Name: | FIRST CHOICE CONCRETE CONTRACTORS INC. |
Jurisdiction: | New York |
Legal type: | DOMESTIC BUSINESS CORPORATION |
Status: | Active |
Date of registration: | 07 Feb 2017 (8 years ago) (Companies founded in February 2017) |
Entity Number: | 5081546 |
ZIP code: | 10301 (Companies in Richmond, 10301) |
County: | Richmond |
Place of Formation: | New York |
Address: | 296 STANLEY AVE, STATEN ISLAND, NY, United States, 10301 |
Shares Details
Shares issued 200
Share Par Value 0
Type NO PAR VALUE
Name | Role | Address |
---|---|---|
ROSARIO MACALUSO | Chief Executive Officer | 296 STANLEY AVE, STATEN ISLAND, NY, United States, 10301 |
Name | Role | Address |
---|---|---|
FIRST CHOICE CONCRETE CONTRACTORS INC. | DOS Process Agent | 296 STANLEY AVE, STATEN ISLAND, NY, United States, 10301 |
Number | Date | End date | Type | Address |
---|---|---|---|---|
S042024298A03 | 2024-10-24 | 2024-11-22 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | DELAWARE AVENUE, STATEN ISLAND, FROM STREET PLATTSBURG STREET TO STREET RICHMOND ROAD |
S012024298A45 | 2024-10-24 | 2024-11-22 | RESET, REPAIR OR REPLACE CURB | DELAWARE AVENUE, STATEN ISLAND, FROM STREET PLATTSBURG STREET TO STREET RICHMOND ROAD |
S042024296A06 | 2024-10-22 | 2024-11-21 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | DENTON PLACE, STATEN ISLAND, FROM STREET HAWTHORNE AVENUE |
S042024296A05 | 2024-10-22 | 2024-11-21 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | DENTON PLACE, STATEN ISLAND, FROM STREET HAWTHORNE AVENUE |
S042024281A03 | 2024-10-07 | 2024-11-05 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | RICHMOND ROAD, STATEN ISLAND, FROM STREET BEACON AVENUE TO STREET GELDNER AVENUE |
S012024281A49 | 2024-10-07 | 2024-11-05 | RESET, REPAIR OR REPLACE CURB-PROTECTED | RICHMOND ROAD, STATEN ISLAND, FROM STREET BEACON AVENUE TO STREET GELDNER AVENUE |
S042024271A06 | 2024-09-27 | 2024-10-24 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | CLERMONT PLACE, STATEN ISLAND, FROM STREET WESTWOOD AVENUE |
S042024269A08 | 2024-09-25 | 2024-10-22 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | DENTON PLACE, STATEN ISLAND, FROM STREET HAWTHORNE AVENUE |
S042024269A07 | 2024-09-25 | 2024-10-22 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | DENTON PLACE, STATEN ISLAND, FROM STREET HAWTHORNE AVENUE |
S012024256B04 | 2024-09-12 | 2024-10-10 | PAVE STREET-W/ ENGINEERING & INSP FEE | GANSEVOORT BOULEVARD, STATEN ISLAND, FROM STREET HOLDEN BOULEVARD TO STREET WESTWOOD AVENUE |
S022024256A08 | 2024-09-12 | 2024-10-10 | TEMPORARY PEDESTRIAN WALK | WESTWOOD AVENUE, STATEN ISLAND, FROM STREET CLERMONT PLACE TO STREET GANSEVOORT BOULEVARD |
S042024256A28 | 2024-09-12 | 2024-10-10 | REPAIR SIDEWALK | CLERMONT PLACE, STATEN ISLAND, FROM STREET SOUTH GANNON AVENUE TO STREET WESTWOOD AVENUE |
S042024256A27 | 2024-09-12 | 2024-10-10 | REPAIR SIDEWALK | WESTWOOD AVENUE, STATEN ISLAND, FROM STREET CLERMONT PLACE TO STREET GANSEVOORT BOULEVARD |
S042024256A26 | 2024-09-12 | 2024-10-10 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | GANSEVOORT BOULEVARD, STATEN ISLAND, FROM STREET WESTWOOD AVENUE |
S042024256A25 | 2024-09-12 | 2024-10-10 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | CLERMONT PLACE, STATEN ISLAND, FROM STREET WESTWOOD AVENUE |
S042024256A24 | 2024-09-12 | 2024-10-10 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | GANSEVOORT BOULEVARD, STATEN ISLAND, FROM STREET WESTWOOD AVENUE |
S022024256A11 | 2024-09-12 | 2024-10-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | CLERMONT PLACE, STATEN ISLAND, FROM STREET SOUTH GANNON AVENUE TO STREET WESTWOOD AVENUE |
S022024256A10 | 2024-09-12 | 2024-10-10 | TEMPORARY PEDESTRIAN WALK | CLERMONT PLACE, STATEN ISLAND, FROM STREET SOUTH GANNON AVENUE TO STREET WESTWOOD AVENUE |
S022024256A09 | 2024-09-12 | 2024-10-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | WESTWOOD AVENUE, STATEN ISLAND, FROM STREET CLERMONT PLACE TO STREET GANSEVOORT BOULEVARD |
S042024233A09 | 2024-08-20 | 2024-09-18 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CHELSEA STREET, STATEN ISLAND, FROM STREET HYLAN BOULEVARD TO STREET PITTSVILLE AVENUE |
S012024233A12 | 2024-08-20 | 2024-09-18 | RESET, REPAIR OR REPLACE CURB | CHELSEA STREET, STATEN ISLAND, FROM STREET HYLAN BOULEVARD TO STREET PITTSVILLE AVENUE |
S042024185A08 | 2024-07-03 | 2024-08-01 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | DENTON PLACE, STATEN ISLAND, FROM STREET HAWTHORNE AVENUE |
S042024185A07 | 2024-07-03 | 2024-08-01 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | DENTON PLACE, STATEN ISLAND, FROM STREET HAWTHORNE AVENUE |
S042024176A36 | 2024-06-24 | 2024-07-20 | REPLACE SIDEWALK | HOPKINS AVENUE, STATEN ISLAND, FROM STREET NORTH RAILROAD AVENUE TO STREET SHERIDAN COURT |
S042024169A01 | 2024-06-17 | 2024-07-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BROOK STREET, STATEN ISLAND, FROM STREET CASTLETON AVENUE TO STREET JERSEY STREET |
S012024169A18 | 2024-06-17 | 2024-07-13 | RESET, REPAIR OR REPLACE CURB-PROTECTED | BROOK STREET, STATEN ISLAND, FROM STREET CASTLETON AVENUE TO STREET JERSEY STREET |
S022024144A03 | 2024-05-23 | 2024-06-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | GANSEVOORT BOULEVARD, STATEN ISLAND, FROM STREET SOUTH GANNON AVENUE TO STREET WESTWOOD AVENUE |
S042024144A11 | 2024-05-23 | 2024-06-21 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | GANSEVOORT BOULEVARD, STATEN ISLAND, FROM STREET WESTWOOD AVENUE |
S042024144A10 | 2024-05-23 | 2024-06-21 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | GANSEVOORT BOULEVARD, STATEN ISLAND, FROM STREET WESTWOOD AVENUE |
S042024144A09 | 2024-05-23 | 2024-06-21 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | CLERMONT PLACE, STATEN ISLAND, FROM STREET WESTWOOD AVENUE |
S042024144A08 | 2024-05-23 | 2024-06-21 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | CLERMONT PLACE, STATEN ISLAND, FROM STREET WESTWOOD AVENUE |
S042024144A06 | 2024-05-23 | 2024-06-21 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WESTWOOD AVENUE, STATEN ISLAND, FROM STREET CLERMONT PLACE TO STREET GANSEVOORT BOULEVARD |
S022024144A02 | 2024-05-23 | 2024-06-21 | TEMPORARY PEDESTRIAN WALK | GANSEVOORT BOULEVARD, STATEN ISLAND, FROM STREET SOUTH GANNON AVENUE TO STREET WESTWOOD AVENUE |
S042024144A03 | 2024-05-23 | 2024-06-21 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | GANSEVOORT BOULEVARD, STATEN ISLAND, FROM STREET SOUTH GANNON AVENUE TO STREET WESTWOOD AVENUE |
S012024144A03 | 2024-05-23 | 2024-06-21 | RESET, REPAIR OR REPLACE CURB | GANSEVOORT BOULEVARD, STATEN ISLAND, FROM STREET SOUTH GANNON AVENUE TO STREET WESTWOOD AVENUE |
S012024144A06 | 2024-05-23 | 2024-06-21 | RESET, REPAIR OR REPLACE CURB | WESTWOOD AVENUE, STATEN ISLAND, FROM STREET CLERMONT PLACE TO STREET GANSEVOORT BOULEVARD |
S012024144A07 | 2024-05-23 | 2024-06-21 | RESET, REPAIR OR REPLACE CURB | CLERMONT PLACE, STATEN ISLAND, FROM STREET SOUTH GANNON AVENUE TO STREET WESTWOOD AVENUE |
S042024144A07 | 2024-05-23 | 2024-06-21 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CLERMONT PLACE, STATEN ISLAND, FROM STREET SOUTH GANNON AVENUE TO STREET WESTWOOD AVENUE |
S042024131A16 | 2024-05-10 | 2024-06-08 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MASSACHUSETTS STREET, STATEN ISLAND, FROM STREET DEAD END TO STREET HYLAN BOULEVARD |
S012024131A57 | 2024-05-10 | 2024-06-08 | RESET, REPAIR OR REPLACE CURB-PROTECTED | MASSACHUSETTS STREET, STATEN ISLAND, FROM STREET DEAD END TO STREET HYLAN BOULEVARD |
S042024121A26 | 2024-04-30 | 2024-05-29 | REPLACE SIDEWALK | HICKORY AVENUE, STATEN ISLAND, FROM STREET FOCH AVENUE TO STREET OLYMPIA BOULEVARD |
S042024065A03 | 2024-03-05 | 2024-03-23 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | DENTON PLACE, STATEN ISLAND, FROM STREET HAWTHORNE AVENUE |
S012024065A08 | 2024-03-05 | 2024-03-23 | RESET, REPAIR OR REPLACE CURB-PROTECTED | HAWTHORNE AVENUE, STATEN ISLAND, FROM STREET AUBURN AVENUE TO STREET DENTON PLACE |
S012024065A09 | 2024-03-05 | 2024-03-23 | RESET, REPAIR OR REPLACE CURB-PROTECTED | DENTON PLACE, STATEN ISLAND, FROM STREET HAWTHORNE AVENUE TO STREET WILLOWBROOK ROAD |
S042024065A02 | 2024-03-05 | 2024-03-23 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | DENTON PLACE, STATEN ISLAND, FROM STREET HAWTHORNE AVENUE |
S042024065A04 | 2024-03-05 | 2024-03-23 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | HAWTHORNE AVENUE, STATEN ISLAND, FROM STREET AUBURN AVENUE TO STREET DENTON PLACE |
S042024065A05 | 2024-03-05 | 2024-03-23 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | DENTON PLACE, STATEN ISLAND, FROM STREET HAWTHORNE AVENUE TO STREET WILLOWBROOK ROAD |
S042024040A11 | 2024-02-09 | 2024-03-08 | REPLACE SIDEWALK | RICHARD AVENUE, STATEN ISLAND, FROM STREET BARTOW AVENUE TO STREET HYLAN BOULEVARD |
S012024040A23 | 2024-02-09 | 2024-03-08 | RESET, REPAIR OR REPLACE CURB | RICHARD AVENUE, STATEN ISLAND, FROM STREET BARTOW AVENUE TO STREET HYLAN BOULEVARD |
S012023332A36 | 2023-11-28 | 2023-12-30 | RESET, REPAIR OR REPLACE CURB | MC KEE AVENUE, STATEN ISLAND, FROM STREET BEND TO STREET MANSION AVENUE |
S042023305A07 | 2023-11-01 | 2023-11-30 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MC KEE AVENUE, STATEN ISLAND, FROM STREET BEND TO STREET MANSION AVENUE |
S012023305A44 | 2023-11-01 | 2023-11-30 | RESET, REPAIR OR REPLACE CURB | MC KEE AVENUE, STATEN ISLAND, FROM STREET BEND TO STREET MANSION AVENUE |
S022023305A03 | 2023-11-01 | 2023-11-30 | TEMPORARY PEDESTRIAN WALK | MC KEE AVENUE, STATEN ISLAND, FROM STREET BEND TO STREET MANSION AVENUE |
S022023305A04 | 2023-11-01 | 2023-11-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | MC KEE AVENUE, STATEN ISLAND, FROM STREET BEND TO STREET MANSION AVENUE |
S042023121A05 | 2023-05-01 | 2023-05-30 | REPLACE SIDEWALK | HOLDEN BOULEVARD, STATEN ISLAND, FROM STREET FANNING STREET TO STREET GOWER STREET |
S012023121A20 | 2023-05-01 | 2023-05-30 | RESET, REPAIR OR REPLACE CURB | HOLDEN BOULEVARD, STATEN ISLAND, FROM STREET FANNING STREET TO STREET GOWER STREET |
S042023089A05 | 2023-03-30 | 2023-04-21 | REPLACE SIDEWALK | MONSEY PLACE, STATEN ISLAND, FROM STREET RICHMOND AVENUE TO STREET SANDERS STREET |
S012022319A56 | 2022-11-15 | 2022-12-14 | RESET, REPAIR OR REPLACE CURB | WIELAND AVENUE, STATEN ISLAND, FROM STREET FOSTER ROAD TO STREET WOODROW ROAD |
S042022319A09 | 2022-11-15 | 2022-12-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WIELAND AVENUE, STATEN ISLAND, FROM STREET FOSTER ROAD TO STREET WOODROW ROAD |
S012022182A66 | 2022-07-01 | 2022-07-30 | RESET, REPAIR OR REPLACE CURB | MAPLE PARKWAY, STATEN ISLAND, FROM STREET FOREST AVENUE TO STREET SPIRIT LANE |
S042022182A43 | 2022-07-01 | 2022-07-30 | REPLACE SIDEWALK | MAPLE PARKWAY, STATEN ISLAND, FROM STREET FOREST AVENUE TO STREET SPIRIT LANE |
B012022173C11 | 2022-06-22 | 2022-07-20 | RESET, REPAIR OR REPLACE CURB | 73 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE |
B042022173A42 | 2022-06-22 | 2022-07-20 | REPLACE SIDEWALK | 73 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE |
S042021307A09 | 2021-11-03 | 2021-12-02 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BRIGHTON STREET, STATEN ISLAND, FROM STREET BILLOP AVENUE TO STREET CLERMONT AVENUE |
S042021278A01 | 2021-10-05 | 2021-11-02 | REPLACE SIDEWALK | HAWTHORNE AVENUE, STATEN ISLAND, FROM STREET MONTAUK PLACE TO STREET WYONA AVENUE |
S012021277A47 | 2021-10-04 | 2021-11-03 | RESET, REPAIR OR REPLACE CURB | WENTWORTH AVENUE, STATEN ISLAND, FROM STREET DEAD END TO STREET OLYMPIA BOULEVARD |
S042021277A07 | 2021-10-04 | 2021-11-03 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WENTWORTH AVENUE, STATEN ISLAND, FROM STREET DEAD END TO STREET OLYMPIA BOULEVARD |
S012021236A44 | 2021-08-24 | 2021-09-23 | RESET, REPAIR OR REPLACE CURB | WOODVALE AVENUE, STATEN ISLAND, FROM STREET PALMIERI LANE TO STREET VAIL AVENUE |
B042021216A08 | 2021-08-04 | 2021-09-01 | REPLACE SIDEWALK | 39 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
S012021207A77 | 2021-07-26 | 2021-08-24 | RESET, REPAIR OR REPLACE CURB | WOODVALE AVENUE, STATEN ISLAND, FROM STREET PALMIERI LANE TO STREET VAIL AVENUE |
S042021159A02 | 2021-06-08 | 2021-07-07 | REPLACE SIDEWALK | BEDFORD AVENUE, STATEN ISLAND, FROM STREET BOUNDARY AVENUE TO STREET LACONIA AVENUE |
S012021147A42 | 2021-05-27 | 2021-06-25 | RESET, REPAIR OR REPLACE CURB | WOODVALE AVENUE, STATEN ISLAND, FROM STREET PALMIERI LANE TO STREET VAIL AVENUE |
S042021147A21 | 2021-05-27 | 2021-06-25 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WOODVALE AVENUE, STATEN ISLAND, FROM STREET PALMIERI LANE TO STREET VAIL AVENUE |
S042021123A22 | 2021-05-03 | 2021-05-27 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MARETZEK COURT, STATEN ISLAND, FROM STREET BEND TO STREET BLOOMINGDALE ROAD |
S042020363A01 | 2020-12-28 | 2021-01-12 | REPLACE SIDEWALK | IRVING PLACE, STATEN ISLAND, FROM STREET HARDY STREET TO STREET TARGEE STREET |
S042020356A01 | 2020-12-21 | 2021-01-12 | REPLACE SIDEWALK | RUXTON AVENUE, STATEN ISLAND, FROM STREET WOODROW ROAD TO STREET VESPA AVENUE |
S012020356A33 | 2020-12-21 | 2020-12-31 | RESET, REPAIR OR REPLACE CURB | RUXTON AVENUE, STATEN ISLAND, FROM STREET WOODROW ROAD TO STREET VESPA AVENUE |
S042020343A02 | 2020-12-08 | 2021-01-06 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | ADELE STREET, STATEN ISLAND, FROM STREET BURGHER AVENUE TO STREET EVERGREEN AVENUE |
S012020343A23 | 2020-12-08 | 2020-12-31 | RESET, REPAIR OR REPLACE CURB | ADELE STREET, STATEN ISLAND, FROM STREET BURGHER AVENUE TO STREET EVERGREEN AVENUE |
S012020317A85 | 2020-11-12 | 2020-12-10 | RESET, REPAIR OR REPLACE CURB | RUXTON AVENUE, STATEN ISLAND, FROM STREET WOODROW ROAD TO STREET VESPA AVENUE |
S042020317B60 | 2020-11-12 | 2020-12-10 | REPLACE SIDEWALK | RUXTON AVENUE, STATEN ISLAND, FROM STREET WOODROW ROAD TO STREET VESPA AVENUE |
S042020274A08 | 2020-09-30 | 2020-10-28 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | ADELE STREET, STATEN ISLAND, FROM STREET BURGHER AVENUE TO STREET EVERGREEN AVENUE |
S012020274A52 | 2020-09-30 | 2020-10-28 | RESET, REPAIR OR REPLACE CURB | ADELE STREET, STATEN ISLAND, FROM STREET BURGHER AVENUE TO STREET EVERGREEN AVENUE |
S042020273A04 | 2020-09-29 | 2020-10-28 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EVERGREEN AVENUE, STATEN ISLAND, FROM STREET ADELE STREET |
S012020273A24 | 2020-09-29 | 2020-10-29 | RESET, REPAIR OR REPLACE CURB | EVERGREEN AVENUE, STATEN ISLAND, FROM STREET SOUTH RAILROAD AVENUE TO STREET ADELE STREET |
S042020247A06 | 2020-09-03 | 2020-10-01 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | HYLAN BOULEVARD, STATEN ISLAND, FROM STREET ALLEN PLACE TO STREET BARCLAY AVENUE |
S012020247B99 | 2020-09-03 | 2020-10-01 | RESET, REPAIR OR REPLACE CURB | HYLAN BOULEVARD, STATEN ISLAND, FROM STREET ALLEN PLACE TO STREET BARCLAY AVENUE |
S042020245A01 | 2020-09-01 | 2020-09-29 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EVERGREEN AVENUE, STATEN ISLAND, FROM STREET SOUTH RAILROAD AVENUE TO STREET ADELE STREET |
S012020245A68 | 2020-09-01 | 2020-09-29 | RESET, REPAIR OR REPLACE CURB | EVERGREEN AVENUE, STATEN ISLAND, FROM STREET SOUTH RAILROAD AVENUE TO STREET ADELE STREET |
S012020225A38 | 2020-08-12 | 2020-09-10 | RESET, REPAIR OR REPLACE CURB | RICHMOND TERRACE, STATEN ISLAND, FROM STREET FABER STREET TO STREET NORTH STREET |
S012020225A39 | 2020-08-12 | 2020-09-10 | RESET, REPAIR OR REPLACE CURB | FABER STREET, STATEN ISLAND, FROM STREET LARKIN STREET TO STREET RICHMOND TERRACE |
S042020225A04 | 2020-08-12 | 2020-09-10 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | RICHMOND TERRACE, STATEN ISLAND, FROM STREET FABER STREET TO STREET NORTH STREET |
S042020225A05 | 2020-08-12 | 2020-09-10 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | FABER STREET, STATEN ISLAND, FROM STREET LARKIN STREET TO STREET RICHMOND TERRACE |
S042020176A18 | 2020-06-24 | 2020-07-23 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | TARGEE STREET, STATEN ISLAND, FROM STREET BROAD STREET TO STREET PURROY PLACE |
B012020079E76 | 2020-03-19 | 2020-04-10 | RESET, REPAIR OR REPLACE CURB | AVENUE N, BROOKLYN, FROM STREET EAST 69 STREET TO STREET GEORGETOWN LANE |
B012020072C09 | 2020-03-12 | 2020-04-10 | RESET, REPAIR OR REPLACE CURB | AVENUE N, BROOKLYN, FROM STREET EAST 69 STREET TO STREET GEORGETOWN LANE |
S012019361A07 | 2019-12-27 | 2019-12-31 | RESET, REPAIR OR REPLACE CURB | FINLAY AVENUE, STATEN ISLAND, FROM STREET BAYVIEW AVENUE TO STREET EVERETT AVENUE |
S012019298A34 | 2019-10-25 | 2019-11-21 | RESET, REPAIR OR REPLACE CURB | PHILIP AVENUE, STATEN ISLAND, FROM STREET ALLEGRO STREET TO STREET DEAD END |
S012019298A33 | 2019-10-25 | 2019-11-21 | RESET, REPAIR OR REPLACE CURB | ALLEGRO STREET, STATEN ISLAND, FROM STREET BERTRAM AVENUE TO STREET PHILIP AVENUE |
S012019266C03 | 2019-09-23 | 2019-10-21 | RESET, REPAIR OR REPLACE CURB | FREEBORN STREET, STATEN ISLAND, FROM STREET DEAD END TO STREET GREELEY AVENUE |
S012019182D15 | 2019-07-01 | 2019-07-29 | RESET, REPAIR OR REPLACE CURB | GRIMSBY STREET, STATEN ISLAND, FROM STREET GREELEY AVENUE TO STREET LINCOLN AVENUE |
S012019155D18 | 2019-06-04 | 2019-07-01 | RESET, REPAIR OR REPLACE CURB | COLON STREET, STATEN ISLAND, FROM STREET BILLIOU STREET TO STREET DEAD END |
S012019154A45 | 2019-06-03 | 2019-06-29 | RESET, REPAIR OR REPLACE CURB | GRIMSBY STREET, STATEN ISLAND, FROM STREET GREELEY AVENUE TO STREET LINCOLN AVENUE |
S012019128B60 | 2019-05-08 | 2019-06-06 | RESET, REPAIR OR REPLACE CURB | GIEGERICH PLACE, STATEN ISLAND, FROM STREET BEDELL AVENUE TO STREET JOLINE AVENUE |
S012019015A63 | 2019-01-15 | 2019-02-13 | RESET, REPAIR OR REPLACE CURB | FINLAY AVENUE, STATEN ISLAND, FROM STREET BAYVIEW AVENUE TO STREET EVERETT AVENUE |
Start date | End date | Type | Value |
---|---|---|---|
2017-02-07 | 2019-06-11 | Address | 517 YETMAN AVENUE, STATEN ISLAND, NY, 10307, USA (Type of address: Service of Process) |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
230201000703 | 2023-02-01 | BIENNIAL STATEMENT | 2023-02-01 |
211026002236 | 2021-10-26 | BIENNIAL STATEMENT | 2021-10-26 |
190611060130 | 2019-06-11 | BIENNIAL STATEMENT | 2019-02-01 |
170207010373 | 2017-02-07 | CERTIFICATE OF INCORPORATION | 2017-02-07 |
Date | Inspection Object | Address | Grade | Type | Institution | Desctiption |
---|---|---|---|---|---|---|
2024-10-28 | No data | RICHARD AVENUE, FROM STREET BARTOW AVENUE TO STREET HYLAN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb installed |
2024-10-23 | No data | BROOK STREET, FROM STREET CASTLETON AVENUE TO STREET JERSEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/WALK FLAGS INSTALLED |
2024-10-20 | No data | GANSEVOORT BOULEVARD, FROM STREET WESTWOOD AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The roadway was restored and the pedestrian ramp was installed in compliance. |
2024-10-10 | No data | RICHMOND ROAD, FROM STREET BEACON AVENUE TO STREET GELDNER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I OBSERVED RESPONDENT CLOSED 40 SIDEWALK-HAD TEMPORARY WALKWAY ON ROADWAY WITH CONES&TAPE ON ROADWAY-FAILED TO PROVIDE A PROPER PROTECTED WALKWAY ON ROADWAY(TIMBER/CONCRETE BARRIERS OR WEIGHTED BARRICADES);FAILED TO ADHERE TO STIPULATION 014. |
2024-10-09 | No data | CHELSEA STREET, FROM STREET HYLAN BOULEVARD TO STREET PITTSVILLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Still overdue |
2024-09-19 | No data | CHELSEA STREET, FROM STREET HYLAN BOULEVARD TO STREET PITTSVILLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Roadway cutback from newly cured cement curb installed is overdue for final, dirt/gravel filled at this time. |
2024-09-13 | No data | HICKORY AVENUE, FROM STREET FOCH AVENUE TO STREET OLYMPIA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags are ok joints are sealed |
2024-09-11 | No data | GANSEVOORT BOULEVARD, FROM STREET WESTWOOD AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Location does not belong to permittee. It belongs to BPP contractor. Location is not a NICA. |
2024-09-10 | No data | GANSEVOORT BOULEVARD, FROM STREET WESTWOOD AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | FAILED NICA RE-INSECTION -NO RAMPING IN MILLED ROADWAY |
2024-09-10 | No data | GANSEVOORT BOULEVARD, FROM STREET WESTWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | MILLED ROADWAY AROUND PEDESTRIAN RAMP IN SOUTHWEST CORNER OF INTERSECTION DOWN 3 INCHES IN CROSSWALK AT 250 GANSEVOORT BOULEVARD and WESTWOOD AVENUE. PLEASE PROPERLY RAMP ROADWAY FOR PEDESTRIANS TO SAFELY CROSS STREET. |
2024-09-06 | No data | HAWTHORNE AVENUE, FROM STREET AUBURN AVENUE TO STREET DENTON PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/WALK FLAGS INSTALLED |
2024-09-06 | No data | DENTON PLACE, FROM STREET HAWTHORNE AVENUE TO STREET WILLOWBROOK ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB WAS INSTALLED |
2024-08-20 | No data | DENTON PLACE, FROM STREET HAWTHORNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SE4 CORNER. Must correct excessive gutter slope (2.9%), left flare (12.4%) & landing slopes (2.3%). Provide a 0” curb reveal per H-1011-2 detail A (Elevation view). Measured and collected today on 8/20/24. |
2024-08-20 | No data | DENTON PLACE, FROM STREET HAWTHORNE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | SE4 corner has been constructed under permit # S042024185A08. |
2024-08-02 | No data | GANSEVOORT BOULEVARD, FROM STREET WESTWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW1 corner. Work not started permit expired. NP CAR ISSUED |
2024-08-02 | No data | CLERMONT PLACE, FROM STREET WESTWOOD AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Must obtain 410 permit for the NW2 corner and restore as per BPP approval/ H-1011 standard detail drawings. Permit # S042024144A09 used for I.D. only. ( AKA receiving corner for 244 Gansevoort Boulevard). |
2024-08-02 | No data | CLERMONT PLACE, FROM STREET WESTWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NE3 corner. Must install (5’) wide ramp as per BPP approval/H-1011 standard detail drawings, 55” inches ramp is not acceptable. |
2024-08-02 | No data | GANSEVOORT BOULEVARD, FROM STREET WESTWOOD AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Must obtain 410 permit for SW1 corner and restore as per BPP approval/ H-1011 standard detail drawings. Permit # S042024144A11 used for I.D. ONLY. (AKA receiving corner for 244 Gansevoort Blvd). |
2024-07-24 | No data | BROOK STREET, FROM STREET CASTLETON AVENUE TO STREET JERSEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW SWK AT NEW BUILDING-OK |
2024-07-03 | No data | MASSACHUSETTS STREET, FROM STREET DEAD END TO STREET HYLAN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/WALK FLAGS & D/WAY APRONS. |
2024-07-02 | No data | WESTWOOD AVENUE, FROM STREET CLERMONT PLACE TO STREET GANSEVOORT BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | After new curb installation please remove concrete overspill from roadway on the side of corner property address 244 Gansevort Blvd. |
2024-06-12 | No data | DENTON PLACE, FROM STREET HAWTHORNE AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Must obtain 410 permit for the SE4 corner and restore as per BPP approval/H-1011 standard detail drawings. Permit# S042024065A03 used for I.D. Only. (AKA receiving corner for 205 Hawthorne Avenue). |
2024-06-12 | No data | DENTON PLACE, FROM STREET HAWTHORNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NE3 corner. Must correct excessive slopes such as gutter slope 3.3%, counter slope 6.3%, right flare 21.8%, left flare 19.8%, landing running 4.5% & landing cross 2.8%. M&C today on 6/12/24. CAR issued. |
2024-06-11 | No data | MONSEY PLACE, FROM STREET RICHMOND AVENUE TO STREET SANDERS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/WALK FLAGS |
2024-06-07 | No data | WESTWOOD AVENUE, FROM STREET CLERMONT PLACE TO STREET GANSEVOORT BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | NEW CURB INSTALLED ON 3 SIDES WITH 3 NEW DOT PERMIT-RWY OPEN-OK |
2024-05-31 | No data | GANSEVOORT BOULEVARD, FROM STREET SOUTH GANNON AVENUE TO STREET WESTWOOD AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | I observe the above respondent has excavated grass area to install new sidewalk and has failed to abide by stip 014. Respondent has failed to maintain a 5 foot clear protected pedestrian walkway in the roadwa |
2024-05-30 | No data | MASSACHUSETTS STREET, FROM STREET DEAD END TO STREET HYLAN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Curb was installed |
2024-02-07 | No data | BRIGHTON STREET, FROM STREET BILLOP AVENUE TO STREET CLERMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB WAS INSTALLED |
2024-02-06 | No data | MC KEE AVENUE, FROM STREET BEND TO STREET MANSION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB WAS INSTALLED |
2024-02-01 | No data | MC KEE AVENUE, FROM STREET BEND TO STREET MANSION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/WALK FLAGS & D/WAY APRON. |
2023-12-14 | No data | WENTWORTH AVENUE, FROM STREET DEAD END TO STREET OLYMPIA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB WAS INSTALLED |
2023-10-02 | No data | EVERGREEN AVENUE, FROM STREET SOUTH RAILROAD AVENUE TO STREET ADELE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB WAS INSTALLED |
2023-10-02 | No data | ADELE STREET, FROM STREET BURGHER AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURBS WERE INSTALLED |
2023-08-10 | No data | HOLDEN BOULEVARD, FROM STREET FANNING STREET TO STREET GOWER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW CURB OKAT 68 |
2023-05-25 | No data | HOLDEN BOULEVARD, FROM STREET FANNING STREET TO STREET GOWER STREET | No data | Street Construction Inspections: Active | Department of Transportation | NEW CURB -OK AT 68 |
2023-05-05 | No data | HOLDEN BOULEVARD, FROM STREET FANNING STREET TO STREET GOWER STREET | No data | Street Construction Inspections: Active | Department of Transportation | NEW SWK INSTALLED - CREW ON SITE - WARNING GIVEN-THERE ARE JUST 2 SIGNS POSTED AT 40 FOOT FULL SWK CLOSURE &4 SIGNS ARE REQUIRED |
2023-04-28 | No data | MAPLE PARKWAY, FROM STREET FOREST AVENUE TO STREET SPIRIT LANE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NEW SIDEWALK FLAGS WERE PROPERLY SEALED AT 287 MAPLE PKWY-OK |
2023-04-13 | No data | BRIGHTON STREET, FROM STREET BILLOP AVENUE TO STREET CLERMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new s/w acceptable |
2023-03-03 | No data | WIELAND AVENUE, FROM STREET FOSTER ROAD TO STREET WOODROW ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w acceptable. |
2023-02-06 | No data | MAPLE PARKWAY, FROM STREET FOREST AVENUE TO STREET SPIRIT LANE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints were not sealed when the CAR was issued |
2023-01-19 | No data | MAPLE PARKWAY, FROM STREET FOREST AVENUE TO STREET SPIRIT LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE SEAL EXPANSION BETWEEN NEW SIDEWALK FLAGS & CURB - IN FRONT OF 287 MAPLE PARKWAY between FOREST AVENUE and SPIRIT LANE. |
2023-01-11 | No data | HYLAN BOULEVARD, FROM STREET ALLEN PLACE TO STREET BARCLAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB WAS INSTALLED |
2023-01-09 | No data | WIELAND AVENUE, FROM STREET FOSTER ROAD TO STREET WOODROW ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR Re-inspection:Roadway has been re-paved by B.P.P. |
2023-01-09 | No data | WIELAND AVENUE, FROM STREET FOSTER ROAD TO STREET WOODROW ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Street was paved under BPP |
2022-12-19 | No data | WIELAND AVENUE, FROM STREET FOSTER ROAD TO STREET WOODROW ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb was installed in kind at 2 new homes completed, roadway was found with dirt/gravel down 1in in some areas overdue for final, please restore in kind (asphalt) flush with original roadway |
2022-12-13 | No data | FABER STREET, FROM STREET LARKIN STREET TO STREET RICHMOND TERRACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb installed in compliance |
2022-11-11 | No data | EAST 69 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w repaired and insjtalled corner porperty off ave n & e 69th st |
2022-10-09 | No data | RICHMOND TERRACE, FROM STREET FABER STREET TO STREET NORTH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb-k |
2022-09-23 | No data | FREEBORN STREET, FROM STREET DEAD END TO STREET GREELEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb ok. |
2022-09-16 | No data | WENTWORTH AVENUE, FROM STREET DEAD END TO STREET OLYMPIA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/WALK FLAGS & D/WAY APRON |
2022-09-09 | No data | ALLEGRO STREET, FROM STREET BERTRAM AVENUE TO STREET PHILIP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb ok. |
2022-08-31 | No data | FINLAY AVENUE, FROM STREET BAYVIEW AVENUE TO STREET EVERETT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb is ok |
2022-08-22 | No data | AVENUE N, FROM STREET EAST 69 STREET TO STREET GEORGETOWN LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on the sidewalk in compliance new curb installed |
2022-08-04 | No data | PHILIP AVENUE, FROM STREET ALLEGRO STREET TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb is ok |
2022-07-29 | No data | 73 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk ok in compliance |
2022-07-25 | No data | MAPLE PARKWAY, FROM STREET FOREST AVENUE TO STREET SPIRIT LANE | No data | Street Construction Inspections: Active | Department of Transportation | no sidewalk or curb work done as of today |
2022-06-27 | No data | EVERGREEN AVENUE, FROM STREET ADELE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed single ramp within the NW2 corner quadrant was found to be non ADA compliant. Measured and collected in prism on 10/19/20. |
2022-05-26 | No data | WOODVALE AVENUE, FROM STREET PALMIERI LANE TO STREET VAIL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB WAS INSTALLED |
2022-04-21 | No data | HAWTHORNE AVENUE, FROM STREET MONTAUK PLACE TO STREET WYONA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new sidewalk acceptable. |
2022-03-19 | No data | RICHMOND TERRACE, FROM STREET FABER STREET TO STREET NORTH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb ok |
2022-03-13 | No data | IRVING PLACE, FROM STREET HARDY STREET TO STREET TARGEE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w installed, joints sealed. |
2022-03-09 | No data | FREEBORN STREET, FROM STREET DEAD END TO STREET GREELEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB WAS INSTALLED |
2022-02-23 | No data | HYLAN BOULEVARD, FROM STREET ALLEN PLACE TO STREET BARCLAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB WAS INSTALLED |
2022-02-22 | No data | WENTWORTH AVENUE, FROM STREET DEAD END TO STREET OLYMPIA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb was replaced in kind |
2022-02-19 | No data | FABER STREET, FROM STREET LARKIN STREET TO STREET RICHMOND TERRACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb ok |
2022-02-12 | No data | GRIMSBY STREET, FROM STREET GREELEY AVENUE TO STREET LINCOLN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB WAS INSTALLED |
2022-01-22 | No data | PHILIP AVENUE, FROM STREET ALLEGRO STREET TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb ok. |
2022-01-22 | No data | ALLEGRO STREET, FROM STREET BERTRAM AVENUE TO STREET PHILIP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb ok. |
2022-01-15 | No data | COLON STREET, FROM STREET BILLIOU STREET TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB WAS INSTALLED |
2022-01-12 | No data | GIEGERICH PLACE, FROM STREET BEDELL AVENUE TO STREET JOLINE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb acceptable |
2021-12-31 | No data | 39 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sw OK |
2021-12-10 | No data | WOODVALE AVENUE, FROM STREET PALMIERI LANE TO STREET VAIL AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | BPP paved over |
2021-12-02 | No data | EVERGREEN AVENUE, FROM STREET SOUTH RAILROAD AVENUE TO STREET ADELE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb is OK |
2021-12-01 | No data | FINLAY AVENUE, FROM STREET BAYVIEW AVENUE TO STREET EVERETT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb acceptable |
2021-11-03 | No data | 73 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb installed. |
2021-10-26 | No data | FINLAY AVENUE, FROM STREET BAYVIEW AVENUE TO STREET EVERETT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb acceptable |
2021-10-02 | No data | WOODVALE AVENUE, FROM STREET PALMIERI LANE TO STREET VAIL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb ok. |
2021-09-25 | No data | TARGEE STREET, FROM STREET BROAD STREET TO STREET PURROY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW SWK OK AT NEW BUILDING |
2021-09-15 | No data | EVERGREEN AVENUE, FROM STREET ADELE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NW2 corner newly constructed tangent ramps. Ramps functional and accessible, measured and collected on 10/19/20. No action taken today. |
2021-08-28 | No data | RETFORD AVENUE, FROM STREET KOCH BOULEVARD TO STREET SHIRLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb |
2021-08-02 | No data | BEDFORD AVENUE, FROM STREET BOUNDARY AVENUE TO STREET LACONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK HAS BEEN FOUND |
2021-07-20 | No data | ARDEN AVENUE, FROM STREET SHELDON AVENUE TO STREET SINCLAIR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb ok. |
2021-07-15 | No data | MAGUIRE AVENUE, FROM STREET EL CAMINO LOOP TO STREET STAFFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb at driveway of Stafford Av home ok |
2021-06-28 | No data | EAST 69 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb restored in kind sealed and flush. |
2021-06-28 | No data | AVENUE N, FROM STREET EAST 69 STREET TO STREET GEORGETOWN LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb restored in kind sealed and flush. |
2021-06-26 | No data | WOODVALE AVENUE, FROM STREET PALMIERI LANE TO STREET VAIL AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Over due for final |
2021-06-25 | No data | STAFFORD AVENUE, FROM STREET LENEVAR AVENUE TO STREET MAGUIRE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb acceptable |
2021-06-12 | No data | HYLAN BOULEVARD, FROM STREET CODDINGTON AVENUE TO STREET NEW DORP LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/WALK FLAGS |
2021-06-10 | No data | GRIMSBY STREET, FROM STREET GREELEY AVENUE TO STREET LINCOLN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB WAS INSTALLED |
2021-05-10 | No data | IRVING PLACE, FROM STREET HARDY STREET TO STREET TARGEE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sidewalk has been sealed |
2021-03-26 | No data | SHELDON AVENUE, FROM STREET ARDEN AVENUE TO STREET CARLTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curby ok. |
2021-03-08 | No data | ADELE STREET, FROM STREET BURGHER AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No curb work observed |
2021-01-29 | No data | RUXTON AVENUE, FROM STREET WOODROW ROAD TO STREET VESPA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | existing s/w. No work done. |
2021-01-14 | No data | RUXTON AVENUE, FROM STREET WOODROW ROAD TO STREET VESPA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | existing s/w. No work done. |
2020-12-20 | No data | PAGE AVENUE, FROM STREET CHEEVERS LANE TO STREET EASTWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB MOST LIKLEY OK CANT SEE DUE TO SNOW IN PARKING LANE |
2020-12-07 | No data | RICHMOND TERRACE, FROM STREET FABER STREET TO STREET NORTH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb replaced as per bpp |
2020-12-05 | No data | RICHMOND ROAD, FROM STREET BLACKHORSE COURT TO STREET SANTO COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB WAS INSTALLED |
2020-12-01 | No data | FABER STREET, FROM STREET LARKIN STREET TO STREET RICHMOND TERRACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb replaced |
2020-11-27 | No data | BROAD STREET, FROM STREET TARGEE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NE3 corner newly constructed offset ramp. Ramp is functional and accessible. Previously measured and collected. No action taken. |
2020-11-25 | No data | ADELE STREET, FROM STREET BURGHER AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel face curb along the pedestrian ramp, rest of curb/ curbline no work done. |
2020-11-25 | No data | EVERGREEN AVENUE, FROM STREET SOUTH RAILROAD AVENUE TO STREET ADELE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb ok |
2020-11-16 | No data | EVERGREEN AVENUE, FROM STREET ADELE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NW2 corner newly constructed tangent ramps. Ramps functional and accessible, measured and collected on 10/19/20. No need for further action at this time. (Inspected per Kerry) |
2020-11-13 | No data | EVERGREEN AVENUE, FROM STREET ADELE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NW2 corner newly constructed tangent ramps. Ramps are functional and accessible. Previously measured and collected. Curb reveal, r/w grade and gutter slope measured today 11/13/20. No action taken. |
2020-10-29 | No data | PRESTON AVENUE, FROM STREET KING STREET TO STREET SHIRLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb is ok |
2020-10-28 | No data | PHILIP AVENUE, FROM STREET ALLEGRO STREET TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB IS OK |
2020-10-28 | No data | ALLEGRO STREET, FROM STREET BERTRAM AVENUE TO STREET PHILIP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB IS OK |
2020-10-28 | No data | COLON STREET, FROM STREET BILLIOU STREET TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB IS OK |
2020-10-19 | No data | EVERGREEN AVENUE, FROM STREET ADELE STREET | No data | Street Construction Inspections: Active | Department of Transportation | NW2 corner newly constructed tangent ramps. Temporary backfill on the r/w. Must come back and measure curb reveal, r/w grade and gutter slope. Ramps are partially functional and accessible (barricaded). M&C 10/19/20. No action taken. Active permit. |
2020-10-14 | No data | HYLAN BOULEVARD, FROM STREET ALLEN PLACE TO STREET BARCLAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb installed. |
2020-09-29 | No data | KING STREET, FROM STREET ELMBANK STREET TO STREET ORCHARD LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB WAS INSTALLED |
2020-09-26 | No data | GREENWAY AVENUE, FROM STREET FANELLI LANE TO STREET CONRAD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb along side green fence |
2020-09-26 | No data | CONRAD AVENUE, FROM STREET FANELLI LANE TO STREET GREENWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb |
2020-09-24 | No data | GIEGERICH PLACE, FROM STREET BEDELL AVENUE TO STREET JOLINE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/WALK FLAGS |
2020-09-24 | No data | BEDELL AVENUE, FROM STREET GIEGERICH PLACE TO STREET HYLAN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/WALK FLAGS |
2020-09-17 | No data | FINLAY AVENUE, FROM STREET BAYVIEW AVENUE TO STREET EVERETT AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | R/WAY WAS SINCE PAVED VIA BPP |
2020-09-16 | No data | FINLAY AVENUE, FROM STREET BAYVIEW AVENUE TO STREET EVERETT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | BPP has been done covering curbline work |
2020-09-13 | No data | FREEBORN STREET, FROM STREET DEAD END TO STREET GREELEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb |
2020-09-07 | No data | EAST 69 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb installed |
2020-09-01 | No data | AVENUE N, FROM STREET EAST 69 STREET TO STREET GEORGETOWN LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb installed |
2020-08-21 | No data | FABER STREET, FROM STREET LARKIN STREET TO STREET RICHMOND TERRACE | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk construction valid permit on file |
2020-07-07 | No data | 73 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB OK |
2020-06-19 | No data | CASWELL AVENUE, FROM STREET BRYSON AVENUE TO STREET COLLFIELD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk replaced in kind |
2020-06-13 | No data | FINLAY AVENUE, FROM STREET BAYVIEW AVENUE TO STREET EVERETT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | failed to permanently restore cut within required time. |
2020-06-11 | No data | HYLAN BOULEVARD, FROM STREET CODDINGTON AVENUE TO STREET NEW DORP LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w acceptable. |
2020-05-28 | No data | AVENUE N, FROM STREET EAST 69 STREET TO STREET GEORGETOWN LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done. |
2020-05-21 | No data | BROAD STREET, FROM STREET TARGEE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NEC newly completed offset 1 ramp. Pave key installed, curb reveal is zero now and expansion joints are installed around utility pole. Ramp is functional and accessible. Previously measured and collected. No further action is required. |
2020-03-24 | No data | AVENUE N, FROM STREET EAST 69 STREET TO STREET GEORGETOWN LANE | No data | Street Construction Inspections: Active | Department of Transportation | , RESPONDENT IS IN VIOLATION OF STIPULATION I.D 013"MAINTAIN MINIMUM 5 FT CLEAR SIDEWALK" RESPONDENT HAS THE ENTIRE SIDEWALK CLOSED VIOLATING THE STIPULATION |
2020-03-20 | No data | GIEGERICH PLACE, FROM STREET BEDELL AVENUE TO STREET JOLINE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb acceptable |
2020-03-20 | No data | BEDELL AVENUE, FROM STREET GIEGERICH PLACE TO STREET HYLAN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags acceptable |
2020-03-20 | No data | HYLAN BOULEVARD, FROM STREET BEDELL AVENUE TO STREET JOLINE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No sidewalk work performed |
2020-03-19 | No data | RICHMOND ROAD, FROM STREET BLACKHORSE COURT TO STREET SANTO COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb |
2020-03-19 | No data | BROAD STREET, FROM STREET TARGEE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEC newly completed offset 1 ramp non ADA compliant. Pave key has been installed, curb reveal is zero now. Ramp is functional and accessible. Previously measured and collected. No action taken. |
2020-03-17 | No data | EAST 69 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: Active | Department of Transportation | RESPONDENT IS IN VIOLATION OF STIPULATION I.D 013"MAINTAIN MINIMUM 5 FT CLEAR SIDEWALK" RESPONDENT HAS THE ENTIRE SIDEWALK CLOSED OFF WITH CONSTUCTION TAPE DUE TO THE SIDEWALK BEING BROKEN AND DOWN |
2020-03-12 | No data | FINLAY AVENUE, FROM STREET BAYVIEW AVENUE TO STREET EVERETT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb |
2020-03-11 | No data | FINLAY AVENUE, FROM STREET BAYVIEW AVENUE TO STREET EVERETT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Parking lane over due for final after curb installation |
2020-03-10 | No data | COLON STREET, FROM STREET BILLIOU STREET TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb |
2020-02-19 | No data | PRESTON AVENUE, FROM STREET KING STREET TO STREET SHIRLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb |
2020-02-19 | No data | RETFORD AVENUE, FROM STREET KOCH BOULEVARD TO STREET SHIRLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb ok |
2020-01-29 | No data | FINLAY AVENUE, FROM STREET BAYVIEW AVENUE TO STREET EVERETT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb |
2020-01-15 | No data | SHELDON AVENUE, FROM STREET ARDEN AVENUE TO STREET CARLTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB INSTALLATION OK |
2019-12-15 | No data | ANDROS AVENUE, FROM STREET DEAD END TO STREET NETHERLAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb |
2019-12-09 | No data | NETHERLAND AVENUE, FROM STREET ANDROS AVENUE TO STREET MERSEREAU AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb |
2019-11-27 | No data | PHILIP AVENUE, FROM STREET ALLEGRO STREET TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb acceptable |
2019-11-27 | No data | ALLEGRO STREET, FROM STREET BERTRAM AVENUE TO STREET PHILIP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb acceptable |
2019-11-07 | No data | FREEBORN STREET, FROM STREET DEAD END TO STREET GREELEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB WAS INSTALLED |
2019-10-31 | No data | PAGE AVENUE, FROM STREET CHEEVERS LANE TO STREET EASTWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk ok, Driveway Apron and curb looks to have been done under active DDC project- final stages |
2019-10-28 | No data | HAROLD STREET, FROM STREET FIELDS AVENUE TO STREET FOREST HILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDEWALK HAS BEEN REPLACED JOINTS HAVE BEEN SEALED |
2019-10-15 | No data | NEW DORP LANE, FROM STREET NEW DORP PLAZA TO STREET 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/walk flags |
2019-10-09 | No data | MAGUIRE AVENUE, FROM STREET EL CAMINO LOOP TO STREET STAFFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb acceptable |
2019-09-22 | No data | GRIMSBY STREET, FROM STREET GREELEY AVENUE TO STREET LINCOLN AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | s/w open at this time |
2019-09-12 | No data | BROAD STREET, FROM STREET TARGEE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Must correct high curb reveal of 1” at the NEC newly constructed offset 1 ramp non ADA compliant. Ramp is functional and accessible, previously measured and collected. |
2019-09-07 | No data | TARGEE STREET, FROM STREET BROAD STREET TO STREET PURROY PLACE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Sw done |
2019-09-05 | No data | TARGEE STREET, FROM STREET BROAD STREET TO STREET PURROY PLACE | No data | Street Construction Inspections: Active | Department of Transportation | (Active check for bike lane strips) No bike lane obstruction |
2019-08-29 | No data | CONRAD AVENUE, FROM STREET FANELLI LANE TO STREET GREENWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB IS OK |
2019-08-21 | No data | GRIMSBY STREET, FROM STREET GREELEY AVENUE TO STREET LINCOLN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB WAS INSTALLED |
2019-08-16 | No data | TARGEE STREET, FROM STREET BROAD STREET TO STREET PURROY PLACE | No data | Street Construction Inspections: Complaint | Department of Transportation | I have found work being performed without an active permit.. I found areas of s/walk that are excavated & awaiting concrete. Also the s/walk is closed off to thru traffic. *** NOV ISSUED PREVIOUS INSPECTIONS *** |
2019-08-16 | No data | TARGEE STREET, FROM STREET BROAD STREET TO STREET PURROY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/WALK IS CURRENTLY EXCAVATED, FILLED WITH GRAVEL & AWAITING CONCRETE. NO ACTIVE PERMIT ON FILE. SPOKE WITH FOREMAN, ROSARIO ON SITE. |
2019-08-13 | No data | TARGEE STREET, FROM STREET BROAD STREET TO STREET PURROY PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Spoke to formeman and instructed him additional sidewalk closed signs required, crew also on site cleaning up reminded them of 4 olclock stips, no physical work being conducted |
2019-08-07 | No data | GREENWAY AVENUE, FROM STREET FANELLI LANE TO STREET CONRAD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IT SEEMS AFTER DRIVING AROUND THE BLOCKS OF WHERE PERMIT WAS TAKEN OUT BECAUSE IT HAS 58 CONRAD AS AN ADDRESS IN THE PERMIT INFO THAT ITS LOCATED BEHIND GREEN CONSTRUCTION FENCES WHERE STREET ISN'T READILY OPEN TO PUBLIC AS OF YET |
2019-08-01 | No data | BROAD STREET, FROM STREET TARGEE STREET | No data | Street Construction Inspections: Active | Department of Transportation | NE3 old existing apex ramp. Area surrounding utility pole has been restored. Ramp is functional and accessible. Con Ed no longer responsible. Verizon will remove the old pole. GC will restore the full ped ramp as per Kerry. No action is taken. |
2019-07-31 | No data | GRIMSBY STREET, FROM STREET GREELEY AVENUE TO STREET LINCOLN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/WALK IS CLOSED OFF WITH BARRICADES & PLASTIC CONSTRUCTION FENCING WHICH IS MAKING AREA IMPASSABLE FOR PEDESTRIAN THRU TRAFFIC, WHICH IS CLOSING S/WALK. PERMIT EXP ON 7-29-19. |
2019-07-20 | No data | GRIMSBY STREET, FROM STREET GREELEY AVENUE TO STREET LINCOLN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | FULL S/WALK IS CLOSED OFF TO THRU PEDESTRIAN TRAFFIC. NO ONE ON SITE. |
2019-07-12 | No data | COLON STREET, FROM STREET BILLIOU STREET TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb installed. |
2019-06-26 | No data | GRIMSBY STREET, FROM STREET GREELEY AVENUE TO STREET LINCOLN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Portions of curb excavated at this time. Builder was on location during inspection. |
2019-06-23 | No data | ATLANTIC AVENUE, FROM STREET JOHNSON PLACE TO STREET RICHMOND ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Roadway was resurfaced as per Bpp. |
2019-06-12 | No data | CASWELL AVENUE, FROM STREET BRYSON AVENUE TO STREET COLLFIELD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | s/w ok |
2019-06-12 | No data | GIEGERICH PLACE, FROM STREET BEDELL AVENUE TO STREET JOLINE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB WAS INSTALLED |
2019-06-12 | No data | HYLAN BOULEVARD, FROM STREET BEDELL AVENUE TO STREET JOLINE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/WALK FLAGS |
2019-06-12 | No data | BEDELL AVENUE, FROM STREET GIEGERICH PLACE TO STREET HYLAN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/WALK FLAGS |
2019-06-11 | No data | MELHORN ROAD, FROM STREET LIGHTNER AVENUE TO STREET SCHMIDTS LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w -ok |
2019-06-10 | No data | LIGHTNER AVENUE, FROM STREET MELHORN ROAD TO STREET SLOSSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w |
2019-05-01 | No data | SHELDON AVENUE, FROM STREET ARDEN AVENUE TO STREET CARLTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB WAS INSTALLED |
2019-04-27 | No data | PAGE AVENUE, FROM STREET CHEEVERS LANE TO STREET EASTWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/WALK FLAGS |
2019-04-26 | No data | ATLANTIC AVENUE, FROM STREET JOHNSON PLACE TO STREET RICHMOND ROAD | No data | Street Construction Inspections: Complaint | Department of Transportation | Curb was installed. Repair damaged roadway upon curb installation please restore area in kind with asphalt. |
2019-04-24 | No data | 73 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDEWALK INSTALLED |
2019-04-17 | No data | HAROLD STREET, FROM STREET FIELDS AVENUE TO STREET FOREST HILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk cut |
2019-02-28 | No data | FINLAY AVENUE, FROM STREET BAYVIEW AVENUE TO STREET EVERETT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB WAS INSTALLED |
2019-01-10 | No data | PAGE AVENUE, FROM STREET CHEEVERS LANE TO STREET EASTWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/WALK FLAGS |
2018-12-24 | No data | MAGUIRE AVENUE, FROM STREET EL CAMINO LOOP TO STREET STAFFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb -ok |
2018-11-30 | No data | GREENWAY AVENUE, FROM STREET FANELLI LANE TO STREET CONRAD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb |
2018-11-30 | No data | CONRAD AVENUE, FROM STREET FANELLI LANE TO STREET GREENWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb |
2018-11-27 | No data | STAFFORD AVENUE, FROM STREET LENEVAR AVENUE TO STREET MAGUIRE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Permit check, crew on site, excavating s/w, Active. |
2018-11-26 | No data | PRESTON AVENUE, FROM STREET KING STREET TO STREET SHIRLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb - ok |
2018-11-26 | No data | RETFORD AVENUE, FROM STREET KOCH BOULEVARD TO STREET SHIRLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb -ok |
2018-11-19 | No data | LIGHTNER AVENUE, FROM STREET MELHORN ROAD TO STREET SLOSSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w flags ok. |
2018-11-19 | No data | MELHORN ROAD, FROM STREET LIGHTNER AVENUE TO STREET SCHMIDTS LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two s/w flags replaced and b/t s/w & curb w/i grass area. |
2018-10-13 | No data | RICHMOND ROAD, FROM STREET BLACKHORSE COURT TO STREET SANTO COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w and aprons constructed |
2018-10-12 | No data | NEW DORP LANE, FROM STREET NEW DORP PLAZA TO STREET 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/walk flags. |
2018-10-07 | No data | SHELDON AVENUE, FROM STREET ARDEN AVENUE TO STREET CARLTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb - ok |
2018-09-30 | No data | KING STREET, FROM STREET ELMBANK STREET TO STREET ORCHARD LANE | No data | Street Construction Inspections: Complaint | Department of Transportation | Permit check, Curb install work, s/w excavated & barricaded off, signs posted, materials on front lawn & refuse container filled with debris in the p/l w/ active container permit. |
2018-07-08 | No data | HAROLD STREET, FROM STREET FIELDS AVENUE TO STREET FOREST HILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk |
2018-06-29 | No data | RICHMOND ROAD, FROM STREET BLACKHORSE COURT TO STREET SANTO COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | portions of curb replaced/repaired |
2018-06-25 | No data | NETHERLAND AVENUE, FROM STREET ANDROS AVENUE TO STREET MERSEREAU AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb was ok. |
2018-06-25 | No data | ANDROS AVENUE, FROM STREET DEAD END TO STREET NETHERLAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb was ok. |
2018-06-12 | No data | PAGE AVENUE, FROM STREET CHEEVERS LANE TO STREET EASTWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB |