2024-05-29
|
No data
|
38 AVENUE, FROM STREET 223 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
permittee on hold
|
2023-06-29
|
No data
|
38 AVENUE, FROM STREET 223 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Completed single ramp within the SW1 corner quadrant is non Ada due to excessive ramp running slope and excessive landing slope. Measured in prism 9/8/2020.
|
2023-06-12
|
No data
|
CINCINNATUS AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb in place
|
2023-05-07
|
No data
|
22 AVENUE, FROM STREET 147 STREET TO STREET RYAN COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found Resurfaced. Active DDC Major Reconstruction permit on file # (Q012023107A83). No old cuts on the roadway.
|
2023-05-05
|
No data
|
55 DRIVE, FROM STREET 59 STREET TO STREET 60 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP restoration in front of 59-56 to grade in the roadway.
|
2023-04-18
|
No data
|
38 AVENUE, FROM STREET 223 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Completed single ramp within the SW1 corner quadrant is non Ada due to excessive ramp running slope and excessive landing slope. Measured in prism 9/8/2020.
|
2023-04-11
|
No data
|
38 AVENUE, FROM STREET 222 STREET TO STREET 223 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP to grade
|
2022-10-25
|
No data
|
38 AVENUE, FROM STREET 223 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed single ramp within the SW1 corner quadrant is non Ada. Measured in prism 9/8/2020
|
2022-09-02
|
No data
|
WOODHAVEN BOULEVARD, FROM STREET 85 AVENUE TO STREET PARK LANE SOUTH
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb in compliance
|
2022-06-06
|
No data
|
WEST 140 STREET, FROM STREET AMSTERDAM AVENUE TO STREET CONVENT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags OK; expansion joints installed and sealed
|
2022-02-22
|
No data
|
89 AVENUE, FROM STREET 114 STREET TO STREET 115 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk replaced and sealed.
|
2022-01-25
|
No data
|
113 STREET, FROM STREET 89 AVENUE TO STREET JAMAICA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Driveway sidewalk replaced and sealed.
|
2022-01-08
|
No data
|
UNION AVENUE, FROM STREET JOHNSON AVENUE TO STREET MONTROSE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new sidewalk
|
2022-01-06
|
No data
|
NEW MONTROSE AVENUE, FROM STREET BROADWAY TO STREET MONTROSE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new sidewalk
|
2021-12-23
|
No data
|
RIDGEWOOD AVENUE, FROM STREET CRESCENT STREET TO STREET PINE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk in compliance.
|
2021-11-30
|
No data
|
126 STREET, FROM STREET 107 AVENUE TO STREET 109 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk repaired ,expansion joints sealed .
|
2021-11-24
|
No data
|
38 AVENUE, FROM STREET 223 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed single ramp within the SW1 corner quadrant found to be non Ada compliant. Ramp is functional and accessible. Measured in prism on 9/8/2020.
|
2021-09-04
|
No data
|
GRAND AVENUE, FROM STREET 69 LANE TO STREET 69 LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIRED PERM SIDEWALK
|
2021-08-29
|
No data
|
126 STREET, FROM STREET 107 AVENUE TO STREET 109 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Several flags repaired in the driveway area,expansion joints sealed.
|
2021-07-20
|
No data
|
195 STREET, FROM STREET 48 AVENUE TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
tree pit
|
2021-06-25
|
No data
|
BROWN STREET, FROM STREET AVENUE U TO STREET AVENUE V
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags installed in front of property #2156 BROWN STREET expansion joints sealed in between the sidewalk, curb & end of the property line in compliance
|
2021-05-02
|
No data
|
55 DRIVE, FROM STREET 59 STREET TO STREET 60 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
steel face curb installed at time of my inspection.
|
2021-04-20
|
No data
|
GUERLAIN STREET, FROM STREET ARCHER ROAD TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR SIDEWALK
|
2021-04-19
|
No data
|
WEST 140 STREET, FROM STREET AMSTERDAM AVENUE TO STREET CONVENT AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
As per policy, limit NOV’s issued for this defect. Permittee placed on hold.
|
2021-04-14
|
No data
|
WEST 140 STREET, FROM STREET AMSTERDAM AVENUE TO STREET CONVENT AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
s/w joints not sealed.
|
2021-04-13
|
No data
|
38 AVENUE, FROM STREET 223 STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Newly completed tangent ramps within the SW1 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on the 9/8/2020.
|
2021-04-13
|
No data
|
38 AVENUE, FROM STREET 223 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Passing out permit. Will reissue CAR and will advise to obtain TIF for location due to topography affecting ramp running slope
|
2021-04-07
|
No data
|
WOODHAVEN BOULEVARD, FROM STREET 85 AVENUE TO STREET PARK LANE SOUTH
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags restored, expansion joints sealed
|
2021-03-14
|
No data
|
22 AVENUE, FROM STREET 147 STREET TO STREET RYAN COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb restoration completed with expansion joint seal in compliance.
|
2021-03-04
|
No data
|
WHITE PLAINS ROAD, FROM STREET EAST 225 STREET TO STREET EAST 226 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New concrete s/w flag next to the gate.
|
2021-01-27
|
No data
|
WEST 140 STREET, FROM STREET AMSTERDAM AVENUE TO STREET CONVENT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Seal expansion joints at the curb on restored sidewalk flags IFO 459.
|
2021-01-09
|
No data
|
GRAHAM COURT, FROM STREET 120 STREET TO STREET COLLEGE POINT BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new curb installed at time of my inspection .
|
2021-01-07
|
No data
|
WEST 140 STREET, FROM STREET AMSTERDAM AVENUE TO STREET CONVENT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk in compliance.
|
2021-01-07
|
No data
|
22 AVENUE, FROM STREET 147 STREET TO STREET RYAN COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb - expansion joints sealed.
|
2021-01-04
|
No data
|
GRAND AVENUE, FROM STREET 69 LANE TO STREET 69 LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIRED PERM SIDEWALK
|
2020-11-30
|
No data
|
CINCINNATUS AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk flags installed with expansion joints sealed
|
2020-11-23
|
No data
|
38 AVENUE, FROM STREET 223 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Newly completed single ramp within the SW1 corner quadrant with excessive curb reveal (2”) found to be non Ada compliant. Ramp is functional and accessible. Measured in prism on the 9/8/2020.
|
2020-11-20
|
No data
|
55 DRIVE, FROM STREET 59 STREET TO STREET 60 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP Completed and AcceptableCurb to Curb 30' Milled 15'Depth 3" + 5"= 20'Waiver No
|
2020-10-22
|
No data
|
60 AVENUE, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
milling complete and acceptable67' x 25' x 3"
|
2020-10-19
|
No data
|
60 AVENUE, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Permittee must reschedule BPP due to milled area not at minimum depth of 3".
|
2020-10-07
|
No data
|
38 AVENUE, FROM STREET 223 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single ramp within the SW1 corner quadrant with excessive curb reveal (2”) found to be non Ada compliant. Ramp is functional and accessible. Measured in prism on the 9/8/2020.
|
2020-10-03
|
No data
|
BORDEN AVENUE, FROM STREET 11 STREET TO STREET PULASKI BRIDGE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
F/o 21-10 Borden Ave. I observed the above respondent working on site on Saturday.They failed to comply with stipulation 072 from the above permit,which states contractor to work 7 AM - 6 PM Monday through Friday only.
|
2020-09-30
|
No data
|
STRATFORD AVENUE, FROM STREET WATSON AVENUE TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk repaired
|
2020-09-26
|
No data
|
126 STREET, FROM STREET 107 AVENUE TO STREET 109 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk repaired ,expansion joints sealed .
|
2020-09-11
|
No data
|
18 AVENUE, FROM STREET 154 STREET TO STREET MURRAY STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crew onsite roadway observed milled dimensions= 60' x 30' below grade 3''
|
2020-09-09
|
No data
|
NEW MONTROSE AVENUE, FROM STREET BROADWAY TO STREET MONTROSE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk in compliance.
|
2020-09-09
|
No data
|
WEST 16 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags have been installed and expansion joints sealed.
|
2020-09-08
|
No data
|
38 AVENUE, FROM STREET 223 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active permit on file. Newly completed single ramp within the SW1 corner quadrant found to be non Ada compliant. Ramp is functional and accessible. Pavement key needs to install. Measured in prism on the 9/8/2020.
|
2020-09-04
|
No data
|
38 AVENUE, FROM STREET 222 STREET TO STREET 223 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Milled area of roadway ifo 38-02 223rd Street: 105' L x 13'6" W x 4.5" D. Roadway width 17'.
|
2020-08-25
|
No data
|
UNION AVENUE, FROM STREET JOHNSON AVENUE TO STREET MONTROSE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk. Joints sealed. In compliance.
|
2020-08-24
|
No data
|
BATH AVENUE, FROM STREET 19 AVENUE TO STREET BAY 22 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk ok
|
2020-08-05
|
No data
|
22 AVENUE, FROM STREET 147 STREET TO STREET RYAN COURT
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
milling complete and acceptable 50' x 19' 9"146-42
|
2020-07-28
|
No data
|
MESEROLE AVENUE, FROM STREET LORIMER STREET TO STREET MANHATTAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW SWK FLAGS OK
|
2020-07-21
|
No data
|
UNION AVENUE, FROM STREET BROADWAY TO STREET JOHNSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk in compliance.
|
2020-07-19
|
No data
|
RIDGEWOOD AVENUE, FROM STREET CRESCENT STREET TO STREET PINE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new sidewalk repaired
|
2020-07-12
|
No data
|
WEST TREMONT AVENUE, FROM STREET CEDAR AVENUE TO STREET FORDHAM PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk repaired
|
2020-06-05
|
No data
|
WEST 181 STREET, FROM STREET AUDUBON AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
5 sidewalk flags restored and sealed
|
2020-05-18
|
No data
|
WOODHAVEN BOULEVARD, FROM STREET 85 AVENUE TO STREET PARK LANE SOUTH
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk expansion joints sealed
|
2020-05-13
|
No data
|
45 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Entire sidewalk in front of 855 45 Street was repaired and expansion joints were sealed.
|
2020-05-03
|
No data
|
60 AVENUE, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb restoration completed in compliance with expansion joint seal.
|
2020-02-12
|
No data
|
47 ROAD, FROM STREET 5 STREET TO STREET VERNON BOULEVARD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A wooden plank was provided for pedestrians to walk on sidewalk
|
2020-02-11
|
No data
|
47 ROAD, FROM STREET 5 STREET TO STREET VERNON BOULEVARD
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Complaint verified: Backfill only sidewalk 5" below grade, no safe passage for pedestriansNOTE: Crew on site trying to make area safe, waiting on material
|