2024-05-29
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
permittee on hold
|
2023-05-24
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway resurfaced
|
2022-11-28
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Completed tangent ramps in the NW2 corner quadrant was found to be non ADA compliant. Ramps was measured in prism on 12/28/20.
|
2022-09-11
|
No data
|
WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O #36 SIDEWALK IS IN COMPLIANCE ACCEPTABLE CONDITION.
|
2022-08-03
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Completed tangent ramps within the NW2 corner quadrant was found to be non ADA compliant. Ramps are functional and accessible, measured in prism on 12/28/2020.
|
2022-07-27
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
NOV issued on incorrect permit. Permittee failed to obtain the correct 410 ped ramp intersection permit for the NW2 corner. New non permit # QNP2022208A11 issued.
|
2022-07-27
|
No data
|
21 STREET, FROM STREET 29 AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
No 410 permit on file. Completed tangent ramps in the NW2 corner found not to be ADA compliant. Ramps are functional and accessible. Previously measured & collected in Prism on 12/2/20.
|
2022-04-22
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Newly completed tangent ramps within the NW2 corner quadrant was found to be non ADA compliant. Ramps are functional and accessible, measured in prism on 12/28/2020.( Failed to correct excessive ramp running slope)
|
2022-01-27
|
No data
|
21 STREET, FROM STREET 29 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
cases dismissed at OATH
|
2022-01-27
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps within the NW2 corner quadrant was found to be non ADA compliant. Ramps are functional and accessible, measured in prism on 12/28/2020.
|
2021-11-03
|
No data
|
21 STREET, FROM STREET 29 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
No 410 permit on file. Completed tangent ramps in the NW2 corner found not to be ADA compliant. Ramps are functional and accessible. Previously measured & collected in Prism on 12/2/20.
|
2021-09-21
|
No data
|
21 STREET, FROM STREET 29 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
No 410 permit on file. Completed tangent ramps in the NW2 corner quadrant are functional and accessible. Non ADA compliant. Previously measured and collected in Prism on 12/2/2020.
|
2021-09-07
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
steel face curb replaced and sealed i/f/o 28-16
|
2021-08-16
|
No data
|
21 STREET, FROM STREET 29 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
No 410 permit on file. Completed tangent ramps in the NW2 corner quadrant are functional and accessible. Non ADA compliant. Previously measured and collected in Prism on 12/2/2020.
|
2021-06-15
|
No data
|
21 STREET, FROM STREET 29 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
No 410 permit on file. Completed tangent ramps in the NW2 corner quadrant are functional and accessible. Non ADA compliant. Previously measured and collected in Prism on 12/2/2020.
|
2021-04-08
|
No data
|
21 STREET, FROM STREET 29 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
No 410 permit on file. Newly completed tangent ramps in the NW2 corner quadrant are functional and accessible. Non ADA compliant. Previously measured and collected in Prism on 12/2/2020.
|
2020-12-12
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
2 "NO PARKING ANYTIME / temporary construction regulation" signs posted on poles without a permit. Permit number Q022020199B04 is used for ID only.
|
2020-12-12
|
No data
|
29 AVENUE, FROM STREET 14 STREET TO STREET 21 STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
2 "NO PARKING ANYTIME / temporary construction regulation" signs posted on poles without a permit. Permit number Q022020199A96 is used for ID only.
|
2020-12-02
|
No data
|
21 STREET, FROM STREET 29 AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
No 410 permit on file. Newly completed tangent ramps within the NW2 corner quadrant was found to be non ada compliant, however ramps are functional and accessible. Measured and collected in prism on 12/2/20.
|
2020-10-10
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed the above respondent paved a portion of the roadway at the sited location without notifying the NYC DOT HIQA borough office within 4 hours prior to paving as per stipulation 1/2+5.
|
2020-10-10
|
No data
|
29 AVENUE, FROM STREET 14 STREET TO STREET 21 STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
I observed the above respondent has milled and paved the roadway as part of their BBP restoration without a valid street opening permit on file. Permit # Q012020258B47 for related adjacent segment work used for I.D. only
|
2020-10-10
|
No data
|
21 STREET, FROM STREET 29 AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Contractor has milled and paved intersection as part of their BPP restoration policy without a permit on file.
|
2020-09-10
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No BPP roadway work observed at this time of inspection.
|
2020-09-08
|
No data
|
29 AVENUE, FROM STREET 14 STREET TO STREET 21 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No BPP roadway work observed at this time of inspection.
|
2020-08-19
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Barriers adjacent to the curb line at this time.
|
2020-08-06
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO CROSSING SIDEWALK IN PROGRESS
|
2020-08-06
|
No data
|
29 AVENUE, FROM STREET 14 STREET TO STREET 21 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
TEMPORARY PEDESTRIAN WALK IN COMPLIANCE.
|
2020-08-06
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
OCCUPANCY OF SIDEWALK IN COMPLIANCE . SUPERVISOR MOVED BARRIERS CORRECTLY . WALKWAY IN ROADWAY WITH ACTIVE PERMIT.
|
2020-04-17
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no CROSSING SIDEWALK
|
2020-04-17
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Equipment Type: Excavator - exp.
|
2020-04-17
|
No data
|
29 AVENUE, FROM STREET 14 STREET TO STREET 21 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no Equipment Type: Hoist
|
2020-04-17
|
No data
|
29 AVENUE, FROM STREET 14 STREET TO STREET 21 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no CROSSING SIDEWALK - exp.
|
2020-04-16
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no MATERIAL ON STREET - exp.
|
2019-12-27
|
No data
|
WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
KNUCKLE BOOM TRUCK not on site.
|
2019-12-01
|
No data
|
29 AVENUE, FROM STREET 14 STREET TO STREET 21 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Follow up inspection from yesterday - 5' clear ped. w/way on r/w,ramp fixed.
|
2019-11-30
|
No data
|
29 AVENUE, FROM STREET 14 STREET TO STREET 21 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
The ramp on one side is only 2'5" width,creating unsafe condition for pedestrians;the walkway is 3'10" width.Spoke with Cryon on site,told me they have a delivery - start to work to correct the conditions.No NOV issued,will re-inspect tomorrow.
|
2019-11-19
|
No data
|
WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Acceptable
|
2019-11-13
|
No data
|
29 AVENUE, FROM STREET 14 STREET TO STREET 21 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Hoist in place
|
2019-11-12
|
No data
|
29 AVENUE, FROM STREET 14 STREET TO STREET 21 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No crossing sidewalk observed at this time.
|
2019-11-12
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No material on street
|
2019-11-04
|
No data
|
WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Acceptable
|
2019-07-24
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
plastic barriers stored
|
2019-07-19
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
fence stored on sidewalk
|
2019-07-19
|
No data
|
29 AVENUE, FROM STREET 14 STREET TO STREET 21 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
hoist stored on sidewalk
|
2019-04-24
|
No data
|
29 AVENUE, FROM STREET 14 STREET TO STREET 21 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed the above respondent failed to comply with terms and conditions of permit specific stip which states ramped at entry to sidewalk for handicapped accessibility. No ramp applied for pedestrian accessibility.
|
2019-04-19
|
No data
|
29 AVENUE, FROM STREET 14 STREET TO STREET 21 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
tenp signs posted
|
2019-04-19
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
roadway in compliance
|
2019-04-09
|
No data
|
29 AVENUE, FROM STREET 14 STREET TO STREET 21 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
temp signs posted
|
2019-04-09
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
temp signs posted
|
2019-04-07
|
No data
|
29 AVENUE, FROM STREET 14 STREET TO STREET 21 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
fence stored on sidewalk
|
2019-02-01
|
No data
|
65 ROAD, FROM STREET QUEENS BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No signs yet
|
2019-01-31
|
No data
|
QUEENS BOULEVARD, FROM STREET 65 ROAD TO STREET 66 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crossing sidewalk
|
2018-10-28
|
No data
|
29 AVENUE, FROM STREET 14 STREET TO STREET 21 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO CROSSING SIDEWALK
|
2018-10-26
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
material stored behind fence
|
2018-10-26
|
No data
|
29 AVENUE, FROM STREET 14 STREET TO STREET 21 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crssing sidewalk not observed
|
2018-10-26
|
No data
|
QUEENS BOULEVARD, FROM STREET 65 ROAD TO STREET 66 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
roadway occupied with plastic barriers
|
2018-10-19
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
R/W occupied
|
2018-10-19
|
No data
|
29 AVENUE, FROM STREET 14 STREET TO STREET 21 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
signs posted
|
2018-09-10
|
No data
|
29 AVENUE, FROM STREET 14 STREET TO STREET 21 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
OCCUPANCY OF ROADWAY IN COMPLIANCE
|
2018-08-13
|
No data
|
29 AVENUE, FROM STREET 14 STREET TO STREET 21 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
OCCUPANCY OF ROADWAY -BARRIERS
|
2018-08-08
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Maintained Fence
|
2018-08-05
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
OCCUPANCY OF ROADWAY IN COMPLIANCE-CLEAR.
|
2018-07-06
|
No data
|
29 AVENUE, FROM STREET 14 STREET TO STREET 21 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No sidewalk crossing observed at this time
|
2018-06-18
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
active permit for occupancy of roadway.
|
2018-05-08
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
place barriers on the street with active permit.
|
2018-04-05
|
No data
|
29 AVENUE, FROM STREET 14 STREET TO STREET 21 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
-No roadway occupancy at this time
|
2018-04-05
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
-No crossing sidewalk work at this time.
|
2018-03-05
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
s/w clear at this time
|
2018-02-17
|
No data
|
29 AVENUE, FROM STREET 14 STREET TO STREET 21 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no MATERIAL ON STREET
|
2018-02-17
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no MATERIAL ON STREET
|
2018-01-28
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Work in progress - behind the fence.
|
2018-01-08
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No crossing at this time.
|
2017-12-20
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway Clear at time
|
2017-11-24
|
No data
|
21 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Fence on s/w - contractor maintaining only 5'9" width clear s/w for the pedestrians loc. area instead of 8' - NOV issued under the occupancy of s/w permit.
|