2024-05-24
|
No data
|
HUNTER STREET, FROM STREET 28 STREET TO STREET QNSBORO BR UP RY APR
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I observed that the respondent placed plastic barriers on sidewalk without an active DOT permit. Identified by expired permit above and expired DOB permit posted at site: 440653071-01-FO-EA, exp: 9/28/2022.
|
2023-12-22
|
No data
|
EAST 188 STREET, FROM STREET PARK AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Respondent using concrete pump and truck at site without a DOT permit. D O B permit use for id
|
2023-12-15
|
No data
|
PITKIN AVENUE, FROM STREET OSBORN STREET TO STREET WATKINS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp in compliance half +5 for property 1755
|
2023-12-08
|
No data
|
MERRICK BOULEVARD, FROM STREET ARCHER AVENUE TO STREET LONG ISLAND RAILROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
OPEN PROTECTED SIDEWALK FOR FOUNDATION
|
2023-11-29
|
No data
|
EAST 188 STREET, FROM STREET PARK AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Respondent concrete pump/concrete truck obstructing the street without a DOT permit
|
2023-10-26
|
No data
|
LIBERTY AVENUE, FROM STREET INWOOD STREET TO STREET PINEGROVE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Fence removed building operation done.
|
2023-08-26
|
No data
|
101 AVENUE, FROM STREET REMINGTON STREET TO STREET SANDERS PLACE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
I OBSERVED THE RESPONDENT HAS STORE CONSTRUCTION EQUIPMENT (CONCRETE WASHOUT BOX ) ON THE ROADWAY WITHOUT AN ACTIVE DOT PERMIT ON FILE. RESPONDENT ID THROUGH ACTIVE DOB PERMIT Q08027338-I1-GC ON FILLE.
|
2023-06-03
|
No data
|
LIBERTY AVENUE, FROM STREET INWOOD STREET TO STREET PINEGROVE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I OBSERVED THE RESPONDENT HAS CLOSED OFF PARKING LANE AND OCCUPIED THE ROADWAY WITH AN EXPIRED PERMIT ON FLIE I/F/O THEIR ACTIVE BUILDING OPERATION( Permit No: 420667709-01-NB ).PERMIT CITED EXPIRED ON 7/2/202 AND BEING USED FOR ID.
|
2023-04-23
|
No data
|
101 AVENUE, FROM STREET 113 STREET TO STREET 114 STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Respondent used/maintained a construction fence that extended more than three (3) out onto the sidewalk without pulling/obtaining a DOT permit to do so. DOB New Building permit# 421133534-01-NB for work at location was used to identify respondent.
|
2023-04-05
|
No data
|
MERRICK BOULEVARD, FROM STREET ARCHER AVENUE TO STREET LONG ISLAND RAILROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PAVE STREET-PERM ROADWAY
|
2023-03-21
|
No data
|
150 STREET, FROM STREET 88 AVENUE TO STREET HILLSIDE AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
fence erected no permit
|
2023-03-21
|
No data
|
HILLSIDE AVENUE, FROM STREET 150 STREET TO STREET 153 STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
fence erected no permit
|
2023-03-18
|
No data
|
ARCHER AVENUE, FROM STREET 165 STREET TO STREET MERRICK BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PAVE STREET-W/ ENGINEERING & INSP FEE-PERM ROADWAY. 2 VIOLATIONS ISSUED . WILL FOLLOW UP.
|
2023-03-12
|
No data
|
PITKIN AVENUE, FROM STREET OSBORN STREET TO STREET WATKINS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed in compliance
|
2023-02-24
|
No data
|
HILLSIDE AVENUE, FROM STREET 150 STREET TO STREET 153 STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
FENCE ERECTED NO PERMIT
|
2023-02-21
|
No data
|
HILLSIDE AVENUE, FROM STREET 150 STREET TO STREET 153 STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
FENCE ERECTED NO ACTIVE PERMIT
|
2023-01-08
|
No data
|
PITKIN AVENUE, FROM STREET OSBORN STREET TO STREET WATKINS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm in roadway. BPP and half plus five in compliance.
|
2022-11-02
|
No data
|
HILLSIDE AVENUE, FROM STREET 150 STREET TO STREET 153 STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
I observed the above respondent with temporary construction fence, that has been installed, extending 3' past the property line in front of active Building Operation, on the sidewalk.
|
2022-09-20
|
No data
|
JEROME AVENUE, FROM STREET CROSS BRONX EXPWY WB ET 2 A TO STREET CROSS BRONX EP SB EN JEROME AV
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
I found the above respondent with a partial street closing with water filled barriers without a valid DOT permit. Respondent identified by DOB permit number 220728390-01-NB that expires on 09/29/2020 and used for identification only.
|
2022-06-27
|
No data
|
HILLSIDE AVENUE, FROM STREET 150 STREET TO STREET 153 STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Respondent erected and maintained a construction fence along the sidewalk, more than 3' out, at 87-57 150th Street without pulling a DOT permit to do so. DOB permit# Q00699644-11-FN posted on fence at location was used to identify respondent.
|
2022-06-22
|
No data
|
LIBERTY AVENUE, FROM STREET INWOOD STREET TO STREET PINEGROVE STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No temp signs
|
2022-06-10
|
No data
|
LIBERTY AVENUE, FROM STREET INWOOD STREET TO STREET PINEGROVE STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No material stored
|
2022-06-08
|
No data
|
PITKIN AVENUE, FROM STREET OSBORN STREET TO STREET WATKINS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NO WORK DONE PERMIT EXPIRED
|
2022-05-19
|
No data
|
62 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No material on street
|
2022-05-05
|
No data
|
PITKIN AVENUE, FROM STREET OSBORN STREET TO STREET WATKINS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDE WALK FLAGS INSTALLED AND SEALED
|
2022-04-26
|
No data
|
PITKIN AVENUE, FROM STREET OSBORN STREET TO STREET WATKINS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
not started yet
|
2022-04-26
|
No data
|
PITKIN AVENUE, FROM STREET OSBORN STREET TO STREET WATKINS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass, new curb .. n/s of street ...
|
2022-04-17
|
No data
|
PITKIN AVENUE, FROM STREET OSBORN STREET TO STREET WATKINS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
not started yet ....
|
2022-04-17
|
No data
|
EAST 150 STREET, FROM STREET COURTLANDT AVENUE TO STREET MORRIS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No material on street
|
2022-04-12
|
No data
|
MERRICK BOULEVARD, FROM STREET ARCHER AVENUE TO STREET LONG ISLAND RAILROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP completed and acceptable. • Curb to Curb width – 40’• Milled area – 26’ x 124'• Depth of milled area – 3’’
|
2022-04-11
|
No data
|
ARCHER AVENUE, FROM STREET 165 STREET TO STREET MERRICK BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed the respondent milled and paved a section of the roadway112' x 24'. Respondent failed to notify the NYC DOT HIQA borough office within 4 hours prior to paving as per stipulation 1/2 +5 of the DOT permit. ID by permit #Q012022083A90.
|
2022-04-08
|
No data
|
ARCHER AVENUE, FROM STREET 165 STREET TO STREET MERRICK BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed the respondent milling and paving in the roadway during restricted hours. Respondent failed to comply with stipulation #087 Work 9 am - 3 pm Monday to Friday. ID by permit number.
|
2022-04-03
|
No data
|
PITKIN AVENUE, FROM STREET OSBORN STREET TO STREET WATKINS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
pass, new curb ,.....
|
2022-03-29
|
No data
|
PITKIN AVENUE, FROM STREET OSBORN STREET TO STREET WATKINS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
new walk installed .... n/s of black ..
|
2022-02-17
|
No data
|
37 AVENUE, FROM STREET 24 STREET TO STREET 25 STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Respondent has a construction fence along the sidewalk, extended three feet out from the property line, without a DOT permit to do so. Respondent was identified by current DOB permits # 410053203-01-NB and 410053203-01-EQ-FN for location.
|
2021-12-20
|
No data
|
92 STREET, FROM STREET 97 AVENUE TO STREET 101 AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Upon arrival respondent SUPREME BUILDERS CORP failed to obtain a valid DOT permit on file for the storage of the concrete washout-box/equipment stored in the roadway adjacent to the active building operation. Nov issued
|
2021-10-21
|
No data
|
101 AVENUE, FROM STREET 91 STREET TO STREET 92 STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Condition not verified. No blocked construction at this time. R/w and s/w clear. No one onsite.
|
2021-09-23
|
No data
|
101 AVENUE, FROM STREET 91 STREET TO STREET 92 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crossing not observed
|
2021-09-23
|
No data
|
92 STREET, FROM STREET 97 AVENUE TO STREET 101 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway in compliance
|
2021-09-16
|
No data
|
92 STREET, FROM STREET 97 AVENUE TO STREET 101 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Not visible
|
2021-09-08
|
No data
|
101 AVENUE, FROM STREET 91 STREET TO STREET 92 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crossing not observed
|
2021-08-30
|
No data
|
MERRICK BOULEVARD, FROM STREET ARCHER AVENUE TO STREET LONG ISLAND RAILROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No Boom Truck Visible On Site At Time Of Inspection
|
2021-08-27
|
No data
|
MERRICK BOULEVARD, FROM STREET ARCHER AVENUE TO STREET LONG ISLAND RAILROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temp Construction Signs/Markings Posted On Site At Time Of Inspection
|
2021-08-25
|
No data
|
MERRICK BOULEVARD, FROM STREET ARCHER AVENUE TO STREET LONG ISLAND RAILROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Materials On Site Behind Fence At Time Of Inspection
|
2021-07-16
|
No data
|
MERRICK BOULEVARD, FROM STREET ARCHER AVENUE TO STREET LONG ISLAND RAILROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No Boom Truck Visible On Site At Time Of Inspection
|
2021-07-15
|
No data
|
MERRICK BOULEVARD, FROM STREET ARCHER AVENUE TO STREET LONG ISLAND RAILROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk Occupied At Time Of Inspection
|
2021-07-14
|
No data
|
MERRICK BOULEVARD, FROM STREET ARCHER AVENUE TO STREET LONG ISLAND RAILROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No Sidewalk Crossing Being Done On Site At Time Of Inspection
|
2021-07-13
|
No data
|
MERRICK BOULEVARD, FROM STREET ARCHER AVENUE TO STREET LONG ISLAND RAILROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No Materials Visible Placed On Site At Time Of Inspection
|
2021-06-22
|
No data
|
NEWTOWN ROAD, FROM STREET 50 STREET TO STREET NORTHERN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Section of s/w replaced
|
2021-06-15
|
No data
|
MERRICK BOULEVARD, FROM STREET ARCHER AVENUE TO STREET LONG ISLAND RAILROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No boom truck on site
|
2021-06-14
|
No data
|
MERRICK BOULEVARD, FROM STREET ARCHER AVENUE TO STREET LONG ISLAND RAILROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No material on street
|
2021-04-21
|
No data
|
MERRICK BOULEVARD, FROM STREET ARCHER AVENUE TO STREET LONG ISLAND RAILROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No Materials Visible Placed On Street At Time Of Inspection
|
2021-02-20
|
No data
|
MERRICK BOULEVARD, FROM STREET ARCHER AVENUE TO STREET LONG ISLAND RAILROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
none at this time
|
2021-01-28
|
No data
|
MERRICK BOULEVARD, FROM STREET ARCHER AVENUE TO STREET LONG ISLAND RAILROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Fence Installed & Maintained On Site At Time Of Inspection
|
2021-01-05
|
No data
|
MERRICK BOULEVARD, FROM STREET ARCHER AVENUE TO STREET LONG ISLAND RAILROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway Not Being Occupied At Time Of Inspection
|
2021-01-04
|
No data
|
MERRICK BOULEVARD, FROM STREET ARCHER AVENUE TO STREET LONG ISLAND RAILROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Materials On Site Behind Fence At Time Of Inspection
|
2020-12-02
|
No data
|
MERRICK BOULEVARD, FROM STREET ARCHER AVENUE TO STREET LONG ISLAND RAILROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Materials On Site Behind Fence At Time Of Inspection
|
2020-10-29
|
No data
|
147 PLACE, FROM STREET 97 AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No Barrier on site
|
2020-10-07
|
No data
|
147 PLACE, FROM STREET 97 AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new steel faced curb
|
2020-09-10
|
No data
|
PITKIN AVENUE, FROM STREET OSBORN STREET TO STREET WATKINS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO MATERIAL PLACED ON STREET AT TIME OF INSPECTION IFO PROPERTY #1755
|
2020-08-29
|
No data
|
11 STREET, FROM STREET 38 AVENUE TO STREET 40 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP work not started.
|
2020-08-26
|
No data
|
11 STREET, FROM STREET 38 AVENUE TO STREET 40 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NEW SIDEWALK EXCAVATED IN SOME AREAS. 5 FT CLEARANCE. NO CREW ON SITE.
|
2020-08-25
|
No data
|
97 AVENUE, FROM STREET 147 PLACE TO STREET SUTPHIN BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No Materials Visible Placed On Street At Time Of Inspection
|
2020-08-25
|
No data
|
147 PLACE, FROM STREET 97 AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No Materials Visible Placed On Street At Time Of Inspection
|
2020-08-15
|
No data
|
97 AVENUE, FROM STREET 147 PLACE TO STREET SUTPHIN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work has commenced, however, permit has expired and permittee is restricting parking for on-going work. spoke to foreman Alfonzo of the need of a renewed permit due to mayoral executive order, no action was taken at this time. i/f/o 147-16
|
2020-08-06
|
No data
|
11 STREET, FROM STREET 38 AVENUE TO STREET 40 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CONSTRUCT NEW SIDEWALK IN PROGRESS. 5 FT CLEARANCE.
|
2020-08-04
|
No data
|
PITKIN AVENUE, FROM STREET OSBORN STREET TO STREET WATKINS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No material observed on roadway
|
2020-07-30
|
No data
|
11 STREET, FROM STREET 38 AVENUE TO STREET 40 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No BPP roadway work observed at this time of inspection.
|
2020-06-22
|
No data
|
PITKIN AVENUE, FROM STREET OSBORN STREET TO STREET WATKINS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CROSSING SIDEWALK, acceptable
|