Name: | SAT CONSTRUCTION SERVICES, LLC |
Jurisdiction: | New York |
Legal type: | DOMESTIC LIMITED LIABILITY COMPANY |
Status: | Active |
Date of registration: | 09 May 2018 (7 years ago) |
Entity Number: | 5338322 |
County: | Kings |
Place of Formation: | New York |
Address: | 48 SOUTH SERVICE ROAD, SUITE 404, MELVILLE, NY, United States, 11747 |
Address ZIP Code: | 11747 |
Name | Role | Address |
---|---|---|
SINGER & FALK CPA'S | DOS Process Agent | 48 SOUTH SERVICE ROAD, SUITE 404, MELVILLE, NY, United States, 11747 |
Number | Date | End date | Type | Address |
---|---|---|---|---|
B022024303B45 | 2024-10-29 | 2024-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024303B40 | 2024-10-29 | 2024-12-31 | PLACE MATERIAL ON STREET | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024303B41 | 2024-10-29 | 2024-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B012024303B07 | 2024-10-29 | 2024-12-31 | OPEN SIDEWALK TO INSTALL FOUNDATION | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024303B44 | 2024-10-29 | 2024-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024303B46 | 2024-10-29 | 2024-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024303B43 | 2024-10-29 | 2024-12-31 | TEMP. CONST. SIGNS/MARKINGS | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024303B42 | 2024-10-29 | 2024-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024302G79 | 2024-10-28 | 2024-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | FLUSHING AVENUE, BROOKLYN, FROM STREET SANDFORD STREET TO STREET WALWORTH STREET |
B022024302G78 | 2024-10-28 | 2024-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FLUSHING AVENUE, BROOKLYN, FROM STREET SANDFORD STREET TO STREET WALWORTH STREET |
B022024290B74 | 2024-10-16 | 2024-11-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022024290B68 | 2024-10-16 | 2024-11-25 | PLACE MATERIAL ON STREET | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022024290B69 | 2024-10-16 | 2024-11-25 | CROSSING SIDEWALK | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022024290B70 | 2024-10-16 | 2024-11-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022024290B73 | 2024-10-16 | 2024-11-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022024290B71 | 2024-10-16 | 2024-11-25 | TEMP. CONST. SIGNS/MARKINGS | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022024290B72 | 2024-10-16 | 2024-11-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
Q042024290A61 | 2024-10-16 | 2024-11-13 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 72 AVENUE, QUEENS, FROM STREET AGUILAR AVENUE |
B022024290B82 | 2024-10-16 | 2024-12-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024290B81 | 2024-10-16 | 2024-12-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024290B80 | 2024-10-16 | 2024-12-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024290B79 | 2024-10-16 | 2024-12-20 | OCCUPANCY OF ROADWAY AS STIPULATED | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024290B78 | 2024-10-16 | 2024-12-20 | CROSSING SIDEWALK | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024290B77 | 2024-10-16 | 2024-12-20 | PLACE MATERIAL ON STREET | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024290B76 | 2024-10-16 | 2024-11-25 | TEMP. CONST. SIGNS/MARKINGS | STANHOPE STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022024290B75 | 2024-10-16 | 2024-11-25 | PLACE MATERIAL ON STREET | STANHOPE STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
Q012024277A00 | 2024-10-03 | 2024-10-30 | RESET, REPAIR OR REPLACE CURB | 11 STREET, QUEENS, FROM STREET 33 ROAD TO STREET 34 AVENUE |
Q042024277A00 | 2024-10-03 | 2024-10-30 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 11 STREET, QUEENS, FROM STREET 33 ROAD TO STREET 34 AVENUE |
Q012024277A01 | 2024-10-03 | 2024-10-30 | PAVE STREET-W/ ENGINEERING & INSP FEE | 11 STREET, QUEENS, FROM STREET 33 ROAD TO STREET 34 AVENUE |
X042024274A14 | 2024-09-30 | 2024-10-29 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | RYER AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST BURNSIDE AVENUE |
Q012024274B17 | 2024-09-30 | 2024-10-26 | RESET, REPAIR OR REPLACE CURB | 229 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET 67 AVENUE |
Q012024274B18 | 2024-09-30 | 2024-10-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | 229 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET 67 AVENUE |
Q042024274A05 | 2024-09-30 | 2024-10-26 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 229 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET 67 AVENUE |
X012024274B02 | 2024-09-30 | 2024-10-29 | RESET, REPAIR OR REPLACE CURB | RYER AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST BURNSIDE AVENUE |
X012024270A22 | 2024-09-26 | 2024-10-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | RYER AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST BURNSIDE AVENUE |
B012024260C98 | 2024-09-16 | 2024-10-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | BEDFORD AVENUE, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE |
Q042024256A06 | 2024-09-12 | 2024-10-09 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 28 AVENUE, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
Q012024256A37 | 2024-09-12 | 2024-10-09 | RESET, REPAIR OR REPLACE CURB | 28 AVENUE, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
Q012024256A38 | 2024-09-12 | 2024-10-09 | PAVE STREET-W/ ENGINEERING & INSP FEE | 28 AVENUE, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
Q022024256A13 | 2024-09-12 | 2024-10-09 | TEMPORARY PEDESTRIAN WALK | 28 AVENUE, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
Q022024256A14 | 2024-09-12 | 2024-10-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | 28 AVENUE, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
M022024248C23 | 2024-09-04 | 2024-11-16 | CROSSING SIDEWALK | WEST 22 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET 10 AVENUE |
M022024248C25 | 2024-09-04 | 2024-11-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 22 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET 10 AVENUE |
M022024248C24 | 2024-09-04 | 2024-11-16 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 22 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET 10 AVENUE |
M022024248C22 | 2024-09-04 | 2024-11-16 | PLACE MATERIAL ON STREET | WEST 22 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET 10 AVENUE |
M022024248C27 | 2024-09-04 | 2024-11-16 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 22 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET 10 AVENUE |
M022024248C26 | 2024-09-04 | 2024-11-16 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 22 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET 10 AVENUE |
B042024236A71 | 2024-08-23 | 2024-09-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MILFORD STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
B012024236B64 | 2024-08-23 | 2024-09-20 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | MILFORD STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
B012024236B63 | 2024-08-23 | 2024-09-20 | RESET, REPAIR OR REPLACE CURB-PROTECTED | MILFORD STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
B022024232C57 | 2024-08-19 | 2024-11-16 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FLUSHING AVENUE, BROOKLYN, FROM STREET SANDFORD STREET TO STREET WALWORTH STREET |
Q012024227F36 | 2024-08-14 | 2024-08-30 | PAVE STREET-W/ ENGINEERING & INSP FEE | 157 STREET, QUEENS, FROM STREET 24 AVENUE TO STREET 24 ROAD |
Q012024226B74 | 2024-08-13 | 2024-09-06 | PAVE STREET-W/ ENGINEERING & INSP FEE | SMITH STREET, QUEENS, FROM STREET 120 AVENUE TO STREET BEND |
Q012024226B73 | 2024-08-13 | 2024-09-06 | PAVE STREET-W/ ENGINEERING & INSP FEE | 122 AVENUE, QUEENS, FROM STREET 164 STREET TO STREET SMITH STREET |
Q012024226B72 | 2024-08-13 | 2024-09-06 | PAVE STREET-W/ ENGINEERING & INSP FEE | 122 AVENUE, QUEENS, FROM STREET SMITH STREET |
Q042024225A17 | 2024-08-12 | 2024-09-07 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 72 AVENUE, QUEENS, FROM STREET AGUILAR AVENUE |
Q042024225A18 | 2024-08-12 | 2024-09-07 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 72 AVENUE, QUEENS, FROM STREET PARSONS BOULEVARD |
Q012024222A49 | 2024-08-09 | 2024-09-07 | C.A.R. RESTORATION | 84 AVENUE, QUEENS, FROM STREET 150 STREET TO STREET SMEDLEY STREET |
B022024220A02 | 2024-08-07 | 2024-10-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FLUSHING AVENUE, BROOKLYN, FROM STREET SANDFORD STREET TO STREET WALWORTH STREET |
B022024220A01 | 2024-08-07 | 2024-10-30 | OCCUPANCY OF ROADWAY AS STIPULATED | FLUSHING AVENUE, BROOKLYN, FROM STREET SANDFORD STREET TO STREET WALWORTH STREET |
B022024220A00 | 2024-08-07 | 2024-10-30 | CROSSING SIDEWALK | FLUSHING AVENUE, BROOKLYN, FROM STREET SANDFORD STREET TO STREET WALWORTH STREET |
B022024219A47 | 2024-08-06 | 2024-11-03 | TEMP. CONST. SIGNS/MARKINGS | FLUSHING AVENUE, BROOKLYN, FROM STREET SANDFORD STREET TO STREET WALWORTH STREET |
Q012024213A80 | 2024-07-31 | 2024-08-28 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 150 STREET, QUEENS, FROM STREET 89 AVENUE TO STREET 90 AVENUE |
Q012024213A79 | 2024-07-31 | 2024-08-28 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 150 STREET, QUEENS, FROM STREET 89 AVENUE TO STREET 90 AVENUE |
Q042024213A47 | 2024-07-31 | 2024-08-28 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 150 STREET, QUEENS, FROM STREET 89 AVENUE TO STREET 90 AVENUE |
B022024212B66 | 2024-07-30 | 2024-10-26 | PLACE MATERIAL ON STREET | STANHOPE STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022024212B67 | 2024-07-30 | 2024-10-26 | TEMP. CONST. SIGNS/MARKINGS | STANHOPE STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022024211C33 | 2024-07-29 | 2024-10-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | FLUSHING AVENUE, BROOKLYN, FROM STREET SANDFORD STREET TO STREET WALWORTH STREET |
B022024211C32 | 2024-07-29 | 2024-10-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FLUSHING AVENUE, BROOKLYN, FROM STREET SANDFORD STREET TO STREET WALWORTH STREET |
B012024211B67 | 2024-07-29 | 2024-08-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | CENTRAL AVENUE, BROOKLYN, FROM STREET JEFFERSON STREET TO STREET TROUTMAN STREET |
B022024208C71 | 2024-07-26 | 2024-10-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HANCOCK STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B022024208D05 | 2024-07-26 | 2024-10-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024208D04 | 2024-07-26 | 2024-10-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024208D03 | 2024-07-26 | 2024-10-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024208D02 | 2024-07-26 | 2024-10-20 | TEMP. CONST. SIGNS/MARKINGS | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024208D01 | 2024-07-26 | 2024-10-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024208D00 | 2024-07-26 | 2024-10-20 | OCCUPANCY OF ROADWAY AS STIPULATED | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024208C99 | 2024-07-26 | 2024-10-20 | PLACE MATERIAL ON STREET | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024208C98 | 2024-07-26 | 2024-10-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022024208C97 | 2024-07-26 | 2024-10-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022024208C96 | 2024-07-26 | 2024-10-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022024208C95 | 2024-07-26 | 2024-10-23 | TEMP. CONST. SIGNS/MARKINGS | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022024208C94 | 2024-07-26 | 2024-10-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022024208C93 | 2024-07-26 | 2024-10-23 | CROSSING SIDEWALK | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022024208C92 | 2024-07-26 | 2024-10-23 | PLACE MATERIAL ON STREET | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022024208C91 | 2024-07-26 | 2024-10-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024208C90 | 2024-07-26 | 2024-10-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024208C89 | 2024-07-26 | 2024-10-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024208C88 | 2024-07-26 | 2024-10-23 | OCCUPANCY OF ROADWAY AS STIPULATED | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024208C87 | 2024-07-26 | 2024-10-23 | CROSSING SIDEWALK | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024208C86 | 2024-07-26 | 2024-10-23 | PLACE MATERIAL ON STREET | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024208C85 | 2024-07-26 | 2024-10-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEIRFIELD STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024208C84 | 2024-07-26 | 2024-10-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEIRFIELD STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024208C83 | 2024-07-26 | 2024-10-23 | TEMP. CONST. SIGNS/MARKINGS | WEIRFIELD STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024208C82 | 2024-07-26 | 2024-10-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEIRFIELD STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024208C81 | 2024-07-26 | 2024-10-23 | OCCUPANCY OF ROADWAY AS STIPULATED | WEIRFIELD STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024208C80 | 2024-07-26 | 2024-10-23 | CROSSING SIDEWALK | WEIRFIELD STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024208C79 | 2024-07-26 | 2024-10-23 | PLACE MATERIAL ON STREET | WEIRFIELD STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024208C78 | 2024-07-26 | 2024-10-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024208C77 | 2024-07-26 | 2024-10-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B012024208C24 | 2024-07-26 | 2024-10-20 | OPEN SIDEWALK TO INSTALL FOUNDATION | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024208C76 | 2024-07-26 | 2024-10-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024208C75 | 2024-07-26 | 2024-10-23 | OCCUPANCY OF ROADWAY AS STIPULATED | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024208C74 | 2024-07-26 | 2024-10-23 | CROSSING SIDEWALK | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024208C73 | 2024-07-26 | 2024-10-23 | PLACE MATERIAL ON STREET | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024208C72 | 2024-07-26 | 2024-10-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HANCOCK STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B022024208C70 | 2024-07-26 | 2024-10-23 | TEMP. CONST. SIGNS/MARKINGS | HANCOCK STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B022024208C69 | 2024-07-26 | 2024-10-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | HANCOCK STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B022024208C68 | 2024-07-26 | 2024-10-23 | OCCUPANCY OF ROADWAY AS STIPULATED | HANCOCK STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B022024208C67 | 2024-07-26 | 2024-10-23 | CROSSING SIDEWALK | HANCOCK STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B022024208C66 | 2024-07-26 | 2024-10-23 | PLACE MATERIAL ON STREET | HANCOCK STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
Q042024200A24 | 2024-07-18 | 2024-07-24 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 72 AVENUE, QUEENS, FROM STREET AGUILAR AVENUE |
Q042024200A25 | 2024-07-18 | 2024-07-24 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 72 AVENUE, QUEENS, FROM STREET PARSONS BOULEVARD |
X012024193A41 | 2024-07-11 | 2024-07-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 223 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD |
B022024191B11 | 2024-07-09 | 2024-07-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024191B10 | 2024-07-09 | 2024-07-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024191B09 | 2024-07-09 | 2024-07-24 | TEMP. CONST. SIGNS/MARKINGS | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B012024191A74 | 2024-07-09 | 2024-07-24 | OPEN SIDEWALK TO INSTALL FOUNDATION | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024191B12 | 2024-07-09 | 2024-07-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024191B06 | 2024-07-09 | 2024-07-24 | PLACE MATERIAL ON STREET | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024191B08 | 2024-07-09 | 2024-07-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024191B07 | 2024-07-09 | 2024-07-24 | OCCUPANCY OF ROADWAY AS STIPULATED | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B012024187B48 | 2024-07-05 | 2024-07-24 | RESET, REPAIR OR REPLACE CURB | MOFFAT STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B042024187A30 | 2024-07-05 | 2024-07-24 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MOFFAT STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B042024187A18 | 2024-07-05 | 2024-07-24 | REPAIR SIDEWALK | MOFFAT STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022024187B57 | 2024-07-05 | 2024-07-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MOFFAT STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022024187B56 | 2024-07-05 | 2024-07-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | MOFFAT STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012024187B25 | 2024-07-05 | 2024-07-24 | RESET, REPAIR OR REPLACE CURB | MOFFAT STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012024187B49 | 2024-07-05 | 2024-07-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | MOFFAT STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
X012024180B08 | 2024-06-28 | 2024-07-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | PAULDING AVENUE, BRONX, FROM STREET EAST 217 STREET TO STREET EAST 218 STREET |
B022024170B67 | 2024-06-18 | 2024-07-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | FLUSHING AVENUE, BROOKLYN, FROM STREET SANDFORD STREET TO STREET WALWORTH STREET |
B022024170B68 | 2024-06-18 | 2024-07-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FLUSHING AVENUE, BROOKLYN, FROM STREET SANDFORD STREET TO STREET WALWORTH STREET |
X012024157A21 | 2024-06-05 | 2024-07-03 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEEKS AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 175 STREET |
B012024155C23 | 2024-06-03 | 2024-06-28 | PAVE STREET-W/ ENGINEERING & INSP FEE | ST MARKS AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012024151B06 | 2024-05-30 | 2024-06-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | NEW YORK AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET GLENWOOD ROAD |
B012024150B47 | 2024-05-29 | 2024-06-21 | PAVE STREET-W/ ENGINEERING & INSP FEE | NORTH 8 STREET, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET |
B022024143D46 | 2024-05-22 | 2024-07-24 | PLACE MATERIAL ON STREET | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B012024143C51 | 2024-05-22 | 2024-07-05 | OPEN SIDEWALK TO INSTALL FOUNDATION | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024143D64 | 2024-05-22 | 2024-07-24 | TEMP. CONST. SIGNS/MARKINGS | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022024143D59 | 2024-05-22 | 2024-07-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024143D58 | 2024-05-22 | 2024-07-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024143D57 | 2024-05-22 | 2024-07-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024143D56 | 2024-05-22 | 2024-07-05 | TEMP. CONST. SIGNS/MARKINGS | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024143D55 | 2024-05-22 | 2024-07-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024143D54 | 2024-05-22 | 2024-07-05 | OCCUPANCY OF ROADWAY AS STIPULATED | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024143D53 | 2024-05-22 | 2024-07-05 | PLACE MATERIAL ON STREET | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024143D52 | 2024-05-22 | 2024-07-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022024143D51 | 2024-05-22 | 2024-07-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022024143D50 | 2024-05-22 | 2024-07-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022024143D49 | 2024-05-22 | 2024-07-24 | TEMP. CONST. SIGNS/MARKINGS | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022024143D48 | 2024-05-22 | 2024-07-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022024143D47 | 2024-05-22 | 2024-07-24 | CROSSING SIDEWALK | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022024142B94 | 2024-05-21 | 2024-07-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024142C09 | 2024-05-21 | 2024-07-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024142C08 | 2024-05-21 | 2024-07-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024142C07 | 2024-05-21 | 2024-07-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024142C06 | 2024-05-21 | 2024-07-18 | OCCUPANCY OF ROADWAY AS STIPULATED | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024142C05 | 2024-05-21 | 2024-07-18 | CROSSING SIDEWALK | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024142C04 | 2024-05-21 | 2024-07-18 | PLACE MATERIAL ON STREET | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024142C03 | 2024-05-21 | 2024-07-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HANCOCK STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B022024142C02 | 2024-05-21 | 2024-07-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HANCOCK STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B022024142C01 | 2024-05-21 | 2024-07-24 | TEMP. CONST. SIGNS/MARKINGS | HANCOCK STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B022024142C00 | 2024-05-21 | 2024-07-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | HANCOCK STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B022024142B99 | 2024-05-21 | 2024-07-24 | OCCUPANCY OF ROADWAY AS STIPULATED | HANCOCK STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B022024142B98 | 2024-05-21 | 2024-07-24 | CROSSING SIDEWALK | HANCOCK STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B022024142B97 | 2024-05-21 | 2024-07-24 | PLACE MATERIAL ON STREET | HANCOCK STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B022024142B95 | 2024-05-21 | 2024-07-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024142B93 | 2024-05-21 | 2024-07-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024142B92 | 2024-05-21 | 2024-07-18 | OCCUPANCY OF ROADWAY AS STIPULATED | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024142B52 | 2024-05-21 | 2024-06-19 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FLUSHING AVENUE, BROOKLYN, FROM STREET SANDFORD STREET TO STREET WALWORTH STREET |
B022024142B51 | 2024-05-21 | 2024-06-19 | TEMP. CONST. SIGNS/MARKINGS | FLUSHING AVENUE, BROOKLYN, FROM STREET SANDFORD STREET TO STREET WALWORTH STREET |
B022024142B50 | 2024-05-21 | 2024-06-19 | OCCUPANCY OF ROADWAY AS STIPULATED | FLUSHING AVENUE, BROOKLYN, FROM STREET SANDFORD STREET TO STREET WALWORTH STREET |
B022024142B49 | 2024-05-21 | 2024-06-19 | TEMPORARY PEDESTRIAN WALK | FLUSHING AVENUE, BROOKLYN, FROM STREET SANDFORD STREET TO STREET WALWORTH STREET |
B022024142B48 | 2024-05-21 | 2024-06-19 | CROSSING SIDEWALK | FLUSHING AVENUE, BROOKLYN, FROM STREET SANDFORD STREET TO STREET WALWORTH STREET |
B022024142B90 | 2024-05-21 | 2024-07-18 | PLACE MATERIAL ON STREET | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024142B91 | 2024-05-21 | 2024-07-18 | CROSSING SIDEWALK | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B012024142B23 | 2024-05-21 | 2024-06-19 | OPEN PROTECTED SIDEWALK FOR FOUNDATION | FLUSHING AVENUE, BROOKLYN, FROM STREET SANDFORD STREET TO STREET WALWORTH STREET |
B022024141A68 | 2024-05-20 | 2024-06-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | FLUSHING AVENUE, BROOKLYN, FROM STREET SANDFORD STREET TO STREET WALWORTH STREET |
B022024141A69 | 2024-05-20 | 2024-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FLUSHING AVENUE, BROOKLYN, FROM STREET SANDFORD STREET TO STREET WALWORTH STREET |
B012024141B35 | 2024-05-20 | 2024-06-18 | INSTALL FENCE - PROTECTED | FLUSHING AVENUE, BROOKLYN, FROM STREET SANDFORD STREET TO STREET WALWORTH STREET |
Q042024140A03 | 2024-05-19 | 2024-06-15 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 72 AVENUE, QUEENS, FROM STREET AGUILAR AVENUE |
Q042024140A02 | 2024-05-19 | 2024-06-15 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 72 AVENUE, QUEENS, FROM STREET PARSONS BOULEVARD |
B022024134D86 | 2024-05-13 | 2024-07-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | DE KALB AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B012024134D00 | 2024-05-13 | 2024-06-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | DE KALB AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B022024134D87 | 2024-05-13 | 2024-07-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DE KALB AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B012024134C99 | 2024-05-13 | 2024-06-11 | RESET, REPAIR OR REPLACE CURB | DE KALB AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B042024134A28 | 2024-05-13 | 2024-06-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | DE KALB AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B022024124A30 | 2024-05-03 | 2024-07-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEIRFIELD STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024124A26 | 2024-05-03 | 2024-07-18 | OCCUPANCY OF ROADWAY AS STIPULATED | WEIRFIELD STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024124A28 | 2024-05-03 | 2024-07-18 | TEMP. CONST. SIGNS/MARKINGS | WEIRFIELD STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024124A29 | 2024-05-03 | 2024-07-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEIRFIELD STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024124A25 | 2024-05-03 | 2024-07-18 | CROSSING SIDEWALK | WEIRFIELD STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024124A24 | 2024-05-03 | 2024-07-18 | PLACE MATERIAL ON STREET | WEIRFIELD STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024124A27 | 2024-05-03 | 2024-07-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEIRFIELD STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024113C32 | 2024-04-22 | 2024-05-25 | TEMP. CONST. SIGNS/MARKINGS | HANCOCK STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B022024113C30 | 2024-04-22 | 2024-05-25 | OCCUPANCY OF ROADWAY AS STIPULATED | HANCOCK STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B022024113C29 | 2024-04-22 | 2024-05-25 | CROSSING SIDEWALK | HANCOCK STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B022024113C34 | 2024-04-22 | 2024-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HANCOCK STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B022024113C33 | 2024-04-22 | 2024-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HANCOCK STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B022024113C31 | 2024-04-22 | 2024-05-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | HANCOCK STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
X012024113A52 | 2024-04-22 | 2024-05-17 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 152 STREET, BRONX, FROM STREET COURTLANDT AVENUE TO STREET MELROSE AVENUE |
B022024113C28 | 2024-04-22 | 2024-05-25 | PLACE MATERIAL ON STREET | HANCOCK STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
Q012024106D52 | 2024-04-15 | 2024-05-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | METROPOLITAN AVENUE, QUEENS, FROM STREET 132 STREET TO STREET KEW GARDENS ROAD |
Q042024101A60 | 2024-04-10 | 2024-05-09 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 39 PLACE, QUEENS, FROM STREET 43 AVENUE TO STREET SKILLMAN AVENUE |
Q012024101C36 | 2024-04-10 | 2024-05-09 | RESET, REPAIR OR REPLACE CURB | 39 PLACE, QUEENS, FROM STREET 43 AVENUE TO STREET SKILLMAN AVENUE |
Q012024101C37 | 2024-04-10 | 2024-05-09 | PAVE STREET-W/ ENGINEERING & INSP FEE | 39 PLACE, QUEENS, FROM STREET 43 AVENUE TO STREET SKILLMAN AVENUE |
B012024096C71 | 2024-04-05 | 2024-05-07 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 16 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
Q042024096A62 | 2024-04-05 | 2024-05-07 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 150 STREET, QUEENS, FROM STREET 89 AVENUE TO STREET 90 AVENUE |
Q012024096D34 | 2024-04-05 | 2024-05-07 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 150 STREET, QUEENS, FROM STREET 89 AVENUE TO STREET 90 AVENUE |
Q012024096D35 | 2024-04-05 | 2024-05-07 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 150 STREET, QUEENS, FROM STREET 89 AVENUE TO STREET 90 AVENUE |
X012024095A68 | 2024-04-04 | 2024-05-04 | PAVE STREET-W/ ENGINEERING & INSP FEE | BEECH TERRACE, BRONX, FROM STREET BEEKMAN AVENUE TO STREET DEAD END |
B022024094A20 | 2024-04-03 | 2024-05-25 | OCCUPANCY OF ROADWAY AS STIPULATED | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022024094A19 | 2024-04-03 | 2024-05-25 | TEMPORARY PEDESTRIAN WALK | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022024094A18 | 2024-04-03 | 2024-05-25 | CROSSING SIDEWALK | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022024094A17 | 2024-04-03 | 2024-05-25 | PLACE MATERIAL ON STREET | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022024094A23 | 2024-04-03 | 2024-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022024094A21 | 2024-04-03 | 2024-05-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022024094A22 | 2024-04-03 | 2024-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022024088D80 | 2024-03-28 | 2024-05-25 | CROSSING SIDEWALK | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022024088D85 | 2024-03-28 | 2024-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022024088D81 | 2024-03-28 | 2024-05-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022024088D84 | 2024-03-28 | 2024-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022024088D83 | 2024-03-28 | 2024-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022024088D82 | 2024-03-28 | 2024-05-25 | TEMP. CONST. SIGNS/MARKINGS | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022024088D79 | 2024-03-28 | 2024-05-25 | PLACE MATERIAL ON STREET | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022024087A01 | 2024-03-27 | 2024-05-25 | CROSSING SIDEWALK | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024087C41 | 2024-03-27 | 2024-05-25 | TEMP. CONST. SIGNS/MARKINGS | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022024087C40 | 2024-03-27 | 2024-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024087C39 | 2024-03-27 | 2024-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024087C38 | 2024-03-27 | 2024-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024087C37 | 2024-03-27 | 2024-05-25 | TEMP. CONST. SIGNS/MARKINGS | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024087C36 | 2024-03-27 | 2024-05-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024087C35 | 2024-03-27 | 2024-05-25 | OCCUPANCY OF ROADWAY AS STIPULATED | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024087C34 | 2024-03-27 | 2024-05-25 | PLACE MATERIAL ON STREET | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022024087B85 | 2024-03-27 | 2024-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024087B84 | 2024-03-27 | 2024-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024087B83 | 2024-03-27 | 2024-05-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024087B82 | 2024-03-27 | 2024-05-25 | OCCUPANCY OF ROADWAY AS STIPULATED | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024087B81 | 2024-03-27 | 2024-05-25 | CROSSING SIDEWALK | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024087B80 | 2024-03-27 | 2024-05-25 | PLACE MATERIAL ON STREET | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024087A12 | 2024-03-27 | 2024-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022024087A11 | 2024-03-27 | 2024-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022024087A10 | 2024-03-27 | 2024-05-25 | TEMP. CONST. SIGNS/MARKINGS | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B012024087B29 | 2024-03-27 | 2024-05-25 | OPEN SIDEWALK TO INSTALL FOUNDATION | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B012024087B33 | 2024-03-27 | 2024-04-30 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022024087A09 | 2024-03-27 | 2024-05-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022024087A08 | 2024-03-27 | 2024-05-25 | OCCUPANCY OF ROADWAY AS STIPULATED | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022024087A06 | 2024-03-27 | 2024-05-25 | PLACE MATERIAL ON STREET | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022024087A05 | 2024-03-27 | 2024-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024087A04 | 2024-03-27 | 2024-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024087A03 | 2024-03-27 | 2024-05-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024087A02 | 2024-03-27 | 2024-05-25 | OCCUPANCY OF ROADWAY AS STIPULATED | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024087A00 | 2024-03-27 | 2024-05-25 | PLACE MATERIAL ON STREET | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024087A07 | 2024-03-27 | 2024-05-25 | CROSSING SIDEWALK | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
Q012024078B58 | 2024-03-18 | 2024-04-13 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 210 STREET, QUEENS, FROM STREET 50 AVENUE TO STREET 53 AVENUE |
Q012024078B59 | 2024-03-18 | 2024-04-13 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 210 STREET, QUEENS, FROM STREET 50 AVENUE TO STREET 53 AVENUE |
Q042024078A05 | 2024-03-18 | 2024-04-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 210 STREET, QUEENS, FROM STREET 50 AVENUE TO STREET 53 AVENUE |
Q012024060B25 | 2024-02-29 | 2024-03-30 | RESET, REPAIR OR REPLACE CURB | 127 STREET, QUEENS, FROM STREET 7 AVENUE TO STREET 9 AVENUE |
Q042024060A16 | 2024-02-29 | 2024-03-30 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 127 STREET, QUEENS, FROM STREET 7 AVENUE TO STREET 9 AVENUE |
Q012024060B26 | 2024-02-29 | 2024-03-28 | PAVE STREET-W/ ENGINEERING & INSP FEE | 127 STREET, QUEENS, FROM STREET 7 AVENUE TO STREET 9 AVENUE |
B012024053B03 | 2024-02-22 | 2024-03-22 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 16 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B042024052A23 | 2024-02-21 | 2024-03-22 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012024052C11 | 2024-02-21 | 2024-03-22 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022024038A16 | 2024-02-07 | 2024-05-06 | TEMP. CONST. SIGNS/MARKINGS | WEIRFIELD STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024038A12 | 2024-02-07 | 2024-05-06 | PLACE MATERIAL ON STREET | WEIRFIELD STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024038A13 | 2024-02-07 | 2024-05-06 | CROSSING SIDEWALK | WEIRFIELD STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024038A14 | 2024-02-07 | 2024-05-06 | OCCUPANCY OF ROADWAY AS STIPULATED | WEIRFIELD STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024038A18 | 2024-02-07 | 2024-05-06 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEIRFIELD STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024038A17 | 2024-02-07 | 2024-05-06 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEIRFIELD STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024038A15 | 2024-02-07 | 2024-05-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEIRFIELD STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
Q012024024B06 | 2024-01-24 | 2024-02-22 | PAVE STREET-W/ ENGINEERING & INSP FEE | GIPSON STREET, QUEENS, FROM STREET JAYDEE COURT TO STREET MOTT AVENUE |
B012024022B22 | 2024-01-22 | 2024-02-16 | PAVE STREET-W/ ENGINEERING & INSP FEE | GATES AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B042024017A09 | 2024-01-17 | 2024-02-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 20 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B012024017B50 | 2024-01-17 | 2024-02-13 | RESET, REPAIR OR REPLACE CURB | 20 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
Q012024012A96 | 2024-01-12 | 2024-01-12 | PAVE STREET-W/ ENGINEERING & INSP FEE | GIPSON STREET, QUEENS, FROM STREET JAYDEE COURT TO STREET MOTT AVENUE |
Q022024012A50 | 2024-01-12 | 2024-02-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | GIPSON STREET, QUEENS, FROM STREET JAYDEE COURT TO STREET MOTT AVENUE |
Q042024012A06 | 2024-01-12 | 2024-02-10 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | GIPSON STREET, QUEENS, FROM STREET JAYDEE COURT TO STREET MOTT AVENUE |
Q022024012A51 | 2024-01-12 | 2024-02-10 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | GIPSON STREET, QUEENS, FROM STREET JAYDEE COURT TO STREET MOTT AVENUE |
Q022024012A53 | 2024-01-12 | 2024-02-10 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | GIPSON STREET, QUEENS, FROM STREET JAYDEE COURT TO STREET MOTT AVENUE |
Q022024012A52 | 2024-01-12 | 2024-02-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | GIPSON STREET, QUEENS, FROM STREET JAYDEE COURT TO STREET MOTT AVENUE |
Q012024012A95 | 2024-01-12 | 2024-02-10 | RESET, REPAIR OR REPLACE CURB | GIPSON STREET, QUEENS, FROM STREET JAYDEE COURT TO STREET MOTT AVENUE |
Q012024012A94 | 2024-01-12 | 2024-02-10 | PAVE STREET-W/ ENGINEERING & INSP FEE | GIPSON STREET, QUEENS, FROM STREET JAYDEE COURT TO STREET MOTT AVENUE |
Q012024012A93 | 2024-01-12 | 2024-02-10 | RESET, REPAIR OR REPLACE CURB | GIPSON STREET, QUEENS, FROM STREET JAYDEE COURT TO STREET MOTT AVENUE |
Q042024012A05 | 2024-01-12 | 2024-02-10 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | GIPSON STREET, QUEENS, FROM STREET JAYDEE COURT TO STREET MOTT AVENUE |
B022024011A22 | 2024-01-11 | 2024-04-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | COVERT STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE |
B012024011B12 | 2024-01-11 | 2024-02-09 | RESET, REPAIR OR REPLACE CURB | COVERT STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE |
B012024011B13 | 2024-01-11 | 2024-02-09 | PAVE STREET-W/ ENGINEERING & INSP FEE | COVERT STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE |
B042024011A01 | 2024-01-11 | 2024-02-09 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | COVERT STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE |
B022024011A23 | 2024-01-11 | 2024-04-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COVERT STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE |
B012024008B64 | 2024-01-08 | 2024-02-02 | PAVE STREET-W/ ENGINEERING & INSP FEE | ROGERS AVENUE, BROOKLYN, FROM STREET PARK PLACE TO STREET PROSPECT PLACE |
B012024004C04 | 2024-01-04 | 2024-02-02 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 16 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
Q042024004A20 | 2024-01-04 | 2024-02-02 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 19 AVENUE, QUEENS, FROM STREET 149 STREET TO STREET 150 STREET |
Q012024004C34 | 2024-01-04 | 2024-02-02 | RESET, REPAIR OR REPLACE CURB | 19 AVENUE, QUEENS, FROM STREET 149 STREET TO STREET 150 STREET |
Q012024004C35 | 2024-01-04 | 2024-02-02 | PAVE STREET-W/ ENGINEERING & INSP FEE | 19 AVENUE, QUEENS, FROM STREET 149 STREET TO STREET 150 STREET |
B022024003C73 | 2024-01-03 | 2024-04-10 | TEMP. CONST. SIGNS/MARKINGS | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024003C82 | 2024-01-03 | 2024-04-10 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024003C81 | 2024-01-03 | 2024-04-10 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024003C80 | 2024-01-03 | 2024-04-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024003C79 | 2024-01-03 | 2024-04-10 | OCCUPANCY OF ROADWAY AS STIPULATED | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024003C78 | 2024-01-03 | 2024-04-10 | CROSSING SIDEWALK | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024003C77 | 2024-01-03 | 2024-04-10 | PLACE MATERIAL ON STREET | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022023363E56 | 2023-12-29 | 2024-03-30 | CROSSING SIDEWALK | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022023363E58 | 2023-12-29 | 2024-03-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022023363E59 | 2023-12-29 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022023363E60 | 2023-12-29 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022023363E61 | 2023-12-29 | 2024-03-30 | TEMP. CONST. SIGNS/MARKINGS | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022023363E62 | 2023-12-29 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022023363E81 | 2023-12-29 | 2024-01-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B042023363A10 | 2023-12-29 | 2024-01-30 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 16 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B022023363E55 | 2023-12-29 | 2024-03-30 | PLACE MATERIAL ON STREET | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022023363E57 | 2023-12-29 | 2024-03-30 | OCCUPANCY OF ROADWAY AS STIPULATED | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022023362D08 | 2023-12-28 | 2024-01-11 | PLACE MATERIAL ON STREET | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022023362D09 | 2023-12-28 | 2024-01-11 | CROSSING SIDEWALK | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022023362D11 | 2023-12-28 | 2024-01-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022023362D12 | 2023-12-28 | 2024-01-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022023362D13 | 2023-12-28 | 2024-01-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022023362D14 | 2023-12-28 | 2024-01-11 | TEMP. CONST. SIGNS/MARKINGS | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022023362D10 | 2023-12-28 | 2024-01-11 | OCCUPANCY OF ROADWAY AS STIPULATED | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022023361D45 | 2023-12-27 | 2024-03-30 | TEMP. CONST. SIGNS/MARKINGS | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B012023361C39 | 2023-12-27 | 2024-03-30 | OPEN PROTECTED SIDEWALK FOR FOUNDATION | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B012023361C43 | 2023-12-27 | 2024-03-30 | OPEN SIDEWALK TO INSTALL FOUNDATION | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022023361D40 | 2023-12-27 | 2024-03-30 | OCCUPANCY OF ROADWAY AS STIPULATED | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022023361D41 | 2023-12-27 | 2024-03-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022023361D42 | 2023-12-27 | 2024-03-30 | PLACE MATERIAL ON STREET | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022023361D43 | 2023-12-27 | 2024-03-30 | OCCUPANCY OF ROADWAY AS STIPULATED | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022023361D44 | 2023-12-27 | 2024-03-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022023361D46 | 2023-12-27 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022023361D47 | 2023-12-27 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022023361D48 | 2023-12-27 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022023360B06 | 2023-12-26 | 2024-03-30 | OCCUPANCY OF ROADWAY AS STIPULATED | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022023360B07 | 2023-12-26 | 2024-03-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022023360B08 | 2023-12-26 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022023360B09 | 2023-12-26 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022023360B14 | 2023-12-26 | 2024-03-30 | PLACE MATERIAL ON STREET | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023360B15 | 2023-12-26 | 2024-03-30 | CROSSING SIDEWALK | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023360B16 | 2023-12-26 | 2024-03-30 | OCCUPANCY OF ROADWAY AS STIPULATED | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023360B17 | 2023-12-26 | 2024-03-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023360B18 | 2023-12-26 | 2024-03-30 | TEMP. CONST. SIGNS/MARKINGS | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023360B19 | 2023-12-26 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023360B20 | 2023-12-26 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023360B03 | 2023-12-26 | 2024-03-30 | PLACE MATERIAL ON STREET | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022023360B04 | 2023-12-26 | 2024-03-30 | CROSSING SIDEWALK | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022023360B05 | 2023-12-26 | 2024-03-30 | TEMPORARY PEDESTRIAN WALK | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012023354B48 | 2023-12-20 | 2024-01-17 | PAVE STREET-W/ ENGINEERING & INSP FEE | GATES AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
X042023354A09 | 2023-12-20 | 2024-01-16 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 152 STREET, BRONX, FROM STREET COURTLANDT AVENUE TO STREET MELROSE AVENUE |
X022023354B27 | 2023-12-20 | 2024-01-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 152 STREET, BRONX, FROM STREET COURTLANDT AVENUE TO STREET MELROSE AVENUE |
X022023354B26 | 2023-12-20 | 2024-01-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 152 STREET, BRONX, FROM STREET COURTLANDT AVENUE TO STREET MELROSE AVENUE |
X012023354A31 | 2023-12-20 | 2024-01-16 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 152 STREET, BRONX, FROM STREET COURTLANDT AVENUE TO STREET MELROSE AVENUE |
B042023354A10 | 2023-12-20 | 2024-01-17 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | GATES AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
X012023354A30 | 2023-12-20 | 2024-01-16 | RESET, REPAIR OR REPLACE CURB | EAST 152 STREET, BRONX, FROM STREET COURTLANDT AVENUE TO STREET MELROSE AVENUE |
B012023354B47 | 2023-12-20 | 2024-01-17 | RESET, REPAIR OR REPLACE CURB | GATES AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B012023352B59 | 2023-12-18 | 2024-01-13 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | DEAN STREET, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE |
B012023334B85 | 2023-11-30 | 2023-12-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | 20 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B022023331B57 | 2023-11-27 | 2023-12-31 | TEMP. CONST. SIGNS/MARKINGS | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022023326A69 | 2023-11-22 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022023326A48 | 2023-11-22 | 2023-12-31 | PLACE MATERIAL ON STREET | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023326A49 | 2023-11-22 | 2023-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023326A50 | 2023-11-22 | 2023-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023326A51 | 2023-11-22 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023326A52 | 2023-11-22 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023326A53 | 2023-11-22 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023326A54 | 2023-11-22 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023326A63 | 2023-11-22 | 2023-12-31 | PLACE MATERIAL ON STREET | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022023326A64 | 2023-11-22 | 2023-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022023326A65 | 2023-11-22 | 2023-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022023326A66 | 2023-11-22 | 2023-12-31 | TEMP. CONST. SIGNS/MARKINGS | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022023326A67 | 2023-11-22 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022023326A68 | 2023-11-22 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B012023326B16 | 2023-11-22 | 2023-12-31 | OPEN SIDEWALK TO INSTALL FOUNDATION | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022023325B38 | 2023-11-21 | 2023-12-31 | TEMP. CONST. SIGNS/MARKINGS | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B012023325A85 | 2023-11-21 | 2023-12-31 | OPEN PROTECTED SIDEWALK FOR FOUNDATION | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022023325C56 | 2023-11-21 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022023325C55 | 2023-11-21 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022023325C54 | 2023-11-21 | 2023-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022023325C53 | 2023-11-21 | 2023-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022023325C52 | 2023-11-21 | 2023-12-31 | CROSSING SIDEWALK | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022023325C51 | 2023-11-21 | 2023-12-31 | PLACE MATERIAL ON STREET | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022023325B40 | 2023-11-21 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023325B39 | 2023-11-21 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023325B37 | 2023-11-21 | 2023-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023325B36 | 2023-11-21 | 2023-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023325B35 | 2023-11-21 | 2023-12-31 | CROSSING SIDEWALK | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023325B34 | 2023-11-21 | 2023-12-31 | PLACE MATERIAL ON STREET | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023325B30 | 2023-11-21 | 2023-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022023325B29 | 2023-11-21 | 2023-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022023324A98 | 2023-11-20 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022023324A97 | 2023-11-20 | 2023-12-31 | TEMP. CONST. SIGNS/MARKINGS | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022023317B78 | 2023-11-13 | 2023-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022023317B79 | 2023-11-13 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022023317B80 | 2023-11-13 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022023317B76 | 2023-11-13 | 2023-12-31 | TEMPORARY PEDESTRIAN WALK | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022023317B77 | 2023-11-13 | 2023-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022023317B74 | 2023-11-13 | 2023-12-31 | PLACE MATERIAL ON STREET | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022023317B75 | 2023-11-13 | 2023-12-31 | CROSSING SIDEWALK | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012023313C06 | 2023-11-09 | 2023-12-06 | PAVE STREET-W/ ENGINEERING & INSP FEE | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
B012023306B19 | 2023-11-02 | 2023-11-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | 54 STREET, BROOKLYN, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
B022023303D03 | 2023-10-30 | 2023-11-25 | CROSSING SIDEWALK | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022023303D04 | 2023-10-30 | 2023-11-25 | OCCUPANCY OF ROADWAY AS STIPULATED | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022023303D06 | 2023-10-30 | 2023-11-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022023303D05 | 2023-10-30 | 2023-11-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022023303D07 | 2023-10-30 | 2023-11-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022023303D02 | 2023-10-30 | 2023-11-25 | PLACE MATERIAL ON STREET | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B012023299D64 | 2023-10-26 | 2023-11-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | RUTLAND ROAD, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B012023299D63 | 2023-10-26 | 2023-11-24 | RESET, REPAIR OR REPLACE CURB | RUTLAND ROAD, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B022023299C77 | 2023-10-26 | 2023-11-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLAND ROAD, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B042023299A72 | 2023-10-26 | 2023-11-24 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | RUTLAND ROAD, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B022023299C78 | 2023-10-26 | 2023-11-24 | OCCUPANCY OF ROADWAY AS STIPULATED | RUTLAND ROAD, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B022023297D62 | 2023-10-24 | 2023-11-25 | TEMP. CONST. SIGNS/MARKINGS | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023297D64 | 2023-10-24 | 2023-11-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023297D63 | 2023-10-24 | 2023-11-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023297D61 | 2023-10-24 | 2023-11-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023297D60 | 2023-10-24 | 2023-11-25 | OCCUPANCY OF ROADWAY AS STIPULATED | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023297D59 | 2023-10-24 | 2023-11-25 | CROSSING SIDEWALK | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023297D58 | 2023-10-24 | 2023-11-25 | PLACE MATERIAL ON STREET | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B012023297B12 | 2023-10-24 | 2023-11-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | 15 AVENUE, BROOKLYN, FROM STREET 47 STREET TO STREET 48 STREET |
B012023297B13 | 2023-10-24 | 2023-11-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | 15 AVENUE, BROOKLYN, FROM STREET 48 STREET |
B012023297B14 | 2023-10-24 | 2023-11-15 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 48 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
B022023292B78 | 2023-10-19 | 2023-11-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023292B75 | 2023-10-19 | 2023-11-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023292B74 | 2023-10-19 | 2023-11-25 | OCCUPANCY OF ROADWAY AS STIPULATED | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023292B73 | 2023-10-19 | 2023-11-25 | PLACE MATERIAL ON STREET | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023292B79 | 2023-10-19 | 2023-11-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023292B77 | 2023-10-19 | 2023-11-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023292B76 | 2023-10-19 | 2023-11-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B012023290A83 | 2023-10-17 | 2023-11-15 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | MILFORD STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
B022023290A49 | 2023-10-17 | 2023-11-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MILFORD STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
B042023290A94 | 2023-10-17 | 2023-11-15 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MILFORD STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
B012023290A82 | 2023-10-17 | 2023-11-15 | RESET, REPAIR OR REPLACE CURB-PROTECTED | MILFORD STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
M012023277B61 | 2023-10-04 | 2023-10-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 110 STREET, MANHATTAN, FROM STREET FRAWLEY CIRCLE TO STREET MADISON AVENUE |
Q012023277B65 | 2023-10-04 | 2023-11-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEEKS LANE, QUEENS, FROM STREET 50 AVENUE TO STREET 51 AVENUE |
M012023277B62 | 2023-10-04 | 2023-10-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | MADISON AVENUE, MANHATTAN, FROM STREET EAST 109 STREET TO STREET EAST 110 STREET |
B022023275B30 | 2023-10-02 | 2023-12-30 | OCCUPANCY OF ROADWAY AS STIPULATED | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022023275B29 | 2023-10-02 | 2023-12-30 | CROSSING SIDEWALK | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022023275B28 | 2023-10-02 | 2023-12-30 | PLACE MATERIAL ON STREET | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022023275B33 | 2023-10-02 | 2023-12-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022023275B32 | 2023-10-02 | 2023-12-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022023275B31 | 2023-10-02 | 2023-12-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B012023269B19 | 2023-09-26 | 2023-10-24 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | PITKIN AVENUE, BROOKLYN, FROM STREET CLEVELAND STREET TO STREET ELTON STREET |
B012023269B20 | 2023-09-26 | 2023-10-24 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | CLEVELAND STREET, BROOKLYN, FROM STREET PITKIN AVENUE |
B012023269B21 | 2023-09-26 | 2023-10-24 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | CLEVELAND STREET, BROOKLYN, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE |
M012023261B04 | 2023-09-18 | 2023-10-17 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 110 STREET, MANHATTAN, FROM STREET FRAWLEY CIRCLE TO STREET MADISON AVENUE |
B022023249A81 | 2023-09-06 | 2023-11-25 | TEMP. CONST. SIGNS/MARKINGS | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
Q012023249B58 | 2023-09-06 | 2023-10-05 | PAVE STREET-W/ ENGINEERING & INSP FEE | 46 ROAD, QUEENS, FROM STREET 202 STREET TO STREET 204 STREET |
B022023248D90 | 2023-09-05 | 2023-10-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | LEE AVENUE, BROOKLYN, FROM STREET HEYWARD STREET TO STREET LYNCH STREET |
B042023248A49 | 2023-09-05 | 2023-09-26 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | LEE AVENUE, BROOKLYN, FROM STREET HEYWARD STREET TO STREET LYNCH STREET |
B012023248B15 | 2023-09-05 | 2023-09-26 | RESET, REPAIR OR REPLACE CURB | LEE AVENUE, BROOKLYN, FROM STREET HEYWARD STREET TO STREET LYNCH STREET |
B012023248B16 | 2023-09-05 | 2023-09-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | LEE AVENUE, BROOKLYN, FROM STREET HEYWARD STREET TO STREET LYNCH STREET |
B022023248D91 | 2023-09-05 | 2023-10-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | LEE AVENUE, BROOKLYN, FROM STREET HEYWARD STREET TO STREET LYNCH STREET |
B022023244A54 | 2023-09-01 | 2023-11-25 | TEMP. CONST. SIGNS/MARKINGS | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022023244A55 | 2023-09-01 | 2023-11-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022023233A91 | 2023-08-21 | 2023-11-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 59 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
B012023233A84 | 2023-08-21 | 2023-09-19 | RESET, REPAIR OR REPLACE CURB | 59 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
B042023233A10 | 2023-08-21 | 2023-09-19 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 59 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
B012023233A85 | 2023-08-21 | 2023-09-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | 59 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
B022023233A90 | 2023-08-21 | 2023-11-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | 59 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
B022023229B10 | 2023-08-17 | 2023-11-14 | PLACE MATERIAL ON STREET | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022023229B16 | 2023-08-17 | 2023-11-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022023229B15 | 2023-08-17 | 2023-11-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022023229B14 | 2023-08-17 | 2023-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022023229B13 | 2023-08-17 | 2023-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022023229B12 | 2023-08-17 | 2023-11-14 | TEMPORARY PEDESTRIAN WALK | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022023229B11 | 2023-08-17 | 2023-11-14 | CROSSING SIDEWALK | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022023227A50 | 2023-08-15 | 2023-11-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022023227A51 | 2023-08-15 | 2023-11-06 | TEMP. CONST. SIGNS/MARKINGS | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022023227A52 | 2023-08-15 | 2023-11-06 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022023227A55 | 2023-08-15 | 2023-11-06 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022023227A49 | 2023-08-15 | 2023-11-06 | OCCUPANCY OF ROADWAY AS STIPULATED | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022023227A48 | 2023-08-15 | 2023-11-06 | PLACE MATERIAL ON STREET | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B012023227A73 | 2023-08-15 | 2023-11-06 | OPEN SIDEWALK TO INSTALL FOUNDATION | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B012023227A74 | 2023-08-15 | 2023-09-07 | INSTALL FENCE | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022023227A53 | 2023-08-15 | 2023-11-06 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022023227A54 | 2023-08-15 | 2023-11-06 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DE GRAW STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET STRONG PLACE |
B022023223A57 | 2023-08-11 | 2023-10-31 | OCCUPANCY OF ROADWAY AS STIPULATED | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B012023223A54 | 2023-08-11 | 2023-09-01 | INSTALL FENCE - PROTECTED | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B012023223A53 | 2023-08-11 | 2023-10-31 | OPEN PROTECTED SIDEWALK FOR FOUNDATION | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022023223A58 | 2023-08-11 | 2023-10-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022023222C41 | 2023-08-10 | 2023-11-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022023222C40 | 2023-08-10 | 2023-11-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B012023222B62 | 2023-08-10 | 2023-09-07 | PAVE STREET-W/ ENGINEERING & INSP FEE | BROOKLYN AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET GLENWOOD ROAD |
B022023222C37 | 2023-08-10 | 2023-11-04 | PLACE MATERIAL ON STREET | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022023222C39 | 2023-08-10 | 2023-11-04 | OCCUPANCY OF ROADWAY AS STIPULATED | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022023222C38 | 2023-08-10 | 2023-11-04 | CROSSING SIDEWALK | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022023222C43 | 2023-08-10 | 2023-09-08 | TEMP. CONST. SIGNS/MARKINGS | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022023222C42 | 2023-08-10 | 2023-11-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
Q012023219C35 | 2023-08-07 | 2023-09-06 | PAVE STREET-W/ ENGINEERING & INSP FEE | 25 AVENUE, QUEENS, FROM STREET 125 STREET |
Q012023219C34 | 2023-08-07 | 2023-09-06 | PAVE STREET-W/ ENGINEERING & INSP FEE | 25 AVENUE, QUEENS, FROM STREET 125 STREET TO STREET 126 STREET |
Q012023219C36 | 2023-08-07 | 2023-09-06 | PAVE STREET-W/ ENGINEERING & INSP FEE | 125 STREET, QUEENS, FROM STREET 23 AVENUE TO STREET 25 AVENUE |
Q042023205A19 | 2023-07-24 | 2023-08-22 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 188 STREET, QUEENS, FROM STREET PERTH ROAD |
Q042023205A20 | 2023-07-24 | 2023-08-22 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 188 STREET, QUEENS, FROM STREET PERTH ROAD |
B012023202A60 | 2023-07-21 | 2023-08-22 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 14 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022023202A72 | 2023-07-21 | 2023-10-22 | TEMP. CONST. SIGNS/MARKINGS | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022023202A71 | 2023-07-21 | 2023-10-22 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022023202A70 | 2023-07-21 | 2023-10-22 | PLACE MATERIAL ON STREET | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022023202A54 | 2023-07-21 | 2023-10-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023202A53 | 2023-07-21 | 2023-10-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023202A52 | 2023-07-21 | 2023-10-22 | TEMP. CONST. SIGNS/MARKINGS | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023202A51 | 2023-07-21 | 2023-10-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023202A50 | 2023-07-21 | 2023-10-22 | OCCUPANCY OF ROADWAY AS STIPULATED | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023202A48 | 2023-07-21 | 2023-10-22 | PLACE MATERIAL ON STREET | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023202A45 | 2023-07-21 | 2023-10-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023202A44 | 2023-07-21 | 2023-10-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023202A43 | 2023-07-21 | 2023-10-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023202A42 | 2023-07-21 | 2023-10-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023202A41 | 2023-07-21 | 2023-10-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023202A40 | 2023-07-21 | 2023-10-22 | OCCUPANCY OF ROADWAY AS STIPULATED | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023202A39 | 2023-07-21 | 2023-10-22 | PLACE MATERIAL ON STREET | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023202A49 | 2023-07-21 | 2023-10-22 | CROSSING SIDEWALK | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B042023202A14 | 2023-07-21 | 2023-08-22 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 14 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B012023202A59 | 2023-07-21 | 2023-08-22 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 14 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022023202A73 | 2023-07-21 | 2023-10-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B012023177C62 | 2023-06-26 | 2023-07-22 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | NEW YORK AVENUE, BROOKLYN, FROM STREET NEWKIRK AVENUE |
B012023177C61 | 2023-06-26 | 2023-07-22 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | NEW YORK AVENUE, BROOKLYN, FROM STREET AVENUE D TO STREET NEWKIRK AVENUE |
B012023172B06 | 2023-06-21 | 2023-07-13 | PAVE STREET-W/ ENGINEERING & INSP FEE | WINDSOR PLACE, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012023172B36 | 2023-06-21 | 2023-07-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | 53 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE |
B012023172B44 | 2023-06-21 | 2023-07-13 | RESET, REPAIR OR REPLACE CURB | CONEY ISLAND AVENUE, BROOKLYN, FROM STREET BANNER AVENUE TO STREET SHORE PARKWAY |
B012023172B45 | 2023-06-21 | 2023-07-13 | PAVE STREET-W/ ENGINEERING & INSP FEE | CONEY ISLAND AVENUE, BROOKLYN, FROM STREET BANNER AVENUE TO STREET SHORE PARKWAY |
B022023172B92 | 2023-06-21 | 2023-07-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CONEY ISLAND AVENUE, BROOKLYN, FROM STREET BANNER AVENUE TO STREET SHORE PARKWAY |
B042023172A16 | 2023-06-21 | 2023-07-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WINDSOR PLACE, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B042023172A22 | 2023-06-21 | 2023-07-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CONEY ISLAND AVENUE, BROOKLYN, FROM STREET BANNER AVENUE TO STREET SHORE PARKWAY |
B012023172B05 | 2023-06-21 | 2023-07-13 | RESET, REPAIR OR REPLACE CURB | WINDSOR PLACE, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012023167C00 | 2023-06-16 | 2023-07-13 | PAVE STREET-W/ ENGINEERING & INSP FEE | PARK AVENUE, BROOKLYN, FROM STREET CUMBERLAND STREET TO STREET NORTH OXFORD STREET |
B022023167B74 | 2023-06-16 | 2023-07-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | PARK AVENUE, BROOKLYN, FROM STREET CUMBERLAND STREET TO STREET NORTH OXFORD STREET |
B022023167B75 | 2023-06-16 | 2023-07-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PARK AVENUE, BROOKLYN, FROM STREET CUMBERLAND STREET TO STREET NORTH OXFORD STREET |
B022023167B76 | 2023-06-16 | 2023-07-13 | TEMPORARY PEDESTRIAN WALK | PARK AVENUE, BROOKLYN, FROM STREET CUMBERLAND STREET TO STREET NORTH OXFORD STREET |
B042023167A24 | 2023-06-16 | 2023-07-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | PARK AVENUE, BROOKLYN, FROM STREET CUMBERLAND STREET TO STREET NORTH OXFORD STREET |
B012023167B99 | 2023-06-16 | 2023-07-13 | RESET, REPAIR OR REPLACE CURB | PARK AVENUE, BROOKLYN, FROM STREET CUMBERLAND STREET TO STREET NORTH OXFORD STREET |
B012023166B88 | 2023-06-15 | 2023-07-14 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | NEWKIRK AVENUE, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
X012023163C41 | 2023-06-12 | 2023-07-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 169 STREET, BRONX, FROM STREET NELSON AVENUE TO STREET SHAKESPEARE AVENUE |
Q042023159A20 | 2023-06-08 | 2023-07-07 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 72 AVENUE, QUEENS, FROM STREET AGUILAR AVENUE |
Q042023159A21 | 2023-06-08 | 2023-07-07 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 72 AVENUE, QUEENS, FROM STREET PARSONS BOULEVARD |
B022023157B53 | 2023-06-06 | 2023-07-24 | CROSSING SIDEWALK | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023157B52 | 2023-06-06 | 2023-07-24 | PLACE MATERIAL ON STREET | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023157B56 | 2023-06-06 | 2023-07-24 | TEMP. CONST. SIGNS/MARKINGS | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023157B57 | 2023-06-06 | 2023-07-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B012023157B72 | 2023-06-06 | 2023-07-05 | RESET, REPAIR OR REPLACE CURB | GARFIELD PLACE, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022023157B54 | 2023-06-06 | 2023-07-24 | OCCUPANCY OF ROADWAY AS STIPULATED | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B042023157A40 | 2023-06-06 | 2023-07-05 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | GARFIELD PLACE, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022023157B55 | 2023-06-06 | 2023-07-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023157B58 | 2023-06-06 | 2023-07-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023157C53 | 2023-06-06 | 2023-07-05 | TEMPORARY PEDESTRIAN WALK | GARFIELD PLACE, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022023157C52 | 2023-06-06 | 2023-07-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | GARFIELD PLACE, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022023152D74 | 2023-06-01 | 2023-07-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | WINTHROP STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B022023152D75 | 2023-06-01 | 2023-07-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WINTHROP STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012023152C75 | 2023-06-01 | 2023-07-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | WINTHROP STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012023152C74 | 2023-06-01 | 2023-07-01 | RESET, REPAIR OR REPLACE CURB | WINTHROP STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B042023152A34 | 2023-06-01 | 2023-07-01 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WINTHROP STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B022023150C21 | 2023-05-30 | 2023-07-24 | PLACE MATERIAL ON STREET | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022023150C19 | 2023-05-30 | 2023-07-24 | TEMP. CONST. SIGNS/MARKINGS | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022023150C20 | 2023-05-30 | 2023-07-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022023150C18 | 2023-05-30 | 2023-07-24 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022023143A97 | 2023-05-23 | 2023-06-24 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022023143A96 | 2023-05-23 | 2023-06-24 | PLACE MATERIAL ON STREET | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022023143A92 | 2023-05-23 | 2023-07-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022023143A91 | 2023-05-23 | 2023-07-24 | TEMP. CONST. SIGNS/MARKINGS | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022023143A99 | 2023-05-23 | 2023-06-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022023143A98 | 2023-05-23 | 2023-06-24 | TEMP. CONST. SIGNS/MARKINGS | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
Q042023137A13 | 2023-05-17 | 2023-06-15 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 188 STREET, QUEENS, FROM STREET PERTH ROAD |
Q042023137A14 | 2023-05-17 | 2023-06-14 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 188 STREET, QUEENS, FROM STREET PERTH ROAD |
B022023136C03 | 2023-05-16 | 2023-07-24 | OCCUPANCY OF ROADWAY AS STIPULATED | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022023136B46 | 2023-05-16 | 2023-07-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023136B47 | 2023-05-16 | 2023-07-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023136B44 | 2023-05-16 | 2023-07-24 | PLACE MATERIAL ON STREET | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023136C02 | 2023-05-16 | 2023-07-24 | TEMPORARY PEDESTRIAN WALK | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022023136C04 | 2023-05-16 | 2023-07-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022023136C05 | 2023-05-16 | 2023-07-24 | TEMP. CONST. SIGNS/MARKINGS | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022023136C06 | 2023-05-16 | 2023-07-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022023136C07 | 2023-05-16 | 2023-07-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022023136B48 | 2023-05-16 | 2023-07-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023136B45 | 2023-05-16 | 2023-07-24 | OCCUPANCY OF ROADWAY AS STIPULATED | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023136B49 | 2023-05-16 | 2023-07-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023136B50 | 2023-05-16 | 2023-07-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023136C00 | 2023-05-16 | 2023-07-24 | PLACE MATERIAL ON STREET | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022023136C01 | 2023-05-16 | 2023-07-24 | CROSSING SIDEWALK | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B012023134A01 | 2023-05-14 | 2023-06-07 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022023134A06 | 2023-05-14 | 2023-07-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022023134A07 | 2023-05-14 | 2023-06-07 | TEMPORARY PEDESTRIAN WALK | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022023134A05 | 2023-05-14 | 2023-07-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B012023134A00 | 2023-05-14 | 2023-06-07 | RESET, REPAIR OR REPLACE CURB-PROTECTED | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B042023134A00 | 2023-05-14 | 2023-06-07 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B012023131B16 | 2023-05-11 | 2023-06-08 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST END AVENUE, BROOKLYN, FROM STREET CASS PLACE TO STREET OCEAN COURT |
B042023125A33 | 2023-05-05 | 2023-05-25 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | ST MARK'S AVENUE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY |
B022023125B06 | 2023-05-05 | 2023-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ST MARK'S AVENUE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY |
B012023125B56 | 2023-05-05 | 2023-05-25 | RESET, REPAIR OR REPLACE CURB | ST MARK'S AVENUE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY |
B012023125B57 | 2023-05-05 | 2023-05-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | ST MARK'S AVENUE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY |
B012023123C49 | 2023-05-03 | 2023-05-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | CLASSON AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE |
B022023123A35 | 2023-05-03 | 2023-05-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | CLASSON AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE |
B042023123A04 | 2023-05-03 | 2023-05-25 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CLASSON AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE |
B012023123C48 | 2023-05-03 | 2023-05-25 | RESET, REPAIR OR REPLACE CURB | CLASSON AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE |
B022023123A36 | 2023-05-03 | 2023-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLASSON AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE |
Q042023117A15 | 2023-04-27 | 2023-05-19 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 72 AVENUE, QUEENS, FROM STREET PARSONS BOULEVARD |
Q042023117A18 | 2023-04-27 | 2023-05-25 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 89 STREET, QUEENS, FROM STREET ASTORIA BOULEVARD |
Q042023117A13 | 2023-04-27 | 2023-05-19 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 72 AVENUE, QUEENS, FROM STREET PARSONS BOULEVARD |
Q042023117A14 | 2023-04-27 | 2023-05-19 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 72 AVENUE, QUEENS, FROM STREET PARSONS BOULEVARD |
Q042023117A16 | 2023-04-27 | 2023-05-19 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 72 AVENUE, QUEENS, FROM STREET AGUILAR AVENUE |
Q042023117A17 | 2023-04-27 | 2023-05-19 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 72 AVENUE, QUEENS, FROM STREET AGUILAR AVENUE |
Q012023116A97 | 2023-04-26 | 2023-05-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | PARSONS BOULEVARD, QUEENS, FROM STREET 71 AVENUE TO STREET 72 AVENUE |
Q012023116A98 | 2023-04-26 | 2023-05-24 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 72 AVENUE, QUEENS, FROM STREET AGUILAR AVENUE TO STREET PARSONS BOULEVARD |
Q012023116A99 | 2023-04-26 | 2023-05-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | AGUILAR AVENUE, QUEENS, FROM STREET 72 AVENUE |
Q012023116B00 | 2023-04-26 | 2023-05-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | AGUILAR AVENUE, QUEENS, FROM STREET 72 AVENUE TO STREET BEND |
B022023115A98 | 2023-04-25 | 2023-05-25 | PLACE MATERIAL ON STREET | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022023115B00 | 2023-04-25 | 2023-05-25 | TEMP. CONST. SIGNS/MARKINGS | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022023115B01 | 2023-04-25 | 2023-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022023115A99 | 2023-04-25 | 2023-05-25 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B042023114A79 | 2023-04-24 | 2023-05-18 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CORTELYOU ROAD, BROOKLYN, FROM STREET EAST 11 STREET TO STREET EAST 12 STREET |
B012023114B88 | 2023-04-24 | 2023-05-18 | RESET, REPAIR OR REPLACE CURB-PROTECTED | CORTELYOU ROAD, BROOKLYN, FROM STREET EAST 11 STREET TO STREET EAST 12 STREET |
B012023114C39 | 2023-04-24 | 2023-05-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N |
B022023114B65 | 2023-04-24 | 2023-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CORTELYOU ROAD, BROOKLYN, FROM STREET EAST 11 STREET TO STREET EAST 12 STREET |
B012023114B89 | 2023-04-24 | 2023-05-18 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | CORTELYOU ROAD, BROOKLYN, FROM STREET EAST 11 STREET TO STREET EAST 12 STREET |
B012023111B19 | 2023-04-21 | 2023-05-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | BROOKLYN AVENUE, BROOKLYN, FROM STREET AVENUE I TO STREET LIRR BAY RIDGE DIV |
B012023107A61 | 2023-04-17 | 2023-05-16 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEIRFIELD STREET, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B042023107A14 | 2023-04-17 | 2023-05-18 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | LEXINGTON AVENUE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE |
B012023107A46 | 2023-04-17 | 2023-05-18 | RESET, REPAIR OR REPLACE CURB-PROTECTED | LEXINGTON AVENUE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE |
B012023107A47 | 2023-04-17 | 2023-05-18 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | LEXINGTON AVENUE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE |
B012023107B82 | 2023-04-17 | 2023-05-16 | PAVE STREET-W/ ENGINEERING & INSP FEE | NEWELL STREET, BROOKLYN, FROM STREET MESEROLE AVENUE TO STREET NORMAN AVENUE |
B022023102A58 | 2023-04-12 | 2023-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012023102B64 | 2023-04-12 | 2023-05-10 | RESET, REPAIR OR REPLACE CURB-PROTECTED | BUFFALO AVENUE, BROOKLYN, FROM STREET ST JOHNS PLACE TO STREET STERLING PLACE |
B022023102A57 | 2023-04-12 | 2023-05-25 | TEMP. CONST. SIGNS/MARKINGS | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B042023102A08 | 2023-04-12 | 2023-05-09 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BUFFALO AVENUE, BROOKLYN, FROM STREET ST JOHNS PLACE TO STREET STERLING PLACE |
Q042023099A00 | 2023-04-09 | 2023-05-03 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | PARSONS BOULEVARD, QUEENS, FROM STREET 71 AVENUE TO STREET 72 AVENUE |
Q022023099A03 | 2023-04-09 | 2023-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 72 AVENUE, QUEENS, FROM STREET AGUILAR AVENUE TO STREET PARSONS BOULEVARD |
Q022023099A04 | 2023-04-09 | 2023-05-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | AGUILAR AVENUE, QUEENS, FROM STREET 72 AVENUE TO STREET BEND |
Q022023099A05 | 2023-04-09 | 2023-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AGUILAR AVENUE, QUEENS, FROM STREET 72 AVENUE TO STREET BEND |
Q012023099A01 | 2023-04-09 | 2023-05-03 | RESET, REPAIR OR REPLACE CURB | PARSONS BOULEVARD, QUEENS, FROM STREET 71 AVENUE TO STREET 72 AVENUE |
Q012023099A02 | 2023-04-09 | 2023-05-03 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 72 AVENUE, QUEENS, FROM STREET AGUILAR AVENUE TO STREET PARSONS BOULEVARD |
Q012023099A03 | 2023-04-09 | 2023-05-03 | RESET, REPAIR OR REPLACE CURB | AGUILAR AVENUE, QUEENS, FROM STREET 72 AVENUE TO STREET BEND |
Q022023099A02 | 2023-04-09 | 2023-05-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | 72 AVENUE, QUEENS, FROM STREET AGUILAR AVENUE TO STREET PARSONS BOULEVARD |
Q022023099A01 | 2023-04-09 | 2023-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PARSONS BOULEVARD, QUEENS, FROM STREET 71 AVENUE TO STREET 72 AVENUE |
Q022023099A00 | 2023-04-09 | 2023-05-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | PARSONS BOULEVARD, QUEENS, FROM STREET 71 AVENUE TO STREET 72 AVENUE |
B012023099A00 | 2023-04-09 | 2023-05-04 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | BUFFALO AVENUE, BROOKLYN, FROM STREET ST JOHNS PLACE TO STREET STERLING PLACE |
Q042023099A01 | 2023-04-09 | 2023-05-03 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 72 AVENUE, QUEENS, FROM STREET AGUILAR AVENUE TO STREET PARSONS BOULEVARD |
Q042023099A02 | 2023-04-09 | 2023-05-03 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | AGUILAR AVENUE, QUEENS, FROM STREET 72 AVENUE TO STREET BEND |
X012023094B57 | 2023-04-04 | 2023-04-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | BRONXWOOD AVENUE, BRONX, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE |
B022023093C51 | 2023-04-03 | 2023-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023093B75 | 2023-04-03 | 2023-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022023093B69 | 2023-04-03 | 2023-05-25 | PLACE MATERIAL ON STREET | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022023093B70 | 2023-04-03 | 2023-05-25 | CROSSING SIDEWALK | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022023093B71 | 2023-04-03 | 2023-05-25 | TEMPORARY PEDESTRIAN WALK | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022023093C52 | 2023-04-03 | 2023-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023093C50 | 2023-04-03 | 2023-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023093C49 | 2023-04-03 | 2023-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023093B72 | 2023-04-03 | 2023-05-25 | OCCUPANCY OF ROADWAY AS STIPULATED | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022023093B74 | 2023-04-03 | 2023-05-25 | TEMP. CONST. SIGNS/MARKINGS | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022023093B73 | 2023-04-03 | 2023-05-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022023093C48 | 2023-04-03 | 2023-05-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023093C47 | 2023-04-03 | 2023-05-25 | OCCUPANCY OF ROADWAY AS STIPULATED | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023093C46 | 2023-04-03 | 2023-05-25 | PLACE MATERIAL ON STREET | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023093B76 | 2023-04-03 | 2023-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
Q042023089A21 | 2023-03-30 | 2023-04-28 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 89 STREET, QUEENS, FROM STREET ASTORIA BOULEVARD |
B042023088A33 | 2023-03-29 | 2023-04-27 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EVERGREEN AVENUE, BROOKLYN, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE |
B012023088B78 | 2023-03-29 | 2023-04-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | EVERGREEN AVENUE, BROOKLYN, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE |
B012023088B77 | 2023-03-29 | 2023-04-27 | RESET, REPAIR OR REPLACE CURB | EVERGREEN AVENUE, BROOKLYN, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE |
B022023088A51 | 2023-03-29 | 2023-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EVERGREEN AVENUE, BROOKLYN, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE |
B022023088A50 | 2023-03-29 | 2023-05-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | EVERGREEN AVENUE, BROOKLYN, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE |
Q012023087B73 | 2023-03-28 | 2023-04-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | 111 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET NYCTA SUBWAY |
B022023087B34 | 2023-03-28 | 2023-04-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ATLANTIC AVENUE, BROOKLYN, FROM STREET HOYT STREET TO STREET SMITH STREET |
B022023087B33 | 2023-03-28 | 2023-04-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | ATLANTIC AVENUE, BROOKLYN, FROM STREET HOYT STREET TO STREET SMITH STREET |
B042023087A07 | 2023-03-28 | 2023-04-26 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | ATLANTIC AVENUE, BROOKLYN, FROM STREET HOYT STREET TO STREET SMITH STREET |
B012023087B35 | 2023-03-28 | 2023-04-26 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | ATLANTIC AVENUE, BROOKLYN, FROM STREET HOYT STREET TO STREET SMITH STREET |
B012023087B34 | 2023-03-28 | 2023-04-26 | RESET, REPAIR OR REPLACE CURB-PROTECTED | ATLANTIC AVENUE, BROOKLYN, FROM STREET HOYT STREET TO STREET SMITH STREET |
Q012023087B72 | 2023-03-28 | 2023-04-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | 111 STREET, QUEENS, FROM STREET ROOSEVELT AVENUE |
Q012023087B71 | 2023-03-28 | 2023-04-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | ROOSEVELT AVENUE, QUEENS, FROM STREET 108 STREET TO STREET 111 STREET |
B042023083A17 | 2023-03-24 | 2023-04-21 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | NOBLE STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET LORIMER STREET |
B012023083B91 | 2023-03-24 | 2023-04-21 | RESET, REPAIR OR REPLACE CURB | NOBLE STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET LORIMER STREET |
B012023082A54 | 2023-03-23 | 2023-04-19 | RESET, REPAIR OR REPLACE CURB-PROTECTED | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET |
B042023082A10 | 2023-03-23 | 2023-04-19 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET |
B022023082B22 | 2023-03-23 | 2023-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET |
B012023082A55 | 2023-03-23 | 2023-04-19 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET |
X012023080A65 | 2023-03-21 | 2023-04-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | TOPPING AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
B012023079B84 | 2023-03-20 | 2023-04-18 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | LEXINGTON AVENUE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE |
B022023079A92 | 2023-03-20 | 2023-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | LEXINGTON AVENUE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE |
B022023079A91 | 2023-03-20 | 2023-05-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | LEXINGTON AVENUE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE |
B042023079A14 | 2023-03-20 | 2023-04-18 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | LEXINGTON AVENUE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE |
B012023079B83 | 2023-03-20 | 2023-04-18 | RESET, REPAIR OR REPLACE CURB-PROTECTED | LEXINGTON AVENUE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE |
B042023067A13 | 2023-03-08 | 2023-03-08 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BUSHWICK AVENUE, BROOKLYN, FROM STREET GROVE STREET |
B042023067A14 | 2023-03-08 | 2023-03-08 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BUSHWICK AVENUE, BROOKLYN, FROM STREET GROVE STREET |
B042023067A12 | 2023-03-08 | 2023-03-08 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BUSHWICK AVENUE, BROOKLYN, FROM STREET GROVE STREET |
B012023065A94 | 2023-03-06 | 2023-04-05 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | VAN BUREN STREET, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B042023065A05 | 2023-03-06 | 2023-04-05 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | VAN BUREN STREET, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B022023065A24 | 2023-03-06 | 2023-04-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VAN BUREN STREET, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B022023065A23 | 2023-03-06 | 2023-04-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | VAN BUREN STREET, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B012023065A93 | 2023-03-06 | 2023-04-05 | RESET, REPAIR OR REPLACE CURB-PROTECTED | VAN BUREN STREET, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B042023060A05 | 2023-03-01 | 2023-03-18 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BUSHWICK AVENUE, BROOKLYN, FROM STREET GROVE STREET |
B042023060A06 | 2023-03-01 | 2023-03-18 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BUSHWICK AVENUE, BROOKLYN, FROM STREET GROVE STREET |
B042023060A07 | 2023-03-01 | 2023-03-18 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BUSHWICK AVENUE, BROOKLYN, FROM STREET GROVE STREET |
B042023060A09 | 2023-03-01 | 2023-03-30 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BUSHWICK AVENUE, BROOKLYN, FROM STREET GROVE STREET TO STREET LINDEN STREET |
B042023060A10 | 2023-03-01 | 2023-03-30 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BUSHWICK AVENUE, BROOKLYN, FROM STREET GROVE STREET |
B042023060A11 | 2023-03-01 | 2023-03-30 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | GROVE STREET, BROOKLYN, FROM STREET BEND TO STREET BUSHWICK AVENUE |
Q042023058A24 | 2023-02-27 | 2023-03-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 188 STREET, QUEENS, FROM STREET PERTH ROAD |
Q042023058A23 | 2023-02-27 | 2023-03-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 188 STREET, QUEENS, FROM STREET PERTH ROAD |
B012023044A07 | 2023-02-13 | 2023-03-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | LAMONT COURT, BROOKLYN, FROM STREET EMPIRE BOULEVARD TO STREET LEFFERTS AVENUE |
B022023038B53 | 2023-02-07 | 2023-05-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B012023038B37 | 2023-02-07 | 2023-03-07 | PAVE STREET-W/ ENGINEERING & INSP FEE | BEDFORD AVENUE, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B012023038B36 | 2023-02-07 | 2023-03-07 | RESET, REPAIR OR REPLACE CURB | BEDFORD AVENUE, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B042023038A18 | 2023-02-07 | 2023-03-07 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BEDFORD AVENUE, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B012023023B58 | 2023-01-23 | 2023-02-16 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | CARROLL STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
B042023023A23 | 2023-01-23 | 2023-02-16 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CARROLL STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
B012023023B57 | 2023-01-23 | 2023-02-16 | RESET, REPAIR OR REPLACE CURB-PROTECTED | CARROLL STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
B022023019D12 | 2023-01-19 | 2023-04-10 | PLACE MATERIAL ON STREET | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022023019D14 | 2023-01-19 | 2023-04-10 | OCCUPANCY OF ROADWAY AS STIPULATED | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022023019D15 | 2023-01-19 | 2023-04-10 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022023019D16 | 2023-01-19 | 2023-04-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022023019D17 | 2023-01-19 | 2023-04-10 | TEMP. CONST. SIGNS/MARKINGS | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022023019D18 | 2023-01-19 | 2023-04-10 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022023019D13 | 2023-01-19 | 2023-04-10 | CROSSING SIDEWALK | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B012023018A95 | 2023-01-18 | 2023-02-11 | RESET, REPAIR OR REPLACE CURB | BUSHWICK AVENUE, BROOKLYN, FROM STREET GROVE STREET TO STREET LINDEN STREET |
B012023018A96 | 2023-01-18 | 2023-02-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | BUSHWICK AVENUE, BROOKLYN, FROM STREET GROVE STREET TO STREET LINDEN STREET |
B012023018A97 | 2023-01-18 | 2023-02-11 | RESET, REPAIR OR REPLACE CURB | BUSHWICK AVENUE, BROOKLYN, FROM STREET GROVE STREET |
B012023018A98 | 2023-01-18 | 2023-02-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | BUSHWICK AVENUE, BROOKLYN, FROM STREET GROVE STREET |
B042023018A02 | 2023-01-18 | 2023-02-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BUSHWICK AVENUE, BROOKLYN, FROM STREET GROVE STREET TO STREET LINDEN STREET |
B022023018A62 | 2023-01-18 | 2023-02-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | GROVE STREET, BROOKLYN, FROM STREET BEND TO STREET BUSHWICK AVENUE |
B042023018A03 | 2023-01-18 | 2023-02-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BUSHWICK AVENUE, BROOKLYN, FROM STREET GROVE STREET |
B042023018A04 | 2023-01-18 | 2023-02-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | GROVE STREET, BROOKLYN, FROM STREET BEND TO STREET BUSHWICK AVENUE |
B022023018A59 | 2023-01-18 | 2023-02-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | BUSHWICK AVENUE, BROOKLYN, FROM STREET GROVE STREET TO STREET LINDEN STREET |
B022023018A60 | 2023-01-18 | 2023-02-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BUSHWICK AVENUE, BROOKLYN, FROM STREET GROVE STREET TO STREET LINDEN STREET |
B022023018A61 | 2023-01-18 | 2023-02-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | GROVE STREET, BROOKLYN, FROM STREET BEND TO STREET BUSHWICK AVENUE |
B012023018A99 | 2023-01-18 | 2023-02-11 | RESET, REPAIR OR REPLACE CURB | GROVE STREET, BROOKLYN, FROM STREET BEND TO STREET BUSHWICK AVENUE |
B012023018B00 | 2023-01-18 | 2023-02-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | GROVE STREET, BROOKLYN, FROM STREET BEND TO STREET BUSHWICK AVENUE |
Q042023012A21 | 2023-01-12 | 2023-02-10 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 89 STREET, QUEENS, FROM STREET ASTORIA BOULEVARD |
B012023011A89 | 2023-01-11 | 2023-02-08 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 18 STREET, BROOKLYN, FROM STREET JEROME AVENUE TO STREET VOORHIES AVENUE |
Q022023010A70 | 2023-01-10 | 2023-04-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 84 AVENUE, QUEENS, FROM STREET 150 STREET TO STREET SMEDLEY STREET |
Q012023010A84 | 2023-01-10 | 2023-02-02 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 84 AVENUE, QUEENS, FROM STREET 150 STREET TO STREET SMEDLEY STREET |
Q012023010A85 | 2023-01-10 | 2023-02-02 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 84 AVENUE, QUEENS, FROM STREET 150 STREET TO STREET SMEDLEY STREET |
Q042023010A08 | 2023-01-10 | 2023-02-02 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 84 AVENUE, QUEENS, FROM STREET 150 STREET TO STREET SMEDLEY STREET |
B012023009B43 | 2023-01-09 | 2023-02-07 | RESET, REPAIR OR REPLACE CURB | ROGERS AVENUE, BROOKLYN, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD |
B042023009A18 | 2023-01-09 | 2023-02-07 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | ROGERS AVENUE, BROOKLYN, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD |
B012023009B44 | 2023-01-09 | 2023-02-07 | PAVE STREET-W/ ENGINEERING & INSP FEE | ROGERS AVENUE, BROOKLYN, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD |
B022023006D16 | 2023-01-06 | 2023-04-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022023006D40 | 2023-01-06 | 2023-04-03 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 16 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B022023006D41 | 2023-01-06 | 2023-04-03 | TEMP. CONST. SIGNS/MARKINGS | 16 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B022023006D18 | 2023-01-06 | 2023-04-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022023006D42 | 2023-01-06 | 2023-04-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 16 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B022023006D10 | 2023-01-06 | 2023-04-05 | PLACE MATERIAL ON STREET | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022023006D11 | 2023-01-06 | 2023-04-05 | CROSSING SIDEWALK | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022023006D12 | 2023-01-06 | 2023-04-05 | TEMPORARY PEDESTRIAN WALK | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022023006D13 | 2023-01-06 | 2023-04-05 | OCCUPANCY OF ROADWAY AS STIPULATED | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022023006D15 | 2023-01-06 | 2023-04-05 | TEMP. CONST. SIGNS/MARKINGS | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022023006D14 | 2023-01-06 | 2023-04-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B012023006A98 | 2023-01-06 | 2023-04-05 | OPEN PROTECTED SIDEWALK FOR FOUNDATION | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022023006D17 | 2023-01-06 | 2023-04-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022023005A69 | 2023-01-05 | 2023-04-03 | PLACE MATERIAL ON STREET | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022023005A74 | 2023-01-05 | 2023-04-03 | TEMP. CONST. SIGNS/MARKINGS | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022023005A75 | 2023-01-05 | 2023-04-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022023005A72 | 2023-01-05 | 2023-04-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022023005A71 | 2023-01-05 | 2023-04-03 | TEMP. CONST. SIGNS/MARKINGS | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
Q012023005A87 | 2023-01-05 | 2023-02-02 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 89 STREET, QUEENS, FROM STREET 23 AVENUE TO STREET 25 AVENUE |
B022023005A70 | 2023-01-05 | 2023-04-03 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B042023003A20 | 2023-01-03 | 2023-02-01 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | LEXINGTON AVENUE, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
Q012022364A75 | 2022-12-30 | 2023-01-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | 89 STREET, QUEENS, FROM STREET ASTORIA BOULEVARD |
B042022357A05 | 2022-12-23 | 2023-01-19 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | LEXINGTON AVENUE, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
B022022357A50 | 2022-12-23 | 2023-02-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | LEXINGTON AVENUE, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
B022022357A49 | 2022-12-23 | 2023-02-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | LEXINGTON AVENUE, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
B012022357A38 | 2022-12-23 | 2023-01-19 | RESET, REPAIR OR REPLACE CURB-PROTECTED | LEXINGTON AVENUE, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
B012022357A39 | 2022-12-23 | 2023-01-19 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | LEXINGTON AVENUE, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
B012022355C61 | 2022-12-21 | 2023-01-19 | RESET, REPAIR OR REPLACE CURB | PACIFIC STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE |
B012022355C62 | 2022-12-21 | 2023-01-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | PACIFIC STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE |
B042022355A20 | 2022-12-21 | 2023-01-19 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | PACIFIC STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE |
B022022355D46 | 2022-12-21 | 2023-01-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PACIFIC STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE |
Q012022353B88 | 2022-12-19 | 2022-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | 164 AVENUE, QUEENS, FROM STREET 104 STREET TO STREET BODY OF WATER |
Q022022353B71 | 2022-12-19 | 2023-01-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | ASTORIA BOULEVARD, QUEENS, FROM STREET 88 STREET TO STREET BEND |
Q022022353B72 | 2022-12-19 | 2023-01-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ASTORIA BOULEVARD, QUEENS, FROM STREET 88 STREET TO STREET BEND |
Q042022353A15 | 2022-12-19 | 2023-01-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | ASTORIA BOULEVARD, QUEENS, FROM STREET 88 STREET TO STREET BEND |
Q012022353C18 | 2022-12-19 | 2023-01-13 | RESET, REPAIR OR REPLACE CURB | ASTORIA BOULEVARD, QUEENS, FROM STREET 88 STREET TO STREET BEND |
Q012022353C19 | 2022-12-19 | 2023-01-13 | PAVE STREET-W/ ENGINEERING & INSP FEE | ASTORIA BOULEVARD, QUEENS, FROM STREET 88 STREET TO STREET BEND |
Q012022348C40 | 2022-12-14 | 2022-12-31 | RESET, REPAIR OR REPLACE CURB | LEEDS ROAD, QUEENS, FROM STREET BEND TO STREET BEND |
Q042022348A12 | 2022-12-14 | 2022-12-31 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | LEEDS ROAD, QUEENS, FROM STREET BEND TO STREET BEND |
Q012022348C41 | 2022-12-14 | 2022-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | LEEDS ROAD, QUEENS, FROM STREET BEND TO STREET BEND |
B012022348B31 | 2022-12-14 | 2022-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | LINCOLN AVENUE, BROOKLYN, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE |
B012022348B30 | 2022-12-14 | 2022-12-31 | RESET, REPAIR OR REPLACE CURB | LINCOLN AVENUE, BROOKLYN, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE |
B042022348A20 | 2022-12-14 | 2023-01-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | LINCOLN AVENUE, BROOKLYN, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE |
Q042022346A52 | 2022-12-12 | 2023-01-07 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 89 STREET, QUEENS, FROM STREET ASTORIA BOULEVARD |
Q042022346A51 | 2022-12-12 | 2023-01-10 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 89 STREET, QUEENS, FROM STREET ASTORIA BOULEVARD |
B042022342A11 | 2022-12-08 | 2022-12-31 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | PALMETTO STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012022342C00 | 2022-12-08 | 2022-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | PALMETTO STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012022342B99 | 2022-12-08 | 2022-12-31 | RESET, REPAIR OR REPLACE CURB | PALMETTO STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022022342A50 | 2022-12-08 | 2022-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | PALMETTO STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022022342A51 | 2022-12-08 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PALMETTO STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012022341A65 | 2022-12-07 | 2022-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE L TO STREET WASHINGTON CEMETERY BOUNDARY |
B012022340C66 | 2022-12-06 | 2022-12-24 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 16 STREET, BROOKLYN, FROM STREET AVENUE Z TO STREET SHEEPSHEAD BAY ROAD |
Q022022335B02 | 2022-12-01 | 2022-12-30 | TEMPORARY PEDESTRIAN WALK | 89 STREET, QUEENS, FROM STREET 23 AVENUE TO STREET 25 AVENUE |
Q022022335B01 | 2022-12-01 | 2022-12-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 89 STREET, QUEENS, FROM STREET 23 AVENUE TO STREET 25 AVENUE |
Q022022335B00 | 2022-12-01 | 2022-12-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | 89 STREET, QUEENS, FROM STREET 23 AVENUE TO STREET 25 AVENUE |
Q042022335A46 | 2022-12-01 | 2022-12-30 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 89 STREET, QUEENS, FROM STREET 23 AVENUE TO STREET 25 AVENUE |
Q012022335C34 | 2022-12-01 | 2022-12-30 | PAVE STREET-W/ ENGINEERING & INSP FEE | 89 STREET, QUEENS, FROM STREET ASTORIA BOULEVARD |
Q012022335C35 | 2022-12-01 | 2022-12-30 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 89 STREET, QUEENS, FROM STREET 23 AVENUE TO STREET 25 AVENUE |
X012022335A26 | 2022-12-01 | 2022-12-30 | PAVE STREET-W/ ENGINEERING & INSP FEE | GILES PLACE, BRONX, FROM STREET CANNON PLACE TO STREET FT INDEPENDENCE STREET |
Q012022335C33 | 2022-12-01 | 2022-12-30 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 89 STREET, QUEENS, FROM STREET 23 AVENUE TO STREET 25 AVENUE |
B012022327B11 | 2022-11-23 | 2022-12-20 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | LINCOLN PLACE, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET ROCHESTER AVENUE |
B022022321A40 | 2022-11-17 | 2022-12-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 4 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B022022321A39 | 2022-11-17 | 2022-12-15 | TEMPORARY PEDESTRIAN WALK | EAST 4 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B012022321A53 | 2022-11-17 | 2022-12-15 | RESET, REPAIR OR REPLACE CURB | EAST 4 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B042022321A04 | 2022-11-17 | 2022-12-15 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 4 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B022022320B76 | 2022-11-16 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022022320B72 | 2022-11-16 | 2022-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022022320B73 | 2022-11-16 | 2022-12-31 | TEMP. CONST. SIGNS/MARKINGS | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022022320B74 | 2022-11-16 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022022320B75 | 2022-11-16 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022022320B68 | 2022-11-16 | 2022-12-31 | CROSSING SIDEWALK | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B012022320D48 | 2022-11-16 | 2022-12-31 | OPEN PROTECTED SIDEWALK FOR FOUNDATION | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022022320B67 | 2022-11-16 | 2022-12-31 | PLACE MATERIAL ON STREET | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022022320B69 | 2022-11-16 | 2022-12-31 | TEMPORARY PEDESTRIAN WALK | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022022320B70 | 2022-11-16 | 2022-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B012022320D56 | 2022-11-16 | 2022-12-06 | PAVE STREET-W/ ENGINEERING & INSP FEE | GRAVESEND NECK ROAD, BROOKLYN, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET |
B022022320B79 | 2022-11-16 | 2022-11-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022022320B71 | 2022-11-16 | 2022-12-31 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B012022318A44 | 2022-11-14 | 2022-12-08 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 4 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B012022314A79 | 2022-11-10 | 2022-12-09 | PAVE STREET-W/ ENGINEERING & INSP FEE | HEYWARD STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE |
Q042022314A23 | 2022-11-10 | 2022-12-08 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 164 AVENUE, QUEENS, FROM STREET 104 STREET TO STREET BODY OF WATER |
Q012022314B08 | 2022-11-10 | 2022-12-08 | PAVE STREET-W/ ENGINEERING & INSP FEE | 164 AVENUE, QUEENS, FROM STREET 104 STREET TO STREET BODY OF WATER |
Q012022314B07 | 2022-11-10 | 2022-12-08 | RESET, REPAIR OR REPLACE CURB | 164 AVENUE, QUEENS, FROM STREET 104 STREET TO STREET BODY OF WATER |
B012022311B22 | 2022-11-07 | 2022-12-06 | PAVE STREET-W/ ENGINEERING & INSP FEE | 43 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B012022308B38 | 2022-11-04 | 2022-12-03 | PAVE STREET-W/ ENGINEERING & INSP FEE | STANHOPE STREET, BROOKLYN, FROM STREET WYCKOFF AVENUE |
B012022307B72 | 2022-11-03 | 2022-12-02 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | INDIA STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B012022305A78 | 2022-11-01 | 2022-11-30 | PAVE STREET-W/ ENGINEERING & INSP FEE | HIMROD STREET, BROOKLYN, FROM STREET WYCKOFF AVENUE |
B012022305A77 | 2022-11-01 | 2022-11-30 | PAVE STREET-W/ ENGINEERING & INSP FEE | STANHOPE STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B012022304B67 | 2022-10-31 | 2022-11-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | WYCKOFF AVENUE, BROOKLYN, FROM STREET HIMROD STREET TO STREET STANHOPE STREET |
Q012022294A95 | 2022-10-21 | 2022-11-19 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | JUNCTION BOULEVARD, QUEENS, FROM STREET 40 ROAD TO STREET 41 AVENUE |
B012022284A42 | 2022-10-11 | 2022-10-19 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | NEW YORK AVENUE, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD |
B012022284B40 | 2022-10-11 | 2022-11-10 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | NEW YORK AVENUE, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD |
B012022279B05 | 2022-10-06 | 2022-11-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | RUTLAND ROAD, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE |
B012022270D17 | 2022-09-27 | 2022-10-19 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | INDIA STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B042022270A14 | 2022-09-27 | 2022-10-19 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | INDIA STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B022022270B70 | 2022-09-27 | 2022-10-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | INDIA STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B022022270B71 | 2022-09-27 | 2022-10-19 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | INDIA STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B012022270D38 | 2022-09-27 | 2022-10-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | OCEAN AVENUE, BROOKLYN, FROM STREET AVENUE O TO STREET AVENUE P |
B012022270D16 | 2022-09-27 | 2022-10-19 | RESET, REPAIR OR REPLACE CURB-PROTECTED | INDIA STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B012022267A00 | 2022-09-24 | 2022-10-22 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE X TO STREET AVENUE Y |
B012022263C17 | 2022-09-20 | 2022-10-11 | RESET, REPAIR OR REPLACE CURB | GRAVESEND NECK ROAD, BROOKLYN, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET |
B022022263D32 | 2022-09-20 | 2022-12-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | GRAVESEND NECK ROAD, BROOKLYN, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET |
B012022263C18 | 2022-09-20 | 2022-10-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | GRAVESEND NECK ROAD, BROOKLYN, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET |
B042022263A28 | 2022-09-20 | 2022-10-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | GRAVESEND NECK ROAD, BROOKLYN, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET |
B012022262E38 | 2022-09-19 | 2022-10-12 | PAVE STREET-W/ ENGINEERING & INSP FEE | 43 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
Q012022255A10 | 2022-09-12 | 2022-10-05 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 24 AVENUE, QUEENS, FROM STREET 157 STREET TO STREET 160 STREET |
B022022251B93 | 2022-09-08 | 2022-11-25 | CROSSING SIDEWALK | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022022251B98 | 2022-09-08 | 2022-11-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022022251B97 | 2022-09-08 | 2022-11-25 | TEMP. CONST. SIGNS/MARKINGS | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022022251B96 | 2022-09-08 | 2022-11-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022022251B95 | 2022-09-08 | 2022-11-25 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022022251B94 | 2022-09-08 | 2022-11-25 | OCCUPANCY OF ROADWAY AS STIPULATED | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022022251B92 | 2022-09-08 | 2022-11-25 | PLACE MATERIAL ON STREET | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022022250B50 | 2022-09-07 | 2022-12-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | MOFFAT STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B042022250B71 | 2022-09-07 | 2022-10-05 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MOFFAT STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012022250B22 | 2022-09-07 | 2022-10-05 | RESET, REPAIR OR REPLACE CURB-PROTECTED | MOFFAT STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012022250B23 | 2022-09-07 | 2022-10-05 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | MOFFAT STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022022250B51 | 2022-09-07 | 2022-12-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MOFFAT STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B042022243A50 | 2022-08-31 | 2022-09-22 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | RUTLAND ROAD, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE |
B012022243C48 | 2022-08-31 | 2022-09-22 | RESET, REPAIR OR REPLACE CURB | RUTLAND ROAD, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE |
B012022243C49 | 2022-08-31 | 2022-09-22 | PAVE STREET-W/ ENGINEERING & INSP FEE | RUTLAND ROAD, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE |
B022022242C41 | 2022-08-30 | 2022-11-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022022242C40 | 2022-08-30 | 2022-11-04 | TEMP. CONST. SIGNS/MARKINGS | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
Q022022241A19 | 2022-08-29 | 2022-09-27 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DOUGLASTON PARKWAY, QUEENS, FROM STREET 39 AVENUE TO STREET 235 STREET |
Q012022241B02 | 2022-08-29 | 2022-09-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | DOUGLASTON PARKWAY, QUEENS, FROM STREET 39 AVENUE TO STREET 235 STREET |
Q012022241B01 | 2022-08-29 | 2022-09-27 | RESET, REPAIR OR REPLACE CURB | DOUGLASTON PARKWAY, QUEENS, FROM STREET 39 AVENUE TO STREET 235 STREET |
Q042022241A10 | 2022-08-29 | 2022-09-27 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | DOUGLASTON PARKWAY, QUEENS, FROM STREET 39 AVENUE TO STREET 235 STREET |
B022022240A00 | 2022-08-28 | 2022-11-21 | TEMP. CONST. SIGNS/MARKINGS | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B042022236A30 | 2022-08-24 | 2022-09-22 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 21 AVENUE, BROOKLYN, FROM STREET 74 STREET |
B012022234C04 | 2022-08-22 | 2022-09-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | VERNON AVENUE, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE |
B012022234C05 | 2022-08-22 | 2022-09-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | LEWIS AVENUE, BROOKLYN, FROM STREET VERNON AVENUE |
B012022234C06 | 2022-08-22 | 2022-09-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | LEWIS AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
X012022228A76 | 2022-08-16 | 2022-09-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 184 STREET, BRONX, FROM STREET BEND TO STREET BEND |
Q012022221C55 | 2022-08-09 | 2022-09-06 | PAVE STREET-W/ ENGINEERING & INSP FEE | PALO ALTO AVENUE, QUEENS, FROM STREET BEND TO STREET NERO AVENUE |
B012022221A20 | 2022-08-09 | 2022-09-05 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
B022022217A13 | 2022-08-05 | 2022-10-21 | TEMPORARY PEDESTRIAN WALK | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022022217A11 | 2022-08-05 | 2022-10-21 | PLACE MATERIAL ON STREET | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022022217A12 | 2022-08-05 | 2022-10-21 | CROSSING SIDEWALK | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B012022217A38 | 2022-08-05 | 2022-10-21 | OPEN PROTECTED SIDEWALK FOR FOUNDATION | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B012022217A39 | 2022-08-05 | 2022-09-02 | INSTALL FENCE - PROTECTED | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022022217A21 | 2022-08-05 | 2022-10-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022022217A20 | 2022-08-05 | 2022-10-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022022217A19 | 2022-08-05 | 2022-10-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022022217A18 | 2022-08-05 | 2022-10-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022022217A17 | 2022-08-05 | 2022-10-21 | TEMP. CONST. SIGNS/MARKINGS | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022022217A16 | 2022-08-05 | 2022-10-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022022217A15 | 2022-08-05 | 2022-10-21 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022022217A14 | 2022-08-05 | 2022-10-21 | OCCUPANCY OF ROADWAY AS STIPULATED | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B012022214A95 | 2022-08-02 | 2022-08-30 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | LEXINGTON AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
B012022213A68 | 2022-08-01 | 2022-08-23 | PAVE STREET-W/ ENGINEERING & INSP FEE | RUTLAND ROAD, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE |
B012022213A67 | 2022-08-01 | 2022-08-23 | RESET, REPAIR OR REPLACE CURB | RUTLAND ROAD, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE |
B022022213A42 | 2022-08-01 | 2022-08-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLAND ROAD, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE |
B042022213A21 | 2022-08-01 | 2022-08-23 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | RUTLAND ROAD, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE |
B022022210B55 | 2022-07-29 | 2022-10-23 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 16 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B022022210B56 | 2022-07-29 | 2022-10-23 | TEMP. CONST. SIGNS/MARKINGS | 16 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B022022210B57 | 2022-07-29 | 2022-10-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 16 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B022022209C06 | 2022-07-28 | 2022-08-27 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022022209C07 | 2022-07-28 | 2022-08-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022022209C03 | 2022-07-28 | 2022-08-27 | PLACE MATERIAL ON STREET | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022022209C09 | 2022-07-28 | 2022-08-27 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022022209C08 | 2022-07-28 | 2022-08-27 | TEMP. CONST. SIGNS/MARKINGS | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022022209C04 | 2022-07-28 | 2022-08-27 | CROSSING SIDEWALK | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022022209C05 | 2022-07-28 | 2022-08-27 | OCCUPANCY OF ROADWAY AS STIPULATED | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022022208C28 | 2022-07-27 | 2022-08-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022022208C27 | 2022-07-27 | 2022-08-24 | TEMP. CONST. SIGNS/MARKINGS | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022022203A57 | 2022-07-22 | 2022-10-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022022203A56 | 2022-07-22 | 2022-10-21 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022022203A55 | 2022-07-22 | 2022-10-21 | PLACE MATERIAL ON STREET | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
Q042022186A06 | 2022-07-05 | 2022-07-24 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 188 STREET, QUEENS, FROM STREET PERTH ROAD |
Q042022186A05 | 2022-07-05 | 2022-07-24 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 188 STREET, QUEENS, FROM STREET PERTH ROAD |
Q012022180D30 | 2022-06-29 | 2022-07-24 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 51 AVENUE, QUEENS, FROM STREET GORSLINE STREET TO STREET MANILLA STREET |
Q012022180D31 | 2022-06-29 | 2022-07-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | QUEENS BOULEVARD, QUEENS, FROM STREET 51 AVENUE TO STREET CORNISH AVENUE |
Q012022180D32 | 2022-06-29 | 2022-07-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | 51 AVENUE, QUEENS, FROM STREET QUEENS BOULEVARD |
B012022178C40 | 2022-06-27 | 2022-07-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | MYRTLE AVENUE, BROOKLYN, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET |
Q022022178B48 | 2022-06-27 | 2022-07-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PERTH ROAD, QUEENS, FROM STREET 188 STREET TO STREET HADDON STREET |
Q042022178A07 | 2022-06-27 | 2022-07-24 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | PERTH ROAD, QUEENS, FROM STREET 188 STREET TO STREET HADDON STREET |
Q012022178H29 | 2022-06-27 | 2022-07-24 | RESET, REPAIR OR REPLACE CURB-PROTECTED | PERTH ROAD, QUEENS, FROM STREET 188 STREET TO STREET HADDON STREET |
B012022178C39 | 2022-06-27 | 2022-07-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | MYRTLE AVENUE, BROOKLYN, FROM STREET STANHOPE STREET |
Q012022174C71 | 2022-06-23 | 2022-07-22 | PAVE STREET-W/ ENGINEERING & INSP FEE | 188 STREET, QUEENS, FROM STREET PERTH ROAD TO STREET TROON ROAD |
Q042022174A20 | 2022-06-23 | 2022-07-22 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 188 STREET, QUEENS, FROM STREET PERTH ROAD TO STREET TROON ROAD |
Q012022174C69 | 2022-06-23 | 2022-07-22 | PAVE STREET-W/ ENGINEERING & INSP FEE | 188 STREET, QUEENS, FROM STREET PERTH ROAD |
Q012022174C70 | 2022-06-23 | 2022-07-22 | RESET, REPAIR OR REPLACE CURB | 188 STREET, QUEENS, FROM STREET PERTH ROAD TO STREET TROON ROAD |
Q042022172A64 | 2022-06-21 | 2022-07-20 | REPAIR SIDEWALK | 157 STREET, QUEENS, FROM STREET 59 AVENUE TO STREET BOOTH MEMORIAL AVENUE |
B012022172D76 | 2022-06-21 | 2022-07-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N |
B042022170A00 | 2022-06-19 | 2022-07-17 | REPAIR SIDEWALK | HERKIMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
X012022170A00 | 2022-06-19 | 2022-07-17 | PAVE STREET-W/ ENGINEERING & INSP FEE | HOFFMAN STREET, BRONX, FROM STREET EAST 184 STREET TO STREET EAST 187 STREET |
X012022170A01 | 2022-06-19 | 2022-07-17 | PAVE STREET-W/ ENGINEERING & INSP FEE | HOFFMAN STREET, BRONX, FROM STREET EAST 184 STREET TO STREET EAST 187 STREET |
B042022170A01 | 2022-06-19 | 2022-07-17 | REPAIR SIDEWALK | HERKIMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B012022166C26 | 2022-06-15 | 2022-07-07 | PAVE STREET-W/ ENGINEERING & INSP FEE | LINDEN BOULEVARD, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B042022157A23 | 2022-06-06 | 2022-07-05 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | PRESIDENT STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
B022022157B25 | 2022-06-06 | 2022-07-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PRESIDENT STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
B012022157B22 | 2022-06-06 | 2022-07-05 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | PRESIDENT STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
B012022157B21 | 2022-06-06 | 2022-07-05 | RESET, REPAIR OR REPLACE CURB-PROTECTED | PRESIDENT STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
X012022153A00 | 2022-06-02 | 2022-06-30 | PAVE STREET-W/ ENGINEERING & INSP FEE | ARTHUR AVENUE, BRONX, FROM STREET OAK TREE PLACE |
X012022153A02 | 2022-06-02 | 2022-06-30 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 182 STREET, BRONX, FROM STREET ARTHUR AVENUE TO STREET QUARRY ROAD |
X012022153A01 | 2022-06-02 | 2022-06-30 | PAVE STREET-W/ ENGINEERING & INSP FEE | ARTHUR AVENUE, BRONX, FROM STREET BEND TO STREET EAST 182 STREET |
B022022151C08 | 2022-05-31 | 2022-07-24 | TEMP. CONST. SIGNS/MARKINGS | 16 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B022022151C09 | 2022-05-31 | 2022-07-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 16 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B022022151C11 | 2022-05-31 | 2022-07-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022022151C10 | 2022-05-31 | 2022-07-24 | TEMP. CONST. SIGNS/MARKINGS | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022022151C07 | 2022-05-31 | 2022-07-24 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 16 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B022022146C29 | 2022-05-26 | 2022-07-24 | PLACE MATERIAL ON STREET | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022022146C30 | 2022-05-26 | 2022-07-24 | CROSSING SIDEWALK | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022022146C31 | 2022-05-26 | 2022-07-24 | OCCUPANCY OF ROADWAY AS STIPULATED | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022022146C32 | 2022-05-26 | 2022-07-24 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022022146C33 | 2022-05-26 | 2022-07-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022022146C34 | 2022-05-26 | 2022-07-24 | TEMP. CONST. SIGNS/MARKINGS | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022022146C35 | 2022-05-26 | 2022-07-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
Q012022143C36 | 2022-05-23 | 2022-06-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | 231 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
B012022136B01 | 2022-05-16 | 2022-05-25 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | MOFFAT STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
B012022136A76 | 2022-05-16 | 2022-05-25 | RESET, REPAIR OR REPLACE CURB-PROTECTED | BUSHWICK AVENUE, BROOKLYN, FROM STREET COOPER STREET TO STREET MOFFAT STREET |
B042022136A22 | 2022-05-16 | 2022-05-25 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BUSHWICK AVENUE, BROOKLYN, FROM STREET COOPER STREET TO STREET MOFFAT STREET |
B012022136B05 | 2022-05-16 | 2022-05-25 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | MOFFAT STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
B012022136B00 | 2022-05-16 | 2022-05-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | BUSHWICK AVENUE, BROOKLYN, FROM STREET MOFFAT STREET |
B012022125A26 | 2022-05-05 | 2022-05-25 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | VAN BUREN STREET, BROOKLYN, FROM STREET BROADWAY TO STREET PATCHEN AVENUE |
B012022125A27 | 2022-05-05 | 2022-05-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | PATCHEN AVENUE, BROOKLYN, FROM STREET KOSSUTH PLACE TO STREET VAN BUREN STREET |
Q012022123A92 | 2022-05-03 | 2022-05-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | 123 STREET, QUEENS, FROM STREET 22 AVENUE TO STREET 23 AVENUE |
B012022122C17 | 2022-05-02 | 2022-05-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | PATCHEN AVENUE, BROOKLYN, FROM STREET VAN BUREN STREET |
B012022122C20 | 2022-05-02 | 2022-05-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | 40 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY |
Q012022116B10 | 2022-04-26 | 2022-05-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | 104 STREET, QUEENS, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD |
Q022022116A50 | 2022-04-26 | 2022-05-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | 104 STREET, QUEENS, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD |
Q012022116B09 | 2022-04-26 | 2022-05-25 | RESET, REPAIR OR REPLACE CURB | 104 STREET, QUEENS, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD |
Q022022116A52 | 2022-04-26 | 2022-05-25 | TEMPORARY PEDESTRIAN WALK | 104 STREET, QUEENS, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD |
Q022022116A51 | 2022-04-26 | 2022-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 104 STREET, QUEENS, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD |
Q042022116A83 | 2022-04-26 | 2022-05-25 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 104 STREET, QUEENS, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD |
B022022109B26 | 2022-04-19 | 2022-05-25 | TEMP. CONST. SIGNS/MARKINGS | 16 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B022022109B25 | 2022-04-19 | 2022-05-25 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 16 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B022022109B27 | 2022-04-19 | 2022-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 16 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012022103B90 | 2022-04-13 | 2022-05-11 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST NEW YORK AVENUE, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET LINCOLN ROAD |
B042022103A49 | 2022-04-13 | 2022-05-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST NEW YORK AVENUE, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET LINCOLN ROAD |
B022022103A50 | 2022-04-13 | 2022-05-25 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B012022103B89 | 2022-04-13 | 2022-05-11 | RESET, REPAIR OR REPLACE CURB-PROTECTED | EAST NEW YORK AVENUE, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET LINCOLN ROAD |
Q012022102B45 | 2022-04-12 | 2022-05-10 | PAVE STREET-W/ ENGINEERING & INSP FEE | OAK DRIVE, QUEENS, FROM STREET ELVIRA AVENUE TO STREET READS LANE |
B012022096B73 | 2022-04-06 | 2022-04-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | CORNELIA STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B022022094B62 | 2022-04-04 | 2022-05-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022022094B61 | 2022-04-04 | 2022-05-25 | OCCUPANCY OF ROADWAY AS STIPULATED | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022022094B60 | 2022-04-04 | 2022-05-25 | CROSSING SIDEWALK | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022022094A64 | 2022-04-04 | 2022-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022022094B59 | 2022-04-04 | 2022-05-25 | PLACE MATERIAL ON STREET | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022022094A63 | 2022-04-04 | 2022-05-25 | TEMP. CONST. SIGNS/MARKINGS | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022022094B64 | 2022-04-04 | 2022-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022022094B63 | 2022-04-04 | 2022-05-25 | TEMP. CONST. SIGNS/MARKINGS | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
Q012022089B73 | 2022-03-30 | 2022-04-27 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 183 STREET, QUEENS, FROM STREET 143 AVENUE TO STREET 144 AVENUE |
B012022088A13 | 2022-03-29 | 2022-04-21 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 34 STREET, BROOKLYN, FROM STREET BROOKLYN ROAD TO STREET FARRAGUT ROAD |
B022022088F37 | 2022-03-29 | 2022-04-27 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | LINCOLN ROAD, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B022022088F38 | 2022-03-29 | 2022-04-27 | TEMPORARY PEDESTRIAN WALK | LINCOLN ROAD, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B042022088A21 | 2022-03-29 | 2022-04-27 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | LINCOLN ROAD, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B022022088F36 | 2022-03-29 | 2022-04-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | LINCOLN ROAD, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012022088B87 | 2022-03-29 | 2022-04-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | LINCOLN ROAD, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012022088B86 | 2022-03-29 | 2022-04-27 | RESET, REPAIR OR REPLACE CURB | LINCOLN ROAD, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012022088D58 | 2022-03-29 | 2022-04-23 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | BRIGHTON 8 STREET, BROOKLYN, FROM STREET BEND TO STREET OCEAN VIEW AVENUE |
B012022088D57 | 2022-03-29 | 2022-04-23 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 3 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B042022087A07 | 2022-03-28 | 2022-04-26 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | JEFFERSON AVENUE, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B012022087C31 | 2022-03-28 | 2022-04-26 | RESET, REPAIR OR REPLACE CURB-PROTECTED | JEFFERSON AVENUE, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B042022082A02 | 2022-03-23 | 2022-04-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | GREENE AVENUE, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012022082B18 | 2022-03-23 | 2022-04-20 | RESET, REPAIR OR REPLACE CURB | GREENE AVENUE, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012022082B19 | 2022-03-23 | 2022-04-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | GREENE AVENUE, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012022081D50 | 2022-03-22 | 2022-04-20 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | DOONE COURT, BROOKLYN, FROM STREET EAST 12 STREET TO STREET HOMECREST AVENUE |
B012022075C25 | 2022-03-16 | 2022-04-16 | PAVE STREET-W/ ENGINEERING & INSP FEE | FAYETTE STREET, BROOKLYN, FROM STREET BEAVER STREET TO STREET BROADWAY |
B012022075C17 | 2022-03-16 | 2022-04-14 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 66 STREET, BROOKLYN, FROM STREET OHIO WALK TO STREET WHITMAN DRIVE |
B042022069A20 | 2022-03-10 | 2022-04-08 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | ST JOHNS PLACE, BROOKLYN, FROM STREET HAMPTON PLACE TO STREET KINGSTON AVENUE |
B012022069I74 | 2022-03-10 | 2022-04-08 | RESET, REPAIR OR REPLACE CURB-PROTECTED | ST JOHNS PLACE, BROOKLYN, FROM STREET HAMPTON PLACE TO STREET KINGSTON AVENUE |
B012022069I75 | 2022-03-10 | 2022-04-08 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | ST JOHNS PLACE, BROOKLYN, FROM STREET HAMPTON PLACE TO STREET KINGSTON AVENUE |
B022022069B29 | 2022-03-10 | 2022-04-08 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ST JOHNS PLACE, BROOKLYN, FROM STREET HAMPTON PLACE TO STREET KINGSTON AVENUE |
B042022066A06 | 2022-03-07 | 2022-04-05 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | PALMETTO STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET RIDGEWOOD PLACE |
B012022066B24 | 2022-03-07 | 2022-04-05 | RESET, REPAIR OR REPLACE CURB | PALMETTO STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET RIDGEWOOD PLACE |
B012022066B25 | 2022-03-07 | 2022-04-05 | PAVE STREET-W/ ENGINEERING & INSP FEE | PALMETTO STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET RIDGEWOOD PLACE |
B022022066A51 | 2022-03-07 | 2022-05-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | PALMETTO STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET RIDGEWOOD PLACE |
B022022066A52 | 2022-03-07 | 2022-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PALMETTO STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET RIDGEWOOD PLACE |
B012022065A03 | 2022-03-06 | 2022-04-05 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | NOSTRAND AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE |
B012022065A02 | 2022-03-06 | 2022-04-05 | RESET, REPAIR OR REPLACE CURB-PROTECTED | NOSTRAND AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE |
B042022065A03 | 2022-03-06 | 2022-04-05 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | NOSTRAND AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE |
B022022054A20 | 2022-02-23 | 2022-03-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | JEFFERSON AVENUE, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B022022054A19 | 2022-02-23 | 2022-03-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | JEFFERSON AVENUE, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B042022054A05 | 2022-02-23 | 2022-03-23 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | JEFFERSON AVENUE, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B012022054B83 | 2022-02-23 | 2022-03-23 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | JEFFERSON AVENUE, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B012022054B82 | 2022-02-23 | 2022-03-23 | RESET, REPAIR OR REPLACE CURB-PROTECTED | JEFFERSON AVENUE, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B012022054D12 | 2022-02-23 | 2022-03-23 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | MARTENSE STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET MARTENSE COURT |
B042022051A01 | 2022-02-20 | 2022-03-18 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MARTENSE STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET MARTENSE COURT |
B012022051A05 | 2022-02-20 | 2022-03-18 | RESET, REPAIR OR REPLACE CURB-PROTECTED | MARTENSE STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET MARTENSE COURT |
B022022047C22 | 2022-02-16 | 2022-03-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FAYETTE STREET, BROOKLYN, FROM STREET BEAVER STREET TO STREET BROADWAY |
B042022047A20 | 2022-02-16 | 2022-03-17 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | FAYETTE STREET, BROOKLYN, FROM STREET BEAVER STREET TO STREET BROADWAY |
B012022047B47 | 2022-02-16 | 2022-03-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | BUSHWICK AVENUE, BROOKLYN, FROM STREET BLEECKER STREET TO STREET MENAHAN STREET |
B012022047B54 | 2022-02-16 | 2022-03-17 | RESET, REPAIR OR REPLACE CURB | FAYETTE STREET, BROOKLYN, FROM STREET BEAVER STREET TO STREET BROADWAY |
B012022047B55 | 2022-02-16 | 2022-03-17 | PAVE STREET-W/ ENGINEERING & INSP FEE | FAYETTE STREET, BROOKLYN, FROM STREET BEAVER STREET TO STREET BROADWAY |
B022022047C21 | 2022-02-16 | 2022-03-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | FAYETTE STREET, BROOKLYN, FROM STREET BEAVER STREET TO STREET BROADWAY |
Q012022045B53 | 2022-02-14 | 2022-02-23 | PAVE STREET-W/ ENGINEERING & INSP FEE | 179 STREET, QUEENS, FROM STREET 69 AVENUE TO STREET JEWEL AVENUE |
B012022045C02 | 2022-02-14 | 2022-03-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | KENT AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B012022041B16 | 2022-02-10 | 2022-03-15 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | NEW YORK AVENUE, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
Q012022039B63 | 2022-02-08 | 2022-03-09 | PAVE STREET-W/ ENGINEERING & INSP FEE | 179 STREET, QUEENS, FROM STREET 69 AVENUE TO STREET JEWEL AVENUE |
Q012022039B62 | 2022-02-08 | 2022-02-23 | PAVE STREET-W/ ENGINEERING & INSP FEE | 179 STREET, QUEENS, FROM STREET 69 AVENUE TO STREET JEWEL AVENUE |
B012022038B23 | 2022-02-07 | 2022-03-08 | RESET, REPAIR OR REPLACE CURB | JEFFERSON AVENUE, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B042022038A08 | 2022-02-07 | 2022-03-08 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | JEFFERSON AVENUE, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B022022038B06 | 2022-02-07 | 2022-03-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | JEFFERSON AVENUE, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B012022038B24 | 2022-02-07 | 2022-03-08 | PAVE STREET-W/ ENGINEERING & INSP FEE | JEFFERSON AVENUE, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B022022038B07 | 2022-02-07 | 2022-03-08 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | JEFFERSON AVENUE, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
Q012022032A40 | 2022-02-01 | 2022-03-02 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 18 ROAD, QUEENS, FROM STREET CROSS BAY BOULEVARD TO STREET BODY OF WATER |
B012022024B45 | 2022-01-24 | 2022-02-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | OCEAN AVENUE, BROOKLYN, FROM STREET AVENUE L TO STREET AVENUE M |
B042022018A14 | 2022-01-18 | 2022-02-16 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 38 STREET, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE |
B012022018C35 | 2022-01-18 | 2022-02-16 | RESET, REPAIR OR REPLACE CURB | EAST 38 STREET, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE |
B022022014A62 | 2022-01-14 | 2022-04-16 | TEMP. CONST. SIGNS/MARKINGS | 16 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B022022014A61 | 2022-01-14 | 2022-04-16 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 16 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B022022014A63 | 2022-01-14 | 2022-04-16 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 16 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B022022006B68 | 2022-01-06 | 2022-04-03 | TEMP. CONST. SIGNS/MARKINGS | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022022006B67 | 2022-01-06 | 2022-04-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022022006B66 | 2022-01-06 | 2022-04-03 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022022006B65 | 2022-01-06 | 2022-04-03 | OCCUPANCY OF ROADWAY AS STIPULATED | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022022006B64 | 2022-01-06 | 2022-04-03 | CROSSING SIDEWALK | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022022006B63 | 2022-01-06 | 2022-04-03 | PLACE MATERIAL ON STREET | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022022006B69 | 2022-01-06 | 2022-04-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022022004E05 | 2022-01-04 | 2022-04-03 | TEMP. CONST. SIGNS/MARKINGS | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022022004E06 | 2022-01-04 | 2022-04-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B042021342A04 | 2021-12-08 | 2021-12-31 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | GREENE AVENUE, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B012021342A53 | 2021-12-08 | 2021-12-31 | RESET, REPAIR OR REPLACE CURB-PROTECTED | GREENE AVENUE, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
Q042021334A32 | 2021-11-30 | 2021-12-30 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 200 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 35 AVENUE |
Q022021334B42 | 2021-11-30 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 200 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 35 AVENUE |
Q042021334A09 | 2021-11-30 | 2021-12-29 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 149 PLACE, QUEENS, FROM STREET ASH AVENUE TO STREET BEECH AVENUE |
Q042021320A10 | 2021-11-16 | 2021-11-30 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 200 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 35 AVENUE |
B022021319A04 | 2021-11-15 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | STANHOPE STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
B022021319A00 | 2021-11-15 | 2021-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | STANHOPE STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
B022021319A02 | 2021-11-15 | 2021-12-31 | TEMP. CONST. SIGNS/MARKINGS | STANHOPE STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
B022021319A03 | 2021-11-15 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | STANHOPE STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
Q042021295A08 | 2021-10-22 | 2021-11-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MURRAY STREET, QUEENS, FROM STREET 22 AVENUE TO STREET 23 AVENUE |
B022021287A69 | 2021-10-14 | 2021-12-31 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022021287A72 | 2021-10-14 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022021287A71 | 2021-10-14 | 2021-12-31 | TEMP. CONST. SIGNS/MARKINGS | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022021287A70 | 2021-10-14 | 2021-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022021287A68 | 2021-10-14 | 2021-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022021287A67 | 2021-10-14 | 2021-12-31 | CROSSING SIDEWALK | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B022021287A66 | 2021-10-14 | 2021-12-31 | PLACE MATERIAL ON STREET | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B042021285A34 | 2021-10-12 | 2021-11-10 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BAINBRIDGE STREET, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE |
Q042021281A01 | 2021-10-08 | 2021-11-06 | REPAIR SIDEWALK | MERRICK BOULEVARD, QUEENS, FROM STREET 104 AVENUE TO STREET 105 AVENUE |
Q042021281A03 | 2021-10-08 | 2021-11-06 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MERRICK BOULEVARD, QUEENS, FROM STREET 104 AVENUE TO STREET 105 AVENUE |
Q012021281A30 | 2021-10-08 | 2021-11-06 | PAVE STREET-W/ ENGINEERING & INSP FEE | MERRICK BOULEVARD, QUEENS, FROM STREET 104 AVENUE TO STREET 105 AVENUE |
Q012021281A29 | 2021-10-08 | 2021-11-06 | RESET, REPAIR OR REPLACE CURB | MERRICK BOULEVARD, QUEENS, FROM STREET 104 AVENUE TO STREET 105 AVENUE |
B042021256A10 | 2021-09-13 | 2021-10-12 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | PRESIDENT STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
Q012021245A69 | 2021-09-02 | 2021-10-01 | RESET, REPAIR OR REPLACE CURB | 188 STREET, QUEENS, FROM STREET 75 AVENUE TO STREET UNION TURNPIKE |
Q042021245A03 | 2021-09-02 | 2021-10-01 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 188 STREET, QUEENS, FROM STREET 75 AVENUE TO STREET UNION TURNPIKE |
Q012021245A70 | 2021-09-02 | 2021-10-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | 188 STREET, QUEENS, FROM STREET 75 AVENUE TO STREET UNION TURNPIKE |
B012021242B32 | 2021-08-30 | 2021-09-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | CORNELIA STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE |
B012021217A30 | 2021-08-05 | 2021-09-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | HERKIMER STREET, BROOKLYN, FROM STREET GUNTHER PLACE TO STREET ROCKAWAY AVENUE |
B012021217A29 | 2021-08-05 | 2021-09-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | HERKIMER STREET, BROOKLYN, FROM STREET GUNTHER PLACE TO STREET ROCKAWAY AVENUE |
Q012021213A00 | 2021-08-01 | 2021-08-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | 153 STREET, QUEENS, FROM STREET 119 AVENUE TO STREET 119 ROAD |
B042021201A35 | 2021-07-20 | 2021-08-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | HERKIMER STREET, BROOKLYN, FROM STREET SACKMAN STREET TO STREET SHERLOCK PLACE |
Q042021192A00 | 2021-07-11 | 2021-07-24 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | FRESH MEADOW LANE, QUEENS, FROM STREET GLADWIN AVENUE |
B012021168B59 | 2021-06-17 | 2021-07-16 | PAVE STREET-W/ ENGINEERING & INSP FEE | 61 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE |
B012021162B26 | 2021-06-11 | 2021-07-09 | PAVE STREET-W/ ENGINEERING & INSP FEE | 61 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET NEW UTRECHT AVENUE |
Q012021154A01 | 2021-06-03 | 2021-07-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | 103 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET NORTHERN BOULEVARD |
Q012021154A00 | 2021-06-03 | 2021-07-01 | RESET, REPAIR OR REPLACE CURB | 103 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET NORTHERN BOULEVARD |
Q042021154A00 | 2021-06-03 | 2021-07-01 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 103 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET NORTHERN BOULEVARD |
B012021147B91 | 2021-05-27 | 2021-06-30 | PAVE STREET-W/ ENGINEERING & INSP FEE | 54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B012021147B90 | 2021-05-27 | 2021-06-30 | RESET, REPAIR OR REPLACE CURB | 54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B042021147A22 | 2021-05-27 | 2021-06-30 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B012021133A78 | 2021-05-13 | 2021-06-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 38 STREET, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE |
B012021133A77 | 2021-05-13 | 2021-06-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 38 STREET, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE |
B042021133A12 | 2021-05-13 | 2021-06-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEBSTER AVENUE, BROOKLYN, FROM STREET EAST 3 STREET TO STREET OCEAN PARKWAY |
B012021133A76 | 2021-05-13 | 2021-06-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 38 STREET, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE |
B012021132B54 | 2021-05-12 | 2021-06-11 | RESET, REPAIR OR REPLACE CURB | KANSAS PLACE, BROOKLYN, FROM STREET ARKANSAS DRIVE TO STREET NATIONAL DRIVE |
B042021132A45 | 2021-05-12 | 2021-06-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | KANSAS PLACE, BROOKLYN, FROM STREET ARKANSAS DRIVE TO STREET NATIONAL DRIVE |
B012021132B55 | 2021-05-12 | 2021-06-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | KANSAS PLACE, BROOKLYN, FROM STREET ARKANSAS DRIVE TO STREET NATIONAL DRIVE |
Q042021127A12 | 2021-05-07 | 2021-06-03 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 52 AVENUE, QUEENS, FROM STREET DOUGLASTON PARKWAY |
Q042021127A11 | 2021-05-07 | 2021-06-03 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 52 AVENUE, QUEENS, FROM STREET DOUGLASTON PARKWAY |
Q042021127A10 | 2021-05-07 | 2021-06-03 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | DOUGLASTON PARKWAY, QUEENS, FROM STREET 52 AVENUE TO STREET THORNHILL AVENUE |
Q012021127B83 | 2021-05-07 | 2021-06-03 | RESET, REPAIR OR REPLACE CURB | DOUGLASTON PARKWAY, QUEENS, FROM STREET 52 AVENUE TO STREET THORNHILL AVENUE |
Q012021127B84 | 2021-05-07 | 2021-06-03 | PAVE STREET-W/ ENGINEERING & INSP FEE | DOUGLASTON PARKWAY, QUEENS, FROM STREET 52 AVENUE TO STREET THORNHILL AVENUE |
Q012021127B85 | 2021-05-07 | 2021-06-03 | PAVE STREET-W/ ENGINEERING & INSP FEE | 52 AVENUE, QUEENS, FROM STREET DOUGLASTON PARKWAY |
Q012021127B87 | 2021-05-07 | 2021-06-04 | RESET, REPAIR OR REPLACE CURB | 52 AVENUE, QUEENS, FROM STREET 241 STREET TO STREET DOUGLASTON PARKWAY |
Q012021127B88 | 2021-05-07 | 2021-06-04 | PAVE STREET-W/ ENGINEERING & INSP FEE | 52 AVENUE, QUEENS, FROM STREET 241 STREET TO STREET DOUGLASTON PARKWAY |
Q042021127A13 | 2021-05-07 | 2021-06-04 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 52 AVENUE, QUEENS, FROM STREET 241 STREET TO STREET DOUGLASTON PARKWAY |
B042021124A58 | 2021-05-04 | 2021-06-02 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | QUINCY STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
B042021124A36 | 2021-05-04 | 2021-05-25 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 44 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
B042021124A35 | 2021-05-04 | 2021-05-25 | REPLACE SIDEWALK | EAST 13 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B012021124B41 | 2021-05-04 | 2021-05-25 | RESET, REPAIR OR REPLACE CURB | 44 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
B012021124B97 | 2021-05-04 | 2021-06-03 | RESET, REPAIR OR REPLACE CURB | QUINCY STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
B012021124B98 | 2021-05-04 | 2021-06-03 | PAVE STREET-W/ ENGINEERING & INSP FEE | QUINCY STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
B012021105A72 | 2021-04-15 | 2021-05-13 | PAVE STREET-W/ ENGINEERING & INSP FEE | 44 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
Q012021103A96 | 2021-04-13 | 2021-05-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | FRESH MEADOW LANE, QUEENS, FROM STREET GLADWIN AVENUE |
B042021103A03 | 2021-04-13 | 2021-05-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | GRAND STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET |
Q012021103A80 | 2021-04-13 | 2021-05-12 | PAVE STREET-W/ ENGINEERING & INSP FEE | 49 AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD TO STREET WEEKS LANE |
Q012021092C96 | 2021-04-02 | 2021-05-01 | RESET, REPAIR OR REPLACE CURB | DALNY ROAD, QUEENS, FROM STREET 184 STREET TO STREET SOMERSET STREET |
Q042021092A18 | 2021-04-02 | 2021-05-01 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | DALNY ROAD, QUEENS, FROM STREET 184 STREET TO STREET SOMERSET STREET |
Q012021092C97 | 2021-04-02 | 2021-05-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | DALNY ROAD, QUEENS, FROM STREET 184 STREET TO STREET SOMERSET STREET |
Q012021083C63 | 2021-03-24 | 2021-04-24 | RESET, REPAIR OR REPLACE CURB | 180 STREET, QUEENS, FROM STREET 73 AVENUE TO STREET 75 AVENUE |
Q042021083A12 | 2021-03-24 | 2021-04-24 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 180 STREET, QUEENS, FROM STREET 73 AVENUE TO STREET 75 AVENUE |
Q012021083C64 | 2021-03-24 | 2021-04-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | 180 STREET, QUEENS, FROM STREET 73 AVENUE TO STREET 75 AVENUE |
Q042021082A10 | 2021-03-23 | 2021-04-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | FRESH MEADOW LANE, QUEENS, FROM STREET GLADWIN AVENUE |
Q042021082A11 | 2021-03-23 | 2021-04-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | FRESH MEADOW LANE, QUEENS, FROM STREET GLADWIN AVENUE |
Q042021082A08 | 2021-03-23 | 2021-04-21 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | GLADWIN AVENUE, QUEENS, FROM STREET 186 STREET TO STREET FRESH MEADOW LANE |
Q012021082B56 | 2021-03-23 | 2021-04-21 | RESET, REPAIR OR REPLACE CURB | GLADWIN AVENUE, QUEENS, FROM STREET 186 STREET TO STREET FRESH MEADOW LANE |
Q012021082B57 | 2021-03-23 | 2021-04-21 | PAVE STREET-W/ ENGINEERING & INSP FEE | GLADWIN AVENUE, QUEENS, FROM STREET 186 STREET TO STREET FRESH MEADOW LANE |
Q012021082B58 | 2021-03-23 | 2021-04-21 | RESET, REPAIR OR REPLACE CURB | FRESH MEADOW LANE, QUEENS, FROM STREET GLADWIN AVENUE TO STREET PIDGEON MEADOW ROAD |
Q012021082B59 | 2021-03-23 | 2021-04-21 | PAVE STREET-W/ ENGINEERING & INSP FEE | FRESH MEADOW LANE, QUEENS, FROM STREET GLADWIN AVENUE TO STREET PIDGEON MEADOW ROAD |
Q042021082A09 | 2021-03-23 | 2021-04-21 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | FRESH MEADOW LANE, QUEENS, FROM STREET GLADWIN AVENUE TO STREET PIDGEON MEADOW ROAD |
Q012021062B04 | 2021-03-03 | 2021-03-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | 49 AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD TO STREET WEEKS LANE |
Q012021062B03 | 2021-03-03 | 2021-03-29 | RESET, REPAIR OR REPLACE CURB | 49 AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD TO STREET WEEKS LANE |
Q042021062A01 | 2021-03-03 | 2021-03-29 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 49 AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD TO STREET WEEKS LANE |
B012021060C02 | 2021-03-01 | 2021-03-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | DOUGLASS STREET, BROOKLYN, FROM STREET HOYT STREET TO STREET SMITH STREET |
B012021055D49 | 2021-02-24 | 2021-03-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 17 STREET, BROOKLYN, FROM STREET CROPSEY AVENUE TO STREET MERMAID AVENUE |
B012021055D18 | 2021-02-24 | 2021-02-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | 46 STREET, BROOKLYN, FROM STREET 9 AVENUE TO STREET 10 AVENUE |
Q042021022A02 | 2021-01-22 | 2021-02-19 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 167 STREET, QUEENS, FROM STREET LITHONIA AVENUE TO STREET METCALF AVENUE |
Q012021022A91 | 2021-01-22 | 2021-02-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | 167 STREET, QUEENS, FROM STREET LITHONIA AVENUE TO STREET METCALF AVENUE |
Q012021022A90 | 2021-01-22 | 2021-02-19 | RESET, REPAIR OR REPLACE CURB | 167 STREET, QUEENS, FROM STREET LITHONIA AVENUE TO STREET METCALF AVENUE |
M012021020B12 | 2021-01-20 | 2021-02-10 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 118 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
B012021018A08 | 2021-01-18 | 2021-02-16 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 17 STREET, BROOKLYN, FROM STREET CROPSEY AVENUE TO STREET MERMAID AVENUE |
B012021006E59 | 2021-01-06 | 2021-01-29 | RESET, REPAIR OR REPLACE CURB | PULASKI STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
B042021006A42 | 2021-01-06 | 2021-01-29 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | PULASKI STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
B042021004A09 | 2021-01-04 | 2021-02-02 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | QUINCY STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
B012020366A50 | 2020-12-31 | 2021-01-29 | INSTALL FENCE | GREENE AVENUE, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B042020363A16 | 2020-12-28 | 2020-12-31 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 13 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B042020356A03 | 2020-12-21 | 2020-12-31 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | QUINCY STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
Q012020339B58 | 2020-12-04 | 2020-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | 181 STREET, QUEENS, FROM STREET 75 AVENUE TO STREET UNION TURNPIKE |
Q042020339A00 | 2020-12-04 | 2020-12-31 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MURRAY STREET, QUEENS, FROM STREET 22 AVENUE TO STREET 23 AVENUE |
B012020336C00 | 2020-12-01 | 2020-12-23 | INSTALL FENCE | GREENE AVENUE, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012020334A00 | 2020-11-29 | 2020-12-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | GATES AVENUE, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
B012020334A01 | 2020-11-29 | 2020-12-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | GATES AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
M012020324A89 | 2020-11-19 | 2020-12-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 118 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
Q012020307A96 | 2020-11-02 | 2020-11-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | 181 STREET, QUEENS, FROM STREET 75 AVENUE TO STREET UNION TURNPIKE |
Q012020307A95 | 2020-11-02 | 2020-11-26 | RESET, REPAIR OR REPLACE CURB | 181 STREET, QUEENS, FROM STREET 75 AVENUE TO STREET UNION TURNPIKE |
Q042020307A51 | 2020-11-02 | 2020-11-26 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 181 STREET, QUEENS, FROM STREET 75 AVENUE TO STREET UNION TURNPIKE |
B012020294B56 | 2020-10-20 | 2020-11-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | GREENE AVENUE, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
B012020287D17 | 2020-10-13 | 2020-11-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | SHERIDAN AVENUE, BROOKLYN, FROM STREET LIBERTY AVENUE TO STREET MC KINLEY AVENUE |
Q042020287A57 | 2020-10-13 | 2020-11-10 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 193 STREET, QUEENS, FROM STREET 81 AVENUE TO STREET ABERDEEN ROAD |
Q012020287D28 | 2020-10-13 | 2020-11-10 | PAVE STREET-W/ ENGINEERING & INSP FEE | 193 STREET, QUEENS, FROM STREET 81 AVENUE TO STREET ABERDEEN ROAD |
Q012020287D27 | 2020-10-13 | 2020-11-10 | RESET, REPAIR OR REPLACE CURB | 193 STREET, QUEENS, FROM STREET 81 AVENUE TO STREET ABERDEEN ROAD |
B012020287D16 | 2020-10-13 | 2020-11-11 | RESET, REPAIR OR REPLACE CURB | SHERIDAN AVENUE, BROOKLYN, FROM STREET LIBERTY AVENUE TO STREET MC KINLEY AVENUE |
B042020287A45 | 2020-10-13 | 2020-11-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | SHERIDAN AVENUE, BROOKLYN, FROM STREET LIBERTY AVENUE TO STREET MC KINLEY AVENUE |
B012020275B19 | 2020-10-01 | 2020-11-03 | RESET, REPAIR OR REPLACE CURB | GRAND STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET UNION AVENUE |
B012020275B20 | 2020-10-01 | 2020-11-03 | PAVE STREET-W/ ENGINEERING & INSP FEE | GRAND STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET UNION AVENUE |
B042020275A15 | 2020-10-01 | 2020-11-03 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | GRAND STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET UNION AVENUE |
B042020273A05 | 2020-09-29 | 2020-10-28 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | ST MARKS AVENUE, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE |
B012020273A20 | 2020-09-29 | 2020-10-28 | RESET, REPAIR OR REPLACE CURB | ST MARKS AVENUE, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE |
B012020267B37 | 2020-09-23 | 2020-10-22 | PAVE STREET-W/ ENGINEERING & INSP FEE | GATES AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
B042020246A06 | 2020-09-02 | 2020-09-30 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 20 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B042020244A46 | 2020-08-31 | 2020-09-30 | REPLACE SIDEWALK | GATES AVENUE, BROOKLYN, FROM STREET WASHINGTON AVENUE TO STREET WAVERLY AVENUE |
B042020240A09 | 2020-08-27 | 2020-09-25 | REPAIR SIDEWALK | STANHOPE STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012020232A28 | 2020-08-19 | 2020-09-17 | RESET, REPAIR OR REPLACE CURB | CORNELIA STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B012020232A32 | 2020-08-19 | 2020-09-17 | RESET, REPAIR OR REPLACE CURB | CORNELIA STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B012020232A29 | 2020-08-19 | 2020-09-17 | PAVE STREET-W/ ENGINEERING & INSP FEE | CORNELIA STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B012020232A33 | 2020-08-19 | 2020-09-17 | PAVE STREET-W/ ENGINEERING & INSP FEE | CORNELIA STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B042020232A04 | 2020-08-19 | 2020-09-17 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CORNELIA STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B042020232A03 | 2020-08-19 | 2020-09-17 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CORNELIA STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B012020230B99 | 2020-08-17 | 2020-09-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | ST MARKS AVENUE, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE |
B012020225B50 | 2020-08-12 | 2020-09-10 | PAVE STREET-W/ ENGINEERING & INSP FEE | GATES AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
B042020212A16 | 2020-07-30 | 2020-08-28 | REPLACE SIDEWALK | GATES AVENUE, BROOKLYN, FROM STREET WASHINGTON AVENUE TO STREET WAVERLY AVENUE |
B012020069C67 | 2020-03-09 | 2020-03-26 | INSTALL FENCE | MONROE STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
180509010350 | 2018-05-09 | ARTICLES OF ORGANIZATION | 2018-05-09 |
Date | Inspection Object | Address | Grade | Type | Institution | Desctiption |
---|---|---|---|---|---|---|
2024-10-30 | No data | MOFFAT STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP is in compliance |
2024-10-30 | No data | MURRAY STREET, FROM STREET 22 AVENUE TO STREET 23 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builder pave cut needs to be resealed |
2024-10-28 | No data | EAST 223 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new building BPP done |
2024-10-21 | No data | BRONXWOOD AVENUE, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1/2 plus 5 of the roadway paved |
2024-10-17 | No data | SMITH STREET, FROM STREET 120 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP in good condition. |
2024-10-17 | No data | 122 AVENUE, FROM STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP completed markings replaced. |
2024-10-17 | No data | 122 AVENUE, FROM STREET 164 STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BBP completed markings replaced. |
2024-10-17 | No data | BEECH TERRACE, FROM STREET BEEKMAN AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done. In compliance |
2024-10-15 | No data | 229 STREET, FROM STREET 64 AVENUE TO STREET 67 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed in front of 64-59, Curb to curb is 29’, Milled Area is 19’9”, Depth is 3” |
2024-10-15 | No data | 11 STREET, FROM STREET 33 ROAD TO STREET 34 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Q012024277A01• Curb to Curb width – 40’ • Milled area – 35’x 20’• Depth of milled area – n/a• ½ +5’ milled (yes/no) – yes• Waiver (yes/no)- no. Permit is still valid. |
2024-10-11 | No data | 89 STREET, FROM STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newer permit Q042023341A32 on file |
2024-10-11 | No data | 72 AVENUE, FROM STREET PARSONS BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newer permit Q042024225A18 on file |
2024-10-10 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Before milling the width of roadway is 47’ Width milled is 28’ 7” & Length milled is 17' 11” & Depth is 2.5" before reaching the concrete base. Foreman on site. |
2024-10-10 | No data | WEST 169 STREET, FROM STREET NELSON AVENUE TO STREET SHAKESPEARE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP in place at time of inspection. |
2024-10-07 | No data | MOFFAT STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb in compliance |
2024-10-03 | No data | DOUGLASTON PARKWAY, FROM STREET 39 AVENUE TO STREET 235 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete curb installed in front of 39-15. |
2024-09-30 | No data | 28 AVENUE, FROM STREET 154 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Q012024256A38• Curb to Curb width – 29' • Milled area – 69' x 19'• Depth of milled area – 3"• ½ +5’ milled (yes/no) – yes• Waiver (yes/no)-no |
2024-09-28 | No data | VAN BUREN STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY PAVED HALF +5 |
2024-09-26 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP conducted on the roadway |
2024-09-25 | No data | AINSLIE STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Jersey barriers in compliance i/f/o 185 |
2024-09-25 | No data | 72 AVENUE, FROM STREET AGUILAR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Contractor on site , only landing flag restored in the NE corner quadrant , unable to measure due to concrete still curing. Will need to be re inspected at a later date when work is completed. |
2024-09-25 | No data | 72 AVENUE, FROM STREET AGUILAR AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Contractor obtained permit # Q042024225A17 for the NE corner quadrant , landing flag was restored but found to be non ADA compliant. Please reference permit for further information. |
2024-09-25 | No data | 84 AVENUE, FROM STREET 150 STREET TO STREET SMEDLEY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR Re-inspection passed, perm area of BPP restoration is no longer sunken in front of 147-27. Correct permit type 0135’ issued under permit Q012024222A49 for the correction of the CAR. |
2024-09-23 | No data | 72 AVENUE, FROM STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Contractor restored landing area in the NW corner quadrant to satisfy CAR under permit # Q042024200A25. Corner quadrant was found to be non ADA compliant , missing expansion joints around traffic control device post. M&C prism on 8/28/24 ,CAR issued. |
2024-09-23 | No data | 72 AVENUE, FROM STREET AGUILAR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Contractor restored landing area to satisfy CAR under permit # Q042024200A24. Upon measuring landing cross slope (2.4%) remains non ADA compliant. Measured and collected in Prism on 8/28/24. |
2024-09-18 | No data | 157 STREET, FROM STREET 24 AVENUE TO STREET 24 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | builder pave to grade |
2024-09-17 | No data | VAN BUREN STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CONCRETE CURB INSTALLED |
2024-09-17 | No data | DOUGLASTON PARKWAY, FROM STREET 39 AVENUE TO STREET 235 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP restoration to grade in front of 39-15 |
2024-09-14 | No data | BUFFALO AVENUE, FROM STREET ST JOHNS PLACE TO STREET STERLING PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY PAVED HALF +5 |
2024-09-13 | No data | MOFFAT STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Flags restored in compliance i/f/o 164. |
2024-09-11 | No data | VAN BUREN STREET, FROM STREET BROADWAY TO STREET PATCHEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY HAS BEEN RESURFACED |
2024-09-09 | No data | EAST 152 STREET, FROM STREET COURTLANDT AVENUE TO STREET MELROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 110’ of roadway abutting newly installed steel faced curb broken out and cracked up, from property line to property line. Ifo 398. |
2024-09-08 | No data | GLENWOOD ROAD, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done |
2024-09-06 | No data | FLUSHING AVENUE, FROM STREET SANDFORD STREET TO STREET WALWORTH STREET | No data | Street Construction Inspections: Active | Department of Transportation | Temp construction signs without proper identification numbers on front and back. |
2024-09-04 | No data | NEW YORK AVENUE, FROM STREET AVENUE D TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Rw has since been resurfaced |
2024-09-02 | No data | DE GRAW STREET, FROM STREET CLINTON STREET TO STREET STRONG PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Fence is installed IFO 238, incompliance. |
2024-08-30 | No data | 157 STREET, FROM STREET 24 AVENUE TO STREET 24 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | 1/2+5 BPP roadway pavement completed front of 24-11 157 Street. Respondent notified Queens HIQA on 8/18/24. |
2024-08-29 | No data | MILFORD STREET, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ROADWAY CUTB TO CURB IS 30FT MILLED ROADWAY IS 20FT X 20FT WITH A DEPTH OF 3 INCHES |
2024-08-28 | No data | 72 AVENUE, FROM STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Contractor restored landing area in the NW corner quadrant to satisfy CAR under permit # Q042024200A25. Corner quadrant was found to be non ADA compliant , missing expansion joints around traffic control device post. M&C prism on 8/28/24. |
2024-08-28 | No data | 72 AVENUE, FROM STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Contractor restored landing area in the NW corner quadrant , please reference latest permit # Q042024225A18 for inspection remarks. |
2024-08-28 | No data | 150 STREET, FROM STREET 89 AVENUE TO STREET 90 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent paved portion of the roadway in front of sited location without notifying the NYCDOT HIQA borough office within 4 hours prior to paving as per stip violation 1/2+5. |
2024-08-28 | No data | 72 AVENUE, FROM STREET AGUILAR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Contractor obtained permit # Q042024225A17 for the NE corner quadrant , landing area restored , however landing cross slope (2.4%) remains non ADA compliant. Please reference permit for further information. |
2024-08-28 | No data | 72 AVENUE, FROM STREET AGUILAR AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Contractor restored landing area to satisfy CAR under permit # Q042024200A24. Upon measuring landing cross slope (2.4%) remains non ADA compliant. Measured and collected in Prism on 8/28/24. |
2024-08-24 | No data | 150 STREET, FROM STREET 89 AVENUE TO STREET 90 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb in compliance. |
2024-08-24 | No data | 72 AVENUE, FROM STREET AGUILAR AVENUE TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb in compliance. |
2024-08-21 | No data | 122 AVENUE, FROM STREET SMITH STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed. • Curb to Curb width – 35’• Milled & paved area– 23’ x 22’ did not witness milled portion, due to no inspector was available on 8/15/24. |
2024-08-21 | No data | SMITH STREET, FROM STREET 120 AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed. • Curb to Curb width – 26’• Milled & paved area– 20’ x 115’ did not witness milled portion. Due to no inspector was available on 8/15/24. |
2024-08-21 | No data | 122 AVENUE, FROM STREET 164 STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed. • Curb to Curb width – 33’• Milled & paved area– 23’ x 60’ did not witness milled portion. |
2024-08-14 | No data | MANHATTAN AVENUE, FROM STREET CLAY STREET TO STREET DUPONT STREET | No data | Street Construction Inspections: Active | Department of Transportation | Barriers, pass |
2024-08-11 | No data | 125 STREET, FROM STREET 23 AVENUE TO STREET 25 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Half plus 5' of roadway repaved. |
2024-08-11 | No data | 25 AVENUE, FROM STREET 125 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Half plus 5' of roadway repaved. |
2024-08-09 | No data | 54 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done for property in compliance |
2024-08-07 | No data | 72 AVENUE, FROM STREET AGUILAR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed single ramp within the NE3 corner quadrant was found to be non Ada compliant. Remeasured and collected in prism on 8/7/24. |
2024-08-07 | No data | 72 AVENUE, FROM STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Reconstructed tangent ramps within the NW2 corner quadrant was found to be non Ada compliant. Measured and collected in prism on 8/7/24. |
2024-08-07 | No data | 72 AVENUE, FROM STREET PARSONS BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Reconstructed tangent ramps within the NW2 corner quadrant was found to be non Ada compliant. Remeasured and collected in prism on 8/7/24. Will issue new CAR on most recent expired permit Q042024200A25. |
2024-08-07 | No data | 72 AVENUE, FROM STREET AGUILAR AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed single ramp within the NE3 corner quadrant was found to be non Ada compliant due to landing cross slope. Will issue CAR on most recent expired permit Q042024200A24. |
2024-08-05 | No data | DE GRAW STREET, FROM STREET CLINTON STREET TO STREET STRONG PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done on s/w |
2024-08-02 | No data | CENTRAL AVENUE, FROM STREET JEFFERSON STREET TO STREET TROUTMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | W of RDWY 34ft, W milled 22ft, L milled 35ft, D milled 3.5-in. |
2024-08-01 | No data | 84 AVENUE, FROM STREET 150 STREET TO STREET SMEDLEY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | At the time of the inspection this was not correct. And these photos you submitted is still not a correct repair |
2024-07-23 | No data | 210 STREET, FROM STREET 50 AVENUE TO STREET 53 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition was not repaired but the CAR will be closed and the permittee placed on hold until they correct the condition as per DOT specifications. |
2024-07-20 | No data | 210 STREET, FROM STREET 50 AVENUE TO STREET 53 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to fully install expansion joints. |
2024-07-19 | No data | 16 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk and stone face curb installed for property 395 sealed in compliance |
2024-07-14 | No data | 84 AVENUE, FROM STREET 150 STREET TO STREET SMEDLEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb in compliance. |
2024-07-12 | No data | 17 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | At time of inspection, I observed temporary "NO PARKING" construction signs posted at the site. The contractor has an active permit on file and expires on 7/24/2024. |
2024-07-12 | No data | 17 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent has a temporary construction regulation sign, posted at their site, but failed to affix their five-digit identification number on all signs. Cited permit used for ID. |
2024-07-11 | No data | MOFFAT STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP complete Curb to Curb- 29ftLength- 30.2ftWidth- 20.5ftDepth- 3 inches |
2024-07-08 | No data | DE GRAW STREET, FROM STREET CLINTON STREET TO STREET STRONG PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at this time. |
2024-07-03 | No data | 39 PLACE, FROM STREET 43 AVENUE TO STREET SKILLMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete curb restored expansion joints sealed I/F/O 41-13/15 39th Place |
2024-06-30 | No data | DE KALB AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed |
2024-06-24 | No data | 72 AVENUE, FROM STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Contractor only restored landing area in the NW2 corner quadrant to satisfy CAR under permit # Q042023117A13. Non ADA compliant flare slopes and roadway counter slope on Parsons Blvd ramp remains. M&C in Prism 6/11/24. |
2024-06-22 | No data | 72 AVENUE, FROM STREET AGUILAR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp within the NE3 corner quadrant was found to be non ADA compliant due to excessive 12.3% right flare. Prism updated on 6/11/24. |
2024-06-22 | No data | DE KALB AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp done and in compliance |
2024-06-14 | No data | 53 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done for property in compliance |
2024-06-11 | No data | 72 AVENUE, FROM STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Contractor obtained permit # Q042024140A02. Only restored landing area in the NW2 corner quadrant to satisfy CAR. Non ADA compliant flare slopes and roadway counter slope on Parsons Blvd ramp remains. M&C in Prism 6/11/24. |
2024-06-11 | No data | 72 AVENUE, FROM STREET AGUILAR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Contractor obtained permit # Q042024140A03 for the NE corner quadrant. Also restored landing area to satisfy CAR. Upon measuring landing Cross (3.5%) now found non compliant. Prism updated on 6/11/24. Right flare (12.3%) remains. |
2024-06-11 | No data | 72 AVENUE, FROM STREET AGUILAR AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Contractor restored landing area to satisfy CAR under permit # Q042023117A16. Upon measuring landing Cross (3.5%) now found non compliant. Prism updated on 6/11/24. Right flare (12.3%) remains. |
2024-06-11 | No data | 72 AVENUE, FROM STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Contractor only restored landing area in the NW2 corner quadrant to satisfy CAR under permit # Q042023117A13. Non ADA compliant flare slopes and roadway counter slope on Parsons Blvd ramp remains. M&C in Prism 6/11/24. |
2024-06-11 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | BPP IN COMPLIANCE. ROADWAY MILED 21"9" X 89" 8" X 3INCH |
2024-06-11 | No data | 210 STREET, FROM STREET 50 AVENUE TO STREET 53 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE INSTALL AND SEAL EXPANSION GOING DOWN TO ROADWAY. ONLY PORTION OF JOINT IS INSTALLED AND SEALED |
2024-06-03 | No data | NORTH 8 STREET, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Active | Department of Transportation | Location: 207 north 8th street Permit: B012024150B47Width of Roadway: 20’Width of milled area: 30’Length of milled area: 35’Depth of milled area:3” |
2024-06-03 | No data | GATES AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp done in compliance |
2024-06-03 | No data | ST MARKS AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site roadway milled half+ 5’ for 669 BPP IN COMPLIANCE |
2024-06-03 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | No work done |
2024-06-01 | No data | DE GRAW STREET, FROM STREET CLINTON STREET TO STREET STRONG PLACE | No data | Street Construction Inspections: Complaint | Department of Transportation | permittee has an active permit to occupy the roadway that expires on 7/5/2024 |
2024-05-31 | No data | DE GRAW STREET, FROM STREET CLINTON STREET TO STREET STRONG PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done, the permit has expired and a new permit is on file #B012024143C51. |
2024-05-28 | No data | DE KALB AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Location: 647 dekalb avenue Permit: B012024134D00Width of Roadway: 39’Width of milled area: 25’Length of milled area: 40’Depth of milled area:3” |
2024-05-24 | No data | 39 PLACE, FROM STREET 43 AVENUE TO STREET SKILLMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP perm to grade I/F/O 41-13/15 39th Place |
2024-05-22 | No data | COVERT STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration sealed 1/2 + 5 IFO #170. |
2024-05-22 | No data | HANCOCK STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | no signs posted at this time of inspection |
2024-05-21 | No data | DE GRAW STREET, FROM STREET CLINTON STREET TO STREET STRONG PLACE | No data | Street Construction Inspections: Active | Department of Transportation | No temp sign posted |
2024-05-20 | No data | MADISON STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Signs posted in compliance |
2024-05-20 | No data | HANCOCK STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No signs posted |
2024-05-18 | No data | GIPSON STREET, FROM STREET JAYDEE COURT TO STREET MOTT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | paving complete |
2024-05-18 | No data | 127 STREET, FROM STREET 7 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed at time of my inspection. |
2024-05-10 | No data | 20 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed in front of 187 20 Street, pass. |
2024-05-09 | No data | AINSLIE STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CROSSING SIDEWALK, pass |
2024-05-07 | No data | 150 STREET, FROM STREET 89 AVENUE TO STREET 90 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No BPP paving roadway work started at this time of inspection. |
2024-05-07 | No data | 89 STREET, FROM STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Reconstructed single ramp within the NW2 corner quadrant was found to be non Ada compliant. Measured and collected in prism on 7/19/23. Condition remains |
2024-04-25 | No data | 188 STREET, FROM STREET PERTH ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Open CAR on file on permit #Q042023339A26. |
2024-04-17 | No data | 188 STREET, FROM STREET PERTH ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | General Contractor re upgraded NW2 corner quadrant to satisfy CAR # 20237680021, upon re inspection corner quadrant has been found to be still non ADA compliant. Measured and collected in Prism on 3/8/23. |
2024-04-17 | No data | DE GRAW STREET, FROM STREET CLINTON STREET TO STREET STRONG PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done on the sidewalk at this time. There is a BO in progress, IFO PROPERTY 238. |
2024-04-17 | No data | METROPOLITAN AVENUE, FROM STREET 132 STREET TO STREET KEW GARDENS ROAD | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed and acceptable. • Curb to Curb width – 37’• Milled area – 23’10’’• Depth of milled area – 3’’ |
2024-04-16 | No data | 39 PLACE, FROM STREET 43 AVENUE TO STREET SKILLMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Milled area 60'00" x 20'00" as per stip 1/2+5. |
2024-04-14 | No data | WEIRFIELD STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Signs posted with no id marking. DG3 issued. |
2024-04-13 | No data | 72 AVENUE, FROM STREET AGUILAR AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed single ramp in the NE3 corner quadrant was found to be non ADA compliant. Measured and collected in Prism on 5/5/23. |
2024-04-13 | No data | 72 AVENUE, FROM STREET PARSONS BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps within the NW2 corner quadrant was found to be non ADA compliant. Measured and collected in prism on 5/24/23. |
2024-04-13 | No data | 210 STREET, FROM STREET 50 AVENUE TO STREET 53 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work done |
2024-04-12 | No data | NEW YORK AVENUE, FROM STREET NEWKIRK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm cut has been resealed |
2024-04-12 | No data | NEWKIRK AVENUE, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cut has been resealed |
2024-04-12 | No data | DE GRAW STREET, FROM STREET CLINTON STREET TO STREET STRONG PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done on the sidewalk, IFO 238 Degraw St. |
2024-04-12 | No data | 16 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PROTEST DENIED REPAIRED- it has been re sealed |
2024-04-12 | No data | MENAHAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CROSSING SIDEWALK, pass |
2024-04-11 | No data | GIPSON STREET, FROM STREET JAYDEE COURT TO STREET MOTT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP installed |
2024-04-09 | No data | BROOKLYN AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp done and in compliance |
2024-04-05 | No data | GATES AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb repaired and sealed in compliance ifo 422 1/2 |
2024-04-05 | No data | BEECH TERRACE, FROM STREET BEEKMAN AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Active | Department of Transportation | Bpp passed and completed. 1/2 + 5 paved and sealed at time of inspection. |
2024-04-05 | No data | 17 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | r.w milled in compliance with bpp |
2024-04-05 | No data | 16 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The builder pavement restoration in the roadway need to re-sealed in front of 100 16 Street & permit expired on 2/2/2024. |
2024-04-03 | No data | COVERT STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no Bobcat permit is aactive |
2024-04-02 | No data | 72 AVENUE, FROM STREET AGUILAR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to re measure the SE corner quadrant and update Prism due to weather conditions (rain). |
2024-03-30 | No data | 43 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work was done under permit #B012022311B22. |
2024-03-28 | No data | 127 STREET, FROM STREET 7 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No bpp paving roadway work started at this time of inspection. |
2024-03-27 | No data | CONEY ISLAND AVENUE, FROM STREET BANNER AVENUE TO STREET SHORE PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done for property in compliance |
2024-03-23 | No data | MENAHAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | MATERIAL ON STREET |
2024-03-23 | No data | COVERT STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No Bob cat found upon inspection. |
2024-03-22 | No data | OCEAN PARKWAY, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced by BPP. |
2024-03-22 | No data | EAST 38 STREET, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp in compliance |
2024-03-22 | No data | 17 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No work started. No work done. No inspection found at this time of inspection. |
2024-03-22 | No data | 16 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started. No work done. No inspection found at this time. Work in front of this address is from sewer repair work. |
2024-03-16 | No data | WEIRFIELD STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW paved |
2024-03-15 | No data | WEST END AVENUE, FROM STREET CASS PLACE TO STREET OCEAN COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done for property in compliance |
2024-03-13 | No data | 72 AVENUE, FROM STREET AGUILAR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Non compliant landing running (4.3%) & right flare (12.3%) remain in the NE corner quadrant at this time of inspection. |
2024-03-11 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp done in compliance |
2024-03-08 | No data | LINCOLN AVENUE, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP complete and in compliance |
2024-03-06 | No data | 89 STREET, FROM STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Reconstructed single ramp within the NE3 corner quadrant was found to be non Ada compliant. Remeasured and collected in prism on 5/8/23. Acceptable per TI 22-001. |
2024-03-04 | No data | AINSLIE STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | jrsey barriers stored on the RW |
2024-03-02 | No data | WEIRFIELD STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | permit active but no material stored at this time |
2024-03-01 | No data | COVERT STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new building installed and expansion joints sealed |
2024-02-29 | No data | BROOKLYN AVENUE, FROM STREET AVENUE I TO STREET LIRR BAY RIDGE DIV | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp done in compliance |
2024-02-29 | No data | AGUILAR AVENUE, FROM STREET 72 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP Restoration paving acceptable. |
2024-02-29 | No data | PARSONS BOULEVARD, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paving done. |
2024-02-27 | No data | NEW YORK AVENUE, FROM STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in roadway needs to be resealed |
2024-02-27 | No data | NEWKIRK AVENUE, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in roadway needs to be resealed at 3301 |
2024-02-26 | No data | ROGERS AVENUE, FROM STREET PARK PLACE TO STREET PROSPECT PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP was done |
2024-02-26 | No data | GIPSON STREET, FROM STREET JAYDEE COURT TO STREET MOTT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | concrete curb installed |
2024-02-25 | No data | EAST 34 STREET, FROM STREET BROOKLYN ROAD TO STREET FARRAGUT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp done in compliance |
2024-02-23 | No data | EAST 38 STREET, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb in compliance |
2024-02-16 | No data | GATES AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Rodeway, Mill and paved half +5 in accordance with BPP for property 422 1/2 |
2024-02-11 | No data | GIPSON STREET, FROM STREET JAYDEE COURT TO STREET MOTT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | concrete curb installed |
2024-02-06 | No data | 19 AVENUE, FROM STREET 149 STREET TO STREET 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builder's pave 1/2+5 perm to grade I/F/O 149-31 19th Avenue |
2024-02-05 | No data | AINSLIE STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Jersey barriers installed on the roadway ifo 185 in compliance |
2024-01-31 | No data | 164 AVENUE, FROM STREET 104 STREET TO STREET BODY OF WATER | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed. |
2024-01-30 | No data | 54 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | portion of r,w repaved |
2024-01-26 | No data | AINSLIE STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | jersey barriers stored on the roadway |
2024-01-26 | No data | GIPSON STREET, FROM STREET JAYDEE COURT TO STREET MOTT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | • Curb to Curb width – 30’• Milled area – 30’ x 20’• Depth of milled area – 4’’• ½ +5’ milled (yes/no) – yes• Waiver (yes/no)- no |
2024-01-26 | No data | LEEDS ROAD, FROM STREET BEND TO STREET BEND | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints installed recess & sealed at curb line I/F/O 252-35 Leeds Road |
2024-01-24 | No data | COVERT STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Location:170 Covert Street Permit: B012024011B13Width of Roadway: 29ft 3inWidth of milled area: 19ft 10inLength of milled area: 29ft 1in Depth of milled area: 3fin down |
2024-01-24 | No data | MANHATTAN AVENUE, FROM STREET CLAY STREET TO STREET DUPONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work to be continued under permitB022024003C78, pass |
2024-01-24 | No data | MANHATTAN AVENUE, FROM STREET CLAY STREET TO STREET DUPONT STREET | No data | Street Construction Inspections: Active | Department of Transportation | CROSSING SIDEWALK, pass |
2024-01-23 | No data | GATES AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site upon arrival roadway milled for property 422 |
2024-01-23 | No data | 59 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | portion of rw repaved |
2024-01-22 | No data | MADISON STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk crossing is in compliance |
2024-01-17 | No data | GATES AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work was done on roadway at time of inspection. |
2024-01-16 | No data | EAST 152 STREET, FROM STREET COURTLANDT AVENUE TO STREET MELROSE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started at time of inspection. |
2024-01-11 | No data | ROGERS AVENUE, FROM STREET PARK PLACE TO STREET PROSPECT PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Before milling the width of roadway was 39’ 5” Width milled is 24’ 9” & Length milled is 43' 11” & Depth is 3". Foreman on site. |
2024-01-11 | No data | GRAVESEND NECK ROAD, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel faced curb and sidewalk installed for property #1711 in compliance |
2024-01-10 | No data | RUTLAND ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PROTEST DENIED REPAIRED- areas sunken brought to grade |
2024-01-10 | No data | 46 ROAD, FROM STREET 202 STREET TO STREET 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP perm restoration |
2024-01-10 | No data | 16 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | W of RDWY 30ft, W milled 20ft, L milled 35ft, D milled 4-inches. |
2024-01-06 | No data | DE GRAW STREET, FROM STREET CLINTON STREET TO STREET STRONG PLACE | No data | Street Construction Inspections: Active | Department of Transportation | No signs posted. |
2024-01-05 | No data | 17 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent has a temporary construction sign posted. Respondent failed to affix their assigned or correct five-digit ID number in lower right hand corner (FRONT) & lower right/left (BACK) of the sign using a waterproof label. |
2024-01-03 | No data | MANHATTAN AVENUE, FROM STREET CLAY STREET TO STREET DUPONT STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O the above respondent Failure to have the necessary ID markings on DOT required signs. No ID marking on the sign. |
2024-01-02 | No data | MADISON STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp construction posted on green plywood of scaffolding |
2023-12-26 | No data | WEEKS LANE, FROM STREET 50 AVENUE TO STREET 51 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP perm restoration |
2023-12-26 | No data | 46 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to ascertain. |
2023-12-25 | No data | RUTLAND ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb installed and in compliance |
2023-12-24 | No data | LEE AVENUE, FROM STREET HEYWARD STREET TO STREET LYNCH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed |
2023-12-22 | No data | 44 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced by BPP. |
2023-12-19 | No data | DEAN STREET, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | W of RDWY 34ft, W milled 22ft, L milled 40ft, D milled 3-iinches. |
2023-12-16 | No data | PUTNAM AVENUE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the above respondent failed to secure DOT permit to post temporary construction no parking/ standing signs on the sidewalk. DOB permit# B00478823-I1-FN was used for ID. |
2023-12-13 | No data | 15 AVENUE, FROM STREET 48 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Intersection milled and resurfaced |
2023-12-13 | No data | 20 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP PASS. width of roadway 34ft width of milled area 24ft length of milled area 35ft depth of milled area 3in. |
2023-12-13 | No data | 15 AVENUE, FROM STREET 47 STREET TO STREET 48 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP completed |
2023-12-11 | No data | DE GRAW STREET, FROM STREET CLINTON STREET TO STREET STRONG PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done |
2023-12-06 | No data | LEE AVENUE, FROM STREET HEYWARD STREET TO STREET LYNCH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP is in compliance |
2023-12-01 | No data | GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cement face curb installed |
2023-11-30 | No data | 84 AVENUE, FROM STREET 150 STREET TO STREET SMEDLEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete curb installed in front of 147-27. |
2023-11-28 | No data | GROVE STREET, FROM STREET BEND TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW installed, expansion joints sealed |
2023-11-27 | No data | 72 AVENUE, FROM STREET AGUILAR AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed single ramp in the NE3 corner quadrant was found to be non ADA compliant. Measured and collected in Prism on 5/5/23. |
2023-11-27 | No data | 72 AVENUE, FROM STREET PARSONS BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps within the NW2 corner quadrant was found to be non ADA compliant. Measured and collected in prism on 5/24/23. |
2023-11-22 | No data | MADISON AVENUE, FROM STREET EAST 109 STREET TO STREET EAST 110 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paved and in compliance at this time. |
2023-11-21 | No data | 89 STREET, FROM STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Reconstructed single ramp within the NW2 corner quadrant was found to be non Ada compliant. Measured and collected in prism on 7/19/23. Condition remains |
2023-11-20 | No data | GROVE STREET, FROM STREET BEND TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW flags installed, in compliance |
2023-11-18 | No data | AINSLIE STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | fence up at location |
2023-11-17 | No data | KANSAS PLACE, FROM STREET ARKANSAS DRIVE TO STREET NATIONAL DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PAVE ST CONDUCTED 1/2 + 5 OF THE ROADWAY .. |
2023-11-16 | No data | EAST 18 STREET, FROM STREET JEROME AVENUE TO STREET VOORHIES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP in compliance. Perm in roadway. |
2023-11-16 | No data | BROOKLYN AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP COMPLETE AND IN COMPLIANCE |
2023-11-10 | No data | OCEAN PARKWAY, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Active | Department of Transportation | Width of Roadway: 25 feetWidth of milled area: 25 feetLength of milled area: 50 feetDepth of milled area: 3 inchesContractor in compliance with required BPP measurements, pass. |
2023-11-07 | No data | 59 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb installed |
2023-11-07 | No data | 54 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Full Roadway Width 30'0Cut size L41'0 W20'0 D0'3 |
2023-11-07 | No data | DE GRAW STREET, FROM STREET CLINTON STREET TO STREET STRONG PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | fence installed |
2023-11-04 | No data | RUTLAND ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the sidewalk closed off with a jersey barrier. Respondent failed to adhere to OCMC stipulation 013 to maintain a 5 foot walkway in the sidewalk. Respondent ID by cited permit. |
2023-11-03 | No data | TOPPING AVENUE, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Portion of roadway found repaved for new building |
2023-11-01 | No data | WEIRFIELD STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway paved by BPP |
2023-10-30 | No data | 15 AVENUE, FROM STREET 48 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Contractor has milled the intersection in line with both segments, pass. |
2023-10-30 | No data | 48 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Width of Roadway: 30 feetWidth of milled area: 20 feetLength of milled area: 74 feetDepth of milled area: 3 inchesIn compliance with required BPP measurement, pass. |
2023-10-30 | No data | 15 AVENUE, FROM STREET 47 STREET TO STREET 48 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Width of Roadway: 42 feetWidth of milled area: 27 feetLength of milled area: 68 feetDepth of milled area: 3 inchesIn compliance with required BPP measurement, pass. |
2023-10-19 | No data | MILFORD STREET, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Width of Roadway: 30’Width of milled area: 25’Length of milled area: 30’Depth of milled area:3 “ |
2023-10-14 | No data | 188 STREET, FROM STREET PERTH ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition has been resolved within the SW1 corner quadrant. Newer permit Q042023205A20 on file |
2023-10-13 | No data | 89 STREET, FROM STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Reconstructed single ramp within the NW2 corner quadrant was found to be non Ada compliant. Measured and collected in prism on 7/19/23. Condition remains. |
2023-10-06 | No data | WEEKS LANE, FROM STREET 50 AVENUE TO STREET 51 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Building Paving Plan. 53’x19’x3” portion of roadway was milled. Total width of roadway: 28’. Half +5 in compliance. |
2023-10-05 | No data | MADISON AVENUE, FROM STREET EAST 109 STREET TO STREET EAST 110 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP location is in compliance at time of inspection. All findings emailed. |
2023-10-03 | No data | WINTHROP STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP COMPLETE and in compliance |
2023-09-30 | No data | BAINBRIDGE STREET, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY PAVED HALF +5 |
2023-09-28 | No data | CLEVELAND STREET, FROM STREET PITKIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Location: 2390 Pitkin AvenuePermit: B012023269B20Width of Roadway: 50’Width of milled area: 30’Length of milled area: 22’Depth of milled area:3” |
2023-09-28 | No data | PITKIN AVENUE, FROM STREET CLEVELAND STREET TO STREET ELTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Location: 2390 Pitkin AvenuePermit: B012023269B19Width of Roadway: 50’Width of milled area: 30’Length of milled area: 100’Depth of milled area:3” |
2023-09-28 | No data | CLEVELAND STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Location: 2390 Pitkin AvenuePermit: B012023269B21Width of Roadway: 30’Width of milled area: 20’Length of milled area: 30’Depth of milled area:3” |
2023-09-27 | No data | 7 AVENUE, FROM STREET 44 STREET TO STREET 45 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I OBSERVED ABOVE RESPONDENT HAS CONSTRUCTION EQUIPMENT “BARRIERS” ON ROADWAY PARKING LANE)OBSTRUCTION PARKING lane-NO PERMIT. Respondent ID BY DOB PERMIT # B00152047-I1-FN expires on 11/25/2023 |
2023-09-27 | No data | 72 AVENUE, FROM STREET AGUILAR AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed single ramp in the NE3 corner quadrant was found to be non ADA compliant. Measured and collected in Prism on 5/5/23. |
2023-09-27 | No data | 72 AVENUE, FROM STREET PARSONS BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps within the NW2 corner quadrant was found to be non ADA compliant. Measured and collected in prism on 5/24/23. |
2023-09-19 | No data | GROVE STREET, FROM STREET BEND TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk lags installed, expansion joint sealed |
2023-09-16 | No data | AINSLIE STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Temp construction sign up at location |
2023-09-15 | No data | AINSLIE STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Material stored at site |
2023-09-12 | No data | LEE AVENUE, FROM STREET HEYWARD STREET TO STREET LYNCH STREET | No data | Street Construction Inspections: Active | Department of Transportation | Location: 217 Lee Avenue Permit: B012023248B16Width of Roadway: 33ft 9in Width of milled area: 22ft 2in Length of milled area: 43ft 3inDepth of milled area: 3fin down |
2023-09-11 | No data | 59 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Width of Roadway: 30 feetWidth of milled area: 20 feetLength of milled area: 55 feetUpon arrival, I found the area to be milled and paved. In compliance with required BPP inspection, pass. |
2023-09-08 | No data | 46 ROAD, FROM STREET 202 STREET TO STREET 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | • Curb to Curb width – 50’ 3’’• Milled area – 30’ x 20’ 3’’• Depth of milled area – 3’’• ½ +5’ milled (yes/no) – yes• Waiver (yes/no)-no |
2023-09-05 | No data | 188 STREET, FROM STREET PERTH ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp within the SW1 corner quadrant was found to be ADA compliant. Re measured and collected in prism on 8/16/23, prism verified on 9/5/23. Missing expansion joints on all sides of street light post. |
2023-09-04 | No data | GRAVESEND NECK ROAD, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found roadway resurfaced |
2023-09-03 | No data | EAST 24 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP completed |
2023-09-03 | No data | CONEY ISLAND AVENUE, FROM STREET BANNER AVENUE TO STREET SHORE PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joint sealed on sidewalk |
2023-08-30 | No data | WINDSOR PLACE, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP was done |
2023-08-30 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration IFO property #218. |
2023-08-26 | No data | LEWIS AVENUE, FROM STREET VERNON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP is in compliance |
2023-08-26 | No data | LEWIS AVENUE, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP is in compliance |
2023-08-25 | No data | AINSLIE STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Green construction fence installed on sidewalk in compliance |
2023-08-24 | No data | VERNON AVENUE, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP is in compliance |
2023-08-22 | No data | 14 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No work started. No work done. No inspection found at this time. |
2023-08-21 | No data | WEST END AVENUE, FROM STREET CASS PLACE TO STREET OCEAN COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved for BPP, In compliance |
2023-08-18 | No data | BROOKLYN AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Contractor has milled a 50’x22’ area of roadway to a depth of 3” in compliance, roadway 33’ wide. |
2023-08-16 | No data | 188 STREET, FROM STREET PERTH ROAD | No data | Street Construction Inspections: Active | Department of Transportation | No new ped ramp work started at this time within the NW2 corner quadrant. Condition remains the same, we’ll reinspect at later date when work is completed. |
2023-08-14 | No data | 25 AVENUE, FROM STREET 125 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP in compliance Curb to Curb width – 26’Milled area – 20’X20’X3”Depth of milled area – 3”½ +5’ milled (yes/no) –Y• Waiver (yes/no)- No |
2023-08-14 | No data | 25 AVENUE, FROM STREET 125 STREET TO STREET 126 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP in compliance: Curb to Curb width 26’ /83’X20’X3”/ Depth 3”/ ½ +5’ milled Yes /Waiver No |
2023-08-14 | No data | 125 STREET, FROM STREET 23 AVENUE TO STREET 25 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP in compliance Curb to Curb width – 26’ • Milled area –118’X20’X3”• Depth of milled area – 3”• ½ +5’ milled (yes/no) –Y • Waiver (yes/no)- No |
2023-08-10 | No data | PARSONS BOULEVARD, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed expansion joint recessed and sealed. |
2023-08-10 | No data | PARK AVENUE, FROM STREET CUMBERLAND STREET TO STREET NORTH OXFORD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane IFO property #123. |
2023-08-09 | No data | WEST 18 ROAD, FROM STREET CROSS BAY BOULEVARD TO STREET BODY OF WATER | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R/w paved curb to curb |
2023-08-09 | No data | LINCOLN AVENUE, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Swk flags sealed and in compliance |
2023-08-08 | No data | AINSLIE STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | barricades stored in the parking lane |
2023-08-04 | No data | WINTHROP STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Contractors BPP roadway restoration found to be in compliance |
2023-08-03 | No data | 53 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP IN COMPLIANCE. |
2023-08-03 | No data | AGUILAR AVENUE, FROM STREET 72 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb is restored with expansion joints sealed at the corner of 71-82 near the bend on Aguilar Ave & 72nd Ave. |
2023-08-02 | No data | 188 STREET, FROM STREET PERTH ROAD TO STREET TROON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed and sealed. |
2023-08-02 | No data | WINDSOR PLACE, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb installed |
2023-07-23 | No data | 72 AVENUE, FROM STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 74 - Pedestrian Ramp Spec. CAR issued. Ped. Ramp. Unit will reinspect CAR. |
2023-07-23 | No data | PARK AVENUE, FROM STREET CUMBERLAND STREET TO STREET NORTH OXFORD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb reset |
2023-07-23 | No data | 72 AVENUE, FROM STREET AGUILAR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 74 - Pedestrian Ramp Spec. CAR issued. Ped. Ramp. Unit will reinspect CAR. |
2023-07-22 | No data | CONEY ISLAND AVENUE, FROM STREET BANNER AVENUE TO STREET SHORE PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel face curb |
2023-07-20 | No data | 89 STREET, FROM STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP sealed and to grade in the intersection of 89 St and Astoria Blvd. |
2023-07-20 | No data | GARFIELD PLACE, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb installed |
2023-07-20 | No data | ASTORIA BOULEVARD, FROM STREET 88 STREET TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel face curb installed expansion joints sealed in front of 88-23 Astoria Blvd |
2023-07-19 | No data | 89 STREET, FROM STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Reconstructed single ramp within the NW2 corner quadrant was found to be non Ada compliant. Measured and collected in prism on 7/19/23. |
2023-07-19 | No data | PALO ALTO AVENUE, FROM STREET BEND TO STREET NERO AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BBP in good condition. |
2023-07-19 | No data | OAK DRIVE, FROM STREET ELVIRA AVENUE TO STREET READS LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R/w was paved. |
2023-07-18 | No data | MIDWOOD STREET, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no crew on site |
2023-07-14 | No data | 72 AVENUE, FROM STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done, permit expired. Non ADA compliant elements still remains at this time of inspection. Please reference permit # Q042023117A13 for further information. |
2023-07-14 | No data | 72 AVENUE, FROM STREET AGUILAR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done, permit expired. Non ADA compliant elements still remains, please reference permit # Q042023117A16 for further information. |
2023-07-13 | No data | CONEY ISLAND AVENUE, FROM STREET BANNER AVENUE TO STREET SHORE PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Full rw width 30’0Cut L50’0 W20’0 D0’3 |
2023-07-13 | No data | WINDSOR PLACE, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP PASSED AT THIS TIME. |
2023-07-12 | No data | WINTHROP STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb (Concrete) found to be in compliance |
2023-07-12 | No data | 188 STREET, FROM STREET PERTH ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No new work started at the time within the SW1 corner quadrant, condition remains the same. Open CAR is on file, ramp is functional and accessible measured and collected in Prism on 3/8/23. |
2023-07-07 | No data | 84 AVENUE, FROM STREET 150 STREET TO STREET SMEDLEY STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | I observed the respondent placed a construction container on street without a valid DOT permit. It was being used by the respondent at an active work site to collect construction debris. |
2023-07-06 | No data | PARK AVENUE, FROM STREET CUMBERLAND STREET TO STREET NORTH OXFORD STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site upon arrival full width of roadway 30’-20’x20’x3” milled in compliance ifo property 123 |
2023-07-06 | No data | 72 AVENUE, FROM STREET AGUILAR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit # Q042023159A20 obtained for the NE corner quadrant. Please reference permit for further information. |
2023-07-06 | No data | 72 AVENUE, FROM STREET AGUILAR AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No new pedestrian ramp work started. Completed single ramp in the NE3 corner quadrant has been found to be non ADA compliant. Measured and collected in Prism on 5/5/23 under permit # Q042023117A16. |
2023-07-06 | No data | 72 AVENUE, FROM STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit # Q042023159A21 obtained for the NW corner with no new work observed at this time of inspection. |
2023-07-06 | No data | 72 AVENUE, FROM STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No new pedestrian ramp work started. Completed tangent ramps within the NW2 corner quadrant was found to be non ADA compliant. Measured and collected in prism on 5/24/23 under permit # Q042023117A13. |
2023-07-04 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb reset |
2023-06-30 | No data | 89 STREET, FROM STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Reconstructed single ramp within the NE3 corner quadrant was found to be non Ada compliant. Remeasured and collected in prism on 5/8/23. |
2023-06-30 | No data | 89 STREET, FROM STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permittee has removed plastic from DWS mat and corrected left flare slope. Landing cross slope is non Ada. Will pass and issue new CAR |
2023-06-29 | No data | NEWELL STREET, FROM STREET MESEROLE AVENUE TO STREET NORMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp in compliance for new building 151 |
2023-06-28 | No data | BROOKLYN AVENUE, FROM STREET AVENUE I TO STREET LIRR BAY RIDGE DIV | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Contractors BPP roadway restoration is found in compliance |
2023-06-28 | No data | 52 AVENUE, FROM STREET DOUGLASTON PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | SW corner quadrant upgraded by a different contractor (Prime Construction New York Inc , Q042023080A06). Please reference permit for further information. |
2023-06-27 | No data | NEWKIRK AVENUE, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Contractor has milled a 100’x22’ area of roadway to a depth of 3” in compliance |
2023-06-27 | No data | NEW YORK AVENUE, FROM STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Contractor has milled a 29’x22’ area of roadway to a depth of 3” in compliance, Intersection 44’x35’ in diameter |
2023-06-27 | No data | NEW YORK AVENUE, FROM STREET AVENUE D TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Contractor has milled a 47’x26’ area of roadway to a depth of 3” in compliance, roadway is 43’ curb to curb. |
2023-06-25 | No data | 17 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No Parking 7:00AM - 6:00PM MONDAY - FRIDAY, Temporary Construction. |
2023-06-24 | No data | 193 STREET, FROM STREET 81 AVENUE TO STREET ABERDEEN ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | BPP restoration was resealed. |
2023-06-24 | No data | LEEDS ROAD, FROM STREET BEND TO STREET BEND | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | All expansion joints found installed where needed & sealed. Protest reason is not acceptable. |
2023-06-21 | No data | WINTHROP STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Contractor has milled a 90’x19’ area of roadway to a depth of 3” in compliance, Width of roadway 29’ |
2023-06-17 | No data | WEST 169 STREET, FROM STREET NELSON AVENUE TO STREET SHAKESPEARE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Roadway in front of new building was paved BPP done. |
2023-06-15 | No data | MURRAY STREET, FROM STREET 22 AVENUE TO STREET 23 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pave street restoration |
2023-06-15 | No data | ST MARK'S AVENUE, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved in front new building five feet plus more completed |
2023-06-13 | No data | WEST 169 STREET, FROM STREET NELSON AVENUE TO STREET SHAKESPEARE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Observed crew closing rw and machinery on sidewalk ifo school…spoke with foreman, instructed and complied to stop any work, start at 9am |
2023-06-13 | No data | MADISON STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | material not visible |
2023-06-13 | No data | GARFIELD PLACE, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Construction crew has an active permit to excavated the sidewalk |
2023-06-12 | No data | MADISON STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | barriers not visible |
2023-06-07 | No data | PUTNAM AVENUE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | fence s/w |
2023-06-07 | No data | AGUILAR AVENUE, FROM STREET 72 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP Restoration is acceptable. |
2023-06-07 | No data | 111 STREET, FROM STREET ROOSEVELT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builder's pave perm to grade within the intersection of 111th Street & Roosevelt Avenue |
2023-06-07 | No data | ROOSEVELT AVENUE, FROM STREET 108 STREET TO STREET 111 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builder's pave perm to grade at 108-68 Roosevelt Avenue |
2023-06-07 | No data | 188 STREET, FROM STREET PERTH ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp work preformed. |
2023-06-07 | No data | 188 STREET, FROM STREET PERTH ROAD TO STREET TROON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp work done |
2023-06-07 | No data | AGUILAR AVENUE, FROM STREET 72 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP restoration acceptable. |
2023-06-06 | No data | 153 STREET, FROM STREET 119 AVENUE TO STREET 119 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP installed |
2023-06-06 | No data | 51 AVENUE, FROM STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paving done as per inspector Sibiri Yakubu. |
2023-06-06 | No data | QUEENS BOULEVARD, FROM STREET 51 AVENUE TO STREET CORNISH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paving done as per inspector Sibiri Yakubu. |
2023-06-05 | No data | 188 STREET, FROM STREET PERTH ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | New permit # Q042023137A13 obtain for the NW2 corner quadrant, non ADA compliant elements still remains at this time of inspection. Please reference most recent permit for further information. |
2023-06-05 | No data | 188 STREET, FROM STREET PERTH ROAD | No data | Street Construction Inspections: Active | Department of Transportation | No new pedestrian ramp work started. General Contractor re upgraded SW corner quadrant to satisfy CAR # 20236880018, upon re inspection corner quadrant still remains non ADA compliant. Measured and collected in Prism on 3/8/23. |
2023-06-02 | No data | ST MARK'S AVENUE, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w installed & sealed |
2023-06-02 | No data | 111 STREET, FROM STREET 41 AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builder's pave perm to grade |
2023-06-01 | No data | GILES PLACE, FROM STREET CANNON PLACE TO STREET FT INDEPENDENCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2023-05-30 | No data | 188 STREET, FROM STREET PERTH ROAD | No data | Street Construction Inspections: Active | Department of Transportation | No new pedestrian ramp work observed in the SW1 corner quadrant. Non ADA compliant landing cross slope still remains at this time of inspection, open CAR under permit # Q042023058A24. |
2023-05-30 | No data | 188 STREET, FROM STREET PERTH ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Non ADA compliant landing running/cross and left flare slopes still remains at this time of inspection. New permit # Q042023137A13 obtained for the NW2 corner with no new pedestrian ramp work observed at this time of inspection. |
2023-05-27 | No data | HERKIMER STREET, FROM STREET GUNTHER PLACE TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | resealed |
2023-05-25 | No data | 72 AVENUE, FROM STREET AGUILAR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp within the SE4 corner quadrant was found to be ADA compliant. Measured and collected in prism on 5/25/23. |
2023-05-24 | No data | GRAVESEND NECK ROAD, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel face curb |
2023-05-24 | No data | 72 AVENUE, FROM STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the SW1 corner quadrant was found to be non ADA compliant. Measured and collected in prism on 5/24/23. |
2023-05-19 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | W OF RDWY 32FT, W MILLED 21FT, L MILLED 35FT, D MILLED 3.5 INCHES. |
2023-05-19 | No data | MIDWOOD STREET, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Full rw width 30’0Cut L51’0 W21’0 D0’3 |
2023-05-17 | No data | 89 STREET, FROM STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | sticker/plastic covering was removed |
2023-05-17 | No data | WEST END AVENUE, FROM STREET CASS PLACE TO STREET OCEAN COURT | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site, in compliance for BPP |
2023-05-15 | No data | CORTELYOU ROAD, FROM STREET EAST 11 STREET TO STREET EAST 12 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Width of Roadway: 44'7Width Milled: 27'9Length Milled: 60'3Depth Milled: 3" |
2023-05-15 | No data | ST MARK'S AVENUE, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Active | Department of Transportation | BPP was inspected. Whole r/w 42' milled width 26' Length 36' 2" Depth 2.5" before reaching the concrete. Foreman on site. |
2023-05-11 | No data | ATLANTIC AVENUE, FROM STREET HOYT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk it’s open at time of inspection. |
2023-05-10 | No data | EAST 24 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: Active | Department of Transportation | Full Roadway width: 30'0Cut size: L50'0 W20'0 D0'3 |
2023-05-09 | No data | 188 STREET, FROM STREET PERTH ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | General Contractor re upgraded SW corner quadrant to satisfy CAR # 20236880018, upon re inspection corner quadrant has been found to be still non ADA compliant. Measured and collected in Prism on 3/8/23. |
2023-05-08 | No data | 89 STREET, FROM STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Reconstructed single ramp within the NE3 corner quadrant was found to be non Ada compliant. Remeasured and collected in prism on 5/8/23. |
2023-05-08 | No data | 89 STREET, FROM STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Reconstructed single ramp within the NW2 corner quadrant was found to be non Ada compliant. Remeasured and collected in prism on 5/8/23. Must remove plastic from DWS mat and seal expansion joints. |
2023-05-05 | No data | 72 AVENUE, FROM STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps in the NW2 corner quadrant have been found to be non ADA. Measured and collected in Prism on 5/5/23. |
2023-05-05 | No data | AINSLIE STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent with a temporary regulatory signs posted. Respondent failed to affix their Department issued five-digit identification number using a waterproof label or sticker on all temporary signs. |
2023-05-05 | No data | 72 AVENUE, FROM STREET AGUILAR AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed single ramp in the NE3 corner quadrant has been found to be non ADA compliant. Measured and collected in Prism on 5/5/23. |
2023-05-04 | No data | 72 AVENUE, FROM STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps in the NW2 corner quadrant have been found to be functional and accessible. Unable to measure due to weather conditions (rain) will reinspect at later date. Plastic over DWS and expansion joints not sealed. |
2023-05-04 | No data | 72 AVENUE, FROM STREET AGUILAR AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No new pedestrian ramp work observed in the SE4 corner quadrant. Previously upgraded by New York Concrete (Q042020302A27) HWPR19Q1. |
2023-05-04 | No data | LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Curb to curb- 35ftLength- 83.5ft Width- 23ftDepth-3 inches |
2023-05-04 | No data | BUFFALO AVENUE, FROM STREET ST JOHNS PLACE TO STREET STERLING PLACE | No data | Street Construction Inspections: Active | Department of Transportation | BPP IN COMPLIANCE CREW ON SITE ROADWAY MILLED WITH DIMENSIONS OF RW38’. L24’xW20’xD3” . |
2023-05-02 | No data | EVERGREEN AVENUE, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest Denied/ Repaired. Bike lane marking restored at this time. |
2023-05-01 | No data | 72 AVENUE, FROM STREET AGUILAR AVENUE TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | • Curb to Curb width – 36’• Milled area – 146’ x 23’• Depth of milled area – 4’’• ½ +5’ milled (yes/no) – Yes• Waiver (yes/no)- No |
2023-05-01 | No data | AGUILAR AVENUE, FROM STREET 72 AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | • Curb to Curb width – 50’• Milled area – 121’ x 30’• Depth of milled area – 4’’• ½ +5’ milled (yes/no) – Yes • Waiver (yes/no)- No |
2023-05-01 | No data | EVERGREEN AVENUE, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed. |
2023-05-01 | No data | AGUILAR AVENUE, FROM STREET 72 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | • Curb to Curb width – 50’• Milled area – 30’ x 23’• Depth of milled area – 4’’• ½ +5’ milled (yes/no) – yes• Waiver (yes/no)- No |
2023-05-01 | No data | PARSONS BOULEVARD, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | • Curb to Curb width – 52’• Milled area – 103’ x 52’• Depth of milled area – 4’’• ½ +5’ milled (yes/no) – Yes• Waiver (yes/no)- No |
2023-04-28 | No data | NOBLE STREET, FROM STREET FRANKLIN STREET TO STREET LORIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed. |
2023-04-28 | No data | 40 STREET, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP restoration |
2023-04-25 | No data | 89 STREET, FROM STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | General contractor re upgraded the NE3 corner to satisfy CAR under permit # Q042023012A21. After measuring I found corner quadrant still remains non ADA compliant. Re measured and collected in Prism on 4/25/23. |
2023-04-25 | No data | 89 STREET, FROM STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | General contractor re upgraded the NW2 corner to satisfy CAR # 20237810025. After measuring I found corner quadrant still remains non ADA compliant. Re measured and collected in Prism on 4/25/23. |
2023-04-21 | No data | EVERGREEN AVENUE, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | W OF RDWY 34FT, W PAVED 21FT, L PAVED 31FT. |
2023-04-18 | No data | WEIRFIELD STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site, in compliance for BPP |
2023-04-13 | No data | 72 AVENUE, FROM STREET AGUILAR AVENUE TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT-CREW ON SITE WORINKING IN EXCAVATED SIDEWALK AREA . ALL STIPS IN COMPLIANCE. |
2023-04-13 | No data | PARSONS BOULEVARD, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF SIDEWALK IN COMPLIANCE |
2023-04-13 | No data | RUTLAND ROAD, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut resurfaced by BPP |
2023-04-06 | No data | 180 STREET, FROM STREET 73 AVENUE TO STREET 75 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | builder pave in compliance |
2023-04-05 | No data | GLENWOOD ROAD, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP inspected. Length 50' 2" Before Milling width 42' after milling 26' Depth 2.5" before reaching the concrete base. Foreman on site |
2023-04-05 | No data | ATLANTIC AVENUE, FROM STREET HOYT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Active | Department of Transportation | Width of Roadway: 60 feetWidth of milled area: 35 feetLength of milled area: 30 feetDepth of milled area: 3 inchesIn compliance with required BPP measurements, pass. |
2023-04-01 | No data | HERKIMER STREET, FROM STREET GUNTHER PLACE TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESEAL THE PERM RESTORATION IN THE DRIVIG LANE. |
2023-03-31 | No data | 193 STREET, FROM STREET 81 AVENUE TO STREET ABERDEEN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP needs edges re-sealed edges are cracking. |
2023-03-31 | No data | VAN BUREN STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | W OF RDWY 33FT, W MILLED 21FT, D MILLED 3 INCHES, L MILLED 20FT IFO PROPERTY #474. |
2023-03-30 | No data | LAMONT COURT, FROM STREET EMPIRE BOULEVARD TO STREET LEFFERTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP was done |
2023-03-30 | No data | BEDFORD AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb installed |
2023-03-30 | No data | MIDWOOD STREET, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Respondent failed to comply with stipulation ID 023 |
2023-03-29 | No data | 111 STREET, FROM STREET ROOSEVELT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | The below BPP is completed and acceptable. Curb to Curb width – 42’0”, Milled area – 27’0” x 24’0”, Depth of milled area – 3”, ½ +5’ milled (yes/no) – Yes.• Waiver (yes/no)- No |
2023-03-29 | No data | 188 STREET, FROM STREET 75 AVENUE TO STREET UNION TURNPIKE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp in order. |
2023-03-29 | No data | ROOSEVELT AVENUE, FROM STREET 108 STREET TO STREET 111 STREET | No data | Street Construction Inspections: Active | Department of Transportation | The below BPP is completed and acceptable. Curb to Curb width – 42’0”, Milled area – 27’0” x 184’0”, Depth of milled area – 3”, ½ +5’ milled (yes/no) – Yes.• Waiver (yes/no)- No |
2023-03-29 | No data | 111 STREET, FROM STREET 41 AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Active | Department of Transportation | The below BPP is completed and acceptable. Curb to Curb width – 40’0”, Milled area – 25’0” x 116’0”, Depth of milled area – 3”, ½ +5’ milled (yes/no) – Yes.• Waiver (yes/no)- No |
2023-03-24 | No data | 231 STREET, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | builder pave in compliance |
2023-03-23 | No data | 179 STREET, FROM STREET 69 AVENUE TO STREET JEWEL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway |
2023-03-22 | No data | 181 STREET, FROM STREET 75 AVENUE TO STREET UNION TURNPIKE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street paved. |
2023-03-21 | No data | BUSHWICK AVENUE, FROM STREET GROVE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started. New permit obtained B042023068A28 Stellar Singla Inc is now responsible for this NE3 corner. |
2023-03-19 | No data | ASTORIA BOULEVARD, FROM STREET 88 STREET TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm roadway trench maintain to grade. |
2023-03-19 | No data | 89 STREET, FROM STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builder's pavement restoration maintain to grade in d/l. |
2023-03-17 | No data | 52 AVENUE, FROM STREET 241 STREET TO STREET DOUGLASTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP to grade |
2023-03-16 | No data | DOUGLASTON PARKWAY, FROM STREET 52 AVENUE TO STREET THORNHILL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway Resurfaced |
2023-03-16 | No data | 123 STREET, FROM STREET 22 AVENUE TO STREET 23 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP was completed as inspector Sibiri Yakubu. |
2023-03-16 | No data | 52 AVENUE, FROM STREET DOUGLASTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | intersection resurfaced |
2023-03-14 | No data | 164 AVENUE, FROM STREET 104 STREET TO STREET BODY OF WATER | No data | Street Construction Inspections: Post-Audit | Department of Transportation | builder pave complete |
2023-03-09 | No data | HEYWARD STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved. |
2023-03-09 | No data | PACIFIC STREET, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work completed on roadway in front of 1346 Pacific street |
2023-03-08 | No data | 188 STREET, FROM STREET PERTH ROAD | No data | Street Construction Inspections: Active | Department of Transportation | General Contractor re upgraded NW2 corner quadrant to satisfy CAR # 20237680021, upon re inspection corner quadrant has been found to be still non ADA compliant. Measured and collected in Prism on 3/8/23. |
2023-03-08 | No data | 188 STREET, FROM STREET PERTH ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit obtained for the SW1 corner quadrant. Please refer for further information. |
2023-03-04 | No data | HIMROD STREET, FROM STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done in the intersection |
2023-03-04 | No data | EAST 3 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Previous work covered by bpp |
2023-03-03 | No data | 89 STREET, FROM STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR 20237810025 is the for Northwest corner in front of 88-23 Astoria Blvd. This CAR 20236870041 is for the Northeast receiving corner in front of 89-01 Astoria Blvd. These are two separate corners. |
2023-03-03 | No data | EAST 38 STREET, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb installed |
2023-03-01 | No data | 89 STREET, FROM STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed single ramp within the NE corner quadrant is non ADA. Measured in prism on 2/1/23. |
2023-02-28 | No data | AINSLIE STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Permit #B022023005A71 issued for construction sign |
2023-02-28 | No data | 44 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | IFO property #702, I observed plastic barriers on the streets. Respondent placed construction equipment on the streets without an active NYC DOT permit on file. |
2023-02-27 | No data | 52 AVENUE, FROM STREET DOUGLASTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | General contractor only installed Grey DWS on old existing single ramp. After measuring corner quadrant has been found to be non ADA compliant. Measured and collected in Prism on 2/27/23. |
2023-02-25 | No data | 17 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | construction signs posted |
2023-02-23 | No data | BUSHWICK AVENUE, FROM STREET GROVE STREET TO STREET LINDEN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PROTEST ACCEPTED- CAR 20236860048 ISSUED PRIOR RELATED TO THIS WORK |
2023-02-22 | No data | BUSHWICK AVENUE, FROM STREET GROVE STREET TO STREET LINDEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Partial sidewalk flag was repaired, full flag needs to be repaired, patch work is not allowed |
2023-02-22 | No data | PACIFIC STREET, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb reset in front of 1346 Pacific street |
2023-02-22 | No data | BUSHWICK AVENUE, FROM STREET GROVE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR was issued for patch work for the segment |
2023-02-20 | No data | LINCOLN ROAD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb installed |
2023-02-17 | No data | 84 AVENUE, FROM STREET 150 STREET TO STREET SMEDLEY STREET | No data | Street Construction Inspections: Active | Department of Transportation | No bobcat |
2023-02-16 | No data | GROVE STREET, FROM STREET BUSHWICK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Updated BPP drawings submitted today 2/16/23 |
2023-02-16 | No data | 25 AVENUE, FROM STREET 89 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Q042022346A51 |
2023-02-15 | No data | BUSHWICK AVENUE, FROM STREET GROVE STREET TO STREET LINDEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No new curb installed |
2023-02-15 | No data | PALMETTO STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest Denied/Repaired. Expansion joints on sidewalk now sealed. |
2023-02-15 | No data | GRAVESEND NECK ROAD, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest Denied/ Repaired. wearing course restored in kind at time of inspection. |
2023-02-15 | No data | GROVE STREET, FROM STREET BEND TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW paved by BPP |
2023-02-15 | No data | BUSHWICK AVENUE, FROM STREET GROVE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Intersection repaved |
2023-02-15 | No data | LEEDS ROAD, FROM STREET BEND TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Recess and seal expansion joint on restored sidewalk flags, Remove wood form between restored sidewalk and adjacent property. |
2023-02-14 | No data | PALMETTO STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest Accepted. Duplicate of CAR#20237400031. |
2023-02-14 | No data | LAMONT COURT, FROM STREET EMPIRE BOULEVARD TO STREET LEFFERTS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Width of roadway:26 feetProperty line to Property line: 21 feetMilled portion: 13 + 5= 18Depth of roadway: 3 inches |
2023-02-14 | No data | BEDFORD AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Active | Department of Transportation | BPP was inspected. Before milling the roadway Width was 43' 9" & After milling Width is 27' Length 29' 6" Depth 3". Foreman on site |
2023-02-13 | No data | WYCKOFF AVENUE, FROM STREET HIMROD STREET TO STREET STANHOPE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved, In compliance |
2023-02-13 | No data | GROVE STREET, FROM STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | No 410 permit on file. Permittee constructed new sidewalks in the NE3 corner and completely left out pedestrian ramps. We’ll measure & reinspect when ramps are completed. |
2023-02-13 | No data | EAST 18 STREET, FROM STREET JEROME AVENUE TO STREET VOORHIES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Paved street by builder |
2023-02-12 | No data | ROGERS AVENUE, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No BPP was done |
2023-02-11 | No data | GROVE STREET, FROM STREET BEND TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | HIQA inspector Alberto Louis was on site monitoring crew on 2/9 on intersection permit and Bushwick Avenue permit |
2023-02-09 | No data | BUSHWICK AVENUE, FROM STREET GROVE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site |
2023-02-09 | No data | BUSHWICK AVENUE, FROM STREET GROVE STREET TO STREET LINDEN STREET | No data | Street Construction Inspections: Active | Department of Transportation | In compliance |
2023-02-08 | No data | GLADWIN AVENUE, FROM STREET 186 STREET TO STREET FRESH MEADOW LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced. |
2023-02-08 | No data | FRESH MEADOW LANE, FROM STREET GLADWIN AVENUE TO STREET PIDGEON MEADOW ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP restoration to grade in the roadway. |
2023-02-07 | No data | 44 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the full width of the sidewalk closed without a permit to do so. Respondent failed to obtain a DOT permit before closing the sidewalk. Respondent ID by active DOB permit B00152047-I1-FN. |
2023-02-06 | No data | GROVE STREET, FROM STREET BEND TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Flags installed. Expansion joints needs to be sealed |
2023-02-06 | No data | 89 STREET, FROM STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newer permit on file #Q042023012A21. Newly completed single ramp in the NW2 corner quadrant is non ADA compliant. Excessive landing slopes and ramp cross slope. Measured and collected in Prism on 2/6/23. |
2023-02-05 | No data | SHERIDAN AVENUE, FROM STREET LIBERTY AVENUE TO STREET MC KINLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY PAVED |
2023-02-04 | No data | 54 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1/2 + 5 feet of the roadway adjacent to the property was milled and paved. |
2023-02-03 | No data | JEFFERSON AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No BPP done |
2023-02-02 | No data | PATCHEN AVENUE, FROM STREET VAN BUREN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest Accepted. Approved BPP waiver at location. |
2023-02-02 | No data | MYRTLE AVENUE, FROM STREET STANHOPE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in the intersection |
2023-02-02 | No data | MYRTLE AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW paved |
2023-02-02 | No data | LINCOLN AVENUE, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP in compliance. Perm in roadway IFO 688 sealed and flush |
2023-02-02 | No data | CORNELIA STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved by BPP |
2023-02-01 | No data | 25 AVENUE, FROM STREET 89 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Newly completed single ramp within the NW2 corner quadrant was found to be non Ada compliant. Measured and collected in prism on 2/1/23. |
2023-02-01 | No data | 89 STREET, FROM STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed single ramp within the NE corner quadrant has been found to be non ADA compliant. Measured and collected in Prism on 2/1/23. |
2023-01-31 | No data | OCEAN AVENUE, FROM STREET AVENUE O TO STREET AVENUE P | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp sealed and in compliance |
2023-01-31 | No data | 49 AVENUE, FROM STREET FRANCIS LEWIS BOULEVARD TO STREET WEEKS LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP to grade |
2023-01-31 | No data | STANHOPE STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW resurfaced by BPP |
2023-01-31 | No data | STANHOPE STREET, FROM STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Intersection repaved by BPP |
2023-01-31 | No data | WYCKOFF AVENUE, FROM STREET HIMROD STREET TO STREET STANHOPE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW paved by BPP |
2023-01-30 | No data | 188 STREET, FROM STREET PERTH ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp within the SW1 corner quadrant have been found to be non ADA compliant. Previously measured and collected in Prism on 8/9/22 updated on 1/30/23. |
2023-01-30 | No data | AINSLIE STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp signs posted at site |
2023-01-29 | No data | OCEAN PARKWAY, FROM STREET AVENUE L TO STREET WASHINGTON CEMETERY BOUNDARY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP final restoration acceptable |
2023-01-28 | No data | EAST 22 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp sealed and in compliance |
2023-01-28 | No data | BUSHWICK AVENUE, FROM STREET BLEECKER STREET TO STREET MENAHAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW paved |
2023-01-28 | No data | OCEAN AVENUE, FROM STREET AVENUE L TO STREET AVENUE M | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp sealed and in compliance |
2023-01-27 | No data | GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cement face curb |
2023-01-26 | No data | MOFFAT STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway repaved by BPP |
2023-01-26 | No data | MOFFAT STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW paved by BPP |
2023-01-26 | No data | NEW YORK AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP was done |
2023-01-26 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP was done |
2023-01-25 | No data | EAST 66 STREET, FROM STREET OHIO WALK TO STREET WHITMAN DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street paved - in compliance. |
2023-01-25 | No data | BUSHWICK AVENUE, FROM STREET GROVE STREET TO STREET LINDEN STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk fully open |
2023-01-25 | No data | LINCOLN PLACE, FROM STREET BUFFALO AVENUE TO STREET ROCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP COMPLETED ON ROADWAY IN FRONT OF 1526 LINCOLN PLACE |
2023-01-25 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP COMPLETED ON ROADWAY IN FRONT OF 1015 PRESIDENT STREET |
2023-01-24 | No data | 104 STREET, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP restoration flush to grade i/f/o 32-43. |
2023-01-24 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Width of roadway:34feetProperty line to property line:29 feetMilled portion: 17 + 5 =22 feetDepth of roadway:3 inches |
2023-01-24 | No data | MARTENSE STREET, FROM STREET BEDFORD AVENUE TO STREET MARTENSE COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP was done |
2023-01-23 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW resurfaced by BPP |
2023-01-21 | No data | OCEAN PARKWAY, FROM STREET AVENUE L TO STREET WASHINGTON CEMETERY BOUNDARY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway milled and paved from curb to curb, in front of 1161 Ocean Parkway. |
2023-01-21 | No data | PALMETTO STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joints need to be sealed, permit expired 12/31/2022 |
2023-01-20 | No data | GRAVESEND NECK ROAD, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to mill and to restore roadway as required - skin patch job- (See stipulation :ROADWAY TO A DEPTH OF 3 INCHES AS A MINIMUM RESTORATION REQUIREMENT) |
2023-01-18 | No data | PALMETTO STREET, FROM STREET IRVING AVENUE TO STREET RIDGEWOOD PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway repaved by BPP |
2023-01-18 | No data | LINCOLN AVENUE, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work at this Time for this permit |
2023-01-18 | No data | EAST 118 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street repaved |
2023-01-17 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP was done |
2023-01-17 | No data | RUTLAND ROAD, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP was done |
2023-01-17 | No data | 103 STREET, FROM STREET 34 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP restoration flush to grade in the roadway i/f/o 3319. |
2023-01-17 | No data | MONROE STREET, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Fence installed |
2023-01-17 | No data | BUSHWICK AVENUE, FROM STREET MOFFAT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Intersection paved by BPP |
2023-01-16 | No data | PALMETTO STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joints needs to be sealed, your permit expired 12/31/2022 |
2023-01-12 | No data | BAINBRIDGE STREET, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | LANE MARKINGS RESTORED ON 1/2 + 5 RESTORATION. |
2023-01-12 | No data | EAST 18 STREET, FROM STREET JEROME AVENUE TO STREET VOORHIES AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP COMPLETEDWidth of Roadway 29'8Width Milled: 20'3Length Milled: 58'5Depth Milled: 4" |
2023-01-11 | No data | 89 STREET, FROM STREET 23 AVENUE TO STREET 25 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP measurements are accurate: 157' x 20' x 3''. |
2023-01-11 | No data | 89 STREET, FROM STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | At this time BPP measurements are accurate. 26' x 20' x 3''. |
2023-01-11 | No data | LINDEN BOULEVARD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP was done |
2023-01-11 | No data | ASTORIA BOULEVARD, FROM STREET 88 STREET TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | Hi Greg send back NOV for Edit. |
2023-01-10 | No data | FRESH MEADOW LANE, FROM STREET GLADWIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed single ramp within the SE4 corner quadrant is non Ada. Measured in prism 3/14/22 |
2023-01-10 | No data | ASTORIA BOULEVARD, FROM STREET 88 STREET TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent failed to comply with the terms and conditions of DOT permits Stip#072 which stated work 9AM - 4PM, Monday to Friday . Respondent has began roadway repair before 9AM. |
2023-01-10 | No data | 89 STREET, FROM STREET 23 AVENUE TO STREET 25 AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the respondent obstructed a portion of the street with a construction container in the parking lane without a valid DOT permit. It was being used at a Building operation in progress. Above permit# Q022022335B01 is being used for ID. |
2023-01-09 | No data | 200 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP to grade |
2023-01-09 | No data | EAST 4 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP in compliance at this time. |
2023-01-09 | No data | EAST 2 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP complete and in compliance |
2023-01-08 | No data | PATCHEN AVENUE, FROM STREET VAN BUREN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | THE INTERSECTION WIDTH MEASURES 36FT. YOU WERE TO MILL AND PAVE 23FT. YOU ONLY PAVED 13FT. RESTORE 23FT RESTORATION. |
2023-01-07 | No data | KENT AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP is in compliance |
2023-01-07 | No data | LEWIS AVENUE, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | LANE MARKINGS RESTORED ON THE 1/2 + 5 RESTORATION IFO PROPERTY #63. |
2023-01-07 | No data | VERNON AVENUE, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | LANE MARKINGS RESTORED ON 1/2 + 5 RESTORATION ON THE SIDE OF PROPERTY #63 LEWIS AV. |
2023-01-07 | No data | LEWIS AVENUE, FROM STREET VERNON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESEAL PERM RESTORATION IN THE INTERSECTION. BPP DONE FOR PROPERTY #63 LEWIS AV. |
2023-01-06 | No data | PACIFIC STREET, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Contractor has milled a 20’x21’ area of roadway to a depth of 3” in compliance, Roadway 32’ from curb to curb |
2023-01-06 | No data | EAST 34 STREET, FROM STREET BROOKLYN ROAD TO STREET FARRAGUT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP was done |
2023-01-05 | No data | LINCOLN ROAD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP was done |
2023-01-05 | No data | RUTLAND ROAD, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP was done |
2023-01-03 | No data | LEXINGTON AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | New sidewalk installed |
2023-01-03 | No data | FAYETTE STREET, FROM STREET BEAVER STREET TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced by BPP |
2022-12-30 | No data | PALMETTO STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Contractor has milled a 28’x19’ area of roadway to a depth of 3” in compliance, roadway measures to be 29’ from curb to curb |
2022-12-30 | No data | LEXINGTON AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | W OF RDWY 38FT, W MILLED 24FT, L MILLED 24FT, D MILLED 3 INCHES. |
2022-12-29 | No data | 89 STREET, FROM STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No new ped ramp work started in the NE3 corner quadrant at time of inspection |
2022-12-29 | No data | LINCOLN AVENUE, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site. |
2022-12-28 | No data | ASTORIA BOULEVARD, FROM STREET 88 STREET TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site with full width swk excavation. |
2022-12-26 | No data | AINSLIE STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the above respondent with jersey barriers stored on roadway in front of 185 Ainslie Street. Respondent failed to obtain a valid DOT permit for storage of jersey barriers. DOB permit #B00741100-I1-GC used for ID. |
2022-12-22 | No data | EAST 4 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb reset in compliance |
2022-12-20 | No data | 164 AVENUE, FROM STREET 104 STREET TO STREET BODY OF WATER | No data | Street Construction Inspections: Active | Department of Transportation | BPP Completed: Start 09:15 Departed 10:45 • Curb to Curb width – 20’ • Milled area – 44’ • Depth of milled area – 3” • ½ +5’ milled (yes/no) – Yes 20’• Waiver (yes/no)-NO |
2022-12-17 | No data | GILES PLACE, FROM STREET CANNON PLACE TO STREET FT INDEPENDENCE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Building paving plan completed. Roadway paved curb to curb. |
2022-12-14 | No data | OCEAN PARKWAY, FROM STREET AVENUE L TO STREET WASHINGTON CEMETERY BOUNDARY | No data | Street Construction Inspections: Active | Department of Transportation | BPP was inspected. Length 49' 6" Width 24' 6" Depth 3". Foreman was on site |
2022-12-08 | No data | GILES PLACE, FROM STREET CANNON PLACE TO STREET FT INDEPENDENCE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Building paving plan in progress. Full width of roadway being milled at this time. Crew, flagger, foreman Peter on site. Spoke to foreman Peter regarding placing construction men at work signs on block segment. |
2022-12-07 | No data | EAST 16 STREET, FROM STREET AVENUE Z TO STREET SHEEPSHEAD BAY ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Milling complete Width of Roadway 29'9Width milled 20'4Length milled 30'1Depth milled 3 1/4" |
2022-12-02 | No data | MIDWOOD STREET, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work not started |
2022-11-30 | No data | MIDWOOD STREET, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work not started |
2022-11-30 | No data | MIDWOOD STREET, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Fence, acceptable |
2022-11-29 | No data | LINCOLN PLACE, FROM STREET BUFFALO AVENUE TO STREET ROCHESTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Contractor has milled a 40’x20’ area of roadway to a depth of 3” in compliance, roadway measures to be 20’ from curb to curb |
2022-11-23 | No data | MIDWOOD STREET, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed a active construction site. Respondent failed to comply with the terms of the OCMC stip 072, work hours are from 9am-4pm Monday- Friday. Respondent is currently working after hours, permit# B022022320B74 was used for ID. |
2022-11-22 | No data | MOFFAT STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk is occupied |
2022-11-18 | No data | EAST 4 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Active | Department of Transportation | BPP INSPECTION IN COMPLIANCE WIDTH OF ROADWAY 30FT WIDTH OF MILLED AREA 20FT LENGTH OF MILLED AREA 30FT DEPTH OF MILLED AREA 3INCHES |
2022-11-14 | No data | HEYWARD STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Roadway measures 34 feet from curb to curb. Contractor has milled 22 feet, of the roadway, adjacent to the property, with a length of 42 feet, and a depth of 3 inches. In compliance with required BPP measurements. |
2022-11-12 | No data | STANHOPE STREET, FROM STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP is in compliance |
2022-11-12 | No data | STANHOPE STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP is in compliance |
2022-11-12 | No data | WYCKOFF AVENUE, FROM STREET HIMROD STREET TO STREET STANHOPE STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP is in compliance |
2022-11-10 | No data | INDIA STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Width of Roadway:30’Width of milled area:20’Length of milled area:35”Depth of milled area:3.5” |
2022-11-10 | No data | 43 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Roadway curb to curb 29ft 6 in, milled 20ft, length 25ft 1in |
2022-11-10 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | No BPP paving work done at the time of inspection. |
2022-11-04 | No data | STANHOPE STREET, FROM STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Contractor has milled a 21’x21’ area of roadway to a depth of 3” in compliance, Intersection is measured to be 33’x31’ in diameter |
2022-11-04 | No data | WYCKOFF AVENUE, FROM STREET HIMROD STREET TO STREET STANHOPE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Contractor has milled a 116’x21’ area of roadway to a depth of 3” in compliance, roadway measures to be 33’ from curb to curb |
2022-11-04 | No data | STANHOPE STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Contractor has milled a 114’x19’ area of roadway to a depth of 3” in compliance, roadway 29’ from curb to curb |
2022-11-03 | No data | MARTENSE STREET, FROM STREET BEDFORD AVENUE TO STREET MARTENSE COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB REPLACED INFRONT OF 54 MARTENSE STREET |
2022-10-31 | No data | INDIA STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed. |
2022-10-25 | No data | JUNCTION BOULEVARD, FROM STREET 40 ROAD TO STREET 41 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | B.P.P. milling in compliance within the roadway at 40-53 Junction Boulevard. Curb to Curb 40'6". Milled area 30'4"x27'6"x4". Depth 4". 1/2+5' milled: YES. Waiver: NO. |
2022-10-16 | No data | GRAVESEND NECK ROAD, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel face curb in compliance |
2022-10-12 | No data | 43 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started. No work done. No inspection found at this time. |
2022-10-10 | No data | MOFFAT STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb is in compliance |
2022-10-07 | No data | 17 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No Parking Monday - Friday 7am - 6pm, Temporary Construction in compliance |
2022-10-07 | No data | EAST 2 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: Active | Department of Transportation | BPP INSPECTION IS IN COMPLIANCE. WIDTH OF ROADWAYIS IS 30FT. WIDTH OF MILLED AREA IS 20FT. DEPTH OF MILLED AREA IS 3INCHES. |
2022-10-02 | No data | JEFFERSON AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk is in compliance & curb |
2022-10-01 | No data | MOFFAT STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work found |
2022-09-30 | No data | FAYETTE STREET, FROM STREET BEAVER STREET TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed |
2022-09-30 | No data | OCEAN AVENUE, FROM STREET AVENUE O TO STREET AVENUE P | No data | Street Construction Inspections: Active | Department of Transportation | BPP was inspected. Before milling the width of roadway is 69’ Width milled is 40’ & Length milled is 87' 11” & Depth is 3". Foreman on site |
2022-09-27 | No data | 21 AVENUE, FROM STREET 74 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Ramps Constructed by SIM as per permit # B152022158A65. Ramps are functional and accessible. |
2022-09-26 | No data | RUTLAND ROAD, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb repaired in front of 422 Rutland road |
2022-09-25 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb replaced in front of 1015 A President street |
2022-09-22 | No data | RUTLAND ROAD, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started. No work done. No inspection found at this time of inspection. |
2022-09-21 | No data | MOFFAT STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP complete Curb to curb- 30ftLength:32ftWidth: 21ftDepth: 3.5 inches |
2022-09-14 | No data | 24 AVENUE, FROM STREET 157 STREET TO STREET 160 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP Measurements are accurate. |
2022-09-12 | No data | DOUGLASTON PARKWAY, FROM STREET 39 AVENUE TO STREET 235 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 77’x20’x3” bpp milling in compliance ready for paving |
2022-09-08 | No data | 21 AVENUE, FROM STREET 74 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started. No new work done. Ramps Constructed by SIM as per permit # B152022158A65. Ramps are functional and accessible. |
2022-08-30 | No data | EAST 38 STREET, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb in compliance |
2022-08-26 | No data | VERNON AVENUE, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Full RW width 34’0CutL44’0 W22’0 D0’3 |
2022-08-26 | No data | LEWIS AVENUE, FROM STREET VERNON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Full Rw width 34’0CutL22’0 W22’0 D0’3 |
2022-08-26 | No data | LEWIS AVENUE, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Full RW Width 34’0 CutL130’0 W 22’0 D0’4 |
2022-08-23 | No data | RUTLAND ROAD, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No Active BPP work started on site , active work being done. |
2022-08-20 | No data | 17 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp /signs posted |
2022-08-11 | No data | OCEAN PARKWAY, FROM STREET AVENUE F TO STREET DITMAS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | are4a in compliance with bpp 45x24 acceptable milled |
2022-08-11 | No data | MIDWOOD STREET, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | TEMP. CONST. SIGNS/MARKINGS on site at the time of inspection. |
2022-08-10 | No data | PALO ALTO AVENUE, FROM STREET BEND TO STREET NERO AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed and acceptable. • Curb to Curb width – 37’• Milled area – 25’6’’ x 60'• Depth of milled area – 3’’ |
2022-08-09 | No data | 188 STREET, FROM STREET PERTH ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp within the NW2 corner quadrant was found to be non ADA complaint. Ramp is functional and accessible, measured in prism on 8/9/2022. "KM - IF NON COMPLIANT, PLEASE WRITE A CAR, THANK YOU" |
2022-08-08 | No data | LEXINGTON AVENUE, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | W OF ROADWAY 37ft, W MILLED 24ft, L MILLED 40ft, D MILLED 3.5in. |
2022-08-04 | No data | HERKIMER STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk repaired in front of 85 herkimer street |
2022-07-31 | No data | EAST NEW YORK AVENUE, FROM STREET BROOKLYN AVENUE TO STREET LINCOLN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Swk flags sealed and in compliance |
2022-07-19 | No data | PERTH ROAD, FROM STREET 188 STREET TO STREET HADDON STREET | No data | Street Construction Inspections: Active | Department of Transportation | No Bobcat Visible On Site At Time Of Inspection |
2022-07-14 | No data | BUSHWICK AVENUE, FROM STREET COOPER STREET TO STREET MOFFAT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed. |
2022-07-10 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb repaired in front of 1015 President street |
2022-07-07 | No data | 188 STREET, FROM STREET PERTH ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Q012022174C69• Curb to Curb width – 48’ 5”• Milled area – 23’9” x 19’7”• Depth of milled area – 3.6”• ½ +5’ milled (yes/no) – no• Waiver (yes/no)-yes |
2022-07-07 | No data | 188 STREET, FROM STREET PERTH ROAD TO STREET TROON ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Q012022174C71• Curb to Curb width – 48’ 5”• Milled area – 65’ x 23’9”• Depth of milled area – 4”• ½ +5’ milled (yes/no) – no• Waiver (yes/no)-yes |
2022-07-05 | No data | 51 AVENUE, FROM STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | The below BPP is completed and acceptable. Curb to Curb width – 33', Milled area – 24' x 54' , Depth of milled area – 3", ½ +5’ milled (yes/no) – Yes, Waiver (yes/no)- No |
2022-07-05 | No data | QUEENS BOULEVARD, FROM STREET 51 AVENUE TO STREET CORNISH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | The below BPP is completed and acceptable. Curb to Curb width – 33', Milled area – 20' x 288' , Depth of milled area – 3", ½ +5’ milled (yes/no) – Yes, Waiver (yes/no)- No |
2022-07-05 | No data | 51 AVENUE, FROM STREET GORSLINE STREET TO STREET MANILLA STREET | No data | Street Construction Inspections: Active | Department of Transportation | The below BPP is completed and acceptable.Curb to Curb width – 46', Milled area – 28' x 260' , Depth of milled area – 3", ½ +5’ milled (yes/no) – Yes, Waiver (yes/no)- No |
2022-07-01 | No data | EAST 22 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: Active | Department of Transportation | 50x 20 milled r.w in compliance with bpp |
2022-06-29 | No data | MYRTLE AVENUE, FROM STREET STANHOPE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Width of Roadway:34’Width of milled area:22’Length of milled area:12’Depth of milled area:3” |
2022-06-29 | No data | MYRTLE AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | Width of roadway: 34’Width of milled area: 22’Length of area: 96’Depth: 3” |
2022-06-28 | No data | LINDEN BOULEVARD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Location:290 linden boulevardPermit: B012022166C26Width of Roadway:60’Width of milled area: 35’Length of milled area: 42’Depth of milled area: 3” |
2022-06-22 | No data | 16 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temporary construction signs in compliance |
2022-06-17 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Full roadway Width:35'0Cut size: L26'9 W23'8 D0'3Full roadway Width:35'0Cut size: L26'9 W23'8 D0'3Pass |
2022-06-13 | No data | PROSPECT PLACE, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | material stored on street in compliance |
2022-06-09 | No data | EAST NEW YORK AVENUE, FROM STREET BROOKLYN AVENUE TO STREET LINCOLN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb in compliance |
2022-05-29 | No data | NOSTRAND AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | SIDEWALK FLAGS INSTALLED ON SIDEWALK IN FRONT OF 670 NOSTRAND AVENUE |
2022-05-26 | No data | PROSPECT PLACE, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no material found on roadway |
2022-05-25 | No data | 231 STREET, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed and acceptable. Curb to curb - 29' 5", milled area - 39' 6" x 20' 0", depth - 3". |
2022-05-25 | No data | 103 STREET, FROM STREET 34 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete curb restored i/f/o 3319. |
2022-05-20 | No data | MOFFAT STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Width of milled are - 20’Total width - 30Length of milled area - 166’Depth 3 1/2” |
2022-05-20 | No data | BUSHWICK AVENUE, FROM STREET MOFFAT STREET | No data | Street Construction Inspections: Active | Department of Transportation | B012022136B00Width of milled are - 25’Total width - 40’ Length of milled area - 19’Depth 3 1/2” |
2022-05-17 | No data | JEFFERSON AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Full swk restoration for property, cement/concrete residue left behind. |
2022-05-16 | No data | MERRICK BOULEVARD, FROM STREET 104 AVENUE TO STREET 105 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest reason not acceptable. The bus lane paint found restored upon inspection. |
2022-05-15 | No data | LINCOLN ROAD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new curb in compliance |
2022-05-12 | No data | LINCOLN ROAD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk flags sealed and in compliance |
2022-05-12 | No data | JEFFERSON AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flags. |
2022-05-12 | No data | 123 STREET, FROM STREET 22 AVENUE TO STREET 23 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | The below BPP is completed and acceptable. Curb to Curb width – 25’, Milled area – 25’ x 31’, Depth of milled area – 3”, ½ +5’ milled (yes/no) – Yes, Waiver (yes/no)- No. |
2022-05-11 | No data | PALMETTO STREET, FROM STREET IRVING AVENUE TO STREET RIDGEWOOD PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed. |
2022-05-11 | No data | 104 STREET, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | New sidewalk complete in front of # 3243. |
2022-05-10 | No data | VAN BUREN STREET, FROM STREET BROADWAY TO STREET PATCHEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Full Width 34'0L92'0 W12'0 D0'4 |
2022-05-10 | No data | GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed. |
2022-05-10 | No data | PATCHEN AVENUE, FROM STREET KOSSUTH PLACE TO STREET VAN BUREN STREET | No data | Street Construction Inspections: Active | Department of Transportation | Full Width of the roadway 35'0L143'0 W22'0 D0'4 |
2022-05-10 | No data | PATCHEN AVENUE, FROM STREET VAN BUREN STREET | No data | Street Construction Inspections: Active | Department of Transportation | Full Width 35'0L12'0 W 22'0 D0'4 |
2022-05-06 | No data | JEFFERSON AVENUE, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb installed |
2022-05-05 | No data | 40 STREET, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | street curb to curb 30ft mill 20ft by 20ft done 3in |
2022-05-03 | No data | 104 STREET, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | BPP in front of 32-43 completed and acceptable. Curb to curb - 29' 3", milled area - 30' 5" x 20' 1", depth 3". |
2022-04-26 | No data | PROSPECT PLACE, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Jersey barriers placed down in front of 373. |
2022-04-24 | No data | ST JOHNS PLACE, FROM STREET HAMPTON PLACE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed IFO property #1120. |
2022-04-23 | No data | NOSTRAND AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed IFO property #668. |
2022-04-23 | No data | EAST NEW YORK AVENUE, FROM STREET BROOKLYN AVENUE TO STREET LINCOLN ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Full swk restoration IFO newly constructed building. No defects & no impaction to opp conventional bike lane. |
2022-04-21 | No data | CHRISTOPHER AVENUE, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, bpp , new building .. ok .. |
2022-04-14 | No data | EAST NEW YORK AVENUE, FROM STREET BROOKLYN AVENUE TO STREET LINCOLN ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Contractor has milled a 29’x24’ area of roadway to a depth of 3” in compliance, Roadway measures to be 43’ curb to curb. |
2022-04-13 | No data | OAK DRIVE, FROM STREET ELVIRA AVENUE TO STREET READS LANE | No data | Street Construction Inspections: Active | Department of Transportation | Curb to Curb width – 29’11”• Milled area – 20’• Depth of milled area – 3”• ½ +5’ milled (yes/no) – yes• Waiver (yes/no)- no |
2022-04-08 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | UPON INSPECTION ROADWAY CURB TO CURB IS 29FT 10IN MILLED ROADWAY IS 20FT 8IN X 30FT 2IN WITH A DEPTHOF 4 INCHES |
2022-04-08 | No data | GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Location: 1160 Greene AvePermit: B012022082B19Width of Roadway: 29ft 8inWidth of milled area: 20ft 2inLength of milled area: 20ft 1in Depth of milled area: 3fin down |
2022-04-05 | No data | LINCOLN ROAD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Contractor has milled a 27’x22’ area of roadway to a depth of 3” in compliance, Roadway measures from curb to curb to be 35’. |
2022-04-05 | No data | NOSTRAND AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No BPP paving work done at the time of inspection. |
2022-04-04 | No data | ST JOHNS PLACE, FROM STREET HAMPTON PLACE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | street 50ft curb to curb mil 30ft by 130ft down 3in |
2022-04-01 | No data | LINCOLN ROAD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Respondent failed to comply with stipulation ID 014 |
2022-04-01 | No data | DOONE COURT, FROM STREET EAST 12 STREET TO STREET HOMECREST AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Location: 1215 Doone courtPermit: B012022081D50Width of Roadway: 30’Width of milled area: 20’Length of milled area: 25’Depth of milled area: 3 inches |
2022-03-31 | No data | 183 STREET, FROM STREET 143 AVENUE TO STREET 144 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | • Curb to Curb width – 32’• Milled area – 22’• Depth of milled area – 4”• ½ +5’ milled (yes/no) – yes• Waiver (yes/no)- no |
2022-03-30 | No data | EAST 3 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Active | Department of Transportation | BPP done in compliance with DOT specs. |
2022-03-30 | No data | EAST 34 STREET, FROM STREET BROOKLYN ROAD TO STREET FARRAGUT ROAD | No data | Street Construction Inspections: Active | Department of Transportation | BPP was inspected. Before milling the width of roadway is 29’ Width milled is 20’ & Length milled is 39' 11” & Depth is 3". Foreman on site. |
2022-03-30 | No data | BRIGHTON 8 STREET, FROM STREET BEND TO STREET OCEAN VIEW AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Location: 3017 brighton 8th streetPermit: B012022088D58Width of Roadway: 25’Width of milled area: 25’Length of milled area: 40’Depth of milled area: 3 inches |
2022-03-23 | No data | MARTENSE STREET, FROM STREET BEDFORD AVENUE TO STREET MARTENSE COURT | No data | Street Construction Inspections: Active | Department of Transportation | No BPP paving work done at the time of inspection. |
2022-03-23 | No data | EAST 66 STREET, FROM STREET OHIO WALK TO STREET WHITMAN DRIVE | No data | Street Construction Inspections: Active | Department of Transportation | Contractor has a wavier to only do 8’ of roadway signed off by DOT. r/w is milled down 3 inches. |
2022-03-21 | No data | NOSTRAND AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk and curb excavated . |
2022-03-17 | No data | FAYETTE STREET, FROM STREET BEAVER STREET TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | No new work done on the roadway, permit still active. |
2022-03-15 | No data | JEFFERSON AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk restored in kind sealed and flush |
2022-03-15 | No data | 52 AVENUE, FROM STREET DOUGLASTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp within the SW1 corner quadrant is functional and accessible. Gray DWS need to change to red, we’ll measure at a later date. |
2022-03-14 | No data | GRAND STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Blue face steel curb intact, no defects at this time |
2022-03-14 | No data | FRESH MEADOW LANE, FROM STREET GLADWIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp within the SE4 corner quadrant is functional and accessible. Non Ada compliant. Measured in prism on 3/14/22 |
2022-03-14 | No data | PALMETTO STREET, FROM STREET IRVING AVENUE TO STREET RIDGEWOOD PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Half plus five in compliance (W20ftxL36ft) roadway 29ft. IFO 373. |
2022-03-09 | No data | JEFFERSON AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work ongoing and compliant. |
2022-02-25 | No data | JEFFERSON AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | New sidewalk constructed. |
2022-02-24 | No data | NEW YORK AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Active | Department of Transportation | BPP was inspected. Before milling the width of roadway is 43’ 10” Width milled is 27’ 5” & Length milled is 44' 5” & Depth is 2" before reaching the concrete base. Foreman on site. |
2022-02-24 | No data | JEFFERSON AVENUE, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | UPON INSPECTION IN FRONT OF #714 JEFFERSON THE ROADWAY CURB TO CURB IS 33FT 6IN. MILLED ROADWAY IS 30FT X 21FT 11IN WITH A DEPTH OF 4INCHES |
2022-02-21 | No data | EAST 38 STREET, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w installed |
2022-02-18 | No data | 16 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Construction container on parking lane, adjacent to property. Bike lane is clear. |
2022-02-17 | No data | KENT AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Roadway measures 30 feet from curb to curb. Contractor has milled 20 feet of the roadway adjacent to the property, with a length of 26 feet, and a depth of 3 inches. BPP inspection, pass. |
2022-02-17 | No data | BUSHWICK AVENUE, FROM STREET BLEECKER STREET TO STREET MENAHAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | L: 30’ W: 25’ D: 3” FW: 40’ |
2022-02-16 | No data | 179 STREET, FROM STREET 69 AVENUE TO STREET JEWEL AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP in front of 69-13 completed and acceptable.Curb to curb - 29' 5"milled area - 49' 10" x 20' 1"Depth - 3" |
2022-02-16 | No data | WEST 18 ROAD, FROM STREET CROSS BAY BOULEVARD TO STREET BODY OF WATER | No data | Street Construction Inspections: Active | Department of Transportation | permanent restoration with dimensions= 35' x 25' to grade |
2022-02-15 | No data | JEFFERSON AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | New curb & swk installed for newly constructed building. Missing sealer joints & wood face remains on curb. Opp bike lane is clear. |
2022-02-10 | No data | 179 STREET, FROM STREET 69 AVENUE TO STREET JEWEL AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | The below BPP is completed and acceptable.Curb to Curb width – 30’, Milled area – 20’ x 96’, Depth of milled area – 3”, ½ +5’ milled (yes/no) – Yes. |
2022-02-04 | No data | GREENE AVENUE, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW CONCRETE CURB INSTALLED |
2022-01-31 | No data | 16 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CONTAINER rw ok |
2022-01-25 | No data | OCEAN AVENUE, FROM STREET AVENUE L TO STREET AVENUE M | No data | Street Construction Inspections: Active | Department of Transportation | Full Width of the roadway: 70'0Cut: L60'0 W 40'0 D 0'3 |
2022-01-25 | No data | WILLMOHR STREET, FROM STREET EAST 98 STREET TO STREET ROCKAWAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, bpp .... |
2022-01-24 | No data | CHRISTOPHER AVENUE, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass, bop...for new building .. |
2022-01-13 | No data | STANHOPE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk in compliance. |
2022-01-10 | No data | 149 PLACE, FROM STREET ASH AVENUE TO STREET BEECH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete curb repaired I/F/O 42-36. |
2022-01-05 | No data | GATES AVENUE, FROM STREET WASHINGTON AVENUE TO STREET WAVERLY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk replaced in front of 83 Gates avenue |
2021-12-30 | No data | MERRICK BOULEVARD, FROM STREET 104 AVENUE TO STREET 105 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed. |
2021-12-20 | No data | GREENE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY PAVED HALF +5 |
2021-12-15 | No data | 200 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb replaced, joint sealed. |
2021-12-12 | No data | HERKIMER STREET, FROM STREET SACKMAN STREET TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW SIDEWALK INSTALLED |
2021-12-11 | No data | GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | boom truck |
2021-12-11 | No data | STANHOPE STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Jersey Barrier |
2021-12-10 | No data | 200 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | bobcat not visible |
2021-12-04 | No data | MERRICK BOULEVARD, FROM STREET 104 AVENUE TO STREET 105 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - In Bus Laneplease restore/repair RED BUS LANE PAINT roadway pavement lane markings in kind over permanent BUILDERS PAVEMENT PLAN RESTORATION in the roadway in front of property #104-32 MERRICK BOULEVARD, in a timely fashion. CAR issued |
2021-12-03 | No data | BAINBRIDGE STREET, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed |
2021-12-03 | No data | 200 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | new curb in progress |
2021-11-30 | No data | 200 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No BPP roadway pavement work observed at this time of inspection. |
2021-11-19 | No data | 200 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Bobcat not visible |
2021-11-18 | No data | 16 ROAD, FROM STREET 150 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP in front of 150-21 completed and acceptable. Curb to curb 29' 11", milled area 41' 2" x 20' 0", depth of milled area 3" 1/2. |
2021-11-13 | No data | HERKIMER STREET, FROM STREET SACKMAN STREET TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | White lane marking have been replaced |
2021-11-08 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb (Concrete) found to be in compliance |
2021-11-06 | No data | 188 STREET, FROM STREET 75 AVENUE TO STREET UNION TURNPIKE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed |
2021-10-30 | No data | MURRAY STREET, FROM STREET 22 AVENUE TO STREET 23 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Paving perm to grade and sealed. |
2021-10-27 | No data | BAINBRIDGE STREET, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NO BOB CAT ON THE STREET |
2021-10-22 | No data | MERRICK BOULEVARD, FROM STREET 104 AVENUE TO STREET 105 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No equipment on location |
2021-10-21 | No data | MERRICK BOULEVARD, FROM STREET 104 AVENUE TO STREET 105 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No sidewalk occupancy |
2021-10-21 | No data | BAINBRIDGE STREET, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ROADWAY WIDTH IS 33 FT THEY HAVE MILLED 22 FT WIDTH X 30 FT LENGHT THAT IS DOWN 3 INCHES ALL B.P.P REQUIREMENTS HAVE BEEN MET. |
2021-10-02 | No data | HERKIMER STREET, FROM STREET SACKMAN STREET TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERM RESTORATION IN THE ROADWAY FOR THEIR B.P.P PLAN THEY FAIL TO RESTORE THE WHITE LANE MARKING TO THE R4OADWAY PAVEMENT THEY WAS NOTIFIED BY C.A.R# 20217380158 AND FAIL TO MAKE THE REPAIRS NEEDED. |
2021-10-02 | No data | HERKIMER STREET, FROM STREET SACKMAN STREET TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW CURB INSTALLED |
2021-10-01 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site. 23ft width of 34ft wide roadway has been milled. Depth is >3inches. In compliance. |
2021-09-29 | No data | 17 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp /signs posted |
2021-09-29 | No data | CORNELIA STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started. No work done. No Bpp inspections found at this time. No further action taken att. |
2021-09-17 | No data | 188 STREET, FROM STREET 75 AVENUE TO STREET UNION TURNPIKE | No data | Street Construction Inspections: Active | Department of Transportation | The below BPP is completed and acceptable.Curb to Curb width – 50’0”, Milled area – 30’0” x 40’0”, Depth of milled area – 3”, ½ +5’ milled (yes/no) – Yes |
2021-09-13 | No data | 17 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | barriers r/w |
2021-09-11 | No data | WILLMOHR STREET, FROM STREET EAST 98 STREET TO STREET ROCKAWAY PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | double yellow line restored |
2021-09-09 | No data | ST MARKS AVENUE, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | reset curb |
2021-09-03 | No data | 16 AVENUE, FROM STREET 86 STREET TO STREET BENSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done in compliance |
2021-08-29 | No data | WEBSTER AVENUE, FROM STREET EAST 3 STREET TO STREET OCEAN PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plus 5 BPP in Compliance |
2021-08-19 | No data | FRESH MEADOW LANE, FROM STREET GLADWIN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Gray DWS has been changed to red within the SE4 corner as per the H-1011 note#15. |
2021-08-18 | No data | STANHOPE STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observe the above respondent with construction equipment stored on the roadway with expired permit. Respondent failed to reapply for permit in order to do so. Permit #b012021005B05 expired 1/21/2021 used for ID |
2021-08-18 | No data | 16 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | ATPO I observe the above respondent with 3 jersey barriers in the parking lane with out a valid permit on file. The respondent has been ID by permit B022020363D44, exp 3/31/21 and active DOB permit 321908593-01-nb. |
2021-08-15 | No data | HERKIMER STREET, FROM STREET SACKMAN STREET TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: Active | Department of Transportation | - In Parking Laneplease restore/repair white divided parking pavement lane markings in kind over permanent BPP 1/2+5 restoration in the roadway in front of property #1405 HERKIMER STREET, in a timely fashion. CAR issued |
2021-08-15 | No data | DALNY ROAD, FROM STREET 184 STREET TO STREET SOMERSET STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Half plus 5' perm to grade. |
2021-08-13 | No data | HERKIMER STREET, FROM STREET SACKMAN STREET TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: Active | Department of Transportation | pass, fully paved .... |
2021-08-12 | No data | HERKIMER STREET, FROM STREET SACKMAN STREET TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk flags installed in front of property #1405 HERKIMER STREET expansion joints sealed in between the sidewalk, curb & end of the property line in compliance |
2021-08-06 | No data | HERKIMER STREET, FROM STREET GUNTHER PLACE TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site. 22ft width of 34ft wide roadway has been milled (1/2 + 5’). Depth is >3inches. In compliance. |
2021-08-06 | No data | 153 STREET, FROM STREET 119 AVENUE TO STREET 119 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed and acceptable. • Curb to Curb width – 40’• Milled area – 25’8’’• Depth of milled area – 3’’ |
2021-07-31 | No data | 61 STREET, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw pave 1\2 +5 |
2021-07-29 | No data | KANSAS PLACE, FROM STREET ARKANSAS DRIVE TO STREET NATIONAL DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved. BPP. |
2021-07-27 | No data | QUINCY STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, fully paved ... due to bpp... |
2021-07-27 | No data | EAST 38 STREET, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Contractors BPP roadway restoration found to be in compliance |
2021-07-27 | No data | FRESH MEADOW LANE, FROM STREET GLADWIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Action taken on permit #Q042021082A10. Newly completed single ramp within the SE4 corner quadrant with gray DWS. Gray DWS must change to red, ramp is functional and accessible |
2021-07-27 | No data | CHRISTOPHER AVENUE, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pave st 1/2 + 5 ft done .. in compliance |
2021-07-25 | No data | QUINCY STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP COMPLETED IN FRONT OF 151 QUINCY STREET |
2021-07-23 | No data | 61 STREET, FROM STREET 15 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP was done |
2021-07-15 | No data | QUINCY STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb replaced in front of 151 Quincy street |
2021-07-13 | No data | FRESH MEADOW LANE, FROM STREET GLADWIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit on file. Newly completed single ramp within the SE4 corner quadrant with gray DWS. Ramp is functional and accessible. Will reinspect at a later date. |
2021-07-12 | No data | 193 STREET, FROM STREET 81 AVENUE TO STREET ABERDEEN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags restored to grade. |
2021-07-07 | No data | WEBSTER AVENUE, FROM STREET EAST 3 STREET TO STREET OCEAN PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb installed |
2021-07-07 | No data | EAST 13 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2021-07-06 | No data | 180 STREET, FROM STREET 73 AVENUE TO STREET 75 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb installed, expansion joints sealed in front of 73-26 |
2021-07-02 | No data | WILLMOHR STREET, FROM STREET EAST 98 STREET TO STREET ROCKAWAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | missing double yellow line lane markings , restore all lane markings |
2021-06-25 | No data | GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | boom truck not visible |
2021-06-24 | No data | GREENE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street is paved and in compliance |
2021-06-22 | No data | GATES AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street is paved and in compliance |
2021-06-20 | No data | EAST 13 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection in front of property #951 EAST 13 STREET |
2021-06-19 | No data | KANSAS PLACE, FROM STREET ARKANSAS DRIVE TO STREET NATIONAL DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no curb work done for ifo location |
2021-06-18 | No data | WEST 17 STREET, FROM STREET CROPSEY AVENUE TO STREET MERMAID AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done in compliance |
2021-06-17 | No data | WEST 17 STREET, FROM STREET CROPSEY AVENUE TO STREET MERMAID AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done in compliance |
2021-06-16 | No data | 52 AVENUE, FROM STREET DOUGLASTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp within the SW1 corner quadrant with Gray DWS is functional and accessible. Will reinspect at a later date. |
2021-06-16 | No data | 103 STREET, FROM STREET 34 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Curb installed at time of inspection. There is one rain garden along the segment, that is 62' from the SE corner, that is not affected by any active work at this time. Valid permit on file. |
2021-06-16 | No data | DOUGLASTON PARKWAY, FROM STREET 52 AVENUE TO STREET THORNHILL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb restored at 52-06 |
2021-06-16 | No data | 52 AVENUE, FROM STREET 241 STREET TO STREET DOUGLASTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb restored at 52-06 Corner property |
2021-06-15 | No data | GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no x s/w |
2021-06-13 | No data | GREENE AVENUE, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway paved half plus 5 feet. |
2021-06-11 | No data | FRESH MEADOW LANE, FROM STREET GLADWIN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expired permit on file. Newly completed single ramp within the SE4 corner quadrant with gray DWS. Gray DWS must change to red, ramp is functional and accessible. Will measure at a later date. |
2021-06-08 | No data | 103 STREET, FROM STREET 34 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Be advise all BPP measurements are accurate at this time. |
2021-06-07 | No data | QUINCY STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CONCRETE CURB INSTALLED |
2021-06-03 | No data | QUINCY STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No BPP roadway pavement work observed at this time of inspection. |
2021-05-27 | No data | WILLMOHR STREET, FROM STREET EAST 98 STREET TO STREET ROCKAWAY PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | pass, section of street milled out as well as, paved .. 37'x27x3" .. |
2021-05-27 | No data | CHRISTOPHER AVENUE, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | pass, street full milled out ..41x20x3"...no lines to be restored .... |
2021-05-26 | No data | 52 AVENUE, FROM STREET DOUGLASTON PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Curb to Curb width – 39’• Milled area – 26’• Depth of milled area – 4”• ½ +5’ milled (yes/no) – yes• Waiver (yes/no)- no |
2021-05-26 | No data | DOUGLASTON PARKWAY, FROM STREET 52 AVENUE TO STREET THORNHILL AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Curb to Curb width – 35’• Milled area – 23’• Depth of milled area – 4”• ½ +5’ milled (yes/no) – yes• Waiver (yes/no)- no |
2021-05-26 | No data | 52 AVENUE, FROM STREET 241 STREET TO STREET DOUGLASTON PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Curb to Curb width – 30’• Milled area – 22’• Depth of milled area – 3”• ½ +5’ milled (yes/no) – yes • Waiver (yes/no)- no |
2021-05-22 | No data | 13 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb ok |
2021-05-22 | No data | 49 AVENUE, FROM STREET FRANCIS LEWIS BOULEVARD TO STREET WEEKS LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb in compliance at time of inspection |
2021-05-20 | No data | WEBSTER AVENUE, FROM STREET EAST 3 STREET TO STREET OCEAN PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | BPP ROADWAY IS MILLED LENGTH 25FT WIDTH 20FT DEPTH 3INCHES |
2021-05-20 | No data | EAST 38 STREET, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 20' of 30' roadway is milled down 3 inches in compliance |
2021-05-19 | No data | DALNY ROAD, FROM STREET 184 STREET TO STREET SOMERSET STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb repaired in compliance |
2021-05-15 | No data | GRAND STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW CURB OK |
2021-05-14 | No data | KANSAS PLACE, FROM STREET ARKANSAS DRIVE TO STREET NATIONAL DRIVE | No data | Street Construction Inspections: Active | Department of Transportation | monitoring bpp NOTES: • Milled area – 22’• Depth of milled area – 3” • ½ +5’ milled (yes/no) – yes 22’ • Waiver (yes/no) –NO |
2021-05-14 | No data | 52 AVENUE, FROM STREET 241 STREET TO STREET DOUGLASTON PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | no work started |
2021-05-14 | No data | DOUGLASTON PARKWAY, FROM STREET 52 AVENUE TO STREET THORNHILL AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk close signs up & area barricades & tape off at this time in compliance. |
2021-05-13 | No data | 52 AVENUE, FROM STREET DOUGLASTON PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | No ped ramp work started at this time for the NW2 corner quadrant. Old existing ramp is functional and accessible. Will reinspect at a later date. |
2021-05-07 | No data | BAY 29 STREET, FROM STREET BATH AVENUE TO STREET BENSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP Completed.Length of milled roadway – 49’Width of roadway (curb to curb) – 30’Width of milled roadway – 20’Depth of area milled – 3" |
2021-05-05 | No data | GRAND STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | GREEN MARKING RESTORED AT 535 GRAND STREET |
2021-04-29 | No data | 44 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP was inspected. Before milling the width of roadway is 29' 8” Milling length is 34’ 7” & Width milled is 20' & Depth is 3". Foreman on site |
2021-04-28 | No data | GLADWIN AVENUE, FROM STREET 186 STREET TO STREET FRESH MEADOW LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb restored expansion joints sealed i/f/o 174-06 |
2021-04-28 | No data | FRESH MEADOW LANE, FROM STREET GLADWIN AVENUE TO STREET PIDGEON MEADOW ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb restored expansion joints sealed at 174-06 |
2021-04-26 | No data | FRESH MEADOW LANE, FROM STREET GLADWIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expired permit on file. Newly completed single ramp within the SE4 corner quadrant with gray DWS. Gray DWS must change to red, ramp is functional and accessible. Will measure at a later date. |
2021-04-14 | No data | 49 AVENUE, FROM STREET FRANCIS LEWIS BOULEVARD TO STREET WEEKS LANE | No data | Street Construction Inspections: Active | Department of Transportation | The below BPP is completed and acceptable.Curb to Curb width – 30'0", Milled area – 20'0", Depth of milled area – 3", ½ +5’ milled – Yes |
2021-04-12 | No data | GLADWIN AVENUE, FROM STREET 186 STREET TO STREET FRESH MEADOW LANE | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed and acceptable. • Curb to Curb width – 29’ 4’’• Milled area – 20’ 3’’• Depth of milled area – 3’’ |
2021-04-12 | No data | FRESH MEADOW LANE, FROM STREET GLADWIN AVENUE TO STREET PIDGEON MEADOW ROAD | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed and acceptable • Curb to Curb width – 29’ 6’’• Milled area – 20’ 3’’• Depth of milled area – 3’’ |
2021-04-09 | No data | 180 STREET, FROM STREET 73 AVENUE TO STREET 75 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed and acceptable • Curb to Curb width – 30’• Milled area – 20’ 3’’• Depth of milled area – 3’’ |
2021-04-09 | No data | DALNY ROAD, FROM STREET 184 STREET TO STREET SOMERSET STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed and acceptable. Curb to curb - 30' 2", milled area - 20' 1", depth of milled area - 4" |
2021-04-09 | No data | GRAND STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RE-PAVE OK |
2021-04-04 | No data | GRAND STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL FACED CURB INSTALLED |
2021-04-01 | No data | QUINCY STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb (Concrete) found to be in compliance |
2021-03-30 | No data | GRAND STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Active | Department of Transportation | UPON INSPECTION ROADWAY CURB TO CURB IS 43FT 10IN.MILLED ROADWAY IS 27FT 10IN X 28FT WITH A DEPTH OF 3INCHES. ADJACENT SIDES OF PROPERTY NEED TO BE MILLED AS PER RRM.{1} 17FTX8FT 2IN {2} 11FTX8FT WILL BE MILLED TODAY & MADE INTO T SHAPED RESTORATION |
2021-03-29 | No data | 49 AVENUE, FROM STREET FRANCIS LEWIS BOULEVARD TO STREET WEEKS LANE | No data | Street Construction Inspections: Active | Department of Transportation | No work started. No work done. No inspection found at this time. |
2021-03-25 | No data | FRESH MEADOW LANE, FROM STREET GLADWIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. Open excavation for ped ramp reconstruction in the SE4 corner. We’ll measure and reinspect when ramps are completed. |
2021-03-24 | No data | WEST 17 STREET, FROM STREET CROPSEY AVENUE TO STREET MERMAID AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | The above respondent failed to notify nyc dot hiqa borough office within 4 hour prior to paving. As per stipulation 1/2 + 5. If not admitting the charge you MUST APPEAR IN PERSON. |
2021-03-23 | No data | GATES AVENUE, FROM STREET WASHINGTON AVENUE TO STREET WAVERLY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete sidewalk restoration found to be in compliance |
2021-03-22 | No data | PULASKI STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk in compliance. |
2021-03-12 | No data | DOUGLASS STREET, FROM STREET HOYT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Active | Department of Transportation | street 30ft curb to curb mill 2ft by 30ft down 3in |
2021-03-11 | No data | PULASKI STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb in compliance. |
2021-03-09 | No data | 167 STREET, FROM STREET LITHONIA AVENUE TO STREET METCALF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk installed. All expansion joints sealed. |
2021-02-25 | No data | 46 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Roadway measures 30 feet from curb to curb. Contractor has milled 20 feet of the roadway, adjacent to the property, with a depth of 3 inches. In compliance with BPP required measurements. |
2021-02-24 | No data | PULASKI STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No bobcat stored. |
2021-02-19 | No data | 16 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no material on st |
2021-02-10 | No data | PULASKI STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No bobcat. |
2021-02-09 | No data | WEST 17 STREET, FROM STREET CROPSEY AVENUE TO STREET MERMAID AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NO BPP started or completed, lot line is 37.10 feet wide. |
2021-02-06 | No data | PULASKI STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NO BOBCAT ON THE ROADWAY |
2021-02-05 | No data | NOSTRAND AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CROSSING SIDEWALK |
2021-02-05 | No data | PULASKI STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF SIDEWALK |
2021-02-03 | No data | 167 STREET, FROM STREET LITHONIA AVENUE TO STREET METCALF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Unable to fully inspect the roadway due to snow at time of inspection. Valid permit on file. |
2021-01-31 | No data | 16 AVENUE, FROM STREET 86 STREET TO STREET BENSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1/2 + 5 feet of the roadway in front of 8658 16 Avenue was paved. |
2021-01-27 | No data | GATES AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PAVING DONE 1/2 PLUS 5FT. |
2021-01-23 | No data | 13 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb (Concrete) found to be in compliance |
2021-01-22 | No data | QUINCY STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site. 22ft width of 34ft wide roadway is milled. Depth is >3inches. In compliance. |
2021-01-21 | No data | GATES AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PAVING DONE IN THE ROADWAY. |
2021-01-12 | No data | GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent SAT CONSTRUCTION SERVICES, LLC failed to comply with terms & conditions of stipulation #013, maintain minimum 5 FOOT clear sidewalk passage to all ongoing pedestrians. Nov issued |
2021-01-10 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection in front of property #315 CORNELIA STREET |
2021-01-09 | No data | 13 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Contractor BPP roadway restoration is found to be in compliance |
2021-01-07 | No data | PULASKI STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent SAT CONSTRUCTION SERVICES, LLC failed to comply with terms & conditions of stipulation #OCMC12, post signs meeting NYCDOT specs at the work-zone & at both intersections redirecting all pedestrians. Nov issued |
2021-01-06 | No data | STANHOPE STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent SAT CONSTRUCTION SERVICES, LLC failed to comply with terms & conditions of stipulation #023, maintain one 11 FOOT lane for all ongoing vehicular traffic. Nov issued |
2021-01-06 | No data | QUINCY STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb in compliance. |
2020-12-15 | No data | EAST 118 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2020-12-12 | No data | ST MARKS AVENUE, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new sidewalk |
2020-12-12 | No data | SHERIDAN AVENUE, FROM STREET LIBERTY AVENUE TO STREET MC KINLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESET, REPAIR OR REPLACE CURB |
2020-12-11 | No data | GATES AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site. 22ft width of 33ft wide roadway has been milled for paving. Depth is >3inches. In compliance. |
2020-12-11 | No data | GATES AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site. 22ft width of 33ft wide roadway has been milled for paving. Depth is >3inches. In compliance. |
2020-12-08 | No data | 181 STREET, FROM STREET 75 AVENUE TO STREET UNION TURNPIKE | No data | Street Construction Inspections: Active | Department of Transportation | Curb to Curb width – 29’11” Milled area – 19’11”Depth of milled area – 3 ½ +5’ milled (yes/no) – YESI/F/O 75-61 |
2020-12-07 | No data | 181 STREET, FROM STREET 75 AVENUE TO STREET UNION TURNPIKE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb restoration completed with expansion joint seal in compliance. |
2020-12-01 | No data | GATES AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PAVING DONE IF0 484. |
2020-12-01 | No data | 193 STREET, FROM STREET 81 AVENUE TO STREET ABERDEEN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb restoration completed with expansion joint seal in compliance. |
2020-11-28 | No data | GREENE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PAVING DONE. |
2020-11-26 | No data | 181 STREET, FROM STREET 75 AVENUE TO STREET UNION TURNPIKE | No data | Street Construction Inspections: Active | Department of Transportation | No BPP street pave work started at this time |
2020-11-25 | No data | 16 AVENUE, FROM STREET 86 STREET TO STREET BENSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP: PASS - Length: 51ft 8in Width of Milling: 27ft 2in Full Width of Roadway: 44ft Depth: 4in |
2020-11-21 | No data | GRAND STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RE-PAVE OK |
2020-11-14 | No data | ST MARKS AVENUE, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | reset curb |
2020-11-12 | No data | GRAND STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Blue face steel curb intact, no defects at this time. |
2020-11-10 | No data | BERGEN STREET, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE PARKING LANE. |
2020-11-07 | No data | GRAND STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please remove clear stripe tape/tissue covering cohesive sealant in between the sidewalk, curb & end of the property line in front of building #535 GRAND STREET, in a timely fashion. CAR issued |
2020-11-05 | No data | 20 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb ok |
2020-11-04 | No data | DUFFIELD STREET, FROM STREET CONCORD STREET TO STREET NASSAU STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paving ok.. |
2020-11-03 | No data | GRAND STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2020-11-02 | No data | GREENE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site. 22ft width of 34ft roadway is milled for paving. Depth is >3inches. In compliance. |
2020-11-01 | No data | 16 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no materials placed at this time |
2020-10-22 | No data | SHERIDAN AVENUE, FROM STREET LIBERTY AVENUE TO STREET MC KINLEY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | pass, full paving curb to curb ...30x24x3"..... |
2020-10-18 | No data | GRAND STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Brand new sidewalk flags installed in front of building #535 GRAND STREET, expansion joints needs to be sealed in between the sidewalk, curb & end of the property line will reinspect prior to the expiration date of the DOT permit |
2020-10-16 | No data | 16 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Jersey Barrier on the street ok |
2020-10-15 | No data | BERGEN STREET, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 1545Whole street: 33ft 9in Half plus 5: 21ft 7inWidth: 25ft 3in down 1528Whole street: 33ft 9in Half plus 5: 21ft 3in Half plus 5: 24ft 2in 3in down |
2020-10-15 | No data | 193 STREET, FROM STREET 81 AVENUE TO STREET ABERDEEN ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Curb to Curb width – 50’Milled area – 30’Depth of milled area – 3”½ +5’ milled (yes/no) – yesWaiver (yes/no)- noi/f/o 81-26 |
2020-10-08 | No data | 16 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Jersey Barrier street and sidewalk open |
2020-10-08 | No data | GRAND STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent SAT CONSTRUCTION SERVICES, LLC failed to comply with terms & conditions of stipulation #072, WORK 9 AM - 4 PM, MONDAY TO FRIDAY. Nov issued |
2020-10-01 | No data | STANHOPE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDE WALK FLAGS INSTALLED |
2020-09-25 | No data | GATES AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ROADWAY HAS BEEN MILLED. 34FT X 22FT, DOWN 3 1/2 INCHES. |
2020-09-25 | No data | ST MARKS AVENUE, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY PAVED BY BPP |
2020-09-24 | No data | GATES AVENUE, FROM STREET WASHINGTON AVENUE TO STREET WAVERLY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW SIDEWALK. ACTIVE PERMIT EXIST AT TIME OF INSPECTION. JOINTS NOT SEALED. |
2020-09-24 | No data | GATES AVENUE, FROM STREET WASHINGTON AVENUE TO STREET WAVERLY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NEW SIDEWALK. AT TIME OF INSPECTION, JOINTS WERE NOT SEALED. |
2020-09-24 | No data | DUFFIELD STREET, FROM STREET CONCORD STREET TO STREET NASSAU STREET | No data | Street Construction Inspections: Active | Department of Transportation | Width of roadway - 29ftWidth of roadway after mil - 20ftLength of the roadway - 35ft 10inDepth of roadway - 3.5in |
2020-09-20 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2020-09-17 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No BPP work started at the time of inspection. |
2020-09-17 | No data | LOTT STREET, FROM STREET BEVERLY ROAD TO STREET TILDEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Full width of roadway repaved in front of 169 Lott street |
2020-09-10 | No data | GATES AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No BPP paving work done at the time of inspection. |
2020-09-03 | No data | 20 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP: PASS - Length: 25ft 8in Width of Milling: 22ft 2in Full Width of Roadway: 32ft 2in Depth: 4in |
2020-09-01 | No data | 16 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | MATERIAL ON STREET ok |
2020-08-24 | No data | CARLTON AVENUE, FROM STREET BEND TO STREET CUMBERLAND WALK | No data | Street Construction Inspections: Active | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD HAD CLOSED 350 FEET OF NORTHBOUND CARLTON AVE(FORCING 2 WAYS OF TRAFFIC INTO SOUTHBOUND SIDE OF ROADWAY)&FAILED TO MAINTAIN 2-11 FT LANES, 1-11 FT LANE ON EACH SIDE OF MALL- |
2020-08-23 | No data | GATES AVENUE, FROM STREET WASHINGTON AVENUE TO STREET WAVERLY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no work at this time |
2020-08-21 | No data | ST MARKS AVENUE, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | UPON INSPECTION ROADWAY CURB TO CURB IS 33FTFT. RESPONDENT HAS MILLED 29FT 11 INCHES X 21 9 INCHES WITH A DEPTH OF 4 INCHES |
2020-07-30 | No data | 16 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent SAT CONSTRUCTION SERVICES, LLC failed to comply with terms & conditions of stipulation #913, maintain minimum 5 FOOT clear sidewalk passage to all ongoing pedestrians. Nov issued |
2020-03-25 | No data | 16 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent SAT CONSTRUCTION SERVICES, LLC failed to comply with terms & conditions of stipulation #023, maintain one 11 foot lane for all ongoing vehicular traffic. Nov issued |
SINGER & FALK CPA'S
DRIGGS AVE. APARTMENTS LLC EMPIRE CRUISES LLC GUARDIAN DEVELOPMENT LLC MTAV11 INC FULTON IC NY DEV LLC COMPASSIONATE CARE ADVISORS LLC LOTUS BK INC. FIRST CLASS GLASS INC. 1 CROSBY LLC48 SOUTH SERVICE ROAD, SUITE 404, MELVILLE, NY, United States, 11747
1044 GRANT LLC 1066 LAFAYETTE LLC 1068 LAFAYETTE LLC 1069 BEDFORD LLC 108 STEUBEN LLC 11 DEAN INC. 114 VANDERVEER STREET HOLDINGS LLC 115 MER LLC 125 FASHION LEADERS, INC. 126 SOUTH 2 LLCDate of last update: 04 Nov 2024
Sources: New York Secretary of State
© 2024 nycompanysearch.com