Name: | MES CONSTRUCTION CORP. |
Jurisdiction: | New York |
Legal type: | DOMESTIC BUSINESS CORPORATION |
Status: | Active |
Date of registration: | 22 Mar 2016 (9 years ago) |
Entity Number: | 4917033 |
ZIP code: | 10461 |
County: | Bronx |
Place of Formation: | New York |
Address: | 2620 halperin ave, BRONX, NY, United States, 10461 |
Principal Address: | 60 EAST BROADWAY, GROUND FLOOR SUITE 103, NEW YORK, NY, United States, 10002 |
Shares Details
Shares issued 200
Share Par Value 0
Type NO PAR VALUE
Name | Role | Address |
---|---|---|
ALBAN SHALA | Chief Executive Officer | 60 EAST BROADWAY, GROUND FLOOR SUITE 103, NEW YORK, NY, United States, 10002 |
Name | Role | Address |
---|---|---|
THE CORPORATION | DOS Process Agent | 2620 halperin ave, BRONX, NY, United States, 10461 |
Number | Date | End date | Type | Address |
---|---|---|---|---|
X012024320B14 | 2024-11-15 | 2024-12-13 | REPAIR WATER | EAST 232 STREET, BRONX, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD |
B012024319B42 | 2024-11-14 | 2024-12-06 | REPAIR WATER | EAST 25 STREET, BROOKLYN, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD |
X012024319A89 | 2024-11-14 | 2024-11-21 | REPAIR SEWER - PROTECTED | WEST 170 STREET, BRONX, FROM STREET EDWARD L GRANT HIGHWAY TO STREET SHAKESPEARE AVENUE |
X192024318A00 | 2024-11-13 | 2024-12-31 | PLACE TEMPORARY PLATES | WEST 170 STREET, BRONX, FROM STREET EDWARD L GRANT HIGHWAY TO STREET SHAKESPEARE AVENUE |
X022024318B24 | 2024-11-13 | 2024-12-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLAY AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET PROSPECT PLACE |
X022024318B23 | 2024-11-13 | 2024-12-25 | PLACE MATERIAL ON STREET | CLAY AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET PROSPECT PLACE |
X012024318C00 | 2024-11-13 | 2024-12-12 | REPAIR WATER - PROTECTED | CLAY AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET PROSPECT PLACE |
X002024318A02 | 2024-11-13 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
B012024316A28 | 2024-11-11 | 2024-12-06 | REPAIR WATER | HOWARD AVENUE, BROOKLYN, FROM STREET BEND TO STREET BLAKE AVENUE |
B022024316A81 | 2024-11-11 | 2024-12-06 | PLACE MATERIAL ON STREET | HOWARD AVENUE, BROOKLYN, FROM STREET BEND TO STREET BLAKE AVENUE |
B022024316A82 | 2024-11-11 | 2024-12-06 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HOWARD AVENUE, BROOKLYN, FROM STREET BEND TO STREET BLAKE AVENUE |
M002024313A30 | 2024-11-08 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
M012024312A89 | 2024-11-07 | 2024-11-09 | REPAIR WATER | EAST 27 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
B022024311D39 | 2024-11-06 | 2024-12-02 | PLACE MATERIAL ON STREET | PARK PLACE, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RALPH AVENUE |
B012024311C63 | 2024-11-06 | 2024-11-30 | REPAIR WATER - PROTECTED | PARK PLACE, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RALPH AVENUE |
X012024309B37 | 2024-11-04 | 2024-11-14 | REPAIR SEWER - PROTECTED | WEST 170 STREET, BRONX, FROM STREET EDWARD L GRANT HIGHWAY TO STREET SHAKESPEARE AVENUE |
M012024309B39 | 2024-11-04 | 2024-11-17 | REPAIR WATER | 1 AVENUE, MANHATTAN, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET |
B012024308A09 | 2024-11-03 | 2024-11-26 | REPAIR SEWER - PROTECTED | 4 AVENUE, BROOKLYN, FROM STREET 1 STREET TO STREET GARFIELD PLACE |
X002024308A00 | 2024-11-03 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
M012024306A69 | 2024-11-01 | 2024-11-03 | REPAIR SEWER - PROTECTED | CHRISTOPHER STREET, MANHATTAN, FROM STREET GAY STREET TO STREET GROVE STREET |
B022024304D67 | 2024-10-30 | 2024-11-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PROSPECT PLACE, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RALPH AVENUE |
B012024304C01 | 2024-10-30 | 2024-11-22 | REPAIR WATER | PROSPECT PLACE, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RALPH AVENUE |
B022024304D66 | 2024-10-30 | 2024-11-22 | PLACE MATERIAL ON STREET | PROSPECT PLACE, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RALPH AVENUE |
B022024302A00 | 2024-10-28 | 2024-11-30 | PLACE MATERIAL ON STREET | SHEPHERD AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE |
B012024302A02 | 2024-10-28 | 2024-11-05 | REPAIR SEWER | SHEPHERD AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE |
B022024302A01 | 2024-10-28 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | SHEPHERD AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE |
B012024302B23 | 2024-10-28 | 2024-11-22 | REPAIR SEWER | AVENUE L, BROOKLYN, FROM STREET EAST 15 STREET TO STREET NYCTA SUBWAY |
B012024301A01 | 2024-10-27 | 2024-11-26 | REPAIR WATER - PROTECTED | LAFAYETTE AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022024301A01 | 2024-10-27 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | LAFAYETTE AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022024301A00 | 2024-10-27 | 2024-11-29 | PLACE MATERIAL ON STREET | LAFAYETTE AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B012024298B32 | 2024-10-24 | 2024-11-21 | REPAIR WATER - SEWER - PROTECTED | SEIGEL STREET, BROOKLYN, FROM STREET SEIGEL COURT TO STREET WHITE STREET |
Q012024298C13 | 2024-10-24 | 2024-11-23 | REPAIR WATER - SEWER | LIBERTY AVENUE, QUEENS, FROM STREET 150 STREET TO STREET TUCKERTON STREET |
M012024292B14 | 2024-10-18 | 2024-11-05 | REPAIR WATER | 1 AVENUE, MANHATTAN, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET |
B012024291A11 | 2024-10-17 | 2024-11-12 | REPAIR SEWER - PROTECTED | PROSPECT PLACE, BROOKLYN, FROM STREET GRAND AVENUE TO STREET WASHINGTON AVENUE |
X022024291A62 | 2024-10-17 | 2024-12-16 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 135 STREET, BRONX, FROM STREET LOCUST AVENUE TO STREET ROSE FEISS BOULEVARD |
X022024291A61 | 2024-10-17 | 2024-12-16 | PLACE MATERIAL ON STREET | EAST 135 STREET, BRONX, FROM STREET LOCUST AVENUE TO STREET ROSE FEISS BOULEVARD |
X012024291A81 | 2024-10-17 | 2024-11-16 | REPAIR SEWER | EAST 135 STREET, BRONX, FROM STREET LOCUST AVENUE TO STREET ROSE FEISS BOULEVARD |
B022024291A03 | 2024-10-17 | 2024-11-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PROSPECT PLACE, BROOKLYN, FROM STREET GRAND AVENUE TO STREET WASHINGTON AVENUE |
Q042024288A04 | 2024-10-14 | 2024-10-29 | REPAIR SIDEWALK | DARTMOUTH STREET, QUEENS, FROM STREET 68 AVENUE TO STREET 69 AVENUE |
X022024288A14 | 2024-10-14 | 2024-11-09 | OCCUPANCY OF ROADWAY AS STIPULATED | BAINBRIDGE AVENUE, BRONX, FROM STREET EAST 204 STREET TO STREET EAST 206 STREET |
B012024286A00 | 2024-10-12 | 2024-10-14 | REPAIR WATER | 28 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
Q012024283A71 | 2024-10-09 | 2024-10-31 | REPAIR WATER | 82 AVENUE, QUEENS, FROM STREET 126 STREET TO STREET QUEENS BOULEVARD |
X012024281A31 | 2024-10-07 | 2024-11-05 | REPAIR SEWER - PROTECTED | WEST 170 STREET, BRONX, FROM STREET EDWARD L GRANT HIGHWAY TO STREET SHAKESPEARE AVENUE |
B012024278A89 | 2024-10-04 | 2024-10-24 | REPAIR SEWER | DE KALB AVENUE, BROOKLYN, FROM STREET KENT AVENUE TO STREET TAAFFE PLACE |
B022024278I20 | 2024-10-04 | 2024-10-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DE KALB AVENUE, BROOKLYN, FROM STREET KENT AVENUE TO STREET TAAFFE PLACE |
B022024278I19 | 2024-10-04 | 2024-10-24 | PLACE MATERIAL ON STREET | DE KALB AVENUE, BROOKLYN, FROM STREET KENT AVENUE TO STREET TAAFFE PLACE |
B022024277C19 | 2024-10-03 | 2024-10-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 17 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET CEDAR STREET |
B012024277C41 | 2024-10-03 | 2024-10-31 | REPAIR WATER - SEWER | EAST 17 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET CEDAR STREET |
X012024276B67 | 2024-10-02 | 2024-10-31 | REPAIR WATER - SEWER | REV JAMES POLITE AVENUE, BRONX, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET |
B192024274A01 | 2024-09-30 | 2024-10-31 | PLACE TEMPORARY PLATES | EAST 17 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET CEDAR STREET |
Q012024268C24 | 2024-09-26 | 2024-10-23 | REPAIR WATER - PROTECTED | NANSEN STREET, QUEENS, FROM STREET 69 AVENUE TO STREET SELFRIDGE STREET |
M012024268C08 | 2024-09-24 | 2024-10-24 | REPAIR WATER - SEWER | WEST 169 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET FT WASHINGTON AVENUE |
X012024268A85 | 2024-09-24 | 2024-10-22 | REPAIR SEWER | GODWIN TERRACE, BRONX, FROM STREET KIMBERLY PLACE TO STREET WEST 231 STREET |
M012024268C09 | 2024-09-24 | 2024-10-24 | REPAIR WATER | BROADWAY, MANHATTAN, FROM STREET WEST 169 STREET TO STREET WEST 170 STREET |
B012024268A52 | 2024-09-24 | 2024-10-22 | REPAIR WATER | CEDAR STREET, BROOKLYN, FROM STREET EAST 16 STREET TO STREET EAST 17 STREET |
X012024268B53 | 2024-09-24 | 2024-10-19 | REPAIR WATER - SEWER | BEACH AVENUE, BRONX, FROM STREET LACOMBE AVENUE TO STREET RANDALL AVENUE |
X012024266A00 | 2024-09-22 | 2024-10-06 | REPAIR SEWER - PROTECTED | WEST 170 STREET, BRONX, FROM STREET EDWARD L GRANT HIGHWAY TO STREET SHAKESPEARE AVENUE |
X012024262B37 | 2024-09-18 | 2024-10-17 | REPAIR SEWER | CROTONA PARK EAST, BRONX, FROM STREET CLAREMONT PARKWAY TO STREET CROTONA AVENUE |
Q012024262D26 | 2024-09-18 | 2024-10-05 | REPAIR WATER | 82 AVENUE, QUEENS, FROM STREET 126 STREET TO STREET QUEENS BOULEVARD |
X012024261B73 | 2024-09-17 | 2024-09-22 | REPAIR SEWER - PROTECTED | WEST 170 STREET, BRONX, FROM STREET EDWARD L GRANT HIGHWAY TO STREET SHAKESPEARE AVENUE |
X012024260A23 | 2024-09-16 | 2024-10-16 | REPAIR SEWER | RYER AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET |
B012024259A01 | 2024-09-15 | 2024-10-12 | REPAIR WATER - SEWER | 16 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
X012024254A68 | 2024-09-10 | 2024-10-04 | REPAIR SEWER | EAST 205 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET LISBON PLACE |
X012024254A67 | 2024-09-10 | 2024-10-08 | REPAIR WATER | TOPPING AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
Q012024250B85 | 2024-09-06 | 2024-09-16 | REPAIR WATER | 82 AVENUE, QUEENS, FROM STREET 126 STREET TO STREET QUEENS BOULEVARD |
M192024249A01 | 2024-09-05 | 2024-12-03 | PLACE TEMPORARY PLATES | WEST 65 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
X012024248A15 | 2024-09-04 | 2024-09-16 | REPAIR WATER - PROTECTED | CLAY AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
B012024246A03 | 2024-09-02 | 2024-09-16 | REPAIR WATER - PROTECTED | MILLER AVENUE, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE |
B012024246A00 | 2024-09-02 | 2024-09-16 | REPAIR WATER | CLINTON STREET, BROOKLYN, FROM STREET BRYANT STREET TO STREET HALLECK STREET |
B012024246A02 | 2024-09-02 | 2024-09-16 | REPAIR WATER | SOUTH 9 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET |
X012024246A00 | 2024-09-02 | 2024-09-16 | REPAIR SEWER | RYER AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET |
B012024246A01 | 2024-09-02 | 2024-09-16 | REPAIR WATER - SEWER | 54 STREET, BROOKLYN, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
Q012024246A08 | 2024-09-02 | 2024-09-02 | REPAIR WATER | 82 AVENUE, QUEENS, FROM STREET 126 STREET TO STREET QUEENS BOULEVARD |
B022024243C10 | 2024-08-30 | 2024-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MILLER AVENUE, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE |
B022024243C09 | 2024-08-30 | 2024-09-02 | PLACE MATERIAL ON STREET | MILLER AVENUE, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE |
B012024243B19 | 2024-08-30 | 2024-09-02 | REPAIR WATER - PROTECTED | MILLER AVENUE, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE |
X022024241A73 | 2024-08-28 | 2024-09-02 | PLACE MATERIAL ON STREET | CLAY AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
X022024241A74 | 2024-08-28 | 2024-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLAY AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
X012024241B23 | 2024-08-28 | 2024-09-02 | REPAIR WATER - PROTECTED | CLAY AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
X022024239C14 | 2024-08-26 | 2024-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FINDLAY AVENUE, BRONX, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET |
X022024239C13 | 2024-08-26 | 2024-09-02 | PLACE MATERIAL ON STREET | FINDLAY AVENUE, BRONX, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET |
X012024239B10 | 2024-08-26 | 2024-09-02 | REPAIR WATER - PROTECTED | FINDLAY AVENUE, BRONX, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET |
B012024238A00 | 2024-08-25 | 2024-09-02 | REPAIR WATER | CLINTON STREET, BROOKLYN, FROM STREET BRYANT STREET TO STREET HALLECK STREET |
B012024235C48 | 2024-08-22 | 2024-09-02 | REPAIR WATER - SEWER | 54 STREET, BROOKLYN, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
B022024233A96 | 2024-08-20 | 2024-08-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PROSPECT PLACE, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE |
B022024233A95 | 2024-08-20 | 2024-08-20 | PLACE MATERIAL ON STREET | PROSPECT PLACE, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE |
B012024233B73 | 2024-08-20 | 2024-09-02 | REPAIR WATER | PROSPECT PLACE, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE |
B012024233A96 | 2024-08-20 | 2024-08-20 | REPAIR WATER | PROSPECT PLACE, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE |
Q012024232B01 | 2024-08-19 | 2024-09-02 | REPAIR WATER | 82 AVENUE, QUEENS, FROM STREET 126 STREET TO STREET QUEENS BOULEVARD |
B012024232A79 | 2024-08-19 | 2024-09-02 | REPAIR WATER | SOUTH 9 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET |
X012024229A53 | 2024-08-16 | 2024-08-24 | REPAIR SEWER - PROTECTED | WEST 170 STREET, BRONX, FROM STREET EDWARD L GRANT HIGHWAY TO STREET SHAKESPEARE AVENUE |
B012024228A52 | 2024-08-15 | 2024-09-02 | REPAIR WATER | BEVERLY ROAD, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET LOTT STREET |
X012024223A07 | 2024-08-14 | 2024-09-02 | REPAIR WATER | TIFFANY STREET, BRONX, FROM STREET OAK POINT AVENUE TO STREET RANDALL AVENUE |
X022024227A01 | 2024-08-14 | 2024-09-02 | PLACE MATERIAL ON STREET | RYER AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET |
X012024227A20 | 2024-08-14 | 2024-09-02 | REPAIR SEWER | RYER AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET |
M012024226A37 | 2024-08-13 | 2024-08-28 | REPAIR SEWER - PROTECTED | WEST 65 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
X022024223A01 | 2024-08-10 | 2024-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CARLISLE PLACE, BRONX, FROM STREET EAST 211 STREET TO STREET EAST 213 STREET |
X022024223A00 | 2024-08-10 | 2024-09-02 | PLACE MATERIAL ON STREET | CARLISLE PLACE, BRONX, FROM STREET EAST 211 STREET TO STREET EAST 213 STREET |
X012024223A08 | 2024-08-10 | 2024-08-25 | REPAIR WATER - PROTECTED | CLIFFORD PLACE, BRONX, FROM STREET TOWNSEND AVENUE TO STREET WALTON AVENUE |
X012024223A09 | 2024-08-10 | 2024-09-02 | REPAIR WATER | CARLISLE PLACE, BRONX, FROM STREET EAST 211 STREET TO STREET EAST 213 STREET |
B012024221A83 | 2024-08-08 | 2024-08-29 | REPAIR SEWER | CHURCH AVENUE, BROOKLYN, FROM STREET LLOYD STREET TO STREET ROGERS AVENUE |
B012024220A46 | 2024-08-07 | 2024-08-22 | REPAIR SEWER - PROTECTED | BALTIC STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET NEVINS STREET |
B012024215B63 | 2024-08-02 | 2024-08-29 | REPAIR SEWER | CHURCH AVENUE, BROOKLYN, FROM STREET LLOYD STREET TO STREET ROGERS AVENUE |
Q192024214A00 | 2024-08-01 | 2024-09-02 | PLACE TEMPORARY PLATES | 82 AVENUE, QUEENS, FROM STREET 126 STREET TO STREET QUEENS BOULEVARD |
X022024213B38 | 2024-07-31 | 2024-08-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RYER AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET |
X012024213B33 | 2024-07-31 | 2024-08-13 | REPAIR SEWER | RYER AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET |
X022024213B37 | 2024-07-31 | 2024-08-13 | PLACE MATERIAL ON STREET | RYER AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET |
X022024211B11 | 2024-07-29 | 2024-08-28 | PLACE MATERIAL ON STREET | MANOR AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET WATSON AVENUE |
M012024211B04 | 2024-07-29 | 2024-08-11 | REPAIR SEWER - PROTECTED | WEST 65 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
X022024211B12 | 2024-07-29 | 2024-08-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MANOR AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET WATSON AVENUE |
X012024211A82 | 2024-07-29 | 2024-08-28 | REPAIR WATER | MANOR AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET WATSON AVENUE |
X022024210A07 | 2024-07-28 | 2024-08-21 | PLACE MATERIAL ON STREET | NELSON AVENUE, BRONX, FROM STREET EDWARD L GRANT HIGHWAY TO STREET WEST 172 STREET |
X012024210A01 | 2024-07-28 | 2024-08-20 | REPAIR WATER - PROTECTED | NELSON AVENUE, BRONX, FROM STREET EDWARD L GRANT HIGHWAY TO STREET WEST 172 STREET |
X022024210A08 | 2024-07-28 | 2024-08-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NELSON AVENUE, BRONX, FROM STREET EDWARD L GRANT HIGHWAY TO STREET WEST 172 STREET |
X012024207B53 | 2024-07-25 | 2024-08-24 | REPAIR WATER | MORRIS AVENUE, BRONX, FROM STREET EAST 181 STREET TO STREET EAST BURNSIDE AVENUE |
X022024207B29 | 2024-07-25 | 2024-08-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MORRIS AVENUE, BRONX, FROM STREET EAST 181 STREET TO STREET EAST BURNSIDE AVENUE |
X022024207B28 | 2024-07-25 | 2024-08-31 | PLACE MATERIAL ON STREET | MORRIS AVENUE, BRONX, FROM STREET EAST 181 STREET TO STREET EAST BURNSIDE AVENUE |
M012024206A81 | 2024-07-24 | 2024-08-21 | REPAIR SEWER | EAST 2 STREET, MANHATTAN, FROM STREET AVENUE C TO STREET BEND |
B022024206B33 | 2024-07-24 | 2024-08-07 | PLACE MATERIAL ON STREET | PENNSYLVANIA AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE |
B022024206B34 | 2024-07-24 | 2024-08-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PENNSYLVANIA AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE |
B012024206B99 | 2024-07-24 | 2024-08-07 | REPAIR WATER - PROTECTED | PENNSYLVANIA AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE |
X012024205B10 | 2024-07-23 | 2024-08-20 | REPAIR WATER | SELWYN AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST MT EDEN AVENUE |
X022024205A00 | 2024-07-23 | 2024-08-21 | PLACE MATERIAL ON STREET | LONGFELLOW AVENUE, BRONX, FROM STREET BEND TO STREET JENNINGS STREET |
X022024205B13 | 2024-07-23 | 2024-08-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | SELWYN AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST MT EDEN AVENUE |
X022024205A01 | 2024-07-23 | 2024-08-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | LONGFELLOW AVENUE, BRONX, FROM STREET BEND TO STREET JENNINGS STREET |
X022024205B12 | 2024-07-23 | 2024-08-20 | PLACE MATERIAL ON STREET | SELWYN AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST MT EDEN AVENUE |
X012024205A01 | 2024-07-23 | 2024-08-21 | REPAIR WATER | LONGFELLOW AVENUE, BRONX, FROM STREET BEND TO STREET JENNINGS STREET |
X022024201A00 | 2024-07-19 | 2024-08-11 | PLACE MATERIAL ON STREET | CLIFFORD PLACE, BRONX, FROM STREET TOWNSEND AVENUE TO STREET WALTON AVENUE |
X012024201A00 | 2024-07-19 | 2024-08-11 | REPAIR WATER - PROTECTED | CLIFFORD PLACE, BRONX, FROM STREET TOWNSEND AVENUE TO STREET WALTON AVENUE |
X022024201A01 | 2024-07-19 | 2024-08-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLIFFORD PLACE, BRONX, FROM STREET TOWNSEND AVENUE TO STREET WALTON AVENUE |
M192024200A02 | 2024-07-18 | 2024-07-27 | PLACE TEMPORARY PLATES | WEST 66 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
B012024200A05 | 2024-07-18 | 2024-07-31 | REPAIR SEWER | LORIMER STREET, BROOKLYN, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET |
B012024200D60 | 2024-07-18 | 2024-08-14 | REPAIR WATER - SEWER | 49 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET OLD NEW UTRECHT ROAD |
X022024198B38 | 2024-07-16 | 2024-07-30 | PLACE MATERIAL ON STREET | CARLISLE PLACE, BRONX, FROM STREET EAST 211 STREET TO STREET EAST 213 STREET |
X012024198C42 | 2024-07-16 | 2024-07-30 | REPAIR WATER | CARLISLE PLACE, BRONX, FROM STREET EAST 211 STREET TO STREET EAST 213 STREET |
X022024198B39 | 2024-07-16 | 2024-07-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CARLISLE PLACE, BRONX, FROM STREET EAST 211 STREET TO STREET EAST 213 STREET |
M192024197A16 | 2024-07-15 | 2024-09-02 | PLACE TEMPORARY PLATES | WEST 66 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
M012024197A82 | 2024-07-15 | 2024-07-28 | REPAIR SEWER - PROTECTED | WEST 65 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
B012024196A26 | 2024-07-14 | 2024-08-08 | REPAIR SEWER - PROTECTED | BALTIC STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET NEVINS STREET |
B012024196A25 | 2024-07-14 | 2024-08-10 | REPAIR WATER - SEWER - PROTECTED | FLUSHING AVENUE, BROOKLYN, FROM STREET HARRISON AVENUE TO STREET WHIPPLE STREET |
X022024193A01 | 2024-07-11 | 2024-07-30 | PLACE MATERIAL ON STREET | FAILE STREET, BRONX, FROM STREET ALDUS STREET TO STREET EAST 165 STREET |
X012024193A23 | 2024-07-11 | 2024-07-27 | REPAIR WATER | FAILE STREET, BRONX, FROM STREET ALDUS STREET TO STREET EAST 165 STREET |
X022024193A02 | 2024-07-11 | 2024-08-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FAILE STREET, BRONX, FROM STREET ALDUS STREET TO STREET EAST 165 STREET |
Q012024191B17 | 2024-07-09 | 2024-07-24 | REPAIR WATER | 82 AVENUE, QUEENS, FROM STREET 126 STREET TO STREET QUEENS BOULEVARD |
M012024190B73 | 2024-07-08 | 2024-07-20 | REPAIR SEWER | EAST 2 STREET, MANHATTAN, FROM STREET AVENUE C TO STREET BEND |
X022024189A01 | 2024-07-07 | 2024-07-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VYSE AVENUE, BRONX, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET |
X012024189A00 | 2024-07-07 | 2024-07-25 | REPAIR WATER | VYSE AVENUE, BRONX, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET |
X022024189A00 | 2024-07-07 | 2024-07-31 | PLACE MATERIAL ON STREET | VYSE AVENUE, BRONX, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET |
M012024184C06 | 2024-07-02 | 2024-07-14 | REPAIR SEWER - PROTECTED | WEST 65 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
X022024183B86 | 2024-07-01 | 2024-08-01 | PLACE MATERIAL ON STREET | HONEYWELL AVENUE, BRONX, FROM STREET BRONX PARK SOUTH TO STREET HORNADAY PLACE |
X012024183B98 | 2024-07-01 | 2024-07-27 | REPAIR WATER | HONEYWELL AVENUE, BRONX, FROM STREET BRONX PARK SOUTH TO STREET HORNADAY PLACE |
X012024182A02 | 2024-06-30 | 2024-07-25 | REPAIR WATER | COLLEGE AVENUE, BRONX, FROM STREET EAST 164 STREET TO STREET EAST 165 STREET |
X022024182A03 | 2024-06-30 | 2024-07-31 | PLACE MATERIAL ON STREET | COLLEGE AVENUE, BRONX, FROM STREET EAST 164 STREET TO STREET EAST 165 STREET |
X022024182A04 | 2024-06-30 | 2024-07-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COLLEGE AVENUE, BRONX, FROM STREET EAST 164 STREET TO STREET EAST 165 STREET |
M012024179A75 | 2024-06-27 | 2024-07-10 | REPAIR SEWER | WEST 207 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET 10 AVENUE |
X022024177B34 | 2024-06-25 | 2024-07-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HARROD AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
Q012024177C63 | 2024-06-25 | 2024-07-10 | REPAIR WATER | 82 AVENUE, QUEENS, FROM STREET 126 STREET TO STREET QUEENS BOULEVARD |
B012024177B98 | 2024-06-25 | 2024-07-10 | REPAIR SEWER | LORIMER STREET, BROOKLYN, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET |
B012024177C42 | 2024-06-25 | 2024-07-05 | REPAIR WATER | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE |
X012024177B71 | 2024-06-25 | 2024-07-25 | REPAIR WATER | HARROD AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
B022024177E45 | 2024-06-25 | 2024-07-31 | PLACE MATERIAL ON STREET | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE |
B022024177E46 | 2024-06-25 | 2024-07-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE |
X022024177B33 | 2024-06-25 | 2024-07-31 | PLACE MATERIAL ON STREET | HARROD AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
B022024176E04 | 2024-06-24 | 2024-07-31 | PLACE MATERIAL ON STREET | EAST 95 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET WILLMOHR STREET |
B022024176E05 | 2024-06-24 | 2024-07-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 95 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET WILLMOHR STREET |
B012024176D44 | 2024-06-24 | 2024-07-20 | REPAIR WATER | EAST 95 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET WILLMOHR STREET |
B012024172E16 | 2024-06-20 | 2024-06-28 | REPAIR WATER | 84 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET BAY 16 STREET |
B022024170A25 | 2024-06-18 | 2024-07-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET ALBEMARLE ROAD TO STREET TILDEN AVENUE |
B012024170A60 | 2024-06-18 | 2024-07-05 | REPAIR WATER | BEDFORD AVENUE, BROOKLYN, FROM STREET ALBEMARLE ROAD TO STREET TILDEN AVENUE |
B022024170A24 | 2024-06-18 | 2024-07-24 | PLACE MATERIAL ON STREET | BEDFORD AVENUE, BROOKLYN, FROM STREET ALBEMARLE ROAD TO STREET TILDEN AVENUE |
X012024169A81 | 2024-06-17 | 2024-07-16 | REPAIR SEWER - PROTECTED | CROTONA PARK NORTH, BRONX, FROM STREET CLINTON AVENUE TO STREET PROSPECT AVENUE |
X022024169B67 | 2024-06-17 | 2024-07-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CROTONA PARK NORTH, BRONX, FROM STREET CLINTON AVENUE TO STREET PROSPECT AVENUE |
X022024169B66 | 2024-06-17 | 2024-07-31 | PLACE MATERIAL ON STREET | CROTONA PARK NORTH, BRONX, FROM STREET CLINTON AVENUE TO STREET PROSPECT AVENUE |
X012024168A01 | 2024-06-16 | 2024-07-16 | REPAIR WATER | EAST 162 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET TELLER AVENUE |
X022024168A00 | 2024-06-16 | 2024-07-31 | PLACE MATERIAL ON STREET | EAST 162 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET TELLER AVENUE |
X042024166A07 | 2024-06-14 | 2024-07-09 | REPAIR SIDEWALK | EAST 176 STREET, BRONX, FROM STREET CLAY AVENUE TO STREET TOPPING AVENUE |
M012024162C76 | 2024-06-10 | 2024-06-25 | REPAIR SEWER | WEST 207 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET 10 AVENUE |
X022024162C50 | 2024-06-10 | 2024-07-10 | PLACE MATERIAL ON STREET | EAST 179 STREET, BRONX, FROM STREET DALY AVENUE TO STREET HONEYWELL AVENUE |
X022024162C51 | 2024-06-10 | 2024-07-10 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 179 STREET, BRONX, FROM STREET DALY AVENUE TO STREET HONEYWELL AVENUE |
X012024162B40 | 2024-06-10 | 2024-07-10 | REPAIR SEWER - PROTECTED | EAST 179 STREET, BRONX, FROM STREET DALY AVENUE TO STREET HONEYWELL AVENUE |
M012024161A02 | 2024-06-09 | 2024-06-15 | REPAIR SEWER | EAST 2 STREET, MANHATTAN, FROM STREET AVENUE C TO STREET BEND |
M012024158C19 | 2024-06-06 | 2024-06-30 | REPAIR SEWER - PROTECTED | WEST 65 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
B012024158A62 | 2024-06-06 | 2024-07-05 | REPAIR WATER | MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE |
X022024157A99 | 2024-06-05 | 2024-07-04 | PLACE MATERIAL ON STREET | NELSON AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET FEATHERBED LANE |
X012024157A46 | 2024-06-05 | 2024-07-04 | REPAIR WATER - SEWER | BEDFORD PARK BOULEVARD, BRONX, FROM STREET METRO NORTH RR TO STREET WEBSTER AVENUE |
X012024157A55 | 2024-06-05 | 2024-07-04 | REPAIR WATER | NELSON AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET FEATHERBED LANE |
X012024157A47 | 2024-06-05 | 2024-06-16 | REPAIR WATER - PROTECTED | WEBSTER AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 199 STREET |
X022024157B00 | 2024-06-05 | 2024-07-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NELSON AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET FEATHERBED LANE |
X012024156B30 | 2024-06-04 | 2024-07-03 | REPAIR WATER - SEWER | 3 AVENUE, BRONX, FROM STREET EAST 178 STREET TO STREET EAST 179 STREET |
B012024155A01 | 2024-06-03 | 2024-06-27 | REPAIR SEWER - PROTECTED | EASTERN PARKWAY, BROOKLYN, FROM STREET ROCHESTER AVENUE TO STREET UTICA AVENUE |
X022024150A01 | 2024-05-29 | 2024-06-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLACE AVENUE, BRONX, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE |
X022024150A00 | 2024-05-29 | 2024-06-26 | PLACE MATERIAL ON STREET | WALLACE AVENUE, BRONX, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE |
X012024150A00 | 2024-05-29 | 2024-06-20 | REPAIR WATER - PROTECTED | WALLACE AVENUE, BRONX, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE |
X012024150A95 | 2024-05-29 | 2024-06-19 | REPAIR WATER | FTELEY AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
M012024139A02 | 2024-05-28 | 2024-06-16 | REPAIR SEWER | EAST 36 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET QNS MDTWN TNNL EXIT |
B012024148A03 | 2024-05-27 | 2024-06-07 | REPAIR WATER - PROTECTED | MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
M012024141C37 | 2024-05-20 | 2024-06-01 | REPAIR SEWER | EAST 2 STREET, MANHATTAN, FROM STREET AVENUE C TO STREET BEND |
B022024140A03 | 2024-05-19 | 2024-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 9 AVENUE TO STREET 10 AVENUE |
B012024140A01 | 2024-05-19 | 2024-06-14 | REPAIR WATER - PROTECTED | 51 STREET, BROOKLYN, FROM STREET 9 AVENUE TO STREET 10 AVENUE |
M012024137B08 | 2024-05-16 | 2024-06-16 | REPAIR WATER - SEWER | 2 AVENUE, MANHATTAN, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET |
X012024136A28 | 2024-05-15 | 2024-06-07 | REPAIR SEWER | BEAUMONT AVENUE, BRONX, FROM STREET EAST 183 STREET TO STREET EAST 187 STREET |
M012024135B21 | 2024-05-14 | 2024-06-11 | REPAIR SEWER | WEST 207 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET 10 AVENUE |
M012024134B14 | 2024-05-13 | 2024-06-11 | REPAIR WATER | 9 AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 207 STREET |
B012024133A00 | 2024-05-12 | 2024-05-14 | REPAIR SEWER | LORIMER STREET, BROOKLYN, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET |
Q022024133A00 | 2024-05-12 | 2024-06-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 44 DRIVE, QUEENS, FROM STREET JACKSON AVENUE TO STREET THOMSON AVENUE |
Q012024133A01 | 2024-05-12 | 2024-06-05 | REPAIR SEWER | 44 DRIVE, QUEENS, FROM STREET JACKSON AVENUE TO STREET THOMSON AVENUE |
B022024131C16 | 2024-05-10 | 2024-06-08 | OCCUPANCY OF ROADWAY AS STIPULATED | NEW YORK AVENUE, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE |
B012024130B06 | 2024-05-09 | 2024-05-23 | REPAIR WATER - PROTECTED | STRAUSS STREET, BROOKLYN, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE |
M012024129A27 | 2024-05-08 | 2024-05-11 | REPAIR SEWER | 9 AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 207 STREET |
B012024127D00 | 2024-05-06 | 2024-05-30 | REPAIR SEWER | ROCKWELL PLACE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET FULTON STREET |
B012024127A27 | 2024-05-06 | 2024-05-22 | REPAIR SEWER | 20 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022024127C39 | 2024-05-06 | 2024-05-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ROCKWELL PLACE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET FULTON STREET |
X012024123A36 | 2024-05-02 | 2024-05-10 | REPAIR WATER | HOLLAND AVENUE, BRONX, FROM STREET EAST 213 STREET TO STREET EAST 214 STREET |
M012024121A77 | 2024-04-30 | 2024-05-28 | REPAIR SEWER | 9 AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 207 STREET |
M152024120A28 | 2024-04-29 | 2024-06-05 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | EAST 2 STREET, MANHATTAN, FROM STREET AVENUE C TO STREET BEND |
B012024115B91 | 2024-04-24 | 2024-05-22 | REPAIR SEWER | BOERUM STREET, BROOKLYN, FROM STREET BROADWAY TO STREET LORIMER STREET |
M012024107B73 | 2024-04-16 | 2024-05-01 | REPAIR SEWER | CHRYSTIE STREET, MANHATTAN, FROM STREET RIVINGTON STREET TO STREET STANTON STREET |
B022024107A03 | 2024-04-16 | 2024-05-09 | PLACE MATERIAL ON STREET | STRAUSS STREET, BROOKLYN, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE |
M012024107A49 | 2024-04-16 | 2024-04-26 | REPAIR SEWER | WEST 37 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET AMTRAK RR |
B012024107C22 | 2024-04-16 | 2024-05-14 | REPAIR WATER - SEWER | MOORE STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET WHITE STREET |
X192024107A17 | 2024-04-16 | 2024-07-14 | PLACE TEMPORARY PLATES | INTERVALE AVENUE, BRONX, FROM STREET CHISHOLM STREET TO STREET HOME STREET |
B012024107A02 | 2024-04-16 | 2024-05-09 | REPAIR WATER - PROTECTED | STRAUSS STREET, BROOKLYN, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE |
M192024107A23 | 2024-04-16 | 2024-07-14 | PLACE TEMPORARY PLATES | WEST 66 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
B012024103A00 | 2024-04-12 | 2024-05-08 | REPAIR WATER - SEWER - PROTECTED | 58 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE |
X012024103A00 | 2024-04-12 | 2024-05-09 | REPAIR WATER - PROTECTED | WEST 174 STREET, BRONX, FROM STREET DAVIDSON AVENUE TO STREET GRAND AVENUE |
X022024103A00 | 2024-04-12 | 2024-05-09 | PLACE MATERIAL ON STREET | WEST 174 STREET, BRONX, FROM STREET DAVIDSON AVENUE TO STREET GRAND AVENUE |
X022024103A01 | 2024-04-12 | 2024-04-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 174 STREET, BRONX, FROM STREET DAVIDSON AVENUE TO STREET GRAND AVENUE |
B012024100B58 | 2024-04-09 | 2024-04-16 | REPAIR WATER | PENNSYLVANIA AVENUE, BROOKLYN, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE |
X012024098A02 | 2024-04-07 | 2024-05-02 | REPAIR WATER | EAST 183 STREET, BRONX, FROM STREET CROTONA AVENUE TO STREET PROSPECT AVENUE |
B012024095A92 | 2024-04-04 | 2024-04-30 | REPAIR SEWER | NEW YORK AVENUE, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE |
B012024092E94 | 2024-04-01 | 2024-04-12 | REPAIR WATER - SEWER - PROTECTED | 48 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
M022024092F47 | 2024-04-01 | 2024-04-22 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST END AVENUE, MANHATTAN, FROM STREET WEST 85 STREET TO STREET WEST 86 STREET |
X012024091A00 | 2024-03-31 | 2024-04-10 | TRIBUTARY INSTALL - GAS | INTERVALE AVENUE, BRONX, FROM STREET CHISHOLM STREET TO STREET HOME STREET |
X012024091A01 | 2024-03-31 | 2024-04-27 | REPAIR WATER | PROSPECT AVENUE, BRONX, FROM STREET EAST 175 STREET TO STREET EAST 176 STREET |
M012024091A01 | 2024-03-31 | 2024-04-17 | REPAIR SEWER | CHRYSTIE STREET, MANHATTAN, FROM STREET RIVINGTON STREET TO STREET STANTON STREET |
X012024088C13 | 2024-03-28 | 2024-04-25 | REPAIR WATER | NELSON AVENUE, BRONX, FROM STREET BRANDT PLACE TO STREET MACOMBS ROAD |
B012024087C00 | 2024-03-27 | 2024-04-25 | REPAIR WATER - SEWER | LEONARD STREET, BROOKLYN, FROM STREET SCHOLES STREET TO STREET STAGG STREET |
B012024086A82 | 2024-03-26 | 2024-04-18 | REPAIR WATER - PROTECTED | HERZL STREET, BROOKLYN, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE |
X012024085A52 | 2024-03-25 | 2024-04-23 | REPAIR WATER | TELLER AVENUE, BRONX, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET |
M012024080B63 | 2024-03-20 | 2024-04-17 | REPAIR SEWER | CHRYSTIE STREET, MANHATTAN, FROM STREET RIVINGTON STREET TO STREET STANTON STREET |
X012024079B47 | 2024-03-19 | 2024-04-18 | REPAIR WATER - PROTECTED | POPHAM AVENUE, BRONX, FROM STREET WEST 175 STREET TO STREET WEST 176 STREET |
X012024079B10 | 2024-03-19 | 2024-04-17 | REPAIR WATER | BUCK STREET, BRONX, FROM STREET SEDDON STREET TO STREET ZEREGA AVENUE |
B012024078D18 | 2024-03-18 | 2024-03-29 | REPAIR WATER - SEWER | DITMAS AVENUE, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE |
B012024078D19 | 2024-03-18 | 2024-03-25 | REPAIR WATER - SEWER | 55 STREET, BROOKLYN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012024078C60 | 2024-03-18 | 2024-04-16 | REPAIR SEWER | 9 AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 207 STREET |
M012024078C59 | 2024-03-18 | 2024-04-14 | TEST PITS, CORES OR BORING | WEST 66 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
M012024075B34 | 2024-03-15 | 2024-03-30 | REPAIR SEWER - PROTECTED | 3 AVENUE, MANHATTAN, FROM STREET EAST 60 STREET TO STREET EAST 61 STREET |
X012024075B04 | 2024-03-15 | 2024-04-12 | REPAIR WATER | FINDLAY AVENUE, BRONX, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET |
M012024074D60 | 2024-03-14 | 2024-04-09 | REPAIR SEWER | WEST 37 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET AMTRAK RR |
X012024073A85 | 2024-03-13 | 2024-04-10 | REPAIR WATER | EAST 176 STREET, BRONX, FROM STREET CLAY AVENUE TO STREET TOPPING AVENUE |
X012024072A72 | 2024-03-12 | 2024-03-29 | REPAIR WATER - PROTECTED | HEATH AVENUE, BRONX, FROM STREET WEST 229 STREET TO STREET WEST KINGSBRIDGE ROAD |
Q012024071A00 | 2024-03-11 | 2024-04-09 | REPAIR WATER - SEWER - PROTECTED | 30 AVENUE, QUEENS, FROM STREET 23 STREET TO STREET 25 STREET |
B012024071C19 | 2024-03-11 | 2024-03-26 | REPAIR WATER | METROPOLITAN AVENUE, BROOKLYN, FROM STREET OLIVE STREET TO STREET ORIENT AVENUE |
Q012024067B60 | 2024-03-07 | 2024-04-04 | REPAIR WATER - SEWER - PROTECTED | DITMARS BOULEVARD, QUEENS, FROM STREET 27 STREET TO STREET 28 STREET |
M012024067A39 | 2024-03-07 | 2024-04-06 | REPAIR WATER - SEWER | 2 AVENUE, MANHATTAN, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET |
B012024066D30 | 2024-03-06 | 2024-03-19 | REPAIR SEWER - PROTECTED | ST JOHNS PLACE, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE |
B012024065A41 | 2024-03-05 | 2024-03-12 | REPAIR WATER | METROPOLITAN AVENUE, BROOKLYN, FROM STREET OLIVE STREET TO STREET ORIENT AVENUE |
B012024064D27 | 2024-03-04 | 2024-03-29 | REPAIR SEWER - PROTECTED | 4 AVENUE, BROOKLYN, FROM STREET 1 STREET TO STREET GARFIELD PLACE |
X012024064B36 | 2024-03-04 | 2024-03-28 | REPAIR SEWER | VILLA AVENUE, BRONX, FROM STREET EAST 205 STREET TO STREET VAN CORTLANDT AVENUE EAST |
B012024060C14 | 2024-02-29 | 2024-03-29 | REPAIR WATER - SEWER - PROTECTED | 48 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
X012024059A67 | 2024-02-28 | 2024-03-26 | REPAIR SEWER | DECATUR AVENUE, BRONX, FROM STREET EAST 195 STREET TO STREET EAST 197 STREET |
M012024059A99 | 2024-02-28 | 2024-03-13 | REPAIR SEWER | 1 AVENUE, MANHATTAN, FROM STREET EAST 36 STREET TO STREET EAST 37 STREET |
B012024059B82 | 2024-02-28 | 2024-03-28 | REPAIR WATER | DEAN STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B012024058B58 | 2024-02-27 | 2024-03-23 | REPAIR WATER | LINDEN BOULEVARD, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
X012024057B66 | 2024-02-26 | 2024-03-27 | TRIBUTARY INSTALL - GAS | INTERVALE AVENUE, BRONX, FROM STREET CHISHOLM STREET TO STREET HOME STREET |
M012024057D18 | 2024-02-26 | 2024-03-16 | REPAIR SEWER - PROTECTED | 3 AVENUE, MANHATTAN, FROM STREET EAST 60 STREET TO STREET EAST 61 STREET |
M012024054A40 | 2024-02-23 | 2024-03-21 | REPAIR SEWER | EAST 2 STREET, MANHATTAN, FROM STREET AVENUE C TO STREET BEND |
X012024053A76 | 2024-02-22 | 2024-03-21 | REPAIR WATER - SEWER | RYER AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST BURNSIDE AVENUE |
B012024053B95 | 2024-02-22 | 2024-03-15 | REPAIR SEWER - PROTECTED | FARRAGUT ROAD, BROOKLYN, FROM STREET FLATBUSH AVENUE TO STREET KENILWORTH PLACE |
B012024052C28 | 2024-02-21 | 2024-03-15 | REPAIR WATER - SEWER | DITMAS AVENUE, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE |
X012024051B43 | 2024-02-20 | 2024-03-19 | REPAIR WATER | KELLY STREET, BRONX, FROM STREET EAST 156 STREET TO STREET LONGWOOD AVENUE |
Q012024050A23 | 2024-02-19 | 2024-03-19 | REPAIR WATER - SEWER | BEACH 19 STREET, QUEENS, FROM STREET CORNAGA AVENUE TO STREET MOTT AVENUE |
M192024047A02 | 2024-02-16 | 2024-04-30 | PLACE TEMPORARY PLATES | 3 AVENUE, MANHATTAN, FROM STREET EAST 60 STREET TO STREET EAST 61 STREET |
M012024046A41 | 2024-02-15 | 2024-03-01 | TEST PITS, CORES OR BORING | WEST 66 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
X012024046B42 | 2024-02-15 | 2024-03-16 | REPAIR WATER | TELLER AVENUE, BRONX, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE |
X012024046B41 | 2024-02-15 | 2024-03-15 | REPAIR WATER - SEWER | SEDGWICK AVENUE, BRONX, FROM STREET BEND TO STREET STEVENSON PLACE |
X012024045A94 | 2024-02-14 | 2024-03-14 | REPAIR WATER - SEWER - PROTECTED | HENRY HUDSON PARKWAY, BRONX, FROM STREET WEST 231 STREET TO STREET WEST 232 STREET |
X012024045A95 | 2024-02-14 | 2024-02-29 | REPAIR WATER - PROTECTED | LONGFELLOW AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET |
X012024044A29 | 2024-02-13 | 2024-02-26 | TRIBUTARY INSTALL - GAS | INTERVALE AVENUE, BRONX, FROM STREET CHISHOLM STREET TO STREET HOME STREET |
B012024044B33 | 2024-02-13 | 2024-03-13 | REPAIR WATER | LORIMER STREET, BROOKLYN, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET |
X002024044A00 | 2024-02-13 | No data | MISCELLANEOUS - MINOR SALES | No data |
X012024036A82 | 2024-02-05 | 2024-03-02 | C.A.R. RESTORATION | BROADWAY, BRONX, FROM STREET BOROUGH BOUNDARY TO STREET WEST 262 STREET |
X012024036A80 | 2024-02-05 | 2024-03-05 | REPAIR WATER | FINDLAY AVENUE, BRONX, FROM STREET EAST 164 STREET TO STREET EAST 165 STREET |
B012024033A87 | 2024-02-02 | 2024-03-05 | REPAIR SEWER - PROTECTED | ST JOHNS PLACE, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE |
M012024032B46 | 2024-02-01 | 2024-02-28 | REPAIR SEWER | 1 AVENUE, MANHATTAN, FROM STREET EAST 36 STREET TO STREET EAST 37 STREET |
X012024032B48 | 2024-02-01 | 2024-03-02 | REPAIR WATER | MULINER AVENUE, BRONX, FROM STREET LYDIG AVENUE TO STREET PELHAM PARKWAY |
B012024030B97 | 2024-01-30 | 2024-02-27 | REPAIR SEWER | LORIMER STREET, BROOKLYN, FROM STREET MESEROLE STREET TO STREET MONTROSE AVENUE |
X012024029A90 | 2024-01-29 | 2024-03-09 | REPAIR SEWER | EAST 215 STREET, BRONX, FROM STREET HOLLAND AVENUE TO STREET WHITE PLAINS ROAD |
B012024029C13 | 2024-01-29 | 2024-02-27 | REPAIR WATER | PENNSYLVANIA AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE |
B012024026C09 | 2024-01-26 | 2024-02-24 | REPAIR WATER - SEWER | 1 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET |
B012024026C08 | 2024-01-26 | 2024-02-24 | REPAIR WATER - SEWER | 55 STREET, BROOKLYN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012024025A07 | 2024-01-25 | 2024-02-16 | TEST PITS, CORES OR BORING | WEST 66 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
X012023348A76 | 2024-01-25 | 2023-12-18 | REPAIR WATER | GODWIN TERRACE, BRONX, FROM STREET KIMBERLY PLACE TO STREET WEST 231 STREET |
X012024025A26 | 2024-01-25 | 2024-02-22 | REPAIR WATER - PROTECTED | GRAND AVENUE, BRONX, FROM STREET WEST 174 STREET TO STREET WEST 175 STREET |
M012024025B01 | 2024-01-25 | 2024-02-17 | REPAIR SEWER - PROTECTED | 3 AVENUE, MANHATTAN, FROM STREET EAST 60 STREET TO STREET EAST 61 STREET |
X012024018B40 | 2024-01-23 | 2024-02-16 | REPAIR WATER | EAST 135 STREET, BRONX, FROM STREET WILLIS AVENUE BRIDGE TO STREET MAJOR DEEGAN EXPWY ET 2 NB |
M012024023A90 | 2024-01-23 | 2024-02-18 | REPAIR SEWER | 1 AVENUE, MANHATTAN, FROM STREET EAST 36 STREET TO STREET EAST 37 STREET |
X012024022A95 | 2024-01-22 | 2024-02-21 | REPAIR SEWER | FINDLAY AVENUE, BRONX, FROM STREET BEND TO STREET EAST 169 STREET |
B012024021A04 | 2024-01-21 | 2024-02-20 | REPAIR WATER - SEWER | KENT AVENUE, BROOKLYN, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET |
X012024017A56 | 2024-01-17 | 2024-02-09 | REPAIR SEWER | EAST 215 STREET, BRONX, FROM STREET HOLLAND AVENUE TO STREET WHITE PLAINS ROAD |
X012024017A55 | 2024-01-17 | 2024-02-15 | REPAIR WATER - PROTECTED | LONGFELLOW AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET |
X012024017A52 | 2024-01-17 | 2024-02-12 | TRIBUTARY INSTALL - GAS | INTERVALE AVENUE, BRONX, FROM STREET CHISHOLM STREET TO STREET HOME STREET |
B192024014A02 | 2024-01-14 | 2024-03-31 | PLACE TEMPORARY PLATES | LORIMER STREET, BROOKLYN, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET |
X012024011A00 | 2024-01-11 | 2024-02-09 | REPAIR SEWER | WALTON AVENUE, BRONX, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET |
B012024009B70 | 2024-01-09 | 2024-02-07 | REPAIR WATER | CLINTON STREET, BROOKLYN, FROM STREET BRYANT STREET TO STREET HALLECK STREET |
B012024008C21 | 2024-01-08 | 2024-01-30 | REPAIR WATER - SEWER | FRANKLIN AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE |
X012024007A01 | 2024-01-07 | 2024-02-01 | REPAIR WATER | PROSPECT AVENUE, BRONX, FROM STREET DEAD END TO STREET EAST 187 STREET |
X012024007A02 | 2024-01-07 | 2024-02-01 | REPAIR WATER | COLLEGE AVENUE, BRONX, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET |
Q012024002C92 | 2024-01-02 | 2024-01-17 | C.A.R. RESTORATION | HILLSIDE AVENUE, QUEENS, FROM STREET 153 STREET TO STREET PARSONS BOULEVARD |
B012024002C11 | 2024-01-02 | 2024-01-13 | REPAIR WATER - SEWER | EAST 4 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET AVENUE F |
X012024002B32 | 2024-01-02 | 2024-01-17 | REPAIR WATER - SEWER | BROADWAY, BRONX, FROM STREET BOROUGH BOUNDARY TO STREET WEST 262 STREET |
X012024002B31 | 2024-01-02 | 2024-01-17 | REPAIR WATER | ELDER AVENUE, BRONX, FROM STREET BRONX RIVER AVENUE TO STREET EAST 172 STREET |
X012024002B30 | 2024-01-02 | 2024-01-12 | REPAIR WATER - PROTECTED | VYSE AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET |
X012024002B29 | 2024-01-02 | 2024-01-13 | TRIBUTARY INSTALL - GAS | INTERVALE AVENUE, BRONX, FROM STREET CHISHOLM STREET TO STREET HOME STREET |
X012023363A60 | 2023-12-29 | 2024-01-17 | REPAIR WATER | EAST 223 STREET, BRONX, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD |
M192023363A06 | 2023-12-29 | 2024-03-30 | PLACE TEMPORARY PLATES | 3 AVENUE, MANHATTAN, FROM STREET EAST 60 STREET TO STREET EAST 61 STREET |
X012023361A60 | 2023-12-27 | 2024-01-17 | REPAIR WATER | CRESTON AVENUE, BRONX, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET |
B012023359A00 | 2023-12-25 | 2024-01-13 | REPAIR WATER | ATLANTIC AVENUE, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE |
B012023358A02 | 2023-12-24 | 2024-01-07 | REPAIR WATER | LORIMER STREET, BROOKLYN, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET |
Q012023354A96 | 2023-12-20 | 2023-12-30 | REPAIR WATER - SEWER | 70 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET QUEENS BOULEVARD |
M012023353A58 | 2023-12-19 | 2024-01-16 | TEST PITS, CORES OR BORING | WEST 66 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
B012023349C43 | 2023-12-15 | 2023-12-30 | REPAIR WATER - SEWER - PROTECTED | 62 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
M012023349A42 | 2023-12-15 | 2024-01-12 | REPAIR WATER - SEWER - PROTECTED | WEST 19 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M192023348A15 | 2023-12-14 | 2024-01-17 | PLACE TEMPORARY PLATES | WEST 66 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
Q012023348C01 | 2023-12-14 | 2024-01-13 | REPAIR WATER - SEWER | 24 STREET, QUEENS, FROM STREET 42 ROAD TO STREET QNSBO BR UP RY APPROACH |
X012023346B10 | 2023-12-12 | 2024-01-10 | REPAIR WATER - SEWER | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
Q012023340A94 | 2023-12-12 | 2023-12-08 | REPAIR WATER | BEACH 19 STREET, QUEENS, FROM STREET PLAINVIEW AVENUE TO STREET SEAGIRT BOULEVARD |
X012023341B82 | 2023-12-07 | 2023-12-31 | REPAIR WATER | WEST 174 STREET, BRONX, FROM STREET MACOMBS ROAD TO STREET NELSON AVENUE |
X012023338A80 | 2023-12-04 | 2023-12-31 | TRIBUTARY INSTALL - GAS | INTERVALE AVENUE, BRONX, FROM STREET CHISHOLM STREET TO STREET HOME STREET |
B012023337A06 | 2023-12-03 | 2023-12-30 | REPAIR WATER - SEWER | EAST 4 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET AVENUE F |
X012023334A93 | 2023-11-30 | 2023-12-29 | REPAIR WATER - PROTECTED | VYSE AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET |
X012023334A92 | 2023-11-30 | 2023-12-28 | REPAIR WATER - SEWER | ALBANY CRESCENT, BRONX, FROM STREET BEND TO STREET WEST 233 STREET |
B012023333A34 | 2023-11-29 | 2023-12-12 | REPAIR WATER - SEWER | MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE |
X012023333B36 | 2023-11-29 | 2023-12-27 | REPAIR WATER | UNIVERSITY AVENUE, BRONX, FROM STREET RESERVOIR AVENUE TO STREET WEST 197 STREET |
B012023332C03 | 2023-11-28 | 2023-12-24 | REPAIR WATER | LORIMER STREET, BROOKLYN, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET |
Q012023332E33 | 2023-11-28 | 2023-12-16 | REPAIR WATER - SEWER | 70 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET QUEENS BOULEVARD |
X012023332B66 | 2023-11-28 | 2023-12-28 | REPAIR WATER | HALPERIN AVENUE, BRONX, FROM STREET BLONDELL AVENUE TO STREET WILLIAMSBRIDGE ROAD |
X012023331A98 | 2023-11-27 | 2023-12-13 | REPAIR WATER | CROTONA AVENUE, BRONX, FROM STREET EAST 187 STREET TO STREET EAST 189 STREET |
X012023328A00 | 2023-11-24 | 2023-12-16 | REPAIR WATER - SEWER | BAINBRIDGE AVENUE, BRONX, FROM STREET EAST 204 STREET TO STREET EAST 206 STREET |
B012023325C27 | 2023-11-21 | 2023-12-03 | REPAIR SEWER | LORIMER STREET, BROOKLYN, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET |
B012023325C28 | 2023-11-21 | 2023-12-19 | REPAIR WATER - SEWER | 6 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET 63 STREET |
X012023325A58 | 2023-11-21 | 2023-12-13 | REPAIR WATER | CRUGER AVENUE, BRONX, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE |
M012023325B08 | 2023-11-21 | 2023-12-13 | TEST PITS, CORES OR BORING | WEST 66 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
X012023321A47 | 2023-11-17 | 2023-12-13 | REPAIR WATER | MORRIS PARK AVENUE, BRONX, FROM STREET FILLMORE STREET TO STREET GARFIELD STREET |
B012023321B27 | 2023-11-17 | 2023-12-16 | REPAIR WATER - SEWER - PROTECTED | 62 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
Q012023320A63 | 2023-11-16 | 2023-12-13 | REPAIR WATER - SEWER | 40 ROAD, QUEENS, FROM STREET 29 STREET TO STREET NORTHERN BOULEVARD |
X012023319A00 | 2023-11-15 | 2023-12-08 | REPAIR WATER | VAN CORTLANDT AVENUE EAST, BRONX, FROM STREET BAINBRIDGE AVENUE TO STREET ROCHAMBEAU AVENUE |
X012023317A62 | 2023-11-13 | 2023-12-13 | REPAIR WATER - SEWER | INWOOD AVENUE, BRONX, FROM STREET CLARKE PLACE WEST TO STREET WEST 169 STREET |
M012023314A00 | 2023-11-10 | 2023-11-14 | REPAIR SEWER - PROTECTED | 3 AVENUE, MANHATTAN, FROM STREET EAST 60 STREET TO STREET EAST 61 STREET |
M192023312A16 | 2023-11-08 | 2023-12-31 | PLACE TEMPORARY PLATES | 3 AVENUE, MANHATTAN, FROM STREET EAST 60 STREET TO STREET EAST 61 STREET |
B192023312A04 | 2023-11-08 | 2023-12-31 | PLACE TEMPORARY PLATES | LORIMER STREET, BROOKLYN, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET |
X012023310A27 | 2023-11-06 | 2023-12-01 | REPAIR WATER | WARD AVENUE, BRONX, FROM STREET WATSON AVENUE TO STREET WESTCHESTER AVENUE |
M012023306A69 | 2023-11-02 | 2023-12-01 | REPAIR WATER | EAST 14 STREET, MANHATTAN, FROM STREET AVENUE B TO STREET AVENUE C |
B012023304B47 | 2023-10-31 | 2023-11-28 | REPAIR WATER - SEWER | MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE |
B012023304B48 | 2023-10-31 | 2023-11-25 | REPAIR WATER | QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE |
M002023304A03 | 2023-10-31 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
M002023304A04 | 2023-10-31 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
M012023304A58 | 2023-10-31 | 2023-11-14 | TEST PITS, CORES OR BORING | WEST 66 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
Q012023303D23 | 2023-10-30 | 2023-11-13 | REPAIR WATER - PROTECTED | DARTMOUTH STREET, QUEENS, FROM STREET 68 AVENUE TO STREET 69 AVENUE |
M002023300A23 | 2023-10-27 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
M022023297C35 | 2023-10-24 | 2023-11-30 | OCCUPANCY OF ROADWAY AS STIPULATED | AVENUE C, MANHATTAN, FROM STREET EAST 13 STREET TO STREET EAST 14 STREET |
X012023293A01 | 2023-10-20 | 2023-11-18 | REPAIR WATER - SEWER - PROTECTED | EAST 141 STREET, BRONX, FROM STREET CONCORD AVENUE TO STREET WALES AVENUE |
X012023293A00 | 2023-10-20 | 2023-11-18 | REPAIR WATER | BRUCKNER BOULEVARD, BRONX, FROM STREET EAST 141 STREET TO STREET WALES AVENUE |
B012023293B10 | 2023-10-20 | 2023-11-19 | REPAIR SEWER | LORIMER STREET, BROOKLYN, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET |
X012023290A85 | 2023-10-17 | 2023-11-16 | REPAIR SEWER | PROSPECT AVENUE, BRONX, FROM STREET EAST 183 STREET TO STREET EAST 185 STREET |
X012023289B38 | 2023-10-16 | 2023-11-14 | REPAIR WATER - SEWER - PROTECTED | EAST 138 STREET, BRONX, FROM STREET BRE EASTBOUND ENTRANCE E 138 ST TO STREET WILLOW AVENUE |
Q012023289C41 | 2023-10-16 | 2023-11-16 | REPAIR WATER - SEWER | 69 STREET, QUEENS, FROM STREET 56 ROAD TO STREET HULL AVENUE |
M012023287A00 | 2023-10-14 | 2023-11-10 | REPAIR SEWER - PROTECTED | 3 AVENUE, MANHATTAN, FROM STREET EAST 60 STREET TO STREET EAST 61 STREET |
X012023284C13 | 2023-10-11 | 2023-11-09 | REPAIR WATER | ORLOFF AVENUE, BRONX, FROM STREET BEND TO STREET CHARLES HALLEY PLACE |
B012023282A31 | 2023-10-09 | 2023-10-24 | REPAIR WATER - SEWER | BEAUMONT STREET, BROOKLYN, FROM STREET HAMPTON AVENUE TO STREET ORIENTAL BOULEVARD |
B012023279A32 | 2023-10-06 | 2023-10-20 | REPAIR SEWER | LORIMER STREET, BROOKLYN, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET |
X012023278A01 | 2023-10-05 | 2023-10-31 | REPAIR WATER | RADCLIFF AVENUE, BRONX, FROM STREET ARNOW AVENUE TO STREET BOSTON ROAD |
X012023278A00 | 2023-10-05 | 2023-10-31 | REPAIR SEWER | WILLIAMSBRIDGE ROAD, BRONX, FROM STREET BOSTON ROAD TO STREET BRONXWOOD AVENUE |
Q012023274A01 | 2023-10-03 | 2023-10-30 | REPAIR WATER - PROTECTED | DARTMOUTH STREET, QUEENS, FROM STREET 68 AVENUE TO STREET 69 AVENUE |
M012023275A59 | 2023-10-02 | 2023-10-26 | REPAIR WATER - SEWER | EAST 77 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET YORK AVENUE |
M012023275A58 | 2023-10-02 | 2023-10-25 | REPAIR WATER | WEST 47 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET BROADWAY |
M012023275A16 | 2023-10-02 | 2023-10-27 | REPAIR WATER | STATE STREET, MANHATTAN, FROM STREET BRIDGE STREET TO STREET PEARL STREET |
X012023272A24 | 2023-09-29 | 2023-10-08 | REPAIR WATER - SEWER | STRANG AVENUE, BRONX, FROM STREET BAYCHESTER AVENUE TO STREET EDSON AVENUE |
M012023272A27 | 2023-09-29 | 2023-10-23 | REPAIR WATER - SEWER | WEST 142 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET RIVERSIDE DRIVE |
M012023272A14 | 2023-09-29 | 2023-10-13 | REPAIR WATER - SEWER | WEST 126 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
X012023271B57 | 2023-09-28 | 2023-10-24 | REPAIR WATER - SEWER - PROTECTED | UNDERCLIFF AVENUE, BRONX, FROM STREET WEST 175 STREET TO STREET WEST 176 STREET |
X012023269C87 | 2023-09-26 | 2023-10-25 | REPAIR WATER | BECK STREET, BRONX, FROM STREET EAST 156 STREET TO STREET LONGWOOD AVENUE |
X012023268B73 | 2023-09-25 | 2023-10-24 | REPAIR WATER - SEWER | EAST 170 STREET, BRONX, FROM STREET BRISTOW STREET TO STREET PROSPECT AVENUE |
X012023265A18 | 2023-09-22 | 2023-10-05 | REPAIR WATER - PROTECTED | COSTER STREET, BRONX, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE |
X012023265B15 | 2023-09-22 | 2023-10-24 | REPAIR WATER | EAST 153 STREET, BRONX, FROM STREET ELTON AVENUE TO STREET MELROSE AVENUE |
X012023265A42 | 2023-09-22 | 2023-10-24 | REPAIR WATER - SEWER | ELTON AVENUE, BRONX, FROM STREET EAST 153 STREET TO STREET 3 AVENUE |
Q012023265C17 | 2023-09-22 | 2023-10-15 | REPAIR WATER | HILLSIDE AVENUE, QUEENS, FROM STREET 153 STREET TO STREET PARSONS BOULEVARD |
B012023265C71 | 2023-09-22 | 2023-10-06 | REPAIR SEWER | LORIMER STREET, BROOKLYN, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET |
Q012023262A01 | 2023-09-19 | 2023-10-17 | REPAIR WATER | HILLSIDE AVENUE, QUEENS, FROM STREET 153 STREET TO STREET PARSONS BOULEVARD |
B012023261A30 | 2023-09-18 | 2023-09-22 | REPAIR SEWER | LORIMER STREET, BROOKLYN, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET |
B012023260A00 | 2023-09-17 | 2023-10-14 | REPAIR WATER - SEWER | STERLING PLACE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
X012023256A84 | 2023-09-13 | 2023-10-10 | REPAIR WATER - PROTECTED | JESUP AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET FEATHERBED LANE |
X012023251A44 | 2023-09-11 | 2023-10-06 | REPAIR WATER | EAST 176 STREET, BRONX, FROM STREET CLAY AVENUE TO STREET TOPPING AVENUE |
M012023251A90 | 2023-09-08 | 2023-10-07 | REPAIR SEWER - PROTECTED | AVENUE C, MANHATTAN, FROM STREET EAST 13 STREET TO STREET EAST 14 STREET |
M012023251A91 | 2023-09-08 | 2023-09-18 | REPAIR WATER | WEST 47 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET BROADWAY |
M012023248B21 | 2023-09-05 | 2023-09-29 | REPAIR WATER - SEWER | WEST 126 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012023247A03 | 2023-09-04 | 2023-09-29 | REPAIR WATER - SEWER | EAST 87 STREET, BROOKLYN, FROM STREET FLATLANDS AVENUE TO STREET GLENWOOD ROAD |
X012023242B39 | 2023-08-30 | 2023-09-28 | REPAIR WATER | EAST 176 STREET, BRONX, FROM STREET CLAY AVENUE TO STREET TOPPING AVENUE |
M012023242B21 | 2023-08-30 | 2023-09-23 | REPAIR WATER - SEWER | WEST 142 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET RIVERSIDE DRIVE |
X012023241B51 | 2023-08-29 | 2023-09-26 | REPAIR WATER - SEWER | EAST 170 STREET, BRONX, FROM STREET BOSTON ROAD TO STREET CROTONA AVENUE |
X012023240B47 | 2023-08-28 | 2023-09-21 | REPAIR WATER - PROTECTED | COSTER STREET, BRONX, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE |
M012023235C38 | 2023-08-23 | 2023-09-07 | REPAIR SEWER - PROTECTED | AVENUE C, MANHATTAN, FROM STREET EAST 13 STREET TO STREET EAST 14 STREET |
S012023232A01 | 2023-08-23 | 2023-09-18 | REPAIR WATER | HAROLD STREET, STATEN ISLAND, FROM STREET ELVIN STREET TO STREET FANNING STREET |
X012023230A25 | 2023-08-18 | 2023-09-15 | REPAIR WATER - SEWER | STRANG AVENUE, BRONX, FROM STREET BAYCHESTER AVENUE TO STREET EDSON AVENUE |
X012023230A30 | 2023-08-18 | 2023-09-16 | REPAIR WATER | CANNON PLACE, BRONX, FROM STREET BEND TO STREET BEND |
M012023228A72 | 2023-08-16 | 2023-09-04 | REPAIR WATER | WEST 47 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET BROADWAY |
X012023218A01 | 2023-08-06 | 2023-09-02 | REPAIR WATER - PROTECTED | EAST 132 STREET, BRONX, FROM STREET BROOK AVENUE TO STREET ST ANNS AVENUE |
X012023218A00 | 2023-08-06 | 2023-09-01 | REPAIR WATER - PROTECTED | WYTHE PLACE, BRONX, FROM STREET EAST 170 STREET TO STREET EAST 171 STREET |
M012023216B32 | 2023-08-04 | 2023-08-16 | REPAIR WATER | WEST 47 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET BROADWAY |
B012023209B16 | 2023-07-28 | 2023-08-25 | REPAIR WATER - SEWER | CHURCH AVENUE, BROOKLYN, FROM STREET 36 STREET TO STREET CHESTER AVENUE |
B012023209B17 | 2023-07-28 | 2023-08-25 | REPAIR WATER - SEWER | 59 STREET, BROOKLYN, FROM STREET 10 AVENUE TO STREET 11 AVENUE |
X012023208A38 | 2023-07-27 | 2023-08-16 | REPAIR SEWER - PROTECTED | BRUCKNER BOULEVARD, BRONX, FROM STREET BROOK AVENUE TO STREET ST ANNS AVENUE |
M012023206B45 | 2023-07-25 | 2023-08-24 | REPAIR SEWER - PROTECTED | AVENUE C, MANHATTAN, FROM STREET EAST 13 STREET TO STREET EAST 14 STREET |
Q012023205A38 | 2023-07-24 | 2023-08-02 | REPAIR SEWER | 70 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET QUEENS BOULEVARD |
M012023201A02 | 2023-07-20 | 2023-07-28 | REPAIR WATER - SEWER | WEST 128 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET LENOX AVENUE |
B012023201C58 | 2023-07-20 | 2023-08-02 | REPAIR WATER - SEWER | 84 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET BAY 16 STREET |
M012023197A05 | 2023-07-16 | 2023-08-02 | REPAIR WATER | WEST 47 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET BROADWAY |
Q012023197A03 | 2023-07-16 | 2023-08-02 | C.A.R. RESTORATION | HILLSIDE AVENUE, QUEENS, FROM STREET 240 STREET TO STREET CREEDMOOR HOSPITAL BOUNDARY |
B012023194D01 | 2023-07-13 | 2023-08-02 | REPAIR WATER - SEWER | AVENUE M, BROOKLYN, FROM STREET DAHILL ROAD TO STREET MC DONALD AVENUE |
Q012023191B87 | 2023-07-10 | 2023-07-20 | REPAIR SEWER | 70 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET QUEENS BOULEVARD |
Q012023191B88 | 2023-07-10 | 2023-07-20 | REPAIR SEWER | 47 AVENUE, QUEENS, FROM STREET 70 STREET TO STREET 72 STREET |
M012023191B97 | 2023-07-10 | 2023-07-25 | REPAIR SEWER - PROTECTED | AVENUE C, MANHATTAN, FROM STREET EAST 13 STREET TO STREET EAST 14 STREET |
X012023175A01 | 2023-07-05 | 2023-07-23 | REPAIR WATER | PROVOST AVENUE, BRONX, FROM STREET CITY LIMIT TO STREET EAST 233 STREET |
M012023184A66 | 2023-07-03 | 2023-07-16 | REPAIR WATER | WEST 47 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET BROADWAY |
S012023179A74 | 2023-06-28 | 2023-07-27 | REPAIR WATER - SEWER | FOREST AVENUE, STATEN ISLAND, FROM STREET ELIZABETH GROVE ROAD TO STREET MEEKER AVENUE |
X012023179B21 | 2023-06-28 | 2023-07-25 | REPAIR SEWER - PROTECTED | BRUCKNER BOULEVARD, BRONX, FROM STREET BROOK AVENUE TO STREET ST ANNS AVENUE |
M012023178C04 | 2023-06-27 | 2023-07-18 | REPAIR WATER - SEWER | 1 AVENUE, MANHATTAN, FROM STREET EAST 2 STREET TO STREET EAST 3 STREET |
M012023178C03 | 2023-06-27 | 2023-07-19 | REPAIR WATER - SEWER | EAST 2 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET MARBLE CEMETERY BOUNDARY |
X012023176A01 | 2023-06-25 | 2023-07-21 | REPAIR WATER | EAST 181 STREET, BRONX, FROM STREET CLINTON AVENUE TO STREET CROTONA AVENUE |
M012023174A73 | 2023-06-23 | 2023-07-11 | REPAIR SEWER - PROTECTED | AVENUE C, MANHATTAN, FROM STREET EAST 13 STREET TO STREET EAST 14 STREET |
M012023172C04 | 2023-06-21 | 2023-07-14 | REPAIR WATER - SEWER | EAST 117 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
M012023168A11 | 2023-06-17 | 2023-06-21 | REPAIR SEWER - PROTECTED | AVENUE C, MANHATTAN, FROM STREET EAST 13 STREET TO STREET EAST 14 STREET |
Q012023165A55 | 2023-06-14 | 2023-07-11 | REPAIR SEWER | 47 AVENUE, QUEENS, FROM STREET 70 STREET |
Q012023164B83 | 2023-06-13 | 2023-07-01 | REPAIR SEWER | 32 STREET, QUEENS, FROM STREET 37 AVENUE TO STREET 38 AVENUE |
M012023163A92 | 2023-06-12 | 2023-07-11 | C.A.R. RESTORATION | WEST 26 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012023154A06 | 2023-06-08 | 2023-06-08 | REPAIR WATER | WEST 27 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M012023159B40 | 2023-06-08 | 2023-07-02 | REPAIR WATER | WEST 47 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET BROADWAY |
Q012023159B28 | 2023-06-08 | 2023-07-07 | REPAIR WATER - SEWER | 40 ROAD, QUEENS, FROM STREET 29 STREET TO STREET NORTHERN BOULEVARD |
X012023159A02 | 2023-06-08 | 2023-07-06 | REPAIR WATER - SEWER | HALL PLACE, BRONX, FROM STREET EAST 165 STREET TO STREET EAST 167 STREET |
Q012023157A17 | 2023-06-06 | 2023-07-06 | REPAIR SEWER | 70 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET QUEENS BOULEVARD |
Q012023157A16 | 2023-06-06 | 2023-07-06 | REPAIR SEWER | 47 AVENUE, QUEENS, FROM STREET 70 STREET TO STREET 72 STREET |
B012023157A36 | 2023-06-06 | 2023-07-06 | REPAIR WATER | JEFFERSON AVENUE, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
X012023151B56 | 2023-05-31 | 2023-06-29 | REPAIR WATER - SEWER | EAST 233 STREET, BRONX, FROM STREET MULVEY AVENUE TO STREET PROVOST AVENUE |
M012023150B84 | 2023-05-30 | 2023-06-20 | REPAIR SEWER - PROTECTED | AVENUE C, MANHATTAN, FROM STREET EAST 13 STREET TO STREET EAST 14 STREET |
B012023147A00 | 2023-05-27 | 2023-06-10 | REPAIR WATER - PROTECTED | NOSTRAND AVENUE, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD |
B012023147A01 | 2023-05-27 | 2023-06-10 | REPAIR WATER - PROTECTED | FARRAGUT ROAD, BROOKLYN, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE |
B012023145A69 | 2023-05-25 | 2023-06-22 | REPAIR SEWER | LINDEN BOULEVARD, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
Q012023143B75 | 2023-05-23 | 2023-06-06 | REPAIR SEWER | 70 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET QUEENS BOULEVARD |
X012023143B17 | 2023-05-23 | 2023-06-22 | REPAIR WATER | ROBERTS AVENUE, BRONX, FROM STREET BLONDELL AVENUE TO STREET EAST TREMONT AVENUE |
Q012023141A02 | 2023-05-21 | 2023-06-06 | REPAIR SEWER | 47 AVENUE, QUEENS, FROM STREET 70 STREET TO STREET 72 STREET |
X012023138B46 | 2023-05-18 | 2023-06-17 | REPAIR WATER | TELLER AVENUE, BRONX, FROM STREET EAST 171 STREET TO STREET EAST 172 STREET |
X012023138B45 | 2023-05-18 | 2023-06-15 | REPAIR WATER | SHERMAN AVENUE, BRONX, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET |
M012023131B09 | 2023-05-11 | 2023-05-23 | REPAIR WATER - PROTECTED | 8 AVENUE, MANHATTAN, FROM STREET WEST 24 STREET TO STREET WEST 25 STREET |
Q012023131B33 | 2023-05-11 | 2023-05-23 | REPAIR SEWER | 47 AVENUE, QUEENS, FROM STREET 70 STREET TO STREET 72 STREET |
Q012023131B32 | 2023-05-11 | 2023-05-23 | REPAIR SEWER | 70 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET QUEENS BOULEVARD |
M012023127A02 | 2023-05-07 | 2023-06-01 | REPAIR WATER | EAST 83 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
X012023124A04 | 2023-05-04 | 2023-06-02 | REPAIR SEWER | HALPERIN AVENUE, BRONX, FROM STREET BLONDELL AVENUE TO STREET WILLIAMSBRIDGE ROAD |
B012023124A01 | 2023-05-04 | 2023-05-27 | REPAIR WATER - PROTECTED | FARRAGUT ROAD, BROOKLYN, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE |
B012023124A02 | 2023-05-04 | 2023-05-27 | REPAIR WATER - PROTECTED | NOSTRAND AVENUE, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD |
B012023121C15 | 2023-05-01 | 2023-05-16 | REPAIR WATER | 3 STREET, BROOKLYN, FROM STREET BOND STREET TO STREET BODY OF WATER |
Q012023120A07 | 2023-04-30 | 2023-05-28 | REPAIR WATER | 31 STREET, QUEENS, FROM STREET 28 AVENUE TO STREET ASTORIA BOULEVARD |
B012023118B55 | 2023-04-28 | 2023-05-27 | REPAIR WATER - SEWER | BRIGHTON 14 STREET, BROOKLYN, FROM STREET BEND TO STREET OCEAN VIEW AVENUE |
B012023116B90 | 2023-04-26 | 2023-05-26 | REPAIR WATER - SEWER | 47 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
Q192023114A01 | 2023-04-24 | 2023-07-22 | PLACE TEMPORARY PLATES | 70 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET QUEENS BOULEVARD |
Q192023114A00 | 2023-04-24 | 2023-07-22 | PLACE TEMPORARY PLATES | 47 AVENUE, QUEENS, FROM STREET 70 STREET TO STREET 72 STREET |
M012023114A52 | 2023-04-24 | 2023-05-02 | REPAIR WATER | 7 AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 153 STREET |
M012023107A15 | 2023-04-21 | 2023-04-18 | REPAIR WATER - PROTECTED | WEST END AVENUE, MANHATTAN, FROM STREET WEST 85 STREET TO STREET WEST 86 STREET |
Q012023109C33 | 2023-04-19 | 2023-05-17 | REPAIR WATER | 35 STREET, QUEENS, FROM STREET REVIEW AVENUE TO STREET VAN DAM STREET |
M012023109B79 | 2023-04-19 | 2023-05-03 | REPAIR SEWER - PROTECTED | WEST 65 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
Q012023102C83 | 2023-04-12 | 2023-05-10 | REPAIR WATER | GUY R BREWER BOULEVARD, QUEENS, FROM STREET 107 AVENUE TO STREET SOUTH ROAD |
Q012023100C02 | 2023-04-10 | 2023-04-24 | REPAIR SEWER | 70 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET QUEENS BOULEVARD |
Q012023100C03 | 2023-04-10 | 2023-04-24 | REPAIR SEWER | 47 AVENUE, QUEENS, FROM STREET 70 STREET TO STREET 72 STREET |
M012023100B76 | 2023-04-10 | 2023-05-09 | REPAIR WATER - PROTECTED | 8 AVENUE, MANHATTAN, FROM STREET WEST 24 STREET TO STREET WEST 25 STREET |
X012023100B34 | 2023-04-10 | 2023-04-22 | REPAIR WATER - PROTECTED | GERARD AVENUE, BRONX, FROM STREET EAST 150 STREET TO STREET EAST 151 STREET |
M012023094B86 | 2023-04-04 | 2023-05-02 | REPAIR SEWER | 2 AVENUE, MANHATTAN, FROM STREET EAST 82 STREET TO STREET EAST 83 STREET |
B012023094A61 | 2023-04-04 | 2023-05-01 | REPAIR WATER | WEBSTER AVENUE, BROOKLYN, FROM STREET EAST 3 STREET TO STREET OCEAN PARKWAY |
X012023093A17 | 2023-04-03 | 2023-04-25 | REPAIR WATER | LONGFELLOW AVENUE, BRONX, FROM STREET BEND TO STREET JENNINGS STREET |
X012023088A85 | 2023-03-29 | 2023-04-28 | REPAIR WATER | ANTHONY AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET |
B012023087D42 | 2023-03-28 | 2023-04-25 | REPAIR WATER | 99 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET FT HAMILTON PARKWAY |
B012023087A17 | 2023-03-28 | 2023-04-25 | REPAIR WATER | 57 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B012023084A03 | 2023-03-28 | 2023-03-27 | REPAIR WATER | COLERIDGE STREET, BROOKLYN, FROM STREET ESPLANADE TO STREET ORIENTAL BOULEVARD |
B012023083D02 | 2023-03-24 | 2023-04-21 | REPAIR WATER | CLINTON STREET, BROOKLYN, FROM STREET BRYANT STREET TO STREET HALLECK STREET |
M012023083B66 | 2023-03-24 | 2023-04-19 | REPAIR SEWER - PROTECTED | WEST 65 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
X012023069B29 | 2023-03-15 | 2023-04-08 | REPAIR WATER - PROTECTED | GERARD AVENUE, BRONX, FROM STREET EAST 150 STREET TO STREET EAST 151 STREET |
Q012023073A19 | 2023-03-14 | 2023-04-10 | REPAIR SEWER | 70 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET QUEENS BOULEVARD |
X012023072C82 | 2023-03-13 | 2023-04-11 | REPAIR WATER | EASTCHESTER ROAD, BRONX, FROM STREET MORRIS PARK AVENUE TO STREET STILLWELL AVENUE |
B012023072D77 | 2023-03-13 | 2023-03-25 | REPAIR WATER | PUTNAM AVENUE, BROOKLYN, FROM STREET BEND TO STREET GRAND AVENUE |
B012023072D78 | 2023-03-13 | 2023-03-23 | REPAIR WATER - PROTECTED | 13 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
Q012023072B13 | 2023-03-13 | 2023-03-24 | REPAIR WATER | 82 AVENUE, QUEENS, FROM STREET 126 STREET TO STREET 132 STREET |
Q012023072B12 | 2023-03-13 | 2023-04-10 | REPAIR SEWER | 47 AVENUE, QUEENS, FROM STREET 70 STREET TO STREET 72 STREET |
B012023070A06 | 2023-03-11 | 2023-03-11 | REPAIR WATER | PUTNAM AVENUE, BROOKLYN, FROM STREET BEND TO STREET GRAND AVENUE |
M012023067A96 | 2023-03-08 | 2023-03-25 | REPAIR WATER | EAST 9 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET UNIVERSITY PLACE |
B012023067C30 | 2023-03-08 | 2023-04-04 | REPAIR WATER | 56 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
M012023067A97 | 2023-03-08 | 2023-04-04 | REPAIR SEWER | WEST 50 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
B012023066B93 | 2023-03-07 | 2023-03-23 | REPAIR WATER - PROTECTED | 13 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
M012023060C03 | 2023-03-01 | 2023-03-25 | REPAIR WATER | EAST 9 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET UNIVERSITY PLACE |
M012023060C02 | 2023-03-01 | 2023-03-15 | REPAIR SEWER - PROTECTED | WEST 65 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
Q012023060C87 | 2023-03-01 | 2023-03-11 | REPAIR SEWER | 70 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET QUEENS BOULEVARD |
Q012023059C49 | 2023-02-28 | 2023-03-11 | REPAIR SEWER | 47 AVENUE, QUEENS, FROM STREET 70 STREET TO STREET 72 STREET |
M012023058A00 | 2023-02-27 | 2023-03-26 | REPAIR WATER | WEST 26 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
X012023054B00 | 2023-02-23 | 2023-03-24 | REPAIR WATER | MACOMBS ROAD, BRONX, FROM STREET NELSON AVENUE TO STREET WEST 176 STREET |
B012023045A15 | 2023-02-14 | 2023-02-25 | REPAIR WATER | SHEFFIELD AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
M012023045A41 | 2023-02-14 | 2023-02-24 | REPAIR SEWER | WEST 48 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
M012023045A48 | 2023-02-14 | 2023-03-19 | REPAIR WATER | EAST 36 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET SNIFFEN COURT |
M012023045A47 | 2023-02-14 | 2023-03-19 | REPAIR WATER | 3 AVENUE, MANHATTAN, FROM STREET EAST 35 STREET TO STREET EAST 36 STREET |
M012023045A42 | 2023-02-14 | 2023-02-22 | REPAIR WATER | 7 AVENUE, MANHATTAN, FROM STREET WEST 47 STREET TO STREET WEST 48 STREET |
Q012023039B28 | 2023-02-08 | 2023-03-10 | REPAIR WATER - PROTECTED | HOOVER AVENUE, QUEENS, FROM STREET 83 AVENUE TO STREET 132 STREET |
Q012023039B26 | 2023-02-08 | 2023-03-10 | REPAIR WATER | 82 AVENUE, QUEENS, FROM STREET 126 STREET TO STREET 132 STREET |
B012023039B48 | 2023-02-08 | 2023-03-09 | REPAIR WATER - PROTECTED | 13 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
Q012023039B27 | 2023-02-08 | 2023-03-10 | REPAIR WATER | 132 STREET, QUEENS, FROM STREET HOOVER AVENUE TO STREET PEDESTRIAN OVERPASS |
Q012023038C81 | 2023-02-07 | 2023-02-25 | REPAIR SEWER | 70 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET QUEENS BOULEVARD |
X012023038A67 | 2023-02-07 | 2023-02-23 | REPAIR WATER | WHITE PLAINS ROAD, BRONX, FROM STREET PENFIELD STREET TO STREET ST OUEN STREET |
Q012023038C80 | 2023-02-07 | 2023-02-25 | REPAIR SEWER | 47 AVENUE, QUEENS, FROM STREET 70 STREET TO STREET 72 STREET |
S012023036A00 | 2023-02-05 | 2023-03-03 | REPAIR WATER | PERRY AVENUE, STATEN ISLAND, FROM STREET SOUTH GANNON AVENUE TO STREET WESTWOOD AVENUE |
X012023033A41 | 2023-02-02 | 2023-03-02 | REPAIR WATER | BOONE AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET |
M012023032B46 | 2023-02-01 | 2023-03-05 | REPAIR WATER | EAST 30 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH |
M012023031C51 | 2023-01-31 | 2023-03-01 | REPAIR SEWER - PROTECTED | WEST 65 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
B012023031C61 | 2023-01-31 | 2023-03-03 | REPAIR WATER | EAST 48 STREET, BROOKLYN, FROM STREET BEVERLY ROAD TO STREET CANARSIE LANE |
B012023030A24 | 2023-01-30 | 2023-02-25 | REPAIR WATER | 2 STREET, BROOKLYN, FROM STREET BOND STREET TO STREET BODY OF WATER |
B012023024A62 | 2023-01-24 | 2023-02-11 | REPAIR WATER | SHEFFIELD AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B012023024A61 | 2023-01-24 | 2023-02-11 | REPAIR SEWER | WORTMAN AVENUE, BROOKLYN, FROM STREET GEORGIA AVENUE TO STREET SHEFFIELD AVENUE |
B012023024A57 | 2023-01-24 | 2023-02-04 | REPAIR WATER | 58 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
Q012023024B25 | 2023-01-24 | 2023-02-08 | REPAIR SEWER | 70 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET QUEENS BOULEVARD |
B012023024A59 | 2023-01-24 | 2023-02-04 | REPAIR WATER | 57 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
Q012023024B26 | 2023-01-24 | 2023-02-08 | REPAIR SEWER | 47 AVENUE, QUEENS, FROM STREET 70 STREET TO STREET 72 STREET |
B012023023B52 | 2023-01-23 | 2023-02-14 | REPAIR WATER | MESEROLE AVENUE, BROOKLYN, FROM STREET ECKFORD STREET TO STREET MC GUINNESS BOULEVARD |
B012023020A36 | 2023-01-20 | 2023-02-14 | REPAIR WATER - PROTECTED | FREEMAN STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B012023017C40 | 2023-01-17 | 2023-02-14 | C.A.R. RESTORATION | BROOKLYN AVENUE, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD |
B012023017C41 | 2023-01-17 | 2023-01-25 | REPAIR SEWER - PROTECTED | SOUTH PORTLAND AVENUE, BROOKLYN, FROM STREET ACADEMY PARK PLACE TO STREET HANSON PLACE |
M192023017A14 | 2023-01-17 | 2023-04-17 | PLACE TEMPORARY PLATES | WEST 65 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
M012023013B29 | 2023-01-13 | 2023-02-10 | REPAIR SEWER | WEST 48 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
Q012023011A13 | 2023-01-11 | 2023-01-17 | REPAIR WATER | 108 STREET, QUEENS, FROM STREET 37 DRIVE TO STREET 38 AVENUE |
M012023010A32 | 2023-01-10 | 2023-02-08 | REPAIR WATER | 7 AVENUE, MANHATTAN, FROM STREET WEST 47 STREET TO STREET WEST 48 STREET |
Q012023009A28 | 2023-01-09 | 2023-02-03 | REPAIR WATER | 31 STREET, QUEENS, FROM STREET 28 AVENUE TO STREET ASTORIA BOULEVARD |
M012022364A87 | 2023-01-07 | 2023-01-04 | REPAIR WATER | EAST 48 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
Q012023006B90 | 2023-01-06 | 2023-01-19 | REPAIR WATER | 168 STREET, QUEENS, FROM STREET 82 ROAD TO STREET GOETHALS AVENUE |
Q012023004B54 | 2023-01-04 | 2023-01-25 | REPAIR SEWER | 70 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET QUEENS BOULEVARD |
Q012023004B53 | 2023-01-04 | 2023-01-25 | REPAIR SEWER | 47 AVENUE, QUEENS, FROM STREET 70 STREET TO STREET 72 STREET |
Q012023002A09 | 2023-01-02 | 2023-01-17 | REPAIR SEWER | 47 AVENUE, QUEENS, FROM STREET 70 STREET |
B012022362A23 | 2022-12-28 | 2023-01-17 | REPAIR WATER | LORIMER STREET, BROOKLYN, FROM STREET MESEROLE AVENUE TO STREET NORMAN AVENUE |
Q012022360A05 | 2022-12-26 | 2023-01-05 | REPAIR WATER | 168 STREET, QUEENS, FROM STREET 82 ROAD TO STREET GOETHALS AVENUE |
M192022360A00 | 2022-12-26 | 2023-01-17 | PLACE TEMPORARY PLATES | WEST 65 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
B012022348A04 | 2022-12-14 | 2023-01-11 | REPAIR SEWER - PROTECTED | SOUTH PORTLAND AVENUE, BROOKLYN, FROM STREET ACADEMY PARK PLACE TO STREET HANSON PLACE |
M002022341A00 | 2022-12-07 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
M012022341A22 | 2022-12-07 | 2023-01-05 | REPAIR WATER - SEWER | BATTERY PLACE, MANHATTAN, FROM STREET BEND TO STREET LITTLE WEST STREET |
M012022334B08 | 2022-11-30 | 2022-12-26 | REPAIR SEWER - PROTECTED | WEST 65 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
B012022332B51 | 2022-11-28 | 2022-12-28 | REPAIR WATER | EAST 40 STREET, BROOKLYN, FROM STREET AVENUE D TO STREET FOSTER AVENUE |
X012022332A15 | 2022-11-28 | 2022-12-17 | REPAIR WATER | EAST 141 STREET, BRONX, FROM STREET LOCUST AVENUE TO STREET ROSE FEISS BOULEVARD |
B012022331A00 | 2022-11-27 | 2022-12-20 | C.A.R. RESTORATION | 52 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
X012022320A07 | 2022-11-16 | 2022-12-03 | REPAIR WATER | ROMBOUTS AVENUE, BRONX, FROM STREET BOSTON ROAD TO STREET HOLLERS AVENUE |
Q012022319E11 | 2022-11-15 | 2022-12-12 | REPAIR WATER - PROTECTED | 21 STREET, QUEENS, FROM STREET 25 ROAD TO STREET HOYT AVENUE |
Q012022314C13 | 2022-11-10 | 2022-11-12 | REPAIR WATER - PROTECTED | 21 STREET, QUEENS, FROM STREET 25 ROAD TO STREET HOYT AVENUE |
Q012022313C54 | 2022-11-09 | 2022-12-03 | REPAIR WATER | 29 STREET, QUEENS, FROM STREET 30 DRIVE TO STREET 30 ROAD |
M012022313B10 | 2022-11-09 | 2022-11-14 | REPAIR WATER - PROTECTED | WEST 14 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
M002022308A01 | 2022-11-04 | No data | MISCELLANEOUS - MINOR SALES | No data |
M012022308A00 | 2022-11-04 | 2022-11-14 | REPAIR WATER - PROTECTED | 3 AVENUE, MANHATTAN, FROM STREET EAST 60 STREET TO STREET EAST 61 STREET |
M012022306E51 | 2022-11-02 | 2022-11-14 | REPAIR WATER - PROTECTED | 6 AVENUE, MANHATTAN, FROM STREET WEST 13 STREET TO STREET WEST 14 STREET |
B012022306B44 | 2022-11-02 | 2022-11-17 | REPAIR WATER | 52 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
M002022301A50 | 2022-10-28 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
M002022300A34 | 2022-10-27 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
M002022299A44 | 2022-10-26 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
M002022299A42 | 2022-10-26 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
B012022297C01 | 2022-10-24 | 2022-11-03 | REPAIR WATER | 52 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
M012022290B21 | 2022-10-17 | 2022-11-11 | REPAIR WATER | WEST 66 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
Q012022289A11 | 2022-10-16 | 2022-11-11 | REPAIR WATER | 40 ROAD, QUEENS, FROM STREET COLLEGE POINT BOULEVARD TO STREET DELONG STREET |
M012022287A83 | 2022-10-14 | 2022-11-14 | REPAIR WATER | EAST 46 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
M012022286A10 | 2022-10-13 | 2022-11-10 | REPAIR WATER - PROTECTED | WEST 14 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B012022281A06 | 2022-10-08 | 2022-10-22 | REPAIR WATER - PROTECTED | 16 AVENUE, BROOKLYN, FROM STREET 46 STREET TO STREET 47 STREET |
M012022280A45 | 2022-10-07 | 2022-10-29 | REPAIR WATER - PROTECTED | EAST 103 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M012022276B95 | 2022-10-03 | 2022-11-01 | REPAIR WATER | MADISON AVENUE, MANHATTAN, FROM STREET EAST 102 STREET TO STREET EAST 103 STREET |
Q012022275A06 | 2022-10-02 | 2022-10-29 | REPAIR SEWER | 24 STREET, QUEENS, FROM STREET 40 AVENUE TO STREET 41 AVENUE |
X012022270B71 | 2022-09-27 | 2022-10-11 | REPAIR WATER - PROTECTED | BUSH STREET, BRONX, FROM STREET CRESTON AVENUE TO STREET GRAND CONCOURSE |
B012022269A70 | 2022-09-26 | 2022-10-21 | REPAIR WATER | CONEY ISLAND AVENUE, BROOKLYN, FROM STREET BANNER AVENUE TO STREET SHORE PARKWAY |
M012022265B65 | 2022-09-22 | 2022-10-06 | REPAIR SEWER | WEST 66 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
B012022257D94 | 2022-09-14 | 2022-10-12 | REPAIR WATER | 47 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B012022257A83 | 2022-09-14 | 2022-10-08 | REPAIR WATER - PROTECTED | 16 AVENUE, BROOKLYN, FROM STREET 46 STREET TO STREET 47 STREET |
X012022256C63 | 2022-09-13 | 2022-09-27 | REPAIR WATER - PROTECTED | BUSH STREET, BRONX, FROM STREET CRESTON AVENUE TO STREET GRAND CONCOURSE |
Q012022252D33 | 2022-09-09 | 2022-09-25 | REPAIR WATER - PROTECTED | HOOVER AVENUE, QUEENS, FROM STREET 83 AVENUE TO STREET 132 STREET |
M012022252B47 | 2022-09-09 | 2022-10-02 | REPAIR WATER - PROTECTED | 6 AVENUE, MANHATTAN, FROM STREET WEST 13 STREET TO STREET WEST 14 STREET |
B012022250B48 | 2022-09-07 | 2022-10-01 | REPAIR WATER | NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B012022244C28 | 2022-09-01 | 2022-09-30 | REPAIR WATER | 57 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B012022243A27 | 2022-08-31 | 2022-09-24 | REPAIR WATER - PROTECTED | WALWORTH STREET, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE |
Q012022237B55 | 2022-08-28 | 2022-09-23 | REPAIR WATER | BELL BOULEVARD, QUEENS, FROM STREET 42 AVENUE TO STREET 43 AVENUE |
M012022237A01 | 2022-08-25 | 2022-09-22 | REPAIR SEWER | WEST 66 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
X012022234A52 | 2022-08-22 | 2022-09-03 | REPAIR WATER | UNIVERSITY AVENUE, BRONX, FROM STREET MORTON PLACE TO STREET WEST BURNSIDE AVENUE |
M012022234B60 | 2022-08-22 | 2022-09-03 | REPAIR WATER - PROTECTED | 6 AVENUE, MANHATTAN, FROM STREET WEST 13 STREET TO STREET WEST 14 STREET |
X012022230A69 | 2022-08-18 | 2022-09-13 | REPAIR WATER - PROTECTED | BUSH STREET, BRONX, FROM STREET CRESTON AVENUE TO STREET GRAND CONCOURSE |
M012022228B08 | 2022-08-16 | 2022-08-20 | REPAIR SEWER | WEST 66 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
M012022228B07 | 2022-08-16 | 2022-08-31 | REPAIR WATER - PROTECTED | EAST 86 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
Q012022228B63 | 2022-08-16 | 2022-09-11 | REPAIR WATER | 132 STREET, QUEENS, FROM STREET HOOVER AVENUE TO STREET PEDESTRIAN OVERPASS |
Q012022228B62 | 2022-08-16 | 2022-09-11 | REPAIR WATER - PROTECTED | HOOVER AVENUE, QUEENS, FROM STREET 83 AVENUE TO STREET 132 STREET |
X012022223A36 | 2022-08-11 | 2022-09-09 | REPAIR SEWER | ROBERTS AVENUE, BRONX, FROM STREET BLONDELL AVENUE TO STREET EAST TREMONT AVENUE |
Q012022213B36 | 2022-08-01 | 2022-08-16 | REPAIR WATER | 132 STREET, QUEENS, FROM STREET HOOVER AVENUE TO STREET PEDESTRIAN OVERPASS |
M012022213A99 | 2022-08-01 | 2022-08-16 | REPAIR WATER - PROTECTED | EAST 86 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
Q012022213B38 | 2022-08-01 | 2022-08-16 | REPAIR WATER - PROTECTED | HOOVER AVENUE, QUEENS, FROM STREET 83 AVENUE TO STREET 132 STREET |
B012022210A78 | 2022-07-29 | 2022-08-19 | REPAIR WATER | 60 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET LIRR BAY RIDGE DIV |
Q012022207D91 | 2022-07-26 | 2022-08-17 | REPAIR WATER - PROTECTED | NORTHERN BOULEVARD, QUEENS, FROM STREET 73 STREET TO STREET 74 STREET |
B012022199A57 | 2022-07-25 | 2022-08-16 | REPAIR WATER | ASHLAND PLACE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET FULTON STREET |
M012022206A28 | 2022-07-25 | 2022-08-07 | REPAIR SEWER | WEST 66 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
M012022203A44 | 2022-07-22 | 2022-08-20 | REPAIR WATER - PROTECTED | 6 AVENUE, MANHATTAN, FROM STREET WEST 13 STREET TO STREET WEST 14 STREET |
M012022200B45 | 2022-07-19 | 2022-08-17 | REPAIR WATER - PROTECTED | EAST 50 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
B012022197A06 | 2022-07-16 | 2022-07-31 | REPAIR WATER | 55 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
Q012022195B86 | 2022-07-14 | 2022-08-02 | REPAIR WATER - PROTECTED | HOOVER AVENUE, QUEENS, FROM STREET 83 AVENUE TO STREET 132 STREET |
B012022195B14 | 2022-07-14 | 2022-07-29 | REPAIR WATER | 52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
Q012022195B87 | 2022-07-14 | 2022-08-02 | REPAIR WATER | 132 STREET, QUEENS, FROM STREET HOOVER AVENUE TO STREET PEDESTRIAN OVERPASS |
X012022192A76 | 2022-07-11 | 2022-08-02 | REPAIR WATER | EAST 158 STREET, BRONX, FROM STREET ELTON AVENUE TO STREET 3 AVENUE |
B012022191A09 | 2022-07-10 | 2022-08-02 | REPAIR WATER | COURT STREET, BROOKLYN, FROM STREET BRYANT STREET TO STREET HALLECK STREET |
Q012022191A00 | 2022-07-10 | 2022-07-12 | REPAIR WATER | 40 AVENUE, QUEENS, FROM STREET 29 STREET TO STREET 30 STREET |
M012022188A76 | 2022-07-07 | 2022-08-02 | REPAIR WATER - PROTECTED | EAST 86 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012022187B04 | 2022-07-06 | 2022-07-24 | REPAIR WATER | 2 AVENUE, MANHATTAN, FROM STREET EAST 49 STREET TO STREET EAST 50 STREET |
B012022186D21 | 2022-07-05 | 2022-07-22 | REPAIR WATER | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
M012022182B02 | 2022-07-01 | 2022-07-16 | C.A.R. RESTORATION | BROADWAY, MANHATTAN, FROM STREET WEST 54 STREET TO STREET WEST 55 STREET |
B012022182C34 | 2022-07-01 | 2022-07-17 | REPAIR WATER | 55 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
M012022181C72 | 2022-06-30 | 2022-07-24 | REPAIR SEWER | WEST 66 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
X012022181A80 | 2022-06-30 | 2022-07-29 | REPAIR WATER - PROTECTED | WALES AVENUE, BRONX, FROM STREET EAST 145 STREET TO STREET EAST 147 STREET |
Q012022176A03 | 2022-06-25 | 2022-07-10 | REPAIR WATER | 92 STREET, QUEENS, FROM STREET ELMHURST AVENUE TO STREET NYCTA SUBWAY |
B012022175A17 | 2022-06-24 | 2022-07-15 | REPAIR WATER | 52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
B012022172F30 | 2022-06-21 | 2022-07-20 | C.A.R. RESTORATION | SEAVIEW AVENUE, BROOKLYN, FROM STREET BEND TO STREET ERSKINE STREET |
B012022172F29 | 2022-06-21 | 2022-07-02 | REPAIR WATER | 55 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
B012022168A25 | 2022-06-17 | 2022-07-12 | REPAIR WATER - PROTECTED | FARRAGUT ROAD, BROOKLYN, FROM STREET EAST 31 STREET TO STREET EAST 32 STREET |
M012022166C09 | 2022-06-15 | 2022-07-02 | C.A.R. RESTORATION | BROADWAY, MANHATTAN, FROM STREET WEST 54 STREET TO STREET WEST 55 STREET |
B012022165A20 | 2022-06-14 | 2022-06-30 | REPAIR SEWER - PROTECTED | STRAUSS STREET, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET PITKIN AVENUE |
B012022165A22 | 2022-06-14 | 2022-06-30 | REPAIR WATER | EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SARATOGA AVENUE TO STREET ST JOHNS PLACE |
B012022164A40 | 2022-06-13 | 2022-06-18 | REPAIR WATER | 55 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
Q012022162A03 | 2022-06-11 | 2022-06-25 | REPAIR WATER | 92 STREET, QUEENS, FROM STREET ELMHURST AVENUE TO STREET NYCTA SUBWAY |
X012022161A03 | 2022-06-10 | 2022-07-07 | REPAIR WATER | BUCHANAN PLACE, BRONX, FROM STREET AQUEDUCT AVENUE TO STREET GRAND AVENUE |
B012022157A61 | 2022-06-06 | 2022-07-01 | C.A.R. RESTORATION | FOUNTAIN AVENUE, BROOKLYN, FROM STREET SEAVIEW AVENUE TO STREET VANDALIA AVENUE |
X012022153A99 | 2022-06-02 | 2022-06-29 | C.A.R. RESTORATION | BERGEN AVENUE, BRONX, FROM STREET EAST 152 STREET TO STREET EAST 153 STREET |
M012022153B75 | 2022-06-02 | 2022-06-21 | REPAIR WATER - PROTECTED | EAST 50 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
B002022153A01 | 2022-06-02 | No data | MISCELLANEOUS - MINOR SALES | No data |
B012022151A22 | 2022-05-31 | 2022-06-24 | REPAIR WATER - PROTECTED | MC GUINNESS BOULEVARD, BROOKLYN, FROM STREET CALYER STREET TO STREET MESEROLE AVENUE |
B012022147A37 | 2022-05-27 | 2022-06-18 | REPAIR WATER | 57 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B012022144C22 | 2022-05-24 | 2022-06-07 | REPAIR SEWER | SEAVIEW AVENUE, BROOKLYN, FROM STREET BEND TO STREET ERSKINE STREET |
M012022139B14 | 2022-05-19 | 2022-06-03 | REPAIR WATER - PROTECTED | EAST 50 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
Q012022136A50 | 2022-05-16 | 2022-06-11 | REPAIR WATER | 92 STREET, QUEENS, FROM STREET ELMHURST AVENUE TO STREET NYCTA SUBWAY |
Q012022136A51 | 2022-05-16 | 2022-06-11 | REPAIR WATER | 91 STREET, QUEENS, FROM STREET ELMHURST AVENUE TO STREET NYCTA SUBWAY |
M012022132A98 | 2022-05-12 | 2022-05-26 | REPAIR WATER | WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
M012022131A91 | 2022-05-11 | 2022-05-25 | REPAIR WATER - PROTECTED | HUDSON STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET CANAL STREET |
B012022130A58 | 2022-05-10 | 2022-05-25 | REPAIR WATER | FOUNTAIN AVENUE, BROOKLYN, FROM STREET SEAVIEW AVENUE TO STREET VANDALIA AVENUE |
M012022129B47 | 2022-05-09 | 2022-05-20 | REPAIR WATER | BROADWAY, MANHATTAN, FROM STREET WEST 54 STREET TO STREET WEST 55 STREET |
X012022129D00 | 2022-05-09 | 2022-05-20 | REPAIR WATER | BARNES AVENUE, BRONX, FROM STREET BRONXDALE AVENUE TO STREET RHINELANDER AVENUE |
B012022129B95 | 2022-05-09 | 2022-05-24 | REPAIR SEWER | SEAVIEW AVENUE, BROOKLYN, FROM STREET BEND TO STREET ERSKINE STREET |
M012022124C15 | 2022-05-04 | 2022-05-13 | REPAIR WATER - PROTECTED | LAFAYETTE STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HOWARD STREET |
M012022111A91 | 2022-05-02 | 2022-05-20 | REPAIR WATER - PROTECTED | EAST 50 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
B012022122C81 | 2022-05-02 | 2022-05-17 | REPAIR WATER - PROTECTED | DE KALB AVENUE, BROOKLYN, FROM STREET HUDSON AVENUE TO STREET NAVY STREET |
B012022122C80 | 2022-05-02 | 2022-05-25 | C.A.R. RESTORATION | NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
X012022115A60 | 2022-04-25 | 2022-05-24 | REPAIR WATER - PROTECTED | BLONDELL AVENUE, BRONX, FROM STREET FINK AVENUE TO STREET PONTON AVENUE |
M012022111B07 | 2022-04-21 | 2022-05-12 | REPAIR WATER | WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012022109A68 | 2022-04-19 | 2022-05-13 | REPAIR SEWER | ERSKINE STREET, BROOKLYN, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE |
M012022092A06 | 2022-04-19 | 2022-04-13 | REPAIR WATER - PROTECTED | HUDSON STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET CANAL STREET |
B012022108C07 | 2022-04-18 | 2022-05-11 | REPAIR WATER | FOUNTAIN AVENUE, BROOKLYN, FROM STREET SEAVIEW AVENUE TO STREET VANDALIA AVENUE |
B012022108C06 | 2022-04-18 | 2022-05-10 | REPAIR SEWER | SEAVIEW AVENUE, BROOKLYN, FROM STREET BEND TO STREET ERSKINE STREET |
M012022104A13 | 2022-04-14 | 2022-05-12 | REPAIR WATER | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET WEST 183 STREET TO STREET WEST 185 STREET |
M012022102B17 | 2022-04-12 | 2022-05-01 | REPAIR WATER - PROTECTED | WEST 55 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
M012022102B10 | 2022-04-12 | 2022-05-11 | REPAIR WATER - PROTECTED | HUDSON STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET CANAL STREET |
M012022100A03 | 2022-04-10 | 2022-05-06 | REPAIR WATER | BROADWAY, MANHATTAN, FROM STREET WEST 54 STREET TO STREET WEST 55 STREET |
M012022090A99 | 2022-04-10 | 2022-04-29 | REPAIR WATER - PROTECTED | EAST 50 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
X012022097A52 | 2022-04-07 | 2022-05-06 | REPAIR WATER | BARNES AVENUE, BRONX, FROM STREET BRONXDALE AVENUE TO STREET RHINELANDER AVENUE |
M012022096A58 | 2022-04-06 | 2022-05-05 | C.A.R. RESTORATION | 1 AVENUE, MANHATTAN, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET |
B012022095B84 | 2022-04-05 | 2022-04-21 | REPAIR WATER | JEFFERSON AVENUE, BROOKLYN, FROM STREET CLAVER PLACE TO STREET FRANKLIN AVENUE |
B012022095B55 | 2022-04-05 | 2022-05-03 | REPAIR WATER - PROTECTED | DE KALB AVENUE, BROOKLYN, FROM STREET HUDSON AVENUE TO STREET NAVY STREET |
B012022094B72 | 2022-04-04 | 2022-04-19 | REPAIR WATER | NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
M012022090B01 | 2022-03-31 | 2022-04-28 | REPAIR WATER - PROTECTED | EAST 50 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012022088C15 | 2022-03-29 | 2022-04-12 | REPAIR WATER - PROTECTED | WEST 55 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
X012022087A86 | 2022-03-28 | 2022-04-21 | REPAIR WATER | ST PAUL AVENUE, BRONX, FROM STREET EAST 196 STREET TO STREET NYCTA SUBWAY |
X012022086A02 | 2022-03-27 | 2022-04-21 | REPAIR WATER | WEST 170 STREET, BRONX, FROM STREET EDWARD L GRANT HIGHWAY TO STREET SHAKESPEARE AVENUE |
X012022076C40 | 2022-03-17 | 2022-04-01 | REPAIR WATER | BERGEN AVENUE, BRONX, FROM STREET EAST 152 STREET TO STREET EAST 153 STREET |
B012022076D02 | 2022-03-17 | 2022-04-15 | REPAIR WATER | FLATLANDS AVENUE, BROOKLYN, FROM STREET PENNSYLVANIA AVENUE TO STREET SHEFFIELD AVENUE |
B012022076A01 | 2022-03-17 | 2022-04-15 | REPAIR SEWER - PROTECTED | NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE V TO STREET AVENUE W |
B012022073A52 | 2022-03-14 | 2022-04-01 | REPAIR WATER | FLATLANDS AVENUE, BROOKLYN, FROM STREET PENNSYLVANIA AVENUE TO STREET SHEFFIELD AVENUE |
B012022069K16 | 2022-03-10 | 2022-04-07 | REPAIR WATER | JEFFERSON AVENUE, BROOKLYN, FROM STREET CLAVER PLACE TO STREET FRANKLIN AVENUE |
M012022063B32 | 2022-03-04 | 2022-03-19 | REPAIR SEWER | WEST 30 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
X012022062A57 | 2022-03-03 | 2022-03-18 | REPAIR WATER | BERGEN AVENUE, BRONX, FROM STREET EAST 152 STREET TO STREET EAST 153 STREET |
M012022059B38 | 2022-03-02 | 2022-03-29 | REPAIR WATER - PROTECTED | WEST 55 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012022056B77 | 2022-02-25 | 2022-03-12 | REPAIR WATER | FLATLANDS AVENUE, BROOKLYN, FROM STREET PENNSYLVANIA AVENUE TO STREET SHEFFIELD AVENUE |
B012022047B60 | 2022-02-16 | 2022-03-09 | C.A.R. RESTORATION | PITKIN AVENUE, BROOKLYN, FROM STREET CLEVELAND STREET TO STREET ELTON STREET |
B012022047B61 | 2022-02-16 | 2022-03-09 | C.A.R. RESTORATION - PROTECTED | UNION STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET NEVINS STREET |
X012022046A78 | 2022-02-15 | 2022-02-18 | REPAIR WATER | EAST 148 STREET, BRONX, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE |
M012022046A74 | 2022-02-15 | 2022-03-16 | REPAIR WATER | 1 AVENUE, MANHATTAN, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET |
M012022041A97 | 2022-02-10 | 2022-03-05 | REPAIR SEWER | WEST 30 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
B012022039A43 | 2022-02-08 | 2022-03-09 | REPAIR WATER | FLATLANDS AVENUE, BROOKLYN, FROM STREET EAST 92 STREET TO STREET EAST 93 STREET |
B012022035A07 | 2022-02-04 | 2022-02-26 | REPAIR WATER | LENOX ROAD, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B012022033A37 | 2022-02-02 | 2022-03-03 | REPAIR WATER - PROTECTED | NEVINS STREET, BROOKLYN, FROM STREET PRESIDENT STREET TO STREET UNION STREET |
B012022028A06 | 2022-02-01 | 2022-02-26 | REPAIR WATER | FLATLANDS AVENUE, BROOKLYN, FROM STREET PENNSYLVANIA AVENUE TO STREET SHEFFIELD AVENUE |
B012022027A46 | 2022-01-27 | 2022-02-12 | REPAIR WATER - PROTECTED | NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET |
M012022024B27 | 2022-01-24 | 2022-02-13 | REPAIR WATER | 1 AVENUE, MANHATTAN, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET |
X012022021A02 | 2022-01-21 | 2022-01-21 | REPAIR WATER | EAST 148 STREET, BRONX, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE |
B012022019A59 | 2022-01-19 | 2022-02-16 | REPAIR WATER | BERGEN STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
X012021347A17 | 2022-01-11 | 2022-01-07 | REPAIR WATER | EDGEWATER ROAD, BRONX, FROM STREET AVENUE A TO STREET DRAKE STREET |
M012022011B08 | 2022-01-11 | 2022-01-14 | REPAIR WATER | 1 AVENUE, MANHATTAN, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET |
B012022006C32 | 2022-01-06 | 2022-01-19 | REPAIR SEWER | WILLOUGHBY STREET, BROOKLYN, FROM STREET FLATBUSH AVENUE EXTENSION TO STREET GOLD STREET |
B012022005A43 | 2022-01-05 | 2022-01-19 | REPAIR SEWER | GOLD STREET, BROOKLYN, FROM STREET WILLOUGHBY STREET |
X012021364A70 | 2021-12-30 | 2021-12-31 | REPAIR WATER | EAST 148 STREET, BRONX, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE |
X012021364A71 | 2021-12-30 | 2022-01-14 | REPAIR WATER | EAST 148 STREET, BRONX, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE |
Q012021356B65 | 2021-12-22 | 2021-12-31 | REPAIR WATER | QUEENS STREET, QUEENS, FROM STREET DEAD END TO STREET JACKSON AVENUE |
M012021350C25 | 2021-12-16 | 2021-12-31 | REPAIR WATER - PROTECTED | WHITE STREET, MANHATTAN, FROM STREET BROADWAY TO STREET CORTLANDT ALLEY |
M012021345A00 | 2021-12-14 | 2021-12-31 | REPAIR WATER | 1 AVENUE, MANHATTAN, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET |
B192021344A00 | 2021-12-10 | 2021-12-31 | PLACE TEMPORARY PLATES | WILLOUGHBY STREET, BROOKLYN, FROM STREET FLATBUSH AVENUE EXTENSION TO STREET GOLD STREET |
B192021344A01 | 2021-12-10 | 2021-12-31 | PLACE TEMPORARY PLATES | GOLD STREET, BROOKLYN, FROM STREET WILLOUGHBY STREET |
M012021306A39 | 2021-11-02 | 2021-11-14 | REPAIR WATER | WEST 49 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET BROADWAY |
B012021301A51 | 2021-10-28 | 2021-11-11 | REPAIR SEWER - PROTECTED | DE KALB AVENUE, BROOKLYN, FROM STREET ASHLAND PLACE TO STREET NAVY STREET |
Q012021291A54 | 2021-10-18 | 2021-11-08 | REPAIR WATER - PROTECTED | 69 STREET, QUEENS, FROM STREET LONG ISLAND RAILROAD TO STREET QUEENS BOULEVARD |
M012021286A82 | 2021-10-13 | 2021-11-02 | REPAIR WATER | WEST 49 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET BROADWAY |
Q192021278A01 | 2021-10-05 | 2021-12-31 | PLACE TEMPORARY PLATES | 47 AVENUE, QUEENS, FROM STREET 70 STREET TO STREET LONG ISLAND RAILROAD |
B012021266C84 | 2021-09-23 | 2021-10-20 | REPAIR SEWER | WILLOUGHBY STREET, BROOKLYN, FROM STREET FLATBUSH AVENUE EXTENSION TO STREET GOLD STREET |
X012021260A76 | 2021-09-17 | 2021-09-29 | REPAIR WATER | UNION AVENUE, BRONX, FROM STREET EAST 163 STREET TO STREET EAST 165 STREET |
B012021260A82 | 2021-09-17 | 2021-10-02 | REPAIR WATER - PROTECTED | CARROLL STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET WHITWELL PLACE |
Q012021256B30 | 2021-09-13 | 2021-10-13 | REPAIR WATER - PROTECTED | 69 STREET, QUEENS, FROM STREET LONG ISLAND RAILROAD TO STREET QUEENS BOULEVARD |
B012021253A92 | 2021-09-10 | 2021-10-08 | REPAIR WATER | EAST 28 STREET, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FLATBUSH AVENUE |
B012021246A20 | 2021-09-03 | 2021-09-15 | REPAIR WATER - PROTECTED | CARROLL STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET WHITWELL PLACE |
B012021246A19 | 2021-09-03 | 2021-09-15 | REPAIR SEWER | WILLOUGHBY STREET, BROOKLYN, FROM STREET FLATBUSH AVENUE EXTENSION TO STREET GOLD STREET |
M012021240A00 | 2021-08-28 | 2021-09-24 | REPAIR SEWER | WEST 66 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
X012021239A04 | 2021-08-27 | 2021-09-15 | REPAIR WATER | UNION AVENUE, BRONX, FROM STREET EAST 163 STREET TO STREET EAST 165 STREET |
B012021232A45 | 2021-08-20 | 2021-09-21 | REPAIR WATER | PITKIN AVENUE, BROOKLYN, FROM STREET CLEVELAND STREET TO STREET ELTON STREET |
Q012021232B28 | 2021-08-20 | 2021-09-16 | REPAIR WATER | METROPOLITAN AVENUE, QUEENS, FROM STREET 80 STREET TO STREET COOPER AVENUE |
B012021230B07 | 2021-08-18 | 2021-09-01 | REPAIR SEWER | WILLOUGHBY STREET, BROOKLYN, FROM STREET FLATBUSH AVENUE EXTENSION TO STREET GOLD STREET |
B012021225B80 | 2021-08-13 | 2021-09-14 | REPAIR SEWER - PROTECTED | DE KALB AVENUE, BROOKLYN, FROM STREET ASHLAND PLACE TO STREET NAVY STREET |
Q012021215B90 | 2021-08-03 | 2021-09-01 | REPAIR WATER | 47 AVENUE, QUEENS, FROM STREET 70 STREET TO STREET LONG ISLAND RAILROAD |
B012021215A90 | 2021-08-03 | 2021-09-01 | REPAIR WATER - PROTECTED | CARROLL STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET WHITWELL PLACE |
Q012021214C49 | 2021-08-02 | 2021-08-02 | REPAIR WATER | 47 AVENUE, QUEENS, FROM STREET 70 STREET TO STREET LONG ISLAND RAILROAD |
B012021214A16 | 2021-08-02 | 2021-08-16 | REPAIR SEWER | GOLD STREET, BROOKLYN, FROM STREET WILLOUGHBY STREET |
B012021214A15 | 2021-08-02 | 2021-08-16 | REPAIR SEWER | WILLOUGHBY STREET, BROOKLYN, FROM STREET FLATBUSH AVENUE EXTENSION TO STREET GOLD STREET |
X012021214A26 | 2021-08-02 | 2021-08-16 | REPAIR WATER | UNION AVENUE, BRONX, FROM STREET EAST 163 STREET TO STREET EAST 165 STREET |
B012021204A00 | 2021-07-23 | 2021-08-02 | REPAIR SEWER - PROTECTED | DE KALB AVENUE, BROOKLYN, FROM STREET ASHLAND PLACE TO STREET NAVY STREET |
B012021204D53 | 2021-07-23 | 2021-08-18 | REPAIR SEWER | ASHLAND PLACE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET FULTON STREET |
B012021201A01 | 2021-07-20 | 2021-08-02 | REPAIR SEWER | GOLD STREET, BROOKLYN, FROM STREET WILLOUGHBY STREET |
B012021201A02 | 2021-07-20 | 2021-08-02 | REPAIR SEWER | WILLOUGHBY STREET, BROOKLYN, FROM STREET FLATBUSH AVENUE EXTENSION TO STREET GOLD STREET |
Q012021198A02 | 2021-07-17 | 2021-07-30 | REPAIR WATER | 47 AVENUE, QUEENS, FROM STREET 70 STREET TO STREET LONG ISLAND RAILROAD |
B012021198A07 | 2021-07-17 | 2021-08-01 | REPAIR WATER - PROTECTED | CARROLL STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET WHITWELL PLACE |
X012021189A64 | 2021-07-08 | 2021-08-02 | REPAIR WATER | UNION AVENUE, BRONX, FROM STREET EAST 163 STREET TO STREET EAST 165 STREET |
B012021184A00 | 2021-07-03 | 2021-07-18 | REPAIR WATER - PROTECTED | CARROLL STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET WHITWELL PLACE |
X012021175A15 | 2021-06-24 | 2021-07-16 | REPAIR WATER | UNION AVENUE, BRONX, FROM STREET EAST 156 STREET TO STREET WESTCHESTER AVENUE |
B012021169B61 | 2021-06-18 | 2021-07-03 | REPAIR WATER - PROTECTED | CARROLL STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET WHITWELL PLACE |
M012021167A30 | 2021-06-16 | 2021-06-17 | REPAIR WATER | 5 AVENUE, MANHATTAN, FROM STREET EAST 48 STREET TO STREET EAST 49 STREET |
Q012021166B25 | 2021-06-15 | 2021-07-20 | REPAIR WATER | 70 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET QUEENS BOULEVARD |
Q012021166B24 | 2021-06-15 | 2021-07-16 | REPAIR WATER | 47 AVENUE, QUEENS, FROM STREET 70 STREET TO STREET LONG ISLAND RAILROAD |
M012021165B55 | 2021-06-14 | 2021-06-30 | REPAIR WATER | 5 AVENUE, MANHATTAN, FROM STREET EAST 48 STREET TO STREET EAST 49 STREET |
B012021162A11 | 2021-06-11 | 2021-06-27 | REPAIR WATER | EAST 28 STREET, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FLATBUSH AVENUE |
M012021153A96 | 2021-06-02 | 2021-06-29 | REPAIR WATER - PROTECTED | EAST 65 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
B012021149A03 | 2021-05-29 | 2021-06-11 | REPAIR WATER | EAST 28 STREET, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FLATBUSH AVENUE |
B012021144A36 | 2021-05-24 | 2021-06-19 | REPAIR WATER - PROTECTED | CARROLL STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET WHITWELL PLACE |
M012021138A28 | 2021-05-21 | 2021-06-16 | REPAIR WATER | 5 AVENUE, MANHATTAN, FROM STREET EAST 48 STREET TO STREET EAST 49 STREET |
X012021126A56 | 2021-05-06 | 2021-05-20 | REPAIR WATER | LONGFELLOW AVENUE, BRONX, FROM STREET ALDUS STREET TO STREET EAST 165 STREET |
B012021125B50 | 2021-05-05 | 2021-05-20 | REPAIR WATER - PROTECTED | CARROLL STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET WHITWELL PLACE |
B012021124A89 | 2021-05-04 | 2021-05-28 | REPAIR WATER | EAST 28 STREET, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FLATBUSH AVENUE |
X012021115A00 | 2021-04-26 | 2021-05-24 | REPAIR WATER | EAST 196 STREET, BRONX, FROM STREET BAINBRIDGE AVENUE TO STREET MARION AVENUE |
B012021097C13 | 2021-04-07 | 2021-05-06 | REPAIR WATER - PROTECTED | CARROLL STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET WHITWELL PLACE |
M012021096B16 | 2021-04-06 | 2021-04-22 | REPAIR WATER | WEST 23 STREET, MANHATTAN, FROM STREET HIGH LINE TO STREET 11 AVENUE |
X012021096B08 | 2021-04-06 | 2021-05-06 | REPAIR WATER | LONGFELLOW AVENUE, BRONX, FROM STREET ALDUS STREET TO STREET EAST 165 STREET |
M012021089A22 | 2021-03-30 | 2021-04-28 | REPAIR WATER | WEST 132 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET LENOX AVENUE |
Q012021084A79 | 2021-03-25 | 2021-04-22 | REPAIR WATER | 19 AVENUE, QUEENS, FROM STREET 43 STREET TO STREET 45 STREET |
X012021081A72 | 2021-03-22 | 2021-04-16 | REPAIR WATER | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
B012021075E28 | 2021-03-22 | 2021-03-21 | REPAIR WATER | WILLOUGHBY STREET, BROOKLYN, FROM STREET FLATBUSH AVENUE EXTENSION TO STREET GOLD STREET |
X012021071A41 | 2021-03-12 | 2021-04-09 | REPAIR WATER | EAST TREMONT AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET SCHLEY AVENUE |
M012021070A86 | 2021-03-11 | 2021-04-08 | REPAIR WATER | WEST 23 STREET, MANHATTAN, FROM STREET HIGH LINE TO STREET 11 AVENUE |
M012021055B07 | 2021-03-08 | 2021-02-28 | REPAIR WATER | LENOX AVENUE, MANHATTAN, FROM STREET WEST 131 STREET TO STREET WEST 132 STREET |
Q012021062A76 | 2021-03-03 | 2021-04-01 | REPAIR WATER | 72 STREET, QUEENS, FROM STREET 60 AVENUE TO STREET CALDWELL AVENUE |
X012021054A25 | 2021-02-23 | 2021-03-12 | REPAIR WATER | MACOMBS ROAD, BRONX, FROM STREET CROMWELL AVENUE TO STREET GOBLE PLACE |
M012021053B68 | 2021-02-22 | 2021-03-09 | REPAIR WATER | WEST 23 STREET, MANHATTAN, FROM STREET HIGH LINE TO STREET 11 AVENUE |
M012021046A14 | 2021-02-15 | 2021-02-23 | REPAIR WATER | WEST 23 STREET, MANHATTAN, FROM STREET HIGH LINE TO STREET 11 AVENUE |
M012021039B24 | 2021-02-08 | 2021-02-23 | REPAIR WATER | WEST 23 STREET, MANHATTAN, FROM STREET HIGH LINE TO STREET 11 AVENUE |
M012021025B41 | 2021-02-03 | 2021-02-23 | REPAIR WATER | WEST 23 STREET, MANHATTAN, FROM STREET HIGH LINE TO STREET 11 AVENUE |
B012021028A35 | 2021-01-28 | 2021-02-26 | REPAIR WATER | BRIGHTON 11 STREET, BROOKLYN, FROM STREET CASS PLACE TO STREET OCEAN VIEW AVENUE |
Q012021016A06 | 2021-01-16 | 2021-01-31 | REPAIR WATER | HILLSIDE AVENUE, QUEENS, FROM STREET 240 STREET TO STREET CREEDMOOR HOSPITAL BOUNDARY |
M012021016A01 | 2021-01-16 | 2021-01-31 | REPAIR WATER | LENOX AVENUE, MANHATTAN, FROM STREET WEST 131 STREET TO STREET WEST 132 STREET |
B012021013A78 | 2021-01-13 | 2021-01-17 | REPAIR WATER | BRIGHTON 11 STREET, BROOKLYN, FROM STREET CASS PLACE TO STREET OCEAN VIEW AVENUE |
Q012020365A55 | 2021-01-12 | 2021-01-17 | REPAIR WATER | HILLSIDE AVENUE, QUEENS, FROM STREET 240 STREET TO STREET CREEDMOOR HOSPITAL BOUNDARY |
M012021005A09 | 2021-01-05 | 2021-01-17 | REPAIR WATER | LENOX AVENUE, MANHATTAN, FROM STREET WEST 131 STREET TO STREET WEST 132 STREET |
X012020366A91 | 2020-12-31 | 2021-01-14 | REPAIR WATER | MACOMBS ROAD, BRONX, FROM STREET CROMWELL AVENUE TO STREET GOBLE PLACE |
Q012020366C66 | 2020-12-31 | 2021-01-14 | REPAIR WATER | 35 STREET, QUEENS, FROM STREET 28 AVENUE TO STREET 30 AVENUE |
X012020363A03 | 2020-12-28 | 2020-12-31 | REPAIR WATER | MACOMBS ROAD, BRONX, FROM STREET CROMWELL AVENUE TO STREET GOBLE PLACE |
B012020356A81 | 2020-12-21 | 2020-12-31 | REPAIR WATER | SOUTH ELLIOTT PLACE, BROOKLYN, FROM STREET ACADEMY PARK PLACE TO STREET HANSON PLACE |
M012020346A08 | 2020-12-11 | 2020-12-22 | REPAIR WATER | LENOX AVENUE, MANHATTAN, FROM STREET WEST 131 STREET TO STREET WEST 132 STREET |
M012020344A06 | 2020-12-09 | 2020-12-31 | REPAIR WATER | LENOX AVENUE, MANHATTAN, FROM STREET WEST 130 STREET TO STREET WEST 131 STREET |
Q012020343A68 | 2020-12-08 | 2020-12-31 | REPAIR WATER | 35 STREET, QUEENS, FROM STREET 28 AVENUE TO STREET 30 AVENUE |
Q012020323A48 | 2020-11-18 | 2020-12-17 | REPAIR WATER | SPRINGFIELD BOULEVARD, QUEENS, FROM STREET 131 AVENUE TO STREET 132 AVENUE |
M012020311A38 | 2020-11-13 | 2020-11-24 | REPAIR WATER | FRANKLIN STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET WEST BROADWAY |
M012020316A15 | 2020-11-11 | 2020-12-08 | REPAIR WATER | LENOX AVENUE, MANHATTAN, FROM STREET WEST 131 STREET TO STREET WEST 132 STREET |
M012020309B54 | 2020-11-04 | 2020-11-20 | REPAIR WATER | 2 AVENUE, MANHATTAN, FROM STREET EAST 2 STREET TO STREET NY MARBLE CEMETERY BOUNDARY |
B012020307A68 | 2020-11-02 | 2020-11-12 | REPAIR WATER - PROTECTED | 57 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012020279A10 | 2020-10-05 | 2020-10-29 | REPAIR WATER - PROTECTED | 57 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012020273A05 | 2020-09-29 | 2020-10-24 | REPAIR WATER | BROOKLYN AVENUE, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD |
M012020259B10 | 2020-09-15 | 2020-09-30 | REPAIR WATER - PROTECTED | 7 AVENUE, MANHATTAN, FROM STREET WEST 144 STREET TO STREET WEST 145 STREET |
M012020258B31 | 2020-09-14 | 2020-09-20 | REPAIR WATER | 3 AVENUE, MANHATTAN, FROM STREET EAST 44 STREET TO STREET EAST 45 STREET |
M012020255A43 | 2020-09-11 | 2020-10-09 | REPAIR WATER | WEST 8 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET MAC DOUGAL STREET |
M012020247A66 | 2020-09-03 | 2020-09-20 | REPAIR WATER | 3 AVENUE, MANHATTAN, FROM STREET EAST 44 STREET TO STREET EAST 45 STREET |
B012020247B04 | 2020-09-03 | 2020-09-29 | REPAIR WATER | MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD |
X012020246A29 | 2020-09-02 | 2020-09-29 | REPAIR WATER | MANIDA STREET, BRONX, FROM STREET EAST BAY AVENUE TO STREET OAK POINT AVENUE |
M012020198A28 | 2020-08-25 | 2020-08-14 | REPAIR WATER - PROTECTED | EAST 46 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
B012020233A18 | 2020-08-20 | 2020-09-16 | REPAIR WATER | MARCY AVENUE, BROOKLYN, FROM STREET HOPE STREET TO STREET METROPOLITAN AVENUE |
B012020233A28 | 2020-08-20 | 2020-09-18 | REPAIR SEWER | METROPOLITAN AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NORTH 5 STREET |
M012020233A60 | 2020-08-20 | 2020-09-16 | REPAIR WATER - PROTECTED | 7 AVENUE, MANHATTAN, FROM STREET WEST 144 STREET TO STREET WEST 145 STREET |
M012020213A11 | 2020-08-19 | 2020-08-26 | REPAIR WATER | 3 AVENUE, MANHATTAN, FROM STREET EAST 44 STREET TO STREET EAST 45 STREET |
Q012020223A33 | 2020-08-10 | 2020-09-04 | REPAIR WATER | 122 STREET, QUEENS, FROM STREET 28 AVENUE TO STREET 29 AVENUE |
M012020216A26 | 2020-08-03 | 2020-08-27 | REPAIR WATER - PROTECTED | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 164 STREET TO STREET WEST 165 STREET |
M012020210B69 | 2020-07-28 | 2020-08-16 | REPAIR WATER - PROTECTED | 7 AVENUE, MANHATTAN, FROM STREET WEST 144 STREET TO STREET WEST 145 STREET |
M012020206A00 | 2020-07-24 | 2020-08-21 | REPAIR WATER - PROTECTED | EAST 46 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
B012020199A00 | 2020-07-17 | 2020-08-02 | REPAIR WATER | GROVE STREET, BROOKLYN, FROM STREET BEND TO STREET BUSHWICK AVENUE |
M012020191A10 | 2020-07-09 | 2020-08-02 | REPAIR WATER - PROTECTED | 7 AVENUE, MANHATTAN, FROM STREET WEST 144 STREET TO STREET WEST 145 STREET |
M012020183A27 | 2020-07-01 | 2020-07-30 | REPAIR WATER | WEST 125 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET LENOX AVENUE |
M012020178A16 | 2020-06-26 | 2020-07-15 | REPAIR WATER - PROTECTED | EAST 124 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
M012020169A15 | 2020-06-17 | 2020-06-28 | REPAIR WATER | EAST 125 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
M012020149B38 | 2020-05-28 | 2020-06-12 | REPAIR WATER - PROTECTED | 8 AVENUE, MANHATTAN, FROM STREET WEST 148 STREET TO STREET WEST 149 STREET |
Q012020129A40 | 2020-05-08 | 2020-06-05 | REPAIR WATER | JACKSON AVENUE, QUEENS, FROM STREET 50 AVENUE TO STREET 51 AVENUE |
X012019296E04 | 2020-05-06 | 2019-11-07 | REPAIR WATER | EASTCHESTER ROAD, BRONX, FROM STREET HAMMERSLEY AVENUE TO STREET NYCTA SUBWAY |
M012020125A23 | 2020-05-04 | 2020-05-29 | REPAIR WATER - PROTECTED | 8 AVENUE, MANHATTAN, FROM STREET WEST 148 STREET TO STREET WEST 149 STREET |
M012020083A05 | 2020-03-23 | 2020-04-16 | REPAIR WATER | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 168 STREET TO STREET WEST 169 STREET |
M012020077A09 | 2020-03-17 | 2020-04-07 | REPAIR WATER - SEWER - PROTECTED | EAST 104 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
X012020064A21 | 2020-03-04 | 2020-03-19 | REPAIR WATER - SEWER | EAST 159 STREET, BRONX, FROM STREET COURTLANDT AVENUE TO STREET MELROSE AVENUE |
B012020064A76 | 2020-03-04 | 2020-03-18 | REPAIR WATER - SEWER | 3 AVENUE, BROOKLYN, FROM STREET 100 STREET TO STREET 101 STREET |
B012020059A34 | 2020-02-28 | 2020-03-24 | REPAIR WATER - SEWER | WEST END AVENUE, BROOKLYN, FROM STREET HAMPTON AVENUE TO STREET OCEAN COURT |
X012020051A91 | 2020-02-20 | 2020-03-17 | REPAIR SEWER - PROTECTED | CLINTON AVENUE, BRONX, FROM STREET BOSTON ROAD TO STREET JEFFERSON PLACE |
X012020051A44 | 2020-02-20 | 2020-03-17 | REPAIR WATER | BOSTON ROAD, BRONX, FROM STREET CLINTON AVENUE TO STREET UNION AVENUE |
X012020050A38 | 2020-02-19 | 2020-03-17 | REPAIR WATER - SEWER | JEFFERSON PLACE, BRONX, FROM STREET BOSTON ROAD TO STREET CLINTON AVENUE |
M012020048A05 | 2020-02-17 | 2020-03-03 | REPAIR WATER - PROTECTED | 8 AVENUE, MANHATTAN, FROM STREET WEST 148 STREET TO STREET WEST 149 STREET |
B012020044A86 | 2020-02-13 | 2020-03-12 | REPAIR WATER - SEWER | 39 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B012020037A41 | 2020-02-06 | 2020-02-11 | REPAIR WATER - SEWER | OCEAN AVENUE, BROOKLYN, FROM STREET AVENUE O TO STREET AVENUE P |
B012020036A41 | 2020-02-05 | 2020-03-04 | REPAIR WATER - SEWER | 3 AVENUE, BROOKLYN, FROM STREET 100 STREET TO STREET 101 STREET |
B012020035A23 | 2020-02-04 | 2020-02-27 | REPAIR WATER - SEWER | HURON STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD |
M012020027A81 | 2020-01-27 | 2020-02-24 | REPAIR WATER - SEWER | 8 AVENUE, MANHATTAN, FROM STREET WEST 45 STREET TO STREET WEST 46 STREET |
M012020027A79 | 2020-01-27 | 2020-02-22 | REPAIR WATER - SEWER | WEST 45 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET SHUBERT ALLEY |
Q012020008A23 | 2020-01-09 | 2020-01-17 | REPAIR WATER - PROTECTED | 48 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET BROADWAY |
B012020009B54 | 2020-01-09 | 2020-01-17 | REPAIR WATER - SEWER | UTICA AVENUE, BROOKLYN, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE |
X012019353A33 | 2019-12-19 | 2019-12-31 | REPAIR WATER - SEWER | OGDEN AVENUE, BRONX, FROM STREET BEND TO STREET DR M L KING JR BOULEVARD |
X012019352A30 | 2019-12-18 | 2019-12-31 | REPAIR WATER - SEWER | EAST 159 STREET, BRONX, FROM STREET COURTLANDT AVENUE TO STREET MELROSE AVENUE |
X012019346A02 | 2019-12-12 | 2019-12-28 | REPAIR WATER - SEWER | EXTERIOR STREET, BRONX, FROM STREET MAJOR DEEGAN EXPWY ET 3 SB TO STREET MAJOR DEEGAN EXPRESSWAY |
X012019340A04 | 2019-12-06 | 2019-12-31 | REPAIR WATER - SEWER - PROTECTED | WEBSTER AVENUE, BRONX, FROM STREET EAST 204 STREET TO STREET EAST 205 STREET |
M012019318A06 | 2019-11-14 | 2019-11-14 | REPAIR SEWER - PROTECTED | WEST 125 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET ST CLAIRE PLACE |
X012019318A06 | 2019-11-14 | 2019-12-07 | REPAIR WATER - SEWER | HOME STREET, BRONX, FROM STREET SIMPSON STREET TO STREET SOUTHERN BOULEVARD |
B012019310C69 | 2019-11-06 | 2019-11-14 | REPAIR WATER | FULTON STREET, BROOKLYN, FROM STREET BOND STREET TO STREET HANOVER PLACE |
Q012019302F67 | 2019-10-29 | 2019-11-27 | REPAIR WATER - SEWER | REDFERN AVENUE, QUEENS, FROM STREET BIRDSALL AVENUE TO STREET NAMEOKE AVENUE |
Q012019302F68 | 2019-10-29 | 2019-11-26 | REPAIR WATER | NAMEOKE AVENUE, QUEENS, FROM STREET BRUNSWICK AVENUE TO STREET REDFERN AVENUE |
B012019300A01 | 2019-10-27 | 2019-10-31 | REPAIR WATER | FULTON STREET, BROOKLYN, FROM STREET BOND STREET TO STREET HANOVER PLACE |
X012019298B49 | 2019-10-25 | 2019-11-22 | REPAIR WATER - SEWER | MANIDA STREET, BRONX, FROM STREET EAST BAY AVENUE TO STREET OAK POINT AVENUE |
M012019297A66 | 2019-10-24 | 2019-11-14 | REPAIR WATER - PROTECTED | WEST 66 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
M012019275B62 | 2019-10-02 | 2019-11-01 | REPAIR WATER - PROTECTED | EAST 54 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012019268A76 | 2019-09-25 | 2019-09-25 | REPAIR WATER - PROTECTED | WEST 66 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
M012019268A83 | 2019-09-25 | 2019-10-09 | REPAIR WATER - PROTECTED | WEST 66 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
B012019261D31 | 2019-09-18 | 2019-10-17 | REPAIR WATER | FULTON STREET, BROOKLYN, FROM STREET BOND STREET TO STREET HANOVER PLACE |
M012019260C18 | 2019-09-17 | 2019-10-02 | REPAIR WATER - PROTECTED | EAST 54 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012019254A80 | 2019-09-11 | 2019-09-25 | REPAIR WATER - PROTECTED | WEST 66 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
B012019249B81 | 2019-09-06 | 2019-10-04 | REPAIR WATER - SEWER | 17 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B012019241B04 | 2019-08-29 | 2019-09-18 | REPAIR WATER | GATEWAY DRIVE, BROOKLYN, FROM STREET BEND TO STREET VANDALIA AVENUE |
M012019240A05 | 2019-08-28 | 2019-09-18 | REPAIR WATER - PROTECTED | EAST 54 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012019235A18 | 2019-08-23 | 2019-09-18 | REPAIR WATER - PROTECTED | EAST 126 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
M012019230A06 | 2019-08-18 | 2019-09-11 | REPAIR WATER - PROTECTED | WEST 66 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
M012019223A03 | 2019-08-11 | 2019-09-07 | REPAIR WATER - PROTECTED | WEST 55 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012019220C53 | 2019-08-08 | 2019-09-06 | REPAIR WATER - SEWER | MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD |
M012019214A01 | 2019-08-02 | 2019-08-12 | REPAIR SEWER - PROTECTED | EAST 19 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET PARK AVENUE SOUTH |
M012019213A61 | 2019-08-01 | 2019-08-04 | REPAIR WATER - SEWER | EAST 124 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
M012019199B21 | 2019-07-18 | 2019-08-12 | REPAIR WATER - PROTECTED | WEST 66 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
X012019192A00 | 2019-07-11 | 2019-07-31 | REPAIR WATER - SEWER | WOODYCREST AVENUE, BRONX, FROM STREET WEST 162 STREET TO STREET WEST 163 STREET |
X012019184A71 | 2019-07-03 | 2019-07-31 | REPAIR WATER - SEWER | LYVERE STREET, BRONX, FROM STREET BEND TO STREET ZEREGA AVENUE |
B012019178A00 | 2019-06-27 | 2019-07-17 | REPAIR WATER - SEWER | 38 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
X012019175B67 | 2019-06-24 | 2019-07-13 | REPAIR WATER - SEWER | UNIVERSITY AVENUE, BRONX, FROM STREET STRONG STREET TO STREET WEST 195 STREET |
M012019173A02 | 2019-06-22 | 2019-07-06 | REPAIR WATER - PROTECTED | WEST 66 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
X012019171A00 | 2019-06-20 | 2019-07-17 | REPAIR SEWER | BRUCKNER BOULEVARD, BRONX, FROM STREET OLMSTEAD AVENUE TO STREET PUGSLEY AVENUE |
B012019162B51 | 2019-06-11 | 2019-06-17 | REPAIR WATER - SEWER | MESEROLE AVENUE, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET GEM STREET |
Q012019161B66 | 2019-06-10 | 2019-06-26 | REPAIR WATER - SEWER | SPRINGFIELD BOULEVARD, QUEENS, FROM STREET 131 AVENUE TO STREET 132 AVENUE |
B012019161A00 | 2019-06-10 | 2019-07-02 | REPAIR WATER | FRANKLIN STREET, BROOKLYN, FROM STREET MESEROLE AVENUE TO STREET NORTH 15 STREET |
B012019154A01 | 2019-06-03 | 2019-07-02 | REPAIR WATER | MARCUS GARVEY BOULEVARD, BROOKLYN, FROM STREET DECATUR STREET TO STREET FULTON STREET |
M012019154D17 | 2019-06-03 | 2019-06-26 | REPAIR WATER - SEWER - PROTECTED | EAST 12 STREET, MANHATTAN, FROM STREET AVENUE A TO STREET AVENUE B |
M012019154D18 | 2019-06-03 | 2019-06-20 | REPAIR WATER - SEWER | AVENUE A, MANHATTAN, FROM STREET EAST 12 STREET TO STREET EAST 13 STREET |
M012019151A95 | 2019-05-31 | 2019-06-22 | REPAIR WATER - PROTECTED | WEST 66 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
B012019150F02 | 2019-05-30 | 2019-06-20 | REPAIR WATER - SEWER | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B012019150F01 | 2019-05-30 | 2019-06-02 | REPAIR WATER - SEWER | MESEROLE AVENUE, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET GEM STREET |
Q012019148D51 | 2019-05-28 | 2019-06-09 | REPAIR SEWER | SPRINGFIELD BOULEVARD, QUEENS, FROM STREET 131 AVENUE TO STREET 132 AVENUE |
X012019148A12 | 2019-05-28 | 2019-06-18 | REPAIR WATER - SEWER | BELMONT AVENUE, BRONX, FROM STREET CRESCENT AVENUE TO STREET EAST 183 STREET |
B012019141A29 | 2019-05-21 | 2019-06-12 | REPAIR WATER - PROTECTED | FLATBUSH AVENUE, BROOKLYN, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET |
B012019139A00 | 2019-05-19 | 2019-06-11 | REPAIR WATER - PROTECTED | FLATBUSH AVENUE, BROOKLYN, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET |
B012019135E04 | 2019-05-15 | 2019-05-30 | REPAIR WATER - SEWER | MESEROLE AVENUE, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET GEM STREET |
B012019130B21 | 2019-05-10 | 2019-06-11 | REPAIR WATER | STATE STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET FLATBUSH AVENUE |
B012019130B23 | 2019-05-10 | 2019-06-11 | REPAIR WATER | SCHERMERHORN STREET, BROOKLYN, FROM STREET BEND TO STREET FLATBUSH AVENUE |
M012019129A03 | 2019-05-09 | 2019-06-05 | REPAIR WATER - SEWER | BROADWAY, MANHATTAN, FROM STREET CUMMING STREET TO STREET DYCKMAN STREET |
M012019127A32 | 2019-05-07 | 2019-06-18 | REPAIR WATER - SEWER | BROADWAY, MANHATTAN, FROM STREET CUMMING STREET TO STREET DYCKMAN STREET |
X012019123B75 | 2019-05-03 | 2019-05-30 | REPAIR WATER - SEWER | EAST 133 STREET, BRONX, FROM STREET CYPRESS AVENUE TO STREET WILLOW AVENUE |
Q012019117A00 | 2019-04-27 | 2019-05-26 | REPAIR SEWER | SPRINGFIELD BOULEVARD, QUEENS, FROM STREET 131 AVENUE TO STREET 132 AVENUE |
M012019114B24 | 2019-04-24 | 2019-05-20 | REPAIR WATER - SEWER | CANAL STREET, MANHATTAN, FROM STREET CENTRE STREET TO STREET LAFAYETTE STREET |
X012019114A00 | 2019-04-24 | 2019-05-18 | REPAIR WATER - SEWER | COSTER STREET, BRONX, FROM STREET EAST BAY AVENUE TO STREET OAK POINT AVENUE |
M012019107B16 | 2019-04-17 | 2019-05-12 | REPAIR WATER - PROTECTED | JOHN STREET, MANHATTAN, FROM STREET CLIFF STREET TO STREET PEARL STREET |
M012019107B15 | 2019-04-17 | 2019-05-01 | REPAIR WATER | PLATT STREET, MANHATTAN, FROM STREET GOLD STREET TO STREET PEARL STREET |
B012019106B42 | 2019-04-16 | 2019-05-16 | REPAIR WATER - SEWER | MESEROLE AVENUE, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET GEM STREET |
B012019106F81 | 2019-04-16 | 2019-05-03 | REPAIR WATER - SEWER - PROTECTED | NORTH 15 STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET GEM STREET |
B012019105A00 | 2019-04-15 | 2019-05-03 | REPAIR WATER - SEWER - PROTECTED | 58 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
Q012019102A31 | 2019-04-12 | 2019-04-26 | REPAIR SEWER | SPRINGFIELD BOULEVARD, QUEENS, FROM STREET 131 AVENUE TO STREET 132 AVENUE |
B012019100G52 | 2019-04-10 | 2019-05-03 | REPAIR WATER - SEWER | BLEECKER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE |
X012019092B66 | 2019-04-02 | 2019-04-20 | REPAIR WATER - SEWER | EAST TREMONT AVENUE, BRONX, FROM STREET DALY AVENUE TO STREET HONEYWELL AVENUE |
B012019078B55 | 2019-03-19 | 2019-04-11 | REPAIR WATER - SEWER | HALSEY STREET, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
Q012019074B05 | 2019-03-15 | 2019-04-12 | REPAIR SEWER | SPRINGFIELD BOULEVARD, QUEENS, FROM STREET 131 AVENUE TO STREET 132 AVENUE |
B012019072A84 | 2019-03-13 | 2019-04-12 | REPAIR WATER - SEWER | TOMPKINS AVENUE, BROOKLYN, FROM STREET HALSEY STREET TO STREET HANCOCK STREET |
X012019067A00 | 2019-03-08 | 2019-04-04 | REPAIR WATER | JEROME AVENUE, BRONX, FROM STREET EAST 176 STREET TO STREET WEST 176 STREET |
M012019066A75 | 2019-03-07 | 2019-04-06 | REPAIR WATER - SEWER | BROOME STREET, MANHATTAN, FROM STREET BEND TO STREET CHRYSTIE STREET |
M012019065A60 | 2019-03-06 | 2019-04-06 | REPAIR WATER - SEWER | BOWERY, MANHATTAN, FROM STREET BROOME STREET TO STREET GRAND STREET |
B012019060A04 | 2019-03-01 | 2019-03-07 | REPAIR WATER - SEWER | 44 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
X012019055A00 | 2019-02-24 | 2019-03-22 | REPAIR WATER - SEWER | TRINITY AVENUE, BRONX, FROM STREET EAST 158 STREET TO STREET EAST 160 STREET |
X012019051A50 | 2019-02-20 | 2019-03-21 | REPAIR WATER - PROTECTED | HUNTS POINT AVENUE, BRONX, FROM STREET BRYANT AVENUE TO STREET SPOFFORD AVENUE |
M012019045A02 | 2019-02-14 | 2019-03-13 | REPAIR WATER - SEWER - PROTECTED | 3 AVENUE, MANHATTAN, FROM STREET EAST 119 STREET TO STREET EAST 120 STREET |
M012019043B17 | 2019-02-12 | 2019-03-13 | REPAIR WATER - SEWER - PROTECTED | EAST 120 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
B012019037D82 | 2019-02-06 | 2019-03-03 | REPAIR WATER - SEWER | WEST 17 STREET, BROOKLYN, FROM STREET AVENUE Z TO STREET BAY 50 STREET |
B012019023B68 | 2019-01-23 | 2019-02-16 | REPAIR WATER - SEWER - PROTECTED | EAST 21 STREET, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE |
X012019018A40 | 2019-01-18 | 2019-02-15 | REPAIR WATER - SEWER | RIVER AVENUE, BRONX, FROM STREET EAST 167 STREET TO STREET MC CLELLAN STREET |
X012019014B52 | 2019-01-14 | 2019-02-10 | REPAIR WATER - SEWER - PROTECTED | 3 AVENUE, BRONX, FROM STREET EAST 166 STREET TO STREET EAST 167 STREET |
X012018359A00 | 2018-12-25 | 2018-12-31 | REPAIR WATER - SEWER | MAPES AVENUE, BRONX, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET |
X012018359A01 | 2018-12-25 | 2018-12-31 | REPAIR WATER - SEWER | EAST 147 STREET, BRONX, FROM STREET AUSTIN PLACE TO STREET TIMPSON PLACE |
X012018346B05 | 2018-12-12 | 2018-12-31 | REPAIR WATER - SEWER | JACKSON AVENUE, BRONX, FROM STREET EAST 147 STREET TO STREET EAST 149 STREET |
B012018344C85 | 2018-12-10 | 2018-12-18 | REPAIR WATER - SEWER - PROTECTED | WEST STREET, BROOKLYN, FROM STREET GREEN STREET TO STREET HURON STREET |
B012018338B86 | 2018-12-04 | 2018-12-31 | REPAIR WATER - SEWER - PROTECTED | UNION AVENUE, BROOKLYN, FROM STREET HEWES STREET TO STREET STAGG STREET |
B012018331G13 | 2018-11-27 | 2018-12-10 | REPAIR WATER - SEWER - PROTECTED | WEST STREET, BROOKLYN, FROM STREET GREEN STREET TO STREET HURON STREET |
B012018261B49 | 2018-09-18 | 2018-10-11 | REPAIR WATER - SEWER - PROTECTED | STERLING PLACE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET WASHINGTON AVENUE |
X012018166A08 | 2018-06-15 | 2018-07-08 | REPAIR WATER - SEWER - PROTECTED | FRANKLIN AVENUE, BRONX, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET |
B012018163F01 | 2018-06-12 | 2018-07-07 | REPAIR WATER - SEWER - PROTECTED | BERGEN STREET, BROOKLYN, FROM STREET KINGSBOROUGH 1 WALK TO STREET KINGSBOROUGH 2 WALK |
X012018156C36 | 2018-06-05 | 2018-06-12 | REPAIR WATER - SEWER | EAST 179 STREET, BRONX, FROM STREET ARTHUR AVENUE TO STREET HUGHES AVENUE |
B012018151C13 | 2018-05-31 | 2018-06-15 | REPAIR WATER | WILLOUGHBY STREET, BROOKLYN, FROM STREET FLATBUSH AVENUE EXTENSION TO STREET GOLD STREET |
B012018127A01 | 2018-05-07 | 2018-06-12 | REPAIR WATER - SEWER - PROTECTED | 63 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE |
X012018093A44 | 2018-04-03 | 2018-04-22 | REPAIR WATER - PROTECTED | 3 AVENUE, BRONX, FROM STREET EAST 136 STREET TO STREET EAST 137 STREET |
X012018087B65 | 2018-03-28 | 2018-04-22 | REPAIR SEWER - PROTECTED | 3 AVENUE, BRONX, FROM STREET EAST 136 STREET TO STREET EAST 137 STREET |
M012018031B90 | 2018-02-14 | 2018-02-28 | REPAIR WATER - PROTECTED | LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 56 STREET TO STREET EAST 57 STREET |
B012018030D00 | 2018-01-30 | 2018-02-15 | REPAIR WATER - PROTECTED | PRESIDENT STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
X012018016A93 | 2018-01-16 | 2018-02-11 | REPAIR WATER - SEWER - PROTECTED | FRANKLIN AVENUE, BRONX, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET |
B012018008B96 | 2018-01-08 | 2018-02-01 | REPAIR WATER - PROTECTED | PRESIDENT STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
M012017320A49 | 2017-12-11 | 2017-11-20 | REPAIR WATER - PROTECTED | LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 56 STREET TO STREET EAST 57 STREET |
Start date | End date | Type | Value |
---|---|---|---|
2024-10-02 | 2024-10-03 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-08-13 | 2024-10-02 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-06-04 | 2024-08-13 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-06-04 | 2024-06-04 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-05-23 | 2024-06-04 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-05-15 | 2024-05-23 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-05-08 | 2024-05-15 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-02-26 | 2024-05-08 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-01-03 | 2024-02-26 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-12-15 | 2024-01-03 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-08-01 | 2023-12-15 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-07-24 | 2023-08-01 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-07-18 | 2023-07-24 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-07-18 | 2023-07-18 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-07-10 | 2023-07-18 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-06-17 | 2023-07-10 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-06-07 | 2023-06-07 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-06-07 | 2023-06-17 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-05-08 | 2023-06-07 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-04-25 | 2023-05-08 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-04-20 | 2023-04-25 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-04-12 | 2023-04-20 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-01-30 | 2023-04-12 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-01-19 | 2023-01-30 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-01-10 | 2023-01-19 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-12-29 | 2022-12-29 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-12-29 | 2023-01-10 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-12-28 | 2022-12-29 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-11-10 | 2022-12-28 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-11-10 | 2022-11-10 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-11-09 | 2022-11-10 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-09-27 | 2022-11-09 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-09-08 | 2022-09-27 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-09-07 | 2022-09-08 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-09-07 | 2022-09-07 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-04 | 2022-09-07 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-07-22 | 2022-08-04 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-07-22 | 2022-07-22 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-06-30 | 2022-07-22 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-06-30 | 2022-06-30 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-05-12 | 2022-06-30 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-05-12 | 2022-05-12 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-04-15 | 2022-05-12 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-04-15 | 2022-04-15 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-03-16 | 2022-04-15 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-03-16 | 2022-03-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-03-03 | 2022-03-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-03-03 | 2022-03-03 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-03-02 | 2022-03-03 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-03-02 | 2022-03-02 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-02-16 | 2022-03-02 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-02-16 | 2022-02-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-08-23 | 2022-02-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-02-09 | 2023-01-31 | Address | 60 EAST BROADWAY, GROUND FLOOR SUITE 103, NEW YORK, NY, 10002, USA (Type of address: Chief Executive Officer) |
2020-10-01 | 2021-02-09 | Address | 103-61 99TH STREET, OZONE PARK, NY, 11416, USA (Type of address: Chief Executive Officer) |
2017-02-03 | 2017-02-08 | Name | MES CONTRACTING CORP. |
2016-03-22 | 2023-01-31 | Address | 2818 DITMARS BLVD., ASTORIA, NY, 11105, USA (Type of address: Service of Process) |
2016-03-22 | 2021-08-23 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2016-03-22 | 2017-02-03 | Name | MES CONSTRUCTION CORP. |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
230131002419 | 2023-01-30 | CERTIFICATE OF CHANGE BY ENTITY | 2023-01-30 |
210209002007 | 2021-02-09 | AMENDMENT TO BIENNIAL STATEMENT | 2020-03-01 |
201001062191 | 2020-10-01 | BIENNIAL STATEMENT | 2020-03-01 |
170208000618 | 2017-02-08 | CERTIFICATE OF AMENDMENT | 2017-02-08 |
170203000643 | 2017-02-03 | CERTIFICATE OF AMENDMENT | 2017-02-03 |
160322010272 | 2016-03-22 | CERTIFICATE OF INCORPORATION | 2016-03-22 |
Date | Inspection Object | Address | Grade | Type | Institution | Desctiption |
---|---|---|---|---|---|---|
2024-10-30 | No data | BUCHANAN PLACE, FROM STREET AQUEDUCT AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flag is flush with sealed expansion joints |
2024-10-30 | No data | NELSON AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET FEATHERBED LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration and sidewalk flags restored around water valve IFO 1534. |
2024-10-30 | No data | EAST 205 STREET, FROM STREET GRAND CONCOURSE TO STREET LISBON PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has a perm cut in the p/l. |
2024-10-29 | No data | HARROD AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in roadway , sidewalk in compliance w |
2024-10-27 | No data | DE KALB AVENUE, FROM STREET KENT AVENUE TO STREET TAAFFE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joint needs to be sealed in the curb area & patchwork is unacceptable sidewalk flag need to be restored in full in front of 463 Dekalb Ave. Permit expired on 10/24/2024 |
2024-10-27 | No data | CEDAR STREET, FROM STREET EAST 16 STREET TO STREET EAST 17 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane |
2024-10-23 | No data | FAILE STREET, FROM STREET ALDUS STREET TO STREET EAST 165 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent plumbers restoration in roadway two concrete sidewalk flags installed in compliance |
2024-10-23 | No data | 54 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water repair in compliance |
2024-10-22 | No data | FLATLANDS AVENUE, FROM STREET PENNSYLVANIA AVENUE TO STREET SHEFFIELD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut closer to car wash okay |
2024-10-20 | No data | BROADWAY, FROM STREET BOROUGH BOUNDARY TO STREET WEST 262 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm st cut |
2024-10-19 | No data | LONGFELLOW AVENUE, FROM STREET BEND TO STREET JENNINGS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent plumbers restoration in the driving lane in compliance |
2024-10-18 | No data | EAST 135 STREET, FROM STREET LOCUST AVENUE TO STREET ROSE FEISS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site, Working in rw nearest Locust Ave |
2024-10-18 | No data | 1 AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the respondent failed to mark out, proposed excavated area on the roadway as required with white paint. Respondent ID by submitted application#2024100400667206. |
2024-10-17 | No data | WEST 174 STREET, FROM STREET MACOMBS ROAD TO STREET NELSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the driving lane IFO 83. |
2024-10-17 | No data | WEST 55 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a permanent cut within the driving lane near the parking garage entrance/exit in front of 77. |
2024-10-12 | No data | MANOR AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in roadway in compliance |
2024-10-12 | No data | 28 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic Water Service Leak Contractor currently making Repairs in the Roadway 3 Day Dep Notice Issued |
2024-10-10 | No data | SOUTH 9 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration to grade located in the driving lane IFO property 100 |
2024-10-08 | No data | HALPERIN AVENUE, FROM STREET BLONDELL AVENUE TO STREET WILLIAMSBRIDGE ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plumber work done in the sidewalk and roadway |
2024-10-07 | No data | WALLACE AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in the roadway and sidewalk |
2024-10-06 | No data | KELLY STREET, FROM STREET EAST 156 STREET TO STREET LONGWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut on sidewalk and roadway in compliance |
2024-10-06 | No data | TIFFANY STREET, FROM STREET OAK POINT AVENUE TO STREET RANDALL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway |
2024-10-05 | No data | VYSE AVENUE, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in the middle of the roadway in compliance |
2024-10-01 | No data | GRAND AVENUE, FROM STREET WEST 174 STREET TO STREET WEST 175 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the driving lane of the roadway. |
2024-10-01 | No data | BAINBRIDGE AVENUE, FROM STREET EAST 204 STREET TO STREET EAST 206 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the driving lane need to install yellow lane marking, remove white lane marking. |
2024-09-26 | No data | EAST 17 STREET, FROM STREET AVENUE M TO STREET CEDAR STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | steel plate marked Metro Sewer found on roadway without a DOT permit |
2024-09-25 | No data | NANSEN STREET, FROM STREET 69 AVENUE TO STREET SELFRIDGE STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | 2 steel plates pinned and ramped on roadway at time of inspection. |
2024-09-24 | No data | PROSPECT PLACE, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE PARKING LANE AND SIDE WALK FLAG INSTALLED AROUND WATER CAP COVER |
2024-09-23 | No data | BRUCKNER BOULEVARD, FROM STREET BROOK AVENUE TO STREET ST ANNS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done , BPP paved over cut in roadway in compliance |
2024-09-20 | No data | VILLA AVENUE, FROM STREET EAST 205 STREET TO STREET VAN CORTLANDT AVENUE EAST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | resurfaced by 1/2+ 5. |
2024-09-19 | No data | BERGEN STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the r/w behind jersey barriers. |
2024-09-18 | No data | STATE STREET, FROM STREET BRIDGE STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done. |
2024-09-18 | No data | 49 STREET, FROM STREET 18 AVENUE TO STREET OLD NEW UTRECHT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sewer repair in compliance |
2024-09-17 | No data | CHURCH AVENUE, FROM STREET LLOYD STREET TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water repair in the parking lane |
2024-09-16 | No data | EAST 162 STREET, FROM STREET MORRIS AVENUE TO STREET TELLER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the driving lane and sidewalk restored in kind around water valve IFO 305. |
2024-09-16 | No data | DARTMOUTH STREET, FROM STREET 68 AVENUE TO STREET 69 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Sidewalk restoration not in kind. Full flag restoration needed |
2024-09-15 | No data | CLINTON STREET, FROM STREET BRYANT STREET TO STREET HALLECK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found and the permit expired 9/2/2024. A newer permit is on file #B012024246A00. |
2024-09-14 | No data | RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plated excavation in the roadway and sidewalk IFO 2104. |
2024-09-11 | No data | 82 AVENUE, FROM STREET 126 STREET TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done refer to newer permit Q012024191B17 |
2024-09-07 | No data | CARLISLE PLACE, FROM STREET EAST 211 STREET TO STREET EAST 213 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm. roadway cut opposite 3553, one sidewalk cut. |
2024-09-06 | No data | LORIMER STREET, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work visible within the roadway due to DOT paving of the segment after the permit expired. B152024208A71 |
2024-09-01 | No data | FINDLAY AVENUE, FROM STREET EAST 164 STREET TO STREET EAST 165 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints sealed |
2024-08-30 | No data | 1 AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | okay |
2024-08-29 | No data | EAST 36 STREET, FROM STREET 2 AVENUE TO STREET QNS MDTWN TNNL EXIT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO #225 (opposite 220) located on the sidewalk there is a single flag restoration around two (2) water valve covers. |
2024-08-27 | No data | EAST 179 STREET, FROM STREET DALY AVENUE TO STREET HONEYWELL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent sewer repair restoration in roadway |
2024-08-26 | No data | HONEYWELL AVENUE, FROM STREET BRONX PARK SOUTH TO STREET HORNADAY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water repair restoration in roadway |
2024-08-24 | No data | STRANG AVENUE, FROM STREET BAYCHESTER AVENUE TO STREET EDSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in the roadway and sidewalk |
2024-08-23 | No data | WALTON AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work downe at 1058. |
2024-08-23 | No data | CROTONA AVENUE, FROM STREET EAST 187 STREET TO STREET EAST 189 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent plumbing restoration in the parking lane flush to grade, color coded and sealed. i/f/o 2437 |
2024-08-10 | No data | TIFFANY STREET, FROM STREET OAK POINT AVENUE TO STREET RANDALL AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Sprinkler system out. Leaking onto property. Plumber working behind property line and in roadway opposite I/f/o location. |
2024-08-10 | No data | WILLOUGHBY AVENUE, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2024-08-09 | No data | EAST 4 STREET, FROM STREET 18 AVENUE TO STREET AVENUE F | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration on parking lane and sidewalk 1 flag in compliance |
2024-08-06 | No data | 7 AVENUE, FROM STREET WEST 47 STREET TO STREET WEST 48 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER |
2024-08-05 | No data | RADCLIFF AVENUE, FROM STREET ARNOW AVENUE TO STREET BOSTON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2024-08-04 | No data | 3 AVENUE, FROM STREET EAST 178 STREET TO STREET EAST 179 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | wATER I/F/O 4263 in compliance |
2024-08-02 | No data | NELSON AVENUE, FROM STREET EDWARD L GRANT HIGHWAY TO STREET WEST 172 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 8’ occupied near curb. |
2024-08-01 | No data | MORRIS AVENUE, FROM STREET EAST 181 STREET TO STREET EAST BURNSIDE AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | NOV for stip 078. |
2024-08-01 | No data | 20 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced BPP done for property permit #B012024142A88 |
2024-07-30 | No data | 1 AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w okay |
2024-07-30 | No data | STRAUSS STREET, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration covered by ConEdison cut opposite of the roadway. |
2024-07-29 | No data | NELSON AVENUE, FROM STREET EDWARD L GRANT HIGHWAY TO STREET WEST 172 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Rw open, vehicles not moved for alternate side parking, to run pipe, allowed to close rw for 10 min to place pipe. |
2024-07-24 | No data | WEST 27 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found no work done permit expired. |
2024-07-24 | No data | FARRAGUT ROAD, FROM STREET FLATBUSH AVENUE TO STREET KENILWORTH PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on the roadway |
2024-07-23 | No data | WILLIAMSBRIDGE ROAD, FROM STREET BOSTON ROAD TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on sidewalk, in compliance |
2024-07-23 | No data | WEBSTER AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 199 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B issued for failure to obtain a confirmation number prior to expiration of DOT street opening permit (protected street) |
2024-07-22 | No data | EAST 95 STREET, FROM STREET CHURCH AVENUE TO STREET WILLMOHR STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration within the parking lane located IFO 469 east 95th street |
2024-07-21 | No data | COURT STREET, FROM STREET BRYANT STREET TO STREET HALLECK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Segment found resurfaced and the permit expired 8/2/22. |
2024-07-18 | No data | 1 AVENUE, FROM STREET EAST 36 STREET TO STREET EAST 37 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done, permit expired. |
2024-07-17 | No data | 51 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has a permanent restoration, backfilled on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit # B012024140A01 expired 6/14/24. |
2024-07-17 | No data | STRAUSS STREET, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 5/23/24. |
2024-07-17 | No data | EASTERN PARKWAY, FROM STREET ROCHESTER AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired on 6/27/2024. |
2024-07-16 | No data | MC DONALD AVENUE, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has a permanent restoration, backfilled on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit # B012024148A03 expired 6/7/24. |
2024-07-16 | No data | LORIMER STREET, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2024-07-16 | No data | 48 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 4/12/24 |
2024-07-14 | No data | WEST 207 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to fully inspect due to ongoing building operation |
2024-07-14 | No data | BEDFORD PARK BOULEVARD, FROM STREET METRO NORTH RR TO STREET WEBSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water i/f/o Garage |
2024-07-13 | No data | EAST 176 STREET, FROM STREET CLAY AVENUE TO STREET TOPPING AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restored |
2024-07-13 | No data | EAST 176 STREET, FROM STREET CLAY AVENUE TO STREET TOPPING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | For CAR repairs |
2024-07-13 | No data | FINDLAY AVENUE, FROM STREET EAST 164 STREET TO STREET EAST 165 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the respondent failed to seal expansion joints as per subsection 19-152. MES Construction Corp. has sidewalk expansion joints that are not seal VIA CAR 20248580122 issued 6/4/24. |
2024-07-11 | No data | VYSE AVENUE, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET | No data | Street Construction Inspections: Active | Department of Transportation | Material currently placed in portion of parking lane |
2024-07-10 | No data | EAST 117 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flushed to grade. |
2024-07-09 | No data | CHRYSTIE STREET, FROM STREET RIVINGTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a permanent Restoration in the driving lane. |
2024-07-08 | No data | VYSE AVENUE, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active permit, crew on site working in the middle of roadway. Flagger placed |
2024-07-08 | No data | 1 AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w okay |
2024-07-08 | No data | FTELEY AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water repair restoration in roadway |
2024-07-06 | No data | FLATLANDS AVENUE, FROM STREET PENNSYLVANIA AVENUE TO STREET SHEFFIELD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the RW by gas station |
2024-07-02 | No data | 84 STREET, FROM STREET 17 AVENUE TO STREET BAY 16 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water repair in compliance |
2024-07-01 | No data | BOERUM STREET, FROM STREET BROADWAY TO STREET LORIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found |
2024-06-30 | No data | EAST 183 STREET, FROM STREET CROTONA AVENUE TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2024-06-30 | No data | EAST 50 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in compliance. |
2024-06-29 | No data | EAST 176 STREET, FROM STREET CLAY AVENUE TO STREET TOPPING AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joint appied and sealed. |
2024-06-29 | No data | EAST 103 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 cuts okay in d/l. i/f/o School Yard |
2024-06-25 | No data | 2 AVENUE, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut okay in d/l. |
2024-06-22 | No data | 9 AVENUE, FROM STREET BEND TO STREET WEST 207 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to fully inspect due to ongoing building operation |
2024-06-20 | No data | WEST 50 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER: R/W resurfaced |
2024-06-18 | No data | WEST 207 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to fully inspect due to ongoing building operation. |
2024-06-17 | No data | EAST 215 STREET, FROM STREET HOLLAND AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in the roadway |
2024-06-15 | No data | LORIMER STREET, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work completed on a more current permit. |
2024-06-15 | No data | NEW YORK AVENUE, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Lane marking installed |
2024-06-15 | No data | LORIMER STREET, FROM STREET MESEROLE STREET TO STREET MONTROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut from driving lane to the curb. |
2024-06-14 | No data | WEBSTER AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 199 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Has temp cut with asphalt on the bus lane. |
2024-06-14 | No data | 9 AVENUE, FROM STREET BEND TO STREET WEST 207 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to fully inspect due to ongoing building operation |
2024-06-13 | No data | WEBSTER AVENUE, FROM STREET EAST 3 STREET TO STREET OCEAN PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration on parking/driving lane in compliance |
2024-06-11 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced by DOT IN-HOUSE PAVING AND MILLING Permit #B152023223B10 |
2024-06-11 | No data | 47 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration on parking lane in compliance |
2024-06-07 | No data | LINDEN BOULEVARD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Cut in Travel Lane/ parking lane & 1 sidewalk flag installed. No Corrective Action Request, Permit expired. |
2024-06-06 | No data | NELSON AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET FEATHERBED LANE | No data | Street Construction Inspections: Active | Department of Transportation | NOV for not maintaining 1 - 11 ft lane for traffic. |
2024-06-06 | No data | EAST 176 STREET, FROM STREET CLAY AVENUE TO STREET TOPPING AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | all flags must be fully restored. we understand the poor state that is was in however, you disturbed the flag partially so it will have to be repaired in its entirety. contact. 212-839-2322 for more information. |
2024-06-06 | No data | SHERMAN AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway sidewalk in compliance |
2024-06-06 | No data | NELSON AVENUE, FROM STREET BRANDT PLACE TO STREET MACOMBS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the driving lane IFO 1709. |
2024-06-04 | No data | TELLER AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway in compliance I/f/o 1063 |
2024-06-04 | No data | FINDLAY AVENUE, FROM STREET EAST 164 STREET TO STREET EAST 165 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joints are missing IFO 998. Expansion joints need to be fully filled and sealed. |
2024-06-03 | No data | BEACH 19 STREET, FROM STREET CORNAGA AVENUE TO STREET MOTT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in roadway |
2024-05-31 | No data | EAST 170 STREET, FROM STREET BRISTOW STREET TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done |
2024-05-30 | No data | WALLACE AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass |
2024-05-30 | No data | WALLACE AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV equipment type excavator |
2024-05-29 | No data | FINDLAY AVENUE, FROM STREET BEND TO STREET EAST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the driving lane of the roadway IFO 1323. |
2024-05-27 | No data | INTERVALE AVENUE, FROM STREET CHISHOLM STREET TO STREET HOME STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Con Edison has active permit on file for 1230 Active fiber glass plate on sidewalk X012024131A80 |
2024-05-27 | No data | POPHAM AVENUE, FROM STREET WEST 175 STREET TO STREET WEST 176 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the driving lane of the roadway. |
2024-05-27 | No data | FINDLAY AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the driving lane and sidewalk flags restored in kind IFO 1229. |
2024-05-26 | No data | EAST 176 STREET, FROM STREET CLAY AVENUE TO STREET TOPPING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Patchwork is unacceptable IFO 230. Full flag restoration is needed. |
2024-05-25 | No data | COLLEGE AVENUE, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the driving lane of the roadway. |
2024-05-23 | No data | 40 AVENUE, FROM STREET 29 STREET TO STREET 30 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cobble stone restored within the driving lane over water restoration I/F/O 29-16 40th Avenue. |
2024-05-20 | No data | 4 AVENUE, FROM STREET 1 STREET TO STREET GARFIELD PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No visible work done. |
2024-05-18 | No data | PROSPECT AVENUE, FROM STREET EAST 175 STREET TO STREET EAST 176 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2024-05-18 | No data | EAST 36 STREET, FROM STREET 2 AVENUE TO STREET QNS MDTWN TNNL EXIT | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic Sanitary Sewer Backing up into Property. Contractor currently Making Repairs in the Sidewalk |
2024-05-17 | No data | HOLLAND AVENUE, FROM STREET EAST 213 STREET TO STREET EAST 214 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in the roadway and sidewalk |
2024-05-17 | No data | DITMAS AVENUE, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration on driving lane IFO property #124 and #128 in compliance |
2024-05-15 | No data | 44 DRIVE, FROM STREET JACKSON AVENUE TO STREET THOMSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Excavator in Road in front of 2604. |
2024-05-14 | No data | 58 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm plumber restorations on parking lane in compliance |
2024-05-13 | No data | 2 AVENUE, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut okay in d/l. |
2024-05-11 | No data | PENNSYLVANIA AVENUE, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY IS CURRENTLY MILLED |
2024-05-11 | No data | EAST 124 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No defects observed at time of inspection. |
2024-05-10 | No data | SEAVIEW AVENUE, FROM STREET BEND TO STREET ERSKINE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the RW, sealed and flushed |
2024-05-07 | No data | WEST 126 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Latest Permit# M012023272A14 |
2024-05-06 | No data | 62 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking/driving lane, AKA 6201 - 6223 6 Avenue. |
2024-05-06 | No data | EAST 4 STREET, FROM STREET 18 AVENUE TO STREET AVENUE F | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration on parking lane in compliance |
2024-05-04 | No data | EAST 233 STREET, FROM STREET MULVEY AVENUE TO STREET PROVOST AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done near the Double yellow line in the roadway |
2024-05-04 | No data | ROMBOUTS AVENUE, FROM STREET BOSTON ROAD TO STREET HOLLERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2024-05-04 | No data | NEW YORK AVENUE, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESTORE 1 OUT THE DOUBLE YELLOW LANE MARKINGS IN THE DRIVING LANE , LANE MARKINGS NOT RESTORED , RESTORE LANE MARKING IFO 931 NEW YORK AVE |
2024-05-04 | No data | PROVOST AVENUE, FROM STREET CITY LIMIT TO STREET EAST 233 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2024-05-04 | No data | SHEFFIELD AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the PL |
2024-05-02 | No data | CLINTON STREET, FROM STREET BRYANT STREET TO STREET HALLECK STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest Accepted. Restoration cut thru by MADISON PIPE CONSULTANTS INC. Color code was once installed. |
2024-04-30 | No data | DITMARS BOULEVARD, FROM STREET 27 STREET TO STREET 28 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work was done, not cuts. Permit expired. |
2024-04-30 | No data | LEONARD STREET, FROM STREET SCHOLES STREET TO STREET STAGG STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sewer work complete. |
2024-04-29 | No data | BRUCKNER BOULEVARD, FROM STREET BROOK AVENUE TO STREET ST ANNS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done under barriers |
2024-04-28 | No data | DEAN STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done in the r/w |
2024-04-28 | No data | HILLSIDE AVENUE, FROM STREET 153 STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR: Re-inspection passed. Wearing course has been joined to one cut within the roadway using permit #Q012024002C92 |
2024-04-27 | No data | STRAUSS STREET, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED EXCAVATION IN THE ROADWAY OPPOSITE ADDRESS AND PLATED EXCAVATION ON THE SIDE WALK AND EXCAVATED DEBRIS STORED ON BOTH SIDES OF THE STREET |
2024-04-27 | No data | BUCK STREET, FROM STREET SEDDON STREET TO STREET ZEREGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway I/F/O 2424 |
2024-04-26 | No data | HERZL STREET, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO CONFIRMATION NUMBER |
2024-04-25 | No data | HERZL STREET, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION NO CONFIRMATION NUMBER |
2024-04-22 | No data | 70 STREET, FROM STREET 47 AVENUE TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R/W resurfaced (NYC-DOT), new s/w, new building. |
2024-04-22 | No data | 69 STREET, FROM STREET LONG ISLAND RAILROAD TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R/W resurfaced, new s/w. |
2024-04-21 | No data | RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST BURNSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut on sidewalk in compliance |
2024-04-18 | No data | ROBERTS AVENUE, FROM STREET BLONDELL AVENUE TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Street joints resealed |
2024-04-18 | No data | KENT AVENUE, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut opposite property, bike lane markout installed |
2024-04-17 | No data | CLINTON STREET, FROM STREET BRYANT STREET TO STREET HALLECK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Flag around two water valve IFO property #757. |
2024-04-17 | No data | ST JOHNS PLACE, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired on 3/19/2024. |
2024-04-17 | No data | HENRY HUDSON PARKWAY, FROM STREET WEST 231 STREET TO STREET WEST 232 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 3/14/24 |
2024-04-16 | No data | 47 AVENUE, FROM STREET 70 STREET TO STREET 72 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | accepted |
2024-04-16 | No data | VYSE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass consecutive permit on file |
2024-04-16 | No data | LONGFELLOW AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has consecutive permit on file |
2024-04-15 | No data | 3 AVENUE, FROM STREET EAST 60 STREET TO STREET EAST 61 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1J issued. |
2024-04-15 | No data | WEST 174 STREET, FROM STREET DAVIDSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 2 cuts in roadway, 1 on sidewalk. To be left plated. |
2024-04-13 | No data | WEST END AVENUE, FROM STREET WEST 85 STREET TO STREET WEST 86 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Lane markings corrected; proper permit obtained. M022024092F47 |
2024-04-13 | No data | PENNSYLVANIA AVENUE, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the p/l .. in compliance |
2024-04-12 | No data | 48 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sewer repair in compliance |
2024-04-11 | No data | CLINTON STREET, FROM STREET BRYANT STREET TO STREET HALLECK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Install the missing color code marker in the perm restoration in the driving lane IFO property #757. |
2024-04-07 | No data | BROADWAY, FROM STREET BOROUGH BOUNDARY TO STREET WEST 262 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plumber’s restoration made permanent |
2024-04-05 | No data | FOREST AVENUE, FROM STREET ELIZABETH GROVE ROAD TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration on roadway ok |
2024-04-04 | No data | WHITE PLAINS ROAD, FROM STREET PENFIELD STREET TO STREET ST OUEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in the roadway and sidewalk |
2024-03-27 | No data | BRIGHTON 14 STREET, FROM STREET BEND TO STREET OCEAN VIEW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration on parking lane IFO property in compliance |
2024-03-27 | No data | 47 AVENUE, FROM STREET 70 STREET TO STREET 72 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk - Patchwork behind the catch basin cutting in the pedestrian ramp, missing curb expansion joint, curb chipped. Loose old broken curb not removed off the sidewalk dirt area. |
2024-03-25 | No data | 24 STREET, FROM STREET 42 ROAD TO STREET QNSBO BR UP RY APPROACH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration cut in the parking lane. |
2024-03-24 | No data | HAROLD STREET, FROM STREET ELVIN STREET TO STREET FANNING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration opposite of 56 Harold Street. |
2024-03-22 | No data | DECATUR AVENUE, FROM STREET EAST 195 STREET TO STREET EAST 197 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Has open excavations in the driving lane, parking lane, s/w new building. Need to paint steel plates, also MES markings on all the plates d/l, s/w. Install raise plow I/F/O the plates. |
2024-03-20 | No data | FLATLANDS AVENUE, FROM STREET PENNSYLVANIA AVENUE TO STREET SHEFFIELD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration remains in compliance |
2024-03-19 | No data | FARRAGUT ROAD, FROM STREET EAST 31 STREET TO STREET EAST 32 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2024-03-18 | No data | HEATH AVENUE, FROM STREET WEST 229 STREET TO STREET WEST KINGSBRIDGE ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | Wet Density 125.7 Dry Density 118.2 Max Dry Density 123.5 Actual Moisture 6.4% Top test 97.9%. Backfill accepted |
2024-03-18 | No data | WEST 23 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work was found on the roadway. |
2024-03-15 | No data | EAST 215 STREET, FROM STREET HOLLAND AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restorations in the roadway. |
2024-03-13 | No data | VILLA AVENUE, FROM STREET EAST 205 STREET TO STREET VAN CORTLANDT AVENUE EAST | No data | Street Construction Inspections: Active | Department of Transportation | Spoke to Alvan the owner, Israel foreman on site. Need to countersink plates, skid resistance, name on the plates. Install 5 digit ID #. Has a open excavation driving lane, s/w. |
2024-03-11 | No data | REMSEN AVENUE, FROM STREET FOSTER AVENUE TO STREET KRIER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2024-03-10 | No data | FARRAGUT ROAD, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in rw sealed and in compliance |
2024-03-09 | No data | ST JOHNS PLACE, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve on s/w & perm restoration in p/l |
2024-03-09 | No data | SHEFFIELD AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway in compliance |
2024-03-09 | No data | WORTMAN AVENUE, FROM STREET GEORGIA AVENUE TO STREET SHEFFIELD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags in compliance |
2024-03-04 | No data | FARRAGUT ROAD, FROM STREET FLATBUSH AVENUE TO STREET KENILWORTH PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill Pass - - L3ft7in W18ft10in D4ft4in - - BACKFILL BASED ON REPAIRING WATER SERVICE TO #2605. STEEL PLATES IN DRIVING LANE AND TEMPORARY RESTORATION IN SIDEWALK. UNABLE TO DO PROPER CUT BACK DUE TO ABANDONED TROLLY TRACKS IN ROADWAY. |
2024-03-03 | No data | CRESTON AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2024-03-02 | No data | FOREST AVENUE, FROM STREET ELIZABETH GROVE ROAD TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w & rwy restored |
2024-03-01 | No data | WEST END AVENUE, FROM STREET WEST 85 STREET TO STREET WEST 86 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 535 West End Ave, please restore white lane marking in kind. |
2024-02-29 | No data | FRANKLIN AVENUE, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway driving lane sealed in compliance 1 new sidewalk flag ifo property 289 |
2024-02-28 | No data | EAST 48 STREET, FROM STREET BEVERLY ROAD TO STREET CANARSIE LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration in roadway |
2024-02-28 | No data | 70 STREET, FROM STREET 47 AVENUE TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm d/l cut to grade, perm s/w. |
2024-02-28 | No data | BEACH 19 STREET, FROM STREET CORNAGA AVENUE TO STREET MOTT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temporary cut to grade in roadway |
2024-02-27 | No data | TELLER AVENUE, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site, 1 lane maintained and sw always in compliance |
2024-02-25 | No data | ROBERTS AVENUE, FROM STREET BLONDELL AVENUE TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Restoration needs to be re-sealed |
2024-02-24 | No data | GODWIN TERRACE, FROM STREET KIMBERLY PLACE TO STREET WEST 231 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the driving lane opposite 224 W 231 St. |
2024-02-24 | No data | 6 AVENUE, FROM STREET 62 STREET TO STREET 63 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done, permit expired. |
2024-02-23 | No data | SEDGWICK AVENUE, FROM STREET BEND TO STREET STEVENSON PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Specific Location: work for 3870 & 3874 Sedgwick Ave. I/F/O 3881 Sedgwick Ave, has 2 perm cuts in the driving lane. |
2024-02-23 | No data | KELLY STREET, FROM STREET EAST 156 STREET TO STREET LONGWOOD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site actively working in the roadway and sidewalk at time of inspection. |
2024-02-23 | No data | 7 AVENUE, FROM STREET BEND TO STREET WEST 153 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags ok |
2024-02-22 | No data | UNIVERSITY AVENUE, FROM STREET RESERVOIR AVENUE TO STREET WEST 197 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water repair restoration in roadway |
2024-02-20 | No data | EAST 40 STREET, FROM STREET AVENUE D TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in rw sealed and in compliance |
2024-02-20 | No data | MC DONALD AVENUE, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water restoration on roadway parking lane and new sidewalk flag installed ifo 1905 McDonald ave. |
2024-02-19 | No data | LORIMER STREET, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET | No data | Street Construction Inspections: Active | Department of Transportation | steel plate counter sunken |
2024-02-19 | No data | VYSE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done |
2024-02-16 | No data | QUENTIN ROAD, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done. |
2024-02-14 | No data | FLATLANDS AVENUE, FROM STREET PENNSYLVANIA AVENUE TO STREET SHEFFIELD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane in compliance. |
2024-02-12 | No data | GRAND AVENUE, FROM STREET WEST 174 STREET TO STREET WEST 175 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 20x3.5x3. In driving lane. |
2024-02-10 | No data | CROTONA AVENUE, FROM STREET EAST 187 STREET TO STREET EAST 189 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2024-02-06 | No data | 5 AVENUE, FROM STREET EAST 48 STREET TO STREET EAST 49 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO #605 there is a permanent restoration flush to grade with a 21 color code marker applied. |
2024-02-04 | No data | VAN CORTLANDT AVENUE EAST, FROM STREET BAINBRIDGE AVENUE TO STREET ROCHAMBEAU AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water repair restoration in parking/driving lane |
2024-02-03 | No data | PROSPECT AVENUE, FROM STREET DEAD END TO STREET EAST 187 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance new service |
2024-02-03 | No data | EAST 48 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 270 park ave water restoration in compliance |
2024-02-01 | No data | EAST 14 STREET, FROM STREET AVENUE B TO STREET AVENUE C | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Cut adjacent the crosswalk near Ave C , Permit expired. |
2024-01-31 | No data | EAST 4 STREET, FROM STREET 18 AVENUE TO STREET AVENUE F | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water repair in compliance |
2024-01-30 | No data | EAST 223 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the parking lane. |
2024-01-30 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent sewer repair restoration crossing roadway |
2024-01-28 | No data | BAINBRIDGE AVENUE, FROM STREET EAST 204 STREET TO STREET EAST 206 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water repair restoration in driving lane |
2024-01-27 | No data | HUDSON STREET, FROM STREET BROOME STREET TO STREET CANAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | F/O #229 water cut in the bike lane green paint restored and in compliance. |
2024-01-25 | No data | BROADWAY, FROM STREET BOROUGH BOUNDARY TO STREET WEST 262 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3x2’ saw cut in roadway found overdue for final |
2024-01-25 | No data | ELDER AVENUE, FROM STREET BRONX RIVER AVENUE TO STREET EAST 172 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass perm in roadway in compliance |
2024-01-24 | No data | 31 STREET, FROM STREET 28 AVENUE TO STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In front of 25-81 two cuts in the Roadway. Permit expired. |
2024-01-24 | No data | WEST 19 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued to the above respondent for having a permanent repair water restoration backfilled on a protected street but failed to obtain a confirmation number. Permit# M012023349A42 expired 1/12/2024. |
2024-01-23 | No data | 3 AVENUE, FROM STREET EAST 60 STREET TO STREET EAST 61 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued for the above Respondent has a permanent Restoration for repair Sewer work Backfilled on a protected Street but failed to obtain a confirmation number. Permit # M012023314A00 expired on 11/14/2023. |
2024-01-23 | No data | DARTMOUTH STREET, FROM STREET 68 AVENUE TO STREET 69 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has a permanent restoration, (Water) backfilled on a protected street but failed to obtain a confirmation number. Permit # (Q012023303D23) expired 11/13/23. |
2024-01-22 | No data | EAST 215 STREET, FROM STREET HOLLAND AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Plumber on site repairing sewer, spoke to Mike |
2024-01-22 | No data | COLERIDGE STREET, FROM STREET ESPLANADE TO STREET ORIENTAL BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration on sidewalk (2flags) 1 with valve in compliance |
2024-01-21 | No data | MORRIS PARK AVENUE, FROM STREET FILLMORE STREET TO STREET GARFIELD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration in the bike lane of the roadway. |
2024-01-21 | No data | EAST 138 STREET, FROM STREET BRE EASTBOUND ENTRANCE E 138 ST TO STREET WILLOW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1J issued for Failure to obtain a confirmation number two hours prior to the commencement of a backfill on a protected street |
2024-01-19 | No data | 62 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has a permanent restoration, sewer repair backfilled on a protected street but failed to obtain a confirmation number. Permit #B012023349C43 expired 12/30/23. |
2024-01-18 | No data | EAST 153 STREET, FROM STREET ELTON AVENUE TO STREET MELROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the driving lane of the roadway. |
2024-01-18 | No data | ELTON AVENUE, FROM STREET EAST 153 STREET TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the driving lane of the roadway. |
2024-01-16 | No data | EAST 141 STREET, FROM STREET CONCORD AVENUE TO STREET WALES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1J issued for failure to obtain a confirmation number two hours prior to the commencement of a backfill on a protected street |
2024-01-12 | No data | BOONE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2024-01-12 | No data | BEACH 19 STREET, FROM STREET PLAINVIEW AVENUE TO STREET SEAGIRT BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent long water cuts sidewalk restored |
2024-01-12 | No data | CRUGER AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 Permanent restoration in the roadway and sidewalk |
2024-01-12 | No data | WEST 19 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I found a permanent restoration flush to grade in the driving lane and one sidewalk flag restored at the curb. |
2024-01-11 | No data | GUY R BREWER BOULEVARD, FROM STREET 107 AVENUE TO STREET SOUTH ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut under parked car at time of inspection. |
2024-01-11 | No data | ORLOFF AVENUE, FROM STREET BEND TO STREET CHARLES HALLEY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found newly repaved |
2024-01-10 | No data | LONGFELLOW AVENUE, FROM STREET BEND TO STREET JENNINGS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass work done |
2024-01-09 | No data | NOSTRAND AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration (r/w & s/w) found to be in compliance |
2024-01-06 | No data | WEST 66 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NOV issued for Failure to post “Steel Plates Ahead” or “Raise Plow” sign. |
2024-01-04 | No data | VYSE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway in compliance |
2024-01-03 | No data | BECK STREET, FROM STREET EAST 156 STREET TO STREET LONGWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the driving lane and sidewalk restored around water valve IFO 768. |
2024-01-02 | No data | ALBANY CRESCENT, FROM STREET BEND TO STREET WEST 233 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent plumber’s sewer repair restoration in roadway opposite 3156 |
2023-12-31 | No data | INWOOD AVENUE, FROM STREET CLARKE PLACE WEST TO STREET WEST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent plumber’s sewer repair restoration in the middle of roadway |
2023-12-30 | No data | EAST 30 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O # 127, Sidewalk Flags restored with Roadway found resurfaced. |
2023-12-27 | No data | HALPERIN AVENUE, FROM STREET BLONDELL AVENUE TO STREET WILLIAMSBRIDGE ROAD | No data | Street Construction Inspections: Active | Department of Transportation | New sw flags and perm cut in rw |
2023-12-26 | No data | EAST 36 STREET, FROM STREET 3 AVENUE TO STREET SNIFFEN COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | AKA 3 Ave on East 36 Street, found a permanent Restoration located in the driving lane. |
2023-12-26 | No data | MORRIS PARK AVENUE, FROM STREET FILLMORE STREET TO STREET GARFIELD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration in the bile lane of the roadway. |
2023-12-26 | No data | 168 STREET, FROM STREET 82 ROAD TO STREET GOETHALS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newer permit on file Q012023006B90. |
2023-12-22 | No data | FLATLANDS AVENUE, FROM STREET PENNSYLVANIA AVENUE TO STREET SHEFFIELD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway parking lane sealed in compliance ifo bp gas station |
2023-12-22 | No data | WARD AVENUE, FROM STREET WATSON AVENUE TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway and one sidewalk flag.I/F/O 1149 |
2023-12-20 | No data | BUSH STREET, FROM STREET CRESTON AVENUE TO STREET GRAND CONCOURSE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done at new B/O |
2023-12-20 | No data | 70 STREET, FROM STREET 47 AVENUE TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found. |
2023-12-19 | No data | WEST 142 STREET, FROM STREET BROADWAY TO STREET RIVERSIDE DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012023272A27 |
2023-12-17 | No data | WEST 170 STREET, FROM STREET EDWARD L GRANT HIGHWAY TO STREET SHAKESPEARE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work in roadway found resurfaced by recently paved roadway |
2023-12-15 | No data | 69 STREET, FROM STREET 56 ROAD TO STREET HULL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration to grade within the driving lane opposite 55-31 |
2023-12-13 | No data | EAST 9 STREET, FROM STREET BROADWAY TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration acceptable |
2023-12-12 | No data | 99 STREET, FROM STREET 4 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking lane, in front of 415 99 Street. |
2023-12-12 | No data | WEST 174 STREET, FROM STREET MACOMBS ROAD TO STREET NELSON AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Upon my arrival no obstruction found in roadway nor on sidewalk. Plumber’s MES labeled steel plate countersunk in roadway, mini excavator & cones stored in 8’ portion of parking lane. Site currently in compliance |
2023-12-09 | No data | HILLSIDE AVENUE, FROM STREET 153 STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration in front of 153-01 to grade in the driving lane. |
2023-12-08 | No data | BRUCKNER BOULEVARD, FROM STREET EAST 141 STREET TO STREET WALES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restorations in the driving lane. |
2023-12-05 | No data | EAST 77 STREET, FROM STREET 1 AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In front of 439, parking garage driveway repair water/ sewer , restoration, flushed and sealed to grade in middle of roadway. |
2023-12-05 | No data | FLATLANDS AVENUE, FROM STREET EAST 92 STREET TO STREET EAST 93 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found area resurfaced in front of new building - B012023087B39 |
2023-12-05 | No data | 31 ROAD, FROM STREET 216 STREET TO STREET 218 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway was resurfaced by new home BPP. |
2023-12-04 | No data | AVENUE C, FROM STREET EAST 13 STREET TO STREET EAST 14 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no crew on site |
2023-12-03 | No data | PITKIN AVENUE, FROM STREET CLEVELAND STREET TO STREET ELTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Rw covered by bpp |
2023-12-03 | No data | 47 AVENUE, FROM STREET 70 STREET TO STREET 72 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration to grade adjacent to catch basin, nearest 70 Street. |
2023-12-03 | No data | 47 AVENUE, FROM STREET 70 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration trench to grade within the intersection. |
2023-12-03 | No data | 70 STREET, FROM STREET 47 AVENUE TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration to grade around catch basin, nearest 47 Avenue. |
2023-11-28 | No data | AVENUE C, FROM STREET EAST 13 STREET TO STREET EAST 14 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found two permanent restoration one within both driving lanes, other within southbound driving lane and bike lane. |
2023-11-25 | No data | CANNON PLACE, FROM STREET BEND TO STREET BEND | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Wooden plank removed out of sidewalk |
2023-11-22 | No data | LORIMER STREET, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | B012023325C27 permit active plated excavation |
2023-11-22 | No data | LORIMER STREET, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET | No data | Street Construction Inspections: Active | Department of Transportation | permit active plated excavation |
2023-11-19 | No data | AVENUE C, FROM STREET EAST 13 STREET TO STREET EAST 14 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | All lane markings and bike lane paint restored. |
2023-11-14 | No data | PROSPECT AVENUE, FROM STREET EAST 183 STREET TO STREET EAST 185 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Cut made permanent |
2023-11-14 | No data | BEAUMONT STREET, FROM STREET HAMPTON AVENUE TO STREET ORIENTAL BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane, sidewalk restored inkind |
2023-11-08 | No data | WILLIAMSBRIDGE ROAD, FROM STREET BOSTON ROAD TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass work done |
2023-11-08 | No data | RADCLIFF AVENUE, FROM STREET ARNOW AVENUE TO STREET BOSTON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass perm in roadway in compliance |
2023-10-30 | No data | GERARD AVENUE, FROM STREET EAST 150 STREET TO STREET EAST 151 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2023 permanent restoration in the roadway. |
2023-10-27 | No data | PROSPECT AVENUE, FROM STREET EAST 183 STREET TO STREET EAST 185 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plumber cut plated in the roadway, plumber working behind fence |
2023-10-22 | No data | SPRINGFIELD BOULEVARD, FROM STREET 131 AVENUE TO STREET 132 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in roadway to grade Also entire sidewalk done IFO 131-24 |
2023-10-20 | No data | STERLING PLACE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration cut in the parking lane. |
2023-10-19 | No data | CANNON PLACE, FROM STREET BEND TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failed to removed 2 by 4 wood in the concrete s/w. I/F/O 3450. |
2023-10-17 | No data | JESUP AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET FEATHERBED LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1J issued for failure to obtain a confirmation number two hours prior to water repair work done on protected street |
2023-10-17 | No data | MADISON AVENUE, FROM STREET EAST 102 STREET TO STREET EAST 103 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found resurfaced under permit M152023234A08. |
2023-10-17 | No data | 1 AVENUE, FROM STREET EAST 2 STREET TO STREET EAST 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found permanent restoration within driving lane. |
2023-10-16 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not located |
2023-10-16 | No data | SEAVIEW AVENUE, FROM STREET BEND TO STREET ERSKINE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway driving lane sealed in compliance 5 P E |
2023-10-16 | No data | AVENUE C, FROM STREET EAST 13 STREET TO STREET EAST 14 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | on west side of street mid-block. A/T/P/O I observed the above respondent has a two permanent sewer restorations, backfilled on a protected street but failed to obtain a confirmation number. Permit # M012023251A90 expired 10/7/2023. |
2023-10-16 | No data | ROMBOUTS AVENUE, FROM STREET BOSTON ROAD TO STREET HOLLERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass work done |
2023-10-16 | No data | COSTER STREET, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ATPO I observed the above respondent has a permanent restoration, repair water work backfilled on a protected street but failed to obtain a confirmation number. Permit number X012023265A18 expired 10/05/2023. |
2023-10-13 | No data | STRANG AVENUE, FROM STREET BAYCHESTER AVENUE TO STREET EDSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in roadway in compliance sidewalk ok |
2023-10-10 | No data | LORIMER STREET, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the parking lane |
2023-10-10 | No data | BARNES AVENUE, FROM STREET BRONXDALE AVENUE TO STREET RHINELANDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the roadway and 2 sidewalk flag restored in kind around water valve IFO 1918. |
2023-10-10 | No data | EAST 170 STREET, FROM STREET BOSTON ROAD TO STREET CROTONA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water repair restoration in driving lane |
2023-10-10 | No data | EAST 233 STREET, FROM STREET MULVEY AVENUE TO STREET PROVOST AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to locate |
2023-10-03 | No data | EAST 87 STREET, FROM STREET FLATLANDS AVENUE TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NWK found, permit expired on 9/29/2023. |
2023-10-02 | No data | AVENUE C, FROM STREET EAST 13 STREET TO STREET EAST 14 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit M012023251A90 on file. |
2023-10-02 | No data | AVENUE C, FROM STREET EAST 13 STREET TO STREET EAST 14 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Found two permanent restoration one with both driving lanes other within southbound driving lane and bike lane. At this time no lane markings have been restored permit still active. |
2023-10-01 | No data | DARTMOUTH STREET, FROM STREET 68 AVENUE TO STREET 69 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site repairing domestic water service leak in roadway. One excavation in roadway at this time |
2023-09-30 | No data | EAST 176 STREET, FROM STREET CLAY AVENUE TO STREET TOPPING AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Permanent restoration in the roadway |
2023-09-30 | No data | EAST 176 STREET, FROM STREET CLAY AVENUE TO STREET TOPPING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the roadway |
2023-09-27 | No data | UNION AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 165 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in intersection found resurfaced by newly paved roadway |
2023-09-27 | No data | 24 STREET, FROM STREET 40 AVENUE TO STREET 41 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in r/w |
2023-09-24 | No data | SHEFFIELD AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in rw sealed and in compliance |
2023-09-23 | No data | LENOX AVENUE, FROM STREET WEST 131 STREET TO STREET WEST 132 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk in compliance |
2023-09-22 | No data | STRANG AVENUE, FROM STREET BAYCHESTER AVENUE TO STREET EDSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass perm in roadway cut on sidewalk |
2023-09-20 | No data | CHURCH AVENUE, FROM STREET 36 STREET TO STREET CHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | One new sidewalk flag installed and unable to ascertain roadway due to multiple school buses on roadway parking lane. |
2023-09-18 | No data | WYTHE PLACE, FROM STREET EAST 170 STREET TO STREET EAST 171 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water repair restoration crossing roadway |
2023-09-14 | No data | BRIGHTON 11 STREET, FROM STREET CASS PLACE TO STREET OCEAN VIEW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane sealed and flush. |
2023-09-13 | No data | FLATLANDS AVENUE, FROM STREET PENNSYLVANIA AVENUE TO STREET SHEFFIELD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway in front of car wash is in compliance. |
2023-09-10 | No data | JEFFERSON AVENUE, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-09-10 | No data | EAST 50 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm final in compliance |
2023-09-09 | No data | 2 AVENUE, FROM STREET EAST 82 STREET TO STREET EAST 83 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1598 2 ave water restoration in compliance |
2023-09-09 | No data | EAST 176 STREET, FROM STREET CLAY AVENUE TO STREET TOPPING AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Water leak in basement. Contractor on site making repairs on sidewalk. Work also done in roadway covered by steel plate. |
2023-09-09 | No data | PROVOST AVENUE, FROM STREET CITY LIMIT TO STREET EAST 233 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2023-09-07 | No data | 59 STREET, FROM STREET 10 AVENUE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done |
2023-09-06 | No data | EAST 132 STREET, FROM STREET BROOK AVENUE TO STREET ST ANNS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done. |
2023-09-06 | No data | 84 STREET, FROM STREET 17 AVENUE TO STREET BAY 16 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking lane, opposite 1722-1724 84 Street. |
2023-09-01 | No data | ANTHONY AVENUE, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in the roadway |
2023-08-31 | No data | SHEFFIELD AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in rw sealed and in compliance |
2023-08-31 | No data | EAST 2 STREET, FROM STREET 1 AVENUE TO STREET MARBLE CEMETERY BOUNDARY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER |
2023-08-31 | No data | WEST 8 STREET, FROM STREET 6 AVENUE TO STREET MAC DOUGAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced by DOT ( M152023066A66 ) and work no longer visible at this time. No sidewalk work observed either. |
2023-08-30 | No data | EAST 117 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flushed to grade. |
2023-08-30 | No data | BRUCKNER BOULEVARD, FROM STREET BROOK AVENUE TO STREET ST ANNS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass perm under barricades |
2023-08-28 | No data | BOWERY, FROM STREET BROOME STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The BPP restoration has resurfaced the water restoration. |
2023-08-27 | No data | HILLSIDE AVENUE, FROM STREET 240 STREET TO STREET CREEDMOOR HOSPITAL BOUNDARY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Roadway found milled, at time of inspection. |
2023-08-24 | No data | ASHLAND PLACE, FROM STREET DE KALB AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced B152023205A13. |
2023-08-23 | No data | FT WASHINGTON AVENUE, FROM STREET WEST 183 STREET TO STREET WEST 185 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Resurfaced |
2023-08-22 | No data | AVENUE C, FROM STREET EAST 13 STREET TO STREET EAST 14 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER : New permit# M012023206B45 |
2023-08-21 | No data | EAST 46 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O # 135, found a permanent Restoration in the driving / parking lanes. |
2023-08-21 | No data | LENOX AVENUE, FROM STREET WEST 131 STREET TO STREET WEST 132 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk restored. |
2023-08-20 | No data | HAROLD STREET, FROM STREET ELVIN STREET TO STREET FANNING STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | STEEL PLATED DRIVING LANE OPPOSITE 56 - STREET LEAK REMAINS - NO ONE ON SITE - NO SWK WORK DONE |
2023-08-18 | No data | WORTMAN AVENUE, FROM STREET GEORGIA AVENUE TO STREET SHEFFIELD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Swk flags in compliance |
2023-08-17 | No data | HILLSIDE AVENUE, FROM STREET 240 STREET TO STREET CREEDMOOR HOSPITAL BOUNDARY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I visited the YMCA 8/17/23 and the Dir. did not have any info about a container being stored there. Also, your 5'x5' sidewalk flag is really patchwork since the original size is 11'9"X9'2" and was not restored fully. Just repave and reseal your cut. |
2023-08-16 | No data | 1 AVENUE, FROM STREET EAST 2 STREET TO STREET EAST 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER: In the driving lane |
2023-08-16 | No data | LENOX AVENUE, FROM STREET WEST 130 STREET TO STREET WEST 131 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk restored. |
2023-08-16 | No data | AVENUE M, FROM STREET DAHILL ROAD TO STREET MC DONALD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the parking lane in compliance. |
2023-08-15 | No data | EAST 181 STREET, FROM STREET CLINTON AVENUE TO STREET CROTONA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm cuts in roadway. |
2023-08-14 | No data | HILLSIDE AVENUE, FROM STREET 240 STREET TO STREET CREEDMOOR HOSPITAL BOUNDARY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | As per inspection protest accepted |
2023-08-13 | No data | ROBERTS AVENUE, FROM STREET BLONDELL AVENUE TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | MES CONSTRUCTION CORP restoration I/F/O 2623 has been properly sealed at the edges of the cut. Seal with liquid asphalt cement ironed in with a heated smoothing iron. Must be properly maintained throughout 6/22/2026 guarantee.period. |
2023-08-12 | No data | FOREST AVENUE, FROM STREET ELIZABETH GROVE ROAD TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway and sidewalk restoration in compliance in front of Rover Self Storage. |
2023-08-12 | No data | REMSEN AVENUE, FROM STREET FOSTER AVENUE TO STREET KRIER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in rw sealed and in compliance |
2023-08-07 | No data | AVENUE C, FROM STREET EAST 13 STREET TO STREET EAST 14 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED BASE RESTORATION ACROSS RWY 150 FEET SOUTH OF E 14 STREET OFF WCL AT BUILDING OPERATION-OK-NP#M012023206B45 |
2023-08-07 | No data | AVENUE C, FROM STREET EAST 13 STREET TO STREET EAST 14 STREET | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE - DIGGING TEST PITS TO LOCATE CE FACIITIES- WALKWAY OPEN & MAINTAIN 2 LANES |
2023-08-06 | No data | HUDSON STREET, FROM STREET BROOME STREET TO STREET CANAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration remains in compliance. |
2023-08-05 | No data | EAST 50 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR pass Restoration sealed. |
2023-08-05 | No data | WEST 128 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 39-49 west 128 water restoration on roadway in compliance |
2023-08-05 | No data | AVENUE C, FROM STREET EAST 13 STREET TO STREET EAST 14 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER: New permit # M012023206B45 |
2023-08-04 | No data | AVENUE C, FROM STREET EAST 13 STREET TO STREET EAST 14 STREET | No data | Street Construction Inspections: Active | Department of Transportation | On the side of property #644 E 14 st 4 steel plates placed in the Roadway. |
2023-08-04 | No data | FLATLANDS AVENUE, FROM STREET PENNSYLVANIA AVENUE TO STREET SHEFFIELD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut near car wash okay |
2023-08-02 | No data | BRIGHTON 14 STREET, FROM STREET BEND TO STREET OCEAN VIEW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the roadway, in compliance |
2023-08-01 | No data | FARRAGUT ROAD, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done |
2023-08-01 | No data | NOSTRAND AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done |
2023-08-01 | No data | HALL PLACE, FROM STREET EAST 165 STREET TO STREET EAST 167 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | One sidewalk flag in place. Permanent restoration in parking lane. |
2023-07-27 | No data | TELLER AVENUE, FROM STREET EAST 171 STREET TO STREET EAST 172 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in sidewalk behind property line and one 5’x5’ flag in place. Surrounding sidewalk does not have typical sidewalk flags. |
2023-07-27 | No data | GERARD AVENUE, FROM STREET EAST 150 STREET TO STREET EAST 151 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has a permanent restoration, water service repair backfilled on a protected street but failed to obtain a confirmation number. Permit # x012023100b34expired 4/22/23 |
2023-07-26 | No data | BRUCKNER BOULEVARD, FROM STREET BROOK AVENUE TO STREET ST ANNS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 7/25/23 |
2023-07-26 | No data | 19 AVENUE, FROM STREET 43 STREET TO STREET 45 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work complete in front of 43-15. |
2023-07-25 | No data | WEST END AVENUE, FROM STREET WEST 85 STREET TO STREET WEST 86 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1J issued. |
2023-07-25 | No data | FARRAGUT ROAD, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has a permanent restoration, repair water backfilled on a protected street but failed to obtain a confirmation number. Permit # B012023147A01 expired 6/10/23. |
2023-07-25 | No data | 8 AVENUE, FROM STREET WEST 24 STREET TO STREET WEST 25 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued for the above Respondent obtained a Street opening permit on a protected Street but failed to obtain a Confirmation number prior to the expiration of such permit as required. Permit expired on 5/23/2023. |
2023-07-25 | No data | NOSTRAND AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has a permanent restoration, repair water backfilled on a protected street but failed to obtain a confirmation number. Permit # B012023147A00 expired 6/10/23 |
2023-07-23 | No data | 40 ROAD, FROM STREET COLLEGE POINT BOULEVARD TO STREET DELONG STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm /rest d/l |
2023-07-19 | No data | 47 AVENUE, FROM STREET 70 STREET TO STREET 72 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Catch basin installed at 47th Avenue & 70th Street |
2023-07-19 | No data | 47 AVENUE, FROM STREET 70 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench to grade within the intersection of 47th Avenue & 70th Street |
2023-07-13 | No data | UNION AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 165 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Union Av has been milled. New sidewalk I/F/O 1001-1007. |
2023-07-13 | No data | AVENUE C, FROM STREET EAST 13 STREET TO STREET EAST 14 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER New permit # M012023191B97 |
2023-07-10 | No data | LINDEN BOULEVARD, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found to be in compliance |
2023-07-07 | No data | 47 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the parking lane in compliance. |
2023-07-07 | No data | WEST 26 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | M012023163A92 has been obtained. |
2023-07-07 | No data | EAST 50 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | On the North side, found 4 permanent Restorations in the driving lane. |
2023-07-06 | No data | EAST 46 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 161 driveway, found a permanent Restoration in the Roadway. |
2023-07-06 | No data | HILLSIDE AVENUE, FROM STREET 240 STREET TO STREET CREEDMOOR HOSPITAL BOUNDARY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration within the parking lane is sunken 2" in localize area, also along the edges need to be resealed in front of 238-10 Hillside Avenue. |
2023-07-05 | No data | AVENUE C, FROM STREET EAST 13 STREET TO STREET EAST 14 STREET | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR SEWER : Crew is on site |
2023-07-05 | No data | ROBERTS AVENUE, FROM STREET BLONDELL AVENUE TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | MES CONSTRUCTION CORP restoration I/F/O 2623 not properly sealed at the edges of the cut. Seal with liquid asphalt cement ironed in with a heated smoothing iron.The cut must be properly maintained throughout 6/22/2026 guarantee.period |
2023-06-28 | No data | EAST 46 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O # 135, found a permanent Restoration located in the driving / parking lanes with 2 Sidewalk flags restored. |
2023-06-27 | No data | 7 AVENUE, FROM STREET BEND TO STREET WEST 153 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest accepted. The sidewalk flags were pre-existing prior to the permittee work permit. The street-view on cyclomeda shows the sidewalk flags on 9/27/22. This was probably done by Parks Department with no permit. |
2023-06-24 | No data | PROVOST AVENUE, FROM STREET CITY LIMIT TO STREET EAST 233 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic water shut off to 3967 provost avenue , 2 excavations made on roadway at time of inspection , crew on site. |
2023-06-22 | No data | 7 AVENUE, FROM STREET BEND TO STREET WEST 153 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w joints not sealed. |
2023-06-21 | No data | EAST 125 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No defects on roadway or sidewalk . |
2023-06-21 | No data | 7 AVENUE, FROM STREET BEND TO STREET WEST 153 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to send photos to email, will reinspect @ later date |
2023-06-21 | No data | WEST 30 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut & sidewalk restored in kind. |
2023-06-16 | No data | LONGFELLOW AVENUE, FROM STREET BEND TO STREET JENNINGS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway |
2023-06-15 | No data | 7 AVENUE, FROM STREET WEST 144 STREET TO STREET WEST 145 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012020273A89-latest permit |
2023-06-14 | No data | 2 AVENUE, FROM STREET EAST 2 STREET TO STREET NY MARBLE CEMETERY BOUNDARY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER: In the turning lane I/F/O an empty lot |
2023-06-14 | No data | HALPERIN AVENUE, FROM STREET BLONDELL AVENUE TO STREET WILLIAMSBRIDGE ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The permittee MES Construction work in compliance |
2023-06-14 | No data | PERRY AVENUE, FROM STREET SOUTH GANNON AVENUE TO STREET WESTWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN PK LANE OF ROADWAY-OK & NEW SWK FLAG |
2023-06-13 | No data | BOONE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway |
2023-06-08 | No data | EAST 126 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Asphalt is broken out exposing concrete base , of water restoration. |
2023-06-06 | No data | FLATLANDS AVENUE, FROM STREET PENNSYLVANIA AVENUE TO STREET SHEFFIELD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in rw near car wash in compliance |
2023-06-04 | No data | FRANKLIN STREET, FROM STREET 6 AVENUE TO STREET WEST BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water acceptable |
2023-06-02 | No data | 5 AVENUE, FROM STREET EAST 48 STREET TO STREET EAST 49 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in the driving lane match to grade in front of 609. |
2023-06-01 | No data | 3 AVENUE, FROM STREET EAST 44 STREET TO STREET EAST 45 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done. |
2023-05-30 | No data | ROBERTS AVENUE, FROM STREET BLONDELL AVENUE TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | The permittee is working on site |
2023-05-25 | No data | ROBERTS AVENUE, FROM STREET BLONDELL AVENUE TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Foreman Mentor & crew on site working on new water line, working in roadway & on sidewalk. Flaggers in place, Site currently in compliance |
2023-05-24 | No data | 21 STREET, FROM STREET 25 ROAD TO STREET HOYT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut opposite address |
2023-05-24 | No data | CLAY STREET, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the parking lane |
2023-05-23 | No data | WEST 26 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I found the above respondent repaired the conditions on CAR#20236390262 issued on 4/1/2023, without the noted permit listed as required |
2023-05-21 | No data | 6 AVENUE, FROM STREET WEST 13 STREET TO STREET WEST 14 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO #519 in the driving lane there is a permanent restoration flush to grade. (Asphalt sealed, and a 2022 color code marker installed) |
2023-05-20 | No data | 3 STREET, FROM STREET BOND STREET TO STREET BODY OF WATER | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut restoration on roadway bike lane IFO 130 3rd street and new sidewalk flag IFO 141 3rd street. |
2023-05-17 | No data | NOSTRAND AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration (r/w & s/w) found in compliance |
2023-05-16 | No data | 3 AVENUE, FROM STREET EAST 44 STREET TO STREET EAST 45 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | [Wendys] I found a permanent restoration in the parking lane. There is a parked car over restoration. |
2023-05-11 | No data | FARRAGUT ROAD, FROM STREET EAST 31 STREET TO STREET EAST 32 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway in front of 3115 Farragut road |
2023-05-09 | No data | MANIDA STREET, FROM STREET EAST BAY AVENUE TO STREET OAK POINT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2023-05-09 | No data | WEBSTER AVENUE, FROM STREET EAST 3 STREET TO STREET OCEAN PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the parking/driving lane in compliance |
2023-05-09 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in place and in compliance. |
2023-05-06 | No data | HOOVER AVENUE, FROM STREET 83 AVENUE TO STREET 132 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUTS NEAR THE CORNER OF 132 ST IN THE PARKING LANE AND SIDEWALK |
2023-05-05 | No data | FLATLANDS AVENUE, FROM STREET EAST 92 STREET TO STREET EAST 93 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in the r/w in compliance. |
2023-05-04 | No data | HALPERIN AVENUE, FROM STREET BLONDELL AVENUE TO STREET WILLIAMSBRIDGE ROAD | No data | Street Construction Inspections: Active | Department of Transportation | The permittee MES Construction I/F/O 2626 property Block / Lot : Description Of Work: Two (2) restorations in the driving lane Length 10’ X Width 4’ X Depth 4 a sidewalk flag Repair existing water relay service .. |
2023-05-02 | No data | WEST 23 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started permit expired |
2023-05-02 | No data | EAST 30 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O # 127, Found permanent, repair, water restoration in parking / driving lanes flush to grade with 2 sidewalk flags around a water valve box restored and sealed in kind. |
2023-05-01 | No data | CLINTON STREET, FROM STREET BRYANT STREET TO STREET HALLECK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done within private property |
2023-04-29 | No data | 56 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent roadway restoration in compliance |
2023-04-26 | No data | MESEROLE AVENUE, FROM STREET ECKFORD STREET TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in parking lane. |
2023-04-26 | No data | 13 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the driving lane, in front of 241 13 Street. |
2023-04-26 | No data | EAST 36 STREET, FROM STREET 3 AVENUE TO STREET SNIFFEN COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | On East 36 street closest to 3rd Avenue. Found permanent repair water restoration in the center driving lane flush to grade. |
2023-04-25 | No data | EASTCHESTER ROAD, FROM STREET MORRIS PARK AVENUE TO STREET STILLWELL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The permittee received a CAR for A Frame Barricades and debris in the parking lane. Was protest and resolved and new Corrective Action Request was issued to Consolidated Edison for poor housekeeping |
2023-04-25 | No data | GOLD STREET, FROM STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to ascertain |
2023-04-24 | No data | 13 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has a permanent restoration, repair water backfilled on a protected street but failed to obtain a confirmation number. Permit #B012023066B93 expired 3/23/2023. |
2023-04-24 | No data | 3 AVENUE, FROM STREET EAST 35 STREET TO STREET EAST 36 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #534-536 found 2 permanent repair water restorations in the driving lane flush to grade |
2023-04-24 | No data | SOUTH PORTLAND AVENUE, FROM STREET ACADEMY PARK PLACE TO STREET HANSON PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 1/25/2023. |
2023-04-21 | No data | 2 STREET, FROM STREET BOND STREET TO STREET BODY OF WATER | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking lane, in front of 142 2 Street. |
2023-04-20 | No data | WEST 65 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B issued. |
2023-04-19 | No data | WILLOUGHBY STREET, FROM STREET FLATBUSH AVENUE EXTENSION TO STREET GOLD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sewer work found resurfaced by bpp |
2023-04-17 | No data | WEST END AVENUE, FROM STREET WEST 85 STREET TO STREET WEST 86 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic Water Service Leak in the Basement Contractor currently making Repairs in the Roadway. 3 Day Dep Notice Issued. Building Super on site |
2023-04-16 | No data | MC DONALD AVENUE, FROM STREET AVENUE P TO STREET QUENTIN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flag and roadway in compliance. |
2023-04-16 | No data | SOUTH PORTLAND AVENUE, FROM STREET ACADEMY PARK PLACE TO STREET HANSON PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway in front of 150 South Portland avenue |
2023-04-13 | No data | GUY R BREWER BOULEVARD, FROM STREET 107 AVENUE TO STREET SOUTH ROAD | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER-CREW ON SITE WORKING INOPEN EXCAVATION IN PARKING LANE. SPOKE WITH SUPERVISOR AL ON SITE. |
2023-04-13 | No data | EAST 141 STREET, FROM STREET LOCUST AVENUE TO STREET ROSE FEISS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to located due to trucks and vans parked |
2023-04-12 | No data | EASTCHESTER ROAD, FROM STREET MORRIS PARK AVENUE TO STREET STILLWELL AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | protest resolved. CAR issued to Con ed gas for cut off to 1958 eastchester rd. |
2023-04-12 | No data | EAST 9 STREET, FROM STREET BROADWAY TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | After communication and agreement contractor and Adam Zerda from building management (Century), email azerda@centuryny.com. Sidewalk area/patched will be restored by Century. Notarized letter provided to Manhattan HIQA office. Permittee released of d |
2023-04-10 | No data | EASTCHESTER ROAD, FROM STREET MORRIS PARK AVENUE TO STREET STILLWELL AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Homeowner states permittee cut into this cut and left the debris in the parking lane. Protest denied. Please request joint inspection at 212-839-2322 |
2023-04-09 | No data | COLERIDGE STREET, FROM STREET ESPLANADE TO STREET ORIENTAL BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber cut (water) on sidewalk |
2023-04-08 | No data | 52 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm restoration found in the parking lane. CAR Restoration permit#B012022331400 was taken out. |
2023-04-05 | No data | BROOKLYN AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm restoration in p/l on opp side & permit B012023017C40 was taken out |
2023-04-04 | No data | ROMBOUTS AVENUE, FROM STREET BOSTON ROAD TO STREET HOLLERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the roadway |
2023-04-01 | No data | WHITE PLAINS ROAD, FROM STREET PENFIELD STREET TO STREET ST OUEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in the roadway and sidewalk |
2023-04-01 | No data | PUTNAM AVENUE, FROM STREET BEND TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-04-01 | No data | WEST 26 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Solid white lane marking needs to be restored in kind in the buffer zone. Opposite 307. |
2023-03-30 | No data | EASTCHESTER ROAD, FROM STREET MORRIS PARK AVENUE TO STREET STILLWELL AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon my post inspection and determination I/F/O 1958 there is (1) one A frame barricades and construction debris obstruction the parking lane. |
2023-03-30 | No data | LORIMER STREET, FROM STREET MESEROLE AVENUE TO STREET NORMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flag. |
2023-03-29 | No data | NORTHERN BOULEVARD, FROM STREET 73 STREET TO STREET 74 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration maintain to grade in D/L. |
2023-03-29 | No data | EAST 9 STREET, FROM STREET BROADWAY TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found patch work done on 1 sidewalk flag around a water valve box full sidewalk flag must be repaired In kind, also must restore white lane marking on permanent restoration in roadway. |
2023-03-28 | No data | EAST 48 STREET, FROM STREET BEVERLY ROAD TO STREET CANARSIE LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the r/w |
2023-03-26 | No data | MADISON AVENUE, FROM STREET EAST 102 STREET TO STREET EAST 103 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Located in the driving lane. Water restoration has been made final |
2023-03-25 | No data | COLERIDGE STREET, FROM STREET ESPLANADE TO STREET ORIENTAL BOULEVARD | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic Water Service was Damaged by DDC Contractor.Contractor currently making Repairs in the Sidewalk to Restore Water Service. Property owner on site |
2023-03-23 | No data | EASTCHESTER ROAD, FROM STREET MORRIS PARK AVENUE TO STREET STILLWELL AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Repair water line in the parking lane |
2023-03-23 | No data | BELL BOULEVARD, FROM STREET 42 AVENUE TO STREET 43 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent long water cuts, Double yellow lane divider marker restored |
2023-03-22 | No data | BATTERY PLACE, FROM STREET BEND TO STREET LITTLE WEST STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a permanent cut flushed to grade in the driving lane bend I/F/O AKA 2 West. |
2023-03-19 | No data | PUTNAM AVENUE, FROM STREET BEND TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade IFO #1 |
2023-03-18 | No data | AMSTERDAM AVENUE, FROM STREET WEST 164 STREET TO STREET WEST 165 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags in compliance |
2023-03-18 | No data | WEST 66 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent trench in parking/driving lane runs South to North I/F/O 36. Active BO , jersey barriers covering portion. |
2023-03-16 | No data | 108 STREET, FROM STREET 37 DRIVE TO STREET 38 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent repair water restoration flush to grade in the driving lane i/f/o 3739. |
2023-03-15 | No data | WEST 26 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 3 perm cuts in the parking/ buffer zone all more than 10ft apart from each other. |
2023-03-13 | No data | 13 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | (Complaint) No crew found on site, it appears work was done within the property. |
2023-03-09 | No data | BARNES AVENUE, FROM STREET BRONXDALE AVENUE TO STREET RHINELANDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration going across roadway and two new sidewalk flags I/F/O # 1918. |
2023-03-07 | No data | EAST 46 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work is complete in Road in front of side entrance to 750 third Avenue. |
2023-03-07 | No data | 3 AVENUE, FROM STREET EAST 35 STREET TO STREET EAST 36 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work not started. |
2023-03-07 | No data | EAST 36 STREET, FROM STREET 3 AVENUE TO STREET SNIFFEN COURT | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O Aka 538 third ave, found permanent restoration in driving lane. |
2023-03-02 | No data | FREEMAN STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in parking lane opposite address. |
2023-03-02 | No data | EAST 50 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Street opening was done under M012022200B45. |
2023-03-01 | No data | SHEFFIELD AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PErmi nroadway o parking lane NEAR WORTMAN IFO 73 GATE |
2023-02-27 | No data | 47 AVENUE, FROM STREET 70 STREET TO STREET 72 STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Respondent failed to countersink the steel plate in the parking lane near 70 Street during the winter moratorium (Effective 12/1/22-3/31/23). ID by permit number on file. New permit #Q012023038C80 on file expired on 2/25/2023. |
2023-02-27 | No data | 47 AVENUE, FROM STREET 70 STREET TO STREET 72 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the respondent with steel plate marked "HALLEN CONSTRUCTION" stored in the parking lane near 70th Street without an active NYC DOT permit on file. Cited permit expired on 2/25/2023. |
2023-02-26 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane ON FOUNTAIN |
2023-02-26 | No data | FOUNTAIN AVENUE, FROM STREET SEAVIEW AVENUE TO STREET VANDALIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Resurfaced by DOT |
2023-02-26 | No data | SEAVIEW AVENUE, FROM STREET BEND TO STREET ERSKINE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane |
2023-02-25 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on the rw |
2023-02-25 | No data | 58 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on the rw at 2063 |
2023-02-24 | No data | EAST 30 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O #127, Found a permanent restoration in the driving with one sidewalk flag restored around a water valve box along with an second restoration in the driving lane I/F/O Aka 160-162 Lexington Avenue. |
2023-02-24 | No data | WHITE PLAINS ROAD, FROM STREET PENFIELD STREET TO STREET ST OUEN STREET | No data | Street Construction Inspections: Active | Department of Transportation | Permanent restorations in the roadway |
2023-02-19 | No data | SHEFFIELD AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway IFO 73 |
2023-02-18 | No data | FLATLANDS AVENUE, FROM STREET PENNSYLVANIA AVENUE TO STREET SHEFFIELD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane IFO CAR WASH in compliance |
2023-02-16 | No data | WORTMAN AVENUE, FROM STREET GEORGIA AVENUE TO STREET SHEFFIELD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Multiple sidewalk flags restored in kind |
2023-02-15 | No data | WEST 30 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done permit expired. |
2023-02-14 | No data | NEVINS STREET, FROM STREET PRESIDENT STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 permanent restorations, in the driving lane, 60 feet from Union Street. |
2023-02-04 | No data | BROADWAY, FROM STREET WEST 54 STREET TO STREET WEST 55 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 1710, REPAIR WATER RESTORATION IN BUFFER ZONE ADJACENT LEFT TURN ONLY LANE FLUSHED AND SEALED TO GRADE . |
2023-01-31 | No data | WILLOUGHBY STREET, FROM STREET FLATBUSH AVENUE EXTENSION TO STREET GOLD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced |
2023-01-25 | No data | WORTMAN AVENUE, FROM STREET GEORGIA AVENUE TO STREET SHEFFIELD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE WORKING IN BARRICADED OPEN EXCAVATION IN THE SIDE WALK 35FT FROM THE CORNER OF GEORGIA |
2023-01-25 | No data | BLONDELL AVENUE, FROM STREET FINK AVENUE TO STREET PONTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work is completed on the sidewalk |
2023-01-25 | No data | EAST 50 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration cut in driving lane with fading away sealer! |
2023-01-25 | No data | 6 AVENUE, FROM STREET WEST 13 STREET TO STREET WEST 14 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired on 11/14/2022. 2 cuts in roadway but confirmations called under permits. |
2023-01-25 | No data | EAST 50 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Permanent restoration cut in driving lane IFO #306. No permit on file for cut. |
2023-01-23 | No data | EAST 46 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration cut on rwy. No defects & all bike lanes are clear. |
2023-01-23 | No data | WEST 65 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired on 12/26/2022. Work is behind a building operations. |
2023-01-20 | No data | EAST 103 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV 3 permanent Repair Water restorations backfilled on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit #M012022280A45 expired on 10/29/2022. |
2023-01-20 | No data | FREEMAN STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 3’ x 2’ x 5’ in parking lane opposite address.WD - 125.1DD - 116.3MDD - 121.5M - 7.5Bottom Test - 96.3. Top Test -97.8. Arrived at 12:47pm. Completed at 2:18pm. |
2023-01-17 | No data | 108 STREET, FROM STREET 37 DRIVE TO STREET 38 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm restoration in the driving lane & new SWK flag. |
2023-01-12 | No data | JEFFERSON AVENUE, FROM STREET CLAVER PLACE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water in the parking lane/ sidewalk is flush to grade |
2023-01-10 | No data | BROOKLYN AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp cut overdue for final. Cut was across the street from property #1540. |
2023-01-10 | No data | 47 AVENUE, FROM STREET 70 STREET TO STREET 72 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plated excavation on rwy not countersunk. |
2023-01-06 | No data | DE KALB AVENUE, FROM STREET HUDSON AVENUE TO STREET NAVY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Prem cut on roadway driving lane IFO 85 Dekalb avenue |
2023-01-04 | No data | EAST 40 STREET, FROM STREET AVENUE D TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the r/w |
2023-01-03 | No data | HUDSON STREET, FROM STREET BROOME STREET TO STREET CANAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #229 water cut in the bike lane green paint restored and in compliance. |
2023-01-03 | No data | 47 AVENUE, FROM STREET 70 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working in intersection, spoke to foreman regarding plates & swk occupancy. Says he will request for waiver. |
2023-01-03 | No data | ASHLAND PLACE, FROM STREET DE KALB AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Prem cut on roadway driving lane IFO 178 Ashland pl. |
2022-12-31 | No data | WEBSTER AVENUE, FROM STREET EAST 204 STREET TO STREET EAST 205 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2022-12-31 | No data | NOSTRAND AVENUE, FROM STREET AVENUE V TO STREET AVENUE W | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration resurfaced due to BPP |
2022-12-28 | No data | WEST 8 STREET, FROM STREET 6 AVENUE TO STREET MAC DOUGAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Solid white lane marking starting to breakout from roadway. In front of 37-39. |
2022-12-24 | No data | STERLING PLACE, FROM STREET CLASSON AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane sealed and flush |
2022-12-24 | No data | 8 AVENUE, FROM STREET WEST 148 STREET TO STREET WEST 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW incompliance at time of inspection. |
2022-12-21 | No data | UNIVERSITY AVENUE, FROM STREET MORTON PLACE TO STREET WEST BURNSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut has been resurfaced |
2022-12-20 | No data | 6 AVENUE, FROM STREET WEST 13 STREET TO STREET WEST 14 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut is up to grade in roadway. In front of AKA 527 6th Ave. |
2022-12-20 | No data | ST PAUL AVENUE, FROM STREET EAST 196 STREET TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in roadway found resurfaced |
2022-12-19 | No data | 2 AVENUE, FROM STREET EAST 49 STREET TO STREET EAST 50 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER: W/ Insp Givens # 839 |
2022-12-15 | No data | FLATLANDS AVENUE, FROM STREET PENNSYLVANIA AVENUE TO STREET SHEFFIELD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY FRONT OF CAR WASH |
2022-12-07 | No data | BROADWAY, FROM STREET WEST 54 STREET TO STREET WEST 55 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 1710 two permanent restoration made in buffer and bike/driving lanes. Restoration closer to W 53 St has small portion starting to sink no CRA at this time. |
2022-12-07 | No data | 21 STREET, FROM STREET 25 ROAD TO STREET HOYT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm cut in r/w opp. address |
2022-12-05 | No data | 8 AVENUE, FROM STREET WEST 148 STREET TO STREET WEST 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW flag around water valve incompliance. |
2022-12-03 | No data | FLATLANDS AVENUE, FROM STREET PENNSYLVANIA AVENUE TO STREET SHEFFIELD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY |
2022-11-22 | No data | FLATLANDS AVENUE, FROM STREET PENNSYLVANIA AVENUE TO STREET SHEFFIELD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | LARGE PERM WATER RESTORATION IN THE ROADWAY IN FRONT OF CAR WASH. |
2022-11-19 | No data | 52 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary to grade roadway restoration in front of 1625 52nd Street overdue for final, the last permit on file expired 11/17/22. |
2022-11-19 | No data | 3 AVENUE, FROM STREET EAST 60 STREET TO STREET EAST 61 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the driving lane in front of property #1024 3 AVENUE in compliance |
2022-11-13 | No data | EAST 86 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent gas restoration covered perm water restoration M012022158A16 between 220-222 East 86th street |
2022-11-12 | No data | EAST 86 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration acceptable |
2022-11-09 | No data | BUSH STREET, FROM STREET CRESTON AVENUE TO STREET GRAND CONCOURSE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ATPO I observed the above respondent has a permanent restoration, water repair work backfilled on a protected street but failed to obtain a confirmation number. Permit number expired 10/21/2022. |
2022-11-08 | No data | MANIDA STREET, FROM STREET EAST BAY AVENUE TO STREET OAK POINT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2022-11-05 | No data | 52 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary roadway restoration with a newer active permit on file. |
2022-11-03 | No data | HOOVER AVENUE, FROM STREET 83 AVENUE TO STREET 132 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P O I observed the above respondent has a permanent repair water restoration, backfilled on a protected street but failed to obtain a confirmation number. Permit #Q012022252D33 expired 09/25/2022. |
2022-11-02 | No data | LENOX ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway in front of 423 Lenox road |
2022-11-02 | No data | 16 AVENUE, FROM STREET 46 STREET TO STREET 47 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration opposite of 4609 16th Ave. |
2022-11-01 | No data | 47 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration in the parking lane near the hydrant near 16th Ave AKA 4623 16th Ave. |
2022-10-29 | No data | WEST 66 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm restoration in driving lane at time of inspection. |
2022-10-29 | No data | WEST 66 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit M012022290B21 on file with perm restoration in driving lane at this time. |
2022-10-28 | No data | CONEY ISLAND AVENUE, FROM STREET BANNER AVENUE TO STREET SHORE PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane. |
2022-10-26 | No data | 6 AVENUE, FROM STREET WEST 13 STREET TO STREET WEST 14 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired on 10/2/2022. |
2022-10-25 | No data | WALWORTH STREET, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has a permanent restoration, (REPAIR WATER) backfilled on a protected street but failed to obtain a confirmation number.Permit #B012022243A27 expired 9/24/2022. |
2022-10-24 | No data | WALWORTH STREET, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE DRIVING LANE ON THE SIDE OF PROPERTY 486 FLUSHING AV. |
2022-10-22 | No data | 1 AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration acceptable in the bus lane |
2022-10-17 | No data | 24 STREET, FROM STREET 40 AVENUE TO STREET 41 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site. street was close. spoke with crew on site. street open before departure. |
2022-10-14 | No data | NOSTRAND AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT FOUND IN PARKING LANE IN FRONT OF 1815 NOSTRAND AVENUE |
2022-10-12 | No data | FLATLANDS AVENUE, FROM STREET EAST 92 STREET TO STREET EAST 93 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass,perm |
2022-10-08 | No data | 57 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway long water and a sidewalk restoration in compliance. |
2022-10-03 | No data | BROADWAY, FROM STREET WEST 54 STREET TO STREET WEST 55 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The respondent has applied the color code marker to the permanent restoration within the bike/turning lane. |
2022-09-29 | No data | FARRAGUT ROAD, FROM STREET EAST 31 STREET TO STREET EAST 32 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane sealed and flush. |
2022-09-27 | No data | 47 AVENUE, FROM STREET 70 STREET TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER PERM CUT IN THE P/L |
2022-09-27 | No data | 70 STREET, FROM STREET 47 AVENUE TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTRORATION ROADWAY - REPAIR WATER |
2022-09-25 | No data | REMSEN AVENUE, FROM STREET FOSTER AVENUE TO STREET KRIER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2022-09-24 | No data | ROBERTS AVENUE, FROM STREET BLONDELL AVENUE TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in the roadway and sidewalk, adjacent to Building # 2635 |
2022-09-24 | No data | 60 STREET, FROM STREET 15 AVENUE TO STREET LIRR BAY RIDGE DIV | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration in the driving lane opposite of 1514 60th Street. |
2022-09-21 | No data | BUCHANAN PLACE, FROM STREET AQUEDUCT AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w flag is flush with sealed expansion joints |
2022-09-20 | No data | 57 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Permanent roadway long water and a sidewalk restoration in compliance. |
2022-09-20 | No data | 69 STREET, FROM STREET LONG ISLAND RAILROAD TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER WORK IN THE P/L ONE PERM CUT |
2022-09-15 | No data | EAST 158 STREET, FROM STREET ELTON AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 5.5x5’ perm cut in driving lane ifo 456 |
2022-09-13 | No data | WEST 55 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR pass due to Expansion Joints found sealed. |
2022-09-12 | No data | 3 AVENUE, FROM STREET 100 STREET TO STREET 101 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cur ok rw |
2022-09-11 | No data | WEST 45 STREET, FROM STREET 8 AVENUE TO STREET SHUBERT ALLEY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in compliance |
2022-09-10 | No data | 7 AVENUE, FROM STREET WEST 144 STREET TO STREET WEST 145 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 2488 7 ave sidewalk restoration in compliance no defects to report |
2022-09-10 | No data | EAST 86 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection in front of property #222 EAST 86 STREET |
2022-09-10 | No data | AMSTERDAM AVENUE, FROM STREET WEST 164 STREET TO STREET WEST 165 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2110 amsterdam sidewalk restoration in compliance non defective |
2022-09-07 | No data | 3 AVENUE, FROM STREET 100 STREET TO STREET 101 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok p\l d\l |
2022-09-07 | No data | HOOVER AVENUE, FROM STREET 83 AVENUE TO STREET 132 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Prima steel plates ramped in the roadway and across the sidewalk at 132 St. |
2022-09-01 | No data | WEST 66 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to properly inspect due to active BO |
2022-08-26 | No data | BELL BOULEVARD, FROM STREET 42 AVENUE TO STREET 43 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Two temporary restorations ( long water) in roadway visible flush with surrounding area |
2022-08-25 | No data | OCEAN AVENUE, FROM STREET AVENUE O TO STREET AVENUE P | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane sealed and flush |
2022-08-25 | No data | BROADWAY, FROM STREET WEST 54 STREET TO STREET WEST 55 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Color Code Marker is missing from your permanent Restoration located in the Bike / left turning lanes. |
2022-08-25 | No data | BROADWAY, FROM STREET WEST 54 STREET TO STREET WEST 55 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR pass due to Restoration found permanently restored with no Color Code Marker applied. CAR will be issued to apply ID maker. |
2022-08-24 | No data | WALES AVENUE, FROM STREET EAST 145 STREET TO STREET EAST 147 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is flush and color coded in th P/L ifo 449 Wales |
2022-08-20 | No data | 52 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cuts ok p\l sw |
2022-08-20 | No data | 60 STREET, FROM STREET 15 AVENUE TO STREET LIRR BAY RIDGE DIV | No data | Street Construction Inspections: Active | Department of Transportation | cut ok d\l |
2022-08-18 | No data | 55 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair water acceptable |
2022-08-15 | No data | AMSTERDAM AVENUE, FROM STREET WEST 168 STREET TO STREET WEST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection in front of property #2185 AMSTERDAM AVENUE |
2022-08-12 | No data | COURT STREET, FROM STREET BRYANT STREET TO STREET HALLECK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERMANENT RESTORATIONS IN RWY & NEW SWK FLAGS 688 & 688 1/2-OK |
2022-08-12 | No data | WEST 55 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - REPAIR WATER: sidewalk flag |
2022-08-11 | No data | 92 STREET, FROM STREET ELMHURST AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut within parking lane, corner roosevelt |
2022-08-10 | No data | WEST 66 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I'm unable to locate the work due to a building operation. |
2022-08-09 | No data | BROADWAY, FROM STREET WEST 54 STREET TO STREET WEST 55 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Second restoration finalized in bike lane, green paint and lane markings restored. No color code at this time. Active CAR on file for overdue at this time, no CAR issued. |
2022-08-06 | No data | SEAVIEW AVENUE, FROM STREET BEND TO STREET ERSKINE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm cut in the RW, in compliance |
2022-08-04 | No data | 6 AVENUE, FROM STREET WEST 13 STREET TO STREET WEST 14 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work not started. |
2022-08-04 | No data | DE KALB AVENUE, FROM STREET HUDSON AVENUE TO STREET NAVY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERM RESTORATIONS WERE PROPERLY RE-SEALED OK |
2022-07-30 | No data | 92 STREET, FROM STREET ELMHURST AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A new sidewalk found in place at this three sided building operation under permit # Q042022195A29. Cut in CAR was flush & now a new sidewalk is in place. |
2022-07-30 | No data | 91 STREET, FROM STREET ELMHURST AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Upon inspection a new sidewalk was in place under permit # Q042022195A30 for this three sided building operation. |
2022-07-28 | No data | NORTHERN BOULEVARD, FROM STREET 73 STREET TO STREET 74 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed and acceptable in the driving lane in front of 73-01 Northern Blvd. Cut size: 3'5" x 2'3" x 3'. |
2022-07-27 | No data | EAST 28 STREET, FROM STREET FARRAGUT ROAD TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Swk flags sealed and in compliance |
2022-07-27 | No data | NORTHERN BOULEVARD, FROM STREET 73 STREET TO STREET 74 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill will be re-scheduled for a later date due to DEP not showing up on time (Forman requested cancellation). |
2022-07-27 | No data | CLAY STREET, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the parking lane is flush to grade |
2022-07-26 | No data | WEST 55 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 5/1/22. |
2022-07-26 | No data | DE KALB AVENUE, FROM STREET HUDSON AVENUE TO STREET NAVY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has a permanent restoration, repair water backfilled on a protected street but failed to obtain a confirmation number. Permit #B012022122C81 expired 5/17/22. |
2022-07-25 | No data | EAST 50 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 3 x 2 x 1.6 in compliance tested at 96.0 |
2022-07-25 | No data | STRAUSS STREET, FROM STREET EAST NEW YORK AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 6/30/22. |
2022-07-20 | No data | EAST 50 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill rescheduled due to no lab tech & 3PM time stipulation. Arrival: 2:02PM Departure: 3PM |
2022-07-19 | No data | HOOVER AVENUE, FROM STREET 83 AVENUE TO STREET 132 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work not started. |
2022-07-18 | No data | ASHLAND PLACE, FROM STREET DE KALB AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, excavating rwy, water leak repair for #178, BO, water service line damaged, visually verified leak on the property. Confirmed. |
2022-07-14 | No data | 55 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water repair in r.w acceptable |
2022-07-12 | No data | 92 STREET, FROM STREET ELMHURST AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk patchwork done on restored sidewalk flag around water valve. Restore full flag. |
2022-07-12 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm repair in parking lane acceptable |
2022-07-12 | No data | 91 STREET, FROM STREET ELMHURST AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk patchwork done on Two flags around water valve. Restore full sidewalk flags. |
2022-07-11 | No data | 40 AVENUE, FROM STREET 29 STREET TO STREET 30 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Cobblestone backfill completed & acceptable within driving lane opposite 29-16 40th Avenue. 3'2"x2'7"x3'4". |
2022-07-10 | No data | 1 AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass 2 new flags on the sidewalk in compliance |
2022-07-10 | No data | BERGEN AVENUE, FROM STREET EAST 152 STREET TO STREET EAST 153 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | white lane markings has been applied to the perm restoration |
2022-07-09 | No data | MC GUINNESS BOULEVARD, FROM STREET CALYER STREET TO STREET MESEROLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the parking lane is flush to grade |
2022-07-07 | No data | STRAUSS STREET, FROM STREET EAST NEW YORK AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK FOUND PERMIT EXPIRED |
2022-07-05 | No data | EAST NEW YORK AVENUE, FROM STREET SARATOGA AVENUE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO VISIBLE REPAIR WATER WORK FOUND |
2022-07-03 | No data | EAST 28 STREET, FROM STREET FARRAGUT ROAD TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut sealed and in compliance |
2022-07-02 | No data | 38 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw pave |
2022-06-30 | No data | HURON STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the parking lane/sidewalk is flush to grade |
2022-06-30 | No data | FOUNTAIN AVENUE, FROM STREET SEAVIEW AVENUE TO STREET VANDALIA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Segment has been resurfaced by DOT |
2022-06-29 | No data | EAST 28 STREET, FROM STREET FARRAGUT ROAD TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | swk flags sealed and in compliance |
2022-06-27 | No data | SPRINGFIELD BOULEVARD, FROM STREET 131 AVENUE TO STREET 132 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration to grade within the roadway. |
2022-06-27 | No data | ERSKINE STREET, FROM STREET GATEWAY DRIVE TO STREET SCHROEDERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done on fountain ave CAR was issued for temp cut with expired permit |
2022-06-24 | No data | BROADWAY, FROM STREET WEST 54 STREET TO STREET WEST 55 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time to restore overdue/sawcut portion of bike lane at this time. Active CAR remains on file #M012022129B47. |
2022-06-17 | No data | FOUNTAIN AVENUE, FROM STREET SEAVIEW AVENUE TO STREET VANDALIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW resurfaced by DOT |
2022-06-17 | No data | SEAVIEW AVENUE, FROM STREET BEND TO STREET ERSKINE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary restoration cut in the roadway needs to be finalized, your permit expired on 6/7/2022 |
2022-06-17 | No data | FARRAGUT ROAD, FROM STREET EAST 31 STREET TO STREET EAST 32 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BKFILL NOTES: (L) 3 FT (W) 2FT (D) 3.6 FT ..ACTUAL START TIME 1:00 PM .. COMPACTION: 97.9% / 98.2% |
2022-06-17 | No data | FOUNTAIN AVENUE, FROM STREET SEAVIEW AVENUE TO STREET VANDALIA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | RW was resurfaced by DOT |
2022-06-12 | No data | WEST 66 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The Street was resurfaced. |
2022-06-09 | No data | MC GUINNESS BOULEVARD, FROM STREET CALYER STREET TO STREET MESEROLE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | L4FT, W3FT, D3FT CUT IN THE DRIVING LANE IFO PROPERTY #161. |
2022-06-07 | No data | NOSTRAND AVENUE, FROM STREET AVENUE V TO STREET AVENUE W | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in the r/w |
2022-06-02 | No data | MC GUINNESS BOULEVARD, FROM STREET CALYER STREET TO STREET MESEROLE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill reschedule due to no lab tester |
2022-06-02 | No data | BROADWAY, FROM STREET WEST 54 STREET TO STREET WEST 55 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 1710 in bike lane, temp restoration/saw cut lines overdue for final. Perm restoration in buffer zone is acceptable. Previous permit application on file was denied. |
2022-05-29 | No data | EAST 148 STREET, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not started |
2022-05-29 | No data | 7 AVENUE, FROM STREET WEST 144 STREET TO STREET WEST 145 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Ifo 2488 7 ave sidewalk in compliance |
2022-05-26 | No data | NOSTRAND AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | work done on s/w & perm restoration in the r/w |
2022-05-26 | No data | FOUNTAIN AVENUE, FROM STREET SEAVIEW AVENUE TO STREET VANDALIA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp cut on the roadway needs to be finalized, your permit expired on 5/25/2022 |
2022-05-25 | No data | BERGEN AVENUE, FROM STREET EAST 152 STREET TO STREET EAST 153 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | White roadway markings and "STOP" lane markings needed |
2022-05-25 | No data | BROADWAY, FROM STREET WEST 54 STREET TO STREET WEST 55 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In buffer zone on restoration finalized and in bike lane one small cut remain temp at this time. Permit application on file #2022050700011460 "Payment Ready" status. |
2022-05-23 | No data | DE KALB AVENUE, FROM STREET HUDSON AVENUE TO STREET NAVY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the driving lane, needs to be sealed.In front of 85 Dekalb Avenue between Hudson Avenue and Navy Street. |
2022-05-23 | No data | DE KALB AVENUE, FROM STREET HUDSON AVENUE TO STREET NAVY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Steel plate was removed and restoration was finalized. Condition corrected, pass. |
2022-05-21 | No data | JEFFERSON AVENUE, FROM STREET CLAVER PLACE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done started |
2022-05-20 | No data | FLATLANDS AVENUE, FROM STREET PENNSYLVANIA AVENUE TO STREET SHEFFIELD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in he RW by car wash, in compliance |
2022-05-19 | No data | FOUNTAIN AVENUE, FROM STREET SEAVIEW AVENUE TO STREET VANDALIA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate on the roadway |
2022-05-19 | No data | BROADWAY, FROM STREET WEST 54 STREET TO STREET WEST 55 STREET | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O 1710 in buffer zone restoration was finalized under previous permit. Sawcut area with cold patch in bike lane remains present. Permit remains active. |
2022-05-18 | No data | SEAVIEW AVENUE, FROM STREET BEND TO STREET ERSKINE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate in the RW, in compliance |
2022-05-18 | No data | SEAVIEW AVENUE, FROM STREET BEND TO STREET ERSKINE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plate on the RW, active permit on file |
2022-05-18 | No data | FT WASHINGTON AVENUE, FROM STREET WEST 183 STREET TO STREET WEST 185 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water restoration I/F/O 524 remains in acceptable condition. No defects to report |
2022-05-17 | No data | FLATLANDS AVENUE, FROM STREET PENNSYLVANIA AVENUE TO STREET SHEFFIELD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in he RW by car wash, in compliance |
2022-05-16 | No data | FLATLANDS AVENUE, FROM STREET PENNSYLVANIA AVENUE TO STREET SHEFFIELD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the RW IFO car wash |
2022-05-12 | No data | UNION STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Roadway restoration’s found to a permanently restored and in compliance at this time |
2022-05-12 | No data | BEDFORD AVENUE, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | 4 Temp cuts in the roadway , 185, 186, 188 and 190 . No permit . Can not see if there is a cut located in front of 192 due to mini van parked . |
2022-05-11 | No data | EAST 50 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found 3 water repair restoration in the roadway flush to grade. |
2022-05-10 | No data | BARNES AVENUE, FROM STREET BRONXDALE AVENUE TO STREET RHINELANDER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plumber foreman Mentur combine 2 plumber cuts plus cave in restoration into 1. Restoration now 20' x 14' cut 2ft from the curb. I ask Mentur if he could patch out a 7' x 2' pot hole area adjacent to the curb next to plumber restoration and he did. |
2022-05-10 | No data | BARNES AVENUE, FROM STREET BRONXDALE AVENUE TO STREET RHINELANDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber made cuts in 1. 20' x 14' restoration 2' from the curb. Plumber patch out a 7' x 2' pothole area with excess asphalt in the parking lane next to his restoration. This 7'x 2' area does not belong to the plumber. I asked the plumber to fill out |
2022-05-05 | No data | 1 AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | full concrete panel restored in kind concrete. |
2022-05-05 | No data | LAFAYETTE STREET, FROM STREET CANAL STREET TO STREET HOWARD STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work done. |
2022-05-04 | No data | EAST 54 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced from new building BPP. |
2022-05-04 | No data | WEST 55 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done. |
2022-04-29 | No data | 1 AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: Active | Department of Transportation | full panel was restored and Concrete pour was monitored. rebars were installed 16" apart. original matching tint was applied. area coned off to dry and tomorrow cones will be removed. |
2022-04-27 | No data | BROADWAY, FROM STREET WEST 54 STREET TO STREET WEST 55 STREET | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O 1710, one perm restoration in buffer zone. One small temp and saw- cut area closer to W 54 St in bike/turning lane. Permit remains active. |
2022-04-27 | No data | BLONDELL AVENUE, FROM STREET FINK AVENUE TO STREET PONTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Spoke to owner AL, as per plumber water main is located on the sidewalk, opposite side, cuts on the sidewalk on both sides and roadway. |
2022-04-26 | No data | NOSTRAND AVENUE, FROM STREET AVENUE V TO STREET AVENUE W | No data | Street Construction Inspections: Post-Audit | Department of Transportation | d1j violation |
2022-04-26 | No data | BLONDELL AVENUE, FROM STREET FINK AVENUE TO STREET PONTON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Back fill pass |
2022-04-24 | No data | STERLING PLACE, FROM STREET CLASSON AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut found in parking lane in front of 520 Sterling place |
2022-04-24 | No data | NOSTRAND AVENUE, FROM STREET AVENUE V TO STREET AVENUE W | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut sealed and in compliance |
2022-04-23 | No data | PRESIDENT STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2022-04-23 | No data | ST PAUL AVENUE, FROM STREET EAST 196 STREET TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PASS PERM TO GRADE AND SEAL 110 ' FROM WESTCHESTER AVE ON THE R/W |
2022-04-22 | No data | NOSTRAND AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary asphalt roadway restoration, Overdue for FINAL RESTORATION. (2) - Concrete sidewalk flag restoration not restored in kind, Full flag restoration needed. |
2022-04-21 | No data | FLATLANDS AVENUE, FROM STREET PENNSYLVANIA AVENUE TO STREET SHEFFIELD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the p/l incompliance |
2022-04-21 | No data | EAST 50 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Heavy Domestic Water Service Leak in the Roadway Currently being Pumped out. 3 Day Dep Notice Issued |
2022-04-19 | No data | LENOX AVENUE, FROM STREET WEST 131 STREET TO STREET WEST 132 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Patchwork restored with full flag restoration |
2022-04-19 | No data | FLATLANDS AVENUE, FROM STREET PENNSYLVANIA AVENUE TO STREET SHEFFIELD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut ifo gas station / carwash area in the d/l p/l in compliance |
2022-04-18 | No data | DE KALB AVENUE, FROM STREET HUDSON AVENUE TO STREET NAVY STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Steel plate was removed from the roadway and the restoration was left temporary to grade. |
2022-04-14 | No data | BROADWAY, FROM STREET WEST 54 STREET TO STREET WEST 55 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time. Mark-out present in bike/turning lane. Permit remains active. |
2022-04-14 | No data | DE KALB AVENUE, FROM STREET HUDSON AVENUE TO STREET NAVY STREET | No data | Street Construction Inspections: Active | Department of Transportation | (Complaint) Pinned and ramped steel plate, in the driving lane, remains noisy when driven over by vehicles. A CAR was previously issued on 4/11/2022. |
2022-04-12 | No data | DE KALB AVENUE, FROM STREET HUDSON AVENUE TO STREET NAVY STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Pinned and ramped steel plate, in the driving lane, in front 85 Dekalb Avenue. The steel plate is very noisy when driven over by vehicles. A CAR was issued to the contractor for this condition on 4/11/2022. (CAR #20226540036) |
2022-04-11 | No data | DE KALB AVENUE, FROM STREET HUDSON AVENUE TO STREET NAVY STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | There is a Loose and Noisy Steel Plate, Vibrating Loudly as Vehicles drive over it. |
2022-04-11 | No data | BARNES AVENUE, FROM STREET BRONXDALE AVENUE TO STREET RHINELANDER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed 2 plumber cuts temp to grade, also cave in area temp to grade. Joint inspection needs to be made with Plumber in regards to cave in restoration. |
2022-04-10 | No data | 5 AVENUE, FROM STREET EAST 48 STREET TO STREET EAST 49 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration remains in compliance. |
2022-04-09 | No data | UNION AVENUE, FROM STREET EAST 156 STREET TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | restoration restored |
2022-04-07 | No data | PITKIN AVENUE, FROM STREET CLEVELAND STREET TO STREET ELTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | SEGMENT FOUND MILLED AT THIS TIME OF INSPECTION IN PREPERATION TO PAVE |
2022-04-05 | No data | AVENUE A, FROM STREET EAST 12 STREET TO STREET EAST 13 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #204 plumbers cut in the driving/parking lane is in compliance. |
2022-04-03 | No data | JEFFERSON AVENUE, FROM STREET CLAVER PLACE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp water cut found in parking lane in front of 24 Jefferson avenue |
2022-04-02 | No data | LENOX AVENUE, FROM STREET WEST 131 STREET TO STREET WEST 132 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 426 lenox permanent restoration on sidewalk in compliance |
2022-04-02 | No data | LENOX AVENUE, FROM STREET WEST 130 STREET TO STREET WEST 131 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 406 lenox sidewalk no defects found |
2022-04-02 | No data | HUDSON STREET, FROM STREET BROOME STREET TO STREET CANAL STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | domestic water hit during construction by prima paving corp under permit M012022091B15 , one excavation made on roadway and one excavation made in construction site, 3 day notice issued. |
2022-04-01 | No data | EAST 50 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Temporary restoration in roadway opposite address (driving lane) |
2022-03-31 | No data | 1 AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp cut remain in the bus lane. |
2022-03-30 | No data | 1 AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 1758 in the parking lane/bus stop , your temporary restoration is over due for final restoration. |
2022-03-29 | No data | EAST 19 STREET, FROM STREET BROADWAY TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Cut in South parking lane. |
2022-03-23 | No data | FLATLANDS AVENUE, FROM STREET EAST 92 STREET TO STREET EAST 93 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, perm .... water relay . |
2022-03-19 | No data | NEVINS STREET, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No cut on Nevins street. No work done at this time. |
2022-03-17 | No data | LENOX ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found in compliance |
2022-03-15 | No data | WEST 30 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work has been started at this time. |
2022-03-12 | No data | WEST 55 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No water cut on bike lane/driving lane for property. Protected bike lane is clear. |
2022-03-06 | No data | 70 STREET, FROM STREET 47 AVENUE TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTRORATION ROADWAY - REPAIR WATER |
2022-03-06 | No data | 47 AVENUE, FROM STREET 70 STREET TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER-PERM RSTORATION ROADWAY |
2022-03-05 | No data | 69 STREET, FROM STREET LONG ISLAND RAILROAD TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - PERM ROADWAY |
2022-03-04 | No data | FLATLANDS AVENUE, FROM STREET PENNSYLVANIA AVENUE TO STREET SHEFFIELD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp cut in th ep/l ifo gas station also plated excavation in complaince |
2022-02-26 | No data | LENOX AVENUE, FROM STREET WEST 131 STREET TO STREET WEST 132 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk in compliance |
2022-02-24 | No data | BROOKLYN AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in p/l on opp side |
2022-02-23 | No data | BERGEN STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the roadway behind jersey barriers |
2022-02-18 | No data | WEST 30 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Unable to see work due to construction fence. Split pedestrian walkway and bike lane in rdwy under shed. |
2022-02-14 | No data | REMSEN AVENUE, FROM STREET FOSTER AVENUE TO STREET KRIER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass, perm ... S/b dir . |
2022-02-14 | No data | BERGEN STREET, FROM STREET KINGSBOROUGH 1 WALK TO STREET KINGSBOROUGH 2 WALK | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE PARKING LANE OPPOSITE #1668 RIGHT BEFORE BUS PAD |
2022-02-09 | No data | QUEENS STREET, FROM STREET DEAD END TO STREET JACKSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade cut in the driving lane. |
2022-02-08 | No data | 1 AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Temporary restoration cut in the bus lane in front of 1758. |
2022-02-04 | No data | NEVINS STREET, FROM STREET PRESIDENT STREET TO STREET UNION STREET | No data | Street Construction Inspections: Active | Department of Transportation | Cut in the roadway is plated & temp to grade |
2022-02-03 | No data | CANAL STREET, FROM STREET CENTRE STREET TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway is up to grade. |
2022-02-03 | No data | 1 AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary water repair cut in the roadway. Active permit on file M012022024B27 |
2022-02-02 | No data | BERGEN STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work not started at time of inspection nor visible on roadway. |
2022-02-02 | No data | NEVINS STREET, FROM STREET PRESIDENT STREET TO STREET UNION STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | L3'10 W 3'0 D 3'4Compaction 97.7Pass |
2022-01-28 | No data | FLATLANDS AVENUE, FROM STREET PENNSYLVANIA AVENUE TO STREET SHEFFIELD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew working on r/w at this time emergency # , plates will be countersunken also advised to post raise plow signs |
2022-01-28 | No data | PITKIN AVENUE, FROM STREET CLEVELAND STREET TO STREET ELTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | bike lane markings missing , apply bike lane markings on r/w |
2022-01-28 | No data | FLATLANDS AVENUE, FROM STREET PENNSYLVANIA AVENUE TO STREET SHEFFIELD AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Cut on sidewalk , bp gas station 3 day notice issued |
2022-01-27 | No data | AMSTERDAM AVENUE, FROM STREET WEST 164 STREET TO STREET WEST 165 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags have been fully replaced |
2022-01-27 | No data | UNION STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest Denied, Spoke with the Owner , Alban Sahala , 6:28pm, 1-27-2022 , in regards to CAR protest. Plumbing excavation was done without a permit in error. As per owner, a permit will be obtained to restore temporary restoration cuts in the roadway |
2022-01-26 | No data | METROPOLITAN AVENUE, FROM STREET 80 STREET TO STREET COOPER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut on driving lane, 100' off 80 st, |
2022-01-24 | No data | NORTH 15 STREET, FROM STREET FRANKLIN STREET TO STREET GEM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two permanent water restoration flush and sealed in the driving lane ifo DEP parking/gas station lot. |
2022-01-23 | No data | DE KALB AVENUE, FROM STREET ASHLAND PLACE TO STREET NAVY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 11/11/21 |
2022-01-19 | No data | WHITE STREET, FROM STREET BROADWAY TO STREET CORTLANDT ALLEY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV respondent has a permanent Repair Water restoration backfilled on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit #M012021350C25 expired on 12/31/2021. |
2022-01-15 | No data | FRANKLIN STREET, FROM STREET MESEROLE AVENUE TO STREET NORTH 15 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2022-01-08 | No data | WILLOUGHBY STREET, FROM STREET FLATBUSH AVENUE EXTENSION TO STREET GOLD STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew currently within an open excavation, in the parking lane, at the corner of Willoughby Street and Gold Street. Contractor is allowed to work on Saturday from 8AM - 4PM. |
2022-01-06 | No data | STATE STREET, FROM STREET 3 AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work can be seen at this time due to construction |
2022-01-06 | No data | EDGEWATER ROAD, FROM STREET AVENUE A TO STREET DRAKE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | After performing research in the DASH database I observed the above respondent failed to submit an application for a regular permit within two business days of receiving Emergency permit number X012021347A17 on 12/13/21 . |
2022-01-04 | No data | MARCUS GARVEY BOULEVARD, FROM STREET DECATUR STREET TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY FOUND REPAVED |
2021-12-30 | No data | MESEROLE AVENUE, FROM STREET FRANKLIN STREET TO STREET GEM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please repair cracked and broken out asphalt opposite of property #8 |
2021-12-29 | No data | 7 AVENUE, FROM STREET WEST 144 STREET TO STREET WEST 145 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags have been fully replaced. No defects to report |
2021-12-28 | No data | UNION STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | 2temp cut overdue for final |
2021-12-23 | No data | EAST 28 STREET, FROM STREET FARRAGUT ROAD TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | work done on s/w & perm restoration in p/l on opp side |
2021-12-22 | No data | WHITE STREET, FROM STREET BROADWAY TO STREET CORTLANDT ALLEY | No data | Street Construction Inspections: LL14 | Department of Transportation | REPAIR WATER: D.E.P. changed contractor inspection time to P.M. |
2021-12-21 | No data | BROADWAY, FROM STREET CUMMING STREET TO STREET DYCKMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w is good |
2021-12-18 | No data | CARROLL STREET, FROM STREET 3 AVENUE TO STREET WHITWELL PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok rw |
2021-12-17 | No data | UNION STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | 2 temp cuts in the bicycle lane and 2 sidewalk flags , in front of 585 -Union St . |
2021-12-13 | No data | GOLD STREET, FROM STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Active | Department of Transportation | plates covering excavation |
2021-12-13 | No data | EDGEWATER ROAD, FROM STREET AVENUE A TO STREET DRAKE STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | leaking at city main, one cut, plumber to do restoration. |
2021-12-12 | No data | BOWERY, FROM STREET BROOME STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut IFO of new building operation acceptable. Area will be resurfaced through BPP. IFO aka 337 Broome St. |
2021-12-11 | No data | 1 AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | domestic water leaking in basement , 3 day notice,one excavation made on roadway at time of inspection |
2021-12-09 | No data | SPRINGFIELD BOULEVARD, FROM STREET 131 AVENUE TO STREET 132 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade within the p/l. 131-24 |
2021-12-07 | No data | 48 STREET, FROM STREET 34 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Final restoration on roadway ifo # 32-36, opp 32-37. May need to be resealed soon. |
2021-12-04 | No data | JOHN STREET, FROM STREET CLIFF STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Resurfaced |
2021-12-02 | No data | LEXINGTON AVENUE, FROM STREET EAST 56 STREET TO STREET EAST 57 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sewer restoration may have been paved over. |
2021-11-30 | No data | LEXINGTON AVENUE, FROM STREET EAST 56 STREET TO STREET EAST 57 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration may have been paved over. |
2021-11-30 | No data | WEST 66 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street is entirely resurfaced |
2021-11-28 | No data | GRAND AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY |
2021-11-16 | No data | BROOME STREET, FROM STREET BEND TO STREET CHRYSTIE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Closer to Bend next to south curb, sewer cut remains temp to grade within BO. Foreman John stated the BO will be doing 1/2 +5 cobblestone BPP in the future. No overdue CAR issued at this time. |
2021-11-16 | No data | HALSEY STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDE WALK FLAG INSTILLED FOR NEW BUILDING CLOSER TO TOMPKINS |
2021-11-16 | No data | UNION AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 165 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to properly inspect due to active building operations throughout segment |
2021-11-14 | No data | 69 STREET, FROM STREET LONG ISLAND RAILROAD TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | 2 perm water restorations flush to grade in the roadway of the driving lane in front of property #46-09 QUEENS BOULEVARD pavement roadway lane markings restored in kind in compliance |
2021-11-14 | No data | BOWERY, FROM STREET BROOME STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the driving lane. |
2021-11-13 | No data | 69 STREET, FROM STREET LONG ISLAND RAILROAD TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | MES crew on site currently performing work in the roadway of the driving lane 2 concrete base restorations currently during final restoration course in front of property #46-09 QUEENS BOULEVARD in a efficient manner in compliance |
2021-11-12 | No data | TOMPKINS AVENUE, FROM STREET HALSEY STREET TO STREET HANCOCK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY FOUND RESURFACED |
2021-11-11 | No data | EAST 28 STREET, FROM STREET FARRAGUT ROAD TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent has permanently restore the roadway (after receiving (NOV [#0702829921] on 10/28/2021)-Without a valid DOT permit on file to restore the roadway. |
2021-11-11 | No data | EAST 28 STREET, FROM STREET FARRAGUT ROAD TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | work done on s/w & perm restoration in p/l on opp side |
2021-11-10 | No data | UNION AVENUE, FROM STREET EAST 156 STREET TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A 4' x 4' portion of plumber restoration sunken 2" below. Entire wearing course needs to do over . |
2021-11-08 | No data | LENOX AVENUE, FROM STREET WEST 131 STREET TO STREET WEST 132 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Patch Work Sidewalk Flags need to be fully restored. |
2021-11-06 | No data | CARROLL STREET, FROM STREET 3 AVENUE TO STREET WHITWELL PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok rw |
2021-11-05 | No data | CARROLL STREET, FROM STREET 3 AVENUE TO STREET WHITWELL PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on r/w |
2021-11-01 | No data | CARROLL STREET, FROM STREET 3 AVENUE TO STREET WHITWELL PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 8/1/2021 |
2021-10-28 | No data | EAST 28 STREET, FROM STREET FARRAGUT ROAD TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Temp cut in the crosswalk area at Flatbush ave |
2021-10-26 | No data | DE KALB AVENUE, FROM STREET ASHLAND PLACE TO STREET NAVY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 8/2/2021. |
2021-10-24 | No data | MAPES AVENUE, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2021-10-23 | No data | 7 AVENUE, FROM STREET WEST 144 STREET TO STREET WEST 145 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk in compliance |
2021-10-20 | No data | DE KALB AVENUE, FROM STREET ASHLAND PLACE TO STREET NAVY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Nw Concrete Bus Pad in RWY opp. # 96-98. Ashland between Rockwell Pl. Not Navy St. |
2021-10-19 | No data | 69 STREET, FROM STREET LONG ISLAND RAILROAD TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired on 10/13/2021. |
2021-09-26 | No data | 52 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk Flag in Compliance |
2021-09-22 | No data | AVENUE A, FROM STREET EAST 12 STREET TO STREET EAST 13 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 204 permanent sewer restoration is in compliance |
2021-09-19 | No data | EAST 54 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sub-sequently secured permit for this work. |
2021-09-19 | No data | 44 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | half of cut resurfaced in the r/w & perm cut in p/l |
2021-09-17 | No data | ASHLAND PLACE, FROM STREET DE KALB AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NEW PERMANENT RESTORATION IN RWY TO GRADE |
2021-09-15 | No data | LENOX AVENUE, FROM STREET WEST 131 STREET TO STREET WEST 132 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Recess and seal the expansion joints |
2021-09-15 | No data | LENOX AVENUE, FROM STREET WEST 131 STREET TO STREET WEST 132 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Recess and seal the expansion joints |
2021-09-11 | No data | 42 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw paved sw ok |
2021-09-09 | No data | UNION AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 165 STREET | No data | Street Construction Inspections: Active | Department of Transportation | work not started |
2021-09-08 | No data | UNION AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 165 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2021-09-08 | No data | WEST 8 STREET, FROM STREET 6 AVENUE TO STREET MAC DOUGAL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The respondent has restored the white lane markings on the permanent cut in the bike lane. |
2021-09-04 | No data | PITKIN AVENUE, FROM STREET CLEVELAND STREET TO STREET ELTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Temp water cut in the bike lane |
2021-09-01 | No data | 46 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in p/l |
2021-08-29 | No data | ASHLAND PLACE, FROM STREET DE KALB AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION CENTER OF RWY |
2021-08-29 | No data | DE KALB AVENUE, FROM STREET ASHLAND PLACE TO STREET NAVY STREET | No data | Street Construction Inspections: Active | Department of Transportation | NEW CONCRETE BUS PADS OPPOSITE 96-98 & NEW SWK FLAGS |
2021-08-29 | No data | DE KALB AVENUE, FROM STREET ASHLAND PLACE TO STREET NAVY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW CONCRETE BUS PADS OPPOSITE 96-98 & NEW SWK FLAGS |
2021-08-23 | No data | DE KALB AVENUE, FROM STREET ASHLAND PLACE TO STREET NAVY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Upon arrival respondent MES CONSTRUCTION CORP failed to restore/repair the temporary sewer restorations to grade flush with surrounding areas after notified via CORRECTIVE ACTION REQUEST #20214510916. NOV DD5 issued condition remains please re-notify |
2021-08-23 | No data | DE KALB AVENUE, FROM STREET ASHLAND PLACE TO STREET NAVY STREET | No data | Street Construction Inspections: Active | Department of Transportation | TEMPORARY RESTORATIONS IN DRIVING LANE OF ROADWAY DOWN 8 INCHES - OPPOSITE 96-98 DEKALB AVENUE BETWEEN ASHLAND PLACE & NAVY STREET. PLEASE RESTORE ROADWAY TO GRADE. |
2021-08-22 | No data | DE KALB AVENUE, FROM STREET ASHLAND PLACE TO STREET NAVY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW SWK FLAGS |
2021-08-20 | No data | GROVE STREET, FROM STREET BEND TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane 70 feet from Bushwick Av. |
2021-08-20 | No data | 61 STREET, FROM STREET 15 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve on s/w & cut resurfaced by BPP |
2021-08-17 | No data | BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW resurfaced |
2021-08-14 | No data | WILLOUGHBY STREET, FROM STREET FLATBUSH AVENUE EXTENSION TO STREET GOLD STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED SIDEWALK AREA - OVER NEWLY INSTALLED CATCH BASIN (HALLEN PLATES) FOR 138 WILLOUGHBY STREET |
2021-08-14 | No data | GOLD STREET, FROM STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED SIDEWALK AREA - OVER NEWLY INSTALLED CATCH BASIN (HALLEN PLATES) FOR 138 WILLOUGHBY STREET |
2021-08-14 | No data | WILLOUGHBY STREET, FROM STREET FLATBUSH AVENUE EXTENSION TO STREET GOLD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED SIDEWALK AREA - OVER NEWLY INSTALLED CATCH BASIN (HALLEN PLATES) FOR 138 WILLOUGHBY STREET |
2021-08-11 | No data | METROPOLITAN AVENUE, FROM STREET MARCY AVENUE TO STREET NORTH 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW SWK FLAGS WERE RESTORED AT 2 SIDED EMPTY LOT OFF SCL |
2021-08-08 | No data | ASHLAND PLACE, FROM STREET DE KALB AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | - Temporary Restoration SunkenPlease make temp water cut on the roadway in front of 185 Ashland place flush with surrounding area. Temp water cut down 1 inch in driving lane |
2021-08-08 | No data | UNION AVENUE, FROM STREET EAST 156 STREET TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 - REPAIR WATER |
2021-08-07 | No data | CARROLL STREET, FROM STREET 3 AVENUE TO STREET WHITWELL PLACE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation on r/w |
2021-08-07 | No data | CARROLL STREET, FROM STREET 3 AVENUE TO STREET WHITWELL PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation on r/wnewer active permit on file |
2021-08-04 | No data | WEST 8 STREET, FROM STREET 6 AVENUE TO STREET MAC DOUGAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bike/parking solid white lane marking within your 2020 water repair 5'x5' restoration has faded and needs to be restored. IFO 37-37 West 8 Street. |
2021-08-02 | No data | CARROLL STREET, FROM STREET 3 AVENUE TO STREET WHITWELL PLACE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavationapplication#2021072900984996 was submitted on 7/29/21 |
2021-07-31 | No data | 7 AVENUE, FROM STREET WEST 144 STREET TO STREET WEST 145 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | M042021181A06-entire sidewalk replaced & restored. |
2021-07-29 | No data | WEST 125 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut located on the roadway has been made final. No defects to report |
2021-07-16 | No data | LENOX AVENUE, FROM STREET WEST 131 STREET TO STREET WEST 132 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flag has been replaced, however expansion joints have not been recessed and sealed. |
2021-07-09 | No data | LENOX AVENUE, FROM STREET WEST 131 STREET TO STREET WEST 132 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failed to fully replace concrete sidewalk flags |
2021-07-07 | No data | CARROLL STREET, FROM STREET 3 AVENUE TO STREET WHITWELL PLACE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation on r/w |
2021-07-07 | No data | CARROLL STREET, FROM STREET 3 AVENUE TO STREET WHITWELL PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | active permit on file |
2021-07-05 | No data | EAST 28 STREET, FROM STREET FARRAGUT ROAD TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane opposite from property #639 EAST 28 STREET in compliance |
2021-06-30 | No data | 72 STREET, FROM STREET 60 AVENUE TO STREET CALDWELL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in the driving lane, sidewalk flags restored around water valve. |
2021-06-30 | No data | JACKSON AVENUE, FROM STREET EAST 141 STREET TO STREET EAST 142 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w ok |
2021-06-29 | No data | EAST 159 STREET, FROM STREET COURTLANDT AVENUE TO STREET MELROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2021-06-28 | No data | PRESIDENT STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok |
2021-06-27 | No data | EAST 28 STREET, FROM STREET FARRAGUT ROAD TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 new sidewalk flag |
2021-06-24 | No data | BOSTON ROAD, FROM STREET BOUCK AVENUE TO STREET EAST 212 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2021-06-22 | No data | WEST 36 STREET, FROM STREET 10 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced and sidewalk reconstructed for new building. Plumber's restoration no longer visible. |
2021-06-21 | No data | EAST 28 STREET, FROM STREET FARRAGUT ROAD TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in compliance |
2021-06-14 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on sidewalk |
2021-06-13 | No data | EAST 28 STREET, FROM STREET FARRAGUT ROAD TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | construction materials removed from sidewalk |
2021-06-09 | No data | BROOKLYN AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLUMBERS WORK DONE ON SIDEWALK. PATCHWORK. |
2021-06-09 | No data | WEST 36 STREET, FROM STREET 10 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP DONE & NEW S/W |
2021-06-09 | No data | WEST 23 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No defect found in the roadway however there is 2021 Con Ed restoration in the parking lane. |
2021-06-09 | No data | CARROLL STREET, FROM STREET 3 AVENUE TO STREET WHITWELL PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plate pinned and ramped in the roadway, active permit on file B012021144A36 |
2021-06-08 | No data | WILLOUGHBY STREET, FROM STREET FLATBUSH AVENUE EXTENSION TO STREET GOLD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RWY RESURFACED & NEW SWK AT NEW BUILDING |
2021-06-04 | No data | GRAND CONCOURSE, FROM STREET EAST 153 STREET TO STREET EAST 156 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w ok |
2021-06-03 | No data | WEST 132 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2021-06-03 | No data | EAST 65 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill rescheduled due to other utility clutter; difficult to access pipe. |
2021-05-27 | No data | 8 AVENUE, FROM STREET WEST 45 STREET TO STREET WEST 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Final restoration complete. |
2021-05-26 | No data | EAST 151 STREET, FROM STREET COURTLANDT AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2021-05-24 | No data | GRAND AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm work on r/w in compliance |
2021-05-24 | No data | AMSTERDAM AVENUE, FROM STREET WEST 164 STREET TO STREET WEST 165 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest accepted, the permittee provided a letter stating that the general contractor (Avante Contracting Corp.) will be responsible to restore the sidewalk flags. |
2021-05-24 | No data | LENOX AVENUE, FROM STREET WEST 130 STREET TO STREET WEST 131 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest accepted, the permittee provided a letter stating that the general contractor (Avante Contracting Corp.) will be responsible to restore the sidewalk flags. |
2021-05-24 | No data | 35 STREET, FROM STREET 28 AVENUE TO STREET 30 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut on parking lane IFO for water. Conventional bike lane is up & running |
2021-05-21 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the d/l |
2021-05-18 | No data | 5 AVENUE, FROM STREET EAST 48 STREET TO STREET EAST 49 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic water service leak. 3 day notice issued. One excavation in roadway at this time |
2021-05-17 | No data | LENOX AVENUE, FROM STREET WEST 130 STREET TO STREET WEST 131 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | scaffold obstructing defective s/w flag. CAR will be re-issued. |
2021-05-17 | No data | LENOX AVENUE, FROM STREET WEST 131 STREET TO STREET WEST 132 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | patch work on s/w not corrected. |
2021-05-17 | No data | LENOX AVENUE, FROM STREET WEST 130 STREET TO STREET WEST 131 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | patchwork on s/w. |
2021-05-16 | No data | 17 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | DOT paved the r/w |
2021-05-16 | No data | PACIFIC STREET, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY FOUND RESURFACED BY BPP |
2021-05-14 | No data | AMSTERDAM AVENUE, FROM STREET WEST 164 STREET TO STREET WEST 165 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Full width of sidewalk flags must be restored after completion of water restoration located I/F/O 2110. |
2021-05-14 | No data | LONGFELLOW AVENUE, FROM STREET ALDUS STREET TO STREET EAST 165 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Repair water IFO house #1042 (2) permanent restoration in parking/travel lane and (1) sidewalk in compliance. Bike lane clear. |
2021-05-11 | No data | EAST TREMONT AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET SCHLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway and sidewalk in compliance. |
2021-05-10 | No data | JOHN STREET, FROM STREET CLIFF STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | while inspecting the location there was no repair water restoration found in the Roadway. |
2021-05-09 | No data | PLATT STREET, FROM STREET GOLD STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The respondent did not do the work, and the permit has expired. |
2021-05-09 | No data | EAST 28 STREET, FROM STREET FARRAGUT ROAD TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | SIDEWALK FLAG DRY- PLEASE REMOVE CONSTRUCTION MATERIALS OFF SIDEWALK IN FRONT OF 639 EAST 28 STREET BETWEEN FLATBUSH AVENUE & FARRAGUT ROAD. OPEN FOR PEDESTRIANS. |
2021-05-04 | No data | LONGFELLOW AVENUE, FROM STREET ALDUS STREET TO STREET EAST 165 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work not done on 1042 LONGFELLOW AVENUE. |
2021-05-02 | No data | BROOME STREET, FROM STREET BEND TO STREET CHRYSTIE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area within an enclosed building operation worksite. |
2021-05-01 | No data | SOUTH ELLIOTT PLACE, FROM STREET ACADEMY PARK PLACE TO STREET HANSON PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sw ok seal |
2021-05-01 | No data | WEST 123 STREET, FROM STREET LENOX AVENUE TO STREET MT MORRIS PARK WEST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut okay in r/w. |
2021-04-28 | No data | EAST 147 STREET, FROM STREET AUSTIN PLACE TO STREET TIMPSON PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w ok |
2021-04-25 | No data | EAST 196 STREET, FROM STREET BAINBRIDGE AVENUE TO STREET MARION AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken water service. 3 day notice issued. One excavation in roadway at this time |
2021-04-20 | No data | HALSEY STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut on the sidewalk is in compliance |
2021-04-20 | No data | WILLOW AVENUE, FROM STREET EAST 133 STREET TO STREET EAST 134 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2021-04-19 | No data | BOWERY, FROM STREET BROOME STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Active | Department of Transportation | Contractor on location in compliance |
2021-04-19 | No data | TOMPKINS AVENUE, FROM STREET HALSEY STREET TO STREET HANCOCK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the parking lane is flush to grade. |
2021-04-17 | No data | MARCUS GARVEY BOULEVARD, FROM STREET DECATUR STREET TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the roadway is flush to grade |
2021-04-07 | No data | HILLSIDE AVENUE, FROM STREET 240 STREET TO STREET CREEDMOOR HOSPITAL BOUNDARY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent roadway restoration to grade 1 flag restored around water valve |
2021-04-06 | No data | CANAL STREET, FROM STREET CENTRE STREET TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permanent water restoration acceptable |
2021-04-05 | No data | LENOX AVENUE, FROM STREET WEST 131 STREET TO STREET WEST 132 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | patch work on s/w not corrected. |
2021-04-03 | No data | HURON STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cannot properly inspect due to construction equipment Stored in the parking lane, active B.O |
2021-03-30 | No data | LENOX AVENUE, FROM STREET WEST 131 STREET TO STREET WEST 132 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Condition remains patchwork not acceptable all sidewalk flags not restored. |
2021-03-30 | No data | 7 AVENUE, FROM STREET WEST 144 STREET TO STREET WEST 145 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Condition remains patchwork not acceptable however scaffold over sidewalk. |
2021-03-28 | No data | WILLOUGHBY STREET, FROM STREET FLATBUSH AVENUE EXTENSION TO STREET GOLD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTOR HAD A OPEN REPAIR WATER BACKFILL DOWN 9 INCHES IN SIDEWALK;FAILED TO UPON COMPLATION OF BACKFILL TO INSTALL TEMPORARY PAVEMENT FLUSH WITH SURROUNDING AREA. |
2021-03-27 | No data | EAST 138 STREET, FROM STREET AMTRAK RR TO STREET WILLOW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No issuance needed |
2021-03-26 | No data | BRIGHTON 11 STREET, FROM STREET CASS PLACE TO STREET OCEAN VIEW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in p/l on opp side |
2021-03-25 | No data | 19 AVENUE, FROM STREET 43 STREET TO STREET 45 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | water leak in street front of property. 3 day DEP notice confirmed. one open cut i/f/o 43-15. crew on site to repair |
2021-03-25 | No data | WOODYCREST AVENUE, FROM STREET WEST 167 STREET TO STREET WEST 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2021-03-23 | No data | RIVER AVENUE, FROM STREET EAST 167 STREET TO STREET MC CLELLAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2021-03-22 | No data | MACOMBS ROAD, FROM STREET CROMWELL AVENUE TO STREET GOBLE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | worked not done |
2021-03-22 | No data | WEST 23 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work not started. |
2021-03-17 | No data | WILLOUGHBY STREET, FROM STREET FLATBUSH AVENUE EXTENSION TO STREET GOLD STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | WORK DONE INSIDE OF ORK ZONE ON S/W BEHIND WALKWALK( FIRE SPRINKLER ) |
2021-03-16 | No data | WILLOUGHBY STREET, FROM STREET FLATBUSH AVENUE EXTENSION TO STREET GOLD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RWY RESUTFACED BY NYC DOT |
2021-03-16 | No data | WILLOUGHBY STREET, FROM STREET FLATBUSH AVENUE EXTENSION TO STREET GOLD STREET | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE REPAIR WATER SIDEWALK STREET OPENING OFF BUILDING OPERATION OFF SCL OFF FLATBUSH AVENUE EXTENSION BY HYDRANT |
2021-03-10 | No data | MACOMBS ROAD, FROM STREET CROMWELL AVENUE TO STREET GOBLE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to properly inspect due to active demolition site and vehicles |
2021-03-09 | No data | WEST 23 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed respondent failed to post "Steel Plate ahead" or "raise Plow Sign" 5ft prior to location as required during the 2020 - 2021 Winter Moratorium. |
2021-02-26 | No data | EAST 124 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration is flushed to grade DL. |
2021-02-25 | No data | LENOX AVENUE, FROM STREET WEST 131 STREET TO STREET WEST 132 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Sidewalk plated. Pinned and ramped |
2021-02-14 | No data | LENOX AVENUE, FROM STREET WEST 131 STREET TO STREET WEST 132 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on the s/w ifo 426 |
2021-02-03 | No data | LENOX AVENUE, FROM STREET WEST 131 STREET TO STREET WEST 132 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest denied, the reasoning in the comments is not a protest. You will have until the end of the winter moratorium to address the CAR which is on 3/31/21. |
2021-01-31 | No data | EAST 133 STREET, FROM STREET CYPRESS AVENUE TO STREET WILLOW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2021-01-31 | No data | LIBERTY AVENUE, FROM STREET ESSEX STREET TO STREET LINWOOD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no visible work found at this time |
2021-01-29 | No data | WEST 23 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At 136 West 23 St., (INCORRECT ADDRESS ON PERMITTEES EMERGENCY PERMIT)• Plated excavation in driving lane, at address driveway apron, with wet connection leaking in roadway at curb, and leaking on sidewalk, then freezing causing hazardous condition |
2021-01-28 | No data | BROADWAY, FROM STREET CUMMING STREET TO STREET DYCKMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk in compliance (scaffold set in location) |
2021-01-28 | No data | EAST 120 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flushed to grade in BL. |
2021-01-27 | No data | LENOX AVENUE, FROM STREET WEST 131 STREET TO STREET WEST 132 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Patchwork in front of 432 is unacceptable. Full flag restoration is required |
2021-01-27 | No data | WOODYCREST AVENUE, FROM STREET WEST 162 STREET TO STREET WEST 163 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to locate cut due to BO |
2021-01-26 | No data | WEST 23 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Temp Cut in the Roadway In Compliance. However, Water is Still Coming up at the Curb. |
2021-01-21 | No data | STATE STREET, FROM STREET 3 AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 PERM RESTORATIONS ON STATE STREET (CAP WATER FOR DEMO BUILDING OPERATION) & 4 PERM RESTORATION ON FLATBUSH AVE AT 102 |
2021-01-21 | No data | FLATBUSH AVENUE, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY & SWK WORK AT 98-102 FLATBUSH AVE DEMO BUILDING OPERATION |
2021-01-16 | No data | WEST 103 STREET, FROM STREET RIVERSIDE DRIVE TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w okay |
2021-01-15 | No data | TRINITY AVENUE, FROM STREET EAST 158 STREET TO STREET EAST 160 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2021-01-11 | No data | EAGLE AVENUE, FROM STREET EAST 156 STREET TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2021-01-09 | No data | 122 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent restoration in good condition ,BBP Paved area at time of my inspection. |
2021-01-07 | No data | MACOMBS ROAD, FROM STREET CROMWELL AVENUE TO STREET GOBLE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2021-01-07 | No data | WAYNE AVENUE, FROM STREET EAST 211 STREET TO STREET EAST GUN HILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm final in compliance |
2021-01-04 | No data | LENOX AVENUE, FROM STREET WEST 130 STREET TO STREET WEST 131 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent has patchwork on the sidewalk and need expansion joints sealed |
2020-12-20 | No data | WEST 8 STREET, FROM STREET 6 AVENUE TO STREET MAC DOUGAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration perm flush w/color code. |
2020-12-19 | No data | LENOX AVENUE, FROM STREET WEST 131 STREET TO STREET WEST 132 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two sidewalk flags not fully restored in kind. New permit on file. |
2020-12-15 | No data | 2 AVENUE, FROM STREET EAST 2 STREET TO STREET NY MARBLE CEMETERY BOUNDARY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I found a permanent restoration flushed to grade in the turning lane. |
2020-12-10 | No data | EAST 136 STREET, FROM STREET LINCOLN AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm final color coded |
2020-12-08 | No data | 7 AVENUE, FROM STREET WEST 144 STREET TO STREET WEST 145 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest denied, as per our phone conversation on 12/08/20, you will be responsible to restore the sidewalk once the scaffolding is removed. The building operation is under renovation, not a new construction, therefore no BPP on file. |
2020-12-04 | No data | 7 AVENUE, FROM STREET WEST 144 STREET TO STREET WEST 145 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO building 2488, sidewalk around water cap contains patchwork. As per rule patchwork is unacceptable, full flag restorations now required. |
2020-11-27 | No data | EAST 46 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | expansion joints have been sealed and are in compliance |
2020-11-27 | No data | 7 AVENUE, FROM STREET WEST 144 STREET TO STREET WEST 145 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1J/D1B project-D1B issued. |
2020-11-17 | No data | EAST 46 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOVobtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 8/14/2020. Respondent failed to obtain a confirmation number from the department. |
2020-11-16 | No data | JACKSON AVENUE, FROM STREET 50 AVENUE TO STREET 51 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in the parking lane opposite of 10-27 |
2020-11-16 | No data | BROOKLYN AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found in parking lane in front of 1544 brooklyn avenue |
2020-11-15 | No data | UNION AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 165 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk and roadway restored |
2020-11-13 | No data | 57 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2020-11-09 | No data | MAPES AVENUE, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-11-08 | No data | FRANKLIN STREET, FROM STREET 6 AVENUE TO STREET WEST BROADWAY | No data | Street Construction Inspections: E-Number | Department of Transportation | s/w plated. |
2020-11-02 | No data | LINCOLN AVENUE, FROM STREET EAST 136 STREET TO STREET EAST 137 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in compliance |
2020-10-27 | No data | WEBSTER AVENUE, FROM STREET EAST 197 STREET TO STREET EAST 198 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration may have been resurfaced by bus lane. Work done on sidewalk surrounding water valve. |
2020-10-26 | No data | WILLOUGHBY STREET, FROM STREET FLATBUSH AVENUE EXTENSION TO STREET GOLD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RWY RESURFACED WITH NEW WORK |
2020-10-24 | No data | WEST 66 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012019297A66-updated permit |
2020-10-20 | No data | EAST 46 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk expansion joints need to be sealed and installed I/F/O Building #135. |
2020-10-15 | No data | MC DONALD AVENUE, FROM STREET AVENUE P TO STREET QUENTIN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway and sidewalk |
2020-10-14 | No data | ROMBOUTS AVENUE, FROM STREET HOLLERS AVENUE TO STREET NEW ENGLAND THRWY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In compliance |
2020-10-07 | No data | METROPOLITAN AVENUE, FROM STREET MARCY AVENUE TO STREET NORTH 5 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ALL EQUIPMENT & CONCRETE WAS REMOVED |
2020-10-07 | No data | 3 AVENUE, FROM STREET EAST 44 STREET TO STREET EAST 45 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been milled and paved |
2020-10-05 | No data | BOSTON ROAD, FROM STREET BOUCK AVENUE TO STREET EAST 212 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk ok |
2020-10-03 | No data | EAST 176 STREET, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance i/f/o school |
2020-10-02 | No data | NAMEOKE AVENUE, FROM STREET BRUNSWICK AVENUE TO STREET REDFERN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired, work is not visible amid active work within segment |
2020-10-01 | No data | REDFERN AVENUE, FROM STREET BIRDSALL AVENUE TO STREET NAMEOKE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired, work is obstructed by DDC major reconstruction work, refer to active permit on file: Q012020237D34 |
2020-09-21 | No data | WILLOW AVENUE, FROM STREET EAST 133 STREET TO STREET EAST 134 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade in the driving lane |
2020-09-19 | No data | MARCY AVENUE, FROM STREET HOPE STREET TO STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 sidewalk flag installed adjacent to building #416 AKA METROPOLITAN AVENUE on MARCY AVENUE IN COMPLIANCE |
2020-09-17 | No data | MANIDA STREET, FROM STREET EAST BAY AVENUE TO STREET OAK POINT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | perm to grade |
2020-09-15 | No data | METROPOLITAN AVENUE, FROM STREET MARCY AVENUE TO STREET NORTH 5 STREET | No data | Street Construction Inspections: Active | Department of Transportation | SWK CLEAR |
2020-09-13 | No data | AVENUE A, FROM STREET EAST 12 STREET TO STREET EAST 13 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I found a permanent cut that is flushed to grade in the roadway. |
2020-09-08 | No data | WEST 23 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Restoration in the south bound driving lane with a faded color code I/F/O The Cortland Active Bo. |
2020-09-06 | No data | EAST 151 STREET, FROM STREET COURTLANDT AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the driving lane |
2020-09-02 | No data | EAST TREMONT AVENUE, FROM STREET DALY AVENUE TO STREET HONEYWELL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2020-08-31 | No data | WEST 66 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plate partially paved over, flush in the driving lane ifo 36 |
2020-08-31 | No data | EAST 179 STREET, FROM STREET BOSTON ROAD TO STREET BRONX STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2020-08-31 | No data | MOHEGAN AVENUE, FROM STREET BRONX PARK SOUTH TO STREET HORNADAY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2020-08-31 | No data | WEST 230 STREET, FROM STREET CORLEAR AVENUE TO STREET TIBBETT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | X012018284A74 up to date permit on file |
2020-08-31 | No data | WEST 66 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | area was addressed paved over plate removed.New CAR to be issued on the street opening permit |
2020-08-30 | No data | COSTER STREET, FROM STREET EAST BAY AVENUE TO STREET OAK POINT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-08-30 | No data | OCEAN AVENUE, FROM STREET AVENUE O TO STREET AVENUE P | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm water restorations flush to grade in the roadway of the driving lane in front of property #2037 in compliance |
2020-08-29 | No data | EAST 54 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Portion of a permanent Restoration exposed due to partially Plated / Construction Barricades |
2020-08-27 | No data | MANIDA STREET, FROM STREET EAST BAY AVENUE TO STREET OAK POINT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | made perm to grade |
2020-08-27 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in driving lane. |
2020-08-26 | No data | MARCY AVENUE, FROM STREET HOPE STREET TO STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | WOOD COVERED SWK TO CAP WATER SERVICE AT 12 MARCY AVE |
2020-08-26 | No data | METROPOLITAN AVENUE, FROM STREET MARCY AVENUE TO STREET NORTH 5 STREET | No data | Street Construction Inspections: Active | Department of Transportation | SIDEWALK FLAG DRY. PLEASE REMOVE CONSTRUCTION EQUIPMENT(PLASTIC PLATE, WOOD & CONES FROM SIDEWALK, IN FRONT OF 416 METROPOLITAN AVENUE BETWEEN MARCY AVENUE & NORTH 5 STREET. PLEASE REMOVE FRESH CONCRETE IN TREE PIT. |
2020-08-26 | No data | BELMONT AVENUE, FROM STREET CRESCENT AVENUE TO STREET EAST 183 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w ok |
2020-08-25 | No data | WEST 23 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O ongoing B/O at "The Cortland", perm 2018 cut within South Side Driving lane is flush to grade. |
2020-08-23 | No data | WEST 66 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO the respondent failed to have its permanent restoration flush with its surrounding area. CAR20206790144 was issued on 3-21-20 |
2020-08-15 | No data | BOSTON ROAD, FROM STREET BOUCK AVENUE TO STREET EAST 212 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New concrete sidewalk flags flush and sealed |
2020-08-15 | No data | REMSEN AVENUE, FROM STREET EAST 53 STREET TO STREET RUTLAND ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm restoration i/f/o crosswalk at 914 rutland |
2020-08-14 | No data | AMSTERDAM AVENUE, FROM STREET WEST 164 STREET TO STREET WEST 165 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Concrete base installed. Cutbacks made on base |
2020-08-12 | No data | GROVE STREET, FROM STREET BEND TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT IN THE ROADWAY |
2020-08-12 | No data | ATLANTIC AVENUE, FROM STREET UNDERHILL AVENUE TO STREET WAVERLY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok |
2020-08-11 | No data | MARCUS GARVEY BOULEVARD, FROM STREET DECATUR STREET TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in RW, in compliance |
2020-08-10 | No data | EAST 138 STREET, FROM STREET AMTRAK RR TO STREET WILLOW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade in rw. |
2020-08-09 | No data | EXTERIOR STREET, FROM STREET MAJOR DEEGAN EXPWY ET 3 SB TO STREET MAJOR DEEGAN EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-08-08 | No data | BOSTON ROAD, FROM STREET EAST 179 STREET TO STREET EAST 180 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2020-07-31 | No data | EAST 125 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sprinkler service cut ok |
2020-07-31 | No data | 3 AVENUE, FROM STREET EAST 44 STREET TO STREET EAST 45 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | D.E.P 3 DAY NOTICE ONE RD/W CUT WILL BE DOING 2 MORE CUTS IN RD/W |
2020-07-30 | No data | WAVERLY AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area of roadway found to be resurfaced BPP (B012018312B55) |
2020-07-30 | No data | JOHN STREET, FROM STREET CLIFF STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2019 gas work overlap water repair in the roadway. |
2020-07-29 | No data | 8 AVENUE, FROM STREET WEST 148 STREET TO STREET WEST 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | active bo could not prop inspect |
2020-07-29 | No data | EAST 46 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrived @ 11:30am scheduled @ 12pm started @12pm departed @1:3pm. The backfill passed, & the 6'' cutbacks were done. The restoration was left plated for concrete curing in the parking lane. Also,there are 2 cuts on the sidewalk.(L-7'W-4'.9''D-3'.6'') |
2020-07-29 | No data | MESEROLE AVENUE, FROM STREET FRANKLIN STREET TO STREET GEM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RWY RESURFACED BY NYC DOT & NEW SWK FLAG OK |
2020-07-27 | No data | 8 AVENUE, FROM STREET WEST 45 STREET TO STREET WEST 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent sewer restoration is in compliance |
2020-07-25 | No data | WEST 22 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 555, unable to fully view location due to ongoing B/O roadway occupancy. |
2020-07-21 | No data | WEST 123 STREET, FROM STREET LENOX AVENUE TO STREET MT MORRIS PARK WEST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER RESTORATION IN D/L IS OK |
2020-07-17 | No data | EAST 46 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | PLATED EXCAVATION ON SIDEWALK & TEMP CUT MADE ON RD/W DRIVING LANE I/F/O 135 EAST 46 ST |
2020-07-13 | No data | HOME STREET, FROM STREET SIMPSON STREET TO STREET SOUTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-07-12 | No data | EAST 21 STREET, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer-water flush to grade in the roadway extending into the parking lane opposite from building #740 in compliance |
2020-07-12 | No data | FLATBUSH AVENUE, FROM STREET EAST 26 STREET TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer restoration flush to grade in the roadway of the driving lane in front of property #1353 in compliance |
2020-07-12 | No data | WEST 66 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is flush and color coded in the D/L |
2020-07-09 | No data | 11 AVENUE, FROM STREET WEST 22 STREET TO STREET WEST 23 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Closer to West 22nd ( North Bound on 11th Ave ), perm 2018 cut to Center Cobble Stone median is flush to grade. Yellow lane marking is in compliance. |
2020-07-07 | No data | 48 STREET, FROM STREET 34 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade within the d/l. across from 32-47 |
2020-07-07 | No data | EAST 124 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ifo 158, perm water restoration in d/l is in compliance. |
2020-07-01 | No data | EASTCHESTER ROAD, FROM STREET HAMMERSLEY AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 cuts flush and sealed in the driving lane flush and sealed |
2020-06-30 | No data | HURON STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed in the parking lane, sidewalk flag flush and sealed behind plywood fence |
2020-06-29 | No data | WEST 55 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut is perm not ifo 10 but opp. In parking lane /Driving. No defects |
2020-06-29 | No data | EAST 124 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 3x2x4 completed. Permittee started to excavate in hole within 12” of restoration and has cutback to combine both excavations. Site will be Barricaded for concrete curing |
2020-06-28 | No data | EAST 159 STREET, FROM STREET COURTLANDT AVENUE TO STREET MELROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-06-27 | No data | BERGEN STREET, FROM STREET KINGSBOROUGH 1 WALK TO STREET KINGSBOROUGH 2 WALK | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE PARKING LANE OPPOSITE #1668 RIGHT BEFORE BUS PAD |
2020-06-27 | No data | LEXINGTON AVENUE, FROM STREET EAST 56 STREET TO STREET EAST 57 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to locate work due to parked cars. |
2020-06-24 | No data | HOLLERS AVENUE, FROM STREET STEENWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade in the intersection flush and sealed |
2020-06-20 | No data | WEST 103 STREET, FROM STREET RIVERSIDE DRIVE TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags restored and in compliance. |
2020-06-17 | No data | WEST 36 STREET, FROM STREET 10 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | area appears to be resurfaced due to BPP |
2020-06-17 | No data | FRANKLIN STREET, FROM STREET MESEROLE AVENUE TO STREET NORTH 15 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two permanent water restoration flush and sealed in the driving lane. |
2020-06-17 | No data | NORTH 15 STREET, FROM STREET FRANKLIN STREET TO STREET GEM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two permanent water restoration flush and sealed in the driving lane ifo DEP parking/gas station lot. |
2020-06-17 | No data | EAST 120 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 205, PERM WATER RESTORATION BY BIKE LANE IS OK |
2020-06-17 | No data | BOWERY, FROM STREET CANAL STREET TO STREET HESTER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | This segment was resurfaced on 5/25/2020, any roadway cuts completed prior to this date no longer exist in the segment. |
2020-06-15 | No data | WEST 45 STREET, FROM STREET 8 AVENUE TO STREET SHUBERT ALLEY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | approximately 60 ft from 8 ave. permanent water restoration within the turning lane is in compliance |
2020-06-15 | No data | WOODYCREST AVENUE, FROM STREET WEST 167 STREET TO STREET WEST 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-06-14 | No data | JACKSON AVENUE, FROM STREET EAST 147 STREET TO STREET EAST 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2020-06-14 | No data | JACKSON AVENUE, FROM STREET EAST 141 STREET TO STREET EAST 142 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk and roadway restored |
2020-06-14 | No data | EAST 147 STREET, FROM STREET AUSTIN PLACE TO STREET TIMPSON PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work within BO |
2020-06-12 | No data | EAST 126 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water restoration in d/l is ok |
2020-06-11 | No data | EAST 56 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found Street resurfaced. |
2020-06-10 | No data | GRAND CONCOURSE, FROM STREET EAST 153 STREET TO STREET EAST 156 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work within B O |
2020-06-10 | No data | GRAND AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found in parking lane in front of 15 Grand ave |
2020-06-09 | No data | THWAITES PLACE, FROM STREET BOSTON ROAD TO STREET OLINVILLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2020-06-09 | No data | HALSEY STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk. Ok. |
2020-06-09 | No data | BROADWAY, FROM STREET CUMMING STREET TO STREET DYCKMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Ifo 4778 no defects sidewalk in complaince |
2020-06-09 | No data | JEROME AVENUE, FROM STREET EAST 176 STREET TO STREET MT HOPE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-06-06 | No data | WARREN STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of driving lane in front of property #579 in compliance |
2020-06-05 | No data | EBBITTS STREET, FROM STREET ALLISON AVENUE TO STREET MILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut ok. |
2020-06-04 | No data | 3 AVENUE, FROM STREET 100 STREET TO STREET 101 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Multiple perm water restorations in parking lane. |
2020-06-03 | No data | FULTON STREET, FROM STREET BOND STREET TO STREET HANOVER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW CONCRETE RESTORATIONS RWY |
2020-06-03 | No data | EAST 104 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work behind fence at B.O. |
2020-05-18 | No data | AMSTERDAM AVENUE, FROM STREET WEST 168 STREET TO STREET WEST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Due to Covid our policy is allowing permit to be still valid |
2020-05-17 | No data | 39 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway restoration in the bus stop |
2020-05-16 | No data | MILL ROAD, FROM STREET EBBITTS STREET TO STREET INA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration acceptable. |
2020-05-16 | No data | INA STREET, FROM STREET MILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm r/w cut acceptable. |
2020-05-16 | No data | MILL ROAD, FROM STREET DARTMOUTH LOOP TO STREET INA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm r/w cut acceptable. |
2020-05-10 | No data | 3 AVENUE, FROM STREET 100 STREET TO STREET 101 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | car issued permit B012020090D51 cut down 1 1\2in |
2020-05-05 | No data | 8 AVENUE, FROM STREET WEST 45 STREET TO STREET WEST 46 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I/F/O 726 a perm water restoration in driving lane on e/s corrected CAR. |
2020-05-05 | No data | EAST 159 STREET, FROM STREET COURTLANDT AVENUE TO STREET MELROSE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | condition corrected |
2020-05-04 | No data | WEST END AVENUE, FROM STREET HAMPTON AVENUE TO STREET OCEAN COURT | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm restoration in d/l |
2020-05-03 | No data | WEBSTER AVENUE, FROM STREET EAST 204 STREET TO STREET EAST 205 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut restored to bus lane |
2020-05-01 | No data | HURON STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Upon arrival at time of inspection respondent MES CONSTRUCTION CORP. has sealed expansion joints in the sidewalk in front of property #186 in compliance |
2020-04-28 | No data | 8 AVENUE, FROM STREET WEST 148 STREET TO STREET WEST 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B |
2020-04-16 | No data | EAST 149 STREET, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk and roadway restored |
2020-04-14 | No data | EAST 156 STREET, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | made perm to grade |
2020-03-28 | No data | PRESIDENT STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the parking lane in front of property #643 & sidewalk flags installed in compliance |
2020-03-27 | No data | MARCUS GARVEY BOULEVARD, FROM STREET DECATUR STREET TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut ok. |
2020-03-25 | No data | JEFFERSON PLACE, FROM STREET BOSTON ROAD TO STREET CLINTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 651 made perm to grade |
2020-03-25 | No data | BOSTON ROAD, FROM STREET CLINTON AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 1325 made perm to grade |
2020-03-25 | No data | CLINTON AVENUE, FROM STREET BOSTON ROAD TO STREET JEFFERSON PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 1330 made perm to grade |
2020-03-24 | No data | HURON STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY AND NEW SWK FLAG |
2020-03-21 | No data | WEST 66 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temporary asphalt is broken out and around steel plate in the roadway. Make broken out areas flush with surrounding roadway IFO 36. |
2020-03-18 | No data | UNION AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 165 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | made perm to grade |
2020-03-18 | No data | EAST 165 STREET, FROM STREET TINTON AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later work done |
2020-03-14 | No data | EAST 124 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been milled and resurfaced. No defects to report |
2020-03-12 | No data | FRANKLIN AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | made perm to grade |
2020-03-12 | No data | EAST 168 STREET, FROM STREET FRANKLIN AVENUE TO STREET FULTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk restored |
2020-03-12 | No data | EAST 176 STREET, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2020-03-10 | No data | 95 STREET, FROM STREET 161 AVENUE TO STREET 162 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration is obstructed by DDC major reconstruction on roadway |
2020-03-10 | No data | WEST 18 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to fully inspect active B.O on site. |
2020-03-08 | No data | SCHERMERHORN STREET, FROM STREET BEND TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut on roadway |
2020-03-08 | No data | EAST 159 STREET, FROM STREET COURTLANDT AVENUE TO STREET MELROSE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | IFO 369 temp to grade |
2020-03-07 | No data | STATE STREET, FROM STREET 3 AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Disregard previous inspection perm water restoration flush to grade in the roadway of the driving lane in front of property #550 in compliance |
2020-03-05 | No data | FLATBUSH AVENUE, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut on roadway |
2020-03-01 | No data | WILLOUGHBY STREET, FROM STREET FLATBUSH AVENUE EXTENSION TO STREET GOLD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the driving lane in front of building #138 WILLOUGHBY STREET IN COMPLIANCE |
2020-03-01 | No data | RIVER AVENUE, FROM STREET EAST 167 STREET TO STREET MC CLELLAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced |
2020-02-29 | No data | UNION AVENUE, FROM STREET HEWES STREET TO STREET STAGG STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found in compliance |
2020-02-26 | No data | WOODYCREST AVENUE, FROM STREET WEST 162 STREET TO STREET WEST 163 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 985 perm to grade |
2020-02-25 | No data | GOLD STREET, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind in compliance |
2020-02-24 | No data | EAST 151 STREET, FROM STREET COURTLANDT AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 292 sidewalk and roadway restored |
2020-02-23 | No data | FLATBUSH AVENUE, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind in compliance |
2020-02-23 | No data | FULTON STREET, FROM STREET FLATBUSH AVENUE EXTENSION TO STREET HANOVER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind in compliance |
2020-02-19 | No data | TRINITY AVENUE, FROM STREET EAST 158 STREET TO STREET EAST 160 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-02-19 | No data | EAGLE AVENUE, FROM STREET EAST 156 STREET TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-02-18 | No data | 61 STREET, FROM STREET 15 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2020-02-14 | No data | OCEAN AVENUE, FROM STREET AVENUE O TO STREET AVENUE P | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work observed. |
2020-02-12 | No data | WEST 47 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to view work due to active construction site. |
2020-02-11 | No data | 8 AVENUE, FROM STREET WEST 45 STREET TO STREET WEST 46 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Your temporary repair water sewer Restoration sunken 1 to 2 inches below Roadway surface in the driving lane. |
2020-02-10 | No data | WEST 47 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to locate work due to active construction site. |
2020-02-09 | No data | HURON STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Complaint | Department of Transportation | S/w perm w/one cone @ curing conc., temp cut in p+d/l |
2020-02-02 | No data | OGDEN AVENUE, FROM STREET BEND TO STREET DR M L KING JR BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Opposite 1415 perm to grade |
2020-01-30 | No data | WEBSTER AVENUE, FROM STREET EAST 204 STREET TO STREET EAST 205 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the driving bus lane i/f/o 3119 Webster Ave needs to be painted RED. |
2020-01-30 | No data | MAPES AVENUE, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-01-29 | No data | EXTERIOR STREET, FROM STREET MAJOR DEEGAN EXPWY ET 3 SB TO STREET MAJOR DEEGAN EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - REPAIR WATER - SEWER |
2020-01-29 | No data | UTICA AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, perm ....east side of street ... |
2020-01-28 | No data | CANAL STREET, FROM STREET CENTRE STREET TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 250 permanent sewer restoration is in compliance |
2020-01-25 | No data | EAST 159 STREET, FROM STREET COURTLANDT AVENUE TO STREET MELROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Must remove patchwork and restore full flag restoration on the sidewalk. |
2020-01-24 | No data | ROMBOUTS AVENUE, FROM STREET HOLLERS AVENUE TO STREET NEW ENGLAND THRWY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm good |
2020-01-22 | No data | WEST 125 STREET, FROM STREET BROADWAY TO STREET ST CLAIRE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Respondent failed to obtain a confirmation number from the department |
2020-01-22 | No data | BOSTON ROAD, FROM STREET BOUCK AVENUE TO STREET EAST 212 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on the sidewalk only |
2020-01-20 | No data | MC DONALD AVENUE, FROM STREET AVENUE P TO STREET QUENTIN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane in front of property #1881 in compliance |
2020-01-16 | No data | WEST 56 STREET, FROM STREET 6 1/2 AVENUE TO STREET AVENUE OF THE AMERICAS | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active B.O on site. |
2020-01-15 | No data | GOLD STREET, FROM STREET FULTON STREET TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN CENTER OF RWY 50 FT SOUTH OF WILLOUGHBY ST |
2020-01-15 | No data | WEST 66 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Excavtion plated in the parking lane/driving lane. Permit M192020007A03 for temporary steel plate still active. |
2020-01-09 | No data | WEST 56 STREET, FROM STREET 6 1/2 AVENUE TO STREET AVENUE OF THE AMERICAS | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active B.O on site. |
2020-01-08 | No data | BROADWAY, FROM STREET CUMMING STREET TO STREET DYCKMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk flags in compliance |
2020-01-08 | No data | 48 STREET, FROM STREET 34 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken domestic water service. Leaking in roadway. Property issued 3 day notice |
2020-01-07 | No data | EAST TREMONT AVENUE, FROM STREET DALY AVENUE TO STREET HONEYWELL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-01-07 | No data | HOME STREET, FROM STREET SIMPSON STREET TO STREET SOUTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2020-01-04 | No data | MESEROLE AVENUE, FROM STREET FRANKLIN STREET TO STREET GEM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind. |
2019-12-31 | No data | COSTER STREET, FROM STREET EAST BAY AVENUE TO STREET OAK POINT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/o SWC perm to grade |
2019-12-31 | No data | EAST 12 STREET, FROM STREET AVENUE A TO STREET AVENUE B | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced. no work on sidewalk present |
2019-12-25 | No data | MESEROLE AVENUE, FROM STREET FRANKLIN STREET TO STREET GEM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane opposite from property #8 & sidewalk flags installed in compliance. |
2019-12-24 | No data | UNIVERSITY AVENUE, FROM STREET STRONG STREET TO STREET WEST 195 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2019-12-22 | No data | WEST STREET, FROM STREET GREEN STREET TO STREET HURON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind. |
2019-12-22 | No data | MANHATTAN AVENUE, FROM STREET BAYARD STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind. |
2019-12-20 | No data | WEST 123 STREET, FROM STREET LENOX AVENUE TO STREET MT MORRIS PARK WEST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flushed to grade PL / DL . |
2019-12-04 | No data | MANIDA STREET, FROM STREET EAST BAY AVENUE TO STREET OAK POINT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | made perm to grade |
2019-11-30 | No data | TOMPKINS AVENUE, FROM STREET HALSEY STREET TO STREET HANCOCK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the parking lane in front of property #429 |
2019-11-27 | No data | BROADWAY, FROM STREET CUMMING STREET TO STREET DYCKMAN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sidewalk flags restored. |
2019-11-20 | No data | WEST 103 STREET, FROM STREET RIVERSIDE DRIVE TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w flags acceptable; unable to inspect r/w due to parked vehicles. |
2019-11-18 | No data | HALSEY STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flag IFO BO close to Tompkins. In compliance. |
2019-11-17 | No data | GRAND AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front of property #15 |
2019-11-17 | No data | EAST 179 STREET, FROM STREET BOSTON ROAD TO STREET BRONX STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Trench perm to grade. |
2019-11-15 | No data | BOSTON ROAD, FROM STREET EAST 179 STREET TO STREET EAST 180 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk and roadway restored |
2019-11-15 | No data | MOHEGAN AVENUE, FROM STREET BRONX PARK SOUTH TO STREET HORNADAY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk restored |
2019-11-15 | No data | BRONX PARK AVENUE, FROM STREET EAST 179 STREET TO STREET LEBANON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced |
2019-11-14 | No data | FULTON STREET, FROM STREET BOND STREET TO STREET HANOVER PLACE | No data | Street Construction Inspections: Active | Department of Transportation | NEW CONCRETE SLABS IN ROADWAY (RESTORED CAP WATER RESTORATIONS IN CONCRETE ROADWAY)- EXPLAIN TO MES MAN ON SITE FLAGGERS ARE REQUIRED MADE PHONE FLAGGERS ARE COMING |
2019-11-07 | No data | WEST 66 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 10" area on your Permanent Trench has Broken out and down 2' below grade causing a dangerous condition. |
2019-11-07 | No data | WEST 66 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Area made safe with Temporary Asphalt. |
2019-11-07 | No data | WEST 66 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to active permit #M012019297A66 . Currently plated and paved over. |
2019-11-06 | No data | FULTON STREET, FROM STREET BOND STREET TO STREET HANOVER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 4 TEMP CAP WATER SERVICE IN CONCRETE ROADWAY-NEW PERMIT APPLIED FOR NYC STREETS |
2019-10-30 | No data | WEST 66 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O 36, Plate has been paved over for marathon will monitor condition as asphalt is starting to break. |
2019-10-29 | No data | WEST 66 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work complete without confirmation....perm restoration in driving lane at time of inspection. |
2019-10-27 | No data | STERLING PLACE, FROM STREET CLASSON AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front of property property #520 |
2019-10-26 | No data | INA STREET, FROM STREET MILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w |
2019-10-26 | No data | ATLANTIC AVENUE, FROM STREET UNDERHILL AVENUE TO STREET WAVERLY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front of property #555 |
2019-10-26 | No data | WAVERLY AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane in front of building #555 |
2019-10-26 | No data | MILL ROAD, FROM STREET DARTMOUTH LOOP TO STREET INA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w cut |
2019-10-26 | No data | MILL ROAD, FROM STREET EBBITTS STREET TO STREET INA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | INFO 116 MILL RD |
2019-10-25 | No data | EAST 126 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut okay in d/l. |
2019-10-24 | No data | WEST 66 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Area has been made safe with temporary Asphalt. |
2019-10-24 | No data | WEST 66 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 36, Restoration over your steel plate has broken out 9 inches and down 2' 6" and causing a dangerous condition in the roadway. |
2019-10-24 | No data | EBBITTS STREET, FROM STREET ALLISON AVENUE TO STREET MILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm r/w cut cut was flush with the surrounding area. |
2019-10-23 | No data | EASTCHESTER ROAD, FROM STREET HAMMERSLEY AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: E-Number | Department of Transportation | plumber on site water leak, 3 day notice one cut on the roadway. |
2019-10-23 | No data | GATEWAY DRIVE, FROM STREET BEND TO STREET VANDALIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work observed |
2019-10-23 | No data | EASTCHESTER ROAD, FROM STREET HAMMERSLEY AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Pick-Up | Department of Transportation | MES foreman Mentor and field workers use/opening of street to repair water service line, without a DOT permit.i spoke to Supt. AL Shala from MES, he said he will pull street opening permit. |
2019-10-23 | No data | EASTCHESTER ROAD, FROM STREET HAMMERSLEY AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Active | Department of Transportation | Plumber cut temp to grade in the roadway |
2019-10-21 | No data | MILL ROAD, FROM STREET DARTMOUTH LOOP TO STREET INA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no such address |
2019-10-19 | No data | BROADWAY, FROM STREET CUMMING STREET TO STREET DYCKMAN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | s/w made safe by plating broken sidewalk flags |
2019-10-19 | No data | BROADWAY, FROM STREET CUMMING STREET TO STREET DYCKMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ifo 4778 Broadway -restore 2 s/w flags |
2019-10-18 | No data | EAST 138 STREET, FROM STREET AMTRAK RR TO STREET WILLOW AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | made safe with temp asphalt. |
2019-10-18 | No data | BROADWAY, FROM STREET CUMMING STREET TO STREET DYCKMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 4778 Broadway b/t Cumming st & Dyckman st – found 2 sidewalk flags broken out and cave-in 8” down creating dangerous ( trip) condition to the public. |
2019-10-18 | No data | WATSON AVENUE, FROM STREET COMMONWEALTH AVENUE TO STREET ROSEDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced |
2019-10-17 | No data | EAST 138 STREET, FROM STREET AMTRAK RR TO STREET WILLOW AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | The restoration sunken down 4 inches in the driving lane |
2019-10-07 | No data | FULTON STREET, FROM STREET BOND STREET TO STREET HANOVER PLACE | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED CONCRETE RWY |
2019-10-06 | No data | HUNTS POINT AVENUE, FROM STREET BRYANT AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced |
2019-10-05 | No data | WEST 66 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk and Roadway plated. |
2019-10-05 | No data | WEST 66 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk and Roadway plated with active permit # M012019268A83 on fie. |
2019-10-02 | No data | WARREN STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of driving lane in front of property #579 |
2019-10-02 | No data | WEST 22 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plumbers cut behind active B.O. fence is in compliance |
2019-09-29 | No data | SPRINGFIELD BOULEVARD, FROM STREET 131 AVENUE TO STREET 132 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Duplicate permit on file |
2019-09-28 | No data | BOWERY, FROM STREET CANAL STREET TO STREET HESTER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit secured for this work. |
2019-09-26 | No data | BRUCKNER BOULEVARD, FROM STREET OLMSTEAD AVENUE TO STREET PUGSLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2019-09-25 | No data | UNION STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind. |
2019-09-22 | No data | PRESIDENT STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the parking lane in front of property #643 |
2019-09-21 | No data | EAST 120 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Ifo hair salons ifo 205 bike lane no defects |
2019-09-20 | No data | EAST 132 STREET, FROM STREET HRD SOUTHBOUND ENTRANCE PARK AVE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w milled |
2019-09-19 | No data | MARCUS GARVEY BOULEVARD, FROM STREET DECATUR STREET TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane in front of property #488 |
2019-09-11 | No data | FRANKLIN STREET, FROM STREET MESEROLE AVENUE TO STREET NORTH 15 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2019-09-10 | No data | 3 AVENUE, FROM STREET EAST 119 STREET TO STREET EAST 120 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Possibly paved over with Con Edison Cut 2019 another small cut exists but looks to old with no color code |
2019-09-08 | No data | WEST 20 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The Street was resurfaced. |
2019-09-06 | No data | WEST 66 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk and Roadway Plated behind a active BO. |
2019-09-06 | No data | WEST 66 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Roadway plated. |
2019-09-06 | No data | 17 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CREW ARE WORKING ON STREET |
2019-09-04 | No data | HURON STREET, FROM STREET BODY OF WATER TO STREET WEST STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection in front building #161 roadway under reconstruction at time of inspection. |
2019-08-31 | No data | STATE STREET, FROM STREET 3 AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the parking lane in front of property #102 |
2019-08-29 | No data | FLATBUSH AVENUE, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the parking lane opposite from Whole Foods market. |
2019-08-29 | No data | SCHERMERHORN STREET, FROM STREET BEND TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the parking lane opposite from Whole Foods market |
2019-08-28 | No data | WEST 230 STREET, FROM STREET CORLEAR AVENUE TO STREET TIBBETT AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Restored |
2019-08-28 | No data | EAST 124 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flag restored IFO 167. |
2019-08-25 | No data | WEST 18 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no defects found in area |
2019-08-24 | No data | AVENUE A, FROM STREET EAST 12 STREET TO STREET EAST 13 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restorations perm; roadway sealed w/color code, sidewalk flag restored with sealed expansion joints. |
2019-08-19 | No data | FLATBUSH AVENUE, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No confirmation number |
2019-08-18 | No data | WEST 55 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 3ft x 2ft x 3.6ft BlendWD 122.1/ DD114.8/ MD 121.0/ Moist 6.4Compaction 97.6 |
2019-08-17 | No data | 44 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the parking lane in front of property #1674 |
2019-08-15 | No data | NORTH 15 STREET, FROM STREET FRANKLIN STREET TO STREET GEM STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | EXPANSION JOINT SEALED |
2019-08-13 | No data | EAST 149 STREET, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2019-08-12 | No data | LYVERE STREET, FROM STREET BEND TO STREET ZEREGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not started |
2019-08-04 | No data | WOODYCREST AVENUE, FROM STREET WEST 162 STREET TO STREET WEST 163 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance i/f/o 985 |
2019-07-24 | No data | NAGLE AVENUE, FROM STREET HILLSIDE AVENUE TO STREET THAYER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced |
2019-07-20 | No data | 38 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk |
2019-07-15 | No data | MAPES AVENUE, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2019-07-12 | No data | WEST 66 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit on file. M012019191B75 |
2019-07-05 | No data | CANAL STREET, FROM STREET CENTRE STREET TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in roadway up to grade in front of 250. |
2019-07-02 | No data | NORTH 15 STREET, FROM STREET FRANKLIN STREET TO STREET GEM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE SEAL EXPANSION JOINT IN NEW SIDEWALK FLAG, NORTH 15 STREET BETWEEN FRANKLIN STREET & GEM STREET. |
2019-07-02 | No data | MESEROLE AVENUE, FROM STREET FRANKLIN STREET TO STREET GEM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | MILLED RWY NEW SWK FLAGS RESTORED |
2019-06-28 | No data | WEST 23 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm SEWER repair acceptable |
2019-06-27 | No data | THROOP AVENUE, FROM STREET ELLERY STREET TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water c/o cut paved over by keyspan cut ... |
2019-06-23 | No data | BELMONT AVENUE, FROM STREET CRESCENT AVENUE TO STREET EAST 183 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk and roadway restored |
2019-06-23 | No data | MESEROLE AVENUE, FROM STREET FRANKLIN STREET TO STREET GEM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY OPPOSITE #8 AND SIDE WALK FLAG |
2019-06-15 | No data | ROMBOUTS AVENUE, FROM STREET HOLLERS AVENUE TO STREET NEW ENGLAND THRWY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work is good |
2019-06-13 | No data | WEST 36 STREET, FROM STREET 10 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench i/f/o 515 driveway flush to grade |
2019-06-13 | No data | JACKSON AVENUE, FROM STREET EAST 141 STREET TO STREET EAST 142 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2019-06-12 | No data | BROADWAY, FROM STREET CUMMING STREET TO STREET DYCKMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW is flushed with sealed expansion joints |
2019-06-12 | No data | BROADWAY, FROM STREET CUMMING STREET TO STREET DYCKMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | perm restoration on SW is flushed with sealed expansion joints |
2019-06-06 | No data | EAST 12 STREET, FROM STREET AVENUE A TO STREET AVENUE B | No data | Street Construction Inspections: Active | Department of Transportation | At the time of inspection, I found the respondent actively working on site finalizing their repair sewer restoration in the parking lane and one sidewalk flag restored. |
2019-06-06 | No data | COSTER STREET, FROM STREET EAST BAY AVENUE TO STREET OAK POINT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane on Coster St AKA 1280 OAKPOINT AVE , Flush and sealed. |
2019-06-03 | No data | EAST 133 STREET, FROM STREET CYPRESS AVENUE TO STREET WILLOW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2019-06-02 | No data | THROOP AVENUE, FROM STREET ELLERY STREET TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | pass, temped to grade ....sidewalk restored as well...full flag .. |
2019-05-31 | No data | THROOP AVENUE, FROM STREET ELLERY STREET TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | svc install .... crew on location .. |
2019-05-28 | No data | LINCOLN AVENUE, FROM STREET EAST 136 STREET TO STREET EAST 137 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in compliance in driving lane. |
2019-05-25 | No data | WEST 230 STREET, FROM STREET CORLEAR AVENUE TO STREET TIBBETT AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | A/T/P/O I observed the above respondent has 2 temp cuts on top of perm cut in the driving lanes I/F/O TD Bank need to be repair overdue for final permit expired on 4/30/18. |
2019-05-23 | No data | MESEROLE AVENUE, FROM STREET FRANKLIN STREET TO STREET GEM STREET | No data | Street Construction Inspections: Active | Department of Transportation | PERM RESTORATION IN ROADWAY PLATE IN SIDEWALK AT 8 MESEROLE AVE |
2019-05-22 | No data | EAST 168 STREET, FROM STREET FRANKLIN AVENUE TO STREET FULTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk and roadway secured |
2019-05-21 | No data | FRANKLIN AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to inspect |
2019-05-16 | No data | UNION AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 165 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | full street closure, unable to inspect |
2019-05-15 | No data | EAST 165 STREET, FROM STREET TINTON AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2019-05-10 | No data | BOWERY, FROM STREET BROOME STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 149, roadway area compromised by ongoing roadway reconstruction by MFM. NO work visible at this time. |
2019-05-08 | No data | WEST 103 STREET, FROM STREET RIVERSIDE DRIVE TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 Sidewalk flags restored with possible perm restoration repaved over by Con Edison trench. |
2019-05-08 | No data | BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, perm water svc .. cut .......09 |
2019-05-07 | No data | WEST 123 STREET, FROM STREET LENOX AVENUE TO STREET MT MORRIS PARK WEST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in parking/driving lane of roadway. |
2019-05-07 | No data | BROOME STREET, FROM STREET BEND TO STREET CHRYSTIE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 4'x4' water cut IFO 331 Broome St. Restoration acceptable. |
2019-05-06 | No data | PLATT STREET, FROM STREET GOLD STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Spoke to Al, he disconnected water from the inside of building, No work on rd/w or s.w. |
2019-05-01 | No data | SPRINGFIELD BOULEVARD, FROM STREET 131 AVENUE TO STREET 132 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active - Plated excavations on roadway and on sidewalk. |
2019-05-01 | No data | SPRINGFIELD BOULEVARD, FROM STREET 131 AVENUE TO STREET 132 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated sewer excavation on roadway and on sidewalk. Active permit# Q012019117A00 on file for work. |
2019-04-30 | No data | EAST 176 STREET, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2019-04-29 | No data | MESEROLE AVENUE, FROM STREET FRANKLIN STREET TO STREET GEM STREET | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE , PLATED SWK & OPEN SWK TRENCH & OPP PK LANE OPEN TRENCH TO CAP WATER SERVICE TO 8 MESEROLE |
2019-04-29 | No data | EAST TREMONT AVENUE, FROM STREET DALY AVENUE TO STREET HONEYWELL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in r/w in compliance. |
2019-04-25 | No data | EAST 156 STREET, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2019-04-25 | No data | GRAND CONCOURSE, FROM STREET EAST 153 STREET TO STREET EAST 156 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | construction is going on cut is in a fence up area |
2019-04-22 | No data | 58 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 2ft 3ft down 3ft |
2019-04-20 | No data | JOHN STREET, FROM STREET CLIFF STREET TO STREET PEARL STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Tech on Location, Material(CLEAN FILL)passed. Wet Density: 109.5, Dry Density: 100.7, Max Dry Density: 104.0, Actual Moisture: 8.7% Excavation is 3'X2'X4' - Deep. 2 lifts 2 tests 98.2, 97.3. BAC was saw cut and chipped out for BSE. |
2019-04-19 | No data | NORTH 15 STREET, FROM STREET FRANKLIN STREET TO STREET GEM STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BRUNO & 2 TRAINEES ARRIVE AT 115 PM-BACKFILL A PASS,CAP WATER SERVICE-(L) 3 FT X (W) 2 FT X (D)3 FT- SAW CUTBACKS DONE-TEST 97.1; WD 107.1, DD 98.5, MD 103, AM 8.7- LEFT AT 2 PM- CREW WAITING FOR CONCRETE DELIVERY. |
2019-04-19 | No data | NORTH 15 STREET, FROM STREET FRANKLIN STREET TO STREET GEM STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site for backfill, cap water service-Green Point Beer & Ale Co.- small cut opp 7, work in parking lane |
2019-04-16 | No data | TOMPKINS AVENUE, FROM STREET HALSEY STREET TO STREET HANCOCK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE PARKING LANE |
2019-04-13 | No data | TRINITY AVENUE, FROM STREET EAST 158 STREET TO STREET EAST 160 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restoration in roadway and sidewalk |
2019-04-12 | No data | GRAND AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE ROADWAY |
2019-04-11 | No data | WEST 17 STREET, FROM STREET AVENUE Z TO STREET BAY 50 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration (P/L), found to be in compliance |
2019-04-10 | No data | JEROME AVENUE, FROM STREET EAST 176 STREET TO STREET WEST 176 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | milled r/w ok |
2019-04-05 | No data | WEBSTER AVENUE, FROM STREET EAST 197 STREET TO STREET EAST 198 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk and roadway restored |
2019-03-18 | No data | WAYNE AVENUE, FROM STREET EAST 211 STREET TO STREET EAST GUN HILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2019-03-06 | No data | HUNTS POINT AVENUE, FROM STREET BRYANT AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 3' by 3'6' by 3' backfill |
2019-03-05 | No data | WEST STREET, FROM STREET GREEN STREET TO STREET HURON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on roadway. |
2019-02-26 | No data | HUNTS POINT AVENUE, FROM STREET BRYANT AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 steel plates on the roadway recessed and raise plow signs posted |
2019-02-15 | No data | 3 AVENUE, FROM STREET EAST 119 STREET TO STREET EAST 120 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut located in driving lane of roadway. Dirt taken out of excavation is being tested and used for back fill. Chris from Exclusive testing performed 2 test.Cut 1: 3' x 2' x 4'.2" |
2019-02-15 | No data | EAST 120 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut in bike lane of roadway i/f/o #205 East 120 Street for work done for #2201 3rd Ave. Dirt taken out of excavation has been tested and used for back fill.Cut 1: 3' x 2' x 3'.8" |
2019-02-11 | No data | RIVER AVENUE, FROM STREET EAST 167 STREET TO STREET MC CLELLAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | unable to locate cut due to parked cars |
2019-01-27 | No data | WEST STREET, FROM STREET GREEN STREET TO STREET HURON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Respondent failed to obtain a confirmation number from the dept. |
2019-01-24 | No data | EAST 21 STREET, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | a-12:45pmcut-3'x2'x3'6'' test-96.7 & 97.2mentorjack hammer (flat plate)exclusive testing labandrewsand conesandw-122.7d-112.9md-114.5am-8.7% |
2019-01-15 | No data | PACIFIC STREET, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut okay, swk flags in compliance |
2019-01-15 | No data | WILLOUGHBY STREET, FROM STREET FLATBUSH AVENUE EXTENSION TO STREET GOLD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION 50 SOUTH OF WILLOUGHBY ST CENTER OF RWY- OK |
2019-01-13 | No data | MOHEGAN AVENUE, FROM STREET BRONX PARK SOUTH TO STREET HORNADAY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sw good. perm cut in rw IFO 2155. |
2019-01-06 | No data | WEST 52 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No Cuts found on location, possibly inside of the MFM storage site opposite 462 |
2019-01-05 | No data | WAVERLY AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT NEAR THE CROSS WALK |
2019-01-04 | No data | MAPES AVENUE, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2018-12-29 | No data | EAST 147 STREET, FROM STREET AUSTIN PLACE TO STREET TIMPSON PLACE | No data | Street Construction Inspections: Active | Department of Transportation | work in progress |
2018-12-26 | No data | JACKSON AVENUE, FROM STREET EAST 147 STREET TO STREET EAST 149 STREET | No data | Street Construction Inspections: Active | Department of Transportation | work not done |
2018-12-19 | No data | EAGLE AVENUE, FROM STREET EAST 156 STREET TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2018-12-17 | No data | EAST 138 STREET, FROM STREET AMTRAK RR TO STREET WILLOW AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | MES Construction Corp is on site. |
2018-12-17 | No data | EAST 138 STREET, FROM STREET AMTRAK RR TO STREET WILLOW AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | monitored from 1030-1133am, BF acceptable |
2018-12-14 | No data | CROMWELL AVENUE, FROM STREET WEST 169 STREET TO STREET WEST 170 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - REPAIR WATER - SEWER |
2018-12-10 | No data | UNION AVENUE, FROM STREET HEWES STREET TO STREET STAGG STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | CUT#1=L(2’)W(3’)D(3')TEST#1=97.2Backfill pass saw cuts done |
2018-12-10 | No data | UNION AVENUE, FROM STREET HEWES STREET TO STREET STAGG STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site awaiting backfill |
2018-12-10 | No data | EAST 179 STREET, FROM STREET BOSTON ROAD TO STREET BRONX STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in roadway |
2018-12-10 | No data | BOSTON ROAD, FROM STREET EAST 179 STREET TO STREET EAST 180 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway and sidewalk |
2018-12-01 | No data | WILLOW AVENUE, FROM STREET EAST 133 STREET TO STREET EAST 134 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2018-11-27 | No data | PACIFIC STREET, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK IS FOUND ON BIKE LANE AND SIDEWALK NEW FLAG AND LANE LINE WORK IS FINAL |
2018-11-24 | No data | WEST 36 STREET, FROM STREET 10 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | consecutive permit on file |
2018-11-23 | No data | 63 STREET, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMANENT RESTORATION IN THE PARKING/DRIVING LANE |
2018-11-23 | No data | EAST 138 STREET, FROM STREET AMTRAK RR TO STREET WILLOW AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | failing to begin emergency work with in two hours of gettin emergency authorization |
2018-11-20 | No data | 63 STREET, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMANENT RESTORATION IN THE PARKING/DRIVING LANE |
2018-11-10 | No data | GOLD STREET, FROM STREET FULTON STREET TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Active | Department of Transportation | RE-OPENED AND REPLATED RWY |
2018-11-07 | No data | THWAITES PLACE, FROM STREET BOSTON ROAD TO STREET OLINVILLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade in the driving lane I/F/O 681 (“C” coring run inspection) |
2018-11-07 | No data | ROMBOUTS AVENUE, FROM STREET HOLLERS AVENUE TO STREET NEW ENGLAND THRWY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 cuts in the parking lane I/F/O 3448A ( “C” coring run inspection) |
2018-11-07 | No data | WATSON AVENUE, FROM STREET COMMONWEALTH AVENUE TO STREET ROSEDALE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | spoke to foreman about having debris in the middle of driving lane of roadway. Working in a 3' x 3' repair water cut in driving lane . |
2018-11-07 | No data | BOSTON ROAD, FROM STREET BOUCK AVENUE TO STREET EAST 212 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flag flush and sealed, no roadway work done (coring run inspection) |
2018-11-07 | No data | WEST FARMS ROAD, FROM STREET CROSS BRONX EXPWY NB ET 4 A TO STREET EAST 174 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No cut found, has been Resurfaced due to new building BPP. (coring run inspection) |
2018-11-04 | No data | WEST 36 STREET, FROM STREET 10 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water trench extending from the curb out partially in the driving lane and inside of an active B.O... Sidewalk has been patched/New Building construction. I/F/O 515 |
2018-10-31 | No data | 42 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair broken out curb adjacent to a permanent restoration on the sidewalk.In front 1225 42 Street between 12 Avenue and 13 Avenue. |
2018-10-30 | No data | MANHATTAN AVENUE, FROM STREET BAYARD STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | (L) 3 feet x (W) 2 feet x (D) 2 feet 10 inches.. compaction of 97.4% |
2018-10-27 | No data | GOLD STREET, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY 50 FEET WILLOUGHBY ST |
2018-10-27 | No data | GOLD STREET, FROM STREET FULTON STREET TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION CENTER OF RWY 100 FT FROM WILLOUGHBY ST |
2018-10-27 | No data | GOLD STREET, FROM STREET FULTON STREET TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Active | Department of Transportation | PERM RESTORATION CENTER OF RWY 100 FT FROM WILLOUGHBY ST |
2018-10-24 | No data | 61 STREET, FROM STREET 15 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASS3’6”L X 2’W X 2’10”D = 99.8%ARRIVAL TIME: 1:06 PMDEPARTURE 3:00 PM |
2018-10-18 | No data | 63 STREET, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE DRIVING LANE |
2018-10-16 | No data | BRONX PARK AVENUE, FROM STREET EAST 179 STREET TO STREET LEBANON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm restoration in the roadway |
2018-10-12 | No data | 63 STREET, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE DRIVING LANE |
2018-10-05 | No data | 46 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | (5ft. x 5ft.) permanent restoration in the parking lane and on the sidewalk (1 flag), in front of 1515 46 Street. |
2018-10-04 | No data | STERLING PLACE, FROM STREET CLASSON AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Backfill Pass1 Cut size:3 Feet by 2 Feet Down 4 Feet 5 inches lift – 96.3%;97.1WD – 113.7; DD – 104.6; Max D – 109.0 , AM – 8.7%AR: 10:30AM; DP: 11:06AM |
2018-10-04 | No data | STERLING PLACE, FROM STREET CLASSON AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill completed upon arrival |
2018-09-28 | No data | 42 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | (5ft. x 5ft.) permanent restoration in the parking lane and on the sidewalk, in front of 1225 42 Street. |
2018-09-28 | No data | WEST 36 STREET, FROM STREET 10 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: LL14 | Department of Transportation | water & sewer combo is is back filled and plated no cut back done |
2018-09-27 | No data | LIBERTY AVENUE, FROM STREET ESSEX STREET TO STREET LINWOOD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the driving lane |
2018-09-24 | No data | 52 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 1:30-2:50 L-3'4"x W-2'10"x D-3'11" Tests: 97.6%/98.8% Cut is located in the parking lane I/F/O 1145 52nd street. |
2018-09-17 | No data | 52 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 2:50-3:30 backfill has been re-scheduled due to tester not showing up to site. I have explained to foreman when re-scheduling a job its like starting new and a new comfirmation number is needed at the future date. |
2018-09-10 | No data | 46 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work started |
2018-09-06 | No data | WEST 36 STREET, FROM STREET 10 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLATED EXCAVATION ON ROADWAY. NO CONFIRMATION D1B ISSUED |
2018-08-20 | No data | MILL ROAD, FROM STREET DARTMOUTH LOOP TO STREET INA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench opposite Building Op |
2018-08-20 | No data | MILL ROAD, FROM STREET EBBITTS STREET TO STREET INA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench opposite Building Op |
2018-08-18 | No data | FLATBUSH AVENUE, FROM STREET EAST 26 STREET TO STREET FOSTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | IBM tag inserted. |
2018-08-15 | No data | JACKSON AVENUE, FROM STREET EAST 141 STREET TO STREET EAST 142 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass 1 cut on the sidewalk and roadway in compliance |
2018-08-09 | No data | WEST 23 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Cut in the driving lane flush to grade. |
2018-08-09 | No data | EAST 149 STREET, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk and roadway restored |
2018-08-07 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | (6ft. x 5ft.) permanent restoration in the driving lane, opposite of 2054 57 Street. |
2018-08-06 | No data | INA STREET, FROM STREET MILL ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | No data |
2018-08-06 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temporary restoration in the driving lane, opposite of 2054 57 Street. |
2018-08-06 | No data | MILL ROAD, FROM STREET DARTMOUTH LOOP TO STREET INA STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | No data |
2018-08-03 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL PASSLENGTH: 3’ 0”WIDTH: 2’ 2”DEPTH: 3’ 5”TEST1: 97.0%TEST2: 96.2%DEPARTURE: 2:20PM |
2018-08-03 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew working on site. |
2018-07-31 | No data | WEBSTER AVENUE, FROM STREET EAST 197 STREET TO STREET EAST 198 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has a perm cut in the bus lane painted red, new sidewalk flag. |
2018-07-26 | No data | INA STREET, FROM STREET MILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 18" CUT BACK WERE NOT DONE CUT MESURES 56"X56" |
2018-07-26 | No data | MILL ROAD, FROM STREET DARTMOUTH LOOP TO STREET INA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | INFO 80 AND 84 CUTS NEED CUTBACKS 18" ON ALL SIDES |
2018-07-23 | No data | GOLD STREET, FROM STREET FULTON STREET TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Active | Department of Transportation | METRO STEEL PLATE 75 FEET FROM WILLOUGHBY STREET |
2018-07-21 | No data | EAST 166 STREET, FROM STREET 3 AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2018-07-20 | No data | RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST BURNSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to locate cut due to BO |
2018-07-19 | No data | 21 STREET, FROM STREET 30 AVENUE TO STREET 30 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade in the d/l |
2018-07-18 | No data | WEST 123 STREET, FROM STREET LENOX AVENUE TO STREET MT MORRIS PARK WEST | No data | Street Construction Inspections: LL14 | Department of Transportation | 4.9 x 3 x 3.2 tested 96.7 96.4 2 lifts. |
2018-07-13 | No data | WOODYCREST AVENUE, FROM STREET WEST 167 STREET TO STREET WEST 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2018-07-11 | No data | EAST 56 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | active BO with fence placed on sidewalk no work done |
2018-07-08 | No data | ROMBOUTS AVENUE, FROM STREET HOLLERS AVENUE TO STREET NEW ENGLAND THRWY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sewer cut iI/F/O 3448 in compliance |
2018-07-05 | No data | WILLOUGHBY STREET, FROM STREET FLATBUSH AVENUE EXTENSION TO STREET GOLD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Restoration cut on the roadway is flush to grade |
2018-07-05 | No data | 43 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | (4ft.6in. x 4ft.6in.) permanent restoration in the driving lane, in front of 1247 43 Street. |
2018-07-01 | No data | JENNINGS STREET, FROM STREET MINFORD PLACE TO STREET SOUTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced |
2018-06-27 | No data | JEROME AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Con ED paved over plumber restoration |
2018-06-24 | No data | EAST 151 STREET, FROM STREET COURTLANDT AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm final color coded on the sidewalk and roadway |
2018-06-22 | No data | 43 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | (4ft. x 4ft.) temporary restoration in the parking/driving lane and permanent restoration on the sidewalk, in front of 1247 43 Street |
2018-06-21 | No data | FRANKLIN AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | monitored site from 0949-1040am, BF acceptable |
2018-06-14 | No data | EAST 156 STREET, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2018-06-14 | No data | GRAND CONCOURSE, FROM STREET EAST 153 STREET TO STREET EAST 156 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk restored |
2018-06-13 | No data | BERGEN STREET, FROM STREET KINGSBOROUGH 1 WALK TO STREET KINGSBOROUGH 2 WALK | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASSED {L}3FTX {W}2FT {D}4FT 4IN TEST 97.2 98.8 ARRIVED 230 LEFT 415 |
2018-06-13 | No data | BERGEN STREET, FROM STREET KINGSBOROUGH 1 WALK TO STREET KINGSBOROUGH 2 WALK | No data | Street Construction Inspections: Active | Department of Transportation | OPEN EXCAVATION IN THE PARKING LANE OPPOSITE #1668 CREW ON SITE AWAITING BACK FILL |
2018-06-03 | No data | NAGLE AVENUE, FROM STREET HILLSIDE AVENUE TO STREET THAYER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 4'x4' perm restoration in DL is sealed, color coded and flushed with surrounding area.. Cut is ifo abandoned lot |
2018-06-03 | No data | WEST 36 STREET, FROM STREET 10 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Active | Department of Transportation | crew on site actively excavating a sewer connection. cut measures at 11'ft L x 4'ft 6 " W x 4'ft 2" D ,and still going; foreman Al |
2018-06-02 | No data | EAST 132 STREET, FROM STREET HRD SOUTHBOUND ENTRANCE PARK AVE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water cut no defects |
2018-05-31 | No data | HOLLERS AVENUE, FROM STREET STEENWICK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill completed and acceptable, 1 cut in the intersection adjacent to curb, 6"and 12" SAW CUT cutbacks done, cut brought back to the curb. |
2018-05-26 | No data | RIVER AVENUE, FROM STREET EAST 167 STREET TO STREET MC CLELLAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk restored |
2018-05-21 | No data | 63 STREET, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 1:00-2:45 L-3'x W-2'1"x D-3'9" Tests: 96.5%/98.1% Cut is located in the parking lane opposite of the aka address on 14th avenue. |
2018-05-12 | No data | FULTON STREET, FROM STREET FLATBUSH AVENUE EXTENSION TO STREET HANOVER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration on roadway |
2018-05-10 | No data | EAST 176 STREET, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has a perm water cut 9'x5' in the driving lane, new building. |
2018-05-10 | No data | FLATBUSH AVENUE, FROM STREET EAST 26 STREET TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Missing IBM color code tag |
2018-05-06 | No data | LINCOLN AVENUE, FROM STREET EAST 136 STREET TO STREET EAST 137 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in driving lane in compliance |
2018-05-06 | No data | 3 AVENUE, FROM STREET EAST 136 STREET TO STREET EAST 137 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 4/22/18. Respondent failed to obtain a confirmation number from the department. |
2018-05-06 | No data | EAST 136 STREET, FROM STREET LINCOLN AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade color coded |
2018-04-28 | No data | THWAITES PLACE, FROM STREET BOSTON ROAD TO STREET OLINVILLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in roadway and sidewalk |
2018-04-25 | No data | WARREN STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp ok new permit B012018030C97 |
2018-04-23 | No data | EAST 176 STREET, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed and acceptable |
2018-04-19 | No data | 3 AVENUE, FROM STREET EAST 136 STREET TO STREET EAST 137 STREET | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - PROTECTED |
2018-04-19 | No data | 3 AVENUE, FROM STREET EAST 136 STREET TO STREET EAST 137 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | REPAIR WATER - PROTECTED |
2018-04-18 | No data | WEST 230 STREET, FROM STREET CORLEAR AVENUE TO STREET TIBBETT AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill started late do to Chris from Exclusive Testing Lab, 3'x2'. 6'' saw cut on the Base opp 230 W 230 St. |
2018-04-17 | No data | WEST 103 STREET, FROM STREET RIVERSIDE DRIVE TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to properly inspect due to vehicle parked I/F/O provided located |
2018-04-17 | No data | MILL ROAD, FROM STREET EBBITTS STREET TO STREET INA STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERM CUT WAS MADE SYMMETRICAL IN SHAPE. |
2018-04-11 | No data | 11 AVENUE, FROM STREET WEST 22 STREET TO STREET WEST 23 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CUT & CAP FOR DEMO . 1 CUT ON S/W & 1 CUT ON R/W |
2018-04-05 | No data | FLATBUSH AVENUE, FROM STREET EAST 26 STREET TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp on s/w, perm restoration p/l, d/l. |
2018-04-05 | No data | EAST 132 STREET, FROM STREET HRD SOUTHBOUND ENTRANCE PARK AVE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no defects cut in roadway visible |
2018-03-29 | No data | EAST 56 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Area has been closed off, Active B.O. has occupied site, I/F/O 139... (CAR Re-inspection Pass) |
2018-03-29 | No data | WEST 20 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | White lane markings correctly placed on the Permanent Restoration. |
2018-03-17 | No data | 95 STREET, FROM STREET 161 AVENUE TO STREET 162 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade in the r/w opposite color coded and sealed |
2018-03-12 | No data | 11 AVENUE, FROM STREET WEST 22 STREET TO STREET WEST 23 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Two perm restoration cuts within 1 foot apart must be combined as one wearing cost. |
2018-03-10 | No data | WEST 93 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No sewer work observed in the roadway IFO 212 . |
2018-02-28 | No data | FLATBUSH AVENUE, FROM STREET EAST 26 STREET TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | OPEN EXCAVATION IN CENTER OF ROADWAY. CREW ON SITE |
2018-02-28 | No data | FLATBUSH AVENUE, FROM STREET EAST 26 STREET TO STREET FOSTER AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASSED {L}7FT 11IN X {W}3FT 11IN X {D}2FT 8IN TEST 96.5 BASE CUT BACKS SPRAYED. CUT IS IN CENTER OF ROADWAY. ARRIVED 1200 LEFT 120 |
2018-02-27 | No data | BOWERY, FROM STREET CANAL STREET TO STREET HESTER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the driving lane |
2018-02-22 | No data | PRESIDENT STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags sealed. Ok |
2018-02-22 | No data | LEXINGTON AVENUE, FROM STREET EAST 56 STREET TO STREET EAST 57 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | b/f passed / not actual b/f took place DUE to Consolidated Edison took over the excavation. Upon inspection at location found Con Edison had a permanent restoration 6'10" x 6' with permanent blue color code b/t p/l d/l |
2018-02-17 | No data | FULTON STREET, FROM STREET FLATBUSH AVENUE EXTENSION TO STREET HANOVER PLACE | No data | Street Construction Inspections: Active | Department of Transportation | 4 TEMP RESTORATIONS IN CONCRETE RWY |
2018-02-17 | No data | ROMBOUTS AVENUE, FROM STREET HOLLERS AVENUE TO STREET NEW ENGLAND THRWY | No data | Street Construction Inspections: Active | Department of Transportation | perm restoration is good |
2018-02-14 | No data | PRESIDENT STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Back Fill PassCut size:6 Feet 7 inches by 3 Feet Down 3 feet 4 inches.First lift â 96.9%; Last 97.0 %WD â 123.3DD â 115.9Max D â 119.5AM â 6.4 |
2018-02-14 | No data | WEST 47 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration I/f/o building operation |
2018-02-14 | No data | WAYNE AVENUE, FROM STREET EAST 211 STREET TO STREET EAST GUN HILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in roadway, fine crack developing in street joint |
2018-02-12 | No data | UNION STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok |
2018-02-12 | No data | LEXINGTON AVENUE, FROM STREET EAST 56 STREET TO STREET EAST 57 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Nov issued for respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Respondent failed to obtain a confirmation number from the department. |
2018-02-10 | No data | ROMBOUTS AVENUE, FROM STREET HOLLERS AVENUE TO STREET NEW ENGLAND THRWY | No data | Street Construction Inspections: Active | Department of Transportation | Perm Rest is good. |
2018-02-08 | No data | ROMBOUTS AVENUE, FROM STREET HOLLERS AVENUE TO STREET NEW ENGLAND THRWY | No data | Street Construction Inspections: Active | Department of Transportation | work done in roadway |
2018-02-08 | No data | WEST 35 STREET, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER |
2018-02-03 | No data | EAST 168 STREET, FROM STREET FRANKLIN AVENUE TO STREET FULTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm b/l & s/w perm-series |
2018-02-03 | No data | WEST 23 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest accepted. Temporary restorations adjacent to Plumber restoration belong to Con Edison expired permits. CAR to be issued to Con Edison. |
2018-02-03 | No data | WEST 23 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found crew working on an active permit making permanent 2 cuts on the eastbound lane and 2 cuts on the westbound lane. 2 cuts in a temporary asplhat restoration state not "MES" were recently Issued a NICA but were fixed by "MES" out of courtesy. |
2018-02-02 | No data | WEST 23 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 3 temporary asphalt restoration in the roadway I/f/O 548 Uhaul garage B Active permit at this time. |
2018-01-31 | No data | FRANKLIN AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 3x2 down 1.6 in parking lane. |
2018-01-31 | No data | LEXINGTON AVENUE, FROM STREET EAST 56 STREET TO STREET EAST 57 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | crew on site, water repair work ongoing |
2018-01-29 | No data | 10 AVENUE, FROM STREET WEST 34 STREET TO STREET WEST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WATER CUT IN THE DRIVING LANE IS IN COMPLIANCE |
2018-01-08 | No data | RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST BURNSIDE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work found on the R/W due to piled up snow, or on the sidewalk, No visible work seems to have been done at this time. |
2018-01-05 | No data | UNION AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 165 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PROTEST ACCEPTED DUE TO WORK DONE AROUND HYDRANT WAS A DDC JOB DONE BY GATEWAY DEMO/CIVIL CORP. UNDER P# X012017340A17. THE PERMITTEE SHOWED PROOF OF ONLY DOING ONE FLAG AT THE BUILDING LINE. |
2017-12-28 | No data | UNION AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 165 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway restoration and new sidewalk flags around hydrant. |
2017-12-27 | No data | WEST 47 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER |
2017-12-19 | No data | WEST 22 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in driving lane of roadway. ( Inspector # 672 ) |
2017-12-18 | No data | JEROME AVENUE, FROM STREET EAST 176 STREET TO STREET MT HOPE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 cut in the roadway and 2 flags on the sidewalk pass |
2017-12-15 | No data | UNION AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 165 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk expansion joints need to be installed and sealed between curb and sidewalk I/F/O 999. |
2017-12-15 | No data | EAST 165 STREET, FROM STREET TINTON AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumbers restoration in roadway OPP 802, sidewalk covered with snow. |
2017-12-13 | No data | REMSEN AVENUE, FROM STREET EAST 53 STREET TO STREET RUTLAND ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN D/LON RUTLAND ROAD SIDE NEAR CROSSWALK |
2017-12-08 | No data | EAST 56 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk Expansion joints needs to be recessed and sealed. Two Permanent "Water-Sewer" restoration in the roadway has broken/cracked asphalt that needs to be mill & repaved. located i/f/o 139. |
2017-12-06 | No data | WEST FARMS ROAD, FROM STREET CROSS BRONX EXPWY NB ET 4 A TO STREET EAST 174 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 Trench center on rd'wy O.K. |
2017-12-04 | No data | EAST 165 STREET, FROM STREET TINTON AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp restoration within a con ed restoration in driving lane OPP 802, Updated active permit on file. |
2017-12-04 | No data | UNION AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 165 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp restorationin driving lane missing cutbacks. Updated active permit on file. |
2017-11-29 | No data | SHERIDAN AVENUE, FROM STREET EAST 153 STREET TO STREET EAST 156 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK FOUND NO ADDRESS OR FOOTAGE |
2017-11-28 | No data | EAST 56 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm restorations next to each other flush to grade near Lexington avenue crosswalk |
2017-11-21 | No data | EAST 56 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration flush to grade in the driving lane near Lexington avenue. |
2017-11-18 | No data | WEST 20 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bike Lane Markings need to be properly restored |
2017-11-17 | No data | WEST 113 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no signs of work- only major work from con edison |
2017-11-16 | No data | LEXINGTON AVENUE, FROM STREET EAST 56 STREET TO STREET EAST 57 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Respondent failed to begin emergency work within 2 hours after authorization at the above location. During inspection there was no excavation made in roadway , side walk or surrounding area of above location. |
2017-11-15 | No data | GRAND CONCOURSE, FROM STREET EAST 153 STREET TO STREET EAST 156 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 8/10/17. |
2017-11-15 | No data | JENNINGS STREET, FROM STREET MINFORD PLACE TO STREET SOUTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Confirmation # found on file. Inspected / In Compliance. |
2017-11-14 | No data | ATLANTIC AVENUE, FROM STREET UNDERHILL AVENUE TO STREET WAVERLY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE ROADWAY |
2017-11-13 | No data | WAVERLY AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 9/1/2017. Respondent fai |
2017-11-01 | No data | MILL ROAD, FROM STREET DARTMOUTH LOOP TO STREET INA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm r/w trench was to grade opp backside of shopping center @ address # 116. Three perm r/w cuts were to grade in opp pkg la. @ address #'s 98, 84, & 80. S/W cut was ok opp # 84. |
2017-11-01 | No data | INA STREET, FROM STREET MILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm r/w cut was to grade. |
2017-11-01 | No data | MILL ROAD, FROM STREET EBBITTS STREET TO STREET INA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Multiple s/w cuts were ok behind 2600 Hylan blvd; Three perm r/w cuts were to grade i/f/o address #'s 124, 136,& 146. C.A.R was issued to square off restoration i/f/o address # 136 as to DOT S.D.D. #H-1042 D. |
2017-10-25 | No data | EBBITTS STREET, FROM STREET ALLISON AVENUE TO STREET MILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to locate address # 15 but the only r/w cut observed in segment was opposite driveway entrance to Dunkin Donuts at Tysen Park Shopping Plaza. |
2017-10-16 | No data | EBBITTS STREET, FROM STREET ALLISON AVENUE TO STREET MILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to locate address # 15 but the only r/w cut observed in segment was opposite driveway entrance to Dunkin Donuts at Tysen Park Shopping Plaza. |
2017-10-15 | No data | WEST 56 STREET, FROM STREET 6 1/2 AVENUE TO STREET AVENUE OF THE AMERICAS | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER |
2017-10-11 | No data | EAST 156 STREET, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | up to date permit on file |
2017-10-11 | No data | EAST 156 STREET, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | perm to grade |
2017-10-09 | No data | EBBITTS STREET, FROM STREET ALLISON AVENUE TO STREET MILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | couldn't locate |
2017-10-07 | No data | MILL ROAD, FROM STREET EBBITTS STREET TO STREET INA STREET | No data | Street Construction Inspections: Active | Department of Transportation | can't locate any work |
2017-10-07 | No data | INA STREET, FROM STREET MILL ROAD | No data | Street Construction Inspections: Active | Department of Transportation | info 116 eight small cuts made saw cut only at this time opp new shopping center |
2017-10-07 | No data | MILL ROAD, FROM STREET DARTMOUTH LOOP TO STREET INA STREET | No data | Street Construction Inspections: Active | Department of Transportation | no such address |
2017-10-05 | No data | EAST 149 STREET, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm final on the sidewalk and roadway |
2017-09-30 | No data | EAST 149 STREET, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in the roadway and sidewalk pass |
2017-09-26 | No data | WAVERLY AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK DONE IN THE CROSSWALK |
2017-09-12 | No data | 95 STREET, FROM STREET 161 AVENUE TO STREET 162 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade in the r/w |
2017-09-11 | No data | THWAITES PLACE, FROM STREET BOSTON ROAD TO STREET OLINVILLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration is good. Inspected / In Compliance |
2017-09-08 | No data | GRAND CONCOURSE, FROM STREET EAST 153 STREET TO STREET EAST 156 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2017-09-05 | No data | MILL ROAD, FROM STREET DARTMOUTH LOOP TO STREET INA STREET | No data | Street Construction Inspections: Active | Department of Transportation | Check permit: C.O.S. was excavating the r/w behind Hylan Shopping Plaza, in the opposite parking lane @ address # 116. |
2017-08-25 | No data | GRAND CONCOURSE, FROM STREET EAST 153 STREET TO STREET EAST 156 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Sidewalk only having work done |
2017-08-22 | No data | BOWERY, FROM STREET CANAL STREET TO STREET HESTER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR issued for this location CAR #20176550237 |
2017-08-18 | No data | ATLANTIC AVENUE, FROM STREET UNDERHILL AVENUE TO STREET WAVERLY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 19FT X 6FT PERM RESTORATION TRENCH ON THE ROADWAY IN THE PARKING/DRIVING LANE I/F/0 555 WAVERLY PL , IS FLUSH TO GRADE |
2017-08-12 | No data | JENNINGS STREET, FROM STREET MINFORD PLACE TO STREET SOUTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in p&d/l, confirmations called in on X012017181A34 Active X201718432 BAC 7/3/2017 14:30 Alban Shala 07/03/2017 12:22 PM Active X201718432 BSE 7/3/2017 14:30 Alban Shala 07/03/2017 12:22 PM |
2017-08-09 | No data | WAVERLY AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL PASSED 1 CUT IN THE DRIVING LANE I/F/O 555 (L) 15FT (W) 4FT 2IN (D) 3FT 3IN WET DENSITY-130.8DRY DENSITY-121.6MAX DRY DENSITY-125.5ACTUAL MOISTURE-7.5 LAST LIFT-96.7CUT BACKS WERE DONE FOR BASE |
2017-08-02 | No data | WAVERLY AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | 7FT X 6FT STEEL PLATED EXCAVATION ON THE ROADWAY, ADJACENT TO THE CROSSWALK I/F/O 555, PINNED AND RAMMPED |
2017-08-02 | No data | WAVERLY AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 7FT X 6FT STEEL PLATED EXCAVATION ON THE ROADWAY ADAJACENT TO THE CROSSWALK PINNED AND RAMMPED I/F/O 555, NEW ACTIVE PERMIT ON FILE |
2017-07-25 | No data | WEST 19 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no cut was found in front of 508 |
2017-07-25 | No data | WEST 18 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut acceptable |
2017-07-08 | No data | EAST 168 STREET, FROM STREET FRANKLIN AVENUE TO STREET FULTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 perm b/l & s/w perm |
2017-07-08 | No data | EAST 168 STREET, FROM STREET FRANKLIN AVENUE TO STREET FULTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm b/l & s/w perm |
2017-07-07 | No data | WAYNE AVENUE, FROM STREET EAST 211 STREET TO STREET EAST GUN HILL ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | foreman Avni, jack hammer, blend. LAB. Exclusive testing. Chris, sand cone, (w)132.0 (d)117.5 (md)119.5 (am)12.3 Test 97.3. backfill accepted |
2017-07-05 | No data | 10 AVENUE, FROM STREET WEST 34 STREET TO STREET WEST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Restoration in the Driving Lane is Flush to Grade...I/F/O 447-449 |
2017-07-05 | No data | WEST 47 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | perm cut in the roadway and perm sidewalk flag not sealed . permit active |
2017-06-23 | No data | EAST 132 STREET, FROM STREET HRD SOUTHBOUND ENTRANCE PARK AVE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 11FT TRENCH NO DEFECTS- SIDEWALK WILL MOST LIKLEY BE RE DONE WITH NEW BUILDING NO STRESS OVER EXPANSION JOINTS UNTIL COMPLETION OF BO |
2017-06-21 | No data | WEST 47 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp cut on the sidewalk and a temp cut in the roadway ifo 145 |
2017-06-07 | No data | EAST 132 STREET, FROM STREET HRD SOUTHBOUND ENTRANCE PARK AVE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent have a steel plate on the roadway with no valid DOT permit on file. Permit M012017125B29 expired on 6/1/17. |
2017-05-31 | No data | JEROME AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed and acceptable |
2017-05-11 | No data | EAST 132 STREET, FROM STREET HRD SOUTHBOUND ENTRANCE PARK AVE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site, looking for sewer connection in the sidewalk. |
Number | Adjudicates | Phase | Disposition | Date | Fine amount | Date fine paid | description |
---|---|---|---|---|---|---|---|
TWC-221418 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-04-13 | 2000 | 2022-09-07 | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
THE CORPORATION
ARSHIA DESIGNS INC. AAA VACUUM CORP. ATLANTICA TELECOM, INC. MISTY SPORTSWEAR, INC. INRACKS, INC. FAT JAMS ELECTRONICS INC. CROQUEMBOUCHE, INC. LONG BEACH PEDIATRIC GROUP, P.C. LAW OFFICES OF JOSEPH A. GRECO, P.C. TEREZ, INC.No related companies by address
Date of last update: 23 Nov 2024
Sources: New York Secretary of State
© 2024 nycompanysearch.com, Part of Big Data Integrated