 201 STREET TO STREET EAST 202 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done on sidewalk |
2021-04-16 | No data | WASHINGTON STREET, FROM STREET DESBROSSES STREET TO STREET WATTS STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Wearing Course: L:33' W:10' D:2" Cut was sealed & Color code marker applied. |
2021-04-16 | No data | WALTON AVENUE, FROM STREET EAST 144 STREET TO STREET EAST 146 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2021-04-15 | No data | EAST 112 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | located in front of BO, partial restoration is showing and is in compliance. |
2021-04-14 | No data | MOTHER GASTON BOULEVARD, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site with open excavation in the RW |
2021-04-14 | No data | MOTHER GASTON BOULEVARD, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | (L) 18ft (W) 4ft (D) 3ft WD 123.3 DD 113.4 MD 120.5 AM 8.7. 1 lift 98.5 |
2021-04-13 | No data | WEST 19 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Part of the roadway is resurfaced, there are multiple construction vehicles on the block |
2021-04-10 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer restoration flush to grade in the roadway of driving lane opposite from building #911 ERSKINE STREET in compliance |
2021-04-10 | No data | WASHINGTON STREET, FROM STREET DESBROSSES STREET TO STREET WATTS STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill complete 6” cutbacks were done 12” cutbacks will be done on final restoration |
2021-04-09 | No data | WEST 20 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done on multiple parts of the sidewalk |
2021-04-09 | No data | 29 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Heavy Leak in the Basement & Sidewalk 3 Day Dep Notice Issued Building Super on Site |
2021-04-07 | No data | HINSDALE STREET, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer restoration flush to grade in the roadway extending into the parking lane in front of property #642 HINSDALE STREET in compliance |
2021-04-06 | No data | SNEDIKER AVENUE, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk restored in kind sealed and flush. |
2021-04-06 | No data | EAST 70 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Base will be rescheduled for 10:30am |
2021-04-05 | No data | EAST 205 STREET, FROM STREET GRAND CONCOURSE TO STREET LISBON PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway at new building |
2021-04-05 | No data | EAST 70 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill pass; cleanfill in P/L ..comp. 98.7% |
2021-04-04 | No data | BOSTON ROAD, FROM STREET NYCTA SUBWAY TO STREET THWAITES PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PO-TAP INSTALL 12’’ X 3 ‘’ Wet connection with 3” domestic service BL 4342/46 with a updated permit number X01-2021082-B51 |
2021-04-04 | No data | EAST 70 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #41 Two counter sunk Steal plates with one marked ARBEN NY within the roadway with active Permit M012021092A84 on file. |
2021-04-04 | No data | BOSTON ROAD, FROM STREET NYCTA SUBWAY TO STREET THWAITES PLACE | No data | Street Construction Inspections: Active | Department of Transportation | PO-TAP INSTALL 12’’ X 3 ‘’ Wet connection with 3” domestic service BL 4342/46 with a previous existing permit number X01-2021069-A87 |
2021-04-02 | No data | EAST 163 STREET, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in front of hydrant in parking lane |
2021-04-02 | No data | HINSDALE STREET, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | WATER / SEWER HAVE BEEN MADE PERM |
2021-04-01 | No data | EAST 165 STREET, FROM STREET PROSPECT AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active site active crew in compliance |
2021-03-31 | No data | SUFFOLK STREET, FROM STREET BROOME STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Nov issued to the respondent for maintaining two steel plates marked Arben NY, which are countersunk in the driving lane without a valid permit on file. The permit cited above is used for identification, and it has expired on 3/21/21. |
2021-03-31 | No data | EAST 11 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #112 found roadway re-surfaced from BBP. |
2021-03-30 | No data | CRUGER AVENUE, FROM STREET BARTHOLDI STREET TO STREET MAGENTA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paved over plumber work |
2021-03-30 | No data | 3 AVENUE, FROM STREET EAST 109 STREET TO STREET EAST 110 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in compliance |
2021-03-30 | No data | WEST 43 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced by BPP. |
2021-03-30 | No data | DESBROSSES STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | 25' east of Washington (north side of street parking/driving lane), 8'x12' was completed. Just east of restoration a concrete area of roadway is present and not done by this contractor. Some small stones used. Monitored from 10:30AM-12:35PM. |
2021-03-29 | No data | 3 AVENUE, FROM STREET EAST 109 STREET TO STREET EAST 110 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In compliance no defects |
2021-03-29 | No data | GRAND STREET, FROM STREET NORFOLK STREET TO STREET SUFFOLK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The Street is currently milled and awaiting the final pavement. |
2021-03-29 | No data | SUFFOLK STREET, FROM STREET BROOME STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found two steel plates countersunk in the roadway and a perm cut; however, the respondent has a later permit on file. |
2021-03-27 | No data | PARKSIDE PLACE, FROM STREET EAST 209 STREET TO STREET WEBSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plates in the roadway. Active permit X012021081A36. |
2021-03-27 | No data | WEST 87 STREET, FROM STREET RIVERSIDE DRIVE TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M152020227A29-r/w resurfaced |
2021-03-26 | No data | 24 STREET, FROM STREET 40 AVENUE TO STREET 41 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has a permanent restoration,(type of work) backfilled on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. |
2021-03-25 | No data | WEST 116 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Monitored wearing course it pass . |
2021-03-25 | No data | BUHRE AVENUE, FROM STREET JARVIS AVENUE TO STREET MAHAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | fine cracks developing in street joint |
2021-03-25 | No data | GREAT JONES STREET, FROM STREET BOWERY TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber restoration in the driving lane is in compliance. |
2021-03-25 | No data | DESBROSSES STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Multiple Arben steel plates are present behind BO fence along north curb closer to Washington St. Permit remains active at this time. |
2021-03-25 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | HALF OF ROADWAY RESURFACED BY B.P.P THERE IS NEW SIDEWALK FLAGS TO SEWER COVER |
2021-03-24 | No data | HINSDALE STREET, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm sewer trench in the roadway & sidewalk |
2021-03-24 | No data | MOTHER GASTON BOULEVARD, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill Pass - L4ft W17ft 4in D8ft - WD129.9 DD118.2 MD120.7 AM9.9 - Backfilled only 5ft today. Steel plates in roadway parking and driving lane in front of #273. |
2021-03-23 | No data | WESTCHESTER AVENUE, FROM STREET BERGEN AVENUE TO STREET EAST 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2021-03-23 | No data | WEST 116 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 20.6 x 5.3 x 8 tested 97.0 96.6 |
2021-03-21 | No data | GRAND STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a permanent restoration flushed to grade in the driving lane opposite the cited address. |
2021-03-21 | No data | VANDALIA AVENUE, FROM STREET ERSKINE STREET TO STREET FOUNTAIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the roadway. |
2021-03-20 | No data | BRUCKNER BOULEVARD, FROM STREET BRE WESTBOUND ENTRANCE BUHRE AVE TO STREET ROBERTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway |
2021-03-20 | No data | EAST 198 STREET, FROM STREET CRESTON AVENUE TO STREET JEROME AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2021-03-20 | No data | SNEDIKER AVENUE, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the parking lane in compliance |
2021-03-18 | No data | MOTHER GASTON BOULEVARD, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | THERE IS A PLATED WATER / SEWER CUT ON THE SIDEWALK PLATES ARE RAMPED PERMIT IS VALID |
2021-03-17 | No data | COMMONWEALTH AVENUE, FROM STREET GLEASON AVENUE TO STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - REPAIR SEWER |
2021-03-17 | No data | BRONX PARK EAST, FROM STREET THWAITES PLACE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done, new BPP |
2021-03-16 | No data | WALTON AVENUE, FROM STREET EAST 144 STREET TO STREET EAST 146 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Done |
2021-03-16 | No data | BRONX PARK EAST, FROM STREET THWAITES PLACE TO STREET WARING AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Contractors started before inspector arrival. Also Stip 072 work must be finished by 4pm. |
2021-03-15 | No data | EAST 70 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 9’L x 4’W 11’D Cut. 6‘ sewer Portion of Backfill was Completed, Remaining 5’of backfill will be completed at a later date backfill will be left plated. |
2021-03-12 | No data | WEST 44 STREET, FROM STREET 10 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 505 missing IBM color code on your permanent Trench running North to South in the driving lane. |
2021-03-12 | No data | WEST 87 STREET, FROM STREET BROADWAY TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M152020227A28-r/w resurfaced |
2021-03-10 | No data | HINSDALE STREET, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER / SEWER CUT IN THE ROADWAY |
2021-03-10 | No data | WEST 85 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sewer access cover regrade not done |
2021-03-10 | No data | STATE STREET, FROM STREET HOYT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw sw ok |
2021-03-10 | No data | BARNES AVENUE, FROM STREET ADEE AVENUE TO STREET WILLIAMSBRIDGE ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway |
2021-02-26 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the roadway is flush to grade |
2021-02-23 | No data | MOTHER GASTON BOULEVARD, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work done at this time. Permit still active. |
2021-02-17 | No data | EAST 120 STREET, FROM STREET 1 AVENUE TO STREET PLEASANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No defects observed at time of inspection. |
2021-02-17 | No data | VANDAM STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to inspect Active BO on site work not found. |
2021-02-09 | No data | EAST 205 STREET, FROM STREET GRAND CONCOURSE TO STREET LISBON PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | 20'x5'x5' in the d/l, p/l, Lab tech Veta from ELT. Has Con Ed pipes on the p/l next to the curb. Zymer foreman for ARBEN. |
2021-02-05 | No data | WALTON AVENUE, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 18' by 4' backfill |
2021-02-03 | No data | WALTON AVENUE, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Abren contracting of New York inc zymerJumping jack-exclusive Troy s cone- cleanfillCut size- 16ftx4ft d 11ftLift- 96.8-97.6Comments: only 11ft done from 16 length and 5 ft left unfilled to top for another day |
2021-01-31 | No data | HINSDALE STREET, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - SEWER |
2021-01-30 | No data | CRUGER AVENUE, FROM STREET ARNOW AVENUE TO STREET WILLIAMSBRIDGE ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Perm restoration in the roadway |
2021-01-28 | No data | REV JAMES POLITE AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2021-01-28 | No data | FOX STREET, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2021-01-27 | No data | CHRISTOPHER AVENUE, FROM STREET EAST NEW YORK AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work completed on this segment as the location is not here. Permit B012020357B23 is the correct permit for the location where the work was actually completed. |
2021-01-27 | No data | CHRISTOPHER AVENUE, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration found in the roadway in front of house 38. |
2021-01-27 | No data | HINSDALE STREET, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | pass, sewer install , sprinkler as well ... now plated ... |
2021-01-27 | No data | GREAT JONES STREET, FROM STREET BOWERY TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | OPP Building #363 closer to Lafayette Plumbers restoration in the driving lane is in compliance. |
2021-01-27 | No data | OGDEN AVENUE, FROM STREET WEST 165 STREET TO STREET WEST 166 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2021-01-27 | No data | EAST 205 STREET, FROM STREET GRAND CONCOURSE TO STREET LISBON PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | Exclusive Testing Labs Inc. Material Item 4 Compaction number Wet density: 127.8 Dry Density: 117.6 Max Dry : 121.0 Moisture 8.7 Only bottom test 96.6 preformed. The crew is not completing backfill today. |
2021-01-27 | No data | WEST 135 STREET, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut is flush and color coded in the roadway 50ft from St Nicholas ave |
2021-01-27 | No data | EAST 205 STREET, FROM STREET GRAND CONCOURSE TO STREET LISBON PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Crew is on site REPAIR SEWER - |
2021-01-26 | No data | BEACH 34 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET ROCKAWAY FREEWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no longer visible due to BPP |
2021-01-24 | No data | HINSDALE STREET, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation |
2021-01-22 | No data | TRYON AVENUE, FROM STREET EAST 211 STREET TO STREET EAST GUN HILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm final in compliance portion of later work being done by Con Edison. |
2021-01-21 | No data | SEYMOUR AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Zyer, jumping jack, 12' x 4' depth 8', Blend. Lab Exclusive Testing ,Michelle, Sand Cone (W)129.3 (D)121.5(MD)126.0 (AM) 6.4 Test 95.5/ 96.0 . Backfill Accepted. |
2021-01-19 | No data | WEST 85 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to properly inspect due to vehicles parked and ongoing construction of roadway restaurant seating. |
2021-01-19 | No data | WESTCHESTER AVENUE, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to inspect due to BO. pedestrian crosswalk is blocking parked of roadway |
2021-01-18 | No data | INWOOD AVENUE, FROM STREET CLARKE PLACE WEST TO STREET WEST 169 STREET | No data | Street Construction Inspections: Active | Department of Transportation | domestic water leaking in roadway 2 excavations made on roadway at time of inspection,3 day notice issued operator 52 contacted,roadway closed till 1900. |
2021-01-18 | No data | INWOOD AVENUE, FROM STREET CLARKE PLACE WEST TO STREET WEST 169 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | domestic water leaking in roadway 2 excavations made on roadway at time of inspection,roadway closed till 1900. |
2021-01-13 | No data | WEST 135 STREET, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Concrete panel was not fully restored car will be issued. Earring course roadway was done prior to start time. Did not observed wearing course. Arrived 1:13 but scheduled for 1:30 concrete was cured for more than a day as observed. |
2021-01-13 | No data | WEST 135 STREET, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Please restore a full concrete panel as per standard details of construction of “Concrete pavements” 1042B |
2021-01-13 | No data | LYNCH STREET, FROM STREET BROADWAY TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN DRIVING LANE IFO 242. |
2021-01-12 | No data | EAST 205 STREET, FROM STREET GRAND CONCOURSE TO STREET LISBON PLACE | No data | Street Construction Inspections: Active | Department of Transportation | plated recessed on the roadway sign poisted |
2021-01-10 | No data | FULTON STREET, FROM STREET ADAMS STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done behind fence at building operation at 1 Boerum Place |
2021-01-09 | No data | WEST 135 STREET, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | LL14 Backfill pass and complete IFO 320. Measurements: L- 4ft 1in, W- 20ft, D- 11ft 5in. Test: 96.1 & 96.5 |
2021-01-09 | No data | EAST 219 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent has 2 steel plates with ARBEN markings in the roadway, failed to post ''Raise Plow '' sign. No one on site working I/F/O 758 E 219 St. |
2021-01-09 | No data | MIDDLETON STREET, FROM STREET THROOP AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT OK. |
2021-01-09 | No data | EAST 219 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has updated permit # X012021004A12 |
2021-01-09 | No data | EAST 86 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in p/l; unable to fully inspect due to parked vehicle. |
2021-01-08 | No data | EAST 204 STREET, FROM STREET JEROME AVENUE TO STREET VILLA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | found resurfaced curb to curb |
2021-01-08 | No data | CHESTER STREET, FROM STREET NEWPORT STREET TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration found in the roadway. |
2021-01-08 | No data | HOPKINSON AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration found in the roadway. |
2021-01-07 | No data | HOLT PLACE, FROM STREET PERRY AVENUE TO STREET RESERVOIR OVAL | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk and roadway in compliance |
2021-01-06 | No data | RESERVOIR OVAL, FROM STREET BEND TO STREET HOLT PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk and roadway in compliance |
2021-01-06 | No data | EAST 222 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in the d/l. |
2021-01-05 | No data | ELIZABETH STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The respondent did not do the work, and the permit has expired. |
2021-01-04 | No data | TRYON AVENUE, FROM STREET EAST 211 STREET TO STREET EAST GUN HILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent has steel plates recessed in the roadway, Respondent Failed to post raise plow sign / steel plates ahead during the 2020 2021 winter moratorium policy. Permit and steel plate used for ID. |
2020-12-16 | No data | WEST 135 STREET, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plates counter sunk in the roadway and sidewalk plated. New permit on file. |
2020-12-16 | No data | EAST 205 STREET, FROM STREET GRAND CONCOURSE TO STREET LISBON PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | up to date permit on file |
2020-12-15 | No data | PARKSIDE PLACE, FROM STREET EAST 207 STREET TO STREET WEBSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway and sidewalk in compliance. |
2020-12-15 | No data | PERRY AVENUE, FROM STREET EAST 201 STREET TO STREET EAST MOSHOLU PARKWAY SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass |
2020-12-13 | No data | ATLANTIC AVENUE, FROM STREET ALABAMA AVENUE TO STREET GEORGIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found resurfaced |
2020-12-12 | No data | GREAT JONES STREET, FROM STREET BOWERY TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the driving lane |
2020-12-11 | No data | EAST 206 STREET, FROM STREET EAST MOSHOLU PARKWAY NORTH TO STREET ROCHAMBEAU AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm good. |
2020-12-09 | No data | LINDEN BOULEVARD, FROM STREET HINSDALE STREET TO STREET SNEDIKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, prem... west bound ... |
2020-12-08 | No data | EAST 205 STREET, FROM STREET GRAND CONCOURSE TO STREET LISBON PLACE | No data | Street Construction Inspections: Active | Department of Transportation | crew working on site |
2020-12-07 | No data | WEST 105 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut is flush and color coded ifo 107 |
2020-12-06 | No data | WEST 251 STREET, FROM STREET BROADWAY TO STREET OLD ALBANY POST ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass no need for exp joints in middle of s/w |
2020-12-06 | No data | BROADWAY, FROM STREET WEST 251 STREET TO STREET WEST 252 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass |
2020-12-05 | No data | ARNOW AVENUE, FROM STREET DEWITT PLACE TO STREET SEYMOUR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has updated permit # X012020338A25 |
2020-12-05 | No data | ARNOW AVENUE, FROM STREET DEWITT PLACE TO STREET SEYMOUR AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent has steel plates with ARBEN NY marking in the driving lanes. Failed to install ''Raise Plow'' signs on both sides of the 2 way roadway. During the Winter Moratorium Policy. No one on site working. |
2020-12-03 | No data | CHRISTOPHER AVENUE, FROM STREET EAST NEW YORK AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Error on permit, new permit on file. |
2020-12-03 | No data | CHRISTOPHER AVENUE, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | L4ft W10ft D7ft 6in - WD115.2 DD106 MD114 AM8.7 - Only 4ft depth backfill at this time. Steel plate in roadway ifo #38 Christopher Ave. |
2020-12-03 | No data | FORSYTH STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER : Resurfaced by BPP |
2020-12-02 | No data | KINGSLAND AVENUE, FROM STREET ASTOR AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut was resurfaced |
2020-12-02 | No data | WASHINGTON STREET, FROM STREET JANE STREET TO STREET WEST 12 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | restoration measuring 7.3x 8.6.x10d cut within the barricaded work zone |
2020-12-02 | No data | EAST HOUSTON STREET, FROM STREET LUDLOW STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - REPAIR WATER: Resurfaced by Con Edison trench: W/Insp # 779 |
2020-12-01 | No data | SNEDIKER AVENUE, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut t resurfaced by NatGrid gas excavation B012020304A29. |
2020-12-01 | No data | WEST 135 STREET, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Start 12:20 due to material in cut upon arrival. Material was removed and new backfill material was tested and used. Cut 8’10”x5’x2’ in parking lane concrete pad. Test ETL pass at 97.0.No cut back due to full break out of base for rebar later. |
2020-11-30 | No data | EAST 213 STREET, FROM STREET BARNES AVENUE TO STREET CARLISLE PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation |
2020-11-30 | No data | EAST 213 STREET, FROM STREET BARNES AVENUE TO STREET CARLISLE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Updated permit X012020329A75 |
2020-11-29 | No data | MIDDLETON STREET, FROM STREET THROOP AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration paved over by BPP |
2020-11-28 | No data | COFFEY STREET, FROM STREET CONOVER STREET TO STREET FERRIS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2020-11-27 | No data | RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST BURNSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later work done |
2020-11-24 | No data | FULTON STREET, FROM STREET ADAMS STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Active | Department of Transportation | CREW WORKING IN STREET OPENING BEHIND FENCE NEXT TO STARBUCK'S |
2020-11-24 | No data | HOPKINSON AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration found in the roadway. |
2020-11-22 | No data | BUCHANAN PLACE, FROM STREET DAVIDSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP street resurfaced |
2020-11-21 | No data | MADISON AVENUE, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | I/F/O 1044 ( service for 1045 ), Water Cut ( 11'6"L x 3'3"W ) is the second trench ( of 2 at this time for Arben ) closer to E80th St within driving lanes. No sidewalk work for this permittee. Backfill Pass and cutbacks marked out for 6" Base. |
2020-11-20 | No data | ANDREWS AVENUE, FROM STREET WEST 183 STREET TO STREET WEST FORDHAM ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-11-20 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway and sidewalk in compliance |
2020-11-20 | No data | BRISTOL STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway. |
2020-11-19 | No data | MATTHEWS AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done on sidewalk |
2020-11-19 | No data | MADISON AVENUE, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill rescheduled due to water leak nearby running into excavation. Foreman Mus was notified. New York City Water Works LLC presently doing repairs under emergency permit # M012020324A32 I/F/O # 1044. |
2020-11-18 | No data | MADISON AVENUE, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Steel plates on the roadway without a permit |
2020-11-18 | No data | ELIZABETH STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | L:19' W:5'7" D:3'7" 6" cut back was completed. |
2020-11-18 | No data | KINGSBRIDGE TERRACE, FROM STREET WEST 229 STREET TO STREET WEST KINGSBRIDGE ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-11-17 | No data | TIEBOUT AVENUE, FROM STREET EAST 184 STREET TO STREET EAST 187 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-11-16 | No data | ARNOW AVENUE, FROM STREET BRONXWOOD AVENUE TO STREET WILLIAMSBRIDGE ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway |
2020-11-16 | No data | BRONXWOOD AVENUE, FROM STREET BOSTON ROAD TO STREET WILLIAMSBRIDGE ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done behind fence, also at corner property on Arnow Avenue |
2020-11-15 | No data | LINDEN BOULEVARD, FROM STREET HINSDALE STREET TO STREET SNEDIKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, now plated west bound ... |
2020-11-13 | No data | ARTHUR AVENUE, FROM STREET BEND TO STREET OAK TREE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk restored IFO 2180 |
2020-11-13 | No data | ELIZABETH STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Monitored Backfill. Backfill pass & complete. 17'x4'x5' Arrival: 11:30AM Departure: 1:03PM |
2020-11-10 | No data | FULTON STREET, FROM STREET ADAMS STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE WORKING BEHIND FENCE |
2020-11-10 | No data | FULTON STREET, FROM STREET ADAMS STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CREW ON SITE WORKING BEHIND FENCE |
2020-11-09 | No data | BELMONT AVENUE, FROM STREET EAST 179 STREET TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 1982 perm to grade |
2020-11-08 | No data | LINDEN BOULEVARD, FROM STREET HINSDALE STREET TO STREET SNEDIKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | pass, hole now plated ...... |
2020-11-08 | No data | WEST 11 STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration perm flush. |
2020-11-06 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration found in roadway. |
2020-11-05 | No data | SEDGWICK AVENUE, FROM STREET BEND TO STREET GILES PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2020-11-04 | No data | JEROME AVENUE, FROM STREET EAST KINGSBRIDGE ROAD TO STREET WEST 195 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repaved r/w |
2020-11-04 | No data | WEST 56 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active B.O. occupying the roadway unable to fully inspect |
2020-11-04 | No data | CHESTER STREET, FROM STREET NEWPORT STREET TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm restorations found in the roadway. |
2020-11-04 | No data | HOPKINSON AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway. |
2020-11-03 | No data | BRISTOL STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BKFILL NOTES: 1 CUT IN THE PARKING LANE .. (L) 7' (W) 6' (D) 4' ..ACTUAL START TIME 9:05 PM .. COMPACTION: 97.3% 97.7% |
2020-11-03 | No data | CHESTER STREET, FROM STREET NEWPORT STREET TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Length of the cut1-12’/cut2-6’Width of the cut1-4’/cut2-5’Depth of the cut1-12’/cut2-4’W.D-122.4D.D-113.3M.D.D-119.3A.M-8.0%1st lift cut1-98/cut2-98.3%last lift cut1-98.5%/cut2-99.1% |
2020-11-03 | No data | HOPKINSON AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BKFILL NOTES: (L) 6.6' (W) 4.6' (D) 4' ..ACTUAL START TIME 10:15 PM ...COMPACTION: 96.8% 97.9% |
2020-11-03 | No data | TIFFANY STREET, FROM STREET BARRY STREET TO STREET BURNETT PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration within B.O |
2020-11-02 | No data | MAPES AVENUE, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-11-02 | No data | WEBSTER AVENUE, FROM STREET EAST 203 STREET TO STREET EAST 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP street resurfaced |
2020-11-02 | No data | PARKSIDE PLACE, FROM STREET EAST 209 STREET TO STREET WEBSTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work in progress |
2020-10-31 | No data | JAY STREET, FROM STREET JOHN STREET TO STREET PLYMOUTH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK DONE IN COBBLESTONE |
2020-10-31 | No data | PLYMOUTH STREET, FROM STREET JAY STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | POSSIBLE WORK DONE UNDER HALCYON PLATE -WATER SHUT OFF ORDERED BY DEP -NOTICE POSTED ON BUILDING |
2020-10-30 | No data | CHESTER STREET, FROM STREET NEWPORT STREET TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done new permit on file. B012020302D82 |
2020-10-28 | No data | HOPKINSON AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration found in the roadway. |
2020-10-28 | No data | TAYLOR AVENUE, FROM STREET DEAD END TO STREET VAN NEST AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found resurfaces under update permit number # X012019050B49 |
2020-10-26 | No data | EAST 46 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to inspect due to active B/O |
2020-10-26 | No data | 9 AVENUE, FROM STREET BEND TO STREET WEST 15 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There was no 2018 water cut found in the roadway; however, more than likely, the work has been resurfaced by the BPP. |
2020-10-23 | No data | CLARKSON STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cobblestone restoration is acceptable. (Restoration is in driving lane and 3 sidewalk flags east of light pole.) East of restoration cobblestone are in disarray, this isn't part of the restoration. Stones have been moved by truck traffic. |
2020-10-23 | No data | EAST 120 STREET, FROM STREET 1 AVENUE TO STREET PLEASANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Resurfaced roadway but sidewalk in compliance |
2020-10-22 | No data | EAST 46 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O Building #315 unable to inspect active B/O. |
2020-10-21 | No data | ELSMERE PLACE, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-10-17 | No data | BRISTOL STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Upon arrival respondent ARBEN CONTRACTING OF NEW YORK, INC failed to obtain a DOT permit on file for the 3 steel plate street openings in the roadway down 1’ on a protected street. Nov issued |
2020-10-16 | No data | BRISTOL STREET, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL COMPLETE16FT0IN X 8FT0IN X 12FT0IN C:97.1 (1), 97.3 (2)WD:106.5; DD:99.0; MDD:103.5; MST:7.5% (SAND); WD:114.0; DD:103.7; MDD:111.0; MST:9.9% (CLEAN FILL)START 9:34 END 12:39 - P.S : CROSS STREETS DO NOT MATCH DUE TO TRAIN TRACT - |
2020-10-15 | No data | EAST 78 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been milled |
2020-10-13 | No data | MC DONALD STREET, FROM STREET BASSETT AVENUE TO STREET STILLWELL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2020-10-11 | No data | CROTONA AVENUE, FROM STREET EAST 176 STREET TO STREET FAIRMOUNT PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2020-10-10 | No data | TIFFANY STREET, FROM STREET BARRY STREET TO STREET BURNETT PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | L.30FT Width. 4FT Depth. 2FTW. 124.2 D.114.3 Max. 118.3 Actual 8.7Lift 97.3 2nd Lift 97.6 |
2020-10-09 | No data | 24 STREET, FROM STREET 40 AVENUE TO STREET 41 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Back fill 6'.8" by 3'.1" down 3'.3" Completed and Acceptable |
2020-10-09 | No data | CLAFLIN AVENUE, FROM STREET RESERVOIR AVENUE TO STREET WEST 197 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2020-10-08 | No data | EAST TREMONT AVENUE, FROM STREET UNIONPORT ROAD TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2020-10-08 | No data | BEACH AVENUE, FROM STREET GUION PLACE TO STREET MERRILL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new work in progress unable to inspect |
2020-10-08 | No data | LELAND AVENUE, FROM STREET ARCHER STREET TO STREET GUERLAIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-10-08 | No data | GUERLAIN STREET, FROM STREET ARCHER ROAD TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-10-08 | No data | UNIONPORT ROAD, FROM STREET EAST TREMONT AVENUE TO STREET GUERLAIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced |
2020-10-08 | No data | WHITE PLAINS ROAD, FROM STREET EAST TREMONT AVENUE TO STREET GUERLAIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/o SEC sidewalk restored |
2020-10-07 | No data | VANDAM STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active B.O on site unable to fully inspect inside fence area. |
2020-10-07 | No data | EAST 70 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in parking/bike lane of roadway with sidewalk restored at this time. |
2020-10-06 | No data | EAST 23 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration acceptable |
2020-10-05 | No data | EAST 206 STREET, FROM STREET EAST MOSHOLU PARKWAY NORTH TO STREET ROCHAMBEAU AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-10-05 | No data | WHITE PLAINS ROAD, FROM STREET EAST TREMONT AVENUE TO STREET GUERLAIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done |
2020-10-05 | No data | GRAND STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in RW |
2020-10-05 | No data | 33 STREET, FROM STREET AMTRAK RAILROAD TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in parking driving lane and sidewalk cut |
2020-10-05 | No data | MADISON AVENUE, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I’m unable to properly inspect due to ongoing new building construction. |
2020-10-04 | No data | GEORGIA AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the d/l in compliance |
2020-10-03 | No data | 31 STREET, FROM STREET 21 AVENUE TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | Back Fill 22' by 4' down 9' Completed and Acceptable. |
2020-10-03 | No data | BEACH 34 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET ROCKAWAY FREEWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired, work no longer visible due to painted pedestrian plaza. 34-11 |
2020-10-02 | No data | PARK AVENUE, FROM STREET EAST 107 STREET TO STREET EAST 108 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut resurfaced |
2020-10-02 | No data | SNEDIKER AVENUE, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway and two new sidewalk flags. |
2020-10-01 | No data | EAST 60 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | portion of perm restoration viewed in roadway. |
2020-10-01 | No data | EAST 213 STREET, FROM STREET BARNES AVENUE TO STREET CARLISLE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in the roadway and new concrete sidewalk flags flush and sealed |
2020-10-01 | No data | THIERIOT AVENUE, FROM STREET BEND TO STREET LACOMBE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP street resurfaced |
2020-10-01 | No data | VAN WYCK EXPRESSWAY, FROM STREET 138 STREET TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2020-09-30 | No data | CENTRAL AVENUE, FROM STREET BAYPORT PLACE TO STREET FOAM PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | three perm water restorations flush to grade within the d/l, i/f/o 15-20 |
2020-09-30 | No data | HINSDALE STREET, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in the driving lane curb to curb |
2020-09-30 | No data | WEST 135 STREET, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk and parking lane plated and secured IFO 320. |
2020-09-27 | No data | ATTORNEY STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I found a permanent restoration that is flushed to grade in the parking/driving lane. |
2020-09-25 | No data | EAST 120 STREET, FROM STREET 1 AVENUE TO STREET PLEASANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut remains no defects in compliance ifo 409 |
2020-09-25 | No data | EAST 107 STREET, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP |
2020-09-25 | No data | BLACKROCK AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET CROSS BRONX EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench crossing the roadway and new concrete sidewalk flag flush and sealed |
2020-09-24 | No data | WHITE PLAINS ROAD, FROM STREET EAST TREMONT AVENUE TO STREET GUERLAIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in roadway and sidewalk |
2020-09-24 | No data | MIDDLETON STREET, FROM STREET THROOP AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway ok. |
2020-09-23 | No data | BROADWAY, FROM STREET EAST 10 STREET TO STREET EAST 11 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration acceptable |
2020-09-23 | No data | 3 AVENUE, FROM STREET EAST 109 STREET TO STREET EAST 110 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in d/l is acceptable. |
2020-09-23 | No data | GARRISON AVENUE, FROM STREET EDGEWATER ROAD TO STREET WHITTIER STREET | No data | Street Construction Inspections: Active | Department of Transportation | work not started |
2020-09-23 | No data | WEST 163 STREET, FROM STREET AMSTERDAM AVENUE TO STREET EDGECOMBE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk flags in front of 444 in compliance. surrounding water valve. |
2020-09-22 | No data | WEST 11 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | The backfill passed, the cut was left plated in the driving lane; also, the sidewalk is plated. There were no cutbacks done for the base. |
2020-09-20 | No data | EAST MOSHOLU PARKWAY SOUTH, FROM STREET MARION AVENUE TO STREET PERRY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced |
2020-09-20 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP street resurfaced |
2020-09-19 | No data | EAST 165 STREET, FROM STREET BRYANT AVENUE TO STREET FAILE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-09-18 | No data | WALTON AVENUE, FROM STREET EAST 144 STREET TO STREET EAST 146 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm final color coded |
2020-09-18 | No data | CARLISLE PLACE, FROM STREET EAST 211 STREET TO STREET EAST 213 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration final in front of new building |
2020-09-17 | No data | ELIZABETH STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | I/F/O #208 in the driving/parking lane cut backs marked out for a later date for base.L-9' W-4' D-9 |
2020-09-17 | No data | TIFFANY STREET, FROM STREET BARRY STREET TO STREET BURNETT PLACE | No data | Street Construction Inspections: Active | Department of Transportation | working within B/O |
2020-09-16 | No data | EAST 172 STREET, FROM STREET CROES AVENUE TO STREET FTELEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk and roadway restored |
2020-09-16 | No data | EAST 222 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has perm trench in the driving, parking lanes I/F/O 629 E 222 St. |
2020-09-15 | No data | BRONX PARK EAST, FROM STREET THWAITES PLACE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the p/l. |
2020-09-15 | No data | NORTH 9 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Disregard previous inspection & CORRECTIVE ACTION REQUEST perm sewer restoration overlapped by electrical restoration in the roadway of the parking lane adjacent to building #97 AKA WYTHE AVENUE |
2020-09-14 | No data | EAST 173 STREET, FROM STREET BOONE AVENUE TO STREET WEST FARMS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-09-13 | No data | VYSE AVENUE, FROM STREET BEND TO STREET EAST 174 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP street resurfaced |
2020-09-13 | No data | BOWERY, FROM STREET PRINCE STREET TO STREET RIVINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - REPAIR WATER - SEWER |
2020-09-09 | No data | EAST 219 STREET, FROM STREET BARNES AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the driving lane. |
2020-09-09 | No data | EAST 11 STREET, FROM STREET BROADWAY TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Plated water restoration behind construction fence acceptable |
2020-09-09 | No data | EAST 11 STREET, FROM STREET BROADWAY TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit has been updated M012020251A10 |
2020-09-08 | No data | EAST HOUSTON STREET, FROM STREET AVENUE B TO STREET SUFFOLK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER: FINAL RESTORATION HAS BEEN RESURFACED BY NEW BUILDING'S B.P.P. 1/2+5 |
2020-09-06 | No data | WHITE PLAINS ROAD, FROM STREET EAST TREMONT AVENUE TO STREET GUERLAIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut opp. of 1585 in compliance |
2020-09-06 | No data | SNEDIKER AVENUE, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation in the r/w & new permit on file |
2020-09-05 | No data | BARNES AVENUE, FROM STREET EAST 213 STREET TO STREET EAST 214 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut was resurfaced |
2020-09-05 | No data | BARNES AVENUE, FROM STREET EAST 218 STREET TO STREET EAST 219 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the parking lane Opp 3768. |
2020-09-05 | No data | WEST 87 STREET, FROM STREET RIVERSIDE DRIVE TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced. |
2020-09-05 | No data | TILDEN STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut was resurfaced |
2020-09-05 | No data | PURDY STREET, FROM STREET NYCTA SUBWAY TO STREET STARLING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Gas cut cutting over water cut |
2020-09-03 | No data | EAST 218 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Trench was resurfaced permit # X012020008B67 stip # 1/2 + 5' |
2020-09-03 | No data | RODMAN PLACE, FROM STREET LONGFELLOW AVENUE TO STREET WEST FARMS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2020-09-03 | No data | BAY STREET, FROM STREET GRANT STREET TO STREET ST JULIAN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench to grade in r/w at new building |
2020-09-02 | No data | ELTON AVENUE, FROM STREET EAST 156 STREET TO STREET EAST 157 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the parking lane and work done on sidewalk |
2020-09-01 | No data | HOPKINSON AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | NOTES: LENGTH- 19FT 0IN WIDTH- 4FT 0IN DEPTH 10FT 0IN LAB MOBILE TESTING TESTER JOE DEVICE SANDCONE WET- 117.9 DRY 110.6 MAX 114.7 MOIST 6.6 1st Test 97.1 2nd Test 97.0 COMPACTION JUMPING JACK AREA SPRAYED FOR CUTBACKS EXCAVATION PLATED |
2020-08-31 | No data | HORNADAY PLACE, FROM STREET CROTONA PARKWAY TO STREET MOHEGAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2020-08-30 | No data | PURDY STREET, FROM STREET NYCTA SUBWAY TO STREET STARLING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Gas cutting over water cut |
2020-08-27 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | portion of r/w found resurfaced due to new building bpp 1/2 +5' |
2020-08-27 | No data | MANIDA STREET, FROM STREET BEND TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-08-26 | No data | EAST 223 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the parking lane |
2020-08-26 | No data | VYSE AVENUE, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER |
2020-08-26 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | segment found resurfaced due to new building bpp 1/2 + 5' paved |
2020-08-25 | No data | WEST END AVENUE, FROM STREET WEST 86 STREET TO STREET WEST 87 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway was resurfaced with B.P.P. Sidewalk in compliance. |
2020-08-24 | No data | SEAVIEW AVENUE, FROM STREET BEND TO STREET ERSKINE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | found resurfaced due to new building bpp 1/2 + 5 ' resurfaced |
2020-08-24 | No data | HUGHES AVENUE, FROM STREET EAST 188 STREET TO STREET EAST 189 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w ok |
2020-08-24 | No data | GRAND STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut on roadway ok. |
2020-08-24 | No data | EAST 224 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the roadway |
2020-08-23 | No data | WEST 87 STREET, FROM STREET BROADWAY TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced. |
2020-08-23 | No data | STORY AVENUE, FROM STREET BOYNTON AVENUE TO STREET ELDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk restored |
2020-08-22 | No data | HINSDALE STREET, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLATED EXCAVATION IN THE DRIVING LANE UNDER A VALID PERMIT #B012020141A87 |
2020-08-22 | No data | SEAVIEW AVENUE, FROM STREET BEND TO STREET ERSKINE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | found resurfaced due to new building bpp 1/2 + 5 |
2020-08-22 | No data | SNEDIKER AVENUE, FROM STREET LINDEN BOULEVARD TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CHECKING .. PLATED EXCAVATION IN THE DRIVING LANE ..IN COMPLIANCE |
2020-08-21 | No data | GRAND AVENUE, FROM STREET 55 STREET TO STREET 56 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm long water cuts, SWK flag restored |
2020-08-20 | No data | WEST 126 STREET, FROM STREET BEND TO STREET WEST 127 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | back fill completed, located in middle of roadway in front of 450 west 126th street. measures 25' x 3'3'' x 4' down. cutbacks made ready for concrete |
2020-08-19 | No data | EAST 68 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012017353C03-latest permit |
2020-08-19 | No data | MOHEGAN AVENUE, FROM STREET BRONX PARK SOUTH TO STREET HORNADAY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk in place, also 1/2 + 5 of roadway paved |
2020-08-17 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found to be in compliance |
2020-08-15 | No data | MADISON AVENUE, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 9x10x10 site will be plated for concrete curing. 6” cutbacks made on base |
2020-08-14 | No data | EAST 144 STREET, FROM STREET GRAND CONCOURSE TO STREET WALTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No cut in segment yet, |
2020-08-14 | No data | VANDALIA AVENUE, FROM STREET ERSKINE STREET TO STREET FOUNTAIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the driving lane for water for new building opp |
2020-08-12 | No data | HULL STREET, FROM STREET BROADWAY TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water & sewer cut in the roadway |
2020-08-12 | No data | FULTON STREET, FROM STREET HUDSON AVENUE TO STREET ROCKWELL PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok |
2020-08-11 | No data | SARATOGA AVENUE, FROM STREET PARK PLACE TO STREET STERLING PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION PARTIALLY COVERED BY BPP IN THE ROADWAY ODD SIDE OF THE STREET CLOSER TO STERLING |
2020-08-11 | No data | CARPENTER AVENUE, FROM STREET EAST 220 STREET TO STREET EAST 221 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Temp cut in the parking lane |
2020-08-11 | No data | WEST END AVENUE, FROM STREET WEST 86 STREET TO STREET WEST 87 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway repaved with BPP. |
2020-08-10 | No data | EAST 165 STREET, FROM STREET BRYANT AVENUE TO STREET FAILE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER |
2020-08-09 | No data | EAST 180 STREET, FROM STREET BRYANT AVENUE TO STREET VYSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut i/f/o 998 in compliance |
2020-08-06 | No data | FRANKLIN AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP street resurfaced |
2020-08-05 | No data | WESTCHESTER AVENUE, FROM STREET BERGEN AVENUE TO STREET EAST 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | not found |
2020-08-05 | No data | AUSTIN PLACE, FROM STREET EAST 147 STREET TO STREET EAST 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced |
2020-08-04 | No data | BLACKROCK AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET CROSS BRONX EXPRESSWAY | No data | Street Construction Inspections: Active | Department of Transportation | plated pinned and ramped |
2020-08-02 | No data | 5 AVENUE, FROM STREET EAST 106 STREET TO STREET EAST 107 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been milled in preparation for resurfacing |
2020-08-01 | No data | EAST 62 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut okay in r/w. |
2020-08-01 | No data | NORTH 9 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATIONS IN RWY |
2020-07-31 | No data | GRAND AVENUE, FROM STREET 56 STREET TO STREET 57 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SWK flag restored,Active BO |
2020-07-31 | No data | WEST 14 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done permit expired. Refer to permit #M012019207B89 on file. |
2020-07-31 | No data | EAST 14 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to locate work possibly in the parking lane behind active BO. |
2020-07-30 | No data | BRONX PARK EAST, FROM STREET THWAITES PLACE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in the parking lane and sidewalk |
2020-07-30 | No data | WASHINGTON STREET, FROM STREET BATTERY PLACE TO STREET PEDESTRIAN OVERPASS | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water repair curb to curb with two sidewalk flags repaired/restored with expansion joints sealed. |
2020-07-30 | No data | EAST 31 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found resurfaced |
2020-07-30 | No data | GRAND AVENUE, FROM STREET 55 STREET TO STREET 56 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade long water cuts |
2020-07-29 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in compliance |
2020-07-29 | No data | JANE STREET, FROM STREET GREENWICH AVENUE TO STREET WEST 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to locate restoration due to active BO. |
2020-07-29 | No data | CRUGER AVENUE, FROM STREET BURKE AVENUE TO STREET SOUTH OAK DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the driving lane |
2020-07-28 | No data | 3 AVENUE, FROM STREET EAST 20 STREET TO STREET EAST 21 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I was unable to inspect the repair water work because of the barricades stored in the parking lane. |
2020-07-26 | No data | GRAND CONCOURSE, FROM STREET EAST 144 STREET TO STREET EAST 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work completed under later permit |
2020-07-26 | No data | GRAND CONCOURSE, FROM STREET EAST 144 STREET TO STREET EAST 149 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated work site |
2020-07-25 | No data | WEST 87 STREET, FROM STREET BROADWAY TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced with BPP. |
2020-07-25 | No data | WEST 95 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane/parking lane with sidewalk flags restored IFO 206-216. |
2020-07-24 | No data | EAST 46 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to view work due to active construction site. |
2020-07-24 | No data | JANE STREET, FROM STREET GREENWICH AVENUE TO STREET WEST 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Partial view of Permanent Trench due to active BO. |
2020-07-23 | No data | GREENWICH STREET, FROM STREET CHARLTON STREET TO STREET KING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water cut acceptable |
2020-07-23 | No data | WALTON AVENUE, FROM STREET EAST 144 STREET TO STREET EAST 146 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | monitored site from 0944 - 1120 am, BF acceptable |
2020-07-23 | No data | EAST 198 STREET, FROM STREET CRESTON AVENUE TO STREET JEROME AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to locate cut due to truck parked |
2020-07-23 | No data | HUDSON STREET, FROM STREET SPRING STREET TO STREET VANDAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water cut acceptable |
2020-07-23 | No data | VANDAM STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration acceptable |
2020-07-22 | No data | WEST 124 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER RESTORATION BY #144 IN D/L |
2020-07-21 | No data | 31 STREET, FROM STREET 21 AVENUE TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cannot identify work at this time - active BO,fence on r/w,cannot see work at this time. |
2020-07-19 | No data | GARRISON AVENUE, FROM STREET EDGEWATER ROAD TO STREET WHITTIER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER |
2020-07-19 | No data | BOERUM PLACE, FROM STREET ADAMS STREET TO STREET LIVINGSTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW SWK HYDRANT REPLACED |
2020-07-17 | No data | SURF AVENUE, FROM STREET JONES WALK TO STREET WEST 12 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk restored in kind. |
2020-07-13 | No data | ARTHUR AVENUE, FROM STREET EAST 178 STREET TO STREET EAST 179 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2020-07-11 | No data | FULTON STREET, FROM STREET CLINTON STREET TO STREET JOHNSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RWY RESURFACED BY NGRID OR DDC RESTANI |
2020-07-07 | No data | BEACH AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | opposite 702 perm to grade partially covered by later work |
2020-07-06 | No data | CRESTON AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-07-06 | No data | EAST 179 STREET, FROM STREET CRESTON AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-07-06 | No data | CRESTON AVENUE, FROM STREET BUSH STREET TO STREET EAST 179 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-07-02 | No data | CROTONA AVENUE, FROM STREET EAST 176 STREET TO STREET FAIRMOUNT PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-07-02 | No data | EAST 108 STREET, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I’m unable to properly inspect due to ongoing new building construction. Barriers on the roadway |
2020-07-01 | No data | EAST 107 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Long water cut I/F/O 153 remains in acceptable condition. No defects to report |
2020-07-01 | No data | BEACH 34 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET ROCKAWAY FREEWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | covered by BPP |
2020-07-01 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | found resurfaced due to new building BPP |
2020-07-01 | No data | PORT RICHMOND AVENUE, FROM STREET HOOKER PLACE TO STREET WALKER STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew onsite excavated Sidewalk to find connection for Denino's Restaurant, water is leaking from curb & temp around hydrant. Cannot verify 3day notice no one is at restaurant- owner left. P/L is only being used for equipment & excavated material. |
2020-06-30 | No data | GEORGIA AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | section of ...street paved over .... due to bpp..n/w/c... |
2020-06-28 | No data | WESTCHESTER AVENUE, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-06-27 | No data | 14 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r\w paved be building pavers |
2020-06-27 | No data | EAST 218 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration paved over by BPP IFO 842 |
2020-06-26 | No data | ROSEDALE AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm final color coded in the driving lane in front of 747-49 |
2020-06-25 | No data | LAFAYETTE STREET, FROM STREET BOND STREET TO STREET GREAT JONES STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done permit expired. Refer to permit #M012018247D00 on file. |
2020-06-25 | No data | CRUGER AVENUE, FROM STREET BARTHOLDI STREET TO STREET MAGENTA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Resurfaced by bpp |
2020-06-25 | No data | DEBEVOISE STREET, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway trench in compliance. |
2020-06-24 | No data | BARNES AVENUE, FROM STREET EAST 213 STREET TO STREET EAST 214 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced bpp |
2020-06-24 | No data | EAST 45 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found 2 permanent Restoration in the driving / parking lanes. |
2020-06-23 | No data | PARK AVENUE, FROM STREET EAST 111 STREET TO STREET EAST 112 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm sewer restoration in d/l is in compliance (on west side of segment, about 60' going south) |
2020-06-23 | No data | CARLISLE PLACE, FROM STREET EAST 211 STREET TO STREET EAST 213 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in front of New building |
2020-06-23 | No data | REV JAMES POLITE AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade, BPP done |
2020-06-23 | No data | STORY AVENUE, FROM STREET BOYNTON AVENUE TO STREET ELDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 1520 Installation of new Hydrant on 8 inches cast iron distribution main |
2020-06-23 | No data | AUSTIN PLACE, FROM STREET EAST 147 STREET TO STREET EAST 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced |
2020-06-23 | No data | EAST 46 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a permanent Restoration in the protected walkway in the Roadway and behind Fence, unable to properly view work due to active construction site. |
2020-06-22 | No data | ANDREWS AVENUE, FROM STREET WEST 183 STREET TO STREET WEST FORDHAM ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-06-22 | No data | BRUCKNER BOULEVARD, FROM STREET BRE WESTBOUND ENTRANCE BUHRE AVE TO STREET ROBERTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in parking lane and sidewalk |
2020-06-22 | No data | EAST 219 STREET, FROM STREET BARNES AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration with no defects |
2020-06-22 | No data | WALTON AVENUE, FROM STREET EAST 144 STREET TO STREET EAST 146 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working in excavation. |
2020-06-22 | No data | EAST 222 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sewer work in front of new building |
2020-06-20 | No data | WEST 87 STREET, FROM STREET BROADWAY TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway repaved with B.P.P. |
2020-06-20 | No data | EAST 86 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012017304C02-LATEST PERMIT |
2020-06-18 | No data | EDISON AVENUE, FROM STREET ST THERESA AVENUE TO STREET BUHRE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in roadway |
2020-06-18 | No data | STERLING PLACE, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY HAS BEEN RESURFACED |
2020-06-17 | No data | LENOX ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT ON ROADWAY |
2020-06-17 | No data | EAST 120 STREET, FROM STREET 1 AVENUE TO STREET PLEASANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water restoration in p/l is ok. |
2020-06-17 | No data | BUHRE AVENUE, FROM STREET JARVIS AVENUE TO STREET MAHAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Fine cracks developing in street joint. |
2020-06-17 | No data | HOBART AVENUE, FROM STREET ST THERESA AVENUE TO STREET WILKINSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2020-06-17 | No data | FOX STREET, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-06-16 | No data | EAST 21 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I found a permanent repair water restoration that is flushed to grade in the parking/driving lane. |
2020-06-16 | No data | EAST 213 STREET, FROM STREET BARNES AVENUE TO STREET CARLISLE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in front of upcoming new building |
2020-06-16 | No data | TOWNSEND AVENUE, FROM STREET CLIFFORD PLACE TO STREET EAST 175 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to locate cut due to double park cars |
2020-06-15 | No data | SHAKESPEARE AVENUE, FROM STREET JESUP PLACE TO STREET WEST 172 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | made perm to grade |
2020-06-15 | No data | NELSON AVENUE, FROM STREET WEST 167 STREET TO STREET WEST 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced |
2020-06-15 | No data | CLARKSON STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In driving/parking lane opposite the Fedex garage, the perm water cobblestone restoration remains acceptable at this time. Photo taken. |
2020-06-15 | No data | UNDERCLIFF AVENUE, FROM STREET MDE NORTHBOUND EXIT 7 NORTH TO STREET WEST 171 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-06-14 | No data | AUSTIN PLACE, FROM STREET EAST 147 STREET TO STREET EAST 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP street resurfaced |
2020-06-13 | No data | STATE STREET, FROM STREET HOYT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Disregard previous inspection perm water restoration flush to grade in the roadway extending into the parking lane opposite from building #265 STATE STREET & 1 sidewalk flag installed IN COMPLIANCE |
2020-06-12 | No data | SPRING STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration |
2020-06-11 | No data | WEST 87 STREET, FROM STREET BROADWAY TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water restoration resurfaced with B.P.P. |
2020-06-11 | No data | WEST 35 STREET, FROM STREET 10 AVENUE TO STREET LINCOLN TNNL APPROACH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced since work M152017289A35. |
2020-06-10 | No data | NORTH 9 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Overdue for final. |
2020-06-10 | No data | NORTH 9 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Nov will be issued. |
2020-06-10 | No data | WEST 126 STREET, FROM STREET BEND TO STREET WEST 127 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in compliance |
2020-06-10 | No data | WEBSTER AVENUE, FROM STREET EAST 233 STREET TO STREET WOODLAWN CEMETERY BOUNDARY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to find cut, possibly permed over with later work done |
2020-06-09 | No data | BEACH AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | opposite 700 perm to grade / partially covered by later work |
2020-06-09 | No data | EAST 11 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced. |
2020-06-08 | No data | MOTT STREET, FROM STREET EAST HOUSTON STREET TO STREET PRINCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water cut in the driving lane is flush to grade... I/F/O 277 |
2020-06-06 | No data | 4 AVENUE, FROM STREET 14 STREET TO STREET 15 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind in prestigious condition BPP 1/2+5 in compliance |
2020-06-05 | No data | BLACKROCK AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET CROSS BRONX EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm final opposite 2234 |
2020-06-04 | No data | EAST 219 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New concrete sidewalk flags flush and sealed |
2020-06-03 | No data | JACKSON AVENUE, FROM STREET EAST 151 STREET TO STREET PONTIAC PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP street resurfaced |
2020-06-03 | No data | ELTON AVENUE, FROM STREET EAST 156 STREET TO STREET EAST 157 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-06-02 | No data | PEARL STREET, FROM STREET BEND TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY & TEMPORARY RESTORATION SWK BEHIND FENCE OF BUILDING OPERATION ON WCL |
2020-05-31 | No data | ALEXANDER AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET EAST 134 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-05-16 | No data | WEST 28 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to locate due to active building operations (HAP construction LLC) |
2020-05-11 | No data | WEST 87 STREET, FROM STREET BROADWAY TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair sewer/water restorations have been paved over due to buildings paving plan. |
2020-05-08 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sewer work in progress, plumber back filling |
2020-05-06 | No data | WESTCHESTER AVENUE, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work completed under later permit |
2020-05-06 | No data | WESTCHESTER AVENUE, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | perm to grade |
2020-05-05 | No data | SIMPSON STREET, FROM STREET EAST 163 STREET TO STREET FIRE ACCESS LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-05-05 | No data | 38 STREET, FROM STREET 43 AVENUE TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the driving lane found flushed to grade with 1 sw flag restored ifo 43-30. |
2020-05-05 | No data | BARNES AVENUE, FROM STREET EAST 218 STREET TO STREET EAST 219 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | street joint resealed |
2020-05-04 | No data | AUSTIN PLACE, FROM STREET EAST 144 STREET TO STREET EAST 147 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cuts on roadway of active BO |
2020-04-29 | No data | BROADWAY, FROM STREET EAST 10 STREET TO STREET EAST 11 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | next permit on file |
2020-04-29 | No data | VANDAM STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | DELINQUENT CONFIRMATION |
2020-04-29 | No data | WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | No plates at this time area has been made permanent curb to curb. |
2020-04-28 | No data | WEST 126 STREET, FROM STREET BEND TO STREET WEST 127 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B |
2020-04-28 | No data | WEST 251 STREET, FROM STREET BROADWAY TO STREET OLD ALBANY POST ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has a new concrete sidewalk flag. Failed to install sidewalk expansion joints. |
2020-04-28 | No data | WEST 251 STREET, FROM STREET BROADWAY TO STREET OLD ALBANY POST ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | New concrete sidewalk flag was installed. |
2020-04-19 | No data | EAST 31 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I was unable to locate the repair water cut due to the roadway which is currently occupied with construction materials/equipment's. |
2020-04-16 | No data | FULTON STREET, FROM STREET HUDSON AVENUE TO STREET ROCKWELL PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2020-04-15 | No data | PEARL STREET, FROM STREET BEND TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED RWY & WOOD COVERED SWK BEHIND FENCE |
2020-04-14 | No data | AJ GRIFFIN PLACE, FROM STREET EAST 149 STREET TO STREET EAST 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk restored after hydrant relocation |
2020-04-14 | No data | WESTCHESTER AVENUE, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-04-14 | No data | SIMPSON STREET, FROM STREET EAST 163 STREET TO STREET FIRE ACCESS LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-04-13 | No data | PEARL STREET, FROM STREET BEND TO STREET FULTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED RWY & WOOD COVERED SWK BEHIND FENCE |
2020-04-11 | No data | NORTH 9 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Will re-issue. |
2020-04-11 | No data | NORTH 9 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Overdue |
2020-04-07 | No data | WEST 118 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the D/L ifo 17 is flush and color coded |
2020-04-03 | No data | EAST 78 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ifo 116, perm trench in p/l is good. |
2020-04-02 | No data | MONROE STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT |
2020-03-28 | No data | BERGEN STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane in front of property #375 & sidewalk flags installed in compliance |
2020-03-27 | No data | VARICK STREET, FROM STREET SPRING STREET TO STREET VANDAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the west side driving lane. |
2020-03-27 | No data | WEST 48 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to locate work due to active construction site. |
2020-03-26 | No data | GRAND STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restoration still not corrected |
2020-03-26 | No data | EAST 120 STREET, FROM STREET 1 AVENUE TO STREET PLEASANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut remains in acceptable condition. |
2020-03-24 | No data | EAST HOUSTON STREET, FROM STREET LUDLOW STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not found due to possible con Edison restoration |
2020-03-24 | No data | WEST 118 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut is flush and color coded ifo 17. |
2020-03-23 | No data | PEARL STREET, FROM STREET BEND TO STREET FULTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED RWY & WOOD COVERED SWK BEHIND FENCE |
2020-03-23 | No data | PEARL STREET, FROM STREET BEND TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED RWY & WOOD COVERED SWK WITH NEW PERMIT# B012020069C09 EXP 4/5/20 |
2020-03-22 | No data | LENOX ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind BPP 1/2+5 in compliance |
2020-03-21 | No data | SPRING STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Opposite 278 Permanent Restoration in the roadway. |
2020-03-21 | No data | WEST 4 STREET, FROM STREET BANK STREET TO STREET WEST 12 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 311, newer perm 2018 cut ( permit M012018255B78 ) done by another plumbing company and worked over old 2017 cut. This permit has expired. |
2020-03-20 | No data | EAST 204 STREET, FROM STREET JEROME AVENUE TO STREET VILLA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 90 percent of the trench was resurfaced in the driving, parking lanes. I/F/O 16 E 204 St. |
2020-03-19 | No data | EAST 46 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated water excavation acceptable |
2020-03-19 | No data | EAST 46 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit on file (M012020069B08) |
2020-03-18 | No data | JENNINGS STREET, FROM STREET MINFORD PLACE TO STREET SOUTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP street resurfaced |
2020-03-18 | No data | EAST 78 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water restorations in r/w are good |
2020-03-17 | No data | EAST 165 STREET, FROM STREET BRYANT AVENUE TO STREET FAILE STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated crews recessing steel plates |
2020-03-17 | No data | WASHINGTON STREET, FROM STREET BATTERY PLACE TO STREET PEDESTRIAN OVERPASS | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water trench in roadway is up to grade. Sidewalk restored in kind behind building operations. In front of 2. |
2020-03-17 | No data | GEORGIA AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY |
2020-03-16 | No data | REV JAMES POLITE AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 1027, new work in progress |
2020-03-16 | No data | PARK AVENUE, FROM STREET EAST 107 STREET TO STREET EAST 108 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ok |
2020-03-16 | No data | EAST 83 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water trench in d/l is good. |
2020-03-14 | No data | WEST 251 STREET, FROM STREET BROADWAY TO STREET OLD ALBANY POST ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has new sidewalk flag with Lettuce Eats ASS. Carved in the concrete sidewalk need to be repair. Also failed to install sidewalk expansion joints. |
2020-03-14 | No data | BROADWAY, FROM STREET WEST 251 STREET TO STREET WEST 252 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has updated permit# X012020049A15. On W 251 St. |
2020-03-12 | No data | 35 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | covered by BPP |
2020-03-12 | No data | CLARKSON STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cobblestone restoration is acceptable. South curb approx 25' west of hydrant near Washington. |
2020-03-12 | No data | WEST 23 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Opposite 557 west 23rd street permanently restored sewer cut adjacent to sewer access cover flushed and sealed to grade. |
2020-03-12 | No data | CROTONA AVENUE, FROM STREET EAST 176 STREET TO STREET FAIRMOUNT PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2020-03-12 | No data | EAST 167 STREET, FROM STREET BOSTON ROAD TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 598 made perm to grade |
2020-03-12 | No data | EAST 167 STREET, FROM STREET FULTON AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | e/o NEC perm to grade |
2020-03-09 | No data | WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | CAR#20201360004 issued by Inspector #136, on 3/7/2020 |
2020-03-09 | No data | EAST HOUSTON STREET, FROM STREET AVENUE B TO STREET SUFFOLK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 287 permanent sewer restoration in the driving lane is in compliance |
2020-03-08 | No data | WESTCHESTER AVENUE, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work not started |
2020-03-07 | No data | WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | "Arben" marked steel plates countersunk extending across the roadway is deflecting causing noise; needs wedging. |
2020-03-06 | No data | LENOX ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance |
2020-03-05 | No data | EAST 120 STREET, FROM STREET 1 AVENUE TO STREET PLEASANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Short water cut I/F/O 409 remains in acceptable condition. No defects to report |
2020-03-05 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Cont-abren contracting of N.Y.Sup-zymerComp dev- j jack-Lab compliance- exclusiveLab tech- AndrewTest dev- s coneCut size 4’x2’ d4’Material-cleanfillLift-97.3-97.0B.f pass |
2020-03-04 | No data | CONOVER STREET, FROM STREET KING STREET TO STREET SULLIVAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the parking lane in front of property #137 in compliance |
2020-03-02 | No data | MOTT STREET, FROM STREET EAST HOUSTON STREET TO STREET PRINCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 277 permanent sewer restoration is in compliance |
2020-03-02 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Permanent restoration on the roadway recently done. Building operation is still active. |
2020-03-02 | No data | REV JAMES POLITE AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | made perm to grade |
2020-02-29 | No data | EAST 10 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O aka 71 4th Ave on East 10th St, street resurfaced by BPP at aka 71 4th Ave. Work no longer visible. This permit has expired. |
2020-02-28 | No data | OGDEN AVENUE, FROM STREET WEST 165 STREET TO STREET WEST 166 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-02-26 | No data | SCHOLES STREET, FROM STREET LEONARD STREET TO STREET LORIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration (r/w & s/w) found to be in compliance |
2020-02-24 | No data | AUSTIN PLACE, FROM STREET EAST 144 STREET TO STREET EAST 147 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failed to comply with detail standard drawing H 1042 A Note # 9 |
2020-02-23 | No data | EAST 162 STREET, FROM STREET DEAD END TO STREET MELROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | made perm to grade |
2020-02-23 | No data | ELTON AVENUE, FROM STREET BROOK AVENUE TO STREET EAST 161 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work site within BO |
2020-02-23 | No data | BOERUM PLACE, FROM STREET ADAMS STREET TO STREET LIVINGSTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags installed in front of property #1 BOERUM PLACE In compliance |
2020-02-23 | No data | PEARL STREET, FROM STREET BEND TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection in front of property #1 BOERUM PLACE ON RED HOOK LANE AKA BEND |
2020-02-22 | No data | ELTON AVENUE, FROM STREET EAST 156 STREET TO STREET EAST 157 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later work done over cut small portion of cut pass in compliance |
2020-02-18 | No data | EAST 78 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water restoration in d/l is ok. |
2020-02-17 | No data | 3 AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2020-02-17 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | 1 cut in DL, (L) 26ft (W) 4ft (D) 3ft 7in WD 124.8 DD 114.8 DD 122.0 AM 8.7 2 lift 1st lift 97.7 2nd 97.9. Lab Co exclusive, Denise, Sand cone |
2020-02-16 | No data | FULTON STREET, FROM STREET CLINTON STREET TO STREET JOHNSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind in compliance |
2020-02-15 | No data | EAST 107 STREET, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w & r/w okay |
2020-02-14 | No data | WEST 56 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in driving lane of roadway. |
2020-02-14 | No data | BARNES AVENUE, FROM STREET EAST 213 STREET TO STREET EAST 214 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In compliance |
2020-02-11 | No data | WASHINGTON STREET, FROM STREET BATTERY PLACE TO STREET PEDESTRIAN OVERPASS | No data | Street Construction Inspections: Active | Department of Transportation | Perm is still active 3 countersunk plates on roadway & 2 sidewalk flags behind building operations have been restored in kind. Expansion joints need to be checked. In front of 2. |
2020-02-10 | No data | ATTORNEY STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the driving/parking lane I/F/O 148 |
2020-02-09 | No data | LEGGETT AVENUE, FROM STREET BECK STREET TO STREET KELLY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-02-08 | No data | LAFAYETTE STREET, FROM STREET BOND STREET TO STREET GREAT JONES STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flush on the west side of the roadway. The east side of the roadway has been paved by the builder entire length of block. |
2020-02-08 | No data | EAST 100 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012018058B37-cut resurfaced by BPP. |
2020-02-08 | No data | DEAN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane in front of property #251 in compliance |
2020-02-07 | No data | BERGEN STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w flag in compliance, roadway restoration overlapped by gas temp gas cut. |
2020-02-07 | No data | REV JAMES POLITE AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET | No data | Street Construction Inspections: Active | Department of Transportation | work not started |
2020-02-07 | No data | CONOVER STREET, FROM STREET KING STREET TO STREET SULLIVAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind in compliance. |
2020-02-07 | No data | EAST 222 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Plumber cut plated and countersink. |
2020-02-03 | No data | EAST HOUSTON STREET, FROM STREET AVENUE B TO STREET SUFFOLK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 287 permanent sewer restoration in the driving lane is in compliance |
2020-02-03 | No data | BRUCKNER BOULEVARD, FROM STREET BRUCKNER EXPRESSWAY EXIT 46 EB TO STREET BARRETTO STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street milled |
2020-02-01 | No data | PARK AVENUE, FROM STREET EAST 111 STREET TO STREET EAST 112 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done |
2020-02-01 | No data | BERGEN STREET, FROM STREET BOERUM PLACE TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane opposite from property #20 in compliance |
2020-02-01 | No data | CRUGER AVENUE, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade in the driving lane flush and sealed |
2020-01-31 | No data | EAST 46 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Excavation crossing driving/parking lane at active building operation.Arben crew on site working with Exclusive Testing for compaction. Blend used a material.6" cut backs saw cut around excavation.Cut 1: 14'.2" x4' x 4'.10" |
2020-01-30 | No data | MAPES AVENUE, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-01-30 | No data | AUSTIN PLACE, FROM STREET EAST 147 STREET TO STREET EAST 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | partial later work done pass in compliance |
2020-01-29 | No data | WASHINGTON STREET, FROM STREET BATTERY PLACE TO STREET PEDESTRIAN OVERPASS | No data | Street Construction Inspections: Active | Department of Transportation | Perm is still active 3 countersunk plates on roadway & 2 plates on sidewalk behind building operations. In front of 2. |
2020-01-29 | No data | EAST 70 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway with sidewalk restored. |
2020-01-29 | No data | WASHINGTON STREET, FROM STREET BATTERY PLACE TO STREET PEDESTRIAN OVERPASS | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plates countersunk in roadway. However active permit is on file. In front of 2 at an active building operations. M012020019A02. |
2020-01-29 | No data | FRANKLIN AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | X012019115A40 up to date permit on file perm to grade |
2020-01-28 | No data | HULL STREET, FROM STREET BROADWAY TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water & sewer cut in the roadway |
2020-01-28 | No data | ST ANNS AVENUE, FROM STREET EAST 141 STREET TO STREET EAST 142 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER |
2020-01-28 | No data | EAST 62 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2020-01-27 | No data | EAST 68 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restortion in roadway. |
2020-01-27 | No data | WALTON AVENUE, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced |
2020-01-27 | No data | BOWERY, FROM STREET PRINCE STREET TO STREET RIVINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent sewer restoration in the parking and driving lane is in compliance |
2020-01-27 | No data | WESTCHESTER AVENUE, FROM STREET BERGEN AVENUE TO STREET EAST 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm final color coded in the roadway |
2020-01-26 | No data | EAST 142 STREET, FROM STREET BROOK AVENUE TO STREET ST ANNS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - PROTECTED |
2020-01-26 | No data | WEST 126 STREET, FROM STREET BEND TO STREET WEST 127 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut is good ifo 450 |
2020-01-23 | No data | BARNES AVENUE, FROM STREET EAST 213 STREET TO STREET EAST 214 STREET | No data | Street Construction Inspections: Active | Department of Transportation | perm restoration in the roadway |
2020-01-23 | No data | CLARKSON STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cobblestone restoration is acceptable. South curb approx 25' west of hydrant near Washington. |
2020-01-23 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired [10/20/2019]. |
2020-01-22 | No data | WEST 126 STREET, FROM STREET BEND TO STREET WEST 127 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Respondent failed to obtain a confirmation number from the department |
2020-01-22 | No data | VANDAM STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 12/26/2019. |
2020-01-22 | No data | ANDREWS AVENUE, FROM STREET WEST 183 STREET TO STREET WEST FORDHAM ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-01-22 | No data | BELMONT AVENUE, FROM STREET EAST 179 STREET TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-01-22 | No data | ARTHUR AVENUE, FROM STREET BEND TO STREET OAK TREE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk restored |
2020-01-21 | No data | WEST 28 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 11/17/2019. |
2020-01-21 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired [12/04/2019]. |
2020-01-14 | No data | BROADWAY, FROM STREET WEST 181 STREET TO STREET WEST 182 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done yet. Sidewalk |
2020-01-14 | No data | CRESTON AVENUE, FROM STREET BUSH STREET TO STREET EAST 179 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill properly compacted |
2020-01-14 | No data | EAST 179 STREET, FROM STREET CRESTON AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Wet:129.9Dry:119.5Max:124.0Moisture:8.7First Lift: 98.7Last: 97.5 |
2020-01-14 | No data | SEAVIEW AVENUE, FROM STREET BEND TO STREET ERSKINE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No visible work observed on roadway or sidewalk at location |
2020-01-14 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut on the roadway |
2020-01-12 | No data | HUDSON STREET, FROM STREET SPRING STREET TO STREET VANDAM STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Water cut to find tap to main. Water main found but no connection. Backfill compactions, 96.7% and 97.2% acceptable. Clean fill material used. Original cut 4' deep, 2'6"x1'9". approximately 100' south of Vandam St. 9' WE of Hudson St. |
2020-01-11 | No data | EAST 223 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the parking lane and sidewalk. |
2020-01-10 | No data | VANDAM STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 Permanent Restoration along segment with 3 different Permits from same contractor on file. However no sketches on NYCSTREETS. All Restorations are in compliance at this time. |
2020-01-10 | No data | BARNES AVENUE, FROM STREET EAST 213 STREET TO STREET EAST 214 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plumber cut plated and countersink in the roadway, cut also plated on the sidewalk, raise plow signs posted. |
2020-01-10 | No data | EAST 83 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water trench in d/l is in compliance |
2020-01-10 | No data | BARNES AVENUE, FROM STREET EAST 213 STREET TO STREET EAST 214 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber cut plated in the roadway and sidewalk, researching for updated permit |
2020-01-10 | No data | HORNADAY PLACE, FROM STREET CROTONA PARKWAY TO STREET MOHEGAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | made perm to grade |
2020-01-10 | No data | EAST 180 STREET, FROM STREET BRYANT AVENUE TO STREET VYSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated work site |
2020-01-09 | No data | 5 AVENUE, FROM STREET EAST 106 STREET TO STREET EAST 107 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut okay on s/w also in p/l & d/l. |
2020-01-09 | No data | EAST 62 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to locate work at this time. |
2020-01-09 | No data | AUSTIN PLACE, FROM STREET EAST 147 STREET TO STREET EAST 149 STREET | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - PROTECTED |
2020-01-08 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut on the roadway near Shopping Mall |
2020-01-08 | No data | RODMAN PLACE, FROM STREET LONGFELLOW AVENUE TO STREET WEST FARMS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-01-08 | No data | EAST 60 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2020-01-08 | No data | VYSE AVENUE, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-01-08 | No data | VYSE AVENUE, FROM STREET BEND TO STREET EAST 174 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP, street repaved |
2020-01-07 | No data | CROSS BRONX EXPRESSWAY, FROM STREET LONGFELLOW AVENUE TO STREET WEST FARMS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced |
2020-01-05 | No data | WEST 48 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sewer repair acceptable |
2020-01-03 | No data | CLARKSON STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Cobblestone restored started. All stones restored to area and sand was added due to inclement weather. Contractor will return next week to add grout to restoration. Permit valid until 1/15/2020. |
2020-01-03 | No data | EAST 31 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active Construction site unable to see work. |
2020-01-03 | No data | EAST 46 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | active BO |
2020-01-03 | No data | BUCHANAN PLACE, FROM STREET DAVIDSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has updated permit X012019240B44. |
2020-01-03 | No data | EAST 70 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flush in the parking lane/driving lane flush to grade. |
2020-01-02 | No data | EAST 46 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | working within active BO |
2019-12-31 | No data | 4 AVENUE, FROM STREET 14 STREET TO STREET 15 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on sidewalk |
2019-12-31 | No data | CLARKSON STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site actively working in parking lane near south curb closest to Washington St. Photos taken. |
2019-12-29 | No data | WEST 163 STREET, FROM STREET AMSTERDAM AVENUE TO STREET EDGECOMBE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water cut ifo 444 is good |
2019-12-29 | No data | NORTH 10 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind. |
2019-12-29 | No data | NORTH 9 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind |
2019-12-29 | No data | GRAND STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2019-12-26 | No data | ORCHARD STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not found permit expired |
2019-12-26 | No data | GRAND STREET, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2019-12-26 | No data | PARK AVENUE, FROM STREET EAST 111 STREET TO STREET EAST 112 STREET | No data | Street Construction Inspections: Active | Department of Transportation | In compliance crew on site at time of inspection. Building Op has permits for sidewalk closure. Plumber has 1 11ft maintained for traffic. Signs postd |
2019-12-25 | No data | NORTH 12 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind. |
2019-12-24 | No data | JANE STREET, FROM STREET GREENWICH AVENUE TO STREET WEST 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active building operations at location. |
2019-12-24 | No data | EAST 222 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway |
2019-12-23 | No data | EAST 108 STREET, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Behind jersey barriers current active bo |
2019-12-22 | No data | LYNCH STREET, FROM STREET BROADWAY TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway with in crosswalk a.k.a. 120 union |
2019-12-20 | No data | NORTH 9 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | two temporary restorations on roadway, overdue for final. |
2019-12-20 | No data | EAST 60 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Perm restoration but paved over by 2019 Con Edison cut |
2019-12-20 | No data | WEST 35 STREET, FROM STREET 10 AVENUE TO STREET LINCOLN TNNL APPROACH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street found resurfaced. |
2019-12-19 | No data | WEST 4 STREET, FROM STREET BANK STREET TO STREET WEST 12 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work has covered by M012018255B78. |
2019-12-16 | No data | WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street found resurfaced. |
2019-12-16 | No data | EAST 83 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2019-12-15 | No data | ST ANNS AVENUE, FROM STREET EAST 141 STREET TO STREET EAST 142 STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I discovered the respondent failure to use skid resistance plating in the driving lane. Multiple steel plates marked ARBEN NY is smooth to the touch.The plate offering no resistance to pedestrians & wheelchairs during the steady rainfall. |
2019-12-14 | No data | SPRING STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit secured for this work. |
2019-12-14 | No data | WASHINGTON STREET, FROM STREET SPRING STREET TO STREET WEST HOUSTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No street openings made with this permit. |
2019-12-14 | No data | WEST HOUSTON STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work confined to sidewalk within building operation. |
2019-12-11 | No data | OCEAN AVENUE, FROM STREET BEVERLY ROAD TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front of property #1921 CORTELYOU ROAD |
2019-12-10 | No data | EAST 107 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In driving lane no defects |
2019-12-05 | No data | CRUGER AVENUE, FROM STREET BURKE AVENUE TO STREET SOUTH OAK DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade in the driving lane IFO 3212, Flush and sealed |
2019-12-03 | No data | MURDOCK AVENUE, FROM STREET NEREID AVENUE TO STREET PITMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut behind property line with plywood covering it. |
2019-12-01 | No data | WEST 23 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | At the time of inspection, I found the permanent repair Sewer restoration which is measured 64'' in width which is in conform with the H-1042D note 6. |
2019-11-30 | No data | ARNOW AVENUE, FROM STREET BRONXWOOD AVENUE TO STREET WILLIAMSBRIDGE ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade in the driving lane N/W/C, and new concrete sidewalk flags flush and sealed |
2019-11-30 | No data | EAST 223 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Active | Department of Transportation | cut plated on the sidewalk and temp to grade in the parking lane |
2019-11-28 | No data | VANDALIA AVENUE, FROM STREET ERSKINE STREET TO STREET FOUNTAIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in RW corner of Milford street, water valve in dirt area. |
2019-11-27 | No data | EAST HOUSTON STREET, FROM STREET LUDLOW STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | REPAIR WATER - Contractors cut has been overlapped by a Con Edison cut( Electric) |
2019-11-27 | No data | WEST 87 STREET, FROM STREET RIVERSIDE DRIVE TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm sewer cut in compliance. |
2019-11-26 | No data | MOTT STREET, FROM STREET EAST HOUSTON STREET TO STREET PRINCE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | street opening joints have been sealed and is in compliance |
2019-11-26 | No data | EAST 173 STREET, FROM STREET BOONE AVENUE TO STREET WEST FARMS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2019-11-25 | No data | POWER ROAD, FROM STREET 23 AVENUE TO STREET 24 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Street resurfaced at this time. |
2019-11-23 | No data | BOWERY, FROM STREET PRINCE STREET TO STREET RIVINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway and sidewalk perm flush. |
2019-11-22 | No data | WEST FARMS ROAD, FROM STREET CROSS BRONX EXPWY NB ET 4 A TO STREET EAST 174 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP street resurfaced |
2019-11-22 | No data | MAPLE STREET, FROM STREET EAST 48 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway in front of 830. Partially covered by another roadway restoration. |
2019-11-22 | No data | VYSE AVENUE, FROM STREET BEND TO STREET EAST 174 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2019-11-22 | No data | BARNES AVENUE, FROM STREET ADEE AVENUE TO STREET WILLIAMSBRIDGE ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade in the driving lane flush and sealed |
2019-11-19 | No data | BEACH AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Opp 700 perm to grade |
2019-11-18 | No data | CRESTON AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Pass. First Lift 97.1Last Lift 97.3 |
2019-11-18 | No data | SOUTH 1 STREET, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2019-11-15 | No data | MOHEGAN AVENUE, FROM STREET BRONX PARK SOUTH TO STREET HORNADAY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk restored |
2019-11-15 | No data | WEST 95 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active B.O. at this time; unable to inspect. |
2019-11-15 | No data | EAST 180 STREET, FROM STREET BRYANT AVENUE TO STREET VYSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work completed under later permt |
2019-11-13 | No data | WEST 104 STREET, FROM STREET COLUMBUS AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP |
2019-11-13 | No data | WEST 163 STREET, FROM STREET AMSTERDAM AVENUE TO STREET EDGECOMBE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is good in the parking lane |
2019-11-11 | No data | EAST 224 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway |
2019-11-11 | No data | TIEBOUT AVENUE, FROM STREET EAST 184 STREET TO STREET EAST 187 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2019-11-11 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in roadway and sidewalk |
2019-11-11 | No data | CRESTON AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | L.10Ft W.4Ft D 7ft Wet 126.0 / 121.5Dry 117.2 / 113.0Max 119.5 /115.5Actual 7.5 / 7.512Ft from original pipe only 7ft was backfil. DEP has to connect sewer to new building. |
2019-11-10 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front of property #1090 |
2019-11-10 | No data | VYSE AVENUE, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced |
2019-11-09 | No data | EAST 218 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 Permanent restoration in the roadway |
2019-11-09 | No data | EAST 45 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 2 cuts 17'x2'8"x2 and 8'x4'x4' |
2019-11-08 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired [08/07/2019 |
2019-11-08 | No data | BARNES AVENUE, FROM STREET ADEE AVENUE TO STREET WILLIAMSBRIDGE ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in the driving lan IFO 2953 |
2019-11-07 | No data | WEST 39 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut acceptable |
2019-11-06 | No data | BEACH AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade near BPP |
2019-11-05 | No data | 4 AVENUE, FROM STREET 14 STREET TO STREET 15 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp work done on sidewalk in front of B/O underneath scafold |
2019-11-04 | No data | 14 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane in front of building #535 on 14 Street |
2019-11-04 | No data | EAST 45 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATE AND TEMP CUT IN THE ROADWAY |
2019-11-03 | No data | VANDAM STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Tech on Location, Material(BLEND)passed. Wet Density: 126.0, Dry Density: 118.4, Max Dry Density: 121.0, Actual Moisture: 6.4%. Excavation is 3'7"X2'11"X3'6" - Deep. 1 Lift 1 Test. 98.9. BAC was saw cut and chipped out for BSE. |
2019-11-03 | No data | EAST 21 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm WATER/SEWER repair acceptable |
2019-11-02 | No data | EAST 218 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Arben plates covering cuts with concrete base, in front of 842/844, updated permit on file # X012019305a63 |
2019-11-02 | No data | BARNES AVENUE, FROM STREET EAST 218 STREET TO STREET EAST 219 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | long water restoration in the roadway, opposite side p/l |
2019-10-31 | No data | WEST 95 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | failed to obtain a confirmation number prior to expiration of DOT street opening permit (protected street) |
2019-10-30 | No data | WEST 95 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to inspect due to active B.O |
2019-10-28 | No data | GRAND AVENUE, FROM STREET 55 STREET TO STREET 56 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cuts plus one s/w |
2019-10-28 | No data | EAST 172 STREET, FROM STREET CROES AVENUE TO STREET FTELEY AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | broken sewer one open cut on roadway and one open cut on sidewalk in front of 1687-E |
2019-10-27 | No data | STORY AVENUE, FROM STREET BOYNTON AVENUE TO STREET ELDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced |
2019-10-26 | No data | MC DONALD STREET, FROM STREET BASSETT AVENUE TO STREET STILLWELL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2019-10-26 | No data | 4 AVENUE, FROM STREET 14 STREET TO STREET 15 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp work on s/w around hardware active permit on file |
2019-10-25 | No data | FULTON STREET, FROM STREET HUDSON AVENUE TO STREET ROCKWELL PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane opposite from building #1Flatbush Avenue |
2019-10-25 | No data | EAST 81 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in parking/driving lane of roadway. |
2019-10-24 | No data | BARNES AVENUE, FROM STREET EAST 218 STREET TO STREET EAST 219 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber permanent restoration street joint needs to be sealed in the roadway. Long water cut, cut on opposite side |
2019-10-24 | No data | EAST 218 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plumber cut plated in the roadway and sidewalk |
2019-10-23 | No data | 14 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent ARBEN Failed to comply with terms and conditions of stipulation#023, MaintainOne 11 Foot lane for all on going vehicular traffic. Nov issued |
2019-10-23 | No data | EAST 86 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in parking lane of roadway. |
2019-10-22 | No data | MOTT STREET, FROM STREET EAST HOUSTON STREET TO STREET PRINCE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The respondent has fail to re-seal their roadway street joints, on their roadway cut, as required. Prior CAR #20196720341 dated 8/7/2019 was issued, to no avail. |
2019-10-20 | No data | BLACKROCK AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET CROSS BRONX EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk and roadway restored |
2019-10-18 | No data | WEST 23 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sewer repair that failed to comply with DOT Standard and Specifications H-1042 note 6. All final restorations should measure 4'6" after cutbacks. Respondent was issued CAR#20196540112 on 6/20/2019 to correct this condition and failed to do so. |
2019-10-18 | No data | WEST 87 STREET, FROM STREET BROADWAY TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP from new building. |
2019-10-17 | No data | EAST 214 STREET, FROM STREET BARNES AVENUE TO STREET HOLLAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway |
2019-10-13 | No data | 14 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 steel plated street openings in the roadway of the driving lane in front of building #535 |
2019-10-13 | No data | 14 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 steel plated street openings in the roadway of the driving lane in front of building #535 |
2019-10-11 | No data | WEST 28 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I was unable to locate the repair water-sewer work due to the roadway that is barricaded. There is an active construction site which is occupying both the roadway and the sidewalk. |
2019-10-11 | No data | WEST 104 STREET, FROM STREET COLUMBUS AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w resurfaced. |
2019-10-10 | No data | THIERIOT AVENUE, FROM STREET BEND TO STREET LACOMBE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plates removed |
2019-10-10 | No data | TILDEN STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paved over plumber restoration in the roadway |
2019-10-10 | No data | EAST 214 STREET, FROM STREET BARNES AVENUE TO STREET HOLLAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway and sidewalk |
2019-10-08 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED EXCAVATION ACROSS THE ROADWAY IN FRONT OF #911 CLOSER TO HOME DEPOT |
2019-10-08 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED TRENCH THROUGH ROADWAY CUT IS ACTUALLY IN FRONT OF #911 CLOSER TO HOME DEPOT |
2019-10-08 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASSED {L}60FT X {W}4FT 1IN X {D}7FT 6IN TEST 98.5 973 98.8 95.7 20FT OF TRENCH HAD GROUND WATER WHICH WAS PUMPED OUT AND THEN 1FT 6IN OF GRAVEL WAS USED THEN SAND WAS USED TO FINISH OFF BACK FILL. TRENCH WAS REPLATED. ARRIVED 840 LEFT 330 |
2019-10-07 | No data | WEST 87 STREET, FROM STREET RIVERSIDE DRIVE TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration has been paved over by Con Edison cut. |
2019-10-06 | No data | 27 STREET, FROM STREET 40 AVENUE TO STREET 41 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER- no work found |
2019-10-05 | No data | EDISON AVENUE, FROM STREET ST THERESA AVENUE TO STREET BUHRE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in roadway |
2019-10-05 | No data | BURR AVENUE, FROM STREET EAST 196 STREET TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No sign of any work been done |
2019-10-05 | No data | LACOMBE AVENUE, FROM STREET TAYLOR AVENUE TO STREET THIERIOT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 1833, BPP street resurfaced |
2019-10-04 | No data | WEST 95 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active BO at this time. Unable to inspect ... |
2019-10-04 | No data | JACKSON AVENUE, FROM STREET EAST 151 STREET TO STREET PONTIAC PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2019-10-03 | No data | EAST 204 STREET, FROM STREET JEROME AVENUE TO STREET VILLA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has updated permit # X012019263A85 |
2019-10-03 | No data | EAST 204 STREET, FROM STREET JEROME AVENUE TO STREET VILLA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent has 1 of the 3 street plates in the roadway w/o any required identifying information to plating, decking I/F/O 16 W 204 St. |
2019-10-03 | No data | KINGSLAND AVENUE, FROM STREET ASTOR AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plumber cut plated, pinned and ramp |
2019-10-02 | No data | EAST 162 STREET, FROM STREET DEAD END TO STREET MELROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2019-10-02 | No data | WEST 118 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration has been brought up to grade . |
2019-10-02 | No data | STATE STREET, FROM STREET HOYT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front building #140 |
2019-10-02 | No data | MANIDA STREET, FROM STREET BEND TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | made perm to grade |
2019-10-02 | No data | 3 AVENUE, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to observe work at this time due to being located in an active b/o. |
2019-10-01 | No data | GREENWICH STREET, FROM STREET CHARLTON STREET TO STREET KING STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Water cut in front of 551 in driving lane. Opposite UPS garage. Backfill passed proceeding to base next. |
2019-09-30 | No data | WEST 56 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | This condition is inside of an Active BO, no defects found at time of inspection |
2019-09-30 | No data | ELTON AVENUE, FROM STREET EAST 156 STREET TO STREET EAST 157 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2019-09-30 | No data | EAST 120 STREET, FROM STREET 1 AVENUE TO STREET PLEASANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In complaince |
2019-09-28 | No data | ELIZABETH STREET, FROM STREET EAST HOUSTON STREET TO STREET PRINCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Subsequent permit secured for this work. |
2019-09-26 | No data | LIVONIA AVENUE, FROM STREET PEDESTRIAN OVERPASS TO STREET SNEDIKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY IS MILLED AT THIS TIME. |
2019-09-25 | No data | UNION STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind. |
2019-09-25 | No data | WEST 33 STREET, FROM STREET 5 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found Street resurfaced. |
2019-09-24 | No data | MONROE STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found to be in compliance |
2019-09-23 | No data | WEST 124 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration flushed to grade in the DL. |
2019-09-23 | No data | WEST 15 STREET, FROM STREET HIGH LINE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The repair water restoration was resurfaced by the cited address builders pavement plan restoration. |
2019-09-22 | No data | EAST HOUSTON STREET, FROM STREET LUDLOW STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please re-install a color code ID marker on 2018 sewer repair cut within bike lane on east bound lane. Also restore broken solid white lane marking. IFO CVS pharmacy. |
2019-09-21 | No data | EAST 120 STREET, FROM STREET 1 AVENUE TO STREET PLEASANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm retsoration |
2019-09-21 | No data | EAST 204 STREET, FROM STREET JEROME AVENUE TO STREET VILLA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Has steel plates in the roadway pinned, ramp I/F/O 16 E 204 St. |
2019-09-20 | No data | SEAVIEW AVENUE, FROM STREET BEND TO STREET ERSKINE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration work done on the roadway in the parking lane over national grid restoration |
2019-09-19 | No data | EAST 46 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work seen active BO |
2019-09-18 | No data | BERRIMAN STREET, FROM STREET GLENMORE AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | part of roadway have been resurfaced by B.P.P |
2019-09-18 | No data | TENBROECK AVENUE, FROM STREET BEND TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Xing roadway perm to grade |
2019-09-17 | No data | WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut in d/l is acceptable. |
2019-09-15 | No data | GRAND STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New 2019 plumber restoration over old plumber work present - refer to active permit M012019241A78. Opposite 282-286 Grand St. |
2019-09-14 | No data | WEST 139 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk in compliance. Roadway was resurfaced by B.P.P. |
2019-09-13 | No data | EAST 31 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER |
2019-09-13 | No data | WEST 28 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to fully inspect due to active building operations (763) |
2019-09-12 | No data | EAST 86 STREET, FROM STREET HENDERSON PLACE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench restorations in driving lane of roadway. |
2019-09-12 | No data | WEST 138 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At time of inspection the roadway was found resurfaced. |
2019-09-10 | No data | ANDREWS AVENUE, FROM STREET WEST 183 STREET TO STREET WEST FORDHAM ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | Back Fill, Pass |
2019-09-10 | No data | 3 AVENUE, FROM STREET EAST 109 STREET TO STREET EAST 110 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in complaince |
2019-09-10 | No data | EAST 45 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the roadway |
2019-09-09 | No data | BRUCKNER BOULEVARD, FROM STREET BRUCKNER EXPRESSWAY EXIT 46 EB TO STREET BARRETTO STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to inspect due to heavy traffic. |
2019-09-09 | No data | VANDAM STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 2 water cuts in front 50 across from Manhattan storage loading docks. Each cut in front of the 2 loading docks. |
2019-09-08 | No data | TAYLOR AVENUE, FROM STREET DEAD END TO STREET VAN NEST AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced |
2019-09-08 | No data | UNION STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front of property #889 |
2019-09-07 | No data | SURF AVENUE, FROM STREET JONES WALK TO STREET WEST 12 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Domestic Water & Sewer Plug Performed on the Sidewalk in Compliance |
2019-09-03 | No data | 3 AVENUE, FROM STREET EAST 109 STREET TO STREET EAST 110 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No defects |
2019-09-01 | No data | DEBEVOISE STREET, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, job still ongoing ...now plated new permit obtained . |
2019-09-01 | No data | CONOVER STREET, FROM STREET KING STREET TO STREET SULLIVAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the parking lane in front of property #137 |
2019-09-01 | No data | DEBEVOISE STREET, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Active | Department of Transportation | new sprinkler connection ... install .. |
2019-08-30 | No data | BERGEN STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm work in parking lane & sidewalk |
2019-08-30 | No data | EAST 45 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a permanent Restoration in the driving / parking lanes with two newly done Sidewalk Flags. |
2019-08-29 | No data | BOWERY, FROM STREET PRINCE STREET TO STREET RIVINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I found a permanent repair water-sewer restoration that is flushed to grade in the parking/driving lane. |
2019-08-29 | No data | EAST 83 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in south curb parking lane/driving lane of roadway. |
2019-08-27 | No data | EAST 120 STREET, FROM STREET 1 AVENUE TO STREET PLEASANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flush to grade in the parking lane/driving lane. |
2019-08-26 | No data | WEST 14 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I found a permanent L shaped repair water restoration that is flushed to grade in the parking lane and one and a half sidewalk flags were restored. |
2019-08-23 | No data | GRAND STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Place on stop, Carmen |
2019-08-23 | No data | ORCHARD STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 194 ( aka New Building 196 ), roadway partially resurfaced ( NOT in accordance with BPP ) but no 2017 / 2018 plumber work observed in roadway or sidewalk at this time. Permit expired. |
2019-08-22 | No data | OCEAN AVENUE, FROM STREET BEVERLY ROAD TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2019-08-21 | No data | GRAND STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Oppo 284-286, NOV issued for a perm Water / Sewer repair that measured 40" in width and failed to conform to Standard Detail Drawing H-1042A note 6, minimum width - 54". Respondent notified via CAR 20186030416 on 4/10/2018 and failed to correct. |
2019-08-19 | No data | EAST 10 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There are 2 permanent restoration that are flushed to grade in the parking/driving lane which has a 2019 color code marker installed within the restorations. |
2019-08-19 | No data | WEST 125 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found at location during this time. |
2019-08-19 | No data | BOERUM PLACE, FROM STREET ADAMS STREET TO STREET LIVINGSTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No confirmation number |
2019-08-19 | No data | EAST 11 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The street was resurfaced by the cited address builders pavement plan. |
2019-08-19 | No data | EAST 83 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1J/D1B project-D1J issued. |
2019-08-19 | No data | EAST 70 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B/D1J Project-No NOV issued criteria met. |
2019-08-15 | No data | OCEAN AVENUE, FROM STREET BEVERLY ROAD TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No confirmation number |
2019-08-15 | No data | WEST 118 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 1042D note 9 violation |
2019-08-15 | No data | WEST 23 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued |
2019-08-15 | No data | HUGHES AVENUE, FROM STREET EAST 188 STREET TO STREET EAST 189 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1J |
2019-08-14 | No data | WEST 22 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sewer restoration on the roadway I/F/O property is in compliance. |
2019-08-12 | No data | EAST 148 STREET, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repaved street |
2019-08-11 | No data | CRUGER AVENUE, FROM STREET BURKE AVENUE TO STREET SOUTH OAK DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2019-08-10 | No data | EAST 229 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway and sidewalk |
2019-08-09 | No data | ELTON AVENUE, FROM STREET EAST 156 STREET TO STREET EAST 157 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | X012019214B49 up to date permit on file |
2019-08-09 | No data | WEST 44 STREET, FROM STREET 10 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to find due to active BO. |
2019-08-09 | No data | ELTON AVENUE, FROM STREET EAST 156 STREET TO STREET EAST 157 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated cuts |
2019-08-07 | No data | MOTT STREET, FROM STREET EAST HOUSTON STREET TO STREET PRINCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 277, please properly seal / reseal all street opening joints for permanent 2017 restoration in roadway. |
2019-08-07 | No data | ATTORNEY STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the roadway is up to grade. However sidewalk flag around water valve has not been restored in kind. No CAR due to scaffolding and building operation. |
2019-08-06 | No data | BROOME STREET, FROM STREET ATTORNEY STREET TO STREET CLINTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut covered by BPP. |
2019-08-06 | No data | SOUTH 1 STREET, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SWK & RWY RESURFACED NEW BUILDING |
2019-08-04 | No data | 4 AVENUE, FROM STREET 63 STREET TO STREET 64 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection in front of property #6307 |
2019-08-03 | No data | CORTELYOU ROAD, FROM STREET EAST 19 STREET TO STREET OCEAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r\w paved |
2019-08-03 | No data | 9 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w was resurfaced & s/w was done over |
2019-08-02 | No data | 21 STREET, FROM STREET 46 ROAD TO STREET JACKSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER-ROADWAY PERM |
2019-08-02 | No data | CONOVER STREET, FROM STREET KING STREET TO STREET SULLIVAN STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | A:9:30amcut-3'5''x3'x2' test-98.5zymerjumping jackETLfatimasand coneW-123.3d-113.4md-119.5am-8.76'' cutback in progress |
2019-08-01 | No data | LIVINGSTON STREET, FROM STREET FLATBUSH AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY RESURFACED BY NYC DOT IN AUGUST 2018 |
2019-08-01 | No data | NEVINS STREET, FROM STREET LIVINGSTON STREET TO STREET SCHERMERHORN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RWY RESURFACED BY NYC DOT OCT 2017 |
2019-08-01 | No data | JOHN STREET, FROM STREET ADAMS STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new hydrant in sidewalk- now under DDC |
2019-08-01 | No data | PARK AVENUE, FROM STREET EAST 107 STREET TO STREET EAST 108 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoraton flush in the parking lane. |
2019-08-01 | No data | EAST 107 STREET, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 Partial perm restorations cuts visible in the driving lane. Behind the barriers at B.O the roadway was milled. |
2019-07-31 | No data | EAST 100 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags in compliance around water utility covers. Roadway resurfaced by BPP. |
2019-07-30 | No data | BARNES AVENUE, FROM STREET ADEE AVENUE TO STREET WILLIAMSBRIDGE ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Sewer pipes stored in the parking lane |
2019-07-30 | No data | TAYLOR AVENUE, FROM STREET MC GRAW AVENUE TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2019-07-29 | No data | WEST 14 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | At the time of inspection, I found one steel plate pinned and ramped in the parking lane and three fiberglass plates which are ramped on the sidewalk. |
2019-07-29 | No data | DEAN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | CUT #1 LENGTH 3 FT 1 IN WIDTH 2 FT 7 DEPTH 3 FT 6 WET DENSITY 119.4DRY DENSITY 109.8MAX DRY DENSITY 114.0ACTUAL MOISTURE 8.7FIRST LIFT 97.3 |
2019-07-29 | No data | WEST 20 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY IS MILLED |
2019-07-28 | No data | WEST 27 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no defects found in area |
2019-07-27 | No data | 4 AVENUE, FROM STREET 15 STREET TO STREET 16 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in parking lane |
2019-07-27 | No data | WEST END AVENUE, FROM STREET WEST 86 STREET TO STREET WEST 87 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to view restoration/work in roadway due to portion of roadway being paved for work at #555 West End Ave. |
2019-07-26 | No data | WEST 20 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY IS MILLED |
2019-07-26 | No data | 27 STREET, FROM STREET 40 AVENUE TO STREET 41 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | TEMP RESTORATION IN THE PARKING LANE. SIDEWALK FLAG CONCRETE DRYING AND BARRICADED . STIP (-016) NOT VIOLATED- REPAIR WATER - SEWER |
2019-07-26 | No data | WEST 87 STREET, FROM STREET BROADWAY TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair sewer/water restorations have been paved over due to buildings paving plan. |
2019-07-26 | No data | BARNES AVENUE, FROM STREET ADEE AVENUE TO STREET WILLIAMSBRIDGE ROAD | No data | Street Construction Inspections: Active | Department of Transportation | New sewer excavation in progress, warns workers of storage of equipment at unattended site, also needs additional men at work sign |
2019-07-25 | No data | LINDEN BOULEVARD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found resurfaced BPP |
2019-07-21 | No data | BOWERY, FROM STREET PRINCE STREET TO STREET RIVINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There is a permanent repair sewer restoration that is flushed to grade in the parking lane which extends into the driving lane. |
2019-07-21 | No data | DEBEVOISE STREET, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, serw install , new permit obtained .. |
2019-07-21 | No data | DEBEVOISE STREET, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Active | Department of Transportation | sewer connection ...new building ...now plated ... |
2019-07-16 | No data | EAST 70 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration is flushed to grade in the Parking lane of roadway and sidewalk flag restored. |
2019-07-15 | No data | POWER ROAD, FROM STREET 23 AVENUE TO STREET 24 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the respondent failed to seal a permanent sewer cut , this condition remains despite prior notice in car # #20186000325 dated 12/18/2018 . |
2019-07-15 | No data | CORTELYOU ROAD, FROM STREET EAST 19 STREET TO STREET OCEAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r\w mailed for pave |
2019-07-14 | No data | AVENUE D, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER: Resurface new bldg 1/2+5 |
2019-07-12 | No data | BOWERY, FROM STREET PRINCE STREET TO STREET RIVINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 216, roadway plated ( ARBEN marked plates fastened ) and worm within sidewalk. Ongoing B/O at location and NOV issued at this time under active permit M012019179B59 on file. ( plating not skid resistant ) |
2019-07-12 | No data | BOWERY, FROM STREET PRINCE STREET TO STREET RIVINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O 216, NOV issued for 2 "ARBEN" marked steel plates fastened to the roadway that are smooth to the touch and offer no skid resistance equal to or greater than the surrounding roadway surface. |
2019-07-12 | No data | WEST 126 STREET, FROM STREET BEND TO STREET WEST 127 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 25ft.9 x 4ft x 6ft.5 tested bottom and top 96.5 and 96.6 |
2019-07-10 | No data | WEST 126 STREET, FROM STREET BEND TO STREET WEST 127 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | At this time only 23ft x 3.10 x 11.9 of restoration was done. How ever only 4ft of backfill was placed for today nothing more.3 lifts done tested last at 97.1 |
2019-07-06 | No data | CRUGER AVENUE, FROM STREET BARTHOLDI STREET TO STREET MAGENTA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway |
2019-07-01 | No data | JANE STREET, FROM STREET GREENWICH AVENUE TO STREET WEST 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There is a permanent repair water trench that is flushed to grade in the parking lane. |
2019-06-29 | No data | EAST 172 STREET, FROM STREET WALTON AVENUE TO STREET WYTHE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP, street resurfaced |
2019-06-29 | No data | ROCKWOOD STREET, FROM STREET GRAND CONCOURSE TO STREET WALTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP, street resurfaced |
2019-06-28 | No data | EAST 162 STREET, FROM STREET DEAD END TO STREET MELROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2019-06-27 | No data | VYSE AVENUE, FROM STREET BEND TO STREET EAST 174 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | No issuance needed, construction site partially covering restoration. |
2019-06-26 | No data | ELTON AVENUE, FROM STREET EAST 156 STREET TO STREET EAST 157 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | X012019172A94 up to date permit on file |
2019-06-26 | No data | ELTON AVENUE, FROM STREET EAST 156 STREET TO STREET EAST 157 STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew working on site |
2019-06-26 | No data | GRAND STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Oppo 284-286, NOV issued for a perm Water / Sewer repair that measured 40" in width and failed to conform to Standard Detail Drawing H-1042A note 6, minimum width - 54". Respondent notified via CAR 20186030416 on 4/10/2018 and failed to correct. |
2019-06-25 | No data | WEST 34 STREET, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | REPAIR WATER - SEWER: The area and a portion of the 2 cuts have been covered by another contractors work. MALOTA PLUMBING CONTRACTING CORP. Permit# M012019071A43 |
2019-06-24 | No data | BOERUM PLACE, FROM STREET ADAMS STREET TO STREET LIVINGSTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | CREW WORKING OPEN TRENCH IN SWK TO REPAIR HYDRANT-DEP ON SITE BEHIND FENCE |
2019-06-23 | No data | WEST 118 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 1042D note 9 violation |
2019-06-22 | No data | JENNINGS STREET, FROM STREET MINFORD PLACE TO STREET SOUTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2019-06-22 | No data | TOMLINSON AVENUE, FROM STREET MORRIS PARK AVENUE TO STREET RHINELANDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk in compliance |
2019-06-21 | No data | PERRY AVENUE, FROM STREET EAST 201 STREET TO STREET EAST MOSHOLU PARKWAY SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut on East Mosholu Parkway South, perm to grade |
2019-06-20 | No data | WEST 23 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued for failure to adhere to DOT Standards and Specifications |
2019-06-20 | No data | EAST 70 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Violation of stip 078 of this permit by having wood logs, planks and cones in the parking lane of the roadway, while site was unattended. Stipulation 078 requires full width of roadway be open to traffic while site is unattended. |
2019-06-20 | No data | EAST MOSHOLU PARKWAY SOUTH, FROM STREET MARION AVENUE TO STREET PERRY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | e/o SWC perm to grade |
2019-06-19 | No data | ATTORNEY STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 148, perm 2018 restoration within driving / parking lanes. |
2019-06-16 | No data | TILDEN STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | updated permit X012019151A88 |
2019-06-16 | No data | TILDEN STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | excavation plated in front of building op |
2019-06-14 | No data | TOWNSEND AVENUE, FROM STREET CLIFFORD PLACE TO STREET EAST 175 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2019-06-12 | No data | WALTON AVENUE, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Opposite location |
2019-06-12 | No data | WEEKS AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 175 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced |
2019-06-10 | No data | JANE STREET, FROM STREET GREENWICH AVENUE TO STREET WEST 4 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | The backfill passed and the 6'' cutback was performed on the restoration in the parking/driving lane . Arrive @ 10:08am scheduled @ 10:30am started @ 11am departed @ 12pm (L-10'.8''X W-5'XD-4'.4'') |
2019-06-10 | No data | MAPES AVENUE, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2019-06-10 | No data | EAST 83 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1J/D1B project-D1J issued. |
2019-06-10 | No data | 3 AVENUE, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP, street resurfaced |
2019-06-10 | No data | BELMONT AVENUE, FROM STREET EAST 179 STREET TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2019-06-10 | No data | BATHGATE AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP, street resurfaced |
2019-06-09 | No data | WEST 163 STREET, FROM STREET AMSTERDAM AVENUE TO STREET EDGECOMBE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP completed at this location. Water restoration no longer present. |
2019-06-09 | No data | KINGSBRIDGE TERRACE, FROM STREET WEST 229 STREET TO STREET WEST KINGSBRIDGE ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in r/w and new s/w. |
2019-06-08 | No data | WEST 104 STREET, FROM STREET COLUMBUS AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1J/D1B project-D1J issued. |
2019-06-08 | No data | THIERIOT AVENUE, FROM STREET BEND TO STREET LACOMBE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration has been resurfaced with later BPP work done. |
2019-06-07 | No data | JANE STREET, FROM STREET GREENWICH AVENUE TO STREET WEST 4 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | REPAIR WATER: this is in front of a B.O. they are having deliveries all day. |
2019-06-06 | No data | EAST 46 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration |
2019-06-06 | No data | WEST 23 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no defects found in area |
2019-06-06 | No data | VYSE AVENUE, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in the P/D lane IFO 1424 (New Building ) Flush and sealed. |
2019-06-06 | No data | WEST 118 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in parking/driving lane of roadway. |
2019-06-05 | No data | EAST 46 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active Construction site with Sidewalk and Roadway Plated. With active permit # M012019139A04 on file. |
2019-06-05 | No data | CRUGER AVENUE, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I came across plumber mixing concrete with hands to replace sidewalk flag, Plumber remove hand mix concrete out of sidewalk, worker went to pick up motorized mixer.Spoke to owner moos, at no time can concrete be mix without a mixer, spoke to BC/dbc |
2019-06-05 | No data | EAST 70 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | respondent in violation of stip 078 of this permit by having wood logs, planks and cones in the parking lane of the roadway, while unattended. Stip 078 requires full width of R/W and parking lanes be open to traffic while site is unattended. |
2019-06-05 | No data | FRANKLIN AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permit renewed (d1b d1j project) |
2019-06-05 | No data | BOWERY, FROM STREET PRINCE STREET TO STREET RIVINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | At the time of inspection, I found three steel plates pinned and ramped in the parking/driving lane and there are four plates secured onto the sidewalk. |
2019-06-05 | No data | DESBROSSES STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway cobble stones are being reset curb to curb, end to end. Resurface in progress. Acceptable. |
2019-06-05 | No data | VESTRY STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sewer cut area is being resurfaced. Cobble stones restoration in progress IFO 70 Vestry St. |
2019-06-05 | No data | 8 AVENUE, FROM STREET WEST 140 STREET TO STREET WEST 141 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No defects |
2019-06-05 | No data | AVENUE D, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER |
2019-06-05 | No data | WESTCHESTER AVENUE, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2019-06-05 | No data | WEBSTER AVENUE, FROM STREET EAST 203 STREET TO STREET EAST 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP, street resurfaced |
2019-06-03 | No data | CRUGER AVENUE, FROM STREET BARTHOLDI STREET TO STREET MAGENTA STREET | No data | Street Construction Inspections: Active | Department of Transportation | Cut plated in roadway |
2019-06-03 | No data | CRUGER AVENUE, FROM STREET BARTHOLDI STREET TO STREET MAGENTA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut plated in roadway, will research for updated permit |
2019-06-03 | No data | BELMONT AVENUE, FROM STREET EAST 179 STREET TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permit renewed (d1b d1j project) |
2019-06-02 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 45 STREET TO STREET BEACH 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 3/28/2019. |
2019-05-31 | No data | GREAT JONES STREET, FROM STREET BOWERY TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There is a permanent repair water-sewer restoration that is flushed to grade in the driving lane. |
2019-05-31 | No data | BROADWAY, FROM STREET WEST 181 STREET TO STREET WEST 182 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1J/D1B project-D1B issued. |
2019-05-30 | No data | WEST 163 STREET, FROM STREET AMSTERDAM AVENUE TO STREET EDGECOMBE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP has been completed. Water cut is no longer seen. |
2019-05-30 | No data | EAST 11 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon inspection, I was unable to locate the repair water-sewer restoration due to the work is located within a construction barricaded area. |
2019-05-30 | No data | REV JAMES POLITE AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP, street resurfaced |
2019-05-30 | No data | ALEXANDER AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET EAST 134 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in the roadway |
2019-05-30 | No data | PLEASANT AVENUE, FROM STREET EAST 117 STREET TO STREET EAST 118 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced with B.P.P for new building. Sidewalk flags restored and in compliance. |
2019-05-30 | No data | FOX STREET, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2019-05-30 | No data | REV JAMES POLITE AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2019-05-29 | No data | 3 AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk restored |
2019-05-29 | No data | VESTRY STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration being resurfaced with active BPP on cobblestone restoration |
2019-05-29 | No data | EAST 156 STREET, FROM STREET COURTLANDT AVENUE TO STREET MELROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass |
2019-05-28 | No data | 3 AVENUE, FROM STREET EAST 166 STREET TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP, street resurfaced |
2019-05-28 | No data | 3 AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk and roadway restored |
2019-05-26 | No data | EAST 70 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Respondent in violation of stip 078 of this permit by having logs, and cones in the parking lane of the roadway, while site was unattended. Stipulation 078 requires full width of roadway including parking lanes be open to traffic while unattended. |
2019-05-25 | No data | BEACH CHANNEL DRIVE, FROM STREET BEACH 51 STREET TO STREET BEACH 53 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w repaved s/w restored |
2019-05-25 | No data | BOWERY, FROM STREET PRINCE STREET TO STREET RIVINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk plated and steel plates in the parking and driving lane of the roadway. |
2019-05-25 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 50 STREET TO STREET BEACH 52 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w and r/w restored |
2019-05-22 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BKFILL NOTES: (L) 31 FT (W) 4 FT (D) 5 FT ..ACTUAL START TIME 10:30 AM COMPACTION: 96.0% / 96.4% ...CUT BACKS ON THE BASE CONDUCTED . CONCRETE WILL BE POURED |
2019-05-22 | No data | 5 AVENUE, FROM STREET EAST 106 STREET TO STREET EAST 107 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew actively woking in the paking lane and sidewalk. |
2019-05-22 | No data | EAST 167 STREET, FROM STREET BOSTON ROAD TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 598, perm to grade |
2019-05-22 | No data | WESTCHESTER AVENUE, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2019-05-22 | No data | EAST 167 STREET, FROM STREET FULTON AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2019-05-22 | No data | AVENUE D, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER |
2019-05-22 | No data | EAST 107 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut restoration flush to grade in driving lane. |
2019-05-22 | No data | EAST 108 STREET, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut restoration located in the parking lane behind barriers. |
2019-05-21 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BKFILL NOTES: 1 CTRENCH IN THE PARKING LANE 65' IN TOTAL ONLY 34' OF THE TRENCH WAS CONDUCTED ... (L) 34FT (W) 4FT (D) 5FT .. COMPACTION 97.2% / 97.4% ...ACTUAL START TIME 11:30 AM |
2019-05-20 | No data | OCEAN AVENUE, FROM STREET BEVERLY ROAD TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | 3ft 8in 3ft down 3ft 4in |
2019-05-19 | No data | 25 STREET, FROM STREET 40 AVENUE TO STREET 41 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade in the p/d/l |
2019-05-19 | No data | HAWKINS STREET, FROM STREET PAULIS PLACE TO STREET WILLIAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work is ok |
2019-05-19 | No data | LAFAYETTE AVENUE, FROM STREET ASHLAND PLACE TO STREET ROCKWELL PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work don on r/w |
2019-05-18 | No data | EAST 46 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Full trenching was not fully done to the Curb due to due to other Utility pipes. Trench was not fully Back-filled due to the water line has to run in the same hole. no 18" cut back was done. L10' 6" and W 4' 6" |
2019-05-17 | No data | WEST 163 STREET, FROM STREET AMSTERDAM AVENUE TO STREET EDGECOMBE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Long water cut in compliance. |
2019-05-17 | No data | BELMONT AVENUE, FROM STREET EAST 179 STREET TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | New building, full trenching done, voids removed to solid ground, backfill pass |
2019-05-16 | No data | EAST 31 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | located within BO |
2019-05-16 | No data | BEACH AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Two permanent water cuts have been restored with proper cutbacks in the driving lane OPP 70, Flush and sealed |
2019-05-16 | No data | PROSPECT AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP, street resurfaced |
2019-05-15 | No data | CRUGER AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2019-05-15 | No data | CRUGER AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber cut paved over at new building BPP |
2019-05-15 | No data | PROSPECT AVENUE, FROM STREET EAST 156 STREET TO STREET MACY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repaved r/w |
2019-05-15 | No data | EAST 10 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I found a permanent repair Sewer trench that is flushed to grade in the roadway which extends from within a temporary pedestrian walkway in the parking lane into the driving lane. |
2019-05-14 | No data | FOX STREET, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2019-05-14 | No data | WEST 87 STREET, FROM STREET RIVERSIDE DRIVE TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration is flushed to grade PL/DL. |
2019-05-14 | No data | BELMONT AVENUE, FROM STREET EAST 179 STREET TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Back fill pass, |
2019-05-10 | No data | REV JAMES POLITE AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2019-05-10 | No data | WEST 56 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to inspect due to active B.O |
2019-05-09 | No data | GREAT JONES STREET, FROM STREET BOWERY TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There is a permanent repair Water-Sewer restoration that is flushed to grade in the driving lane. |
2019-05-09 | No data | EAST 11 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I was unable to locate the repair water restoration due to the roadway that is barricaded in the parking lane at the cited address. |
2019-05-08 | No data | WEST 234 STREET, FROM STREET CORLEAR AVENUE TO STREET KINGSBRIDGE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in the driving lanes. |
2019-05-08 | No data | BEACH AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade IFO 702 and new concrete sidewalk flags flush and sealed for new Building (BO) |
2019-05-08 | No data | JANE STREET, FROM STREET GREENWICH AVENUE TO STREET WEST 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I was unable to locate the repair water restoration due to work is within a construction barricaded area in the parking lane. |
2019-05-08 | No data | 3 AVENUE, FROM STREET EAST 161 STREET TO STREET EAST 163 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to locate cut |
2019-05-05 | No data | FRANKLIN AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I discovered the above respondent's has four (4) cones,(4) orange traffic barricades ,excavated material obstructing of the parking lane. This prevent the safe passage of vehicles, pedestrians in the parking lane. No worker currently on site |
2019-05-04 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plate ok |
2019-05-04 | No data | 35 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | builder's pave i/f/o 34-22 |
2019-05-04 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Countersunken plates d/l. |
2019-05-03 | No data | WEST 163 STREET, FROM STREET AMSTERDAM AVENUE TO STREET EDGECOMBE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway I/F/O 444 restored as per BPP |
2019-05-02 | No data | WEST 104 STREET, FROM STREET COLUMBUS AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in parking/driving lane of roadway with work also found on sidewalk. There is currently an active permit M012019119A84 on file for sidewalk reconstruction at #61 W. 104 St during this time. |
2019-05-02 | No data | BOWERY, FROM STREET PRINCE STREET TO STREET RIVINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Contractor actively working within driving lane. In compliance. |
2019-05-01 | No data | PROSPECT AVENUE, FROM STREET EAST TREMONT AVENUE TO STREET ELSMERE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP, street resurfaced |
2019-05-01 | No data | EAST 173 STREET, FROM STREET BOONE AVENUE TO STREET WEST FARMS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm final in compliance |
2019-05-01 | No data | VYSE AVENUE, FROM STREET BEND TO STREET EAST 174 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Must reseal water cut in the driving lane |
2019-05-01 | No data | EAST 14 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE | No data | Street Construction Inspections: Active | Department of Transportation | At the time of inspection, I found a permanent repair water cut that is flushed to grade in the roadway which is located on the south side in the intersection at Irving place. |
2019-05-01 | No data | LAFAYETTE STREET, FROM STREET BOND STREET TO STREET GREAT JONES STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I found a permanent repair water restoration that is flushed to grade in the parking lane which is located opposite of 363. |
2019-04-30 | No data | CROTONA AVENUE, FROM STREET EAST 176 STREET TO STREET FAIRMOUNT PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2019-04-29 | No data | WEST 118 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 1042D note 9 violation |
2019-04-26 | No data | BEACH AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Condition previously reported. |
2019-04-26 | No data | THIERIOT AVENUE, FROM STREET BEND TO STREET LACOMBE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway need to be resealed |
2019-04-26 | No data | JANE STREET, FROM STREET GREENWICH AVENUE TO STREET WEST 4 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Edwardo w/Arben using Jumping Jack Andrew w/ Exclusive using Sandcone 7'1"x4'x10'5" Material removed after 5' for voided space to be connected. 5 lifts 2 test. Proceed to base cutback. |
2019-04-26 | No data | GRAND STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RESPONDENT FAILED TO RESTORE WATER CUT IN ACCORDANCE WITH STANDARD DETAIL DRAWING H-1042A NOTE #6. MINIMUM PERM LENGTH OF RESTORATION (AFTER CUTBACKS) SHOULD BE 54". RESTORATION IS 40". PRIOR CAR 20186030416 ISSUED 4/10/18. CONDITION REMAINS |
2019-04-25 | No data | EDISON AVENUE, FROM STREET ST THERESA AVENUE TO STREET BUHRE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sewer trench in the P/D lane flush and sealed IFO 1814. |
2019-04-25 | No data | AJ GRIFFIN PLACE, FROM STREET EAST 149 STREET TO STREET EAST 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | fire hydrant s/w ok |
2019-04-24 | No data | LAFAYETTE AVENUE, FROM STREET BEACH AVENUE TO STREET COMMONWEALTH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm final in compliance |
2019-04-24 | No data | EAST 46 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - REPAIR SEWER: Work in progress. New permit# M012019094A71 exp 5/5/19 |
2019-04-22 | No data | VYSE AVENUE, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLATED AND RECESSED ON THE ROADWAY NEW PERMIT ON FILE X012019106B12 |
2019-04-22 | No data | VYSE AVENUE, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET | No data | Street Construction Inspections: Active | Department of Transportation | PLATED AND RECESSED IN THE ROADWAY |
2019-04-20 | No data | VANDALIA AVENUE, FROM STREET ERSKINE STREET TO STREET FOUNTAIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 perm cut p/l ifo new BO. |
2019-04-19 | No data | BELMONT AVENUE, FROM STREET EAST 179 STREET TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced |
2019-04-19 | No data | CARLISLE PLACE, FROM STREET EAST 211 STREET TO STREET EAST 213 STREET | No data | Street Construction Inspections: Active | Department of Transportation | work do e in roadway and sidewalk |
2019-04-17 | No data | 3 AVENUE, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP, street resurfaced |
2019-04-17 | No data | WEST 44 STREET, FROM STREET 10 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent sewer restoration in driving lane is in compliance. |
2019-04-17 | No data | NELSON AVENUE, FROM STREET WEST 167 STREET TO STREET WEST 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2019-04-17 | No data | WALTON AVENUE, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - REPAIR WATER - SEWER |
2019-04-17 | No data | 3 AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP, street resurfaced |
2019-04-17 | No data | BATHGATE AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP, street resurfaced |
2019-04-16 | No data | SIMPSON STREET, FROM STREET EAST 163 STREET TO STREET FIRE ACCESS LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Flush to grade in roadway. |
2019-04-16 | No data | 3 AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Milling for BPP in progress |
2019-04-15 | No data | BATHGATE AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later work done. roadway paved new building |
2019-04-15 | No data | BELMONT AVENUE, FROM STREET EAST 179 STREET TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | active 2 steel plates recessed on the roadway new active permits on file |
2019-04-15 | No data | BELMONT AVENUE, FROM STREET EAST 179 STREET TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 steel plates recessed in the driving lane |
2019-04-15 | No data | EAST 206 STREET, FROM STREET EAST MOSHOLU PARKWAY NORTH TO STREET ROCHAMBEAU AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later work done GO5, INC. X012018101A01 PERMIT VALID FROM: 4/11/2018 TO: 5/8/2018 PAVE STREET-W/ ENGINEERING |
2019-04-14 | No data | BUHRE AVENUE, FROM STREET JARVIS AVENUE TO STREET MAHAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2019-04-12 | No data | NORTH 12 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway |
2019-04-12 | No data | WEST 87 STREET, FROM STREET BROADWAY TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Con Edison restoration partially overlaps water cut. Roadway remains in acceptable condition. |
2019-04-11 | No data | WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Restoration in the driving lane, however unable to see area behind active Construction site. (Insp.#746) |
2019-04-11 | No data | RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST BURNSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk restored |
2019-04-10 | No data | WEST 104 STREET, FROM STREET COLUMBUS AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Actively working 2 lanes maintained permittee was reminded to post ID sign. He took I’d sign out from truck and was asked to post it where visible |
2019-04-10 | No data | CRESTON AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work behind BO fence |
2019-04-10 | No data | WEST 127 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No defects at time of inspection . |
2019-04-10 | No data | AMSTERDAM AVENUE, FROM STREET WEST 147 STREET TO STREET WEST 148 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut restoration in driving lane with minor defects. |
2019-04-10 | No data | HOBART AVENUE, FROM STREET ST THERESA AVENUE TO STREET WILKINSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Sewer restoration flush and sealed, partially permed over by later Gas work done. |
2019-04-10 | No data | WEST 104 STREET, FROM STREET COLUMBUS AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012019094A70 Active permit on site. Area in complaince. Crew on site. |
2019-04-09 | No data | LYNCH STREET, FROM STREET BROADWAY TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut is in compliance |
2019-04-09 | No data | BEACH AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | pass out CAR and re issue new CAR |
2019-04-09 | No data | BEACH AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent water cut 3'.6" by 3' in size. Failure to comply with standard detail drawing # H-1042D note # 6 All permanent restorations should be a minimum of 54" in size. Opposite 700-702 Beach Ave. |
2019-04-06 | No data | EAST 83 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Counter sunken plates |
2019-04-05 | No data | SHAKESPEARE AVENUE, FROM STREET JESUP PLACE TO STREET WEST 172 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | pass |
2019-04-05 | No data | SHAKESPEARE AVENUE, FROM STREET JESUP PLACE TO STREET WEST 172 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the respondent permanent restoration of wearing course not flush with the surrounding area.Sunken restoration 1 to 2 inches but was not restored. |
2019-04-05 | No data | WEST 43 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to inspect due to active BO |
2019-04-05 | No data | WEBSTER AVENUE, FROM STREET EAST 203 STREET TO STREET EAST 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2019-04-04 | No data | EAST 83 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Spoke to supervisor at active site for building alteration/operation they are not closing the roadway. Repair water work in progress with 2 steel plates crossing p/d lane. At times traffic is delayed when crew is on site working in excavation. |
2019-04-03 | No data | POWER ROAD, FROM STREET 23 AVENUE TO STREET 24 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The respondent failed to re-seal the 6'x3' sewer cut edge cracking. A CAR for the repairs was issued on 12/18/18. CAR #20186000325 the condition remains. |
2019-04-03 | No data | HULL STREET, FROM STREET BROADWAY TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Contractor on site excavating on the sidewalk behind construction fence, IF/O: 220. Excavation in the roadway was plated at time of inspection. |
2019-04-02 | No data | WEST 134 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No defects on SW or rdwy at time of inspection IFO 132. |
2019-04-02 | No data | TELLER AVENUE, FROM STREET EAST 162 STREET TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | worked done |
2019-04-02 | No data | ATLANTIC AVENUE, FROM STREET ESSEX STREET TO STREET LINWOOD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut in the roadway |
2019-04-01 | No data | EAST 46 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER : New permit # M012019088C77 |
2019-04-01 | No data | FRANKLIN AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Wet: 130.8Dry: 121.6Max: 125.5Moisture: 7.5First Lift: 98.8Last Lift: 97.5 |
2019-04-01 | No data | NELSON AVENUE, FROM STREET WEST 167 STREET TO STREET WEST 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | area striped paved |
2019-03-30 | No data | ELTON AVENUE, FROM STREET BROOK AVENUE TO STREET EAST 161 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to properly inspect due to building operation |
2019-03-29 | No data | EAST 222 STREET, FROM STREET EASTCHESTER ROAD TO STREET LACONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in roadway |
2019-03-28 | No data | WEST 56 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plate partially in driving line and in workzone IFO 611. active permit on file for plate and work under permit M012019083A04 |
2019-03-28 | No data | WEST 56 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate partially in driving line and in workzone IFO 611. |
2019-03-27 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Countersunken plates are in compliance. Flush with surrounding area. |
2019-03-26 | No data | EAST 86 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in parking lane of roadway during this time. |
2019-03-24 | No data | EAST 198 STREET, FROM STREET CRESTON AVENUE TO STREET JEROME AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2019-03-21 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | (1 out of 11) plate is 1 ½” below grade due to a 3’ stress crack surrounding plate. |
2019-03-21 | No data | EAST 206 STREET, FROM STREET EAST MOSHOLU PARKWAY NORTH TO STREET ROCHAMBEAU AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2019-03-20 | No data | EAST 120 STREET, FROM STREET 1 AVENUE TO STREET PLEASANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration is flushed to grade , PL/ DL IFO 409. |
2019-03-20 | No data | WEST 87 STREET, FROM STREET RIVERSIDE DRIVE TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut opp of 303 was 90 % paved over by 2019 con Edison cut. |
2019-03-20 | No data | LORIMER STREET, FROM STREET AINSLIE STREET TO STREET DEVOE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2019-03-19 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk and roadway restored |
2019-03-18 | No data | WEST 87 STREET, FROM STREET RIVERSIDE DRIVE TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No defects found |
2019-03-17 | No data | PARKSIDE PLACE, FROM STREET EAST 207 STREET TO STREET WEBSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk and roadway restored |
2019-03-17 | No data | LORIMER STREET, FROM STREET GRAND STREET TO STREET POWERS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk restoration |
2019-03-14 | No data | 3 AVENUE, FROM STREET EAST 20 STREET TO STREET EAST 21 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to locate condition due to Active BO, and Barricades and Material stored on street, no defects found |
2019-03-13 | No data | WEST 44 STREET, FROM STREET 10 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMANENT SEWER RESTORATION IS IN COMPLIANCE (BRIAN GARLAND) |
2019-03-13 | No data | BOONE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TO GRADE |
2019-03-11 | No data | ARTHUR AVENUE, FROM STREET BEND TO STREET OAK TREE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk ok |
2019-03-11 | No data | EAST 206 STREET, FROM STREET EAST MOSHOLU PARKWAY NORTH TO STREET ROCHAMBEAU AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | not found |
2019-03-11 | No data | LINWOOD STREET, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut in the roadway |
2019-03-08 | No data | WEST 124 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Three perm water cut restorations flush to grade located on West 124th street with sidewalk flags restored and expansion joints sealed. |
2019-03-08 | No data | WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | See active permit # M012019063A86 on file. (Karen Johnson) |
2019-03-08 | No data | WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Contractor on site maintaing one 11' lane for traffic. (Karen Johnson) |
2019-03-08 | No data | WEST 104 STREET, FROM STREET COLUMBUS AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated and counter sunken and raise plow signs |
2019-03-07 | No data | MICKLE AVENUE, FROM STREET BURKE AVENUE TO STREET GIVAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2019-03-06 | No data | JEROME AVENUE, FROM STREET EAST KINGSBRIDGE ROAD TO STREET WEST 195 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2019-03-06 | No data | 83 STREET, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade in the p/l |
2019-03-06 | No data | AMSTERDAM AVENUE, FROM STREET WEST 111 STREET TO STREET WEST 112 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration ifo the cathedral church no defects |
2019-03-04 | No data | HUMBOLDT STREET, FROM STREET GRAND STREET TO STREET MAUJER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in r/w okay |
2019-02-28 | No data | EAST 120 STREET, FROM STREET 1 AVENUE TO STREET PLEASANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration flushed and sealed to grade.PL / DL |
2019-02-28 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut size: 24ft x 4ft x 3ft 8ft x 2ft 6in x 3ft Pass: 98.3% 98.1% |
2019-02-28 | No data | BRONXWOOD AVENUE, FROM STREET EAST 220 STREET TO STREET EAST 221 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2019-02-27 | No data | BROADWAY, FROM STREET WEST 25 STREET TO STREET WEST 26 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work seen |
2019-02-26 | No data | WALES AVENUE, FROM STREET EAST 142 STREET TO STREET ST MARYS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk work in compliance. will do research on trench in intersection |
2019-02-25 | No data | JENNINGS STREET, FROM STREET MINFORD PLACE TO STREET SOUTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Buildin operation on site |
2019-02-22 | No data | EAST 205 STREET, FROM STREET GRAND CONCOURSE TO STREET LISBON PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk restored |
2019-02-20 | No data | BOERUM STREET, FROM STREET BUSHWICK AVENUE TO STREET BUSHWICK PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | swk flags in compliance |
2019-02-19 | No data | EAST 83 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working in open excavation located in parking/driving lane of roadway. Site in compliance at this time. |
2019-02-19 | No data | EAST 81 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in parking/driving lane of roadway. |
2019-02-18 | No data | WEBSTER AVENUE, FROM STREET EAST 204 STREET TO STREET EAST 205 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2019-02-18 | No data | WEBSTER AVENUE, FROM STREET EAST 203 STREET TO STREET EAST 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut i compliance |
2019-02-15 | No data | ELIZABETH STREET, FROM STREET EAST HOUSTON STREET TO STREET PRINCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut on roadway acceptable |
2019-02-15 | No data | EAST 78 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench crossing driving lane of roadway with portion in parking lane at #116. |
2019-02-14 | No data | WEST 44 STREET, FROM STREET 10 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plates on roadway |
2019-02-13 | No data | RESERVOIR OVAL, FROM STREET BEND TO STREET HOLT PLACE | No data | Street Construction Inspections: Active | Department of Transportation | work on Holt Place |
2019-02-13 | No data | WALTON AVENUE, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - REPAIR WATER - SEWER |
2019-02-13 | No data | HOLT PLACE, FROM STREET PERRY AVENUE TO STREET RESERVOIR OVAL | No data | Street Construction Inspections: Active | Department of Transportation | Raise plow sign posted |
2019-02-11 | No data | OGDEN AVENUE, FROM STREET WEST 165 STREET TO STREET WEST 166 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2019-02-11 | No data | GRAND AVENUE, FROM STREET 55 STREET TO STREET 56 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 5'03"x 3'09" and 7'03"x 5'10" i/f/o and opp 58-58 Grand Ave. Sidewalk at s/e/c (adj to ped ramp) of Grand Ave and 56 st. |
2019-02-11 | No data | FULTON AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2019-02-09 | No data | SEAVIEW AVENUE, FROM STREET BEND TO STREET ERSKINE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work observed. |
2019-02-08 | No data | AMSTERDAM AVENUE, FROM STREET WEST 111 STREET TO STREET WEST 112 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk restored and perm restoration in driving lane and parking lane with minor defects. |
2019-02-07 | No data | EAST 10 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | next permit with con # |
2019-02-06 | No data | WEST 125 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work at the time of inspection. |
2019-02-06 | No data | 31 STREET, FROM STREET 31 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in parking lane to grade |
2019-02-05 | No data | EAST 162 STREET, FROM STREET DEAD END TO STREET MELROSE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 perm cuts in roadway; one around catch basin and another leading to access cover in driving lane. |
2019-02-04 | No data | ARNOW AVENUE, FROM STREET BRONXWOOD AVENUE TO STREET WILLIAMSBRIDGE ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade in the driving lane N/W/C , and new concrete sidewalk flag On Arnow Ave AKA 2761 Bronxwood Ave. |
2019-02-04 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 45 STREET TO STREET BEACH 46 STREET | No data | Street Construction Inspections: Active | Department of Transportation | sewer cuts lines replaced |
2019-02-01 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 45 STREET TO STREET BEACH 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to obtain a confirmation number two hours prior to the commencement of a backfill on a protected street |
2019-01-31 | No data | MIDDLETON STREET, FROM STREET THROOP AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2019-01-30 | No data | STORY AVENUE, FROM STREET BOYNTON AVENUE TO STREET ELDER AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed and acceptable / 9' by 4'.6" cut # 2 ) 36' by 3' |
2019-01-29 | No data | VICTORY BOULEVARD, FROM STREET MANOR ROAD TO STREET RAYMOND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rwy to grade, s/w work |
2019-01-29 | No data | MARION AVENUE, FROM STREET EAST 194 STREET TO STREET EAST 195 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later work done |
2019-01-29 | No data | BRINKERHOFF AVENUE, FROM STREET 179 PLACE TO STREET 180 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to obtain a confirmation number two hours prior to the commencement of a backfill on a protected street |
2019-01-29 | No data | BRINKERHOFF AVENUE, FROM STREET 179 PLACE TO STREET 179 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to obtain a confirmation number two hours prior to the commencement of a backfill on a protected street |
2019-01-28 | No data | MARION AVENUE, FROM STREET EAST 194 STREET TO STREET EAST 195 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later work done |
2019-01-25 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in roadway |
2019-01-23 | No data | EAST 229 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work done in roadway and sidewalk |
2019-01-22 | No data | JENNINGS STREET, FROM STREET MINFORD PLACE TO STREET SOUTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Construction site. Notfound |
2019-01-18 | No data | EAST 78 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | resurfaced M012018364A02 |
2019-01-16 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in roadway |
2019-01-15 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 45 STREET TO STREET BEACH 46 STREET | No data | Street Construction Inspections: Active | Department of Transportation | work not started. |
2019-01-13 | No data | EAST 21 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER: latest permit# M012018012C13 |
2019-01-12 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway |
2019-01-11 | No data | EAST 229 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work done in roadway and sidewalk |
2019-01-11 | No data | WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut okay in r/w. |
2019-01-09 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done |
2019-01-08 | No data | ATTORNEY STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | steel plates removed perm restoration in front of bo |
2019-01-06 | No data | LACOMBE AVENUE, FROM STREET TAYLOR AVENUE TO STREET THIERIOT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLATES RECESSED AND SIGNS POSTED IN COMPLIANCE |
2019-01-06 | No data | EAST 21 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER |
2019-01-06 | No data | THIERIOT AVENUE, FROM STREET BEND TO STREET LACOMBE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATES RECESSED AND SIGNS POSTED IN COMPLIANCE |
2019-01-06 | No data | BRUCKNER BOULEVARD, FROM STREET BRE WESTBOUND ENTRANCE BUHRE AVE TO STREET ROBERTS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Two cuts in the parking lane temp to grade and new concrete sidewalk flag flush and sealed, permit active |
2019-01-05 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SEWER AND WATER |
2019-01-05 | No data | MONROE STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | new svc ,,,,remains plated .. |
2019-01-03 | No data | 35 STREET, FROM STREET 34 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm. cut to grade p/d/l,new s/w. |
2019-01-03 | No data | BRONXWOOD AVENUE, FROM STREET BOSTON ROAD TO STREET WILLIAMSBRIDGE ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Work done behind the property lane |
2019-01-03 | No data | ARNOW AVENUE, FROM STREET MATTHEWS AVENUE TO STREET WILLIAMSBRIDGE ROAD | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the above respondent with the use opening of the street without a DOT permit.. Permit # X012019002A52 is for 2761 Bronxwood Ave crew found working on Arnow Avenue. Permit # used for ID. Use open of the street without a permit. |
2019-01-03 | No data | REV JAMES POLITE AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in driving lane of roadway. |
2018-12-31 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO POST" STEEL PLATES AHEAD" OR "RAISE PLOW" SIGNS AND ALSO FAIL TO COUNTERSINK THE STEEL PLATES FLUSH WITH ROASWAY" AS PER DOT WINTER MORATORIUM THAT BEGINS ON 12/1/18 AND ENDS 3/31/19 |
2018-12-29 | No data | EAST 147 STREET, FROM STREET AUSTIN PLACE TO STREET TIMPSON PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later work done |
2018-12-29 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2018-12-27 | No data | EAST 10 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Active Construction site, I/F/O Building # 80, Back-fill pass two Restorations with Sidewalk work been done. Cut # 1 L 10' 9" and W 5', cut # 2 L 9' and W 3'. |
2018-12-26 | No data | FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDE WALK IN COMPLIANCE |
2018-12-24 | No data | ATTORNEY STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | atpo i bserved the above respondent had a steel plate counter sunk covering an open excavtion in the roadway without a permit to do so.above permit expired on 12/18/18 and is being used for id only |
2018-12-22 | No data | WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flush to grade. |
2018-12-20 | No data | MIDDLETON STREET, FROM STREET THROOP AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench. |
2018-12-19 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2018-12-19 | No data | LACOMBE AVENUE, FROM STREET TAYLOR AVENUE TO STREET THIERIOT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | the above respondent with 4 steel plates pinned and rampped located in the driving lane of roadway. Respondent failed to have steel plates counter sunken and flush with roadway. |
2018-12-18 | No data | JENNINGS STREET, FROM STREET MINFORD PLACE TO STREET SOUTHERN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation ( countersink w/ sign posted ) |
2018-12-18 | No data | POWER ROAD, FROM STREET 23 AVENUE TO STREET 24 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please reseal perm cut joints in roadway. |
2018-12-18 | No data | WEST 162 STREET, FROM STREET OGDEN AVENUE TO STREET SUMMIT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - PROTECTED |
2018-12-15 | No data | MONROE STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | pass, crew on location installing water ... |
2018-12-15 | No data | THIERIOT AVENUE, FROM STREET BEND TO STREET LACOMBE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | respondent failed to have steel plates counter sunken with no raise plow sign posted at this time. |
2018-12-15 | No data | THIERIOT AVENUE, FROM STREET BEND TO STREET LACOMBE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit X012018338A00 on file with steel plates in driving lane at this time. |
2018-12-12 | No data | WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water/sewer cut is flush to grade IFO 142. |
2018-12-10 | No data | EDISON AVENUE, FROM STREET ST THERESA AVENUE TO STREET BUHRE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Wearing course properly applied and done. Sealed and color coded |
2018-12-09 | No data | 3 AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Re-surfaced over Con-Edison gas cut |
2018-12-09 | No data | 3 AVENUE, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut re-surface from new building |
2018-12-09 | No data | BATHGATE AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut is re-surfaced new building |
2018-12-08 | No data | MAPES AVENUE, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut i/f/o 2131 |
2018-12-07 | No data | EAST 78 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012018337A92-New permit |
2018-12-07 | No data | EAST 78 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | two separate coutersunken steel plates in d/l & p/l with raise plow sign posted. |
2018-12-07 | No data | EDISON AVENUE, FROM STREET ST THERESA AVENUE TO STREET BUHRE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Base properly re-dug and compacted. Contractor to place plates over trench until scheduled wearing course completion. |
2018-12-07 | No data | ATTORNEY STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plates in r/w newer permit on file M012018338A65 |
2018-12-05 | No data | EAST 148 STREET, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | awaiting soil for scheduled BF |
2018-12-05 | No data | EAST 148 STREET, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | monitored site from 1045-1228pm, BF acceptable |
2018-12-01 | No data | WEST 162 STREET, FROM STREET OGDEN AVENUE TO STREET SUMMIT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later work done |
2018-11-30 | No data | MOTT STREET, FROM STREET EAST HOUSTON STREET TO STREET PRINCE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | sw acceptable |
2018-11-29 | No data | WEST 163 STREET, FROM STREET AMSTERDAM AVENUE TO STREET EDGECOMBE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permit extended- d1b project |
2018-11-29 | No data | GRAND STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to restore water cut in accordance with Standard Detail H-1042A, opposite 284-286... (CAR Re-inspection FAIL) |
2018-11-28 | No data | HOBART AVENUE, FROM STREET ST THERESA AVENUE TO STREET WILKINSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Pass. |
2018-11-27 | No data | EAST 222 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Verified crew on site 1 cut in the driving lane in compliance / water repair |
2018-11-27 | No data | WEST 118 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The respondent failed covert 2 restorations from a long water cut in to one restoration as per standard detail drawing 1042d note9 stating if two restorations are less then 10' apart it shall be made final as one. restorations are 6.5' apart correc |
2018-11-26 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired [8/17/18]. |
2018-11-26 | No data | SHAKESPEARE AVENUE, FROM STREET JESUP PLACE TO STREET WEST 172 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO I observed the respondents permanent restoration of wearing course not flush with the surrounding area. Sunken restoration 1-2" reported in CAR 20181380291 but was not restored to grade |
2018-11-24 | No data | WEST 163 STREET, FROM STREET AMSTERDAM AVENUE TO STREET EDGECOMBE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut is sealed, and flushed ifo 444 |
2018-11-23 | No data | REV JAMES POLITE AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2018-11-21 | No data | EAST 11 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | previous permit with con # |
2018-11-18 | No data | EAST 23 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - REPAIR WATER - SEWER |
2018-11-18 | No data | MIDDLETON STREET, FROM STREET THROOP AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on r/w |
2018-11-17 | No data | EAST 148 STREET, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new permit on file / permit # X012018319B69 |
2018-11-17 | No data | EAST 148 STREET, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated pinned and ramped in the driving lane / plated and ramped on the sidewalk new building installation of sewer |
2018-11-15 | No data | EDISON AVENUE, FROM STREET ST THERESA AVENUE TO STREET BUHRE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A CORE SAMPLE OF THE RESPONDENTS PERMANENT RESTORATION IN THE DRIVING LANE WITH GREEN COLOR CODE MARKER IBM# 50011 ON IT THAT RESULTED WITH 3 INCHES OF BINDER BASE INSTALLED NOT MATCHING THE EXISTING ROADWAY GRADE OF 6 INCHES OF BINDER BASE. |
2018-11-14 | No data | EAST HOUSTON STREET, FROM STREET AVENUE B TO STREET SUFFOLK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water repair acceptable |
2018-11-14 | No data | EAST 107 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 8-28-18. Respondent failed to obtain a confirmation number from the department. |
2018-11-14 | No data | WEBSTER AVENUE, FROM STREET EAST 203 STREET TO STREET EAST 204 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | bus lane acceptable |
2018-11-14 | No data | BRINKERHOFF AVENUE, FROM STREET 179 PLACE TO STREET 180 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to obtain a confirmation number prior to expiration of DOT street opening permit (protected street) |
2018-11-13 | No data | BEACH AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm ater-sewer cut failed to have 6" and 12" cut backs made. |
2018-11-11 | No data | EAST 108 STREET, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Building Opp ongoing barriers on the roadway. Unable to properly inspect |
2018-11-08 | No data | MIDDLETON STREET, FROM STREET THROOP AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on r.w |
2018-11-08 | No data | LACOMBE AVENUE, FROM STREET TAYLOR AVENUE TO STREET THIERIOT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | steel plates in driving/ parking lane at this time. |
2018-11-08 | No data | EAST TREMONT AVENUE, FROM STREET UNIONPORT ROAD TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B ISSUED. |
2018-11-07 | No data | REV JAMES POLITE AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | REPAIR WATER - SEWER - PROTECTED |
2018-11-07 | No data | NORTH 12 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench, closer to Wythe ave |
2018-11-07 | No data | EDISON AVENUE, FROM STREET ST THERESA AVENUE TO STREET BUHRE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade the driving lane and new SW flag I/F/O 1828 (“C” Coring run inspection) |
2018-11-07 | No data | WEST 44 STREET, FROM STREET 10 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Active | Department of Transportation | one steel plate on the roadway ongoing work site |
2018-11-07 | No data | WEST 44 STREET, FROM STREET 10 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | active permit on file- M012018305B16 on going work |
2018-11-07 | No data | EAST 219 STREET, FROM STREET BARNES AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cuts are not visible, R/W paved due to new building BPP I/F/O 725-727 (CORING RUN INSPECTION) |
2018-11-07 | No data | REV JAMES POLITE AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET | No data | Street Construction Inspections: Active | Department of Transportation | rew is on site |
2018-11-07 | No data | EAST 173 STREET, FROM STREET BOONE AVENUE TO STREET WEST FARMS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade crossing the roadway closer to west farms road I/F/O 1560 (“C”) |
2018-11-07 | No data | EAST 23 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER: New permit # M012018305B39 |
2018-11-05 | No data | MIDDLETON STREET, FROM STREET THROOP AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut. |
2018-11-05 | No data | REV JAMES POLITE AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 17' by 4' backfill17' by 4'' backfillbackfill was done up to 4' and contrractor will reschedule for another day to finish completing the backfill |
2018-11-04 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 45 STREET TO STREET BEACH 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair sewer, plated roadway excavation new permit# Q0122018305C03. |
2018-11-03 | No data | BRINKERHOFF AVENUE, FROM STREET 179 PLACE TO STREET 180 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w restored |
2018-11-03 | No data | SHAKESPEARE AVENUE, FROM STREET JESUP PLACE TO STREET WEST 172 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR 20181380291 still open for sunken cut, permit X012018238A02 |
2018-11-01 | No data | BRINKERHOFF AVENUE, FROM STREET 179 PLACE TO STREET 179 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration |
2018-10-31 | No data | EAST 23 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER: New permit # M012018295E24 |
2018-10-30 | No data | 3 AVENUE, FROM STREET EAST 161 STREET TO STREET EAST 163 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Opp 3240 perm to grade |
2018-10-30 | No data | EAST 162 STREET, FROM STREET DEAD END TO STREET MELROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2018-10-30 | No data | EAST 68 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 36 perm restoration flushed to grade in the driving / parking lane. |
2018-10-30 | No data | CLAFLIN AVENUE, FROM STREET RESERVOIR AVENUE TO STREET WEST 197 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm restoration flush and sealed, P and D lane. |
2018-10-29 | No data | BEACH AVENUE, FROM STREET GUION PLACE TO STREET MERRILL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway |
2018-10-29 | No data | WEST 44 STREET, FROM STREET 10 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | several steel plates on the r/w with contractors name on them active permit on file-M012018298A78 |
2018-10-29 | No data | EAST 156 STREET, FROM STREET COURTLANDT AVENUE TO STREET MELROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2018-10-29 | No data | EAST 173 STREET, FROM STREET BOONE AVENUE TO STREET WEST FARMS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench crossing portion of driving lane closer to corner property of # 1661 West Farms Rd. |
2018-10-28 | No data | EDISON AVENUE, FROM STREET ST THERESA AVENUE TO STREET BUHRE AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Water leaking in the basement, 1 sidewalk excavated next to the curb and 1excavation made opposite of property. |
2018-10-27 | No data | RODMAN PLACE, FROM STREET LONGFELLOW AVENUE TO STREET WEST FARMS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2018-10-26 | No data | WATSON AVENUE, FROM STREET CLOSE AVENUE TO STREET COLGATE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway found resurfaced. |
2018-10-24 | No data | BRINKERHOFF AVENUE, FROM STREET 179 PLACE TO STREET 179 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Monitor back fill retoration, cut size 10' x 5'2'' x 4'8''. |
2018-10-24 | No data | BRINKERHOFF AVENUE, FROM STREET 179 PLACE TO STREET 180 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Monitor back fill restoration , cut size 9' x 5' x 4' 4'' and 3'6'' x 2' x 4'. |
2018-10-23 | No data | EXTERIOR STREET, FROM STREET MAJOR DEEGAN EXPWY ET 4 NB TO STREET EAST 146 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP street resurfaced 1/2 + 5 |
2018-10-23 | No data | FULTON STREET, FROM STREET HUDSON AVENUE TO STREET ROCKWELL PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK DONE NEW PERMIT ON FILE |
2018-10-22 | No data | 165 STREET, FROM STREET ARCHER AVENUE TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | time of inspection Found resurfaced builders pavement, no visible work found. |
2018-10-21 | No data | 25 STREET, FROM STREET 40 AVENUE TO STREET 41 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER-PERM RESTORATIONS ROADWAY SIDEWALK. SIDEWALK I/F/O ACTIVE BUILDING OPERATION. |
2018-10-20 | No data | EAST 138 STREET, FROM STREET RIDER AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP, street resurfaced |
2018-10-18 | No data | WEST 163 STREET, FROM STREET AMSTERDAM AVENUE TO STREET EDGECOMBE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | only sewer backfill was done. PASS 97.6 and 96.3%, will be left plated. |
2018-10-15 | No data | MOTT STREET, FROM STREET EAST HOUSTON STREET TO STREET PRINCE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO I observed respondent failed to properly seal and maintain the wearing course. Respondent failed to re-seal perm water cut in roadway. CAR 20186030489 issued on 4/15/2018 |
2018-10-15 | No data | EAST 173 STREET, FROM STREET BOONE AVENUE TO STREET WEST FARMS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration crossing r/w near West Farms. |
2018-10-14 | No data | 165 STREET, FROM STREET ARCHER AVENUE TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2018-10-13 | No data | WEST 87 STREET, FROM STREET RIVERSIDE DRIVE TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration water cut in the parking lane and driving lane flush to grade. |
2018-10-11 | No data | NELSON AVENUE, FROM STREET WEST 167 STREET TO STREET WEST 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2018-10-10 | No data | BRINKERHOFF AVENUE, FROM STREET 179 PLACE TO STREET 180 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | excavation steel plated pin and ramp |
2018-10-10 | No data | 165 STREET, FROM STREET ARCHER AVENUE TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2018-10-10 | No data | ROCKWOOD STREET, FROM STREET GRAND CONCOURSE TO STREET WALTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade on s/s of property(E.172 ST). |
2018-10-07 | No data | HOBART AVENUE, FROM STREET ST THERESA AVENUE TO STREET WILKINSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration 36in in width missing 6' and 12' cutbacks as per 1042 standard specs IFO 1949. |
2018-10-07 | No data | WEST 118 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The respondent failed covert 2 restorations from a "long water" cut in to one restoration as per standard detail drawing 1042 d note 9 stating: if two restorations are less then 10ft apart it shall be made final as one. corrective action request is |
2018-10-05 | No data | SHAKESPEARE AVENUE, FROM STREET JESUP PLACE TO STREET WEST 172 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - In Driving Lane - Restoration Sunken 1-2" |
2018-10-05 | No data | NELSON AVENUE, FROM STREET WEST 167 STREET TO STREET WEST 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2018-10-03 | No data | 165 STREET, FROM STREET ARCHER AVENUE TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration |
2018-09-28 | No data | EAST 219 STREET, FROM STREET BARNES AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Active | Department of Transportation | 2 cuts perm final color coded. sidewalk OK new building under construction. |
2018-09-26 | No data | WEST 163 STREET, FROM STREET AMSTERDAM AVENUE TO STREET EDGECOMBE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | rd/w and s/w plated, crew working inside of property line. |
2018-09-26 | No data | 33 STREET, FROM STREET AMTRAK RAILROAD TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut on D/L flush, S/W flags restored |
2018-09-25 | No data | BUSHWICK PLACE, FROM STREET BOERUM STREET TO STREET JOHNSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | found resurfaced by new building half +5 |
2018-09-25 | No data | 25 STREET, FROM STREET 40 AVENUE TO STREET 41 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | REPAIR WATER - SEWER-PLATED EXCAVATION ON THE SIDEWALK AND ROADWAY IN COMPLIANCE. PERMIT VAID AND PLATES RAMP WITH TEMP MACK. NO CREW ON SITE. ACTIVE BUILDING OPERATION. |
2018-09-24 | No data | CARPENTER AVENUE, FROM STREET EAST 220 STREET TO STREET EAST 221 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm final color coded in the driving lane |
2018-09-24 | No data | CRUGER AVENUE, FROM STREET BURKE AVENUE TO STREET SOUTH OAK DRIVE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Pass, cutback made |
2018-09-24 | No data | AVENUE D, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut has been paved over |
2018-09-24 | No data | STATE STREET, FROM STREET HOYT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2018-09-24 | No data | WEST 44 STREET, FROM STREET 10 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w plated next permit on file M012018253A72 |
2018-09-23 | No data | LAFAYETTE STREET, FROM STREET BOND STREET TO STREET GREAT JONES STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm WATER repair acceptable |
2018-09-22 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 45 STREET TO STREET BEACH 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the respondent has a plated excavation in the the roadway without an active NYC DOT permit on file, respondent previous permit expired on 9/20/2018. |
2018-09-21 | No data | VESTRY STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to locate work at this time due to active B/O ta location. Cobble stone roadway shows wear and tear due to B/O. |
2018-09-20 | No data | EAST 11 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | L:20' W:4'11" D:3'9"to 4' WD:120.9 DD:113.6 Max Dry:116.5 Moisture:6.4 LIFT#1:95.5 LIFT#2:97.16" cut back was completed. |
2018-09-20 | No data | TOWNSEND AVENUE, FROM STREET CLIFFORD PLACE TO STREET EAST 175 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO I observed the respondents failure to comply with all sections of Highway Rules, Standard Specs. and Standard Detail Drawings,and all other applicable laws for restoring LL14 restorations |
2018-09-19 | No data | 25 STREET, FROM STREET 40 AVENUE TO STREET 41 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - SEWER-OPEN PLATED EXCAVATION ON THE ROADWAY NEAR 40 AVE .CREW ON SITE. 10AM STIPS. |
2018-09-17 | No data | EAST HOUSTON STREET, FROM STREET LUDLOW STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water repair acceptable |
2018-09-15 | No data | NEVINS STREET, FROM STREET LIVINGSTON STREET TO STREET SCHERMERHORN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | swk flag sealed ok |
2018-09-15 | No data | MOTT STREET, FROM STREET EAST HOUSTON STREET TO STREET PRINCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair water acceptable |
2018-09-15 | No data | EAST 222 STREET, FROM STREET EASTCHESTER ROAD TO STREET LACONIA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | pass in compliance |
2018-09-14 | No data | BLACKROCK AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET CROSS BRONX EXPRESSWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm cut opp of #2234 has proper cut back made to restoration at this time. |
2018-09-13 | No data | GRAND STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed that the Respondent Failed to restore/Cutback the base and/or wearing course on their water cut with a width of 40".As per Standard Detail |
2018-09-13 | No data | EAST HOUSTON STREET, FROM STREET LUDLOW STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN BIKE LANE. NO CONFIRMATION. D1J ISSUED |
2018-09-12 | No data | PARKSIDE PLACE, FROM STREET EAST 207 STREET TO STREET WEBSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit has been updated as per permit #X012018225A00 |
2018-09-12 | No data | ELIZABETH STREET, FROM STREET EAST HOUSTON STREET TO STREET PRINCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Backfill restored on later permit |
2018-09-12 | No data | 25 STREET, FROM STREET 40 AVENUE TO STREET 41 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - SEWER-PLATED EXCAVATION ON THE ROADWAY NEAR 40 AVE. NO CREW ON SITE. |
2018-09-11 | No data | EAST 219 STREET, FROM STREET BARNES AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Active | Department of Transportation | plated pinned and ramped on the roadway in front of 725 and 727 E219th street |
2018-09-11 | No data | WEST 87 STREET, FROM STREET RIVERSIDE DRIVE TO STREET WEST END AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation located in the parking lane and driving lane on West 87th street. Plates marked ARBEN NY. |
2018-09-10 | No data | WEST 44 STREET, FROM STREET 10 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Complaint | Department of Transportation | roadway is plated no one on site |
2018-09-08 | No data | WEST 87 STREET, FROM STREET RIVERSIDE DRIVE TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation located in the parking lane and driving lane on West 87th street. Plates marked ARBEN NY. |
2018-09-07 | No data | 25 STREET, FROM STREET 40 AVENUE TO STREET 41 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - SEWER-PLATED EXCAVATIONS ROADWAY AND SIDEWALK. NO CREW ON SITE. |
2018-09-07 | No data | NELSON AVENUE, FROM STREET WEST 167 STREET TO STREET WEST 168 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated pinned and ramped on the roadway and sidewalk |
2018-09-06 | No data | WEST 163 STREET, FROM STREET AMSTERDAM AVENUE TO STREET EDGECOMBE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site. Water & sewer job. |
2018-09-06 | No data | EAST 219 STREET, FROM STREET BARNES AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Active | Department of Transportation | plated pinned and ramped on the roadway in front of 725 and 727 E219th street |
2018-09-06 | No data | EAST 219 STREET, FROM STREET BARNES AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated pinned and ramped on the roadway new permit on file X012018247A50 |
2018-09-06 | No data | CRUGER AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In front construction site. |
2018-09-05 | No data | LYNCH STREET, FROM STREET BROADWAY TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in crosswalk okay |
2018-09-05 | No data | EAST 100 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to properly inspect as water barriers and vehicles on the roadway. |
2018-09-05 | No data | THEATRE ALLEY, FROM STREET ANN STREET TO STREET BEEKMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Observed no work under this particular contractor. Other plumber color codes present on segment. |
2018-09-05 | No data | EAST 173 STREET, FROM STREET BOONE AVENUE TO STREET WEST FARMS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit X012018242A71 on file with 2 steel plates in drivng lane of roadway and one steel plate crossing portion of roadway at this time. |
2018-09-05 | No data | EAST 173 STREET, FROM STREET BOONE AVENUE TO STREET WEST FARMS ROAD | No data | Street Construction Inspections: Active | Department of Transportation | 2 steel plates in drivng lane of roadway with one steel plate crossing portion of roadway at this time. |
2018-09-05 | No data | WEST 44 STREET, FROM STREET 10 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work in progress permit on file-M012018235A63 |
2018-09-05 | No data | WEST 44 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway found resurfaced |
2018-09-04 | No data | 3 AVENUE, FROM STREET EAST 20 STREET TO STREET EAST 21 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | After performing research in the DASH database I observed the above respondent failed to submit an application for a regular permit within two days of receiving an emergency permit number. |
2018-09-03 | No data | BOONE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2018-09-02 | No data | EAST 120 STREET, FROM STREET 1 AVENUE TO STREET PLEASANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No defects to report on short water cut |
2018-09-02 | No data | 25 STREET, FROM STREET 40 AVENUE TO STREET 41 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | REPAIR WATER - SEWER-PLATED EXCAVATION ON THE ROADWAY AND SIDEWALK . NO CAVE-IN FOUND . |
2018-09-01 | No data | LAFAYETTE STREET, FROM STREET BOND STREET TO STREET GREAT JONES STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 45'9" water trench extending across roadway backfilled and completed in front of 363. 2 tests performed- First lift-97.5% Last Lift- 97.2%. (Blend Material). |
2018-08-31 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 45 STREET TO STREET BEACH 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade trench extending across the roadway |
2018-08-29 | No data | BEACH AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration opp #700 approx 2.9"ft wide missing required H- 1042 6" and 12" cutbacks. |
2018-08-28 | No data | AUSTIN PLACE, FROM STREET EAST 147 STREET TO STREET EAST 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | found resurfaced |
2018-08-28 | No data | FOX STREET, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B ISSUED |
2018-08-28 | No data | 35 STREET, FROM STREET 34 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | REPAIR WATER - SEWER - BACK-FILL COMPLETE PON ARRIVAL. ASSIST CREW WITH CUT-BACK DUE TO VOID IN THE ROADWAY. WAS ON SITE FOR 20 MIN ALREADY. |
2018-08-28 | No data | EAST 173 STREET, FROM STREET BOONE AVENUE TO STREET WEST FARMS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has updated permit on file. |
2018-08-27 | No data | WEST 44 STREET, FROM STREET 10 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY PLATED WITH ACTIVE PERMIT M012018235A63 |
2018-08-26 | No data | EAST 78 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration flush in the d/l, partially visible, other restorations on top |
2018-08-26 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work is good |
2018-08-25 | No data | WEST 87 STREET, FROM STREET RIVERSIDE DRIVE TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation located in the parking lane and driving lane on West 87th street. Plates marked ARBEN NY. |
2018-08-24 | No data | EAST 60 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration flushed to grade in the roadway |
2018-08-24 | No data | WHITE PLAINS ROAD, FROM STREET EAST TREMONT AVENUE TO STREET GUERLAIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk flag restored curbside; closer to White Plains Rd & E. Tremont Ave. |
2018-08-23 | No data | STORY AVENUE, FROM STREET BOYNTON AVENUE TO STREET ELDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B ISSUED |
2018-08-23 | No data | FULTON STREET, FROM STREET HUDSON AVENUE TO STREET ROCKWELL PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 6/7/2018. Respondent failed to obtain a conf |
2018-08-23 | No data | ELIZABETH STREET, FROM STREET EAST HOUSTON STREET TO STREET PRINCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in front of 242 acceptable |
2018-08-23 | No data | EAST TREMONT AVENUE, FROM STREET UNIONPORT ROAD TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B ISSUED |
2018-08-21 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Renewed on 6/5/2018 |
2018-08-21 | No data | MC DONALD STREET, FROM STREET BASSETT AVENUE TO STREET STILLWELL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2018-08-21 | No data | HONE AVENUE, FROM STREET ESPLANADE TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2018-08-21 | No data | TENBROECK AVENUE, FROM STREET BEND TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in roadway |
2018-08-21 | No data | NARRAGANSETT AVENUE, FROM STREET LYDIG AVENUE TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | bpp paved over plumber cut |
2018-08-20 | No data | WEST 43 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | UNABLE TO FULLY INSPECT DUE TO ACTIVE B.O |
2018-08-20 | No data | CRUGER AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plumber on site, excavation in the roadway and sidewalk |
2018-08-17 | No data | 3 AVENUE, FROM STREET EAST 20 STREET TO STREET EAST 21 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Temp cut in the driving lane , in front of street light post , middle of segment. A.K.A 200 East 21 St . |
2018-08-17 | No data | SARATOGA AVENUE, FROM STREET PARK PLACE TO STREET STERLING PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | one perm trench on r/w |
2018-08-16 | No data | EAST TREMONT AVENUE, FROM STREET UNIONPORT ROAD TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Active | Department of Transportation | steel plate on sidewalk located on the White Plains Rd side of corner property (gas station). |
2018-08-14 | No data | CORLEAR AVENUE, FROM STREET WEST 232 STREET TO STREET WEST 234 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no cut in the roadway or sidewalk at address given |
2018-08-14 | No data | ATLANTIC AVENUE, FROM STREET ALABAMA AVENUE TO STREET GEORGIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in the driving lane in compliance |
2018-08-14 | No data | FLATBUSH AVENUE, FROM STREET 3 AVENUE TO STREET LIVINGSTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway Has Been Repaved |
2018-08-14 | No data | CRUGER AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 3 steel plates in the P/D lane and fiberglass plate on the sidewalk pin and ramp, I/F/O 2749 active BO site, permit still active at this time. |
2018-08-14 | No data | CRUGER AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 steel plates in the P/D lane and fiberglass plate on the sidewalk pin and ramp, I/F/O 2749 active BO site, Has updated (ACTIVE) permit #X012018219A07on file. |
2018-08-12 | No data | TAYLOR AVENUE, FROM STREET MC GRAW AVENUE TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | taken over by con-edison gas trench. |
2018-08-11 | No data | BRONXWOOD AVENUE, FROM STREET EAST 220 STREET TO STREET EAST 221 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut on roadway and sidewalk in compliance |
2018-08-11 | No data | PARK AVENUE, FROM STREET EAST 107 STREET TO STREET EAST 108 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active building Opp. I'm unable to full inspect |
2018-08-11 | No data | MAPLE STREET, FROM STREET EAST 48 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration overlapped by Con Ed |
2018-08-10 | No data | VANDERBILT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk Flags In Good Condition |
2018-08-09 | No data | CRUGER AVENUE, FROM STREET BURKE AVENUE TO STREET SOUTH OAK DRIVE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Arben crew on site, spoke to foreman muse, crew is in progress of doing the proper cutbacks for cut OPP 3216, Will return. |
2018-08-08 | No data | EAST 173 STREET, FROM STREET BOONE AVENUE TO STREET WEST FARMS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plates covering excavation under later permit.X012018211A00 |
2018-08-08 | No data | EAST 206 STREET, FROM STREET EAST MOSHOLU PARKWAY NORTH TO STREET ROCHAMBEAU AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Portion of roadway paved as per BPP, new sidewalk in place |
2018-08-08 | No data | MATTHEWS AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Eduardo/ jumping jack/ blend/ cut 16' x4' depth 10' EXCLUSIVE TESTING/ SHAKEEL/ SAND CONE (w)121.5(d)113.0 (md)120.0 (am) 7.5 TEST 97.0/ 98.6. Backfill incomplete, plumber only backfill 6' of excavation, he request 2 test to be done. |
2018-08-07 | No data | LIVINGSTON STREET, FROM STREET FLATBUSH AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Restoration Cut On The Roadway in the Driving Lane Is Flush To Grade |
2018-08-04 | No data | BERGEN STREET, FROM STREET BOERUM PLACE TO STREET COURT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | marking applied |
2018-08-04 | No data | NEVINS STREET, FROM STREET LIVINGSTON STREET TO STREET SCHERMERHORN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO I OBSERVED THE ABOVE RESPONDENT FAILED TO SEAL EXPANSION JOINTS IN NEWLY INSTALLED SIDEWALK FLAG;FAILED TO RESPOND TO CAR#20181670179 DOT PERMIT#B012016306B19 EXP 11/8/2016 USED FOR ID. |
2018-08-02 | No data | EAST 173 STREET, FROM STREET BOONE AVENUE TO STREET WEST FARMS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Updated permit on file. Plated excavation. |
2018-07-30 | No data | ELIZABETH STREET, FROM STREET EAST HOUSTON STREET TO STREET PRINCE STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 7'0"x3'6"x4'5" 3 lifts 2 test. Material support under pipe before initial lift. Proceed to base cutback |
2018-07-29 | No data | VICTORY BOULEVARD, FROM STREET MANOR ROAD TO STREET RAYMOND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm r/w cut in pkg la. S/W ok. |
2018-07-28 | No data | WEST 44 STREET, FROM STREET 10 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Active | Department of Transportation | failed to comply with stip |
2018-07-27 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 50 STREET TO STREET BEACH 52 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done on S/W. |
2018-07-26 | No data | WEST 162 STREET, FROM STREET OGDEN AVENUE TO STREET SUMMIT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later work done by Con Edison |
2018-07-26 | No data | ELIZABETH STREET, FROM STREET EAST HOUSTON STREET TO STREET PRINCE STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | I/F/O 242, portion of new sewer/water trench backfilled and plated. Undermining present and needs to be broken out when remainder of trench is backfilled. No base cutbacks performed. Small water cut adjacent to trench and backfilled temp to grade. |
2018-07-25 | No data | LEGGETT AVENUE, FROM STREET BECK STREET TO STREET KELLY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2018-07-25 | No data | LINDEN BOULEVARD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced. |
2018-07-24 | No data | WEBSTER AVENUE, FROM STREET EAST 204 STREET TO STREET EAST 205 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2018-07-23 | No data | MATTHEWS AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site, spoke to Antonio foreman for Arben, Excavating in the roadway for sewer than water connections for new building # 2744, Working in compliance to stipulations. |
2018-07-21 | No data | EAST 78 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration flush in the b/l. |
2018-07-21 | No data | STORY AVENUE, FROM STREET BOYNTON AVENUE TO STREET ELDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway completely resurfaced. |
2018-07-21 | No data | EAST 167 STREET, FROM STREET BOSTON ROAD TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2018-07-21 | No data | LENOX ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in P/L / D/L opp.333 partially covered by BPP & Verizon |
2018-07-21 | No data | LANDING ROAD, FROM STREET CEDAR AVENUE TO STREET MAJOR DEEGAN EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new sidewalk in place, also have of roadway paved as per new building BPP |
2018-07-21 | No data | EAST 167 STREET, FROM STREET FULTON AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work completed under later permit |
2018-07-20 | No data | JEROME AVENUE, FROM STREET EAST KINGSBRIDGE ROAD TO STREET WEST 195 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2018-07-20 | No data | EDISON AVENUE, FROM STREET ST THERESA AVENUE TO STREET BUHRE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2018-07-19 | No data | AUSTIN PLACE, FROM STREET EAST 147 STREET TO STREET EAST 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | in compliance plated pinned and ramped new permit on file / X012018184B28 |
2018-07-19 | No data | AUSTIN PLACE, FROM STREET EAST 147 STREET TO STREET EAST 149 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated pinned and ramped |
2018-07-18 | No data | UNION AVENUE, FROM STREET LYNCH STREET TO STREET MIDDLETON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done on this segment |
2018-07-17 | No data | EAST NEW YORK AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration on roadway |
2018-07-17 | No data | MAPLE STREET, FROM STREET EAST 48 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in roadway |
2018-07-16 | No data | EAST 170 STREET, FROM STREET COTTAGE PLACE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2018-07-16 | No data | WEST FARMS ROAD, FROM STREET CROSS BRONX EXPWY NB ET 4 A TO STREET EAST 174 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site backfilling trench, instructed to remove excess water, crew complied. |
2018-07-16 | No data | EAST 173 STREET, FROM STREET BOONE AVENUE TO STREET WEST FARMS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Crew working inside trench approx 50' from West of West Farms ave under updated permit on file X012018193A26 |
2018-07-16 | No data | 3 AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk and roadway restored |
2018-07-16 | No data | FULTON AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2018-07-15 | No data | BLACKROCK AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET CROSS BRONX EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway 3.5' in width, missing proper cutbacks as per H 1042D note 6 I/F/O 2334. |
2018-07-14 | No data | PARKSIDE PLACE, FROM STREET EAST 207 STREET TO STREET WEBSTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plumber trench plated in the roadway and sidewalk, at new BO site |
2018-07-14 | No data | PARKSIDE PLACE, FROM STREET EAST 207 STREET TO STREET WEBSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plumber trench plated in roadway and sidewalk, will research for updated permit |
2018-07-14 | No data | WEST 118 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The respondent failed covert 2 restorations from a "long water" cut in to one restoration as per standard detail drawing 1042 d note 9 stating: if two restorations are less then 10ft apart it shall be made final as one. corrective action request iss |
2018-07-13 | No data | UNDERCLIFF AVENUE, FROM STREET MDE NORTHBOUND EXIT 7 NORTH TO STREET WEST 171 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2018-07-13 | No data | WEST 162 STREET, FROM STREET OGDEN AVENUE TO STREET SUMMIT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later gas work done |
2018-07-12 | No data | WEST 44 STREET, FROM STREET 10 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ACTIVE PERMIT ON FILE (M012018190C55) EXCAVATION PLATED IN THE DRIVING LANE |
2018-07-11 | No data | WEST 43 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK IN PROGRESS ACTIVE PERMIT ON FILE(M012018190C56) |
2018-07-10 | No data | EAST 81 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been milled in preparation for resurfacing. Sidewalk flags I/F/O this location currently have temp asphalt as new building construction is on going |
2018-07-09 | No data | TOWNSEND AVENUE, FROM STREET CLIFFORD PLACE TO STREET EAST 175 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO I observed the respondents failure to comply with all sections of Highway Rules, Standard Specs. and Standard Detail Drawings,and all other applicable laws for restoring LL14 restorations |
2018-07-09 | No data | EAST 120 STREET, FROM STREET 1 AVENUE TO STREET PLEASANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No defects to short water cut |
2018-07-07 | No data | EAST 222 STREET, FROM STREET EASTCHESTER ROAD TO STREET LACONIA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent failed to resealed broken and cracked areas in perm restoration street joint. |
2018-07-07 | No data | GREAT JONES STREET, FROM STREET BOWERY TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BO in progress, no defects found |
2018-07-06 | No data | ELIZABETH STREET, FROM STREET EAST HOUSTON STREET TO STREET PRINCE STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Jose w/ Arben using Jumping Jack Tester Chris w/ Exclusive using Sandcone. 8'6"x3'6"x7'7" 2 lifts 2 test. Area replated |
2018-07-05 | No data | PARKSIDE PLACE, FROM STREET EAST 207 STREET TO STREET WEBSTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Has open excavation on the sidewalk and next to the bus lane i/f/o 3211. Spoke to Eduardo on site must barricades with a water barricade on the sidewalk open excavation and remove cones. |
2018-07-05 | No data | WEBSTER AVENUE, FROM STREET EAST 203 STREET TO STREET EAST 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failed to restore Bus lane RED paint on a perm trench portion 10'x11' i/f/o 3100 Webster Ave. Permit expired on 5/12/18 as per H 1042 -D/ Code Section DB1-34 RCNY 2-11 (e)(12)(vi). |
2018-07-04 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in roadway and sidewalk |
2018-07-04 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk in complaince |
2018-07-04 | No data | GRAND STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench. |
2018-07-03 | No data | SIMPSON STREET, FROM STREET EAST 163 STREET TO STREET FIRE ACCESS LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2018-07-03 | No data | WEST 162 STREET, FROM STREET OGDEN AVENUE TO STREET SUMMIT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later work done |
2018-07-02 | No data | AVENUE Z, FROM STREET EAST 6 STREET TO STREET OCEAN PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done |
2018-07-01 | No data | WEST 44 STREET, FROM STREET 10 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 Steel Plates secured to the Roadway I/F/O 510-514 "taxi mechanic" |
2018-06-30 | No data | ROCKWOOD STREET, FROM STREET GRAND CONCOURSE TO STREET WALTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2018-06-30 | No data | WEST 162 STREET, FROM STREET OGDEN AVENUE TO STREET SUMMIT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later work done |
2018-06-28 | No data | EAST HOUSTON STREET, FROM STREET AVENUE B TO STREET SUFFOLK STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The Roadway Lane Markings have been restored over the areas of the water cut not currently obstructed by the active B.O. barricades, I/F/O 287.... (CAR re-inspection Pass) |
2018-06-27 | No data | ORCHARD STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not found, Active BO |
2018-06-26 | No data | CRUGER AVENUE, FROM STREET BURKE AVENUE TO STREET SOUTH OAK DRIVE | No data | Street Construction Inspections: LL14 | Department of Transportation | Made contractor cut out tunneling and make into 1 large trench, properly back filled and tamped I/F/O 3204-3206, Joseph supe on site, new sidewalk flags around water valve box. |
2018-06-26 | No data | CRUGER AVENUE, FROM STREET BURKE AVENUE TO STREET SOUTH OAK DRIVE | No data | Street Construction Inspections: Active | Department of Transportation | 1 perm trench final flush and sealed, 1 trench plated pin and ramp waiting to be back filled and made final restoration on the sidewalk covered with fiber glass plate and flushed, spoke to worker Joseph, R/W opened to traffic, in compliance to stips. |
2018-06-26 | No data | CRUGER AVENUE, FROM STREET BURKE AVENUE TO STREET SOUTH OAK DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has updated permit #X012018171A18 |
2018-06-26 | No data | WEST 34 STREET, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I found respondent failed to complete 18" cutbacks on 2 cuts as per H-1042A #6. Cut#1 width is 44" and Cut#2 is 46" in width. CAR #20185410022 was issued 3/24/18 prior to NOV being written. |
2018-06-26 | No data | GRAND STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to restore water cut in accordance with Standard Detail H-1042A, opposite 284-286... (CAR Re-inspection FAIL) |
2018-06-25 | No data | WEST 162 STREET, FROM STREET OGDEN AVENUE TO STREET SUMMIT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later work done |
2018-06-25 | No data | PROSPECT AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2018-06-25 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BKFILL NOTES: 1 CUT IN THE DRIVING LANE (L) 40 FT (W) 5 FT (D) 5 FT ...ACTUAL START TIME :12:17 PM ..COMPACTION: 97.4% / 97.7% / 97.8% |
2018-06-25 | No data | REV JAMES POLITE AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 960 perm to grade |
2018-06-25 | No data | BERGEN STREET, FROM STREET BOERUM PLACE TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | failed to restore markimngs on the street |
2018-06-23 | No data | BEACH 34 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET ROCKAWAY FREEWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP went over permanent restoration in roadway, no visible cuts seem in the street. |
2018-06-23 | No data | GRAND STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench on r/w. |
2018-06-22 | No data | WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | area of roadway found resurfaced |
2018-06-22 | No data | EAST TREMONT AVENUE, FROM STREET UNIONPORT ROAD TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk flag restored around water cap hardware. |
2018-06-22 | No data | PARKSIDE PLACE, FROM STREET EAST 207 STREET TO STREET WEBSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut plated on sidewalk, updated permit on file X012018166B58 |
2018-06-21 | No data | PURDY STREET, FROM STREET NYCTA SUBWAY TO STREET STARLING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in driving lane of roadway at 1360-1364. 2 slightly sunken areas are starting to form in perm cut . |
2018-06-20 | No data | ALEXANDER AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET EAST 134 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later work done |
2018-06-19 | No data | WEST 87 STREET, FROM STREET BROADWAY TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration flush in the rd/w under jersey barriers, active BO site. |
2018-06-18 | No data | WEST 162 STREET, FROM STREET OGDEN AVENUE TO STREET SUMMIT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later work done |
2018-06-17 | No data | EAST 60 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Overdue for Final Water Cut, I/F/O 155 |
2018-06-17 | No data | EAST 60 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR passed out, summons to be issued at the Departments discretion. |
2018-06-16 | No data | MOTT STREET, FROM STREET EAST HOUSTON STREET TO STREET PRINCE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO I observed respondent failed to properly seal and maintain the wearing course. Respondent failed to re-seal perm water cut in roadway. CAR 20186030489 issued on 4/15/2018. |
2018-06-16 | No data | GREAT JONES STREET, FROM STREET BOWERY TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 25'6"X4' long water cut required 2 lifts and 2 tests both passing compaction rate of 97.4%, 98.1%. Prior to backfill 3 foot voided area taken out. Contractors will proceed to base. In front of a.k.a 363 Lafayette Street) |
2018-06-15 | No data | BELMONT AVENUE, FROM STREET EAST 179 STREET TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm 3.5''x4' in the driving lane i/f/o 1982 Belmont Ave, new building construction. |
2018-06-14 | No data | AJ GRIFFIN PLACE, FROM STREET EAST 149 STREET TO STREET EAST 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | hydrant re located on sidewalk |
2018-06-12 | No data | EAST 222 STREET, FROM STREET EASTCHESTER ROAD TO STREET LACONIA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CONDITION STILL REMAINS. A NOV WILL BE ISSUED TO EXPIRED PERMIT. |
2018-06-12 | No data | EAST 222 STREET, FROM STREET EASTCHESTER ROAD TO STREET LACONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I FOUND THAT THE ABOVE RESPONDENT TO RESEAL AND MAINTAIN IT'S WEARING COURSE AS PER CAR#20184820285 ISSUED 4/30/18 |
2018-06-12 | No data | WEST 162 STREET, FROM STREET OGDEN AVENUE TO STREET SUMMIT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later work done |
2018-06-11 | No data | 31 STREET, FROM STREET 31 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm roadway trench has been sealed. |
2018-06-11 | No data | ROCKWOOD STREET, FROM STREET GRAND CONCOURSE TO STREET WALTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated work site |
2018-06-11 | No data | EAST 172 STREET, FROM STREET WALTON AVENUE TO STREET WYTHE PLACE | No data | Street Construction Inspections: Active | Department of Transportation | perm to grade |
2018-06-11 | No data | MOHEGAN AVENUE, FROM STREET BRONX PARK SOUTH TO STREET HORNADAY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | sidewalk flag restored with expansion joints sealed. |
2018-06-10 | No data | WEST 162 STREET, FROM STREET OGDEN AVENUE TO STREET SUMMIT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later work done |
2018-06-09 | No data | OGDEN AVENUE, FROM STREET WEST 163 STREET TO STREET WEST 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP, street re paved |
2018-06-08 | No data | 3 AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm trench in the driving, parking lanes. |
2018-06-08 | No data | EAST 213 STREET, FROM STREET BARNES AVENUE TO STREET CARLISLE PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints has been installed. |
2018-06-08 | No data | EAST 219 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition has been repaired. Inspected / In Compliance. |
2018-06-07 | No data | TOWNSEND AVENUE, FROM STREET CLIFFORD PLACE TO STREET EAST 175 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO I observed the respondent failure to conform to the applicable DOT approved standard for restoring street openings of LL14 operations. The respondent was notified of the failure to do proper cutbacks in CAR 20181380161 dated 12/2/2017. |
2018-06-06 | No data | FOX STREET, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | - REPAIR WATER - SEWER crew is on site |
2018-06-05 | No data | WEST 169 STREET, FROM STREET NELSON AVENUE TO STREET PLIMPTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP, street resurfaced |
2018-06-05 | No data | WEST 162 STREET, FROM STREET OGDEN AVENUE TO STREET SUMMIT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later work done |
2018-06-05 | No data | UNDERCLIFF AVENUE, FROM STREET MDE NORTHBOUND EXIT 7 NORTH TO STREET WEST 171 STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site, cut still plated |
2018-06-05 | No data | NEVINS STREET, FROM STREET LIVINGSTON STREET TO STREET SCHERMERHORN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO I OBSERVED THE ABOVE RESPONDENT FAILED TO SEAL EXPANSION JOINTS IN NEWLY INSTALLED SIDEWALK FLAG. CAR#20181670179 DOT PERMIT#B012016306B19 EXP 11/8/2016 USED FOR ID. |
2018-06-04 | No data | FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | SIDE WALK RESTORED TO GRADE |
2018-06-03 | No data | GRAND STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on r/w. |
2018-06-02 | No data | WEST 162 STREET, FROM STREET OGDEN AVENUE TO STREET SUMMIT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later work done |
2018-06-02 | No data | EAST 180 STREET, FROM STREET BRYANT AVENUE TO STREET VYSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut crossing driving lane of roadway. |
2018-06-02 | No data | GREAT JONES STREET, FROM STREET BOWERY TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Interferences present. Actual total dimentions 15'x4' and 7'2" to 8' in depth. Only 3'2" backfill material placed back on cut #1: 5'x4' (96.2% and 97.3% compaction test) and 2' backfill on cut #2: 2'x4' (97.2%) water to be install now. 8:03-10:35am |
2018-06-02 | No data | WHITE PLAINS ROAD, FROM STREET EAST TREMONT AVENUE TO STREET GUERLAIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in parking lane of roadway with sidewalk flags restored. |
2018-06-01 | No data | UNIONPORT ROAD, FROM STREET EAST TREMONT AVENUE TO STREET GUERLAIN STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent failed to add required identifying information to plating. Responent currently has steel plate in the driving lane of roadway at 1611 Unionport Rd. Use permit for ID purpose. |
2018-06-01 | No data | GUERLAIN STREET, FROM STREET ARCHER ROAD TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoratin adjacent to parking lane of roadway near 1897 Guerlain St. |
2018-06-01 | No data | WEST 162 STREET, FROM STREET OGDEN AVENUE TO STREET SUMMIT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later work done |
2018-05-31 | No data | PARKSIDE PLACE, FROM STREET EAST 207 STREET TO STREET WEBSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in roadway, plumber did not do the required cut back on 2'6" x 2' restoration on non protected street. i Will have to speak to bc about it |
2018-05-30 | No data | CRUGER AVENUE, FROM STREET BURKE AVENUE TO STREET SOUTH OAK DRIVE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent has a opened excavation covered by "ARBEN CONST" marked steel plates in the driving lane I/F/O 3204-3206 without a valid DOT permit on file. Permit used for ID expired on 5/29/18, Therefore NOV issued. |
2018-05-30 | No data | FOX STREET, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrived at BACKFILL at 11:27am-3pm 2 cuts was made into one 22'x4'x3.5'' trench water. sewer was done by Dean on 5/21/18. tunneling was removed, base, W.C at the curb. Greg F AUDIT CAR, BACKFILL. |
2018-05-29 | No data | GRAND STREET, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cuts in r/w. |
2018-05-29 | No data | MARION AVENUE, FROM STREET EAST 194 STREET TO STREET EAST 195 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway |
2018-05-26 | No data | EAST 120 STREET, FROM STREET 1 AVENUE TO STREET PLEASANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut is in compliance. |
2018-05-26 | No data | MAPES AVENUE, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has perm trench in the driving, parking lanes. |
2018-05-26 | No data | EAST HOUSTON STREET, FROM STREET LUDLOW STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed and acceptable,. 5'X4' water cut down 4' required 3 lifts and 2 tests both passing compaction of 97.2%,97.0%. cutbacks marked out for later date, contractors had base re-scheduled. |
2018-05-25 | No data | EAST 21 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - REPAIR WATER - SEWER : New permit # M012018012C13 |
2018-05-25 | No data | PELHAM PARKWAY, FROM STREET FISH AVENUE TO STREET SEYMOUR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Not done, on roadway, possible work on sidewalk behind property. |
2018-05-24 | No data | ORCHARD STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active Bo work behind fence acceptable. |
2018-05-23 | No data | EAST HOUSTON STREET, FROM STREET LUDLOW STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work acceptable reapir water |
2018-05-21 | No data | WEST 134 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012016175A73-Latest permit. |
2018-05-20 | No data | BEACH CHANNEL DRIVE, FROM STREET BEACH 34 STREET TO STREET BEACH CHANNEL DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builder's pavement work not visible. |
2018-05-20 | No data | STORY AVENUE, FROM STREET BOYNTON AVENUE TO STREET ELDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent with 3 Arben labeled steel plates crossing the roadway I/F/O 1520 Story ave without a valid DOT permit on file, permit exp 10/28/2017. |
2018-05-18 | No data | SHAKESPEARE AVENUE, FROM STREET WEST 169 STREET TO STREET WEST 170 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | opp 1282 perm to grade |
2018-05-16 | No data | FOX STREET, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 12'x5" X 4' X 10'excavation in p/d lane with cut on sidewalk. 4'x6" remains to be back filled;will complete at another time. 2'x9" of wearing course & base must be removed adjacent to curb.2 test were taken one adjacent to curb another in d/l. |
2018-05-16 | No data | NELSON AVENUE, FROM STREET WEST 167 STREET TO STREET WEST 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2018-05-15 | No data | CRUGER AVENUE, FROM STREET BURKE AVENUE TO STREET SOUTH OAK DRIVE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill is complete. |
2018-05-15 | No data | WEST 169 STREET, FROM STREET NELSON AVENUE TO STREET PLIMPTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP, street re paved |
2018-05-14 | No data | EAST 172 STREET, FROM STREET WALTON AVENUE TO STREET WYTHE PLACE | No data | Street Construction Inspections: Active | Department of Transportation | work in progress |
2018-05-14 | No data | EAST 172 STREET, FROM STREET WALTON AVENUE TO STREET WYTHE PLACE | No data | Street Construction Inspections: Complaint | Department of Transportation | one 11 foot lane maintained for passing traffic around street opening |
2018-05-14 | No data | WEST 87 STREET, FROM STREET BROADWAY TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Short water cut has been made final. No defects to report at this time. Ongoing building Opp at location. Water barriers on roadway |
2018-05-13 | No data | EAST 223 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New property re-surfaced over water cut, portion in complaince |
2018-05-13 | No data | EAST 81 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plated in the roadway IFO 316. |
2018-05-13 | No data | EAST 81 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 316, steel plated in driving lane and parking lane. Active permit M012018128A93 |
2018-05-12 | No data | HOE AVENUE, FROM STREET BEND TO STREET BOSTON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2018-05-12 | No data | EAST 162 STREET, FROM STREET DEAD END TO STREET MELROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm final in the riving lane / partial late work done along the curb new steel face curb |
2018-05-09 | No data | EAST 21 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permit M012018029A99 with conf # M201803042. one day grace period |
2018-05-09 | No data | EAST 206 STREET, FROM STREET EAST MOSHOLU PARKWAY NORTH TO STREET ROCHAMBEAU AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 2/23/18. Respondent failed to obtain a confirmation number from the department. |
2018-05-09 | No data | WEST 22 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent "Water-Sewer" restoration in the parking lane that extends out into the driving lane flush to grade. |
2018-05-08 | No data | WEST 28 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent "Water-Sewer" restoration flush to grade in the roadway. |
2018-05-08 | No data | CRESTON AVENUE, FROM STREET BUSH STREET TO STREET EAST BURNSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BO operation has street closed unable to inspect cut |
2018-05-08 | No data | STORY AVENUE, FROM STREET BOYNTON AVENUE TO STREET ELDER AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Currently light traffic and 2 flagmen posted to direct traffic, Cut leading to middle of roadway. |
2018-05-07 | No data | REV JAMES POLITE AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 1/16/18. Respondent failed to obtain a confirmation number from the department. |
2018-05-07 | No data | FOX STREET, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Delinquent permit has been renewed, Pass( D1B PROJECT INSPECTION) |
2018-05-06 | No data | WEST 87 STREET, FROM STREET BROADWAY TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Short water cut has been made final. Ongoing building Opp. Short water cut behind orange and white water barriers. |
2018-05-06 | No data | VYSE AVENUE, FROM STREET BEND TO STREET EAST 174 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in driving/parkng lane. |
2018-05-05 | No data | EAST 198 STREET, FROM STREET CRESTON AVENUE TO STREET JEROME AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in roadway |
2018-05-05 | No data | JEROME AVENUE, FROM STREET EAST KINGSBRIDGE ROAD TO STREET WEST 195 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in roadway |
2018-05-05 | No data | WEST END AVENUE, FROM STREET WEST 86 STREET TO STREET WEST 87 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed & sealed in the roadway , I/F/O active BO |
2018-05-03 | No data | PARK AVENUE, FROM STREET EAST 107 STREET TO STREET EAST 108 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | above respondent has backfilled an opening on protected street but failed to obtain a confirmation number at least 2 hours prior to the commencement of backfill Permit expired 2-24-18 Respondent failed to obtain confirmation number from department |
2018-05-03 | No data | BERGEN STREET, FROM STREET BOERUM PLACE TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 2/12/2018. Respondent failed to obtain a conf |
2018-05-03 | No data | WEBSTER AVENUE, FROM STREET EAST 203 STREET TO STREET EAST 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in the driving, parking lanes, new building. |
2018-05-02 | No data | BEACH 34 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET ROCKAWAY FREEWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation in the R/W, active permit on file. |
2018-05-02 | No data | BEAUMONT AVENUE, FROM STREET EAST 183 STREET TO STREET EAST 187 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street resurfaced |
2018-05-02 | No data | BATHGATE AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Updated permit #X012018053B27 has confirmation # (D1B PROJECT INSPECTION) |
2018-05-01 | No data | BEACH AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Condition is good. Inspected / In Compliance. |
2018-05-01 | No data | EAST 206 STREET, FROM STREET EAST MOSHOLU PARKWAY NORTH TO STREET ROCHAMBEAU AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Updated permit # X012018068C04 has confirmation # (D1B PROJECT INSPECTION) |
2018-04-30 | No data | WEST END AVENUE, FROM STREET WEST 86 STREET TO STREET WEST 87 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | above respondent has backfilled an opening on protected street but failed to obtain a confirmation number at least 2 hours prior to the commencement of backfill Permit expired 2-8-18 Respondent failed to obtain confirmation number from department |
2018-04-30 | No data | EAST 175 STREET, FROM STREET CROTONA PARK NORTH TO STREET MOHEGAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later work done |
2018-04-30 | No data | EAST 222 STREET, FROM STREET EASTCHESTER ROAD TO STREET LACONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Asphalt broken and cracked in permanent restoration street joint, street joint needs to be resealed. |
2018-04-28 | No data | FULTON STREET, FROM STREET HUDSON AVENUE TO STREET ROCKWELL PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMANENT LONG WATER RESTORATION IN ROADWAY IN FRONT OF 635 FULTON |
2018-04-27 | No data | GRAND STREET, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on r/w. |
2018-04-24 | No data | POPHAM AVENUE, FROM STREET WEST 175 STREET TO STREET WEST 176 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | DEP MADE THE OPENING. |
2018-04-23 | No data | EAST 112 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Rd/w has been repaved, s/w flush expansion joints sealed. |
2018-04-22 | No data | BARNES AVENUE, FROM STREET EAST 213 STREET TO STREET EAST 214 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut on sidewalk and roadway in compliance |
2018-04-20 | No data | FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failed to permanently restore a temporary sidewalk cut within required time. NYCDOT permit B012016004D33, which expired on 2/2/2016, was used to ID. *Previous CAR #20185850026 closed. |
2018-04-20 | No data | FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR will be reissued. *CAR cleanup. |
2018-04-20 | No data | BUHRE AVENUE, FROM STREET JARVIS AVENUE TO STREET MAHAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in the driving, parking lanes i/f/o 3066,3073. |
2018-04-20 | No data | 161 STREET, FROM STREET 59 AVENUE TO STREET BOOTH MEMORIAL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | One flags inside property line restored (i/f/o stairway). |
2018-04-19 | No data | SIMPSON STREET, FROM STREET EAST 163 STREET TO STREET FIRE ACCESS LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | made perm to grade |
2018-04-19 | No data | 83 STREET, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut on roadway in compliance |
2018-04-19 | No data | REV JAMES POLITE AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2018-04-18 | No data | EAST 172 STREET, FROM STREET WALTON AVENUE TO STREET WYTHE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2018-04-18 | No data | CRUGER AVENUE, FROM STREET BURKE AVENUE TO STREET SOUTH OAK DRIVE | No data | Street Construction Inspections: Active | Department of Transportation | plumber doing sewer work, i spoke to foreman Zymer, in regards to cut backs on restoration |
2018-04-17 | No data | VESTRY STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cobblestone ok |
2018-04-17 | No data | BEACH AVENUE, FROM STREET GUION PLACE TO STREET MERRILL STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 17' by 5' backfill6'' cutback was done on site |
2018-04-17 | No data | JANE STREET, FROM STREET GREENWICH AVENUE TO STREET WEST 4 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ACTIVE B.O AT HOUSE 11 OCCUPYING R/W & S/W |
2018-04-16 | No data | MAPLE STREET, FROM STREET EAST 48 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR will be reissued. *CAR clean-up. |
2018-04-16 | No data | MAPLE STREET, FROM STREET EAST 48 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Irregular shaped permanent trench found on the roadway. As per Standard Drawing H-1042D(3), all final trench restorations should be square/rectangular in shape. Also, restore lane markings. *Previous CAR #20176260205 closed. |
2018-04-15 | No data | MOTT STREET, FROM STREET EAST HOUSTON STREET TO STREET PRINCE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR passed out during cleanup, to be re-issued. |
2018-04-15 | No data | MOTT STREET, FROM STREET EAST HOUSTON STREET TO STREET PRINCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The Permanent Water Cut in the Roadway needs to have its street opening joints re-sealed, I/F/O 277... (20185910050) |
2018-04-15 | No data | WEBSTER AVENUE, FROM STREET EAST 203 STREET TO STREET EAST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated work site |
2018-04-14 | No data | TOWNSEND AVENUE, FROM STREET CLIFFORD PLACE TO STREET EAST 175 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - In Driving Lane, as reported in CAR 20170690291, permanent resoration not restored as per the 1042 A-D specifications for cutbacks of base and wearing course |
2018-04-14 | No data | BELMONT AVENUE, FROM STREET EAST 179 STREET TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3'x3' Permanent restoration with green plastic color code does not have proper cutbacks applied as per 1042-A-D Specifications.Previously issued CAR #20174110102. |
2018-04-14 | No data | BELMONT AVENUE, FROM STREET EAST 179 STREET TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 3'x3' Permanent restoration with green plastic color code does not have proper cutbacks applied as per 1042-A-D Specifications.Previously issued CAR #20174110102. |
2018-04-14 | No data | TOWNSEND AVENUE, FROM STREET CLIFFORD PLACE TO STREET EAST 175 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | - In Driving Lane, as reported in CAR 20170690291, permanent resoration not restored as per the 1042 A-D specifications for cutbacks of base and wearing course |
2018-04-13 | No data | 31 STREET, FROM STREET 31 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | seal broken out on roadway water cut must be resealed. |
2018-04-13 | No data | RODMAN PLACE, FROM STREET LONGFELLOW AVENUE TO STREET WEST FARMS ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | Foreman ZYMER. jumping jack, 3' x 2' 8" depth 3'9" LAB. EXCLUSIVE TESTING, WATSON, sand cone, (w)120.0 (d)116.6 (md)117.5 (am) 7.5 TEST 96.2 / 97.1. Backfill accepted, concrete for base job reschedule, markings for cut back made. |
2018-04-13 | No data | GUERLAIN STREET, FROM STREET ARCHER ROAD TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill passed. |
2018-04-13 | No data | 3 AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Saw cut area needs to be sealed and permanent restoration needs to be resealed in driving lane. Previously issued CAR #20186500127. |
2018-04-13 | No data | 3 AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Saw cut area needs to be sealed and permanent restoration needs to be resealed in driving lane. Previously issued CAR #20186500127. |
2018-04-13 | No data | 31 STREET, FROM STREET 31 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | seal broken out on roadway water cut must be resealed. |
2018-04-13 | No data | BATHGATE AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plate removed |
2018-04-12 | No data | POPHAM AVENUE, FROM STREET WEST 175 STREET TO STREET WEST 176 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | made temp to grade |
2018-04-12 | No data | EAST HOUSTON STREET, FROM STREET AVENUE B TO STREET SUFFOLK STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR passed out during cleanup, to be re-issued. |
2018-04-12 | No data | EAST HOUSTON STREET, FROM STREET AVENUE B TO STREET SUFFOLK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restore all missing and re-restore all broken up Lane Markings to the Roadway as required, I/F/O 287.... (20185910044) |
2018-04-12 | No data | CRESTON AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Pass |
2018-04-12 | No data | FORSYTH STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Water Cut ok, lane markings broken up but acceptable for now, I/F/O 204... (CAR Passed Out) |
2018-04-10 | No data | FOX STREET, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | plates covered by new pemit... X012018095B25 |
2018-04-10 | No data | EAST 167 STREET, FROM STREET FULTON AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | concrete roadway restored full panel |
2018-04-10 | No data | GRAND STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR passed out during cleanup, to be re-issued. |
2018-04-10 | No data | FOX STREET, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavations on sidewalk and roadway |
2018-04-10 | No data | GRAND STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 of 2 Water cuts in the Roadway's width measures at 40", Base/and or Wearing Course have not been properly Cutback. Restore Cut in accordance with Standard Detail H-1042A note #6, opposite 284-286 |
2018-04-08 | No data | 3 AVENUE, FROM STREET EAST 109 STREET TO STREET EAST 110 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration flush in the parking/driving lane (3 lanes long) s/w flush expansion joints sealed. |
2018-04-06 | No data | CLAFLIN AVENUE, FROM STREET RESERVOIR AVENUE TO STREET WEST 197 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 2 cuts, 1 in parking 1 in driving lane good. |
2018-04-06 | No data | EAST 213 STREET, FROM STREET BARNES AVENUE TO STREET CARLISLE PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joint needs to be installed between the curb and new sidewalk flag, that has in defacement. |
2018-04-06 | No data | EAST 219 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joint between curb and sidewalk flag, needs to be sealed. |
2018-04-06 | No data | EAST 219 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joint between curb and sidewalk flag, needs to be sealed. |
2018-04-06 | No data | EAST 213 STREET, FROM STREET BARNES AVENUE TO STREET CARLISLE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joint needs to be installed between the curb and new sidewalk flag, that has in defacement. |
2018-04-06 | No data | EAST 120 STREET, FROM STREET 1 AVENUE TO STREET PLEASANT AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 8'4 x 3'5 x 6'2 5 lifts 2 tests 97.3 and 97.6 |
2018-04-05 | No data | WEST 118 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Please restore 2 short water cuts that are 5'6" apart. Restorations less than 10' apart from edge to edge must be combined to form 1 continuous trench as per H-1042D note 9. Original CAR 20175010103 issued 8-10-17 |
2018-04-05 | No data | AMSTERDAM AVENUE, FROM STREET WEST 147 STREET TO STREET WEST 148 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w and rd/w cuts ok |
2018-04-05 | No data | FOX STREET, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work to be completed under later permit |
2018-04-05 | No data | FOX STREET, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated work site |
2018-04-05 | No data | 1 AVENUE, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/w flush expansion joints sealed opp #1918 |
2018-04-05 | No data | WEST 118 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please restore 2 short water cuts that are 5'6" apart. Restorations less than 10' apart from edge to edge must be combined to form 1 continuous trench as per H-1042D note 9. Original CAR 20175010103 issued 8-10-17 |
2018-04-04 | No data | PARK AVENUE, FROM STREET EAST 107 STREET TO STREET EAST 108 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration flush in the p/l, lane markings restored. 30' NNC from e. 107th. |
2018-04-02 | No data | WEST 87 STREET, FROM STREET BROADWAY TO STREET WEST END AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Two steel plates on the roadway. Plates are counter sunken. Raise plow sign also on site. |
2018-04-01 | No data | WEST 48 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no new work observed |
2018-03-31 | No data | CRUGER AVENUE, FROM STREET BURKE AVENUE TO STREET SOUTH OAK DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No cut back were made on plumber 2'6" x 2' perm restoration, on newly paved roadway. Cut back need to be made ASAP |
2018-03-31 | No data | WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No 18" cut back was done on both sides of one out of two permanent Restorations measured 36" in width in the Roadway, as per H1042D note 6 when completed restoration should be 54" in width. |
2018-03-31 | No data | FORSYTH STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR open under permit M012016322D00 |
2018-03-31 | No data | WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | No 18" cut back was done on both sides of one out two Restorations measured 36" in width as per H1042D note 6, when restoration completed it should be 54" in width. |
2018-03-31 | No data | BURR AVENUE, FROM STREET EAST 196 STREET TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | no work done |
2018-03-31 | No data | CRUGER AVENUE, FROM STREET BURKE AVENUE TO STREET SOUTH OAK DRIVE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | No cut back were made on plumber 2'6" x 2' perm restoration, on newly paved roadway. Cut back need to be made ASAP |
2018-03-31 | No data | HOBART AVENUE, FROM STREET ST THERESA AVENUE TO STREET WILKINSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Water cut in complaince |
2018-03-30 | No data | BEACH 34 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET ROCKAWAY FREEWAY | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O The respondent opened the street and roadway without a correct DOT permit on file. The attached permit is for sewer repair permit type 0114. A new buildings is on location permit type 0111 new sewer installation required. |
2018-03-29 | No data | MOHEGAN AVENUE, FROM STREET BRONX PARK SOUTH TO STREET HORNADAY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restored sidewalk flag needs expansion joints sealed also, adjacent flag has concrete patchwork and needs full flag restoration. |
2018-03-29 | No data | EAST 78 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR Project-Condition no longer exist s/w cut resurfaced by replace s/w job under permit #M042017342A00. CAR will not be re-issued. |
2018-03-29 | No data | ORCHARD STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut located behind BO fence |
2018-03-29 | No data | MOHEGAN AVENUE, FROM STREET BRONX PARK SOUTH TO STREET HORNADAY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restored sidewalk flag needs expansion joints sealed also, adjacent flag has concrete patchwork and needs full flag restoration. |
2018-03-28 | No data | VYSE AVENUE, FROM STREET BEND TO STREET EAST 174 STREET | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER |
2018-03-28 | No data | LORIMER STREET, FROM STREET GRAND STREET TO STREET POWERS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | sidewalk good. |
2018-03-28 | No data | BEACH AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Pass |
2018-03-27 | No data | 3 AVENUE, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration remain in compliance on r/w |
2018-03-27 | No data | FOX STREET, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated countersunken |
2018-03-26 | No data | EAST 120 STREET, FROM STREET 1 AVENUE TO STREET PLEASANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | active BO in progress |
2018-03-26 | No data | EAST 206 STREET, FROM STREET EAST MOSHOLU PARKWAY NORTH TO STREET ROCHAMBEAU AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill completed and acceptable |
2018-03-24 | No data | NEVINS STREET, FROM STREET LIVINGSTON STREET TO STREET SCHERMERHORN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NEW CAR ISSUED |
2018-03-24 | No data | WEST 34 STREET, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm restorations 2'X3' less than minimum 54 inches in width with required cutbacks. Less than 6 feet apart. Mill and combine into 1 cut per H-1042A. Red paint for bus lane and lane markings need to be restored. |
2018-03-24 | No data | WEST 4 STREET, FROM STREET BANK STREET TO STREET WEST 12 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 313 there is patch work on sidewalk. Please replace full sidewalk flags. CAR issued due to active BO on location, there is a scaffold on sidewalk. |
2018-03-24 | No data | NEVINS STREET, FROM STREET LIVINGSTON STREET TO STREET SCHERMERHORN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | joints on the sidewalk not seal |
2018-03-24 | No data | WEST 34 STREET, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR clean Up. CAR to be passed and reissued. |
2018-03-24 | No data | YATES AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Pass |
2018-03-23 | No data | LELAND AVENUE, FROM STREET ARCHER STREET TO STREET GUERLAIN STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | monitored BF from 0850-0938, BF acceptable |
2018-03-23 | No data | 33 STREET, FROM STREET AMTRAK RAILROAD TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | start 9:30 contractor has a sewer cut 11.0 x 4.2 x 10.0 instead of water. Need sewer permit to proceed.: |
2018-03-20 | No data | EAST 60 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR passed out during cleanup, to be re-issued |
2018-03-20 | No data | EAST 60 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary Water Cut is Overdue and needs to be made Final, I/F/O 147-155 |
2018-03-19 | No data | WEST 118 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Open CAR on file for most recent permit M0120750B07 , for no sealer around restotation . |
2018-03-19 | No data | JEROME AVENUE, FROM STREET EAST KINGSBRIDGE ROAD TO STREET WEST 195 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm restoration in driving/parking lane. |
2018-03-18 | No data | AVENUE D, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Condition is inside of Barricaded area for Active BO, no visible defects, acceptable |
2018-03-18 | No data | 3 AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work completed under later permit |
2018-03-17 | No data | BROOME STREET, FROM STREET ATTORNEY STREET TO STREET CLINTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut was resurfaced due to BPP to new building |
2018-03-16 | No data | WEST 22 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Trench. |
2018-03-16 | No data | BERGEN STREET, FROM STREET BOERUM PLACE TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CUT IN ROADWAY GOOD. PASS. |
2018-03-15 | No data | 3 AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2018-03-14 | No data | EAST 60 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary Water Cut is Overdue and needs to be made Final, I/F/O 155 |
2018-03-10 | No data | PROSPECT AVENUE, FROM STREET EAST TREMONT AVENUE TO STREET ELSMERE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2018-03-09 | No data | FORSYTH STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | open CAR under permit M012016322D00 |
2018-03-07 | No data | 165 STREET, FROM STREET ARCHER AVENUE TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found resurfaced builders pavement, no visible work found. |
2018-03-06 | No data | BATHGATE AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in parking/driving lane. |
2018-03-06 | No data | WEST 48 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restorations (5) flush to grade |
2018-03-06 | No data | REV JAMES POLITE AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 12x4 down 7.5 cut in parking/driving lane. 960 prospect. |
2018-03-04 | No data | MEEKER AVENUE, FROM STREET MANHATTAN AVENUE TO STREET RICHARDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Possibly resurfaced by BPP. |
2018-03-04 | No data | LORIMER STREET, FROM STREET AINSLIE STREET TO STREET DEVOE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in roadway. |
2018-03-03 | No data | BROOME STREET, FROM STREET ATTORNEY STREET TO STREET CLINTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut was resurfaced due to BPP to new building |
2018-03-03 | No data | GRAND STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm water-sewer cuts i/f/o 285 not meeting 1042A requirements for proper cutbacks 6", 12". 3'4" width of cuts should be minimum 54". Please make proper corrections |
2018-02-28 | No data | LORIMER STREET, FROM STREET GRAND STREET TO STREET POWERS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway ok. |
2018-02-27 | No data | POPHAM AVENUE, FROM STREET WEST 175 STREET TO STREET WEST 176 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Asphalt within perm plumbers restoration broken and cracked out and sunken approx 2-3" in driving/parking lane I/F/O 1645. |
2018-02-27 | No data | CRESTON AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Must seal expansion joints between the curb and the sidewalk I/F/O 2245. |
2018-02-27 | No data | BATHGATE AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 10x4 down 6 in parking lane 4511 3 ave. |
2018-02-27 | No data | WEST 28 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to locate work due to active Construction site. |
2018-02-25 | No data | WEST 234 STREET, FROM STREET CORLEAR AVENUE TO STREET KINGSBRIDGE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | e/o SEC perm to grade |
2018-02-24 | No data | YATES AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Asphalt broken and cracked in permanent restoration street joint, street joint needs to be resealed. |
2018-02-22 | No data | PARK AVENUE, FROM STREET EAST 107 STREET TO STREET EAST 108 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 1/11/2018.Respondent failed |
2018-02-22 | No data | REV JAMES POLITE AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Crew on site working in excavation under updated permitX012018029B38. |
2018-02-22 | No data | FOX STREET, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Excavation plated in parking/driving lane and on sidewalk under later permitX012018029B37. |
2018-02-22 | No data | FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temporary restroom on the sidewalk overdue for final in front of 1452 |
2018-02-22 | No data | WEST 35 STREET, FROM STREET 10 AVENUE TO STREET LINCOLN TNNL APPROACH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street found resurfaced. |
2018-02-22 | No data | EAST 120 STREET, FROM STREET 1 AVENUE TO STREET PLEASANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has back filled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the back fill. permit expired 11/1/2017. Respondent failed . |
2018-02-22 | No data | EAST 31 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER |
2018-02-21 | No data | EAST 107 STREET, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Active | Department of Transportation | new s/w flag around hydrant needs to be sealed (permit still active) & 2 perm. cuts in p/l & d/l. Opp #104 |
2018-02-21 | No data | FORLEY STREET, FROM STREET 85 STREET TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in compliance at time of inspection. |
2018-02-21 | No data | EAST 107 STREET, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012018039B96-New Permit |
2018-02-21 | No data | WEST 4 STREET, FROM STREET BANK STREET TO STREET WEST 12 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active BO on location barriers occupying roadway acceptable. |
2018-02-20 | No data | WEST 139 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CUT WAS PAVED OVER BY CON EDISON RESTORATION SIDEWALK WAS RE CONSTRRUCTED FOR NEW BUIDING |
2018-02-19 | No data | PROSPECT AVENUE, FROM STREET EAST TREMONT AVENUE TO STREET ELSMERE PLACE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent with an excavation in the roadway down 6' with a worker inside without shoring, sheeting or bracing for protection AT corner property of 760 E Tremont. |
2018-02-19 | No data | CROTONA AVENUE, FROM STREET EAST 176 STREET TO STREET FAIRMOUNT PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumbers restoration in parkingn lane. |
2018-02-18 | No data | EAST 167 STREET, FROM STREET FULTON AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New concrete square in roadway connected to NYC SEWER access cover. |
2018-02-17 | No data | EAST 31 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Actve Construction site unable to see work. |
2018-02-17 | No data | WEST END AVENUE, FROM STREET WEST 86 STREET TO STREET WEST 87 STREET | No data | Street Construction Inspections: Active | Department of Transportation | excavation Length is actually 27'ft ( 37 was written in error ) |
2018-02-17 | No data | WEST END AVENUE, FROM STREET WEST 86 STREET TO STREET WEST 87 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 37'ft L x 4'ft excavation in roadway extending from west parking lane into driving lane |
2018-02-16 | No data | EAST 205 STREET, FROM STREET GRAND CONCOURSE TO STREET LISBON PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2018-02-15 | No data | BUSHWICK PLACE, FROM STREET BOERUM STREET TO STREET JOHNSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Resurfaced by BPP. |
2018-02-14 | No data | 3 AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Aphalt within perm restoration broken and cracked and street joints must be completely resealed I/F/O 4511. |
2018-02-14 | No data | PURDY STREET, FROM STREET NYCTA SUBWAY TO STREET STARLING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated with signs posted |
2018-02-14 | No data | EAST 180 STREET, FROM STREET BRYANT AVENUE TO STREET VYSE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | perm to grade |
2018-02-14 | No data | EAST HOUSTON STREET, FROM STREET AVENUE B TO STREET SUFFOLK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | open CAR under permit M012017348A15, CAR condition remains. |
2018-02-14 | No data | BERGEN STREET, FROM STREET BOERUM PLACE TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2018-02-13 | No data | 3 AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1J |
2018-02-13 | No data | EAST 31 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER |
2018-02-12 | No data | EAST 180 STREET, FROM STREET BRYANT AVENUE TO STREET VYSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done, Permit has expired. |
2018-02-10 | No data | 21 STREET, FROM STREET 46 ROAD TO STREET JACKSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags restored in kind around the two water hardware, Roadway resurfaced |
2018-02-10 | No data | EAST 107 STREET, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012018039B96-New permit |
2018-02-10 | No data | EAST 107 STREET, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Active | Department of Transportation | plates countersunken in r/w & one plate on s/w with "Plow" sign posted. Opp#104 |
2018-02-09 | No data | UNIVERSITY AVENUE, FROM STREET RESERVOIR AVENUE TO STREET WEST 197 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done. |
2018-02-08 | No data | BOERUM STREET, FROM STREET BUSHWICK AVENUE TO STREET BUSHWICK PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Swk ok. |
2018-02-08 | No data | AVENUE D, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active NB in process, condition compromised by OCCUPANCY of r/w, under permit#M022017360F95 |
2018-02-08 | No data | EAST 11 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | failed to obtain confirmation number |
2018-02-08 | No data | WEST 42 STREET, FROM STREET 10 AVENUE TO STREET DYER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done on Multiple sidewalk flags. No defects. |
2018-02-07 | No data | 43 AVENUE, FROM STREET 25 STREET TO STREET 27 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration to grade in the d/p/l |
2018-02-06 | No data | 10 AVENUE, FROM STREET WEST 33 STREET TO STREET WEST 34 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | UNABLE TO LOCATE DUE TO ACTIVE B.O |
2018-02-06 | No data | EAST HOUSTON STREET, FROM STREET AVENUE B TO STREET SUFFOLK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | failed to obtain confirmation number |
2018-02-06 | No data | 3 AVENUE, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B |
2018-02-06 | No data | AVENUE A, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w resurfaced after this condition |
2018-02-06 | No data | EAST 206 STREET, FROM STREET EAST MOSHOLU PARKWAY NORTH TO STREET ROCHAMBEAU AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plates on site. |
2018-02-06 | No data | EAST 206 STREET, FROM STREET EAST MOSHOLU PARKWAY NORTH TO STREET ROCHAMBEAU AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B |
2018-02-06 | No data | EAST 162 STREET, FROM STREET MORRIS AVENUE TO STREET TELLER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later work done roadway repaved half plus 5' |
2018-02-06 | No data | EAST 68 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Trench from the curb extending out is flush to Grade, 1 Sidewalk Flag is Temp covered by a Grace - Water/Ice Shield (currently inside of an active B.O.) I/F/O 36 |
2018-02-05 | No data | BATHGATE AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site in excavation over 5.5ft, crew installing shoring after being instructed to do so. OPP 2265 POE. |
2018-02-05 | No data | FOX STREET, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B |
2018-02-05 | No data | SOUTH 1 STREET, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2018-02-05 | No data | EAST 112 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M152017186A23-Street resurfaced |
2018-02-05 | No data | BATHGATE AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work continued under later permitX012018019B02 |
2018-02-04 | No data | EAST 21 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | failed to obtain confirmation number |
2018-02-04 | No data | MICKLE AVENUE, FROM STREET BURKE AVENUE TO STREET GIVAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water cut in compliance |
2018-02-04 | No data | EAST 167 STREET, FROM STREET FULTON AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent with a Arben NY labelled steel plate pinned and ramped and not countersunk during winter moratorium AT side of 3458 3rd ave corner property. |
2018-02-03 | No data | WEST 138 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration 25 ft from 7 ave opp of 145. |
2018-02-03 | No data | WEST 139 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2017 Con Edison restoration surfaced over and sidewalk was redone |
2018-02-03 | No data | EAST 100 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restoration okay in d/l. |
2018-02-02 | No data | EAST 21 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER : Unable to inspect properlyI/F/O Active B.O. |
2018-02-02 | No data | 3 AVENUE, FROM STREET EAST 109 STREET TO STREET EAST 110 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | trench okay in p/l & d/l. |
2018-02-01 | No data | NARRAGANSETT AVENUE, FROM STREET LYDIG AVENUE TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1J |
2018-02-01 | No data | 31 STREET, FROM STREET 31 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm. trench to be resealed,cracked edges. |
2018-02-01 | No data | WEST END AVENUE, FROM STREET WEST 86 STREET TO STREET WEST 87 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated exc. on s/w & r/w |
2018-01-31 | No data | EAST 21 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 20'ft L x 3'ft 6''in W x 5'ft D ; respondent has rescheduled in preparation of full trenching fro new sewer installation |
2018-01-31 | No data | MOTT STREET, FROM STREET EAST HOUSTON STREET TO STREET PRINCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please reseal street opening joints around 2017 repair water-sewer cut in front of 277 Mott St. |
2018-01-31 | No data | EAST 21 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Nov issued for respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Respondent failed to obtain a confirmation number from the department. |
2018-01-30 | No data | PURDY STREET, FROM STREET NYCTA SUBWAY TO STREET STARLING AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site work in progress |
2018-01-30 | No data | CRUGER AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2018-01-30 | No data | PURDY STREET, FROM STREET NYCTA SUBWAY TO STREET STARLING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work completed under later permit... X012018029A27 |
2018-01-30 | No data | WEST 22 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Nov issued for the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 11/18/2017. |
2018-01-29 | No data | PARK AVENUE, FROM STREET EAST 107 STREET TO STREET EAST 108 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in r/w near E107st |
2018-01-29 | No data | PARK AVENUE, FROM STREET EAST 107 STREET TO STREET EAST 108 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012018025B10-New permit on file. |
2018-01-28 | No data | TOMLINSON AVENUE, FROM STREET MORRIS PARK AVENUE TO STREET RHINELANDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2018-01-27 | No data | EAST 180 STREET, FROM STREET BRYANT AVENUE TO STREET VYSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2018-01-27 | No data | PARK AVENUE, FROM STREET EAST 107 STREET TO STREET EAST 108 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street. but failed to obtain a confirmation number prior to the expiration of such permit as required. permit expired 12/12/17. |
2018-01-26 | No data | BARNES AVENUE, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway new paved as per BPP. x012017251A18 |
2018-01-25 | No data | BRADY AVENUE, FROM STREET BOGART AVENUE TO STREET RADCLIFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2018-01-24 | No data | EAST HOUSTON STREET, FROM STREET AVENUE B TO STREET SUFFOLK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In front of 287 East Houston Street 1- street opening joints need to be resealed due to wearing off2- bike lane markings wore off, white arrow marking adjacent to bike lane not restored, please restore full lane markings |
2018-01-24 | No data | WALES AVENUE, FROM STREET EAST 142 STREET TO STREET ST MARYS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w & r/w ok |
2018-01-22 | No data | EAST 162 STREET, FROM STREET DEAD END TO STREET MELROSE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew working on site |
2018-01-22 | No data | AJ GRIFFIN PLACE, FROM STREET EAST 149 STREET TO STREET EAST 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work started |
2018-01-22 | No data | EAST 167 STREET, FROM STREET FULTON AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent with a Arben NY labelled steel plate pinned and ramped and not countersunk during winter moratorium AT side of 3458 3rd ave corner property. |
2018-01-22 | No data | EAST 162 STREET, FROM STREET DEAD END TO STREET MELROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | up to date permit on file |
2018-01-22 | No data | EAST 147 STREET, FROM STREET AUSTIN PLACE TO STREET TIMPSON PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to locate cut due to building operation |
2018-01-20 | No data | EAST 60 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Leak @ Curb Valve. Building Super on Site |
2018-01-17 | No data | JEROME AVENUE, FROM STREET EAST KINGSBRIDGE ROAD TO STREET WEST 195 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Has 3 steel plates countersink in the roadway, raise plow sign posted. Open excavation on concrete sidewalk. No one working on site. |
2018-01-13 | No data | WEST 35 STREET, FROM STREET 10 AVENUE TO STREET LINCOLN TNNL APPROACH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R/W RESURFACED |
2018-01-12 | No data | TAYLOR AVENUE, FROM STREET DEAD END TO STREET VAN NEST AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work completed under later permit |
2018-01-12 | No data | WEST 87 STREET, FROM STREET BROADWAY TO STREET WEST END AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm in roadway in compliance. |
2018-01-12 | No data | EAST 86 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Respondent posted a raised plow sign at their job site, however respondent failed to counter sink steel plate in the roadway during the winter moratorium; therefore NOV being issued. |
2018-01-12 | No data | EAST 86 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | No crew on site, plated excavation in the roadway. |
2018-01-10 | No data | JEROME AVENUE, FROM STREET EAST KINGSBRIDGE ROAD TO STREET WEST 195 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Permittee on site has updated permit # X012018009B25 expire on 2/8/18. Has steel plates roadway, raise plow sign posted. |
2018-01-09 | No data | EAST 68 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Only 2 Steel plates are currently visible and countersunk into the Roadway, I/F/O 36... will follow up |
2018-01-03 | No data | WEST 35 STREET, FROM STREET 9 AVENUE TO STREET LINCOLN TUNNEL ENTRANCE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found resurfaced utility work not visible. BP Plan extending from curb to driving lane along entire property. Insp. #679 |
2018-01-03 | No data | AVENUE A, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk installed at location. Roadway was resurfaced after work was done. |
2017-12-30 | No data | JEROME AVENUE, FROM STREET EAST KINGSBRIDGE ROAD TO STREET WEST 195 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Has steel plates countersink behind barricades at the construction site in the parking, driving lanes. |
2017-12-29 | No data | WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | More than half of the street is resurfaced no work found. (Insp. #679) |
2017-12-28 | No data | LAFAYETTE AVENUE, FROM STREET ASHLAND PLACE TO STREET ROCKWELL PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2017-12-28 | No data | EAST 206 STREET, FROM STREET EAST MOSHOLU PARKWAY NORTH TO STREET ROCHAMBEAU AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Has a open excavation in the driving, parking lane. Permittee working on site. |
2017-12-28 | No data | WEST 35 STREET, FROM STREET 9 AVENUE TO STREET LINCOLN TUNNEL ENTRANCE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street found resurfaced. (Insp.#679) |
2017-12-28 | No data | WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found Resurfaced. No work found. (Insp. #679) |
2017-12-28 | No data | 3 AVENUE, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work continued under later permit. |
2017-12-27 | No data | 3 AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumbers restoration in roadway. |
2017-12-27 | No data | BUHRE AVENUE, FROM STREET JARVIS AVENUE TO STREET MAHAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2017-12-27 | No data | FULTON STREET, FROM STREET HUDSON AVENUE TO STREET ROCKWELL PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2017-12-27 | No data | WEST 127 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut in D/L flushed & sealed |
2017-12-26 | No data | EAST 21 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 steel plates in the roadway within Building operation's protected Temporary pedestrian walk. active permit M012017348A17. |
2017-12-24 | No data | AMSTERDAM AVENUE, FROM STREET WEST 111 STREET TO STREET WEST 112 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no defects found |
2017-12-24 | No data | EAST 100 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I'm unable to inspect at this time due to ongoing building Opp at this location. |
2017-12-23 | No data | EAST 120 STREET, FROM STREET 1 AVENUE TO STREET PLEASANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway in compliance. |
2017-12-23 | No data | BROOME STREET, FROM STREET GREENE STREET TO STREET WOOSTER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No plumber's cut/trench found IFO building aka 52 Wooster st. Street segment resurfaced by the city. Sidewalk replaced by owner. Acceptable. |
2017-12-22 | No data | WEST 87 STREET, FROM STREET BROADWAY TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | three plumber cuts found on the roadway, s/w is still under construction. |
2017-12-22 | No data | 3 AVENUE, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 1 Cut = 5'4''x 5'--6' PASS |
2017-12-21 | No data | 3 AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET | No data | Street Construction Inspections: Active | Department of Transportation | At 3458 3Ave.,⢠Unsecured plated excavation on sidewalk inadequately ramped, shifted 6-7â off of ramping, plate is 3â above sidewalk pavement causing trip condition to pedestrians. |
2017-12-21 | No data | EAST 213 STREET, FROM STREET BARNES AVENUE TO STREET CARLISLE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in roadway and sidewalk |
2017-12-21 | No data | WESTCHESTER AVENUE, FROM STREET EAST 160 STREET TO STREET EAST 161 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2017-12-21 | No data | 3 AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plate reset on sidewalk, temp material applied as ramping |
2017-12-21 | No data | EAST 167 STREET, FROM STREET FULTON AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | having an unattended, steel plated excavation in roadway without any "Raise Plow" signs posted. Respondent failed to post "Raise Plow" signs during 2017/2018 Winter Moratorium. |
2017-12-20 | No data | WEST 48 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SEWER RESTORATION IS IN COMPLIANCE |
2017-12-20 | No data | WEST 33 STREET, FROM STREET 5 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to locate "Water" restoration due active building operation occupying this portion of the roadway. |
2017-12-20 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Back fill started at 11:45am- 12:50PM 3'x2.5'x3' in the driving lane, 6'' saw cut done. No 12'' saw cut back on W.C I/F/O 3055. I spoke to MUS forman must redo new concrete sidewalk flag. Not flush with the sidewalk, has active permit. |
2017-12-20 | No data | FOX STREET, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | 1 Steel plate in roadway serving no purpose I/F/O 1000. |
2017-12-20 | No data | EAST HOUSTON STREET, FROM STREET AVENUE B TO STREET SUFFOLK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | refer to updated permit M012017348A15 |
2017-12-19 | No data | BEACH AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later work done |
2017-12-18 | No data | PARK AVENUE, FROM STREET EAST 107 STREET TO STREET EAST 108 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit M012017346A44 on file. Expires 1-11-18 roadway is also occupied with barriers for ongoing building Opp at this location. |
2017-12-18 | No data | WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started. ( INSP #673 ). |
2017-12-18 | No data | WEST 22 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Permanent "Water" trench in the driving lane with an area has broken and cracked asphalt, however permit still active at this time. |
2017-12-18 | No data | ATLANTIC AVENUE, FROM STREET ALABAMA AVENUE TO STREET GEORGIA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO POST " STEEL PLATES AHEAD" OR "RAISE PLOW" SIGNS, ALSO FAIL TO COUNTERSINK THE STEEL PLATE FLUSH WITH ROADWAY AS PER DOT WINTER MORATORIUM, WINTER MORATORIUM STARTS ON 12/1/17 TO 3/31/18 |
2017-12-17 | No data | 200 STREET, FROM STREET 120 AVENUE TO STREET NASHVILLE BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | found the roadway paved at time of my inspection |
2017-12-15 | No data | ATLANTIC AVENUE, FROM STREET ALABAMA AVENUE TO STREET GEORGIA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO POST " STEEL PLATES AHEAD" OR "RAISE PLOW" SIGNS, ALSO FAIL TO COUNTERSINK THE STEEL PLATE FLUSH WITH ROADWAY AS PER DOT WINTER MORATORIUM, WINTER MORATORIUM STARTS ON 12/1/17 TO 3/31/18 |
2017-12-13 | No data | EAST 120 STREET, FROM STREET 1 AVENUE TO STREET PLEASANT AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Back fill pass. |
2017-12-13 | No data | VESTRY STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active Bo going on, fence occupying roadway |
2017-12-13 | No data | SOUTH STREET, FROM STREET BEEKMAN STREET TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No evidence of water repair cut at location. |
2017-12-13 | No data | DESBROSSES STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active BO on location , permit for occupying roadway M022017269I63 |
2017-12-12 | No data | JEROME AVENUE, FROM STREET EAST KINGSBRIDGE ROAD TO STREET WEST 195 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Spoke to Mus on site has a open excavation in the driving, parking lanes. |
2017-12-11 | No data | BEACH AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - In Driving Lane - Restoration needs to be re-sealed |
2017-12-11 | No data | EAST 11 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration acceptable sidewalk behind fence |
2017-12-09 | No data | ST LAWRENCE AVENUE, FROM STREET LACOMBE AVENUE TO STREET RANDALL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced |
2017-12-08 | No data | ATLANTIC AVENUE, FROM STREET ALABAMA AVENUE TO STREET GEORGIA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO POST STEEL PLATES AHEAD OR "RAISE PLOW" SIGN; ALSO FAIL TO COUNTER SINK STEEL PLATES FLUSH WITH THE ROADWAY AS PER DOT WINTER MORATORIUM |
2017-12-08 | No data | WEST 87 STREET, FROM STREET BROADWAY TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cant inspect area under construction. |
2017-12-08 | No data | LAFAYETTE AVENUE, FROM STREET BEACH AVENUE TO STREET COMMONWEALTH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2017-12-07 | No data | THIERIOT AVENUE, FROM STREET BEND TO STREET LACOMBE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2017-12-07 | No data | PLEASANT AVENUE, FROM STREET EAST 117 STREET TO STREET EAST 118 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway and sidewalk in compliance. |
2017-12-06 | No data | TOWNSEND AVENUE, FROM STREET CLIFFORD PLACE TO STREET EAST 175 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 4'.4" by 3' permanent water cut restoration not properly cut back as per H-1042 A-D specification |
2017-12-05 | No data | 43 AVENUE, FROM STREET 27 STREET TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no new water work visible |
2017-12-05 | No data | EAST 218 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new sidewalk and roadway newly paved as per BPP |
2017-12-05 | No data | EAST 213 STREET, FROM STREET BARNES AVENUE TO STREET CARLISLE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joint needs to be installed between the curb and new sidewalk flag, that has in defacement. |
2017-12-04 | No data | ATLANTIC AVENUE, FROM STREET ALABAMA AVENUE TO STREET GEORGIA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO POST STEEL PLATES AHEAD OR "RAISE PLOW" SIGN; ALSO FAIL TO COUNTER SINK STEEL PLATES FLUSH WITH THE ROADWAY AS PER DOT WINTER MORATORIUM |
2017-12-04 | No data | ATLANTIC AVENUE, FROM STREET ALABAMA AVENUE TO STREET GEORGIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation in the driving lane under valid DOT permit on file |
2017-12-04 | No data | FOX STREET, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site cut in roadway and on sidewalk. |
2017-12-03 | No data | JANE STREET, FROM STREET GREENWICH AVENUE TO STREET WEST 4 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | failed to conform with 1042D restoration |
2017-12-03 | No data | FOX STREET, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 Arben labelled steel plates left in roadway serving no purpose I/F/O 1000. |
2017-12-03 | No data | NARRAGANSETT AVENUE, FROM STREET LYDIG AVENUE TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | steel plates I/F/O 2061-63 pin and ramp. |
2017-12-03 | No data | NARRAGANSETT AVENUE, FROM STREET LYDIG AVENUE TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has updated active Permit Number: X012017328A05. |
2017-12-02 | No data | MOHEGAN AVENUE, FROM STREET BRONX PARK SOUTH TO STREET HORNADAY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut back made on plumber cut in roadway, full concrete flag restored |
2017-12-02 | No data | FORSYTH STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/f/o 204 Forsyth street there is a perm water cut that has exposed open joints, needs to replace defected white lane marking and brokenout asphalt within the perm water cut. |
2017-12-02 | No data | FORSYTH STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I/f/o 204 Forsyth street there is a perm water cut that has exposed open joints, needs to replace defected white lane marking and brokenout asphalt within the perm water cut. |
2017-12-02 | No data | EAST 219 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joint between curb and sidewalk flag, needs to be sealed. |
2017-12-02 | No data | RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST BURNSIDE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | New sidewalk flags. |
2017-12-02 | No data | MOHEGAN AVENUE, FROM STREET BRONX PARK SOUTH TO STREET HORNADAY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joint needs to be seal between curb and new sidewalk flag. |
2017-12-01 | No data | ALEXANDER AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET EAST 134 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | pass later work done |
2017-12-01 | No data | NARRAGANSETT AVENUE, FROM STREET LYDIG AVENUE TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL PASSED. |
2017-11-30 | No data | FULTON STREET, FROM STREET HUDSON AVENUE TO STREET ROCKWELL PLACE | No data | Street Construction Inspections: Active | Department of Transportation | WORK DONE IN THE ROADWAY |
2017-11-30 | No data | SOUTH 1 STREET, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sewer work in compliance |
2017-11-30 | No data | MANHATTAN AVENUE, FROM STREET FROST STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut resurfaced by BPP IFO BO. |
2017-11-30 | No data | WEST 15 STREET, FROM STREET HIGH LINE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2017-11-30 | No data | WEST 22 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Nov issued for the above respondent with use of the street by having 5 steel plates secured to the roadway and 2 on the sidewalk on a protected street without a valid NYC DOT permit on file to do so. |
2017-11-30 | No data | 10 AVENUE, FROM STREET WEST 44 STREET TO STREET WEST 45 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK NOT DONE, PERMIT EXPIRED |
2017-11-30 | No data | FULTON STREET, FROM STREET HUDSON AVENUE TO STREET ROCKWELL PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | B012017317B66 ACTIVE PERMIT ON FILE |
2017-11-29 | No data | STERLING PLACE, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut ,on saratoga side |
2017-11-29 | No data | NARRAGANSETT AVENUE, FROM STREET LYDIG AVENUE TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | 2 Trenches 1- 15'x 4'--10' & 1- 9'6''X 4'--9' PASS. |
2017-11-29 | No data | DESBROSSES STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cobblestones restoration acceptable. |
2017-11-27 | No data | WEEKS AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 175 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later work done new building street repaved |
2017-11-27 | No data | 35 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No visible work found due to active building operation |
2017-11-27 | No data | WEST 34 STREET, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I found respondent failed to complete 18" cutbacks on 2 cuts that are 2'x3' as per H-1042A #6. Also cuts are less than 10' apart from each other respondent failed to combine them into one cut as per H1042#9. C.A.R.#20176030162 |
2017-11-27 | No data | VAN NEST AVENUE, FROM STREET ADAMS STREET TO STREET VAN BUREN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later work done |
2017-11-26 | No data | CRUGER AVENUE, FROM STREET BURKE AVENUE TO STREET SOUTH OAK DRIVE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent has failed to perform neccessary 6" and 12" cutbacks on plumbers permanent restoration OPP #3216 as instructed in CAR#20174820246. |
2017-11-26 | No data | EAST 78 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Nov issued for the above respondent failure to seal the sidewalk expansion joints at the curb. respondent was previously notified to correct this condition by via (CAR #20175280159) on 8/4/2017. But failed to do so. |
2017-11-26 | No data | BELMONT AVENUE, FROM STREET EAST 179 STREET TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | the above respondent has a 3'x3' permanent restoration in the driving lane OPP 1982. Respondent failed to do the 6" and 12" cutbacks as required on both sides of plumbers cut as per CAR #20174110102 issued on 8/31/17, and has yet to be corrected. |
2017-11-25 | No data | EAST 162 STREET, FROM STREET DEAD END TO STREET MELROSE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | pass new building under construction partial roadway to be repaved upon completion of building operation |
2017-11-25 | No data | 3 AVENUE, FROM STREET EAST 166 STREET TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm in d/l @ bldg op |
2017-11-25 | No data | MAPLE STREET, FROM STREET EAST 48 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO COMPLY WITH HIGHWAY RULES , STANDARD DETAIL DRAWING H-1042(All trench restorations should be square or rectangular |
2017-11-25 | No data | WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent failed to do the minimum 18 inch Cutback on both sides of their permanent water restoration in the roadway as per dot drawing H-1042D note 6. respondent was notified on prior CAR #20176040445 on 10.4.17 |
2017-11-24 | No data | EAST 11 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass. 14'3"X4' sewer cut down 8'4" required 6 lift and tests. first lift and last lift compacted and tested at 96.7% and 97.1%. 6" basecut backs marked out. |
2017-11-24 | No data | EAST 213 STREET, FROM STREET BARNES AVENUE TO STREET CARLISLE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2017 perm restoration in roadway |
2017-11-24 | No data | LORIMER STREET, FROM STREET GRAND STREET TO STREET POWERS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO I OBSERVED THE ABOVE RESPONDENT FAILED TO SEAL EXPANSION JOINTS ON THE SIDEWALK AS PER SUBSECTION; CAR#20160920414 ISSUED ON 11/27/2016 USED FOR ID. |
2017-11-22 | No data | EAST 78 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | More recent permit on file (M012017310D65) |
2017-11-22 | No data | EAST 78 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp restoration flushed in the rd/w. |
2017-11-22 | No data | LORIMER STREET, FROM STREET GRAND STREET TO STREET POWERS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed a new sidewalk flag with an expansion joint installed but not sealed. Respondent was notified to make correction via (CAR #20160920414) on 11/27/16 and failed to do so. |
2017-11-22 | No data | WEST 22 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Nov issued for the above respondent with use of the street by having 5 steel plates secured to the roadway and 2 on the sidewalk on a protected street without a valid NYC DOT permit on file to do so. |
2017-11-21 | No data | EAST 147 STREET, FROM STREET AUSTIN PLACE TO STREET TIMPSON PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | up to date permit on file |
2017-11-21 | No data | VESTRY STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to locate the cut , permit occupying roadway M022017269I86 |
2017-11-21 | No data | STORY AVENUE, FROM STREET BOYNTON AVENUE TO STREET ELDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done inside fence area P.S. 93 Private property O.K. |
2017-11-21 | No data | EAST 147 STREET, FROM STREET AUSTIN PLACE TO STREET TIMPSON PLACE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site |
2017-11-20 | No data | NEVINS STREET, FROM STREET LIVINGSTON STREET TO STREET SCHERMERHORN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent failed to seal expansion joints on the sidewalk. A CAR was issued on 9/5/2017, for joints on the sidedwalk not sealed, CAR #20171670356. |
2017-11-20 | No data | MAPES AVENUE, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New building, roadway resurfaced, |
2017-11-20 | No data | AVENUE D, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active B/O at location. Multiple lanes barricaded and cosed. Materials stored on roadway. Fence installed on sidewalk. |
2017-11-19 | No data | BELMONT AVENUE, FROM STREET EAST 179 STREET TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent fail to perform proper cutbacks on a 3x3 plumbers permanent restoration in roadway OPP 1984 as instructed in CAR# 20174110102. |
2017-11-18 | No data | CRUGER AVENUE, FROM STREET BURKE AVENUE TO STREET SOUTH OAK DRIVE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent failed to do required cut back, on newly paved street |
2017-11-17 | No data | EAST 120 STREET, FROM STREET 1 AVENUE TO STREET PLEASANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit on file |
2017-11-17 | No data | 3 AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Confirmation # on file. |
2017-11-17 | No data | WEST 169 STREET, FROM STREET NELSON AVENUE TO STREET PLIMPTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Confirmation # on file. |
2017-11-16 | No data | LENOX ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TWO PERM TRENCHS IN THE ROADWAY PARTIALLY COVERED BY CONTAINER |
2017-11-16 | No data | ALEXANDER AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET EAST 134 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2017-11-15 | No data | 3 AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Confirmation # found on file. |
2017-11-15 | No data | BRONXWOOD AVENUE, FROM STREET EAST 220 STREET TO STREET EAST 221 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut in roadway |
2017-11-15 | No data | WEST 87 STREET, FROM STREET BROADWAY TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | located in active building operation |
2017-11-15 | No data | SIMPSON STREET, FROM STREET EAST 163 STREET TO STREET FIRE ACCESS LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 8/26/17. |
2017-11-15 | No data | 3 AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated exc. s/w & r/w |
2017-11-14 | No data | EAST 120 STREET, FROM STREET 1 AVENUE TO STREET PLEASANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | More recent permit on file (M012017305A90) |
2017-11-13 | No data | GRAND STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | failed to obtain confirmation number |
2017-11-11 | No data | EAST 167 STREET, FROM STREET FULTON AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3'x3' perm cut ⢠2'8" away from transverse transverse joint not sawcut to transverse cut⢠East side of cut not sawcut from curb to longitudinal jointFinal restoration should be approx. 5â8x15â |
2017-11-11 | No data | WEST 134 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no defects found if0 132 west 134 st |
2017-11-09 | No data | FULTON STREET, FROM STREET HUDSON AVENUE TO STREET ROCKWELL PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | active permit on file B012017305A75 |
2017-11-09 | No data | SARATOGA AVENUE, FROM STREET PARK PLACE TO STREET STERLING PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | arr at 1145, 2cuts...14ft x 4ft down 4ft(98.6/98.5)...10ft x 5ft 8in down 5ft 9in(97.9/97.3) |
2017-11-08 | No data | EAST 21 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | refer to latest permit M012017306A78 |
2017-11-08 | No data | 35 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration. Active Bo site |
2017-11-08 | No data | 3 AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 07/18/17. |
2017-11-08 | No data | EAST 21 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work plated ,located in pedestrian walkway and behind fence to active BO |
2017-11-08 | No data | NORTH 9 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 9/16/2017. Respondent |
2017-11-06 | No data | RODMAN PLACE, FROM STREET LONGFELLOW AVENUE TO STREET WEST FARMS ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plumber restoration sealed |
2017-11-06 | No data | ORCHARD STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There is a temp water cut behind a construction fence , a BO is in progress Will reinsp when BO is complete |
2017-11-06 | No data | EAST 86 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER: New permit # M012017298A60 |
2017-11-06 | No data | CROSS BRONX EXPRESSWAY, FROM STREET LONGFELLOW AVENUE TO STREET WEST FARMS ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plumber restoration sealed |
2017-11-06 | No data | EAST 86 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - SEWER: FYI: R/W has been repaved: |
2017-11-04 | No data | WEST 22 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 5 steel plates in the roadway. new permit M012017306A77 at time of this inspection. |
2017-11-03 | No data | NARRAGANSETT AVENUE, FROM STREET LYDIG AVENUE TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 10/19/17. |
2017-11-01 | No data | GEORGIA AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the d/l |
2017-11-01 | No data | EDISON AVENUE, FROM STREET ST THERESA AVENUE TO STREET BUHRE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in the P/D lane flush and sealed. |
2017-11-01 | No data | POWER ROAD, FROM STREET 23 AVENUE TO STREET 24 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permittee Out of business? |
2017-10-30 | No data | NARRAGANSETT AVENUE, FROM STREET LYDIG AVENUE TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | plumber cut plated, pinned and ramped, in roadway and sidewalk. |
2017-10-30 | No data | RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST BURNSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Sidewalk restoration not in kind. Full flag restoration needed in concrete - Expansion joints need to be installed - Sidewalk expansion joints need to be sealed |
2017-10-28 | No data | LINDEN BOULEVARD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TRENCH COVERED BY BUILDERS PAVERS |
2017-10-27 | No data | EAST 138 STREET, FROM STREET RIDER AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work completed under later permit |
2017-10-27 | No data | EAST 138 STREET, FROM STREET RIDER AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work in progress |
2017-10-27 | No data | VESTRY STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Contacted permittee via phone,to setup a field meeting to go over specific location of sewe cut/trench & work procedures as per DOT standard specifications (stip 105). Spoke with Matt, foreman at location who couldn't specify location. Pending meetin |
2017-10-27 | No data | WEST 22 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | respondent is not in compliance with LL14 to commence back-filling at this time |
2017-10-26 | No data | WEST 22 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | respondent failed o comply with backfill procedures 2-11(e)(3)(ii) full street opening of new sewer installation , no tunneling acceptable |
2017-10-26 | No data | BATHGATE AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 1 Sewer trench = 10'x 4'-- 11' opp 1259 PASS. |
2017-10-25 | No data | MOHEGAN AVENUE, FROM STREET BRONX PARK SOUTH TO STREET HORNADAY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut back was not done on 2' x 2' perm restoration in the roadway,as per dot section rules 2-11 (e)12. Full concrete flag restoration needs to be restored on the sidewalk, patch work with temp asphalt is not acceptable. |
2017-10-24 | No data | NORTH 9 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 cuts on r/w overdue for final . nov will be issued under newer permit on file |
2017-10-23 | No data | WEST 118 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The Standard specification as per sub section (e) (12)(iv) "When One or more openings are made against the a single permit and are 3ft or less from each other cut shall be made as one at the Wearing Course. CAR#20175010103 Issued 8-10-17 |
2017-10-23 | No data | SIMPSON STREET, FROM STREET EAST 163 STREET TO STREET FIRE ACCESS LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | up to date permit on file |
2017-10-21 | No data | NEVINS STREET, FROM STREET LIVINGSTON STREET TO STREET SCHERMERHORN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r\w paved |
2017-10-21 | No data | EAST 139 STREET, FROM STREET ALEXANDER AVENUE TO STREET WILLIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced |
2017-10-20 | No data | BEACH AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has new permit # x012017284a43 valid till 11/1/17 steel plates over trench rd'wy & sidewalk O.K. |
2017-10-20 | No data | WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street found resurfaced after new building completed. |
2017-10-19 | No data | EAST 156 STREET, FROM STREET COURTLANDT AVENUE TO STREET MELROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2017-10-18 | No data | WEST 22 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | respondent failed to open entire excavation from connection in roadway into building property. respondent also failed to perform proper lifts respondent didnt provide enough materials at time of work , 23'ft x 4'ft x 5'ft 4'inch with and 8'ft tunnel |
2017-10-18 | No data | JANE STREET, FROM STREET GREENWICH AVENUE TO STREET WEST 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please comply with 1042A procedures, proper cutbacks 6"&12" not made. width of restoration only 32". Please correct. i/f/o20 opposite 11 |
2017-10-18 | No data | ORCHARD STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done, New permit on file M012017284C20 |
2017-10-18 | No data | WEST 27 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active B/O unable to locate work. |
2017-10-17 | No data | ALEXANDER AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET EAST 134 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has updated permit # X012017269B38. |
2017-10-17 | No data | 8 AVENUE, FROM STREET WEST 140 STREET TO STREET WEST 141 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut |
2017-10-17 | No data | EAST 219 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Active | Department of Transportation | NO CONTAINER AT TIME OF INSPECTION |
2017-10-17 | No data | EAST 120 STREET, FROM STREET 1 AVENUE TO STREET PLEASANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Crew on site .A active Valid permit found |
2017-10-17 | No data | NORTH 9 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Concrete truck has broken down en route to location. Will re-schedule for a later time. |
2017-10-17 | No data | WEBSTER AVENUE, FROM STREET EAST 233 STREET TO STREET WOODLAWN CEMETERY BOUNDARY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH IN THE D/L AND P/L COLOR CODED |
2017-10-17 | No data | ALEXANDER AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET EAST 134 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Jason on site working on a open excavation in the driving lane. |
2017-10-14 | No data | GRAND STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in roadway ifo 283 acceptable. |
2017-10-14 | No data | LENOX ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TWO PERM TRENCHS IN THE ROADWAY PARTIALLY COVERED BY CONTAINER |
2017-10-13 | No data | WEST 22 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | at this time excavation filled with water & preexisting materials which is covering connection. backfill not prepared for commencement at this time 23'ft L x 4'ft W x 8'ft 2''inches D. |
2017-10-13 | No data | WEST 39 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water cut in the driving lane IFO 30 |
2017-10-13 | No data | WEST 44 STREET, FROM STREET 10 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R/W RESURFACED |
2017-10-13 | No data | BATHGATE AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated work site |
2017-10-13 | No data | EAST 183 STREET, FROM STREET BATHGATE AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later work done |
2017-10-13 | No data | WEST 35 STREET, FROM STREET 10 AVENUE TO STREET LINCOLN TNNL APPROACH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active B/O at location unable to locate work at this time. |
2017-10-12 | No data | 35 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to inspect. Active BO. Area behind fence |
2017-10-12 | No data | EAST 86 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plate pinned & ramped in the d/l, I/F/O 350 |
2017-10-12 | No data | EAST 86 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | More recent permit on file (M012017283B02) |
2017-10-11 | No data | SIMPSON STREET, FROM STREET EAST 163 STREET TO STREET FIRE ACCESS LANE | No data | Street Construction Inspections: LL14 | Department of Transportation | 15' by 4' backfillcutback was done on site |
2017-10-10 | No data | STORY AVENUE, FROM STREET BOYNTON AVENUE TO STREET ELDER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | At 1520 Story Ave.,⢠1 of 3 unsecured plates, center plate, at plated excavation across driving lane, plate bounces 1-2â when rolled upon, with 1-2â gap in between plates causing hazardous condition to bicyclists & motorists. |
2017-10-10 | No data | STORY AVENUE, FROM STREET BOYNTON AVENUE TO STREET ELDER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Steels plates continue to jolt 1"-2" up when driven over, causing a hazardous condition in this heavy traffic area with constant trucks and school bus travel. All steel plates needs to be pin and ramp and on all sides I/F/O 1520 . |
2017-10-08 | No data | BEAUMONT AVENUE, FROM STREET EAST 183 STREET TO STREET EAST 187 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done, street resurfaced |
2017-10-05 | No data | WEST 22 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 4 steel plates secured to the roadway and 2 on the sidewalk with later permit on file. |
2017-10-04 | No data | WEST 15 STREET, FROM STREET HIGH LINE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | refer to latest permit M012017251B17 |
2017-10-04 | No data | NORTH 9 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | (L) 21 feet 6 inches x (W) 4 feet 2 inches x (D) 4 feet.. 2nd cut: 11 feet x (W) 5 feet x (D) 8 feet. compaction of 95.9,96.3,96.9 and 96.9%.. monitored from 9:57-2:00p.m. |
2017-10-04 | No data | WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No 18'' cutback was done on 1 out of 2 permanent cuts measuring 3' in width as per dot drawing H-1042D note 6 and 1 out of 2 said cuts has chipped out wearing course mix with binder that needs to be repaved in kind. |
2017-10-02 | No data | ALEXANDER AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET EAST 134 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | failed to restore permanent sewer cut either square or rectangle as per 1042 A-D Specifications |
2017-10-02 | No data | BLACKROCK AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET CROSS BRONX EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 R/W Cut & 1 S/W Flag O.K. |
2017-10-02 | No data | BARNES AVENUE, FROM STREET EAST 213 STREET TO STREET EAST 214 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2017-09-28 | No data | WEST 34 STREET, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There are two cuts in the bus lane 1)permanent restoration cuts that do not comply with H1042 18 " cut back was not done one two sides of each cut. 2) Failed to paint the permanent restoration with red paint. |
2017-09-28 | No data | WEST 33 STREET, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - REPAIR WATER - SEWER: This is part of the Hudson yrds project the segment is closed off. |
2017-09-27 | No data | NARRAGANSETT AVENUE, FROM STREET LYDIG AVENUE TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Plumber cut plated |
2017-09-27 | No data | WEST 162 STREET, FROM STREET OGDEN AVENUE TO STREET SUMMIT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2017-09-27 | No data | WEST 33 STREET, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER: Work was done under permit # M012017202D67 |
2017-09-27 | No data | NARRAGANSETT AVENUE, FROM STREET LYDIG AVENUE TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sewer cut plated, updated permit on file |
2017-09-26 | No data | 1 AVENUE, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk is in compliance. |
2017-09-26 | No data | FULTON STREET, FROM STREET HUDSON AVENUE TO STREET ROCKWELL PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ACTIVE PERMIT ON FILE #B012017264D46 |
2017-09-26 | No data | BROADWAY, FROM STREET WEST 25 STREET TO STREET WEST 26 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway Resurfaced by building operation. |
2017-09-26 | No data | NEVINS STREET, FROM STREET LIVINGSTON STREET TO STREET SCHERMERHORN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok |
2017-09-25 | No data | BUHRE AVENUE, FROM STREET JARVIS AVENUE TO STREET MAHAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water trench crossing the roadway , flush and sealed. |
2017-09-24 | No data | 5 AVENUE, FROM STREET EAST 26 STREET TO STREET WEST 25 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | THIS PORTION OF THE ROADWAY HAS BEEN REPAVED THE CITED ADDRESS "BPP'' . |
2017-09-23 | No data | WEST 28 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete jersey barriers in the roadway unable to view possible restoration in the roadway. |
2017-09-22 | No data | WEST 169 STREET, FROM STREET NELSON AVENUE TO STREET PLIMPTON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Only 1/2 done not enough concrete will call for new time to finish. |
2017-09-21 | No data | UNION STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 31FT X 5FT PERM RESTORATION TRENCH ON THE ROADWAY IN THE DRIVING LANE IN FRONT OF 889 IS FLUSH TO GRADE IN GOOD CONDITION |
2017-09-21 | No data | HUMBOLDT STREET, FROM STREET DEVOE STREET TO STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORN NOT DONE, PERMIT EXPIRED |
2017-09-20 | No data | GEORGIA AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | CHECKING... CREW ON SITE WORKING A THIS TIME OF INSPECTION |
2017-09-20 | No data | 27 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 plated excavations in r/w |
2017-09-20 | No data | 27 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 plated excavations in r/w. Active permit in file |
2017-09-20 | No data | WEST 169 STREET, FROM STREET NELSON AVENUE TO STREET PLIMPTON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | base rescheduled |
2017-09-20 | No data | GRAND STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 perm water cut ifo 285 in driving lane. |
2017-09-20 | No data | 4 AVENUE, FROM STREET 15 STREET TO STREET 16 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 cuts on r/w behind barriers |
2017-09-17 | No data | 3 AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER - PROTECTED |
2017-09-17 | No data | 3 AVENUE, FROM STREET EAST 109 STREET TO STREET EAST 110 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I'm closing this out due to a Con Edison restoration that is adjacent to scarring found on roadway. |
2017-09-16 | No data | 35 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active building operation. Unable to locate cut |
2017-09-16 | No data | AVENUE D, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp water cut in active BO work side. Permit M022017255E27 for occupying roadway acceptable. |
2017-09-16 | No data | EAST 112 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced, sidewalk in compliance. |
2017-09-16 | No data | EAST 162 STREET, FROM STREET DEAD END TO STREET MELROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At 432 E.162 St.,7'x3' area of perm cut asphalt broken out 2" |
2017-09-15 | No data | MYRTLE AVENUE, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no wk seen (building opr) |
2017-09-13 | No data | SHAKESPEARE AVENUE, FROM STREET WEST 169 STREET TO STREET WEST 170 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2017-09-13 | No data | NELSON AVENUE, FROM STREET WEST 167 STREET TO STREET WEST 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2017-09-13 | No data | WEBSTER AVENUE, FROM STREET EAST 204 STREET TO STREET EAST 205 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2017-09-12 | No data | VESTRY STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Notification was send to HIQA via Email. However, a reply was send to company to provide permit # & start time of cobblestones restoration but no response received. Cobblestones were restore. Spoke with permittee. Area currently with Triumph plates. |
2017-09-12 | No data | VESTRY STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to latest sewer permit M012017237B31. |
2017-09-10 | No data | EAST 223 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY REPAVED |
2017-09-09 | No data | WEST 28 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Wet Density: 128.4Dry Density: 119.4Max Dry Density: 124.5Actual Moisture: 7.5%Arrived at BAC, tech on site. Excavation is 4'X3' - 4'7" deep. 2 lifts 2 tests. 97, 96.7 |
2017-09-09 | No data | TENBROECK AVENUE, FROM STREET BEND TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in roadway |
2017-09-08 | No data | EAST 31 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | area currently occupied , work not visible |
2017-09-08 | No data | MARION AVENUE, FROM STREET EAST 194 STREET TO STREET EAST 195 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2017-09-07 | No data | WEST 34 STREET, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I found rspondent failed to combine 2 cuts into one cutas per standard details H1042A. C.A.R.#20176030162 was issued 4/19/17 prior to NOV being written. |
2017-09-07 | No data | LIVINGSTON STREET, FROM STREET FLATBUSH AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2017-09-05 | No data | WEST 169 STREET, FROM STREET NELSON AVENUE TO STREET PLIMPTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew working on site |
2017-09-05 | No data | WEST 169 STREET, FROM STREET NELSON AVENUE TO STREET PLIMPTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | up to date permit on file |
2017-09-05 | No data | NEVINS STREET, FROM STREET LIVINGSTON STREET TO STREET SCHERMERHORN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | joints on the sidewalk not seal |
2017-09-02 | No data | JACKSON AVENUE, FROM STREET ORCHARD STREET TO STREET WEST STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade in the p/l |
2017-09-02 | No data | WEST 138 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut extended from the P/L to the D/L flushed to grade |
2017-09-02 | No data | PROSPECT AVENUE, FROM STREET EAST 156 STREET TO STREET MACY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Street repaved |
2017-08-31 | No data | WEST 28 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway occupied at time of inspection by BO |
2017-08-31 | No data | BELMONT AVENUE, FROM STREET EAST 179 STREET TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration does not have proper 6" base and 12" wearing course cut backs. Sidewalk flag also needs expansion joints sealed. |
2017-08-30 | No data | AMSTERDAM AVENUE, FROM STREET WEST 147 STREET TO STREET WEST 148 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restoration flushed |
2017-08-29 | No data | RODMAN PLACE, FROM STREET LONGFELLOW AVENUE TO STREET WEST FARMS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber perm restoration needs to be sealed in the roadway. |
2017-08-29 | No data | CROSS BRONX EXPRESSWAY, FROM STREET LONGFELLOW AVENUE TO STREET WEST FARMS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration street joint, needs to be sealed |
2017-08-29 | No data | EAST NEW YORK AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK FOUND ON SIDE WALK OR SEGMENT |
2017-08-29 | No data | WEST 169 STREET, FROM STREET NELSON AVENUE TO STREET PLIMPTON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 14'.2'' by 4' backfill6'' cut back was done on site |
2017-08-29 | No data | 3 AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Trench 17'8''x 4'2''--5'5'' in P &D lane PASS. |
2017-08-28 | No data | WEST 35 STREET, FROM STREET 10 AVENUE TO STREET LINCOLN TNNL APPROACH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 Steel Plates secured to the Roadway and 1 on the Sidewalk I/F/O 445, Active Permit maintained on file... (M012017220B87) |
2017-08-28 | No data | LENOX ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED EXCAVATION IN ROADWAY NEW PERMIT ON FILE |
2017-08-27 | No data | NORTH 10 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | complete r/w was found re-paved |
2017-08-27 | No data | WEST 22 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 3 steel plates on roadway, 1 of the 3 ( middle ) , plate loose and noisy |
2017-08-26 | No data | 165 STREET, FROM STREET ARCHER AVENUE TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 0114 - REPAIR SEWER /perm cut r/w |
2017-08-25 | No data | 3 AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit, X012017219A23. Steel plates on site. |
2017-08-25 | No data | HUMBOLDT STREET, FROM STREET DEVOE STREET TO STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE DRIVING LANE ON HUMBOLDT IN FRONT OF #771 |
2017-08-25 | No data | 3 AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Pass |
2017-08-25 | No data | 21 STREET, FROM STREET 46 ROAD TO STREET JACKSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | builder's pave |
2017-08-25 | No data | WEST 48 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 5 water cuts in the roadway IFO 148 |
2017-08-25 | No data | GRAND STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | (2) cuts 1)- 2'10" X2' X 4' & 2)-2'8" X 2' X 4' Wet-120.0 / Dry-110.4 / Max-116.0 Test first cut 96.2 & 96.9 second cut-96.5 & 97.2 Cut backs observed. |
2017-08-24 | No data | CRUGER AVENUE, FROM STREET BURKE AVENUE TO STREET SOUTH OAK DRIVE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O No cut back were made on plumber 2'6" x 2' perm restoration, on newly paved roadway as per CAR# 20174820246 issued 7/1/17 |
2017-08-23 | No data | EAST 167 STREET, FROM STREET FULTON AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cut finalized. Other action to be taken |
2017-08-22 | No data | EAST 90 STREET, FROM STREET 1 AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2017-08-22 | No data | WEST 34 STREET, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 Cuts measure identical to after completion of Base no Wearing Course Cutback has been done, upon completion of WC red paint must be restored. Also Sidewalk expansion Joint was sealed with Tar which is unacceptable,DOT approved silicon must be used. |
2017-08-20 | No data | EAST 86 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent "Sewer" restoration flush to grade in the roadway. |
2017-08-20 | No data | EAST 31 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to obtain a Confirmation number on a Protected Street. |
2017-08-19 | No data | LORIMER STREET, FROM STREET GRAND STREET TO STREET POWERS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO SEAL EXPANSION JOINT ON SIDEWALK AS PER CAR#20160920414 ISSUED ON 11/27/16. |
2017-08-19 | No data | MAPLE STREET, FROM STREET EAST 48 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent failed to comply with Standard Specifications, specifically Standard Detail Drawing H-1042D. Two permanent trenches found in the roadway without required cutbacks, and irregular shaped. |
2017-08-19 | No data | MAPLE STREET, FROM STREET EAST 48 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent failed to restore lane marking (bike-lane). On 6/5/17, respondent was notified of condition via CAR#20176260205, and failed to take any corrective action. Permit B012017095B08 was used to ID. |
2017-08-18 | No data | 3 AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill re schedule due rain |
2017-08-16 | No data | EAST 31 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active Construction site unable to see work. |
2017-08-16 | No data | WEST 4 STREET, FROM STREET BANK STREET TO STREET WEST 12 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done on sidewalk. Old sidewalk still in place. Active B/O at location. |
2017-08-16 | No data | 3 AVENUE, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water and sewer now share to the same trench. |
2017-08-16 | No data | AMSTERDAM AVENUE, FROM STREET WEST 111 STREET TO STREET WEST 112 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Roadway flush to grade. |
2017-08-15 | No data | SIMPSON STREET, FROM STREET EAST 163 STREET TO STREET FIRE ACCESS LANE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate under concrete truck. |
2017-08-15 | No data | SIMPSON STREET, FROM STREET EAST 163 STREET TO STREET FIRE ACCESS LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B project |
2017-08-15 | No data | WEST 35 STREET, FROM STREET 10 AVENUE TO STREET LINCOLN TNNL APPROACH | No data | Street Construction Inspections: Active | Department of Transportation | 0114 - REPAIR SEWER /plated excavation |
2017-08-12 | No data | 35 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plated p/d/l - active BO. |
2017-08-10 | No data | EAST 175 STREET, FROM STREET CROTONA PARK NORTH TO STREET MOHEGAN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | monitored site from 0938-1045am, BF acceptable @1045am. |
2017-08-10 | No data | 38 AVENUE, FROM STREET 25 STREET TO STREET 27 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 12'x4' perm cut |
2017-08-10 | No data | RODMAN PLACE, FROM STREET LONGFELLOW AVENUE TO STREET WEST FARMS ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | 21.8 x 4 down 4.2 trench adjacent to west farms crosswalk. |
2017-08-10 | No data | WEST 139 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to obtain a Confirmation number on a Protected Street. |
2017-08-10 | No data | WEST 118 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESTORATIONS 10' OR LESS FROM EACH OTHER SHALL BE JOINED AS ONE AT THE "WEARING COURSE" ONLY. as per STANDARD DETSILS OF CONSTRUCTION 1042 A-DALSO SEAL STREET JOINTS |
2017-08-08 | No data | 3 AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1J Project |
2017-08-07 | No data | EAST 31 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to obtain a Confirmation number on a Protected Street. |
2017-08-05 | No data | WEST 28 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 6/4/17. Respondent failed to obtain a confirmation number |
2017-08-05 | No data | HAWKINS STREET, FROM STREET PAULIS PLACE TO STREET WILLIAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration is ok...located btwn William & Dead end opp #20 |
2017-08-05 | No data | 3 AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm & plated in d/l-series |
2017-08-05 | No data | 3 AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET | No data | Street Construction Inspections: Active | Department of Transportation | perm & plated in d/l |
2017-08-04 | No data | EAST 78 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w joints not sealed. |
2017-08-04 | No data | EAST 198 STREET, FROM STREET CRESTON AVENUE TO STREET JEROME AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL HAS PASSED. INSPECTED / IN COMPLIANCE. |
2017-07-31 | No data | BEACH CHANNEL DRIVE, FROM STREET BEACH 51 STREET TO STREET BEACH 53 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TIME OF INSPECTION ROADWAY PAVED OVER |
2017-07-30 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 50 STREET TO STREET BEACH 52 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER on s/w |
2017-07-27 | No data | DESBROSSES STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to notify DOT for monitoring of cobblestones as stated on permit. Spoke with Albert (foreman) & Matt who confirmed their sewer work. NOV issued. |
2017-07-26 | No data | 3 AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 1 water cut on the sidewalk and 1 cut on the parking/ driving lane, I/F/O 3475, leaving location for complaint. |
2017-07-25 | No data | WEST 28 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | utility work in north parking lane |
2017-07-25 | No data | EAST 31 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to see work due to an active Construction site. |
2017-07-24 | No data | SMITH STREET, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no visible cuts due to r/w being paved half plus five |
2017-07-22 | No data | WEST 34 STREET, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | (2) cuts along driving lane. Concrete base applied. 4â9â X 3â9â x 1â1â & 4â6â X 3â9â X 1â1â |
2017-07-21 | No data | CROSS BRONX EXPRESSWAY, FROM STREET LONGFELLOW AVENUE TO STREET WEST FARMS ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | 1 Cut = 8'x 8' --7'8'' PASS. |
2017-07-21 | No data | WEST 139 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | active permit on file |
2017-07-20 | No data | ANTHONY AVENUE, FROM STREET BUSH STREET TO STREET EAST 179 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2017-07-20 | No data | ALEXANDER AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET EAST 134 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site, Plated excavation in driving lane. |
2017-07-17 | No data | FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ATPO I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE TEMPORARY RESTORATION CUT ON THE SIDEWALK IN FRONT OF 1452 WITHIN REQUIRED TIME. DOT PERMIT EXP 2/2/2016 DOT PERMIT#B012016004D33. USED FOR ID |
2017-07-17 | No data | WEST 139 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill PASS 1 cut 97.3, 97.2% and 2nd 97.0%, both cut was made into one large trench. Only concrete was used. Will be left plated during curing. |
2017-07-17 | No data | WEST 139 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | bf taken over by inspector #369 |
2017-07-15 | No data | WEST 34 STREET, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | Base re-scheduled due to concrete mixer breaking down |
2017-07-15 | No data | POWER ROAD, FROM STREET 23 AVENUE TO STREET 24 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ifo 23-38 There's a perm cut around water valve that is sunken 1" in localized area forming a ponding condition along the sidewalk. Also restore abrasion on wearing course on perm cut in the Parking/Driving lane. |
2017-07-15 | No data | FORSYTH STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm WATER repair acceptable |
2017-07-15 | No data | MOTT STREET, FROM STREET EAST HOUSTON STREET TO STREET PRINCE STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Wet Density: 127.8Dry Density: 116.3Max Dry Density: 119.5Actual Moisture: 9.8%Arrived at BAC, tech on site, Material(BLEND) passed. Excavation 8'X3'6" - 3' deep. 1 lift 1 test, 96.9 |
2017-07-14 | No data | LANDING ROAD, FROM STREET CEDAR AVENUE TO STREET MAJOR DEEGAN EXPRESSWAY | No data | Street Construction Inspections: Active | Department of Transportation | plated work in progress |
2017-07-14 | No data | WEST 34 STREET, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | (2) Cuts along driving lane. 1)- 3'8" X 3'4" X 4' & 3'8" X 2'11" X 4'7". Proctor-wet-127.2/ Dry-115.8/ Max-119.5/ Moisture-9.8 Test cut 1- 97.5 & 98.7 Cut-2 98.3 & 98.6 Cut backs observed |
2017-07-14 | No data | LANDING ROAD, FROM STREET CEDAR AVENUE TO STREET MAJOR DEEGAN EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work completed under later permit |
2017-07-13 | No data | WEST KINGSBRIDGE ROAD, FROM STREET BEND TO STREET HEATH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permit expired |
2017-07-12 | No data | GRAND AVENUE, FROM STREET WEST 190 STREET TO STREET WEST 192 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later work done IFO 2536-38 |
2017-07-12 | No data | BROOME STREET, FROM STREET ATTORNEY STREET TO STREET CLINTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | condition currently plated, acceptable |
2017-07-12 | No data | BROOME STREET, FROM STREET ATTORNEY STREET TO STREET CLINTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work to continue on permit#M012017191C07 |
2017-07-12 | No data | BOERUM STREET, FROM STREET BUSHWICK AVENUE TO STREET BUSHWICK PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDE WALK IS OK |
2017-07-11 | No data | WEST 34 STREET, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O 509 1 Steel Plate in the Bus Lane marked "Empire Sewer" also 1 plates secured to the Sidewalk |
2017-07-11 | No data | NORTH 10 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut needs to be squared off as per DOT Standard Specification 1042 D Note #3cut must be square or rectangular |
2017-07-10 | No data | 3 AVENUE, FROM STREET EAST 109 STREET TO STREET EAST 110 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | condition remains, no action taken. |
2017-07-10 | No data | GRAND AVENUE, FROM STREET WEST 190 STREET TO STREET WEST 192 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later work done IFO 2536-38 |
2017-07-08 | No data | LANDING ROAD, FROM STREET CEDAR AVENUE TO STREET MAJOR DEEGAN EXPRESSWAY | No data | Street Construction Inspections: Active | Department of Transportation | work in progress |
2017-07-08 | No data | EAST 31 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: LL14 | Department of Transportation | By building operation. L: 6 ft 3 in W: 5 ft 3 in. D: 5 ft 5 in. Void cut back made for irregular shape. |
2017-07-07 | No data | BUSHWICK PLACE, FROM STREET BOERUM STREET TO STREET JOHNSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CUT COVERED BY BUILDERS PAVERS |
2017-07-06 | No data | EAST 62 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Restoration flush to grade in the roadway. |
2017-07-06 | No data | WEST 35 STREET, FROM STREET 10 AVENUE TO STREET LINCOLN TNNL APPROACH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area Plated, Permittee maintaining an active Permit on file for this location.. (M012017160B74) |
2017-07-06 | No data | WEST 35 STREET, FROM STREET 10 AVENUE TO STREET LINCOLN TNNL APPROACH | No data | Street Construction Inspections: Active | Department of Transportation | 2 Steel Plates secured to the roadway I/F/O 445. |
2017-07-06 | No data | OGDEN AVENUE, FROM STREET WEST 163 STREET TO STREET WEST 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | up to date permit on file |
2017-07-06 | No data | OGDEN AVENUE, FROM STREET WEST 163 STREET TO STREET WEST 164 STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site working |
2017-07-05 | No data | AVENUE A, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rdwy has been resurfaced & s/w replaced |
2017-07-04 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in roadway |
2017-07-04 | No data | MICKLE AVENUE, FROM STREET BURKE AVENUE TO STREET GIVAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in roadway |
2017-07-02 | No data | LORIMER STREET, FROM STREET GRAND STREET TO STREET POWERS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed a sidewalk flag with an expansion joint installed but not sealed. Sidewalk was left with plastic capping covering the expansion joint. Respondent was notified to make correction via CAR #20160920414 on 11/27/16 and failed to do so |
2017-07-01 | No data | CRUGER AVENUE, FROM STREET BURKE AVENUE TO STREET SOUTH OAK DRIVE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plumber failed to do the required cut back on perm restoration |
2017-06-30 | No data | 3 AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 11' by 4' backfillContractor is only backfilling up to 5' because DEP will be making a water connection next week sometime. Then Arben Contracting of N. Y. Inc. will contact the office with a new Conformation number to backfill |
2017-06-29 | No data | EAST 100 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site, concrete curing, crew filling sidewalk. |
2017-06-29 | No data | EAST 100 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 17ft 4 ft 3ft 10" 2 tests- 95.5 95.8 |
2017-06-29 | No data | EAST 162 STREET, FROM STREET MORRIS AVENUE TO STREET TELLER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2017-06-29 | No data | MOTT STREET, FROM STREET EAST HOUSTON STREET TO STREET PRINCE STREET | No data | Street Construction Inspections: Active | Department of Transportation | work in progress, condition plated, acceptable |
2017-06-29 | No data | MOTT STREET, FROM STREET EAST HOUSTON STREET TO STREET PRINCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work to continue on permit#M012017163C63 |
2017-06-27 | No data | AVENUE D, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to locate restoration due to BO |
2017-06-26 | No data | BUHRE AVENUE, FROM STREET JARVIS AVENUE TO STREET MAHAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2017-06-24 | No data | 3 AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET | No data | Street Construction Inspections: Active | Department of Transportation | r/w & s/w plated |
2017-06-22 | No data | PLEASANT AVENUE, FROM STREET EAST 117 STREET TO STREET EAST 118 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | resurfaced due to new building |
2017-06-22 | No data | EAST 100 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sewer and water service are sharing the same trench. |
2017-06-22 | No data | EAST 100 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | water and sewer are sharing the same trench, trench is currently plated. |
2017-06-22 | No data | EAST 62 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Three steel plates secured to the roadway with later permit on file. |
2017-06-22 | No data | EAST 3 STREET, FROM STREET 2 AVENUE TO STREET BOWERY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to locate restoration could have been resurfaced no s/w observed |
2017-06-21 | No data | EAST 112 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restoration no defects |
2017-06-21 | No data | YATES AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in r/w |
2017-06-20 | No data | 3 AVENUE, FROM STREET EAST 109 STREET TO STREET EAST 110 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O the respondent has fail to repair the scaring of the roadway, as per CAR# 20163790223 dated 12/21/2016. Condition remains the same, resulting in this 2nd NOV. |
2017-06-19 | No data | AVENUE A, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rdwy has been resurfaced and s/w replaced |
2017-06-19 | No data | TAYLOR AVENUE, FROM STREET MC GRAW AVENUE TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in the roadway is good. Inspected / In Compliance. |
2017-06-18 | No data | PROSPECT AVENUE, FROM STREET EAST 156 STREET TO STREET MACY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Your sewer trench measure 3ft 11 inches, proper cut backs were not done. |
2017-06-18 | No data | BEACH AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Must add new color code with year and IBM # on perm gas cut in the driving lane, I/F/O 719. |
2017-06-18 | No data | EAST 162 STREET, FROM STREET DEAD END TO STREET MELROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | believed to be 40 east of main entry gate. |
2017-06-17 | No data | ORCHARD STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | active NB in progress, condition inside fence |
2017-06-17 | No data | WEST 44 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2106 WATER CUT IN THE DRVING AND PARKNG LANE I/F/O 536 E 43STREET |
2017-06-17 | No data | EAST 31 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit on file also at an active Construction site. |
2017-06-15 | No data | TAYLOR AVENUE, FROM STREET MC GRAW AVENUE TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration is good. Inspected / In Compliance. |
2017-06-14 | No data | WEST 42 STREET, FROM STREET 10 AVENUE TO STREET DYER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A Majority of the Sidewalk I/F/O "Manhattan Plaza Parking" have been restored, unable to determine which was done by water contractor. |
2017-06-13 | No data | WEST 118 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Permit still "active" but Sidewalk no joints installed and 2 cuts in roadway are not sealed as they were made final.NOTE: RESTORATIONS 10' OR LESS FROM EACH OTHER SHALL BE JOINED AS ONE AT THE "WEARING COURSE" ONLY. |
2017-06-13 | No data | WEST 118 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | more recent permit on file- 2 PLUMBERS CUTS IN ROADWAY NEEDS TO BE SEALAED AS THEY ARE FINAL- AWAITING EXPIRATION ON PERMIT |
2017-06-13 | No data | HONE AVENUE, FROM STREET ESPLANADE TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2017-06-13 | No data | WEST 138 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water restoration flushed |
2017-06-13 | No data | 35 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 0115P - REPAIR WATER - SEWER - PROTECTED /plated excavation |
2017-06-12 | No data | BARNES AVENUE, FROM STREET EAST 213 STREET TO STREET EAST 214 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done under later permit. |
2017-06-12 | No data | BARNES AVENUE, FROM STREET EAST 213 STREET TO STREET EAST 214 STREET | No data | Street Construction Inspections: Active | Department of Transportation | New sidewalk flags around water valve box and perm restoration in parking lane. |
2017-06-11 | No data | WEST 34 STREET, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Empire Sewer marked Steel Plate in the Bus Lane Opposite 516 "Post Office entrance" |
2017-06-11 | No data | EAST 167 STREET, FROM STREET FULTON AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO I observed the respondents failure to comply with DOT Standard Specifications of 1042B for concrete roadway restoration. CAR 20174960052 issued but respondent failed to make the repair |
2017-06-09 | No data | MC DONALD STREET, FROM STREET BASSETT AVENUE TO STREET STILLWELL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | fire hydrant in place |
2017-06-09 | No data | NARRAGANSETT AVENUE, FROM STREET LYDIG AVENUE TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2017-06-08 | No data | VESTRY STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cobblestones ok |
2017-06-08 | No data | EAST 100 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 8ft 9" down. Installing 8"water main. 9ft x 4ft. only 4-5ft being backfilled4 lefts 2 tests- 97.2 96.8 |
2017-06-07 | No data | AMSTERDAM AVENUE, FROM STREET WEST 111 STREET TO STREET WEST 112 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please notified Arben Contracting of New York Inc.. Asphalt broken out and down 5 to 6 inches I/F/O. 1047 Amsterdam avenue. White and orange cones place in cave in. |
2017-06-07 | No data | AMSTERDAM AVENUE, FROM STREET WEST 111 STREET TO STREET WEST 112 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Please notified Arben Contracting of New York Inc.. Asphalt broken out and down 5 to 6 inches I/F/O. 1047 Amsterdam avenue. White and orange cones place in cave in. |
2017-06-05 | No data | EAST 167 STREET, FROM STREET BOSTON ROAD TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2017-06-05 | No data | MAPLE STREET, FROM STREET EAST 48 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1. Failure to adhere to Standard Drawing H-1042D:a. All trench restorations should be square or rectangular shaped. b. Required cutbacks were not completed; should have a min. size of 54"x54" after cutbacks. 2. Restore Bike-Lane markin |
2017-06-03 | No data | EAST 167 STREET, FROM STREET FULTON AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | condition remains the same. unable to fail or pass because of building operation is in progress |
2017-06-02 | No data | AMSTERDAM AVENUE, FROM STREET WEST 111 STREET TO STREET WEST 112 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Please notified D.E.P. Asphalt broken out and down 5 to 6 inches I/F/O. 1047 Amsterdam avenue |
2017-06-02 | No data | 3 AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew working on site |
2017-06-02 | No data | OGDEN AVENUE, FROM STREET WEST 163 STREET TO STREET WEST 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 987-89 Ogden Avenue, I observed the the respondents use of street without a valid permit on file for the steel plate covering excavation below. The permit for the steel plates with green color code expired 5/23/2017 |
2017-06-01 | No data | EAST 167 STREET, FROM STREET FULTON AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w ok |
2017-06-01 | No data | EAST 176 STREET, FROM STREET BOSTON ROAD TO STREET CROTONA PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | FOUND RESURFACED |
2017-06-01 | No data | EAST 170 STREET, FROM STREET COTTAGE PLACE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2017-05-30 | No data | FORSYTH STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Water repairs completed. wearing course restored & looks acceptable. However, LL14 for concrete was supposed to be re-schedule but base was done anyways. IFO 204 Forsyth st. |
2017-05-30 | No data | 161 STREET, FROM STREET 59 AVENUE TO STREET BOOTH MEMORIAL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 flag replace |
2017-05-26 | No data | TOMLINSON AVENUE, FROM STREET MORRIS PARK AVENUE TO STREET RHINELANDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2017-05-25 | No data | WEST 4 STREET, FROM STREET BANK STREET TO STREET WEST 12 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Water repair acceptable |
2017-05-25 | No data | WEST 35 STREET, FROM STREET 9 AVENUE TO STREET LINCOLN TUNNEL ENTRANCE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I found respondent maintained a street opening covered with a steel plate without a permit to do so. Permit cited expired 5/23/17, and is also being used to identify respondent. |
2017-05-24 | No data | WEST 35 STREET, FROM STREET 9 AVENUE TO STREET LINCOLN TUNNEL ENTRANCE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I FOUnd respondent failed to restore cut within the required time. Permit cited expired 4/23/17 |
2017-05-21 | No data | LORIMER STREET, FROM STREET GRAND STREET TO STREET POWERS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed a sidewalk flag with an expansion joint installed but not sealed. Sidewalk was left with plastic capping covering the expansion joint. Respondent was notified to make correction via CAR #20160920414 on 11/27/16 and failed to do so |
2017-05-20 | No data | WEST 139 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation in the d/l. |
2017-05-20 | No data | WEST 139 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | More recent permit on file (M012017128A70) |
2017-05-20 | No data | FORSYTH STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Monitored backfill from 9:31am to 12:47pm |
2017-05-18 | No data | FORSYTH STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Failure to use skid resistant steel plates on roadway - NOV issued. |
2017-05-17 | No data | WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 permanent water cuts flushed to grade in driving lane. |
2017-05-17 | No data | BARNES AVENUE, FROM STREET EAST 213 STREET TO STREET EAST 214 STREET | No data | Street Construction Inspections: Active | Department of Transportation | cut plated on the sidewalk and parking lane |
2017-05-17 | No data | DESBROSSES STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sewer work not started at specific location as per sketch provide. Photos taken. |
2017-05-15 | No data | CRUGER AVENUE, FROM STREET BURKE AVENUE TO STREET SOUTH OAK DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No cut back were made on plumber 2'6" x 2' perm restoration, on newly paved roadway. Cut back need to be made ASAP |
2017-05-14 | No data | SOUTH 1 STREET, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in r/w. |
2017-05-14 | No data | WEST 48 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 Steel plates secured in the Center of the Roadway I/F/O 162 |
2017-05-12 | No data | WEST 139 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in driving lane |
2017-05-09 | No data | ORCHARD STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work to continue under permit#M012017122B90 |
2017-05-09 | No data | WEST 48 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK DONE |
2017-05-09 | No data | FORLEY STREET, FROM STREET 85 STREET TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade |
2017-05-08 | No data | PLEASANT AVENUE, FROM STREET EAST 117 STREET TO STREET EAST 118 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cant see restoration due to active B.O. at location |
2017-05-07 | No data | SHAKESPEARE AVENUE, FROM STREET CORPORAL IRWIN FISCHER PLACE TO STREET WEST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP, street resurfaced |
2017-05-07 | No data | SUMMIT AVENUE, FROM STREET WEST 162 STREET TO STREET WEST 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP street resurfaced |
2017-05-06 | No data | EAST 78 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In compliance. |
2017-05-04 | No data | LAFAYETTE AVENUE, FROM STREET ASHLAND PLACE TO STREET ROCKWELL PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CUT IN THE ROADWAY |
2017-05-04 | No data | 3 AVENUE, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IN COMPLIANCE NO DEFECTS UPON INSPECTION |
2017-05-03 | No data | MARION AVENUE, FROM STREET EAST 194 STREET TO STREET EAST 195 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | excavation in parking/driving lane of roadway with wood shoring applied.(L) 9'x9" (W) 5'x6" (D) 5' Void previously mentioned has been removed.Con ed will be cutting into Arben's restoration (in process with saw cut lines). |
2017-05-03 | No data | BARNES AVENUE, FROM STREET EAST 213 STREET TO STREET EAST 214 STREET | No data | Street Construction Inspections: Active | Department of Transportation | cut plated in parking lane |
2017-05-03 | No data | EAST 167 STREET, FROM STREET FULTON AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to locate cut |
2017-05-02 | No data | MARION AVENUE, FROM STREET EAST 194 STREET TO STREET EAST 195 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 10' by 4' backfill is incomplete cut was left 4' down until later date.I monitor backfill and two lift with done tester on site. contractor had to cut some void s out |
2017-05-02 | No data | 3 AVENUE, FROM STREET EAST 161 STREET TO STREET EAST 163 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in roadway opp of 3240. |
2017-04-29 | No data | EAST 60 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site |
2017-04-28 | No data | FULTON AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | up to date permit on file |
2017-04-25 | No data | 10 AVENUE, FROM STREET WEST 44 STREET TO STREET WEST 45 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 2/5/17. Respondent failed to obtain a confirmation number |
2017-04-25 | No data | SOUTH 1 STREET, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | (L) 14 feet by (W) 4 feet by (D) 4 feet. compaction of 97.1 and 97.7%... 3 foot void cut out... arrival 8;50am- 12:05pm. |
2017-04-25 | No data | FORSYTH STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Failure to use skid-resitant plates surface as required. NOV issued. |
2017-04-22 | No data | REV JAMES POLITE AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w ok |
2017-04-21 | No data | EAST 100 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate on r/w |
2017-04-21 | No data | EAST 100 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Above permit expired found active permit M012017097A00 on file |
2017-04-20 | No data | FORSYTH STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | over due for final |
2017-04-20 | No data | AVENUE D, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | respondent failed to obtain a confirmation number on a protected street by the department. |
2017-04-20 | No data | WEST 139 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | More recent permit on file (M012017101B82) |
2017-04-19 | No data | WEST 34 STREET, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to obtain a Confirmation number on a Protected Street |
2017-04-17 | No data | RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST BURNSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B issued |
2017-04-16 | No data | SOUTH 1 STREET, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permit renewed before expiration of permit. |
2017-04-15 | No data | EAST 167 STREET, FROM STREET FULTON AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3'x3' perm cut in concrete roadway, cut not restored and cutback as required by 1042B |
2017-04-15 | No data | 10 AVENUE, FROM STREET WEST 33 STREET TO STREET WEST 34 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 1/15/17. Respondent failed to obtain a confirmation number |
2017-04-15 | No data | 8 AVENUE, FROM STREET WEST 140 STREET TO STREET WEST 141 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the parking/driving lane, s/w flushed expansion joints sealed. |
2017-04-15 | No data | FULTON STREET, FROM STREET CLINTON STREET TO STREET JOHNSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 2/8/17. |
2017-04-12 | No data | VAN NEST AVENUE, FROM STREET ADAMS STREET TO STREET VAN BUREN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B issued. Con Ed working on site |
2017-04-09 | No data | LORIMER STREET, FROM STREET GRAND STREET TO STREET POWERS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed a sidewalk flag with an expansion joint installed but not sealed. Respondent was notified to make correction via CAR #20160920414 on 11/27/16 and failed to do so. |
2017-04-09 | No data | SOUTH 1 STREET, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMIT RENEWED BEFORE EXPIRATION |
2017-04-09 | No data | 3 AVENUE, FROM STREET EAST 166 STREET TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER - PROTECTED |
2017-04-05 | No data | 3 AVENUE, FROM STREET EAST 109 STREET TO STREET EAST 110 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent failed to restore street in kind by leaving scarring on roadway next to their permanent water trench. Respondent notified via CAR #20163790223 on 12/21/16. |
2017-04-05 | No data | AVENUE D, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2017-04-04 | No data | AJ GRIFFIN PLACE, FROM STREET EAST 149 STREET TO STREET EAST 150 STREET | No data | Street Construction Inspections: Active | Department of Transportation | LOCATED NEAR E149 ST.- CONTRACTOR WORKING ON SITE RELOCATING HYDRANT ON SIDEWALK ONLY AT THIS TIME. |
2017-04-02 | No data | STORY AVENUE, FROM STREET BOYNTON AVENUE TO STREET ELDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work started |
2017-04-02 | No data | WESTCHESTER AVENUE, FROM STREET EAST 160 STREET TO STREET EAST 161 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm final in the driving lane |
2017-03-29 | No data | 3 AVENUE, FROM STREET EAST 109 STREET TO STREET EAST 110 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade water trench |
2017-03-28 | No data | AVENUE A, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water repair acceptable |
2017-03-27 | No data | 10 AVENUE, FROM STREET WEST 44 STREET TO STREET WEST 45 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No Work Done. |
2017-03-25 | No data | WEST 134 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed |
2017-03-25 | No data | AMSTERDAM AVENUE, FROM STREET WEST 111 STREET TO STREET WEST 112 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway is in compliance. |
2017-03-25 | No data | AJ GRIFFIN PLACE, FROM STREET EAST 149 STREET TO STREET EAST 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2017-03-23 | No data | 3 AVENUE, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent having a steel plate on roadway That was smooth to the Touch and Offered no skid resistance and or Decking. Plate was ID by "Arben NY" weld markings. |
2017-03-22 | No data | EAST 62 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work observed in r/w. |
2017-03-22 | No data | LEGGETT AVENUE, FROM STREET BECK STREET TO STREET KELLY STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL COMPLETED AND ACCEPTABLE |
2017-03-21 | No data | UNION STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | trench ok r\w |
2017-03-21 | No data | COMMONWEALTH AVENUE, FROM STREET BRONX RIVER AVENUE TO STREET MANSION STREET | No data | Street Construction Inspections: Paving Inspections | Department of Transportation | Not protected , 10' x 11' x 2 1/2" |
2017-03-18 | No data | SEDGWICK AVENUE, FROM STREET BEND TO STREET FT INDEPENDENCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced. |
2017-03-13 | No data | HOE AVENUE, FROM STREET BEND TO STREET BOSTON ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill completed and acceptable |
2017-03-13 | No data | EAST 162 STREET, FROM STREET MORRIS AVENUE TO STREET TELLER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2017-03-12 | No data | WEST 55 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Resurfaced by BPP. |
2017-03-11 | No data | 200 STREET, FROM STREET 120 AVENUE TO STREET NASHVILLE BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut to grade(part of cut covered by building paving) |
2017-03-11 | No data | SHAKESPEARE AVENUE, FROM STREET WEST 169 STREET TO STREET WEST 170 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp to grade |
2017-03-11 | No data | POPHAM AVENUE, FROM STREET WEST 175 STREET TO STREET WEST 176 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2017-03-11 | No data | SHAKESPEARE AVENUE, FROM STREET CORPORAL IRWIN FISCHER PLACE TO STREET WEST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work completed under later permit |
2017-03-09 | No data | LEGGETT AVENUE, FROM STREET BECK STREET TO STREET KELLY STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, sprinkler service broken, Excavation in the parking lane. 3 day notice on site. |
2017-03-08 | No data | COMMONWEALTH AVENUE, FROM STREET BRONX RIVER AVENUE TO STREET MANSION STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, Water service leaking, Excavation in the parking/driving lane. 3 day notice on site. |
2017-03-06 | No data | EAST 218 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2017-03-06 | No data | WALES AVENUE, FROM STREET EAST 142 STREET TO STREET ST MARYS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk flag restored with portion of trench leading into intersection of roadway. |
2017-03-06 | No data | WEST 28 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp cut flush in driving lane |
2017-03-05 | No data | SHERIDAN AVENUE, FROM STREET EAST 170 STREET TO STREET MARCY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP, street resurfaced |
2017-03-05 | No data | BOONE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trenches pass |
2017-03-03 | No data | EAST 217 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway newly paved by con ed |
2017-03-02 | No data | EAST 112 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade water restoration |
2017-03-02 | No data | WEST 44 STREET, FROM STREET 10 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Restoration in the Driving Lane I/F/O 504 is Flush to Grade, also opposite 504 1 Sidewalk Flag has been restored and is Free of Defects |
2017-03-02 | No data | 21 STREET, FROM STREET 46 ROAD TO STREET JACKSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O, I observed the respondent failed to post ID signs at the work sitethat show the name of the permitte, phone# for contracting permit # type of work been performed start and completion dates of prosect and sub contractor name if needed. |
2017-03-01 | No data | FORSYTH STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR condition remains. |
2017-03-01 | No data | AVENUE D, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Length is 7'x 5' width, depth is 2'5". Backfill with blend. two lift one test maked out for base and wearing course cut back. |
2017-03-01 | No data | WEEKS AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 175 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in roadway. |
2017-03-01 | No data | FULTON STREET, FROM STREET CLINTON STREET TO STREET JOHNSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway repaved |
2017-02-25 | No data | LINDEN BOULEVARD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK DONE IN THE ROADWAY |
2017-02-22 | No data | CRUGER AVENUE, FROM STREET BURKE AVENUE TO STREET SOUTH OAK DRIVE | No data | Street Construction Inspections: Active | Department of Transportation | work done on s/w/ r/w. newly paved r/w . spoke to BC. PHIL. in regards to plumber permit not showing up as protected |
2017-02-21 | No data | 1 AVENUE, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/W incompliance |
2017-02-21 | No data | WEST 27 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - REPAIR WATER - SEWER |
2017-02-21 | No data | WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O B.O |
2017-02-21 | No data | SEDGWICK AVENUE, FROM STREET BEND TO STREET FT INDEPENDENCE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm trench in the driving, parking lanes. No work in the sidewalk. |
2017-02-18 | No data | EAST 86 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway in compliance |
2017-02-18 | No data | NELSON AVENUE, FROM STREET WEST 167 STREET TO STREET WEST 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2017-02-17 | No data | 3 AVENUE, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IN COMPLIANCE NO DEFECTS |
2017-02-17 | No data | 3 AVENUE, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Active | Department of Transportation | NO NEW WORK |
2017-02-17 | No data | EAST 31 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to locate work due active B.O occupying the roadway at this time of inspection. |
2017-02-16 | No data | WEST 39 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Surrounding area of restoration broken out & down 2.5" |
2017-02-15 | No data | EAST 78 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joint sealed on S/W. unable to see roadway do to car parking over Trench. |
2017-02-14 | No data | 26 AVENUE, FROM STREET 1 STREET TO STREET 2 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway to white from snow can't see cut. |
2017-02-06 | No data | WEST 43 STREET, FROM STREET 10 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No restoration found looks to have possibly been overlapped by a recent trench stretching the entire segment. |
2017-02-05 | No data | EAST 3 STREET, FROM STREET 2 AVENUE TO STREET BOWERY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no cut found |
2017-02-04 | No data | SEDGWICK AVENUE, FROM STREET BEND TO STREET FT INDEPENDENCE STREET | No data | Street Construction Inspections: Active | Department of Transportation | 2 Steel plate in the parking lane countersink. |
2017-02-04 | No data | WEST 162 STREET, FROM STREET OGDEN AVENUE TO STREET SUMMIT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2017-02-04 | No data | SUMMIT AVENUE, FROM STREET WEST 162 STREET TO STREET WEST 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced |
2017-02-03 | No data | FULTON STREET, FROM STREET CLINTON STREET TO STREET JOHNSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | perm trench at 280 Cadman Plaza West 150 feet Tillary St |
2017-02-03 | No data | AVENUE A, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass sewer cut |
2017-02-03 | No data | BARNES AVENUE, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2017-02-03 | No data | FULTON STREET, FROM STREET CLINTON STREET TO STREET JOHNSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench pk lane at 280 Cadman Plaza West |
2017-02-02 | No data | 21 STREET, FROM STREET 46 ROAD TO STREET JACKSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | check permit , repair sewer maintained a plated roadway excavation in d/p/l.. |
2017-02-01 | No data | WEST 26 STREET, FROM STREET 5 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water Repair has been resurfaced by Bpp 12+5 rule. |
2017-02-01 | No data | WEST 33 STREET, FROM STREET 5 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 temp Cuts, currently inside of an Active Building Operations Barricades |
2017-02-01 | No data | WEST 30 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER |
2017-01-30 | No data | 83 STREET, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm short water restoration |
2017-01-30 | No data | CRUGER AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2017-01-30 | No data | LORIMER STREET, FROM STREET GRAND STREET TO STREET POWERS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO SEAL EXPANSION JOINT ON SIDEWALK AS PER CAR#20160920414 ISSUED ON 11/27/16. |
2017-01-30 | No data | EAST 222 STREET, FROM STREET EASTCHESTER ROAD TO STREET LACONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in roadway |
2017-01-28 | No data | THEATRE ALLEY, FROM STREET ANN STREET TO STREET BEEKMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | was not able to locate cut in segment due to building opp |
2017-01-28 | No data | 5 AVENUE, FROM STREET EAST 26 STREET TO STREET WEST 25 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm flush w/color code. |
2017-01-28 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water cut in compliance |
2017-01-26 | No data | THIERIOT AVENUE, FROM STREET BEND TO STREET LACOMBE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in driving lane of roadway. |
2017-01-26 | No data | LAFAYETTE AVENUE, FROM STREET BEACH AVENUE TO STREET COMMONWEALTH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench going across driving lane or roadway. |
2017-01-26 | No data | 165 STREET, FROM STREET ARCHER AVENUE TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench p/d/l |
2017-01-25 | No data | SHAKESPEARE AVENUE, FROM STREET WEST 169 STREET TO STREET WEST 170 STREET | No data | Street Construction Inspections: Active | Department of Transportation | perm to grade |
2017-01-23 | No data | WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER |
2017-01-22 | No data | AMSTERDAM AVENUE, FROM STREET WEST 147 STREET TO STREET WEST 148 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm-Restoration on sidewalk/roadway in compliance. |
2017-01-21 | No data | WEST 138 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation in the d/l |
2017-01-21 | No data | EAST 167 STREET, FROM STREET FULTON AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | peermit expired |
2017-01-21 | No data | NEVINS STREET, FROM STREET LIVINGSTON STREET TO STREET SCHERMERHORN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | swk sealed |
2017-01-20 | No data | ST LAWRENCE AVENUE, FROM STREET LACOMBE AVENUE TO STREET RANDALL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in roadway alongside the parking lane. |
2017-01-20 | No data | PROSPECT AVENUE, FROM STREET EAST 156 STREET TO STREET MACY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Crew is on site doing resurfaced roadway |
2017-01-19 | No data | EAST 167 STREET, FROM STREET FULTON AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work not started |
2017-01-19 | No data | 10 AVENUE, FROM STREET WEST 33 STREET TO STREET WEST 34 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER |
2017-01-19 | No data | 3 AVENUE, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Active | Department of Transportation | new cut not yet started- existing cut marked 2016b |
2017-01-19 | No data | 3 AVENUE, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | completed 2016 color coded |
2017-01-13 | No data | VICTORY BOULEVARD, FROM STREET MANOR ROAD TO STREET RAYMOND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2017-01-12 | No data | BERRIMAN STREET, FROM STREET GLENMORE AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill â Pass(L): 12ft (W): 4ft (D): 4ft â 96.3%; 96.1%Arrival: 8:30AMDeparture: 9:55AM |
2017-01-12 | No data | BRONXWOOD AVENUE, FROM STREET EAST 220 STREET TO STREET EAST 221 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN ROADWAY ALONGSIDE THE PARKING AND SIDEWALK FLAG RESTORED. |
2017-01-12 | No data | PROSPECT AVENUE, FROM STREET EAST 156 STREET TO STREET MACY PLACE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent with steel plates in driving lane. Failure to use skid resistant plates currently smooth to touch. D.O.T require plates to have skid resistance greater than or equal to roadway surface. |
2017-01-12 | No data | EAST 218 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 PERM TRENCHES IN THE DRIVING/PARKING LANES OF ROADWAY. |
2017-01-12 | No data | PROSPECT AVENUE, FROM STREET EAST 156 STREET TO STREET MACY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - REPAIR SEWER |
2017-01-12 | No data | WALTON AVENUE, FROM STREET EAST MT EDEN AVENUE TO STREET HAWKSTONE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to lcate due to building operation on block |
2017-01-10 | No data | WEST 138 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | More recent permit on file (M012016354A48) |
2017-01-10 | No data | 3 AVENUE, FROM STREET EAST 165 STREET TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work completed under later permit |
2017-01-10 | No data | 3 AVENUE, FROM STREET EAST 166 STREET TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated work |
2017-01-10 | No data | 8 AVENUE, FROM STREET WEST 140 STREET TO STREET WEST 141 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in parking/driving lane. Cannot see sidewalk due to active B.O (M042016357A04) |
2017-01-10 | No data | WEST 138 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Excavation plated in the d/l |
2017-01-09 | No data | WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No Work has been done as of yet, active permit on file Permit #(M012016354A47) |
2017-01-06 | No data | TENBROECK AVENUE, FROM STREET BEND TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2017-01-06 | No data | 3 AVENUE, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMANENT RESTORATION IN THE PARKING LANE (NOW WALKWAY DUE TO BUILDING OPERATION) ASPHALT BROKEN OUT AND DOWN 2''. |
2017-01-05 | No data | SHERIDAN AVENUE, FROM STREET EAST 170 STREET TO STREET MARCY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to locate cut |
2017-01-05 | No data | WEST 138 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated sewer excavation in compliance in the roadway |
2017-01-04 | No data | FORSYTH STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water-sewer cut IFO 204 Forsyth st. left in binder top with ID tags - overdue for final restoration. Please correct. Sidewalk is excavated with shoring. Permittee was not able to get permits during embargo, as per const. foreman. No NOV issued. |
2017-01-04 | No data | 3 AVENUE, FROM STREET EAST 166 STREET TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | steel plates now re-set re-pin & ramp |
2017-01-03 | No data | 3 AVENUE, FROM STREET EAST 166 STREET TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 50' by 6' backfill |
2017-01-02 | No data | VESTRY STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cobble stone ok |
2017-01-02 | No data | EAST 222 STREET, FROM STREET EASTCHESTER ROAD TO STREET LACONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2017-01-01 | No data | 3 AVENUE, FROM STREET EAST 166 STREET TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 3 STEEL PLATES IN THE ROADWAY WITH ONE SUNKEN 15 INCHES AND A FOOT OF ASPHALT BROKEN ADJACENT TO THE PLATE. |
2016-12-31 | No data | MICKLE AVENUE, FROM STREET BURKE AVENUE TO STREET GIVAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water cut in compliance |
2016-12-31 | No data | EAST 86 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm sewer restoration flushed in P/L |
2016-12-28 | No data | WEST 30 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work observed IFO 520 IN THE ROADWAY. active biulding operation opposite 520 occupying roadway with workzone and barriracades. un able to accuratley determine if cut was made. |
2016-12-23 | No data | WEST 234 STREET, FROM STREET CORLEAR AVENUE TO STREET KINGSBRIDGE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in the parking lane leading into driving lane; closer to Corlear Ave and West 234 St. |
2016-12-22 | No data | EAST 213 STREET, FROM STREET BARNES AVENUE TO STREET CARLISLE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in roadway alongside the parking lane at 771. |
2016-12-21 | No data | 3 AVENUE, FROM STREET EAST 109 STREET TO STREET EAST 110 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway scarring in driving lane after restoration was made perm to grade I/F/O 1992 3 Avenue |
2016-12-21 | No data | HUMBOLDT STREET, FROM STREET GRAND STREET TO STREET MAUJER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in r/w |
2016-12-21 | No data | EAST 120 STREET, FROM STREET 1 AVENUE TO STREET PLEASANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work |
2016-12-21 | No data | AVENUE A, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair sewer ok |
2016-12-20 | No data | 3 AVENUE, FROM STREET EAST 165 STREET TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent with steel plates in driving lane. Failure to use skid resistant plates currently smooth to touch. D.O.T require plates to have skid resistance greater than or equal to roadway surface. |
2016-12-19 | No data | POWER ROAD, FROM STREET 23 AVENUE TO STREET 24 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new s/w ,perm restoration in r/w |
2016-12-14 | No data | WATSON AVENUE, FROM STREET CLOSE AVENUE TO STREET COLGATE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2016-12-14 | No data | WEST 55 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut were paved over new building |
2016-12-13 | No data | AMSTERDAM AVENUE, FROM STREET WEST 111 STREET TO STREET WEST 112 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | THIS PARTICULAR JOB WAS TAKEN OVER BY THE DEPARTMENT OF ENVIRONMENTAL PROTECTION AND HAS BEEN RESTORED TO THEIR POTENTIAL. |
2016-12-12 | No data | PROSPECT AVENUE, FROM STREET EAST 156 STREET TO STREET MACY PLACE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent steel plates over a excavation not counter-sink. The steel plates currently in the parking lane. Failed to post signs indicating Steel Plates Ahead or Raise Plow sign. This during winter moratorium |
2016-12-11 | No data | PLEASANT AVENUE, FROM STREET EAST 117 STREET TO STREET EAST 118 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway restration in compliance color coded sealed. |
2016-12-10 | No data | EAST 167 STREET, FROM STREET FULTON AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2016-12-08 | No data | 8 AVENUE, FROM STREET WEST 140 STREET TO STREET WEST 141 STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE RESPONDENT FAILED TO COUNTERSINK STEEL PLATES FLUSH WITH THE ROADWAY DURING THE WINTER MORATORIUM. STEEL PLATES MARK "ARBEN NYC" WAS USED FOR I.D |
2016-12-08 | No data | WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to fully inspect due to an active b/o |
2016-12-05 | No data | 31 STREET, FROM STREET 31 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm. cut to grade p/d/l - parked cars on top p/l at this time,heavy traffic. |
2016-12-05 | No data | NEVINS STREET, FROM STREET LIVINGSTON STREET TO STREET SCHERMERHORN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please seal expansion joint in new sidewalk flag, opposite 30 Nevins St between Livingston St and Schermerhorn St. |
2016-12-03 | No data | WEST 42 STREET, FROM STREET 10 AVENUE TO STREET DYER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO ROADWAY WORKS/W IN COMPLIANCE |
2016-12-03 | No data | BEACH AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | permanent restoration cuts flush sealed |
2016-12-02 | No data | PROSPECT AVENUE, FROM STREET EAST 156 STREET TO STREET MACY PLACE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent with steel plates in driving lane. Failure to use skid resistant plates currently smooth to touch. D.O.T require plates to have skid resistance greater than or equal to roadway surface. |
2016-11-30 | No data | EAST 162 STREET, FROM STREET EAST 163 STREET TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street resurfaced |
2016-11-30 | No data | WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to do a full inspection due to acive b/o. |
2016-11-29 | No data | BERRIMAN STREET, FROM STREET GLENMORE AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Open excavation. Crew on site. |
2016-11-29 | No data | YATES AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESTORATION IN ROADWAY IS GOOD. INSPECTION / IN COMPLIANCE. |
2016-11-29 | No data | EAST 167 STREET, FROM STREET BOSTON ROAD TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2016-11-28 | No data | EXTERIOR STREET, FROM STREET MAJOR DEEGAN EXPWY ET 4 NB TO STREET EAST 146 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2016-11-28 | No data | PLEASANT AVENUE, FROM STREET EAST 117 STREET TO STREET EAST 118 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued to respondent for failing to obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit, as required. Permit expired 9/14/16 |
2016-11-27 | No data | LORIMER STREET, FROM STREET GRAND STREET TO STREET POWERS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed respondent failed to seal expansion joint as per subsection previous notification by car # 2016092014 no repairs made must remove plastic and seal expansion joint still |
2016-11-27 | No data | EAST 112 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in Compliance roadway no defects |
2016-11-27 | No data | PLEASANT AVENUE, FROM STREET EAST 117 STREET TO STREET EAST 118 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued to respondent for failing to obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit, as required. Permit expired 10/9/16 |
2016-11-26 | No data | EAST 3 STREET, FROM STREET 2 AVENUE TO STREET BOWERY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water cut i f o building operation is ok |
2016-11-25 | No data | FORSYTH STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Failure to used skid-resistant plating on roadway - NOV issued. |
2016-11-25 | No data | FORSYTH STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit M012016322D00 on file, area plated(4). |
2016-11-23 | No data | PROSPECT AVENUE, FROM STREET EAST 156 STREET TO STREET MACY PLACE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent with steel plates in driving lane. Failure to use skid resistant plates currently smooth to touch. D.O.T require plates to have skid resistance greater than or equal to roadway surface. |
2016-11-23 | No data | AVENUE D, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Active | Department of Transportation | building operation in progress, no sewer cut visible on active permit |
2016-11-21 | No data | CORLEAR AVENUE, FROM STREET WEST 232 STREET TO STREET WEST 234 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | No summons issued permittee took out the correct address for the water trench. |
2016-11-21 | No data | GRAND AVENUE, FROM STREET WEST 190 STREET TO STREET WEST 192 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site installing new water and sewer |
2016-11-21 | No data | WEST 234 STREET, FROM STREET CORLEAR AVENUE TO STREET KINGSBRIDGE AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Permanent water trench in the parking/driving lane flush. |
2016-11-16 | No data | VESTRY STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Water repair / connection for new building ongoing. Area plated(2) 27 ft EEC of Joe DiMaggio Highway & 3 ft SNC of Vestry st. |
2016-11-15 | No data | EAST 162 STREET, FROM STREET MORRIS AVENUE TO STREET TELLER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Building construction in progress in area |
2016-11-12 | No data | WEST 26 STREET, FROM STREET 5 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | 30' East of Broadway and 1' N/S/C, Backfill pass arrival time 07:40am, start time 08:40am and end at 10:00am. One Restoration in the Roadway. |
2016-11-12 | No data | MC DONALD STREET, FROM STREET BASSETT AVENUE TO STREET STILLWELL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | fire hydrant relocate |
2016-11-12 | No data | EAST 170 STREET, FROM STREET COTTAGE PLACE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2016-11-12 | No data | EAST 167 STREET, FROM STREET FULTON AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | full depth concrete restoration |
2016-11-12 | No data | AVENUE A, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | c/c applied |
2016-11-10 | No data | 1 AVENUE, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk no defects |
2016-11-10 | No data | FORSYTH STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Area plated (4) IFO premise. Water-sewer repair in progress. Photos taken. |
2016-11-10 | No data | WEST 44 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area paved I/F/O 546 |
2016-11-10 | No data | 9 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cuts in parking lane ok |
2016-11-09 | No data | 4 AVENUE, FROM STREET 15 STREET TO STREET 16 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cuts in parking lane ok |
2016-11-08 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2016-11-08 | No data | WEST 127 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | updated permit on file |
2016-11-04 | No data | PROSPECT AVENUE, FROM STREET EAST 156 STREET TO STREET MACY PLACE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent with steel plates in driving lane. Failure to use skid resistant plates currently smooth to touch. D.O.T require plates to have skid resistance greater than or equal to roadway surface. |
2016-11-03 | No data | WEST 33 STREET, FROM STREET 5 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to see work due to active Construction site. |
2016-11-02 | No data | PLEASANT AVENUE, FROM STREET EAST 117 STREET TO STREET EAST 118 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Six steel plates with markings "Arben" secured on the roadwalk. |
2016-11-02 | No data | SUMMIT AVENUE, FROM STREET WEST 162 STREET TO STREET WEST 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Building operation covering part of plumbers cut |
2016-11-02 | No data | WEST 29 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street found resurfaced.( insp 634 ) |
2016-11-01 | No data | BOONE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2016-11-01 | No data | WEST 138 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | updated permit on file |
2016-11-01 | No data | WEST 138 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation is in compliance in the roadway |
2016-10-31 | No data | 3 AVENUE, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER-PERM RESTORATION IN ROADWAY. SIDEWALK CLOSED OFF BY CONSTRUCTION FENCE AT ACTIVE BUILDING OPERATION. |
2016-10-31 | No data | WEST 39 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 perm. cuts okay in d/l. i/f/o #26 & #30 |
2016-10-28 | No data | EAST 176 STREET, FROM STREET BOSTON ROAD TO STREET CROTONA PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | hydrant/sidewalk repaired |
2016-10-27 | No data | AVENUE D, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Active | Department of Transportation | it doesnt look like work has started yet |
2016-10-26 | No data | PROSPECT AVENUE, FROM STREET EAST 156 STREET TO STREET MACY PLACE | No data | Street Construction Inspections: Active | Department of Transportation | trench of steel plates going across driving lane and in the parking lane of roadway at this time . |
2016-10-26 | No data | BOERUM STREET, FROM STREET BUSHWICK AVENUE TO STREET BUSHWICK PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/W IN COMPLIANCE |
2016-10-26 | No data | PROSPECT AVENUE, FROM STREET EAST 156 STREET TO STREET MACY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | active permit X012016298A95 on file at this time.....trench of steel plates going across driving lane and in the parking lane of roadway at this time . |
2016-10-25 | No data | SHAKESPEARE AVENUE, FROM STREET CORPORAL IRWIN FISCHER PLACE TO STREET WEST 169 STREET | No data | Street Construction Inspections: Active | Department of Transportation | con edison has area plated |
2016-10-24 | No data | FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent failed to permanently restore a temporary cut on the sidewalk within required time; in front of 1452 Fulton St. Referenced permit which expired on 02/02/16 was used to ID. |
2016-10-21 | No data | TOMLINSON AVENUE, FROM STREET MORRIS PARK AVENUE TO STREET RHINELANDER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work done |
2016-10-21 | No data | PROSPECT AVENUE, FROM STREET EAST 156 STREET TO STREET MACY PLACE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent with steel plates in driving lane. Failure to use skid resistant plates currently smooth to touch. D.O.T require plates to have skid resistance greater than or equal to roadway surface. |
2016-10-19 | No data | TOMLINSON AVENUE, FROM STREET MORRIS PARK AVENUE TO STREET RHINELANDER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work done |
2016-10-15 | No data | NEVINS STREET, FROM STREET LIVINGSTON STREET TO STREET SCHERMERHORN STREET | No data | Street Construction Inspections: Active | Department of Transportation | steel plated rwy 75ft south of livingston st |
2016-10-15 | No data | HONE AVENUE, FROM STREET ESPLANADE TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2016-10-14 | No data | PROSPECT AVENUE, FROM STREET EAST 156 STREET TO STREET MACY PLACE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent with steel plates in driving lane. Failure to use skid resistant plates currently smooth to touch. D.O.T require plates to have skid resistance greater than or equal to roadway surface. |
2016-10-14 | No data | NEVINS STREET, FROM STREET LIVINGSTON STREET TO STREET SCHERMERHORN STREET | No data | Street Construction Inspections: Active | Department of Transportation | talked to owner new permit in NYC streets ready for payment she will comply |
2016-10-12 | No data | POWERS STREET, FROM STREET HOPE STREET TO STREET LORIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Paved By Dot s/w ok |
2016-10-07 | No data | FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent failed to permanently restore a temporary cut on the sidewalk within required time; in front of 1452 Fulton St. Referenced permit which expired on 02/02/16 was used to ID. |
2016-10-07 | No data | PROSPECT AVENUE, FROM STREET EAST 156 STREET TO STREET MACY PLACE | No data | Street Construction Inspections: Active | Department of Transportation | steel plates in driving lane of roadway at this time. |
2016-10-04 | No data | BEACH AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Sidewalk new flags expansion joints need to be sealed |
2016-10-04 | No data | 3 AVENUE, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER-LARGE PERM RESTORATION IN ROADWAY. SIDEWALK BLOCKED BY CONSTRUCTION FENCE. |
2016-10-04 | No data | AVENUE A, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm sewer cut is missing its green color code |
2016-10-04 | No data | 8 AVENUE, FROM STREET WEST 140 STREET TO STREET WEST 141 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | updated permit on file |
2016-10-03 | No data | REV JAMES POLITE AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2016-10-03 | No data | TENBROECK AVENUE, FROM STREET BEND TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in r/w |
2016-10-03 | No data | TOMLINSON AVENUE, FROM STREET MORRIS PARK AVENUE TO STREET RHINELANDER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work done on s/w and r/w |
2016-10-01 | No data | EAST 78 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no defects foun |
2016-09-29 | No data | WEST 55 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | resurfaced |
2016-09-29 | No data | 3 AVENUE, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER-PERM RESTORATION IN ROADWAY. SIDEWALK BLOCKED BYCONSTRUCTION FENCE. |
2016-09-29 | No data | EDISON AVENUE, FROM STREET ST THERESA AVENUE TO STREET BUHRE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SEWER CUT IN R/W |
2016-09-27 | No data | NARRAGANSETT AVENUE, FROM STREET LYDIG AVENUE TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restoration in parking lane |
2016-09-26 | No data | 161 STREET, FROM STREET 59 AVENUE TO STREET BOOTH MEMORIAL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new concrete restoration front walk of property behind property line no related defects found sidewalk , grass area or roadway |
2016-09-26 | No data | 3 AVENUE, FROM STREET EAST 109 STREET TO STREET EAST 110 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway restoration in compliance. Sidewalk patch work but NEW BUIDLING BEING ERECTING and will most likely redo entire sidewalk |
2016-09-24 | No data | EAST 167 STREET, FROM STREET FULTON AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site. Dometic/sprinkle line broken. Water verified. Excavation in the driving lane. |
2016-09-23 | No data | MANHATTAN AVENUE, FROM STREET FROST STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in d/l & P/l B/O active ok |
2016-09-22 | No data | 8 AVENUE, FROM STREET WEST 140 STREET TO STREET WEST 141 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | updated permit on file |
2016-09-22 | No data | WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER |
2016-09-22 | No data | LAFAYETTE AVENUE, FROM STREET ASHLAND PLACE TO STREET ROCKWELL PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair Sewer ( work not done active permit B012016258A90 expires on 9/27/2016) |
2016-09-21 | No data | LORIMER STREET, FROM STREET GRAND STREET TO STREET POWERS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk square expansion joint not sealed must remove plastic and seal expansion joint plastic joint does not comply with DOT Standard Specifications |
2016-09-21 | No data | FULTON AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2016-09-17 | No data | PLEASANT AVENUE, FROM STREET EAST 117 STREET TO STREET EAST 118 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Securely plated, color coded. |
2016-09-15 | No data | WESTCHESTER AVENUE, FROM STREET EAST 160 STREET TO STREET EAST 161 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the driving lane adjacent to the parking lane near the corner of E. 162 street and Westchester Ave. |
2016-09-14 | No data | EXTERIOR STREET, FROM STREET MAJOR DEEGAN EXPWY ET 4 NB TO STREET EAST 146 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Core survey, steel plates on site |
2016-09-14 | No data | 3 AVENUE, FROM STREET EAST 161 STREET TO STREET EAST 163 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Core survey, not found |
2016-09-13 | No data | EAST 162 STREET, FROM STREET DEAD END TO STREET MELROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH IN ROADWAY CLOSER TO DEAD END NEAR FIRE HYDRANT AT CURRENT BUILDING OPERATION |
2016-09-12 | No data | 9 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut ok |
2016-09-09 | No data | TAYLOR AVENUE, FROM STREET MC GRAW AVENUE TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in roadway |
2016-09-09 | No data | EAST 162 STREET, FROM STREET EAST 163 STREET TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street Resurfaced |
2016-09-08 | No data | WEST 55 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | late work overlapping |
2016-09-06 | No data | FULTON AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2016-08-28 | No data | 43 AVENUE, FROM STREET 25 STREET TO STREET 27 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2016-08-26 | No data | EAST 172 STREET, FROM STREET BOONE AVENUE TO STREET WEST FARMS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R/W was resurf O.K. |
2016-08-26 | No data | WEST 30 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sealer applied |
2016-08-26 | No data | BOONE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 Trenches opp 1547 into fence of new building O.K. |
2016-08-25 | No data | JAY STREET, FROM STREET PLYMOUTH STREET TO STREET WATER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no wk seen |
2016-08-25 | No data | EAST 205 STREET, FROM STREET GRAND CONCOURSE TO STREET LISBON PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repaved r/w |
2016-08-24 | No data | WALES AVENUE, FROM STREET EAST 142 STREET TO STREET ST MARYS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Going into intersection. |
2016-08-24 | No data | EAST 222 STREET, FROM STREET EASTCHESTER ROAD TO STREET LACONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2016-08-24 | No data | 3 AVENUE, FROM STREET EAST 161 STREET TO STREET EAST 163 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | No crew on site. Water restoration flushed in the bus stop Opp. location. |
2016-08-22 | No data | AMSTERDAM AVENUE, FROM STREET WEST 111 STREET TO STREET WEST 112 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 13ft by 6ft area of plumbers trench with portions sunken up to 4 inches in driving lane causing an unsafe condition. located north bound side in front of church. |
2016-08-19 | No data | EAST 222 STREET, FROM STREET EASTCHESTER ROAD TO STREET LACONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed & sealed |
2016-08-19 | No data | EAST 112 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration is in compliance. |
2016-08-19 | No data | JOHN STREET, FROM STREET ADAMS STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | re locate hydrant |
2016-08-18 | No data | 3 AVENUE, FROM STREET EAST 109 STREET TO STREET EAST 110 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 6" base cut back was made, 1ft wearing course was not, scheduled for later date and time.Long sewer and water trench will be plate until concrete cures. Details can be found on backfill sheet. |
2016-08-18 | No data | BROADWAY, FROM STREET WEST 25 STREET TO STREET WEST 26 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | i/f/o 1138, Perm restoration in the parking lane extends into the bike lane. |
2016-08-12 | No data | 165 STREET, FROM STREET ARCHER AVENUE TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 10x5' perm cut d/l |
2016-08-11 | No data | AVENUE A, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | lane marking present acceptable |
2016-08-11 | No data | EAST 86 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut okay in d/l. |
2016-08-11 | No data | EAST 31 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER. |
2016-08-09 | No data | EAGLE STREET, FROM STREET FRANKLIN STREET TO STREET WEST STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Picone excavated to install new water main & Sewer under DDC Capital project |
2016-08-05 | No data | AVENUE A, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | trench running across rdwy acceptable |
2016-08-02 | No data | AVENUE A, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration running across rdwy acceptable unable to see s/w due to BO |
2016-08-01 | No data | EAST 205 STREET, FROM STREET GRAND CONCOURSE TO STREET LISBON PLACE | No data | Street Construction Inspections: Active | Department of Transportation | crew working on site |
2016-08-01 | No data | BROADWAY, FROM STREET WEST 25 STREET TO STREET WEST 26 STREET | No data | Street Construction Inspections: Active | Department of Transportation | roadway secured with one steel plate marked arben that extended from the parking lane into the bike lane. |
2016-07-31 | No data | EAST 78 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NEW SWK FLAG AND STEEL PLATE IN RWY. |
2016-07-27 | No data | WEST 30 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - REPAIR WATER |
2016-07-27 | No data | EAST 3 STREET, FROM STREET 2 AVENUE TO STREET BOWERY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut no defects |
2016-07-27 | No data | WEST 30 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | - REPAIR WATER |
2016-07-27 | No data | 200 STREET, FROM STREET 120 AVENUE TO STREET NASHVILLE BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | half of perm cut covered by builders pave, in compliance |
2016-07-25 | No data | BROADWAY, FROM STREET WEST 25 STREET TO STREET WEST 26 STREET | No data | Street Construction Inspections: Active | Department of Transportation | roadway secured with steel plate in the bike lane. |
2016-07-25 | No data | 3 AVENUE, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Crew on site, valid permit found, no action taken. |
2016-07-25 | No data | 3 AVENUE, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Updated permit found. |
2016-07-22 | No data | 43 AVENUE, FROM STREET 25 STREET TO STREET 27 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in parking/ driving lane |
2016-07-22 | No data | JOHN STREET, FROM STREET ADAMS STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Active | Department of Transportation | no new wk seen |
2016-07-22 | No data | BUHRE AVENUE, FROM STREET JARVIS AVENUE TO STREET MAHAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | permanent restoration trench crossing roadway flush, sealed,Double yellow lines restored,sidewalk flush concrete new building construction site grace period |
2016-07-21 | No data | AMSTERDAM AVENUE, FROM STREET WEST 111 STREET TO STREET WEST 112 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Was called On Compliant-Plumber repaired his 6 âmain and passed inspection but they found a leak on 2â ½ old pipe that is continuous for a month and DEP was notified. DEP Then made the plumber open holes in roadway. Plumber states leak is not theres |
2016-07-20 | No data | NELSON AVENUE, FROM STREET WEST 167 STREET TO STREET WEST 168 STREET | No data | Street Construction Inspections: Active | Department of Transportation | perm to grade |
2016-07-19 | No data | EAST 217 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 10x4x4 pass sand cone test |
2016-07-19 | No data | SHERIDAN AVENUE, FROM STREET EAST 170 STREET TO STREET MARCY PLACE | No data | Street Construction Inspections: Active | Department of Transportation | perm to grade |
2016-07-15 | No data | BUHRE AVENUE, FROM STREET JARVIS AVENUE TO STREET MAHAN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill completed 2 cuts crossing roadway,2:00pm crew on site foreman Jason |
2016-07-14 | No data | AMSTERDAM AVENUE, FROM STREET WEST 111 STREET TO STREET WEST 112 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent with use of the street by having 5 steel plates marked (W.M) with green color code in the roadway without a valid permit on file.Permit expired on 6/29/16. |
2016-07-14 | No data | 165 STREET, FROM STREET ARCHER AVENUE TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration |
2016-07-13 | No data | 165 STREET, FROM STREET ARCHER AVENUE TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration |
2016-07-13 | No data | EAST 222 STREET, FROM STREET EASTCHESTER ROAD TO STREET LACONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK DONE |
2016-07-13 | No data | THEATRE ALLEY, FROM STREET ANN STREET TO STREET BEEKMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to locate cut on segment due to BO |
2016-07-13 | No data | BUHRE AVENUE, FROM STREET JARVIS AVENUE TO STREET MAHAN AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | 2 cuts steel plate pin & ramp, crossing roadway into sidewalk of new building site |
2016-07-12 | No data | EAST 217 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | cut plated in roadway |
2016-07-08 | No data | WEST 134 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm to grade restoration opposite #132 |
2016-07-06 | No data | 43 AVENUE, FROM STREET 25 STREET TO STREET 27 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 6'6"x5'x3'9" in the parking lane complete & pass.Backfill started at 12:00 hrs and finished at 12:45 hrs. |
2016-07-01 | No data | 1 AVENUE, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flag in compliance. |
2016-07-01 | No data | AMSTERDAM AVENUE, FROM STREET WEST 111 STREET TO STREET WEST 112 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | I/f/o #1047 2 out of 3 excavations were backfilled. The 3rd excavation was not backfilled because of a water leak. Plumber must make an appointment with DEP as per DEP Protocol to see where the leak is coming from. I spoke with Eduardo. 904am-10:50am |
2016-06-30 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done street joint sealed |
2016-06-30 | No data | BRONXWOOD AVENUE, FROM STREET EAST 220 STREET TO STREET EAST 221 STREET | No data | Street Construction Inspections: Active | Department of Transportation | perm restoration in roadway and new sidewalk flag |
2016-06-30 | No data | WEST 134 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade water cut opposite #132 |
2016-06-28 | No data | 8 AVENUE, FROM STREET WEST 135 STREET TO STREET WEST 136 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2016-06-28 | No data | 31 STREET, FROM STREET 31 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in driving lane |
2016-06-28 | No data | WEST 55 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW BUILDING (BPP) PAVED OVER CUT |
2016-06-24 | No data | AMSTERDAM AVENUE, FROM STREET WEST 147 STREET TO STREET WEST 148 STREET | No data | Street Construction Inspections: Active | Department of Transportation | no work done |
2016-06-24 | No data | WEST 127 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | bf arrival time:8:30bf departure time: 11:00Jason from Arben Contracting of New York Inc was the foreman & Laura from twin Peaks was the tester9'7"X3'9"X3' water cut in P/L6" cut back was done |
2016-06-24 | No data | BRONXWOOD AVENUE, FROM STREET EAST 220 STREET TO STREET EAST 221 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Respondent on site working in complaince . Excavation in the roadway & sidewalk. |
2016-06-22 | No data | CRUGER AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ROADWAY AND SIDEWALK OK PERMIT CHECK |
2016-06-20 | No data | 26 AVENUE, FROM STREET 1 STREET TO STREET 2 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in p/d/l |
2016-06-20 | No data | 165 STREET, FROM STREET ARCHER AVENUE TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm plumbers cut |
2016-06-18 | No data | 3 AVENUE, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Six steel plates secured on the roadway marked "ARBEN" . Active permit M012016159A72 on file. |
2016-06-18 | No data | 3 AVENUE, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Respondent having 3 out of 6 steel plates with markings " W- ARBEN Const " on the roadway that was smooth to the touch. Respondent's plates did not have resistance greater than or equal to the adjacent roadway surface as reqiured by rule. |
2016-06-17 | No data | VICTORY BOULEVARD, FROM STREET MANOR ROAD TO STREET RAYMOND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/w, & perm r/w rests. |
2016-06-16 | No data | WEST 43 STREET, FROM STREET 10 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SEWER RESTORATION IS IN COMPLIANCE |
2016-06-15 | No data | 165 STREET, FROM STREET ARCHER AVENUE TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM SEWER CUT IN R/W.. |
2016-06-13 | No data | VICTORY BOULEVARD, FROM STREET MANOR ROAD TO STREET RAYMOND AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | water leak..crew finalizing cut..no way to verify emergency |
2016-06-13 | No data | WEST 30 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER |
2016-06-13 | No data | AVENUE A, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2016-06-12 | No data | EAST 86 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TO GRADE |
2016-06-12 | No data | VICTORY BOULEVARD, FROM STREET MANOR ROAD TO STREET RAYMOND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Cp: Leak in the r/w. Contr. showed me the DEP's notice via his phone. |
2016-06-09 | No data | SHERIDAN AVENUE, FROM STREET EAST 170 STREET TO STREET MARCY PLACE | No data | Street Construction Inspections: Active | Department of Transportation | plated work |
2016-06-09 | No data | DESBROSSES STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2016-06-07 | No data | BUSHWICK PLACE, FROM STREET BOERUM STREET TO STREET JOHNSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm restorations in p/l ok |
2016-06-05 | No data | 5 AVENUE, FROM STREET EAST 26 STREET TO STREET WEST 25 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER IN COMPLIANCE.NO WORK FOUND. CON-ED PLATES I/F/O ADDRESS WITH ACTIVE PERMIT ON FILE. |
2016-06-05 | No data | AVENUE A, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | the respondent failed to restore lane (white line) markings. Respondent was notified by prior CAR#20165810071 on 1-22-16, No action was taken. |
2016-06-04 | No data | SUMMIT AVENUE, FROM STREET WEST 162 STREET TO STREET WEST 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later work done |
2016-06-02 | No data | BARNES AVENUE, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 CUTS OK |
2016-06-01 | No data | LORIMER STREET, FROM STREET AINSLIE STREET TO STREET DEVOE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | bruno arrived at 7:30 am, Arben's crew repairing cap water permanent trench |
2016-05-31 | No data | LORIMER STREET, FROM STREET AINSLIE STREET TO STREET DEVOE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent trench cave-in 7 inch(L) X 8inch(W) X down 1 foot in roadway, in front 534 Lorimer st between Ainslie st and Devoe st. Please restore to grade and place your proper color code in new permanent trench. |
2016-05-31 | No data | MAUJER STREET, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway. |
2016-05-26 | No data | FLATBUSH AVENUE, FROM STREET 3 AVENUE TO STREET LIVINGSTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trenches |
2016-05-25 | No data | WEST 42 STREET, FROM STREET 10 AVENUE TO STREET DYER AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Sidewalk being excavated in front of parking garage , sewer is backing causing toilets to leak into the first parking garage level . |
2016-05-25 | No data | WEST 42 STREET, FROM STREET 10 AVENUE TO STREET DYER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | S/W EXCAVATED NO ROADWAY WORK PERMITTEE IN COMPLIANCE |
2016-05-25 | No data | ST MARYS STREET, FROM STREET CONCORD AVENUE TO STREET WALES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Not done |
2016-05-25 | No data | SHERIDAN AVENUE, FROM STREET EAST 170 STREET TO STREET MARCY PLACE | No data | Street Construction Inspections: Active | Department of Transportation | work in progress, one flagger |
2016-05-24 | No data | POWER ROAD, FROM STREET 23 AVENUE TO STREET 24 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active - Plated restorations on the sidewalk, parking & driving lanes - pinned & ramped. |
2016-05-23 | No data | 5 AVENUE, FROM STREET EAST 26 STREET TO STREET WEST 25 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair water i/f/o 212 5 Avenue ( work not done active permit M012016124A77 expires 5/31/2016) |
2016-05-21 | No data | WEST 55 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR ISSUED FOR LANE MARKINGS ON A LATER PERMIT |
2016-05-19 | No data | EAST 167 STREET, FROM STREET BOSTON ROAD TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | REPAIR WATER - SEWER - PROTECTED |
2016-05-19 | No data | EAST 167 STREET, FROM STREET BOSTON ROAD TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - SEWER - PROTECTED |
2016-05-18 | No data | WALTON AVENUE, FROM STREET EAST MT EDEN AVENUE TO STREET HAWKSTONE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2016-05-17 | No data | WATER STREET, FROM STREET JAY STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2016-05-13 | No data | EAST 3 STREET, FROM STREET 2 AVENUE TO STREET BOWERY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass new permit taken out |
2016-05-13 | No data | EAST 3 STREET, FROM STREET 2 AVENUE TO STREET BOWERY | No data | Street Construction Inspections: Active | Department of Transportation | pass plated excavation |
2016-05-12 | No data | SUMMIT AVENUE, FROM STREET WEST 162 STREET TO STREET WEST 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2016-05-11 | No data | PLYMOUTH STREET, FROM STREET BRIDGE STREET TO STREET JAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w |
2016-05-09 | No data | EAST 222 STREET, FROM STREET EASTCHESTER ROAD TO STREET LACONIA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | contractor on site |
2016-05-07 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | double yellow line restored on on restoration |
2016-05-06 | No data | MICKLE AVENUE, FROM STREET BURKE AVENUE TO STREET GIVAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2016-05-06 | No data | EAST 222 STREET, FROM STREET EASTCHESTER ROAD TO STREET LACONIA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | cut plated in roadway |
2016-05-05 | No data | EAST 170 STREET, FROM STREET COTTAGE PLACE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Core survey |
2016-05-05 | No data | WEST 44 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WATER CUT IS IN COMPLIANCE |
2016-05-04 | No data | LORIMER STREET, FROM STREET GRAND STREET TO STREET POWERS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to obtain a confirmation number - protected street |
2016-05-04 | No data | MANHATTAN AVENUE, FROM STREET FROST STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to obtain a confirmation number - protected street |
2016-05-03 | No data | ST LAWRENCE AVENUE, FROM STREET LACOMBE AVENUE TO STREET RANDALL AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | cut in driving lane. |
2016-05-03 | No data | WEST 162 STREET, FROM STREET OGDEN AVENUE TO STREET SUMMIT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Core survey |
2016-05-03 | No data | EAST 162 STREET, FROM STREET EAST 163 STREET TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Core survey |
2016-05-02 | No data | WATSON AVENUE, FROM STREET CLOSE AVENUE TO STREET COLGATE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Core survey |
2016-05-01 | No data | 1 AVENUE, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued under MNP2016586023 for steel plate found on the sidewalk covering an open excavation without a valid permit. |
2016-05-01 | No data | 1 AVENUE, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Unmarked steel plate covering open excavation on sidewalk without valid permit on file. |
2016-04-29 | No data | 3 AVENUE, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Permittee has 6 steel plates counter-sunken in the parking lane and driving lane, I/F/O: 1558. |
2016-04-29 | No data | EAST 222 STREET, FROM STREET EASTCHESTER ROAD TO STREET LACONIA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | sewer work in progress. i spoke to mousee |
2016-04-29 | No data | WEST 127 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued to respondent for failing to obtained a street opening permit on a protected street and completed the backfill, but failed to obtain a confirmation number prior to the expiration of such permit, as required. Permit expired 2/26/16 |
2016-04-29 | No data | EAST 213 STREET, FROM STREET BARNES AVENUE TO STREET CARLISLE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Core survey |
2016-04-29 | No data | BARNES AVENUE, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Core survey |
2016-04-28 | No data | MEEKER AVENUE, FROM STREET MANHATTAN AVENUE TO STREET RICHARDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | work in progress opening roadway new Building under construction working safe |
2016-04-28 | No data | YATES AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sewer cut ok |
2016-04-27 | No data | 5 AVENUE, FROM STREET EAST 26 STREET TO STREET WEST 25 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair water ( work not done area steel plated active permit M012016095B79 expires 5/3/2016) |
2016-04-21 | No data | VANDERBILT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench new swk flags |
2016-04-20 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | worked not started |
2016-04-20 | No data | 8 AVENUE, FROM STREET WEST 140 STREET TO STREET WEST 141 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in the parking lane in compliance |
2016-04-20 | No data | 8 AVENUE, FROM STREET WEST 140 STREET TO STREET WEST 141 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | updated permit on file M012016090A78 |
2016-04-20 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street and completed the backfill but, failed to obtain a confirmation number prior to the expiration of such permit. As required. Permit expired 2/16/2016 |
2016-04-16 | No data | 31 STREET, FROM STREET 31 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill complete and acceptable, witnessed cutbacks for base only |
2016-04-15 | No data | 200 STREET, FROM STREET 120 AVENUE TO STREET NASHVILLE BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in r/w.valid permit |
2016-04-13 | No data | AVENUE A, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | a/t/p/o i observed the respondent failed to restore lane (white line) markings.permittee was notified by prior CAR#20165810071 on 1-22-16 |
2016-04-09 | No data | 31 STREET, FROM STREET 31 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed - 23'x4' cut p/d/l,base to follow. |
2016-04-04 | No data | POWERS STREET, FROM STREET HOPE STREET TO STREET LORIMER STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | seal was placed and removed by others working in area |
2016-04-02 | No data | LIVINGSTON STREET, FROM STREET FLATBUSH AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | pass |
2016-03-31 | No data | 3 AVENUE, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Permittee currently on site working inside an open excavation in the driving lane to install new sewer for building. |
2016-03-31 | No data | BROOME STREET, FROM STREET GREENE STREET TO STREET WOOSTER STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon inspection, 2016 water 25' trench IFO premise (aka 52 Wooster st.) acceptable. |
2016-03-29 | No data | LORIMER STREET, FROM STREET AINSLIE STREET TO STREET DEVOE STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | start time 1005 am end time 1045 am 2 openings 4' x 2' 9" x 2' 6" pass 97.6 % 8' x 3' x 3' pass 96.3 % |
2016-03-29 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Double yellow lanes markings missing off permanent restoration |
2016-03-26 | No data | SCHERMERHORN STREET, FROM STREET HOYT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | did not find work may be behind construction site |
2016-03-24 | No data | SUMMIT AVENUE, FROM STREET WEST 162 STREET TO STREET WEST 164 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated site |
2016-03-23 | No data | YATES AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | SEWER MADE FINAL |
2016-03-22 | No data | MANHATTAN AVENUE, FROM STREET FROST STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | perm restoration in d/l & P/l |
2016-03-21 | No data | WEST 55 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Restoration. |
2016-03-19 | No data | FULTON AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated recessed in the driving lane |
2016-03-18 | No data | FULTON AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET | No data | Street Construction Inspections: Active | Department of Transportation | verified crew working on site. new installation |
2016-03-18 | No data | WEST 30 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012016064B58 New permit on file |
2016-03-16 | No data | WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012016064B58 New permit on file steel plate countersunk in roadway i/f/o mention location NOV issued to latest permit for not having skid resistant plating. |
2016-03-16 | No data | WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NOV issued to the above respondent for having a steel plate on the roadway that was smooth to the touch. Respondentâs plate did not have skid resistance greater than or equal to the adjacent roadway surface as required by rule. |
2016-03-13 | No data | 8 AVENUE, FROM STREET WEST 140 STREET TO STREET WEST 141 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit M012016060B07 on file. Expires 3-29-16 |
2016-03-10 | No data | LORIMER STREET, FROM STREET GRAND STREET TO STREET POWERS STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | start time 9:30 End time 1005 size 5' x 2' 9" x 2' cut of water on s/w sewer compaction 98 % |
2016-03-10 | No data | LORIMER STREET, FROM STREET GRAND STREET TO STREET POWERS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Dismissed no photo bac in process at this time will be made final today |
2016-03-09 | No data | LORIMER STREET, FROM STREET GRAND STREET TO STREET POWERS STREET | No data | Street Construction Inspections: Active | Department of Transportation | Temporary restoration 4' x 3' sunken 7" in driving lane needs immediate attention |
2016-03-07 | No data | YATES AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PERMIT CHECK SEWER REPAIR OK. |
2016-03-07 | No data | WEST 127 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BF arrival time 9:21am and finish time 12:56pm. Cut backs was done |
2016-03-07 | No data | AVENUE A, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Active | Department of Transportation | no cut found |
2016-03-05 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut made final |
2016-03-05 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Active | Department of Transportation | cut made final |
2016-03-04 | No data | VANDERBILT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in roadway ok |
2016-03-04 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work in progress, cut plated and counter sink |
2016-03-03 | No data | WEST 55 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated. |
2016-03-02 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | SEWER CUT 9X4X4 PASS SAND CONE TEST PORTION WAS DONE |
2016-03-01 | No data | 3 AVENUE, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | counter sunken plates |
2016-02-25 | No data | 161 STREET, FROM STREET 59 AVENUE TO STREET BOOTH MEMORIAL AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | crew on site; sewer line has collapsed on s/w--excavation on s/w |
2016-02-25 | No data | BARNES AVENUE, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CUT MADE FINAL |
2016-02-25 | No data | BROOME STREET, FROM STREET GREENE STREET TO STREET WOOSTER STREET | No data | Street Construction Inspections: Active | Department of Transportation | pass cut |
2016-02-25 | No data | BROOME STREET, FROM STREET GREENE STREET TO STREET WOOSTER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass new permit taken out |
2016-02-24 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut plated and counter sink |
2016-02-24 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Active | Department of Transportation | steel plates counter sinks that is covering sewer excavation |
2016-02-23 | No data | WEST 55 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated, |
2016-02-23 | No data | WEST 55 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER latest permit on file. |
2016-02-20 | No data | 8 AVENUE, FROM STREET WEST 140 STREET TO STREET WEST 141 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit M012016029B39 on file. Expires 2-28-16 |
2016-02-20 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Active | Department of Transportation | cut plated in roadway |
2016-02-19 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 17' x 4' --8' 10 'of trench off curb remains 5'down for new water service steel plates over trench. |
2016-02-17 | No data | BOONE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No on site at time temp mac around sewer manhole flush O.K. |
2016-02-17 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Active | Department of Transportation | cut plated and counter sink |
2016-02-11 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work in progress |
2016-02-10 | No data | WESTCHESTER AVENUE, FROM STREET EAST 160 STREET TO STREET EAST 161 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm final in the driving lane |
2016-02-10 | No data | WEST 29 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER; Temp restoration. |
2016-02-08 | No data | WEST 55 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated, |
2016-02-08 | No data | NARRAGANSETT AVENUE, FROM STREET LYDIG AVENUE TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill conf.3X201603903, completed cut parking lane, foreman on site,Sam |
2016-02-06 | No data | WEST 127 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plates countersunk, sign posted |
2016-02-04 | No data | EAST 112 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 3 STEEL PLATES ON R/ ARE COUNTER SUNKEN 1 STEEL PLATE ON S/W |
2016-02-03 | No data | 165 STREET, FROM STREET ARCHER AVENUE TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: Active | Department of Transportation | r/w not fully visible due to active building operation |
2016-02-03 | No data | 1 AVENUE, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATE ON SIDEWALK OVER EXCAVATION |
2016-02-01 | No data | AVENUE A, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon inspection, water work acceptable. Raise plow sign placed at wrong location. Foreman for construction will remove it to the right location, 5' prior to location of steel plates. |
2016-02-01 | No data | WESTCHESTER AVENUE, FROM STREET EAST 160 STREET TO STREET EAST 161 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed and acceptable |
2016-02-01 | No data | 165 STREET, FROM STREET ARCHER AVENUE TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w not fully visible due to snow |
2016-01-29 | No data | MANHATTAN AVENUE, FROM STREET FROST STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | (L) 8'6 x (W) 3'6 x (D) 5'5.. compaction of 97.9 an 97.8%.. monitored from 9:24-11:27am. |
2016-01-26 | No data | WEST 55 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | repaired, Plate reset pinned and ramped at the Curb. |
2016-01-25 | No data | WEST 55 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent failed to post Raise Plow Signs where three Steel Plates countersunk into the Roadway during winter Moratorium period. |
2016-01-22 | No data | AVENUE A, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/t/p/o I observed the above respondent failed to post "Raise Plow" sign 5' prior to countersunk steel plates(2) on bike lane as required during winter moratorium. |
2016-01-22 | No data | AVENUE A, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon inspection, found 2015 water-sewer trench IFO 98-100 missing bike lane markings and with incorrect ID (29613) tags. Please install correct ID 50011 tags & restore solid bike lane markings as required upon completion of wearing course. |
2016-01-21 | No data | 3 AVENUE, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Active | Department of Transportation | spoke to foreman about shoring the excavation |
2016-01-20 | No data | MANHATTAN AVENUE, FROM STREET FROST STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Contractor with personnel working on site warning to place Bike sign posted a flag person to help with bikes was informed must countersink steel plate of the sewer opening cut |
2016-01-13 | No data | WEST 55 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Respondent having three steel plate on the roadway & sidewalk that was smooth to the touch. Respondentâs plate did not have skid resistance greater than or equal to the adjacent roadway & sidewalk surface as required by rule. |
2016-01-11 | No data | EAST 31 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Active | Department of Transportation | steel plate in parking lane.under construction equipment |
2016-01-09 | No data | WEST 55 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | (permit check spoke to foreman informed to put coating on steel plates before departing from site. However respondent in-compliance with stipulations.) |
2016-01-07 | No data | WEST 44 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit on file. M012015365A53 |
2016-01-07 | No data | EAST 112 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Respondent failed to post "Raise Plow" or "Steel Plates Ahead" sign) during winter moratorium. Respondent has three steel plates marked "Empire Sewer" in the roadway. |
2016-01-05 | No data | FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site. All stips are followed accordingly. Advised supervisor to countersinking plates and post signs. |
2016-01-04 | No data | EAST 86 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | SEWER CUT PLATED |
2016-01-04 | No data | WEST 55 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plates on roadway I/F/O buidling # 424. |
2016-01-04 | No data | EAST 86 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLATES ON R/W COUNTER SUNKEN WITH ACTIVE PERMIT M012015365A54 |
2016-01-04 | No data | EAST 162 STREET, FROM STREET EAST 163 STREET TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm final |
2015-12-29 | No data | AVENUE A, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the Above respondent having 6 steel Plates In roadway/Bike Lane that are smooth to the Touch and offered no resistance. NOV issued for Failure to use skid Resisitant Plating and/or Decking. |
2015-12-29 | No data | LIVINGSTON STREET, FROM STREET FLATBUSH AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | lane marking for the bus lane |
2015-12-28 | No data | EAST 31 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Active | Department of Transportation | cut within BO |
2015-12-24 | No data | 165 STREET, FROM STREET ARCHER AVENUE TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated roadway excavation , plates countersunk , raise plow sign posted active permit # Q012015343B14 on file . |
2015-12-24 | No data | 1 AVENUE, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate secured on S/W |
2015-12-24 | No data | 165 STREET, FROM STREET ARCHER AVENUE TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation plates countersunk raise plow sign posted |
2015-12-23 | No data | FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done on roadway/sidewalk i/f/o 1450/1452. |
2015-12-22 | No data | WEST 55 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Respondent having 3 steel plates on the roadway & sidewalk that was smooth to the touch. Respondent’s plate did not have skid resistance greater than or equal to the adjacent roadway & sidewalk surface as required by rule. |
2015-12-22 | No data | WEST 162 STREET, FROM STREET OGDEN AVENUE TO STREET SUMMIT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | cut plated ok |
2015-12-22 | No data | WEST 162 STREET, FROM STREET OGDEN AVENUE TO STREET SUMMIT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY CUT OK NEW BUILDING |
2015-12-20 | No data | WEST 55 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | (permit Check) steel plates counter sink in roadway Re-inspect tomorrow for renewal permit current one expired 12/20/15. |
2015-12-17 | No data | WATSON AVENUE, FROM STREET CLOSE AVENUE TO STREET COLGATE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent with a steel plate pinned and ramped on the roadway. Respondent failed to countersink plates flush with roadway during the 2015-16 winter moratorium |
2015-12-16 | No data | WEST 44 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new permit on file M012015324A51 |
2015-12-14 | No data | WEST 43 STREET, FROM STREET 10 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER permanent restoration flush to grade in roadway. |
2015-12-12 | No data | BARNES AVENUE, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | act area plated |
2015-12-10 | No data | PARK ROW, FROM STREET BEEKMAN STREET TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done under this permit |
2015-12-10 | No data | EAST 78 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WATER REPAIRS ARE IN COMPLIANCE |
2015-12-09 | No data | EAST 112 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Permittee has 3 steel plates countersink in the parking and driving lane, I/F/O: 318. (Notification was given at 11:43am to post "Raise Plow" or "Steel Plates Ahead" sign). |
2015-12-09 | No data | EAST 112 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please refer to renewal permit #M012015329A59 on file. |
2015-12-06 | No data | WEST 55 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | (permit check spoke to foreman Jason informed to place permittee Id signs on location. Signs place while on site. Respondent in-compliance with stipulations) |
2015-12-05 | No data | WEST 162 STREET, FROM STREET OGDEN AVENUE TO STREET SUMMIT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | restored |
2015-12-03 | No data | AVENUE A, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plates pinned and ramped raise pplow sign posted and acceptable ifo of "sidewalk" restaurant and bar |
2015-12-03 | No data | WEST 55 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | (permit Check) steel plates counter sink in roadway. |
2015-12-02 | No data | POWERS STREET, FROM STREET HOPE STREET TO STREET LORIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At time of inspection sidewalk square has a expansion joint between the curb and square not recessed or seal must recess and seal expansion joint |
2015-12-02 | No data | EAST 86 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ACTIVE WORK SITE MAKING REPAIRS TO SEWER |
2015-11-27 | No data | AVENUE A, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no defects |
2015-11-24 | No data | EAST 78 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Base complete dimensions : 4'3''X9' with a depth of 1'4''Start time 12:45PMContractor awaiting a larger steel plate to cover restoration. Wearing course to be completed at a later date.departure 1:15PM |
2015-11-20 | No data | FORLEY STREET, FROM STREET 85 STREET TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O i observed the above respodent failed to use skid resistant paint on steel plates on the sidewalk and roadway and crosswalk. There are 4 plates that are smooth to touch. |
2015-11-15 | No data | EAST 213 STREET, FROM STREET BARNES AVENUE TO STREET CARLISLE PLACE | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Leak in Basement, 3 Day Dep Notice Issued. |
2015-11-13 | No data | WEST 55 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent having two steel plates on the roadway that was smooth to the touch. Respondent’s plates did not have skid resistance greater than or equal to the adjacent roadway surface as required by rule. |
2015-11-12 | No data | 43 AVENUE, FROM STREET 25 STREET TO STREET 27 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 5 STEEL PLATES ACROSS R/W PINNED AND RAMPED AND C.C. |
2015-11-11 | No data | WEST 55 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Area plated I/F/O 424. |
2015-11-10 | No data | MAUJER STREET, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Active | Department of Transportation | perm cut in r/w.. |
2015-11-02 | No data | LIVINGSTON STREET, FROM STREET FLATBUSH AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | steel plated rwy and swk |
2015-10-29 | No data | EAST 170 STREET, FROM STREET COTTAGE PLACE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ACTIVE SITE...STEEL PLATES GOING ACROSS ROADWAY, 11 FOOT LANE OPENED AT TIME OF INSPECTION. |
2015-10-29 | No data | WEST 55 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - SEWER(permit check steel plates in r.w) |
2015-10-28 | No data | WEST 162 STREET, FROM STREET OGDEN AVENUE TO STREET SUMMIT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ACTIVE WORK IN THE DRIVING LANE OF THE ROADWAY WITH STEEL PLATES MISSING COLOR CODE SPRAY. - Restoration Missing Color Code |
Number | Adjudicates | Phase | Disposition | Date | Fine amount | Date fine paid | description |
---|---|---|---|---|---|---|---|
TWC-227755 | Office of Administrative Trials and Hearings | Issued | Calendared | 2023-10-10 | No data | No data | It shall be unlawful for any person to operate a business for the purpose of the collection of trade waste from the premises of a commercial establishment required to provide for the removal of such waste pursuant to the provisions of section 16-116 of this code, or the removal or disposal of trade waste from such premises, or to engage in, conduct or cause the operation of such a business, without having first obtained a license therefor from the commission pursuant to the provisions of this chapter. Notwithstanding the provisions of this subdivision, a business solely engaged in the removal of waste materials resulting from building demolition, construction, alteration or excavation shall be exempt from the licensing provisions of this subdivision where, except in regard to the principals of a business solely in either or both of the class seven or the class three category of licensees as defined in rules previously promulgated by the commissioner of consumer and worker protection pursuant to subchapter eighteen of chapter two of title twenty of this code, no principal of such applicant is a principal of a business or a former business required to be licensed pursuant to this chapter or such former subchapter eighteen. Grant of such exemption shall be made by the commission upon its review of an exemption application, which shall be in the form and contain the information prescribed by rule of the commission and shall be accompanied by a statement by the applicant describing the nature of the applicant's business and listing all principals of such business. |
TWC-218827 | Office of Administrative Trials and Hearings | Issued | Settled | 2020-03-10 | 3000 | 2020-09-09 | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-217535 | Office of Administrative Trials and Hearings | Issued | Settled | 2019-04-18 | 2500 | 2020-06-30 | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-209924 | Office of Administrative Trials and Hearings | Issued | Barred by CPLR | 2014-05-22 | No data | 2015-01-29 | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
No related officers
No related companies by address
Date of last update: 24 Nov 2024
Sources: New York Secretary of State
© 2024 nycompanysearch.com, Part of Big Data Integrated