2024-10-28
|
No data
|
GATEWAY DRIVE, FROM STREET BEND TO STREET VANDALIA AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Upon arrival crew on site roadway milled half+5’ in compliance with bpp specs for property 71-95
|
2024-10-25
|
No data
|
WEST 126 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb in compliance at this time.
|
2024-10-14
|
No data
|
EAST 98 STREET, FROM STREET HEGEMAN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Completed single ramp in the NW2 corner found not to be ADA compliant. Previously M&C in Prism on 4/28/22.
|
2024-09-20
|
No data
|
GATEWAY DRIVE, FROM STREET BEND TO STREET VANDALIA AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Sidewalk is currently being excavated will return at later date for re inspection
|
2024-07-13
|
No data
|
HILLSIDE AVENUE, FROM STREET 208 STREET TO STREET 209 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
C.A.R. reinspection passed, plastic molding caps removed, expansion joints recessed & sealed in front of 208-09 Hillside Avenue.
|
2024-06-16
|
No data
|
EAST 98 STREET, FROM STREET HEGEMAN AVENUE TO STREET STRAUSS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb in compliance
|
2024-06-09
|
No data
|
HILLSIDE AVENUE, FROM STREET 208 STREET TO STREET 209 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed the above respondent has failed to remove plastic caps recess and seal expansion joints as per subsection between the curb and sidewalk flags. Respondent was notified by CAR #20247490067 issued on 5/1/2024. ID by permit number.
|
2024-05-08
|
No data
|
43 AVENUE, FROM STREET 10 STREET TO STREET 11 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP perm to grade at 42-52 11th Street.
|
2024-05-08
|
No data
|
11 STREET, FROM STREET 43 AVENUE TO STREET QUEENS PLAZA
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP perm to grade at 42-52 11th Street.
|
2024-05-01
|
No data
|
HILLSIDE AVENUE, FROM STREET 208 STREET TO STREET 209 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plastic molding caps visible, expansion joints unsealed surrounding newly installed sidewalk flags in front of 208-09 Hillside Avenue.
|
2024-04-30
|
No data
|
FULTON STREET, FROM STREET SHEFFIELD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed single ramp within the SE4 corner quadrant was found to be non ADA compliant. Previously remeasured in prism on 1/17/23. TIF on file
|
2024-04-30
|
No data
|
FULTON STREET, FROM STREET PENNSYLVANIA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the SE4 corner found to not be ADA compliant previously. Previously measured & collected in Prism 11/29/22. Remeasured 10/17/23 ADA compliant from previous CAR on permit # B042022299A15 flares compliant as well.
|
2024-04-24
|
No data
|
EAST 98 STREET, FROM STREET STRAUSS STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
completed single tangent ramp in the NW2 corner found to ADA compliant. Previously Measured & collected in Prism on 9/12/23 and updated on 10/20/23. Permit B042023285A18.
|
2024-04-23
|
No data
|
EAST 98 STREET, FROM STREET STRAUSS STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Completed single tangent ramp in the NW2 corner found to ADA compliant. Previously Measured & collected in Prism on 9/12/23 and updated on 10/20/23. Newer permit B042023285A18 on file
|
2024-04-22
|
No data
|
HEGEMAN AVENUE, FROM STREET HERZL STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Completed single ramp within the NE3 corner quadrant was found to be ADA compliant. Remeasured and in prism on 3/15/24 , updated as well. Newer permit B042023285A19 on file
|
2024-04-21
|
No data
|
EAST 98 STREET, FROM STREET HEGEMAN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
CAR (Other) [#20236860129] Newly completed single ramp in the NW2 corner found not to be ADA compliant. M&C in Prism on 4/28/22.
|
2024-04-21
|
No data
|
HEGEMAN AVENUE, FROM STREET HERZL STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Completed single ramp within the NE3 corner quadrant was found to be ADA compliant. Remeasured and in prism on 3/15/24 , updated as well. Newer permit B042023216A07 on file
|
2024-04-19
|
No data
|
WEST 126 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no work done
|
2024-04-19
|
No data
|
EAST 98 STREET, FROM STREET STRAUSS STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Ramp running slope issue has been resolved. Completed single tangent ramp within the NE3 corner quadrant is ada compliant. Measured and collected in prism on 4/19/24. Newer permit B042023226A08 on file
|
2024-04-15
|
No data
|
EAST 98 STREET, FROM STREET HEGEMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Issue resolved. Newly completed ramp within the NE3 corner quadrant is Ada compliant. Measured and collected in prism on 10/4/23. Newer permit B042023221A30 on file
|
2024-04-15
|
No data
|
HEGEMAN AVENUE, FROM STREET HERZL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Issue resolved, single tangent ramp has been scored. Completed single ramp within the NE3 corner quadrant was found to be non ADA compliant. Remeasured and in prism on 5/18/23. Newer permit B042023216A07 on file
|
2024-04-12
|
No data
|
WEST 126 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no work done
|
2024-04-10
|
No data
|
43 AVENUE, FROM STREET 10 STREET TO STREET 11 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel faced curb installed. Permit expired.
|
2024-04-01
|
No data
|
EAST 98 STREET, FROM STREET STRAUSS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CAR Re-Inspect[#20226860127] NOV (Other)[#0703273661] Completed single ramp in the NE3 corner found not to be ADA compliant. Previously Measured & collected in Prism on 10/13/22.
|
2024-03-23
|
No data
|
EAST 98 STREET, FROM STREET STRAUSS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed single tangent ramp within the NE3 seems to be updated to be compliance. Will measure and collect on later date due to weather conditions.
|
2024-03-19
|
No data
|
43 AVENUE, FROM STREET 10 STREET TO STREET 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No BPP paving roadway work started at this time of inspection.
|
2024-03-19
|
No data
|
11 STREET, FROM STREET 43 AVENUE TO STREET QUEENS PLAZA
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No BPP paving roadway work started at this time of inspection.
|
2024-03-16
|
No data
|
EAST 98 STREET, FROM STREET STRAUSS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single tangent ramp in the NW2 corner found to ADA compliant. Previously Measured & collected in Prism on 9/12/23 and updated on 10/20/23.
|
2024-03-15
|
No data
|
HEGEMAN AVENUE, FROM STREET HERZL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed single ramp within the NE3 corner quadrant was found to be ADA compliant. Remeasured and in prism on 3/15/24 , updated as well .
|
2024-03-15
|
No data
|
EAST 98 STREET, FROM STREET HEGEMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed single ramp within the NW2 corner quadrant was found to be ADA compliant. Remeasured and corrected in prism on 8/15/23.
|
2024-03-11
|
No data
|
EAST 98 STREET, FROM STREET HEGEMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newer B042023221A30 and inspector report on file
|
2024-03-04
|
No data
|
HEGEMAN AVENUE, FROM STREET HERZL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed single ramp within the NE3 corner quadrant was found to be ADA compliant.
|
2024-02-23
|
No data
|
EAST 98 STREET, FROM STREET STRAUSS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single tangent ramp in the NW2 corner found to ADA compliant. Previously Measured & collected in Prism on 9/12/23 and updated on 10/20/23.
|
2024-02-23
|
No data
|
EAST 98 STREET, FROM STREET HEGEMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single ramp in the NE3 corner found to be ADA compliant. Re measured in prism on 8/15/23.
|
2023-12-31
|
No data
|
MYRTLE AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk is in compliance
|
2023-11-29
|
No data
|
84 DRIVE, FROM STREET 159 STREET TO STREET 160 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP restoration to grade in front of 159-03.
|
2023-10-20
|
No data
|
EAST 98 STREET, FROM STREET STRAUSS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed single tangent ramp in the NW2 corner quadrant is Ada compliant. Previously Measured and collected in prism on 9/12/23 and updated on 10/20/23.
|
2023-10-17
|
No data
|
HEGEMAN AVENUE, FROM STREET HERZL STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed tangent ramp in the NE3 corner quadrant are non Ada compliant. Previously measured and collected in prism on 5/18/23.
|
2023-10-17
|
No data
|
FULTON STREET, FROM STREET SHEFFIELD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Single ramp in the SE4 corner has Tif on file since previous Nov was issued. No further action taken at this time.
|
2023-10-17
|
No data
|
FULTON STREET, FROM STREET PENNSYLVANIA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the SE4 corner found to not be ADA compliant previously. Previously measured & collected in Prism 11/29/22. Remeasured 10/17/23 ADA compliant from previous CAR on permit # B042022299A15 flares compliant as well.
|
2023-10-04
|
No data
|
EAST 98 STREET, FROM STREET HEGEMAN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Issue resolved. Newly completed ramp within the NE3 corner quadrant is Ada compliant. Measured and collected in prism on 10/4/23. Newer permit B042023221A30 on file
|
2023-10-04
|
No data
|
HEGEMAN AVENUE, FROM STREET HERZL STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Permittee did not corrected excessive landing running slope in the NE3 corner. Completed single tangent ramp is non Ada compliant, Remeasured & updated in Prism on 11/17/22.
|
2023-10-03
|
No data
|
HEGEMAN AVENUE, FROM STREET HERZL STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Issue resolved, single tangent ramp has been scored. Completed single ramp within the NE3 corner quadrant was found to be non ADA compliant. Remeasured and in prism on 5/18/23. Newer permit B042023216A07 on file
|
2023-09-12
|
No data
|
HEGEMAN AVENUE, FROM STREET HERZL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed single ramp within the NE3 corner quadrant was found to be ADA compliant. Remeasured and in prism on 5/18/23.
|
2023-09-12
|
No data
|
EAST 98 STREET, FROM STREET HEGEMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed single ramp within the NW2 corner quadrant was found to be ADA compliant. Remeasured and corrected in prism on 8/15/23.
|
2023-09-12
|
No data
|
EAST 98 STREET, FROM STREET STRAUSS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps within the NW2 corner quadrant are non Ada compliant. Previously measured and collected in prism on 3/29/23
|
2023-08-29
|
No data
|
EAST 98 STREET, FROM STREET STRAUSS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Half plus 5 done and in compliance
|
2023-08-26
|
No data
|
HEGEMAN AVENUE, FROM STREET EAST 98 STREET TO STREET HERZL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp in compliance
|
2023-08-23
|
No data
|
EAST 98 STREET, FROM STREET HEGEMAN AVENUE TO STREET STRAUSS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb in compliance
|
2023-08-22
|
No data
|
HEGEMAN AVENUE, FROM STREET EAST 98 STREET TO STREET HERZL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp in compliance
|
2023-08-21
|
No data
|
HEGEMAN AVENUE, FROM STREET EAST 98 STREET TO STREET HERZL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb in compliance
|
2023-08-19
|
No data
|
HEGEMAN AVENUE, FROM STREET HERZL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Rw has been paved in compliance
|
2023-08-18
|
No data
|
HEGEMAN AVENUE, FROM STREET HERZL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Rw has been paved in compliance
|
2023-08-15
|
No data
|
EAST 98 STREET, FROM STREET STRAUSS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No ped ramp work started at this time. Condition remains the same, permittee failed to correct excessive landing running slope in the NW2 corner. Measured and collected in prism on 3/39/23.
|
2023-08-15
|
No data
|
HEGEMAN AVENUE, FROM STREET HERZL STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active construction work started at this time within the NW2 corner quadrant. Ramp is not accessible at this time. We’ll reinspect at a later date when work is completed. This permit said NW.
|
2023-08-15
|
No data
|
EAST 98 STREET, FROM STREET HEGEMAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed single ramp within the NW2 corner quadrant was found to be ADA compliant. Remeasured and corrected in prism on 8/15/23.
|
2023-06-29
|
No data
|
EAST 98 STREET, FROM STREET HEGEMAN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Condition remains the same. Permittee failed to correct excessive landing running slopes in the NW2 corner. M& C In Prism on 4/28/22
|
2023-06-29
|
No data
|
EAST 98 STREET, FROM STREET STRAUSS STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Condition remains the same. Permittee failed to correct excessive landing running slope in the NW2 corner. M& C & 3/39/23
|
2023-06-20
|
No data
|
VILLA AVENUE, FROM STREET EAST 205 STREET TO STREET VAN CORTLANDT AVENUE EAST
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass in compliance
|
2023-06-14
|
No data
|
HEGEMAN AVENUE, FROM STREET HERZL STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Permittee did not corrected excessive landing running slope in the NE3 corner. Completed single tangent ramp is non Ada compliant, Remeasured & updated in Prism on 11/17/22.
|
2023-06-13
|
No data
|
EAST 98 STREET, FROM STREET HEGEMAN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Completed ramp in the NE3 corner quadrant is accessible and functional but not Ada compliant, The ramp is functional and accessible. Previously Measured and collected in Prism on 6/8/22 But updated on 2/9/23.
|
2023-06-02
|
No data
|
EAST 98 STREET, FROM STREET STRAUSS STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Completed single ramp in the NE3 corner found not to be ADA compliant. Previously Measured & collected in Prism on 10/13/22.
|
2023-05-18
|
No data
|
HEGEMAN AVENUE, FROM STREET HERZL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single tangent ramp within NE3 corner quadrant are non Ada compliant. Measured and collected in prism on 5/18/23.
|
2023-05-05
|
No data
|
EAST 98 STREET, FROM STREET STRAUSS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Open CAR on permit B042022056A01. M&C in Prism on 10/13/22. Excessive slopes remain.
|
2023-05-04
|
No data
|
EAST 98 STREET, FROM STREET STRAUSS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No issues have been resolved. Permit B042023083A18 was acquired but is now expired.
|
2023-05-02
|
No data
|
EAST 98 STREET, FROM STREET STRAUSS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single ramp in the NW2 corner found not to be ADA compliant. M&C in Prism on 3/29/23
|
2023-05-02
|
No data
|
EAST 98 STREET, FROM STREET HEGEMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Open CAR on file permit # B042022133A20. Single ramp in the NE3 corner found not to be ADA compliant. M&C in Prism on 2/9/23.
|
2023-03-30
|
No data
|
VILLA AVENUE, FROM STREET EAST 205 STREET TO STREET VAN CORTLANDT AVENUE EAST
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work started at time of inspection
|
2023-03-29
|
No data
|
EAST 98 STREET, FROM STREET STRAUSS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Completed single tangent ramp in the NE3 corner quadrant is non ada compliant. Previously measured and collected in prism on 10/13/22.
|
2023-03-29
|
No data
|
EAST 98 STREET, FROM STREET HEGEMAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed single tangent in the NE3 is non ada compliant. Previously measured and collected in prism on 02/09/23
|
2023-02-09
|
No data
|
EAST 98 STREET, FROM STREET HEGEMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed ramp in the NE3 corner quadrant is accessible and functional but not Ada compliant, The ramp is functional and accessible. Previously Measured and collected in Prism on 6/8/22 But updated on 2/9/23.
|
2023-01-26
|
No data
|
STRAUSS STREET, FROM STREET EAST 98 STREET TO STREET LOTT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP in compliance. Perm in roadway. Permit expired.
|
2023-01-26
|
No data
|
HERZL STREET, FROM STREET HEGEMAN AVENUE TO STREET LOTT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP in compliance. Perm in roadway.
|
2023-01-16
|
No data
|
HEGEMAN AVENUE, FROM STREET HERZL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP in compliance. Perm in roadway, markings restored in kind.
|
2023-01-15
|
No data
|
EAST 98 STREET, FROM STREET HEGEMAN AVENUE TO STREET STRAUSS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP in compliance. Perm in roadway, marking restored.
|
2023-01-15
|
No data
|
HEGEMAN AVENUE, FROM STREET EAST 98 STREET TO STREET HERZL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP in compliance. Perm in roadway, markings restored
|
2023-01-15
|
No data
|
EAST 98 STREET, FROM STREET STRAUSS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP in compliance. Perm in roadway, marking restored
|
2023-01-03
|
No data
|
EAST 98 STREET, FROM STREET STRAUSS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved in compliance to half plus five. Perm in roadway and markings restored.
|
2023-01-03
|
No data
|
EAST 98 STREET, FROM STREET HEGEMAN AVENUE TO STREET STRAUSS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved in compliance to half plus five. Perm in roadway and markings restored.
|
2023-01-03
|
No data
|
HEGEMAN AVENUE, FROM STREET HERZL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved in compliance to half plus five. Perm in roadway and markings restored.
|
2023-01-03
|
No data
|
HEGEMAN AVENUE, FROM STREET EAST 98 STREET TO STREET HERZL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved in compliance to half plus five. Perm in roadway and markings restored.
|
2022-12-09
|
No data
|
EAST 98 STREET, FROM STREET HEGEMAN AVENUE TO STREET STRAUSS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb sealed and in compliance
|
2022-12-01
|
No data
|
HEGEMAN AVENUE, FROM STREET EAST 98 STREET TO STREET HERZL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb in compliance
|
2022-11-23
|
No data
|
STRAUSS STREET, FROM STREET EAST 98 STREET TO STREET LOTT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb in compliance
|
2022-11-17
|
No data
|
HEGEMAN AVENUE, FROM STREET HERZL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permittee did not corrected excessive ramp running slope in the NE3 corner. Completed single tangent ramp is non Ada compliant, Remeasured & updated in Prism on 11/17/22.
|
2022-11-17
|
No data
|
HEGEMAN AVENUE, FROM STREET HERZL STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Will issue C.A.R Condition previously reported. Permittee did not corrected excessive ramp running slope in the NE3 corner. Ramp is functional and accessible. Remeasured & updated in Prism on 11/17/22.
|
2022-10-13
|
No data
|
EAST 98 STREET, FROM STREET STRAUSS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Exp permit on file. Newly completed single ramp in the NE3 corner found not to be ADA compliant. Measured & collected in Prism on 10/13/22.
|
2022-09-30
|
No data
|
HEGEMAN AVENUE, FROM STREET HERZL STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Condition repaired. Permittee corrected excessive ramp running slope in the NE3 corner. Ramp is functional and accessible. Remeasured & updated in Prism on 8/9/22.
|
2022-08-11
|
No data
|
EAST 98 STREET, FROM STREET HEGEMAN AVENUE TO STREET STRAUSS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Bpp inspection was made on 4/27/22 and in compliance. No further action taken att.
|
2022-08-11
|
No data
|
HERZL STREET, FROM STREET HEGEMAN AVENUE TO STREET LOTT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work done. No work started. No inspection found at this time of inspection.
|
2022-08-11
|
No data
|
HEGEMAN AVENUE, FROM STREET HERZL STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I OBSERVED THE ABOVE RESPONDENT FAILED TO NOTIFY THE NYC DOT HIQA BOROUGH OFFICE WITHIN 4 HOURS PRIOR TO PAVING NO NOTIFICATION WAS MADE AND WAS STREET PAVED AS PER 1/2 +5’ STIP.
|
2022-08-10
|
No data
|
HEGEMAN AVENUE, FROM STREET EAST 98 STREET TO STREET HERZL STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work started. No work done. No inspection found at this time.
|
2022-08-09
|
No data
|
HEGEMAN AVENUE, FROM STREET HERZL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Condition repaired. Permittee corrected excessive ramp running slope in the NE3 corner. Ramp is functional and accessible. Remeasured & updated in Prism on 8/9/22. (New permit on file)
|
2022-08-03
|
No data
|
HEGEMAN AVENUE, FROM STREET HERZL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramp within NE3 corner quadrant is non ada compliant, the ramp is functional and accessible. Previously Measured and collected in prism on 6/16/22. High running slope within quadrant.
|
2022-08-01
|
No data
|
HEGEMAN AVENUE, FROM STREET HERZL STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Condition repaired. Permittee corrected excessive ramp running slope in the NE3 corner. Ramp is functional and accessible.
|
2022-07-06
|
No data
|
EAST 98 STREET, FROM STREET HEGEMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed ramp in the NE3 corner quad is accessible and functional but not Ada compliant, The ramp is functional and accessible. Previously Measured and collected in Prism on 6/8/22. "FROM KERRY - IF NON COMPLIANT PLEASE WRITE A CAR"
|
2022-06-16
|
No data
|
HEGEMAN AVENUE, FROM STREET HERZL STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed tangent ramp within NE3 corner quadrant is non ada compliant, the ramp is functional and accessible. Measured and collected in prism on 6/16/22. "FROM KERRY - IF NON COMPLIANT PLEASE WRITE A CAR"
|
2022-06-09
|
No data
|
HERZL STREET, FROM STREET HEGEMAN AVENUE TO STREET LOTT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
STEEL,FACED CURB INSTALLED
|
2022-06-08
|
No data
|
EAST 98 STREET, FROM STREET HEGEMAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Plastic on DWS mat, temporary asphalt as pavement key. Newly completed ramp in the NE3 corner quad is accessible and functional but not Ada compliant. Measured and collected in Prism on 6/8/22.
|
2022-06-08
|
No data
|
EAST 98 STREET, FROM STREET HEGEMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Refer to permit B042022133A20 for inspection remarks.
|
2022-06-04
|
No data
|
EAST 98 STREET, FROM STREET HEGEMAN AVENUE TO STREET STRAUSS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB INSTALLED
|
2022-05-28
|
No data
|
HEGEMAN AVENUE, FROM STREET EAST 98 STREET TO STREET HERZL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PORTIONS OF NEW CURB INSTALLED
|
2022-05-19
|
No data
|
EAST 98 STREET, FROM STREET HEGEMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No new pedramp work started as per BPP. Old single tangent ramp in the NW2 corner quadrant is functional and accessible. No active permit on file.
|
2022-05-19
|
No data
|
HEGEMAN AVENUE, FROM STREET HERZL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No new work started as per BPP. Old existing tangent ramp is accessible and functional. No active permit on file.
|
2022-05-13
|
No data
|
STRAUSS STREET, FROM STREET EAST 98 STREET TO STREET LOTT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
STEEL FACED CURB INSTALLED
|
2022-05-12
|
No data
|
HERZL STREET, FROM STREET HEGEMAN AVENUE TO STREET LOTT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No new work done on the roadway, permit still active.
|
2022-05-05
|
No data
|
EAST 98 STREET, FROM STREET HEGEMAN AVENUE TO STREET STRAUSS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDE WALK FLAGS INSTALLED
|
2022-05-03
|
No data
|
EAST 98 STREET, FROM STREET STRAUSS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
UPON INSPECTION INTERSECTION IS CURRENTLY MILLED 29FT X 24 FT 6IN WITH A DEPTH OF 3 INCHES ACHIEVED
|
2022-04-29
|
No data
|
HEGEMAN AVENUE, FROM STREET HERZL STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Old tangent ramps within the NE3 corner quadrant are non Ada compliant, however, ramps are functional and accessible. Will measure and collect when completed, active permit on file.
|
2022-04-28
|
No data
|
EAST 98 STREET, FROM STREET HEGEMAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Old single tangent ramp within the NW2 corner quadrant is non ada compliant, however, the ramp is functional and accessible. Will measure and collect when completed.
|
2022-04-27
|
No data
|
EAST 98 STREET, FROM STREET HEGEMAN AVENUE TO STREET STRAUSS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ROADWAY CURB TO CURB IS 44FT MILLED ROADWAY IS 26FT 10IN X 415FTWITH A DEPTH OF 3 INCHES
|
2022-03-29
|
No data
|
EAST 98 STREET, FROM STREET HEGEMAN AVENUE TO STREET STRAUSS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
pass, new curb install ...east side of block ..
|
2022-03-28
|
No data
|
EAST 98 STREET, FROM STREET STRAUSS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No BPP pedramp work started on receiving corner to building. Old existing ramp is accessible and functional. Will measure and collect once fully restored.
|
2022-03-28
|
No data
|
EAST 98 STREET, FROM STREET HEGEMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No pedramp work started as per BPP. Previously upgraded Existing ramp is accessible and functional.
|
2022-03-16
|
No data
|
EAST 98 STREET, FROM STREET HEGEMAN AVENUE TO STREET STRAUSS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
pass, new walk .. install .. east side of street .... new building ...
|
2022-03-01
|
No data
|
EAST 98 STREET, FROM STREET STRAUSS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No pedramp work started as per BPP. Existing ramp is accessible and functional.
|
2022-03-01
|
No data
|
EAST 98 STREET, FROM STREET HEGEMAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No pedramp work started as per BPP. Existing ramp is accessible and functional.
|
2021-04-26
|
No data
|
27 AVENUE, FROM STREET 14 STREET TO STREET 18 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Hardware cemented in the sidewalk during construction. Clean-up hardware.
|
2020-03-25
|
No data
|
27 AVENUE, FROM STREET 14 STREET TO STREET 18 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w restored
|