EAST 93 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: NOV Re-Inspect
|
Department of Transportation
|
Refer to permit #M012023324B14 on file.
|
2023-11-01
|
No data
|
EAST 93 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
I found respondent opened the street without a permit. Respondent excavated the sidewalk without an active DOT permit. Identified respondent by the name on the truck "CLARKE CONSTRUCTION INC" and Spoke to Ricardo Clarke (Owner on site).
|
2023-01-11
|
No data
|
NOSTRAND AVENUE, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP was done
|
2023-01-08
|
No data
|
TOMPKINS AVENUE, FROM STREET KOSCIUSKO STREET TO STREET LAFAYETTE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP is in compliance
|
2022-05-26
|
No data
|
CENTRAL AVENUE, FROM STREET HIMROD STREET TO STREET STANHOPE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed.
|
2022-04-09
|
No data
|
CLAY STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel curb intact, no defects at this time
|
2022-02-11
|
No data
|
CLAY STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags flush and sealed, entire property
|
2022-01-04
|
No data
|
HARRISON PLACE, FROM STREET KNICKERBOCKER AVENUE TO STREET PORTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new sidewalk
|
2021-09-16
|
No data
|
DRIGGS AVENUE, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
PASS NEW SPECTRUM WORK
|
2021-09-15
|
No data
|
CENTRAL AVENUE, FROM STREET HIMROD STREET TO STREET STANHOPE STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Bike lane mark outs installed
|
2021-08-29
|
No data
|
EAST 2 STREET, FROM STREET AVENUE I TO STREET AVENUE J
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plus 5 BPP in Compliance
|
2021-08-20
|
No data
|
CENTRAL AVENUE, FROM STREET HIMROD STREET TO STREET STANHOPE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway repaved ifo 223 as per BPP, bike lane on left side.
|
2021-08-08
|
No data
|
CLAY STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Blue face steel curb intact, no defects at this time.
|
2021-08-07
|
No data
|
CENTRAL AVENUE, FROM STREET HIMROD STREET TO STREET STANHOPE STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Bike lane installed
|
2021-07-25
|
No data
|
NOSTRAND AVENUE, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags installed in front of property #1503 NOSTRAND AVENUE expansion joints sealed in between the sidewalk, curb & both ends of the property line in compliance
|
2021-07-16
|
No data
|
CENTRAL AVENUE, FROM STREET HIMROD STREET TO STREET STANHOPE STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observe the above respondent repaved the roadway for building pavement plan. Respondent failed to restore in kind all roadway pavement markings. Respondent failed to respond to previous CAR #20214510539 on 5/13/2021. Permit #b012020343f15 expired
|
2021-07-10
|
No data
|
DRIGGS AVENUE, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS FAILED TO RESPOND TO CORRECTIVE ACTION REQUEST#20214510026-FAILED TO RESTORE IN KIND SECOND WHITE BIKE LANE MARKING ON ROADWAY OVER NEW PERMANENT RE-PAVE OF ROADWAY.
|
2021-06-09
|
No data
|
EAST 2 STREET, FROM STREET AVENUE I TO STREET AVENUE J
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new curb
|
2021-06-04
|
No data
|
CENTRAL AVENUE, FROM STREET HIMROD STREET TO STREET STANHOPE STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO RESTORE BIKE LANE MARKING. (CAR #20217380092) WAS ISSUED 1/31/2021
|
2021-05-23
|
No data
|
DRIGGS AVENUE, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW SWK OK
|
2021-05-18
|
No data
|
TOMPKINS AVENUE, FROM STREET KOSCIUSKO STREET TO STREET LAFAYETTE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW SWK SEALED OK
|
2021-05-15
|
No data
|
DRIGGS AVENUE, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS FAILED TO RESPOND TO CORRECTIVE ACTION REQUEST#20214510026-FAILED TO RESTORE IN KIND SECOND WHITE BIKE LANE MARKING ON ROADWAY OVER NEW PERMANENT RE-PAVE OF ROADWAY.
|
2021-05-13
|
No data
|
CENTRAL AVENUE, FROM STREET HIMROD STREET TO STREET STANHOPE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Restoration of BIKE LANE markings neededplease restore/repair divided white bicycle lane markers in the roadway in-kind in front of building #223 CENTRAL AVENUE
|
2021-05-01
|
No data
|
EAST 2 STREET, FROM STREET AVENUE I TO STREET AVENUE J
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
SWK WAS SEALED
|
2021-04-22
|
No data
|
CENTRAL AVENUE, FROM STREET HIMROD STREET TO STREET STANHOPE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
reset curb for new building
|
2021-04-19
|
No data
|
CENTRAL AVENUE, FROM STREET HIMROD STREET TO STREET STANHOPE STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed the above respondent failed to restore bike lane markings in kind with final restoration. Respondent was notified to make correction via (CAR #20217380092) on 1/31/2021 and failed to do so.
|
2021-04-18
|
No data
|
CLAY STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
BARRICADES WERE REMOVED
|
2021-04-18
|
No data
|
DRIGGS AVENUE, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
NOV WAS WRITTEN ON PERMIT ON 4/9/21
|
2021-04-09
|
No data
|
DRIGGS AVENUE, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
concrete clean up ok
|
2021-03-11
|
No data
|
17 AVENUE, FROM STREET 61 STREET TO STREET 62 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Upon arrival respondent CLARKE CONSTRUCTION INCORPORATED failed to comply with terms & conditions of stipulation #013, maintain minimum 5 FOOT clear sidewalk passage to all ongoing pedestrians. Nov issued
|
2021-03-05
|
No data
|
DRIGGS AVENUE, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
PLEASE RESTORE SECOND WHITE BIKE LANE LANE MARKING OVER PERMANENT RE-PAVE BPP WORK AT 801 DRIGGS AVENUE BETWEEN SOUTH 4 STREET & SOUTH 5 STREET ON PERMIT# B012020343F17 EXPIRED 12/31/20.
|
2021-03-05
|
No data
|
DRIGGS AVENUE, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
No data
|
Street Construction Inspections: NOV Re-Inspect
|
Department of Transportation
|
EQUIPMENT REMOVED - CONCRETE CLEANED UP
|
2021-03-04
|
No data
|
NOSTRAND AVENUE, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW CURB.
|
2021-02-26
|
No data
|
EAST 2 STREET, FROM STREET AVENUE I TO STREET AVENUE J
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
- Expansion joints need to be installedplease seal expansion joints in between the sidewalk end of the property line in front of property #1072 EAST 2 STREET, in a timely fashion. CAR issued
|
2021-02-25
|
No data
|
17 AVENUE, FROM STREET 61 STREET TO STREET 62 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Upon arrival respondent CLARKE CONSTRUCTION INCORPORATED failed to comply with terms & conditions of stipulation #013, maintain minimum 5 FOOT clear sidewalk passage to all ongoing pedestrians. Nov issued
|
2021-02-24
|
No data
|
62 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Upon arrival respondent CLARKE CONSTRUCTION INCORPORATED failed to comply with terms & conditions of stipulation #013, maintain minimum of 5 FOOT clear sidewalk passage to all ongoing pedestrians. Nov issued
|
2021-02-23
|
No data
|
17 AVENUE, FROM STREET 61 STREET TO STREET 62 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Upon arrival respondent CLARKE CONSTRUCTION INCORPORATED failed to comply with terms & conditions of stipulation #013, maintain minimum 5 FOOT clear sidewalk passage to all ongoing pedestrians. Nov issued
|
2021-02-22
|
No data
|
61 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no OCCUPANCY OF SIDEWALK
|
2021-02-05
|
No data
|
61 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no fence up
|
2021-02-05
|
No data
|
62 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
the sidewalk is currently excavated
|
2021-02-05
|
No data
|
17 AVENUE, FROM STREET 61 STREET TO STREET 62 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
the sidewalk occupied
|
2021-01-31
|
No data
|
CENTRAL AVENUE, FROM STREET HIMROD STREET TO STREET STANHOPE STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
- Restoration of BIKE LANE markings neededplease restore/repair divided white bicycle lane markers in the roadway in-kind in front of building #223 CENTRAL AVENUE, in a timely fashion. CAR issued
|
2021-01-30
|
No data
|
127 STREET, FROM STREET 25 ROAD TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb repaired at time of my inspection.
|
2021-01-30
|
No data
|
17 AVENUE, FROM STREET 61 STREET TO STREET 62 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
fence maintained
|
2021-01-30
|
No data
|
62 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
the sidewalk is not occupied
|
2021-01-30
|
No data
|
61 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
the sidewalk is not occupied
|
2021-01-25
|
No data
|
NOSTRAND AVENUE, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
the width of the roadway is 44 ft they milled 27.4 ft width x 37.5 ft length that is down 3 to 4 inches
|
2021-01-21
|
No data
|
TOMPKINS AVENUE, FROM STREET KOSCIUSKO STREET TO STREET LAFAYETTE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PAVING DONE, CURB TO CURB. IFO 232.
|
2021-01-05
|
No data
|
DRIGGS AVENUE, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PLEASE RESTORE WHITE BIKE LANE MARKINGS OVER RE-PAVED ROADWAY & SEAL EDGES OF JOINTS OF NEW RE-PAVED ROADWAY-IN FRONT OF 801 DRIGGS AVENUE BETWEEN SOUTH 4 STREET & SOUTH 5 STREET.
|
2021-01-05
|
No data
|
DRIGGS AVENUE, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
PLEASE REMOVE/CLEAN UP SPILLED WET CONCRETE ON ROADWAY (FROM SIDEWALK WORK)- IN FRONT OF 801 DRIGGS AVENUE BETWEEN SOUTH 4 STREET & SOUTH 5 STREET.
|
2021-01-05
|
No data
|
TOMPKINS AVENUE, FROM STREET KOSCIUSKO STREET TO STREET LAFAYETTE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
UNDERESTIMATED AMOUNT OF MATERIAL TO BE USED. WAITING FOR DELIVERY. CAN WORK TO 4PM. WILL CHECK BACK.
|
2021-01-04
|
No data
|
CENTRAL AVENUE, FROM STREET HIMROD STREET TO STREET STANHOPE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY WIDTH 33 FEET ,MILLED WIDTH 22 FEET INTO THE ROADWAY, MILLED LENGTH 28 FEET
|
2021-01-04
|
No data
|
CENTRAL AVENUE, FROM STREET HIMROD STREET TO STREET STANHOPE STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Upon arrival respondent CLARKE CONSTRUCTION INCORPORATED failed to comply with terms & conditions of stipulation #BIKE02, create a temporary bike-way around the work-zone delineated by cones or similar vertical traffic devices. Nov issued
|
2020-12-18
|
No data
|
TOMPKINS AVENUE, FROM STREET KOSCIUSKO STREET TO STREET LAFAYETTE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO WORK OBSERVED.
|
2020-12-08
|
No data
|
17 AVENUE, FROM STREET 61 STREET TO STREET 62 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
fence maintained
|
2020-12-05
|
No data
|
62 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
the sidewalk is occupied
|
2020-12-05
|
No data
|
61 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
the sidewalk is occupied
|
2020-12-03
|
No data
|
17 AVENUE, FROM STREET 61 STREET TO STREET 62 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
fence maintained in compliance
|
2020-12-01
|
No data
|
CLAY STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Blue face steel curb intact, no defects at this time.
|