2022-06-08
|
No data
|
3 AVENUE, FROM STREET EAST 9 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps within the SW1 corner quadrant are functional and accessible. Measured and collected on 10/25/19
|
2022-03-21
|
No data
|
BARTLETT PLACE, FROM STREET EATON COURT TO STREET FRANK COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new curb is in compliance
|
2022-02-03
|
No data
|
EAST 52 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Acceptable
|
2022-01-30
|
No data
|
EAST 52 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway occupied
|
2022-01-23
|
No data
|
5 AVENUE, FROM STREET EAST 18 STREET TO STREET EAST 19 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The respondent made repairs to the curb within- two separate areas.
|
2022-01-03
|
No data
|
5 AVENUE, FROM STREET EAST 18 STREET TO STREET EAST 19 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The respondent has repaired two sections of the granite curb.
|
2021-12-03
|
No data
|
5 AVENUE, FROM STREET EAST 18 STREET TO STREET EAST 19 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RESET, REPAIR OR REPLACE CURB
|
2021-11-23
|
No data
|
3 AVENUE, FROM STREET EAST 9 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps within the SW1 corner quadrant are functional and accessible. Measured and collected on 10/25/19
|
2021-11-13
|
No data
|
53 DRIVE, FROM STREET 64 STREET TO STREET 65 PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed in front of property #64-08 53 DRIVE in compliance
|
2021-05-19
|
No data
|
3 AVENUE, FROM STREET EAST 9 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps within the SW1 corner quadrant are functional and accessible. Measured and collected on 10/25/19
|
2020-10-14
|
No data
|
3 AVENUE, FROM STREET EAST 9 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps within the SW1 corner quadrant are functional and accessible. Measured and collected on 10/25/19
|
2020-08-23
|
No data
|
BARTLETT PLACE, FROM STREET EATON COURT TO STREET FRANK COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb work done.
|
2020-08-03
|
No data
|
53 DRIVE, FROM STREET 64 STREET TO STREET 65 PLACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Curb have been recess and seal expansion joints along driveway.
|
2020-07-31
|
No data
|
BARTLETT PLACE, FROM STREET EATON COURT TO STREET FRANK COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk flags.
|
2020-07-29
|
No data
|
5 AVENUE, FROM STREET EAST 18 STREET TO STREET EAST 19 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 130, observed 2 separate repairs made to existing Stone Curb ( 6' portions restored in Kind ). Expansion joints properly sealed at this time.
|
2020-07-12
|
No data
|
BARTLETT PLACE, FROM STREET EATON COURT TO STREET FRANK COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done.
|
2020-04-07
|
No data
|
3 AVENUE, FROM STREET EAST 9 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
The correct size and color for the DWS was applied.
|
2020-02-07
|
No data
|
53 DRIVE, FROM STREET 64 STREET TO STREET 65 PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CAR - to recess and seal expansion joints along restored curb at driveway.
|
2020-01-24
|
No data
|
2 AVENUE, FROM STREET EAST 58 STREET TO STREET QNSBORO BRIDGE APPROACH
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk acceptable
|
2020-01-14
|
No data
|
5 AVENUE, FROM STREET EAST 18 STREET TO STREET EAST 19 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb restored in kind in front of 130.
|
2019-11-21
|
No data
|
5 AVENUE, FROM STREET EAST 18 STREET TO STREET EAST 19 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The entire curb was not restored however, there are two 6' portion of granite curb that were installed at two different location of the property.
|
2019-11-18
|
No data
|
EAST 9 STREET, FROM STREET 3 AVENUE TO STREET LAFAYETTE COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags restored in kind at aka 51 Astor.
|
2019-11-06
|
No data
|
98 PLACE, FROM STREET 63 DRIVE TO STREET 63 ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
At time of inspection, no boom lift occupying roadway.
|
2019-11-06
|
No data
|
63 ROAD, FROM STREET 98 PLACE TO STREET 98 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
At time of inspection, no boom lift occupying roadway. Location in compliance.
|
2019-11-06
|
No data
|
63 DRIVE, FROM STREET 98 PLACE TO STREET 98 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
At time of inspection, no boom lift occupying roadway. Location in compliance.
|
2019-10-25
|
No data
|
3 AVENUE, FROM STREET EAST 9 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly constructed tangent ramps on the SE corner quadrant is accessible and functional. Measured and updated collector on 10-25-19.
|
2019-10-03
|
No data
|
3 AVENUE, FROM STREET EAST 9 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Work in progress on the SW1 corner quadrant. . Ramps are behind fence on active BO. Collected on 10-3-19.
|
2019-09-27
|
No data
|
NORMAN AVENUE, FROM STREET DOBBIN STREET TO STREET GUERNSEY STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Fence installed as stipulated.
|
2019-09-03
|
No data
|
97 STREET, FROM STREET 62 DRIVE TO STREET 63 ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk replaced, joints sealed.
|
2019-08-07
|
No data
|
5 AVENUE, FROM STREET EAST 18 STREET TO STREET EAST 19 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable
|
2019-07-28
|
No data
|
WEST 18 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable
|
2019-07-22
|
No data
|
NORMAN AVENUE, FROM STREET DOBBIN STREET TO STREET GUERNSEY STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CREW INSTALLING FENCE
|
2019-07-08
|
No data
|
5 AVENUE, FROM STREET EAST 18 STREET TO STREET EAST 19 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable
|
2019-06-30
|
No data
|
BARTLETT PLACE, FROM STREET EATON COURT TO STREET FRANK COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk repair in front of address
|
2019-06-14
|
No data
|
WEST 18 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temp Ped Walkway On Site At Time Of Inspection
|
2019-06-13
|
No data
|
5 AVENUE, FROM STREET EAST 18 STREET TO STREET EAST 19 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work to continue under permit#M012019151B25
|
2019-06-11
|
No data
|
5 AVENUE, FROM STREET EAST 18 STREET TO STREET EAST 19 STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Occupancy of Sidewalk, Pedestrian Walkway acceptable
|
2019-05-30
|
No data
|
5 AVENUE, FROM STREET EAST 18 STREET TO STREET EAST 19 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Air Compressor on location acceptable
|
2019-05-29
|
No data
|
53 DRIVE, FROM STREET 64 STREET TO STREET 65 PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb restored
|
2019-05-24
|
No data
|
WEST 18 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work to continue under permit#M042019123A11
|
2019-05-12
|
No data
|
5 AVENUE, FROM STREET EAST 18 STREET TO STREET EAST 19 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Jersey Barrier: As I was driving passed this location, I noticed the barricades were blown over. While I was on site the contractor arrived to correct the problem. No NOV written for unsafe work site.
|
2019-05-08
|
No data
|
5 AVENUE, FROM STREET EAST 18 STREET TO STREET EAST 19 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crew on site with valid DOT permit on file
|
2019-04-24
|
No data
|
5 AVENUE, FROM STREET EAST 18 STREET TO STREET EAST 19 STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
OCCUPANCY OF SIDEWALK AS STIPULATED no obstructed
|
2019-04-20
|
No data
|
WEST 18 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
pedestrian walkway on roadway
|
2019-04-20
|
No data
|
5 AVENUE, FROM STREET EAST 18 STREET TO STREET EAST 19 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
0211 - OCCUPANCY OF ROADWAY AS STIPULATED/BARRIERS IN USE OCCUPANCY ROADWAY
|
2019-03-26
|
No data
|
WEST 18 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway Occupied At Time Of Inspection
|
2019-03-21
|
No data
|
WEST 18 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
temp walkway on roadway
|
2019-03-19
|
No data
|
WEST 18 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
OCCUPANCY OF ROADWAY-BARRIERS FOR TEMP WALKWAY ON THE ROADWAY.
|
2019-02-26
|
No data
|
WEST 18 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sidewalk being repaired
|
2019-02-26
|
No data
|
WEST 18 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ongoing construction of sidewalk active permit on file
|
2019-02-07
|
No data
|
WEST 18 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
plastic barriers stored
|
2019-01-31
|
No data
|
WEST 18 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
The curb is currently excavated at this time of inspection.
|
2019-01-16
|
No data
|
97 STREET, FROM STREET 62 DRIVE TO STREET 63 ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
40ft of sidewalk replaced in bus stop.
|
2019-01-13
|
No data
|
WEST 18 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Nov issued for the respondent maintaining a temporary pedestrian walk in the roadway with a permit that has expired on 12/31/2018.
|
2019-01-08
|
No data
|
WEST 18 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Nov issued for the respondent with an excavated the curb to waterproof the foundation for a vaulted sidewalk with a permit that has expired on 10/28/2018.
|
2018-12-31
|
No data
|
WEST 113 STREET, FROM STREET AMSTERDAM AVENUE TO STREET MORNINGSIDE DRIVE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sidewalk flags on side of hospital
|
2018-12-31
|
No data
|
WEST 114 STREET, FROM STREET AMSTERDAM AVENUE TO STREET MORNINGSIDE DRIVE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sidewalk replaced with expansion joints covered in plastic. no action taken active status
|
2018-12-31
|
No data
|
AMSTERDAM AVENUE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sidewalk flags replaced. expansion joints covered with plastic. active status on permit no action taken
|
2018-12-13
|
No data
|
WEST 18 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
At the time of inspection, I found the barricades placed which are placed in the roadway is being used a temporary pedestrian walkway.
|