Name: | TWO BROTHERS PLUMBING SERVICES, INC |
Jurisdiction: | New York |
Legal type: | DOMESTIC BUSINESS CORPORATION |
Status: | Active |
Date of registration: | 15 Mar 2016 (9 years ago) |
Entity Number: | 4913273 |
ZIP code: | 10461 |
County: | Suffolk |
Place of Formation: | New York |
Address: | 3028 E TREMONT AVENUE, BRONX, NY, United States, 10461 |
Shares Details
Shares issued 200
Share Par Value 0
Type NO PAR VALUE
Name | Role | Address |
---|---|---|
DITRON MULAJ | DOS Process Agent | 3028 E TREMONT AVENUE, BRONX, NY, United States, 10461 |
Number | Date | End date | Type | Address |
---|---|---|---|---|
X012024320B16 | 2024-11-15 | 2024-12-13 | REPAIR WATER - PROTECTED | EAST 196 STREET, BRONX, FROM STREET CONTINENTAL AVENUE TO STREET MAYFLOWER AVENUE |
X012024310A06 | 2024-11-05 | 2024-11-14 | REPAIR WATER - PROTECTED | EAST 167 STREET, BRONX, FROM STREET GRANDVIEW PLACE TO STREET WALTON AVENUE |
M012024306A82 | 2024-11-01 | 2024-12-03 | REPAIR WATER - PROTECTED | LENOX AVENUE, MANHATTAN, FROM STREET WEST 131 STREET TO STREET WEST 132 STREET |
X012024299A51 | 2024-10-25 | 2024-11-19 | REPAIR WATER - PROTECTED | ADAMS PLACE, BRONX, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET |
X012024299A49 | 2024-10-25 | 2024-11-19 | REPAIR WATER - PROTECTED | ADAMS PLACE, BRONX, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET |
X012024298A28 | 2024-10-24 | 2024-11-20 | REPAIR WATER | ARTHUR AVENUE, BRONX, FROM STREET EAST 178 STREET TO STREET EAST 179 STREET |
Q012024296C39 | 2024-10-22 | 2024-11-07 | REPAIR WATER | 141 STREET, QUEENS, FROM STREET GLASSBORO AVENUE TO STREET LAKEWOOD AVENUE |
X012024288A05 | 2024-10-14 | 2024-10-31 | REPAIR WATER | VAN NEST AVENUE, BRONX, FROM STREET BARNES AVENUE TO STREET MATTHEWS AVENUE |
Q012024288A10 | 2024-10-14 | 2024-10-24 | REPAIR WATER | 141 STREET, QUEENS, FROM STREET GLASSBORO AVENUE TO STREET LAKEWOOD AVENUE |
Q012024282A73 | 2024-10-08 | 2024-10-25 | REPAIR WATER | 141 STREET, QUEENS, FROM STREET GLASSBORO AVENUE TO STREET LAKEWOOD AVENUE |
Q012024276B25 | 2024-10-02 | 2024-10-24 | REPAIR WATER | 141 STREET, QUEENS, FROM STREET GLASSBORO AVENUE TO STREET LAKEWOOD AVENUE |
Q012024260B07 | 2024-09-16 | 2024-10-11 | REPAIR WATER | 141 STREET, QUEENS, FROM STREET GLASSBORO AVENUE TO STREET LAKEWOOD AVENUE |
X012024255A23 | 2024-09-11 | 2024-09-13 | REPAIR WATER - PROTECTED | EAST 237 STREET, BRONX, FROM STREET KATONAH AVENUE TO STREET MARTHA AVENUE |
Q022024248A12 | 2024-09-04 | 2024-09-09 | OCCUPANCY OF ROADWAY AS STIPULATED | 150 STREET, QUEENS, FROM STREET 12 ROAD TO STREET 14 AVENUE |
X012024247B56 | 2024-09-03 | 2024-09-22 | REPAIR SEWER | BELMONT AVENUE, BRONX, FROM STREET CRESCENT AVENUE TO STREET EAST 183 STREET |
Q012024240A56 | 2024-08-27 | 2024-09-09 | REPAIR WATER - PROTECTED | 164 STREET, QUEENS, FROM STREET 14 ROAD TO STREET CRYDERS LANE |
X012024239A77 | 2024-08-26 | 2024-09-08 | REPAIR SEWER | BELMONT AVENUE, BRONX, FROM STREET CRESCENT AVENUE TO STREET EAST 183 STREET |
Q012024222A08 | 2024-08-13 | 2024-09-07 | REPAIR WATER - PROTECTED | CLINTONVILLE STREET, QUEENS, FROM STREET 8 AVENUE TO STREET 151 STREET |
X012024225A36 | 2024-08-12 | 2024-08-27 | REPAIR SEWER | BELMONT AVENUE, BRONX, FROM STREET CRESCENT AVENUE TO STREET EAST 183 STREET |
Q012024211B35 | 2024-07-29 | 2024-08-24 | REPAIR SEWER | 14 AVENUE, QUEENS, FROM STREET 150 STREET TO STREET CLINTONVILLE STREET |
X012024211A58 | 2024-07-29 | 2024-08-13 | REPAIR SEWER | BELMONT AVENUE, BRONX, FROM STREET CRESCENT AVENUE TO STREET EAST 183 STREET |
B012024207A97 | 2024-07-25 | 2024-08-17 | REPAIR WATER - PROTECTED | FURMAN AVENUE, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
X012024202A01 | 2024-07-25 | 2024-08-18 | REPAIR WATER | HOBART AVENUE, BRONX, FROM STREET BUHRE AVENUE TO STREET ROBERTS AVENUE |
Q012024200B06 | 2024-07-18 | 2024-08-05 | REPAIR SEWER | 14 AVENUE, QUEENS, FROM STREET 150 STREET TO STREET CLINTONVILLE STREET |
Q012024197A64 | 2024-07-15 | 2024-07-22 | REPAIR SEWER | 14 AVENUE, QUEENS, FROM STREET 150 STREET TO STREET CLINTONVILLE STREET |
X012024193A14 | 2024-07-11 | 2024-08-06 | REPAIR WATER - PROTECTED | SEYMOUR AVENUE, BRONX, FROM STREET ASTOR AVENUE TO STREET PELHAM PARKWAY |
B012024190A65 | 2024-07-08 | 2024-07-28 | REPAIR WATER - PROTECTED | EAST 65 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N |
Q012024183C88 | 2024-07-01 | 2024-07-12 | REPAIR WATER - PROTECTED | LEFFERTS BOULEVARD, QUEENS, FROM STREET 89 AVENUE TO STREET 91 AVENUE |
Q012024173C25 | 2024-06-21 | 2024-07-06 | REPAIR SEWER | 14 AVENUE, QUEENS, FROM STREET 150 STREET TO STREET CLINTONVILLE STREET |
X012024165B81 | 2024-06-13 | 2024-07-10 | REPAIR SEWER - PROTECTED | WESTCHESTER AVENUE, BRONX, FROM STREET EAST 167 STREET TO STREET HOME STREET |
X012024165B51 | 2024-06-13 | 2024-07-10 | REPAIR SEWER - PROTECTED | WESTCHESTER AVENUE, BRONX, FROM STREET EAST 167 STREET TO STREET HOME STREET |
Q012024162B85 | 2024-06-10 | 2024-06-26 | REPAIR WATER - PROTECTED | LEFFERTS BOULEVARD, QUEENS, FROM STREET 89 AVENUE TO STREET 91 AVENUE |
X012024152C06 | 2024-05-31 | 2024-06-21 | REPAIR WATER | SEDGWICK AVENUE, BRONX, FROM STREET BEND TO STREET BEND |
Q012024150B14 | 2024-05-29 | 2024-06-12 | REPAIR WATER - PROTECTED | LEFFERTS BOULEVARD, QUEENS, FROM STREET 89 AVENUE TO STREET 91 AVENUE |
Q012024150B13 | 2024-05-29 | 2024-06-22 | REPAIR SEWER | 14 AVENUE, QUEENS, FROM STREET 150 STREET TO STREET CLINTONVILLE STREET |
X012024141A55 | 2024-05-20 | 2024-06-04 | REPAIR WATER | SEDGWICK AVENUE, BRONX, FROM STREET BEND TO STREET BEND |
X012024131A61 | 2024-05-10 | 2024-05-21 | REPAIR WATER | SEDGWICK AVENUE, BRONX, FROM STREET BEND TO STREET BEND |
X012024130A69 | 2024-05-09 | 2024-05-31 | REPAIR WATER | EAST 235 STREET, BRONX, FROM STREET HERKIMER PLACE TO STREET NAPIER AVENUE |
Q012024122B30 | 2024-05-01 | 2024-05-30 | REPAIR SEWER | 149 PLACE, QUEENS, FROM STREET BEND TO STREET POWELLS COVE BOULEVARD |
Q012024117A73 | 2024-04-26 | 2024-05-24 | REPAIR WATER | 12 ROAD, QUEENS, FROM STREET TOTTEN STREET TO STREET UTOPIA PARKWAY |
B022024110B51 | 2024-04-19 | 2024-05-18 | OCCUPANCY OF ROADWAY AS STIPULATED | NORTH 6 STREET, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET |
M012024110A66 | 2024-04-19 | 2024-05-18 | REPAIR WATER - PROTECTED | AVENUE C, MANHATTAN, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET |
Q012024105A03 | 2024-04-17 | 2024-05-13 | REPAIR WATER | 20 AVENUE, QUEENS, FROM STREET 163 STREET TO STREET 166 STREET |
X012024103A23 | 2024-04-12 | 2024-04-23 | REPAIR WATER | HOE AVENUE, BRONX, FROM STREET BEND TO STREET JENNINGS STREET |
X012024103A24 | 2024-04-12 | 2024-04-23 | REPAIR WATER | HOE AVENUE, BRONX, FROM STREET BEND TO STREET JENNINGS STREET |
Q012024096B00 | 2024-04-05 | 2024-04-27 | REPAIR WATER | JUNCTION BOULEVARD, QUEENS, FROM STREET 37 AVENUE TO STREET 38 AVENUE |
Q012024093B81 | 2024-04-02 | 2024-04-27 | REPAIR WATER | JUNCTION BOULEVARD, QUEENS, FROM STREET 37 AVENUE TO STREET 38 AVENUE |
Q012024081A41 | 2024-03-21 | 2024-04-11 | REPAIR WATER | 14 ROAD, QUEENS, FROM STREET 150 PLACE TO STREET CROSS ISLAND PARKWAY |
X012024078B01 | 2024-03-18 | 2024-04-04 | REPAIR WATER - PROTECTED | HULL AVENUE, BRONX, FROM STREET EAST 204 STREET TO STREET EAST MOSHOLU PARKWAY NORTH |
X012024072A69 | 2024-03-12 | 2024-03-21 | REPAIR WATER - PROTECTED | HULL AVENUE, BRONX, FROM STREET EAST 204 STREET TO STREET EAST MOSHOLU PARKWAY NORTH |
B012024061A87 | 2024-03-01 | 2024-03-28 | REPAIR WATER - PROTECTED | DEAN STREET, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE |
X012024051A75 | 2024-02-20 | 2024-03-14 | REPAIR WATER - SEWER | EAST 223 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE |
B012024027A04 | 2024-01-30 | 2024-02-25 | REPAIR WATER | HURON STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD |
M012024002A18 | 2024-01-05 | 2024-01-31 | REPAIR WATER - PROTECTED | WEST 74 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
Q012023363B12 | 2023-12-29 | 2024-01-31 | REPAIR WATER - SEWER - PROTECTED | 21 STREET, QUEENS, FROM STREET 25 ROAD TO STREET HOYT AVENUE |
Q012023360C04 | 2023-12-26 | 2024-01-31 | REPAIR WATER - SEWER - PROTECTED | 21 STREET, QUEENS, FROM STREET 25 ROAD TO STREET HOYT AVENUE |
M012023347A15 | 2023-12-13 | 2023-12-28 | REPAIR SEWER | WEST 71 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET WEST END AVENUE |
Q012023340A68 | 2023-12-11 | 2023-12-31 | REPAIR WATER | JAMAICA AVENUE, QUEENS, FROM STREET 169 STREET TO STREET 170 STREET |
Q012023345A62 | 2023-12-11 | 2023-12-27 | REPAIR WATER - PROTECTED | 96 STREET, QUEENS, FROM STREET 95 AVENUE TO STREET ATLANTIC AVENUE |
Q012023335A43 | 2023-12-04 | 2023-12-30 | REPAIR WATER - PROTECTED | JAMAICA AVENUE, QUEENS, FROM STREET 120 STREET TO STREET LEFFERTS BOULEVARD |
Q002023336A00 | 2023-12-02 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
Q012023321B18 | 2023-11-17 | 2023-12-02 | REPAIR WATER - SEWER | PINEGROVE STREET, QUEENS, FROM STREET 109 AVENUE TO STREET LAKEWOOD AVENUE |
Q012023321B60 | 2023-11-17 | 2023-12-02 | REPAIR WATER - SEWER | PINEGROVE STREET, QUEENS, FROM STREET 109 AVENUE TO STREET LAKEWOOD AVENUE |
M012023319A29 | 2023-11-15 | 2023-12-14 | REPAIR SEWER | WEST 71 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET WEST END AVENUE |
Q012023319B42 | 2023-11-15 | 2023-12-14 | REPAIR WATER | ALMEDA AVENUE, QUEENS, FROM STREET BEACH 65 STREET TO STREET BEACH 66 STREET |
X012023306C60 | 2023-11-02 | 2023-11-29 | REPAIR SEWER | STORY AVENUE, BRONX, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE |
Q012023302A00 | 2023-10-29 | 2023-11-18 | REPAIR WATER - SEWER | PINEGROVE STREET, QUEENS, FROM STREET 109 AVENUE TO STREET LAKEWOOD AVENUE |
Q012023302A03 | 2023-10-29 | 2023-11-18 | REPAIR WATER - SEWER | PINEGROVE STREET, QUEENS, FROM STREET 109 AVENUE TO STREET LAKEWOOD AVENUE |
Q012023302A02 | 2023-10-29 | 2023-11-18 | REPAIR WATER - SEWER | PINEGROVE STREET, QUEENS, FROM STREET 109 AVENUE TO STREET LAKEWOOD AVENUE |
Q012023302A01 | 2023-10-29 | 2023-11-18 | REPAIR WATER - SEWER | PINEGROVE STREET, QUEENS, FROM STREET 109 AVENUE TO STREET LAKEWOOD AVENUE |
X012023286A55 | 2023-10-13 | 2023-11-03 | REPAIR WATER - SEWER - PROTECTED | KINGSBRIDGE AVENUE, BRONX, FROM STREET WEST 236 STREET TO STREET WEST 238 STREET |
X012023278A87 | 2023-10-05 | 2023-10-24 | REPAIR SEWER | WEST KINGSBRIDGE ROAD, BRONX, FROM STREET BEND TO STREET KINGSBRIDGE TERRACE |
Q012023269B93 | 2023-09-26 | 2023-10-25 | REPAIR WATER | 105 AVENUE, QUEENS, FROM STREET LIVERPOOL STREET TO STREET WALTHAM STREET |
M012023254B53 | 2023-09-11 | 2023-10-06 | REPAIR WATER - PROTECTED | EAST 129 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
X012023254B09 | 2023-09-11 | 2023-10-10 | REPAIR SEWER | WEST KINGSBRIDGE ROAD, BRONX, FROM STREET BEND TO STREET KINGSBRIDGE TERRACE |
M012023254B48 | 2023-09-11 | 2023-10-06 | REPAIR WATER - PROTECTED | EAST 129 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
X012023243A98 | 2023-08-31 | 2023-09-29 | REPAIR WATER | LELAND AVENUE, BRONX, FROM STREET ARCHER STREET TO STREET GUERLAIN STREET |
Q012023230A33 | 2023-08-18 | 2023-09-09 | REPAIR WATER - SEWER | LEFFERTS BOULEVARD, QUEENS, FROM STREET 107 AVENUE TO STREET LIBERTY AVENUE |
M012023216B30 | 2023-08-04 | 2023-09-01 | REPAIR WATER - PROTECTED | EAST 129 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
Q012023211A02 | 2023-07-30 | 2023-08-24 | REPAIR WATER | 59 AVENUE, QUEENS, FROM STREET 60 LANE TO STREET 60 PLACE |
X012023199A43 | 2023-07-18 | 2023-08-16 | REPAIR WATER | ANDREWS AVENUE, BRONX, FROM STREET WEST 179 STREET TO STREET WEST 180 STREET |
X012023196A00 | 2023-07-18 | 2023-08-13 | REPAIR WATER | CLINTON PLACE, BRONX, FROM STREET DAVIDSON AVENUE TO STREET JEROME AVENUE |
X012023193B33 | 2023-07-12 | 2023-08-10 | REPAIR WATER - SEWER - PROTECTED | ELSMERE PLACE, BRONX, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE |
B012023174B01 | 2023-06-23 | 2023-07-22 | REPAIR WATER | LORIMER STREET, BROOKLYN, FROM STREET CONSELYEA STREET TO STREET METROPOLITAN AVENUE |
B012023166A35 | 2023-06-15 | 2023-07-07 | REPAIR WATER | LORIMER STREET, BROOKLYN, FROM STREET CONSELYEA STREET TO STREET METROPOLITAN AVENUE |
Q012023165D12 | 2023-06-14 | 2023-07-14 | REPAIR WATER - SEWER | 58 STREET, QUEENS, FROM STREET 31 AVENUE TO STREET 32 AVENUE |
Q012023165D15 | 2023-06-14 | 2023-07-14 | REPAIR WATER - SEWER | 58 STREET, QUEENS, FROM STREET 31 AVENUE TO STREET 32 AVENUE |
X012023163B41 | 2023-06-12 | 2023-07-09 | REPAIR WATER - SEWER | WEST KINGSBRIDGE ROAD, BRONX, FROM STREET BEND TO STREET HEATH AVENUE |
X012023156A96 | 2023-06-05 | 2023-07-09 | REPAIR WATER - SEWER | WEST KINGSBRIDGE ROAD, BRONX, FROM STREET BEND TO STREET HEATH AVENUE |
B012023138A09 | 2023-05-18 | 2023-06-23 | REPAIR WATER | LORIMER STREET, BROOKLYN, FROM STREET CONSELYEA STREET TO STREET METROPOLITAN AVENUE |
X012023137A37 | 2023-05-17 | 2023-06-09 | REPAIR WATER - SEWER | WEST KINGSBRIDGE ROAD, BRONX, FROM STREET BEND TO STREET HEATH AVENUE |
B152023137A05 | 2023-05-17 | 2023-06-24 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | LORIMER STREET, BROOKLYN, FROM STREET DEVOE STREET TO STREET METROPOLITAN AVENUE |
Q012023127A01 | 2023-05-11 | 2023-06-05 | REPAIR WATER | SIDWAY PLACE, QUEENS, FROM STREET ANDERSON ROAD TO STREET ZOLLER ROAD |
Q012023109C13 | 2023-04-19 | 2023-05-18 | REPAIR WATER | 74 STREET, QUEENS, FROM STREET 37 ROAD TO STREET BEND |
X012023107B07 | 2023-04-17 | 2023-05-16 | REPAIR WATER - SEWER | WEST KINGSBRIDGE ROAD, BRONX, FROM STREET BEND TO STREET HEATH AVENUE |
Q012023102B06 | 2023-04-12 | 2023-04-28 | REPAIR SEWER - PROTECTED | 150 STREET, QUEENS, FROM STREET 12 ROAD TO STREET 14 AVENUE |
Q012023097A95 | 2023-04-07 | 2023-04-28 | REPAIR SEWER | 14 AVENUE, QUEENS, FROM STREET 150 STREET TO STREET CLINTONVILLE STREET |
Q012023088C15 | 2023-03-29 | 2023-03-29 | REPAIR SEWER | 14 AVENUE, QUEENS, FROM STREET 150 STREET TO STREET CLINTONVILLE STREET |
B012023088A88 | 2023-03-29 | 2023-04-14 | REPAIR SEWER | VANDERBILT STREET, BROOKLYN, FROM STREET EAST 2 STREET TO STREET EAST 3 STREET |
Q012023088C24 | 2023-03-29 | 2023-03-29 | REPAIR SEWER - PROTECTED | 150 STREET, QUEENS, FROM STREET 12 ROAD TO STREET 14 AVENUE |
Q012023088C36 | 2023-03-29 | 2023-04-12 | REPAIR SEWER - PROTECTED | 150 STREET, QUEENS, FROM STREET 12 ROAD TO STREET 14 AVENUE |
B012023086B23 | 2023-03-27 | 2023-03-31 | REPAIR SEWER | VANDERBILT STREET, BROOKLYN, FROM STREET EAST 2 STREET TO STREET EAST 3 STREET |
B012023086B21 | 2023-03-27 | 2023-04-19 | REPAIR WATER - SEWER | EAST 92 STREET, BROOKLYN, FROM STREET AVENUE K TO STREET AVENUE L |
B012023076B09 | 2023-03-17 | 2023-04-08 | REPAIR WATER | EAST 92 STREET, BROOKLYN, FROM STREET AVENUE K TO STREET AVENUE L |
B012023076B05 | 2023-03-17 | 2023-04-08 | REPAIR WATER | EAST 92 STREET, BROOKLYN, FROM STREET AVENUE K TO STREET AVENUE L |
M012023067A59 | 2023-03-08 | 2023-04-05 | REPAIR WATER - SEWER - PROTECTED | WEST 108 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
X012023062A79 | 2023-03-03 | 2023-03-31 | REPAIR WATER - SEWER | GROTE STREET, BRONX, FROM STREET PROSPECT AVENUE TO STREET SOUTHERN BOULEVARD |
M012023038B38 | 2023-02-07 | 2023-03-02 | REPAIR WATER - PROTECTED | WEST 27 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
B012023038A71 | 2023-02-07 | 2023-03-08 | REPAIR WATER - PROTECTED | HOPKINSON AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE |
X012023025A22 | 2023-01-25 | 2023-02-23 | REPAIR SEWER | CARPENTER AVENUE, BRONX, FROM STREET BRONX BOULEVARD TO STREET EAST 220 STREET |
M012023019B34 | 2023-01-19 | 2023-02-07 | REPAIR WATER - PROTECTED | WEST 27 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
M012023018A07 | 2023-01-18 | 2023-02-07 | REPAIR WATER - PROTECTED | WEST 27 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
M012023002A01 | 2023-01-02 | 2023-01-29 | REPAIR WATER | WEST 136 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET LENOX AVENUE |
B012022355C15 | 2022-12-21 | 2023-01-12 | REPAIR WATER - PROTECTED | MACON STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
Q012022350B65 | 2022-12-16 | 2022-12-31 | REPAIR WATER - PROTECTED | 37 STREET, QUEENS, FROM STREET 23 AVENUE TO STREET DITMARS BOULEVARD |
B012022339A00 | 2022-12-05 | 2022-12-29 | REPAIR WATER - PROTECTED | EAST 91 STREET, BROOKLYN, FROM STREET AVENUE K TO STREET AVENUE L |
B012022325B76 | 2022-11-21 | 2022-12-20 | REPAIR WATER | NORTH 6 STREET, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET |
M012022320A30 | 2022-11-16 | 2022-12-14 | REPAIR WATER - PROTECTED | 7 AVENUE, MANHATTAN, FROM STREET WEST 143 STREET TO STREET WEST 144 STREET |
Q012022301A68 | 2022-10-28 | 2022-11-24 | REPAIR SEWER - PROTECTED | 13 AVENUE, QUEENS, FROM STREET 154 STREET TO STREET DEAD END |
B012022285A31 | 2022-10-12 | 2022-11-10 | REPAIR WATER | BUFFALO AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE |
X012022273A12 | 2022-09-30 | 2022-10-20 | REPAIR WATER | EAST GUN HILL ROAD, BRONX, FROM STREET DEKALB AVENUE TO STREET JEROME AVENUE |
Q012022262A59 | 2022-09-19 | 2022-10-07 | REPAIR SEWER | 42 STREET, QUEENS, FROM STREET 23 AVENUE TO STREET DITMARS BOULEVARD |
Q012022243B38 | 2022-08-31 | 2022-09-29 | C.A.R. RESTORATION | 77 STREET, QUEENS, FROM STREET 37 ROAD TO STREET BEND |
X012022241A33 | 2022-08-29 | 2022-09-23 | REPAIR WATER - PROTECTED | CROTONA AVENUE, BRONX, FROM STREET EAST 179 STREET TO STREET OAKLAND PLACE |
X012022241A34 | 2022-08-29 | 2022-09-22 | REPAIR SEWER - PROTECTED | EAST 140 STREET, BRONX, FROM STREET ALEXANDER AVENUE TO STREET 3 AVENUE |
M012022230A15 | 2022-08-18 | 2022-09-18 | REPAIR WATER | EAST 34 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET QNS MDTWN TNNL EXIT |
B012022227A91 | 2022-08-15 | 2022-09-13 | REPAIR WATER | LAFAYETTE AVENUE, BROOKLYN, FROM STREET GRAND AVENUE TO STREET ST JAMES PLACE |
X012022221A25 | 2022-08-09 | 2022-08-31 | REPAIR WATER - SEWER - PROTECTED | EAST 229 STREET, BRONX, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE |
Q012022217A57 | 2022-08-05 | 2022-08-24 | REPAIR WATER | 56 STREET, QUEENS, FROM STREET GRAND AVENUE TO STREET LONG ISLAND RAILROAD |
M012022209B10 | 2022-07-28 | 2022-08-12 | REPAIR WATER | LEROY STREET, MANHATTAN, FROM STREET BEDFORD STREET TO STREET BLEECKER STREET |
Q012022206C49 | 2022-07-25 | 2022-08-13 | REPAIR WATER - PROTECTED | 28 ROAD, QUEENS, FROM STREET 31 STREET TO STREET 33 STREET |
Q012022196D04 | 2022-07-15 | 2022-07-29 | RESTORATION RE-DIG - PROTECTED | POWER ROAD, QUEENS, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD |
M012022195A09 | 2022-07-14 | 2022-08-14 | REPAIR SEWER | EAST 123 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
Q012022182B97 | 2022-07-01 | 2022-07-29 | REPAIR WATER - SEWER - PROTECTED | POWER ROAD, QUEENS, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD |
M012022178A30 | 2022-06-27 | 2022-07-15 | REPAIR SEWER | EAST 123 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
X012022168A54 | 2022-06-17 | 2022-07-13 | REPAIR SEWER | ELSMERE PLACE, BRONX, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE |
X012022166A32 | 2022-06-15 | 2022-07-12 | REPAIR WATER | ANTHONY AVENUE, BRONX, FROM STREET EAST 176 STREET TO STREET MT HOPE PLACE |
X012022166A33 | 2022-06-15 | 2022-07-12 | REPAIR WATER | ANTHONY AVENUE, BRONX, FROM STREET EAST 176 STREET TO STREET MT HOPE PLACE |
X012022164A21 | 2022-06-13 | 2022-07-01 | REPAIR WATER - SEWER - PROTECTED | EAST 183 STREET, BRONX, FROM STREET PROSPECT AVENUE TO STREET SOUTHERN BOULEVARD |
X012022147A04 | 2022-06-02 | 2022-06-25 | REPAIR WATER - PROTECTED | DEKALB AVENUE, BRONX, FROM STREET EAST 212 STREET TO STREET EAST GUN HILL ROAD |
Q012022145B34 | 2022-05-25 | 2022-06-23 | REPAIR WATER | 77 STREET, QUEENS, FROM STREET 37 ROAD TO STREET BEND |
Q012022145B33 | 2022-05-25 | 2022-06-23 | REPAIR WATER | 77 STREET, QUEENS, FROM STREET 37 ROAD TO STREET BEND |
Q012022140A81 | 2022-05-20 | 2022-05-24 | REPAIR WATER | 77 STREET, QUEENS, FROM STREET 37 ROAD TO STREET BEND |
Q012022140A91 | 2022-05-20 | 2022-05-24 | REPAIR WATER | 77 STREET, QUEENS, FROM STREET 37 ROAD TO STREET BEND |
M012022138B41 | 2022-05-18 | 2022-06-15 | REPAIR SEWER | EAST 123 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
Q012022129A48 | 2022-05-09 | 2022-05-25 | REPAIR WATER - SEWER | 58 STREET, QUEENS, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD |
Q012022106A01 | 2022-04-22 | 2022-05-15 | REPAIR WATER - PROTECTED | 97 AVENUE, QUEENS, FROM STREET 127 STREET TO STREET 129 STREET |
Q012022110A36 | 2022-04-20 | 2022-05-18 | REPAIR WATER - SEWER | 58 STREET, QUEENS, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD |
Q012022110A34 | 2022-04-20 | 2022-05-18 | REPAIR WATER - SEWER | 58 STREET, QUEENS, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD |
X012022068A52 | 2022-03-09 | 2022-04-06 | REPAIR SEWER | WHITE PLAINS ROAD, BRONX, FROM STREET BARTHOLDI STREET TO STREET ROSEWOOD STREET |
Q012022061C97 | 2022-03-02 | 2022-03-25 | REPAIR SEWER | 162 STREET, QUEENS, FROM STREET CROSS ISLAND PARKWAY TO STREET CRYDERS LANE |
X012022039A01 | 2022-02-08 | 2022-02-23 | REPAIR SEWER | EAST 219 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE |
X012022039A00 | 2022-02-08 | 2022-02-23 | REPAIR SEWER | EAST 219 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE |
B012022031A24 | 2022-02-07 | 2022-03-01 | REPAIR WATER | DEAN STREET, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE |
X012022033A97 | 2022-02-02 | 2022-03-02 | REPAIR WATER - SEWER | GROTE STREET, BRONX, FROM STREET PROSPECT AVENUE TO STREET SOUTHERN BOULEVARD |
M012022032A78 | 2022-02-01 | 2022-02-18 | REPAIR WATER - PROTECTED | BROADWAY, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET |
B012022024A58 | 2022-01-24 | 2022-02-17 | REPAIR SEWER - PROTECTED | KING STREET, BROOKLYN, FROM STREET RICHARDS STREET TO STREET VAN BRUNT STREET |
M012022010B41 | 2022-01-10 | 2022-02-04 | REPAIR WATER - PROTECTED | BROADWAY, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET |
X012021365A00 | 2021-12-31 | 2022-01-30 | REPAIR WATER - PROTECTED | ST PETERS AVENUE, BRONX, FROM STREET MACLAY AVENUE TO STREET ST RAYMOND AVENUE |
B012021357B84 | 2021-12-23 | 2022-01-19 | REPAIR WATER - PROTECTED | STANHOPE STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
Q012021337A52 | 2021-12-03 | 2021-12-31 | REPAIR WATER - PROTECTED | 183 STREET, QUEENS, FROM STREET 143 AVENUE TO STREET 144 AVENUE |
Q012021270B22 | 2021-09-27 | 2021-10-26 | REPAIR SEWER | 108 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET NYCTA SUBWAY |
M012021265B28 | 2021-09-22 | 2021-10-16 | REPAIR WATER | MOTT STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET KENMARE STREET |
M012021265B29 | 2021-09-22 | 2021-10-16 | REPAIR WATER | BROOME STREET, MANHATTAN, FROM STREET ELIZABETH STREET TO STREET MOTT STREET |
Q012021260A88 | 2021-09-17 | 2021-10-16 | REPAIR SEWER | 27 STREET, QUEENS, FROM STREET 30 AVENUE TO STREET NEWTOWN AVENUE |
Q012021256A53 | 2021-09-13 | 2021-10-09 | REPAIR WATER | 41 AVENUE, QUEENS, FROM STREET POWER ROAD TO STREET 100 STREET |
M012021215B14 | 2021-08-03 | 2021-08-08 | REPAIR SEWER | WEST 159 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M012021208A55 | 2021-07-27 | 2021-08-08 | REPAIR WATER - PROTECTED | WEST 108 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M012021187A93 | 2021-07-06 | 2021-08-04 | REPAIR SEWER | WEST 159 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
B012021183A14 | 2021-07-02 | 2021-07-17 | REPAIR WATER | DE KALB AVENUE, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
M012021176A55 | 2021-06-25 | 2021-07-27 | REPAIR SEWER - PROTECTED | WEST 108 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
X012021174A22 | 2021-06-23 | 2021-07-20 | REPAIR WATER - SEWER | COLONIAL AVENUE, BRONX, FROM STREET EAST 196 STREET TO STREET PELHAM PARKWAY |
M012021167B21 | 2021-06-16 | 2021-06-27 | REPAIR SEWER - PROTECTED | WEST 108 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
X012021152A64 | 2021-06-01 | 2021-06-29 | REPAIR WATER | MARION AVENUE, BRONX, FROM STREET EAST 199 STREET TO STREET OLIVER PLACE |
B012021148B26 | 2021-05-28 | 2021-06-26 | REPAIR WATER | FENIMORE STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
M042021144A05 | 2021-05-24 | 2021-06-22 | REPAIR SIDEWALK | WEST 158 STREET, MANHATTAN, FROM STREET EDWARD M MORGAN PLACE TO STREET RIVERSIDE DRIVE |
X012021135A04 | 2021-05-15 | 2021-06-11 | REPAIR WATER - PROTECTED | MORRIS AVENUE, BRONX, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET |
B012021127A20 | 2021-05-12 | 2021-06-05 | REPAIR WATER | MONTAGUE STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET HENRY STREET |
Q012021126A89 | 2021-05-06 | 2021-06-03 | REPAIR SEWER | 125 STREET, QUEENS, FROM STREET 20 AVENUE TO STREET 22 AVENUE |
Q012021125C01 | 2021-05-05 | 2021-06-03 | REPAIR SEWER | 125 STREET, QUEENS, FROM STREET 20 AVENUE TO STREET 22 AVENUE |
X012021111A67 | 2021-04-21 | 2021-05-19 | REPAIR WATER - SEWER | WILLIAMSBRIDGE ROAD, BRONX, FROM STREET ALLERTON AVENUE TO STREET RADCLIFF AVENUE |
B012021107A00 | 2021-04-20 | 2021-05-16 | REPAIR WATER | WATKINS STREET, BROOKLYN, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE |
Q012021099B05 | 2021-04-09 | 2021-04-23 | REPAIR WATER - SEWER | BROCHER ROAD, QUEENS, FROM STREET 172 STREET TO STREET MERRILL STREET |
Q012021088C00 | 2021-03-29 | 2021-04-20 | REPAIR WATER - PROTECTED | 149 PLACE, QUEENS, FROM STREET 41 AVENUE TO STREET BARCLAY AVENUE |
Q012021064B15 | 2021-03-05 | 2021-04-03 | REPAIR WATER - SEWER | 29 AVENUE, QUEENS, FROM STREET 214 PLACE TO STREET 214 STREET |
X012021054A42 | 2021-02-23 | 2021-03-17 | REPAIR WATER | SOUTHERN BOULEVARD, BRONX, FROM STREET INTERVALE AVENUE TO STREET TIFFANY STREET |
X012020354A01 | 2021-02-11 | 2021-01-17 | REPAIR WATER | PROSPECT AVENUE, BRONX, FROM STREET EAST 183 STREET TO STREET EAST 185 STREET |
X012021013A02 | 2021-01-27 | 2021-02-11 | REPAIR WATER | WEST 232 STREET, BRONX, FROM STREET ARLINGTON AVENUE TO STREET FAIRFIELD AVENUE |
B012021021B43 | 2021-01-21 | 2021-02-06 | REPAIR SEWER - PROTECTED | 15 AVENUE, BROOKLYN, FROM STREET INDEPENDENCE AVENUE TO STREET INDEPENDENCE AVENUE |
X012020365A09 | 2020-12-30 | 2021-01-28 | REPAIR WATER | PROSPECT AVENUE, BRONX, FROM STREET EAST 182 STREET TO STREET GARDEN STREET |
M012020364B38 | 2020-12-29 | 2021-01-20 | REPAIR WATER - PROTECTED | WEST 171 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET AUDUBON AVENUE |
M012020356A38 | 2020-12-21 | 2020-12-31 | REPAIR WATER - PROTECTED | WEST 11 STREET, MANHATTAN, FROM STREET WAVERLY PLACE TO STREET WEST 4 STREET |
Q012020349A39 | 2020-12-16 | 2020-12-31 | REPAIR WATER - PROTECTED | 88 STREET, QUEENS, FROM STREET 151 AVENUE TO STREET PEDESTRIAN OVERPASS |
X012020345A51 | 2020-12-10 | 2020-12-31 | REPAIR SEWER | ANTHONY AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST BURNSIDE AVENUE |
M012020342A18 | 2020-12-07 | 2020-12-23 | REPAIR WATER | AUDUBON AVENUE, MANHATTAN, FROM STREET WEST 170 STREET TO STREET WEST 171 STREET |
B012020328A64 | 2020-11-23 | 2020-12-22 | REPAIR WATER - PROTECTED | LOMBARDY STREET, BROOKLYN, FROM STREET STEWART AVENUE TO STREET VARICK AVENUE |
B012020323A65 | 2020-11-18 | 2020-12-13 | REPAIR WATER - PROTECTED | LINCOLN PLACE, BROOKLYN, FROM STREET ROCHESTER AVENUE TO STREET UTICA AVENUE |
M012020307A83 | 2020-11-02 | 2020-11-30 | REPAIR WATER - PROTECTED | WEST 130 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET LENOX AVENUE |
Q012020307A82 | 2020-11-02 | 2020-11-28 | REPAIR WATER - PROTECTED | 99 AVENUE, QUEENS, FROM STREET 97 STREET TO STREET 98 STREET |
X012020307A99 | 2020-11-02 | 2020-11-21 | REPAIR WATER | ANTHONY AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST BURNSIDE AVENUE |
X012020294A60 | 2020-10-20 | 2020-11-18 | REPAIR WATER - SEWER | TOWNSEND AVENUE, BRONX, FROM STREET CLIFFORD PLACE TO STREET EAST 175 STREET |
X012020283A18 | 2020-10-09 | 2020-10-27 | REPAIR WATER - SEWER | ANTHONY AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST BURNSIDE AVENUE |
Q012020283B69 | 2020-10-09 | 2020-10-31 | REPAIR SEWER | 51 AVENUE, QUEENS, FROM STREET 5 STREET TO STREET VERNON BOULEVARD |
X012020272A26 | 2020-09-28 | 2020-10-23 | REPAIR SEWER - PROTECTED | BOGART AVENUE, BRONX, FROM STREET BRADY AVENUE TO STREET NYCTA SUBWAY |
M012020267A66 | 2020-09-23 | 2020-10-25 | REPAIR SEWER | WEST 19 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
Q012020260B43 | 2020-09-16 | 2020-10-15 | REPAIR SEWER | 216 STREET, QUEENS, FROM STREET 27 AVENUE TO STREET 28 AVENUE |
M012020241A44 | 2020-08-28 | 2020-09-26 | REPAIR SEWER | WEST 19 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
X012020228A00 | 2020-08-15 | 2020-09-12 | REPAIR WATER - PROTECTED | CROTONA AVENUE, BRONX, FROM STREET EAST 179 STREET TO STREET OAKLAND PLACE |
X012020223B42 | 2020-08-10 | 2020-09-08 | REPAIR WATER - SEWER | EAST 230 STREET, BRONX, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE |
Q012020220A05 | 2020-08-07 | 2020-08-22 | REPAIR WATER - SEWER | BURTON STREET, QUEENS, FROM STREET 14 ROAD TO STREET CRYDERS LANE |
X012020210A62 | 2020-07-28 | 2020-08-26 | REPAIR WATER | KINGSLAND AVENUE, BRONX, FROM STREET ARNOW AVENUE TO STREET BEND |
Q012020205B66 | 2020-07-23 | 2020-08-08 | REPAIR WATER - SEWER | BURTON STREET, QUEENS, FROM STREET 14 ROAD TO STREET CRYDERS LANE |
X012020197A05 | 2020-07-21 | 2020-08-08 | REPAIR WATER - PROTECTED | LURTING AVENUE, BRONX, FROM STREET PIERCE AVENUE TO STREET SACKETT AVENUE |
M012020199A17 | 2020-07-17 | 2020-08-02 | REPAIR WATER | WEST 131 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET LENOX AVENUE |
Q012020196A56 | 2020-07-14 | 2020-08-08 | REPAIR WATER | BEACH 127 STREET, QUEENS, FROM STREET BEACH CHANNEL DRIVE TO STREET CRONSTON AVENUE |
Q012020182C59 | 2020-06-30 | 2020-07-28 | REPAIR WATER | CRONSTON AVENUE, QUEENS, FROM STREET BEACH 126 STREET TO STREET BEACH 127 STREET |
X012020181A32 | 2020-06-29 | 2020-07-28 | REPAIR WATER | BOSTON ROAD, BRONX, FROM STREET EAST 179 STREET TO STREET EAST 180 STREET |
X012020172A00 | 2020-06-20 | 2020-07-18 | REPAIR WATER | COMMONWEALTH AVENUE, BRONX, FROM STREET BRONX RIVER AVENUE TO STREET MANSION STREET |
B012020166A02 | 2020-06-18 | 2020-06-18 | REPAIR SEWER - PROTECTED | 15 AVENUE, BROOKLYN, FROM STREET INDEPENDENCE AVENUE TO STREET INDEPENDENCE AVENUE |
X012020153A37 | 2020-06-01 | 2020-06-29 | REPAIR SEWER | BOSTON ROAD, BRONX, FROM STREET EAST 179 STREET TO STREET EAST 180 STREET |
Q012020147A65 | 2020-05-26 | 2020-06-23 | REPAIR WATER | 37 STREET, QUEENS, FROM STREET 28 AVENUE TO STREET ASTORIA BOULEVARD |
M012020143A54 | 2020-05-22 | 2020-06-16 | FINAL RESTORATION ONLY | DIVISION STREET, MANHATTAN, FROM STREET BOWERY TO STREET MARKET STREET |
X012020128A58 | 2020-05-07 | 2020-06-05 | REPAIR SEWER | BOSTON ROAD, BRONX, FROM STREET EAST 179 STREET TO STREET EAST 180 STREET |
B012020124A03 | 2020-05-03 | 2020-05-26 | FINAL RESTORATION ONLY | SACKETT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET NEVINS STREET |
X012020107A04 | 2020-04-17 | 2020-05-15 | REPAIR SEWER | MATTHEWS AVENUE, BRONX, FROM STREET LYDIG AVENUE TO STREET PELHAM PARKWAY |
X012020077A46 | 2020-03-17 | 2020-04-15 | REPAIR WATER - PROTECTED | EAST TREMONT AVENUE, BRONX, FROM STREET MAPES AVENUE TO STREET PROSPECT AVENUE |
B012020074A00 | 2020-03-17 | 2020-04-12 | REPAIR WATER - PROTECTED | UNION STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
X012020071A19 | 2020-03-11 | 2020-04-08 | REPAIR WATER | 3 AVENUE, BRONX, FROM STREET EAST 170 STREET TO STREET ST PAULS PLACE |
X012020069A12 | 2020-03-09 | 2020-04-09 | REPAIR WATER - SEWER | BOGART AVENUE, BRONX, FROM STREET NEILL AVENUE TO STREET RHINELANDER AVENUE |
M012020056A58 | 2020-02-25 | 2020-03-24 | REPAIR WATER | WEST 131 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET LENOX AVENUE |
X012020056A99 | 2020-02-25 | 2020-03-21 | REPAIR WATER | EAST 140 STREET, BRONX, FROM STREET ALEXANDER AVENUE TO STREET 3 AVENUE |
B012020045A04 | 2020-02-14 | 2020-03-13 | REPAIR WATER - PROTECTED | JAMAICA AVENUE, BROOKLYN, FROM STREET MILLER AVENUE TO STREET VAN SICLEN AVENUE |
B012020043A65 | 2020-02-12 | 2020-03-15 | REPAIR WATER - SEWER - PROTECTED | VAN BUREN STREET, BROOKLYN, FROM STREET BROADWAY TO STREET PATCHEN AVENUE |
X012020041A34 | 2020-02-10 | 2020-03-10 | REPAIR WATER - SEWER | BOGART AVENUE, BRONX, FROM STREET NEILL AVENUE TO STREET RHINELANDER AVENUE |
X012020028A03 | 2020-01-28 | 2020-02-25 | REPAIR WATER - SEWER | WEST KINGSBRIDGE ROAD, BRONX, FROM STREET BEND TO STREET HEATH AVENUE |
X012020024A28 | 2020-01-24 | 2020-01-26 | REPAIR WATER - SEWER | WEST KINGSBRIDGE ROAD, BRONX, FROM STREET BEND TO STREET HEATH AVENUE |
B012020015A98 | 2020-01-15 | 2020-02-14 | REPAIR WATER - SEWER - PROTECTED | VAN BUREN STREET, BROOKLYN, FROM STREET BROADWAY TO STREET PATCHEN AVENUE |
M012020008C01 | 2020-01-08 | 2020-01-23 | REPAIR WATER - PROTECTED | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M012020008C00 | 2020-01-08 | 2020-01-28 | FINAL RESTORATION ONLY | DIVISION STREET, MANHATTAN, FROM STREET BOWERY TO STREET MARKET STREET |
B012019360A17 | 2019-12-26 | 2020-01-24 | REPAIR WATER | 12 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
M012019354A51 | 2019-12-20 | 2020-01-09 | REPAIR WATER - PROTECTED | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
B012019352A07 | 2019-12-18 | 2020-01-16 | REPAIR SEWER | SACKETT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET NEVINS STREET |
B012019340C89 | 2019-12-06 | 2019-12-31 | REPAIR WATER | 12 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
X012019324A98 | 2019-11-20 | 2019-12-23 | REPAIR WATER - SEWER | SOUTHERN BOULEVARD, BRONX, FROM STREET INTERVALE AVENUE TO STREET TIFFANY STREET |
X012019324B00 | 2019-11-20 | 2019-12-20 | REPAIR SEWER - PROTECTED | VYSE AVENUE, BRONX, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET |
X012019323A87 | 2019-11-19 | 2019-12-31 | REPAIR WATER - SEWER | EAST 243 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD |
X012019310A00 | 2019-11-06 | 2019-11-20 | REPAIR SEWER - PROTECTED | VYSE AVENUE, BRONX, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET |
X012019309A06 | 2019-11-05 | 2019-11-23 | REPAIR WATER - SEWER | SOUTHERN BOULEVARD, BRONX, FROM STREET INTERVALE AVENUE TO STREET TIFFANY STREET |
X012019309A07 | 2019-11-05 | 2019-12-04 | REPAIR WATER - SEWER | EAST 243 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD |
X012019302A00 | 2019-10-29 | 2019-11-26 | REPAIR WATER | MARBLE HILL AVENUE, BRONX, FROM STREET FT CHARLES PLACE TO STREET MARBLE HILL LANE |
X012019287A00 | 2019-10-14 | 2019-11-06 | REPAIR SEWER - PROTECTED | VYSE AVENUE, BRONX, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET |
X012019284A21 | 2019-10-11 | 2019-11-07 | REPAIR WATER - SEWER | EAST 243 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD |
M012019277A39 | 2019-10-04 | 2019-11-04 | REPAIR WATER - SEWER - PROTECTED | EAST 115 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET PLEASANT AVENUE |
B012019263D19 | 2019-09-20 | 2019-10-18 | REPAIR WATER | 17 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET PRE EASTBOUND ENTRANCE 17 ST |
M012019247A69 | 2019-09-04 | 2019-10-09 | REPAIR WATER | DIVISION STREET, MANHATTAN, FROM STREET BOWERY TO STREET MARKET STREET |
M012019236A02 | 2019-08-24 | 2019-09-09 | REPAIR WATER | DIVISION STREET, MANHATTAN, FROM STREET BOWERY TO STREET MARKET STREET |
M012019235A32 | 2019-08-23 | 2019-09-09 | FINAL RESTORATION ONLY | ESSEX STREET, MANHATTAN, FROM STREET RIVINGTON STREET TO STREET STANTON STREET |
M012019227A13 | 2019-08-21 | 2019-09-08 | REPAIR WATER | EAST 9 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
Q012019221D50 | 2019-08-09 | 2019-09-09 | REPAIR WATER | 104 STREET, QUEENS, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD |
B012019204A03 | 2019-07-25 | 2019-08-08 | REPAIR WATER | 51 STREET, BROOKLYN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
Q012019142B72 | 2019-05-22 | 2019-06-20 | REPAIR SEWER | 27 STREET, QUEENS, FROM STREET 30 AVENUE TO STREET NEWTOWN AVENUE |
M012019116D38 | 2019-04-26 | 2019-05-19 | REPAIR WATER - PROTECTED | WEST 39 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
X012019098A02 | 2019-04-08 | 2019-05-07 | REPAIR SEWER - PROTECTED | SEWARD AVENUE, BRONX, FROM STREET BEACH AVENUE TO STREET TAYLOR AVENUE |
B012019073D21 | 2019-03-14 | 2019-04-02 | REPAIR WATER | HOYT STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET |
B012019061A00 | 2019-03-05 | 2019-03-31 | REPAIR SEWER - PROTECTED | VANDERBILT STREET, BROOKLYN, FROM STREET EAST 2 STREET TO STREET EAST 3 STREET |
B012019064E84 | 2019-03-05 | 2019-04-03 | REPAIR WATER | MELROSE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
M012019061A02 | 2019-03-02 | 2019-03-27 | REPAIR WATER | WEST 128 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET LENOX AVENUE |
B012019058B58 | 2019-02-27 | 2019-03-17 | REPAIR WATER - SEWER | BROADWAY, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET |
Q012019057F13 | 2019-02-26 | 2019-03-25 | REPAIR WATER - PROTECTED | 74 STREET, QUEENS, FROM STREET 21 AVENUE TO STREET DITMARS BOULEVARD |
B012019051D32 | 2019-02-20 | 2019-03-03 | REPAIR WATER - SEWER | BROADWAY, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET |
B012019036A44 | 2019-02-05 | 2019-02-21 | REPAIR WATER - SEWER | BROADWAY, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET |
Q012019026A06 | 2019-01-26 | 2019-02-23 | REPAIR WATER - PROTECTED | VERNON BOULEVARD, QUEENS, FROM STREET 34 AVENUE TO STREET 35 AVENUE |
B012019015D98 | 2019-01-15 | 2019-02-07 | REPAIR WATER - SEWER | BROADWAY, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET |
X012019010A94 | 2019-01-10 | 2019-02-08 | REPAIR WATER - SEWER | EAST 194 STREET, BRONX, FROM STREET DECATUR AVENUE TO STREET MARION AVENUE |
X012019003A16 | 2019-01-03 | 2019-01-25 | REPAIR WATER - PROTECTED | EAST 195 STREET, BRONX, FROM STREET HOBART AVENUE TO STREET MAYFLOWER AVENUE |
M012019002A42 | 2019-01-02 | 2019-01-30 | REPAIR WATER | WEST 128 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET LENOX AVENUE |
M012018342A05 | 2018-12-08 | 2018-12-31 | REPAIR WATER | WEST 128 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET LENOX AVENUE |
M012018274B27 | 2018-10-01 | 2018-10-13 | REPAIR WATER - PROTECTED | WEST 158 STREET, MANHATTAN, FROM STREET EDWARD M MORGAN PLACE TO STREET RIVERSIDE DRIVE |
Q012018262B92 | 2018-09-19 | 2018-10-16 | REPAIR WATER - SEWER - PROTECTED | 74 STREET, QUEENS, FROM STREET 21 AVENUE TO STREET DITMARS BOULEVARD |
M012018248B71 | 2018-09-05 | 2018-09-29 | REPAIR WATER - PROTECTED | WEST 158 STREET, MANHATTAN, FROM STREET EDWARD M MORGAN PLACE TO STREET RIVERSIDE DRIVE |
M012018243A89 | 2018-08-31 | 2018-09-16 | REPAIR WATER - SEWER - PROTECTED | WEST 21 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
M012018229A94 | 2018-08-17 | 2018-09-02 | REPAIR WATER - SEWER - PROTECTED | WEST 21 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
M012018214B32 | 2018-08-02 | 2018-08-08 | REPAIR WATER - SEWER - PROTECTED | WEST 21 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
M012018194A27 | 2018-07-13 | 2018-08-07 | REPAIR SEWER - PROTECTED | EAST 107 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
X012018129A62 | 2018-05-09 | 2018-06-05 | REPAIR SEWER - PROTECTED | WEBSTER AVENUE, BRONX, FROM STREET EAST 233 STREET TO STREET WOODLAWN CEMETERY BOUNDARY |
X012017341A97 | 2017-12-07 | 2017-12-31 | REPAIR WATER - PROTECTED | COLLEGE AVENUE, BRONX, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET |
X012017340B53 | 2017-12-06 | 2017-12-31 | REPAIR WATER - PROTECTED | COLLEGE AVENUE, BRONX, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET |
Start date | End date | Type | Value |
---|---|---|---|
2024-08-08 | 2024-08-08 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-08-08 | 2024-10-02 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-06-07 | 2024-08-08 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-12-26 | 2024-06-07 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-11-09 | 2023-12-26 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2016-03-15 | 2022-11-09 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
160315010402 | 2016-03-15 | CERTIFICATE OF INCORPORATION | 2016-03-15 |
Date | Inspection Object | Address | Grade | Type | Institution | Desctiption |
---|---|---|---|---|---|---|
2024-10-29 | No data | CROTONA AVENUE, FROM STREET EAST 179 STREET TO STREET OAKLAND PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent plumber’s restoration crossing driving lane |
2024-10-25 | No data | 13 AVENUE, FROM STREET 154 STREET TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent roadway cut partially resurfaced |
2024-10-23 | No data | WESTCHESTER AVENUE, FROM STREET EAST 167 STREET TO STREET HOME STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to inspect due to auto shop |
2024-10-20 | No data | MORRIS AVENUE, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2024-10-17 | No data | 141 STREET, FROM STREET GLASSBORO AVENUE TO STREET LAKEWOOD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Permanent sidewalk flags and permanent roadway trench in front of Building Operation. |
2024-10-17 | No data | 141 STREET, FROM STREET GLASSBORO AVENUE TO STREET LAKEWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to the most recent permit #Q012024282A73 for inspection results. |
2024-10-16 | No data | HOBART AVENUE, FROM STREET BUHRE AVENUE TO STREET ROBERTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway and sidewalk |
2024-10-15 | No data | KINGSBRIDGE AVENUE, FROM STREET WEST 236 STREET TO STREET WEST 238 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the driving lane. I/F/O 3633 Kingsbridge Ave |
2024-10-15 | No data | EAST 65 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE PL ..IN COMPLIANCE |
2024-10-15 | No data | VAN NEST AVENUE, FROM STREET BARNES AVENUE TO STREET MATTHEWS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working in roadway, two cuts in roadway at this time |
2024-10-09 | No data | 12 ROAD, FROM STREET TOTTEN STREET TO STREET UTOPIA PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent cut to grade |
2024-10-09 | No data | 164 STREET, FROM STREET 14 ROAD TO STREET CRYDERS LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent cut to grade |
2024-10-07 | No data | 150 STREET, FROM STREET 12 ROAD TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway |
2024-10-06 | No data | WESTCHESTER AVENUE, FROM STREET EAST 167 STREET TO STREET HOME STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to inspect at this due to auto shop |
2024-10-03 | No data | FURMAN AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two permanent restorations in the driving lane, flushed to grade, i/f/o 47 Furman Ave. |
2024-09-23 | No data | EAST 219 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done |
2024-09-19 | No data | CLINTONVILLE STREET, FROM STREET 8 AVENUE TO STREET 151 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent cut to grade parking lane |
2024-09-18 | No data | 14 AVENUE, FROM STREET 150 STREET TO STREET CLINTONVILLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 permanent cuts to grade |
2024-09-16 | No data | DEAN STREET, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 SIDE WALK FLAG INSTALLED AT THE CURB AROUN COVERS AND PERM TRENCH ACROSS THE ROADWAY ABOUT 45FT FROM SCHENECTADY CORNER |
2024-09-11 | No data | EAST 237 STREET, FROM STREET KATONAH AVENUE TO STREET MARTHA AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site. Domestic water service leaking in roadway. DEP notice issued to property. One excavation in roadway at this time |
2024-09-11 | No data | EAST 237 STREET, FROM STREET KATONAH AVENUE TO STREET MARTHA AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | TWO BROTHERS PLUMBING SERVICES, INC., JAson, Jumping Jack, 4'x2' depth 4' , Mobile Testing, Brandon, Sand COne, WD 124.5, DD 115.8, MDD 121.5, AM 7.5, first lift 97% Second Lift 96.7%... Backfill acceptable |
2024-09-06 | No data | 150 STREET, FROM STREET 12 ROAD TO STREET 14 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent repaired the condition on CAR #20246200329 issued on 7/30/2024 without the noted permit listed. |
2024-09-06 | No data | WEST 27 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Final restoration adjacent to the curb in compliance flush to grade |
2024-09-05 | No data | 150 STREET, FROM STREET 12 ROAD TO STREET 14 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Double solid yellow lane markings restored within the driving lane I/F/O 12-50 150th Street |
2024-09-03 | No data | SEYMOUR AVENUE, FROM STREET ASTOR AVENUE TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 75% of perm plumbers restoration covered by Con Ed restoration.Con Ed restoration back to curb. No action taken |
2024-08-20 | No data | 14 ROAD, FROM STREET 150 PLACE TO STREET CROSS ISLAND PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the parking/driving lane. |
2024-08-20 | No data | 14 AVENUE, FROM STREET 150 STREET TO STREET CLINTONVILLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 529 permanent trench cuts in the middle of the roadway in front of 150-16 14 Ave. |
2024-08-09 | No data | CLINTONVILLE STREET, FROM STREET 8 AVENUE TO STREET 151 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic Water Service Leak Contractor currently making Repairs in the Sidewalk. 3 Day Dep Notice Issued. Property Owner on site |
2024-08-09 | No data | 149 PLACE, FROM STREET BEND TO STREET POWELLS COVE BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade water cut in the northbound parking lane, 46' south of Powells Cove Blvd. |
2024-08-09 | No data | CLINTONVILLE STREET, FROM STREET 8 AVENUE TO STREET 151 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill in front of 724 completed and acceptable in the parking lane. 3' 11" x 3' 1" x 3'. |
2024-07-31 | No data | FURMAN AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut #1 L4ft, W2ft, D3ft in the driving lane IFO #47. Cut #2 L3ft, W2ft, D3ft, in the driving lane. Cut #3 L3ft, W2ft, D3ft in the driving lane. Work done on the sidewalk OPP #47. |
2024-07-30 | No data | 14 AVENUE, FROM STREET 150 STREET TO STREET CLINTONVILLE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm restoration across the driving lanes. Two color codes in restoration. Restoration not sealed. Multiple pin holes adjacent to restoration. This permit is still active. |
2024-07-30 | No data | 150 STREET, FROM STREET 12 ROAD TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR - to restore solid double yellow lane diving lines on top of permanent water restoration. |
2024-07-30 | No data | 20 AVENUE, FROM STREET 163 STREET TO STREET 166 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade water restoration across the driving lane. |
2024-07-30 | No data | 150 STREET, FROM STREET 12 ROAD TO STREET 14 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 211 permit type was taken out . And repairs was made. |
2024-07-27 | No data | EAST 129 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 59 east 129 street water restoration in compliance |
2024-07-20 | No data | HOBART AVENUE, FROM STREET BUHRE AVENUE TO STREET ROBERTS AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Water leaking in basement confirmed. Homeowner has 3 day notice from DEP. no water service at time of inspection. Plumber to replace broken service. |
2024-07-17 | No data | EAST 123 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flushed to grade. |
2024-07-17 | No data | AVENUE C, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. |
2024-07-16 | No data | SEYMOUR AVENUE, FROM STREET ASTOR AVENUE TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER crew is on site |
2024-07-15 | No data | LEFFERTS BOULEVARD, FROM STREET 89 AVENUE TO STREET 91 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No confirmation number. |
2024-07-10 | No data | EAST 65 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill Pass - - L2ft10in W6ft3in D3ft - - BACKFILL BASED ON WATER SERVICE SHUT OFF FOR #1335. TEMPORARY RESTORATION OPPOSITE ADDRESS AND SIDEWALK FLAG RESTORED IN KIND. |
2024-07-05 | No data | LEFFERTS BOULEVARD, FROM STREET 89 AVENUE TO STREET 91 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | LL14 Backfill Pass cut size: 8'6'' x 4' x 2'9''. |
2024-07-03 | No data | KING STREET, FROM STREET RICHARDS STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New flags around water valve IFO property #108 |
2024-06-28 | No data | WESTCHESTER AVENUE, FROM STREET EAST 167 STREET TO STREET HOME STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill passed and completed. (12’x 8’x 4) (10’5 x 8’3 x 4’). |
2024-06-15 | No data | 7 AVENUE, FROM STREET WEST 143 STREET TO STREET WEST 144 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2472-2474 7 ave water restoration on sidewalk in compliance no defects found |
2024-06-11 | No data | MOTT STREET, FROM STREET BROOME STREET TO STREET KENMARE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found in the driving and parking lanes a permanent Restoration partially paved over by year 2023 Plumber’s work. |
2024-06-07 | No data | EAST 129 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration flushed to grade. |
2024-06-01 | No data | WEST 136 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway is currently being milled and repaved |
2024-05-31 | No data | EAST 229 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New building BPP Paved over work |
2024-05-29 | No data | JAMAICA AVENUE, FROM STREET 169 STREET TO STREET 170 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flag restored to grade with water valve in front of 169-03. |
2024-05-24 | No data | SEDGWICK AVENUE, FROM STREET BEND TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | Failed to maintain 2 lanes. Nov issued. |
2024-05-22 | No data | WEST 108 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ifo 218, perm water restoration in p/l-d/l is ok |
2024-05-21 | No data | CARPENTER AVENUE, FROM STREET BRONX BOULEVARD TO STREET EAST 220 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2024-05-20 | No data | 21 STREET, FROM STREET 25 ROAD TO STREET HOYT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Core pass. Restored roadway asphalt 3” top, concrete 14” total 17”. Existing roadway core asphalt top 4” , concrete 9” total core length 13”. |
2024-05-17 | No data | HULL AVENUE, FROM STREET EAST 204 STREET TO STREET EAST MOSHOLU PARKWAY NORTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has perm trench in the r/w. |
2024-05-12 | No data | NORTH 6 STREET, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Bike lane is installed |
2024-05-07 | No data | 21 STREET, FROM STREET 25 ROAD TO STREET HOYT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Good location for coring. Plumber long water permanent restoration going across busy 21 Street. Cut was marked out. |
2024-05-03 | No data | HOE AVENUE, FROM STREET BEND TO STREET JENNINGS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water repair restoration in driving lane |
2024-05-01 | No data | HOE AVENUE, FROM STREET BEND TO STREET JENNINGS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber’s permanent water repair restoration in roadway |
2024-04-24 | No data | JUNCTION BOULEVARD, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | all stips are being followed work in progress |
2024-04-23 | No data | 41 AVENUE, FROM STREET POWER ROAD TO STREET 100 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway , made to grade , minor cracking |
2024-04-22 | No data | JUNCTION BOULEVARD, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Excavation in the Roadway Steel Plated in Compliance |
2024-04-21 | No data | EAST 92 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2024-04-15 | No data | JUNCTION BOULEVARD, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp restoration in roadway plated, 5 steel plates have two brothers marking on them |
2024-04-15 | No data | BROCHER ROAD, FROM STREET 172 STREET TO STREET MERRILL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found Resurfaced. No old cuts in the roadway at this time. |
2024-04-14 | No data | 20 AVENUE, FROM STREET 163 STREET TO STREET 166 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | one temporary cut on roadway at time of inspection. |
2024-03-31 | No data | NORTH 6 STREET, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In front of #216 your Permanent Cut is missing bike lane marking. Restore white lane marking as soon as possible! |
2024-03-30 | No data | EAST 223 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the roadway |
2024-03-21 | No data | EAST 92 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm cuts in the r/w, water valve on s/w in grassy area. |
2024-03-17 | No data | JAMAICA AVENUE, FROM STREET 120 STREET TO STREET LEFFERTS BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR Re-inspection passes. Tape was removed from the around the restored sidewalk flag. |
2024-03-15 | No data | HOPKINSON AVENUE, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please reseal permanent plumbing restoration located opposite of property #762. Sealer has become worn and cracked. |
2024-03-15 | No data | DEAN STREET, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrived: 9:00 Departed: 11:30. Two cuts in the roadway 14’3x3’4x4’8 & 6’6x3’8x4’2. Compaction 96.4,96.6 & 96.7,96.4% |
2024-03-09 | No data | EAST 91 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2024-02-26 | No data | 21 STREET, FROM STREET 25 ROAD TO STREET HOYT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to updated permit Q012023363B12. Plumber permanent restoration going across roadway long water cut. |
2024-02-12 | No data | 21 STREET, FROM STREET 25 ROAD TO STREET HOYT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent plumber restoration going across roadway. |
2024-02-12 | No data | ALMEDA AVENUE, FROM STREET BEACH 65 STREET TO STREET BEACH 66 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent cut to grade |
2024-02-08 | No data | 105 AVENUE, FROM STREET LIVERPOOL STREET TO STREET WALTHAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 flag on sidewalk roadway cut to grade. |
2024-02-07 | No data | WEST 108 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a permanent trench flush to grade in the park/Drive lane and and five sidewalk flags restored in kind one around a water valve. I/F/O 218 |
2024-02-02 | No data | JAMAICA AVENUE, FROM STREET 120 STREET TO STREET LEFFERTS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plastics tape must be taken off from edges of the sidewalk flag. |
2024-01-27 | No data | HURON STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: E-Number | Department of Transportation | Heavy Domestic Water Service Leak. Contractor Currently Attempting to Make Repairs in the Roadway. Perhaps Leak Maybe on the City Water Main. DEP Inspector on site |
2024-01-22 | No data | 21 STREET, FROM STREET 25 ROAD TO STREET HOYT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Excavation In front of the property on the sidewalk, Roadway, & opposite the property in the Roadway. Rise plow signs posted. |
2024-01-12 | No data | PINEGROVE STREET, FROM STREET 109 AVENUE TO STREET LAKEWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | install new water and sewer, perm roadway cuts restore to grade. |
2024-01-09 | No data | 21 STREET, FROM STREET 25 ROAD TO STREET HOYT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 3 lanes maintained. Pedestrian access on sidewalk maintained. Plated excavation in parking lane and sidewalk. Told foreman and crew on site to ramp sidewalk plates when not open. Warned about countersinking plates or waiver. I/F/O B.O. |
2024-01-08 | No data | 37 STREET, FROM STREET 23 AVENUE TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber permanent restoration in parking lane. |
2024-01-05 | No data | WEST 74 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | WC Pass; membrane & tack coat used in D/L 8'x5'x3" |
2024-01-05 | No data | 96 STREET, FROM STREET 95 AVENUE TO STREET ATLANTIC AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut to grade. |
2024-01-04 | No data | WEST 71 STREET, FROM STREET AMSTERDAM AVENUE TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water restoration in p/l is ok |
2024-01-03 | No data | LEFFERTS BOULEVARD, FROM STREET 107 AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sewer installed for new building. |
2024-01-03 | No data | WEST 74 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill Pass; cleanfill; 98.3% (D/L) |
2024-01-02 | No data | WEST 74 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, excavating s/w, ifo #150, water leak repair, 3day. |
2023-12-27 | No data | WHITE PLAINS ROAD, FROM STREET BARTHOLDI STREET TO STREET ROSEWOOD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The permittee : 51833 Zefi & CO LLC new roadway pavement linear feet 50.36 by 35 feet wide permit No. X012023144A21 work end on 6/22/2023. Build Paving Project No. 220724839 currently in compliance with DOT rules and regulations. |
2023-12-27 | No data | EAST 219 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2023-12-26 | No data | 96 STREET, FROM STREET 95 AVENUE TO STREET ATLANTIC AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 7'00" x 3'00", p/l. |
2023-12-14 | No data | EAST 92 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration in roadway in compliance |
2023-12-12 | No data | WEST KINGSBRIDGE ROAD, FROM STREET BEND TO STREET KINGSBRIDGE TERRACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm concrete trench in the r/w I/F/O 229. |
2023-12-11 | No data | WEST KINGSBRIDGE ROAD, FROM STREET BEND TO STREET HEATH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber restored concrete panels in roadway |
2023-12-09 | No data | STORY AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut rwy. & work on Grass area |
2023-12-08 | No data | JAMAICA AVENUE, FROM STREET 120 STREET TO STREET LEFFERTS BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill passed and completed. (6' x 2'6" x 1'6") |
2023-12-07 | No data | WATKINS STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway driving lane sealed in compliance ifo 143 |
2023-12-06 | No data | JAMAICA AVENUE, FROM STREET 169 STREET TO STREET 170 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site repaired water service leak. DEP notice issued to property. One excavation in sidewalk only |
2023-12-02 | No data | JAMAICA AVENUE, FROM STREET 120 STREET TO STREET LEFFERTS BOULEVARD | No data | Street Construction Inspections: E-Number | Department of Transportation | Plated excavation in roadway in compliance with winter moratorium. Raise plow sign posted |
2023-11-30 | No data | ANTHONY AVENUE, FROM STREET EAST 180 STREET TO STREET EAST BURNSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2023-11-29 | No data | POWER ROAD, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway |
2023-11-29 | No data | 74 STREET, FROM STREET 37 ROAD TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade within the parking lane, two sidewalk flags restored around water valve I/F/O 37-50 74th Street. |
2023-11-22 | No data | ROSEDALE AVENUE, FROM STREET BRONX RIVER AVENUE TO STREET MANSION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the parking lane IFO 1541. |
2023-11-17 | No data | PINEGROVE STREET, FROM STREET 109 AVENUE TO STREET LAKEWOOD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent having 4 steel plates on the roadway that was smooth to the touch. Respondent's plates did not have skid resistance greater than or equal to the adjacent roadway surface. I ID by permit Q012023302A00 |
2023-11-16 | No data | 14 AVENUE, FROM STREET 150 STREET TO STREET CLINTONVILLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER TRENCH IN THE D/L |
2023-11-12 | No data | WEST KINGSBRIDGE ROAD, FROM STREET BEND TO STREET KINGSBRIDGE TERRACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk in compliance |
2023-11-05 | No data | 7 AVENUE, FROM STREET WEST 143 STREET TO STREET WEST 144 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found several sidewalk restored in kind I/F/O 2474 |
2023-10-30 | No data | EAST 92 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration - in compliance |
2023-10-26 | No data | CARPENTER AVENUE, FROM STREET BRONX BOULEVARD TO STREET EAST 220 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass work done in compliance |
2023-10-26 | No data | LELAND AVENUE, FROM STREET ARCHER STREET TO STREET GUERLAIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration in the driving lane IFO 1555. |
2023-10-25 | No data | WEST 136 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a sidewalk flag restored in kind around a water valve. |
2023-10-25 | No data | KINGSBRIDGE AVENUE, FROM STREET WEST 236 STREET TO STREET WEST 238 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill acceptable , 3 lifts , 3 test done. Sand cone. Eric is the tester from mobile testing, Joseph foreman from two brothers.two cuts on sidewalk and one cut in roadway wet 125.7 dry 116.6 max 121.6 actual 7.8% |
2023-10-24 | No data | HOPKINSON AVENUE, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway parking lane sealed in compliance opp762 |
2023-10-23 | No data | AMSTERDAM AVENUE, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut resealed. |
2023-10-04 | No data | EAST 229 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass work done |
2023-10-03 | No data | 30 STREET, FROM STREET 36 AVENUE TO STREET 37 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in r/w d/l. |
2023-10-02 | No data | CROTONA AVENUE, FROM STREET EAST 179 STREET TO STREET OAKLAND PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the roadway |
2023-10-01 | No data | EAST 92 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm restoration in the roadway in compliance |
2023-09-28 | No data | CLINTON PLACE, FROM STREET DAVIDSON AVENUE TO STREET JEROME AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | small flag restored at property line |
2023-09-28 | No data | MONTAGUE STREET, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane in front of property 130( plaza nails) is in compliance |
2023-09-27 | No data | AMSTERDAM AVENUE, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012020008C01-latest permit |
2023-09-27 | No data | GROTE STREET, FROM STREET PROSPECT AVENUE TO STREET SOUTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in the roadway |
2023-09-19 | No data | EAST 129 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Water restoration in parking lane with all cut backs made at time of inspection.5’.5” X 5’ |
2023-09-19 | No data | LORIMER STREET, FROM STREET CONSELYEA STREET TO STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the RW |
2023-09-15 | No data | EAST 129 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | LL 14 Backfill pass with work performed on the Sidewalk which was Plated. Restoration located in the parking lane. L 4’ 5” and W 4’. |
2023-09-13 | No data | EAST 92 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm plumber restorations opposite of address in compliance |
2023-09-08 | No data | 58 STREET, FROM STREET 31 AVENUE TO STREET 32 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER-PERM RESTORATIONS ROADWAY & SIDEWALK |
2023-09-07 | No data | 15 AVENUE, FROM STREET INDEPENDENCE AVENUE TO STREET INDEPENDENCE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking/driving lane, in front of 8948 15 Avenue. |
2023-09-06 | No data | EAST 129 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in compliance (con edison is cutting through restoration) |
2023-09-01 | No data | LEFFERTS BOULEVARD, FROM STREET 107 AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Excavation in the Roadway Steel Plated in Compliance |
2023-08-31 | No data | ELSMERE PLACE, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber permanent restoration in driving lane and new sidewalk flags I/F/O 811. |
2023-08-30 | No data | EAST 91 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane sealed and flush. |
2023-08-24 | No data | EAST 92 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESTORATION NEEDS TO BE RESEALED |
2023-08-24 | No data | ANDREWS AVENUE, FROM STREET WEST 179 STREET TO STREET WEST 180 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No container found |
2023-08-22 | No data | BROOME STREET, FROM STREET ELIZABETH STREET TO STREET MOTT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found one sidewalk flag restored around a water valve cover and the roadway was resurfaced. |
2023-08-18 | No data | EAST 129 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | WC Pass; membrane & color code applied 11'x7'3" |
2023-08-18 | No data | MACON STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway/ sidewalk is flush to grade |
2023-08-17 | No data | VANDERBILT STREET, FROM STREET EAST 2 STREET TO STREET EAST 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking/driving lane and in the sidewalk (1 flag), AKA 1 East 2 Street. |
2023-08-17 | No data | EAST 129 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass in the parking lane I/F/O 59 |
2023-08-13 | No data | DEAN STREET, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway/ sidewalk is flush to grade |
2023-08-12 | No data | BUFFALO AVENUE, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-08-09 | No data | WEST 171 STREET, FROM STREET AMSTERDAM AVENUE TO STREET AUDUBON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a permanent cut flush to grade in the roadway adjacent to the crosswalk I/F/O 109 |
2023-08-03 | No data | WEST 159 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a cut in the roadway flush to grade I/F/O 510 |
2023-08-02 | No data | SIDWAY PLACE, FROM STREET ANDERSON ROAD TO STREET ZOLLER ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ONE PERM WATER CUT IN THE R/W AND S/W |
2023-08-02 | No data | LORIMER STREET, FROM STREET CONSELYEA STREET TO STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2023-08-02 | No data | WEST KINGSBRIDGE ROAD, FROM STREET BEND TO STREET HEATH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New concrete pads in the parking, driving lane. |
2023-07-22 | No data | ELSMERE PLACE, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated plumbers excavation in sidewalk and roadway. Plates pinned and ramped. |
2023-07-15 | No data | CLINTON PLACE, FROM STREET DAVIDSON AVENUE TO STREET JEROME AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic water leaking in sidewalk , one excavation made behind property line at time of inspection , crew on site to repair. |
2023-07-11 | No data | 42 STREET, FROM STREET 23 AVENUE TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flag has been installed in front. |
2023-07-09 | No data | AUDUBON AVENUE, FROM STREET WEST 170 STREET TO STREET WEST 171 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut flush to grade in the Roadway I/F/O 109 |
2023-07-05 | No data | 150 STREET, FROM STREET 12 ROAD TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway |
2023-06-22 | No data | WEST 130 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway adjacent to parking lane. |
2023-06-21 | No data | WILLIAMSBRIDGE ROAD, FROM STREET ALLERTON AVENUE TO STREET RADCLIFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in rw. |
2023-06-19 | No data | WEST 232 STREET, FROM STREET ARLINGTON AVENUE TO STREET FAIRFIELD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2023-06-17 | No data | WEST KINGSBRIDGE ROAD, FROM STREET BEND TO STREET HEATH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has updated permit # X012023163B41 |
2023-06-17 | No data | WEST KINGSBRIDGE ROAD, FROM STREET BEND TO STREET HEATH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Has active permit with new concrete pads in the r/w. |
2023-06-16 | No data | EAST 34 STREET, FROM STREET 2 AVENUE TO STREET QNS MDTWN TNNL EXIT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found permanent restoration and driving lane flush to grade. |
2023-06-15 | No data | 28 ROAD, FROM STREET 31 STREET TO STREET 33 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut within driving lane |
2023-06-15 | No data | MOTT STREET, FROM STREET BROOME STREET TO STREET KENMARE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a permanent 2021 trench flush to grade in the parking/driving lane; It is located on the Southside of another plumber 2023 restoration. |
2023-06-09 | No data | EAST GUN HILL ROAD, FROM STREET DEKALB AVENUE TO STREET JEROME AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2023-06-09 | No data | WEST 131 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk restored with Roadway found resurfaced under permit M152021201A39. |
2023-06-04 | No data | BROADWAY, FROM STREET WALKER STREET TO STREET WHITE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration acceptable |
2023-06-03 | No data | EAST 92 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | COLOR CODE INSTALLED |
2023-06-01 | No data | DEKALB AVENUE, FROM STREET EAST 212 STREET TO STREET EAST GUN HILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass in compliance |
2023-05-19 | No data | EAST 183 STREET, FROM STREET PROSPECT AVENUE TO STREET SOUTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New cut on the driving bike lane |
2023-05-18 | No data | WEST KINGSBRIDGE ROAD, FROM STREET BEND TO STREET HEATH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Has steel plate pinned, ramp in the driving lane with 8' open excavation. Working on site Email 311 complaint. |
2023-05-18 | No data | WEST KINGSBRIDGE ROAD, FROM STREET BEND TO STREET HEATH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has updated permit # X012023137A37 |
2023-05-07 | No data | SIDWAY PLACE, FROM STREET ANDERSON ROAD TO STREET ZOLLER ROAD | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic Water Service Leak Contractor currently Making Repairs in the Roadway & ( Grass Area) Ribbon Sidewalk 3 Day Dep Notice Issued. Property Owner on site |
2023-04-27 | No data | WEST 27 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut is up to grade & sidewalk flag restored in kind. |
2023-04-24 | No data | WEST 108 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in driving/parking lane opposite of 218 at this time. |
2023-04-24 | No data | EAST 92 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the driving lane in compliance |
2023-04-21 | No data | EAST 92 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE PARKING LANE, MISSING THE COLOR WITH IBM TAG# , APPLY COLOR CODE ON CUT |
2023-04-13 | No data | 150 STREET, FROM STREET 12 ROAD TO STREET 14 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill in front of 12-50 completed and acceptable. 11' 1" x 4' x 8' 3". |
2023-04-12 | No data | 149 PLACE, FROM STREET 41 AVENUE TO STREET BARCLAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in front of 41-26 to grade in the roadway. |
2023-04-03 | No data | HOPKINSON AVENUE, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench curb to curb in compliance and sidewalk restored in kind IFO active B.O #762. |
2023-03-28 | No data | 97 AVENUE, FROM STREET 127 STREET TO STREET 129 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade water cut in the westbound driving lane. |
2023-03-27 | No data | EAST 219 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work in roadway found resurfaced |
2023-03-24 | No data | EAST 219 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent sewer repair restoration in roadway, work also done on sidewalk |
2023-03-20 | No data | WEST 108 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | Monitored wearing course it pass. |
2023-03-18 | No data | WEST 108 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | 5’7”x6’4”x4’2” completed |
2023-03-17 | No data | GROTE STREET, FROM STREET PROSPECT AVENUE TO STREET SOUTHERN BOULEVARD | No data | Street Construction Inspections: Complaint | Department of Transportation | Crew on site Open excavation. Rw open to traffic. Sw open to pedestrians traffic. In compliance. |
2023-03-11 | No data | EAST 140 STREET, FROM STREET ALEXANDER AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done i/f/o 321 |
2023-03-05 | No data | WEST 136 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in compliance |
2023-03-02 | No data | CARPENTER AVENUE, FROM STREET BRONX BOULEVARD TO STREET EAST 220 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent plumbers restoration in roadway |
2023-03-01 | No data | 13 AVENUE, FROM STREET 154 STREET TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent sewer restoration in front of 152-33 to grade across the roadway. |
2023-03-01 | No data | WEST 27 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | Wearing course completed in the parking lane / driving . ML 20’ W ‘8.6 D4”. 6” cutbacks were made and white solid line restored. |
2023-02-28 | No data | WEST 27 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill complete length 16th wide 5.5ft. Base to follow. |
2023-02-21 | No data | CARPENTER AVENUE, FROM STREET BRONX BOULEVARD TO STREET EAST 220 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Permanent plumber’s water repair restoration in parking lane |
2023-02-18 | No data | 183 STREET, FROM STREET 143 AVENUE TO STREET 144 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm water restorations partially covered due to builder's pave at 143-27/29 183rd Street |
2023-02-17 | No data | HOPKINSON AVENUE, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | CUT #1 L10FT, W6FT, D4FT IN THE DRIVING LANE. CUT #2 L8FT, W3FT, D2FT IN THE DRIVING LANE IFO PROPERTY #762. |
2023-02-11 | No data | VAN BUREN STREET, FROM STREET BROADWAY TO STREET PATCHEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PARKING LANE RESURFACED BY BPP FOR PROPERTY #535. |
2023-02-08 | No data | EAST 229 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the roadway and sidewalk |
2023-02-05 | No data | MORRIS AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is flush and color coded in the d/l ifo 1047 |
2023-01-24 | No data | EAST 92 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cuts in the parking lane opp location in compliance |
2023-01-20 | No data | LISPENARD STREET, FROM STREET 6 AVENUE TO STREET CHURCH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 9, perm restoration observed in roadway however, unable to fully view work due to parked USPS truck in location at this time. |
2023-01-19 | No data | ST PETERS AVENUE, FROM STREET MACLAY AVENUE TO STREET ST RAYMOND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumbers permanent restoration going across roadway. |
2023-01-18 | No data | POWER ROAD, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent repair water restoration flush to grade in the driving lane i/f/o 3246. |
2023-01-18 | No data | MACON STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION ACROSS THE ROADWAY. 2 NEW FLAGS AROUND WATER VALVE IFO PROPERTY #340 |
2023-01-11 | No data | VAN BUREN STREET, FROM STREET BROADWAY TO STREET PATCHEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway repaved in front of 535 Van Bruen street |
2023-01-05 | No data | EAST 91 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE DRIVING LANE IN COMPLIANCE |
2022-12-22 | No data | NORTH 6 STREET, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2022-12-20 | No data | 37 STREET, FROM STREET 23 AVENUE TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | 4' x 3' x 3'6" backfill passed within the parking lane in front of 22-64 37th Street |
2022-12-19 | No data | 7 AVENUE, FROM STREET WEST 143 STREET TO STREET WEST 144 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work seen at time of inspection. |
2022-12-14 | No data | EAST 91 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill CompleteL 30'0" X W 6'10" X D 3'0"WET: 123.9 DRY: 115.5 MAX: 121.3 MOIST: 7.3% C: 96.2%START: 7:35 END: 9:40 |
2022-12-05 | No data | MATTHEWS AVENUE, FROM STREET LYDIG AVENUE TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water repair restoration in parking/driving lane |
2022-11-30 | No data | ALEXANDER AVENUE, FROM STREET EAST 140 STREET TO STREET EAST 141 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Area on sw sealed completely. |
2022-11-27 | No data | WATKINS STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2022-11-21 | No data | BUFFALO AVENUE, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration (Long water) found to be in compliance |
2022-11-20 | No data | SOUTHERN BOULEVARD, FROM STREET INTERVALE AVENUE TO STREET TIFFANY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water been resurfaced |
2022-11-16 | No data | 13 AVENUE, FROM STREET 154 STREET TO STREET DEAD END | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL COMPLETE ON 14' 6'' X 4' X 6' 5''. NO TEMPORARY DEPTH DUE TO CONCRETE BASE AND PLATED AFTER. |
2022-11-14 | No data | EAST 123 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | expansion joint sealed |
2022-11-12 | No data | EAST 140 STREET, FROM STREET ALEXANDER AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Blue plastic removed from sw. |
2022-11-10 | No data | FENIMORE STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WATER VALVE INSTALLED ON SIDEWALK IN FRONT OF 341 FNIMORE STREET |
2022-11-06 | No data | 13 AVENUE, FROM STREET 154 STREET TO STREET DEAD END | No data | Street Construction Inspections: Active | Department of Transportation | Permit search, repair sewer plated roadway trench with valid permit. |
2022-11-03 | No data | EAST 34 STREET, FROM STREET 2 AVENUE TO STREET QNS MDTWN TNNL EXIT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a perm cut flushed to grade within the driving lane adjacent to the bus panel. |
2022-10-29 | No data | WEST 171 STREET, FROM STREET AMSTERDAM AVENUE TO STREET AUDUBON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 109 Audubon vehicles doubled parked |
2022-10-24 | No data | LAFAYETTE AVENUE, FROM STREET GRAND AVENUE TO STREET ST JAMES PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE BIKE LANE IFO PROPERTY #338. |
2022-10-24 | No data | WEST 131 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk in compliance |
2022-10-22 | No data | ALEXANDER AVENUE, FROM STREET EAST 140 STREET TO STREET EAST 141 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flag surrounding water valve cover needs expansion joints installed between the curb and sidewalk. |
2022-10-22 | No data | ALEXANDER AVENUE, FROM STREET EAST 138 STREET TO STREET EAST 139 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway and sidewalk ok |
2022-10-22 | No data | EAST 140 STREET, FROM STREET ALEXANDER AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in driving lane |
2022-10-22 | No data | ALEXANDER AVENUE, FROM STREET EAST 139 STREET TO STREET EAST 140 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work in compliance |
2022-10-21 | No data | EAST GUN HILL ROAD, FROM STREET DEKALB AVENUE TO STREET JEROME AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Two new sidewalk flags in place. Spoke to Expediter Marie Pepaj via phone, she states two areas with patchwork in roadway is not plumber. Permit #X012022273A12 is for sidewalk only. I/F/O #814 |
2022-10-21 | No data | 27 STREET, FROM STREET 30 AVENUE TO STREET NEWTOWN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builder paved over cut |
2022-10-15 | No data | BOGART AVENUE, FROM STREET NEILL AVENUE TO STREET RHINELANDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk in place, also roadway paved by DOT |
2022-10-08 | No data | LURTING AVENUE, FROM STREET PIERCE AVENUE TO STREET SACKETT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2022-10-04 | No data | EAST 123 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 170 |
2022-10-02 | No data | ROSEDALE AVENUE, FROM STREET BRONX RIVER AVENUE TO STREET MANSION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway. I/F/O 1541 |
2022-10-01 | No data | AUDUBON AVENUE, FROM STREET WEST 170 STREET TO STREET WEST 171 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 109 audubon ave restoration in compliance non defective |
2022-10-01 | No data | WEST 39 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - PROTECTED RESTORATION IN THE PARKING LANE IS FLUSHED AND SEALED TO GRADE. |
2022-09-30 | No data | 88 STREET, FROM STREET 151 AVENUE TO STREET PEDESTRIAN OVERPASS | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No visible work done. |
2022-09-29 | No data | EAST 123 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Recess and seal expansion joints on newly replaced sidewalk flags |
2022-09-24 | No data | EAST 140 STREET, FROM STREET ALEXANDER AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flag needs blue tape removed from expansion joints. |
2022-09-22 | No data | 42 STREET, FROM STREET 23 AVENUE TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working in excavation behind property fence. |
2022-09-15 | No data | CROTONA AVENUE, FROM STREET EAST 179 STREET TO STREET OAKLAND PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | RE-SCHEDULED |
2022-09-12 | No data | DIVISION STREET, FROM STREET BOWERY TO STREET MARKET STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench flush to grade across the roadway. |
2022-09-09 | No data | 77 STREET, FROM STREET 37 ROAD TO STREET BEND | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permanent cut made to 56" |
2022-09-06 | No data | LAFAYETTE AVENUE, FROM STREET GRAND AVENUE TO STREET ST JAMES PLACE | No data | Street Construction Inspections: Active | Department of Transportation | No work has been started at this time. |
2022-09-03 | No data | WEST 159 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 510 west 159 st restoration in compliance on roadway |
2022-09-03 | No data | ANTHONY AVENUE, FROM STREET EAST 176 STREET TO STREET MT HOPE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2022-09-01 | No data | DEAN STREET, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sw flags installed with hardware |
2022-08-30 | No data | LEROY STREET, FROM STREET BEDFORD STREET TO STREET BLEECKER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #16 Repair Water Restoration in the DL / PL is flushed and sealed to grade |
2022-08-13 | No data | DIVISION STREET, FROM STREET BOWERY TO STREET MARKET STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #43 sidewalk expansion joints have been sealed and in compliance. Refer to permit#M012019247A69 |
2022-08-12 | No data | EAST 115 STREET, FROM STREET 1 AVENUE TO STREET PLEASANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STREET RESURFACED AND SIDEWALK WAS RECONSTRUCTED BY NEW BUILDING |
2022-08-10 | No data | AMSTERDAM AVENUE, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water restoration in p/l-d/l ; slight sealer worn off but OK |
2022-08-10 | No data | EAST 229 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Spoke with foreman Alex. Water and sewer work in progress. Advised them to get confirmation # before permit expires and to take trench to the curb. |
2022-08-02 | No data | STANHOPE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced. No visible cuts. |
2022-07-27 | No data | EAST 123 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | IFO #170 a newly found sidewalk flag with water hardware & a Final restoration flushed to grade across the roadway. |
2022-07-26 | No data | 28 ROAD, FROM STREET 31 STREET TO STREET 33 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed and acceptable. Cut size: 3' x 2' x 4' in the driving lane in front of 31-27 28th Road. |
2022-07-24 | No data | ELSMERE PLACE, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sewer trench |
2022-07-18 | No data | POWER ROAD, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | RESTORATION RE-DIG - 6' 10'' X 5' 4'' X 4'' EXCAVATION RESTORED PERMANENT. ID COLOR CODE MARKER APPLIED. RESTORATION SEALED. |
2022-07-13 | No data | 77 STREET, FROM STREET 37 ROAD TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut 48" in width, restore cut 54" width minimum as per 1042 D note:6 |
2022-07-11 | No data | EAST 92 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE P/L OPP LOCATION IN COMPLIANCE |
2022-07-08 | No data | BROADWAY, FROM STREET WALKER STREET TO STREET WHITE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Found white solid pavement line restored. |
2022-07-06 | No data | EAST 123 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | at this time no sign of sidewalk work but street since has been milled and awaiting paving |
2022-07-06 | No data | POWER ROAD, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | Base restoration pass cut 4'10'' x 3'6'' x 12''. |
2022-06-24 | No data | 58 STREET, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in the parking/driving lane sidewalk flag restored around water valve 32-12 |
2022-06-19 | No data | WEST 131 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 16 west 131 st Perm restorations flush in the roadway with sidewak flag restored and expansion joints sealed. |
2022-06-15 | No data | EAST 183 STREET, FROM STREET PROSPECT AVENUE TO STREET SOUTHERN BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | After void of about 2’ was cutback, there was an excavation of 5’x3’5”x4’ in the roadway. Lab tech on site. Material passed, blend used. |
2022-06-11 | No data | BOGART AVENUE, FROM STREET BRADY AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paved over plumber restoration |
2022-05-28 | No data | DEKALB AVENUE, FROM STREET EAST 212 STREET TO STREET EAST GUN HILL ROAD | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic Water Service Leak in the Roadway 3 Day Dep Notice Issued. Work Crew Currently Paving Cut. Property Owner on Site |
2022-05-23 | No data | 162 STREET, FROM STREET CROSS ISLAND PARKWAY TO STREET CRYDERS LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in the d/p/l. |
2022-05-19 | No data | BROADWAY, FROM STREET WALKER STREET TO STREET WHITE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Solid white lane marking fading from roadway. In front of 394. |
2022-05-18 | No data | BROOME STREET, FROM STREET ELIZABETH STREET TO STREET MOTT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #178 Mott street plumbers cut in the parking/driving lane. |
2022-04-21 | No data | UNION STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | DEP restoration in the driving lane OPP property #1566. |
2022-04-18 | No data | WHITE PLAINS ROAD, FROM STREET BARTHOLDI STREET TO STREET ROSEWOOD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber cut made permanent in the roadway |
2022-04-18 | No data | 108 STREET, FROM STREET 41 AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in southbound driving lane, active building op. |
2022-04-16 | No data | 97 AVENUE, FROM STREET 127 STREET TO STREET 129 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut 1: 5’3” x 3’x 2’4” |
2022-04-05 | No data | EAST 9 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #307 Plumber cut in the parking/driving partly covered by outdoor dining set up is in compliance. |
2022-04-02 | No data | DEAN STREET, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 SIDE WALK FLAG INSTALLED AROUND WATER CAP COVER ALONG CURB FOR SCHOOL TOWARDS THE BACK OF THE BUILDING |
2022-03-29 | No data | DIVISION STREET, FROM STREET BOWERY TO STREET MARKET STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk & roadway is up to grade in front of 41-43. |
2022-03-29 | No data | ESSEX STREET, FROM STREET RIVINGTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit was to correct condition under M012017275C04. |
2022-03-18 | No data | LURTING AVENUE, FROM STREET PIERCE AVENUE TO STREET SACKETT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | trench to grade |
2022-03-18 | No data | BOGART AVENUE, FROM STREET NEILL AVENUE TO STREET RHINELANDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plumbing restoration in compliance |
2022-03-07 | No data | WEST 19 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The BPP has resurfaced the Sewer work in front of the cited address. |
2022-03-06 | No data | WATKINS STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pazd,,perm ... |
2022-02-26 | No data | WEST 130 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No roadway defect found |
2022-02-22 | No data | WEST 21 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut flushed to grade within the driving lane. Also, a Con Edison restoration has paved over the cut within the parking lane. |
2022-02-16 | No data | MOTT STREET, FROM STREET BROOME STREET TO STREET KENMARE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut is up to grade in front of 178. |
2022-02-16 | No data | WEST 158 STREET, FROM STREET EDWARD M MORGAN PLACE TO STREET RIVERSIDE DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags remain in acceptable condition |
2022-02-12 | No data | EAST 107 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No defect found in the roadway and sidewalk. |
2022-02-10 | No data | EAST 219 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plumber cut plated and countersink, in the roadway. Raise plow signs posted |
2022-02-04 | No data | GROTE STREET, FROM STREET PROSPECT AVENUE TO STREET SOUTHERN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | restoration believed to be under double parked vehicles left in a temporary status |
2022-02-02 | No data | KING STREET, FROM STREET RICHARDS STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 10ft by 3ft down 6ft 3ft6in by 3ft down 3ft 3in |
2022-02-01 | No data | BROADWAY, FROM STREET WALKER STREET TO STREET WHITE STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | I/F/O 394 there is a Steel plate in Parking Lane Counter sunken and in compliance. |
2022-01-31 | No data | DEAN STREET, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | One cut on s/w only old pipe line burst leaking in basement |
2022-01-28 | No data | WEST 159 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration has been made final. No defects to report |
2022-01-26 | No data | STANHOPE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway/swk in compliance. |
2022-01-19 | No data | WEST 108 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm ifo 218 in parking lane and sidewalk |
2022-01-19 | No data | WEST 128 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water restoration in d/l is ok |
2022-01-19 | No data | WATKINS STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, perm ...water relay |
2022-01-14 | No data | BROADWAY, FROM STREET WALKER STREET TO STREET WHITE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate in parking lane countersunk & raise plow sign in front of said location. |
2022-01-13 | No data | VANDERBILT STREET, FROM STREET EAST 2 STREET TO STREET EAST 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk near East 2nd Street. |
2022-01-12 | No data | EAST 115 STREET, FROM STREET 1 AVENUE TO STREET PLEASANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut stored ifo 440 |
2022-01-11 | No data | WATKINS STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, perm .... |
2022-01-10 | No data | ST PETERS AVENUE, FROM STREET MACLAY AVENUE TO STREET ST RAYMOND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Jason, jumping jack, 8' x 3'7" depth 4' & 5' x 2'4" depth 4' Lab Mobile Testing, Eric, Sand Cone, (W)125.4 (D) 114.1 (MD)119.1 (AM) 9.8 TEST 97.9/ 97.1 & 96.7 / 97.8 Backfill Accepted |
2022-01-04 | No data | STANHOPE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill - Pass(L): 15ft (W): 3ft (D): 4ftTest Results: 96.9%; 97.2%Located in P/L-D/L IFO 58.Arrival: 11:40AMDeparture: 2:00PM |
2022-01-04 | No data | EAST 92 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Gas valve installed in sidewalk. |
2021-12-30 | No data | MELROSE STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2021-12-27 | No data | 51 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2021-12-17 | No data | 41 AVENUE, FROM STREET POWER ROAD TO STREET 100 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration in front of 99-36 to grade in the driving lane. |
2021-12-16 | No data | 183 STREET, FROM STREET 143 AVENUE TO STREET 144 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Compliant verified: i/f/o 143-27 Permittee is performing water repair work on a protected street with no permit posted for the public. I spoke to foreman Jason, a sign detailing permit number and relevant dates have been posted. site in compliance |
2021-12-15 | No data | WEST 11 STREET, FROM STREET WAVERLY PLACE TO STREET WEST 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a permanent restoration in the parking/driving lane. |
2021-12-07 | No data | ALEXANDER AVENUE, FROM STREET EAST 139 STREET TO STREET EAST 140 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in roadway and sidewalk |
2021-12-05 | No data | ALEXANDER AVENUE, FROM STREET EAST 138 STREET TO STREET EAST 139 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plumbing restoration in roadway and sidewalk in compliance |
2021-11-24 | No data | ALEXANDER AVENUE, FROM STREET EAST 139 STREET TO STREET EAST 140 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Wet 121.2Dry 112.7Max 120.3Moisture 7.5Lift 97.7 |
2021-11-24 | No data | EAST 140 STREET, FROM STREET ALEXANDER AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Wet 121.2Dry 112.7Max 120.3Lift 98.1 |
2021-11-09 | No data | 30 STREET, FROM STREET 36 AVENUE TO STREET 37 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill passed and completed. 2 cuts. (8' x 5' x 3' & 4'6" x 3'2" x 3') |
2021-11-09 | No data | 30 STREET, FROM STREET 36 AVENUE TO STREET 37 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 steel plate street opening’s ramped & pinned in the roadway extending into both parking lanes in front of property #36-19 30 STREET |
2021-11-05 | No data | 108 STREET, FROM STREET 41 AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Active | Department of Transportation | 2 steel plate street opening’s ramped & pinned in the roadway extending into the parking lane adjacent to property AKA #104-72 ROOSEVELT AVENUE |
2021-10-31 | No data | LISPENARD STREET, FROM STREET 6 AVENUE TO STREET CHURCH STREET | No data | Street Construction Inspections: Active | Department of Transportation | Backfill was completed upon inspection, i observed cutbacks and epoxy. |
2021-10-31 | No data | LISPENARD STREET, FROM STREET 6 AVENUE TO STREET CHURCH STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | domestic water line leaking in basement , visibly confirmed ,one excavation made in parking lane . |
2021-10-29 | No data | WEST 108 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm sewer restoration in d/l is in compliance; s/w flags ok |
2021-10-23 | No data | HOYT STREET, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok rw |
2021-10-23 | No data | WATKINS STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on the roadway |
2021-10-20 | No data | MORRIS AVENUE, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET | No data | Street Construction Inspections: Active | Department of Transportation | spoke to plumber Jason, in regards to flaggers and men at work signs |
2021-10-19 | No data | BROOME STREET, FROM STREET ELIZABETH STREET TO STREET MOTT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 178 permanent water restoration is in compliance |
2021-10-06 | No data | EAST 230 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2021-09-29 | No data | MOTT STREET, FROM STREET BROOME STREET TO STREET KENMARE STREET | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O # 278, found 2 Steel Plates with permittee name / pinned and ramped onto the Roadway. |
2021-09-27 | No data | EAST 9 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 307 permanent water restoration is in compliance |
2021-09-24 | No data | 31 AVENUE, FROM STREET 14 STREET TO STREET 21 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration covered by BPP. |
2021-09-19 | No data | DE KALB AVENUE, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, perm ... water repair cut ... |
2021-09-15 | No data | WEST 159 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work complete. |
2021-09-15 | No data | 29 AVENUE, FROM STREET 214 PLACE TO STREET 214 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent cut to grade |
2021-09-12 | No data | FENIMORE STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Upon arrival respondent TWO BROTHERS has sealed the expansion joints in between the curb in front of property #341 FENIMORE STREET in compliance |
2021-08-28 | No data | AUDUBON AVENUE, FROM STREET WEST 170 STREET TO STREET WEST 171 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway in compliance |
2021-08-18 | No data | SOUTH 2 STREET, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY & SWK RESURFACED AT NEW BUILDING |
2021-08-18 | No data | JAMAICA AVENUE, FROM STREET MILLER AVENUE TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDE WALK FLAG INSTALLED AROUND WATER CAP COVER |
2021-08-18 | No data | WEST 21 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At location given Active BO unable to inspect. |
2021-08-14 | No data | COLONIAL AVENUE, FROM STREET EAST 196 STREET TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced BPP. |
2021-08-13 | No data | DE KALB AVENUE, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, perm ... /flag restored as well .... s/s of street .. |
2021-08-04 | No data | WEST 108 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | This LL14 was placed twice. LL14 will be done under confirmation number M202121575, same permit. |
2021-08-04 | No data | WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found roadway resurfaced. |
2021-07-23 | No data | LINCOLN PLACE, FROM STREET ROCHESTER AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2021-07-23 | No data | EAST 140 STREET, FROM STREET ALEXANDER AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restoration believed to be opp of location |
2021-07-22 | No data | WEST 159 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | No sewer excavation for property, bike lane is up & running |
2021-07-16 | No data | DE KALB AVENUE, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | New sidewalk flag IFO house 1070A. Bike lane clear. |
2021-07-14 | No data | BROCHER ROAD, FROM STREET 172 STREET TO STREET MERRILL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Three permanent water restorations in front of 172-62, 172-58, and 172-54 to grade in the roadway. |
2021-07-11 | No data | WEST 158 STREET, FROM STREET EDWARD M MORGAN PLACE TO STREET RIVERSIDE DRIVE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Full s/w flag is restored with sealed expansion joints ifo 648 |
2021-07-07 | No data | WEST 87 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #136 One Sidewalk Flag surrounding a gas & water valve is in compliance area in roadway has been resurfaced. |
2021-07-06 | No data | MARION AVENUE, FROM STREET EAST 199 STREET TO STREET OLIVER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done. |
2021-07-04 | No data | FENIMORE STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Sidewalk expansion joints need to be sealedplease seal expansion joints in between the curb in front of property #341 FENIMORE STREET, in a timely fashion. CAR issued |
2021-07-03 | No data | 15 AVENUE, FROM STREET INDEPENDENCE AVENUE TO STREET INDEPENDENCE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 permanent roadway and 1 sidewalk restoration |
2021-07-03 | No data | WEST 158 STREET, FROM STREET EDWARD M MORGAN PLACE TO STREET RIVERSIDE DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restorartion flush in the roadway with sidewalk flag restored and espansion joints sealed. |
2021-07-02 | No data | CARPENTER AVENUE, FROM STREET EAST 222 STREET TO STREET EAST 223 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | plumber restoration out of guarantee |
2021-06-30 | No data | MONTAGUE STREET, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW SWK FLAG RESTORED OK |
2021-06-29 | No data | 125 STREET, FROM STREET 20 AVENUE TO STREET 22 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade cut across the parking lane. Two sidewalk flags restored in kind. |
2021-06-24 | No data | WEST 108 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site excavating on north swk, has swk closed. Excavation also on driving lane leading up to building. |
2021-06-18 | No data | 12 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw paved |
2021-06-17 | No data | 99 AVENUE, FROM STREET 97 STREET TO STREET 98 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration opposite 97-08 flush to grade in the parking/driving lane. |
2021-06-15 | No data | WATKINS STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, cut ok |
2021-06-11 | No data | 162 STREET, FROM STREET CROSS ISLAND PARKWAY TO STREET CRYDERS LANE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Partial permanent cut (opposite side) in parking lane have been sealed. |
2021-06-09 | No data | MONTAGUE STREET, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW SWK FLAG RESTORED OK |
2021-06-09 | No data | 15 AVENUE, FROM STREET INDEPENDENCE AVENUE TO STREET INDEPENDENCE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2021-06-04 | No data | UNION STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work has been taken over DEP due to the leak coming from the city line. |
2021-06-02 | No data | EAST 80 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm flush |
2021-05-31 | No data | WEST 158 STREET, FROM STREET EDWARD M MORGAN PLACE TO STREET RIVERSIDE DRIVE | No data | Street Construction Inspections: Active | Department of Transportation | SIdewalk flag restored and expansion joints taped over. Permit still active. |
2021-05-26 | No data | ALEXANDER AVENUE, FROM STREET EAST 140 STREET TO STREET EAST 141 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2021-05-23 | No data | EAST 223 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PASS PERM TO GRADE |
2021-05-20 | No data | MORRIS AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Wet: 125.7Dry: 115.9Max: 120.7Moisture: 8.9Lift 96.9 |
2021-05-20 | No data | EAST TREMONT AVENUE, FROM STREET MAPES AVENUE TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Not found |
2021-05-16 | No data | CARPENTER AVENUE, FROM STREET EAST 222 STREET TO STREET EAST 223 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 3923 - 3921 YOUR CUT IS MISSING COLOR CODE |
2021-05-13 | No data | EAST 115 STREET, FROM STREET 1 AVENUE TO STREET PLEASANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent restoration in compliance in front of 440 |
2021-05-07 | No data | MONTAGUE STREET, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic Water Service Leak in the Sidewalk. 3 Day Dep Notice Issued |
2021-05-07 | No data | WEST 158 STREET, FROM STREET EDWARD M MORGAN PLACE TO STREET RIVERSIDE DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Full width of sidewalk flag needs to be restored patch work is not acceptable. Street opening joints around permanent water restoration needs to be re-sealed. |
2021-05-05 | No data | 27 STREET, FROM STREET 30 AVENUE TO STREET NEWTOWN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Paved over by BPP, new s/w installed. |
2021-05-02 | No data | LOMBARDY STREET, FROM STREET STEWART AVENUE TO STREET VARICK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | SWK FLAGS WERE SEALED OK |
2021-05-01 | No data | VAN BUREN STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the roadway is flush to grade. |
2021-04-25 | No data | WILLIAMSBRIDGE ROAD, FROM STREET ALLERTON AVENUE TO STREET RADCLIFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Repair water sewer in the driving lane |
2021-04-24 | No data | WILLIAMSBRIDGE ROAD, FROM STREET ALLERTON AVENUE TO STREET RADCLIFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plumber on site, excavation in the roadway, Also reminds workers of id signs needs to be posted. |
2021-04-22 | No data | MATTHEWS AVENUE, FROM STREET LYDIG AVENUE TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Street joints resealed |
2021-04-21 | No data | 216 STREET, FROM STREET 27 AVENUE TO STREET 28 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm cuts to grade in the driving lane at 27-07 |
2021-04-17 | No data | WATKINS STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | perm cut on roadway in compliance at time of inspection |
2021-04-13 | No data | VAN BUREN STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut on the sidewalk and in the roadway is flush to grade. |
2021-04-08 | No data | 149 PLACE, FROM STREET 41 AVENUE TO STREET BARCLAY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 5' x 4' x 4'5" and 9'4" x 4' x 4' backfills passed at 41-25 149th PL |
2021-03-30 | No data | MADISON AVENUE, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Parking lane ifo 1236 |
2021-03-26 | No data | EAST 230 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in the r/w. |
2021-03-26 | No data | SOUTH 2 STREET, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 8ft x 15ft cut in the driving lane I/F/O BUILDING #189. |
2021-03-26 | No data | SOUTHERN BOULEVARD, FROM STREET INTERVALE AVENUE TO STREET TIFFANY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2021-03-25 | No data | JEROME AVENUE, FROM STREET ELLIOT PLACE TO STREET MARCY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2021-03-21 | No data | ROSEDALE AVENUE, FROM STREET BRONX RIVER AVENUE TO STREET MANSION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - REPAIR WATER - PROTECTED |
2021-03-17 | No data | BRONX PARK EAST, FROM STREET THWAITES PLACE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paved over plumber restoration |
2021-03-16 | No data | 162 STREET, FROM STREET CROSS ISLAND PARKWAY TO STREET CRYDERS LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Opposite 14-69, There is a partial permanent restoration, that has edge cracking on the seal. Also, There is a 1" mounded condition on permanent restoration. Restore roadway with surrounding area. |
2021-03-12 | No data | PROSPECT AVENUE, FROM STREET EAST 182 STREET TO STREET GARDEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done on sidewalk. |
2021-03-06 | No data | BURTON STREET, FROM STREET 14 ROAD TO STREET CRYDERS LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found resurfaced. No old cuts in the roadway at time of inspection. |
2021-03-02 | No data | DIVISION STREET, FROM STREET BOWERY TO STREET MARKET STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There's a permanent trench flushed to grade in the parking/driving lane. |
2021-02-16 | No data | DIVISION STREET, FROM STREET BOWERY TO STREET MARKET STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There's a permanent restoration flushed to grade in the parking/driving lane. |
2021-01-30 | No data | 99 AVENUE, FROM STREET 97 STREET TO STREET 98 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade cut in the opposite P/D/L. One sidewalk flag restored in kind. |
2021-01-30 | No data | 31 STREET, FROM STREET 38 AVENUE TO STREET 39 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in the p/d/l opposite 38-01 31st |
2021-01-29 | No data | WEST 19 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent sewer restoration is in compliance |
2021-01-27 | No data | 15 AVENUE, FROM STREET INDEPENDENCE AVENUE TO STREET INDEPENDENCE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill: PASS - L – 11ft 10in W – 4ft 0in D – 5ft 6in Lift One: 97.3% Lift Two: 97.6% |
2021-01-25 | No data | SOUTH 2 STREET, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Active | Department of Transportation | PERMANENT RESTORATION IN ROADWAY & TEMP RESTORATION IN SWK AT BUILDING OPERATION |
2021-01-20 | No data | SOUTH 2 STREET, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BRUNO ARRIVE 8AM-BACKFILL PASS (L)10 FT X (W) 4 FT X (D) 10 FT 6 IN; TESTS 96.7 + 97.9; WD 125.4, DD 115.9, MD 120.9, AM 8.2- SAW CUT CUTBACKS WERE DONE AND CONCRETE TO BE INSTALLED & REPLATED. LEFT AT 10 AM |
2021-01-20 | No data | SOUTH 2 STREET, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED RWY & SWK |
2021-01-14 | No data | MARBLE HILL AVENUE, FROM STREET FT CHARLES PLACE TO STREET MARBLE HILL LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk and roadway in compliance |
2021-01-13 | No data | WEST 232 STREET, FROM STREET ARLINGTON AVENUE TO STREET FAIRFIELD AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, no leak in basement, leak found on rd/w over main. |
2021-01-13 | No data | WEST KINGSBRIDGE ROAD, FROM STREET BEND TO STREET HEATH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done on sidewalk. |
2021-01-12 | No data | WEST 171 STREET, FROM STREET AMSTERDAM AVENUE TO STREET AUDUBON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | L 21’ x 7’1” x 2’. Tack coat and street joints sealed, wearing course paved sealed and color coded. |
2021-01-11 | No data | WEST 171 STREET, FROM STREET AMSTERDAM AVENUE TO STREET AUDUBON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 16x2x3’9” site will be plated for concrete curing. Cutbacks have been made. |
2021-01-11 | No data | TOWNSEND AVENUE, FROM STREET CLIFFORD PLACE TO STREET EAST 175 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the driving lane ifo #1728 |
2021-01-09 | No data | EAST 9 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration |
2021-01-05 | No data | ANTHONY AVENUE, FROM STREET EAST 180 STREET TO STREET EAST BURNSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the driving lane. |
2020-12-19 | No data | PROSPECT AVENUE, FROM STREET EAST 183 STREET TO STREET EAST 185 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | I observed that the respondent failed to begin emergency work within 2 hours after obtaining permit on 12/19/2020 at 07:59 am . No excavations found in existing roadway or sidewalk. |
2020-12-14 | No data | 88 STREET, FROM STREET 151 AVENUE TO STREET PEDESTRIAN OVERPASS | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic water service leak. 3 day DEP notice issued. one excavation made on sidewalk at this time i/f/o 149-10 |
2020-12-09 | No data | WILKINSON AVENUE, FROM STREET EDISON AVENUE TO STREET PILGRIM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2020-12-02 | No data | BOGART AVENUE, FROM STREET NEILL AVENUE TO STREET RHINELANDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | newly paved roadway |
2020-12-02 | No data | BOGART AVENUE, FROM STREET BRADY AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway |
2020-11-29 | No data | 204 STREET, FROM STREET 89 AVENUE TO STREET 90 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No visible work found |
2020-11-28 | No data | BRONX PARK EAST, FROM STREET THWAITES PLACE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2020-11-24 | No data | ANTHONY AVENUE, FROM STREET EAST 180 STREET TO STREET EAST BURNSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-11-24 | No data | LINCOLN PLACE, FROM STREET ROCHESTER AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL COMPLETE7FT7IN X 4FT6IN X 4FT7IN C:96.9 (1); 96.5 (2)WD:126.3; DD:118.5; MDD:124.8; MST:6.6%START 8:44 END 9:37 |
2020-11-13 | No data | WEST 130 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Compaction 98.6%. |
2020-11-10 | No data | 51 AVENUE, FROM STREET 5 STREET TO STREET VERNON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on sidewalk flags restored expansion joints sealed |
2020-11-06 | No data | 99 AVENUE, FROM STREET 97 STREET TO STREET 98 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | At this time, crew is not ready to proceed with the back fill; it has been Re-scheduled for 10:30 am. |
2020-11-06 | No data | ANTHONY AVENUE, FROM STREET EAST 180 STREET TO STREET EAST BURNSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-11-05 | No data | EAST 115 STREET, FROM STREET 1 AVENUE TO STREET PLEASANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in compliance |
2020-10-28 | No data | UNION STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | THE CUT IN THE OPPOSITE LANE IN FRONT OF THE LAUNDRY MAT WAS TAKEN OVER BY D.E.P AS PER THE NOTES ATTACHED TO THIS PERMIT AFTER EXCAVATING D.E.P VARIFIED LEAK WAS ON THE CITY MAIN |
2020-10-25 | No data | MATTHEWS AVENUE, FROM STREET LYDIG AVENUE TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2179 - 2183 your cut needs to be resealed on the roadway around the edges,asphalt is breaking and cracking around it. Also reseal sidewalk flag by curb |
2020-10-22 | No data | 5 AVENUE, FROM STREET EAST 129 STREET TO STREET EAST 130 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In compliance street resurfaced and sidewalk remians in complaince |
2020-10-19 | No data | EAST 80 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Long water one in the p/l the other in the driving lane, s/w flush & sealed. |
2020-10-11 | No data | BOGART AVENUE, FROM STREET NEILL AVENUE TO STREET RHINELANDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk and roadway restored |
2020-10-05 | No data | GRAND STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in RW |
2020-10-05 | No data | HULL AVENUE, FROM STREET EAST 205 STREET TO STREET EAST 207 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-10-05 | No data | 5 AVENUE, FROM STREET EAST 129 STREET TO STREET EAST 130 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2020-10-04 | No data | DOWNING STREET, FROM STREET BEDFORD STREET TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area in compliance. |
2020-09-21 | No data | EAST 230 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in compliance. It will be paved over by bpp |
2020-09-20 | No data | EAST 205 STREET, FROM STREET GRAND CONCOURSE TO STREET LISBON PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work within B/O |
2020-09-17 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway scaring and pinholes and pinholes. Bpp will be done for new building |
2020-09-17 | No data | WEST 131 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restorations flush in the roadway with sidewak flag restored and expansion joints sealed. |
2020-09-15 | No data | BRONX PARK EAST, FROM STREET THWAITES PLACE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the parking lane. |
2020-09-12 | No data | KINGSLAND AVENUE, FROM STREET ARNOW AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration believed to be under vehicles |
2020-09-09 | No data | WEST 19 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Actively working in the roadway following all Stips. Trench runs South to North. |
2020-09-08 | No data | 15 AVENUE, FROM STREET INDEPENDENCE AVENUE TO STREET INDEPENDENCE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk work was done behind property |
2020-09-08 | No data | EAST 195 STREET, FROM STREET HOBART AVENUE TO STREET MAYFLOWER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-09-06 | No data | 37 STREET, FROM STREET 28 AVENUE TO STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm. cut to grade p/d/l - active BO. |
2020-09-06 | No data | 47 STREET, FROM STREET 25 AVENUE TO STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm. trench to grade p/d/l - active BO. |
2020-09-05 | No data | EAST 243 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No defects |
2020-09-03 | No data | EAST 218 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Trench was resurfaced permit # X012020008B67 stip # 1/2 + 5' |
2020-09-02 | No data | VAN BUREN STREET, FROM STREET BROADWAY TO STREET PATCHEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK DONE IN THE PARKING LANE |
2020-08-27 | No data | HOYT STREET, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok |
2020-08-26 | No data | VYSE AVENUE, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found resurfaced due to a new building |
2020-08-21 | No data | 74 STREET, FROM STREET 21 AVENUE TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut partially resurfaced by gas cut |
2020-08-21 | No data | SACKETT STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r\w cut ok |
2020-08-19 | No data | DIVISION STREET, FROM STREET BOWERY TO STREET MARKET STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Repaired, found Expansion Joints applied at sealed. No patch work found scoring lined up existing scoring on the Sidewalk. |
2020-08-19 | No data | MADISON AVENUE, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to properly inspect due to vehicles parked on the roadway |
2020-08-18 | No data | CROTONA AVENUE, FROM STREET EAST 179 STREET TO STREET OAKLAND PLACE | No data | Street Construction Inspections: Complaint | Department of Transportation | Crew on site, New sw flag ifo 2004 and cut in DL opp 2004. Site in compliance, no action taken. |
2020-08-15 | No data | WEST 87 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags in compliance. Roadway has been milled. |
2020-08-10 | No data | COLONIAL AVENUE, FROM STREET EAST 196 STREET TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration final. New building do bpp will be done |
2020-08-08 | No data | BOSTON ROAD, FROM STREET EAST 179 STREET TO STREET EAST 180 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2020-08-05 | No data | SOUTHERN BOULEVARD, FROM STREET INTERVALE AVENUE TO STREET TIFFANY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-08-05 | No data | WEST 50 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | lane markings have been restored |
2020-07-28 | No data | WEST 128 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT RESURFACED BY CON EDISON TRENCH IN R/W |
2020-07-23 | No data | BOSTON ROAD, FROM STREET EAST 179 STREET TO STREET EAST 180 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the driving lane |
2020-07-15 | No data | LURTING AVENUE, FROM STREET PIERCE AVENUE TO STREET SACKETT AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | crew on site, digging within property for now, until cars move. Two water cuts will be made on rd/w. |
2020-07-14 | No data | COLLEGE AVENUE, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-07-11 | No data | VAN BUREN STREET, FROM STREET BROADWAY TO STREET PATCHEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2020-07-10 | No data | BAISLEY AVENUE, FROM STREET ELLSWORTH AVENUE TO STREET FAIRFAX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in roadway and sidewalk |
2020-07-09 | No data | CROSBY AVENUE, FROM STREET CODDINGTON AVENUE TO STREET DUDLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on sidewalk, roadway paved |
2020-07-02 | No data | SOUTHERN BOULEVARD, FROM STREET INTERVALE AVENUE TO STREET TIFFANY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk and roadway restored |
2020-07-01 | No data | EAST 194 STREET, FROM STREET DECATUR AVENUE TO STREET MARION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-07-01 | No data | EAST 107 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Short water cut remains in acceptable condition. No defects to report |
2020-07-01 | No data | EAST 9 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - REPAIR WATER |
2020-06-23 | No data | WEST KINGSBRIDGE ROAD, FROM STREET BEND TO STREET HEATH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to trench ok |
2020-06-23 | No data | EAST 216 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in front of new building operation |
2020-06-22 | No data | AMSTERDAM AVENUE, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration flush to grade in parking/bike lane in compliance, sidewalk flags in compliance |
2020-06-22 | No data | 12 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w s\w |
2020-06-20 | No data | WEST 128 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | P/L no defects found |
2020-06-19 | No data | WEST 39 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 305 permanent water restoration in the parking lane and sidewalk is in compliance |
2020-06-16 | No data | JEROME AVENUE, FROM STREET ELLIOT PLACE TO STREET MARCY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | parking on location |
2020-06-16 | No data | 15 AVENUE, FROM STREET INDEPENDENCE AVENUE TO STREET INDEPENDENCE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp behind property line..checked for Elaine..location inspected 6/15 @ 3:10 pm |
2020-06-14 | No data | 15 AVENUE, FROM STREET INDEPENDENCE AVENUE TO STREET INDEPENDENCE AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, setting up, front lawn, sewer backed up into home. |
2020-06-11 | No data | SEWARD AVENUE, FROM STREET BEACH AVENUE TO STREET TAYLOR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm final in compliance 2 cuts in the driving lane |
2020-06-06 | No data | WILKINSON AVENUE, FROM STREET EDISON AVENUE TO STREET PILGRIM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2020-06-02 | No data | LOGAN AVENUE, FROM STREET PHILIP AVENUE TO STREET RANDALL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut paved paved over BPP |
2020-06-02 | No data | EAST TREMONT AVENUE, FROM STREET MAPES AVENUE TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2020-06-01 | No data | 3 AVENUE, FROM STREET EAST 170 STREET TO STREET ST PAULS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2020-05-31 | No data | EAST 139 STREET, FROM STREET CYPRESS AVENUE TO STREET ST ANNS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced |
2020-05-26 | No data | EAST 140 STREET, FROM STREET ALEXANDER AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | opp 314 perm to grade |
2020-05-21 | No data | BOGART AVENUE, FROM STREET NEILL AVENUE TO STREET RHINELANDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Trench in front of new construction.Unable to see parking lane |
2020-05-19 | No data | ESSEX STREET, FROM STREET RIVINGTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway has been milled and paved due to BPP |
2020-05-18 | No data | WEST 50 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | White lane markings needs to be fully restored on your permanent repair sewer Restoration in the parking / driving lanes. |
2020-05-08 | No data | DIVISION STREET, FROM STREET BOWERY TO STREET MARKET STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I/F/O 41-43, an "L" shaped patch work is present. No expansion joint has been installed in between flag and curb. Scaffolding is present at this time. |
2020-05-08 | No data | DIVISION STREET, FROM STREET BOWERY TO STREET MARKET STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 41-43, an "L" shaped patch work is present. No expansion joint has been installed in between flag and curb. Scaffolding is present at this time. |
2020-05-07 | No data | VAN BUREN STREET, FROM STREET BROADWAY TO STREET PATCHEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | OBTAINED A STREET OPENING PERMIT ON A PROTECTED STREET BUT FAILED TO OBTAIN A CONFIRMATION NUMBER PRIOR TO THE EXPIRATION OF SUCH PERMIT AS REQUIRED PERMIT B012020015A98 EXPIRED 2/14/2020 |
2020-05-03 | No data | JEWELL STREET, FROM STREET MESEROLE AVENUE TO STREET NORMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane opposite from property #123 & sidewalk flags installed in compliance |
2020-04-16 | No data | MATTHEWS AVENUE, FROM STREET LYDIG AVENUE TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: E-Number | Department of Transportation | plumber on site, broken sewer cut is being made on the sidewalk |
2020-04-05 | No data | WEST 131 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut is flush and color coded ifo 16 |
2020-04-03 | No data | JAMAICA AVENUE, FROM STREET MILLER AVENUE TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDE WALK FLAG INSTALLED AROUND WATER CAP COVER |
2020-03-27 | No data | 5 AVENUE, FROM STREET EAST 129 STREET TO STREET EAST 130 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Short water cut remains in acceptable condition. No defects to report |
2020-03-24 | No data | BOGART AVENUE, FROM STREET NEILL AVENUE TO STREET RHINELANDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway and sidewalk |
2020-03-23 | No data | 30 STREET, FROM STREET ASTORIA BOULEVARD TO STREET NEWTOWN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w and r/w restored |
2020-03-14 | No data | UNION STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Broken Domestic Water Service Heavy Leak in the Roadway 1 Excavation 3 Day Dep Notice Issued. |
2020-03-14 | No data | UNION STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | No work Started within the 2 Hour Grace Period. Will Return Later |
2020-02-26 | No data | EAST 195 STREET, FROM STREET HOBART AVENUE TO STREET MAYFLOWER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in the parking lane and sidewalk |
2020-02-26 | No data | VAN BUREN STREET, FROM STREET BROADWAY TO STREET PATCHEN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 11ft 3in x3ft 7in x 3ft 9in 6ft x 5ft x 3ft 3in97.8%, 97.2%96.5% |
2020-02-25 | No data | WEST 158 STREET, FROM STREET EDWARD M MORGAN PLACE TO STREET RIVERSIDE DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk in compliance roadway resurfaced |
2020-02-24 | No data | WEST KINGSBRIDGE ROAD, FROM STREET BEND TO STREET HEATH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | worked not started |
2020-02-24 | No data | WEST KINGSBRIDGE ROAD, FROM STREET BEND TO STREET HEATH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | X012020028A03 up to date permit on file |
2020-02-24 | No data | EAST 154 STREET, FROM STREET ELTON AVENUE TO STREET MELROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP street resurfaced |
2020-02-19 | No data | DOWNING STREET, FROM STREET BEDFORD STREET TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 21, perm 2017 trench to curb with work in 1 sidewalk flag. |
2020-02-04 | No data | AMSTERDAM AVENUE, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration flushed to grade in the PL , sidewalk flag around water valve is sealed. |
2020-01-31 | No data | 104 STREET, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench across r/w |
2020-01-31 | No data | VERNON BOULEVARD, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2020-01-30 | No data | HOYT STREET, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the driving lane in front of property #251 in compliance |
2020-01-23 | No data | WALTON AVENUE, FROM STREET EAST 183 STREET TO STREET EAST 184 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-01-23 | No data | EAST 115 STREET, FROM STREET 1 AVENUE TO STREET PLEASANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Respondent failed to obtain a confirmation number from the department. |
2020-01-23 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm final color coded in compliance |
2020-01-22 | No data | WEST 87 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench restoration in parking lane of roadway. |
2020-01-21 | No data | VAN BUREN STREET, FROM STREET BROADWAY TO STREET PATCHEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | OPEN TRENCH OPP PK LANE & STEEL PLATES COUNTERSUNK IN RWY & FIBERGLASS PLATE IN SWK 35 FEET EAST OF MALCOLM X BLVD |
2020-01-21 | No data | EAST 80 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water restoration in d/l is good. |
2020-01-17 | No data | MARBLE HILL AVENUE, FROM STREET FT CHARLES PLACE TO STREET MARBLE HILL LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-01-16 | No data | PURDY STREET, FROM STREET STARLING AVENUE TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PErm to grade in r.w. |
2020-01-14 | No data | EAST 99 STREET, FROM STREET AVENUE D TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | AREA INSPECTED , NOW CUTS FOUND ON SEGMENT OR IFO LOCATION ...ACTUAL LOCATION 1205 ROCKAWAY AVE |
2020-01-14 | No data | SOUTHERN BOULEVARD, FROM STREET INTERVALE AVENUE TO STREET TIFFANY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER |
2020-01-11 | No data | EAST 243 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in roadway and sidewalk |
2020-01-10 | No data | 12 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Two counter sunken steel plates on the roadway ,raised plow signs on site, material on roadway within 25 linear feet In compliance. |
2020-01-10 | No data | EAST 83 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2017 cut resurfaced by 2019 cut in d/l |
2020-01-10 | No data | 12 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two counter sunken steel plates on the roadway ,raised plow signs on site, material on roadway within 25 linear feet In compliance.Active permit on file. |
2020-01-08 | No data | AMSTERDAM AVENUE, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 5'.11'' x 4'.6'' x 3'.8'', PL , IFO 1850Foreman Jayson Monitored back fill it Pass . |
2020-01-03 | No data | AMSTERDAM AVENUE, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Site is not active at time of inspection |
2020-01-02 | No data | EAST 243 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in the roadway and sidewalk |
2019-12-29 | No data | GRAND STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2019-12-28 | No data | WEST 128 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012019061A02-Latest permit |
2019-12-27 | No data | SOUTHERN BOULEVARD, FROM STREET INTERVALE AVENUE TO STREET TIFFANY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway and sidewalk restoration in compliance |
2019-12-26 | No data | SACKETT STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | On-site basing cut, 11 ft open in r/w |
2019-12-26 | No data | VYSE AVENUE, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done on r.w or s.w. |
2019-12-18 | No data | SACKETT STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic Sanitary Sewer Backing Up into Basement. Went into Basement to Verity. |
2019-12-11 | No data | EAST 80 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade. |
2019-12-08 | No data | DIVISION STREET, FROM STREET BOWERY TO STREET MARKET STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | L-shape sidewalk flag around tree pit not fully restored IFO 41-43 Division St. Patched work not acceptable. Also, No expansion joint install between curb and flag. Must restore pavement in kind. |
2019-11-30 | No data | VAN BUREN STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane in front of property #101 |
2019-11-22 | No data | VYSE AVENUE, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | double parking no inspection |
2019-11-10 | No data | VYSE AVENUE, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk and roadway restored |
2019-11-09 | No data | EAST 243 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber cut plated in the roadway |
2019-11-09 | No data | 17 STREET, FROM STREET 4 AVENUE TO STREET PRE EASTBOUND ENTRANCE 17 ST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r\w paved |
2019-10-27 | No data | SEWARD AVENUE, FROM STREET BEACH AVENUE TO STREET TAYLOR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plates removed |
2019-10-24 | No data | ESSEX STREET, FROM STREET RIVINGTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Both cuts joined and made perm s/w @ b/op |
2019-10-16 | No data | CROSBY AVENUE, FROM STREET CODDINGTON AVENUE TO STREET DUDLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway Resurfaced and one flag in compliance. |
2019-10-16 | No data | EAST 107 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In compliance ifo address |
2019-10-12 | No data | MADISON AVENUE, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut flushed to grade in the parking/driving lane IFO 1236 |
2019-10-05 | No data | WILKINSON AVENUE, FROM STREET EDISON AVENUE TO STREET PILGRIM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2019-10-05 | No data | COLONIAL AVENUE, FROM STREET EAST 196 STREET TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the roadway |
2019-09-30 | No data | WEST 128 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut resurfaced on s/w by BPP-M042019163A01 & r/w cut by Con Ed-M012019183C27 |
2019-09-27 | No data | WEST 128 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012019061A02-Latest permit |
2019-09-25 | No data | WEST 128 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012019002A42-Latest permit |
2019-09-23 | No data | BROADWAY, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found to be newly resurfaced (Full Depth Concrete Roadway) BPP (B012019164B19) |
2019-09-14 | No data | 204 STREET, FROM STREET 89 AVENUE TO STREET 90 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | permanent cut re-sealed |
2019-09-08 | No data | 5 AVENUE, FROM STREET EAST 129 STREET TO STREET EAST 130 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cuts okay on r/w & s/w. |
2019-09-08 | No data | WEST 21 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I found 2 permanent repair water-sewer restorations are flushed to grade the roadway. One is located in the parking lane and the other one is located in the driving lane. |
2019-08-27 | No data | DIVISION STREET, FROM STREET BOWERY TO STREET MARKET STREET | No data | Street Construction Inspections: Active | Department of Transportation | Caution tape on the expansion joints and sidewalk flag will need to be scored 5x5. |
2019-08-20 | No data | JEWELL STREET, FROM STREET MESEROLE AVENUE TO STREET NORMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY OPPOSITE #123 AND SIDE WALK FLAG INSTALLED |
2019-08-19 | No data | WEST 39 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The expansion joint between the sidewalk and curb has been sealed, I/F/O 305... (CAR Re-inspection Pass) |
2019-08-16 | No data | ESSEX STREET, FROM STREET RIVINGTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I/F/O 130, NOV issued for 2 permanent water/sewer cuts that are less than 10' feet apart and failed to comply with Standard Detail Drawing H-1042D note 9, when the distance between small holes is 10ft or less...shall be opened to a continuous trench. |
2019-08-15 | No data | EAST 9 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | found crew on site excavating open roadway cut to repair water leak to water service dep three day notice on file roadway cave in 2 ft by 2 ft down 2 ft within work site advised permit tee to restore with proper cut backs and back fill procedures |
2019-08-10 | No data | 5 AVENUE, FROM STREET EAST 129 STREET TO STREET EAST 130 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration no defects |
2019-07-31 | No data | DOWNING STREET, FROM STREET BEDFORD STREET TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I found a permanent repair water restoration that is flushed to grade in the parking lane and one sidewalk flag has been restored. |
2019-07-23 | No data | 51 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | water leak..3 day notice |
2019-07-20 | No data | EAST 115 STREET, FROM STREET 1 AVENUE TO STREET PLEASANT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm water restoration flush in the driving lane to the curb. Sidewalk plated. |
2019-07-11 | No data | HOYT STREET, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent restoration in roadway |
2019-06-27 | No data | WEST 87 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk flags restored at location. |
2019-06-24 | No data | COLLEGE AVENUE, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The restoration was property reseal and maintain the wearing course in the roadway |
2019-06-10 | No data | EAST 139 STREET, FROM STREET CYPRESS AVENUE TO STREET ST ANNS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2019-06-05 | No data | WEST 50 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in parking lane in compliance. |
2019-06-04 | No data | ESSEX STREET, FROM STREET RIVINGTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I/F/O 130, NOV issued for 2 permanent water/sewer cuts that are less than 10' feet apart and failed to comply with Standard Detail Drawing H-1042D note 9, when the distance between small holes is 10ft or less...shall be opened to a continuous trench. |
2019-05-30 | No data | VANDERBILT STREET, FROM STREET EAST 2 STREET TO STREET EAST 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDEWALK |
2019-05-29 | No data | VERNON BOULEVARD, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 2/23/2019. |
2019-05-29 | No data | 204 STREET, FROM STREET 89 AVENUE TO STREET 90 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | please reseal roadway cut seal missing /broken out around cut. |
2019-05-22 | No data | WEST 39 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The Expansion Joints around the newly restored sidewalk flag need to be recessed and sealed, I/F/O 305 |
2019-05-19 | No data | COLLEGE AVENUE, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 1344 Restoration needs to be re-sealed |
2019-05-18 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work is good |
2019-05-18 | No data | LOGAN AVENUE, FROM STREET PHILIP AVENUE TO STREET RANDALL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2019-05-16 | No data | BRONX PARK EAST, FROM STREET THWAITES PLACE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | fine cracks developing in street joint |
2019-05-16 | No data | WEST 128 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In complaince sidewalk possible roadway cut but can’t see parked car |
2019-05-03 | No data | WEST 158 STREET, FROM STREET EDWARD M MORGAN PLACE TO STREET RIVERSIDE DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Long water cut remains in acceptable condition. No defects to report |
2019-04-25 | No data | EAST 83 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit M012019087C48 on file with two steel plates in driving lane unable to inspect 2017 restoration. |
2019-04-21 | No data | SEWARD AVENUE, FROM STREET BEACH AVENUE TO STREET TAYLOR AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 3 steel plates in the roadway and 1 steel plate on the sidewalk in compliance |
2019-04-14 | No data | MELROSE STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance |
2019-04-11 | No data | WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to see work due to Active Construction site.(Insp.#746) |
2019-04-09 | No data | WALTON AVENUE, FROM STREET EAST 183 STREET TO STREET EAST 184 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2019-03-26 | No data | 74 STREET, FROM STREET 21 AVENUE TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in r/w d/p/l |
2019-03-21 | No data | EAST 205 STREET, FROM STREET GRAND CONCOURSE TO STREET LISBON PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2019-03-20 | No data | EAST 107 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sewer cut is sealed, color coded and flushed ifo 165 |
2019-03-17 | No data | HULL AVENUE, FROM STREET EAST 205 STREET TO STREET EAST 207 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk and roadway restored |
2019-03-15 | No data | 74 STREET, FROM STREET 21 AVENUE TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | 5'6"x5'x3'4" backfill passed |
2019-03-15 | No data | BROADWAY, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2019-03-11 | No data | BROADWAY, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET | No data | Street Construction Inspections: Active | Department of Transportation | steel plated excavation in driving lane okay |
2019-03-08 | No data | BROADWAY, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET | No data | Street Construction Inspections: Active | Department of Transportation | Open excavation... Concrete roadway inspection passed. Excavation area approved and procedure reviewed with foreman, Jason. Traffic moving both ways. In compliance. |
2019-03-05 | No data | WEST 128 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm water cut in the parking and driving lane and sidewalk flag restored. |
2019-03-02 | No data | VANDERBILT STREET, FROM STREET EAST 2 STREET TO STREET EAST 3 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | found crew on site excavating open sidewalk cut to repair sewer main break |
2019-02-27 | No data | 74 STREET, FROM STREET 21 AVENUE TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Open excavation in r/w and s/w. Crew onsite. Work in progress |
2019-02-15 | No data | WEST 128 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut restoration flush to grade in the parking lane and sidewalk flag also restored. |
2019-01-29 | No data | 5 AVENUE, FROM STREET EAST 129 STREET TO STREET EAST 130 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration flushed and sealed , DL /PL |
2019-01-23 | No data | EAST 194 STREET, FROM STREET DECATUR AVENUE TO STREET MARION AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work not started |
2019-01-07 | No data | EAST 195 STREET, FROM STREET HOBART AVENUE TO STREET MAYFLOWER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Spoke to 1 worker on site who is currently preparing area for work, Also spoke to foreman on phone and asked him to follow by his stips, crew will be excavating the R/W for water work, area safe and in compliance at this time. |
2018-12-26 | No data | VYSE AVENUE, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in driving lane of roadway with sidewalk flag curbside restored. |
2018-12-26 | No data | WEST 87 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flag restored around water valve. Unable to verify if there is a water cut in the roadway due to parked car. |
2018-12-01 | No data | MADISON AVENUE, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 8-8-18. Respondent failed to obtain a confirmation number from the department. |
2018-11-29 | No data | ESSEX STREET, FROM STREET RIVINGTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to restore the Base integrally between 2 water cuts, I/f/O 130... (CAR Re-inspection FAIL) |
2018-11-28 | No data | WEST 21 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | consecutive permit . no summons |
2018-11-27 | No data | 31 AVENUE, FROM STREET 14 STREET TO STREET 21 STREET | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER-CREW ON SITE. EXCAVATION IN THE ROADWAY. SPOKE TO FOREMAN ABOUT MAINTAINING 2 LANES FOR TRAFFIC. |
2018-11-25 | No data | VAN BUREN STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance |
2018-11-23 | No data | MADISON AVENUE, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration final no defects to report |
2018-11-14 | No data | WEST 128 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Contactor working on site at time of inspection on SW. |
2018-11-01 | No data | EAST 80 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | trench okay in p/l & d/l also s/w okay |
2018-10-24 | No data | WEST 158 STREET, FROM STREET EDWARD M MORGAN PLACE TO STREET RIVERSIDE DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | your fiinal restoration measure 6ft 1inches, you are required to restore as per sketch #001. |
2018-10-23 | No data | EAST 80 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 3 cuts in the parking/ driving lane one sidewallk flag . saw cut for the base . |
2018-10-23 | No data | 74 STREET, FROM STREET 21 AVENUE TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer cut on R/W (vehicle over cut) |
2018-10-21 | No data | WEST 21 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There are two permanent restoration flushed to grade in the parking/driving lane. |
2018-10-20 | No data | VAN BUREN STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | domestic water leaking on roadway at 1 1/2'' tap going into 2'' line, one excavation made opposite property at time of inspection,3 day notice issued at time of inspection. |
2018-10-17 | No data | ESSEX STREET, FROM STREET RIVINGTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed that the Respondent has Failed to restore/cutback the Base and/or Wearing Course on their two 2'X3' water cuts as required. As per Standard Detail H-1042D notes |
2018-10-08 | No data | WILKINSON AVENUE, FROM STREET EDISON AVENUE TO STREET PILGRIM AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 6 inches cut back done, binder use for base, base job accepted |
2018-10-05 | No data | WILKINSON AVENUE, FROM STREET EDISON AVENUE TO STREET PILGRIM AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | jason foreman had to reschedule for later time, no lab tec |
2018-09-29 | No data | WEST 158 STREET, FROM STREET EDWARD M MORGAN PLACE TO STREET RIVERSIDE DRIVE | No data | Street Construction Inspections: LL14 | Department of Transportation | Jason from Two Brothers was the foreman & Dario from Twin Peaks was the tester6'X3'X4'5'5"X2'X4'5"6" cut back done |
2018-09-04 | No data | WEBSTER AVENUE, FROM STREET EAST 233 STREET TO STREET WOODLAWN CEMETERY BOUNDARY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B ISSUED |
2018-08-30 | No data | HEATH AVENUE, FROM STREET BAILEY AVENUE TO STREET KINGSBRIDGE TERRACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2018-08-26 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work is good |
2018-08-20 | No data | EAST 223 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Condition is good. Inspected / In Compliance. |
2018-08-20 | No data | EAST 80 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Long water one in the p/l the other in the driving lane, s/w flush & sealed. |
2018-08-18 | No data | VAN BUREN STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic Sanitary Sewer Backing up into Building. Building Super on Site |
2018-08-16 | No data | WEBSTER AVENUE, FROM STREET EAST 233 STREET TO STREET WOODLAWN CEMETERY BOUNDARY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Condition is good. Inspected / In Compliance. |
2018-08-15 | No data | GRAND STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench on r/w. |
2018-08-09 | No data | HULL AVENUE, FROM STREET EAST 205 STREET TO STREET EAST 207 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in roadway |
2018-08-01 | No data | 47 STREET, FROM STREET 21 AVENUE TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done, no address 21-44 on segment |
2018-08-01 | No data | EAST 107 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 9.5 x 3.1 x 3.5 tested 96.4 96.8 |
2018-08-01 | No data | 74 STREET, FROM STREET 21 AVENUE TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R/W milled, unable to see cut,Active BO |
2018-07-31 | No data | CROSBY AVENUE, FROM STREET CODDINGTON AVENUE TO STREET DUDLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk and roadway ok |
2018-07-24 | No data | EAST 83 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At time of inspection cannot properly inspect rd/w due to container & material stored at active B.O. |
2018-07-20 | No data | 5 AVENUE, FROM STREET EAST 129 STREET TO STREET EAST 130 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restoration perm final no defects sidewalk in compliance |
2018-07-13 | No data | 162 STREET, FROM STREET CROSS ISLAND PARKWAY TO STREET CRYDERS LANE | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill complete and acceptable. Cut size 7'x3.6'x5' Tests w/d 123.9, d/d 111.5, m/d/d 115.0, a/m 11.0 % and Lifts 97.6 & 97.4 |
2018-07-11 | No data | EAST 154 STREET, FROM STREET ELTON AVENUE TO STREET MELROSE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | later gas work done |
2018-07-03 | No data | EAST 218 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESTORATION IN ROADWAY IS GOOD. INSPECTED / IN COMPLIANCE. |
2018-06-30 | No data | CROSBY AVENUE, FROM STREET CODDINGTON AVENUE TO STREET DUDLEY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Two long Water cuts one sidewalk flag restored cutting into 1428 |
2018-06-29 | No data | VYSE AVENUE, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Back fill pass I/F/O 1431 |
2018-06-27 | No data | ESSEX STREET, FROM STREET RIVINGTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to restore the Base integrally between 2 water cuts, I/f/O 130... (CAR Re-inspection FAIL) |
2018-06-25 | No data | BAISLEY AVENUE, FROM STREET ELLSWORTH AVENUE TO STREET FAIRFAX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Grass area. Van parked over restoration in driving lane |
2018-06-19 | No data | 47 STREET, FROM STREET 25 AVENUE TO STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2018-06-18 | No data | RUSCOE STREET, FROM STREET 106 AVENUE TO STREET 106 ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill fail, re-schedule. |
2018-06-18 | No data | COLLEGE AVENUE, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2018-06-15 | No data | RUSCOE STREET, FROM STREET 106 AVENUE TO STREET 106 ROAD | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy Leak in the Basement, Went into Basement to Verify |
2018-06-14 | No data | 5 AVENUE, FROM STREET EAST 129 STREET TO STREET EAST 130 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | sealed |
2018-06-10 | No data | JEROME AVENUE, FROM STREET ELLIOT PLACE TO STREET MARCY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to inspect, vehicles on location |
2018-06-09 | No data | OGDEN AVENUE, FROM STREET WEST 163 STREET TO STREET WEST 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP, street re paved |
2018-06-08 | No data | LOGAN AVENUE, FROM STREET PHILIP AVENUE TO STREET RANDALL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two permanent trenches need proper cutbacks made to be made into one restoration. |
2018-06-08 | No data | 20 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permanent restoration in the driving lane is now properly sealed. |
2018-06-08 | No data | LOGAN AVENUE, FROM STREET PHILIP AVENUE TO STREET RANDALL AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Trench ok, going to inquire on angle validity. |
2018-06-07 | No data | WEST 50 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The Roadway Lane Marking has been restored over the water cut, I/F/O 442... (CAR Re-inspection Pass) |
2018-05-23 | No data | CARPENTER AVENUE, FROM STREET EAST 222 STREET TO STREET EAST 223 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restorations in roadway is good. Inspected / In Compliance . |
2018-05-23 | No data | BRONX PARK EAST, FROM STREET THWAITES PLACE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade in the P/D lane, flush and sealed. |
2018-05-05 | No data | EAST 154 STREET, FROM STREET ELTON AVENUE TO STREET MELROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 permanent water cut int the roadway not properly cut back. cuts is only 30 inches wide. minimum requirement is 54 inches as per local law 1042 A-D |
2018-05-03 | No data | 5 AVENUE, FROM STREET EAST 129 STREET TO STREET EAST 130 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | please seal Sidewalk Expansion joints after Completion of Water repair. |
2018-04-29 | No data | 20 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water Cut must be Resealed |
2018-04-28 | No data | 18 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway Recently Resurfaced & No Work found on the Existing Sidewalk. |
2018-04-20 | No data | 204 STREET, FROM STREET 89 AVENUE TO STREET 90 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | TEMP CUT IN PL INTO DL BF TAMPED TESTED CUT BACK FOR BASE & WC MATERIAL |
2018-04-18 | No data | LOGAN AVENUE, FROM STREET PHILIP AVENUE TO STREET RANDALL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Saw cut concrete sidewalk sunken 1''. Need to restore 2 full concrete flags. Has 2 perm trenchs 4' wide- 9' wide in the driving, parking lanes. Wearing Course need to be squared off into 1 complete cut. |
2018-04-15 | No data | 204 STREET, FROM STREET 89 AVENUE TO STREET 90 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, water leak on service. DEP three day notice on site. Excavation in the roadway and on the sidewalk. |
2018-04-14 | No data | COLONIAL AVENUE, FROM STREET EAST 196 STREET TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Perm cut in the driving lane. |
2018-04-11 | No data | ESSEX STREET, FROM STREET RIVINGTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR passed out during cleanup, will be re-issued with additional defects listed. |
2018-04-11 | No data | ESSEX STREET, FROM STREET RIVINGTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 Water Cuts in the R/W measure 2' X 3' Base and Wearing Course have not been cutback, cuts are also within 10' from eachother, Restore as per SD 1042D note #6&9. also remove incorrect marker an apply correct pavement marker (50602) & seal S/W joints |
2018-04-09 | No data | 75 STREET, FROM STREET 95 AVENUE TO STREET BEND | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy Leak in the Roadway. 3 Day Dep Notice Issued |
2018-04-05 | No data | COLLEGE POINT BOULEVARD, FROM STREET 18 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | In-compliance |
2018-04-04 | No data | EAST 216 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Backfill and base completed and acceptable / 12" cutback done on the wearing course |
2018-03-31 | No data | COLONIAL AVENUE, FROM STREET EAST 196 STREET TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | work done |
2018-03-26 | No data | WEST 50 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR REISSUED |
2018-03-26 | No data | WEST 50 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESTORE LANE MARKINGS BACK TO THE ROADWAY |
2018-02-17 | No data | 31 STREET, FROM STREET 38 AVENUE TO STREET 39 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Plated and barricaded sewer service excavation in the parking/ driving lane. |
2018-02-16 | No data | EAST 205 STREET, FROM STREET GRAND CONCOURSE TO STREET LISBON PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2018-02-08 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Active | Department of Transportation | perm restoration in the parking lane, sidewalk flag has snow covering it. |
2018-02-06 | No data | EASTCHESTER ROAD, FROM STREET CHESTER STREET TO STREET HICKS STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, Water service leaking, Excavation in the parking lane and on the sidewalk ( 3 day notice. ) |
2018-02-01 | No data | EAST 80 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 2 water cuts was backfilled 1 i/f/o 124 and the other is opposite #124. cutback done. Arrived @ 9:25am-12:15pm |
2018-01-30 | No data | HULL AVENUE, FROM STREET EAST 205 STREET TO STREET EAST 207 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site. Water service leaking in the basement, Excavation in the driving/parking lane and on the sidewalk. |
2018-01-30 | No data | COLLEGE AVENUE, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm final color coded |
2018-01-27 | No data | EAST 139 STREET, FROM STREET CYPRESS AVENUE TO STREET ST ANNS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade & s/w ok |
2018-01-26 | No data | GRAND STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in roadway with color code painted |
2018-01-25 | No data | COLLEGE POINT BOULEVARD, FROM STREET 18 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESEAL AND REPLACE YELLOW LINE ON PERM TRENCH IN DRIVING LANE |
2018-01-21 | No data | WALTON AVENUE, FROM STREET EAST 183 STREET TO STREET EAST 184 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade in the R/W flush and sealed. |
2018-01-14 | No data | 5 AVENUE, FROM STREET EAST 129 STREET TO STREET EAST 130 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | No crew on site, excavation flushed in the driving lane |
2018-01-13 | No data | EAST 80 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | crew on site; water leak on 2 inch domestic service in basement of building--3 day notice provided by contractor--2 r/w excavations |
2017-12-18 | No data | DOWNING STREET, FROM STREET BEDFORD STREET TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rdwy and s/w acceptable |
2017-12-11 | No data | COLLEGE AVENUE, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 21' by 3'.4'' backfill6'' cutback was done |
2017-12-10 | No data | COLLEGE AVENUE, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET | No data | Street Construction Inspections: Active | Department of Transportation | PLATES RECESSED AND RAISE PLOW SING POSTED |
2017-12-05 | No data | EAST 83 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | found in front of 162 east 83 st crew on site excavating open roadway cut to repair water leak to water service |
2017-11-15 | No data | BRONX PARK EAST, FROM STREET THWAITES PLACE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2017-11-06 | No data | PURDY STREET, FROM STREET STARLING AVENUE TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | expansion joint sealed |
2017-11-05 | No data | WEST 50 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Nov issued for the above respondent has backfill an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired on 9/3/2017. |
2017-11-03 | No data | LOGAN AVENUE, FROM STREET PHILIP AVENUE TO STREET RANDALL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 08/08/17. |
2017-11-02 | No data | ESSEX STREET, FROM STREET RIVINGTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please seal an expose expansion joint in sidewalk flag ifo 140. |
2017-11-02 | No data | LOGAN AVENUE, FROM STREET PHILIP AVENUE TO STREET RANDALL AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Two perm water cuts in the P/D lane and new sidewalk flag flush and sealed, permit active. |
2017-10-23 | No data | ROCKAWAY AVENUE, FROM STREET AMES LANE TO STREET EAST 98 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2017-10-20 | No data | LOGAN AVENUE, FROM STREET PHILIP AVENUE TO STREET RANDALL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the respondent on site doing work in an open excavation in the roadway of a protected street without an active D.O.T. permit. Permit expired 10/17/2017. |
2017-10-19 | No data | 20 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN DRIVING LANE |
2017-10-09 | No data | LOGAN AVENUE, FROM STREET PHILIP AVENUE TO STREET RANDALL AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site, spoke to foreman Jason for Two brothers plumbing services, doing water repair, has open excavation with shoring ,working incompliance to all Stips, I/F/O 750 parking lane. |
2017-10-07 | No data | 24 AVENUE, FROM STREET 24 STREET TO STREET 25 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation crossing the roadway pinned and ramp at time of my inspection |
2017-09-26 | No data | 26 AVENUE, FROM STREET 1 STREET TO STREET 2 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street closed. Active new building operation |
2017-09-26 | No data | EAST 99 STREET, FROM STREET AVENUE D TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut in the parking lane the backside of 1205 rockaway ave |
2017-09-25 | No data | 26 AVENUE, FROM STREET 1 STREET TO STREET 2 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area behind fence. Building operation |
2017-09-19 | No data | ESSEX STREET, FROM STREET RIVINGTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done, permit expired. |
2017-09-16 | No data | 30 STREET, FROM STREET ASTORIA BOULEVARD TO STREET NEWTOWN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut p/l and on s/w |
2017-09-03 | No data | LOGAN AVENUE, FROM STREET PHILIP AVENUE TO STREET RANDALL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No visible work found. |
2017-09-02 | No data | OGDEN AVENUE, FROM STREET WEST 163 STREET TO STREET WEST 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2017-08-31 | No data | WEST 50 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | perm cut on the sidewalk and in the driving /parking lane . travels lane marking needs to restored to perm restoratin |
2017-08-24 | No data | 30 ROAD, FROM STREET 12 STREET TO STREET 14 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 10'x4' perm cut |
2017-08-22 | No data | WEST 50 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | parking lane and sidewalk plated IFO 442 |
2017-08-15 | No data | 20 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavatio |
2017-08-01 | No data | PURDY STREET, FROM STREET STARLING AVENUE TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joint between curb and sidewalk flags, needs to be sealed. |
2017-07-24 | No data | JEWELL STREET, FROM STREET MESEROLE AVENUE TO STREET NORMAN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Departure time 1030amBackfill has been cancelled due to rain |
2017-07-21 | No data | JEWELL STREET, FROM STREET MESEROLE AVENUE TO STREET NORMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp cut in r/w. |
2017-07-10 | No data | WALTON AVENUE, FROM STREET EAST 183 STREET TO STREET EAST 184 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | monitored site from 1009-1052am, BF acceptable |
2017-07-09 | No data | JEWELL STREET, FROM STREET MESEROLE AVENUE TO STREET NORMAN AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Temp. to grade cut on S/W & R/W |
2017-06-28 | No data | EAST 139 STREET, FROM STREET CYPRESS AVENUE TO STREET ST ANNS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 7'.2''. 5'' by 2'.5'' backfillcutback was done on site |
2017-06-13 | No data | EAST 139 STREET, FROM STREET CYPRESS AVENUE TO STREET ST ANNS AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, Water service leaking, Excavation in the driving lane and on the sidewalk. 3 day notice. |
2017-05-13 | No data | 30 ROAD, FROM STREET 12 STREET TO STREET 14 STREET | No data | Street Construction Inspections: Active | Department of Transportation | NOV issued to respondent for having a steel plate on the roadway that was smooth to the touch. Respondentâs plate did not have skid resistance greater than or equal to the adjacent roadway. |
2017-05-10 | No data | 18 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy Leak in the Sidewalk. 3 Day Dep Notice Issued. |
2017-04-29 | No data | BRONX PARK EAST, FROM STREET THWAITES PLACE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in r/w |
2017-04-29 | No data | BRONX PARK EAST, FROM STREET THWAITES PLACE TO STREET WARING AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | perm restoration in roadway |
2017-04-21 | No data | BRONX PARK EAST, FROM STREET THWAITES PLACE TO STREET WARING AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | FOREMAN Mulaj Driton . jumping jack, sand. LAB. Exclusive Testing. Barbara, sand cone, (w)116.1 (d) 108.0 (md)110.5 (am) 7.5 test 96.0. BACKFILL ACCEPTED. Cut temp to grade. |
2017-04-13 | No data | BRONX PARK EAST, FROM STREET THWAITES PLACE TO STREET WARING AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work not done |
2017-03-28 | No data | EAST 205 STREET, FROM STREET GRAND CONCOURSE TO STREET LISBON PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | 2 cuts in the driving lane pass backfill completed and acceptable |
No related officers
No related companies by address
Date of last update: 23 Nov 2024
Sources: New York Secretary of State
© 2024 nycompanysearch.com, Part of Big Data Integrated