2024-07-02
|
No data
|
READE STREET, FROM STREET CHURCH STREET TO STREET WEST BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found 4 Sidewalk Flags restored with Expansion Joints sealed.
|
2024-06-26
|
No data
|
CHAMBERS STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Refer to permit #M042024095A11 on file.
|
2024-06-20
|
No data
|
CHURCH STREET, FROM STREET 6 AVENUE TO STREET WHITE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done.
|
2024-06-04
|
No data
|
BROADWAY, FROM STREET BROOME STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
VAULT CONSTRUCTION OR ALTERATION on the Sidewalk.
|
2024-05-21
|
No data
|
61 STREET, FROM STREET 39 AVENUE TO STREET LONG ISLAND RAILROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
concrete curb installed
|
2024-05-19
|
No data
|
WYTHE AVENUE, FROM STREET NORTH 9 STREET TO STREET NORTH 10 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel face curb is installed on the sidewalk
|
2024-05-19
|
No data
|
NORTH 10 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed on the sidewalk
|
2024-04-18
|
No data
|
NORTH 10 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SW flags nstalled, expansion joints sealed
|
2024-02-07
|
No data
|
WYTHE AVENUE, FROM STREET NORTH 9 STREET TO STREET NORTH 10 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
OCCUPANCY OF SIDEWALK AS STIPULATED, pass
|
2024-02-07
|
No data
|
NORTH 10 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
OCCUPANCY OF ROADWAY AS STIPULATED pass
|
2024-01-25
|
No data
|
WYTHE AVENUE, FROM STREET NORTH 9 STREET TO STREET NORTH 10 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
A/T/P/O I observed Respondent's Barriers stored on Roadway, failed to mark outer surface of Barriers with high intensity Fluorescent Paint or Reflectors capable of producing warning glow when struck by Vehicle Headlamps.
|
2023-12-10
|
No data
|
BROOME STREET, FROM STREET THOMPSON STREET TO STREET WATTS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found no sidewalk work done permit expired.
|
2023-12-07
|
No data
|
BROOME STREET, FROM STREET WATTS STREET TO STREET WOOSTER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found no work done in sidewalk area of roadway.
|
2023-12-07
|
No data
|
WEST BROADWAY, FROM STREET CANAL STREET TO STREET GRAND STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found multiple restored to grade blue stone sidewalk flags. Sidewalk joints sealed
|
2023-11-05
|
No data
|
WEST 141 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found several sidewalk flags restored in kind I/F/O 173
|
2023-09-06
|
No data
|
CHAMBERS STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I found a single flag restored at the curb on the West End of the property.
|
2023-07-19
|
No data
|
LUQUER STREET, FROM STREET CLINTON STREET TO STREET HAMILTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
3 new sidewalk flags installed around street lights pole ifo 98 Luquer street.
|
2023-07-06
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET WEST HOUSTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 151, Vault work completed and sidewalk flags is acceptable.
|
2023-06-13
|
No data
|
7 AVENUE, FROM STREET WEST 141 STREET TO STREET WEST 142 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site, moved equipment out of the bus stop.
|
2023-06-01
|
No data
|
EAST 35 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found entire sidewalk in front of property including steel face, curb line restored and sealed.
|
2023-03-22
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET WEST HOUSTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 151 sidewalk flags restored and expansion joints sealed.
|
2023-03-09
|
No data
|
CHURCH STREET, FROM STREET 6 AVENUE TO STREET WHITE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk restored in kind.
|
2023-02-03
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET WEST HOUSTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Three sidewalk flags restored in kind.
|
2022-12-22
|
No data
|
BROADWAY, FROM STREET BROOME STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
VAULT CONSTRUCTION OR ALTERATION on the Sidewalk. ( App. Insp. #838 Elliott ).
|
2022-12-07
|
No data
|
61 STREET, FROM STREET 39 AVENUE TO STREET LONG ISLAND RAILROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new sidewalk flags expansion joints sealed
|
2022-11-25
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET WEST HOUSTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Vault work completed and sidewalk restoration is acceptable I/F/O 151.
|
2022-11-02
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET WEST HOUSTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I/F/O 149-151 sidewalk repair work is present and covered by tarp at this time. Permit remains active.
|
2022-11-02
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET WEST HOUSTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No vault work conducted under this permit. Permit expired. Active permit on file.
|
2022-10-24
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET WEST HOUSTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work started I/F/O 151 at this time. Permit active.
|
2022-09-30
|
No data
|
VESTRY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Near 177 Hudson vault work completed and acceptable.
|
2022-09-21
|
No data
|
HUDSON STREET, FROM STREET LAIGHT STREET TO STREET VESTRY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No defects to found Sidewalk vault is in compliance
|
2022-09-21
|
No data
|
VESTRY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk around vault is in compliance at this time
|
2022-08-11
|
No data
|
VESTRY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found sidewalk in compliance with expansion joints sealed.
|
2022-06-29
|
No data
|
VESTRY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Fenced removed at this time.
|
2022-05-05
|
No data
|
BROADWAY, FROM STREET WEST 76 STREET TO STREET WEST 77 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The respondent has installed a stone curb.
|
2022-03-08
|
No data
|
7 AVENUE, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPLACE SIDEWALK
|
2022-02-15
|
No data
|
EAST 35 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found Steel Face Curb installed.
|
2022-01-27
|
No data
|
CHAMBERS STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found newly installed sidewalk flags with expansion joints sealed and in compliance in front of 155 Chambers st.
|
2022-01-23
|
No data
|
CHAMBERS STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk is in compliance with no defects.
|
2022-01-11
|
No data
|
VESTRY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Vault installed along building is acceptable.
|
2021-12-23
|
No data
|
VESTRY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Fence removed from location at this time.
|
2021-09-16
|
No data
|
CHAMBERS STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The respondent did not do the work, and the permit has expired.
|
2021-08-18
|
No data
|
VESTRY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done under this permit. Sidewalk restored around vault under more recent permits.
|
2021-08-09
|
No data
|
7 AVENUE, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work has been done. Permit expired on 3/11/2021.
|
2021-08-08
|
No data
|
HUDSON STREET, FROM STREET LAIGHT STREET TO STREET VESTRY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The respondent completed the vault work before restoring the sidewalk, and there was no defect found to the sidewalk pavement.
|
2021-08-08
|
No data
|
VESTRY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The respondent performed the vault work before restoring the sidewalk, and there is no defect found to the sidewalk pavement.
|
2021-07-27
|
No data
|
CHAMBERS STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The respondent did not do the work, and the permit has expired.
|
2021-07-17
|
No data
|
41 AVENUE, FROM STREET 28 STREET TO STREET 29 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Multiple sidewalk flags restored, joints sealed
|
2021-07-16
|
No data
|
28 STREET, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Multiple sidewalk flags restored, expansion joints sealed
|
2021-06-08
|
No data
|
BROADWAY, FROM STREET BROOME STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR SIDEWALK
|
2021-05-24
|
No data
|
CHAMBERS STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done.
|
2021-04-18
|
No data
|
7 AVENUE, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Areas repaired.
|
2021-04-03
|
No data
|
48 AVENUE, FROM STREET 11 STREET TO STREET VERNON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags restored expansion joints sealed
|
2021-03-08
|
No data
|
CHAMBERS STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR SIDEWALK
|
2021-02-16
|
No data
|
CHAMBERS STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
REPAIR SIDEWALK
|
2021-01-04
|
No data
|
CHAMBERS STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR SIDEWALK
|
2020-11-10
|
No data
|
48 AVENUE, FROM STREET 11 STREET TO STREET VERNON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb restored expansion joints sealed
|
2020-11-04
|
No data
|
41 AVENUE, FROM STREET 28 STREET TO STREET 29 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
r/w not occupied
|
2020-11-04
|
No data
|
28 STREET, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
r/w not occupied
|
2020-11-04
|
No data
|
EAST 35 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDEWALK VAULT CONSTRUCTION OR ALTERATION.
|
2020-10-28
|
No data
|
EAST 35 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: NOV Re-Inspect
|
Department of Transportation
|
Permittee had the Street excavated to install Curb with their permit expired when the violation was issued. No action taken at this time.
|
2020-09-26
|
No data
|
LAFAYETTE STREET, FROM STREET FRANKLIN STREET TO STREET WHITE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Closer to Franklin street 6 sidewalk flags repaired/restored with expansion joints sealed.
|
2020-09-15
|
No data
|
EAST 35 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NOV issued for having an excavated Roadway along a Steel Face Curb with no valid NYC DOT permit on file for Street opening. Cited permit for reset, repair or replace Curb expired on 9/5/2020.
|
2020-09-02
|
No data
|
CHAMBERS STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Work not started at this time.Permit still active.
|
2020-08-27
|
No data
|
CHAMBERS STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
At time of CAR re-inspection, there was an active permit M042020213A02 on file and a summons was not warrant. As per summons unit and Vinny, summons was rejected.
|
2020-08-21
|
No data
|
CHAMBERS STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Permit still active patch work,scored lines,expansion joints not sealed and color tint not observed.
|
2020-08-21
|
No data
|
CHAMBERS STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Refer to the latest permit on file M042020213A02. Patch work,scored line, expansion joints and tint color not observed.
|
2020-08-12
|
No data
|
CHAMBERS STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I FOUND THE ABOVE RESPONDENT FAILED TO REPAIR FULL SIDEWALK FLAG, PATCHWORK IS UNACCEPTED.THE PERMITTEE WAS NOTIFIED BY CAR # 20206390096 ON 5/4/2020. I IDENTIFIED BY PERMIT ABOVE.
|
2020-07-24
|
No data
|
48 AVENUE, FROM STREET 11 STREET TO STREET VERNON BOULEVARD
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
THE RESPONDENT FAILED TO COMPLY WITH STIPULATION (014) BY NOT MAINTAINING A 5 FOOT CLEAR PROTECTED PEDESTRIAN WALKWAY IN THE ROADWAY. CONTRACTOR HAD NO BARRIERS ON SITE TO MAINTAIN WALKWAY. SIDEWALK FULLY EXCAVATED AND CLOSED OF TO PEDESTRIANS.
|
2020-07-16
|
No data
|
48 AVENUE, FROM STREET 11 STREET TO STREET VERNON BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No visible pedestrian walkway on location
|
2020-07-09
|
No data
|
VESTRY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
There are no defects found to the sidewalk flags where the vault work performed underneath the sidewalk.
|
2020-05-04
|
No data
|
CHAMBERS STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
New CAR issued to most recent permit M042020098A05. No work done.
|
2020-05-04
|
No data
|
CHAMBERS STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Patch work observed in front of #155. Sidewalk must be restored in kind with no patch work.
|
2020-03-21
|
No data
|
HUDSON STREET, FROM STREET LAIGHT STREET TO STREET VESTRY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk vault in compliance.
|
2020-03-21
|
No data
|
VESTRY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk vault in compliance.
|
2020-03-10
|
No data
|
CHAMBERS STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Permit possibly for open CAR under permit M042020009A67.
|
2020-03-06
|
No data
|
BROADWAY, FROM STREET BROOME STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk concrete curing. However maintaining 5' clear sidewalk.
|
2020-02-26
|
No data
|
CHAMBERS STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Unfortunately, work was to be completed within the expiration time on the permit. As per our conversation, CAR is denied.
|
2020-02-19
|
No data
|
BROADWAY, FROM STREET WEST 76 STREET TO STREET WEST 77 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reset in compliance.
|
2020-02-12
|
No data
|
VESTRY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No vault work appears to have been done at this time.
|
2020-02-05
|
No data
|
CHAMBERS STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Patch work observed in front of 155. Sidewalk must be restored in kind with no patch work.
|
2020-01-28
|
No data
|
VESTRY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Work not started in this area at this time. Permit remains active.
|
2020-01-07
|
No data
|
BROADWAY, FROM STREET WEST 76 STREET TO STREET WEST 77 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags restored and expansion joints sealed.
|
2019-12-30
|
No data
|
VESTRY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Fence on sidewalk on Vestry.
|
2019-12-30
|
No data
|
HUDSON STREET, FROM STREET LAIGHT STREET TO STREET VESTRY STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Fence on sidewalk at this time.
|
2019-12-19
|
No data
|
HUDSON STREET, FROM STREET LAIGHT STREET TO STREET VESTRY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done. Permit expired.
|
2019-12-13
|
No data
|
VESTRY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site, no vault work at this time.
|
2019-12-11
|
No data
|
VESTRY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Actively working I/F/O aka 177 Hudson.
|
2019-12-02
|
No data
|
WEST BROADWAY, FROM STREET FRANKLIN STREET TO STREET WHITE STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
permittee placed on stop/hold
|
2019-11-30
|
No data
|
WEST BROADWAY, FROM STREET FRANKLIN STREET TO STREET WHITE STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I found the respondent failed to Fully restore sidewalk flag, as patch work is unacceptable. Previously notified by CAR #20196580073 on 8/21/2019 to correct the condition.
|
2019-11-30
|
No data
|
NORTH MOORE STREET, FROM STREET VARICK STREET TO STREET WEST BROADWAY
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion Joints have been installed and sealed.
|
2019-11-15
|
No data
|
31 STREET, FROM STREET 34 AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 REPAIRED SIDEWALK FLAGS
|
2019-11-13
|
No data
|
WEST 77 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk flags in compliance no defects
|
2019-11-10
|
No data
|
WEST 39 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RW clear
|
2019-10-18
|
No data
|
NORTH MOORE STREET, FROM STREET VARICK STREET TO STREET WEST BROADWAY
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
atpo i observed the above respondent failed to fully replace defective sidewalk flag. Respondent was issued CAR #20197450003 on 6/5/19 and failed to correct
|
2019-10-18
|
No data
|
WEST BROADWAY, FROM STREET FRANKLIN STREET TO STREET WHITE STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
atpo i observed the above respondent failed to fully replace defective sidewalk flag. Respondent was issued CAR #20196580073 on 8/21/19 and failed to correct
|
2019-10-09
|
No data
|
WEST 77 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no evidence of work done in area
|
2019-09-17
|
No data
|
ELVIRA AVENUE, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Time of inspection at 774 elvira ave , I found expansion joints was not sealed at the cur
|
2019-08-21
|
No data
|
WEST BROADWAY, FROM STREET FRANKLIN STREET TO STREET WHITE STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Patch work was observed with one sidewalk flag. Previous sidewalk flag expansion joints have been sealed.
|
2019-08-21
|
No data
|
WEST BROADWAY, FROM STREET FRANKLIN STREET TO STREET WHITE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Patch work was observed with one sidewalk flag. Previous sidewalk flag expansion joints have been sealed.
|
2019-08-15
|
No data
|
NORTH MOORE STREET, FROM STREET VARICK STREET TO STREET WEST BROADWAY
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Multiple sidewalk flags installed. No expansion joints were installed. S/C.
|
2019-08-08
|
No data
|
WEST 77 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk fully restored with location in compliance.
|
2019-06-20
|
No data
|
BROADWAY, FROM STREET WEST 76 STREET TO STREET WEST 77 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SW curb and flag has been replaced .
|
2019-06-07
|
No data
|
BROADWAY, FROM STREET WEST 76 STREET TO STREET WEST 77 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags have been replaced and sealed .
|
2019-06-05
|
No data
|
NORTH MOORE STREET, FROM STREET VARICK STREET TO STREET WEST BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Respondent failed to install expansion joints and seal the flag off at the curb, patch work is done, please restore full flag restoration at location.
|
2019-06-05
|
No data
|
WEST BROADWAY, FROM STREET FRANKLIN STREET TO STREET WHITE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
respondent failed to restore flag with expansion joints and sealing the flag at the curb. please repair
|
2019-05-29
|
No data
|
CHURCH STREET, FROM STREET 6 AVENUE TO STREET WHITE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
majority of sidewalk replaced except for 1 sidewalk flag.
|
2019-05-23
|
No data
|
BROADWAY, FROM STREET WEST 76 STREET TO STREET WEST 77 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No container on roadway at time of inspection.
|
2019-05-14
|
No data
|
ELVIRA AVENUE, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
THIS CONDITION IS NOT REPAIRED. THE PERMITTEE IS ON A STOP/HOLD FOR FAILURE TO CORRECT DEFECT. AN NOV WAS ISSUED AS PER DOT POLICY
|
2019-05-05
|
No data
|
CENTRE STREET, FROM STREET GRAND STREET TO STREET HOWARD STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
A total of 10 sidewalk flags were replaced IFO 220 Centre St. Expansion joints sealed. Acceptable.
|
2019-04-03
|
No data
|
ELVIRA AVENUE, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed the Respondent failed to seal installed expansion joints at the curb line as per subsection for a curb installation . Respondent was notified prior by CAR # 20191700014 on 01/08/2019 and faillllllled to correct the condition.
|
2019-02-07
|
No data
|
COLUMBUS AVENUE, FROM STREET WEST 80 STREET TO STREET WEST 81 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No defects to report sidewalk restored in kind
|
2019-01-08
|
No data
|
ELVIRA AVENUE, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed expansion joints need to be sealed.
|
2018-10-24
|
No data
|
WYTHE AVENUE, FROM STREET SOUTH 1 STREET TO STREET SOUTH 2 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
0214 - PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET/NO CONTAINER ON SITE
|
2018-05-17
|
No data
|
WEST 41 STREET, FROM STREET 7 AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk repair work on south sidewalk area , flags at CHAMPS okay at this time
|
2018-04-04
|
No data
|
BROADWAY, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion Joints found sealed.
|
2017-12-22
|
No data
|
BROADWAY, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Not a valid reason to appeal. Expansion joints are required to be sealed at the expiration of the permit.
|
2017-11-29
|
No data
|
BROADWAY, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
plastic cap covering sidewalk expansion joints needs to be remove and sidewalk expansion joints needs to be properly sealed.
|
2017-11-21
|
No data
|
EAST 46 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPLACE SIDEWALK: 3 flags replaced.
|
2017-11-19
|
No data
|
WEST 41 STREET, FROM STREET 7 AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags has been restored at the corner quadrant area of Broadway.
|
2017-08-19
|
No data
|
JEROME AVENUE, FROM STREET EAST 193 STREET TO STREET EAST KINGSBRIDGE ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk replaced
|
2017-07-02
|
No data
|
7 AVENUE, FROM STREET WEST 39 STREET TO STREET WEST 40 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPLACE SIDEWALK
|
2017-05-11
|
No data
|
HUDSON STREET, FROM STREET LAIGHT STREET TO STREET VESTRY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk acceptable
|
2017-05-11
|
No data
|
VESTRY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk repairs acceptable
|
2017-02-16
|
No data
|
COLUMBUS AVENUE, FROM STREET WEST 80 STREET TO STREET WEST 81 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk free of defects.
|
2016-11-09
|
No data
|
DE KALB AVENUE, FROM STREET CLASSON AVENUE TO STREET STEUBEN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk flags ok joints are sealed in front of loading dock at 379 dekalb
|
2016-11-09
|
No data
|
DE KALB AVENUE, FROM STREET HALL STREET TO STREET RYERSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk flags ok joints are sealed in front of 379 dekalb ave loading dock
|
2016-10-13
|
No data
|
EAST 70 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPLACE SIDEWALK: There is a sidewalk bridge at this location.
|
2016-09-22
|
No data
|
COLUMBUS AVENUE, FROM STREET WEST 80 STREET TO STREET WEST 81 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
swk ok
|
2016-06-30
|
No data
|
COLUMBUS AVENUE, FROM STREET WEST 80 STREET TO STREET WEST 81 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Blue stone sidewalk under sidewalk shed. I/F/O building #426-428.
|
2016-05-29
|
No data
|
EAST 70 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
r/w occupancy in compliance
|
2016-05-21
|
No data
|
EAST 70 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
rw occupied
|
2016-05-19
|
No data
|
EAST 70 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
not on site
|
2016-05-18
|
No data
|
EAST 70 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
equipment placement
|
2016-05-12
|
No data
|
HUDSON STREET, FROM STREET LAIGHT STREET TO STREET VESTRY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk acceptable
|
2016-04-27
|
No data
|
EAST 70 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No compressor on location at this time.
|
2016-04-01
|
No data
|
EAST 70 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no new sidewalk work observed at this time
|
2016-03-30
|
No data
|
WOOSTER STREET, FROM STREET BROOME STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
upon inspection no boome truck on location
|
2016-03-21
|
No data
|
VESTRY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored. in compliance.
|
2016-03-21
|
No data
|
VESTRY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
equipment behind fence. in compliance.
|
2016-03-20
|
No data
|
COLUMBUS AVENUE, FROM STREET WEST 80 STREET TO STREET WEST 81 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No crossing sidewalk.
|
2016-03-15
|
No data
|
BROOME STREET, FROM STREET WATTS STREET TO STREET WOOSTER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No boom truck on location at this time.
|
2016-03-07
|
No data
|
LAFAYETTE STREET, FROM STREET ASTOR PLACE TO STREET EAST 4 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk ok.
|
2016-02-18
|
No data
|
MADISON AVENUE, FROM STREET EAST 38 STREET TO STREET EAST 39 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NO WORK DONE
|
2016-02-01
|
No data
|
BROOME STREET, FROM STREET WATTS STREET TO STREET WOOSTER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway in compliance as stipulated
|
2016-01-26
|
No data
|
CANAL STREET, FROM STREET LAIGHT STREET TO STREET WEST BROADWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
compressor removed
|
2015-11-27
|
No data
|
DE KALB AVENUE, FROM STREET GRAND AVENUE TO STREET STEUBEN STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
repair swk
|