Name: | CITY & COUNTY PAVING CORP. |
Jurisdiction: | New York |
Legal type: | DOMESTIC BUSINESS CORPORATION |
Status: | Active |
Date of registration: | 07 Dec 1942 (82 years ago) |
Entity Number: | 54191 |
County: | Bronx |
Place of Formation: | New York |
Address: | 1475 EAST 222ND STREET, BRONX, NY, United States, 10469 |
Address ZIP Code: | 10469 |
Shares Details
Shares issued 0
Share Par Value 10000
Type CAP
Name | Role | Address |
---|---|---|
MICHAEL A. BAVARO JR. | Chief Executive Officer | 1475 EAST 222ND STREET, BRONX, NY, United States, 10469 |
Name | Role | Address |
---|---|---|
THE CORPORATION | DOS Process Agent | 1475 EAST 222ND STREET, BRONX, NY, United States, 10469 |
Number | Date | End date | Type | Address |
---|---|---|---|---|
M002024312A27 | 2024-11-07 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
M002024311A34 | 2024-11-06 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
B012024310A25 | 2024-11-05 | 2024-12-15 | RESET, REPAIR OR REPLACE CURB-PROTECTED | NEW LOTS AVENUE, BROOKLYN, FROM STREET CHRISTOPHER AVENUE TO STREET SACKMAN STREET |
B012024310A24 | 2024-11-05 | 2024-12-15 | RESET, REPAIR OR REPLACE CURB | CHRISTOPHER AVENUE, BROOKLYN, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE |
M022024310A62 | 2024-11-05 | 2024-12-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M022024310A61 | 2024-11-05 | 2024-12-14 | TEMPORARY PEDESTRIAN WALK | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M012024310A20 | 2024-11-05 | 2024-12-14 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
B042024310A02 | 2024-11-05 | 2024-12-15 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | NEW LOTS AVENUE, BROOKLYN, FROM STREET CHRISTOPHER AVENUE TO STREET SACKMAN STREET |
B042024310A01 | 2024-11-05 | 2024-12-15 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CHRISTOPHER AVENUE, BROOKLYN, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE |
M042024310A12 | 2024-11-05 | 2024-12-14 | REPAIR SIDEWALK | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M042024310A13 | 2024-11-05 | 2024-12-14 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET |
M042024310A14 | 2024-11-05 | 2024-12-14 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 7 AVENUE, MANHATTAN, FROM STREET WEST 152 STREET |
M042024310A15 | 2024-11-05 | 2024-12-14 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET |
M042024310A16 | 2024-11-05 | 2024-12-14 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | MACOMBS PLACE, MANHATTAN, FROM STREET WEST 151 STREET |
B022024310A85 | 2024-11-05 | 2024-12-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | NEW LOTS AVENUE, BROOKLYN, FROM STREET CHRISTOPHER AVENUE TO STREET SACKMAN STREET |
B022024310A84 | 2024-11-05 | 2024-12-15 | TEMPORARY PEDESTRIAN WALK | NEW LOTS AVENUE, BROOKLYN, FROM STREET CHRISTOPHER AVENUE TO STREET SACKMAN STREET |
B022024310A83 | 2024-11-05 | 2024-12-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | CHRISTOPHER AVENUE, BROOKLYN, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE |
B022024310A82 | 2024-11-05 | 2024-12-15 | TEMPORARY PEDESTRIAN WALK | CHRISTOPHER AVENUE, BROOKLYN, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE |
M042024306A09 | 2024-11-01 | 2024-11-14 | REPAIR SIDEWALK | WEST 42 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
M012024304A76 | 2024-10-30 | 2024-11-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 42 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M002024304A20 | 2024-10-30 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
M012024304A86 | 2024-10-30 | 2024-11-19 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 65 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M012024304A85 | 2024-10-30 | 2024-11-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 65 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M012024304A84 | 2024-10-30 | 2024-11-19 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | MADISON AVENUE, MANHATTAN, FROM STREET EAST 65 STREET TO STREET EAST 66 STREET |
M012024304A75 | 2024-10-30 | 2024-11-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 43 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012024302B13 | 2024-10-28 | 2024-11-14 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 23 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M012024302B12 | 2024-10-28 | 2024-11-14 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 23 STREET, MANHATTAN, FROM STREET PARK AVENUE SOUTH |
M012024302B11 | 2024-10-28 | 2024-11-14 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 24 STREET, MANHATTAN, FROM STREET PARK AVENUE SOUTH |
M012024302B10 | 2024-10-28 | 2024-11-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 24 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE SOUTH |
M012024302B09 | 2024-10-28 | 2024-11-14 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | PARK AVENUE SOUTH, MANHATTAN, FROM STREET EAST 23 STREET TO STREET EAST 24 STREET |
M012024302B08 | 2024-10-28 | 2024-11-14 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 23 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE SOUTH |
M012024302B07 | 2024-10-28 | 2024-11-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | MADISON AVENUE, MANHATTAN, FROM STREET EAST 23 STREET TO STREET EAST 24 STREET |
X022024297A07 | 2024-10-23 | 2024-11-20 | TEMPORARY PEDESTRIAN WALK | EDSON AVENUE, BRONX, FROM STREET EAST 222 STREET TO STREET GIVAN AVENUE |
X022024297A10 | 2024-10-23 | 2024-11-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | GIVAN AVENUE, BRONX, FROM STREET BAYCHESTER AVENUE TO STREET EDSON AVENUE |
X022024297A09 | 2024-10-23 | 2024-11-20 | TEMPORARY PEDESTRIAN WALK | GIVAN AVENUE, BRONX, FROM STREET BAYCHESTER AVENUE TO STREET EDSON AVENUE |
X022024297A06 | 2024-10-23 | 2024-11-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 222 STREET, BRONX, FROM STREET NEW ENGLAND TY SB EN E 222 ST TO STREET EDSON AVENUE |
X022024297A05 | 2024-10-23 | 2024-11-20 | TEMPORARY PEDESTRIAN WALK | EAST 222 STREET, BRONX, FROM STREET NEW ENGLAND TY SB EN E 222 ST TO STREET EDSON AVENUE |
X022024297A08 | 2024-10-23 | 2024-11-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | EDSON AVENUE, BRONX, FROM STREET EAST 222 STREET TO STREET GIVAN AVENUE |
M042024297A02 | 2024-10-23 | 2024-11-14 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | MACOMBS PLACE, MANHATTAN, FROM STREET WEST 151 STREET |
M042024297A01 | 2024-10-23 | 2024-11-14 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET |
X042024297A05 | 2024-10-23 | 2024-11-20 | REPAIR SIDEWALK | EDSON AVENUE, BRONX, FROM STREET EAST 222 STREET TO STREET GIVAN AVENUE |
X042024297A04 | 2024-10-23 | 2024-11-20 | REPAIR SIDEWALK | EAST 222 STREET, BRONX, FROM STREET NEW ENGLAND TY SB EN E 222 ST TO STREET EDSON AVENUE |
X042024297A06 | 2024-10-23 | 2024-11-20 | REPAIR SIDEWALK | GIVAN AVENUE, BRONX, FROM STREET BAYCHESTER AVENUE TO STREET EDSON AVENUE |
B042024297A41 | 2024-10-23 | 2024-11-06 | REPAIR SIDEWALK | NAVY STREET, BROOKLYN, FROM STREET 1 AVENUE TO STREET SANDS STREET |
M042024296A14 | 2024-10-22 | 2024-11-14 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 7 AVENUE, MANHATTAN, FROM STREET WEST 153 STREET |
M042024296A13 | 2024-10-22 | 2024-11-14 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 7 AVENUE, MANHATTAN, FROM STREET WEST 152 STREET |
M042024296A12 | 2024-10-22 | 2024-11-15 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET |
M002024292A30 | 2024-10-18 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
M002024292A41 | 2024-10-18 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
M042024291A14 | 2024-10-17 | 2024-11-14 | REPAIR SIDEWALK | HUDSON STREET, MANHATTAN, FROM STREET DESBROSSES STREET TO STREET VESTRY STREET |
X022024290A33 | 2024-10-16 | 2024-11-09 | TEMPORARY PEDESTRIAN WALK | BEACH AVENUE, BRONX, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE |
X042024290A18 | 2024-10-16 | 2024-11-19 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | ANDREWS AVENUE, BRONX, FROM STREET WEST 176 STREET TO STREET WEST TREMONT AVENUE |
X042024290A17 | 2024-10-16 | 2024-11-09 | REPAIR SIDEWALK | LAFAYETTE AVENUE, BRONX, FROM STREET BEACH AVENUE TO STREET TAYLOR AVENUE |
X042024290A16 | 2024-10-16 | 2024-11-09 | REPAIR SIDEWALK | BEACH AVENUE, BRONX, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE |
X022024290A38 | 2024-10-16 | 2024-11-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | ANDREWS AVENUE, BRONX, FROM STREET WEST 176 STREET TO STREET WEST TREMONT AVENUE |
X022024290A37 | 2024-10-16 | 2024-11-19 | TEMPORARY PEDESTRIAN WALK | ANDREWS AVENUE, BRONX, FROM STREET WEST 176 STREET TO STREET WEST TREMONT AVENUE |
X022024290A36 | 2024-10-16 | 2024-11-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | LAFAYETTE AVENUE, BRONX, FROM STREET BEACH AVENUE TO STREET TAYLOR AVENUE |
X022024290A35 | 2024-10-16 | 2024-11-09 | TEMPORARY PEDESTRIAN WALK | LAFAYETTE AVENUE, BRONX, FROM STREET BEACH AVENUE TO STREET TAYLOR AVENUE |
X022024290A34 | 2024-10-16 | 2024-11-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEACH AVENUE, BRONX, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE |
B042024290B45 | 2024-10-16 | 2024-11-08 | REPAIR SIDEWALK | NAVY STREET, BROOKLYN, FROM STREET 1 AVENUE TO STREET BEND |
B022024290C45 | 2024-10-16 | 2024-11-08 | TEMPORARY PEDESTRIAN WALK | NAVY STREET, BROOKLYN, FROM STREET 1 AVENUE TO STREET BEND |
X012024290B60 | 2024-10-16 | 2024-11-19 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | ANDREWS AVENUE, BRONX, FROM STREET WEST 176 STREET TO STREET WEST TREMONT AVENUE |
X012024290B59 | 2024-10-16 | 2024-11-19 | RESET, REPAIR OR REPLACE CURB-PROTECTED | ANDREWS AVENUE, BRONX, FROM STREET WEST 176 STREET TO STREET WEST TREMONT AVENUE |
B022024290C46 | 2024-10-16 | 2024-11-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | NAVY STREET, BROOKLYN, FROM STREET 1 AVENUE TO STREET BEND |
M042024290A51 | 2024-10-16 | 2024-11-14 | REPAIR SIDEWALK | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M022024290C74 | 2024-10-16 | 2024-11-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M022024290C73 | 2024-10-16 | 2024-11-15 | TEMPORARY PEDESTRIAN WALK | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M012024290B17 | 2024-10-16 | 2024-11-14 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M042024282A14 | 2024-10-08 | 2024-11-14 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST 65 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
X042024282A18 | 2024-10-08 | 2024-11-14 | REPAIR SIDEWALK | ANDREWS AVENUE, BRONX, FROM STREET WEST 176 STREET TO STREET WEST TREMONT AVENUE |
M042024282A32 | 2024-10-08 | 2024-11-17 | REPAIR SIDEWALK | MACOMBS PLACE, MANHATTAN, FROM STREET WEST 152 STREET TO STREET WEST 153 STREET |
M042024282A16 | 2024-10-08 | 2024-11-14 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST 65 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M042024282A15 | 2024-10-08 | 2024-11-14 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST 65 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M022024282B92 | 2024-10-08 | 2024-11-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | MACOMBS PLACE, MANHATTAN, FROM STREET WEST 152 STREET TO STREET WEST 153 STREET |
M022024282B91 | 2024-10-08 | 2024-11-17 | TEMPORARY PEDESTRIAN WALK | MACOMBS PLACE, MANHATTAN, FROM STREET WEST 152 STREET TO STREET WEST 153 STREET |
M012024282B05 | 2024-10-08 | 2024-11-17 | RESET, REPAIR OR REPLACE CURB | MACOMBS PLACE, MANHATTAN, FROM STREET WEST 152 STREET TO STREET WEST 153 STREET |
X042024278A02 | 2024-10-04 | 2024-11-16 | REPAIR SIDEWALK | LAFAYETTE AVENUE, BRONX, FROM STREET CROES AVENUE TO STREET NOBLE AVENUE |
B022024278A02 | 2024-10-04 | 2024-11-15 | TEMPORARY PEDESTRIAN WALK | NEW LOTS AVENUE, BROOKLYN, FROM STREET CHRISTOPHER AVENUE TO STREET SACKMAN STREET |
B022024278A01 | 2024-10-04 | 2024-11-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | CHRISTOPHER AVENUE, BROOKLYN, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE |
B022024278A00 | 2024-10-04 | 2024-11-15 | TEMPORARY PEDESTRIAN WALK | CHRISTOPHER AVENUE, BROOKLYN, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE |
B042024278A00 | 2024-10-04 | 2024-11-04 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | COZINE AVENUE, BROOKLYN, FROM STREET VERMONT STREET |
B012024278A04 | 2024-10-04 | 2024-11-15 | RESET, REPAIR OR REPLACE CURB | CHRISTOPHER AVENUE, BROOKLYN, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE |
B012024278A05 | 2024-10-04 | 2024-11-15 | RESET, REPAIR OR REPLACE CURB-PROTECTED | NEW LOTS AVENUE, BROOKLYN, FROM STREET CHRISTOPHER AVENUE TO STREET SACKMAN STREET |
X022024278A06 | 2024-10-04 | 2024-11-16 | TEMPORARY PEDESTRIAN WALK | LAFAYETTE AVENUE, BRONX, FROM STREET CROES AVENUE TO STREET NOBLE AVENUE |
X022024278A07 | 2024-10-04 | 2024-11-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | LAFAYETTE AVENUE, BRONX, FROM STREET CROES AVENUE TO STREET NOBLE AVENUE |
B022024278A03 | 2024-10-04 | 2024-11-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | NEW LOTS AVENUE, BROOKLYN, FROM STREET CHRISTOPHER AVENUE TO STREET SACKMAN STREET |
B042024278A01 | 2024-10-04 | 2024-11-04 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | COZINE AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE |
B042024278A02 | 2024-10-04 | 2024-11-15 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CHRISTOPHER AVENUE, BROOKLYN, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE |
B042024278A03 | 2024-10-04 | 2024-11-15 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | NEW LOTS AVENUE, BROOKLYN, FROM STREET CHRISTOPHER AVENUE TO STREET SACKMAN STREET |
M012024278A18 | 2024-10-04 | 2024-11-04 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 34 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET QNS MDTWN TNNL EXIT |
Q022024278A00 | 2024-10-04 | 2024-11-03 | PLACE MATERIAL ON STREET | 32 AVENUE, QUEENS, FROM STREET DOWNING STREET TO STREET MILLER STREET |
Q022024278A01 | 2024-10-04 | 2024-11-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 32 AVENUE, QUEENS, FROM STREET DOWNING STREET TO STREET MILLER STREET |
X012024278A34 | 2024-10-04 | 2024-11-16 | RESET, REPAIR OR REPLACE CURB | LAFAYETTE AVENUE, BRONX, FROM STREET CROES AVENUE TO STREET NOBLE AVENUE |
B012024276B65 | 2024-10-02 | 2024-11-01 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 8 AVENUE, BROOKLYN, FROM STREET 46 STREET |
B012024276B64 | 2024-10-02 | 2024-11-01 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 46 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012024276B63 | 2024-10-02 | 2024-11-01 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 8 AVENUE, BROOKLYN, FROM STREET 45 STREET TO STREET 46 STREET |
M042024268A30 | 2024-09-24 | 2024-10-19 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST 65 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M042024268A29 | 2024-09-24 | 2024-10-19 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST 65 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M042024268A28 | 2024-09-24 | 2024-10-19 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST 65 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M022024264A25 | 2024-09-20 | 2024-10-18 | TEMPORARY PEDESTRIAN WALK | MACOMBS PLACE, MANHATTAN, FROM STREET WEST 152 STREET TO STREET WEST 153 STREET |
X012024264A11 | 2024-09-20 | 2024-10-17 | RESET, REPAIR OR REPLACE CURB | LAFAYETTE AVENUE, BRONX, FROM STREET CROES AVENUE TO STREET NOBLE AVENUE |
X042024264A00 | 2024-09-20 | 2024-10-17 | REPAIR SIDEWALK | LAFAYETTE AVENUE, BRONX, FROM STREET CROES AVENUE TO STREET NOBLE AVENUE |
M012024264A37 | 2024-09-20 | 2024-10-18 | RESET, REPAIR OR REPLACE CURB | MACOMBS PLACE, MANHATTAN, FROM STREET WEST 152 STREET TO STREET WEST 153 STREET |
X022024264A39 | 2024-09-20 | 2024-10-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | LAFAYETTE AVENUE, BRONX, FROM STREET CROES AVENUE TO STREET NOBLE AVENUE |
X022024264A38 | 2024-09-20 | 2024-10-17 | TEMPORARY PEDESTRIAN WALK | LAFAYETTE AVENUE, BRONX, FROM STREET CROES AVENUE TO STREET NOBLE AVENUE |
M042024264A03 | 2024-09-20 | 2024-10-18 | REPAIR SIDEWALK | MACOMBS PLACE, MANHATTAN, FROM STREET WEST 152 STREET TO STREET WEST 153 STREET |
M022024264A26 | 2024-09-20 | 2024-10-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | MACOMBS PLACE, MANHATTAN, FROM STREET WEST 152 STREET TO STREET WEST 153 STREET |
B022024262A16 | 2024-09-18 | 2024-10-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | NEW LOTS AVENUE, BROOKLYN, FROM STREET CHRISTOPHER AVENUE TO STREET SACKMAN STREET |
B022024262A17 | 2024-09-18 | 2024-10-16 | TEMPORARY PEDESTRIAN WALK | CHRISTOPHER AVENUE, BROOKLYN, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE |
B012024262A14 | 2024-09-18 | 2024-10-16 | RESET, REPAIR OR REPLACE CURB-PROTECTED | NEW LOTS AVENUE, BROOKLYN, FROM STREET CHRISTOPHER AVENUE TO STREET SACKMAN STREET |
B042024262A04 | 2024-09-18 | 2024-10-16 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CHRISTOPHER AVENUE, BROOKLYN, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE |
B022024262A14 | 2024-09-18 | 2024-10-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | CHRISTOPHER AVENUE, BROOKLYN, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE |
B022024262A15 | 2024-09-18 | 2024-10-16 | TEMPORARY PEDESTRIAN WALK | NEW LOTS AVENUE, BROOKLYN, FROM STREET CHRISTOPHER AVENUE TO STREET SACKMAN STREET |
B012024262A13 | 2024-09-18 | 2024-10-16 | RESET, REPAIR OR REPLACE CURB | CHRISTOPHER AVENUE, BROOKLYN, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE |
B042024262A05 | 2024-09-18 | 2024-10-16 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | NEW LOTS AVENUE, BROOKLYN, FROM STREET CHRISTOPHER AVENUE TO STREET SACKMAN STREET |
B022024261A07 | 2024-09-17 | 2024-10-15 | TEMPORARY PEDESTRIAN WALK | 15 AVENUE, BROOKLYN, FROM STREET 85 STREET TO STREET 86 STREET |
B022024261A08 | 2024-09-17 | 2024-10-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | 15 AVENUE, BROOKLYN, FROM STREET 85 STREET TO STREET 86 STREET |
B022024261A09 | 2024-09-17 | 2024-10-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 15 AVENUE, BROOKLYN, FROM STREET 85 STREET TO STREET 86 STREET |
B042024261A00 | 2024-09-17 | 2024-10-15 | REPAIR SIDEWALK | 15 AVENUE, BROOKLYN, FROM STREET 85 STREET TO STREET 86 STREET |
B022024259A00 | 2024-09-15 | 2024-10-15 | TEMPORARY PEDESTRIAN WALK | WORTMAN AVENUE, BROOKLYN, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE |
B042024259A00 | 2024-09-15 | 2024-10-15 | REPAIR SIDEWALK | WORTMAN AVENUE, BROOKLYN, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE |
X042024259A01 | 2024-09-15 | 2024-10-15 | REPAIR SIDEWALK | ANDREWS AVENUE, BRONX, FROM STREET WEST 176 STREET TO STREET WEST TREMONT AVENUE |
X042024259A00 | 2024-09-15 | 2024-10-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | ANDREWS AVENUE, BRONX, FROM STREET WEST 176 STREET TO STREET WEST TREMONT AVENUE |
X022024259A01 | 2024-09-15 | 2024-10-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | ANDREWS AVENUE, BRONX, FROM STREET WEST 176 STREET TO STREET WEST TREMONT AVENUE |
X022024259A00 | 2024-09-15 | 2024-10-20 | TEMPORARY PEDESTRIAN WALK | ANDREWS AVENUE, BRONX, FROM STREET WEST 176 STREET TO STREET WEST TREMONT AVENUE |
X012024259A01 | 2024-09-15 | 2024-10-20 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | ANDREWS AVENUE, BRONX, FROM STREET WEST 176 STREET TO STREET WEST TREMONT AVENUE |
X012024259A00 | 2024-09-15 | 2024-10-20 | RESET, REPAIR OR REPLACE CURB-PROTECTED | ANDREWS AVENUE, BRONX, FROM STREET WEST 176 STREET TO STREET WEST TREMONT AVENUE |
Q022024259A01 | 2024-09-15 | 2024-10-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 32 AVENUE, QUEENS, FROM STREET DOWNING STREET TO STREET MILLER STREET |
Q022024259A00 | 2024-09-15 | 2024-10-04 | PLACE MATERIAL ON STREET | 32 AVENUE, QUEENS, FROM STREET DOWNING STREET TO STREET MILLER STREET |
M042024259A02 | 2024-09-15 | 2024-10-25 | REPAIR SIDEWALK | EAST 65 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M042024259A01 | 2024-09-15 | 2024-10-25 | REPAIR SIDEWALK | EAST 65 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M042024259A00 | 2024-09-15 | 2024-10-11 | REPAIR SIDEWALK | ST NICHOLAS AVENUE, MANHATTAN, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET |
M022024259A03 | 2024-09-15 | 2024-10-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 65 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M022024259A01 | 2024-09-15 | 2024-10-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 65 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M022024259A00 | 2024-09-15 | 2024-10-25 | TEMPORARY PEDESTRIAN WALK | EAST 65 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M022024259A02 | 2024-09-15 | 2024-10-25 | TEMPORARY PEDESTRIAN WALK | EAST 65 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M012024259A03 | 2024-09-15 | 2024-10-25 | RESET, REPAIR OR REPLACE CURB | EAST 65 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M012024259A02 | 2024-09-15 | 2024-10-25 | RESET, REPAIR OR REPLACE CURB | EAST 65 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M012024259A01 | 2024-09-15 | 2024-10-24 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | NAGLE AVENUE, MANHATTAN, FROM STREET BENNETT AVENUE TO STREET ELLWOOD STREET |
M012024259A00 | 2024-09-15 | 2024-10-24 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | BROADWAY, MANHATTAN, FROM STREET NAGLE AVENUE TO STREET WEST 196 STREET |
B012024259A00 | 2024-09-15 | 2024-10-15 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WORTMAN AVENUE, BROOKLYN, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE |
B022024259A01 | 2024-09-15 | 2024-10-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | WORTMAN AVENUE, BROOKLYN, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE |
Q042024254A27 | 2024-09-10 | 2024-10-05 | REPAIR SIDEWALK | STARR AVENUE, QUEENS, FROM STREET 31 PLACE TO STREET BORDEN AVENUE |
Q022024254A46 | 2024-09-10 | 2024-10-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | STARR AVENUE, QUEENS, FROM STREET 31 PLACE TO STREET BORDEN AVENUE |
Q022024254A45 | 2024-09-10 | 2024-10-05 | TEMPORARY PEDESTRIAN WALK | STARR AVENUE, QUEENS, FROM STREET 31 PLACE TO STREET BORDEN AVENUE |
M012024254A81 | 2024-09-10 | 2024-10-05 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 34 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET QNS MDTWN TNNL EXIT |
B012024254A65 | 2024-09-10 | 2024-10-02 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 8 AVENUE, BROOKLYN, FROM STREET 46 STREET |
B012024254A64 | 2024-09-10 | 2024-10-02 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 46 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012024254A63 | 2024-09-10 | 2024-10-02 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 8 AVENUE, BROOKLYN, FROM STREET 45 STREET TO STREET 46 STREET |
X022024248A69 | 2024-09-04 | 2024-10-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEACH AVENUE, BRONX, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE |
B012024248A80 | 2024-09-04 | 2024-10-02 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 46 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
X042024248A29 | 2024-09-04 | 2024-10-10 | REPAIR SIDEWALK | LAFAYETTE AVENUE, BRONX, FROM STREET BEACH AVENUE TO STREET TAYLOR AVENUE |
X042024248A28 | 2024-09-04 | 2024-10-10 | REPAIR SIDEWALK | BEACH AVENUE, BRONX, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE |
X022024248A71 | 2024-09-04 | 2024-10-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | LAFAYETTE AVENUE, BRONX, FROM STREET BEACH AVENUE TO STREET TAYLOR AVENUE |
X022024248A70 | 2024-09-04 | 2024-10-10 | TEMPORARY PEDESTRIAN WALK | LAFAYETTE AVENUE, BRONX, FROM STREET BEACH AVENUE TO STREET TAYLOR AVENUE |
B012024248A81 | 2024-09-04 | 2024-10-02 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 8 AVENUE, BROOKLYN, FROM STREET 46 STREET |
X022024248A68 | 2024-09-04 | 2024-10-10 | TEMPORARY PEDESTRIAN WALK | BEACH AVENUE, BRONX, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE |
M042024248A07 | 2024-09-04 | 2024-10-10 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 65 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M042024248A06 | 2024-09-04 | 2024-10-10 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MADISON AVENUE, MANHATTAN, FROM STREET EAST 65 STREET TO STREET EAST 66 STREET |
B042024248A59 | 2024-09-04 | 2024-10-11 | REPAIR SIDEWALK | VAN SICLEN AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B042024248A58 | 2024-09-04 | 2024-10-11 | REPAIR SIDEWALK | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B012024248A79 | 2024-09-04 | 2024-10-02 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 8 AVENUE, BROOKLYN, FROM STREET 45 STREET TO STREET 46 STREET |
B042024248A57 | 2024-09-04 | 2024-10-11 | REPAIR SIDEWALK | VERMONT STREET, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B042024248A56 | 2024-09-04 | 2024-10-11 | REPAIR SIDEWALK | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B042024248A54 | 2024-09-04 | 2024-10-05 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | COZINE AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE |
B042024248A53 | 2024-09-04 | 2024-10-05 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | COZINE AVENUE, BROOKLYN, FROM STREET VERMONT STREET |
B022024248B13 | 2024-09-04 | 2024-10-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | VAN SICLEN AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B022024248B12 | 2024-09-04 | 2024-10-11 | TEMPORARY PEDESTRIAN WALK | VAN SICLEN AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B022024248B11 | 2024-09-04 | 2024-10-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022024248B10 | 2024-09-04 | 2024-10-11 | TEMPORARY PEDESTRIAN WALK | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022024248B09 | 2024-09-04 | 2024-10-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | VERMONT STREET, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B022024248B08 | 2024-09-04 | 2024-10-11 | TEMPORARY PEDESTRIAN WALK | VERMONT STREET, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B022024248B07 | 2024-09-04 | 2024-10-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022024248B06 | 2024-09-04 | 2024-10-11 | TEMPORARY PEDESTRIAN WALK | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B012024248A98 | 2024-09-04 | 2024-10-11 | RESET, REPAIR OR REPLACE CURB | VAN SICLEN AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B012024248A97 | 2024-09-04 | 2024-10-11 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B012024248A96 | 2024-09-04 | 2024-10-11 | RESET, REPAIR OR REPLACE CURB-PROTECTED | VERMONT STREET, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B012024248A95 | 2024-09-04 | 2024-10-11 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
M042024242A36 | 2024-08-29 | 2024-09-25 | REPAIR SIDEWALK | EAST 65 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M012024242B01 | 2024-08-29 | 2024-09-25 | RESET, REPAIR OR REPLACE CURB | EAST 65 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M022024242C47 | 2024-08-29 | 2024-09-25 | TEMPORARY PEDESTRIAN WALK | EAST 65 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M022024242C46 | 2024-08-29 | 2024-09-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 65 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M012024242B02 | 2024-08-29 | 2024-09-25 | RESET, REPAIR OR REPLACE CURB | EAST 65 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M022024242C45 | 2024-08-29 | 2024-09-25 | TEMPORARY PEDESTRIAN WALK | EAST 65 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M022024242C48 | 2024-08-29 | 2024-09-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 65 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M042024242A35 | 2024-08-29 | 2024-09-25 | REPAIR SIDEWALK | EAST 65 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M012024238A01 | 2024-08-25 | 2024-09-24 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | NAGLE AVENUE, MANHATTAN, FROM STREET BENNETT AVENUE TO STREET ELLWOOD STREET |
M012024238A00 | 2024-08-25 | 2024-09-24 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | BROADWAY, MANHATTAN, FROM STREET NAGLE AVENUE TO STREET WEST 196 STREET |
X022024234D27 | 2024-08-21 | 2024-09-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | ANDREWS AVENUE, BRONX, FROM STREET WEST 176 STREET TO STREET WEST TREMONT AVENUE |
X022024234D26 | 2024-08-21 | 2024-09-24 | TEMPORARY PEDESTRIAN WALK | ANDREWS AVENUE, BRONX, FROM STREET WEST 176 STREET TO STREET WEST TREMONT AVENUE |
X042024234A11 | 2024-08-21 | 2024-09-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | ANDREWS AVENUE, BRONX, FROM STREET WEST 176 STREET TO STREET WEST TREMONT AVENUE |
X012024234B84 | 2024-08-21 | 2024-09-20 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | ANDREWS AVENUE, BRONX, FROM STREET WEST 176 STREET TO STREET WEST TREMONT AVENUE |
X012024234B83 | 2024-08-21 | 2024-09-20 | RESET, REPAIR OR REPLACE CURB-PROTECTED | ANDREWS AVENUE, BRONX, FROM STREET WEST 176 STREET TO STREET WEST TREMONT AVENUE |
B022024227A05 | 2024-08-14 | 2024-09-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022024227A04 | 2024-08-14 | 2024-09-11 | TEMPORARY PEDESTRIAN WALK | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022024227A07 | 2024-08-14 | 2024-09-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | VAN SICLEN AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B022024227A00 | 2024-08-14 | 2024-09-11 | TEMPORARY PEDESTRIAN WALK | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022024227A01 | 2024-08-14 | 2024-09-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
M042024227A04 | 2024-08-14 | 2024-09-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 65 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M042024227A03 | 2024-08-14 | 2024-09-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MADISON AVENUE, MANHATTAN, FROM STREET EAST 65 STREET TO STREET EAST 66 STREET |
B022024227A03 | 2024-08-14 | 2024-09-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | VERMONT STREET, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B042024227A00 | 2024-08-14 | 2024-09-11 | REPAIR SIDEWALK | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B042024227A01 | 2024-08-14 | 2024-09-11 | REPAIR SIDEWALK | VERMONT STREET, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B042024227A02 | 2024-08-14 | 2024-09-11 | REPAIR SIDEWALK | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B042024227A03 | 2024-08-14 | 2024-09-11 | REPAIR SIDEWALK | VAN SICLEN AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B012024227A10 | 2024-08-14 | 2024-09-11 | RESET, REPAIR OR REPLACE CURB | VAN SICLEN AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B022024227A02 | 2024-08-14 | 2024-09-11 | TEMPORARY PEDESTRIAN WALK | VERMONT STREET, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B012024227A09 | 2024-08-14 | 2024-09-11 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B012024227A08 | 2024-08-14 | 2024-09-11 | RESET, REPAIR OR REPLACE CURB-PROTECTED | VERMONT STREET, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B012024227A07 | 2024-08-14 | 2024-09-11 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022024227A06 | 2024-08-14 | 2024-09-11 | TEMPORARY PEDESTRIAN WALK | VAN SICLEN AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
X022024226A27 | 2024-08-13 | 2024-09-10 | TEMPORARY PEDESTRIAN WALK | BEACH AVENUE, BRONX, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE |
X042024226A10 | 2024-08-13 | 2024-09-10 | REPAIR SIDEWALK | LAFAYETTE AVENUE, BRONX, FROM STREET BEACH AVENUE TO STREET TAYLOR AVENUE |
X042024226A09 | 2024-08-13 | 2024-09-10 | REPAIR SIDEWALK | BEACH AVENUE, BRONX, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE |
X022024226A30 | 2024-08-13 | 2024-09-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | LAFAYETTE AVENUE, BRONX, FROM STREET BEACH AVENUE TO STREET TAYLOR AVENUE |
X022024226A29 | 2024-08-13 | 2024-09-10 | TEMPORARY PEDESTRIAN WALK | LAFAYETTE AVENUE, BRONX, FROM STREET BEACH AVENUE TO STREET TAYLOR AVENUE |
X022024226A28 | 2024-08-13 | 2024-09-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEACH AVENUE, BRONX, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE |
M022024224A00 | 2024-08-11 | 2024-08-11 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 34 STREET, MANHATTAN, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD |
Q022024212A07 | 2024-07-30 | 2024-08-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 32 AVENUE, QUEENS, FROM STREET DOWNING STREET TO STREET MILLER STREET |
B042024212A06 | 2024-07-30 | 2024-08-26 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | COZINE AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE |
Q022024212A06 | 2024-07-30 | 2024-08-22 | PLACE MATERIAL ON STREET | 32 AVENUE, QUEENS, FROM STREET DOWNING STREET TO STREET MILLER STREET |
B042024212A05 | 2024-07-30 | 2024-08-26 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | COZINE AVENUE, BROOKLYN, FROM STREET VERMONT STREET |
M042024211A11 | 2024-07-29 | 2024-08-27 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | NAGLE AVENUE, MANHATTAN, FROM STREET BENNETT AVENUE TO STREET ELLWOOD STREET |
M012024211B68 | 2024-07-29 | 2024-08-27 | RESET, REPAIR OR REPLACE CURB-PROTECTED | NAGLE AVENUE, MANHATTAN, FROM STREET BENNETT AVENUE TO STREET ELLWOOD STREET |
M022024211A84 | 2024-07-29 | 2024-08-27 | TEMPORARY PEDESTRIAN WALK | BROADWAY, MANHATTAN, FROM STREET NAGLE AVENUE TO STREET WEST 196 STREET |
M022024211A85 | 2024-07-29 | 2024-08-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | BROADWAY, MANHATTAN, FROM STREET NAGLE AVENUE TO STREET WEST 196 STREET |
M022024211A86 | 2024-07-29 | 2024-08-27 | TEMPORARY PEDESTRIAN WALK | NAGLE AVENUE, MANHATTAN, FROM STREET BENNETT AVENUE TO STREET ELLWOOD STREET |
M012024211B67 | 2024-07-29 | 2024-08-27 | RESET, REPAIR OR REPLACE CURB-PROTECTED | BROADWAY, MANHATTAN, FROM STREET NAGLE AVENUE TO STREET WEST 196 STREET |
M022024211A87 | 2024-07-29 | 2024-08-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | NAGLE AVENUE, MANHATTAN, FROM STREET BENNETT AVENUE TO STREET ELLWOOD STREET |
M042024211A10 | 2024-07-29 | 2024-08-27 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BROADWAY, MANHATTAN, FROM STREET NAGLE AVENUE TO STREET WEST 196 STREET |
B012024197B72 | 2024-07-15 | 2024-08-10 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B012024197B74 | 2024-07-15 | 2024-08-10 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B012024197B75 | 2024-07-15 | 2024-08-10 | RESET, REPAIR OR REPLACE CURB | VAN SICLEN AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B022024197C14 | 2024-07-15 | 2024-08-10 | TEMPORARY PEDESTRIAN WALK | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022024197C15 | 2024-07-15 | 2024-08-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022024197C16 | 2024-07-15 | 2024-08-10 | TEMPORARY PEDESTRIAN WALK | VERMONT STREET, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B022024197C17 | 2024-07-15 | 2024-08-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | VERMONT STREET, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B022024197C18 | 2024-07-15 | 2024-08-10 | TEMPORARY PEDESTRIAN WALK | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022024197C19 | 2024-07-15 | 2024-08-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022024197C20 | 2024-07-15 | 2024-08-10 | TEMPORARY PEDESTRIAN WALK | VAN SICLEN AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B042024197A30 | 2024-07-15 | 2024-08-10 | REPAIR SIDEWALK | VAN SICLEN AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B042024197A29 | 2024-07-15 | 2024-08-10 | REPAIR SIDEWALK | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B042024197A28 | 2024-07-15 | 2024-08-10 | REPAIR SIDEWALK | VERMONT STREET, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B042024197A27 | 2024-07-15 | 2024-08-10 | REPAIR SIDEWALK | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022024197C21 | 2024-07-15 | 2024-08-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | VAN SICLEN AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B012024197B73 | 2024-07-15 | 2024-08-10 | RESET, REPAIR OR REPLACE CURB-PROTECTED | VERMONT STREET, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
M012024190B42 | 2024-07-08 | 2024-07-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | HUDSON STREET, MANHATTAN, FROM STREET SPRING STREET |
M012024190B39 | 2024-07-08 | 2024-07-31 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | VANDAM STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M012024190B38 | 2024-07-08 | 2024-07-31 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | SPRING STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M012024190B37 | 2024-07-08 | 2024-07-31 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | HUDSON STREET, MANHATTAN, FROM STREET SPRING STREET TO STREET VANDAM STREET |
M012024190B44 | 2024-07-08 | 2024-07-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | VANDAM STREET, MANHATTAN, FROM STREET VARICK STREET |
M012024190B41 | 2024-07-08 | 2024-07-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | SPRING STREET, MANHATTAN, FROM STREET VARICK STREET |
M012024190B43 | 2024-07-08 | 2024-07-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | HUDSON STREET, MANHATTAN, FROM STREET VANDAM STREET |
M012024190B40 | 2024-07-08 | 2024-07-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | VARICK STREET, MANHATTAN, FROM STREET SPRING STREET TO STREET VANDAM STREET |
M042024187A10 | 2024-07-05 | 2024-08-03 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 65 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
B042024187A36 | 2024-07-05 | 2024-07-27 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | COZINE AVENUE, BROOKLYN, FROM STREET VERMONT STREET |
B042024187A37 | 2024-07-05 | 2024-07-27 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | COZINE AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE |
M042024187A09 | 2024-07-05 | 2024-08-03 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MADISON AVENUE, MANHATTAN, FROM STREET EAST 65 STREET TO STREET EAST 66 STREET |
M022024185A26 | 2024-07-03 | 2024-07-28 | TEMPORARY PEDESTRIAN WALK | NAGLE AVENUE, MANHATTAN, FROM STREET BENNETT AVENUE TO STREET ELLWOOD STREET |
M042024185A01 | 2024-07-03 | 2024-07-28 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BROADWAY, MANHATTAN, FROM STREET NAGLE AVENUE TO STREET WEST 196 STREET |
M022024185A25 | 2024-07-03 | 2024-07-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | BROADWAY, MANHATTAN, FROM STREET NAGLE AVENUE TO STREET WEST 196 STREET |
M022024185A27 | 2024-07-03 | 2024-07-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | NAGLE AVENUE, MANHATTAN, FROM STREET BENNETT AVENUE TO STREET ELLWOOD STREET |
M022024185A24 | 2024-07-03 | 2024-07-28 | TEMPORARY PEDESTRIAN WALK | BROADWAY, MANHATTAN, FROM STREET NAGLE AVENUE TO STREET WEST 196 STREET |
M012024185A14 | 2024-07-03 | 2024-07-28 | RESET, REPAIR OR REPLACE CURB-PROTECTED | BROADWAY, MANHATTAN, FROM STREET NAGLE AVENUE TO STREET WEST 196 STREET |
M012024185A15 | 2024-07-03 | 2024-07-28 | RESET, REPAIR OR REPLACE CURB-PROTECTED | NAGLE AVENUE, MANHATTAN, FROM STREET BENNETT AVENUE TO STREET ELLWOOD STREET |
M042024185A02 | 2024-07-03 | 2024-07-28 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | NAGLE AVENUE, MANHATTAN, FROM STREET BENNETT AVENUE TO STREET ELLWOOD STREET |
Q022024179A01 | 2024-06-27 | 2024-07-22 | PLACE MATERIAL ON STREET | 32 AVENUE, QUEENS, FROM STREET DOWNING STREET TO STREET MILLER STREET |
M012024179B30 | 2024-06-27 | 2024-07-12 | RESET, REPAIR OR REPLACE CURB-PROTECTED | MADISON AVENUE, MANHATTAN, FROM STREET EAST 65 STREET TO STREET EAST 66 STREET |
M012024179B31 | 2024-06-27 | 2024-07-12 | RESET, REPAIR OR REPLACE CURB | EAST 65 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
Q022024179A02 | 2024-06-27 | 2024-07-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 32 AVENUE, QUEENS, FROM STREET DOWNING STREET TO STREET MILLER STREET |
M012024170A18 | 2024-06-18 | 2024-07-13 | TEST PITS, CORES OR BORING - PROTECTED | EAST 20 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET PARK AVENUE SOUTH |
M012024170A17 | 2024-06-18 | 2024-07-13 | TEST PITS, CORES OR BORING - PROTECTED | PARK AVENUE SOUTH, MANHATTAN, FROM STREET EAST 20 STREET TO STREET EAST 21 STREET |
M042024144A01 | 2024-05-23 | 2024-06-20 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | MACOMBS PLACE, MANHATTAN, FROM STREET WEST 151 STREET |
M042024144A02 | 2024-05-23 | 2024-06-20 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET |
X042024143A11 | 2024-05-22 | 2024-07-07 | REPAIR SIDEWALK | EVERGREEN AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
Q042024143B35 | 2024-05-22 | 2024-06-20 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 93 AVENUE, QUEENS, FROM STREET 168 STREET |
X022024143B15 | 2024-05-22 | 2024-07-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | EVERGREEN AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
Q042024143B34 | 2024-05-22 | 2024-06-20 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 93 AVENUE, QUEENS, FROM STREET 168 STREET |
X022024143B14 | 2024-05-22 | 2024-07-07 | TEMPORARY PEDESTRIAN WALK | EVERGREEN AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
X022024131B41 | 2024-05-10 | 2024-06-07 | TEMPORARY PEDESTRIAN WALK | EVERGREEN AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
B042024131A24 | 2024-05-10 | 2024-06-07 | REPAIR SIDEWALK | WORTMAN AVENUE, BROOKLYN, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE |
B022024131C76 | 2024-05-10 | 2024-06-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | WORTMAN AVENUE, BROOKLYN, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE |
B022024131C75 | 2024-05-10 | 2024-06-07 | TEMPORARY PEDESTRIAN WALK | WORTMAN AVENUE, BROOKLYN, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE |
X042024131A16 | 2024-05-10 | 2024-06-07 | REPAIR SIDEWALK | EVERGREEN AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
B012024131B25 | 2024-05-10 | 2024-06-07 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WORTMAN AVENUE, BROOKLYN, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE |
X022024131B42 | 2024-05-10 | 2024-06-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | EVERGREEN AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
X042024129A05 | 2024-05-08 | 2024-05-24 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST 160 STREET, BRONX, FROM STREET FOREST AVENUE |
X042024129A03 | 2024-05-08 | 2024-05-25 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST 160 STREET, BRONX, FROM STREET FOREST AVENUE |
M012024115C17 | 2024-04-24 | 2024-05-22 | PAVE STREET-W/ ENGINEERING & INSP FEE | HUDSON BOULEVARD EAST, MANHATTAN, FROM STREET WEST 34 STREET TO STREET WEST 35 STREET |
M012024115C18 | 2024-04-24 | 2024-05-22 | PAVE STREET-W/ ENGINEERING & INSP FEE | HUDSON BOULEVARD, MANHATTAN, FROM STREET WEST 35 STREET |
M012024115C16 | 2024-04-24 | 2024-05-22 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 35 STREET, MANHATTAN, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD |
M042024113A24 | 2024-04-22 | 2024-05-17 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET |
B042024113A26 | 2024-04-22 | 2024-05-14 | REPAIR SIDEWALK | VAN SICLEN AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B042024113A27 | 2024-04-22 | 2024-05-19 | REPAIR SIDEWALK | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
Q042024113A39 | 2024-04-22 | 2024-05-15 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 93 AVENUE, QUEENS, FROM STREET 168 STREET |
Q042024113A38 | 2024-04-22 | 2024-05-15 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 93 AVENUE, QUEENS, FROM STREET 168 STREET |
B022024113C43 | 2024-04-22 | 2024-05-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022024113C40 | 2024-04-22 | 2024-05-14 | TEMPORARY PEDESTRIAN WALK | VAN SICLEN AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B022024113C41 | 2024-04-22 | 2024-05-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | VAN SICLEN AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B022024113C42 | 2024-04-22 | 2024-05-19 | TEMPORARY PEDESTRIAN WALK | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
M042024113A23 | 2024-04-22 | 2024-05-21 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | MACOMBS PLACE, MANHATTAN, FROM STREET WEST 151 STREET |
M012024113C33 | 2024-04-22 | 2024-05-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 62 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
B012024113C79 | 2024-04-22 | 2024-05-14 | RESET, REPAIR OR REPLACE CURB | VAN SICLEN AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B012024113C80 | 2024-04-22 | 2024-05-19 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
M012024113C34 | 2024-04-22 | 2024-05-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | 2 AVENUE, MANHATTAN, FROM STREET EAST 62 STREET TO STREET EAST 63 STREET |
M022024088E47 | 2024-03-28 | 2024-04-25 | TEMPORARY PEDESTRIAN WALK | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET TO STREET MORTON STREET |
M022024088E48 | 2024-03-28 | 2024-04-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET TO STREET MORTON STREET |
M042024088A13 | 2024-03-28 | 2024-04-25 | REPAIR SIDEWALK | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET TO STREET MORTON STREET |
B022024085D85 | 2024-03-25 | 2024-04-20 | TEMPORARY PEDESTRIAN WALK | WORTMAN AVENUE, BROOKLYN, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE |
B012024085C47 | 2024-03-25 | 2024-04-20 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WORTMAN AVENUE, BROOKLYN, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE |
M012024085D30 | 2024-03-25 | 2024-05-23 | INSTALL TRAFFIC STREET LIGHTS | EAST 127 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M022024085G16 | 2024-03-25 | 2024-04-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | 6 AVENUE, MANHATTAN, FROM STREET GRAND STREET TO STREET SULLIVAN STREET |
M022024085G15 | 2024-03-25 | 2024-04-23 | TEMPORARY PEDESTRIAN WALK | 6 AVENUE, MANHATTAN, FROM STREET GRAND STREET TO STREET SULLIVAN STREET |
M012024085C93 | 2024-03-25 | 2024-05-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | 2 AVENUE, MANHATTAN, FROM STREET EAST 62 STREET TO STREET EAST 63 STREET |
M012024085C95 | 2024-03-25 | 2024-05-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 62 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
B042024085C29 | 2024-03-25 | 2024-04-20 | REPAIR SIDEWALK | WORTMAN AVENUE, BROOKLYN, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE |
B022024085D86 | 2024-03-25 | 2024-04-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | WORTMAN AVENUE, BROOKLYN, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE |
M042024085A39 | 2024-03-25 | 2024-04-23 | REPAIR SIDEWALK | 6 AVENUE, MANHATTAN, FROM STREET GRAND STREET TO STREET SULLIVAN STREET |
M042024085A44 | 2024-03-25 | 2024-04-21 | REPAIR SIDEWALK | HUDSON STREET, MANHATTAN, FROM STREET DESBROSSES STREET TO STREET VESTRY STREET |
B012024084A01 | 2024-03-24 | 2024-04-20 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
Q042024084A00 | 2024-03-24 | 2024-04-23 | REPAIR SIDEWALK | 248 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET DEPEW AVENUE |
Q022024084A15 | 2024-03-24 | 2024-04-23 | TEMPORARY PEDESTRIAN WALK | 248 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET DEPEW AVENUE |
Q022024084A16 | 2024-03-24 | 2024-04-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | 248 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET DEPEW AVENUE |
B042024084A00 | 2024-03-24 | 2024-04-20 | REPAIR SIDEWALK | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022024084A02 | 2024-03-24 | 2024-04-20 | TEMPORARY PEDESTRIAN WALK | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022024084A03 | 2024-03-24 | 2024-04-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022024083A68 | 2024-03-23 | 2024-04-24 | TEMPORARY PEDESTRIAN WALK | VAN SICLEN AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B042024083A01 | 2024-03-23 | 2024-04-24 | REPAIR SIDEWALK | VAN SICLEN AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
X012024083A01 | 2024-03-23 | 2024-05-01 | RESET, REPAIR OR REPLACE CURB | WALTON AVENUE, BRONX, FROM STREET EAST 175 STREET TO STREET HENWOOD PLACE |
X042024083A00 | 2024-03-23 | 2024-05-01 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WALTON AVENUE, BRONX, FROM STREET EAST 175 STREET TO STREET HENWOOD PLACE |
B022024083A69 | 2024-03-23 | 2024-04-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | VAN SICLEN AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B012024083A01 | 2024-03-23 | 2024-04-24 | RESET, REPAIR OR REPLACE CURB | VAN SICLEN AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
M012024081A43 | 2024-03-21 | 2024-04-16 | PAVE STREET-W/ ENGINEERING & INSP FEE | HUDSON BOULEVARD, MANHATTAN, FROM STREET WEST 35 STREET |
M012024081A41 | 2024-03-21 | 2024-04-16 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 35 STREET, MANHATTAN, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD |
M012024081A42 | 2024-03-21 | 2024-04-16 | PAVE STREET-W/ ENGINEERING & INSP FEE | HUDSON BOULEVARD EAST, MANHATTAN, FROM STREET WEST 34 STREET TO STREET WEST 35 STREET |
B042024078A02 | 2024-03-18 | 2024-04-13 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | PENNSYLVANIA AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE |
Q042024075A27 | 2024-03-15 | 2024-04-13 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 93 AVENUE, QUEENS, FROM STREET 168 STREET |
Q042024075A26 | 2024-03-15 | 2024-04-13 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 93 AVENUE, QUEENS, FROM STREET 168 STREET |
M042024074A07 | 2024-03-14 | 2024-04-12 | REPAIR SIDEWALK | CHARLTON STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M012024074B39 | 2024-03-14 | 2024-04-12 | RESET, REPAIR OR REPLACE CURB-PROTECTED | CHARLTON STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
B042024073A67 | 2024-03-13 | 2024-04-11 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | COZINE AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE |
B042024073A68 | 2024-03-13 | 2024-04-11 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | COZINE AVENUE, BROOKLYN, FROM STREET VERMONT STREET |
M042024072A13 | 2024-03-12 | 2024-04-01 | REPAIR SIDEWALK | 5 AVENUE, MANHATTAN, FROM STREET EAST 28 STREET TO STREET EAST 29 STREET |
B022024072C31 | 2024-03-12 | 2024-04-09 | TEMPORARY PEDESTRIAN WALK | STANLEY AVENUE, BROOKLYN, FROM STREET NEW JERSEY AVENUE TO STREET PENNSYLVANIA AVENUE |
B012024072C65 | 2024-03-12 | 2024-04-09 | RESET, REPAIR OR REPLACE CURB | STANLEY AVENUE, BROOKLYN, FROM STREET NEW JERSEY AVENUE TO STREET PENNSYLVANIA AVENUE |
B042024072A33 | 2024-03-12 | 2024-04-09 | REPAIR SIDEWALK | STANLEY AVENUE, BROOKLYN, FROM STREET NEW JERSEY AVENUE TO STREET PENNSYLVANIA AVENUE |
B022024072C32 | 2024-03-12 | 2024-04-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | STANLEY AVENUE, BROOKLYN, FROM STREET NEW JERSEY AVENUE TO STREET PENNSYLVANIA AVENUE |
M012024071E61 | 2024-03-11 | 2024-04-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | 2 AVENUE, MANHATTAN, FROM STREET EAST 62 STREET TO STREET EAST 63 STREET |
M012024071E60 | 2024-03-11 | 2024-04-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 62 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
B042024060A37 | 2024-02-29 | 2024-03-27 | REPLACE SIDEWALK | GRAND STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B022024060A48 | 2024-02-29 | 2024-03-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | GRAND STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B012024060A91 | 2024-02-29 | 2024-03-27 | RESET, REPAIR OR REPLACE CURB-PROTECTED | GRAND STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B022024060A47 | 2024-02-29 | 2024-03-27 | TEMPORARY PEDESTRIAN WALK | GRAND STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
X012024058A69 | 2024-02-27 | 2024-04-01 | RESET, REPAIR OR REPLACE CURB | WALTON AVENUE, BRONX, FROM STREET EAST 175 STREET TO STREET HENWOOD PLACE |
X042024058A07 | 2024-02-27 | 2024-04-01 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WALTON AVENUE, BRONX, FROM STREET EAST 175 STREET TO STREET HENWOOD PLACE |
B022024057B92 | 2024-02-26 | 2024-03-25 | TEMPORARY PEDESTRIAN WALK | VAN SICLEN AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B042024057A13 | 2024-02-26 | 2024-03-25 | REPAIR SIDEWALK | VAN SICLEN AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B022024057B93 | 2024-02-26 | 2024-03-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | VAN SICLEN AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B012024057C21 | 2024-02-26 | 2024-03-25 | RESET, REPAIR OR REPLACE CURB | VAN SICLEN AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
X012024057B38 | 2024-02-26 | 2024-03-11 | RESET, REPAIR OR REPLACE CURB | WALTON AVENUE, BRONX, FROM STREET EAST 175 STREET TO STREET HENWOOD PLACE |
X042024057A06 | 2024-02-26 | 2024-03-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WALTON AVENUE, BRONX, FROM STREET EAST 175 STREET TO STREET HENWOOD PLACE |
X042024056A00 | 2024-02-25 | 2024-03-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WALTON AVENUE, BRONX, FROM STREET EAST 175 STREET TO STREET HENWOOD PLACE |
X012024056A00 | 2024-02-25 | 2024-03-11 | RESET, REPAIR OR REPLACE CURB | WALTON AVENUE, BRONX, FROM STREET EAST 175 STREET TO STREET HENWOOD PLACE |
B022024054A13 | 2024-02-23 | 2024-03-25 | TEMPORARY PEDESTRIAN WALK | VERMONT STREET, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B022024054A11 | 2024-02-23 | 2024-03-25 | TEMPORARY PEDESTRIAN WALK | COZINE AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B042024054A03 | 2024-02-23 | 2024-03-25 | REPAIR SIDEWALK | COZINE AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B012024054A13 | 2024-02-23 | 2024-03-25 | RESET, REPAIR OR REPLACE CURB-PROTECTED | COZINE AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B012024054A14 | 2024-02-23 | 2024-03-25 | RESET, REPAIR OR REPLACE CURB-PROTECTED | VERMONT STREET, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B022024054A12 | 2024-02-23 | 2024-03-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | COZINE AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B042024054A04 | 2024-02-23 | 2024-03-25 | REPAIR SIDEWALK | VERMONT STREET, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B022024054A14 | 2024-02-23 | 2024-03-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | VERMONT STREET, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B012024049A02 | 2024-02-18 | 2024-03-18 | RESET, REPAIR OR REPLACE CURB-PROTECTED | KENT AVENUE, BROOKLYN, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET |
B022024044A86 | 2024-02-13 | 2024-03-20 | TEMPORARY PEDESTRIAN WALK | STANLEY AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022024044A87 | 2024-02-13 | 2024-03-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | STANLEY AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B042024044A07 | 2024-02-13 | 2024-03-20 | REPAIR SIDEWALK | STANLEY AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B012024044B26 | 2024-02-13 | 2024-03-20 | RESET, REPAIR OR REPLACE CURB | STANLEY AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022024040B27 | 2024-02-09 | 2024-03-08 | TEMPORARY PEDESTRIAN WALK | WORTMAN AVENUE, BROOKLYN, FROM STREET NEW JERSEY AVENUE TO STREET PENNSYLVANIA AVENUE |
B012024040B21 | 2024-02-09 | 2024-03-08 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WORTMAN AVENUE, BROOKLYN, FROM STREET NEW JERSEY AVENUE TO STREET PENNSYLVANIA AVENUE |
B042024040A35 | 2024-02-09 | 2024-03-08 | REPAIR SIDEWALK | WORTMAN AVENUE, BROOKLYN, FROM STREET NEW JERSEY AVENUE TO STREET PENNSYLVANIA AVENUE |
B022024040B28 | 2024-02-09 | 2024-03-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | WORTMAN AVENUE, BROOKLYN, FROM STREET NEW JERSEY AVENUE TO STREET PENNSYLVANIA AVENUE |
Q042024025A11 | 2024-01-25 | 2024-02-18 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 93 AVENUE, QUEENS, FROM STREET 168 STREET |
Q042024025A10 | 2024-01-25 | 2024-02-18 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 93 AVENUE, QUEENS, FROM STREET 168 STREET |
M042024019A09 | 2024-01-19 | 2024-02-10 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 2 AVENUE, MANHATTAN, FROM STREET EAST 62 STREET TO STREET EAST 63 STREET |
M012024019A81 | 2024-01-19 | 2024-02-10 | RESET, REPAIR OR REPLACE CURB | 2 AVENUE, MANHATTAN, FROM STREET EAST 62 STREET TO STREET EAST 63 STREET |
M012024019A82 | 2024-01-19 | 2024-02-10 | PAVE STREET-W/ ENGINEERING & INSP FEE | 2 AVENUE, MANHATTAN, FROM STREET EAST 62 STREET TO STREET EAST 63 STREET |
B012024017C07 | 2024-01-17 | 2024-02-15 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WORTMAN AVENUE, BROOKLYN, FROM STREET NEW JERSEY AVENUE TO STREET VERMONT STREET |
B022024017B05 | 2024-01-17 | 2024-02-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | WORTMAN AVENUE, BROOKLYN, FROM STREET NEW JERSEY AVENUE TO STREET VERMONT STREET |
B022024017B06 | 2024-01-17 | 2024-02-15 | TEMPORARY PEDESTRIAN WALK | VAN SICLEN AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B042024017A21 | 2024-01-17 | 2024-02-15 | REPAIR SIDEWALK | VERMONT STREET, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B042024017A20 | 2024-01-17 | 2024-02-15 | REPAIR SIDEWALK | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B042024017A19 | 2024-01-17 | 2024-02-15 | REPAIR SIDEWALK | VAN SICLEN AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B022024017B08 | 2024-01-17 | 2024-02-15 | TEMPORARY PEDESTRIAN WALK | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B042024017A18 | 2024-01-17 | 2024-02-15 | REPAIR SIDEWALK | WORTMAN AVENUE, BROOKLYN, FROM STREET NEW JERSEY AVENUE TO STREET VERMONT STREET |
B042024017A17 | 2024-01-17 | 2024-02-15 | REPAIR SIDEWALK | VERMONT STREET, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B012024017C10 | 2024-01-17 | 2024-02-15 | RESET, REPAIR OR REPLACE CURB-PROTECTED | VERMONT STREET, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B012024017C05 | 2024-01-17 | 2024-02-15 | RESET, REPAIR OR REPLACE CURB | STANLEY AVENUE, BROOKLYN, FROM STREET NEW JERSEY AVENUE TO STREET PENNSYLVANIA AVENUE |
B042024017A16 | 2024-01-17 | 2024-02-15 | REPAIR SIDEWALK | STANLEY AVENUE, BROOKLYN, FROM STREET NEW JERSEY AVENUE TO STREET PENNSYLVANIA AVENUE |
B012024017C06 | 2024-01-17 | 2024-02-15 | RESET, REPAIR OR REPLACE CURB-PROTECTED | VERMONT STREET, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B022024017B04 | 2024-01-17 | 2024-02-15 | TEMPORARY PEDESTRIAN WALK | WORTMAN AVENUE, BROOKLYN, FROM STREET NEW JERSEY AVENUE TO STREET VERMONT STREET |
B012024017C08 | 2024-01-17 | 2024-02-15 | RESET, REPAIR OR REPLACE CURB | VAN SICLEN AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B012024017C09 | 2024-01-17 | 2024-02-15 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022024017B07 | 2024-01-17 | 2024-02-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | VAN SICLEN AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B022024017B09 | 2024-01-17 | 2024-02-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022024017B10 | 2024-01-17 | 2024-02-15 | TEMPORARY PEDESTRIAN WALK | VERMONT STREET, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B022024017B11 | 2024-01-17 | 2024-02-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | VERMONT STREET, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B022024017B02 | 2024-01-17 | 2024-02-15 | TEMPORARY PEDESTRIAN WALK | VERMONT STREET, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B022024017B01 | 2024-01-17 | 2024-02-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | STANLEY AVENUE, BROOKLYN, FROM STREET NEW JERSEY AVENUE TO STREET PENNSYLVANIA AVENUE |
B022024017B00 | 2024-01-17 | 2024-02-15 | TEMPORARY PEDESTRIAN WALK | STANLEY AVENUE, BROOKLYN, FROM STREET NEW JERSEY AVENUE TO STREET PENNSYLVANIA AVENUE |
B022024017B03 | 2024-01-17 | 2024-02-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | VERMONT STREET, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B022024016A34 | 2024-01-16 | 2024-02-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | STANLEY AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022024016A39 | 2024-01-16 | 2024-02-20 | TEMPORARY PEDESTRIAN WALK | VAN SICLEN AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B022024016A38 | 2024-01-16 | 2024-02-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022024016A37 | 2024-01-16 | 2024-02-20 | TEMPORARY PEDESTRIAN WALK | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022024016A36 | 2024-01-16 | 2024-02-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | STANLEY AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022024016A35 | 2024-01-16 | 2024-02-20 | TEMPORARY PEDESTRIAN WALK | STANLEY AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022024016A33 | 2024-01-16 | 2024-02-20 | TEMPORARY PEDESTRIAN WALK | STANLEY AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022024016A41 | 2024-01-16 | 2024-02-20 | TEMPORARY PEDESTRIAN WALK | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022024016A40 | 2024-01-16 | 2024-02-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | VAN SICLEN AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B022024016A44 | 2024-01-16 | 2024-02-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | VERMONT STREET, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B022024016A43 | 2024-01-16 | 2024-02-20 | TEMPORARY PEDESTRIAN WALK | VERMONT STREET, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B022024016A42 | 2024-01-16 | 2024-02-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B042024016A14 | 2024-01-16 | 2024-02-20 | REPAIR SIDEWALK | STANLEY AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B042024016A15 | 2024-01-16 | 2024-02-20 | REPAIR SIDEWALK | STANLEY AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B042024016A16 | 2024-01-16 | 2024-02-20 | REPAIR SIDEWALK | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B042024016A17 | 2024-01-16 | 2024-02-20 | REPAIR SIDEWALK | VAN SICLEN AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B042024016A18 | 2024-01-16 | 2024-02-20 | REPAIR SIDEWALK | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B042024016A19 | 2024-01-16 | 2024-02-20 | REPAIR SIDEWALK | VERMONT STREET, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B012024016B43 | 2024-01-16 | 2024-02-20 | RESET, REPAIR OR REPLACE CURB-PROTECTED | VERMONT STREET, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B012024016B42 | 2024-01-16 | 2024-02-20 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B012024016B41 | 2024-01-16 | 2024-02-20 | RESET, REPAIR OR REPLACE CURB | VAN SICLEN AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B012024016B40 | 2024-01-16 | 2024-02-20 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
M042024016A09 | 2024-01-16 | 2024-02-10 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
M042024016A08 | 2024-01-16 | 2024-02-10 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
M042024016A07 | 2024-01-16 | 2024-02-10 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
B012024016B38 | 2024-01-16 | 2024-02-20 | RESET, REPAIR OR REPLACE CURB | STANLEY AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
M022024016C14 | 2024-01-16 | 2024-02-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
M022024016C13 | 2024-01-16 | 2024-02-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
M022024016C12 | 2024-01-16 | 2024-02-10 | TEMPORARY PEDESTRIAN WALK | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
M022024016C11 | 2024-01-16 | 2024-02-10 | TEMPORARY PEDESTRIAN WALK | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
B012024016B39 | 2024-01-16 | 2024-02-20 | RESET, REPAIR OR REPLACE CURB | STANLEY AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
X012024011A54 | 2024-01-11 | 2024-02-06 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 149 STREET, BRONX, FROM STREET BROOK AVENUE TO STREET ST ANNS AVENUE |
X012024011A55 | 2024-01-11 | 2024-02-06 | PAVE STREET-W/ ENGINEERING & INSP FEE | ST ANNS AVENUE, BRONX, FROM STREET EAST 149 STREET TO STREET NYCTA SUBWAY |
X012024011A56 | 2024-01-11 | 2024-02-06 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 149 STREET, BRONX, FROM STREET ST ANNS AVENUE |
M042024008A05 | 2024-01-08 | 2024-02-06 | REPAIR SIDEWALK | WEST 125 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET LENOX AVENUE |
B022023355B06 | 2023-12-21 | 2024-01-21 | TEMPORARY PEDESTRIAN WALK | STANLEY AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B012023355C19 | 2023-12-21 | 2024-01-21 | RESET, REPAIR OR REPLACE CURB | STANLEY AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B012023355C20 | 2023-12-21 | 2024-01-21 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B012023355C21 | 2023-12-21 | 2024-01-21 | RESET, REPAIR OR REPLACE CURB | VAN SICLEN AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B022023355B07 | 2023-12-21 | 2024-01-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | STANLEY AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022023355B08 | 2023-12-21 | 2024-01-21 | TEMPORARY PEDESTRIAN WALK | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022023355B09 | 2023-12-21 | 2024-01-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022023355B15 | 2023-12-21 | 2024-01-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | VERMONT STREET, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B042023355A71 | 2023-12-21 | 2024-01-21 | REPAIR SIDEWALK | STANLEY AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022023355B04 | 2023-12-21 | 2024-01-21 | TEMPORARY PEDESTRIAN WALK | STANLEY AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022023355B05 | 2023-12-21 | 2024-01-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | STANLEY AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B012023355C22 | 2023-12-21 | 2024-01-21 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B012023355C23 | 2023-12-21 | 2024-01-21 | RESET, REPAIR OR REPLACE CURB-PROTECTED | VERMONT STREET, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B022023355B11 | 2023-12-21 | 2024-01-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | VAN SICLEN AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B042023355A72 | 2023-12-21 | 2024-01-21 | REPAIR SIDEWALK | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B042023355A73 | 2023-12-21 | 2024-01-21 | REPAIR SIDEWALK | VAN SICLEN AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B042023355A74 | 2023-12-21 | 2024-01-21 | REPAIR SIDEWALK | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B042023355A75 | 2023-12-21 | 2024-01-21 | REPAIR SIDEWALK | VERMONT STREET, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B022023355B10 | 2023-12-21 | 2024-01-21 | TEMPORARY PEDESTRIAN WALK | VAN SICLEN AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B012023355C18 | 2023-12-21 | 2024-01-21 | RESET, REPAIR OR REPLACE CURB | STANLEY AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022023355B14 | 2023-12-21 | 2024-01-21 | TEMPORARY PEDESTRIAN WALK | VERMONT STREET, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B042023355A70 | 2023-12-21 | 2024-01-21 | REPAIR SIDEWALK | STANLEY AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022023355B13 | 2023-12-21 | 2024-01-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022023355B12 | 2023-12-21 | 2024-01-21 | TEMPORARY PEDESTRIAN WALK | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B012023353B42 | 2023-12-19 | 2023-12-31 | RESET, REPAIR OR REPLACE CURB | STANLEY AVENUE, BROOKLYN, FROM STREET NEW JERSEY AVENUE TO STREET PENNSYLVANIA AVENUE |
B022023353A90 | 2023-12-19 | 2023-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | STANLEY AVENUE, BROOKLYN, FROM STREET NEW JERSEY AVENUE TO STREET PENNSYLVANIA AVENUE |
B022023353A89 | 2023-12-19 | 2023-12-31 | TEMPORARY PEDESTRIAN WALK | STANLEY AVENUE, BROOKLYN, FROM STREET NEW JERSEY AVENUE TO STREET PENNSYLVANIA AVENUE |
B042023353A04 | 2023-12-19 | 2023-12-31 | REPAIR SIDEWALK | STANLEY AVENUE, BROOKLYN, FROM STREET NEW JERSEY AVENUE TO STREET PENNSYLVANIA AVENUE |
M012023339B24 | 2023-12-05 | 2023-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 62 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M022023339C29 | 2023-12-05 | 2023-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
M012023339B25 | 2023-12-05 | 2023-12-31 | RESET, REPAIR OR REPLACE CURB | 2 AVENUE, MANHATTAN, FROM STREET EAST 62 STREET TO STREET EAST 63 STREET |
M012023339B26 | 2023-12-05 | 2023-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | 2 AVENUE, MANHATTAN, FROM STREET EAST 62 STREET TO STREET EAST 63 STREET |
M012023339B23 | 2023-12-05 | 2023-12-31 | RESET, REPAIR OR REPLACE CURB | EAST 62 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M042023339A13 | 2023-12-05 | 2023-12-31 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
M042023339A12 | 2023-12-05 | 2023-12-31 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
M042023339A11 | 2023-12-05 | 2023-12-31 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
M042023339A10 | 2023-12-05 | 2023-12-31 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 2 AVENUE, MANHATTAN, FROM STREET EAST 62 STREET TO STREET EAST 63 STREET |
M042023339A09 | 2023-12-05 | 2023-12-31 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 62 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M022023339C26 | 2023-12-05 | 2023-12-31 | TEMPORARY PEDESTRIAN WALK | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
M022023339C27 | 2023-12-05 | 2023-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
M022023339C28 | 2023-12-05 | 2023-12-31 | TEMPORARY PEDESTRIAN WALK | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
B012023335C06 | 2023-12-01 | 2023-12-28 | PAVE STREET-W/ ENGINEERING & INSP FEE | CALYER STREET, BROOKLYN, FROM STREET LORIMER STREET |
B012023335C04 | 2023-12-01 | 2023-12-28 | PAVE STREET-W/ ENGINEERING & INSP FEE | CALYER STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MANHATTAN AVENUE |
B012023335C05 | 2023-12-01 | 2023-12-28 | PAVE STREET-W/ ENGINEERING & INSP FEE | LORIMER STREET, BROOKLYN, FROM STREET CALYER STREET TO STREET NOBLE STREET |
M022023334B80 | 2023-11-30 | 2023-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 33 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M042023334A08 | 2023-11-30 | 2023-12-31 | REPAIR SIDEWALK | EAST 33 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M022023334B79 | 2023-11-30 | 2023-12-31 | TEMPORARY PEDESTRIAN WALK | EAST 33 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M002023332A24 | 2023-11-28 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
B012023328B13 | 2023-11-24 | 2023-12-21 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B012023328B12 | 2023-11-24 | 2023-12-21 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022023326B20 | 2023-11-22 | 2023-12-21 | TEMPORARY PEDESTRIAN WALK | VAN SICLEN AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B022023326B18 | 2023-11-22 | 2023-12-21 | TEMPORARY PEDESTRIAN WALK | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022023326B17 | 2023-11-22 | 2023-12-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | STANLEY AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022023326B16 | 2023-11-22 | 2023-12-21 | TEMPORARY PEDESTRIAN WALK | STANLEY AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022023326B15 | 2023-11-22 | 2023-12-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | STANLEY AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022023326B14 | 2023-11-22 | 2023-12-21 | TEMPORARY PEDESTRIAN WALK | STANLEY AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022023326A33 | 2023-11-22 | 2023-12-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | LORIMER STREET, BROOKLYN, FROM STREET CALYER STREET TO STREET NOBLE STREET |
B022023326A32 | 2023-11-22 | 2023-12-20 | TEMPORARY PEDESTRIAN WALK | CALYER STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MANHATTAN AVENUE |
B022023326A31 | 2023-11-22 | 2023-12-20 | TEMPORARY PEDESTRIAN WALK | LORIMER STREET, BROOKLYN, FROM STREET CALYER STREET TO STREET NOBLE STREET |
B022023326A30 | 2023-11-22 | 2023-12-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | CALYER STREET, BROOKLYN, FROM STREET LORIMER STREET |
B042023326A32 | 2023-11-22 | 2023-12-21 | REPAIR SIDEWALK | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B042023326A31 | 2023-11-22 | 2023-12-21 | REPAIR SIDEWALK | VAN SICLEN AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B022023326A29 | 2023-11-22 | 2023-12-22 | TEMPORARY PEDESTRIAN WALK | CALYER STREET, BROOKLYN, FROM STREET LORIMER STREET |
B022023326A34 | 2023-11-22 | 2023-12-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | CALYER STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MANHATTAN AVENUE |
B042023326A30 | 2023-11-22 | 2023-12-21 | REPAIR SIDEWALK | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B042023326A29 | 2023-11-22 | 2023-12-21 | REPAIR SIDEWALK | STANLEY AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B042023326A28 | 2023-11-22 | 2023-12-21 | REPAIR SIDEWALK | STANLEY AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
X012023326A42 | 2023-11-22 | 2023-12-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | WESTCHESTER AVENUE, BRONX, FROM STREET BROOK AVENUE TO STREET ST ANN'S AVENUE |
X012023326A41 | 2023-11-22 | 2023-12-20 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | NYCTA SUBWAY, BRONX, FROM STREET ST ANNS AVENUE |
X012023326A40 | 2023-11-22 | 2023-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 149 STREET, BRONX, FROM STREET ST ANNS AVENUE |
X012023326A39 | 2023-11-22 | 2023-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | ST ANNS AVENUE, BRONX, FROM STREET EAST 149 STREET TO STREET NYCTA SUBWAY |
X012023326A38 | 2023-11-22 | 2023-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 149 STREET, BRONX, FROM STREET BROOK AVENUE TO STREET ST ANNS AVENUE |
B042023326A07 | 2023-11-22 | 2023-12-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CALYER STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MANHATTAN AVENUE |
B042023326A06 | 2023-11-22 | 2023-12-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | LORIMER STREET, BROOKLYN, FROM STREET CALYER STREET TO STREET NOBLE STREET |
B042023326A05 | 2023-11-22 | 2023-12-22 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | CALYER STREET, BROOKLYN, FROM STREET LORIMER STREET |
B042023326A04 | 2023-11-22 | 2023-12-22 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | CALYER STREET, BROOKLYN, FROM STREET LORIMER STREET |
B022023326B24 | 2023-11-22 | 2023-12-21 | TEMPORARY PEDESTRIAN WALK | VERMONT STREET, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B022023326B25 | 2023-11-22 | 2023-12-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | VERMONT STREET, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B012023326B41 | 2023-11-22 | 2023-12-21 | RESET, REPAIR OR REPLACE CURB-PROTECTED | VERMONT STREET, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B012023326B40 | 2023-11-22 | 2023-12-21 | RESET, REPAIR OR REPLACE CURB | VAN SICLEN AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B012023326B39 | 2023-11-22 | 2023-12-21 | RESET, REPAIR OR REPLACE CURB | STANLEY AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B012023326B38 | 2023-11-22 | 2023-12-21 | RESET, REPAIR OR REPLACE CURB | STANLEY AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B012023326A85 | 2023-11-22 | 2023-12-20 | RESET, REPAIR OR REPLACE CURB | CALYER STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MANHATTAN AVENUE |
B012023326A84 | 2023-11-22 | 2023-12-20 | RESET, REPAIR OR REPLACE CURB | LORIMER STREET, BROOKLYN, FROM STREET CALYER STREET TO STREET NOBLE STREET |
B042023326A34 | 2023-11-22 | 2023-12-14 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | VAN SICLEN AVENUE, BROOKLYN, FROM STREET WORTMAN AVENUE |
B042023326A33 | 2023-11-22 | 2023-12-21 | REPAIR SIDEWALK | VERMONT STREET, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B022023326B23 | 2023-11-22 | 2023-12-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022023326B22 | 2023-11-22 | 2023-12-21 | TEMPORARY PEDESTRIAN WALK | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
B022023326B21 | 2023-11-22 | 2023-12-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | VAN SICLEN AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B022023326B19 | 2023-11-22 | 2023-12-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | WORTMAN AVENUE, BROOKLYN, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET |
X002023325A03 | 2023-11-21 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
X002023325A02 | 2023-11-21 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
B022023318A91 | 2023-11-14 | 2023-12-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | PENNSYLVANIA AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B022023318A90 | 2023-11-14 | 2023-12-14 | TEMPORARY PEDESTRIAN WALK | PENNSYLVANIA AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B042023318A19 | 2023-11-14 | 2023-12-14 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | PENNSYLVANIA AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE |
B012023318A77 | 2023-11-14 | 2023-12-14 | RESET, REPAIR OR REPLACE CURB | PENNSYLVANIA AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B042023318A20 | 2023-11-14 | 2023-12-14 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | PENNSYLVANIA AVENUE, BROOKLYN, FROM STREET WORTMAN AVENUE |
B042023318A18 | 2023-11-14 | 2023-12-14 | REPAIR SIDEWALK | PENNSYLVANIA AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
X012023312B02 | 2023-11-08 | 2023-11-14 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | NYCTA SUBWAY, BRONX, FROM STREET ST ANNS AVENUE |
X012023312B01 | 2023-11-08 | 2023-12-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | ST ANNS AVENUE, BRONX, FROM STREET EAST 149 STREET TO STREET NYCTA SUBWAY |
X012023312B00 | 2023-11-08 | 2023-12-01 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 149 STREET, BRONX, FROM STREET BROOK AVENUE TO STREET ST ANNS AVENUE |
M022023312E11 | 2023-11-08 | 2023-12-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 33 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M022023312E10 | 2023-11-08 | 2023-12-04 | TEMPORARY PEDESTRIAN WALK | EAST 33 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M042023312A06 | 2023-11-08 | 2023-12-04 | REPAIR SIDEWALK | EAST 33 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
X012023312B03 | 2023-11-08 | 2023-12-01 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 149 STREET, BRONX, FROM STREET ST ANNS AVENUE |
M002023310A22 | 2023-11-06 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
M042023307A08 | 2023-11-03 | 2023-11-13 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST 31 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M022023307A32 | 2023-11-03 | 2023-11-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 31 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M022023307A31 | 2023-11-03 | 2023-11-13 | TEMPORARY PEDESTRIAN WALK | EAST 31 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M022023307A26 | 2023-11-03 | 2023-11-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 31 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M022023307A25 | 2023-11-03 | 2023-11-13 | TEMPORARY PEDESTRIAN WALK | EAST 31 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M042023307A09 | 2023-11-03 | 2023-11-13 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST 31 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
B002023306A08 | 2023-11-02 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
X042023303A21 | 2023-10-30 | 2023-11-28 | REPAIR SIDEWALK | COLDEN AVENUE, BRONX, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE |
X022023303B95 | 2023-10-30 | 2023-11-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | COLDEN AVENUE, BRONX, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE |
X022023303B94 | 2023-10-30 | 2023-11-28 | TEMPORARY PEDESTRIAN WALK | COLDEN AVENUE, BRONX, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE |
B012023298D57 | 2023-10-25 | 2023-11-19 | RESET, REPAIR OR REPLACE CURB | LORIMER STREET, BROOKLYN, FROM STREET CALYER STREET TO STREET NOBLE STREET |
B022023298C36 | 2023-10-25 | 2023-11-19 | TEMPORARY PEDESTRIAN WALK | CALYER STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MANHATTAN AVENUE |
B022023298C35 | 2023-10-25 | 2023-11-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | CALYER STREET, BROOKLYN, FROM STREET LORIMER STREET |
B022023298C34 | 2023-10-25 | 2023-11-22 | TEMPORARY PEDESTRIAN WALK | CALYER STREET, BROOKLYN, FROM STREET LORIMER STREET |
B042023298A62 | 2023-10-25 | 2023-11-22 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | CALYER STREET, BROOKLYN, FROM STREET LORIMER STREET |
B042023298A63 | 2023-10-25 | 2023-11-22 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | CALYER STREET, BROOKLYN, FROM STREET LORIMER STREET |
B042023298A64 | 2023-10-25 | 2023-11-19 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CALYER STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MANHATTAN AVENUE |
B012023298D58 | 2023-10-25 | 2023-11-19 | RESET, REPAIR OR REPLACE CURB | CALYER STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MANHATTAN AVENUE |
B022023298C33 | 2023-10-25 | 2023-11-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | LORIMER STREET, BROOKLYN, FROM STREET CALYER STREET TO STREET NOBLE STREET |
B022023298C37 | 2023-10-25 | 2023-11-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | CALYER STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MANHATTAN AVENUE |
B022023298C32 | 2023-10-25 | 2023-11-19 | TEMPORARY PEDESTRIAN WALK | LORIMER STREET, BROOKLYN, FROM STREET CALYER STREET TO STREET NOBLE STREET |
B042023298A61 | 2023-10-25 | 2023-11-19 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | LORIMER STREET, BROOKLYN, FROM STREET CALYER STREET TO STREET NOBLE STREET |
M012023296C81 | 2023-10-23 | 2023-11-21 | PAVE STREET-W/ ENGINEERING & INSP FEE | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
M012023296C80 | 2023-10-23 | 2023-11-21 | PAVE STREET-W/ ENGINEERING & INSP FEE | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET TO STREET MORTON STREET |
M042023291A15 | 2023-10-18 | 2023-11-10 | REPAIR SIDEWALK | WEST 125 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET LENOX AVENUE |
M012023291B09 | 2023-10-18 | 2023-11-10 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WEST 125 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET LENOX AVENUE |
B012023290B52 | 2023-10-17 | 2023-11-15 | RESET, REPAIR OR REPLACE CURB | SCHENCK AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B012023290B51 | 2023-10-17 | 2023-11-15 | RESET, REPAIR OR REPLACE CURB | SCHENCK AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B012023290B53 | 2023-10-17 | 2023-11-14 | RESET, REPAIR OR REPLACE CURB | PENNSYLVANIA AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B022023290B46 | 2023-10-17 | 2023-11-15 | TEMPORARY PEDESTRIAN WALK | SCHENCK AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B022023290B47 | 2023-10-17 | 2023-11-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | SCHENCK AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B022023290B48 | 2023-10-17 | 2023-11-15 | TEMPORARY PEDESTRIAN WALK | SCHENCK AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B022023290B49 | 2023-10-17 | 2023-11-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | SCHENCK AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B022023290B50 | 2023-10-17 | 2023-11-14 | TEMPORARY PEDESTRIAN WALK | PENNSYLVANIA AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B022023290B51 | 2023-10-17 | 2023-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | PENNSYLVANIA AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B042023290B10 | 2023-10-17 | 2023-11-15 | REPAIR SIDEWALK | SCHENCK AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B042023290B09 | 2023-10-17 | 2023-11-15 | REPAIR SIDEWALK | SCHENCK AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B042023290B11 | 2023-10-17 | 2023-11-14 | REPAIR SIDEWALK | PENNSYLVANIA AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B042023290B12 | 2023-10-17 | 2023-11-14 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | PENNSYLVANIA AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE |
B042023290B13 | 2023-10-17 | 2023-11-14 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | PENNSYLVANIA AVENUE, BROOKLYN, FROM STREET WORTMAN AVENUE |
M012023290B34 | 2023-10-17 | 2023-11-10 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | BROADWAY, MANHATTAN, FROM STREET WEST 102 STREET TO STREET WEST 103 STREET |
M012023290B35 | 2023-10-17 | 2023-10-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 103 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M012023290B36 | 2023-10-17 | 2023-11-10 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | BROADWAY, MANHATTAN, FROM STREET WEST 103 STREET |
M012023285A90 | 2023-10-12 | 2023-11-10 | PAVE STREET-W/ ENGINEERING & INSP FEE | 5 AVENUE, MANHATTAN, FROM STREET EAST 28 STREET TO STREET EAST 29 STREET |
M012023285A91 | 2023-10-12 | 2023-11-10 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | WEST 28 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET BROADWAY |
M012023285A92 | 2023-10-12 | 2023-11-10 | PAVE STREET-W/ ENGINEERING & INSP FEE | 5 AVENUE, MANHATTAN, FROM STREET WEST 28 STREET |
M042023284A50 | 2023-10-11 | 2023-11-13 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST 31 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M042023284A54 | 2023-10-11 | 2023-11-09 | REPAIR SIDEWALK | WEST 28 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET BROADWAY |
M042023284A52 | 2023-10-11 | 2023-11-13 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST 31 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M042023284A51 | 2023-10-11 | 2023-11-13 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST 31 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M042023279A16 | 2023-10-06 | 2023-10-30 | REPAIR SIDEWALK | WEST 28 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET BROADWAY |
M022023279B56 | 2023-10-06 | 2023-10-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 28 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET BROADWAY |
M022023279B55 | 2023-10-06 | 2023-10-30 | TEMPORARY PEDESTRIAN WALK | WEST 28 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET BROADWAY |
M012023279B08 | 2023-10-06 | 2023-10-30 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WEST 28 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET BROADWAY |
B012023276B34 | 2023-10-03 | 2023-10-26 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WORTMAN AVENUE, BROOKLYN, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE |
B042023276A29 | 2023-10-03 | 2023-10-26 | REPAIR SIDEWALK | VAN SICLEN AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B042023276A30 | 2023-10-03 | 2023-10-26 | REPAIR SIDEWALK | VAN SICLEN AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B042023276A31 | 2023-10-03 | 2023-10-26 | REPAIR SIDEWALK | WORTMAN AVENUE, BROOKLYN, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE |
B042023276A32 | 2023-10-03 | 2023-10-26 | REPAIR SIDEWALK | WORTMAN AVENUE, BROOKLYN, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE |
X042023276A40 | 2023-10-03 | 2023-10-25 | REPAIR SIDEWALK | COLDEN AVENUE, BRONX, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE |
X022023276B77 | 2023-10-03 | 2023-10-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | COLDEN AVENUE, BRONX, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE |
M012023276B95 | 2023-10-03 | 2023-10-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 125 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET LENOX AVENUE |
M012023276B96 | 2023-10-03 | 2023-10-29 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | WEST 126 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET LENOX AVENUE |
B012023276B35 | 2023-10-03 | 2023-10-26 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WORTMAN AVENUE, BROOKLYN, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE |
B012023276B32 | 2023-10-03 | 2023-10-26 | RESET, REPAIR OR REPLACE CURB | VAN SICLEN AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B012023276B33 | 2023-10-03 | 2023-10-26 | RESET, REPAIR OR REPLACE CURB | VAN SICLEN AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
X022023276B76 | 2023-10-03 | 2023-10-25 | TEMPORARY PEDESTRIAN WALK | COLDEN AVENUE, BRONX, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE |
B022023276A75 | 2023-10-03 | 2023-10-26 | TEMPORARY PEDESTRIAN WALK | VAN SICLEN AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B022023276A76 | 2023-10-03 | 2023-10-26 | TEMPORARY PEDESTRIAN WALK | VAN SICLEN AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B022023276A77 | 2023-10-03 | 2023-10-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | VAN SICLEN AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B022023276A78 | 2023-10-03 | 2023-10-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | VAN SICLEN AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B022023276A79 | 2023-10-03 | 2023-10-26 | TEMPORARY PEDESTRIAN WALK | WORTMAN AVENUE, BROOKLYN, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE |
B022023276A80 | 2023-10-03 | 2023-10-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | WORTMAN AVENUE, BROOKLYN, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE |
B022023276A81 | 2023-10-03 | 2023-10-26 | TEMPORARY PEDESTRIAN WALK | WORTMAN AVENUE, BROOKLYN, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE |
B022023276A82 | 2023-10-03 | 2023-10-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | WORTMAN AVENUE, BROOKLYN, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE |
M042023262A19 | 2023-09-19 | 2023-10-14 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST 31 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M012023262A64 | 2023-09-19 | 2023-10-09 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 35 STREET, MANHATTAN, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD |
M042023262A21 | 2023-09-19 | 2023-10-14 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST 31 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M042023262A20 | 2023-09-19 | 2023-10-14 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST 31 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M012023262A65 | 2023-09-19 | 2023-10-09 | PAVE STREET-W/ ENGINEERING & INSP FEE | 10 AVENUE, MANHATTAN, FROM STREET WEST 35 STREET |
M022023262C66 | 2023-09-19 | 2023-10-22 | TEMPORARY PEDESTRIAN WALK | EAST 77 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M022023262C67 | 2023-09-19 | 2023-10-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 77 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M022023262C68 | 2023-09-19 | 2023-10-18 | TEMPORARY PEDESTRIAN WALK | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M022023262C69 | 2023-09-19 | 2023-10-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M012023262B23 | 2023-09-19 | 2023-10-22 | RESET, REPAIR OR REPLACE CURB | EAST 77 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012023262B24 | 2023-09-19 | 2023-10-18 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M042023262A26 | 2023-09-19 | 2023-10-21 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 7 AVENUE, MANHATTAN, FROM STREET WEST 153 STREET |
M042023262A25 | 2023-09-19 | 2023-10-21 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 7 AVENUE, MANHATTAN, FROM STREET WEST 152 STREET |
M042023262A24 | 2023-09-19 | 2023-10-21 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET |
M042023262A23 | 2023-09-19 | 2023-10-18 | REPAIR SIDEWALK | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M042023262A22 | 2023-09-19 | 2023-10-22 | REPAIR SIDEWALK | EAST 77 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012023258A61 | 2023-09-15 | 2023-10-09 | PAVE STREET-W/ ENGINEERING & INSP FEE | 10 AVENUE, MANHATTAN, FROM STREET WEST 35 STREET |
M012023258A60 | 2023-09-15 | 2023-10-09 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 35 STREET, MANHATTAN, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD |
M012023257B54 | 2023-09-14 | 2023-10-12 | RESET, REPAIR OR REPLACE CURB | WEST 103 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M042023257A12 | 2023-09-14 | 2023-10-12 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | BROADWAY, MANHATTAN, FROM STREET WEST 103 STREET |
M042023257A11 | 2023-09-14 | 2023-10-12 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | BROADWAY, MANHATTAN, FROM STREET WEST 103 STREET |
M042023257A10 | 2023-09-14 | 2023-10-12 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEST 103 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M042023257A09 | 2023-09-14 | 2023-10-12 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BROADWAY, MANHATTAN, FROM STREET WEST 102 STREET TO STREET WEST 103 STREET |
M022023257C08 | 2023-09-14 | 2023-10-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | BROADWAY, MANHATTAN, FROM STREET WEST 102 STREET TO STREET WEST 103 STREET |
M022023257C07 | 2023-09-14 | 2023-10-12 | TEMPORARY PEDESTRIAN WALK | BROADWAY, MANHATTAN, FROM STREET WEST 102 STREET TO STREET WEST 103 STREET |
M012023257B53 | 2023-09-14 | 2023-10-12 | RESET, REPAIR OR REPLACE CURB-PROTECTED | BROADWAY, MANHATTAN, FROM STREET WEST 102 STREET TO STREET WEST 103 STREET |
B012023255D91 | 2023-09-12 | 2023-09-28 | RESET, REPAIR OR REPLACE CURB | VAN SICLEN AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B022023255C28 | 2023-09-12 | 2023-09-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | VAN SICLEN AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B042023255B22 | 2023-09-12 | 2023-09-28 | REPAIR SIDEWALK | VAN SICLEN AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B022023255C27 | 2023-09-12 | 2023-09-28 | TEMPORARY PEDESTRIAN WALK | VAN SICLEN AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B042023250A89 | 2023-09-07 | 2023-09-27 | REPAIR SIDEWALK | KENT AVENUE, BROOKLYN, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET |
B012023250D08 | 2023-09-07 | 2023-09-27 | RESET, REPAIR OR REPLACE CURB-PROTECTED | KENT AVENUE, BROOKLYN, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET |
M012023250A90 | 2023-09-07 | 2023-10-04 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | GREENWICH STREET, MANHATTAN, FROM STREET MURRAY STREET TO STREET WARREN STREET |
M012023250A91 | 2023-09-07 | 2023-10-04 | PAVE STREET-W/ ENGINEERING & INSP FEE | MURRAY STREET, MANHATTAN, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET GREENWICH STREET |
M012023244A50 | 2023-09-01 | 2023-09-22 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M022023244B79 | 2023-09-01 | 2023-09-22 | TEMPORARY PEDESTRIAN WALK | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M022023244B80 | 2023-09-01 | 2023-09-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M042023244A03 | 2023-09-01 | 2023-09-22 | REPAIR SIDEWALK | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 78 STREET TO STREET WEST 79 STREET |
M042023244A02 | 2023-09-01 | 2023-09-22 | REPAIR SIDEWALK | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M012023243B91 | 2023-08-31 | 2023-09-28 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 125 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET LENOX AVENUE |
M012023243B92 | 2023-08-31 | 2023-09-28 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | WEST 126 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET LENOX AVENUE |
B012023241D84 | 2023-08-29 | 2023-09-26 | RESET, REPAIR OR REPLACE CURB | VAN SICLEN AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B012023241D86 | 2023-08-29 | 2023-09-26 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WORTMAN AVENUE, BROOKLYN, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE |
B042023241A11 | 2023-08-29 | 2023-09-26 | REPAIR SIDEWALK | WORTMAN AVENUE, BROOKLYN, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE |
B042023241A10 | 2023-08-29 | 2023-09-26 | REPAIR SIDEWALK | WORTMAN AVENUE, BROOKLYN, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE |
B042023241A09 | 2023-08-29 | 2023-09-26 | REPAIR SIDEWALK | VAN SICLEN AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B022023241A60 | 2023-08-29 | 2023-09-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | WORTMAN AVENUE, BROOKLYN, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE |
B022023241A59 | 2023-08-29 | 2023-09-26 | TEMPORARY PEDESTRIAN WALK | WORTMAN AVENUE, BROOKLYN, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE |
B022023241A58 | 2023-08-29 | 2023-09-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | WORTMAN AVENUE, BROOKLYN, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE |
B022023241A57 | 2023-08-29 | 2023-09-26 | TEMPORARY PEDESTRIAN WALK | WORTMAN AVENUE, BROOKLYN, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE |
B022023241A56 | 2023-08-29 | 2023-09-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | VAN SICLEN AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
B022023241A55 | 2023-08-29 | 2023-09-26 | TEMPORARY PEDESTRIAN WALK | VAN SICLEN AVENUE, BROOKLYN, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE |
M042023241A25 | 2023-08-29 | 2023-09-22 | REPAIR SIDEWALK | EAST 77 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M022023241C99 | 2023-08-29 | 2023-09-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 77 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M022023241C98 | 2023-08-29 | 2023-09-22 | TEMPORARY PEDESTRIAN WALK | EAST 77 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012023241C17 | 2023-08-29 | 2023-09-21 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | CHARLTON STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M012023241C16 | 2023-08-29 | 2023-09-21 | PAVE STREET-W/ ENGINEERING & INSP FEE | KING STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M012023241C15 | 2023-08-29 | 2023-09-21 | PAVE STREET-W/ ENGINEERING & INSP FEE | GREENWICH STREET, MANHATTAN, FROM STREET CHARLTON STREET TO STREET KING STREET |
M012023241C14 | 2023-08-29 | 2023-09-22 | RESET, REPAIR OR REPLACE CURB | EAST 77 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
B012023241D85 | 2023-08-29 | 2023-09-26 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WORTMAN AVENUE, BROOKLYN, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE |
M042023237A12 | 2023-08-25 | 2023-09-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEST 103 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M042023237A13 | 2023-08-25 | 2023-09-12 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | BROADWAY, MANHATTAN, FROM STREET WEST 103 STREET |
M042023237A14 | 2023-08-25 | 2023-09-12 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | BROADWAY, MANHATTAN, FROM STREET WEST 103 STREET |
M022023237B82 | 2023-08-25 | 2023-09-13 | TEMPORARY PEDESTRIAN WALK | BROADWAY, MANHATTAN, FROM STREET WEST 102 STREET TO STREET WEST 103 STREET |
M042023237A11 | 2023-08-25 | 2023-09-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BROADWAY, MANHATTAN, FROM STREET WEST 102 STREET TO STREET WEST 103 STREET |
M012023237A60 | 2023-08-25 | 2023-09-13 | RESET, REPAIR OR REPLACE CURB | WEST 103 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M012023237A59 | 2023-08-25 | 2023-09-13 | RESET, REPAIR OR REPLACE CURB-PROTECTED | BROADWAY, MANHATTAN, FROM STREET WEST 102 STREET TO STREET WEST 103 STREET |
M022023237B83 | 2023-08-25 | 2023-09-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | BROADWAY, MANHATTAN, FROM STREET WEST 102 STREET TO STREET WEST 103 STREET |
M042023236A43 | 2023-08-24 | 2023-09-21 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 7 AVENUE, MANHATTAN, FROM STREET WEST 152 STREET |
M042023236A44 | 2023-08-24 | 2023-09-21 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 7 AVENUE, MANHATTAN, FROM STREET WEST 153 STREET |
M042023236A42 | 2023-08-24 | 2023-09-21 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET |
M012023234B31 | 2023-08-22 | 2023-09-25 | RESET, REPAIR OR REPLACE CURB-PROTECTED | CHARLTON STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M012023234B30 | 2023-08-22 | 2023-09-25 | RESET, REPAIR OR REPLACE CURB-PROTECTED | HUDSON STREET, MANHATTAN, FROM STREET CHARLTON STREET TO STREET KING STREET |
M012023234B29 | 2023-08-22 | 2023-09-21 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WEST 28 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET BROADWAY |
M022023234B71 | 2023-08-22 | 2023-09-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | HUDSON STREET, MANHATTAN, FROM STREET CHARLTON STREET TO STREET KING STREET |
M022023234B73 | 2023-08-22 | 2023-09-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | CHARLTON STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M022023234B72 | 2023-08-22 | 2023-09-25 | TEMPORARY PEDESTRIAN WALK | CHARLTON STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M022023234B75 | 2023-08-22 | 2023-09-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M022023234B74 | 2023-08-22 | 2023-09-18 | TEMPORARY PEDESTRIAN WALK | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M042023234A18 | 2023-08-22 | 2023-09-25 | REPAIR SIDEWALK | HUDSON STREET, MANHATTAN, FROM STREET CHARLTON STREET TO STREET KING STREET |
M042023234A17 | 2023-08-22 | 2023-09-21 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEST 28 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET BROADWAY |
M012023234B32 | 2023-08-22 | 2023-09-18 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M042023234A19 | 2023-08-22 | 2023-09-25 | REPAIR SIDEWALK | CHARLTON STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
B012023234C63 | 2023-08-22 | 2023-09-16 | RESET, REPAIR OR REPLACE CURB-PROTECTED | COZINE AVENUE, BROOKLYN, FROM STREET HENDRIX STREET TO STREET SCHENCK AVENUE |
B012023234C64 | 2023-08-22 | 2023-09-16 | RESET, REPAIR OR REPLACE CURB-PROTECTED | COZINE AVENUE, BROOKLYN, FROM STREET HENDRIX STREET TO STREET VAN SICLEN AVENUE |
M042023234A20 | 2023-08-22 | 2023-09-18 | REPAIR SIDEWALK | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M022023234B70 | 2023-08-22 | 2023-09-25 | TEMPORARY PEDESTRIAN WALK | HUDSON STREET, MANHATTAN, FROM STREET CHARLTON STREET TO STREET KING STREET |
B042023233A12 | 2023-08-21 | 2023-09-16 | REPAIR SIDEWALK | COZINE AVENUE, BROOKLYN, FROM STREET HENDRIX STREET TO STREET VAN SICLEN AVENUE |
B022023233A95 | 2023-08-21 | 2023-09-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | COZINE AVENUE, BROOKLYN, FROM STREET HENDRIX STREET TO STREET VAN SICLEN AVENUE |
B022023233A94 | 2023-08-21 | 2023-09-16 | TEMPORARY PEDESTRIAN WALK | COZINE AVENUE, BROOKLYN, FROM STREET HENDRIX STREET TO STREET VAN SICLEN AVENUE |
B022023233A92 | 2023-08-21 | 2023-09-16 | TEMPORARY PEDESTRIAN WALK | COZINE AVENUE, BROOKLYN, FROM STREET HENDRIX STREET TO STREET SCHENCK AVENUE |
B022023233A93 | 2023-08-21 | 2023-09-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | COZINE AVENUE, BROOKLYN, FROM STREET HENDRIX STREET TO STREET SCHENCK AVENUE |
B042023233A11 | 2023-08-21 | 2023-09-16 | REPAIR SIDEWALK | COZINE AVENUE, BROOKLYN, FROM STREET HENDRIX STREET TO STREET SCHENCK AVENUE |
Q012023230B33 | 2023-08-18 | 2023-09-08 | PAVE STREET-W/ ENGINEERING & INSP FEE | 59 AVENUE, QUEENS, FROM STREET 174 STREET TO STREET FRESH MEADOW LANE |
M042023219A22 | 2023-08-07 | 2023-08-19 | REPAIR SIDEWALK | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M012023219B78 | 2023-08-07 | 2023-08-19 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M022023219C39 | 2023-08-07 | 2023-08-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M022023219C38 | 2023-08-07 | 2023-08-19 | TEMPORARY PEDESTRIAN WALK | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
B012023215A81 | 2023-08-03 | 2023-08-10 | RESET, REPAIR OR REPLACE CURB-PROTECTED | COZINE AVENUE, BROOKLYN, FROM STREET HENDRIX STREET TO STREET VAN SICLEN AVENUE |
B042023215A16 | 2023-08-03 | 2023-08-10 | REPAIR SIDEWALK | COZINE AVENUE, BROOKLYN, FROM STREET HENDRIX STREET TO STREET VAN SICLEN AVENUE |
B022023215A99 | 2023-08-03 | 2023-08-10 | TEMPORARY PEDESTRIAN WALK | COZINE AVENUE, BROOKLYN, FROM STREET HENDRIX STREET TO STREET VAN SICLEN AVENUE |
B022023215A98 | 2023-08-03 | 2023-08-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | COZINE AVENUE, BROOKLYN, FROM STREET HENDRIX STREET TO STREET SCHENCK AVENUE |
B022023215B00 | 2023-08-03 | 2023-08-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | COZINE AVENUE, BROOKLYN, FROM STREET HENDRIX STREET TO STREET VAN SICLEN AVENUE |
B042023215A15 | 2023-08-03 | 2023-08-10 | REPAIR SIDEWALK | COZINE AVENUE, BROOKLYN, FROM STREET HENDRIX STREET TO STREET SCHENCK AVENUE |
B012023215A80 | 2023-08-03 | 2023-08-10 | RESET, REPAIR OR REPLACE CURB-PROTECTED | COZINE AVENUE, BROOKLYN, FROM STREET HENDRIX STREET TO STREET SCHENCK AVENUE |
B022023215A97 | 2023-08-03 | 2023-08-10 | TEMPORARY PEDESTRIAN WALK | COZINE AVENUE, BROOKLYN, FROM STREET HENDRIX STREET TO STREET SCHENCK AVENUE |
X012023209B26 | 2023-07-28 | 2023-08-25 | RESET, REPAIR OR REPLACE CURB | EVERGREEN AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
X022023209B58 | 2023-07-28 | 2023-08-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | EVERGREEN AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
X042023209A05 | 2023-07-28 | 2023-08-25 | REPAIR SIDEWALK | EVERGREEN AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
M012023209B30 | 2023-07-28 | 2023-08-28 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | WEST 126 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET LENOX AVENUE |
M012023209B29 | 2023-07-28 | 2023-08-28 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 125 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET LENOX AVENUE |
X022023209B57 | 2023-07-28 | 2023-08-25 | TEMPORARY PEDESTRIAN WALK | EVERGREEN AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
M042023208A30 | 2023-07-27 | 2023-08-28 | REPAIR SIDEWALK | BLEECKER STREET, MANHATTAN, FROM STREET MERCER STREET TO STREET WEST BROADWAY |
M042023208A27 | 2023-07-27 | 2023-08-21 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 7 AVENUE, MANHATTAN, FROM STREET WEST 153 STREET |
M042023208A28 | 2023-07-27 | 2023-08-26 | REPAIR SIDEWALK | HUDSON STREET, MANHATTAN, FROM STREET CHARLTON STREET TO STREET KING STREET |
M042023208A29 | 2023-07-27 | 2023-08-26 | REPAIR SIDEWALK | CHARLTON STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
B042023208A23 | 2023-07-27 | 2023-08-24 | REPAIR SIDEWALK | KENT AVENUE, BROOKLYN, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET |
M022023208B26 | 2023-07-27 | 2023-08-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | BLEECKER STREET, MANHATTAN, FROM STREET MERCER STREET TO STREET WEST BROADWAY |
M022023208B25 | 2023-07-27 | 2023-08-28 | TEMPORARY PEDESTRIAN WALK | BLEECKER STREET, MANHATTAN, FROM STREET MERCER STREET TO STREET WEST BROADWAY |
M022023208B24 | 2023-07-27 | 2023-08-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | CHARLTON STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M022023208B23 | 2023-07-27 | 2023-08-26 | TEMPORARY PEDESTRIAN WALK | CHARLTON STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M022023208B22 | 2023-07-27 | 2023-08-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | HUDSON STREET, MANHATTAN, FROM STREET CHARLTON STREET TO STREET KING STREET |
M022023208B21 | 2023-07-27 | 2023-08-26 | TEMPORARY PEDESTRIAN WALK | HUDSON STREET, MANHATTAN, FROM STREET CHARLTON STREET TO STREET KING STREET |
B012023208A95 | 2023-07-27 | 2023-08-24 | RESET, REPAIR OR REPLACE CURB-PROTECTED | KENT AVENUE, BROOKLYN, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET |
M012023208B45 | 2023-07-27 | 2023-08-26 | RESET, REPAIR OR REPLACE CURB-PROTECTED | HUDSON STREET, MANHATTAN, FROM STREET CHARLTON STREET TO STREET KING STREET |
M012023208B46 | 2023-07-27 | 2023-08-26 | RESET, REPAIR OR REPLACE CURB-PROTECTED | CHARLTON STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M012023208B47 | 2023-07-27 | 2023-08-28 | RESET, REPAIR OR REPLACE CURB-PROTECTED | BLEECKER STREET, MANHATTAN, FROM STREET MERCER STREET TO STREET WEST BROADWAY |
M042023208A26 | 2023-07-27 | 2023-08-21 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 7 AVENUE, MANHATTAN, FROM STREET WEST 152 STREET |
M042023208A25 | 2023-07-27 | 2023-08-21 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET |
M012023207A45 | 2023-07-26 | 2023-08-22 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WEST 28 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET BROADWAY |
M042023207A02 | 2023-07-26 | 2023-08-22 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEST 28 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET BROADWAY |
M012023195A72 | 2023-07-14 | 2023-08-12 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | WEST 29 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
M012023192B28 | 2023-07-11 | 2023-07-29 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | WEST 126 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET LENOX AVENUE |
M022023188C06 | 2023-07-07 | 2023-07-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | BLEECKER STREET, MANHATTAN, FROM STREET MERCER STREET TO STREET WEST BROADWAY |
M042023188A13 | 2023-07-07 | 2023-07-29 | REPAIR SIDEWALK | BLEECKER STREET, MANHATTAN, FROM STREET MERCER STREET TO STREET WEST BROADWAY |
M022023188C05 | 2023-07-07 | 2023-07-29 | TEMPORARY PEDESTRIAN WALK | BLEECKER STREET, MANHATTAN, FROM STREET MERCER STREET TO STREET WEST BROADWAY |
M012023188B00 | 2023-07-07 | 2023-07-29 | RESET, REPAIR OR REPLACE CURB-PROTECTED | BLEECKER STREET, MANHATTAN, FROM STREET MERCER STREET TO STREET WEST BROADWAY |
M012023188A98 | 2023-07-07 | 2023-08-05 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 125 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET LENOX AVENUE |
M012023188A97 | 2023-07-07 | 2023-07-29 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | WEST 126 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET LENOX AVENUE |
Q022023187A95 | 2023-07-06 | 2023-08-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | 47 AVENUE, QUEENS, FROM STREET VERNON BOULEVARD |
M042023187A03 | 2023-07-06 | 2023-07-22 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET |
Q022023187A94 | 2023-07-06 | 2023-08-04 | TEMPORARY PEDESTRIAN WALK | 47 AVENUE, QUEENS, FROM STREET VERNON BOULEVARD |
Q042023187A37 | 2023-07-06 | 2023-08-04 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 47 AVENUE, QUEENS, FROM STREET VERNON BOULEVARD |
M042023187A04 | 2023-07-06 | 2023-07-22 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 7 AVENUE, MANHATTAN, FROM STREET WEST 152 STREET |
M042023187A05 | 2023-07-06 | 2023-07-22 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 7 AVENUE, MANHATTAN, FROM STREET WEST 153 STREET |
M042023181A26 | 2023-06-30 | 2023-07-27 | REPAIR SIDEWALK | CHARLTON STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M042023181A25 | 2023-06-30 | 2023-07-27 | REPAIR SIDEWALK | HUDSON STREET, MANHATTAN, FROM STREET CHARLTON STREET TO STREET KING STREET |
M022023181F31 | 2023-06-30 | 2023-07-27 | TEMPORARY PEDESTRIAN WALK | HUDSON STREET, MANHATTAN, FROM STREET CHARLTON STREET TO STREET KING STREET |
M012023181B53 | 2023-06-30 | 2023-08-04 | PAVE STREET-W/ ENGINEERING & INSP FEE | 9 AVENUE, MANHATTAN, FROM STREET NJ TRANSIT RAILROAD TO STREET WEST 31 STREET |
M012023181B54 | 2023-06-30 | 2023-08-04 | PAVE STREET-W/ ENGINEERING & INSP FEE | 9 AVENUE, MANHATTAN, FROM STREET WEST 31 STREET |
M012023181B55 | 2023-06-30 | 2023-08-04 | PAVE STREET-W/ ENGINEERING & INSP FEE | 9 AVENUE, MANHATTAN, FROM STREET NJ TRANSIT RAILROAD TO STREET WEST 33 STREET |
M012023181C26 | 2023-06-30 | 2023-07-27 | RESET, REPAIR OR REPLACE CURB-PROTECTED | HUDSON STREET, MANHATTAN, FROM STREET CHARLTON STREET TO STREET KING STREET |
M012023181C27 | 2023-06-30 | 2023-07-27 | RESET, REPAIR OR REPLACE CURB-PROTECTED | CHARLTON STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M022023181F33 | 2023-06-30 | 2023-07-27 | TEMPORARY PEDESTRIAN WALK | CHARLTON STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M022023181F32 | 2023-06-30 | 2023-07-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | HUDSON STREET, MANHATTAN, FROM STREET CHARLTON STREET TO STREET KING STREET |
M022023181F34 | 2023-06-30 | 2023-07-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | CHARLTON STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M012023180B02 | 2023-06-29 | 2023-08-04 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 31 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET LINCOLN TNNL APPROACH |
M012023180B03 | 2023-06-29 | 2023-08-04 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 31 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET LINCOLN TNNL APPROACH |
M042023174A07 | 2023-06-23 | 2023-07-22 | REPAIR SIDEWALK | WEST 42 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
M012023166B22 | 2023-06-15 | 2023-07-09 | RESET, REPAIR OR REPLACE CURB | 5 AVENUE, MANHATTAN, FROM STREET EAST 28 STREET TO STREET EAST 29 STREET |
M042023166A12 | 2023-06-15 | 2023-07-09 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 5 AVENUE, MANHATTAN, FROM STREET EAST 28 STREET TO STREET EAST 29 STREET |
M042023165A09 | 2023-06-14 | 2023-07-09 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 5 AVENUE, MANHATTAN, FROM STREET EAST 28 STREET TO STREET EAST 29 STREET |
M012023165B09 | 2023-06-14 | 2023-07-09 | RESET, REPAIR OR REPLACE CURB | 5 AVENUE, MANHATTAN, FROM STREET EAST 28 STREET TO STREET EAST 29 STREET |
M042023165A01 | 2023-06-14 | 2023-07-13 | REPLACE SIDEWALK | 5 AVENUE, MANHATTAN, FROM STREET EAST 28 STREET TO STREET EAST 29 STREET |
M012023165A76 | 2023-06-14 | 2023-07-13 | RESET, REPAIR OR REPLACE CURB | 5 AVENUE, MANHATTAN, FROM STREET EAST 28 STREET TO STREET EAST 29 STREET |
Q012023160C13 | 2023-06-09 | 2023-07-06 | PAVE STREET-W/ ENGINEERING & INSP FEE | BEACH 129 STREET, QUEENS, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE |
Q012023160C14 | 2023-06-09 | 2023-07-06 | PAVE STREET-W/ ENGINEERING & INSP FEE | BEACH 129 STREET, QUEENS, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE |
Q012023160C12 | 2023-06-09 | 2023-07-06 | PAVE STREET-W/ ENGINEERING & INSP FEE | BEACH 129 STREET, QUEENS, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE |
Q042023150A23 | 2023-05-30 | 2023-06-30 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 47 AVENUE, QUEENS, FROM STREET VERNON BOULEVARD |
Q022023150A67 | 2023-05-30 | 2023-06-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | 47 AVENUE, QUEENS, FROM STREET VERNON BOULEVARD |
M012023150B41 | 2023-05-30 | 2023-06-29 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | WEST 126 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET LENOX AVENUE |
M012023150B40 | 2023-05-30 | 2023-06-29 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WEST 126 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET LENOX AVENUE |
M042023150A10 | 2023-05-30 | 2023-06-29 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEST 126 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET LENOX AVENUE |
Q022023150A66 | 2023-05-30 | 2023-06-30 | TEMPORARY PEDESTRIAN WALK | 47 AVENUE, QUEENS, FROM STREET VERNON BOULEVARD |
M022023146B14 | 2023-05-26 | 2023-06-24 | TEMPORARY PEDESTRIAN WALK | WEST 84 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
M012023146B25 | 2023-05-26 | 2023-06-24 | RESET, REPAIR OR REPLACE CURB | WEST 84 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
M042023146A18 | 2023-05-26 | 2023-06-24 | REPLACE SIDEWALK | WEST 84 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
M042023146A19 | 2023-05-26 | 2023-06-24 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | CENTRAL PARK WEST, MANHATTAN, FROM STREET WEST 84 STREET |
M022023146B15 | 2023-05-26 | 2023-06-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 84 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
M042023143A17 | 2023-05-23 | 2023-06-22 | REPAIR SIDEWALK | WEST 42 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
M042023143A16 | 2023-05-23 | 2023-06-22 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEST 125 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET LENOX AVENUE |
M012023135A57 | 2023-05-15 | 2023-06-12 | RESET, REPAIR OR REPLACE CURB-PROTECTED | EAST 74 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M022023135A91 | 2023-05-15 | 2023-06-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 74 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M042023135A07 | 2023-05-15 | 2023-06-12 | REPAIR SIDEWALK | EAST 74 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M022023135A90 | 2023-05-15 | 2023-06-12 | TEMPORARY PEDESTRIAN WALK | EAST 74 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012023132B08 | 2023-05-12 | 2023-06-10 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 34 STREET, MANHATTAN, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD |
M012023132B07 | 2023-05-12 | 2023-06-10 | PAVE STREET-W/ ENGINEERING & INSP FEE | HUDSON BOULEVARD EAST, MANHATTAN, FROM STREET WEST 34 STREET TO STREET WEST 35 STREET |
M012023132B10 | 2023-05-12 | 2023-06-10 | PAVE STREET-W/ ENGINEERING & INSP FEE | HUDSON BOULEVARD, MANHATTAN, FROM STREET WEST 34 STREET |
M012023132B11 | 2023-05-12 | 2023-06-10 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 34 STREET, MANHATTAN, FROM STREET 10 AVENUE |
M012023132B09 | 2023-05-12 | 2023-06-10 | PAVE STREET-W/ ENGINEERING & INSP FEE | 10 AVENUE, MANHATTAN, FROM STREET WEST 34 STREET TO STREET WEST 35 STREET |
Q042023129A26 | 2023-05-09 | 2023-05-31 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 47 AVENUE, QUEENS, FROM STREET VERNON BOULEVARD |
Q022023129C14 | 2023-05-09 | 2023-05-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | 47 AVENUE, QUEENS, FROM STREET VERNON BOULEVARD |
Q022023129C13 | 2023-05-09 | 2023-05-31 | TEMPORARY PEDESTRIAN WALK | 47 AVENUE, QUEENS, FROM STREET VERNON BOULEVARD |
M022023124B67 | 2023-05-04 | 2023-06-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | GANSEVOORT STREET, MANHATTAN, FROM STREET WASHINGTON STREET |
M012023124B47 | 2023-05-04 | 2023-05-31 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WEST 126 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET LENOX AVENUE |
M012023124B48 | 2023-05-04 | 2023-05-30 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | WEST 126 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET LENOX AVENUE |
M022023124B66 | 2023-05-04 | 2023-06-01 | TEMPORARY PEDESTRIAN WALK | GANSEVOORT STREET, MANHATTAN, FROM STREET WASHINGTON STREET |
M022023124B64 | 2023-05-04 | 2023-06-01 | TEMPORARY PEDESTRIAN WALK | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
M022023124B65 | 2023-05-04 | 2023-06-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
X042023124A09 | 2023-05-04 | 2023-06-01 | REPAIR SIDEWALK | STORY AVENUE, BRONX, FROM STREET COLGATE AVENUE TO STREET EVERGREEN AVENUE |
X042023124A08 | 2023-05-04 | 2023-06-01 | REPAIR SIDEWALK | COLGATE AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
M042023124A07 | 2023-05-04 | 2023-06-01 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
M042023124A08 | 2023-05-04 | 2023-05-31 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEST 126 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET LENOX AVENUE |
M042023124A09 | 2023-05-04 | 2023-06-01 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GANSEVOORT STREET, MANHATTAN, FROM STREET WASHINGTON STREET |
X022023124B10 | 2023-05-04 | 2023-06-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | STORY AVENUE, BRONX, FROM STREET COLGATE AVENUE TO STREET EVERGREEN AVENUE |
X022023124B09 | 2023-05-04 | 2023-06-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | COLGATE AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
X022023124B08 | 2023-05-04 | 2023-06-01 | TEMPORARY PEDESTRIAN WALK | COLGATE AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
M022023117A98 | 2023-04-27 | 2023-05-25 | TEMPORARY PEDESTRIAN WALK | CENTRAL PARK WEST, MANHATTAN, FROM STREET WEST 83 STREET TO STREET WEST 84 STREET |
M012023117A99 | 2023-04-27 | 2023-05-25 | RESET, REPAIR OR REPLACE CURB | WEST 84 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
M012023117B00 | 2023-04-27 | 2023-05-25 | RESET, REPAIR OR REPLACE CURB | CENTRAL PARK WEST, MANHATTAN, FROM STREET WEST 83 STREET TO STREET WEST 84 STREET |
M022023117A99 | 2023-04-27 | 2023-05-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 84 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
M022023117A97 | 2023-04-27 | 2023-05-25 | TEMPORARY PEDESTRIAN WALK | WEST 84 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
M042023117A05 | 2023-04-27 | 2023-05-25 | REPLACE SIDEWALK | WEST 84 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
M042023117A06 | 2023-04-27 | 2023-05-25 | REPLACE SIDEWALK | CENTRAL PARK WEST, MANHATTAN, FROM STREET WEST 83 STREET TO STREET WEST 84 STREET |
M042023117A07 | 2023-04-27 | 2023-05-24 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | CENTRAL PARK WEST, MANHATTAN, FROM STREET WEST 84 STREET |
M022023117B00 | 2023-04-27 | 2023-05-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | CENTRAL PARK WEST, MANHATTAN, FROM STREET WEST 83 STREET TO STREET WEST 84 STREET |
M042023115A15 | 2023-04-25 | 2023-05-23 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | MACOMBS PLACE, MANHATTAN, FROM STREET WEST 151 STREET |
M042023115A12 | 2023-04-25 | 2023-05-23 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEST 125 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET LENOX AVENUE |
M042023115A13 | 2023-04-25 | 2023-05-23 | REPAIR SIDEWALK | WEST 42 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
M042023115A14 | 2023-04-25 | 2023-05-23 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET |
X022023108A35 | 2023-04-18 | 2023-05-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | WESTCHESTER AVENUE, BRONX, FROM STREET BERGEN AVENUE TO STREET EAST 150 STREET |
X042023108A23 | 2023-04-18 | 2023-05-18 | REPAIR SIDEWALK | WESTCHESTER AVENUE, BRONX, FROM STREET BERGEN AVENUE TO STREET EAST 150 STREET |
X012023108B49 | 2023-04-18 | 2023-05-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEBSTER AVENUE, BRONX, FROM STREET EAST 199 STREET TO STREET OLIVER PLACE |
X022023108A34 | 2023-04-18 | 2023-05-18 | TEMPORARY PEDESTRIAN WALK | WESTCHESTER AVENUE, BRONX, FROM STREET BERGEN AVENUE TO STREET EAST 150 STREET |
X012023102A33 | 2023-04-12 | 2023-05-13 | RESET, REPAIR OR REPLACE CURB | EVERGREEN AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
M042023102A07 | 2023-04-12 | 2023-05-13 | REPAIR SIDEWALK | EAST 74 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012023102D53 | 2023-04-12 | 2023-04-21 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | BROADWAY, MANHATTAN, FROM STREET WEST 84 STREET TO STREET WEST 85 STREET |
M012023102D54 | 2023-04-12 | 2023-05-13 | RESET, REPAIR OR REPLACE CURB-PROTECTED | EAST 74 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
X022023102A41 | 2023-04-12 | 2023-05-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | EVERGREEN AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
X042023102A01 | 2023-04-12 | 2023-05-13 | REPAIR SIDEWALK | EVERGREEN AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
X022023102A40 | 2023-04-12 | 2023-05-13 | TEMPORARY PEDESTRIAN WALK | EVERGREEN AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
M022023102B42 | 2023-04-12 | 2023-05-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 74 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M022023102B41 | 2023-04-12 | 2023-05-13 | TEMPORARY PEDESTRIAN WALK | EAST 74 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012023097A95 | 2023-04-07 | 2023-04-21 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | BROADWAY, MANHATTAN, FROM STREET WEST 84 STREET TO STREET WEST 85 STREET |
M012023097A97 | 2023-04-07 | 2023-04-21 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | BROADWAY, MANHATTAN, FROM STREET WEST 85 STREET |
M012023097A96 | 2023-04-07 | 2023-04-21 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 85 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M042023094A08 | 2023-04-04 | 2023-05-03 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 128 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012023094B44 | 2023-04-04 | 2023-05-03 | RESET, REPAIR OR REPLACE CURB-PROTECTED | EAST 128 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
X022023094B37 | 2023-04-04 | 2023-05-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | COLGATE AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
X022023094B38 | 2023-04-04 | 2023-05-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | STORY AVENUE, BRONX, FROM STREET COLGATE AVENUE TO STREET EVERGREEN AVENUE |
X022023094B36 | 2023-04-04 | 2023-05-02 | TEMPORARY PEDESTRIAN WALK | COLGATE AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
X042023094A10 | 2023-04-04 | 2023-05-02 | REPAIR SIDEWALK | STORY AVENUE, BRONX, FROM STREET COLGATE AVENUE TO STREET EVERGREEN AVENUE |
X042023094A09 | 2023-04-04 | 2023-05-02 | REPAIR SIDEWALK | COLGATE AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
M022023093C84 | 2023-04-03 | 2023-05-02 | TEMPORARY PEDESTRIAN WALK | GANSEVOORT STREET, MANHATTAN, FROM STREET WASHINGTON STREET |
M022023093C86 | 2023-04-03 | 2023-05-02 | TEMPORARY PEDESTRIAN WALK | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
M022023093C87 | 2023-04-03 | 2023-05-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
M042023093A11 | 2023-04-03 | 2023-05-02 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
M022023093C85 | 2023-04-03 | 2023-05-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | GANSEVOORT STREET, MANHATTAN, FROM STREET WASHINGTON STREET |
M042023093A10 | 2023-04-03 | 2023-05-02 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GANSEVOORT STREET, MANHATTAN, FROM STREET WASHINGTON STREET |
M042023089A09 | 2023-03-30 | 2023-04-23 | REPAIR SIDEWALK | WEST 42 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
X022023088A97 | 2023-03-29 | 2023-04-18 | TEMPORARY PEDESTRIAN WALK | WESTCHESTER AVENUE, BRONX, FROM STREET BERGEN AVENUE TO STREET EAST 150 STREET |
X042023088A05 | 2023-03-29 | 2023-04-18 | REPAIR SIDEWALK | WESTCHESTER AVENUE, BRONX, FROM STREET BERGEN AVENUE TO STREET EAST 150 STREET |
X022023088A98 | 2023-03-29 | 2023-04-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | WESTCHESTER AVENUE, BRONX, FROM STREET BERGEN AVENUE TO STREET EAST 150 STREET |
Q022023086C26 | 2023-03-27 | 2023-04-23 | TEMPORARY PEDESTRIAN WALK | 47 AVENUE, QUEENS, FROM STREET VERNON BOULEVARD |
X042023086A18 | 2023-03-27 | 2023-04-25 | REPAIR SIDEWALK | STORY AVENUE, BRONX, FROM STREET EVERGREEN AVENUE TO STREET WHEELER AVENUE |
M042023086A37 | 2023-03-27 | 2023-04-23 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET |
M042023086A38 | 2023-03-27 | 2023-04-23 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | MACOMBS PLACE, MANHATTAN, FROM STREET WEST 151 STREET |
M042023086A39 | 2023-03-27 | 2023-04-23 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEST 125 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET LENOX AVENUE |
X022023086C44 | 2023-03-27 | 2023-04-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | STORY AVENUE, BRONX, FROM STREET EVERGREEN AVENUE TO STREET WHEELER AVENUE |
Q042023086A29 | 2023-03-27 | 2023-04-23 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 47 AVENUE, QUEENS, FROM STREET VERNON BOULEVARD |
Q022023086C27 | 2023-03-27 | 2023-04-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | 47 AVENUE, QUEENS, FROM STREET VERNON BOULEVARD |
M022023080E44 | 2023-03-21 | 2023-04-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 74 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M042023080A08 | 2023-03-21 | 2023-04-13 | REPAIR SIDEWALK | EAST 74 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012023080B71 | 2023-03-21 | 2023-04-13 | RESET, REPAIR OR REPLACE CURB-PROTECTED | EAST 74 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M022023080E43 | 2023-03-21 | 2023-04-13 | TEMPORARY PEDESTRIAN WALK | EAST 74 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
B042023079A26 | 2023-03-20 | 2023-04-18 | REPAIR SIDEWALK | EUCLID AVENUE, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LINDEN BOULEVARD |
X022023075A59 | 2023-03-16 | 2023-04-13 | TEMPORARY PEDESTRIAN WALK | EVERGREEN AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
X012023075A51 | 2023-03-16 | 2023-04-13 | RESET, REPAIR OR REPLACE CURB | EVERGREEN AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
X042023075A10 | 2023-03-16 | 2023-04-13 | REPAIR SIDEWALK | EVERGREEN AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
X022023075A60 | 2023-03-16 | 2023-04-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | EVERGREEN AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
X012023074B58 | 2023-03-15 | 2023-04-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEBSTER AVENUE, BRONX, FROM STREET EAST 199 STREET TO STREET OLIVER PLACE |
X022023074C72 | 2023-03-15 | 2023-04-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEBSTER AVENUE, BRONX, FROM STREET EAST 199 STREET TO STREET OLIVER PLACE |
X012023074B57 | 2023-03-15 | 2023-04-11 | RESET, REPAIR OR REPLACE CURB | WEBSTER AVENUE, BRONX, FROM STREET EAST 199 STREET TO STREET OLIVER PLACE |
X022023074C71 | 2023-03-15 | 2023-04-18 | TEMPORARY PEDESTRIAN WALK | WEBSTER AVENUE, BRONX, FROM STREET EAST 199 STREET TO STREET OLIVER PLACE |
X042023074A15 | 2023-03-15 | 2023-04-18 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEBSTER AVENUE, BRONX, FROM STREET EAST 199 STREET TO STREET OLIVER PLACE |
X042023073A39 | 2023-03-14 | 2023-04-13 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 160 STREET, BRONX, FROM STREET FOREST AVENUE |
X042023073A38 | 2023-03-14 | 2023-04-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | FOREST AVENUE, BRONX, FROM STREET EAST 158 STREET TO STREET EAST 160 STREET |
X042023061A04 | 2023-03-02 | 2023-03-14 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 160 STREET, BRONX, FROM STREET FOREST AVENUE |
X042023061A03 | 2023-03-02 | 2023-03-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | FOREST AVENUE, BRONX, FROM STREET EAST 158 STREET TO STREET EAST 160 STREET |
M042023059A25 | 2023-02-28 | 2023-03-30 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GANSEVOORT STREET, MANHATTAN, FROM STREET WASHINGTON STREET |
M022023059B48 | 2023-02-28 | 2023-03-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
M022023059B47 | 2023-02-28 | 2023-03-30 | TEMPORARY PEDESTRIAN WALK | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
M022023059B46 | 2023-02-28 | 2023-03-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | GANSEVOORT STREET, MANHATTAN, FROM STREET WASHINGTON STREET |
M022023059B45 | 2023-02-28 | 2023-03-30 | TEMPORARY PEDESTRIAN WALK | GANSEVOORT STREET, MANHATTAN, FROM STREET WASHINGTON STREET |
M042023059A26 | 2023-02-28 | 2023-03-30 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
X022023055B39 | 2023-02-24 | 2023-03-27 | TEMPORARY PEDESTRIAN WALK | WHEELER AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
M042023055A02 | 2023-02-24 | 2023-03-23 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET |
X042023055A07 | 2023-02-24 | 2023-03-27 | REPAIR SIDEWALK | STORY AVENUE, BRONX, FROM STREET EVERGREEN AVENUE TO STREET WHEELER AVENUE |
M042023055A03 | 2023-02-24 | 2023-03-23 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | MACOMBS PLACE, MANHATTAN, FROM STREET WEST 151 STREET |
X042023055A06 | 2023-02-24 | 2023-03-27 | REPAIR SIDEWALK | WHEELER AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
M042023055A04 | 2023-02-24 | 2023-03-24 | REPAIR SIDEWALK | WEST 42 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
X022023055B41 | 2023-02-24 | 2023-03-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | STORY AVENUE, BRONX, FROM STREET EVERGREEN AVENUE TO STREET WHEELER AVENUE |
X022023055B40 | 2023-02-24 | 2023-03-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | WHEELER AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
Q042023054A33 | 2023-02-23 | 2023-03-24 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 47 AVENUE, QUEENS, FROM STREET VERNON BOULEVARD |
Q022023054B25 | 2023-02-23 | 2023-03-24 | TEMPORARY PEDESTRIAN WALK | 47 AVENUE, QUEENS, FROM STREET VERNON BOULEVARD |
M042023054A05 | 2023-02-23 | 2023-03-24 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEST 125 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET LENOX AVENUE |
Q022023054B26 | 2023-02-23 | 2023-03-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | 47 AVENUE, QUEENS, FROM STREET VERNON BOULEVARD |
B022023044A90 | 2023-02-13 | 2023-03-14 | TEMPORARY PEDESTRIAN WALK | CONEY ISLAND AVENUE, BROOKLYN, FROM STREET 18 AVENUE TO STREET DITMAS AVENUE |
B022023044A91 | 2023-02-13 | 2023-03-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | CONEY ISLAND AVENUE, BROOKLYN, FROM STREET 18 AVENUE TO STREET DITMAS AVENUE |
B042023044A10 | 2023-02-13 | 2023-03-14 | REPAIR SIDEWALK | CONEY ISLAND AVENUE, BROOKLYN, FROM STREET 18 AVENUE TO STREET DITMAS AVENUE |
X012023040A56 | 2023-02-09 | 2023-03-07 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | MICKLE AVENUE, BRONX, FROM STREET BOSTON ROAD TO STREET TILLOTSON AVENUE |
X012023038A56 | 2023-02-07 | 2023-03-07 | PAVE STREET-W/ ENGINEERING & INSP FEE | EASTCHESTER ROAD, BRONX, FROM STREET BOSTON ROAD TO STREET TILLOTSON AVENUE |
X012023038A57 | 2023-02-07 | 2023-03-07 | PAVE STREET-W/ ENGINEERING & INSP FEE | BOSTON ROAD, BRONX, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE |
X012023038A55 | 2023-02-07 | 2023-03-07 | PAVE STREET-W/ ENGINEERING & INSP FEE | TILLOTSON AVENUE, BRONX, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE |
X012023033A96 | 2023-02-02 | 2023-02-27 | RESET, REPAIR OR REPLACE CURB | BOSTON ROAD, BRONX, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE |
X022023033B03 | 2023-02-02 | 2023-02-27 | TEMPORARY PEDESTRIAN WALK | BOSTON ROAD, BRONX, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE |
X022023033B06 | 2023-02-02 | 2023-02-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | WHEELER AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
X022023033B05 | 2023-02-02 | 2023-02-25 | TEMPORARY PEDESTRIAN WALK | WHEELER AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
X022023033B04 | 2023-02-02 | 2023-02-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | BOSTON ROAD, BRONX, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE |
X042023033A04 | 2023-02-02 | 2023-02-27 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BOSTON ROAD, BRONX, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE |
X042023033A05 | 2023-02-02 | 2023-02-25 | REPAIR SIDEWALK | WHEELER AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
X042023033A06 | 2023-02-02 | 2023-02-25 | REPAIR SIDEWALK | STORY AVENUE, BRONX, FROM STREET EVERGREEN AVENUE TO STREET WHEELER AVENUE |
X022023033B07 | 2023-02-02 | 2023-02-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | STORY AVENUE, BRONX, FROM STREET EVERGREEN AVENUE TO STREET WHEELER AVENUE |
M022023032C43 | 2023-02-01 | 2023-02-28 | TEMPORARY PEDESTRIAN WALK | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
M022023032C44 | 2023-02-01 | 2023-02-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
M022023032C42 | 2023-02-01 | 2023-02-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | GANSEVOORT STREET, MANHATTAN, FROM STREET WASHINGTON STREET |
M022023032C41 | 2023-02-01 | 2023-02-28 | TEMPORARY PEDESTRIAN WALK | GANSEVOORT STREET, MANHATTAN, FROM STREET WASHINGTON STREET |
M042023032A10 | 2023-02-01 | 2023-02-28 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GANSEVOORT STREET, MANHATTAN, FROM STREET WASHINGTON STREET |
M042023032A11 | 2023-02-01 | 2023-02-28 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
M042023026A14 | 2023-01-26 | 2023-02-22 | REPAIR SIDEWALK | WEST 42 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
Q042023026A15 | 2023-01-26 | 2023-02-17 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 47 AVENUE, QUEENS, FROM STREET VERNON BOULEVARD |
M022023026B59 | 2023-01-26 | 2023-02-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 76 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M022023026B58 | 2023-01-26 | 2023-02-21 | TEMPORARY PEDESTRIAN WALK | EAST 76 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
Q022023026A79 | 2023-01-26 | 2023-02-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | 47 AVENUE, QUEENS, FROM STREET VERNON BOULEVARD |
Q022023026A78 | 2023-01-26 | 2023-02-17 | TEMPORARY PEDESTRIAN WALK | 47 AVENUE, QUEENS, FROM STREET VERNON BOULEVARD |
M042023026A15 | 2023-01-26 | 2023-02-21 | REPAIR SIDEWALK | EAST 76 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
X042023025A12 | 2023-01-25 | 2023-02-20 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | MICKLE AVENUE, BRONX, FROM STREET TILLOTSON AVENUE |
X042023025A11 | 2023-01-25 | 2023-02-20 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | MICKLE AVENUE, BRONX, FROM STREET TILLOTSON AVENUE |
X042023025A10 | 2023-01-25 | 2023-02-20 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BOSTON ROAD, BRONX, FROM STREET EASTCHESTER ROAD |
X042023025A09 | 2023-01-25 | 2023-02-20 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BOSTON ROAD, BRONX, FROM STREET EASTCHESTER ROAD |
X042023025A08 | 2023-01-25 | 2023-02-20 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BOSTON ROAD, BRONX, FROM STREET EASTCHESTER ROAD |
X042023025A05 | 2023-01-25 | 2023-02-20 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EASTCHESTER ROAD, BRONX, FROM STREET TILLOTSON AVENUE |
X042023025A07 | 2023-01-25 | 2023-02-20 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EASTCHESTER ROAD, BRONX, FROM STREET TILLOTSON AVENUE |
X042023025A16 | 2023-01-25 | 2023-02-20 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BOSTON ROAD, BRONX, FROM STREET MICKLE AVENUE |
X042023025A15 | 2023-01-25 | 2023-02-20 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BOSTON ROAD, BRONX, FROM STREET MICKLE AVENUE |
X042023025A06 | 2023-01-25 | 2023-02-20 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EASTCHESTER ROAD, BRONX, FROM STREET TILLOTSON AVENUE |
X042023025A14 | 2023-01-25 | 2023-02-20 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BOSTON ROAD, BRONX, FROM STREET MICKLE AVENUE |
X042023025A13 | 2023-01-25 | 2023-02-20 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | MICKLE AVENUE, BRONX, FROM STREET TILLOTSON AVENUE |
M042023017A16 | 2023-01-17 | 2023-02-08 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | MACOMBS PLACE, MANHATTAN, FROM STREET WEST 151 STREET |
M042023017A14 | 2023-01-17 | 2023-02-22 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEST 125 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET LENOX AVENUE |
B042023017A24 | 2023-01-17 | 2023-02-09 | REPAIR SIDEWALK | CONEY ISLAND AVENUE, BROOKLYN, FROM STREET CORTELYOU ROAD TO STREET DORCHESTER ROAD |
B022023017C60 | 2023-01-17 | 2023-02-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | CONEY ISLAND AVENUE, BROOKLYN, FROM STREET CORTELYOU ROAD TO STREET DORCHESTER ROAD |
B022023017C59 | 2023-01-17 | 2023-02-10 | TEMPORARY PEDESTRIAN WALK | CONEY ISLAND AVENUE, BROOKLYN, FROM STREET CORTELYOU ROAD TO STREET DORCHESTER ROAD |
M042023017A15 | 2023-01-17 | 2023-02-08 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET |
B042023017A25 | 2023-01-17 | 2023-02-09 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | JAY STREET, BROOKLYN, FROM STREET WILLOUGHBY STREET |
M042023013A14 | 2023-01-13 | 2023-02-07 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | VANDAM STREET, MANHATTAN, FROM STREET VARICK STREET |
M042023013A13 | 2023-01-13 | 2023-02-07 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | CHARLTON STREET, MANHATTAN, FROM STREET VARICK STREET |
M012023012B16 | 2023-01-12 | 2023-01-26 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | MADISON AVENUE, MANHATTAN, FROM STREET EAST 111 STREET TO STREET EAST 112 STREET |
M012022364A64 | 2022-12-30 | 2023-01-28 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 128 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012022364A63 | 2022-12-30 | 2023-01-28 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 127 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
X042022363A12 | 2022-12-29 | 2023-01-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BOSTON ROAD, BRONX, FROM STREET MICKLE AVENUE |
X042022363A13 | 2022-12-29 | 2023-01-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EASTCHESTER ROAD, BRONX, FROM STREET TILLOTSON AVENUE |
X042022363A14 | 2022-12-29 | 2023-01-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EASTCHESTER ROAD, BRONX, FROM STREET TILLOTSON AVENUE |
X042022363A15 | 2022-12-29 | 2023-01-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BOSTON ROAD, BRONX, FROM STREET EASTCHESTER ROAD |
X042022363A16 | 2022-12-29 | 2023-01-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BOSTON ROAD, BRONX, FROM STREET EASTCHESTER ROAD |
X042022363A17 | 2022-12-29 | 2023-01-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | MICKLE AVENUE, BRONX, FROM STREET TILLOTSON AVENUE |
X042022363A18 | 2022-12-29 | 2023-01-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | MICKLE AVENUE, BRONX, FROM STREET TILLOTSON AVENUE |
X042022363A19 | 2022-12-29 | 2023-01-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BOSTON ROAD, BRONX, FROM STREET MICKLE AVENUE |
X042022363A20 | 2022-12-29 | 2023-01-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BOSTON ROAD, BRONX, FROM STREET MICKLE AVENUE |
X042022363A21 | 2022-12-29 | 2023-01-28 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MICKLE AVENUE, BRONX, FROM STREET BOSTON ROAD TO STREET TILLOTSON AVENUE |
X042022363A22 | 2022-12-29 | 2023-01-28 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | TILLOTSON AVENUE, BRONX, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE |
X042022363A23 | 2022-12-29 | 2023-01-28 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EASTCHESTER ROAD, BRONX, FROM STREET BOSTON ROAD TO STREET TILLOTSON AVENUE |
X042022363A24 | 2022-12-29 | 2023-01-28 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BOSTON ROAD, BRONX, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE |
X022022363C74 | 2022-12-29 | 2023-01-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | BOSTON ROAD, BRONX, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE |
X022022363C73 | 2022-12-29 | 2023-01-28 | TEMPORARY PEDESTRIAN WALK | BOSTON ROAD, BRONX, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE |
X022022363C72 | 2022-12-29 | 2023-01-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | EASTCHESTER ROAD, BRONX, FROM STREET BOSTON ROAD TO STREET TILLOTSON AVENUE |
X022022363C71 | 2022-12-29 | 2023-01-28 | TEMPORARY PEDESTRIAN WALK | EASTCHESTER ROAD, BRONX, FROM STREET BOSTON ROAD TO STREET TILLOTSON AVENUE |
X022022363C70 | 2022-12-29 | 2023-01-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | TILLOTSON AVENUE, BRONX, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE |
X022022363C69 | 2022-12-29 | 2023-01-28 | TEMPORARY PEDESTRIAN WALK | TILLOTSON AVENUE, BRONX, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE |
X022022363C68 | 2022-12-29 | 2023-01-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | MICKLE AVENUE, BRONX, FROM STREET BOSTON ROAD TO STREET TILLOTSON AVENUE |
X022022363C67 | 2022-12-29 | 2023-01-28 | TEMPORARY PEDESTRIAN WALK | MICKLE AVENUE, BRONX, FROM STREET BOSTON ROAD TO STREET TILLOTSON AVENUE |
X012022363A47 | 2022-12-29 | 2023-01-28 | RESET, REPAIR OR REPLACE CURB | BOSTON ROAD, BRONX, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE |
X012022363A46 | 2022-12-29 | 2023-01-28 | RESET, REPAIR OR REPLACE CURB | EASTCHESTER ROAD, BRONX, FROM STREET BOSTON ROAD TO STREET TILLOTSON AVENUE |
X012022363A45 | 2022-12-29 | 2023-01-28 | RESET, REPAIR OR REPLACE CURB | TILLOTSON AVENUE, BRONX, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE |
X012022363A39 | 2022-12-29 | 2023-01-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | FOREST AVENUE, BRONX, FROM STREET EAST 158 STREET TO STREET EAST 160 STREET |
X042022363A09 | 2022-12-29 | 2023-01-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EASTCHESTER ROAD, BRONX, FROM STREET TILLOTSON AVENUE |
X012022363A38 | 2022-12-29 | 2023-01-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 160 STREET, BRONX, FROM STREET FOREST AVENUE TO STREET TINTON AVENUE |
X042022363A10 | 2022-12-29 | 2023-01-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BOSTON ROAD, BRONX, FROM STREET EASTCHESTER ROAD |
X042022363A11 | 2022-12-29 | 2023-01-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | MICKLE AVENUE, BRONX, FROM STREET TILLOTSON AVENUE |
Q042022362A07 | 2022-12-28 | 2023-01-28 | REPAIR SIDEWALK | NATIONAL STREET, QUEENS, FROM STREET 42 AVENUE TO STREET 43 AVENUE |
Q042022362A08 | 2022-12-28 | 2023-01-28 | REPAIR SIDEWALK | 42 AVENUE, QUEENS, FROM STREET BEND TO STREET NATIONAL STREET |
Q022022362C08 | 2022-12-28 | 2023-01-28 | TEMPORARY PEDESTRIAN WALK | NATIONAL STREET, QUEENS, FROM STREET 42 AVENUE TO STREET 43 AVENUE |
Q022022362C11 | 2022-12-28 | 2023-01-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | 42 AVENUE, QUEENS, FROM STREET BEND TO STREET NATIONAL STREET |
Q022022362C10 | 2022-12-28 | 2023-01-28 | TEMPORARY PEDESTRIAN WALK | 42 AVENUE, QUEENS, FROM STREET BEND TO STREET NATIONAL STREET |
Q022022362C09 | 2022-12-28 | 2023-01-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | NATIONAL STREET, QUEENS, FROM STREET 42 AVENUE TO STREET 43 AVENUE |
M042022362A08 | 2022-12-28 | 2023-01-27 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 111 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M012022347A50 | 2022-12-13 | 2022-12-31 | INSTALL TRAFFIC STREET LIGHTS | EAST 127 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M022022336A96 | 2022-12-02 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VANDAM STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET |
M042022336A02 | 2022-12-02 | 2022-12-31 | REPAIR SIDEWALK | VANDAM STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET |
M022022336A98 | 2022-12-02 | 2022-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | VANDAM STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET |
M022022336A97 | 2022-12-02 | 2022-12-31 | TEMPORARY PEDESTRIAN WALK | VANDAM STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET |
M022022336A95 | 2022-12-02 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VANDAM STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET |
M042022332A04 | 2022-11-28 | 2022-12-28 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 111 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
Q022022332A92 | 2022-11-28 | 2022-12-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | 42 AVENUE, QUEENS, FROM STREET BEND TO STREET NATIONAL STREET |
Q022022332A94 | 2022-11-28 | 2022-12-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | NATIONAL STREET, QUEENS, FROM STREET 42 AVENUE TO STREET 43 AVENUE |
Q022022332A91 | 2022-11-28 | 2022-12-29 | TEMPORARY PEDESTRIAN WALK | 42 AVENUE, QUEENS, FROM STREET BEND TO STREET NATIONAL STREET |
Q022022332A93 | 2022-11-28 | 2022-12-29 | TEMPORARY PEDESTRIAN WALK | NATIONAL STREET, QUEENS, FROM STREET 42 AVENUE TO STREET 43 AVENUE |
Q042022332A16 | 2022-11-28 | 2022-12-29 | REPAIR SIDEWALK | 42 AVENUE, QUEENS, FROM STREET BEND TO STREET NATIONAL STREET |
Q042022332A17 | 2022-11-28 | 2022-12-29 | REPAIR SIDEWALK | NATIONAL STREET, QUEENS, FROM STREET 42 AVENUE TO STREET 43 AVENUE |
M012022327A27 | 2022-11-23 | 2022-12-23 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET TO STREET MORTON STREET |
M012022327A28 | 2022-11-23 | 2022-12-23 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
X022022321A74 | 2022-11-17 | 2022-12-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | FOREST AVENUE, BRONX, FROM STREET EAST 158 STREET TO STREET EAST 160 STREET |
X022022321A71 | 2022-11-17 | 2022-12-17 | TEMPORARY PEDESTRIAN WALK | EAST 160 STREET, BRONX, FROM STREET FOREST AVENUE TO STREET TINTON AVENUE |
X042022321A06 | 2022-11-17 | 2022-12-17 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 160 STREET, BRONX, FROM STREET FOREST AVENUE |
X042022321A07 | 2022-11-17 | 2022-12-17 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 160 STREET, BRONX, FROM STREET FOREST AVENUE |
X042022321A08 | 2022-11-17 | 2022-12-17 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 160 STREET, BRONX, FROM STREET FOREST AVENUE |
X022022321A72 | 2022-11-17 | 2022-12-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 160 STREET, BRONX, FROM STREET FOREST AVENUE TO STREET TINTON AVENUE |
X042022321A05 | 2022-11-17 | 2022-12-17 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | FOREST AVENUE, BRONX, FROM STREET EAST 158 STREET TO STREET EAST 160 STREET |
X042022321A04 | 2022-11-17 | 2022-12-17 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 160 STREET, BRONX, FROM STREET FOREST AVENUE TO STREET TINTON AVENUE |
X042022321A03 | 2022-11-17 | 2022-12-17 | REPAIR SIDEWALK | WHEELER AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
X012022321A82 | 2022-11-17 | 2022-12-17 | RESET, REPAIR OR REPLACE CURB | EAST 160 STREET, BRONX, FROM STREET FOREST AVENUE TO STREET TINTON AVENUE |
X012022321A83 | 2022-11-17 | 2022-12-17 | RESET, REPAIR OR REPLACE CURB | FOREST AVENUE, BRONX, FROM STREET EAST 158 STREET TO STREET EAST 160 STREET |
X022022321A69 | 2022-11-17 | 2022-12-17 | TEMPORARY PEDESTRIAN WALK | WHEELER AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
X022022321A73 | 2022-11-17 | 2022-12-17 | TEMPORARY PEDESTRIAN WALK | FOREST AVENUE, BRONX, FROM STREET EAST 158 STREET TO STREET EAST 160 STREET |
X022022321A70 | 2022-11-17 | 2022-12-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | WHEELER AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
M022022319B05 | 2022-11-15 | 2022-12-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VANDAM STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET |
M022022319B04 | 2022-11-15 | 2022-12-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VANDAM STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET |
B042022318A10 | 2022-11-14 | 2022-11-17 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | JAY STREET, BROOKLYN, FROM STREET WILLOUGHBY STREET |
M012022315A12 | 2022-11-11 | 2022-11-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 112 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
M012022315A15 | 2022-11-11 | 2022-11-24 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 111 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M012022315A14 | 2022-11-11 | 2022-11-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 111 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR |
M012022315A13 | 2022-11-11 | 2022-11-24 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | MADISON AVENUE, MANHATTAN, FROM STREET EAST 111 STREET TO STREET EAST 112 STREET |
M042022308A22 | 2022-11-04 | 2022-12-02 | REPAIR SIDEWALK | VANDAM STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET |
M022022308C84 | 2022-11-04 | 2022-12-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | VANDAM STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET |
M022022308C83 | 2022-11-04 | 2022-12-02 | TEMPORARY PEDESTRIAN WALK | VANDAM STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET |
M022022308C82 | 2022-11-04 | 2022-12-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | CHARLTON STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET |
M022022308C81 | 2022-11-04 | 2022-12-02 | TEMPORARY PEDESTRIAN WALK | CHARLTON STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET |
M022022308C80 | 2022-11-04 | 2022-12-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | VARICK STREET, MANHATTAN, FROM STREET CHARLTON STREET TO STREET VANDAM STREET |
M022022308C79 | 2022-11-04 | 2022-12-02 | TEMPORARY PEDESTRIAN WALK | VARICK STREET, MANHATTAN, FROM STREET CHARLTON STREET TO STREET VANDAM STREET |
M042022308A20 | 2022-11-04 | 2022-12-02 | REPAIR SIDEWALK | VARICK STREET, MANHATTAN, FROM STREET CHARLTON STREET TO STREET VANDAM STREET |
M042022308A24 | 2022-11-04 | 2022-12-02 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | VANDAM STREET, MANHATTAN, FROM STREET VARICK STREET |
M042022308A23 | 2022-11-04 | 2022-12-02 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | CHARLTON STREET, MANHATTAN, FROM STREET VARICK STREET |
M042022308A21 | 2022-11-04 | 2022-12-02 | REPAIR SIDEWALK | CHARLTON STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET |
Q022022307A68 | 2022-11-03 | 2022-11-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | 42 AVENUE, QUEENS, FROM STREET BEND TO STREET NATIONAL STREET |
Q042022307A41 | 2022-11-03 | 2022-11-29 | REPAIR SIDEWALK | NATIONAL STREET, QUEENS, FROM STREET 42 AVENUE TO STREET 43 AVENUE |
Q022022307A65 | 2022-11-03 | 2022-11-29 | TEMPORARY PEDESTRIAN WALK | NATIONAL STREET, QUEENS, FROM STREET 42 AVENUE TO STREET 43 AVENUE |
Q022022307A67 | 2022-11-03 | 2022-11-29 | TEMPORARY PEDESTRIAN WALK | 42 AVENUE, QUEENS, FROM STREET BEND TO STREET NATIONAL STREET |
Q022022307A66 | 2022-11-03 | 2022-11-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | NATIONAL STREET, QUEENS, FROM STREET 42 AVENUE TO STREET 43 AVENUE |
Q042022307A42 | 2022-11-03 | 2022-11-29 | REPAIR SIDEWALK | 42 AVENUE, QUEENS, FROM STREET BEND TO STREET NATIONAL STREET |
B042022305A27 | 2022-11-01 | 2022-11-14 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | JAY STREET, BROOKLYN, FROM STREET WILLOUGHBY STREET |
M042022305A17 | 2022-11-01 | 2022-11-14 | REPAIR SIDEWALK | 6 AVENUE, MANHATTAN, FROM STREET WEST 41 STREET TO STREET WEST 42 STREET |
M042022305A16 | 2022-11-01 | 2022-11-14 | REPAIR SIDEWALK | WEST 42 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
M002022304A73 | 2022-10-31 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
M042022301A18 | 2022-10-28 | 2022-11-28 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 111 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M042022301A20 | 2022-10-28 | 2022-11-26 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 111 STREET, MANHATTAN, FROM STREET METRO-NORTH RR |
M022022300C04 | 2022-10-27 | 2022-11-28 | TEMPORARY PEDESTRIAN WALK | MACOMBS PLACE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M012022300A84 | 2022-10-27 | 2022-11-28 | RESET, REPAIR OR REPLACE CURB | MACOMBS PLACE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M022022300C05 | 2022-10-27 | 2022-11-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | MACOMBS PLACE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M042022300A27 | 2022-10-27 | 2022-11-28 | REPLACE SIDEWALK | MACOMBS PLACE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M012022298A55 | 2022-10-25 | 2022-11-23 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET TO STREET MORTON STREET |
M012022298A56 | 2022-10-25 | 2022-11-23 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
M022022297E93 | 2022-10-24 | 2022-11-14 | TEMPORARY PEDESTRIAN WALK | CHARLTON STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET |
M022022297E94 | 2022-10-24 | 2022-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | CHARLTON STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET |
M022022297E95 | 2022-10-24 | 2022-11-14 | TEMPORARY PEDESTRIAN WALK | VANDAM STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET |
M022022297E91 | 2022-10-24 | 2022-11-14 | TEMPORARY PEDESTRIAN WALK | VARICK STREET, MANHATTAN, FROM STREET CHARLTON STREET TO STREET VANDAM STREET |
M042022297A21 | 2022-10-24 | 2022-11-14 | REPAIR SIDEWALK | VANDAM STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET |
M042022297A20 | 2022-10-24 | 2022-11-14 | REPAIR SIDEWALK | CHARLTON STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET |
M042022297A19 | 2022-10-24 | 2022-11-14 | REPAIR SIDEWALK | VARICK STREET, MANHATTAN, FROM STREET CHARLTON STREET TO STREET VANDAM STREET |
M022022297E96 | 2022-10-24 | 2022-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | VANDAM STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET |
M042022297A23 | 2022-10-24 | 2022-11-14 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | VANDAM STREET, MANHATTAN, FROM STREET VARICK STREET |
M042022297A22 | 2022-10-24 | 2022-11-14 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | CHARLTON STREET, MANHATTAN, FROM STREET VARICK STREET |
M022022297E92 | 2022-10-24 | 2022-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | VARICK STREET, MANHATTAN, FROM STREET CHARLTON STREET TO STREET VANDAM STREET |
X042022294A08 | 2022-10-21 | 2022-11-18 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | FOREST AVENUE, BRONX, FROM STREET EAST 158 STREET TO STREET EAST 160 STREET |
X022022294B49 | 2022-10-21 | 2022-11-18 | TEMPORARY PEDESTRIAN WALK | EAST 160 STREET, BRONX, FROM STREET FOREST AVENUE TO STREET TINTON AVENUE |
X042022294A05 | 2022-10-21 | 2022-11-17 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 160 STREET, BRONX, FROM STREET FOREST AVENUE |
X042022294A04 | 2022-10-21 | 2022-11-17 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 160 STREET, BRONX, FROM STREET FOREST AVENUE |
M012022294B39 | 2022-10-21 | 2022-11-14 | RESET, REPAIR OR REPLACE CURB | EAST 111 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR |
X022022294B52 | 2022-10-21 | 2022-11-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | FOREST AVENUE, BRONX, FROM STREET EAST 158 STREET TO STREET EAST 160 STREET |
M012022294B38 | 2022-10-21 | 2022-11-14 | RESET, REPAIR OR REPLACE CURB | PARK AVENUE, MANHATTAN, FROM STREET EAST 111 STREET TO STREET EAST 112 STREET |
X012022294B64 | 2022-10-21 | 2022-11-18 | RESET, REPAIR OR REPLACE CURB | FOREST AVENUE, BRONX, FROM STREET EAST 158 STREET TO STREET EAST 160 STREET |
M042022294A41 | 2022-10-21 | 2022-11-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 111 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR |
M042022294A40 | 2022-10-21 | 2022-11-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | PARK AVENUE, MANHATTAN, FROM STREET EAST 111 STREET TO STREET EAST 112 STREET |
X022022294B50 | 2022-10-21 | 2022-11-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 160 STREET, BRONX, FROM STREET FOREST AVENUE TO STREET TINTON AVENUE |
X022022294B51 | 2022-10-21 | 2022-11-18 | TEMPORARY PEDESTRIAN WALK | FOREST AVENUE, BRONX, FROM STREET EAST 158 STREET TO STREET EAST 160 STREET |
X012022294B63 | 2022-10-21 | 2022-11-18 | RESET, REPAIR OR REPLACE CURB | EAST 160 STREET, BRONX, FROM STREET FOREST AVENUE TO STREET TINTON AVENUE |
M022022294F04 | 2022-10-21 | 2022-11-14 | TEMPORARY PEDESTRIAN WALK | PARK AVENUE, MANHATTAN, FROM STREET EAST 111 STREET TO STREET EAST 112 STREET |
M022022294F05 | 2022-10-21 | 2022-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | PARK AVENUE, MANHATTAN, FROM STREET EAST 111 STREET TO STREET EAST 112 STREET |
M022022294F06 | 2022-10-21 | 2022-11-14 | TEMPORARY PEDESTRIAN WALK | EAST 111 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR |
M022022294F07 | 2022-10-21 | 2022-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 111 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR |
X042022294A06 | 2022-10-21 | 2022-11-17 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 160 STREET, BRONX, FROM STREET FOREST AVENUE |
X042022294A07 | 2022-10-21 | 2022-11-18 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 160 STREET, BRONX, FROM STREET FOREST AVENUE TO STREET TINTON AVENUE |
M022022291D02 | 2022-10-18 | 2022-11-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WASHINGTON STREET, MANHATTAN, FROM STREET SPRING STREET TO STREET WEST HOUSTON STREET |
X042022291A06 | 2022-10-18 | 2022-11-17 | REPAIR SIDEWALK | WHEELER AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
X022022291A64 | 2022-10-18 | 2022-11-17 | TEMPORARY PEDESTRIAN WALK | WHEELER AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
X022022291A65 | 2022-10-18 | 2022-11-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | WHEELER AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
M012022291B27 | 2022-10-18 | 2022-11-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | WASHINGTON STREET, MANHATTAN, FROM STREET SPRING STREET TO STREET WEST HOUSTON STREET |
M012022291B28 | 2022-10-18 | 2022-11-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST HOUSTON STREET, MANHATTAN, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET |
M012022291B29 | 2022-10-18 | 2022-11-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | WASHINGTON STREET, MANHATTAN, FROM STREET WEST HOUSTON STREET |
M022022291D03 | 2022-10-18 | 2022-11-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST HOUSTON STREET, MANHATTAN, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET |
M022022285B64 | 2022-10-12 | 2022-10-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | 6 AVENUE, MANHATTAN, FROM STREET WEST 41 STREET TO STREET WEST 42 STREET |
M042022285A13 | 2022-10-12 | 2022-10-17 | REPAIR SIDEWALK | 6 AVENUE, MANHATTAN, FROM STREET WEST 41 STREET TO STREET WEST 42 STREET |
M042022285A12 | 2022-10-12 | 2022-10-17 | REPAIR SIDEWALK | WEST 42 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
M022022285B62 | 2022-10-12 | 2022-10-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 42 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
M022022285B61 | 2022-10-12 | 2022-10-17 | TEMPORARY PEDESTRIAN WALK | WEST 42 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
M022022285B63 | 2022-10-12 | 2022-10-17 | TEMPORARY PEDESTRIAN WALK | 6 AVENUE, MANHATTAN, FROM STREET WEST 41 STREET TO STREET WEST 42 STREET |
M042022280A05 | 2022-10-07 | 2022-11-07 | REPAIR SIDEWALK | EAST 100 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET F D R DRIVE |
M012022280A71 | 2022-10-07 | 2022-11-07 | RESET, REPAIR OR REPLACE CURB-PROTECTED | EAST 100 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET F D R DRIVE |
M042022280A03 | 2022-10-07 | 2022-11-10 | REPAIR SIDEWALK | WEST 42 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
M022022280B89 | 2022-10-07 | 2022-11-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 100 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET F D R DRIVE |
M022022280B88 | 2022-10-07 | 2022-11-07 | TEMPORARY PEDESTRIAN WALK | EAST 100 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET F D R DRIVE |
M042022280A04 | 2022-10-07 | 2022-11-10 | REPAIR SIDEWALK | 6 AVENUE, MANHATTAN, FROM STREET WEST 41 STREET TO STREET WEST 42 STREET |
M012022280A70 | 2022-10-07 | 2022-11-10 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 47 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
M042022279A09 | 2022-10-06 | 2022-10-29 | REPLACE SIDEWALK | MACOMBS PLACE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M022022279C47 | 2022-10-06 | 2022-10-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | MACOMBS PLACE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M022022279C46 | 2022-10-06 | 2022-10-29 | TEMPORARY PEDESTRIAN WALK | MACOMBS PLACE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M042022279A08 | 2022-10-06 | 2022-10-29 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | MACOMBS PLACE, MANHATTAN, FROM STREET WEST 151 STREET |
M012022279A52 | 2022-10-06 | 2022-10-29 | RESET, REPAIR OR REPLACE CURB | MACOMBS PLACE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M042022273A07 | 2022-09-30 | 2022-10-28 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MADISON AVENUE, MANHATTAN, FROM STREET EAST 111 STREET TO STREET EAST 112 STREET |
M042022273A06 | 2022-09-30 | 2022-10-29 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 111 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M012022273A62 | 2022-09-30 | 2022-10-29 | RESET, REPAIR OR REPLACE CURB-PROTECTED | MADISON AVENUE, MANHATTAN, FROM STREET EAST 111 STREET TO STREET EAST 112 STREET |
M022022273B71 | 2022-09-30 | 2022-10-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | MADISON AVENUE, MANHATTAN, FROM STREET EAST 111 STREET TO STREET EAST 112 STREET |
M022022273B70 | 2022-09-30 | 2022-10-29 | TEMPORARY PEDESTRIAN WALK | MADISON AVENUE, MANHATTAN, FROM STREET EAST 111 STREET TO STREET EAST 112 STREET |
M012022270B14 | 2022-09-27 | 2022-10-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 47 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
M012022266B13 | 2022-09-23 | 2022-10-24 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
M012022266B23 | 2022-09-23 | 2022-10-27 | RESET, REPAIR OR REPLACE CURB | WEST 151 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET MACOMBS PLACE |
M022022266D26 | 2022-09-23 | 2022-10-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 151 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET MACOMBS PLACE |
M042022266A08 | 2022-09-23 | 2022-10-27 | REPLACE SIDEWALK | WEST 151 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET MACOMBS PLACE |
M012022266B12 | 2022-09-23 | 2022-10-24 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET TO STREET MORTON STREET |
M022022266D25 | 2022-09-23 | 2022-10-27 | TEMPORARY PEDESTRIAN WALK | WEST 151 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET MACOMBS PLACE |
M042022266A09 | 2022-09-23 | 2022-10-27 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET |
Q022022265A60 | 2022-09-22 | 2022-10-21 | TEMPORARY PEDESTRIAN WALK | ROCKAWAY BEACH BOULEVARD, QUEENS, FROM STREET BEACH 90 STREET TO STREET BEACH 91 STREET |
Q042022265A39 | 2022-09-22 | 2022-10-21 | REPAIR SIDEWALK | ROCKAWAY BEACH BOULEVARD, QUEENS, FROM STREET BEACH 90 STREET TO STREET BEACH 91 STREET |
Q022022265A61 | 2022-09-22 | 2022-10-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | ROCKAWAY BEACH BOULEVARD, QUEENS, FROM STREET BEACH 90 STREET TO STREET BEACH 91 STREET |
X022022263B17 | 2022-09-20 | 2022-10-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | WHEELER AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
X042022263A09 | 2022-09-20 | 2022-10-18 | REPAIR SIDEWALK | WHEELER AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
X022022263B16 | 2022-09-20 | 2022-10-18 | TEMPORARY PEDESTRIAN WALK | WHEELER AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
M042022257A18 | 2022-09-14 | 2022-10-08 | REPAIR SIDEWALK | EAST 100 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET F D R DRIVE |
Q042022257A18 | 2022-09-14 | 2022-10-07 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BEACH 129 STREET, QUEENS, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE |
Q042022257A19 | 2022-09-14 | 2022-10-07 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BEACH 129 STREET, QUEENS, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE |
Q042022257A20 | 2022-09-14 | 2022-10-07 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BEACH 129 STREET, QUEENS, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE |
M022022257C43 | 2022-09-14 | 2022-10-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 100 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET F D R DRIVE |
M042022257A16 | 2022-09-14 | 2022-10-11 | REPAIR SIDEWALK | WEST 42 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
M012022257A96 | 2022-09-14 | 2022-10-08 | RESET, REPAIR OR REPLACE CURB-PROTECTED | EAST 100 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET F D R DRIVE |
M042022257A17 | 2022-09-14 | 2022-10-11 | REPAIR SIDEWALK | 6 AVENUE, MANHATTAN, FROM STREET WEST 41 STREET TO STREET WEST 42 STREET |
M022022257C42 | 2022-09-14 | 2022-10-08 | TEMPORARY PEDESTRIAN WALK | EAST 100 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET F D R DRIVE |
Q042022251A95 | 2022-09-08 | 2022-10-07 | REPAIR SIDEWALK | BEACH 129 STREET, QUEENS, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE |
Q012022251D51 | 2022-09-08 | 2022-10-07 | RESET, REPAIR OR REPLACE CURB | BEACH 129 STREET, QUEENS, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE |
Q012022251D52 | 2022-09-08 | 2022-10-07 | RESET, REPAIR OR REPLACE CURB | BEACH 129 STREET, QUEENS, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE |
Q012022251D53 | 2022-09-08 | 2022-10-07 | RESET, REPAIR OR REPLACE CURB | BEACH 129 STREET, QUEENS, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE |
Q022022251A97 | 2022-09-08 | 2022-10-07 | TEMPORARY PEDESTRIAN WALK | BEACH 129 STREET, QUEENS, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE |
Q022022251A98 | 2022-09-08 | 2022-10-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEACH 129 STREET, QUEENS, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE |
Q022022251A99 | 2022-09-08 | 2022-10-07 | TEMPORARY PEDESTRIAN WALK | BEACH 129 STREET, QUEENS, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE |
Q022022251B00 | 2022-09-08 | 2022-10-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEACH 129 STREET, QUEENS, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE |
Q022022251B01 | 2022-09-08 | 2022-10-07 | TEMPORARY PEDESTRIAN WALK | BEACH 129 STREET, QUEENS, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE |
Q022022251B02 | 2022-09-08 | 2022-10-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEACH 129 STREET, QUEENS, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE |
Q042022251A94 | 2022-09-08 | 2022-10-07 | REPAIR SIDEWALK | BEACH 129 STREET, QUEENS, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE |
Q042022251A96 | 2022-09-08 | 2022-10-07 | REPAIR SIDEWALK | BEACH 129 STREET, QUEENS, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE |
S012022251B19 | 2022-09-08 | 2022-10-08 | PAVE STREET-W/ ENGINEERING & INSP FEE | VETERANS ROAD WEST, STATEN ISLAND, FROM STREET ALLENTOWN LANE TO STREET WEST SHORE PARKWAY |
B012022245B34 | 2022-09-02 | 2022-10-06 | RESET, REPAIR OR REPLACE CURB | JAY STREET, BROOKLYN, FROM STREET METROTECH ROADWAY TO STREET MYRTLE AVENUE |
M022022245B94 | 2022-09-02 | 2022-10-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST HOUSTON STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M042022245A11 | 2022-09-02 | 2022-10-04 | REPAIR SIDEWALK | HUDSON STREET, MANHATTAN, FROM STREET KING STREET TO STREET WEST HOUSTON STREET |
M042022245A12 | 2022-09-02 | 2022-10-04 | REPAIR SIDEWALK | WEST HOUSTON STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M022022245B92 | 2022-09-02 | 2022-10-04 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WEST HOUSTON STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
B042022245A30 | 2022-09-02 | 2022-10-06 | REPLACE SIDEWALK | WILLOUGHBY STREET, BROOKLYN, FROM STREET JAY STREET TO STREET PEARL STREET |
B042022245A29 | 2022-09-02 | 2022-10-06 | REPLACE SIDEWALK | JAY STREET, BROOKLYN, FROM STREET METROTECH ROADWAY TO STREET MYRTLE AVENUE |
M022022245B91 | 2022-09-02 | 2022-10-04 | TEMPORARY PEDESTRIAN WALK | WEST HOUSTON STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
B012022245B35 | 2022-09-02 | 2022-10-06 | RESET, REPAIR OR REPLACE CURB | WILLOUGHBY STREET, BROOKLYN, FROM STREET JAY STREET TO STREET PEARL STREET |
M022022245B93 | 2022-09-02 | 2022-10-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST HOUSTON STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
B022022245B70 | 2022-09-02 | 2022-10-06 | TEMPORARY PEDESTRIAN WALK | JAY STREET, BROOKLYN, FROM STREET METROTECH ROADWAY TO STREET MYRTLE AVENUE |
B022022245B71 | 2022-09-02 | 2022-10-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | JAY STREET, BROOKLYN, FROM STREET METROTECH ROADWAY TO STREET MYRTLE AVENUE |
M022022245B95 | 2022-09-02 | 2022-10-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST HOUSTON STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M012022236A78 | 2022-08-24 | 2022-09-23 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 7 AVENUE, MANHATTAN, FROM STREET WEST 152 STREET TO STREET WEST 153 STREET |
M022022236C98 | 2022-08-24 | 2022-09-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 151 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET MACOMBS PLACE |
M022022236C97 | 2022-08-24 | 2022-09-27 | TEMPORARY PEDESTRIAN WALK | WEST 151 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET MACOMBS PLACE |
M042022236A37 | 2022-08-24 | 2022-09-23 | REPLACE SIDEWALK | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M012022236A77 | 2022-08-24 | 2022-09-23 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M042022236A38 | 2022-08-24 | 2022-09-23 | REPLACE SIDEWALK | 7 AVENUE, MANHATTAN, FROM STREET WEST 152 STREET TO STREET WEST 153 STREET |
M022022236C54 | 2022-08-24 | 2022-09-23 | TEMPORARY PEDESTRIAN WALK | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M042022236A46 | 2022-08-24 | 2022-09-27 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET |
M042022236A47 | 2022-08-24 | 2022-09-27 | REPLACE SIDEWALK | WEST 151 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET MACOMBS PLACE |
M022022236C55 | 2022-08-24 | 2022-09-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M022022236C56 | 2022-08-24 | 2022-09-23 | TEMPORARY PEDESTRIAN WALK | 7 AVENUE, MANHATTAN, FROM STREET WEST 152 STREET TO STREET WEST 153 STREET |
M022022236C57 | 2022-08-24 | 2022-09-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | 7 AVENUE, MANHATTAN, FROM STREET WEST 152 STREET TO STREET WEST 153 STREET |
M012022236A84 | 2022-08-24 | 2022-09-27 | RESET, REPAIR OR REPLACE CURB | WEST 151 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET MACOMBS PLACE |
M012022236A80 | 2022-08-24 | 2022-09-24 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
M012022236A79 | 2022-08-24 | 2022-09-24 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET TO STREET MORTON STREET |
B012022224A92 | 2022-08-12 | 2022-09-06 | RESET, REPAIR OR REPLACE CURB | JAY STREET, BROOKLYN, FROM STREET METROTECH ROADWAY TO STREET MYRTLE AVENUE |
B022022224B38 | 2022-08-12 | 2022-09-06 | TEMPORARY PEDESTRIAN WALK | JAY STREET, BROOKLYN, FROM STREET METROTECH ROADWAY TO STREET MYRTLE AVENUE |
B022022224B39 | 2022-08-12 | 2022-09-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | JAY STREET, BROOKLYN, FROM STREET METROTECH ROADWAY TO STREET MYRTLE AVENUE |
B042022224A17 | 2022-08-12 | 2022-09-06 | REPLACE SIDEWALK | JAY STREET, BROOKLYN, FROM STREET METROTECH ROADWAY TO STREET MYRTLE AVENUE |
B012022222B01 | 2022-08-10 | 2022-09-06 | RESET, REPAIR OR REPLACE CURB | WILLOUGHBY STREET, BROOKLYN, FROM STREET JAY STREET TO STREET PEARL STREET |
B042022222A13 | 2022-08-10 | 2022-09-06 | REPLACE SIDEWALK | WILLOUGHBY STREET, BROOKLYN, FROM STREET JAY STREET TO STREET PEARL STREET |
B042022222A12 | 2022-08-10 | 2022-09-06 | REPLACE SIDEWALK | JAY STREET, BROOKLYN, FROM STREET METROTECH ROADWAY TO STREET MYRTLE AVENUE |
B012022222B00 | 2022-08-10 | 2022-09-06 | RESET, REPAIR OR REPLACE CURB | JAY STREET, BROOKLYN, FROM STREET METROTECH ROADWAY TO STREET MYRTLE AVENUE |
Q022022217A73 | 2022-08-05 | 2022-09-05 | TEMPORARY PEDESTRIAN WALK | 42 AVENUE, QUEENS, FROM STREET BEND TO STREET NATIONAL STREET |
Q022022217A72 | 2022-08-05 | 2022-09-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | NATIONAL STREET, QUEENS, FROM STREET 42 AVENUE TO STREET 43 AVENUE |
Q022022217A71 | 2022-08-05 | 2022-09-05 | TEMPORARY PEDESTRIAN WALK | NATIONAL STREET, QUEENS, FROM STREET 42 AVENUE TO STREET 43 AVENUE |
M022022217C20 | 2022-08-05 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST HOUSTON STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M042022217A05 | 2022-08-05 | 2022-09-04 | REPAIR SIDEWALK | HUDSON STREET, MANHATTAN, FROM STREET KING STREET TO STREET WEST HOUSTON STREET |
M042022217A06 | 2022-08-05 | 2022-09-04 | REPAIR SIDEWALK | WEST HOUSTON STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
Q022022217A74 | 2022-08-05 | 2022-09-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | 42 AVENUE, QUEENS, FROM STREET BEND TO STREET NATIONAL STREET |
M022022217C18 | 2022-08-05 | 2022-09-04 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WEST HOUSTON STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M022022217C21 | 2022-08-05 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST HOUSTON STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M022022217C19 | 2022-08-05 | 2022-09-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST HOUSTON STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M022022217C17 | 2022-08-05 | 2022-09-04 | TEMPORARY PEDESTRIAN WALK | WEST HOUSTON STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
Q042022217A06 | 2022-08-05 | 2022-09-05 | REPAIR SIDEWALK | 42 AVENUE, QUEENS, FROM STREET BEND TO STREET NATIONAL STREET |
Q042022217A05 | 2022-08-05 | 2022-09-05 | REPAIR SIDEWALK | NATIONAL STREET, QUEENS, FROM STREET 42 AVENUE TO STREET 43 AVENUE |
M012022208A62 | 2022-07-27 | 2022-08-25 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
M012022208A61 | 2022-07-27 | 2022-08-25 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET TO STREET MORTON STREET |
M022022206B06 | 2022-07-25 | 2022-08-24 | TEMPORARY PEDESTRIAN WALK | 7 AVENUE, MANHATTAN, FROM STREET WEST 152 STREET TO STREET WEST 153 STREET |
M012022206A93 | 2022-07-25 | 2022-08-24 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M012022206A94 | 2022-07-25 | 2022-08-24 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 7 AVENUE, MANHATTAN, FROM STREET WEST 152 STREET TO STREET WEST 153 STREET |
M022022206B04 | 2022-07-25 | 2022-08-24 | TEMPORARY PEDESTRIAN WALK | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M022022206B05 | 2022-07-25 | 2022-08-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M022022206B07 | 2022-07-25 | 2022-08-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | 7 AVENUE, MANHATTAN, FROM STREET WEST 152 STREET TO STREET WEST 153 STREET |
M042022206A06 | 2022-07-25 | 2022-08-24 | REPLACE SIDEWALK | 7 AVENUE, MANHATTAN, FROM STREET WEST 152 STREET TO STREET WEST 153 STREET |
M042022206A05 | 2022-07-25 | 2022-08-24 | REPLACE SIDEWALK | 7 AVENUE, MANHATTAN, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET |
M042022196A06 | 2022-07-15 | 2022-08-12 | REPAIR SIDEWALK | WEST 108 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
B012022196B01 | 2022-07-15 | 2022-08-13 | PAVE STREET-W/ ENGINEERING & INSP FEE | ATLANTIC AVENUE, BROOKLYN, FROM STREET CHESTNUT STREET TO STREET CONDUIT BOULEVARD |
M022022196B50 | 2022-07-15 | 2022-08-12 | TEMPORARY PEDESTRIAN WALK | WEST 108 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M022022196B51 | 2022-07-15 | 2022-08-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 108 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M042022195A08 | 2022-07-14 | 2022-08-13 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
B012022195A70 | 2022-07-14 | 2022-08-14 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | CHESTNUT STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET DINSMORE PLACE |
B012022195A69 | 2022-07-14 | 2022-08-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | DINSMORE PLACE, BROOKLYN, FROM STREET CHESTNUT STREET TO STREET RICHMOND STREET |
M022022193B82 | 2022-07-12 | 2022-08-05 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WEST HOUSTON STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M022022193B81 | 2022-07-12 | 2022-08-05 | TEMPORARY PEDESTRIAN WALK | WEST HOUSTON STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
X042022193A06 | 2022-07-12 | 2022-08-06 | REPAIR SIDEWALK | SOUTHERN BOULEVARD, BRONX, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET |
X042022193A07 | 2022-07-12 | 2022-08-06 | REPAIR SIDEWALK | SOUTHERN BOULEVARD, BRONX, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET |
X042022193A08 | 2022-07-12 | 2022-08-06 | REPAIR SIDEWALK | EAST 181 STREET, BRONX, FROM STREET MAPES AVENUE TO STREET SOUTHERN BOULEVARD |
Q042022193A20 | 2022-07-12 | 2022-08-06 | REPAIR SIDEWALK | 42 AVENUE, QUEENS, FROM STREET BEND TO STREET NATIONAL STREET |
Q042022193A19 | 2022-07-12 | 2022-08-06 | REPAIR SIDEWALK | NATIONAL STREET, QUEENS, FROM STREET 42 AVENUE TO STREET 43 AVENUE |
X022022193B05 | 2022-07-12 | 2022-08-06 | TEMPORARY PEDESTRIAN WALK | EAST 181 STREET, BRONX, FROM STREET MAPES AVENUE TO STREET SOUTHERN BOULEVARD |
Q022022193B24 | 2022-07-12 | 2022-08-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | NATIONAL STREET, QUEENS, FROM STREET 42 AVENUE TO STREET 43 AVENUE |
M042022193A10 | 2022-07-12 | 2022-08-05 | REPAIR SIDEWALK | WEST HOUSTON STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
X022022193B06 | 2022-07-12 | 2022-08-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 181 STREET, BRONX, FROM STREET MAPES AVENUE TO STREET SOUTHERN BOULEVARD |
M042022193A09 | 2022-07-12 | 2022-08-05 | REPAIR SIDEWALK | HUDSON STREET, MANHATTAN, FROM STREET KING STREET TO STREET WEST HOUSTON STREET |
X022022193B03 | 2022-07-12 | 2022-08-06 | TEMPORARY PEDESTRIAN WALK | SOUTHERN BOULEVARD, BRONX, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET |
X022022193B02 | 2022-07-12 | 2022-08-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | SOUTHERN BOULEVARD, BRONX, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET |
X022022193B01 | 2022-07-12 | 2022-08-06 | TEMPORARY PEDESTRIAN WALK | SOUTHERN BOULEVARD, BRONX, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET |
X012022193A49 | 2022-07-12 | 2022-08-06 | RESET, REPAIR OR REPLACE CURB | EAST 181 STREET, BRONX, FROM STREET MAPES AVENUE TO STREET SOUTHERN BOULEVARD |
Q022022193B26 | 2022-07-12 | 2022-08-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | 42 AVENUE, QUEENS, FROM STREET BEND TO STREET NATIONAL STREET |
Q022022193B25 | 2022-07-12 | 2022-08-06 | TEMPORARY PEDESTRIAN WALK | 42 AVENUE, QUEENS, FROM STREET BEND TO STREET NATIONAL STREET |
Q022022193B23 | 2022-07-12 | 2022-08-06 | TEMPORARY PEDESTRIAN WALK | NATIONAL STREET, QUEENS, FROM STREET 42 AVENUE TO STREET 43 AVENUE |
X022022193B04 | 2022-07-12 | 2022-08-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | SOUTHERN BOULEVARD, BRONX, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET |
M022022193B83 | 2022-07-12 | 2022-08-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST HOUSTON STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M022022193B84 | 2022-07-12 | 2022-08-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST HOUSTON STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M022022193B85 | 2022-07-12 | 2022-08-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST HOUSTON STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M042022188A12 | 2022-07-07 | 2022-08-06 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 2 AVENUE, MANHATTAN, FROM STREET EAST 47 STREET |
M012022187A20 | 2022-07-06 | 2022-07-29 | RESET, REPAIR OR REPLACE CURB-PROTECTED | EAST 55 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M012022187A19 | 2022-07-06 | 2022-07-29 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 55 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M012022179A57 | 2022-06-28 | 2022-07-27 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
M012022179A56 | 2022-06-28 | 2022-07-27 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET TO STREET MORTON STREET |
M042022179A04 | 2022-06-28 | 2022-07-30 | REPLACE SIDEWALK | EAST 49 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M022022179B40 | 2022-06-28 | 2022-07-30 | TEMPORARY PEDESTRIAN WALK | EAST 49 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M022022179B41 | 2022-06-28 | 2022-07-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 49 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012022174A19 | 2022-06-23 | 2022-07-21 | PAVE STREET-W/ ENGINEERING & INSP FEE | WASHINGTON STREET, MANHATTAN, FROM STREET DESBROSSES STREET TO STREET WATTS STREET |
B012022174B51 | 2022-06-23 | 2022-07-15 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | CHESTNUT STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET DINSMORE PLACE |
B012022174B50 | 2022-06-23 | 2022-07-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | DINSMORE PLACE, BROOKLYN, FROM STREET CHESTNUT STREET TO STREET RICHMOND STREET |
M042022167A04 | 2022-06-16 | 2022-07-14 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
M012022164A33 | 2022-06-13 | 2022-07-02 | RESET, REPAIR OR REPLACE CURB | EAST 51 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M022022164A59 | 2022-06-13 | 2022-07-02 | TEMPORARY PEDESTRIAN WALK | EAST 51 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M022022164A60 | 2022-06-13 | 2022-07-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 51 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M022022164A61 | 2022-06-13 | 2022-07-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 51 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M042022164A03 | 2022-06-13 | 2022-07-02 | REPAIR SIDEWALK | EAST 51 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M042022164A04 | 2022-06-13 | 2022-07-07 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 2 AVENUE, MANHATTAN, FROM STREET EAST 47 STREET |
M012022164A32 | 2022-06-13 | 2022-07-02 | VAULT CONSTRUCTION OR ALTERATION | EAST 51 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M022022157B79 | 2022-06-06 | 2022-07-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 51 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012022157A46 | 2022-06-06 | 2022-07-02 | VAULT CONSTRUCTION OR ALTERATION | EAST 51 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012022157A47 | 2022-06-06 | 2022-07-02 | RESET, REPAIR OR REPLACE CURB | EAST 51 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M022022157B89 | 2022-06-06 | 2022-06-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 49 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M022022157B80 | 2022-06-06 | 2022-07-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 51 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M022022157B88 | 2022-06-06 | 2022-06-30 | TEMPORARY PEDESTRIAN WALK | EAST 49 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M042022157A03 | 2022-06-06 | 2022-07-02 | REPAIR SIDEWALK | EAST 51 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M042022157A04 | 2022-06-06 | 2022-06-30 | REPLACE SIDEWALK | EAST 49 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M022022157B78 | 2022-06-06 | 2022-07-02 | TEMPORARY PEDESTRIAN WALK | EAST 51 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M042022154A03 | 2022-06-03 | 2022-06-30 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 55 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M022022153B38 | 2022-06-02 | 2022-06-02 | TEMPORARY PEDESTRIAN WALK | EAST 51 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M042022153A04 | 2022-06-02 | 2022-06-02 | REPAIR SIDEWALK | EAST 51 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012022153A72 | 2022-06-02 | 2022-06-02 | VAULT CONSTRUCTION OR ALTERATION | EAST 51 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012022153A73 | 2022-06-02 | 2022-06-02 | RESET, REPAIR OR REPLACE CURB | EAST 51 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M022022153B37 | 2022-06-02 | 2022-06-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 51 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M022022153B39 | 2022-06-02 | 2022-06-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 51 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012022145A66 | 2022-05-25 | 2022-06-27 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET TO STREET MORTON STREET |
M012022145A67 | 2022-05-25 | 2022-06-27 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
M042022139A05 | 2022-05-19 | 2022-06-08 | REPAIR SIDEWALK | WEST 79 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M042022139A06 | 2022-05-19 | 2022-06-08 | REPAIR SIDEWALK | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 78 STREET TO STREET WEST 79 STREET |
M042022122A17 | 2022-05-02 | 2022-05-27 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 56 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M042022122A14 | 2022-05-02 | 2022-05-31 | REPLACE SIDEWALK | EAST 55 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M042022122A13 | 2022-05-02 | 2022-05-31 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 55 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M042022122A15 | 2022-05-02 | 2022-05-27 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 55 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M042022122A16 | 2022-05-02 | 2022-05-27 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 55 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M012022122B26 | 2022-05-02 | 2022-05-30 | TEST PITS, CORES OR BORING - PROTECTED | EAST 55 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M012022122B25 | 2022-05-02 | 2022-05-31 | RESET, REPAIR OR REPLACE CURB-PROTECTED | EAST 55 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M012022122B24 | 2022-05-02 | 2022-05-31 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 55 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M022022122B10 | 2022-05-02 | 2022-05-31 | TEMPORARY PEDESTRIAN WALK | EAST 55 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M022022122B12 | 2022-05-02 | 2022-05-31 | TEMPORARY PEDESTRIAN WALK | EAST 55 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M022022122B11 | 2022-05-02 | 2022-05-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 55 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M022022122B13 | 2022-05-02 | 2022-05-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 55 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M022022122B14 | 2022-05-02 | 2022-05-30 | TEMPORARY PEDESTRIAN WALK | EAST 55 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M012022122B23 | 2022-05-02 | 2022-05-31 | RESET, REPAIR OR REPLACE CURB-PROTECTED | EAST 55 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M042022119A03 | 2022-04-29 | 2022-05-30 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 111 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M012022119A60 | 2022-04-29 | 2022-06-02 | RESET, REPAIR OR REPLACE CURB | EAST 51 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012022119A59 | 2022-04-29 | 2022-06-02 | VAULT CONSTRUCTION OR ALTERATION | EAST 51 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012022119A57 | 2022-04-29 | 2022-05-31 | RESET, REPAIR OR REPLACE CURB | LEROY STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M042022119A06 | 2022-04-29 | 2022-05-30 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 111 STREET, MANHATTAN, FROM STREET PARK AVENUE |
M042022119A07 | 2022-04-29 | 2022-05-31 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | LEROY STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M022022119B00 | 2022-04-29 | 2022-06-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 51 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M042022119A08 | 2022-04-29 | 2022-06-02 | REPAIR SIDEWALK | EAST 51 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M042022119A05 | 2022-04-29 | 2022-05-30 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 112 STREET, MANHATTAN, FROM STREET PARK AVENUE |
M042022119A04 | 2022-04-29 | 2022-05-30 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 111 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M012022118A48 | 2022-04-28 | 2022-05-28 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
M012022118A47 | 2022-04-28 | 2022-05-28 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET TO STREET MORTON STREET |
Q012022109B75 | 2022-04-19 | 2022-05-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | QUEENS PLAZA, QUEENS, FROM STREET 41 AVENUE TO STREET NYCTA SUBWAY |
M012022109B44 | 2022-04-19 | 2022-04-28 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
Q012022109B79 | 2022-04-19 | 2022-05-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | 41 AVENUE, QUEENS, FROM STREET QUEENS PLAZA NORTH |
Q012022109B78 | 2022-04-19 | 2022-05-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | QUEENS PLAZA, QUEENS, FROM STREET 41 AVENUE TO STREET NYCTA SUBWAY |
Q012022109B73 | 2022-04-19 | 2022-05-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | QUEENS PLAZA, QUEENS, FROM STREET 41 AVENUE TO STREET NYCTA SUBWAY |
Q012022109B74 | 2022-04-19 | 2022-05-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | QUEENS PLAZA NORTH, QUEENS, FROM STREET NORTHERN BOULEVARD |
M042022109A30 | 2022-04-19 | 2022-05-18 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
M012022109B45 | 2022-04-19 | 2022-04-28 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET TO STREET MORTON STREET |
M042022109A29 | 2022-04-19 | 2022-05-18 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
M012022095D56 | 2022-04-05 | 2022-05-03 | RESET, REPAIR OR REPLACE CURB | EAST 51 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012022095D55 | 2022-04-05 | 2022-05-03 | VAULT CONSTRUCTION OR ALTERATION | EAST 51 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M042022095A13 | 2022-04-05 | 2022-05-03 | REPAIR SIDEWALK | EAST 51 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M022022095C56 | 2022-04-05 | 2022-05-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 51 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M042022094A06 | 2022-04-04 | 2022-04-30 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 112 STREET, MANHATTAN, FROM STREET PARK AVENUE |
M042022094A05 | 2022-04-04 | 2022-04-30 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 111 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M042022094A07 | 2022-04-04 | 2022-04-30 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 111 STREET, MANHATTAN, FROM STREET PARK AVENUE |
M042022094A08 | 2022-04-04 | 2022-04-30 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 111 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M022022091E87 | 2022-04-01 | 2022-05-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 55 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M042022091A18 | 2022-04-01 | 2022-04-27 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 55 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M022022091E86 | 2022-04-01 | 2022-05-01 | TEMPORARY PEDESTRIAN WALK | EAST 55 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M022022091E85 | 2022-04-01 | 2022-05-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 55 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M022022091E84 | 2022-04-01 | 2022-05-01 | TEMPORARY PEDESTRIAN WALK | EAST 55 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M042022091A03 | 2022-04-01 | 2022-05-01 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | LEROY STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M022022091A80 | 2022-04-01 | 2022-04-30 | TEMPORARY PEDESTRIAN WALK | EAST 55 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M012022091A23 | 2022-04-01 | 2022-04-30 | TEST PITS, CORES OR BORING - PROTECTED | EAST 55 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M012022091A25 | 2022-04-01 | 2022-05-01 | RESET, REPAIR OR REPLACE CURB | LEROY STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M012022091B08 | 2022-04-01 | 2022-05-01 | RESET, REPAIR OR REPLACE CURB-PROTECTED | EAST 55 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M012022091B09 | 2022-04-01 | 2022-05-01 | RESET, REPAIR OR REPLACE CURB-PROTECTED | EAST 55 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M012022091B10 | 2022-04-01 | 2022-05-01 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 55 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M042022091A14 | 2022-04-01 | 2022-05-01 | REPLACE SIDEWALK | EAST 55 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M042022091A15 | 2022-04-01 | 2022-05-01 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 55 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M042022091A16 | 2022-04-01 | 2022-05-01 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 55 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M042022091A17 | 2022-04-01 | 2022-05-01 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 56 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M042022080A05 | 2022-03-21 | 2022-04-01 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 55 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M022022080C64 | 2022-03-21 | 2022-04-01 | TEMPORARY PEDESTRIAN WALK | EAST 55 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M022022080C52 | 2022-03-21 | 2022-04-01 | TEMPORARY PEDESTRIAN WALK | EAST 55 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M012022080A42 | 2022-03-21 | 2022-04-01 | TEST PITS, CORES OR BORING - PROTECTED | EAST 55 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M012022080A70 | 2022-03-21 | 2022-04-01 | RESET, REPAIR OR REPLACE CURB-PROTECTED | EAST 55 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M012022080A71 | 2022-03-21 | 2022-04-01 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 55 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M012022080A72 | 2022-03-21 | 2022-04-01 | RESET, REPAIR OR REPLACE CURB-PROTECTED | EAST 55 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M022022080B44 | 2022-03-21 | 2022-04-01 | TEMPORARY PEDESTRIAN WALK | EAST 55 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M022022080C65 | 2022-03-21 | 2022-04-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 55 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M022022080C53 | 2022-03-21 | 2022-04-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 55 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M042022080A06 | 2022-03-21 | 2022-04-01 | REPLACE SIDEWALK | EAST 55 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M042022076A14 | 2022-03-17 | 2022-04-01 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 56 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M042022076A12 | 2022-03-17 | 2022-04-01 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 55 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M042022076A13 | 2022-03-17 | 2022-04-01 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 55 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M042022067A12 | 2022-03-08 | 2022-04-01 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | LEROY STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M012022067B80 | 2022-03-08 | 2022-04-01 | RESET, REPAIR OR REPLACE CURB | LEROY STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M022022066B75 | 2022-03-07 | 2022-03-31 | TEMPORARY PEDESTRIAN WALK | PARK AVENUE, MANHATTAN, FROM STREET EAST 111 STREET TO STREET EAST 112 STREET |
M022022066B77 | 2022-03-07 | 2022-03-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | PARK AVENUE, MANHATTAN, FROM STREET EAST 111 STREET TO STREET EAST 112 STREET |
M022022066B76 | 2022-03-07 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PARK AVENUE, MANHATTAN, FROM STREET EAST 111 STREET TO STREET EAST 112 STREET |
M042022066A08 | 2022-03-07 | 2022-03-31 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | PARK AVENUE, MANHATTAN, FROM STREET EAST 111 STREET TO STREET EAST 112 STREET |
M012022066B60 | 2022-03-07 | 2022-03-31 | RESET, REPAIR OR REPLACE CURB | PARK AVENUE, MANHATTAN, FROM STREET EAST 111 STREET TO STREET EAST 112 STREET |
M012022063A56 | 2022-03-04 | 2022-03-31 | C.A.R. RESTORATION | EAST 74 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M042022055A09 | 2022-02-24 | 2022-03-25 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 56 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M042022055A10 | 2022-02-24 | 2022-03-12 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 55 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M042022055A08 | 2022-02-24 | 2022-03-25 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 55 STREET, MANHATTAN, FROM STREET MADISON AVENUE |
M012022042A66 | 2022-02-11 | 2022-03-12 | C.A.R. RESTORATION | WEST 43 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M042022027A02 | 2022-01-27 | 2022-03-03 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 112 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
M022022027A43 | 2022-01-27 | 2022-03-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 112 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
M022022027A42 | 2022-01-27 | 2022-03-03 | TEMPORARY PEDESTRIAN WALK | EAST 112 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
M012022027A59 | 2022-01-27 | 2022-03-03 | RESET, REPAIR OR REPLACE CURB-PROTECTED | EAST 112 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
M042022006A01 | 2022-01-06 | 2022-02-03 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 112 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
M022022006A64 | 2022-01-06 | 2022-02-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 112 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
M022022006A63 | 2022-01-06 | 2022-02-03 | TEMPORARY PEDESTRIAN WALK | EAST 112 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
M012022006A35 | 2022-01-06 | 2022-02-03 | RESET, REPAIR OR REPLACE CURB-PROTECTED | EAST 112 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
M012022003B15 | 2022-01-03 | 2022-01-30 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET TO STREET MORTON STREET |
M012022003B16 | 2022-01-03 | 2022-01-30 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
M012021347B15 | 2021-12-13 | 2021-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | LEROY STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M012021347B16 | 2021-12-13 | 2021-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET TO STREET MORTON STREET |
M012021347B17 | 2021-12-13 | 2021-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | LEROY STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M012021347B18 | 2021-12-13 | 2021-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET |
M012021347A16 | 2021-12-13 | 2021-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 102 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M012021347B11 | 2021-12-13 | 2021-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | LEROY STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M012021347B12 | 2021-12-13 | 2021-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | LEROY STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M012021347B13 | 2021-12-13 | 2021-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | LEROY STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M012021347B14 | 2021-12-13 | 2021-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | LEROY STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M012021336A41 | 2021-12-02 | 2021-12-31 | RESET, REPAIR OR REPLACE CURB | EAST 111 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR |
M022021336A74 | 2021-12-02 | 2021-12-31 | TEMPORARY PEDESTRIAN WALK | EAST 111 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR |
M022021336A75 | 2021-12-02 | 2021-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 111 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR |
M042021336A10 | 2021-12-02 | 2021-12-31 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 111 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR |
M042021323A09 | 2021-11-19 | 2021-12-16 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | LEROY STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M042021323A04 | 2021-11-19 | 2021-12-16 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | LEROY STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M042021323A05 | 2021-11-19 | 2021-12-16 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | LEROY STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M042021323A06 | 2021-11-19 | 2021-12-16 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | LEROY STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M042021323A08 | 2021-11-19 | 2021-12-16 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | GREENWICH STREET, MANHATTAN, FROM STREET LEROY STREET TO STREET MORTON STREET |
M042021323A07 | 2021-11-19 | 2021-12-16 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | LEROY STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
B042021314A17 | 2021-11-10 | 2021-12-11 | REPAIR SIDEWALK | LOUISIANA AVENUE, BROOKLYN, FROM STREET FLATLANDS AVENUE TO STREET VANDALIA AVENUE |
B042021314A16 | 2021-11-10 | 2021-12-11 | REPAIR SIDEWALK | LOUISIANA AVENUE, BROOKLYN, FROM STREET FLATLANDS AVENUE TO STREET VANDALIA AVENUE |
M042021309A03 | 2021-11-05 | 2021-12-03 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 111 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR |
Q042021308A16 | 2021-11-04 | 2021-11-26 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | VERNON BOULEVARD, QUEENS, FROM STREET 47 AVENUE TO STREET 47 ROAD |
Q042021308A18 | 2021-11-04 | 2021-11-27 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 47 AVENUE, QUEENS, FROM STREET 11 STREET TO STREET VERNON BOULEVARD |
M042021307A18 | 2021-11-03 | 2021-12-05 | REPLACE SIDEWALK | EAST 111 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M042021307A17 | 2021-11-03 | 2021-12-05 | REPLACE SIDEWALK | 2 AVENUE, MANHATTAN, FROM STREET EAST 110 STREET TO STREET EAST 111 STREET |
B012021292B29 | 2021-10-19 | 2021-10-26 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | WILLOUGHBY STREET, BROOKLYN, FROM STREET ASHLAND PLACE TO STREET FLEET STREET |
B042021291A23 | 2021-10-18 | 2021-11-11 | REPAIR SIDEWALK | LOUISIANA AVENUE, BROOKLYN, FROM STREET FLATLANDS AVENUE TO STREET VANDALIA AVENUE |
B042021291A22 | 2021-10-18 | 2021-11-11 | REPAIR SIDEWALK | LOUISIANA AVENUE, BROOKLYN, FROM STREET FLATLANDS AVENUE TO STREET VANDALIA AVENUE |
Q042021288A21 | 2021-10-15 | 2021-11-12 | REPAIR SIDEWALK | 55 AVENUE, QUEENS, FROM STREET 48 STREET TO STREET 50 STREET |
Q042021287A22 | 2021-10-14 | 2021-11-11 | REPLACE SIDEWALK | DOWNING STREET, QUEENS, FROM STREET 31 ROAD TO STREET I 678 |
M042021280A01 | 2021-10-07 | 2021-11-05 | REPLACE SIDEWALK | 2 AVENUE, MANHATTAN, FROM STREET EAST 110 STREET TO STREET EAST 111 STREET |
M042021280A02 | 2021-10-07 | 2021-11-05 | REPLACE SIDEWALK | EAST 111 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012021280A70 | 2021-10-07 | 2021-10-15 | VAULT CONSTRUCTION OR ALTERATION | COLUMBUS AVENUE, MANHATTAN, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET |
M012021273B11 | 2021-09-30 | 2021-10-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | 8 AVENUE, MANHATTAN, FROM STREET WEST 56 STREET TO STREET WEST 57 STREET |
B012021270B42 | 2021-09-27 | 2021-10-23 | PAVE STREET-W/ ENGINEERING & INSP FEE | ASHLAND PLACE, BROOKLYN, FROM STREET WILLOUGHBY STREET |
B012021270B43 | 2021-09-27 | 2021-10-26 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | WILLOUGHBY STREET, BROOKLYN, FROM STREET ASHLAND PLACE TO STREET FLEET STREET |
B012021270B41 | 2021-09-27 | 2021-10-23 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | WILLOUGHBY STREET, BROOKLYN, FROM STREET ASHLAND PLACE TO STREET FLEET STREET |
B012021270B40 | 2021-09-27 | 2021-10-23 | PAVE STREET-W/ ENGINEERING & INSP FEE | ASHLAND PLACE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY STREET |
X042021267A03 | 2021-09-24 | 2021-10-22 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BOSTON ROAD, BRONX, FROM STREET EASTCHESTER ROAD |
X042021267A09 | 2021-09-24 | 2021-10-22 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BOSTON ROAD, BRONX, FROM STREET EASTCHESTER ROAD |
X042021267A10 | 2021-09-24 | 2021-10-22 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BOSTON ROAD, BRONX, FROM STREET EASTCHESTER ROAD |
X042021267A02 | 2021-09-24 | 2021-10-22 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EASTCHESTER ROAD, BRONX, FROM STREET TILLOTSON AVENUE |
X042021267A05 | 2021-09-24 | 2021-10-22 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BOSTON ROAD, BRONX, FROM STREET MICKLE AVENUE |
X042021267A04 | 2021-09-24 | 2021-10-22 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | MICKLE AVENUE, BRONX, FROM STREET TILLOTSON AVENUE |
X042021267A12 | 2021-09-24 | 2021-10-22 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BOSTON ROAD, BRONX, FROM STREET MICKLE AVENUE |
X042021267A11 | 2021-09-24 | 2021-10-22 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BOSTON ROAD, BRONX, FROM STREET MICKLE AVENUE |
X042021267A06 | 2021-09-24 | 2021-10-22 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EASTCHESTER ROAD, BRONX, FROM STREET TILLOTSON AVENUE |
X042021267A07 | 2021-09-24 | 2021-10-22 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | MICKLE AVENUE, BRONX, FROM STREET TILLOTSON AVENUE |
X042021267A08 | 2021-09-24 | 2021-10-22 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | MICKLE AVENUE, BRONX, FROM STREET TILLOTSON AVENUE |
M012021260A26 | 2021-09-17 | 2021-10-15 | VAULT CONSTRUCTION OR ALTERATION | COLUMBUS AVENUE, MANHATTAN, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET |
M042021258A04 | 2021-09-15 | 2021-10-12 | REPAIR SIDEWALK | WEST 108 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M012021258A50 | 2021-09-15 | 2021-10-12 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WEST 108 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M042021244A02 | 2021-09-01 | 2021-10-04 | REPAIR SIDEWALK | SOUTH STREET, MANHATTAN, FROM STREET CLINTON STREET TO STREET RUTGERS SLIP |
M012021244A71 | 2021-09-01 | 2021-10-04 | RESET, REPAIR OR REPLACE CURB | SOUTH STREET, MANHATTAN, FROM STREET CLINTON STREET TO STREET RUTGERS SLIP |
M042021239A08 | 2021-08-27 | 2021-09-24 | REPAIR SIDEWALK | WASHINGTON STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET WATTS STREET |
X012021237A21 | 2021-08-25 | 2021-09-30 | RESET, REPAIR OR REPLACE CURB | EASTCHESTER ROAD, BRONX, FROM STREET BOSTON ROAD TO STREET TILLOTSON AVENUE |
X012021237A17 | 2021-08-25 | 2021-09-30 | PAVE STREET-W/ ENGINEERING & INSP FEE | JEROME AVENUE, BRONX, FROM STREET CLARKE PLACE TO STREET MARCY PLACE |
X012021237A18 | 2021-08-25 | 2021-09-30 | PAVE STREET-W/ ENGINEERING & INSP FEE | CLARKE PLACE WEST, BRONX, FROM STREET INWOOD AVENUE TO STREET JEROME AVENUE |
X012021237A19 | 2021-08-25 | 2021-09-30 | PAVE STREET-W/ ENGINEERING & INSP FEE | CLARKE PLACE WEST, BRONX, FROM STREET JEROME AVENUE |
X012021237A20 | 2021-08-25 | 2021-09-30 | RESET, REPAIR OR REPLACE CURB | TILLOTSON AVENUE, BRONX, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE |
X042021237A02 | 2021-08-25 | 2021-09-30 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EASTCHESTER ROAD, BRONX, FROM STREET BOSTON ROAD TO STREET TILLOTSON AVENUE |
X042021237A01 | 2021-08-25 | 2021-09-30 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | TILLOTSON AVENUE, BRONX, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE |
X042021237A00 | 2021-08-25 | 2021-09-30 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MICKLE AVENUE, BRONX, FROM STREET BOSTON ROAD TO STREET TILLOTSON AVENUE |
Q012021235A33 | 2021-08-23 | 2021-09-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | 168 STREET, QUEENS, FROM STREET 93 AVENUE TO STREET JAMAICA AVENUE |
Q012021235A34 | 2021-08-23 | 2021-09-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | 93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET |
M042021232A02 | 2021-08-20 | 2021-09-25 | REPAIR SIDEWALK | LITTLE WEST 12 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
M012021230A30 | 2021-08-18 | 2021-09-15 | VAULT CONSTRUCTION OR ALTERATION | COLUMBUS AVENUE, MANHATTAN, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET |
Q042021228A30 | 2021-08-16 | 2021-09-15 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | VERNON BOULEVARD, QUEENS, FROM STREET 47 AVENUE TO STREET 47 ROAD |
Q042021228A31 | 2021-08-16 | 2021-09-15 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 47 AVENUE, QUEENS, FROM STREET 11 STREET TO STREET VERNON BOULEVARD |
M012021223A05 | 2021-08-11 | 2021-08-17 | RESET, REPAIR OR REPLACE CURB | 2 AVENUE, MANHATTAN, FROM STREET EAST 46 STREET TO STREET EAST 47 STREET |
M042021223A00 | 2021-08-11 | 2021-08-17 | REPAIR SIDEWALK | 2 AVENUE, MANHATTAN, FROM STREET EAST 46 STREET TO STREET EAST 47 STREET |
X042021223A02 | 2021-08-11 | 2021-09-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BOSTON ROAD, BRONX, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE |
X012021223A91 | 2021-08-11 | 2021-09-13 | RESET, REPAIR OR REPLACE CURB | BOSTON ROAD, BRONX, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE |
X012021217A11 | 2021-08-05 | 2021-09-02 | PAVE STREET-W/ ENGINEERING & INSP FEE | CLARKE PLACE WEST, BRONX, FROM STREET INWOOD AVENUE TO STREET JEROME AVENUE |
X012021217A12 | 2021-08-05 | 2021-09-02 | PAVE STREET-W/ ENGINEERING & INSP FEE | CLARKE PLACE WEST, BRONX, FROM STREET JEROME AVENUE |
M012021215A27 | 2021-08-03 | 2021-08-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | PARK ROW, MANHATTAN, FROM STREET BEND TO STREET BEND |
X012021215A44 | 2021-08-03 | 2021-08-31 | RESET, REPAIR OR REPLACE CURB | TILLOTSON AVENUE, BRONX, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE |
X012021215A45 | 2021-08-03 | 2021-08-31 | RESET, REPAIR OR REPLACE CURB | EASTCHESTER ROAD, BRONX, FROM STREET BOSTON ROAD TO STREET TILLOTSON AVENUE |
M042021215A00 | 2021-08-03 | 2021-08-26 | REPAIR SIDEWALK | LITTLE WEST 12 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
X042021215A07 | 2021-08-03 | 2021-08-31 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EASTCHESTER ROAD, BRONX, FROM STREET BOSTON ROAD TO STREET TILLOTSON AVENUE |
X042021215A05 | 2021-08-03 | 2021-08-31 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MICKLE AVENUE, BRONX, FROM STREET BOSTON ROAD TO STREET TILLOTSON AVENUE |
X012021215A43 | 2021-08-03 | 2021-08-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | JEROME AVENUE, BRONX, FROM STREET CLARKE PLACE TO STREET MARCY PLACE |
X042021215A06 | 2021-08-03 | 2021-08-31 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | TILLOTSON AVENUE, BRONX, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE |
M012021214A74 | 2021-08-02 | 2021-08-31 | RESET, REPAIR OR REPLACE CURB | 2 AVENUE, MANHATTAN, FROM STREET EAST 46 STREET TO STREET EAST 47 STREET |
Q012021214A09 | 2021-08-02 | 2021-08-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | 93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET |
Q012021214A08 | 2021-08-02 | 2021-08-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | 168 STREET, QUEENS, FROM STREET 93 AVENUE TO STREET JAMAICA AVENUE |
B012021214A31 | 2021-08-02 | 2021-08-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | 89 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
M042021214A00 | 2021-08-02 | 2021-08-31 | REPAIR SIDEWALK | 2 AVENUE, MANHATTAN, FROM STREET EAST 46 STREET TO STREET EAST 47 STREET |
M012021211A03 | 2021-07-30 | 2021-09-02 | RESET, REPAIR OR REPLACE CURB | EAST 46 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M042021211A07 | 2021-07-30 | 2021-08-08 | REPAIR SIDEWALK | 2 AVENUE, MANHATTAN, FROM STREET EAST 46 STREET TO STREET EAST 47 STREET |
M042021211A02 | 2021-07-30 | 2021-09-02 | REPAIR SIDEWALK | EAST 46 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012021211A19 | 2021-07-30 | 2021-08-08 | RESET, REPAIR OR REPLACE CURB | 2 AVENUE, MANHATTAN, FROM STREET EAST 46 STREET TO STREET EAST 47 STREET |
M042021211A03 | 2021-07-30 | 2021-09-02 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 2 AVENUE, MANHATTAN, FROM STREET EAST 46 STREET |
M042021211A04 | 2021-07-30 | 2021-09-02 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 2 AVENUE, MANHATTAN, FROM STREET EAST 47 STREET |
M042021211A00 | 2021-07-30 | 2021-09-04 | REPAIR SIDEWALK | SOUTH STREET, MANHATTAN, FROM STREET CLINTON STREET TO STREET RUTGERS SLIP |
M012021211A01 | 2021-07-30 | 2021-09-04 | RESET, REPAIR OR REPLACE CURB | SOUTH STREET, MANHATTAN, FROM STREET CLINTON STREET TO STREET RUTGERS SLIP |
M042021211A01 | 2021-07-30 | 2021-09-02 | REPAIR SIDEWALK | EAST 47 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
B012021210B74 | 2021-07-29 | 2021-08-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | 5 AVENUE, BROOKLYN, FROM STREET 89 STREET TO STREET 90 STREET |
B012021210B75 | 2021-07-29 | 2021-08-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | 5 AVENUE, BROOKLYN, FROM STREET 89 STREET |
B012021209D90 | 2021-07-28 | 2021-08-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | 5 AVENUE, BROOKLYN, FROM STREET 89 STREET TO STREET 90 STREET |
M042021207A11 | 2021-07-26 | 2021-08-01 | REPAIR SIDEWALK | 2 AVENUE, MANHATTAN, FROM STREET EAST 46 STREET TO STREET EAST 47 STREET |
M012021207B45 | 2021-07-26 | 2021-08-01 | RESET, REPAIR OR REPLACE CURB | 2 AVENUE, MANHATTAN, FROM STREET EAST 46 STREET TO STREET EAST 47 STREET |
B012021204A61 | 2021-07-23 | 2021-08-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | 89 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
Q012021197A26 | 2021-07-16 | 2021-08-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | 30 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET THOMSON AVENUE |
M012021194A34 | 2021-07-13 | 2021-08-18 | RESET, REPAIR OR REPLACE CURB | EAST 87 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M012021194A33 | 2021-07-13 | 2021-08-18 | VAULT CONSTRUCTION OR ALTERATION | EAST 87 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M012021194A30 | 2021-07-13 | 2021-08-16 | VAULT CONSTRUCTION OR ALTERATION | COLUMBUS AVENUE, MANHATTAN, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET |
M042021194A06 | 2021-07-13 | 2021-08-18 | REPLACE SIDEWALK | EAST 87 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
Q042021194A12 | 2021-07-13 | 2021-08-16 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 47 AVENUE, QUEENS, FROM STREET 11 STREET TO STREET VERNON BOULEVARD |
Q042021194A11 | 2021-07-13 | 2021-08-16 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | VERNON BOULEVARD, QUEENS, FROM STREET 47 AVENUE TO STREET 47 ROAD |
M042021194A05 | 2021-07-13 | 2021-08-18 | REPLACE SIDEWALK | PARK AVENUE, MANHATTAN, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET |
X042021189A06 | 2021-07-08 | 2021-08-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BOSTON ROAD, BRONX, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE |
M042021189A07 | 2021-07-08 | 2021-08-05 | REPAIR SIDEWALK | SOUTH STREET, MANHATTAN, FROM STREET CLINTON STREET TO STREET RUTGERS SLIP |
X042021189A09 | 2021-07-08 | 2021-08-12 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BAY PLAZA, BRONX, FROM STREET BAYCHESTER AVENUE |
X042021189A08 | 2021-07-08 | 2021-08-12 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BAYCHESTER AVENUE, BRONX, FROM STREET BARTOW AVENUE TO STREET BAY PLAZA |
X042021189A07 | 2021-07-08 | 2021-08-12 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BAYCHESTER AVENUE, BRONX, FROM STREET BARTOW AVENUE TO STREET BAY PLAZA |
M012021189A59 | 2021-07-08 | 2021-08-05 | RESET, REPAIR OR REPLACE CURB | SOUTH STREET, MANHATTAN, FROM STREET CLINTON STREET TO STREET RUTGERS SLIP |
X012021189A27 | 2021-07-08 | 2021-08-12 | PAVE STREET-W/ ENGINEERING & INSP FEE | BAY PLAZA, BRONX, FROM STREET BAYCHESTER AVENUE |
X012021189A26 | 2021-07-08 | 2021-08-12 | PAVE STREET-W/ ENGINEERING & INSP FEE | BAYCHESTER AVENUE, BRONX, FROM STREET BARTOW AVENUE TO STREET BAY PLAZA |
X012021189A25 | 2021-07-08 | 2021-08-14 | RESET, REPAIR OR REPLACE CURB | BOSTON ROAD, BRONX, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE |
M042021187A02 | 2021-07-06 | 2021-08-03 | REPAIR SIDEWALK | EAST 46 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012021187A24 | 2021-07-06 | 2021-08-03 | RESET, REPAIR OR REPLACE CURB | EAST 46 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M042021187A04 | 2021-07-06 | 2021-08-03 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 2 AVENUE, MANHATTAN, FROM STREET EAST 47 STREET |
M012021187A23 | 2021-07-06 | 2021-08-03 | RESET, REPAIR OR REPLACE CURB-PROTECTED | EAST 47 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M042021187A01 | 2021-07-06 | 2021-08-03 | REPAIR SIDEWALK | EAST 47 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M042021187A03 | 2021-07-06 | 2021-08-03 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 2 AVENUE, MANHATTAN, FROM STREET EAST 46 STREET |
B012021182A35 | 2021-07-01 | 2021-07-28 | RESET, REPAIR OR REPLACE CURB | 89 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B042021182A01 | 2021-07-01 | 2021-07-28 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 89 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B042021182A02 | 2021-07-01 | 2021-07-28 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 5 AVENUE, BROOKLYN, FROM STREET 89 STREET |
B042021182A03 | 2021-07-01 | 2021-07-28 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 5 AVENUE, BROOKLYN, FROM STREET 89 STREET |
B042021182A04 | 2021-07-01 | 2021-07-28 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 5 AVENUE, BROOKLYN, FROM STREET 89 STREET |
B012021182A36 | 2021-07-01 | 2021-07-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | 89 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
M042021180A01 | 2021-06-29 | 2021-07-24 | REPAIR SIDEWALK | WEST 44 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET SHUBERT ALLEY |
X042021180A01 | 2021-06-29 | 2021-07-27 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CLARKE PLACE, BRONX, FROM STREET GRAND CONCOURSE TO STREET WALTON AVENUE |
Q012021176E55 | 2021-06-25 | 2021-08-02 | PAVE STREET-W/ ENGINEERING & INSP FEE | 29 STREET, QUEENS, FROM STREET SKILLMAN AVENUE |
Q012021176E56 | 2021-06-25 | 2021-08-02 | PAVE STREET-W/ ENGINEERING & INSP FEE | 30 STREET, QUEENS, FROM STREET THOMSON AVENUE |
Q012021176E54 | 2021-06-25 | 2021-08-02 | PAVE STREET-W/ ENGINEERING & INSP FEE | SKILLMAN AVENUE, QUEENS, FROM STREET 29 STREET TO STREET THOMSON AVENUE |
Q012021176E53 | 2021-06-25 | 2021-08-02 | PAVE STREET-W/ ENGINEERING & INSP FEE | THOMSON AVENUE, QUEENS, FROM STREET 30 STREET TO STREET SKILLMAN AVENUE |
M012021174A86 | 2021-06-23 | 2021-07-21 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | WEST 108 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
X012021172A28 | 2021-06-21 | 2021-07-15 | RESET, REPAIR OR REPLACE CURB | BOSTON ROAD, BRONX, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE |
X042021172A04 | 2021-06-21 | 2021-07-13 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BAYCHESTER AVENUE, BRONX, FROM STREET BARTOW AVENUE TO STREET BAY PLAZA |
X042021172A03 | 2021-06-21 | 2021-07-15 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BOSTON ROAD, BRONX, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE |
X042021172A05 | 2021-06-21 | 2021-07-13 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BAYCHESTER AVENUE, BRONX, FROM STREET BARTOW AVENUE TO STREET BAY PLAZA |
X042021172A06 | 2021-06-21 | 2021-07-13 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BAY PLAZA, BRONX, FROM STREET BAYCHESTER AVENUE |
X012021172A44 | 2021-06-21 | 2021-07-13 | PAVE STREET-W/ ENGINEERING & INSP FEE | BAY PLAZA, BRONX, FROM STREET BAYCHESTER AVENUE |
X012021172A43 | 2021-06-21 | 2021-07-13 | PAVE STREET-W/ ENGINEERING & INSP FEE | BAYCHESTER AVENUE, BRONX, FROM STREET BARTOW AVENUE TO STREET BAY PLAZA |
X012021166A29 | 2021-06-15 | 2021-07-18 | RESET, REPAIR OR REPLACE CURB-PROTECTED | BATHGATE AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET |
X012021166A28 | 2021-06-15 | 2021-07-10 | PAVE STREET-W/ ENGINEERING & INSP FEE | CLARKE PLACE, BRONX, FROM STREET GRAND CONCOURSE TO STREET WALTON AVENUE |
X042021166A04 | 2021-06-15 | 2021-07-18 | REPAIR SIDEWALK | BATHGATE AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET |
X042021166A09 | 2021-06-15 | 2021-07-18 | REPAIR SIDEWALK | 3 AVENUE, BRONX, FROM STREET CLAREMONT PARKWAY TO STREET EAST 172 STREET |
X042021166A06 | 2021-06-15 | 2021-07-18 | REPAIR SIDEWALK | EAST 173 STREET, BRONX, FROM STREET BATHGATE AVENUE TO STREET WASHINGTON AVENUE |
X042021166A05 | 2021-06-15 | 2021-07-18 | REPAIR SIDEWALK | EAST 173 STREET, BRONX, FROM STREET BATHGATE AVENUE TO STREET 3 AVENUE |
X042021166A10 | 2021-06-15 | 2021-07-18 | REPAIR SIDEWALK | 3 AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET |
M012021166A35 | 2021-06-15 | 2021-07-19 | RESET, REPAIR OR REPLACE CURB | EAST 87 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M042021166A00 | 2021-06-15 | 2021-07-19 | REPLACE SIDEWALK | PARK AVENUE, MANHATTAN, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET |
M042021166A01 | 2021-06-15 | 2021-07-19 | REPLACE SIDEWALK | EAST 87 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
X042021166A07 | 2021-06-15 | 2021-07-18 | REPAIR SIDEWALK | BATHGATE AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET |
M012021166A34 | 2021-06-15 | 2021-07-19 | VAULT CONSTRUCTION OR ALTERATION | EAST 87 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
X042021166A08 | 2021-06-15 | 2021-07-18 | REPAIR SIDEWALK | EAST 172 STREET, BRONX, FROM STREET BATHGATE AVENUE TO STREET 3 AVENUE |
Q042021160A17 | 2021-06-09 | 2021-07-17 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 47 AVENUE, QUEENS, FROM STREET 11 STREET TO STREET VERNON BOULEVARD |
Q042021160A16 | 2021-06-09 | 2021-07-17 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | VERNON BOULEVARD, QUEENS, FROM STREET 47 AVENUE TO STREET 47 ROAD |
M012021160C06 | 2021-06-09 | 2021-07-17 | VAULT CONSTRUCTION OR ALTERATION | COLUMBUS AVENUE, MANHATTAN, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET |
Q012021155D92 | 2021-06-04 | 2021-07-03 | PAVE STREET-W/ ENGINEERING & INSP FEE | 29 STREET, QUEENS, FROM STREET SKILLMAN AVENUE |
M042021155A00 | 2021-06-04 | 2021-07-10 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEST 108 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
Q012021155D93 | 2021-06-04 | 2021-07-03 | PAVE STREET-W/ ENGINEERING & INSP FEE | 30 STREET, QUEENS, FROM STREET THOMSON AVENUE |
Q012021155D91 | 2021-06-04 | 2021-07-03 | PAVE STREET-W/ ENGINEERING & INSP FEE | SKILLMAN AVENUE, QUEENS, FROM STREET 29 STREET TO STREET THOMSON AVENUE |
Q012021155D90 | 2021-06-04 | 2021-07-03 | PAVE STREET-W/ ENGINEERING & INSP FEE | THOMSON AVENUE, QUEENS, FROM STREET 30 STREET TO STREET SKILLMAN AVENUE |
X042021152A11 | 2021-06-01 | 2021-06-18 | REPAIR SIDEWALK | 3 AVENUE, BRONX, FROM STREET CLAREMONT PARKWAY TO STREET EAST 172 STREET |
X042021152A05 | 2021-06-01 | 2021-06-18 | REPAIR SIDEWALK | BATHGATE AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
X042021152A03 | 2021-06-01 | 2021-06-18 | REPAIR SIDEWALK | BATHGATE AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
X042021152A04 | 2021-06-01 | 2021-06-18 | REPAIR SIDEWALK | EAST 173 STREET, BRONX, FROM STREET BATHGATE AVENUE TO STREET 3 AVENUE |
X042021152A08 | 2021-06-01 | 2021-06-18 | REPAIR SIDEWALK | EAST 173 STREET, BRONX, FROM STREET BATHGATE AVENUE TO STREET WASHINGTON AVENUE |
X042021152A10 | 2021-06-01 | 2021-06-18 | REPAIR SIDEWALK | EAST 172 STREET, BRONX, FROM STREET BATHGATE AVENUE TO STREET 3 AVENUE |
X042021152A07 | 2021-06-01 | 2021-06-18 | REPAIR SIDEWALK | BATHGATE AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET |
X042021152A06 | 2021-06-01 | 2021-06-18 | REPAIR SIDEWALK | EAST 173 STREET, BRONX, FROM STREET BATHGATE AVENUE TO STREET WASHINGTON AVENUE |
X042021152A12 | 2021-06-01 | 2021-06-18 | REPAIR SIDEWALK | 3 AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET |
X042021152A09 | 2021-06-01 | 2021-06-18 | REPAIR SIDEWALK | BATHGATE AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET |
M042021148A00 | 2021-05-28 | 2021-06-26 | REPLACE SIDEWALK | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M042021148A01 | 2021-05-28 | 2021-06-26 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 78 STREET |
M012021148A28 | 2021-05-28 | 2021-06-26 | RESET, REPAIR OR REPLACE CURB | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M012021147A64 | 2021-05-27 | 2021-06-17 | VAULT CONSTRUCTION OR ALTERATION | COLUMBUS AVENUE, MANHATTAN, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET |
M042021139A00 | 2021-05-19 | 2021-06-19 | REPLACE SIDEWALK | PARK AVENUE, MANHATTAN, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET |
M012021139A14 | 2021-05-19 | 2021-06-19 | RESET, REPAIR OR REPLACE CURB | EAST 87 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M012021139A15 | 2021-05-19 | 2021-06-17 | VAULT CONSTRUCTION OR ALTERATION | COLUMBUS AVENUE, MANHATTAN, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET |
M012021139A13 | 2021-05-19 | 2021-06-19 | VAULT CONSTRUCTION OR ALTERATION | EAST 87 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M042021139A01 | 2021-05-19 | 2021-06-19 | REPLACE SIDEWALK | EAST 87 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M012021138A29 | 2021-05-18 | 2021-06-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | 2 AVENUE, MANHATTAN, FROM STREET EAST 80 STREET |
M012021137B01 | 2021-05-17 | 2021-06-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | 2 AVENUE, MANHATTAN, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET |
M012021137A32 | 2021-05-17 | 2021-05-18 | VAULT CONSTRUCTION OR ALTERATION | COLUMBUS AVENUE, MANHATTAN, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET |
M012021137B00 | 2021-05-17 | 2021-06-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 80 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
Q042021134A09 | 2021-05-14 | 2021-06-17 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | VERNON BOULEVARD, QUEENS, FROM STREET 47 AVENUE TO STREET 47 ROAD |
Q042021134A10 | 2021-05-14 | 2021-06-17 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 47 AVENUE, QUEENS, FROM STREET 11 STREET TO STREET VERNON BOULEVARD |
B012021133A36 | 2021-05-13 | 2021-06-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | FULTON STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
M042021132A08 | 2021-05-12 | 2021-06-10 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEST 108 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M012021131A63 | 2021-05-11 | 2021-05-21 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 80 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012021131A64 | 2021-05-11 | 2021-05-21 | PAVE STREET-W/ ENGINEERING & INSP FEE | 2 AVENUE, MANHATTAN, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET |
M042021131A06 | 2021-05-11 | 2021-06-13 | REPAIR SIDEWALK | BANK STREET, MANHATTAN, FROM STREET WAVERLY PLACE TO STREET WEST 4 STREET |
M042021130A17 | 2021-05-10 | 2021-06-02 | REPAIR SIDEWALK | WEST 63 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET CENTRAL PARK WEST |
M042021124A03 | 2021-05-04 | 2021-06-06 | REPAIR SIDEWALK | VARICK STREET, MANHATTAN, FROM STREET CHARLTON STREET TO STREET VANDAM STREET |
B012021123C46 | 2021-05-03 | 2021-06-07 | RESET, REPAIR OR REPLACE CURB | FULTON STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
M042021123A12 | 2021-05-03 | 2021-05-25 | REPAIR SIDEWALK | WEST 97 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
M042021123A13 | 2021-05-03 | 2021-05-25 | REPAIR SIDEWALK | COLUMBUS AVENUE, MANHATTAN, FROM STREET WEST 96 STREET TO STREET WEST 97 STREET |
B042021123A17 | 2021-05-03 | 2021-06-07 | REPAIR SIDEWALK | FULTON STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
M042021123A11 | 2021-05-03 | 2021-05-25 | REPAIR SIDEWALK | WEST 96 STREET, MANHATTAN, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE |
M012021120B52 | 2021-04-30 | 2021-05-21 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 80 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012021120B53 | 2021-04-30 | 2021-05-21 | PAVE STREET-W/ ENGINEERING & INSP FEE | 2 AVENUE, MANHATTAN, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET |
M042021119A05 | 2021-04-29 | 2021-05-21 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 2 AVENUE, MANHATTAN, FROM STREET EAST 80 STREET TO STREET EAST 81 STREET |
B012021117A88 | 2021-04-27 | 2021-05-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | FULTON STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B042021117A05 | 2021-04-27 | 2021-05-31 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | FULTON STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B012021117A87 | 2021-04-27 | 2021-05-31 | RESET, REPAIR OR REPLACE CURB | FULTON STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
M042021116A19 | 2021-04-26 | 2021-05-20 | REPLACE SIDEWALK | EAST 87 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
Q042021116A38 | 2021-04-26 | 2021-05-18 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 47 AVENUE, QUEENS, FROM STREET 11 STREET TO STREET VERNON BOULEVARD |
Q042021116A37 | 2021-04-26 | 2021-05-18 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | VERNON BOULEVARD, QUEENS, FROM STREET 47 AVENUE TO STREET 47 ROAD |
M042021116A18 | 2021-04-26 | 2021-05-20 | REPLACE SIDEWALK | PARK AVENUE, MANHATTAN, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET |
M012021116B59 | 2021-04-26 | 2021-05-20 | RESET, REPAIR OR REPLACE CURB | EAST 87 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M012021116B58 | 2021-04-26 | 2021-05-20 | VAULT CONSTRUCTION OR ALTERATION | EAST 87 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
Q012021103A89 | 2021-04-13 | 2021-05-12 | PAVE STREET-W/ ENGINEERING & INSP FEE | 29 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET SKILLMAN AVENUE |
M042021099A02 | 2021-04-09 | 2021-05-07 | REPAIR SIDEWALK | VARICK STREET, MANHATTAN, FROM STREET CHARLTON STREET TO STREET VANDAM STREET |
B012021099C08 | 2021-04-09 | 2021-05-08 | RESET, REPAIR OR REPLACE CURB | FULTON STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
M012021099A10 | 2021-04-09 | 2021-05-18 | VAULT CONSTRUCTION OR ALTERATION | COLUMBUS AVENUE, MANHATTAN, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET |
M042021099A01 | 2021-04-09 | 2021-05-14 | REPAIR SIDEWALK | BANK STREET, MANHATTAN, FROM STREET WAVERLY PLACE TO STREET WEST 4 STREET |
B042021099A67 | 2021-04-09 | 2021-05-08 | REPAIR SIDEWALK | FULTON STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B012021096A73 | 2021-04-06 | 2021-04-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | FULTON STREET, BROOKLYN, FROM STREET ROCKWELL PLACE |
B012021096A74 | 2021-04-06 | 2021-04-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | FULTON STREET, BROOKLYN, FROM STREET ASHLAND PLACE TO STREET ROCKWELL PLACE |
M042021096A07 | 2021-04-06 | 2021-04-28 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 78 STREET |
M042021096A04 | 2021-04-06 | 2021-05-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEST 108 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M042021096A06 | 2021-04-06 | 2021-04-28 | REPLACE SIDEWALK | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 78 STREET TO STREET WEST 79 STREET |
M042021096A05 | 2021-04-06 | 2021-04-28 | REPLACE SIDEWALK | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M012021096A41 | 2021-04-06 | 2021-04-28 | RESET, REPAIR OR REPLACE CURB | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
B012021096A71 | 2021-04-06 | 2021-04-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | ROCKWELL PLACE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET FULTON STREET |
B012021096A72 | 2021-04-06 | 2021-04-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | FULTON STREET, BROOKLYN, FROM STREET ASHLAND PLACE TO STREET ROCKWELL PLACE |
B012021095B37 | 2021-04-05 | 2021-04-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | ASHLAND PLACE, BROOKLYN, FROM STREET FULTON STREET |
B012021095B36 | 2021-04-05 | 2021-04-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | FULTON STREET, BROOKLYN, FROM STREET ASHLAND PLACE TO STREET ROCKWELL PLACE |
M012021090A67 | 2021-03-31 | 2021-04-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | KING STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
B012021088C65 | 2021-03-29 | 2021-05-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | FULTON STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B012021088C64 | 2021-03-29 | 2021-05-01 | RESET, REPAIR OR REPLACE CURB | FULTON STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B042021088A13 | 2021-03-29 | 2021-05-01 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | FULTON STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
X042021085A08 | 2021-03-26 | 2021-04-26 | REPAIR SIDEWALK | BATHGATE AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET |
X042021085A07 | 2021-03-26 | 2021-04-26 | REPAIR SIDEWALK | BATHGATE AVENUE, BRONX, FROM STREET CLAREMONT PARKWAY TO STREET EAST 172 STREET |
X042021085A06 | 2021-03-26 | 2021-04-26 | REPAIR SIDEWALK | 3 AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
X042021085A09 | 2021-03-26 | 2021-04-26 | REPAIR SIDEWALK | 3 AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
M042021078A33 | 2021-03-19 | 2021-04-14 | REPAIR SIDEWALK | BANK STREET, MANHATTAN, FROM STREET WAVERLY PLACE TO STREET WEST 4 STREET |
M042021075A19 | 2021-03-16 | 2021-04-18 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 6 STREET, MANHATTAN, FROM STREET AVENUE B TO STREET AVENUE C |
M012021075A48 | 2021-03-16 | 2021-04-18 | VAULT CONSTRUCTION OR ALTERATION | COLUMBUS AVENUE, MANHATTAN, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET |
B042021071A08 | 2021-03-12 | 2021-04-01 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | FULTON STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B012021071C17 | 2021-03-12 | 2021-04-01 | RESET, REPAIR OR REPLACE CURB | FULTON STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B012021071C18 | 2021-03-12 | 2021-04-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | FULTON STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B042021060A08 | 2021-03-01 | 2021-03-15 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | FULTON STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B012021060C07 | 2021-03-01 | 2021-03-15 | RESET, REPAIR OR REPLACE CURB | FULTON STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B012021060C08 | 2021-03-01 | 2021-03-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | FULTON STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
X042021056A09 | 2021-02-25 | 2021-03-27 | REPAIR SIDEWALK | 3 AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
X042021056A03 | 2021-02-25 | 2021-03-26 | REPAIR SIDEWALK | EAST 173 STREET, BRONX, FROM STREET BATHGATE AVENUE TO STREET WASHINGTON AVENUE |
X042021056A02 | 2021-02-25 | 2021-03-27 | REPAIR SIDEWALK | 3 AVENUE, BRONX, FROM STREET CLAREMONT PARKWAY TO STREET EAST 172 STREET |
M042021056A00 | 2021-02-25 | 2021-03-28 | REPAIR SIDEWALK | VARICK STREET, MANHATTAN, FROM STREET CHARLTON STREET TO STREET VANDAM STREET |
X042021056A01 | 2021-02-25 | 2021-03-27 | REPAIR SIDEWALK | BATHGATE AVENUE, BRONX, FROM STREET CLAREMONT PARKWAY TO STREET EAST 172 STREET |
X042021056A00 | 2021-02-25 | 2021-03-27 | REPAIR SIDEWALK | 3 AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
X042021056A08 | 2021-02-25 | 2021-03-27 | REPAIR SIDEWALK | EAST 174 STREET, BRONX, FROM STREET BATHGATE AVENUE TO STREET 3 AVENUE |
X042021056A07 | 2021-02-25 | 2021-03-27 | REPAIR SIDEWALK | EAST 173 STREET, BRONX, FROM STREET BATHGATE AVENUE TO STREET 3 AVENUE |
X042021056A06 | 2021-02-25 | 2021-03-27 | REPAIR SIDEWALK | BATHGATE AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET |
X042021056A05 | 2021-02-25 | 2021-03-26 | REPAIR SIDEWALK | EAST 172 STREET, BRONX, FROM STREET BATHGATE AVENUE TO STREET WASHINGTON AVENUE |
X042021056A04 | 2021-02-25 | 2021-03-26 | REPAIR SIDEWALK | WASHINGTON AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET |
M042021054A14 | 2021-02-23 | 2021-03-18 | REPAIR SIDEWALK | EAST 81 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M042021047B07 | 2021-02-16 | 2021-03-19 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 6 STREET, MANHATTAN, FROM STREET AVENUE B TO STREET AVENUE C |
M042021042A01 | 2021-02-11 | 2021-03-13 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 2 AVENUE, MANHATTAN, FROM STREET EAST 80 STREET |
M012021042A18 | 2021-02-11 | 2021-03-19 | VAULT CONSTRUCTION OR ALTERATION | COLUMBUS AVENUE, MANHATTAN, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET |
M012021042A17 | 2021-02-11 | 2021-03-13 | RESET, REPAIR OR REPLACE CURB | EAST 80 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M042021042A00 | 2021-02-11 | 2021-03-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 80 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
X012021042A07 | 2021-02-11 | 2021-03-16 | RESET, REPAIR OR REPLACE CURB | CLARKE PLACE, BRONX, FROM STREET GRAND CONCOURSE TO STREET WALTON AVENUE |
X042021042A00 | 2021-02-11 | 2021-03-16 | REPLACE SIDEWALK | CLARKE PLACE, BRONX, FROM STREET GRAND CONCOURSE TO STREET WALTON AVENUE |
B012021042A34 | 2021-02-11 | 2021-03-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | FULTON STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B012021042A33 | 2021-02-11 | 2021-03-15 | RESET, REPAIR OR REPLACE CURB | FULTON STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
M042021039A00 | 2021-02-08 | 2021-03-08 | REPAIR SIDEWALK | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
M042021033A00 | 2021-02-02 | 2021-02-26 | REPAIR SIDEWALK | VARICK STREET, MANHATTAN, FROM STREET CHARLTON STREET TO STREET VANDAM STREET |
X042021028A06 | 2021-01-28 | 2021-03-02 | REPAIR SIDEWALK | 3 AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
X042021028A01 | 2021-01-28 | 2021-02-25 | REPAIR SIDEWALK | BATHGATE AVENUE, BRONX, FROM STREET CLAREMONT PARKWAY TO STREET EAST 172 STREET |
X042021028A02 | 2021-01-28 | 2021-02-25 | REPAIR SIDEWALK | 3 AVENUE, BRONX, FROM STREET CLAREMONT PARKWAY TO STREET EAST 172 STREET |
X042021028A03 | 2021-01-28 | 2021-02-25 | REPAIR SIDEWALK | 3 AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
X042021028A04 | 2021-01-28 | 2021-02-25 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 174 STREET, BRONX, FROM STREET 3 AVENUE |
X042021028A05 | 2021-01-28 | 2021-03-02 | REPAIR SIDEWALK | EAST 174 STREET, BRONX, FROM STREET BATHGATE AVENUE TO STREET 3 AVENUE |
X042021028A08 | 2021-01-28 | 2021-03-02 | REPAIR SIDEWALK | WASHINGTON AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
X042021028A07 | 2021-01-28 | 2021-03-02 | REPAIR SIDEWALK | EAST 174 STREET, BRONX, FROM STREET BATHGATE AVENUE TO STREET WASHINGTON AVENUE |
X042021028A00 | 2021-01-28 | 2021-02-25 | REPAIR SIDEWALK | BATHGATE AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET |
X042021027A03 | 2021-01-27 | 2021-02-24 | REPAIR SIDEWALK | WASHINGTON AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET |
X042021027A04 | 2021-01-27 | 2021-02-24 | REPAIR SIDEWALK | EAST 172 STREET, BRONX, FROM STREET BATHGATE AVENUE TO STREET WASHINGTON AVENUE |
X042021027A05 | 2021-01-27 | 2021-02-25 | REPAIR SIDEWALK | EAST 173 STREET, BRONX, FROM STREET BATHGATE AVENUE TO STREET 3 AVENUE |
B012021027B25 | 2021-01-27 | 2021-03-03 | RESET, REPAIR OR REPLACE CURB | 89 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
X042021027A02 | 2021-01-27 | 2021-02-24 | REPAIR SIDEWALK | EAST 173 STREET, BRONX, FROM STREET BATHGATE AVENUE TO STREET WASHINGTON AVENUE |
B012021027B26 | 2021-01-27 | 2021-03-03 | PAVE STREET-W/ ENGINEERING & INSP FEE | 89 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B042021027A07 | 2021-01-27 | 2021-03-03 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 89 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
M042021025A04 | 2021-01-25 | 2021-02-17 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 6 STREET, MANHATTAN, FROM STREET AVENUE B TO STREET AVENUE C |
X042021025A00 | 2021-01-25 | 2021-02-23 | REPAIR SIDEWALK | BATHGATE AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET |
M012021019B48 | 2021-01-19 | 2021-02-17 | VAULT CONSTRUCTION OR ALTERATION | COLUMBUS AVENUE, MANHATTAN, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET |
X042021015A06 | 2021-01-15 | 2021-02-14 | REPLACE SIDEWALK | CLARKE PLACE, BRONX, FROM STREET GRAND CONCOURSE TO STREET WALTON AVENUE |
X012021015A51 | 2021-01-15 | 2021-02-14 | RESET, REPAIR OR REPLACE CURB | CLARKE PLACE, BRONX, FROM STREET GRAND CONCOURSE TO STREET WALTON AVENUE |
M042021014A01 | 2021-01-14 | 2021-02-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 80 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012021014A65 | 2021-01-14 | 2021-02-11 | RESET, REPAIR OR REPLACE CURB | EAST 80 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M042021014A02 | 2021-01-14 | 2021-02-11 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 2 AVENUE, MANHATTAN, FROM STREET EAST 80 STREET |
M012021013A90 | 2021-01-13 | 2021-02-12 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | WASHINGTON STREET, MANHATTAN, FROM STREET GANSEVOORT STREET TO STREET HORATIO STREET |
M012021013A89 | 2021-01-13 | 2021-02-12 | PAVE STREET-W/ ENGINEERING & INSP FEE | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
B042021012A00 | 2021-01-12 | 2021-02-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | FULTON STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B012021012A40 | 2021-01-12 | 2021-02-13 | PAVE STREET-W/ ENGINEERING & INSP FEE | FULTON STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B012021012A39 | 2021-01-12 | 2021-02-13 | RESET, REPAIR OR REPLACE CURB | FULTON STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
X042020366A05 | 2020-12-31 | 2021-01-31 | REPAIR SIDEWALK | WASHINGTON AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
X042020366A04 | 2020-12-31 | 2021-01-31 | REPAIR SIDEWALK | EAST 174 STREET, BRONX, FROM STREET BATHGATE AVENUE TO STREET WASHINGTON AVENUE |
X042020366A03 | 2020-12-31 | 2021-01-31 | REPAIR SIDEWALK | BATHGATE AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
X042020366A02 | 2020-12-31 | 2021-01-31 | REPAIR SIDEWALK | 3 AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
X042020366A01 | 2020-12-31 | 2021-01-31 | REPAIR SIDEWALK | EAST 174 STREET, BRONX, FROM STREET BATHGATE AVENUE TO STREET 3 AVENUE |
X042020366A00 | 2020-12-31 | 2021-01-31 | REPAIR SIDEWALK | BATHGATE AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
B012020366A14 | 2020-12-31 | 2021-02-01 | RESET, REPAIR OR REPLACE CURB | 89 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B012020366A15 | 2020-12-31 | 2021-02-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | 89 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B042020366A02 | 2020-12-31 | 2021-02-01 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 89 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
M042020366A09 | 2020-12-31 | 2021-02-06 | REPAIR SIDEWALK | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
X042020353A03 | 2020-12-18 | 2021-01-24 | REPAIR SIDEWALK | BATHGATE AVENUE, BRONX, FROM STREET CLAREMONT PARKWAY TO STREET EAST 172 STREET |
X042020353A02 | 2020-12-18 | 2021-01-24 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 174 STREET, BRONX, FROM STREET 3 AVENUE |
B042020353A01 | 2020-12-18 | 2021-01-26 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 5 AVENUE, BROOKLYN, FROM STREET 89 STREET TO STREET 90 STREET |
X042020353A01 | 2020-12-18 | 2021-01-24 | REPAIR SIDEWALK | 3 AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
B012020353A72 | 2020-12-18 | 2021-01-26 | RESET, REPAIR OR REPLACE CURB | 5 AVENUE, BROOKLYN, FROM STREET 89 STREET TO STREET 90 STREET |
B012020353A73 | 2020-12-18 | 2021-01-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | 5 AVENUE, BROOKLYN, FROM STREET 89 STREET TO STREET 90 STREET |
B012020353A74 | 2020-12-18 | 2021-01-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | 5 AVENUE, BROOKLYN, FROM STREET 89 STREET |
M042020353A01 | 2020-12-18 | 2021-01-23 | REPAIR SIDEWALK | 1 AVENUE, MANHATTAN, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET |
X042020353A06 | 2020-12-18 | 2021-01-24 | REPAIR SIDEWALK | BATHGATE AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET |
X042020353A05 | 2020-12-18 | 2021-01-24 | REPAIR SIDEWALK | BATHGATE AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET |
X042020353A04 | 2020-12-18 | 2021-01-24 | REPAIR SIDEWALK | 3 AVENUE, BRONX, FROM STREET CLAREMONT PARKWAY TO STREET EAST 172 STREET |
M012020350A26 | 2020-12-15 | 2021-01-17 | RESET, REPAIR OR REPLACE CURB | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M012020350A23 | 2020-12-15 | 2021-01-16 | PAVE STREET-W/ ENGINEERING & INSP FEE | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
M012020350A24 | 2020-12-15 | 2021-01-18 | VAULT CONSTRUCTION OR ALTERATION | COLUMBUS AVENUE, MANHATTAN, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET |
M042020350A00 | 2020-12-15 | 2021-01-17 | REPLACE SIDEWALK | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 78 STREET TO STREET WEST 79 STREET |
M042020350A03 | 2020-12-15 | 2021-01-17 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 79 STREET |
M042020350A02 | 2020-12-15 | 2021-01-17 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 78 STREET |
M042020350A01 | 2020-12-15 | 2021-01-17 | REPLACE SIDEWALK | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
B012020346A75 | 2020-12-11 | 2021-01-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | FULTON STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B042020346A05 | 2020-12-11 | 2021-01-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | FULTON STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B012020346A74 | 2020-12-11 | 2021-01-14 | RESET, REPAIR OR REPLACE CURB | FULTON STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
M012020346A50 | 2020-12-11 | 2021-01-13 | PAVE STREET-W/ ENGINEERING & INSP FEE | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
X042020339A05 | 2020-12-04 | 2021-01-01 | REPAIR SIDEWALK | BATHGATE AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
X042020339A03 | 2020-12-04 | 2021-01-01 | REPAIR SIDEWALK | EAST 174 STREET, BRONX, FROM STREET BATHGATE AVENUE TO STREET WASHINGTON AVENUE |
X042020339A02 | 2020-12-04 | 2021-01-01 | REPAIR SIDEWALK | BATHGATE AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
X042020339A04 | 2020-12-04 | 2021-01-01 | REPAIR SIDEWALK | WASHINGTON AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
X042020339A07 | 2020-12-04 | 2021-01-01 | REPAIR SIDEWALK | 3 AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
X042020339A06 | 2020-12-04 | 2021-01-01 | REPAIR SIDEWALK | EAST 174 STREET, BRONX, FROM STREET BATHGATE AVENUE TO STREET 3 AVENUE |
X042020338A02 | 2020-12-03 | 2020-12-25 | REPAIR SIDEWALK | BATHGATE AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET |
B042020337A02 | 2020-12-02 | 2021-01-02 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 89 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B012020337A75 | 2020-12-02 | 2021-01-02 | RESET, REPAIR OR REPLACE CURB | 89 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
M012020337A05 | 2020-12-02 | 2021-01-07 | RESET, REPAIR OR REPLACE CURB | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
M042020337A00 | 2020-12-02 | 2021-01-07 | REPAIR SIDEWALK | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
X042020337A02 | 2020-12-02 | 2020-12-25 | REPAIR SIDEWALK | BATHGATE AVENUE, BRONX, FROM STREET CLAREMONT PARKWAY TO STREET EAST 172 STREET |
X042020337A03 | 2020-12-02 | 2020-12-25 | REPAIR SIDEWALK | 3 AVENUE, BRONX, FROM STREET CLAREMONT PARKWAY TO STREET EAST 172 STREET |
B012020337A76 | 2020-12-02 | 2021-01-02 | PAVE STREET-W/ ENGINEERING & INSP FEE | 89 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
X042020335A05 | 2020-11-30 | 2020-12-25 | REPAIR SIDEWALK | EAST 173 STREET, BRONX, FROM STREET BATHGATE AVENUE TO STREET 3 AVENUE |
X042020335A04 | 2020-11-30 | 2020-12-25 | REPAIR SIDEWALK | BATHGATE AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET |
X042020335A03 | 2020-11-30 | 2020-12-25 | REPAIR SIDEWALK | 3 AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
M042020335A03 | 2020-11-30 | 2020-12-24 | REPAIR SIDEWALK | 1 AVENUE, MANHATTAN, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET |
X042020335A06 | 2020-11-30 | 2020-12-25 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 174 STREET, BRONX, FROM STREET 3 AVENUE |
Q012020329B25 | 2020-11-24 | 2020-12-28 | PAVE STREET-W/ ENGINEERING & INSP FEE | 29 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET SKILLMAN AVENUE |
M012020328A45 | 2020-11-23 | 2020-12-19 | VAULT CONSTRUCTION OR ALTERATION | COLUMBUS AVENUE, MANHATTAN, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET |
B012020324B73 | 2020-11-19 | 2020-12-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | FULTON STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B042020324A04 | 2020-11-19 | 2020-12-15 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | FULTON STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B012020324B72 | 2020-11-19 | 2020-12-15 | RESET, REPAIR OR REPLACE CURB | FULTON STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
M042020321A10 | 2020-11-16 | 2020-12-18 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 78 STREET |
M012020321A67 | 2020-11-16 | 2020-12-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
M012020321A65 | 2020-11-16 | 2020-12-18 | RESET, REPAIR OR REPLACE CURB | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M012020321A63 | 2020-11-16 | 2020-11-23 | PAVE STREET-W/ ENGINEERING & INSP FEE | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
M042020321A07 | 2020-11-16 | 2020-11-23 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
M042020321A08 | 2020-11-16 | 2020-11-23 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 79 STREET |
M042020321A09 | 2020-11-16 | 2020-12-18 | REPLACE SIDEWALK | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 78 STREET TO STREET WEST 79 STREET |
M042020321A11 | 2020-11-16 | 2020-12-18 | REPLACE SIDEWALK | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M012020318A21 | 2020-11-13 | 2020-12-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | 2 AVENUE, MANHATTAN, FROM STREET EAST 80 STREET |
M012020318A17 | 2020-11-13 | 2020-12-14 | RESET, REPAIR OR REPLACE CURB | EAST 80 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012020318A18 | 2020-11-13 | 2020-12-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 80 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012020318A19 | 2020-11-13 | 2020-12-14 | RESET, REPAIR OR REPLACE CURB | 2 AVENUE, MANHATTAN, FROM STREET EAST 80 STREET TO STREET EAST 81 STREET |
M012020318A20 | 2020-11-13 | 2020-12-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | 2 AVENUE, MANHATTAN, FROM STREET EAST 80 STREET TO STREET EAST 81 STREET |
M012020318A22 | 2020-11-13 | 2020-12-17 | PAVE STREET-W/ ENGINEERING & INSP FEE | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
M042020318A02 | 2020-11-13 | 2020-12-14 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 2 AVENUE, MANHATTAN, FROM STREET EAST 80 STREET |
M042020318A01 | 2020-11-13 | 2020-12-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 2 AVENUE, MANHATTAN, FROM STREET EAST 80 STREET TO STREET EAST 81 STREET |
M042020318A00 | 2020-11-13 | 2020-12-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 80 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012020315B13 | 2020-11-10 | 2020-12-08 | RESET, REPAIR OR REPLACE CURB | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
M042020315A10 | 2020-11-10 | 2020-12-08 | REPAIR SIDEWALK | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
B012020311B39 | 2020-11-06 | 2020-12-03 | PAVE STREET-W/ ENGINEERING & INSP FEE | 89 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B012020311B40 | 2020-11-06 | 2020-11-23 | PAVE STREET-W/ ENGINEERING & INSP FEE | 5 AVENUE, BROOKLYN, FROM STREET 89 STREET |
B012020311B36 | 2020-11-06 | 2020-11-23 | RESET, REPAIR OR REPLACE CURB | 5 AVENUE, BROOKLYN, FROM STREET 89 STREET TO STREET 90 STREET |
B012020311B37 | 2020-11-06 | 2020-11-23 | PAVE STREET-W/ ENGINEERING & INSP FEE | 5 AVENUE, BROOKLYN, FROM STREET 89 STREET TO STREET 90 STREET |
B012020311B38 | 2020-11-06 | 2020-12-03 | RESET, REPAIR OR REPLACE CURB | 89 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B042020311A05 | 2020-11-06 | 2020-12-03 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 89 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B042020311A04 | 2020-11-06 | 2020-11-23 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 5 AVENUE, BROOKLYN, FROM STREET 89 STREET TO STREET 90 STREET |
M012020302B39 | 2020-10-28 | 2020-11-13 | PAVE STREET-W/ ENGINEERING & INSP FEE | COOPER STREET, MANHATTAN, FROM STREET ACADEMY STREET TO STREET WEST 204 STREET |
M042020296A00 | 2020-10-22 | 2020-11-29 | REPAIR SIDEWALK | EAST 74 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
Q012020296A25 | 2020-10-22 | 2020-11-28 | PAVE STREET-W/ ENGINEERING & INSP FEE | 29 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET SKILLMAN AVENUE |
Q012020296A24 | 2020-10-22 | 2020-11-28 | PAVE STREET-W/ ENGINEERING & INSP FEE | 30 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET THOMSON AVENUE |
M042020296A01 | 2020-10-22 | 2020-11-29 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 2 AVENUE, MANHATTAN, FROM STREET EAST 74 STREET |
M012020295A31 | 2020-10-21 | 2020-10-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | COOPER STREET, MANHATTAN, FROM STREET ACADEMY STREET TO STREET WEST 204 STREET |
M012020294A88 | 2020-10-20 | 2020-11-17 | PAVE STREET-W/ ENGINEERING & INSP FEE | 2 AVENUE, MANHATTAN, FROM STREET EAST 80 STREET |
M012020294A87 | 2020-10-20 | 2020-11-17 | PAVE STREET-W/ ENGINEERING & INSP FEE | 2 AVENUE, MANHATTAN, FROM STREET EAST 80 STREET TO STREET EAST 81 STREET |
M042020294A10 | 2020-10-20 | 2020-11-14 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 2 AVENUE, MANHATTAN, FROM STREET EAST 80 STREET |
M012020294A84 | 2020-10-20 | 2020-11-17 | RESET, REPAIR OR REPLACE CURB | EAST 80 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M042020294A09 | 2020-10-20 | 2020-11-17 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 2 AVENUE, MANHATTAN, FROM STREET EAST 80 STREET TO STREET EAST 81 STREET |
M042020294A08 | 2020-10-20 | 2020-11-17 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 80 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012020294A85 | 2020-10-20 | 2020-11-17 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 80 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012020294A86 | 2020-10-20 | 2020-11-17 | RESET, REPAIR OR REPLACE CURB | 2 AVENUE, MANHATTAN, FROM STREET EAST 80 STREET TO STREET EAST 81 STREET |
M012020293A91 | 2020-10-19 | 2020-11-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
M012020293A94 | 2020-10-19 | 2020-11-17 | PAVE STREET-W/ ENGINEERING & INSP FEE | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
M042020290A01 | 2020-10-16 | 2020-11-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WASHINGTON STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET WATTS STREET |
M042020289A11 | 2020-10-15 | 2020-11-18 | REPLACE SIDEWALK | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M012020289A24 | 2020-10-15 | 2020-11-18 | RESET, REPAIR OR REPLACE CURB | WEST 79 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M042020289A07 | 2020-10-15 | 2020-11-18 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 79 STREET |
M042020289A08 | 2020-10-15 | 2020-11-18 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 78 STREET |
M042020289A09 | 2020-10-15 | 2020-11-18 | REPLACE SIDEWALK | WEST 79 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M012020289A26 | 2020-10-15 | 2020-11-18 | RESET, REPAIR OR REPLACE CURB | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M042020289A10 | 2020-10-15 | 2020-11-18 | REPLACE SIDEWALK | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 78 STREET TO STREET WEST 79 STREET |
M042020288A11 | 2020-10-14 | 2020-11-12 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GANSEVOORT STREET, MANHATTAN, FROM STREET WASHINGTON STREET |
M042020288A13 | 2020-10-14 | 2020-11-12 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GANSEVOORT STREET, MANHATTAN, FROM STREET WASHINGTON STREET |
M042020288A12 | 2020-10-14 | 2020-11-12 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GANSEVOORT STREET, MANHATTAN, FROM STREET WASHINGTON STREET |
M042020287A41 | 2020-10-13 | 2020-11-05 | REPAIR SIDEWALK | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
M042020287A40 | 2020-10-13 | 2020-11-05 | REPAIR SIDEWALK | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
M012020287B46 | 2020-10-13 | 2020-11-05 | RESET, REPAIR OR REPLACE CURB | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
M012020287B47 | 2020-10-13 | 2020-11-05 | RESET, REPAIR OR REPLACE CURB | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
M012020283A02 | 2020-10-09 | 2020-11-08 | RESET, REPAIR OR REPLACE CURB | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
M042020283A00 | 2020-10-09 | 2020-11-08 | REPAIR SIDEWALK | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
M042020282A04 | 2020-10-08 | 2020-10-29 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 87 STREET, MANHATTAN, FROM STREET PARK AVENUE |
M042020281A27 | 2020-10-07 | 2020-10-30 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 2 AVENUE, MANHATTAN, FROM STREET EAST 74 STREET |
M042020281A26 | 2020-10-07 | 2020-10-31 | REPAIR SIDEWALK | EAST 74 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M042020280A14 | 2020-10-06 | 2020-11-05 | REPAIR SIDEWALK | PARK AVENUE, MANHATTAN, FROM STREET EAST 107 STREET TO STREET EAST 108 STREET |
Q012020279B98 | 2020-10-05 | 2020-10-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | 29 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET SKILLMAN AVENUE |
M042020274A47 | 2020-09-30 | 2020-10-29 | REPLACE SIDEWALK | PARK AVENUE, MANHATTAN, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET |
M042020274A48 | 2020-09-30 | 2020-10-29 | REPLACE SIDEWALK | EAST 87 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M012020274A58 | 2020-09-30 | 2020-10-29 | VAULT CONSTRUCTION OR ALTERATION | EAST 87 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M012020274A59 | 2020-09-30 | 2020-10-29 | RESET, REPAIR OR REPLACE CURB | EAST 87 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
Q012020273A45 | 2020-09-29 | 2020-10-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | 30 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET THOMSON AVENUE |
M042020255A11 | 2020-09-11 | 2020-10-19 | REPLACE SIDEWALK | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M042020255A13 | 2020-09-11 | 2020-10-13 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GANSEVOORT STREET, MANHATTAN, FROM STREET WASHINGTON STREET |
M042020255A14 | 2020-09-11 | 2020-10-07 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GANSEVOORT STREET, MANHATTAN, FROM STREET WASHINGTON STREET |
M012020255B04 | 2020-09-11 | 2020-10-19 | RESET, REPAIR OR REPLACE CURB | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M042020255A15 | 2020-09-11 | 2020-10-13 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GANSEVOORT STREET, MANHATTAN, FROM STREET WASHINGTON STREET |
M012020255B02 | 2020-09-11 | 2020-10-19 | RESET, REPAIR OR REPLACE CURB | WEST 79 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M042020255A07 | 2020-09-11 | 2020-10-19 | REPLACE SIDEWALK | WEST 79 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M042020255A08 | 2020-09-11 | 2020-10-19 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 78 STREET |
M042020255A09 | 2020-09-11 | 2020-10-19 | REPLACE SIDEWALK | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 78 STREET TO STREET WEST 79 STREET |
M042020255A10 | 2020-09-11 | 2020-10-19 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 79 STREET |
M012020255B01 | 2020-09-11 | 2020-10-12 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 2 AVENUE, MANHATTAN, FROM STREET EAST 93 STREET TO STREET EAST 94 STREET |
M042020246A01 | 2020-09-02 | 2020-10-09 | REPAIR SIDEWALK | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
M012020246A35 | 2020-09-02 | 2020-10-09 | RESET, REPAIR OR REPLACE CURB | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
Q012020246B06 | 2020-09-02 | 2020-09-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | 30 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET THOMSON AVENUE |
B042020239A10 | 2020-08-26 | 2020-09-24 | REPLACE SIDEWALK | WILLOUGHBY STREET, BROOKLYN, FROM STREET ASHLAND PLACE TO STREET FLEET STREET |
M042020238A33 | 2020-08-25 | 2020-09-18 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
M012020238A66 | 2020-08-25 | 2020-09-22 | RESET, REPAIR OR REPLACE CURB | WASHINGTON STREET, MANHATTAN, FROM STREET GANSEVOORT STREET TO STREET HORATIO STREET |
M012020238A67 | 2020-08-25 | 2020-09-18 | RESET, REPAIR OR REPLACE CURB | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
M042020238A32 | 2020-08-25 | 2020-09-22 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WASHINGTON STREET, MANHATTAN, FROM STREET GANSEVOORT STREET TO STREET HORATIO STREET |
M012020237B33 | 2020-08-24 | 2020-09-29 | RESET, REPAIR OR REPLACE CURB | EAST 87 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M042020237A11 | 2020-08-24 | 2020-09-29 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 87 STREET, MANHATTAN, FROM STREET PARK AVENUE |
M042020237A12 | 2020-08-24 | 2020-09-29 | REPLACE SIDEWALK | EAST 87 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M012020237B32 | 2020-08-24 | 2020-09-29 | VAULT CONSTRUCTION OR ALTERATION | EAST 87 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M042020237A10 | 2020-08-24 | 2020-09-29 | REPLACE SIDEWALK | PARK AVENUE, MANHATTAN, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET |
B042020231A26 | 2020-08-18 | 2020-09-22 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | FLEET PLACE, BROOKLYN, FROM STREET WILLOUGHBY STREET |
B042020231A25 | 2020-08-18 | 2020-09-22 | REPLACE SIDEWALK | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
B042020231A24 | 2020-08-18 | 2020-09-22 | REPLACE SIDEWALK | WILLOUGHBY STREET, BROOKLYN, FROM STREET ASHLAND PLACE TO STREET FLEET STREET |
B012020231A88 | 2020-08-18 | 2020-09-22 | RESET, REPAIR OR REPLACE CURB | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
M012020226A36 | 2020-08-13 | 2020-09-19 | RESET, REPAIR OR REPLACE CURB | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M042020226A07 | 2020-08-13 | 2020-09-19 | REPLACE SIDEWALK | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 78 STREET TO STREET WEST 79 STREET |
M042020226A06 | 2020-08-13 | 2020-09-19 | REPLACE SIDEWALK | WEST 79 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M042020226A05 | 2020-08-13 | 2020-09-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | KING STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M012020226A33 | 2020-08-13 | 2020-09-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | KING STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M012020226A34 | 2020-08-13 | 2020-09-19 | RESET, REPAIR OR REPLACE CURB | WEST 79 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M042020226A08 | 2020-08-13 | 2020-09-19 | REPLACE SIDEWALK | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M012020226A29 | 2020-08-13 | 2020-09-09 | RESET, REPAIR OR REPLACE CURB | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
M012020226A32 | 2020-08-13 | 2020-09-14 | RESET, REPAIR OR REPLACE CURB | KING STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M042020226A03 | 2020-08-13 | 2020-09-09 | REPAIR SIDEWALK | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
M042020226A04 | 2020-08-13 | 2020-09-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CHARLTON STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M042020226A10 | 2020-08-13 | 2020-09-19 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 79 STREET |
M042020226A09 | 2020-08-13 | 2020-09-19 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 78 STREET |
M042020225A10 | 2020-08-12 | 2020-09-13 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GANSEVOORT STREET, MANHATTAN, FROM STREET WASHINGTON STREET |
X012020225A28 | 2020-08-12 | 2020-09-08 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 137 STREET, BRONX, FROM STREET ST ANNS AVENUE |
X012020225A26 | 2020-08-12 | 2020-09-08 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 137 STREET, BRONX, FROM STREET CYPRESS AVENUE TO STREET ST ANNS AVENUE |
X012020225A27 | 2020-08-12 | 2020-09-08 | PAVE STREET-W/ ENGINEERING & INSP FEE | ST ANNS AVENUE, BRONX, FROM STREET EAST 135 STREET TO STREET EAST 137 STREET |
M012020212B05 | 2020-07-30 | 2020-08-28 | PAVE STREET-W/ ENGINEERING & INSP FEE | 3 AVENUE, MANHATTAN, FROM STREET EAST 21 STREET |
M012020205B30 | 2020-07-23 | 2020-08-02 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 21 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012020205B31 | 2020-07-23 | 2020-08-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | 3 AVENUE, MANHATTAN, FROM STREET EAST 20 STREET TO STREET EAST 21 STREET |
M012020204B20 | 2020-07-22 | 2020-08-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | KING STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M042020204A02 | 2020-07-22 | 2020-08-19 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 2 AVENUE, MANHATTAN, FROM STREET EAST 81 STREET |
M042020204A18 | 2020-07-22 | 2020-08-30 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 87 STREET, MANHATTAN, FROM STREET PARK AVENUE |
M042020204A10 | 2020-07-22 | 2020-08-30 | REPLACE SIDEWALK | PARK AVENUE, MANHATTAN, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET |
M042020204A11 | 2020-07-22 | 2020-08-30 | REPLACE SIDEWALK | EAST 87 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M042020204A16 | 2020-07-22 | 2020-08-15 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CHARLTON STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M042020204A17 | 2020-07-22 | 2020-08-15 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | KING STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M042020204A03 | 2020-07-22 | 2020-08-19 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 2 AVENUE, MANHATTAN, FROM STREET EAST 81 STREET |
M012020204B03 | 2020-07-22 | 2020-08-30 | RESET, REPAIR OR REPLACE CURB | EAST 87 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M012020204B02 | 2020-07-22 | 2020-08-30 | VAULT CONSTRUCTION OR ALTERATION | EAST 87 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M012020204B19 | 2020-07-22 | 2020-08-15 | RESET, REPAIR OR REPLACE CURB | KING STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M042020204A04 | 2020-07-22 | 2020-08-19 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 2 AVENUE, MANHATTAN, FROM STREET EAST 81 STREET |
M012020203A74 | 2020-07-21 | 2020-08-15 | RESET, REPAIR OR REPLACE CURB-PROTECTED | CHARLTON STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M012020203A76 | 2020-07-21 | 2020-08-15 | RESET, REPAIR OR REPLACE CURB | KING STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M012020203A77 | 2020-07-21 | 2020-08-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | KING STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M012020203A75 | 2020-07-21 | 2020-08-15 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | CHARLTON STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M012020203A69 | 2020-07-21 | 2020-08-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | PEARL STREET, MANHATTAN, FROM STREET FLETCHER STREET TO STREET PLATT STREET |
M012020203A70 | 2020-07-21 | 2020-08-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | PLATT STREET, MANHATTAN, FROM STREET GOLD STREET TO STREET PEARL STREET |
M012020203A71 | 2020-07-21 | 2020-08-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | PEARL STREET, MANHATTAN, FROM STREET PLATT STREET |
M042020199A21 | 2020-07-17 | 2020-08-14 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GANSEVOORT STREET, MANHATTAN, FROM STREET WASHINGTON STREET |
B042020198A01 | 2020-07-16 | 2020-08-23 | REPLACE SIDEWALK | WILLOUGHBY STREET, BROOKLYN, FROM STREET ASHLAND PLACE TO STREET FLEET STREET |
M012020198B11 | 2020-07-16 | 2020-08-20 | RESET, REPAIR OR REPLACE CURB | WEST 79 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M012020198B13 | 2020-07-16 | 2020-08-20 | RESET, REPAIR OR REPLACE CURB | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
B012020198A65 | 2020-07-16 | 2020-08-23 | RESET, REPAIR OR REPLACE CURB | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
M042020198A26 | 2020-07-16 | 2020-08-20 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 78 STREET |
M042020198A25 | 2020-07-16 | 2020-08-20 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 79 STREET |
M042020198A24 | 2020-07-16 | 2020-08-20 | REPLACE SIDEWALK | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M042020198A23 | 2020-07-16 | 2020-08-20 | REPLACE SIDEWALK | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 78 STREET TO STREET WEST 79 STREET |
M042020198A22 | 2020-07-16 | 2020-08-20 | REPLACE SIDEWALK | WEST 79 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
B042020198A02 | 2020-07-16 | 2020-08-23 | REPLACE SIDEWALK | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
B042020195A10 | 2020-07-13 | 2020-08-15 | REPLACE SIDEWALK | MAC KAY PLACE, BROOKLYN, FROM STREET NARROWS AVENUE TO STREET SHORE ROAD |
M012020192A82 | 2020-07-10 | 2020-08-08 | PAVE STREET-W/ ENGINEERING & INSP FEE | 2 AVENUE, MANHATTAN, FROM STREET EAST 81 STREET |
M042020188A08 | 2020-07-06 | 2020-08-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 2 AVENUE, MANHATTAN, FROM STREET EAST 93 STREET TO STREET EAST 94 STREET |
M012020185A04 | 2020-07-03 | 2020-07-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 21 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M042020178A05 | 2020-06-26 | 2020-07-25 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
M012020178A73 | 2020-06-26 | 2020-07-25 | RESET, REPAIR OR REPLACE CURB | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
M012020177B20 | 2020-06-25 | 2020-07-31 | VAULT CONSTRUCTION OR ALTERATION | EAST 87 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M042020177A21 | 2020-06-25 | 2020-08-01 | REPAIR SIDEWALK | EAST 19 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M042020177A20 | 2020-06-25 | 2020-07-31 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 87 STREET, MANHATTAN, FROM STREET PARK AVENUE |
M042020177A19 | 2020-06-25 | 2020-07-31 | REPLACE SIDEWALK | EAST 87 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M042020177A18 | 2020-06-25 | 2020-07-31 | REPLACE SIDEWALK | PARK AVENUE, MANHATTAN, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET |
M012020177B21 | 2020-06-25 | 2020-07-31 | RESET, REPAIR OR REPLACE CURB | EAST 87 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
B012020176C00 | 2020-06-24 | 2020-07-23 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | STERLING PLACE, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE |
M012020176A35 | 2020-06-24 | 2020-07-21 | RESET, REPAIR OR REPLACE CURB | WEST 79 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M012020176A37 | 2020-06-24 | 2020-07-21 | RESET, REPAIR OR REPLACE CURB | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M012020176A38 | 2020-06-24 | 2020-07-17 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 81 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012020176A39 | 2020-06-24 | 2020-07-17 | PAVE STREET-W/ ENGINEERING & INSP FEE | 2 AVENUE, MANHATTAN, FROM STREET EAST 81 STREET TO STREET EAST 82 STREET |
M042020176A07 | 2020-06-24 | 2020-07-17 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 2 AVENUE, MANHATTAN, FROM STREET EAST 81 STREET TO STREET EAST 82 STREET |
M042020176A06 | 2020-06-24 | 2020-07-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 78 STREET |
M042020176A05 | 2020-06-24 | 2020-07-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 79 STREET |
M042020176A04 | 2020-06-24 | 2020-07-21 | REPLACE SIDEWALK | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M042020176A03 | 2020-06-24 | 2020-07-21 | REPLACE SIDEWALK | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 78 STREET TO STREET WEST 79 STREET |
M042020176A02 | 2020-06-24 | 2020-07-21 | REPLACE SIDEWALK | WEST 79 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M012020174A40 | 2020-06-22 | 2020-07-05 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 21 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M042020174A03 | 2020-06-22 | 2020-07-27 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 81 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012020174A41 | 2020-06-22 | 2020-07-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | 3 AVENUE, MANHATTAN, FROM STREET EAST 20 STREET TO STREET EAST 21 STREET |
M042020174A04 | 2020-06-22 | 2020-07-27 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 2 AVENUE, MANHATTAN, FROM STREET EAST 81 STREET TO STREET EAST 82 STREET |
M012020174A44 | 2020-06-22 | 2020-07-27 | RESET, REPAIR OR REPLACE CURB | 2 AVENUE, MANHATTAN, FROM STREET EAST 81 STREET TO STREET EAST 82 STREET |
M012020171A57 | 2020-06-19 | 2020-07-17 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | WEST 59 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET COLUMBUS CIRCLE |
M012020171A58 | 2020-06-19 | 2020-06-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 58 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET BROADWAY |
B042020170A01 | 2020-06-18 | 2020-07-24 | REPLACE SIDEWALK | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
B012020170A01 | 2020-06-18 | 2020-07-24 | RESET, REPAIR OR REPLACE CURB | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
B042020170A15 | 2020-06-18 | 2020-07-16 | REPLACE SIDEWALK | MAC KAY PLACE, BROOKLYN, FROM STREET NARROWS AVENUE TO STREET SHORE ROAD |
B042020170A00 | 2020-06-18 | 2020-07-24 | REPLACE SIDEWALK | WILLOUGHBY STREET, BROOKLYN, FROM STREET ASHLAND PLACE TO STREET FLEET STREET |
B042020170A02 | 2020-06-18 | 2020-07-24 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | FLEET PLACE, BROOKLYN, FROM STREET WILLOUGHBY STREET |
B012020163B35 | 2020-06-11 | 2020-07-10 | PAVE STREET-W/ ENGINEERING & INSP FEE | GRAND STREET, BROOKLYN, FROM STREET KENT AVENUE |
M042020162A06 | 2020-06-10 | 2020-07-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 2 AVENUE, MANHATTAN, FROM STREET EAST 93 STREET TO STREET EAST 94 STREET |
M042020156A03 | 2020-06-04 | 2020-07-01 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 87 STREET, MANHATTAN, FROM STREET PARK AVENUE |
M012020156A64 | 2020-06-04 | 2020-07-02 | VAULT CONSTRUCTION OR ALTERATION | EAST 87 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M042020156A02 | 2020-06-04 | 2020-07-02 | REPLACE SIDEWALK | EAST 87 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M012020156A63 | 2020-06-04 | 2020-07-02 | RESET, REPAIR OR REPLACE CURB-PROTECTED | PARK AVENUE, MANHATTAN, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET |
M042020156A01 | 2020-06-04 | 2020-07-02 | REPLACE SIDEWALK | PARK AVENUE, MANHATTAN, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET |
M012020156A65 | 2020-06-04 | 2020-07-02 | RESET, REPAIR OR REPLACE CURB | EAST 87 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
Q012020155A47 | 2020-06-03 | 2020-07-07 | PAVE STREET-W/ ENGINEERING & INSP FEE | 30 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET THOMSON AVENUE |
M042020155A03 | 2020-06-03 | 2020-07-02 | REPAIR SIDEWALK | EAST 19 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012020150B09 | 2020-05-29 | 2020-06-27 | RESET, REPAIR OR REPLACE CURB | 2 AVENUE, MANHATTAN, FROM STREET EAST 81 STREET TO STREET EAST 82 STREET |
M012020150B08 | 2020-05-29 | 2020-06-27 | RESET, REPAIR OR REPLACE CURB-PROTECTED | EAST 81 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012020149B34 | 2020-05-28 | 2020-06-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 21 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012020149B35 | 2020-05-28 | 2020-06-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | 3 AVENUE, MANHATTAN, FROM STREET EAST 20 STREET TO STREET EAST 21 STREET |
B012020148D01 | 2020-05-27 | 2020-06-24 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WILLOUGHBY STREET, BROOKLYN, FROM STREET ASHLAND PLACE TO STREET FLEET STREET |
B012020148D02 | 2020-05-27 | 2020-06-24 | RESET, REPAIR OR REPLACE CURB | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
B042020148A04 | 2020-05-27 | 2020-06-24 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | FLEET PLACE, BROOKLYN, FROM STREET WILLOUGHBY STREET |
B012020143A18 | 2020-05-22 | 2020-06-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | GRAND STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET RIVER STREET |
B012020143A17 | 2020-05-22 | 2020-06-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | KENT AVENUE, BROOKLYN, FROM STREET GRAND STREET TO STREET SOUTH 1 STREET |
B012020139C71 | 2020-05-18 | 2020-06-22 | PAVE STREET-W/ ENGINEERING & INSP FEE | FULTON STREET, BROOKLYN, FROM STREET ASHLAND PLACE TO STREET ROCKWELL PLACE |
M012020139A71 | 2020-05-18 | 2020-06-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | PLATT STREET, MANHATTAN, FROM STREET GOLD STREET TO STREET PEARL STREET |
B012020139C69 | 2020-05-18 | 2020-06-23 | PAVE STREET-W/ ENGINEERING & INSP FEE | FULTON STREET, BROOKLYN, FROM STREET ASHLAND PLACE TO STREET ROCKWELL PLACE |
Q012020126A31 | 2020-05-05 | 2020-06-07 | PAVE STREET-W/ ENGINEERING & INSP FEE | 30 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET THOMSON AVENUE |
B012020119A22 | 2020-04-28 | 2020-05-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | KENT AVENUE, BROOKLYN, FROM STREET GRAND STREET TO STREET SOUTH 1 STREET |
M012020114A09 | 2020-04-23 | 2020-05-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | F D R DRIVE, MANHATTAN, FROM STREET FDR DRIVE SB EXIT 14 TO STREET EAST 97 STREET |
B012020114A11 | 2020-04-23 | 2020-05-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | FULTON STREET, BROOKLYN, FROM STREET ASHLAND PLACE TO STREET ROCKWELL PLACE |
B012020114A10 | 2020-04-23 | 2020-05-23 | PAVE STREET-W/ ENGINEERING & INSP FEE | FULTON STREET, BROOKLYN, FROM STREET ASHLAND PLACE TO STREET ROCKWELL PLACE |
M012020114A08 | 2020-04-23 | 2020-05-23 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 99 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET F D R DRIVE |
M012020105A93 | 2020-04-14 | 2020-04-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | PEARL STREET, MANHATTAN, FROM STREET FLETCHER STREET TO STREET PLATT STREET |
M012020105A94 | 2020-04-14 | 2020-05-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | PLATT STREET, MANHATTAN, FROM STREET GOLD STREET TO STREET PEARL STREET |
Q012020100B04 | 2020-04-09 | 2020-05-08 | PAVE STREET-W/ ENGINEERING & INSP FEE | 30 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET THOMSON AVENUE |
X042020092A32 | 2020-04-01 | 2020-04-25 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 137 STREET, BRONX, FROM STREET ST ANNS AVENUE |
X042020092A33 | 2020-04-01 | 2020-04-23 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 137 STREET, BRONX, FROM STREET ST ANNS AVENUE |
X042020092A34 | 2020-04-01 | 2020-04-23 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 137 STREET, BRONX, FROM STREET ST ANNS AVENUE |
B012020086C05 | 2020-03-26 | 2020-04-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | FULTON STREET, BROOKLYN, FROM STREET ASHLAND PLACE TO STREET ROCKWELL PLACE |
B012020086C06 | 2020-03-26 | 2020-05-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | KENT AVENUE, BROOKLYN, FROM STREET GRAND STREET TO STREET SOUTH 1 STREET |
B012020086B86 | 2020-03-26 | 2020-04-23 | PAVE STREET-W/ ENGINEERING & INSP FEE | FULTON STREET, BROOKLYN, FROM STREET ASHLAND PLACE TO STREET ROCKWELL PLACE |
X012020086A59 | 2020-03-26 | 2020-04-25 | RESET, REPAIR OR REPLACE CURB | ST ANNS AVENUE, BRONX, FROM STREET EAST 135 STREET TO STREET EAST 137 STREET |
M012020085B50 | 2020-03-25 | 2020-04-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | PEARL STREET, MANHATTAN, FROM STREET FLETCHER STREET TO STREET PLATT STREET |
M012020085B51 | 2020-03-25 | 2020-04-22 | PAVE STREET-W/ ENGINEERING & INSP FEE | PLATT STREET, MANHATTAN, FROM STREET GOLD STREET TO STREET PEARL STREET |
M012020083B03 | 2020-03-23 | 2020-04-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | TRINITY PLACE, MANHATTAN, FROM STREET RECTOR STREET TO STREET THAMES STREET |
M012020083B04 | 2020-03-23 | 2020-04-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | GREENWICH STREET, MANHATTAN, FROM STREET CARLISLE STREET TO STREET RECTOR STREET |
M012020080D38 | 2020-03-20 | 2020-04-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | F D R DRIVE, MANHATTAN, FROM STREET FDR DRIVE SB EXIT 14 TO STREET EAST 97 STREET |
M012020080D37 | 2020-03-20 | 2020-04-23 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 99 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET F D R DRIVE |
X012020070A18 | 2020-03-10 | 2020-04-01 | RESET, REPAIR OR REPLACE CURB | ST ANNS AVENUE, BRONX, FROM STREET EAST 135 STREET TO STREET EAST 137 STREET |
B042020066A25 | 2020-03-06 | 2020-04-01 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GRAND STREET, BROOKLYN, FROM STREET RIVER STREET |
B012020066D85 | 2020-03-06 | 2020-04-01 | RESET, REPAIR OR REPLACE CURB | GRAND STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET RIVER STREET |
B012020066D86 | 2020-03-06 | 2020-04-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | KENT AVENUE, BROOKLYN, FROM STREET GRAND STREET TO STREET SOUTH 1 STREET |
B012020066D87 | 2020-03-06 | 2020-04-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | GRAND STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET RIVER STREET |
X042020058A04 | 2020-02-27 | 2020-03-26 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 137 STREET, BRONX, FROM STREET ST ANNS AVENUE |
X042020058A05 | 2020-02-27 | 2020-03-26 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 137 STREET, BRONX, FROM STREET ST ANNS AVENUE |
X042020058A06 | 2020-02-27 | 2020-03-26 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 137 STREET, BRONX, FROM STREET ST ANNS AVENUE |
X012020058B51 | 2020-02-27 | 2020-03-26 | RESET, REPAIR OR REPLACE CURB | ST ANNS AVENUE, BRONX, FROM STREET EAST 135 STREET TO STREET EAST 137 STREET |
M012020051A23 | 2020-02-20 | 2020-03-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | 1 AVENUE, MANHATTAN, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET |
M012020051A16 | 2020-02-20 | 2020-03-25 | RESET, REPAIR OR REPLACE CURB | 1 AVENUE, MANHATTAN, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET |
M012020051A17 | 2020-02-20 | 2020-03-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | 1 AVENUE, MANHATTAN, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET |
M012020051A18 | 2020-02-20 | 2020-03-25 | RESET, REPAIR OR REPLACE CURB | F D R DRIVE, MANHATTAN, FROM STREET FDR DRIVE SB EXIT 14 TO STREET EAST 97 STREET |
M012020051A19 | 2020-02-20 | 2020-03-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | F D R DRIVE, MANHATTAN, FROM STREET FDR DRIVE SB EXIT 14 TO STREET EAST 97 STREET |
M012020051A22 | 2020-02-20 | 2020-03-24 | RESET, REPAIR OR REPLACE CURB | 1 AVENUE, MANHATTAN, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET |
M012020051A24 | 2020-02-20 | 2020-03-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 99 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET F D R DRIVE |
B012020045B11 | 2020-02-14 | 2020-03-12 | RESET, REPAIR OR REPLACE CURB | GRAND STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET RIVER STREET |
B042020045A11 | 2020-02-14 | 2020-03-12 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GRAND STREET, BROOKLYN, FROM STREET RIVER STREET |
B012020045B12 | 2020-02-14 | 2020-03-12 | PAVE STREET-W/ ENGINEERING & INSP FEE | KENT AVENUE, BROOKLYN, FROM STREET GRAND STREET TO STREET SOUTH 1 STREET |
B012020045B13 | 2020-02-14 | 2020-03-12 | PAVE STREET-W/ ENGINEERING & INSP FEE | GRAND STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET RIVER STREET |
M012020035A37 | 2020-02-04 | 2020-02-29 | RESET, REPAIR OR REPLACE CURB | 2 AVENUE, MANHATTAN, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET |
X012020034A72 | 2020-02-03 | 2020-02-27 | RESET, REPAIR OR REPLACE CURB | ST ANNS AVENUE, BRONX, FROM STREET EAST 135 STREET TO STREET EAST 137 STREET |
X042020034A08 | 2020-02-03 | 2020-02-27 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 137 STREET, BRONX, FROM STREET ST ANNS AVENUE |
X042020034A09 | 2020-02-03 | 2020-02-26 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 137 STREET, BRONX, FROM STREET ST ANNS AVENUE |
X042020034A10 | 2020-02-03 | 2020-02-26 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 137 STREET, BRONX, FROM STREET ST ANNS AVENUE |
M012020029A44 | 2020-01-29 | 2020-02-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 31 STREET, MANHATTAN, FROM STREET 10 AVENUE TO STREET LINCOLN TNNL APPROACH |
X012020024A38 | 2020-01-24 | 2020-02-22 | RESET, REPAIR OR REPLACE CURB | TIEBOUT AVENUE, BRONX, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET |
M012020022A39 | 2020-01-22 | 2020-02-23 | PAVE STREET-W/ ENGINEERING & INSP FEE | 1 AVENUE, MANHATTAN, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET |
M012020022A34 | 2020-01-22 | 2020-02-24 | RESET, REPAIR OR REPLACE CURB | 1 AVENUE, MANHATTAN, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET |
M012020022A40 | 2020-01-22 | 2020-02-23 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 99 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET F D R DRIVE |
M012020022A36 | 2020-01-22 | 2020-02-24 | RESET, REPAIR OR REPLACE CURB | F D R DRIVE, MANHATTAN, FROM STREET FDR DRIVE SB EXIT 14 TO STREET EAST 97 STREET |
M012020022A38 | 2020-01-22 | 2020-02-23 | RESET, REPAIR OR REPLACE CURB | 1 AVENUE, MANHATTAN, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET |
M012020022A37 | 2020-01-22 | 2020-02-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | F D R DRIVE, MANHATTAN, FROM STREET FDR DRIVE SB EXIT 14 TO STREET EAST 97 STREET |
M012020022A35 | 2020-01-22 | 2020-02-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | 1 AVENUE, MANHATTAN, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET |
M012020007A11 | 2020-01-07 | 2020-02-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 125 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET ST NICHOLAS AVENUE |
M012020006A07 | 2020-01-06 | 2020-02-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 24 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH |
M012020002B15 | 2020-01-02 | 2020-01-24 | RESET, REPAIR OR REPLACE CURB | 1 AVENUE, MANHATTAN, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET |
M012020002B14 | 2020-01-02 | 2020-01-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | F D R DRIVE, MANHATTAN, FROM STREET FDR DRIVE SB EXIT 14 TO STREET EAST 97 STREET |
M012020002B13 | 2020-01-02 | 2020-01-25 | RESET, REPAIR OR REPLACE CURB | F D R DRIVE, MANHATTAN, FROM STREET FDR DRIVE SB EXIT 14 TO STREET EAST 97 STREET |
M012020002B19 | 2020-01-02 | 2020-01-31 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | WEST 100 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M012020002B12 | 2020-01-02 | 2020-01-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | 1 AVENUE, MANHATTAN, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET |
M012020002B11 | 2020-01-02 | 2020-01-25 | RESET, REPAIR OR REPLACE CURB | 1 AVENUE, MANHATTAN, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET |
M012020002B17 | 2020-01-02 | 2020-01-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 99 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET F D R DRIVE |
M012020002B18 | 2020-01-02 | 2020-01-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 99 STREET TO STREET WEST 100 STREET |
M012020002B16 | 2020-01-02 | 2020-01-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | 1 AVENUE, MANHATTAN, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET |
M012019337A37 | 2019-12-03 | 2020-01-01 | RESET, REPAIR OR REPLACE CURB | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 99 STREET TO STREET WEST 100 STREET |
M012019337A38 | 2019-12-03 | 2020-01-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 99 STREET TO STREET WEST 100 STREET |
M042019337A05 | 2019-12-03 | 2020-01-01 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 100 STREET |
M012019336A62 | 2019-12-02 | 2019-12-26 | RESET, REPAIR OR REPLACE CURB | 1 AVENUE, MANHATTAN, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET |
M012019336A60 | 2019-12-02 | 2019-12-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | 1 AVENUE, MANHATTAN, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET |
M012019336A59 | 2019-12-02 | 2019-12-25 | RESET, REPAIR OR REPLACE CURB | 1 AVENUE, MANHATTAN, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET |
M012019336A63 | 2019-12-02 | 2019-12-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | 1 AVENUE, MANHATTAN, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET |
M012019336A61 | 2019-12-02 | 2019-12-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 99 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET F D R DRIVE |
M012019336A65 | 2019-12-02 | 2019-12-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | F D R DRIVE, MANHATTAN, FROM STREET FDR DRIVE SB EXIT 14 TO STREET EAST 97 STREET |
M012019336A64 | 2019-12-02 | 2019-12-26 | RESET, REPAIR OR REPLACE CURB | F D R DRIVE, MANHATTAN, FROM STREET FDR DRIVE SB EXIT 14 TO STREET EAST 97 STREET |
M042019333A06 | 2019-11-29 | 2020-01-01 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 2 AVENUE, MANHATTAN, FROM STREET EAST 74 STREET |
M012019333A20 | 2019-11-29 | 2020-01-01 | RESET, REPAIR OR REPLACE CURB | 2 AVENUE, MANHATTAN, FROM STREET EAST 73 STREET TO STREET EAST 74 STREET |
B012019325A05 | 2019-11-21 | 2019-12-30 | RESET, REPAIR OR REPLACE CURB | GRAND STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET RIVER STREET |
X012019325A02 | 2019-11-21 | 2019-12-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 233 STREET, BRONX, FROM STREET BRONXWOOD AVENUE TO STREET BRONXWOOD AVENUE |
B042019325A01 | 2019-11-21 | 2019-12-30 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GRAND STREET, BROOKLYN, FROM STREET RIVER STREET |
B012019325A04 | 2019-11-21 | 2019-12-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | GRAND STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET RIVER STREET |
B012019325A03 | 2019-11-21 | 2019-12-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | KENT AVENUE, BROOKLYN, FROM STREET GRAND STREET TO STREET NORTH 1 STREET |
M012019318A12 | 2019-11-14 | 2019-12-12 | RESET, REPAIR OR REPLACE CURB | LEROY STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M012019304A42 | 2019-10-31 | 2019-11-14 | RESET, REPAIR OR REPLACE CURB | EAST 24 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH |
M012019304A43 | 2019-10-31 | 2019-11-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 24 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH |
B042019303A07 | 2019-10-30 | 2019-11-30 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GRAND STREET, BROOKLYN, FROM STREET RIVER STREET |
B012019303B00 | 2019-10-30 | 2019-11-30 | RESET, REPAIR OR REPLACE CURB | GRAND STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET RIVER STREET |
M042019301A25 | 2019-10-28 | 2019-11-14 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | HUDSON STREET, MANHATTAN, FROM STREET LEROY STREET |
M012019301C03 | 2019-10-28 | 2019-12-02 | RESET, REPAIR OR REPLACE CURB | 2 AVENUE, MANHATTAN, FROM STREET EAST 73 STREET TO STREET EAST 74 STREET |
M042019301A26 | 2019-10-28 | 2019-11-14 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | HUDSON STREET, MANHATTAN, FROM STREET MORTON STREET |
M042019301A23 | 2019-10-28 | 2019-12-02 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 2 AVENUE, MANHATTAN, FROM STREET EAST 74 STREET |
X012019301B68 | 2019-10-28 | 2019-11-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 233 STREET, BRONX, FROM STREET BRONXWOOD AVENUE TO STREET BRONXWOOD AVENUE |
B012019295A38 | 2019-10-22 | 2019-11-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | GRAND STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET RIVER STREET |
B012019295A37 | 2019-10-22 | 2019-11-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | KENT AVENUE, BROOKLYN, FROM STREET GRAND STREET TO STREET NORTH 1 STREET |
M042019288A51 | 2019-10-15 | 2019-11-02 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 2 AVENUE, MANHATTAN, FROM STREET EAST 74 STREET |
M012019283B62 | 2019-10-10 | 2019-11-02 | RESET, REPAIR OR REPLACE CURB | 2 AVENUE, MANHATTAN, FROM STREET EAST 73 STREET TO STREET EAST 74 STREET |
M012019283B56 | 2019-10-10 | 2019-11-06 | PAVE STREET-W/ ENGINEERING & INSP FEE | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 99 STREET TO STREET WEST 100 STREET |
M012019283B61 | 2019-10-10 | 2019-11-02 | RESET, REPAIR OR REPLACE CURB-PROTECTED | EAST 74 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M042019283A42 | 2019-10-10 | 2019-11-05 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 100 STREET |
M012019283B55 | 2019-10-10 | 2019-11-06 | RESET, REPAIR OR REPLACE CURB | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 99 STREET TO STREET WEST 100 STREET |
B012019277B86 | 2019-10-04 | 2019-11-04 | RESET, REPAIR OR REPLACE CURB | GRAND STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET RIVER STREET |
M042019277A08 | 2019-10-04 | 2019-10-31 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | HUDSON STREET, MANHATTAN, FROM STREET MORTON STREET |
M042019277A07 | 2019-10-04 | 2019-10-31 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | HUDSON STREET, MANHATTAN, FROM STREET LEROY STREET |
B042019277A33 | 2019-10-04 | 2019-10-31 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GRAND STREET, BROOKLYN, FROM STREET RIVER STREET |
M012019269A04 | 2019-09-26 | 2019-10-24 | RESET, REPAIR OR REPLACE CURB-PROTECTED | EAST 19 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
X012019262B26 | 2019-09-19 | 2019-10-24 | RESET, REPAIR OR REPLACE CURB | EAST 138 STREET, BRONX, FROM STREET ALEXANDER AVENUE TO STREET LINCOLN AVENUE |
B012019262C79 | 2019-09-19 | 2019-10-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | GRAND STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET RIVER STREET |
B012019262C78 | 2019-09-19 | 2019-10-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | KENT AVENUE, BROOKLYN, FROM STREET GRAND STREET TO STREET NORTH 1 STREET |
M042019259A28 | 2019-09-16 | 2019-10-09 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 153 STREET |
M042019259A29 | 2019-09-16 | 2019-10-09 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 155 STREET |
M042019246A09 | 2019-09-03 | 2019-10-05 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | HUDSON STREET, MANHATTAN, FROM STREET LEROY STREET |
M012019246A50 | 2019-09-03 | 2019-10-05 | RESET, REPAIR OR REPLACE CURB | LEROY STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
B012019246C60 | 2019-09-03 | 2019-09-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | KENT AVENUE, BROOKLYN, FROM STREET GRAND STREET TO STREET NORTH 1 STREET |
B012019246C61 | 2019-09-03 | 2019-09-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | GRAND STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET RIVER STREET |
B012019240B05 | 2019-08-28 | 2019-10-05 | RESET, REPAIR OR REPLACE CURB | KENT AVENUE, BROOKLYN, FROM STREET GRAND STREET TO STREET SOUTH 1 STREET |
B012019240B06 | 2019-08-28 | 2019-10-05 | RESET, REPAIR OR REPLACE CURB | GRAND STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET RIVER STREET |
M012019240B43 | 2019-08-28 | 2019-09-25 | RESET, REPAIR OR REPLACE CURB | WEST HOUSTON STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
B042019240A32 | 2019-08-28 | 2019-10-05 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GRAND STREET, BROOKLYN, FROM STREET KENT AVENUE |
M012019238A63 | 2019-08-26 | 2019-09-10 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 25 STREET, MANHATTAN, FROM STREET HIGH LINE TO STREET 11 AVENUE |
X012019238D08 | 2019-08-26 | 2019-09-24 | RESET, REPAIR OR REPLACE CURB | EAST 138 STREET, BRONX, FROM STREET ALEXANDER AVENUE TO STREET LINCOLN AVENUE |
M042019232A13 | 2019-08-20 | 2019-09-25 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | VARICK STREET, MANHATTAN, FROM STREET WEST HOUSTON STREET |
M012019232B64 | 2019-08-20 | 2019-09-25 | RESET, REPAIR OR REPLACE CURB | VARICK STREET, MANHATTAN, FROM STREET 7 AVENUE SOUTH TO STREET DOWNING STREET |
M012019232B65 | 2019-08-20 | 2019-09-25 | RESET, REPAIR OR REPLACE CURB | WEST HOUSTON STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M042019228A09 | 2019-08-16 | 2019-09-05 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | HUDSON STREET, MANHATTAN, FROM STREET LEROY STREET |
M012019228A71 | 2019-08-16 | 2019-09-05 | RESET, REPAIR OR REPLACE CURB | LEROY STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M042019221A02 | 2019-08-09 | 2019-09-12 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 155 STREET |
M042019221A01 | 2019-08-09 | 2019-09-12 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 153 STREET |
B012019212F30 | 2019-07-31 | 2019-09-05 | RESET, REPAIR OR REPLACE CURB | GRAND STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET RIVER STREET |
B012019212F29 | 2019-07-31 | 2019-09-05 | RESET, REPAIR OR REPLACE CURB | KENT AVENUE, BROOKLYN, FROM STREET GRAND STREET TO STREET SOUTH 1 STREET |
B042019212A32 | 2019-07-31 | 2019-09-05 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GRAND STREET, BROOKLYN, FROM STREET KENT AVENUE |
M012019203A00 | 2019-07-22 | 2019-08-26 | RESET, REPAIR OR REPLACE CURB | VARICK STREET, MANHATTAN, FROM STREET 7 AVENUE SOUTH TO STREET DOWNING STREET |
M012019203A01 | 2019-07-22 | 2019-08-26 | RESET, REPAIR OR REPLACE CURB | WEST HOUSTON STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M012019198B83 | 2019-07-17 | 2019-08-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 46 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M012019198B82 | 2019-07-17 | 2019-07-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | MADISON AVENUE, MANHATTAN, FROM STREET EAST 46 STREET TO STREET EAST 47 STREET |
M012019196A62 | 2019-07-15 | 2019-08-21 | PAVE STREET-W/ ENGINEERING & INSP FEE | 1 AVENUE, MANHATTAN, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET |
X012019193B00 | 2019-07-12 | 2019-08-17 | PAVE STREET-W/ ENGINEERING & INSP FEE | ROGERS PLACE, BRONX, FROM STREET BEND TO STREET NYCTA SUBWAY |
X012019193A99 | 2019-07-12 | 2019-08-17 | PAVE STREET-W/ ENGINEERING & INSP FEE | WESTCHESTER AVENUE, BRONX, FROM STREET EAST 162 STREET TO STREET ROGERS PLACE |
M012019193B55 | 2019-07-12 | 2019-07-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | ST NICHOLAS AVENUE, MANHATTAN, FROM STREET MANHATTAN AVENUE TO STREET WEST 125 STREET |
M012019193B54 | 2019-07-12 | 2019-07-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 125 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET ST NICHOLAS AVENUE |
M012019191B42 | 2019-07-10 | 2019-08-20 | RESET, REPAIR OR REPLACE CURB | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 99 STREET TO STREET WEST 100 STREET |
M012019191B43 | 2019-07-10 | 2019-08-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 99 STREET TO STREET WEST 100 STREET |
B012019184C43 | 2019-07-03 | 2019-08-06 | RESET, REPAIR OR REPLACE CURB | KENT AVENUE, BROOKLYN, FROM STREET GRAND STREET TO STREET SOUTH 1 STREET |
B012019184C44 | 2019-07-03 | 2019-08-06 | RESET, REPAIR OR REPLACE CURB | GRAND STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET RIVER STREET |
M012019175B40 | 2019-06-24 | 2019-07-27 | RESET, REPAIR OR REPLACE CURB | VARICK STREET, MANHATTAN, FROM STREET 7 AVENUE SOUTH TO STREET DOWNING STREET |
M012019175B41 | 2019-06-24 | 2019-07-27 | RESET, REPAIR OR REPLACE CURB | WEST HOUSTON STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M012019165B28 | 2019-06-14 | 2019-07-13 | RESET, REPAIR OR REPLACE CURB | WEST 43 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012019164A84 | 2019-06-13 | 2019-07-22 | PAVE STREET-W/ ENGINEERING & INSP FEE | 1 AVENUE, MANHATTAN, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET |
M012019164A92 | 2019-06-13 | 2019-07-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
M012019164A91 | 2019-06-13 | 2019-07-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
X012019164A70 | 2019-06-13 | 2019-07-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | WESTCHESTER AVENUE, BRONX, FROM STREET EAST 162 STREET TO STREET ROGERS PLACE |
X012019164A71 | 2019-06-13 | 2019-07-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | ROGERS PLACE, BRONX, FROM STREET BEND TO STREET NYCTA SUBWAY |
B012019158B38 | 2019-06-07 | 2019-07-13 | RESET, REPAIR OR REPLACE CURB | KENT AVENUE, BROOKLYN, FROM STREET GRAND STREET TO STREET SOUTH 1 STREET |
B012019158B39 | 2019-06-07 | 2019-07-13 | RESET, REPAIR OR REPLACE CURB | GRAND STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET RIVER STREET |
M012019137B47 | 2019-05-17 | 2019-06-27 | RESET, REPAIR OR REPLACE CURB | WEST HOUSTON STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M012019137B45 | 2019-05-17 | 2019-06-27 | RESET, REPAIR OR REPLACE CURB | VARICK STREET, MANHATTAN, FROM STREET 7 AVENUE SOUTH TO STREET DOWNING STREET |
M012019137B46 | 2019-05-17 | 2019-06-27 | RESET, REPAIR OR REPLACE CURB | CLARKSON STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M012019136A35 | 2019-05-16 | 2019-06-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
M012019136A36 | 2019-05-16 | 2019-06-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
B012019136D70 | 2019-05-16 | 2019-06-14 | RESET, REPAIR OR REPLACE CURB | GEORGE STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
X012019135A40 | 2019-05-15 | 2019-06-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | WESTCHESTER AVENUE, BRONX, FROM STREET EAST 162 STREET TO STREET ROGERS PLACE |
M012019135B63 | 2019-05-15 | 2019-06-22 | PAVE STREET-W/ ENGINEERING & INSP FEE | 1 AVENUE, MANHATTAN, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET |
X012019135A41 | 2019-05-15 | 2019-06-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | ROGERS PLACE, BRONX, FROM STREET BEND TO STREET NYCTA SUBWAY |
B012019129C45 | 2019-05-09 | 2019-06-13 | RESET, REPAIR OR REPLACE CURB | KENT AVENUE, BROOKLYN, FROM STREET GRAND STREET TO STREET SOUTH 1 STREET |
B012019129C46 | 2019-05-09 | 2019-06-13 | RESET, REPAIR OR REPLACE CURB | GRAND STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET RIVER STREET |
M012019115A93 | 2019-04-25 | 2019-05-28 | RESET, REPAIR OR REPLACE CURB | VARICK STREET, MANHATTAN, FROM STREET 7 AVENUE SOUTH TO STREET DOWNING STREET |
X012019115B07 | 2019-04-25 | 2019-05-31 | RESET, REPAIR OR REPLACE CURB | WESTCHESTER AVENUE, BRONX, FROM STREET EAST 162 STREET TO STREET ROGERS PLACE |
M012019115A95 | 2019-04-25 | 2019-05-28 | RESET, REPAIR OR REPLACE CURB | WEST HOUSTON STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M012019115A94 | 2019-04-25 | 2019-05-28 | RESET, REPAIR OR REPLACE CURB | CLARKSON STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
X012019115B08 | 2019-04-25 | 2019-05-31 | RESET, REPAIR OR REPLACE CURB | ROGERS PLACE, BRONX, FROM STREET EAST 165 STREET TO STREET NYCTA SUBWAY |
B012019107D71 | 2019-04-17 | 2019-05-14 | RESET, REPAIR OR REPLACE CURB | GRAND STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET RIVER STREET |
B012019107D70 | 2019-04-17 | 2019-05-14 | RESET, REPAIR OR REPLACE CURB | KENT AVENUE, BROOKLYN, FROM STREET GRAND STREET TO STREET SOUTH 1 STREET |
M012019105C87 | 2019-04-15 | 2019-05-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
M012019105C88 | 2019-04-15 | 2019-05-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
M012019105C89 | 2019-04-15 | 2019-05-23 | PAVE STREET-W/ ENGINEERING & INSP FEE | 1 AVENUE, MANHATTAN, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET |
X012019105A78 | 2019-04-15 | 2019-05-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | ROGERS PLACE, BRONX, FROM STREET BEND TO STREET NYCTA SUBWAY |
X012019105A77 | 2019-04-15 | 2019-05-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | WESTCHESTER AVENUE, BRONX, FROM STREET EAST 162 STREET TO STREET ROGERS PLACE |
B012019093H90 | 2019-04-03 | 2019-05-02 | RESET, REPAIR OR REPLACE CURB | GEORGE STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
X012019088B26 | 2019-03-29 | 2019-04-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 138 STREET, BRONX, FROM STREET ALEXANDER AVENUE TO STREET MORRIS AVENUE |
X012019088B27 | 2019-03-29 | 2019-04-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 139 STREET, BRONX, FROM STREET ALEXANDER AVENUE TO STREET 3 AVENUE |
M012019086C17 | 2019-03-27 | 2019-04-23 | PAVE STREET-W/ ENGINEERING & INSP FEE | 1 AVENUE, MANHATTAN, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET |
M012019084C87 | 2019-03-25 | 2019-04-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
M012019084C86 | 2019-03-25 | 2019-04-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
X012019084A67 | 2019-03-25 | 2019-04-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | WESTCHESTER AVENUE, BRONX, FROM STREET EAST 162 STREET TO STREET ROGERS PLACE |
X012019084A68 | 2019-03-25 | 2019-04-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | ROGERS PLACE, BRONX, FROM STREET BEND TO STREET NYCTA SUBWAY |
X012019084A69 | 2019-03-25 | 2019-05-01 | RESET, REPAIR OR REPLACE CURB | EAST 138 STREET, BRONX, FROM STREET ALEXANDER AVENUE TO STREET LINCOLN AVENUE |
M012019084C92 | 2019-03-25 | 2019-04-27 | RESET, REPAIR OR REPLACE CURB | 1 AVENUE, MANHATTAN, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET |
X012019084A70 | 2019-03-25 | 2019-04-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 138 STREET, BRONX, FROM STREET ALEXANDER AVENUE TO STREET LINCOLN AVENUE |
X012019084A65 | 2019-03-25 | 2019-05-01 | RESET, REPAIR OR REPLACE CURB | WESTCHESTER AVENUE, BRONX, FROM STREET EAST 162 STREET TO STREET ROGERS PLACE |
X012019084A66 | 2019-03-25 | 2019-05-01 | RESET, REPAIR OR REPLACE CURB | ROGERS PLACE, BRONX, FROM STREET EAST 165 STREET TO STREET NYCTA SUBWAY |
X012019070B50 | 2019-03-11 | 2019-04-01 | RESET, REPAIR OR REPLACE CURB | WESTCHESTER AVENUE, BRONX, FROM STREET EAST 162 STREET TO STREET ROGERS PLACE |
X012019070B51 | 2019-03-11 | 2019-04-01 | RESET, REPAIR OR REPLACE CURB | ROGERS PLACE, BRONX, FROM STREET EAST 165 STREET TO STREET NYCTA SUBWAY |
M012019065B49 | 2019-03-06 | 2019-04-01 | RESET, REPAIR OR REPLACE CURB | 1 AVENUE, MANHATTAN, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET |
M012019060B76 | 2019-03-01 | 2019-03-28 | RESET, REPAIR OR REPLACE CURB-PROTECTED | EAST 117 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
X012019060B12 | 2019-03-01 | 2019-04-01 | RESET, REPAIR OR REPLACE CURB | EAST 138 STREET, BRONX, FROM STREET ALEXANDER AVENUE TO STREET LINCOLN AVENUE |
B012019059H04 | 2019-02-28 | 2019-03-28 | RESET, REPAIR OR REPLACE CURB | BALTIC STREET, BROOKLYN, FROM STREET HOYT STREET TO STREET SMITH STREET |
B012019059H02 | 2019-02-28 | 2019-03-29 | RESET, REPAIR OR REPLACE CURB | GEORGE STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012019059H03 | 2019-02-28 | 2019-03-28 | RESET, REPAIR OR REPLACE CURB-PROTECTED | SMITH STREET, BROOKLYN, FROM STREET BALTIC STREET TO STREET BUTLER STREET |
M012019042C07 | 2019-02-11 | 2019-03-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
M012019042C08 | 2019-02-11 | 2019-03-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
X012019036B25 | 2019-02-05 | 2019-03-03 | RESET, REPAIR OR REPLACE CURB | EAST 138 STREET, BRONX, FROM STREET ALEXANDER AVENUE TO STREET LINCOLN AVENUE |
M012019017B54 | 2019-01-17 | 2019-03-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 125 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET ST NICHOLAS AVENUE |
M012019017B55 | 2019-01-17 | 2019-03-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | ST NICHOLAS AVENUE, MANHATTAN, FROM STREET MANHATTAN AVENUE TO STREET WEST 125 STREET |
M012019016B04 | 2019-01-16 | 2019-02-13 | PAVE STREET-W/ ENGINEERING & INSP FEE | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
M012019016B05 | 2019-01-16 | 2019-02-13 | PAVE STREET-W/ ENGINEERING & INSP FEE | GANSEVOORT STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
M012019007A97 | 2019-01-07 | 2019-02-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 125 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET ST NICHOLAS AVENUE |
M012019007A98 | 2019-01-07 | 2019-02-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | ST NICHOLAS AVENUE, MANHATTAN, FROM STREET MANHATTAN AVENUE TO STREET WEST 125 STREET |
B012018347C07 | 2018-12-13 | 2019-01-09 | PAVE STREET-W/ ENGINEERING & INSP FEE | BEARD STREET, BROOKLYN, FROM STREET CONOVER STREET TO STREET VAN BRUNT STREET |
B012018347C06 | 2018-12-13 | 2019-01-10 | RESET, REPAIR OR REPLACE CURB | BEARD STREET, BROOKLYN, FROM STREET CONOVER STREET TO STREET VAN BRUNT STREET |
B012018344C11 | 2018-12-10 | 2019-01-09 | PAVE STREET-W/ ENGINEERING & INSP FEE | FRONT STREET, BROOKLYN, FROM STREET CADMAN PLAZA EAST TO STREET MAIN STREET |
B012018344C12 | 2018-12-10 | 2019-01-09 | PAVE STREET-W/ ENGINEERING & INSP FEE | YORK STREET, BROOKLYN, FROM STREET BEND TO STREET CADMAN PLAZA EAST |
M012018080A49 | 2018-03-21 | 2018-04-18 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WEST 44 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012018080A50 | 2018-03-21 | 2018-04-18 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | WEST 44 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012017240B22 | 2017-08-28 | 2017-09-22 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | BAY 53 STREET, BROOKLYN, FROM STREET CROPSEY AVENUE TO STREET WEST 22 STREET |
Start date | End date | Type | Value |
---|---|---|---|
2024-10-29 | 2024-10-29 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2024-10-14 | 2024-10-29 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2024-09-11 | 2024-10-14 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2024-09-06 | 2024-09-11 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2024-06-26 | 2024-09-06 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2024-04-16 | 2024-04-16 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2024-04-16 | 2024-06-26 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2024-04-15 | 2024-04-16 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2024-02-05 | 2024-04-15 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2023-11-14 | 2024-02-05 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2023-11-14 | 2023-11-14 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2023-11-13 | 2023-11-14 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2023-11-07 | 2023-11-13 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2023-09-20 | 2023-11-07 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2023-08-30 | 2023-09-20 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2023-07-21 | 2023-07-21 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2023-07-21 | 2023-08-30 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2023-07-12 | 2023-07-21 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2023-05-11 | 2023-05-11 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2023-05-11 | 2023-07-12 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2023-05-02 | 2023-05-11 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2023-04-21 | 2023-05-02 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2023-04-21 | 2023-04-21 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2023-04-07 | 2023-04-21 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2023-04-05 | 2023-04-07 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2023-04-05 | 2023-04-05 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2023-02-23 | 2023-04-05 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2023-01-25 | 2023-02-23 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2023-01-18 | 2023-01-25 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2022-08-02 | 2023-01-18 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2022-08-02 | 2022-08-02 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2022-07-08 | 2022-08-02 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2022-05-27 | 2022-07-08 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2021-11-01 | 2022-05-27 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2021-08-05 | 2021-11-01 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2021-07-08 | 2021-08-05 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
2021-06-28 | 2021-07-08 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
1996-12-31 | 2015-03-19 | Address | 11-21 154TH ST, WHITESTONE, NY, 11357, 1954, USA (Type of address: Principal Executive Office) |
1995-08-11 | 2015-03-19 | Address | 11-21 154TH ST, WHITESTONE, NY, 11357, 1954, USA (Type of address: Chief Executive Officer) |
1995-08-11 | 1996-12-31 | Address | 14 UNIVERSITY PLACE, GLEN HEAD, NY, 11545, USA (Type of address: Principal Executive Office) |
1995-08-11 | 2012-04-23 | Address | 11-21 154 STREET, WHITESTONE, NY, 11357, 1954, USA (Type of address: Service of Process) |
1942-12-07 | 1995-08-11 | Address | 103-18 LEFFERTS BLVD., RICHMOND HILL, NY, 11419, USA (Type of address: Service of Process) |
1942-12-07 | 2021-06-28 | Shares | Share type: CAP, Number of shares: 0, Par value: 10000 |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
150319002047 | 2015-03-19 | BIENNIAL STATEMENT | 2014-12-01 |
120423000102 | 2012-04-23 | CERTIFICATE OF CHANGE | 2012-04-23 |
081209002944 | 2008-12-09 | BIENNIAL STATEMENT | 2008-12-01 |
061122002242 | 2006-11-22 | BIENNIAL STATEMENT | 2006-12-01 |
050113002463 | 2005-01-13 | BIENNIAL STATEMENT | 2004-12-01 |
021209002471 | 2002-12-09 | BIENNIAL STATEMENT | 2002-12-01 |
010209002426 | 2001-02-09 | BIENNIAL STATEMENT | 2000-12-01 |
981204002101 | 1998-12-04 | BIENNIAL STATEMENT | 1998-12-01 |
961231002100 | 1996-12-31 | BIENNIAL STATEMENT | 1996-12-01 |
950811002050 | 1995-08-11 | BIENNIAL STATEMENT | 1993-12-01 |
C218180-2 | 1994-12-27 | ASSUMED NAME CORP INITIAL FILING | 1994-12-27 |
6084-118 | 1942-12-07 | CERTIFICATE OF INCORPORATION | 1942-12-07 |
Date | Inspection Object | Address | Grade | Type | Institution | Desctiption |
---|---|---|---|---|---|---|
2024-10-31 | No data | VAN SICLEN AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb is replaced on #245 Wortman ave. |
2024-10-31 | No data | VERMONT STREET, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | One flag missing barricaded with cones. Need to restore in kind. |
2024-10-31 | No data | WORTMAN AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two barricades on sidewalk. In front of #245. |
2024-10-30 | No data | 15 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 35 feet of side walk flags replaced in compliance. |
2024-10-30 | No data | BROADWAY, FROM STREET WEST 103 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SE4 corner quadrant are non Ada compliant. Ramps was measured and collected in prism on 10/13/23. Painted pedestrian installed |
2024-10-30 | No data | WORTMAN AVENUE, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Swk flags sealed and in compliance |
2024-10-30 | No data | WORTMAN AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New Swk for building in compliance |
2024-10-30 | No data | 7 AVENUE, FROM STREET WEST 152 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started |
2024-10-30 | No data | 7 AVENUE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started |
2024-10-29 | No data | EAST 65 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to active M042024282A16 |
2024-10-29 | No data | EAST 65 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started |
2024-10-28 | No data | VAN SICLEN AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Swk flags sealed and in compliance |
2024-10-27 | No data | STANLEY AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Swk flags sealed and in compliance |
2024-10-24 | No data | NAGLE AVENUE, FROM STREET BENNETT AVENUE TO STREET ELLWOOD STREET | No data | Street Construction Inspections: Active | Department of Transportation | 1/2+5 has been paved |
2024-10-24 | No data | BROADWAY, FROM STREET NAGLE AVENUE TO STREET WEST 196 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 1/2+5 has been paved |
2024-10-23 | No data | MACOMBS PLACE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | new permit M042024297A02 obtained |
2024-10-23 | No data | NEW LOTS AVENUE, FROM STREET CHRISTOPHER AVENUE TO STREET SACKMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | I observed the respondent with jersey barriers stored on the roadway occupying over 8ft of the roadway. Respondent failed to comply with permit stip 014, maintain 5ft clear walkway in the roadway with jersey barriers. Cited permit used for ID I |
2024-10-22 | No data | NEW LOTS AVENUE, FROM STREET CHRISTOPHER AVENUE TO STREET SACKMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | I observed the respondent with jersey barriers stored on the roadway occupying over 11ft of the roadway. Respondent failed to comply with permit stip 014, maintain 5ft clear walkway in the roadway with jersey barriers. Cited permit used for ID |
2024-10-21 | No data | LAFAYETTE AVENUE, FROM STREET CROES AVENUE TO STREET NOBLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work in progress, has active permit on file X012024278A34 |
2024-10-21 | No data | COZINE AVENUE, FROM STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition remains the same. Permittee obtained active permit # B042024278A01 for the NW2 corner. We’ll monitor & reinspect for any new work. |
2024-10-21 | No data | CHRISTOPHER AVENUE, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at this time new permit B022024278A00 on file |
2024-10-18 | No data | COZINE AVENUE, FROM STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner found not to be ADA compliant due to landing running slopes. Measured & collected in Prism on 6/14/24. |
2024-10-17 | No data | COZINE AVENUE, FROM STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps within NW2 corner quadrant non Ada compliant. Previously Measured and collected in prism on 6/23/24. |
2024-10-17 | No data | COZINE AVENUE, FROM STREET VERMONT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permit on file B042024278A00. No new work done , completed tangent ramps within the NE3 corner quadrant are non Ada compliant. Previously Measured and collected in prism on 6/14/24. |
2024-10-14 | No data | EAST 56 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SE4 corner quadrant are non Ada. Measured in prism on 5/12/22. TIF on file |
2024-10-14 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the NW2 corner quadrant are non Ada. Measured in prism 2/8/23. TIF on file |
2024-10-11 | No data | EAST 55 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed blended transition in the SW1 corner quadrant is ada compliant. Measured in prism on 7/5/22. |
2024-10-09 | No data | 8 AVENUE, FROM STREET 45 STREET TO STREET 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced by BPP. |
2024-10-09 | No data | 8 AVENUE, FROM STREET 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Intersection resurfaced by BPP. |
2024-10-09 | No data | JAY STREET, FROM STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed ramps found to be Ada compliant. M.C on 2/9/24 |
2024-10-09 | No data | COZINE AVENUE, FROM STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Duplicate permit on file. Action taken on permit # B042024073A67 which have an Open CAR on file. Excessive slopes remain. |
2024-10-08 | No data | 8 AVENUE, FROM STREET 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP passed. |
2024-10-08 | No data | 8 AVENUE, FROM STREET 45 STREET TO STREET 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP passed. |
2024-10-08 | No data | EAST 65 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started |
2024-10-08 | No data | 46 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP passed. |
2024-10-07 | No data | WALTON AVENUE, FROM STREET EAST 175 STREET TO STREET HENWOOD PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plastic fillings need to be removed & expansion joints need to be properly installed |
2024-10-05 | No data | EAST 34 STREET, FROM STREET 3 AVENUE TO STREET QNS MDTWN TNNL EXIT | No data | Street Construction Inspections: Active | Department of Transportation | Work not started. |
2024-10-04 | No data | 7 AVENUE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Refer to M042024144A02 |
2024-10-04 | No data | MACOMBS PLACE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps within the NE3 corner quadrant are non ADA compliant. Measured in prism on 11/23/22. |
2024-10-03 | No data | 46 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work done. |
2024-10-02 | No data | 8 AVENUE, FROM STREET 45 STREET TO STREET 46 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started. No work done. No inspection found at this time. |
2024-10-02 | No data | 2 AVENUE, FROM STREET EAST 47 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps within the SW1 corner quadrant are non Ada. Measured in prism on 3/30/22. |
2024-10-02 | No data | VERMONT STREET, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp walkway in compliance |
2024-10-02 | No data | 46 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started. No work done. No inspection found at this time. |
2024-10-02 | No data | 8 AVENUE, FROM STREET 46 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started. No work done. No inspection found at this time. |
2024-09-30 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newer permit#M042024016A07 was obtained for the NE3 corner quadrant. |
2024-09-30 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the NE3 corner quadrant are non Ada compliant, Ramps was previously measured and collected in prism on 7/13/23. No new work was done. |
2024-09-25 | No data | WEST 34 STREET, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 0211-permit M022024224A00 obtained to satisfy CAR requirement. |
2024-09-25 | No data | VAN SICLEN AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Swk flags sealed and in compliance |
2024-09-24 | No data | COZINE AVENUE, FROM STREET HENDRIX STREET TO STREET SCHENCK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb in compliance |
2024-09-24 | No data | WEST 34 STREET, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Application Tracking Number: 2024062101213090 |
2024-09-24 | No data | BROADWAY, FROM STREET NAGLE AVENUE TO STREET WEST 196 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Respondent failed to notify NYC DOT HIQA borough ( Manhattan ) office within four hours prior to paving. As per stipulation 1/2+ 5. And Roadway was paved and no notification made", |
2024-09-24 | No data | NAGLE AVENUE, FROM STREET BENNETT AVENUE TO STREET ELLWOOD STREET | No data | Street Construction Inspections: Active | Department of Transportation | Respondent failed to notify NYC DOT HIQA borough ( Manhattan ) office within four hours prior to paving. As per stipulation 1/2+ 5. And Roadway was paved and no notification made", |
2024-09-23 | No data | CHRISTOPHER AVENUE, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp ped walkway in compliance |
2024-09-20 | No data | ANDREWS AVENUE, FROM STREET WEST 176 STREET TO STREET WEST TREMONT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started |
2024-09-20 | No data | WEST 125 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP in compliance |
2024-09-20 | No data | VAN SICLEN AVENUE, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb in compliance |
2024-09-20 | No data | STANLEY AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb in compliance |
2024-09-20 | No data | STANLEY AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest Accepted. CAR to be issued to Tony Casale Inc for removal. |
2024-09-17 | No data | CHARLTON STREET, FROM STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SE4 corner quadrant are non Ada. Measured in prism 12/1/22. |
2024-09-17 | No data | COZINE AVENUE, FROM STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the NW2 corner quadrant are non Ada compliant. Previously measured and collected in prism on 6/23/24. No tiff on file |
2024-09-17 | No data | VANDAM STREET, FROM STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the NE3 corner quadrant are non Ada. Measured in prism 12/1/22 |
2024-09-17 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Ramps were previously upgraded by ROCK SOLID LANDSCAPE AND MASONRY DESIGN INC. under permit M042021235A11. New measurements added to prism 9/17/24. No action taken at this time |
2024-09-17 | No data | COZINE AVENUE, FROM STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit B042024253B17. Completed tangent ramps within the NE3 corner quadrant are non Ada compliant. Previously measured and collected in prism on 6/14/24. |
2024-09-14 | No data | WORTMAN AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints have been sealed |
2024-09-09 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant are ADA compliant. Measured in Prism on 4/17/23 |
2024-09-08 | No data | VAN SICLEN AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb in compliance |
2024-09-08 | No data | KENT AVENUE, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work observed within the segment. |
2024-09-06 | No data | CENTRAL PARK WEST, FROM STREET WEST 84 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SW1 corner quadrant are non ADA compliant. Previously measured and collected in Prism on 7/18/23. |
2024-09-06 | No data | EAST 31 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the SW1 corner quadrant are ADA. Measured in prism 9/6/24 |
2024-08-25 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Open CAR on permit M042023093A10. Future inspections should go on my most recent permit M042023124A09 |
2024-08-24 | No data | STANLEY AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Timber barriers needs to be removed, permit expired 3/20/2024 |
2024-08-24 | No data | WORTMAN AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Active | Department of Transportation | Partial SW flags broken, work in progress |
2024-08-24 | No data | VAN SICLEN AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW flags installed, expansion joints sealed |
2024-08-24 | No data | VAN SICLEN AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | SW flags installed, expansion joints sealed |
2024-08-24 | No data | WORTMAN AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pertial SW flags in process of repair, active permit on file |
2024-08-24 | No data | STANLEY AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the respondent with timber barriers stored on the roadway without a permit on file. Respondent failed to apply for permit in order to do so. Permit #B022024044A86 for different property on segment with barriers on roadway used for ID |
2024-08-23 | No data | COZINE AVENUE, FROM STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within NW2 corner quadrant non Ada compliant. Previously Measured and collected in prism on 6/23/24 |
2024-08-22 | No data | COZINE AVENUE, FROM STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the NE3 corner quadrant are non Ada compliant. Previously Measured and collected in prism on 6/14/24. |
2024-08-20 | No data | MACOMBS PLACE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to M042024144A01 |
2024-08-20 | No data | 7 AVENUE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the NW2 corner quadrant are non ADA. Prism updated 8/20/24 |
2024-08-19 | No data | WORTMAN AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Active | Department of Transportation | Partial SW flag installed, expansion joints has been sealed for partial repair |
2024-08-19 | No data | VERMONT STREET, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW flags installed, expansion joints sealed |
2024-08-19 | No data | VERMONT STREET, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Cement face curb installed |
2024-08-11 | No data | EVERGREEN AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk in place |
2024-08-10 | No data | STANLEY AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cement face curb installed |
2024-08-10 | No data | STANLEY AVENUE, FROM STREET NEW JERSEY AVENUE TO STREET PENNSYLVANIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW flags installed, expansion joints sealed |
2024-08-09 | No data | EAST 127 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Traffic light installed. |
2024-08-02 | No data | COZINE AVENUE, FROM STREET VERMONT STREET | No data | Street Construction Inspections: Active | Department of Transportation | Completed tangent ramps within the NE3 corner quadrant are non Ada compliant. Previously measured and collected in prism on 6/14/24. |
2024-08-02 | No data | COZINE AVENUE, FROM STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Completed tangent ramps within the NW2 corner quadrant are non Ada compliant. Previously measured and collected in prism on 6/23/24 |
2024-08-02 | No data | VERMONT STREET, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW flags installed, expansion joints sealed |
2024-08-02 | No data | COZINE AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW flags installed, expansion joints sealed |
2024-08-01 | No data | WEST 28 STREET, FROM STREET 5 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O the 5th Ave hotel found multiple sidewalk flags restored to grade, joints installed and sealed. |
2024-07-31 | No data | 248 STREET, FROM STREET 43 AVENUE TO STREET DEPEW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIRED PERM SIDEWALK FLAGS |
2024-07-25 | No data | WORTMAN AVENUE, FROM STREET NEW JERSEY AVENUE TO STREET PENNSYLVANIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW flags installed, expansion joints sealed |
2024-07-22 | No data | EAST 160 STREET, FROM STREET FOREST AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Dual ramps installed. ADA compliant. Measured in prism 7/22/24 |
2024-07-17 | No data | STANLEY AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW flags installed, expansion joints sealed |
2024-07-16 | No data | HUDSON STREET, FROM STREET SPRING STREET TO STREET VANDAM STREET | No data | Street Construction Inspections: Active | Department of Transportation | Width of roadway: 48'0"Property line to Property line: 224’Milled portion: 24+5=29’Depth of roadway: 3" |
2024-07-16 | No data | HUDSON STREET, FROM STREET SPRING STREET | No data | Street Construction Inspections: Active | Department of Transportation | Width of intersection: 30’0"Milled portion: 15+5=20'Depth of roadway:3” |
2024-07-16 | No data | SPRING STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Active | Department of Transportation | Width of roadway: 34'0"Property line to Property line: 381Milled portion: 17+5=22’Depth of roadway: 3" |
2024-07-16 | No data | VAN SICLEN AVENUE, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cement face curb |
2024-07-16 | No data | PENNSYLVANIA AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW flags installed, expansion joints sealed on NYCHA side |
2024-07-16 | No data | WORTMAN AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Active | Department of Transportation | work not started for corner property |
2024-07-13 | No data | EAST 33 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO #300 (opposite of Chapel of the Sacred Hearts of Jesus & Mary) there are three (3) sidewalk flags fully restored with expansion joints applied and sealed. |
2024-07-12 | No data | CALYER STREET, FROM STREET LORIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner found to be ADA compliant. Measured & collected in Prism on 12/4/23. Street paved at this time. |
2024-07-12 | No data | COZINE AVENUE, FROM STREET VERMONT STREET | No data | Street Construction Inspections: Active | Department of Transportation | Completed tangent ramps within the NE3 corner quadrant are non Ada compliant. Previously Measured and collected in prism on 6/14/24. |
2024-07-11 | No data | GREENWICH STREET, FROM STREET LEROY STREET TO STREET MORTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 621, full width of sidewalk fully restored in kind. All installed expansion joints are properly sealed at this time. |
2024-07-11 | No data | COZINE AVENUE, FROM STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Completed tangent ramps within NW2 corner quadrant non Ada compliant. Previously Measured and collected in prism on 6/23/24. |
2024-07-09 | No data | WORTMAN AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cement face curb installed, CAR will be issued for expansion joints needing to be sealed |
2024-07-03 | No data | BOSTON ROAD, FROM STREET EASTCHESTER ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner quadrant are ADA compliant. Previously measured and collected in Prism on 2/6/23. Pavement key installed and markings restored in crosswalks. |
2024-07-03 | No data | EASTCHESTER ROAD, FROM STREET TILLOTSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp in the NW2 corner quadrant is ADA compliant. Previously measured and collected in Prism on 2/7/23. |
2024-06-26 | No data | PENNSYLVANIA AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cement face curb installed |
2024-06-25 | No data | 93 AVENUE, FROM STREET 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the NW2 corner quadrant was found to be Ada compliant. Measured and collected in prism on 3/8/24. |
2024-06-24 | No data | EAST 160 STREET, FROM STREET FOREST AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two ramps installed. E 160 St is currently closed due to paving and milling. Cannot access corners. Active construction underway at time of inspection. Will need to be reinspected. |
2024-06-23 | No data | COZINE AVENUE, FROM STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within NW2 corner quadrant non Ada compliant. Measured and collected in prism on 6/23/24. |
2024-06-22 | No data | SCHENCK AVENUE, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new curb installed. in compliance |
2024-06-21 | No data | WEST 34 STREET, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above Respondent repaired the condition on CAR # 20236390417 which was issued on 6/15/2023 without the noted permit listed as required. |
2024-06-17 | No data | 10 AVENUE, FROM STREET WEST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a permanent BPP restoration flush to grade within the southwest corner. |
2024-06-15 | No data | 93 AVENUE, FROM STREET 168 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Completed tangent ramps within the NW2 corner quadrant was found to be Ada compliant. Measured and collected in prism on 3/8/24. |
2024-06-14 | No data | PENNSYLVANIA AVENUE, FROM STREET STANLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly single tangent ramp in the SE4 corner quadrant are Ada compliant. Measured and collected in prism on 6/14/24. |
2024-06-14 | No data | COZINE AVENUE, FROM STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant are non Ada compliant. Measured and collected in prism on 6/14/24. |
2024-06-10 | No data | WORTMAN AVENUE, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW flags installed, expansion joints sealed |
2024-06-06 | No data | 93 AVENUE, FROM STREET 168 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No new pedestrian ramp work started at this time within the NE corner. Pre existing ramps are functional and accessible, scaffoldings are within the NE3 corner. |
2024-06-06 | No data | 93 AVENUE, FROM STREET 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the NW2 corner quadrant was found to be Ada compliant. Measured and collected in prism on 3/8/24. |
2024-06-03 | No data | MICKLE AVENUE, FROM STREET TILLOTSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SW1 corner quadrant are ADA compliant. Measured and collected in Prism on 2/1/23. |
2024-05-31 | No data | 2 AVENUE, FROM STREET EAST 62 STREET TO STREET EAST 63 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Email notification on 4/30/24. |
2024-05-28 | No data | GREENWICH STREET, FROM STREET LEROY STREET TO STREET MORTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 621 ( from crosswalk of Leroy St ), perm BPP restoration is flush to grade at this time. All existing lane markings have been restored in kind. |
2024-05-28 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Within N/E/C of intersection, perm BPP restoration for aka 621 Greenwich Street is flush to grade at this time. |
2024-05-18 | No data | VAN SICLEN AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cement face curb installed, in compliance |
2024-05-17 | No data | VAN SICLEN AVENUE, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cement face curb installed |
2024-05-17 | No data | COZINE AVENUE, FROM STREET HENDRIX STREET TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cement face curb |
2024-05-15 | No data | WORTMAN AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cement face curb |
2024-05-15 | No data | WORTMAN AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Active | Department of Transportation | cement face curb |
2024-05-14 | No data | VAN SICLEN AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | SW flags installed, expansion joints sealed |
2024-05-14 | No data | VAN SICLEN AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW flags installed, expansion joints sealed |
2024-05-14 | No data | WORTMAN AVENUE, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW flags installed, expansion joints sealed |
2024-05-14 | No data | WORTMAN AVENUE, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | cement face curb |
2024-05-10 | No data | EAST 111 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb found installed. Permit expired. |
2024-05-09 | No data | 5 AVENUE, FROM STREET 89 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permittee failed to correct excessive landing running slopes in the SE4 corner. M&C in Prism on 7/14/21. |
2024-05-07 | No data | BEACH 129 STREET, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP completed |
2024-05-06 | No data | 5 AVENUE, FROM STREET 89 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permittee failed to correct excessive landing slopes. M&C in Prism on 7/14/21. |
2024-05-06 | No data | WORTMAN AVENUE, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW flags installed, expansion joints sealed |
2024-05-02 | No data | VAN SICLEN AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW flags installed, expansion joints sealed |
2024-05-01 | No data | EAST 62 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Respondent failed to notify NYC DOT HIQA borough ( Manhattan ) office within four hours prior to paving. As per stipulation 1/2+ 5. And Roadway was In the process of being milled and no notification made", |
2024-05-01 | No data | STANLEY AVENUE, FROM STREET NEW JERSEY AVENUE TO STREET PENNSYLVANIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW flags installed, expansion joints sealed |
2024-05-01 | No data | 2 AVENUE, FROM STREET EAST 62 STREET TO STREET EAST 63 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Respondent failed to notify NYC DOT HIQA borough ( Manhattan ) office within four hours prior to paving. As per stipulation 1/2+ 5. And Roadway was In the process of being milled and no notification made", |
2024-04-26 | No data | WEST 35 STREET, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | crew on site paving 164’ by 22’ down 3 inches. inspect and in compliance |
2024-04-26 | No data | EASTCHESTER ROAD, FROM STREET TILLOTSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly completed single ramp in the SE4 corner quadrant is non ADA compliant. Field meeting held on 5/5/23, no new work started at time of inspection. Previously measured and collected in Prism on 2/7/23. |
2024-04-26 | No data | MICKLE AVENUE, FROM STREET TILLOTSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly completed tangent ramps in the NW corner quadrant are non ADA compliant. Previously measured and collected in Prism on 2/1/23. |
2024-04-26 | No data | HUDSON BOULEVARD, FROM STREET WEST 35 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 30' by 22' crew on site milling and paving inspect and in compliance |
2024-04-26 | No data | BOSTON ROAD, FROM STREET EASTCHESTER ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly completed tangent ramps in the SW1 corner quadrant are non ADA compliant. Field meeting held 5/5/23, no new work started. Conditions remain the same. Previously measured and collected in Prism on 2/3/23. |
2024-04-26 | No data | HUDSON BOULEVARD EAST, FROM STREET WEST 34 STREET TO STREET WEST 35 STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site milling and paving. measures 30’ by 25’ down 3 inches. inspect and in compliance |
2024-04-24 | No data | EAST 160 STREET, FROM STREET FOREST AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Newly completed single ramp in the SW1 corner quadrant is Ada compliant, Ramp was measured and collected in prism on 4/24/24. |
2024-04-17 | No data | BROADWAY, FROM STREET WEST 103 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Roadway grades have been corrected. Lame markings also restored |
2024-04-16 | No data | WEST 35 STREET, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No work started |
2024-04-16 | No data | HUDSON BOULEVARD EAST, FROM STREET WEST 34 STREET TO STREET WEST 35 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started |
2024-04-16 | No data | 7 AVENUE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps in the NW2 corner quadrant are non ADA compliant. Previously measured and collected in Prism on 1/24/23. |
2024-04-16 | No data | MACOMBS PLACE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps in the NE3 corner quadrant are non ADA compliant. Ramps was previously measured and collected in Prism on 11/23/22. |
2024-04-16 | No data | HUDSON BOULEVARD, FROM STREET WEST 35 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started |
2024-04-15 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps within the SE4 corner quadrant are non ADA compliant. Previously measured in Prism on 5/25/22. |
2024-04-12 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps in the NE3 corner quadrant are non Ada compliant, Ramps was measured and collected in prism on 7/13/23. |
2024-04-11 | No data | 2 AVENUE, FROM STREET EAST 47 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps within the sw1 corner quadrant are non Ada. Measured in prism on 3/30/22. |
2024-04-09 | No data | STANLEY AVENUE, FROM STREET NEW JERSEY AVENUE TO STREET PENNSYLVANIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk in place and in compliance at this time |
2024-04-09 | No data | VAN SICLEN AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk occupied at this time. |
2024-04-09 | No data | VAN SICLEN AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags in compliance, sidewalks under construction at this time |
2024-04-09 | No data | STANLEY AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags in place and in compliance |
2024-04-09 | No data | STANLEY AVENUE, FROM STREET NEW JERSEY AVENUE TO STREET PENNSYLVANIA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk in compliance |
2024-04-08 | No data | WORTMAN AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags in compliance |
2024-04-07 | No data | STANLEY AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags restored |
2024-04-05 | No data | WORTMAN AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk in compliance |
2024-04-05 | No data | WORTMAN AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk in compliance |
2024-04-05 | No data | VERMONT STREET, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at this time |
2024-04-04 | No data | VERMONT STREET, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk in compliance |
2024-04-04 | No data | WORTMAN AVENUE, FROM STREET NEW JERSEY AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags in compliance |
2024-04-04 | No data | WORTMAN AVENUE, FROM STREET NEW JERSEY AVENUE TO STREET PENNSYLVANIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk in place and in compliance |
2024-04-04 | No data | COZINE AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flag in compliance |
2024-04-03 | No data | BOSTON ROAD, FROM STREET MICKLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the NW2 corner quadrant are ADA compliant. Previously measured and collected in Prism on 2/2/23. |
2024-04-02 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the NW2 corner quadrant are non Ada. Measured in prism 2/8/23. TIF on file. |
2024-04-02 | No data | 47 AVENUE, FROM STREET VERNON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please refer to permit #Q042023150A23 for updated inspection remarks. |
2024-04-01 | No data | 47 AVENUE, FROM STREET VERNON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please refer to newer permit #Q042023086A29 for updated inspection remarks. |
2024-04-01 | No data | EAST 62 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No new roadway work done, permit still active. |
2024-04-01 | No data | 2 AVENUE, FROM STREET EAST 62 STREET TO STREET EAST 63 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No new work done on the roadway, permit still active. |
2024-04-01 | No data | PENNSYLVANIA AVENUE, FROM STREET STANLEY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started in the SE4 corner quadrant at the Time of inspection. |
2024-03-26 | No data | BOSTON ROAD, FROM STREET MICKLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SW1 corner quadrant are ADA compliant. Previously measured and collected in Prism on 2/2/23. Pavement key installed and markings restored in crosswalks. |
2024-03-26 | No data | WEST 34 STREET, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above Respondent repaired the condition on CAR # 20236390417 which was issued on 6/15/2023 without the noted permit listed as required. |
2024-03-25 | No data | 5 AVENUE, FROM STREET EAST 28 STREET TO STREET EAST 29 STREET | No data | Street Construction Inspections: Active | Department of Transportation | - REPAIR SIDEWALK: Expansion joints need to be sealed. Permit Is still active. |
2024-03-23 | No data | COZINE AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Active | Department of Transportation | Walkway in compliance |
2024-03-23 | No data | VERMONT STREET, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk in compliance |
2024-03-22 | No data | EAST 55 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed blended transition ramp in the NE3 corner quadrant is non Ada compliant. Measured in prism on 4/29/22. TIF on file. |
2024-03-22 | No data | STANLEY AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb reset and in compliance |
2024-03-21 | No data | 93 AVENUE, FROM STREET 168 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No new ped ramp work started at this time within the NE3 corner quadrant with excessive measurements. Ramps are functional and accessible, we’ll re-inspect at a later date. |
2024-03-21 | No data | EAST 55 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed blended transition in the SW1 corner quadrant is ada compliant. Measured in prism on 7/5/22. |
2024-03-21 | No data | EAST 56 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SE4 corner quadrant are non Ada. Ramps was previously measured in prism on 5/12/22. TIF on file. |
2024-03-19 | No data | 5 AVENUE, FROM STREET 89 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Landing running slope is not a new requirement and has been requirement per ADA and NYC Standard Detail Drawings since 2010. Landing slopes must be 2% or less. Email HIQApedramp@dot.nyc.gov for any questions. |
2024-03-18 | No data | WEST 31 STREET, FROM STREET 9 AVENUE TO STREET LINCOLN TNNL APPROACH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PAVE STREET-W/ ENGINEERING & INSP FEE |
2024-03-16 | No data | WEST 125 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #123-121 REPAIR SIDEWALK FREE OF DEFECTS AND IN COMPLIANCE |
2024-03-16 | No data | COLUMBUS AVENUE, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | vault alteration in compliance |
2024-03-15 | No data | 5 AVENUE, FROM STREET EAST 28 STREET TO STREET EAST 29 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR passed as per agreement with Contractor to restore below grade flags adjacent to work Active permit #M042024072A13 on file . |
2024-03-13 | No data | JAY STREET, FROM STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Photos of roadway grade measurements are on file under permit # B042022318A10 in Prism at this time. No further action taken at this time. |
2024-03-13 | No data | 5 AVENUE, FROM STREET 89 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the NW2 corner found not to be ADA compliant. Ramps are functional and accessible. Previously measured & collected in Prism on 7/14/21 |
2024-03-11 | No data | JAY STREET, FROM STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed ramps found to be Ada compliant. M.C on 2/9/24 |
2024-03-09 | No data | COZINE AVENUE, FROM STREET HENDRIX STREET TO STREET SCHENCK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb installed and in compliance |
2024-03-08 | No data | 93 AVENUE, FROM STREET 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the NW2 corner quadrant was found to be Ada compliant. Expansion joints sealed. Measured and collected in prism on 3/8/24. |
2024-03-07 | No data | CHARLTON STREET, FROM STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SE4 corner quadrant are non Ada. Ramps was Measured and collected in prism 12/1/22. |
2024-03-07 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired. No ped ramp work started in the SE4 corner quadrant at time of inspection |
2024-03-07 | No data | 5 AVENUE, FROM STREET 89 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the NW2 corner found not to be ADA compliant. Ramps are functional and accessible. Previously measured & collected in Prism on 7/14/21 |
2024-03-06 | No data | VANDAM STREET, FROM STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the NE3 corner quadrant are non Ada. Measured in prism 12/1/22. |
2024-03-05 | No data | EAST 87 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk ok |
2024-03-04 | No data | VAN SICLEN AVENUE, FROM STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started. No new ped ramp work done in the SW1 corner. NYC in-house is responsible for ramps. City & county paving only did the sidewalks on the outer limits of the corner. |
2024-03-03 | No data | VERMONT STREET, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temporary pedestrian walkway in compliance |
2024-03-03 | No data | WORTMAN AVENUE, FROM STREET NEW JERSEY AVENUE TO STREET PENNSYLVANIA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk occupied at this time. |
2024-03-03 | No data | VAN SICLEN AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temporary walk walk in compliance |
2024-03-03 | No data | COZINE AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk occupied |
2024-02-25 | No data | STANLEY AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cub in place and in compliance |
2024-02-25 | No data | VAN SICLEN AVENUE, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb installed and in compliance |
2024-02-24 | No data | BLEECKER STREET, FROM STREET MERCER STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work observed permit expired |
2024-02-23 | No data | WEST 34 STREET, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued for the above Respondent repaired the condition on CAR # 20236390417 which was issued on 6/15/2023 without the noted permit listed as required. |
2024-02-21 | No data | PENNSYLVANIA AVENUE, FROM STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started. No new ped ramp work done. Previous work done by Crown Castle. |
2024-02-18 | No data | STANLEY AVENUE, FROM STREET NEW JERSEY AVENUE TO STREET PENNSYLVANIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb installed and in compliance |
2024-02-18 | No data | VAN SICLEN AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk barricaded at this time. |
2024-02-16 | No data | PENNSYLVANIA AVENUE, FROM STREET STANLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No ped ramp work done. Concrete trenches were constructed outside of the pedestrian ramp area. No further work at this time. |
2024-02-10 | No data | 2 AVENUE, FROM STREET EAST 62 STREET TO STREET EAST 63 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No new work done on the roadway, permit still active. |
2024-02-07 | No data | JAY STREET, FROM STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newer permit B042023017A25 on file.. |
2024-02-07 | No data | WORTMAN AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags in place and in compliance |
2024-02-07 | No data | STANLEY AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags installed, new permit B042024016A14 |
2024-02-07 | No data | VERMONT STREET, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags installed and unsealed. New permit B042024016A19 |
2024-02-06 | No data | VAN SICLEN AVENUE, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk flags in place and in compliance |
2024-02-06 | No data | VAN SICLEN AVENUE, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags in place and in compliance |
2024-02-06 | No data | ST ANNS AVENUE, FROM STREET EAST 149 STREET TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Active | Department of Transportation | Email confirmation |
2024-02-06 | No data | EAST 149 STREET, FROM STREET ST ANNS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Email confirmation? |
2024-02-06 | No data | EAST 149 STREET, FROM STREET BROOK AVENUE TO STREET ST ANNS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Email confirmation . |
2024-02-05 | No data | COLUMBUS AVENUE, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ifo 313, vault alteration on s/w in compliance |
2024-02-04 | No data | WORTMAN AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk barricaded new permit on file. B012024016B42 |
2024-02-02 | No data | SCHENCK AVENUE, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags in place and in compliance |
2024-02-02 | No data | VERMONT STREET, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags installed however they remain unsealed |
2024-02-02 | No data | PENNSYLVANIA AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk in place and in compliance |
2024-02-02 | No data | VAN SICLEN AVENUE, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk in place and in compliance |
2024-02-02 | No data | STANLEY AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done. New permit on file. |
2024-02-01 | No data | STANLEY AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Crew on site new permit on file. B012024016B38 |
2024-02-01 | No data | 93 AVENUE, FROM STREET 168 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No Ped ramp work started at this time within the NE3 corner quadrant. Pre existing ramps are functional and accessible, we’ll re-inspect at a later date. |
2024-01-31 | No data | 93 AVENUE, FROM STREET 168 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No new ped ramp work started at this time within the NW2 corner quadrant. Pre existing ramps are functional and accessible. |
2024-01-29 | No data | BEACH 129 STREET, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP installed |
2024-01-29 | No data | WORTMAN AVENUE, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb reset and in compliance |
2024-01-29 | No data | COZINE AVENUE, FROM STREET HENDRIX STREET TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb installed and in compliance |
2024-01-29 | No data | WORTMAN AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Crew on-site permit on file |
2024-01-27 | No data | 5 AVENUE, FROM STREET EAST 28 STREET TO STREET EAST 29 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | IFO 254, NOV for asphalt ramping left behind on the sidewalk. Respondent notified via CAR# 20236720275 on 11/30/2023 and failed to remove plating and decking, including the ramping material, from the sidewalk prior to the expiration of the permit. |
2024-01-26 | No data | AMSTERDAM AVENUE, FROM STREET WEST 79 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the SW1 corner quadrant are ADA compliant. Measured in prism on 1/7/21. |
2024-01-26 | No data | CENTRAL PARK WEST, FROM STREET WEST 84 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SW1 corner quadrant are non Ada compliant, Ramps was measured and collected in prism on 7/18/23 |
2024-01-26 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No new ped ramp work started at time of inspection |
2024-01-26 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired. New active permit #M042024016A08 on file. |
2024-01-20 | No data | VANDAM STREET, FROM STREET 6 AVENUE TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/K/A#160- Sidewalk has been fully restored. |
2024-01-20 | No data | STANLEY AVENUE, FROM STREET NEW JERSEY AVENUE TO STREET PENNSYLVANIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk installed and missing sealer. New permit on file B042024017A16 |
2024-01-18 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No new work done in the NE3 corner quadrant previously measured in prism on 7/13/23 |
2024-01-16 | No data | VAN SICLEN AVENUE, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk open in compliance |
2024-01-16 | No data | WORTMAN AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk occupied and in compliance |
2024-01-16 | No data | STANLEY AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Active | Department of Transportation | Pedestrian walkway present at this time . |
2024-01-15 | No data | WEST 29 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The respondent has restored 1/2+5 of the roadway. |
2024-01-14 | No data | WEST 28 STREET, FROM STREET 5 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I found the expansion joints sealed. |
2024-01-12 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant are non ADA compliant. Measured in Prism on 4/17/23 |
2024-01-11 | No data | CALYER STREET, FROM STREET LORIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner found to be ADA compliant. Measured & collected in Prism on 12/4/23. Street paved at this time. |
2024-01-11 | No data | WEST 34 STREET, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued to the respondent for repairing the condition on CAR #20236390417 which was issued on 6/15/2023 without the noted permit listed as required. |
2024-01-11 | No data | COLUMBUS AVENUE, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | vault construction in compliance |
2024-01-10 | No data | AMSTERDAM AVENUE, FROM STREET WEST 78 STREET TO STREET WEST 79 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 'TACOMBI' s/w flags are in compliance |
2024-01-09 | No data | 2 AVENUE, FROM STREET EAST 47 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Conditions previously reported. Open CAR on file at time of inspection. |
2024-01-09 | No data | 2 AVENUE, FROM STREET EAST 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the NW2 corner quadrant are Ada compliant. Measured in prism on 9/7/21. Updated Prism with new landing slopes. |
2024-01-08 | No data | 2 AVENUE, FROM STREET EAST 80 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the NE3 corner quadrant are non Ada compliant. Measured in prism on 2/18/22. |
2024-01-07 | No data | 168 STREET, FROM STREET 93 AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway in compliance at this time. |
2024-01-06 | No data | VAN SICLEN AVENUE, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb installed and in compliance |
2024-01-06 | No data | HUDSON STREET, FROM STREET CHARLTON STREET TO STREET KING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #350- sidewalk has been restored and sealed. |
2024-01-06 | No data | STANLEY AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb is in place and in compliance |
2024-01-06 | No data | STANLEY AVENUE, FROM STREET NEW JERSEY AVENUE TO STREET PENNSYLVANIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb installed and in compliance |
2024-01-05 | No data | MACOMBS PLACE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant are non Ada. Measured in prism 11/23/22. Newer permit M042023262A24 on file |
2024-01-05 | No data | VERMONT STREET, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temporary pedestrian walkway is visible & in compliance at this time of inspection. |
2024-01-05 | No data | STANLEY AVENUE, FROM STREET VAN SICLEN AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Active | Department of Transportation | Temporary pedestrian walkway is visible & in compliance at this time of inspection. |
2024-01-05 | No data | CHARLTON STREET, FROM STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joints sealed. Refer to most recent permit #M042023013A13 |
2024-01-05 | No data | VANDAM STREET, FROM STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the NE3 corner quadrant are non ADA compliant. Measured in Prism on 12/1/22. Newer permit M042023013A14 on file |
2024-01-04 | No data | 7 AVENUE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newer permit #M042023115A14 on file for the NW2 Corner quadrant. |
2023-12-31 | No data | CHARLTON STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newer permit on file, refer to permit #M042023234A19 |
2023-12-31 | No data | VARICK STREET, FROM STREET CHARLTON STREET TO STREET VANDAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 160 found multiple restored to grade sidewalk flags.expansion joints sealed. |
2023-12-31 | No data | HUDSON STREET, FROM STREET CHARLTON STREET TO STREET KING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 350 Hudson found multiple restored to grade sidewalk flags, expansion joints sealed. |
2023-12-29 | No data | EAST 33 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no temp pedestrian walk found |
2023-12-29 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No new work done in the NE3 corner quadrant previously measured in prism on 7/13/23 Permit expired. Newer permit #M042023339A11 on file. |
2023-12-27 | No data | EAST 33 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done permit expired. |
2023-12-27 | No data | PENNSYLVANIA AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb and sidewalk installed on NYCHA side of segment starting from corner of Stanley Av |
2023-12-22 | No data | WEST 103 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW incompliance at time of inspection. |
2023-12-20 | No data | 7 AVENUE, FROM STREET WEST 153 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired, no new ped ramp work started at time of inspection |
2023-12-20 | No data | 7 AVENUE, FROM STREET WEST 152 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired. No new ped ramp work started at time of inspection |
2023-12-20 | No data | 7 AVENUE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired, no new ped ramp work started at time of inspection |
2023-12-19 | No data | CALYER STREET, FROM STREET LORIMER STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | reset curb new |
2023-12-14 | No data | EAST 51 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Brand new curb in front of 231. |
2023-12-13 | No data | EAST 31 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No new Ped ramp work done with this permit in the SE4 corner quadrant. Corner was updated by sim/dot permit #M042021148A09 on file. |
2023-12-12 | No data | EAST 31 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired. No new ped ramp work started at time of inspection |
2023-12-11 | No data | WEST HOUSTON STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 375 found multiple restored to grade sidewalk flags. Sidewalk expansion joints sealed. |
2023-12-11 | No data | EASTCHESTER ROAD, FROM STREET TILLOTSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp in the NW2 corner quadrant is ADA compliant. Previously measured and collected in Prism on 2/7/23. |
2023-12-11 | No data | PENNSYLVANIA AVENUE, FROM STREET STANLEY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No work started. No ped ramp work done at this time. We’ll reinspect at a later date. |
2023-12-11 | No data | COLDEN AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass work done |
2023-12-11 | No data | BOSTON ROAD, FROM STREET EASTCHESTER ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SE4 corner quadrant are ADA compliant. Previously measured and collected in Prism on 2/6/23. Pavement key installed and markings restored in crosswalks. |
2023-12-10 | No data | LOUISIANA AVENUE, FROM STREET FLATLANDS AVENUE TO STREET VANDALIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb reset - |
2023-12-07 | No data | HUDSON STREET, FROM STREET KING STREET TO STREET WEST HOUSTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 375 found multiple sidewalk flags running south to north restored to grade. Expansion joints sealed. |
2023-12-07 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps in the NW2 Corner quadrant are non Ada compliant Ramps was measured and collected in prism on 12/7/23. ( landing running-cross slope, right-left flare slopes). |
2023-12-06 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Active | Department of Transportation | No new work done in the SE4 corner quadrant permit still active. |
2023-12-06 | No data | VAN SICLEN AVENUE, FROM STREET WORTMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No work started. No new ped ramp work done. Previously constructed by DOT-HSE permit # B152019281A91. Permittee working on the sidewalk portion and has work covered by orange gate from City & County Paving Corp. |
2023-12-05 | No data | CALYER STREET, FROM STREET LORIMER STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site milling the roadway, in compliance |
2023-12-05 | No data | 47 AVENUE, FROM STREET 11 STREET TO STREET VERNON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done on another permit. |
2023-12-05 | No data | LORIMER STREET, FROM STREET CALYER STREET TO STREET NOBLE STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site milling the roadway, in compliance |
2023-12-05 | No data | CALYER STREET, FROM STREET LORIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site milling the roadway, in compliance |
2023-12-05 | No data | 47 AVENUE, FROM STREET VERNON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Section of r/w was paved. |
2023-12-04 | No data | CALYER STREET, FROM STREET LORIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active permit.Newly completed tangent ramps in the NE3 corner found to be ADA compliant. Measured & collected in Prism on 12/4/23. Streets scheduled to be milled tomorrow and expansion joint must be sealed as plastics caps are not acceptable. |
2023-11-29 | No data | PENNSYLVANIA AVENUE, FROM STREET WORTMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No work started. No new ped ramp work done. Previous work done by Crown Castle. |
2023-11-25 | No data | 5 AVENUE, FROM STREET EAST 28 STREET TO STREET EAST 29 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 250, installed expansion joints have exposed plastic caps. Please remove caps ( if applicable ) and apply sealer over top. Also, temporary asphalt placed needs to be removed and area permanently restored in kind IFO 254. |
2023-11-25 | No data | WEST 28 STREET, FROM STREET 5 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO aka 250 5th Ave on West 28th St, installed sidewalk expansion joints have exposed plastic caps. Please remove caps ( if applicable ) and apply sealer over top. |
2023-11-25 | No data | 5 AVENUE, FROM STREET WEST 28 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Within N/W/C, BPP restoration is perm / flush to grade at this time. |
2023-11-24 | No data | VAN SICLEN AVENUE, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | New sidewalk and curb install from corner of workman Avenue in compliance for building 250 workmen. |
2023-11-23 | No data | SCHENCK AVENUE, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb install for new sidewalk throughout entire segment in compliance. |
2023-11-23 | No data | PENNSYLVANIA AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed for new sidewalk through entire segment on East side in front of 875 . |
2023-11-22 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly completed tangent ramps in the NE3 corner quadrant are non ADA compliant. Previously measured and collected in Prism on 7/13/23. |
2023-11-22 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly completed tangent ramps within the SE4 corner quadrant are non ADA compliant. Previously measured in Prism on 5/25/22 |
2023-11-21 | No data | LORIMER STREET, FROM STREET CALYER STREET TO STREET NOBLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new curb for new building |
2023-11-20 | No data | STANLEY AVENUE, FROM STREET NEW JERSEY AVENUE TO STREET PENNSYLVANIA AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Street closed no permit |
2023-11-17 | No data | GREENWICH STREET, FROM STREET LEROY STREET TO STREET MORTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | PAVE STREET-W/ ENGINEERING & INSP FEE: L:96' W:28' D:3" |
2023-11-17 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Active | Department of Transportation | PAVE STREET-W/ ENGINEERING & INSP FEE: L:28' W:22' D:3" |
2023-11-16 | No data | PENNSYLVANIA AVENUE, FROM STREET STANLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started. No ped ramp work done in the SE4 corner. Paving work was done in the sidewalk approach area. |
2023-11-16 | No data | PENNSYLVANIA AVENUE, FROM STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started from City & county paving Corp. Previously built ramps by Crown Castle. No new work has be done in the NE3 corner. |
2023-11-12 | No data | 7 AVENUE, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started. |
2023-11-10 | No data | PENNSYLVANIA AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | On site, installing new sidewalk and new curb in front of Pen Wertman, Wertman opposite White Castle, in Compliance, permit to active |
2023-11-10 | No data | PENNSYLVANIA AVENUE, FROM STREET STANLEY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site open sidewalk linden blvd northbound side of corner quad in compliance |
2023-11-08 | No data | EAST 174 STREET, FROM STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SE4 corner quadrant are Non ADA compliant. Ramps was Previously measured and collected in Prism on 1/8/21. |
2023-11-07 | No data | EAST 31 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Conditions previously reported |
2023-11-07 | No data | EAST 31 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired. New active permit on file. |
2023-11-06 | No data | EAST 31 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No new work done with this permit. Corner was updated by sim/dot permit #M042021148A09 on file. |
2023-11-04 | No data | EAST 31 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No new work done in the SW1 corner quadrant permit still active. |
2023-11-04 | No data | MICKLE AVENUE, FROM STREET TILLOTSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the NE3 corner quadrant are non ADA compliant. Previously measured and collected in Prism on 2/1/23. |
2023-11-04 | No data | EVERGREEN AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | All sidewalk expansion joint sealed. |
2023-11-04 | No data | WORTMAN AVENUE, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk installed for building restoration 300 |
2023-11-04 | No data | VAN SICLEN AVENUE, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk installed for building restoration |
2023-11-03 | No data | CALYER STREET, FROM STREET LORIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. Ramps previously completed in the past but current permitee has yet to do any new work at this time. We’ll measure & reinspect when ramps are redone. |
2023-11-03 | No data | EAST 31 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps in the NW2 corner quadrant are non Ada compliant, Ramps was measured and collected in prism on 11/3/23 (landing running cross slopes) |
2023-11-03 | No data | BROADWAY, FROM STREET WEST 103 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired. Newer permit #M042023257A11 on file. CAR on file. |
2023-11-02 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 55, a granite curb installed and cobblestones restored. |
2023-10-31 | No data | EAST 74 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #300 CORNER PROPERTY AT 2 AVENUE REPAIR SIDEWALK WIDTH OF PROPERTY FREE OF DEFECTS AND IN COMPLIANCE. |
2023-10-31 | No data | WEST 35 STREET, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP conducted on eastern portion of new building. Active BO and work being done on western portion at this time. |
2023-10-27 | No data | VAN SICLEN AVENUE, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | New curb installed for new sidewalk for building 285 Wortmann Av |
2023-10-26 | No data | ATLANTIC AVENUE, FROM STREET CHESTNUT STREET TO STREET CONDUIT BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp completed in compliance |
2023-10-25 | No data | WEST 103 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | BPP was not monitored. However, the permittee did notify us for an inspection. Email was sent on 10/24/23 at 5:51pm. (Do not issue a summon). |
2023-10-25 | No data | BROADWAY, FROM STREET WEST 103 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP was not monitored. However, the permittee did notify us for an inspection. Email was sent on 10/24/23 at 5:51pm. (Do not issue a summon). |
2023-10-25 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 60-74, curb to curb cobblestone BPP remains and is acceptable. |
2023-10-25 | No data | BROADWAY, FROM STREET WEST 102 STREET TO STREET WEST 103 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP was not monitored. However, the permittee did notify us for an inspection. Email was sent on 10/24/23 at 5:51pm. (Do not issue a summon). |
2023-10-23 | No data | 30 STREET, FROM STREET 47 AVENUE TO STREET THOMSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R/w resurfaced |
2023-10-23 | No data | 29 STREET, FROM STREET 47 AVENUE TO STREET SKILLMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Section of r/w paved. |
2023-10-22 | No data | KING STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway in compliance and free of any restorations within street, pavement |
2023-10-22 | No data | DINSMORE PLACE, FROM STREET CHESTNUT STREET TO STREET RICHMOND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp done and in compliance |
2023-10-22 | No data | WEST 84 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit secured for this work. |
2023-10-22 | No data | CENTRAL PARK WEST, FROM STREET WEST 83 STREET TO STREET WEST 84 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel-faced curb in compliance. |
2023-10-22 | No data | GREENWICH STREET, FROM STREET CHARLTON STREET TO STREET KING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway in compliance and free of any restorations within street, pavement |
2023-10-20 | No data | WEST 28 STREET, FROM STREET 5 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | Permittee made notification for BPP inspection on 10/19/23 at 4:50pm but the inspection was not assigned to an inspector. |
2023-10-20 | No data | 5 AVENUE, FROM STREET WEST 28 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Permittee made notification for BPP inspection on 10/19/23 at 4:50pm but the inspection was not assigned to an inspector. |
2023-10-20 | No data | 5 AVENUE, FROM STREET EAST 28 STREET TO STREET EAST 29 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Permittee made notification for BPP inspection on 10/19/23 at 4:50pm but the inspection was not assigned to an inspector. |
2023-10-19 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 115 parking lane, steel faced curb installed and cobblestone restored. |
2023-10-18 | No data | WEST 28 STREET, FROM STREET 5 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Complaint | Department of Transportation | In compliance, DOT paved the Street, however at permit location the Street was not pave due to the contractor for this active permit will pave the Street in front of the new building stated on permit. Street will be leveled when other areas paved. |
2023-10-17 | No data | 7 AVENUE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No new work done in the Northeast Mid Block, permit still active. |
2023-10-17 | No data | 7 AVENUE, FROM STREET WEST 153 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No new work done in the Southeast Mid Block, permit still active. |
2023-10-17 | No data | 7 AVENUE, FROM STREET WEST 152 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No new work done in the Southeast Mid Block, permit still active. |
2023-10-13 | No data | BROADWAY, FROM STREET WEST 103 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps in the SE4 corner quadrant are non Ada compliant. Ramps was measured and collected in prism on 10/13/23 (roadway counter slopes roadway gutter flow ) |
2023-10-12 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 52-58 cobblestone BPP restoration remains acceptable. |
2023-10-06 | No data | VAN SICLEN AVENUE, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk and curb installed east sidewalk |
2023-10-05 | No data | 10 AVENUE, FROM STREET WEST 35 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP 45'X42.5'X3" - Deep, pass |
2023-10-05 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Duplicate CAR. will issue NOV on newer permit. |
2023-10-05 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly completed tangent ramps in the NE3 corner quadrant are non ADA compliant. Previously measured and collected in Prism on 7/13/23. |
2023-10-05 | No data | 7 AVENUE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps in the NW2 corner quadrant are non Ada compliant, Ramps was previously measured and collected in prism on 1/24/23, |
2023-10-05 | No data | MACOMBS PLACE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps in the NE3 corner quadrant are non ADA compliant. Ramps was previously measured and collected in prism on 11/23/22. |
2023-10-05 | No data | WEST 35 STREET, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | BPP, 260'X37.5'X3" - Deep, pass |
2023-09-28 | No data | WEST 125 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started at time of inspection |
2023-09-28 | No data | WEST 126 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started |
2023-09-27 | No data | 7 AVENUE, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started I/F/O 2641 permit expired. |
2023-09-27 | No data | MICKLE AVENUE, FROM STREET TILLOTSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly completed tangent ramps in the NW corner quadrant are non ADA compliant. Previously measured and collected in Prism on 2/1/23. |
2023-09-27 | No data | BOSTON ROAD, FROM STREET EASTCHESTER ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly completed tangent ramps in the SW1 corner quadrant are non ADA compliant. Field meeting held 5/5/23, no new work started. Conditions remain the same. Previously measured and collected in Prism on 2/3/23. |
2023-09-27 | No data | EASTCHESTER ROAD, FROM STREET TILLOTSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly completed single ramp in the SE4 corner quadrant is non ADA compliant. Field meeting held on 5/5/23, no new work started at time of inspection. Previously measured and collected in Prism on 2/7/23. |
2023-09-25 | No data | EAST 160 STREET, FROM STREET FOREST AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Two ramps was installed as per approved Builder's Pavement Plan drawings "KM - IF TWO RAMPS WERE BUILT PLEASE INSPECT FOR ADA COMPLIANCY IN PRISM. THANK YOU." |
2023-09-25 | No data | WEST 34 STREET, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent repaired the condition(s) on CAR#20236390417 issued on 6/20/2023 without the noted permit listed as required. |
2023-09-21 | No data | COZINE AVENUE, FROM STREET HENDRIX STREET TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk installed in compliance for building 285 |
2023-09-21 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the NW2 corner quadrant are non Ada. Measured in prism 2/8/23. TIF on file. |
2023-09-21 | No data | COZINE AVENUE, FROM STREET HENDRIX STREET TO STREET SCHENCK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk installed for building 295 |
2023-09-19 | No data | 2 AVENUE, FROM STREET EAST 47 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the sw1 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 3/30/22. Newer permit M042022188A12 on file |
2023-09-18 | No data | VAN SICLEN AVENUE, FROM STREET COZINE AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Jersey barriers creating a temporary pedestrian walkway in compliance |
2023-09-18 | No data | BOSTON ROAD, FROM STREET MICKLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SE4 corner quadrant are ADA compliant. Previously measured and collected in Prism on 2/2/23. Pavement key installed and markings restored in crosswalks |
2023-09-18 | No data | WORTMAN AVENUE, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Walkway in side NYCHA complex ifo 170 |
2023-09-15 | No data | BOSTON ROAD, FROM STREET MICKLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NW2 corner quadrant are ADA compliant. Previously measured and collected in Prism on 2/2/23. Pavement key installed and markings restored in crosswalks. |
2023-09-14 | No data | EAST 56 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SE4 corner quadrant are non Ada. Ramps was previously measured in prism on 5/12/22. TIF on file. |
2023-09-13 | No data | WEST 78 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active job site, currently working on the sidewalk area in front of 173. |
2023-09-13 | No data | EAST 55 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed blended transition in the SW1 corner quadrant is ada compliant. Measured in prism on 7/5/22. |
2023-09-09 | No data | WEBSTER AVENUE, FROM STREET EAST 199 STREET TO STREET OLIVER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1/2 plus 5 of the roadway paved |
2023-09-08 | No data | GREENWICH STREET, FROM STREET CHARLTON STREET TO STREET KING STREET | No data | Street Construction Inspections: Active | Department of Transportation | Property line to Property line: 215 feetFull width of roadway: 44 feetMilled portion :22+5=27 feetDepth of roadway:3 inches |
2023-09-08 | No data | CHARLTON STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Property line to Property line: 128 feetFull width of roadway: 36 feetMilled portion :18 +5=23 feetDepth of roadway:3 inches |
2023-09-08 | No data | KING STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Property line to Property line: 99 feetFull width of roadway: 36 feetMilled portion :18 +5= 23 feetDepth of roadway:3 inches |
2023-09-05 | No data | 47 AVENUE, FROM STREET VERNON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary restoration around gas valve. Con Edison is now responsible for the corner. Open CAR 20237680278 on file. |
2023-09-05 | No data | 7 AVENUE, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done. |
2023-09-05 | No data | EAST 87 STREET, FROM STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the NE3 corner quadrant ramps Non Ada compliant. Was Measured and collected in Prism on 8/3/20. Slopes were brought down from 11% to 7%. Updated on 9/14/22. |
2023-09-02 | No data | EVERGREEN AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb in place I/F/O 955. |
2023-09-02 | No data | BROADWAY, FROM STREET WEST 84 STREET TO STREET WEST 85 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 2330, Roadway found to be resurfaced, no work observed at this time. |
2023-08-31 | No data | 7 AVENUE, FROM STREET WEST 152 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No new ped ramp work started at time of inspection |
2023-08-31 | No data | 7 AVENUE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No new ped ramp work started at time of inspection |
2023-08-31 | No data | BROADWAY, FROM STREET WEST 103 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No ped ramp work started at time of inspection |
2023-08-31 | No data | 7 AVENUE, FROM STREET WEST 153 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No new ped ramp work started at time of inspection |
2023-08-30 | No data | 7 AVENUE, FROM STREET WEST 153 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Disregard, previous inspections no new work was completed in the SE4 corner quadrant, permit expired. |
2023-08-30 | No data | 7 AVENUE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Disregard, previous inspections no new work was completed in the NE3 corner quadrant, permit expired. |
2023-08-30 | No data | 7 AVENUE, FROM STREET WEST 152 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Disregard, previous inspections no new work was completed in the SE4 corner quadrant, permit expired. |
2023-08-29 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SW1 corner quadrant are non Ada compliant. Measured in prism on 6/15/21 |
2023-08-26 | No data | WEST 126 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit updated under M012023209B30 |
2023-08-25 | No data | CHARLTON STREET, FROM STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SE4 corner quadrant are non Ada. Measured in prism 12/1/22. |
2023-08-25 | No data | VANDAM STREET, FROM STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the NE3 corner quadrant are non Ada. Measured in prism 12/1/22. |
2023-08-24 | No data | COZINE AVENUE, FROM STREET HENDRIX STREET TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit on file. Sidewalk is closed with temp ped walkway in compliance |
2023-08-24 | No data | COZINE AVENUE, FROM STREET HENDRIX STREET TO STREET SCHENCK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp walkway in compliance |
2023-08-24 | No data | COZINE AVENUE, FROM STREET HENDRIX STREET TO STREET SCHENCK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit on file. Sidewalk is closed with temp ped walkway in compliance |
2023-08-22 | No data | 7 AVENUE, FROM STREET WEST 153 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed single ramp in the SE4 corner quadrant are non Ada compliant, Ramp was measured and collected in prism on 8/17/23 roadway gutter flow slopes, landing running slopes) |
2023-08-22 | No data | 7 AVENUE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired. See permit #M042023208A25 for updated inspection remarks. |
2023-08-22 | No data | 7 AVENUE, FROM STREET WEST 152 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired. See permit #M042023208A26 for updated inspection remarks. |
2023-08-22 | No data | 7 AVENUE, FROM STREET WEST 153 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired. See permit #M042023208A27 for updated inspection remarks. |
2023-08-22 | No data | 7 AVENUE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed single ramp in the NE3 corner quadrant, ramp is Non Ada compliant, Ramp was measured and collected in prism on 8/17/23 ( roadway gutter flow, landing running ) |
2023-08-21 | No data | COZINE AVENUE, FROM STREET HENDRIX STREET TO STREET SCHENCK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Barriers in parking lane okay |
2023-08-20 | No data | FOREST AVENUE, FROM STREET EAST 158 STREET TO STREET EAST 160 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints have been sealed & installed |
2023-08-20 | No data | EAST 160 STREET, FROM STREET FOREST AVENUE TO STREET TINTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints has been sealed & installed |
2023-08-18 | No data | 7 AVENUE, FROM STREET WEST 152 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed single ramp in the SE4 corner quadrant are non Ada compliant, Ramp was measured and collected in prism on 8/18/23 ( roadway gutter flow slopes,landing running-cross slopes) |
2023-08-18 | No data | WEST 34 STREET, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent repaired the condition on CAR #20236390417 issued 6/15/23 without the noted permit as required. |
2023-08-17 | No data | 7 AVENUE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed single ramp in the NE3 corner quadrant, ramp is Non Ada compliant, Ramp was measured and collected in prism on 8/17/23 ( roadway gutter flow, landing running ) |
2023-08-17 | No data | 7 AVENUE, FROM STREET WEST 153 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed single ramp in the SE4 corner quadrant are non Ada compliant, Ramp was measured and collected in prism on 8/17/23 roadway gutter flow slopes, landing running slopes) |
2023-08-17 | No data | PEARL STREET, FROM STREET FLETCHER STREET TO STREET PLATT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Portion of BPP work in compliance, while other portion is resurfaced by other on going work in the area |
2023-07-26 | No data | CLARKE PLACE, FROM STREET GRAND CONCOURSE TO STREET WALTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb in place I/F/O 112. |
2023-07-24 | No data | MACOMBS PLACE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No new ped ramp work, Newly completed tangent ramps in the NE3 corner quadrant are non ADA compliant. Ramps was previously measured and collected in prism on 11/23/22 |
2023-07-24 | No data | 7 AVENUE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the NW2 corner quadrant are non Ada compliant, Ramps was previously measured and collected in prism on 1/24/23, |
2023-07-21 | No data | WEST 29 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Roadway milling 172’ X 22’ X 3 1/2” |
2023-07-20 | No data | COLUMBUS AVENUE, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 313 NEW SIDEWALK VAULT FREE OF DEFECTS AND IN COMPLIANCE |
2023-07-19 | No data | COLUMBUS AVENUE, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | VAULT CONSTRUCTION OR ALTERATION FULL SIDEWALK INSTALLATION WIDTH OF PROPERTY FREE OF DEFECTS |
2023-07-18 | No data | CENTRAL PARK WEST, FROM STREET WEST 84 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SW1 corner quadrant are non Ada compliant, Ramps was measured and collected in prism on 7/18/23.( roadway gutter flow slopes.) |
2023-07-18 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 115 steel faced curb installed and cobblestone restored in parking lane. |
2023-07-16 | No data | FOREST AVENUE, FROM STREET EAST 158 STREET TO STREET EAST 160 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | D68 issued to respondent for failing to install and seal expansion joints |
2023-07-16 | No data | EAST 160 STREET, FROM STREET FOREST AVENUE TO STREET TINTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | D68 issued to respondent for failing to install & seal expansion joints |
2023-07-15 | No data | EUCLID AVENUE, FROM STREET DUMONT AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | EXPANSION JOINT SEALED |
2023-07-13 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner quadrant are non Ada compliant, Ramps was measured and collected in prism on 7/13/23 ( left flare slopes, landing running-cross slopes). |
2023-07-13 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No new work done in the SE4 corner quadrant, permit expired open c.a.r #20237810096 on permit #M042023093A10 |
2023-07-13 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 115, 1/2+5 cobblestone BPP is acceptable at this time. |
2023-07-12 | No data | 47 AVENUE, FROM STREET VERNON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No work started. Completed tangent ramps within the SE4 corner quadrant are Non Ada. Measured in prism 12/20/21. Condition remains the same at this time. Temporary restoration around gas valve within the corner. Will issue C.A.R to con ed. |
2023-07-12 | No data | 47 AVENUE, FROM STREET VERNON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to active permit Q042023187A37 for inspection remarks. |
2023-07-12 | No data | WESTCHESTER AVENUE, FROM STREET BERGEN AVENUE TO STREET EAST 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk in place |
2023-07-11 | No data | BEACH 129 STREET, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | If sinking occurs consider the work done by plumber under permit # Q012022207D13. Spoke to stacy of Triboro about this on 7/18/23 at 15:33. Normal inspections can resume for this location. Will put on calendar to check in 6 months. |
2023-07-10 | No data | EAST 137 STREET, FROM STREET CYPRESS AVENUE TO STREET ST ANNS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street paving in compliance |
2023-07-10 | No data | EAST 137 STREET, FROM STREET ST ANNS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No new street paving found, active permits on file for reconstruction in intersection |
2023-07-10 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the SE4 corner quadrant are non ADA compliant. Previously measured in Prism on 5/25/22 |
2023-07-09 | No data | 10 AVENUE, FROM STREET WEST 34 STREET TO STREET WEST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in compliance |
2023-07-07 | No data | WEST 31 STREET, FROM STREET 9 AVENUE TO STREET LINCOLN TNNL APPROACH | No data | Street Construction Inspections: Active | Department of Transportation | I observed roadway in front of 401 West 31 street repaved by CITY & COUNTY PAVING CORP before arrival of scheduled BPP time of 9:00 pm |
2023-07-06 | No data | 29 STREET, FROM STREET 47 AVENUE TO STREET SKILLMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | B.P.P. restoration to grade throughout segment. |
2023-07-06 | No data | 30 STREET, FROM STREET 47 AVENUE TO STREET THOMSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced to grade. |
2023-07-05 | No data | 93 AVENUE, FROM STREET 168 PLACE TO STREET 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP installed |
2023-06-29 | No data | WEST 126 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No new work done on the roadway, permit still active. |
2023-06-28 | No data | 47 AVENUE, FROM STREET VERNON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No work started. Completed tangent ramps within the SE4 corner quadrant are Non Ada. Measured in prism 12/20/21. Condition remains the same at this time. Temporary restoration around gas valve within the corner. Will issue C.A.R to con ed. |
2023-06-28 | No data | 47 AVENUE, FROM STREET VERNON BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Active permit #Q042023150A23 on file. Refer for inspection remarks. |
2023-06-27 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 117, 1/2+5' cobblestone BPP remains acceptable at this time. |
2023-06-23 | No data | PEARL STREET, FROM STREET PLATT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway flush to grade no defects. |
2023-06-23 | No data | PLATT STREET, FROM STREET GOLD STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway flush to grade no defects. |
2023-06-22 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 60-74, curb to curb cobblestone BPP restoration is present. |
2023-06-21 | No data | COLUMBUS AVENUE, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #313 SIDEWALK VAULT CONSTRUCTION COMPLETED WIDTH OF PROPERTY FRONTAGE FLAGS FREE OF DEFECTS AND IN COMPLIANCE. |
2023-06-21 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 90 STREET TO STREET BEACH 91 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 flags replaced and sealed. |
2023-06-20 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps within the SE4 corner quadrant are non ADA compliant. Excessive landing running slope. Previously measured in Prism on 5/25/22. |
2023-06-20 | No data | STORY AVENUE, FROM STREET COLGATE AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | several flags replace |
2023-06-20 | No data | COLGATE AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Several sidewalk flags replace |
2023-06-16 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Granite curb installed. Cobblestone restored in kind along curb line and acceptable. |
2023-06-15 | No data | WEST 34 STREET, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Red paint must be restored in kind to the entire Bus Lane for the whole segment. |
2023-06-14 | No data | BOSTON ROAD, FROM STREET EASTCHESTER ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly completed tangent ramps in the SW1 corner quadrant are non ADA compliant. Field meeting held 5/5/23, no new work started. Conditions remain the same. Previously measured and collected in Prism on 2/3/23. |
2023-06-14 | No data | EASTCHESTER ROAD, FROM STREET TILLOTSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly completed single ramp in the SE4 corner quadrant is non ADA compliant. Field meeting held on 5/5/23, no new work started at time of inspection. Previously measured and collected in Prism on 2/7/23. |
2023-06-13 | No data | 3 AVENUE, FROM STREET EAST 21 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done permit expired. |
2023-06-10 | No data | EAST 160 STREET, FROM STREET FOREST AVENUE TO STREET TINTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | All sidewalk expansion joints must be sealed at curb, between sidewalk flags, and at property line. At both sides of corner property. |
2023-06-10 | No data | FOREST AVENUE, FROM STREET EAST 158 STREET TO STREET EAST 160 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk expansion joints must be sealed on both sides of corner property, on Forest Av and on E 160 St. |
2023-06-09 | No data | MICKLE AVENUE, FROM STREET TILLOTSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly completed tangent ramps in the NW corner quadrant are non ADA compliant. Previously measured and collected in Prism on 2/1/23. |
2023-06-08 | No data | WEST 84 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No sidewalk occupancy at this time |
2023-06-08 | No data | WEST 85 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY MILLED ½ + 5 FLUSHED SND SEALED |
2023-06-08 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 121, the cobblestone 1/2+5 BPP restoration for north side of street is acceptable. |
2023-06-08 | No data | 10 AVENUE, FROM STREET WEST 34 STREET TO STREET WEST 35 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Half of the BPP is completed & milled. |
2023-06-07 | No data | EAST 81 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 301 found BPP in compliance. No defects to report at this time. |
2023-06-06 | No data | 7 AVENUE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newer permit #M042023115A14 on file for the NW2 Corner quadrant. |
2023-06-05 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 119. multiple sidewalk flags restored. |
2023-06-04 | No data | EUCLID AVENUE, FROM STREET DUMONT AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints need to be sealed |
2023-05-31 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 111, the 1/2+5' cobblestone BPP restoration remains acceptable. |
2023-05-30 | No data | WEST 126 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No new work done on the roadway, permit still active. |
2023-05-30 | No data | 5 AVENUE, FROM STREET 89 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the NW2 corner found not to be ADA compliant. Ramps are functional and accessible. Previously measured & collected in Prism on 7/14/21 |
2023-05-26 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 52-58 the BPP has been completed (cobblestone roadway with outdoor dinning obstructing most of the restoration) |
2023-05-26 | No data | EAST 128 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway restoration flushed to grade. |
2023-05-26 | No data | FLEET PLACE, FROM STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed single ramp in the NE3 corner found to be ADA compliant. Previously Measured & collected in Prism on 8/31/21. |
2023-05-22 | No data | WHEELER AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Several sidewalk flags replace |
2023-05-22 | No data | STORY AVENUE, FROM STREET COLGATE AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Few sidewalk flags replace |
2023-05-22 | No data | COLGATE AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Several sidewalk flags replace |
2023-05-22 | No data | STORY AVENUE, FROM STREET EVERGREEN AVENUE TO STREET WHEELER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Several flags replace |
2023-05-22 | No data | EVERGREEN AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb in place |
2023-05-18 | No data | WEBSTER AVENUE, FROM STREET EAST 199 STREET TO STREET OLIVER PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Respondent failed to notify NYC DOT HIQA borough ( Bronx ) office within four hours prior to paving. As per stipulation 1/2+ 5. |
2023-05-13 | No data | EAST 86 STREET, FROM STREET HENDERSON PLACE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway in compliance |
2023-05-12 | No data | 47 AVENUE, FROM STREET VERNON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No work started. Completed tangent ramps within the SE4 corner quadrant are functional and accessible. Non Ada. Measured in prism 12/20/21. Condition remains the same at this time. |
2023-05-10 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 117 new sidewalk flags have been constructed. |
2023-05-10 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No new ped ramp work started in the SE4 corner quadrant at time of inspection. |
2023-05-10 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No new ped ramp work started in the NE3 corner quadrant at time of inspection |
2023-05-10 | No data | MACOMBS PLACE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No new ped ramp work, Newly completed tangent ramps in the NE3 corner quadrant are non ADA compliant. Ramps was measured and collected in prism on 11/23/22. Newer permit #M042023115A15 on file. |
2023-05-10 | No data | 7 AVENUE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the NW2 corner quadrant are non Ada. Ramps was measured and collected in prism on 1/24/23, open c.a.r on permit #M042023017A15. Newer permit M042023115A14 on file |
2023-05-09 | No data | EAST 160 STREET, FROM STREET FOREST AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp in the SE4 corner quadrant are Ada compliant. Ramp was measured and collected in prism on 5/8/23. |
2023-05-09 | No data | EAST 74 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk expansion joint needs to be recessed and sealed properly. The address is 300 btwn 1st Avenue and 2nd Avenue the building is closer to 2nd Avenue. |
2023-05-08 | No data | LOUISIANA AVENUE, FROM STREET FLATLANDS AVENUE TO STREET VANDALIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb replaced, s/w in compliance. |
2023-05-06 | No data | EAST 76 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 829 found 3 1/2 concrete sidewalk flags fully replaced around a water valve. No defects to report at this time. |
2023-05-04 | No data | MACOMBS PLACE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No new ped ramp work started at time of inspection. Newly completed tangent ramps within the NE3 corner quadrant are non ADA compliant. Measured in prism 11/23/22 |
2023-05-04 | No data | CENTRAL PARK WEST, FROM STREET WEST 84 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No ped ramp work started at time of inspection |
2023-05-04 | No data | 47 AVENUE, FROM STREET VERNON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SE4 corner quadrant are functional and accessible. Non Ada. Measured in prism 12/20/21. |
2023-05-04 | No data | 7 AVENUE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No new ped ramp work started at time of inspection |
2023-05-03 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the SE4 corner quadrant are non ADA compliant. Excessive landing running slope. Previously measured in Prism on 5/25/22. |
2023-05-02 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired. New permit #M042023093A11 on file for the NE corner quadrant |
2023-05-01 | No data | EAST 127 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway incompliance at time of inspection. |
2023-04-27 | No data | JAY STREET, FROM STREET WILLOUGHBY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | expansion joints are installed but not sealed, please issue CAR on latest permit B042023017A25 |
2023-04-26 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No new ped ramp work started. Completed tangent ramps within the SE4 corner quadrant are non ADA compliant. Previously measured in Prism on 5/25/22 |
2023-04-25 | No data | FOREST AVENUE, FROM STREET EAST 158 STREET TO STREET EAST 160 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk in compliance |
2023-04-24 | No data | EUCLID AVENUE, FROM STREET DUMONT AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No sealer in expansion joint. IFO 701 |
2023-04-21 | No data | BROADWAY, FROM STREET WEST 85 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Email confirmation on 4/19 2023. |
2023-04-21 | No data | JAY STREET, FROM STREET WILLOUGHBY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps in the NW2 corner found to be ADA compliant. Previously Measured & collected in Prism on 12/2/22. |
2023-04-20 | No data | EAST 100 STREET, FROM STREET 1 AVENUE TO STREET F D R DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 1954 found 30 concrete sidewalk flags fully replaced. No defects to report at this time. |
2023-04-20 | No data | WEST 85 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | Milled half plus 5 down 3” |
2023-04-19 | No data | BROADWAY, FROM STREET WEST 84 STREET TO STREET WEST 85 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Street milled from Curb to Curb down 3 “ |
2023-04-19 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 60-74, curb to curb cobblestone BPP restoration remains acceptable. |
2023-04-19 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 115 steel faced curb installed and cobblestone restored in parking lane are acceptable. |
2023-04-18 | No data | 47 AVENUE, FROM STREET VERNON BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Active permit Q042023086A29 on file for the SE4 corner. Further action will be taken once active permit expires. |
2023-04-18 | No data | 47 AVENUE, FROM STREET VERNON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No new pedestrian ramp work observed in the SE4 corner quadrant at this time of inspection. Will reinspect at later date once work is completed. |
2023-04-17 | No data | EAST 174 STREET, FROM STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SE4 corner quadrant are non ADA compliant. Previously measured and collected in Prism on 1/8/21. |
2023-04-17 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Obstacles isolated. Counter slope adjusted to ADA standards. Prism updated |
2023-04-15 | No data | WEBSTER AVENUE, FROM STREET EAST 199 STREET TO STREET OLIVER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk and curb in compliance |
2023-04-14 | No data | 2 AVENUE, FROM STREET EAST 46 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Landing now reads 2%. Will update prism |
2023-04-14 | No data | 2 AVENUE, FROM STREET EAST 47 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps within the sw1 corner quadrant are non Ada. Measured in prism on 3/30/22. |
2023-04-12 | No data | MACOMBS PLACE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Active permit on file M042023086A38 |
2023-04-11 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Active | Department of Transportation | No new work. Permit is answering CAR on M042022195A08 |
2023-04-11 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Active permit on file M042023093A11 |
2023-04-11 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Active permit M042023093A10 On file |
2023-04-10 | No data | CHARLTON STREET, FROM STREET VARICK STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints sealed. Refer to most recent permit M042023013A13 |
2023-04-10 | No data | VANDAM STREET, FROM STREET VARICK STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints sealed. Refer to most recent permit M042023013A14 |
2023-04-06 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 52-58 cobblestone BPP restoration remains acceptable at this time. |
2023-04-04 | No data | BOSTON ROAD, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb in place |
2023-04-04 | No data | TILLOTSON AVENUE, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Parking lane paved. I spoke to Robert Conner at City & County paving. He said that due to Dispute with the pedestrian ramped that was installed by them. He also stated that is why 1/2 plus 5 is not done. I told him to renewed the BPP Permits |
2023-04-03 | No data | MICKLE AVENUE, FROM STREET TILLOTSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest for non ADA elements on new permit #X042023025A11. See for updated inspection remarks. |
2023-04-03 | No data | EAST 55 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO #119 there is a newly installed sidewalk curb with a portion of it having a steel face. |
2023-04-01 | No data | EAST 74 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No TEMPORARY PEDESTRIAN WALK on site. |
2023-03-31 | No data | BOSTON ROAD, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb in place |
2023-03-30 | No data | 47 AVENUE, FROM STREET 11 STREET TO STREET VERNON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done, permit expired. |
2023-03-29 | No data | MICKLE AVENUE, FROM STREET TILLOTSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Ramps were re-measured and measurements were found to be the same from original inspection. Multiple elements are non-compliant, if you have any questions please feel free to reach out to HIQApedramp@dot.nyc.gov for further assistance |
2023-03-29 | No data | EASTCHESTER ROAD, FROM STREET BOSTON ROAD TO STREET TILLOTSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb in place |
2023-03-29 | No data | 47 AVENUE, FROM STREET VERNON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No new ped ramp work within the SE4 corner quadrant, open CAR on file. Condition remains the same. |
2023-03-29 | No data | BOSTON ROAD, FROM STREET EASTCHESTER ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Ramps were re-measured and measurements were found to be the same from original inspection. Multiple elements are non-compliant, if you have any questions please feel free to reach out to HIQApedramp@dot.nyc.gov for further assistance |
2023-03-29 | No data | EAST 21 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - PAVE STREET-W/ ENGINEERING & INSP FEE: R/W resurfaced |
2023-03-29 | No data | EASTCHESTER ROAD, FROM STREET TILLOTSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Ramps were re-measured and measurements were found to be the same from original inspection. Multiple elements are non-compliant, if you have any questions please feel free to reach out to HIQApedramp@dot.nyc.gov for further assistance |
2023-03-29 | No data | 47 AVENUE, FROM STREET VERNON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit #Q042023086A29 on file. Refer for inspection remarks. |
2023-03-27 | No data | EAST 160 STREET, FROM STREET FOREST AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired. New active permit on file #X042023073A39 for the SE4 corner quadrant. |
2023-03-27 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cobblestone 1/2+5 BPP restoration for north side of street I/F/O 121. |
2023-03-23 | No data | LITTLE WEST 12 STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O AKA 9 9 Avenue multiple sidewalk flags and patched curb is present. |
2023-03-23 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Multiple sidewalk flags have been restored in kind on north sidewalk. |
2023-03-23 | No data | 3 AVENUE, FROM STREET EAST 20 STREET TO STREET EAST 21 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - PAVE STREET-W/ ENGINEERING & INSP FEE |
2023-03-18 | No data | CONEY ISLAND AVENUE, FROM STREET CORTELYOU ROAD TO STREET DORCHESTER ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Swk flags sealed and in compliance |
2023-03-16 | No data | EAST 160 STREET, FROM STREET FOREST AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No new Ped ramp work done in the SE4 corner quadrant, open excavation, permit still active, will measure and collect once completed. |
2023-03-15 | No data | 2 AVENUE, FROM STREET EAST 74 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SE4 corner quadrant are non Ada compliant. Measured in prism on 12/9/20 |
2023-03-14 | No data | 2 AVENUE, FROM STREET EAST 80 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the NE3 corner quadrant are non Ada compliant. Measured in prism on 2/18/22 |
2023-03-14 | No data | 2 AVENUE, FROM STREET EAST 81 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Location not recognized in prism. Measurements taken 9/2/22. (Landing running 2.4) (Landing cross 0.1) (Ramps running 3.2) (Ramps cross 0.9) (Gutter flow 1.2) (Counter slopes 4.7) (Curb reveal 0.0) (Landing Length 73) (Landing Width 93”) |
2023-03-14 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 115 multiple sidewalk flags restored. |
2023-03-13 | No data | 30 STREET, FROM STREET 47 AVENUE TO STREET THOMSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done, permit expired. |
2023-03-13 | No data | AMSTERDAM AVENUE, FROM STREET WEST 79 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SW1 corner quadrant are ADA compliant. Measured in prism on 1/7/21. |
2023-03-11 | No data | CONEY ISLAND AVENUE, FROM STREET 18 AVENUE TO STREET DITMAS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp walkway in compliance |
2023-03-09 | No data | BEACH 129 STREET, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | curb replaced and sealed I/f/o 431 |
2023-03-09 | No data | 7 AVENUE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Answering CAR on M042023017A15 |
2023-03-09 | No data | 30 STREET, FROM STREET THOMSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done, permit expired. |
2023-03-09 | No data | THOMSON AVENUE, FROM STREET 30 STREET TO STREET SKILLMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done, permit expired. |
2023-03-09 | No data | MACOMBS PLACE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Answering CAR on M042023017A16 |
2023-03-07 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Permit is answering CAR on M042022195A08 |
2023-03-07 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Permit is answering CAR on M042020288A11 |
2023-03-07 | No data | MICKLE AVENUE, FROM STREET BOSTON ROAD TO STREET TILLOTSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started at time of inspection |
2023-03-05 | No data | CHARLTON STREET, FROM STREET 6 AVENUE TO STREET VARICK STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I/F/O #160 sidewalk expansion joints have been properly sealed |
2023-03-05 | No data | KING STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP 1/2 plus 5 paving is flush to grade /white parking lane restored in kind. |
2023-03-03 | No data | BOSTON ROAD, FROM STREET MICKLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SW1 corner quadrant are ADA compliant. Previously measured and collected in Prism on 2/2/23. Pavement key installed and markings restored in crosswalks. |
2023-03-03 | No data | BOSTON ROAD, FROM STREET EASTCHESTER ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SE4 corner quadrant are ADA compliant. Previously measured and collected in Prism on 2/6/23. Pavement key installed and markings restored in crosswalks. |
2023-03-02 | No data | 47 AVENUE, FROM STREET VERNON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No new ped ramp work within the SE4 corner quadrant, open CAR on file. |
2023-03-02 | No data | VARICK STREET, FROM STREET CHARLTON STREET TO STREET VANDAM STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I/F/o #160 Sidewalk expansion joints have been properly sealed, |
2023-03-01 | No data | 47 AVENUE, FROM STREET VERNON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No new ped ramp work within the SE4 corner quadrant at time of inspection. Permit is answering open CAR on Q042021308A17 |
2023-03-01 | No data | EAST 47 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found multiple sidewalk flags restored with steel face curb. |
2023-03-01 | No data | EASTCHESTER ROAD, FROM STREET TILLOTSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp in the NW2 corner quadrant is ADA compliant. Previously measured and collected in Prism on 2/7/23. |
2023-03-01 | No data | MICKLE AVENUE, FROM STREET TILLOTSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SW1 corner quadrant are ADA compliant. Measured and collected in Prism on 2/1/23. |
2023-03-01 | No data | 2 AVENUE, FROM STREET EAST 46 STREET TO STREET EAST 47 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found multiple sidewalk flags restored with steel face curb. |
2023-03-01 | No data | 47 AVENUE, FROM STREET VERNON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to Q042023054A33 |
2023-02-28 | No data | WHEELER AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temporary pedestrian walkway removed. |
2023-02-28 | No data | STORY AVENUE, FROM STREET EVERGREEN AVENUE TO STREET WHEELER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work not started. |
2023-02-28 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb and cobblestone restoration along curb are acceptable. |
2023-02-27 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 119 curb installation is acceptable. Cobblestones restored during BPP are acceptable. |
2023-02-23 | No data | TILLOTSON AVENUE, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Portion of parking lane paved |
2023-02-23 | No data | EASTCHESTER ROAD, FROM STREET BOSTON ROAD TO STREET TILLOTSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Parking lane paved |
2023-02-23 | No data | BOSTON ROAD, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Curb in place |
2023-02-23 | No data | 7 AVENUE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the NW2 corner quadrant are non Ada. Measured in prism 1/24/23 |
2023-02-22 | No data | JAY STREET, FROM STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within NW2 corner quadrant seem to be ada compliant , ramps are functional and accessible. Previously Measured and collected in prism on 12/2/22. |
2023-02-21 | No data | EAST 137 STREET, FROM STREET ST ANNS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SE4 corner quadrant are ADA compliant. Previously measured and collected in Prism on 3/27/20. |
2023-02-21 | No data | DINSMORE PLACE, FROM STREET CHESTNUT STREET TO STREET RICHMOND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY PAVED HALF +5 |
2023-02-21 | No data | EAST 112 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP in compliance. |
2023-02-17 | No data | 9 AVENUE, FROM STREET GANSEVOORT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work conducted under this permit. Permit expired. |
2023-02-16 | No data | ASHLAND PLACE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway repave by BPP |
2023-02-16 | No data | EAST 102 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway remains in acceptable condition |
2023-02-16 | No data | CONEY ISLAND AVENUE, FROM STREET 18 AVENUE TO STREET DITMAS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed Permittee's Plastic Barriers stored on Roadway, failed to mark outer surface of Barriers with high intensity Fluorescent Paint or Reflectors capable of producing warning glow when struck by Vehicle Headlamps. |
2023-02-16 | No data | ASHLAND PLACE, FROM STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway repave by BPP |
2023-02-15 | No data | JEROME AVENUE, FROM STREET CLARKE PLACE TO STREET MARCY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w has been paved |
2023-02-15 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Permit is answering CAR on M042020288A11 |
2023-02-15 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SW1 corner quadrant are non Ada compliant. Measured in prism on 6/15/21 |
2023-02-15 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Permit is answering CAR on M042022195A08 |
2023-02-14 | No data | WEST 151 STREET, FROM STREET 7 AVENUE TO STREET MACOMBS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk in compliance |
2023-02-14 | No data | MACOMBS PLACE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Condtion remains the same. Open CAR on permit M042022279A08 |
2023-02-14 | No data | VANDAM STREET, FROM STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the NE3 corner quadrant are non Ada. Measured in prism 12/1/22 |
2023-02-14 | No data | CHARLTON STREET, FROM STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SE4 corner quadrant are non Ada. Measured in prism 12/1/22. No TIF on file. Original CAR for expansion joints has been resolved |
2023-02-13 | No data | BOSTON ROAD, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb in place |
2023-02-13 | No data | EASTCHESTER ROAD, FROM STREET BOSTON ROAD TO STREET TILLOTSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb in place |
2023-02-12 | No data | EAST 51 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired. New permit M012022119A59 . |
2023-02-09 | No data | WILLOUGHBY STREET, FROM STREET JAY STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flags installed IFO 370 jay street |
2023-02-09 | No data | JAY STREET, FROM STREET METROTECH ROADWAY TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flags installed 370 jay street |
2023-02-08 | No data | EAST 160 STREET, FROM STREET FOREST AVENUE TO STREET TINTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In com |
2023-02-08 | No data | COOPER STREET, FROM STREET ACADEMY STREET TO STREET WEST 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway incompliance at time of inspection. |
2023-02-08 | No data | WHEELER AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work in progress. Has active permit X042023033A05. |
2023-02-08 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the NW2 corner quadrant are non Ada. Measured in prism 2/8/23. TIF on file |
2023-02-07 | No data | EASTCHESTER ROAD, FROM STREET TILLOTSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New active permit #X042023025A06 on file for SE corner quadrant |
2023-02-07 | No data | BOSTON ROAD, FROM STREET MICKLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New active permit #X042023025A15 on file for SE4 corner quadrant |
2023-02-07 | No data | MICKLE AVENUE, FROM STREET TILLOTSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No new work was done in the NE3 corner quadrant, previously measured and collected in Prism on 2/1/23. permit still active |
2023-02-07 | No data | EASTCHESTER ROAD, FROM STREET TILLOTSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No new work done in the NE3 corner quadrant with this permit, still active. |
2023-02-06 | No data | BOSTON ROAD, FROM STREET EASTCHESTER ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps in the SE4 corner quadrant non Ada compliant, Ramps was measured and collected in prism on 2/6/23. ( roadway gutter flow ). |
2023-02-04 | No data | STORY AVENUE, FROM STREET EVERGREEN AVENUE TO STREET WHEELER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work not started on sidewalk. |
2023-02-03 | No data | FOREST AVENUE, FROM STREET EAST 158 STREET TO STREET EAST 160 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Half plus 5 in compliance |
2023-02-03 | No data | BOSTON ROAD, FROM STREET EASTCHESTER ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps in the SW1 corner quadrant non Ada compliant, Ramps was measured and collected in prism on 2/3/23( right flare slopes, landing cross running slopes ) |
2023-02-02 | No data | BOSTON ROAD, FROM STREET MICKLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps in the SE4 corner quadrant non Ada compliant, Ramps was measured and collected in prism on 2/2/23 ( roadway counter slopes, roadway gutter flow.) |
2023-02-01 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 111-121 1/2+5' cobblestone BPP restoration remains in good standing at this time. |
2023-02-01 | No data | MICKLE AVENUE, FROM STREET TILLOTSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SW1 corner quadrant are non ADA compliant. Measured and collected in Prism on 2/1/23. Newer permit X042023025A13 on file |
2023-02-01 | No data | WEST 108 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Paving done for new building. |
2023-02-01 | No data | BOSTON ROAD, FROM STREET MICKLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps in the NW2 corner quadrant non Ada compliant, Ramps was measured and collected in prism on 2/1/23 ( roadway gutter flow slopes). |
2023-02-01 | No data | BOSTON ROAD, FROM STREET MICKLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No new work done on this permit, permit expired newer permit #X042023025A14 on file. |
2023-02-01 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit M042022195A08 |
2023-02-01 | No data | BOSTON ROAD, FROM STREET EASTCHESTER ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner quadrant. Unable to measure due to active construction on Boston Rd. Newer permit X042023025A10 on file |
2023-01-31 | No data | 47 AVENUE, FROM STREET VERNON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit # Q042023026A15 obtained for the SE4 corner quadrant with no new ped ramp work observed. Non ADA compliant elements still remains at this time of inspection. |
2023-01-31 | No data | FULTON STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY REPAVED IN FRONT OF 1618 FULTON STREET |
2023-01-31 | No data | WHEELER AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done. |
2023-01-31 | No data | 47 AVENUE, FROM STREET VERNON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No new pedestrian ramp work observed with the SE4 corner quadrant at this time of inspection. Action taken under permit # Q042021308A17 , non ADA compliant elements still remains. We’ll reinspect at later date when work is completed. |
2023-01-25 | No data | JAY STREET, FROM STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps within NW2 corner quadrant seem to be ada compliant but , due to weather conditions, will return to measure on later date. |
2023-01-25 | No data | 5 AVENUE, FROM STREET 89 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway acceptable |
2023-01-24 | No data | WILLOUGHBY STREET, FROM STREET ASHLAND PLACE TO STREET FLEET STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway repave by BPP |
2023-01-24 | No data | MACOMBS PLACE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Answering CAR on permit M042022279A08 |
2023-01-24 | No data | 2 AVENUE, FROM STREET EAST 93 STREET TO STREET EAST 94 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP completed. |
2023-01-24 | No data | DINSMORE PLACE, FROM STREET CHESTNUT STREET TO STREET RICHMOND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY PAVED HALF +5 |
2023-01-24 | No data | 7 AVENUE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Completed tangent ramps within the NW2 corner quadrant are non Ada. Measured in prism 1/24/23 |
2023-01-20 | No data | EAST 55 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed blended transition in the SW1 corner quadrant is ada compliant. Measured in prism on 7/5/22 |
2023-01-20 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 60-74, curb to curb cobblestone BPP is acceptable. |
2023-01-19 | No data | MICKLE AVENUE, FROM STREET TILLOTSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. Newly completed tangent ramps in the SW1 corner quadrant. Unable to measure and collect due to rain. |
2023-01-19 | No data | GREENWICH STREET, FROM STREET CARLISLE STREET TO STREET RECTOR STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon inspection roadway is resurfaced by D.O.T. BPP work no longer visible due to DOT resurfaced. (M152022319A28) |
2023-01-19 | No data | BOSTON ROAD, FROM STREET MICKLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps in the SW1 corner quadrant. Unable to measure and collect due to rain. |
2023-01-19 | No data | CHESTNUT STREET, FROM STREET ATLANTIC AVENUE TO STREET DINSMORE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY PAVED BY BPP |
2023-01-19 | No data | ATLANTIC AVENUE, FROM STREET CHESTNUT STREET TO STREET CONDUIT BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY PAVED BY BPP |
2023-01-19 | No data | BOSTON ROAD, FROM STREET EASTCHESTER ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. Newly completed tangent ramps in the NE3 corner quadrant. Unable to measure and collect due to rain. |
2023-01-19 | No data | VANDAM STREET, FROM STREET VARICK STREET | No data | Street Construction Inspections: Active | Department of Transportation | Answering CAR on permit M042022308A24 |
2023-01-19 | No data | CHARLTON STREET, FROM STREET VARICK STREET | No data | Street Construction Inspections: Active | Department of Transportation | Answering CAR on permit M042022308A23 |
2023-01-19 | No data | EASTCHESTER ROAD, FROM STREET TILLOTSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. Newly completed tangent ramps in the SE4 corner quadrant. Unable to measure and collect due to rain. |
2023-01-17 | No data | VETERANS ROAD WEST, FROM STREET ALLENTOWN LANE TO STREET WEST SHORE PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP acceptable. |
2023-01-17 | No data | EAST 127 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 146'x19'7" BPP paved before arrival wearing course already applied. |
2023-01-17 | No data | EAST 128 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Monitored Wearing Couse. WC pass & complete. 156'x30'x3" Arrival: 10:12AM Departure: 10:45AM |
2023-01-17 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cobblestone 1/2+5 BPP restoration for north side of street is acceptable I/F/O 121. |
2023-01-15 | No data | PARK AVENUE, FROM STREET EAST 111 STREET TO STREET EAST 112 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb in compliance (s/s) |
2023-01-15 | No data | BAY PLAZA, FROM STREET BAYCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly paved roadway AT 344 |
2023-01-15 | No data | BAYCHESTER AVENUE, FROM STREET BARTOW AVENUE TO STREET BAY PLAZA | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly paved roadway IFO 344 |
2023-01-15 | No data | FULTON STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb reset in front of 1618 Fulton street |
2023-01-13 | No data | WASHINGTON STREET, FROM STREET DESBROSSES STREET TO STREET WATTS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O aka 456 Greenwich Street on Washington St, perm BPP restoration is flush to grade at this time. |
2023-01-13 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP in compliance |
2023-01-13 | No data | 2 AVENUE, FROM STREET EAST 110 STREET TO STREET EAST 111 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb in compliance |
2023-01-11 | No data | TILLOTSON AVENUE, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit, new curb placement in process |
2022-12-30 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No new ped ramp work |
2022-12-30 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to M042022362A08 |
2022-12-28 | No data | VANDAM STREET, FROM STREET 6 AVENUE TO STREET VARICK STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | NOV temporary excavation in the roadway without a NYC DOT permit on file to open the roadway at the location. Respondent was identified by permit #M042022336A02 which is sidewalk only. Curb restoration is 103ft long. Aka 160 Varick St. |
2022-12-28 | No data | VARICK STREET, FROM STREET CHARLTON STREET TO STREET VANDAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joints must be sealed around sidewalk flags. |
2022-12-28 | No data | VANDAM STREET, FROM STREET 6 AVENUE TO STREET VARICK STREET | No data | Street Construction Inspections: Active | Department of Transportation | Expansion joints need to be sealed & sidewalk flags need to be scored in kind. Also D01 issued for curb excavation under MNP2022362A08. |
2022-12-28 | No data | CHARLTON STREET, FROM STREET 6 AVENUE TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joints must be sealed around sidewalk flags. In front of AKA 160 Varick St. |
2022-12-23 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 117 1/2+5' cobblestone BPP is acceptable at this time. |
2022-12-20 | No data | EAST 56 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SE4 corner quadrant are non Ada. Measured in prism on 5/12/22. TIF on file |
2022-12-19 | No data | EAST 160 STREET, FROM STREET FOREST AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired. No ped ramp work started in the SW1 corner quadrant at time of inspection |
2022-12-16 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 121 curb installed and cobblestones restored to roadway. |
2022-12-15 | No data | EAST 111 STREET, FROM STREET METRO-NORTH RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to most recent permit M042022332A04 |
2022-12-15 | No data | MACOMBS PLACE, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW flags and curb incompliance. |
2022-12-13 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No new ped ramp work |
2022-12-11 | No data | BEACH 129 STREET, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel faced curb in compliance at this time. |
2022-12-09 | No data | EAST 55 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to most recent permit M042022122A16 |
2022-12-07 | No data | VANDAM STREET, FROM STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the NE3 corner quadrant are non Ada. Measured in prism 12/1/22 |
2022-12-07 | No data | CHARLTON STREET, FROM STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SE4 corner quadrant are non Ada. Measured in prism 12/1/22 |
2022-12-06 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 111 1/2+5' cobblestone BPP restoration remains acceptable at this time. |
2022-12-06 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active M042022332A04 |
2022-12-05 | No data | LITTLE WEST 12 STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O AKA 9 9 Avenue multiple sidewalk flags and patched curb remain acceptable. |
2022-12-02 | No data | VANDAM STREET, FROM STREET 6 AVENUE TO STREET VARICK STREET | No data | Street Construction Inspections: Active | Department of Transportation | NOV failed to comply with the terms and conditions of DOT permit Stipulation 014. Stipulation 014 states that the walkway must be ramped at the entry for handicapped accessibility. No ramp was provided. Failure to abide by permits terms. |
2022-12-02 | No data | JAY STREET, FROM STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started. No work done. Measured and collected in Prism on 12/2/22 on permit # B042022318A10. |
2022-12-02 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 60-74 cobblestone BPP remains acceptable at this time. |
2022-12-02 | No data | MACOMBS PLACE, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk incompliance at time of inspection . |
2022-12-01 | No data | EAST 160 STREET, FROM STREET FOREST AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No ped ramp work started in the SE4 corner quadrant at time of inspection |
2022-12-01 | No data | CHARLTON STREET, FROM STREET 6 AVENUE TO STREET VARICK STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk restored in kind. Expansion joints must be sealed in front of Aka 160 Varick St. |
2022-12-01 | No data | VARICK STREET, FROM STREET CHARLTON STREET TO STREET VANDAM STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk restored in kind. Expansion joints must be sealed in front of 160 Varick St. |
2022-12-01 | No data | VANDAM STREET, FROM STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Duplicate permit. Refer to permit M042022308A24 |
2022-12-01 | No data | VANDAM STREET, FROM STREET VARICK STREET | No data | Street Construction Inspections: Active | Department of Transportation | Completed tangent ramps within the NE3 corner quadrant are non Ada. Measured in prism 12/1/22 |
2022-12-01 | No data | CHARLTON STREET, FROM STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Duplicate permit. Active permit M042022308A23 |
2022-12-01 | No data | CHARLTON STREET, FROM STREET VARICK STREET | No data | Street Construction Inspections: Active | Department of Transportation | Completed tangent ramps within the SE4 corner quadrant are non Ada. Measured in prism 12/1/22 |
2022-12-01 | No data | EAST 160 STREET, FROM STREET FOREST AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newer permit #X042022321A06 on file for the SE4 corner quadrant |
2022-11-30 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started. Active permit on file M042022332A04 |
2022-11-30 | No data | 47 AVENUE, FROM STREET VERNON BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps in the SE4 corner quadrant are functional and accessible. Non Ada. Ramps was measured in prism 12/20/21. |
2022-11-28 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 55 curb installed and cobblestone restored to roadway. Restoration is acceptable. |
2022-11-26 | No data | WEST 108 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w okay |
2022-11-23 | No data | MACOMBS PLACE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant are non Ada. Measured in prism 11/23/22 |
2022-11-23 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant are non Ada compliant. Measured in prism on 6/14/21 |
2022-11-21 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps within the SE4 corner quadrant are non Ada compliant. Measured in prism on 5/25/22 |
2022-11-21 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel faced curb installation and cobblestones restored are acceptable. |
2022-11-21 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 60-74 curb to curb cobblestone BPP remains acceptable at this time. |
2022-11-18 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit M012022315A14 on file. |
2022-11-16 | No data | 2 AVENUE, FROM STREET EAST 47 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps within the sw1 corner quadrant are non Ada compliant. Measured in prism on 3/30/22. |
2022-11-15 | No data | MADISON AVENUE, FROM STREET EAST 111 STREET TO STREET EAST 112 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP not properly cut back. At time of inspection only 17’ of the roadway milled. Roadway is 54’ BPP should be 37’ |
2022-11-15 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Active | Department of Transportation | BPP in compliance 50’ roadway BPP is 30’ |
2022-11-15 | No data | EAST 112 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP in compliance. 50’ roadway BPP measured in at 30’ |
2022-11-14 | No data | EAST 160 STREET, FROM STREET FOREST AVENUE TO STREET TINTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | fence blocking the curb |
2022-11-14 | No data | EAST 111 STREET, FROM STREET METRO-NORTH RR | No data | Street Construction Inspections: Active | Department of Transportation | No work started |
2022-11-14 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started |
2022-11-14 | No data | FOREST AVENUE, FROM STREET EAST 158 STREET TO STREET EAST 160 STREET | No data | Street Construction Inspections: Active | Department of Transportation | TEMPORARY PEDESTRIAN WALK |
2022-11-13 | No data | WEST 47 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builders pavement in compliance. |
2022-11-11 | No data | PARK AVENUE, FROM STREET EAST 111 STREET TO STREET EAST 112 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work site is not active at this time |
2022-11-10 | No data | 6 AVENUE, FROM STREET WEST 41 STREET TO STREET WEST 42 STREET | No data | Street Construction Inspections: Active | Department of Transportation | IFO # 3 Bryant Park a New SWK flags in compliance. Plastic expansion joint remains as concrete cures. NO CAR. |
2022-11-10 | No data | MICKLE AVENUE, FROM STREET TILLOTSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NW2 corner quadrant non Ada compliant, Ramps was measured and collected in prism on 11/10/22. ( landing cross, running slopes) 1014942 |
2022-11-09 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps within the NE3 corner quadrant are non Ada compliant. Measured in prism on 6/8/22 |
2022-11-07 | No data | BEACH 129 STREET, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Seal all expansion joints in the curb. |
2022-11-07 | No data | 2 AVENUE, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel face curb reveal installed restored in kind adjacent to property AKA #301 EAST 80 STREET in compliance |
2022-11-07 | No data | 2 AVENUE, FROM STREET EAST 73 STREET TO STREET EAST 74 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel face curb reveal installed restored in kind adjacent to property AKA #300 EAST 74 STREET in compliance |
2022-11-04 | No data | EAST 160 STREET, FROM STREET FOREST AVENUE TO STREET TINTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | TEMPORARY PEDESTRIAN WALK |
2022-11-04 | No data | FOREST AVENUE, FROM STREET EAST 158 STREET TO STREET EAST 160 STREET | No data | Street Construction Inspections: Active | Department of Transportation | TEMPORARY PEDESTRIAN WALK |
2022-11-03 | No data | VANDAM STREET, FROM STREET VARICK STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started |
2022-11-03 | No data | CHARLTON STREET, FROM STREET VARICK STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active construction ongoing in corner as well as B.O. |
2022-11-02 | No data | CHARLTON STREET, FROM STREET 6 AVENUE TO STREET VARICK STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site excavating sidewalk. |
2022-11-02 | No data | 7 AVENUE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started. Old existing tangent ramps |
2022-11-01 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 60-74 cobblestone BPP remains acceptable at this time. |
2022-11-01 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cobblestone BPP 1/2 +5 remains on north side of street acceptable at this time. |
2022-10-31 | No data | EAST 160 STREET, FROM STREET FOREST AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No new work done in the SE4 corner quadrant old exist single ramp permit still active. |
2022-10-31 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit on file M042022301A18 |
2022-10-29 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel faced curb installed and 1 ft of roadway restored at 75 E 111 roadway BPP has not started yet will be 1/2 +5 on Roadway |
2022-10-27 | No data | CHESTNUT STREET, FROM STREET ATLANTIC AVENUE TO STREET DINSMORE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved, in compliance |
2022-10-27 | No data | MADISON AVENUE, FROM STREET EAST 111 STREET TO STREET EAST 112 STREET | No data | Street Construction Inspections: Active | Department of Transportation | PED /WALK R/W |
2022-10-26 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Active | Department of Transportation | ped /walk not visible |
2022-10-26 | No data | PARK AVENUE, FROM STREET EAST 111 STREET TO STREET EAST 112 STREET | No data | Street Construction Inspections: Active | Department of Transportation | ped /walk not visible |
2022-10-24 | No data | TILLOTSON AVENUE, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The permittee City & County Paving Corp Block 4723/Lot 66 has replace/ resetting curbs standard concrete flags at established grade. Currently in compliance with a update DOT permit number X012021237A20 the rules and regulations. |
2022-10-24 | No data | GREENWICH STREET, FROM STREET LEROY STREET TO STREET MORTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started |
2022-10-24 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started |
2022-10-24 | No data | MADISON AVENUE, FROM STREET EAST 111 STREET TO STREET EAST 112 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Temp walkway not installed |
2022-10-22 | No data | 7 AVENUE, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW has been replaced , flags are sealed incompliance. |
2022-10-22 | No data | WEST 151 STREET, FROM STREET 7 AVENUE TO STREET MACOMBS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW has been replaced , flags sealed incompliance. |
2022-10-21 | No data | 7 AVENUE, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Contractor on site at time of inspection , active permit on file M012022266B23. |
2022-10-21 | No data | 7 AVENUE, FROM STREET WEST 152 STREET TO STREET WEST 153 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW has been replaced , flags incompliance. |
2022-10-21 | No data | WEST 151 STREET, FROM STREET 7 AVENUE TO STREET MACOMBS PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Contractor on site working at time of inspection , site incompliance. |
2022-10-20 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started |
2022-10-18 | No data | LOUISIANA AVENUE, FROM STREET FLATLANDS AVENUE TO STREET VANDALIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, walk ..ok .../77 |
2022-10-14 | No data | WEST 42 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK NOT DONE PERMIT EXPIRED NO 0401 - REPAIR SIDEWALK WORK AT TIME OF INSPECTION ACTIVE PERMIT M042022285A12 ON FILE. |
2022-10-14 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 90 STREET TO STREET BEACH 91 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Not Verified. Sidewalk restored in kind at time of inspection. There are no cave-ins on the sidewalk at this time. Active permit on file. |
2022-10-12 | No data | 2 AVENUE, FROM STREET EAST 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the NW2 corner quadrant are Non Ada compliant. Measured in prism on 9/7/21 |
2022-10-12 | No data | WEST 151 STREET, FROM STREET 7 AVENUE TO STREET MACOMBS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb and SW has been replaced . |
2022-10-06 | No data | 7 AVENUE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started |
2022-10-05 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb installed and cobblestones restored in kind to roadway. |
2022-10-04 | No data | 7 AVENUE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit on file M042022266A09 |
2022-10-04 | No data | 7 AVENUE, FROM STREET WEST 151 STREET TO STREET WEST 152 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW incompliance at time of inspection. |
2022-09-30 | No data | HUDSON STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed apex ramp within the NW2 corner quadrant is Non ADA compliant. Measured in collector on 11/6/19. |
2022-09-30 | No data | EAST 100 STREET, FROM STREET 1 AVENUE TO STREET F D R DRIVE | No data | Street Construction Inspections: Active | Department of Transportation | No temporary walk |
2022-09-29 | No data | SOUTH STREET, FROM STREET CLINTON STREET TO STREET RUTGERS SLIP | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb & roadway cut is up to grade. |
2022-09-28 | No data | EAST 174 STREET, FROM STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SE4 corner quadrant are non ADA compliant. Previously measured and collected in Prism on 1/8/21. |
2022-09-24 | No data | GREENWICH STREET, FROM STREET LEROY STREET TO STREET MORTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work was done on roadway at time of inspection. |
2022-09-24 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work was done on roadway at time of inspection. |
2022-09-22 | No data | AMSTERDAM AVENUE, FROM STREET WEST 155 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps are Non Ada compliant. Measured in updated collector on 10/16/19. |
2022-09-16 | No data | AMSTERDAM AVENUE, FROM STREET WEST 153 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps are functional. Non Ada compliant. Measured in collector on 10/11/19. |
2022-09-16 | No data | VETERANS ROAD WEST, FROM STREET ALLENTOWN LANE TO STREET WEST SHORE PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Roadway has been milled out (205’x27’4) down 3in ready for paving- flaggers posted to direct heavy traffic. Emailed photos/measurements |
2022-09-16 | No data | BEACH 129 STREET, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Pedestrian walkway on location |
2022-09-16 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work conducted under this permit. Permit expired. |
2022-09-14 | No data | EAST 87 STREET, FROM STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the NE3 corner quadrant ramps Non Ada compliant. Was Measured and collected in Prism on 8/3/20. Slopes were brought down from 11% to 7%. Updated on 9/14/22. |
2022-09-14 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 119 curb installation is acceptable. Cobblestones restored during BPP. |
2022-09-14 | No data | AMSTERDAM AVENUE, FROM STREET WEST 100 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SW1 corner quadrant are ADA compliant. Measured in prism on 3/3/22 |
2022-09-08 | No data | FULTON STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete sidewalk restoration found to be in compliance |
2022-09-03 | No data | 1 AVENUE, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb replacement acceptable |
2022-09-02 | No data | 2 AVENUE, FROM STREET EAST 81 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to put Measurements into prism medium that does not exist, Landing running 2.4Landing cross 0.1,Ramps running 3.2,Ramps cross 0.9,Gutter flow 1.2,Counter slopes 4.7,Curb reveal 0.0,Landing Lenght 73 ,Landing Width93 ramp is accessible. |
2022-08-30 | No data | 1 AVENUE, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CITY & COUNTY PAVING CORP. currently has not restored green bicycle lane roadway pavement markings in kind condition remains in front of property #2269 1 AVENUE, currently out of guarantee period unable to re-issue CORRECTIVE ACTION REQUEST |
2022-08-30 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 52-58 cobblestone BPP restoration is acceptable. |
2022-08-30 | No data | HUDSON STREET, FROM STREET KING STREET TO STREET WEST HOUSTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | New sidewalk flags in front of 375 Hudson. |
2022-08-30 | No data | 7 AVENUE, FROM STREET WEST 151 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No new work done in the NW2 Corner quadrant, permit still active. |
2022-08-30 | No data | WEST HOUSTON STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | New sidewalk flags in front of 375 Hudson. |
2022-08-28 | No data | SOUTHERN BOULEVARD, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk in compliance |
2022-08-28 | No data | EAST 181 STREET, FROM STREET MAPES AVENUE TO STREET SOUTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk and curb in compliance |
2022-08-25 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb installed and cobblestone restored to parking lane. |
2022-08-25 | No data | GREENWICH STREET, FROM STREET LEROY STREET TO STREET MORTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | No BPP roadway pavement work observed at this time of inspection. |
2022-08-25 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Active | Department of Transportation | No BPP roadway pavement work observed at this time of inspection. |
2022-08-23 | No data | 2 AVENUE, FROM STREET EAST 80 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the NE3 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 2/18/22 |
2022-08-23 | No data | 2 AVENUE, FROM STREET EAST 74 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SE4 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 12/9/20 |
2022-08-22 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the NE3 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 6/8/22 |
2022-08-21 | No data | WEST 78 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a steel face curb installed. |
2022-08-21 | No data | AMSTERDAM AVENUE, FROM STREET WEST 78 STREET TO STREET WEST 79 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a steel face curb installed. |
2022-08-18 | No data | AMSTERDAM AVENUE, FROM STREET WEST 79 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SW1 corner quadrant are ADA compliant. Measured in prism on 1/7/21. |
2022-08-17 | No data | 2 AVENUE, FROM STREET EAST 47 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the sw1 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 3/30/22. |
2022-08-16 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 60-74 cobblestone bpp remans acceptable. |
2022-08-15 | No data | GRAND STREET, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL FACED CURB INSTALLED IFO PROPERTY #10. |
2022-08-12 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel curb installed and remains acceptable at this time. |
2022-08-11 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cobblestone BPP 1/2 +5' on north side of street is acceptable. |
2022-08-11 | No data | EAST 19 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found Steel Face Curb installed. |
2022-08-05 | No data | EAST 87 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb okay |
2022-08-05 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SW1 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 6/15/21 |
2022-08-04 | No data | GREENWICH STREET, FROM STREET LEROY STREET TO STREET MORTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done, permit expired. |
2022-08-03 | No data | VARICK STREET, FROM STREET WEST HOUSTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the NW2 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 6/20/20 |
2022-08-03 | No data | LOUISIANA AVENUE, FROM STREET FLATLANDS AVENUE TO STREET VANDALIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new curb installed |
2022-08-03 | No data | HUDSON STREET, FROM STREET MORTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Apex ramp in the sw1 corner quadrant is functional and accessible. Non Ada compliant. Measured and collected on 11/1/19. |
2022-08-01 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to M042022195A08 |
2022-08-01 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Completed tangent ramps within the NE3 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 6/8/22 . Permit is answering CAR on M042022109A29 |
2022-08-01 | No data | WEST HOUSTON STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found sidewalk replaced with expansion joints sealed. |
2022-07-31 | No data | WEST 79 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The respondent restored the sidewalk in kind. |
2022-07-28 | No data | 47 AVENUE, FROM STREET VERNON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SE4 corner quadrant are functional and accessible. Non Ada. Measured in prism 12/20/21. |
2022-07-28 | No data | EAST 55 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | New curb installed in front of #119. |
2022-07-27 | No data | DINSMORE PLACE, FROM STREET CHESTNUT STREET TO STREET RICHMOND STREET | No data | Street Construction Inspections: Active | Department of Transportation | pass, completed , striping as well |
2022-07-27 | No data | 2 AVENUE, FROM STREET EAST 47 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps within the sw1 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 3/30/22 |
2022-07-26 | No data | 2 AVENUE, FROM STREET EAST 47 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the sw1 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 3/30/22 |
2022-07-26 | No data | CHESTNUT STREET, FROM STREET ATLANTIC AVENUE TO STREET DINSMORE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done ...new permit obtained... |
2022-07-26 | No data | CHESTNUT STREET, FROM STREET ATLANTIC AVENUE TO STREET DINSMORE PLACE | No data | Street Construction Inspections: Active | Department of Transportation | ass, fully paved ... all striping as well ... |
2022-07-26 | No data | 2 AVENUE, FROM STREET EAST 47 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps within the sw1 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 3/30/22 |
2022-07-22 | No data | DINSMORE PLACE, FROM STREET CHESTNUT STREET TO STREET RICHMOND STREET | No data | Street Construction Inspections: Active | Department of Transportation | pass, 139x16x3" milled out ....s/s of block ... |
2022-07-22 | No data | ATLANTIC AVENUE, FROM STREET CHESTNUT STREET TO STREET CONDUIT BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | pass143'x30'x3" milled out , by contractor .... |
2022-07-22 | No data | CHESTNUT STREET, FROM STREET ATLANTIC AVENUE TO STREET DINSMORE PLACE | No data | Street Construction Inspections: Active | Department of Transportation | pass., 191x18x3" milled out ....by contractor ... |
2022-07-22 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 117 curb installed, cobblestones restored as part of cobblestone BPP. |
2022-07-21 | No data | ATLANTIC AVENUE, FROM STREET CHESTNUT STREET TO STREET CONDUIT BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Work in progress / requesting taper be moved in |
2022-07-20 | No data | HUDSON STREET, FROM STREET KING STREET TO STREET WEST HOUSTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work not started. |
2022-07-20 | No data | WEST HOUSTON STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work not started. |
2022-07-20 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Completed tangent ramps within the NE3 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 6/8/22. Permit is answering CAR on M042022109A29 |
2022-07-20 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Active permit M042022195A08 on file |
2022-07-20 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps within the SE4 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 5/25/22 |
2022-07-20 | No data | EAST 74 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | respondent is no longer in the roadway |
2022-07-19 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 119, 1/2+5' cobblestone BPP is acceptable. |
2022-07-19 | No data | LITTLE WEST 12 STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Multiple sidewalk flags have been installed. Curb has been patched near sidewalk flags. |
2022-07-19 | No data | LOUISIANA AVENUE, FROM STREET FLATLANDS AVENUE TO STREET VANDALIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDEWALK IN COMPLIANCE |
2022-07-15 | No data | AMSTERDAM AVENUE, FROM STREET WEST 78 STREET TO STREET WEST 79 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The respondent restored the sidewalk in kind. |
2022-07-14 | No data | EAST 49 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NO TEMPORARY PEDESTRIAN WALK IN ROADWAY |
2022-07-13 | No data | AMSTERDAM AVENUE, FROM STREET WEST 99 STREET TO STREET WEST 100 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb in compliance |
2022-07-11 | No data | 2 AVENUE, FROM STREET EAST 47 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Completed tangent ramps within the sw1 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 3/30/22. Permit is answering CAR on permit M042021211A04 |
2022-07-11 | No data | 2 AVENUE, FROM STREET EAST 47 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit M042022188A12 |
2022-07-09 | No data | EAST 87 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk around transformer / aka 1065 Park Ave |
2022-07-08 | No data | EAST 55 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PAVE STREET-W/ ENGINEERING & INSP FEE-P: L:56' W:20' D:3" |
2022-07-06 | No data | EAST 137 STREET, FROM STREET ST ANNS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SE4 corner quadrant are functional and accessible. ADA compliant. Previously measured and collected in Prism on 3/27/20. |
2022-07-05 | No data | EAST 55 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly installed blended transition in the SW1 corner quadrant is ada compliant. Measured in prism on 7/5/22 |
2022-06-23 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Active | Department of Transportation | tangent ramps within the NE3 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 6/8/22 . Permit is answering CAR on M042022109A29 |
2022-06-21 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 111, 1/2' +5 cobblestone BPP is acceptable. |
2022-06-17 | No data | PARK AVENUE, FROM STREET EAST 111 STREET TO STREET EAST 112 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new steel face curb on south bound side of park ave west curb line. new building |
2022-06-16 | No data | EAST 112 STREET, FROM STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started at this time |
2022-06-16 | No data | EAST 55 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Completed ramp in the SW1 corner quadrant is functional and accessible. Unable to measure due heavy rain |
2022-06-16 | No data | EAST 111 STREET, FROM STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started at this time |
2022-06-16 | No data | 2 AVENUE, FROM STREET EAST 47 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Completed tangent ramps within the sw1 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 3/30/22. Permit is answering CAR on permit M042021211A04 |
2022-06-14 | No data | EAST 56 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SE4 corner quadrant are functional and accessible. Measured in prism on 5/12/22 |
2022-06-14 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 6/14/21. No TIF on file. |
2022-06-14 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work conducted under this permit. Permit expired. |
2022-06-13 | No data | EAST 55 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit on file M042022154A03 |
2022-06-12 | No data | GRAND STREET, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL FACED CURB INSTALLED ON THE SIDE OF PROPERTY #262 KENT AV. |
2022-06-12 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Active | Department of Transportation | No rwy BPP at intersection for BO site. All bike lanes are clear. |
2022-06-12 | No data | GREENWICH STREET, FROM STREET LEROY STREET TO STREET MORTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | No rwy BPP on block segment for BO site. Opp conventional bike lane is clear. |
2022-06-08 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done. Scaffolding still present |
2022-06-08 | No data | CONVENT AVENUE, FROM STREET MORNINGSIDE AVENUE TO STREET WEST 128 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Roadway has been re-surfaced . |
2022-06-05 | No data | COLUMBUS AVENUE, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The respondent sealed the expansion joints around the sidewalk flags. |
2022-06-04 | No data | 8 AVENUE, FROM STREET WEST 56 STREET TO STREET WEST 57 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PAVE STREET-W/ ENGINEERING & INSP FEE: Bike lane Markings have been applied |
2022-06-03 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work conducted under this permit. Permit expired. |
2022-06-02 | No data | EAST 24 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESET, REPAIR OR REPLACE CURB |
2022-06-01 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cobblestone BPP is acceptable at this location. |
2022-05-26 | No data | 2 AVENUE, FROM STREET EAST 47 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly completed tangent ramps within the sw1 corner quadrant are functional and accessible. Non Ada compliant. Updated measurements in prism on 3/30/22 |
2022-05-25 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Car has been answered. Prism updated |
2022-05-25 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SE4 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 5/25/22 |
2022-05-24 | No data | EAST 55 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | City & County Paving just arrived on site with trucks but no work started yet. |
2022-05-24 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time. Permit remains active. |
2022-05-24 | No data | EAST 55 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work not started for BPP.. |
2022-05-24 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work conducted under this permit. Permit expired. |
2022-05-23 | No data | GREENWICH STREET, FROM STREET LEROY STREET TO STREET MORTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started |
2022-05-19 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time. Scaffolding still present |
2022-05-19 | No data | GRAND STREET, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW STEEL FACED CURB INSTALLED ON THE SIDE OF PROPERTY #262. |
2022-05-13 | No data | WEST 43 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Final restoration has been made along the curb line |
2022-05-13 | No data | EAST 112 STREET, FROM STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2022-05-13 | No data | EAST 111 STREET, FROM STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2022-05-13 | No data | EAST 112 STREET, FROM STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started at this time |
2022-05-13 | No data | EAST 111 STREET, FROM STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started at this time |
2022-05-12 | No data | EAST 55 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started at this time |
2022-05-12 | No data | EAST 56 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit M042022122A17 |
2022-05-12 | No data | EAST 56 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps within the SE4 corner quadrant are functional and accessible. Measured in prism on 5/12/22 |
2022-05-12 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2022-05-12 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work done under this permit at this time. Permit remains active. |
2022-05-12 | No data | EAST 46 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Multiple sidewalk flags restored/repaired with expansion joints sealed is in compliance. |
2022-05-12 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit M042022119A03 for inspection remarks |
2022-05-12 | No data | EAST 55 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed blended transition ramp in the NE3 corner quadrant is functional and accessible. Non Ada compliant. Measured in prism on 4/29/22. Expansion caps need to be removed |
2022-05-11 | No data | 41 AVENUE, FROM STREET QUEENS PLAZA NORTH | No data | Street Construction Inspections: Active | Department of Transportation | Roadway repaved as per BPP. |
2022-05-11 | No data | QUEENS PLAZA, FROM STREET 41 AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Active | Department of Transportation | Work not started. |
2022-05-09 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cobblestone BPP restoration remains acceptable I/F/O 60-74. |
2022-05-08 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel-face curb in compliance. |
2022-05-06 | No data | EAST 55 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work not started, dismantling shed right now. |
2022-05-06 | No data | EAST 51 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work not started. |
2022-05-05 | No data | LOUISIANA AVENUE, FROM STREET FLATLANDS AVENUE TO STREET VANDALIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new sidewalk installed |
2022-05-04 | No data | 2 AVENUE, FROM STREET EAST 47 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Scaffolding present. Several elements exceeds Ada (landing area of both ramps, ramp cross, & right flare of ramp 2). Passing out |
2022-05-04 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work conducted under this permit. Permit expired. |
2022-05-02 | No data | BOSTON ROAD, FROM STREET EASTCHESTER ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired. No ped ramp work started in the NE3 corner quadrant at time of inspection. “FROM KERRY - PLEASE USE THIS PERMIT FOR THE NE CORNER" |
2022-05-02 | No data | GREENWICH STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2022-05-02 | No data | MICKLE AVENUE, FROM STREET TILLOTSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired. Duplicate permit. Please refer to permit #X042021267A04. "FROM KERRY - PLEASE USE THIS PERMIT FOR THE NE CORNER" |
2022-05-02 | No data | EASTCHESTER ROAD, FROM STREET TILLOTSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired. Duplicate permit. Please refer to permit #X042021267A06 "FROM KERRY - PLEASE USE THIS PERMIT FOR THE NE CORNER" |
2022-05-02 | No data | BOSTON ROAD, FROM STREET MICKLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired. No work started in the SE4 corner quadrant at time of inspection |
2022-04-29 | No data | EAST 55 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed blended transition ramp in the NE3 corner quadrant is functional and accessible. Non Ada compliant. Measured in prism on 4/29/22 |
2022-04-28 | No data | EAST 111 STREET, FROM STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2022-04-27 | No data | EAST 112 STREET, FROM STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2022-04-27 | No data | WEST 44 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new curb is in compliance |
2022-04-27 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2022-04-27 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started under this permit. Permit remains active. |
2022-04-25 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2022-04-22 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 52-58, cobblestone BPP remains acceptable. |
2022-04-21 | No data | EAST 51 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work not started |
2022-04-20 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work done under this permit at this time. Permit remains active. |
2022-04-19 | No data | EAST 87 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Roadway adjacent to the steel face curb was sealed. |
2022-04-19 | No data | EAST 87 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the respondent placed several plastic barriers with a green mesh on top obstructing a portion of the sidewalk without a valid DOT permit. Occupancy of sidewalk permit #M022021194A47 expires on 8/8/2021 |
2022-04-19 | No data | PARK AVENUE, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the respondent placed several plastic barriers with a green mesh on top obstructing a portion of the sidewalk without a valid DOT permit. Occupancy of sidewalk permit #M022021194A45 expires on 8/8/2021 |
2022-04-18 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly completed tangent ramps within the SE4 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 6/15/21 |
2022-04-17 | No data | KENT AVENUE, FROM STREET GRAND STREET TO STREET SOUTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed |
2022-04-17 | No data | GRAND STREET, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed |
2022-04-15 | No data | COLUMBUS AVENUE, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I found the respondent failed to remove white plastic caps and install and seal expansion joint around sidewalk flag. Previously notified by CAR #20215010173 on 12/6/2021 to correct the condition. |
2022-04-15 | No data | 8 AVENUE, FROM STREET WEST 56 STREET TO STREET WEST 57 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I found that the respondent has failed to restore the green bike lane paint in the bike lane. Respondent was notified via CAR#20217970129 on 10/25/21. Respondent was identified by cited permit. Permit expired 10/19/21/ |
2022-04-13 | No data | EAST 55 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Curb not restored/reset IFO property. Opp bike lane is clear. |
2022-04-12 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No new work conducted under this permit. Permit expired. |
2022-04-12 | No data | EAST 74 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration around curb has been finalized. |
2022-04-12 | No data | EAST 74 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration around curb has been finalized with 135 permit M012022063A56 on file. |
2022-04-12 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work done under this permit at this time. Permit remains active. |
2022-04-10 | No data | YORK AVENUE, FROM STREET EAST 85 STREET TO STREET EAST 86 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Crosswalk lane markings have been restored. |
2022-04-08 | No data | EAST 56 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2022-04-08 | No data | CONVENT AVENUE, FROM STREET MORNINGSIDE AVENUE TO STREET WEST 128 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued for failure to restore street in kind (non-historic district). |
2022-04-07 | No data | EAST 55 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2022-04-06 | No data | 5 AVENUE, FROM STREET 89 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SE4 corner found not to be ADA compliant. Ramps are functional and accessible. Previously measured & collected in Prism on 7/14/21."FROM KERRY - IF NON COMPLIANT PLEASE WRITE A CAR, THANK YOU" |
2022-04-06 | No data | EAST 56 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started at this time |
2022-04-06 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | No sidewalk work done under this permit at this time. Permit remains active. |
2022-04-06 | No data | EAST 55 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started at this time |
2022-04-04 | No data | FLEET PLACE, FROM STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp in the NE3 corner found to be ADA compliant. Measured & collected in Prism on 8/31/21. |
2022-03-31 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cobblestone 1/2+5 BPP restoration is acceptable I/F/O 121. |
2022-03-31 | No data | VARICK STREET, FROM STREET 7 AVENUE SOUTH TO STREET DOWNING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 225 ( aka NY Sports Club ), portion of steel face curb replaced / installed and is free of defects at this time. Roadway is perm / flush against curb with minor wear observed. Not CAR worthy at this time. |
2022-03-30 | No data | 2 AVENUE, FROM STREET EAST 47 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the sw1 corner quadrant are functional and accessible. Non Ada compliant. Updated measurements in prism on 3/30/22 |
2022-03-30 | No data | GRAND STREET, FROM STREET KENT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SW1 corner quadrant are functional and accessible. Non ADA compliant. Previously measured and collected on 10/14/2019. |
2022-03-28 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk has been fully reconstructed and is acceptable. |
2022-03-28 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work done under this permit at this time. Permit remains active. |
2022-03-28 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Granite sidewalk constructed I/F/O55 is acceptable. |
2022-03-28 | No data | EAST 55 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work ongoing and compliant. |
2022-03-22 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Near 52-58, cobblestone BPP remains acceptable at this time. |
2022-03-22 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work conducted on sidewalk under this permit at this time. Permit remains active. |
2022-03-19 | No data | PARK AVENUE, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the respondent placed several plastic barriers with a green mesh on top obstructing a portion of the sidewalk without a valid DOT permit. Occupancy of sidewalk permit #M022021194A45 expires on 8/8/2021 |
2022-03-19 | No data | EAST 87 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the respondent placed several plastic barriers with a green mesh on top obstructing a portion of the sidewalk without a valid DOT permit. Occupancy of sidewalk permit #M022021194A47 expires on 8/8/2021 |
2022-03-11 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work conducted under this permit at this time. Permit remains active. |
2022-03-11 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O aka 435 Hudson St on Leroy St ( North sidewalk area ), steel face curb installed and expansion joint properly sealed at this time. Roadway cutback in Cobble stone area is flush against curb. |
2022-03-10 | No data | GREENWICH STREET, FROM STREET LEROY STREET TO STREET MORTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done. |
2022-03-09 | No data | PARK AVENUE, FROM STREET EAST 111 STREET TO STREET EAST 112 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk occupied at time |
2022-03-09 | No data | KENT AVENUE, FROM STREET GRAND STREET TO STREET SOUTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed |
2022-03-08 | No data | GRAND STREET, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed |
2022-03-07 | No data | EAST 56 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2022-03-07 | No data | EAST 55 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2022-03-05 | No data | PARK AVENUE, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the respondent placed several plastic barriers with a green mesh on top obstructing a portion of the sidewalk without a valid DOT permit. Occupancy of sidewalk permit #M022021194A45 expires on 8/8/2021 is for used for ID |
2022-03-05 | No data | EAST 87 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the respondent placed several plastic barriers with a green mesh on top obstructing a portion of the sidewalk without a valid DOT permit. Occupancy of sidewalk permit #M022021194A47 expires on 8/8/2021 and is used for ID |
2022-03-03 | No data | AMSTERDAM AVENUE, FROM STREET WEST 100 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the sw1 corner quadrant are functional and accessible. Measured in prism on 3/3/22 |
2022-03-02 | No data | AMSTERDAM AVENUE, FROM STREET WEST 155 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps are functional and accessible. Non Ada compliant. Measured on and updated collector on 10/16/19. |
2022-03-02 | No data | BAYCHESTER AVENUE, FROM STREET BARTOW AVENUE TO STREET BAY PLAZA | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done on this permit, newer permit # X042021189A07. Newly completed single ramp in the north east corner quadrant non Ada compliant, Ramp is accessible and functional. ( Gutter flow slope. ) |
2022-03-01 | No data | AMSTERDAM AVENUE, FROM STREET WEST 153 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps are functional and accessible. Non Ada compliant. Measured and updated collector on 10/11/19. |
2022-02-27 | No data | 1 AVENUE, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curp is flush with sealed expansion joint |
2022-02-25 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Granite curb installed and cobblestones restored. Restoration is acceptable. |
2022-02-25 | No data | WESTCHESTER AVENUE, FROM STREET EAST 162 STREET TO STREET ROGERS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done on sidewalk. |
2022-02-24 | No data | EAST 74 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O i found the respondent actively working in the roadway with no valid NYC DOT permit on file. Identified the respondent by markings on truck and cited permit for reset,repair or replace curb which expired on 11/29/2020. |
2022-02-23 | No data | EAST 74 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 300, your temporary trench along the curb where cut backs were done for installing curb is over due for final restoration. |
2022-02-23 | No data | EAST 74 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Area has been made safe with temporary asphalt. |
2022-02-23 | No data | FULTON STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW CURB INSTALLED |
2022-02-22 | No data | 2 AVENUE, FROM STREET EAST 81 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to input median measurements in prism at this time. Median is functional and accessible at time of inspection |
2022-02-22 | No data | WEST 43 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Roadway restored by the new steel faced curb ifo #321. |
2022-02-21 | No data | KENT AVENUE, FROM STREET GRAND STREET TO STREET SOUTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed |
2022-02-21 | No data | GRAND STREET, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed |
2022-02-18 | No data | 2 AVENUE, FROM STREET EAST 80 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 2/18/22. Flares, ramp cross, gutter slope, landing running slope exceeds Ada |
2022-02-18 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 60-74, curb to curb cobblestone BPP remains acceptable. |
2022-02-18 | No data | EAST 87 STREET, FROM STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant are functional and accessible. Non Ada compliant. Measured in Prism on 8/3/20. Slopes were brought down from 11% to 7%. |
2022-02-17 | No data | EAST 112 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ped /walk not visible |
2022-02-15 | No data | LOUISIANA AVENUE, FROM STREET FLATLANDS AVENUE TO STREET VANDALIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk restored in kind sealed and flush |
2022-02-11 | No data | 2 AVENUE, FROM STREET EAST 81 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the NW2 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 5/27/21 |
2022-02-11 | No data | 2 AVENUE, FROM STREET EAST 74 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the SE4 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 12/9/20 |
2022-02-10 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 55, curb installation is acceptable. |
2022-02-10 | No data | AMSTERDAM AVENUE, FROM STREET WEST 79 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the SW1 corner quadrant are ADA compliant. Measured in prism on 1/7/21. |
2022-02-05 | No data | EAST 87 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the respondent placed several plastic barriers with a green mesh on top obstructing a portion of the sidewalk without a valid DOT permit. Occupancy of sidewalk permit #M022021194A47 expires on 8/8/2021 and used for ID |
2022-02-05 | No data | PARK AVENUE, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the respondent placed several plastic barriers with a green mesh on top obstructing a portion of the sidewalk without a valid DOT permit. Occupancy of sidewalk permit #M022021194A45 expires on 8/8/2021 and used for ID |
2022-01-28 | No data | HUDSON STREET, FROM STREET MORTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Apex ramp in the sw1 corner quadrant is functional and accessible. Non Ada compliant. Measured and collected on 11/1/19. |
2022-01-28 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the SW1 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 6/15/21 |
2022-01-27 | No data | LOUISIANA AVENUE, FROM STREET FLATLANDS AVENUE TO STREET VANDALIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk and curb replace/repaired in kind. In-compliance. |
2022-01-26 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Granite curb installed and restoration are acceptable at this time. |
2022-01-26 | No data | VARICK STREET, FROM STREET WEST HOUSTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the NW2 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 6/20/20 |
2022-01-24 | No data | WEST 43 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | IFO 321 temporary asphalt has not been removed from your curb restoration and is overdue for final restoration. permit# M012018080A51 used for ID. |
2022-01-21 | No data | NORTHERN BOULEVARD, FROM STREET 40 ROAD TO STREET 41 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway repaved as per BPP, just past double yellow median lines. |
2022-01-21 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP initially done but has been milled and paved over at this time by NYC DOT. |
2022-01-21 | No data | VERNON BOULEVARD, FROM STREET 47 AVENUE TO STREET 47 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway repaved as per BPP, shared bike lane. |
2022-01-19 | No data | WEST HOUSTON STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 240 - 248 W Houston St. RESET, REPAIR OR REPLACE CURB- Steel faced curb in compliance. |
2022-01-19 | No data | WEST 108 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 111 west 108 is the play ground and no sidewalk or curb found done at this time. |
2022-01-14 | No data | VARICK STREET, FROM STREET 7 AVENUE SOUTH TO STREET DOWNING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 225 Varick ( West side ), portion of steel face curb installed ( newer steel used ). No changes since previous inspection. |
2022-01-14 | No data | CLARKSON STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O aka 225 Varick on Clarkson St, steel face curb installed and roadway cutback perm / flush to grade. Lane markings restored in kind. |
2022-01-12 | No data | EAST 112 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ped /walk not visible |
2022-01-12 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb and curb cobblestone restoration are acceptable at this time. |
2022-01-12 | No data | 2 AVENUE, FROM STREET EAST 110 STREET TO STREET EAST 111 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/w are flush with sealed expansion joints |
2022-01-12 | No data | EAST 111 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w is flush with sealed expansion joints |
2022-01-12 | No data | KENT AVENUE, FROM STREET GRAND STREET TO STREET SOUTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed |
2022-01-10 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel faced curb installed and cobblestone restored in parking lane are acceptable. |
2022-01-04 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work conducted under this permit. BPP done under more recent permits and then milling/paving took place. |
2022-01-03 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed and cobblestones restored in kind. |
2022-01-02 | No data | 1 AVENUE, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Subsequently secured permit. |
2021-12-31 | No data | WILLOUGHBY STREET, FROM STREET ASHLAND PLACE TO STREET FLEET STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w in compliance |
2021-12-31 | No data | GEORGE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rest curb |
2021-12-30 | No data | AMSTERDAM AVENUE, FROM STREET WEST 99 STREET TO STREET WEST 100 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb in compliance |
2021-12-28 | No data | EAST 137 STREET, FROM STREET ST ANNS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SE4 corner quadrant, is Ada compliant. Ramps are accessible and functional. Measured and updated in prism on 3/27/20. |
2021-12-23 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The respondent has installed a granite curb. |
2021-12-23 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Monitored BPP from 9:20-11:00 from 115-121 Leroy. Full BPP size180'x20'. Monitored 10' of restoration. Approximately 90' of BPP done at this time. Crew to remain on site. |
2021-12-22 | No data | 2 AVENUE, FROM STREET EAST 110 STREET TO STREET EAST 111 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work complete. |
2021-12-22 | No data | 47 AVENUE, FROM STREET 11 STREET TO STREET VERNON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | The below BPP is completed and acceptable.Curb to Curb width – 30’, Milled area – 20’ x 112’, Depth of milled area – 3”, ½ +5’ milled (yes/no) – Yes. |
2021-12-22 | No data | WASHINGTON STREET, FROM STREET GANSEVOORT STREET TO STREET HORATIO STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Whole roadway repaved recently, no more cobblestone. |
2021-12-22 | No data | 47 AVENUE, FROM STREET VERNON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | The below BPP is completed and acceptable.Curb to Curb width – 45’, Milled area – 30’ x 22’, Depth of milled area – 3”, ½ +5’ milled (yes/no) – Yes. |
2021-12-22 | No data | VERNON BOULEVARD, FROM STREET 47 AVENUE TO STREET 47 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | The below BPP is completed and acceptable.Curb to Curb width – 45’, Milled area – 30’ x 62’, Depth of milled area – 3”, ½ +5’ milled (yes/no) – Yes. |
2021-12-21 | No data | WEST 97 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w flags in compliance |
2021-12-21 | No data | EAST 102 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP inspection complete curb to curb. Spoke with Frank. |
2021-12-21 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The respondent has restored the sidewalk in kind. |
2021-12-21 | No data | GREENWICH STREET, FROM STREET LEROY STREET TO STREET MORTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No walkway on site. |
2021-12-20 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Granite sidewalk flags have been installed and are acceptable. |
2021-12-20 | No data | 47 AVENUE, FROM STREET VERNON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SE4 corner found not to be ADA compliant. Ramps are functional and accessible. Measured & collected in Prism on 12/20/21. |
2021-12-19 | No data | EAST 102 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Sidewalk opened and cleared. |
2021-12-18 | No data | WILLOUGHBY STREET, FROM STREET ASHLAND PLACE TO STREET FLEET STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP work done & completed. Rwy milled & all lane markings restored. No impaction to bike lane. |
2021-12-16 | No data | CONVENT AVENUE, FROM STREET MORNINGSIDE AVENUE TO STREET WEST 128 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Double yellow lane markings are fading from roadway. Lane markings must be restored in kind in front of 17. |
2021-12-15 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP initially done but has been milled and paved over at this time. |
2021-12-11 | No data | EAST 86 STREET, FROM STREET HENDERSON PLACE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP under M012021328A28 |
2021-12-11 | No data | EAST 86 STREET, FROM STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP under M012021328A28 |
2021-12-11 | No data | YORK AVENUE, FROM STREET EAST 85 STREET TO STREET EAST 86 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP under M012021328A26 |
2021-12-10 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Granite curb installed. Cobblestone restored in kind along curb line. |
2021-12-07 | No data | WASHINGTON STREET, FROM STREET CANAL STREET TO STREET WATTS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk repair acceptable |
2021-12-07 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Near 63, curb and cobblestone restoration along curb is acceptable. |
2021-12-07 | No data | LOUISIANA AVENUE, FROM STREET FLATLANDS AVENUE TO STREET VANDALIA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF SIDEWALK in compliance at the time of inspection. |
2021-12-06 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Active | Department of Transportation | No work done. |
2021-12-06 | No data | COLUMBUS AVENUE, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please remove white expansion caps and properly seal sidewalk joints. |
2021-12-04 | No data | LOUISIANA AVENUE, FROM STREET FLATLANDS AVENUE TO STREET VANDALIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sw flags installed |
2021-12-02 | No data | WEST 108 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w in compliance; expansion joints sealed |
2021-12-01 | No data | 9 AVENUE, FROM STREET GANSEVOORT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started at this time |
2021-11-30 | No data | MAC KAY PLACE, FROM STREET NARROWS AVENUE TO STREET SHORE ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flags at school. |
2021-11-29 | No data | YORK AVENUE, FROM STREET EAST 85 STREET TO STREET EAST 86 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active BPP, 35’x3’’ below grade x 5’ pass property line in compliance. |
2021-11-29 | No data | EAST 86 STREET, FROM STREET YORK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active BPP, Half plus 5 in compliance |
2021-11-29 | No data | EAST 86 STREET, FROM STREET HENDERSON PLACE TO STREET YORK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active BPP in compliance. 11’ x 3 inches below grade and 5 feet pass property line in compliance. Contractors have a waver that voids out the half plus 5 of the roadway. |
2021-11-26 | No data | EAST 111 STREET, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Active | Department of Transportation | No work done. |
2021-11-26 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time on the curb. Permit remains active. |
2021-11-26 | No data | 47 AVENUE, FROM STREET VERNON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps in the SE4 corner are functional and accessible. Unable to measure due to weather (rain). We’ll measure and reinspect at a later date. |
2021-11-25 | No data | GREENWICH STREET, FROM STREET LEROY STREET TO STREET MORTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Swk/curb work still in progress. Temp ped walkway made on parking lane. Opp conventional bike lane is clear. |
2021-11-23 | No data | LOUISIANA AVENUE, FROM STREET FLATLANDS AVENUE TO STREET VANDALIA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp ped walkway installed |
2021-11-22 | No data | NORTHERN BOULEVARD, FROM STREET 40 ROAD TO STREET 41 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP paving in compliance along segment. Dimensions: 253'6" x 39'6" in front of 29-59 Northern Boulevard. 1/2 + 5' paved. Roadway 68'6". |
2021-11-18 | No data | 47 AVENUE, FROM STREET 11 STREET TO STREET VERNON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Sw open to pedestrians |
2021-11-18 | No data | VERNON BOULEVARD, FROM STREET 47 AVENUE TO STREET 47 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Sw not occupied. |
2021-11-18 | No data | 41 AVENUE, FROM STREET 29 STREET TO STREET QUEENS PLAZA NORTH | No data | Street Construction Inspections: Active | Department of Transportation | B.P.P. in compliance in front of 29-17 41st Avenue. 214'0" (L) x 20'3" (W) x 3" (D). Roadway width 29'6". |
2021-11-16 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cobblestone BPP remains acceptable near 52-58. |
2021-11-16 | No data | LITTLE WEST 12 STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Multiple sidewalk flags installed and expansion joints sealed. Curb portion of sidewalk patched. |
2021-11-12 | No data | 9 AVENUE, FROM STREET GANSEVOORT STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2021-11-09 | No data | ROCKWELL PLACE, FROM STREET DE KALB AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | plaza area was re-painted and in compliance |
2021-11-08 | No data | 2 AVENUE, FROM STREET EAST 47 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Car has been answered |
2021-11-07 | No data | EAST 87 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk restored. |
2021-11-07 | No data | PARK AVENUE, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit secured for this work. |
2021-11-06 | No data | GEORGE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | reset curb |
2021-11-04 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly completed tangent ramps within the SE4 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 6/15/21 |
2021-11-03 | No data | COLUMBUS AVENUE, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET | No data | Street Construction Inspections: Active | Department of Transportation | New sidewalk at corner property #313, existing granite curb left in place, new barrier-free access ramp and platform. Vault under the sidewalk. Expansion joints still need sealing. |
2021-11-01 | No data | 9 AVENUE, FROM STREET GANSEVOORT STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2021-10-26 | No data | LOUISIANA AVENUE, FROM STREET FLATLANDS AVENUE TO STREET VANDALIA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Not started yet .. |
2021-10-26 | No data | EASTCHESTER ROAD, FROM STREET TILLOTSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired. Duplicate permit. Please refer to permit #X042021267A06 "FROM KERRY - PLEASE USE THIS PERMIT FOR THE NE CORNER" |
2021-10-26 | No data | BOSTON ROAD, FROM STREET EASTCHESTER ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Duplicate permit. Please refer to permit #X042021267A10. "FROM KERRY - PLEASE USE THIS PERMIT FOR THE NE CORNER" |
2021-10-26 | No data | BOSTON ROAD, FROM STREET MICKLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired. No ped ramp work started in the SW1 corner quadrant at time of inspection. |
2021-10-26 | No data | MICKLE AVENUE, FROM STREET TILLOTSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired. Duplicate permit. Please refer to permit #X042021267A04. "FROM KERRY - PLEASE USE THIS PERMIT FOR THE NE CORNER" |
2021-10-26 | No data | WILLOUGHBY STREET, FROM STREET ASHLAND PLACE TO STREET FLEET STREET | No data | Street Construction Inspections: Active | Department of Transportation | Location previously confirmed and inspected. |
2021-10-25 | No data | 8 AVENUE, FROM STREET WEST 56 STREET TO STREET WEST 57 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway repaved as per BPP, lane marking restored, only green paint for bike lane missing. |
2021-10-24 | No data | FULTON STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB INSTALLED |
2021-10-22 | No data | SOUTH STREET, FROM STREET CLINTON STREET TO STREET RUTGERS SLIP | No data | Street Construction Inspections: Post-Audit | Department of Transportation | across from sanitation entrance new curb is in compliance |
2021-10-22 | No data | BALTIC STREET, FROM STREET HOYT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb OK |
2021-10-20 | No data | SMITH STREET, FROM STREET BALTIC STREET TO STREET BUTLER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb ok |
2021-10-19 | No data | 2 AVENUE, FROM STREET EAST 110 STREET TO STREET EAST 111 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work complete in south east corner. |
2021-10-19 | No data | EAST 111 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work complete on the SW corner of property. |
2021-10-06 | No data | AMSTERDAM AVENUE, FROM STREET WEST 78 STREET TO STREET WEST 79 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk replaced. |
2021-10-06 | No data | WEST 78 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk and curb replaced. |
2021-10-05 | No data | EASTCHESTER ROAD, FROM STREET BOSTON ROAD TO STREET TILLOTSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Portion of curb new |
2021-10-05 | No data | SOUTH STREET, FROM STREET CLINTON STREET TO STREET RUTGERS SLIP | No data | Street Construction Inspections: Active | Department of Transportation | occupancy of sidewalk is in compliance |
2021-10-05 | No data | TILLOTSON AVENUE, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb in place |
2021-10-01 | No data | COLUMBUS AVENUE, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work present in front of 313 Columbus Ave. |
2021-09-30 | No data | VERNON BOULEVARD, FROM STREET 47 AVENUE TO STREET 47 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done, permit expired. |
2021-09-30 | No data | 47 AVENUE, FROM STREET VERNON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done, permit expired. |
2021-09-29 | No data | SKILLMAN AVENUE, FROM STREET 29 STREET TO STREET THOMSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP completed, sealed, all roadway markings restored. Shared bike lanes on this street. |
2021-09-29 | No data | EASTCHESTER ROAD, FROM STREET TILLOTSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No work started in the NE3 corner quadrant at time of inspection. Will reinspect at a later date when work is complete. |
2021-09-29 | No data | BOSTON ROAD, FROM STREET MICKLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No ped ramp work started in the SW1 corner quadrant at time of inspection. Will reinspect at a later date when work is complete. |
2021-09-29 | No data | 29 STREET, FROM STREET SKILLMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP completed in roadway with a bumped out pedestrian curb and sidewalk. Roadway markings restored. |
2021-09-29 | No data | BOSTON ROAD, FROM STREET EASTCHESTER ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No ped ramp work started in the SE4 corner quadrant at time of inspection. Will reinspect at a later date when work is complete. |
2021-09-29 | No data | MICKLE AVENUE, FROM STREET TILLOTSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No ped ramp work started in the NW2 corner quadrant at time of inspection. Will reinspect at a later date when work is complete. |
2021-09-28 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb installed and cobblestones restored. Cobblestone restoration is acceptable and was part of BPP. |
2021-09-24 | No data | 1 AVENUE, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk repaired. |
2021-09-23 | No data | VARICK STREET, FROM STREET 7 AVENUE SOUTH TO STREET DOWNING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESET, REPAIR OR REPLACE CURB |
2021-09-21 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly completed tangent ramps within the SE4 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 6/15/21 |
2021-09-20 | No data | LITTLE WEST 12 STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Multiple sidewalk flags have been restored and expansion joints installed/sealed. Permit remains active. |
2021-09-20 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cobblestone and asphalt BPP remains acceptable at this time. |
2021-09-17 | No data | HUDSON STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed apex ramp in the NW2 corner quadrant are functional and accessible. Non ADA compliant. Previously measured and collected on 11/6/19. |
2021-09-17 | No data | ROCKWELL PLACE, FROM STREET DE KALB AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS FAILED TO RESPOND TO CORRECTIVE ACTION REQUEST#20214510754-FAILED TO RE-PAINT NYC DOT PLAZA OVER CITY & COUNTY PAVING CORP. PERMANENT RESTORATION IN ROADWAY. |
2021-09-15 | No data | 47 AVENUE, FROM STREET 11 STREET TO STREET VERNON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No BPP roadway pavement work observed at this time of inspection. |
2021-09-15 | No data | 47 AVENUE, FROM STREET VERNON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No BPP roadway pavement work observed at this time of inspection. |
2021-09-15 | No data | VERNON BOULEVARD, FROM STREET 47 AVENUE TO STREET 47 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | No BPP roadway pavement work observed at this time of inspection. |
2021-09-14 | No data | 2 AVENUE, FROM STREET EAST 46 STREET TO STREET EAST 47 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flags have been installed in front of 240. |
2021-09-11 | No data | COLUMBUS AVENUE, FROM STREET WEST 96 STREET TO STREET WEST 97 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plastic caps have been removed and the expansion joints on newly replaced sidewalk flags has been properly recess and sealed. |
2021-09-10 | No data | LITTLE WEST 12 STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Multiple sidewalk flags have been replaced. Crew sealing expansion joints. Permit remains active at this time. |
2021-09-10 | No data | LITTLE WEST 12 STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work conducted under this permit. Permit expired. Active permit on file. |
2021-09-10 | No data | FULTON STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | expansion joint sealed |
2021-09-09 | No data | 93 AVENUE, FROM STREET 168 PLACE TO STREET 168 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 428' X 42' X 4" milled & i lane of traffic open in each direction |
2021-09-09 | No data | 168 STREET, FROM STREET 93 AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 428’ X 42’X4" milled & 1 lane of traffic open in each direction |
2021-09-09 | No data | EAST 174 STREET, FROM STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SE4 corner quadrant are functional and accessible. Non ADA compliant. Previously measured and collected in Prism on 1/8/21. |
2021-09-07 | No data | BAY PLAZA, FROM STREET BAYCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done. Permit expired. |
2021-09-07 | No data | 2 AVENUE, FROM STREET EAST 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the NW2 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 9/7/21 |
2021-09-07 | No data | BAYCHESTER AVENUE, FROM STREET BARTOW AVENUE TO STREET BAY PLAZA | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done. Permit expired. |
2021-09-07 | No data | 2 AVENUE, FROM STREET EAST 47 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the Sw1 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 9/7/21 |
2021-09-04 | No data | MICKLE AVENUE, FROM STREET BOSTON ROAD TO STREET TILLOTSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Barricades off the street |
2021-09-03 | No data | BOSTON ROAD, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Portion of curb replace |
2021-09-03 | No data | BOSTON ROAD, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Portion of curb replace |
2021-09-02 | No data | LITTLE WEST 12 STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | NO pedestrian walkway on location |
2021-08-31 | No data | JEROME AVENUE, FROM STREET CLARKE PLACE TO STREET MARCY PLACE | No data | Street Construction Inspections: Active | Department of Transportation | No new work done on the roadway, permit still active. |
2021-08-31 | No data | FLEET PLACE, FROM STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp in the NE3 corner found to be ADA compliant. Measured $& collected in Prism on 8/31/21. |
2021-08-28 | No data | 5 AVENUE, FROM STREET 89 STREET TO STREET 90 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway BPP done in compliance outside a concrete bus pad |
2021-08-28 | No data | 5 AVENUE, FROM STREET 89 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway BPP done in compliance within the intersection |
2021-08-28 | No data | 89 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway BPP done in compliance AKA 8902 5th Ave. |
2021-08-27 | No data | 47 AVENUE, FROM STREET VERNON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started bike lane is clear |
2021-08-27 | No data | 93 AVENUE, FROM STREET 168 PLACE TO STREET 168 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No BPP paving work started at this time of inspection. |
2021-08-27 | No data | 168 STREET, FROM STREET 93 AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No BPP paving work started at this time of inspection. |
2021-08-27 | No data | VERNON BOULEVARD, FROM STREET 47 AVENUE TO STREET 47 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Work not started |
2021-08-27 | No data | VERNON BOULEVARD, FROM STREET 47 AVENUE TO STREET 47 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started bike lane is clear |
2021-08-26 | No data | 89 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP work done and inspected on permit B012021204A61. No further action required. |
2021-08-26 | No data | GRAND STREET, FROM STREET KENT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SW1 corner was found to be non Ada compliant ,however, Ramps are functional and accessible. Previously measured and collected on 10/14/2019. |
2021-08-25 | No data | EASTCHESTER ROAD, FROM STREET BOSTON ROAD TO STREET TILLOTSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plastic barriers use for ped walk |
2021-08-23 | No data | BOSTON ROAD, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No temporary pedestrian walk in roadway |
2021-08-20 | No data | 3 AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w ok |
2021-08-20 | No data | EAST 173 STREET, FROM STREET BATHGATE AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w ok |
2021-08-20 | No data | 3 AVENUE, FROM STREET CLAREMONT PARKWAY TO STREET EAST 172 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w ok |
2021-08-20 | No data | EAST 173 STREET, FROM STREET BATHGATE AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w ok |
2021-08-20 | No data | EAST 172 STREET, FROM STREET BATHGATE AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w ok |
2021-08-18 | No data | BEARD STREET, FROM STREET CONOVER STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb in compliance |
2021-08-17 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - RESET, REPAIR OR REPLACE CURB |
2021-08-16 | No data | 47 AVENUE, FROM STREET 11 STREET TO STREET VERNON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No BPP roadway pavement work observed at this time of inspection. |
2021-08-14 | No data | 29 STREET, FROM STREET SKILLMAN AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Complaint not verified: At Skillman ave & 29th street the roadway has been repaved by means of BBP. Permittee has restored original lane markings and lane structure. sidewalk has not been extended. Roadway is incompliance at time of inspection. |
2021-08-13 | No data | BRONXDALE AVENUE, FROM STREET AMTRAK RR TO STREET POPLAR STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk still in compliance. |
2021-08-13 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly completed tangent ramps within the SE4 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 6/15/21 |
2021-08-10 | No data | 2 AVENUE, FROM STREET EAST 46 STREET TO STREET EAST 47 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site. Jersey barriers covering curb, with partial excavation on adjacent sidewalk flags. Corner property at E 47 St. |
2021-08-10 | No data | EAST 47 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Reset curb for corner property, jersey barriers on edge of sidewalk. |
2021-08-10 | No data | BAY PLAZA, FROM STREET BAYCHESTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Portion of roadway paved |
2021-08-09 | No data | 5 AVENUE, FROM STREET 89 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NW2 corner quad are accessible and functional but not Ada compliant. Previously measured and collected in prism on 7/14/21. |
2021-08-08 | No data | EAST 87 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | secured permit on file M012021194A33 |
2021-08-06 | No data | 2 AVENUE, FROM STREET EAST 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started at this time |
2021-08-06 | No data | TILLOTSON AVENUE, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Stop to inspect sidewalk repair operation. I Spoke to Jason Water Barriers at site, also contractor maintaining 5' clear sidewalk |
2021-08-06 | No data | 2 AVENUE, FROM STREET EAST 47 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started at this time |
2021-08-06 | No data | 2 AVENUE, FROM STREET EAST 47 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2021-08-06 | No data | 2 AVENUE, FROM STREET EAST 46 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2021-08-05 | No data | BANK STREET, FROM STREET WAVERLY PLACE TO STREET WEST 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SIDEWALK |
2021-08-02 | No data | WEST 63 STREET, FROM STREET BROADWAY TO STREET CENTRAL PARK WEST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w fags ok |
2021-08-01 | No data | 89 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP done in compliance |
2021-08-01 | No data | 89 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel faced curb installed in compliance |
2021-07-31 | No data | 5 AVENUE, FROM STREET 89 STREET TO STREET 90 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 100ft by 14ft 4in do to 11ft of concrete bus post down 3in |
2021-07-31 | No data | 89 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 150ft by 20ft including intersection down 3in |
2021-07-31 | No data | 5 AVENUE, FROM STREET 89 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 27ft 20ft down 3in |
2021-07-31 | No data | EAST 80 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb for BPP at 301 E 80 |
2021-07-30 | No data | BATHGATE AVENUE, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w ok |
2021-07-30 | No data | BATHGATE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w ok |
2021-07-27 | No data | VERNON BOULEVARD, FROM STREET 47 AVENUE TO STREET 47 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Work for curb not yet started, for corner new building at 47 Ave. |
2021-07-26 | No data | BAYCHESTER AVENUE, FROM STREET BARTOW AVENUE TO STREET BAY PLAZA | No data | Street Construction Inspections: Active | Department of Transportation | work started and sidewalk cleared |
2021-07-26 | No data | BAYCHESTER AVENUE, FROM STREET BARTOW AVENUE TO STREET BAY PLAZA | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Contractor milled a 156' x 24' portion of the roadway down 3" awaiting to be paved |
2021-07-25 | No data | FULTON STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE SEAL EXPANSIONS JOINTS IN NEW SIDEWALK FLAGS & ALONG NEW CURB - IN FRONT OF 1618-1620 FULTON STREET LEWIS AVE/TROY AVENUE & MARCUS GARVEY BLVD. |
2021-07-23 | No data | FULTON STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb reset |
2021-07-23 | No data | EAST 47 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No pedestrian walkway in the roadway at this time. |
2021-07-22 | No data | BAYCHESTER AVENUE, FROM STREET BARTOW AVENUE TO STREET BAY PLAZA | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No ped ramp work started in the NE3 corner quadrant at time of inspection. Will monitor location. |
2021-07-20 | No data | COLUMBUS AVENUE, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Pavement work is compliant. |
2021-07-19 | No data | FULTON STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced in compliance |
2021-07-19 | No data | BAYCHESTER AVENUE, FROM STREET BARTOW AVENUE TO STREET BAY PLAZA | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No ped ramp work started in the SE4 corner quadrant at time of inspection. Will monitor location. |
2021-07-17 | No data | 47 AVENUE, FROM STREET VERNON BOULEVARD | No data | Street Construction Inspections: Pick-Up | Department of Transportation | No 410 permit on file for the temporary restoration on Se4 corner. We’ll measure and collect at a later date. |
2021-07-17 | No data | 47 AVENUE, FROM STREET 11 STREET TO STREET VERNON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No work started on roadway at time of inspection |
2021-07-17 | No data | 47 AVENUE, FROM STREET VERNON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No work started on roadway at time of inspection |
2021-07-17 | No data | VERNON BOULEVARD, FROM STREET 47 AVENUE TO STREET 47 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | No work started on roadway at time of inspection |
2021-07-16 | No data | 30 STREET, FROM STREET THOMSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BBP flush to grade, not sealed. DOT was notified within the required time frame, as stipulated. AKA 29-10 |
2021-07-16 | No data | BAYCHESTER AVENUE, FROM STREET BARTOW AVENUE TO STREET BAY PLAZA | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired. No ped ramp work started in NE3 corner quadrant at time of inspection. Will monitor location. |
2021-07-16 | No data | THOMSON AVENUE, FROM STREET 30 STREET TO STREET SKILLMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BBP flush to grade, not sealed. DOT was notified within the required time frame, as stipulated. i/f/o 29-10 |
2021-07-16 | No data | SKILLMAN AVENUE, FROM STREET 29 STREET TO STREET THOMSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BBP flush to grade, not sealed. DOT was notified within the required time frame, as stipulated. AKA 29-10 |
2021-07-15 | No data | BOSTON ROAD, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | New curb in place |
2021-07-14 | No data | ROCKWELL PLACE, FROM STREET DE KALB AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | DOT PLANNING & MANAGEMENT COMPLAINT. PLEASE RE-PAINT NYC DOT PLAZA OVER NEWLY PVED ROADWAY- AT ROCKWELL PLACE BETWEEN FULTON STREET & DEKALB AVENUE "AKA" 647 FULTON STREET. (PHOTOS 4& 5 GOOGLE MAPS) |
2021-07-14 | No data | 5 AVENUE, FROM STREET 89 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps within the NW2 corner quadrant are non Ada compliant, however, ramps are functional and accessible. Measuring and collecting in prism on 7/14/21. |
2021-07-13 | No data | 29 STREET, FROM STREET SKILLMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work not started in the intersection for BPP street paving. |
2021-07-13 | No data | SKILLMAN AVENUE, FROM STREET 29 STREET TO STREET THOMSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work not started for BPP street paving. |
2021-07-11 | No data | WILLOUGHBY STREET, FROM STREET ASHLAND PLACE TO STREET FLEET STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass.. new curb |
2021-07-11 | No data | FLEET PLACE, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PASS .. NEW S/W |
2021-07-08 | No data | EAST 47 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work done. |
2021-07-08 | No data | WEST 44 STREET, FROM STREET 8 AVENUE TO STREET SHUBERT ALLEY | No data | Street Construction Inspections: Active | Department of Transportation | No work done. |
2021-07-07 | No data | 2 AVENUE, FROM STREET EAST 46 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2021-07-07 | No data | 2 AVENUE, FROM STREET EAST 47 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2021-07-07 | No data | EAST 139 STREET, FROM STREET ALEXANDER AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb reset replace |
2021-07-05 | No data | GRAND STREET, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAVE OK |
2021-07-03 | No data | 30 STREET, FROM STREET THOMSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started |
2021-07-03 | No data | THOMSON AVENUE, FROM STREET 30 STREET TO STREET SKILLMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started on roadway |
2021-06-30 | No data | COLUMBUS AVENUE, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Restoration complete. In front of the shade store and benefit San Francisco. |
2021-06-30 | No data | AMSTERDAM AVENUE, FROM STREET WEST 78 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Corner was previously under OLIVEIRA CONTRACTING, INC. under contract HWPR19M. |
2021-06-29 | No data | 59 STREET, FROM STREET 47 AVENUE TO STREET 48 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | S/w expansion joints sealed |
2021-06-28 | No data | BOSTON ROAD, FROM STREET EASTCHESTER ROAD TO STREET MICKLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | roadway clear |
2021-06-24 | No data | ROCKWELL PLACE, FROM STREET DE KALB AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RE-PAVE OK |
2021-06-24 | No data | HUDSON STREET, FROM STREET MORTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed Apex ramp in the SW1 corner found not to be Ada compliant, Ramp is accessible, functional measured and collected on 11/1/19. |
2021-06-23 | No data | 47 AVENUE, FROM STREET 11 STREET TO STREET VERNON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | New sidewalk and steel faced curb installed at corner building 4701. Expansion joints installed at curb and every 20 ft, but not yet sealed. |
2021-06-23 | No data | VERNON BOULEVARD, FROM STREET 47 AVENUE TO STREET 47 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Work not started. |
2021-06-23 | No data | EAST 137 STREET, FROM STREET ST ANNS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | "FROM KERRY - THIS PERMIT IS FOR THE SW1 CORNER, NOT SE" |
2021-06-23 | No data | BAYCHESTER AVENUE, FROM STREET BARTOW AVENUE TO STREET BAY PLAZA | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No ped ramp work started in NE3 corner quadrant at time of inspection. Will monitor location. |
2021-06-22 | No data | BAYCHESTER AVENUE, FROM STREET BARTOW AVENUE TO STREET BAY PLAZA | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No ped ramp work started in the SE4 corner quadrant at time of inspection. Will reinspect at a later date. |
2021-06-22 | No data | BAY PLAZA, FROM STREET BAYCHESTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No ped ramp work started in the NE3 corner quadrant at time of inspection. Will reinspect at a later date. |
2021-06-22 | No data | VARICK STREET, FROM STREET WEST HOUSTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NW2 corner quadrant was found not to be Ada compliant, Ramps are accessible and functional measured and collected in prism on 6/20/20 |
2021-06-22 | No data | 132 STREET, FROM STREET 15 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Multiple flags on East sidewalk restored in kind. |
2021-06-20 | No data | CLARKSON STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O Building #225 steel face curb installed and in compliance. |
2021-06-19 | No data | FULTON STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDE WALK FLAGS INSTALLED |
2021-06-18 | No data | AMSTERDAM AVENUE, FROM STREET WEST 153 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps are functional and accessible. Non Ada compliant. Measured and updated collector on 10/11/19. |
2021-06-18 | No data | AMSTERDAM AVENUE, FROM STREET WEST 155 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps are functional and accessible. Non Ada compliant. Measured on and updated collector on 10/16/19. |
2021-06-18 | No data | 47 AVENUE, FROM STREET VERNON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No BPP roadway pavement work observed at this time of inspection. |
2021-06-17 | No data | 47 AVENUE, FROM STREET 11 STREET TO STREET VERNON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No BPP roadway pavement work observed at this time of inspection. |
2021-06-17 | No data | EAST 87 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | occupancy of sidewalk in use at time of inspection. |
2021-06-17 | No data | VERNON BOULEVARD, FROM STREET 47 AVENUE TO STREET 47 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | No BPP roadway work observed at this time of inspection. |
2021-06-17 | No data | EAST 87 STREET, FROM STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant are functional and accessible. Non Ada compliant. Measured in Prism on 8/3/20. |
2021-06-17 | No data | ST ANNS AVENUE, FROM STREET EAST 135 STREET TO STREET EAST 137 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w ok |
2021-06-17 | No data | EAST 6 STREET, FROM STREET AVENUE B TO STREET AVENUE C | No data | Street Construction Inspections: Active | Department of Transportation | No BPP street pave work started |
2021-06-17 | No data | 47 AVENUE, FROM STREET VERNON BOULEVARD | No data | Street Construction Inspections: Pick-Up | Department of Transportation | No 411 permit on file. Temporary asphalt restoration within the SE4 corner, existing ramps are functional and accessible. We’ll reinspect at later date when ramps are completed. |
2021-06-16 | No data | 2 AVENUE, FROM STREET EAST 74 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the SE4 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 12/9/20 |
2021-06-16 | No data | AMSTERDAM AVENUE, FROM STREET WEST 79 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started at this time |
2021-06-15 | No data | COLUMBUS AVENUE, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk flags have been restored and sealed properly in front of 313. |
2021-06-15 | No data | VARICK STREET, FROM STREET 7 AVENUE SOUTH TO STREET DOWNING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O Building #225 steel face curb installed and in compliance. |
2021-06-15 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the SE4 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 6/15/21 |
2021-06-10 | No data | 29 STREET, FROM STREET SKILLMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work not started in the roadway |
2021-06-10 | No data | SKILLMAN AVENUE, FROM STREET 29 STREET TO STREET THOMSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | New sidewalk and curb in front of the 29-10 Thomson Ave . From 29 street to 30th st |
2021-06-10 | No data | WEST 78 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | New curb has been installed for property. On north swk, closer to amsterdam Ave. no obstruction to conventional bike lane |
2021-06-09 | No data | BANK STREET, FROM STREET WAVERLY PLACE TO STREET WEST 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O Building #26 Full frontage Blue stone sidewalk repaired and in compliance. |
2021-06-08 | No data | FLEET PLACE, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW CURB OK - OFF ECL |
2021-06-07 | No data | VARICK STREET, FROM STREET CHARLTON STREET TO STREET VANDAM STREET | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR SIDEWALK: S/W shed at this location |
2021-06-07 | No data | COLUMBUS AVENUE, FROM STREET WEST 96 STREET TO STREET WEST 97 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Remove plastic caps |
2021-06-07 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O aka Building #435 Hudson corner property full width of sidewalk replaced. expansion installed / sealed. |
2021-06-06 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | AKA 3 9th Ave sidewalk flags repaired and in compliance. |
2021-06-05 | No data | FULTON STREET, FROM STREET ROCKWELL PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | rw paved 1\2 +5 |
2021-06-03 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O Building #3 Steel face curb installed and in compliance. |
2021-06-02 | No data | EAST 80 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb reset and replaced |
2021-06-01 | No data | AMSTERDAM AVENUE, FROM STREET WEST 78 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Corner was previously under OLIVEIRA CONTRACTING, INC. under contract HWPR19M. Will monitor for any changes |
2021-06-01 | No data | 2 AVENUE, FROM STREET EAST 80 STREET TO STREET EAST 81 STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Temp restoration has been brought up to grade and made perm. |
2021-05-28 | No data | EAST 80 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Rwy recently resurfaced for BPP. Lane markings restored, no obstruction to bike lane |
2021-05-28 | No data | 2 AVENUE, FROM STREET EAST 80 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Pavement of intersection is performed. Lane markings restored, not green bike paint. Bike lane is up & running |
2021-05-28 | No data | 2 AVENUE, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Re-pavement for street not performed. Protected bike lane is up & running |
2021-05-28 | No data | FULTON STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW CURB OK - NP |
2021-05-28 | No data | FULTON STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | RE-PAVE OK |
2021-05-27 | No data | 2 AVENUE, FROM STREET EAST 81 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 5/27/21 |
2021-05-26 | No data | COLUMBUS AVENUE, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET | No data | Street Construction Inspections: Active | Department of Transportation | In front of 313 Columbus Ave. permit still active. Work not done. Bike lane clear |
2021-05-26 | No data | 47 AVENUE, FROM STREET 11 STREET TO STREET VERNON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Permittee has swk closed but created a temp walkway on road with yodocks as protection |
2021-05-26 | No data | 2 AVENUE, FROM STREET EAST 74 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the SE4 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 12/9/20. Refer to permit M042020296A01 for future inspection remarks |
2021-05-24 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O Building #55 Granite Sidewalk installed and in compliance. |
2021-05-21 | No data | EAST 80 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2021-05-21 | No data | FULTON STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | ROADWAY CURB TO CURB IS 41FT 8IN MILLED ROADWAY IS 140FT X 26FT 3IN WITH A DEPTH OF 3 INCHES CREW IS PREPARING TO PAVE |
2021-05-20 | No data | ROCKWELL PLACE, FROM STREET DE KALB AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RE-PAVE OK ENTIRE SEGMENT 1/2+5 FT- OK BUS LANE RE-PAINTED& ALL LANE MARKINGS RESTORED |
2021-05-20 | No data | VERNON BOULEVARD, FROM STREET 47 AVENUE TO STREET 47 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Restorement of curb not performed for new building ops on corner. Bike lane is up & running |
2021-05-20 | No data | WEST 128 STREET, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS TERRACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | timber barrier are being utilized by private person at property, I spoke to Emrush Manager Agent of 410 W128st he informed they will have barriers removed and placed on property. |
2021-05-20 | No data | ASHLAND PLACE, FROM STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RE-PAVE OK ENTIRE SEGMENT 1/2+5 FT- OK BUS LANE RE-PAINTED& ALL LANE MARKINGS RESTORED |
2021-05-20 | No data | FULTON STREET, FROM STREET ASHLAND PLACE TO STREET ROCKWELL PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RE-PAVE OK ENTIRE SEGMENT 1/2+5 FT- OK BUS LANE RE-PAINTED& ALL LANE MARKINGS RESTORED |
2021-05-19 | No data | 47 AVENUE, FROM STREET VERNON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No work started. No work done. No inspection found at this time. |
2021-05-19 | No data | COLUMBUS AVENUE, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Vault construction or alteration IFO house #313 has a temporary yellow PED walkway on sidewalk with white yodock barriers blocking work area on sidewalk. Bike lane clear. |
2021-05-19 | No data | FLEET PLACE, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW CURB OK - OFF ECL |
2021-05-19 | No data | WILLOUGHBY STREET, FROM STREET ASHLAND PLACE TO STREET FLEET STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW SIDEWALK VAULT & NEW DUCTS UNDER SWK BY BUILDING OPERATION HUNTER ROBERTS AT 196 WILLOUGHBY STREET OFF SCL |
2021-05-18 | No data | VERNON BOULEVARD, FROM STREET 47 AVENUE TO STREET 47 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | No work started. No work done. No inspection found at this time. |
2021-05-18 | No data | EAST 6 STREET, FROM STREET AVENUE B TO STREET AVENUE C | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2021-05-18 | No data | 47 AVENUE, FROM STREET 11 STREET TO STREET VERNON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No work started. No work done. No inspection found at this time. |
2021-05-17 | No data | EAST 80 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sealed joints |
2021-05-16 | No data | FULTON STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK DONE NEW PERMIT ON FILE |
2021-05-14 | No data | EAST 138 STREET, FROM STREET ALEXANDER AVENUE TO STREET LINCOLN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | replace reset curb |
2021-05-13 | No data | 2 AVENUE, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Paving work is within permit stipulations. |
2021-05-12 | No data | 29 STREET, FROM STREET 47 AVENUE TO STREET SKILLMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO NOTIFY THE NYC DOT HIQA BOROUGH OFFICE WITHIN 4 HOURS PRIOR TO PAVING NO NOTIFICATION WAS MADE AND WAS STREET PAVED AS PER 1/2 +5’ STIP. |
2021-05-12 | No data | 2 AVENUE, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work in front of 301 E. 80th St. is within permit stipulations. |
2021-05-12 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O Building #55 Granite sidewalk flags are in compliance. |
2021-05-12 | No data | VARICK STREET, FROM STREET CHARLTON STREET TO STREET VANDAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SIDEWALK |
2021-05-11 | No data | BANK STREET, FROM STREET WAVERLY PLACE TO STREET WEST 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O Building #26 work not done permit expired. |
2021-05-10 | No data | 47 AVENUE, FROM STREET 11 STREET TO STREET VERNON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Work on sidewalk for new building, barricaded with jersey barriers. 10 ft of sidewalk open. |
2021-05-10 | No data | COLUMBUS AVENUE, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET | No data | Street Construction Inspections: Active | Department of Transportation | IFO OF HOUSE 313 A Yellow ramp/platform on sidewalk is in compliance. White yodock barriers also present on sidewalk. Bike lane clear. |
2021-05-10 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F//O 60-74, full sidewalk newly reconstructed. |
2021-05-10 | No data | ST ANNS AVENUE, FROM STREET EAST 135 STREET TO STREET EAST 137 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb reset & replace |
2021-05-10 | No data | AMSTERDAM AVENUE, FROM STREET WEST 78 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started at this time |
2021-05-10 | No data | VERNON BOULEVARD, FROM STREET 47 AVENUE TO STREET 47 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Work on sidewalk for new building, barricaded with jersey barriers. 10 ft of sidewalk open. |
2021-05-09 | No data | CANAL STREET, FROM STREET HUDSON STREET TO STREET WATTS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel faced curb installed and free of defects, AKA 205 Hudson Street on Canal Street |
2021-05-07 | No data | FULTON STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK FOUND |
2021-05-06 | No data | BATHGATE AVENUE, FROM STREET CLAREMONT PARKWAY TO STREET EAST 172 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2021-05-06 | No data | BATHGATE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2021-05-05 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Granite curb installed and in compliance. |
2021-05-04 | No data | 2 AVENUE, FROM STREET EAST 80 STREET TO STREET EAST 81 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O The respondent failed to permanently restore 10” of roadway adjacent to newly installed curb. Roadway was left down 2”, dirt exposed awaiting to be restored in permanent asphalt. Last permit on file expired 12-14-2020. |
2021-05-02 | No data | FULTON STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK FOUND PERMIT EXPIRED |
2021-05-01 | No data | COLUMBUS AVENUE, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Yellow ramp/platform on sidewalk IFO OF HOUSE 313 is in compliance. Bike lane clear. |
2021-04-30 | No data | 5 AVENUE, FROM STREET 89 STREET TO STREET 90 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed. |
2021-04-30 | No data | 89 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed. AKA 8902. |
2021-04-30 | No data | AMSTERDAM AVENUE, FROM STREET WEST 99 STREET TO STREET WEST 100 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete curb installed. |
2021-04-29 | No data | AMSTERDAM AVENUE, FROM STREET WEST 78 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2021-04-28 | No data | FULTON STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK DONE NEW PERMIT ON FILE |
2021-04-24 | No data | EAST 173 STREET, FROM STREET BATHGATE AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2021-04-24 | No data | BATHGATE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2021-04-24 | No data | BATHGATE AVENUE, FROM STREET CLAREMONT PARKWAY TO STREET EAST 172 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Not done |
2021-04-24 | No data | EAST 172 STREET, FROM STREET BATHGATE AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done |
2021-04-24 | No data | WASHINGTON AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2021-04-24 | No data | EAST 173 STREET, FROM STREET BATHGATE AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2021-04-24 | No data | 3 AVENUE, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Pass |
2021-04-24 | No data | VARICK STREET, FROM STREET CHARLTON STREET TO STREET VANDAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - REPAIR SIDEWALK |
2021-04-24 | No data | EAST 174 STREET, FROM STREET BATHGATE AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2021-04-24 | No data | 3 AVENUE, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not complete. Inspection on new permit |
2021-04-23 | No data | ROCKWELL PLACE, FROM STREET DE KALB AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | OWNER & 3 MAN CREW ON SITE TO BEGIN TO RAMP CROSSWALKS, HARDWARE , EDGES OF MILLED RWY IN INTERSECTIONS- EVERYTHING WAS MARKED OUT - ROADWAY WILL BE PAVED TONIGHT AFTER 9PM |
2021-04-23 | No data | ASHLAND PLACE, FROM STREET FULTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | MILLED ROADWAY IN A TEMPORARY STATE DOWN 3 - 3 1/2 INCHES IN INTERSECTION OF ROADWAY- PLEASE RAMP AROUND ACCESS OPENING IN INTERSECTION OF ROADWAY AT FULTON STREET & ASHLAND PLACE. |
2021-04-23 | No data | FULTON STREET, FROM STREET ASHLAND PLACE TO STREET ROCKWELL PLACE | No data | Street Construction Inspections: Active | Department of Transportation | MILLED ROADWAY IN TEMPORARY STATE DOWN 2 1/2 INCHES IN CROSSWALK OF ROADWAY & MILLED ROADWAY IN DRIVING LANE DOWN 2 1/2- 3 1/2 INCHES AT 230 ASHLAND PLACE BETWEEN FULTON STREET & DeKALB AVENUE. PROPERLY RE-RAMP ROADWAY IN CROSSWALK & DRIVING LANE. |
2021-04-23 | No data | FULTON STREET, FROM STREET ROCKWELL PLACE | No data | Street Construction Inspections: Active | Department of Transportation | MILLED ROADWAY IN TEMPORARY STATE DOWN 2- 2 1/2 INCHES IN INTERSECTION OF ROADWAY AT FULTON STREET & ROCKWELL PLACE. PLEASE RAMPED EDGES OF MILLED ROADWAY FOR SAFE VEHICLE TRAVEL. |
2021-04-23 | No data | ROCKWELL PLACE, FROM STREET DE KALB AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | MILLED ROADWAY IN A TEMPORARY STATE DOWN 2 1/4 - 2 1/2 INCHES IN CROSSWALK OF ROADWAY- AT ROCKWELL PLACE BETWEEN FULTON STREET & DeKALB AVENUE. PLEASE PROPERLY RAMP CROSSWALK FOR SAFE PEDESTRIAN TRAVEL. |
2021-04-23 | No data | ASHLAND PLACE, FROM STREET FULTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | OWNER & 3 MAN CREW ON SITE TO BEGIN TO RAMP CROSSWALKS, HARDWARE , EDGES OF MILLED RWY IN INTERSECTIONS- EVERYTHING WAS MARKED OUT - ROADWAY WILL BE PAVED TONIGHT AFTER 9PM |
2021-04-23 | No data | FULTON STREET, FROM STREET ASHLAND PLACE TO STREET ROCKWELL PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | OWNER & 3 MAN CREW ON SITE TO BEGIN TO RAMP CROSSWALKS, HARDWARE , EDGES OF MILLED RWY IN INTERSECTIONS- EVERYTHING WAS MARKED OUT - ROADWAY WILL BE PAVED TONIGHT AFTER 9PM |
2021-04-18 | No data | WEST 79 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I/F/O #200 expansion joints on newly installed sidewalk have been sealed. |
2021-04-16 | No data | 3 AVENUE, FROM STREET CLAREMONT PARKWAY TO STREET EAST 172 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2021-04-15 | No data | WEST 78 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk occupied as stipulated. |
2021-04-15 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Near 52-58, curb to curb cobblestone BPP is acceptable. |
2021-04-12 | No data | AMSTERDAM AVENUE, FROM STREET WEST 79 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Caps was removed and expansion joints throughout the corner was sealed. |
2021-04-10 | No data | FULTON STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | NEW SWK AT NEW BUILDING NOT SEALED & WRONG SPECIFIC LOCATION ON PERMIT |
2021-04-08 | No data | GRAND STREET, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest Accepted. roadway was paved half plus feet and lane marking restored on Cyclomedia June2020 photo. roadway was then repaved curb to curb lane marking not restored. |
2021-04-06 | No data | 47 AVENUE, FROM STREET 59 PLACE TO STREET 59 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | S/w expansion joints sealed |
2021-04-03 | No data | WEST 128 STREET, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS TERRACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | timber barrier not removed. |
2021-04-01 | No data | FULTON STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2021-03-31 | No data | EAST 87 STREET, FROM STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant are functional and accessible. Non ADA compliant. Previously measured and collected in Prism on 8/3/20. Newer permit M042020237A11 on file |
2021-03-31 | No data | EAST 174 STREET, FROM STREET BATHGATE AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk is clear at this time. |
2021-03-30 | No data | EAST 174 STREET, FROM STREET BATHGATE AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No temporary pedestrian walk at this time sidewalk is clear. |
2021-03-29 | No data | EAST 137 STREET, FROM STREET ST ANNS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SW1 corner quadrant are functional and accessible. ADA compliant. Previously measured and collected in Prism on 3/27/20. Newer permit X042020092A33 on file |
2021-03-28 | No data | EAST 6 STREET, FROM STREET AVENUE B TO STREET AVENUE C | No data | Street Construction Inspections: Active | Department of Transportation | New sidewalk acceptable |
2021-03-26 | No data | COLUMBUS AVENUE, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit M012021075A48 on file. |
2021-03-26 | No data | EAST 81 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w flags good; expansion joints sealed |
2021-03-24 | No data | AMSTERDAM AVENUE, FROM STREET WEST 100 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the SW1 corner quadrant are functional and accessible. Non ADA compliant. Measured and collected on 03/24/21. |
2021-03-24 | No data | WILLOUGHBY STREET, FROM STREET ASHLAND PLACE TO STREET FLEET STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW SWK OFF NCL |
2021-03-24 | No data | DESBROSSES STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESET, REPAIR OR REPLACE CURB |
2021-03-23 | No data | WEST 78 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags have not been fully replaced |
2021-03-17 | No data | 2 AVENUE, FROM STREET EAST 80 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner quadrant are functional, but not accessible due to active BPP work within corner quadrant. Will measure and collect at a later date when work is complete. |
2021-03-17 | No data | COLUMBUS AVENUE, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit M012021042A18 on file |
2021-03-17 | No data | GRAND STREET, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE RESTORE CROSSWALK LANE MARKINGS OVER RE-PAVED ROADWAY ON GRAND STREET. |
2021-03-17 | No data | EAST 80 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In front of building #301 E. 80th Street, please remove white plastic caps, and properly seal expansion joints on sidewalk. |
2021-03-16 | No data | FULTON STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Steel curb installed |
2021-03-15 | No data | DESBROSSES STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESET, REPAIR OR REPLACE CURB |
2021-03-15 | No data | CANAL STREET, FROM STREET HUDSON STREET TO STREET WATTS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESET, REPAIR OR REPLACE CURB |
2021-03-15 | No data | FULTON STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No BPP work on roadway. |
2021-03-09 | No data | VARICK STREET, FROM STREET CHARLTON STREET TO STREET VANDAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O Building #160 (4) sidewalk flags repaired and in compliance. |
2021-03-05 | No data | HUDSON STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed apex ramp in the NW2 corner quadrant are functional and accessible. Non ADA compliant. Previously measured and collected on 11/6/19. |
2021-03-05 | No data | AMSTERDAM AVENUE, FROM STREET WEST 153 STREET TO STREET WEST 154 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb in compliance. |
2021-03-04 | No data | FULTON STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb installed. |
2021-03-04 | No data | EAST 87 STREET, FROM STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner quadrant are functional and accessible. Non ADA compliant. Previously measured and collected in Prism on 6/19/20. Newer permit M042020237A11 on file |
2021-03-02 | No data | 3 AVENUE, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET | No data | Street Construction Inspections: Active | Department of Transportation | not on site at time |
2021-03-02 | No data | PARK AVENUE, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Still in progress sidewalk vaulted within building property fenced off |
2021-03-02 | No data | EAST 174 STREET, FROM STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SE4 corner quadrant are functional and accessible. Non ADA compliant. Previously measured and collected in Prism on 1/8/21. Newer permit X042021028A04 on file |
2021-03-01 | No data | 2 AVENUE, FROM STREET EAST 80 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started at this time |
2021-02-26 | No data | 1 AVENUE, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb incompliance at time of inspection. |
2021-02-24 | No data | BATHGATE AVENUE, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk in compliance |
2021-02-24 | No data | EAST 174 STREET, FROM STREET BATHGATE AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk in compliance |
2021-02-24 | No data | EAST 174 STREET, FROM STREET BATHGATE AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk ok |
2021-02-24 | No data | WASHINGTON AVENUE, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk ok |
2021-02-24 | No data | CLARKE PLACE, FROM STREET GRAND CONCOURSE TO STREET WALTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | In compliance |
2021-02-24 | No data | CLARKE PLACE, FROM STREET GRAND CONCOURSE TO STREET WALTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Updated permit X012021042A07 |
2021-02-22 | No data | CLARKE PLACE, FROM STREET GRAND CONCOURSE TO STREET WALTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk partially replaced |
2021-02-19 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 60-74, curb to curb cobblestone restoration is acceptable. |
2021-02-16 | No data | 89 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Currently no pedestrian walkway. Area is in compliance. |
2021-02-10 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Cobblestone BPP completed and acceptable. Asphalt portion of crosswalk near Washington has been restored as part of BPP. |
2021-02-10 | No data | WEST 76 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel face curb remains in acceptable condition. No defects to report |
2021-02-09 | No data | 3 AVENUE, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET | No data | Street Construction Inspections: Active | Department of Transportation | s/w not occupied |
2021-02-09 | No data | BATHGATE AVENUE, FROM STREET CLAREMONT PARKWAY TO STREET EAST 172 STREET | No data | Street Construction Inspections: Active | Department of Transportation | ped /walk not visible |
2021-02-09 | No data | 3 AVENUE, FROM STREET CLAREMONT PARKWAY TO STREET EAST 172 STREET | No data | Street Construction Inspections: Active | Department of Transportation | s/w not occupied |
2021-02-09 | No data | BATHGATE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET | No data | Street Construction Inspections: Active | Department of Transportation | ped /walk not visible |
2021-02-08 | No data | WASHINGTON AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk replaced however, unable to properly inspect due to snow |
2021-02-08 | No data | EAST 174 STREET, FROM STREET BATHGATE AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk not done at this time |
2021-02-08 | No data | EAST 174 STREET, FROM STREET BATHGATE AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Unable to properly inspect due to snow |
2021-02-08 | No data | 3 AVENUE, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work done at this time |
2021-02-08 | No data | EAST 173 STREET, FROM STREET BATHGATE AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk not done on this side of segment |
2021-02-08 | No data | WASHINGTON AVENUE, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk currently being worked on.5ft pedestrian walk open to pedestrians |
2021-02-08 | No data | EAST 173 STREET, FROM STREET BATHGATE AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk has not been done on this side of segment |
2021-02-08 | No data | EAST 172 STREET, FROM STREET BATHGATE AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk not done on this segment |
2021-02-08 | No data | 3 AVENUE, FROM STREET CLAREMONT PARKWAY TO STREET EAST 172 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk not done at this time |
2021-02-08 | No data | BATHGATE AVENUE, FROM STREET CLAREMONT PARKWAY TO STREET EAST 172 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work done at this time on this segment |
2021-02-08 | No data | BATHGATE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started |
2021-02-07 | No data | 89 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temporary walkway not being used, at time of inspection. |
2021-02-06 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work not started, sidewalk shed present. |
2021-02-05 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | From 52-58, curb to curb cobblestone BPP was completed. No defects at this time. |
2021-02-05 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Materials is within the work area. |
2021-02-05 | No data | CLARKE PLACE, FROM STREET GRAND CONCOURSE TO STREET WALTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk open to pedestrians |
2021-02-05 | No data | 89 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk is occupied |
2021-01-29 | No data | COLUMBUS AVENUE, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit M012021019B48 on file |
2021-01-29 | No data | 89 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk is occupied |
2021-01-29 | No data | AMSTERDAM AVENUE, FROM STREET WEST 78 STREET TO STREET WEST 79 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags have been fully replaced. No defects to report |
2021-01-27 | No data | 3 AVENUE, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2021-01-27 | No data | 3 AVENUE, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Updated permit X042020366A02 |
2021-01-27 | No data | BATHGATE AVENUE, FROM STREET CLAREMONT PARKWAY TO STREET EAST 172 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk not done on this side of segment |
2021-01-27 | No data | FULTON STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK FOUND NEW PERMIT ON FILE |
2021-01-27 | No data | 3 AVENUE, FROM STREET CLAREMONT PARKWAY TO STREET EAST 172 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at this side of segment at this time |
2021-01-18 | No data | WASHINGTON STREET, FROM STREET GANSEVOORT STREET TO STREET HORATIO STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 134'x22' & 2-3" in depth BPP for corner property at 60 -74 Gansevoort St. completed and in compliance. There is a square and circular covers that were buried with crosswalk - pre existent. |
2021-01-15 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Cobblestone BPP completed and acceptable. Asphalt added at end of restoration near Washington that needs to be sealed. Permit remains active at this time. |
2021-01-14 | No data | EAST 87 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Not done yet vaulted sidewalk still in progress |
2021-01-14 | No data | FULTON STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No new work done on the roadway, permit still active. |
2021-01-14 | No data | EAST 174 STREET, FROM STREET 3 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | work done by other |
2021-01-13 | No data | BATHGATE AVENUE, FROM STREET CLAREMONT PARKWAY TO STREET EAST 172 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | active permit X042020353A03. sidewalk expansion joints have been sealed. |
2021-01-13 | No data | BATHGATE AVENUE, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | active permit X042020353A03. sidewalk expansion joints have been sealed. |
2021-01-12 | No data | WASHINGTON STREET, FROM STREET CANAL STREET TO STREET WATTS STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2021-01-08 | No data | EAST 174 STREET, FROM STREET BATHGATE AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done only markings on the sidewalk seen |
2021-01-08 | No data | COLUMBUS AVENUE, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit M012020350A24 on file |
2021-01-08 | No data | EAST 174 STREET, FROM STREET BATHGATE AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done. Only markings on the sidewalk seen |
2021-01-08 | No data | WASHINGTON AVENUE, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done.Only markings on the sidewalk seen |
2021-01-08 | No data | AMSTERDAM AVENUE, FROM STREET WEST 78 STREET TO STREET WEST 79 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit M042020350A00 on file. |
2021-01-08 | No data | EAST 174 STREET, FROM STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps in the SE4 corner quadrant was found not to be Ada compliant, Ramps are accessible and functional measured and collected in prism on 1/8/21. |
2021-01-07 | No data | EAST 80 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel faced curb in compliance |
2021-01-07 | No data | AMSTERDAM AVENUE, FROM STREET WEST 79 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps within the SW1 corner quadrant are ADA compliant. Measured in prism on 1/7/21. |
2021-01-07 | No data | EAST 173 STREET, FROM STREET BATHGATE AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at this time |
2021-01-06 | No data | BATHGATE AVENUE, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plastic cap covering expansion joints need to be removed, once removed expansion joints need to be properly sealed |
2021-01-06 | No data | BATHGATE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work being done actively |
2021-01-06 | No data | BATHGATE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Updated permit X042020353A06 |
2021-01-06 | No data | 3 AVENUE, FROM STREET CLAREMONT PARKWAY TO STREET EAST 172 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No sidewalk work done |
2021-01-06 | No data | 3 AVENUE, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No sidewalk done on neither sides of segment |
2021-01-06 | No data | BATHGATE AVENUE, FROM STREET CLAREMONT PARKWAY TO STREET EAST 172 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk expansion joints need to be recessed and properly sealed throughout segment |
2021-01-05 | No data | 89 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk is occupied |
2020-12-20 | No data | 89 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk Closure in Compliance |
2020-12-18 | No data | FULTON STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | THERE IS CURRENTLY NO WALKWAY IN THE ROADWAY. |
2020-12-16 | No data | LORIMER STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW paved. In compliance at his time |
2020-12-15 | No data | FULTON STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No BPP paving work done at the time of inspection, barricades are in parking lane of inspection. |
2020-12-14 | No data | WASHINGTON STREET, FROM STREET GANSEVOORT STREET TO STREET HORATIO STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2020-12-14 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2020-12-14 | No data | 2 AVENUE, FROM STREET EAST 80 STREET TO STREET EAST 81 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2020-12-14 | No data | EAST 80 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2020-12-14 | No data | 2 AVENUE, FROM STREET EAST 80 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2020-12-14 | No data | 89 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk is being occupied. |
2020-12-13 | No data | WASHINGTON STREET, FROM STREET CANAL STREET TO STREET WATTS STREET | No data | Street Construction Inspections: Active | Department of Transportation | No new work done on the roadway, permit still active. |
2020-12-13 | No data | 5 AVENUE, FROM STREET 89 STREET TO STREET 90 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No curb was repaired in front of 8902 5 Avenue. No work done, permit expired. |
2020-12-11 | No data | SOUTH 5 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Blue steel face curb intact, no defects at this time. |
2020-12-11 | No data | 2 AVENUE, FROM STREET EAST 80 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2020-12-11 | No data | 2 AVENUE, FROM STREET EAST 80 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Duplicate permit. Refer to permit M042020318A02 for inspection remarks |
2020-12-09 | No data | AMSTERDAM AVENUE, FROM STREET WEST 79 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Old existing tangent ramps within SW1 corner quadrant. |
2020-12-09 | No data | AMSTERDAM AVENUE, FROM STREET WEST 78 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps within the NW2 corner quadrant are functional but not accessible due to barricade. Will measure at later date |
2020-12-09 | No data | 2 AVENUE, FROM STREET EAST 74 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Duplicate permit. Refer to permit M042020296A01 for inspection remarks |
2020-12-08 | No data | EAST 174 STREET, FROM STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No ped ramp work started at time of inspection. Will reinspect at a later date. |
2020-12-07 | No data | EAST 137 STREET, FROM STREET ST ANNS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NE corner |
2020-12-06 | No data | WEST 78 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012020321A65-updated permit |
2020-12-06 | No data | WEST 79 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w joint seal. |
2020-12-06 | No data | 59 STREET, FROM STREET 47 AVENUE TO STREET 48 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | failed to seal expansion joints at new sidewalk flags. |
2020-12-06 | No data | 47 AVENUE, FROM STREET 59 PLACE TO STREET 59 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | failed to seal expansion joints at new sidewalk flags. |
2020-12-03 | No data | 89 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No new work done on the roadway, permit still active. |
2020-12-02 | No data | AMSTERDAM AVENUE, FROM STREET WEST 78 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started at this time |
2020-12-02 | No data | AMSTERDAM AVENUE, FROM STREET WEST 155 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps are functional and accessible. Non Ada compliant. Measured on and updated collector on 10/16/19. |
2020-12-02 | No data | EAST 137 STREET, FROM STREET ST ANNS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SE4 Corner quadrant has been measured and collected in prism under permit #X042020092A32. |
2020-12-02 | No data | AMSTERDAM AVENUE, FROM STREET WEST 153 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps are functional and accessible. Non Ada compliant. Measured and updated collector on 10/11/19. |
2020-12-01 | No data | EAST 74 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plastic caps not removed. |
2020-12-01 | No data | EAST 87 STREET, FROM STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant are functional and accessible. Non Ada compliant. Measured in Prism on 8/3/20. |
2020-12-01 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Old existing tangent ramps within the SW1 corner quadrant are functional and accessible |
2020-11-28 | No data | 30 STREET, FROM STREET 47 AVENUE TO STREET THOMSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent paved a portion of the roadway at the sited location without notifying the NYC DOT HIQA borough office within 4 hours prior to paving as per stipulation 1/2+5 |
2020-11-28 | No data | 29 STREET, FROM STREET 47 AVENUE TO STREET SKILLMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2020-11-27 | No data | TIEBOUT AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk replaced |
2020-11-24 | No data | 31 STREET, FROM STREET 49 AVENUE TO STREET BORDEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb restored expansion joints sealed |
2020-11-23 | No data | 5 AVENUE, FROM STREET 89 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No BPP paving work done at the time of inspection, barricades are in parking lane of location. |
2020-11-23 | No data | 5 AVENUE, FROM STREET 89 STREET TO STREET 90 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No BPP paving work done at the time of inspection. |
2020-11-23 | No data | WEST 78 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | spoke to the foreman explained to him he is was previously issued summons, he then told me he get permits for the roadway & remove private vehicle from worksite. Follow up inspection will be done. |
2020-11-23 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Cobblestone restoration is almost completed. Small portion near utility access cover in parking lane need to be restored. No crew on site today. Photos taken. |
2020-11-21 | No data | WEST 78 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Pick-Up | Department of Transportation | r/w occ. w/o a permit. |
2020-11-21 | No data | WEST 78 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | Respondent is violating stip #103, private vehicle parked within site. |
2020-11-21 | No data | AMSTERDAM AVENUE, FROM STREET WEST 153 STREET TO STREET WEST 154 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no defects found on sidewalk |
2020-11-20 | No data | PARK AVENUE, FROM STREET EAST 107 STREET TO STREET EAST 108 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w in compliance |
2020-11-19 | No data | 5 AVENUE, FROM STREET 89 STREET TO STREET 90 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk occupancy in compliance |
2020-11-18 | No data | WEST 128 STREET, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS TERRACE | No data | Street Construction Inspections: Complaint | Department of Transportation | Please remove timber wood barricades and jersey barriers left on sidewalk serving no purpose. IFO building 410 |
2020-11-17 | No data | 2 AVENUE, FROM STREET EAST 80 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2020-11-17 | No data | 2 AVENUE, FROM STREET EAST 80 STREET TO STREET EAST 81 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2020-11-17 | No data | EAST 80 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2020-11-16 | No data | WASHINGTON STREET, FROM STREET CANAL STREET TO STREET WATTS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started at this time. |
2020-11-14 | No data | COOPER STREET, FROM STREET ACADEMY STREET TO STREET WEST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Permit has expired; roadway has been milled and paved |
2020-11-14 | No data | WASHINGTON STREET, FROM STREET GANSEVOORT STREET TO STREET HORATIO STREET | No data | Street Construction Inspections: Active | Department of Transportation | No new work done on the roadway, permit still active. |
2020-11-14 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | No new work done on the roadway, permit still active. |
2020-11-12 | No data | WEST 43 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Adjacent to 311 found newly installed curb unable to inspect due to ponding conditions |
2020-11-11 | No data | 2 AVENUE, FROM STREET EAST 93 STREET TO STREET EAST 94 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Mike Bavaro Jr 10/09/2020 2:30 PM BPP Milling and paving 3" deep. Mill and pave same day it's. BPP monitored previously. |
2020-11-10 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work one under this permit. Sidewalk constructed under more recent permit. |
2020-11-10 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site finished another portion of cobblestone restoration heading towards Washington. New work is acceptable. |
2020-11-09 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Partially monitored cob restoration from 10:30-12:20pm. Spoke with pm Frank about continuation of work. Approx. 70' left of restoration. |
2020-11-02 | No data | GRAND STREET, FROM STREET KENT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RE-PAVE OK |
2020-11-02 | No data | KENT AVENUE, FROM STREET GRAND STREET TO STREET SOUTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RE-PAVE OK |
2020-11-02 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Approximately 57' of the cobblestone BPP has been completed at this time. Crew will remain on site. Updated photos taken. |
2020-11-02 | No data | GRAND STREET, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RE-PAVE OK AT NEW BUILDING |
2020-11-01 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Portion of sidewalk restored in granite; area near facade safely enclosed awaiting completion. |
2020-11-01 | No data | WASHINGTON STREET, FROM STREET GANSEVOORT STREET TO STREET HORATIO STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel-face curb installed. |
2020-11-01 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel-faced curb installed. Adjacent joints sealed. |
2020-10-30 | No data | 2 AVENUE, FROM STREET EAST 74 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permittee has obtained permit M042020281A27 |
2020-10-29 | No data | COOPER STREET, FROM STREET ACADEMY STREET TO STREET WEST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2020-10-29 | No data | 29 STREET, FROM STREET 47 AVENUE TO STREET SKILLMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started. No work done. No inspection found at this time. |
2020-10-29 | No data | 30 STREET, FROM STREET 47 AVENUE TO STREET THOMSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started. No work done. No inspection found at this time. |
2020-10-27 | No data | AMSTERDAM AVENUE, FROM STREET WEST 78 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started at this time |
2020-10-27 | No data | AMSTERDAM AVENUE, FROM STREET WEST 79 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started at this time |
2020-10-27 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb installed. Cobblestones being restored to curb line as part of cobblestone BPP. |
2020-10-27 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Monitored cob. restoration from 8:45-10:30. 35' of restoration has been restored at this time. Crew will remain on site to continue restoration. Updated photos taken. Work continuing toward Washington St. |
2020-10-26 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Starting near 52, cobblestone bbp is being restored. BPP size is 225'x 17'. At this time 15' of the 225' has been restored and is acceptable. Photos taken. |
2020-10-25 | No data | WEST 78 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012020289A26-updated permit |
2020-10-25 | No data | AMSTERDAM AVENUE, FROM STREET WEST 78 STREET TO STREET WEST 79 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M042020289A10-updated permit |
2020-10-24 | No data | WEST 79 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012020289A24-updated permit |
2020-10-21 | No data | 2 AVENUE, FROM STREET EAST 80 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2020-10-21 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Roadway asphalt has been removed in order to do cobblestone BPP in the near future. Photos taken. Field meeting with contractors (Dave and Frank) held. Crew remains on site. |
2020-10-20 | No data | AMSTERDAM AVENUE, FROM STREET WEST 78 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2020-10-20 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | On south portion of street from Gansevoort toward 9 Avenue, crew on site removing asphalt from street in order to do cobblestone bpp. Spoke with foreman Dave at this time. Photos taken. |
2020-10-20 | No data | AMSTERDAM AVENUE, FROM STREET WEST 79 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2020-10-19 | No data | AMSTERDAM AVENUE, FROM STREET WEST 78 STREET TO STREET WEST 79 STREET | No data | Street Construction Inspections: Active | Department of Transportation | barriers r/w |
2020-10-19 | No data | AMSTERDAM AVENUE, FROM STREET WEST 78 STREET TO STREET WEST 79 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | bobcat stored on sidewalk without a permit . Permit number M022020255G18 is used for ID only. |
2020-10-17 | No data | PARK AVENUE, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No temp walkway in the roadway |
2020-10-17 | No data | EAST 87 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No temp walkway in place. |
2020-10-16 | No data | FLEET PLACE, FROM STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner quadrant are functional and accessible. Unable to measure due to rain. Will measure and collect at a later date. Newer permit B042020231A26 on file |
2020-10-16 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps within the SE4 corner quadrant are functional and accessible. Will measure at later date due to rain |
2020-10-16 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Old existing tangent ramps within the SW1 corner quadrant are functional and accessible. Newer permit M042020288A13 on file |
2020-10-16 | No data | FLEET PLACE, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB OK |
2020-10-15 | No data | 2 AVENUE, FROM STREET EAST 74 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2020-10-15 | No data | EAST 87 STREET, FROM STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant are functional and accessible. Non Ada compliant. Measured in Prism on 8/3/20. Refer to permit M042020282A04 for future inspection remarks |
2020-10-15 | No data | EAST 87 STREET, FROM STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant are functional and accessible. Non Ada compliant. Measured in Prism on 8/3/20. |
2020-10-15 | No data | AMSTERDAM AVENUE, FROM STREET WEST 78 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2020-10-15 | No data | AMSTERDAM AVENUE, FROM STREET WEST 79 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2020-10-14 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started. Permit expired |
2020-10-12 | No data | 2 AVENUE, FROM STREET EAST 93 STREET TO STREET EAST 94 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Mike Bavaro Jr 10/09/2020 2:30 PM BPP Milling and paving 3" deep. Mill and pave same day it's. BPP monitored previously. |
2020-10-09 | No data | AMSTERDAM AVENUE, FROM STREET WEST 78 STREET TO STREET WEST 79 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M042020255A09-updated permit |
2020-10-09 | No data | WILLOUGHBY STREET, FROM STREET ASHLAND PLACE TO STREET FLEET STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB OK. |
2020-10-07 | No data | WEST 79 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M042020255A07-updated permit |
2020-10-07 | No data | KING STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active B.O curb inside fence area unable to fully inspect. |
2020-10-07 | No data | CHARLTON STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active B.O curb inside fence area unable to fully inspect. |
2020-10-07 | No data | WEST 78 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M042020255A11-updated permit |
2020-10-06 | No data | BEACH 108 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET ROCKAWAY FREEWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb replaced and set nearest beach channel |
2020-10-06 | No data | GRAND STREET, FROM STREET KENT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent has removed plastic. Completed tangent ramps in the SW1 corner was found to be non Ada compliant ,however, Ramps are functional and accessible. Previously measured and collected on 10/14/2019. |
2020-10-05 | No data | 2 AVENUE, FROM STREET EAST 81 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the NW2 corner quadrant are functional and accessible. Unable to measure due active construction within intersection. |
2020-10-03 | No data | EAST 139 STREET, FROM STREET ALEXANDER AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | concrete curb in compliance |
2020-10-02 | No data | AMSTERDAM AVENUE, FROM STREET WEST 78 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started at this time |
2020-10-02 | No data | AMSTERDAM AVENUE, FROM STREET WEST 79 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started at this time |
2020-10-02 | No data | EAST 137 STREET, FROM STREET ST ANNS AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Please obtain a 410 for the newly constructed pedestrian ramp at the SEC of E.137 Street & St.Anns Avenue. ID by permit X042020058A02. |
2020-09-30 | No data | EAST 87 STREET, FROM STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly installed tangent ramps within the NE3 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 8/3/20 |
2020-09-29 | No data | EAST 87 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no temp walkway at this time. |
2020-09-28 | No data | EAST 137 STREET, FROM STREET ST ANNS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SW1 corner quadrant. Found to be Ada compliant, Ramps are functional and accessible, Measured and collected in prism on 3/27/20. |
2020-09-24 | No data | FLEET PLACE, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW SWK OK |
2020-09-23 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started at this time. Permit expired |
2020-09-21 | No data | FLEET PLACE, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW SWK OK |
2020-09-21 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started. Active permit on file M042020255A13 |
2020-09-21 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2020-09-21 | No data | AMSTERDAM AVENUE, FROM STREET WEST 78 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started at this time |
2020-09-21 | No data | AMSTERDAM AVENUE, FROM STREET WEST 79 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started at this time. Permit expired |
2020-09-21 | No data | WILLOUGHBY STREET, FROM STREET ASHLAND PLACE TO STREET FLEET STREET | No data | Street Construction Inspections: Active | Department of Transportation | NEW SWK OK |
2020-09-21 | No data | FLEET PLACE, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Active | Department of Transportation | NEW SWK OK |
2020-09-21 | No data | WILLOUGHBY STREET, FROM STREET ASHLAND PLACE TO STREET FLEET STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW CURB OK |
2020-09-17 | No data | STERLING PLACE, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY PAVED |
2020-09-15 | No data | AMSTERDAM AVENUE, FROM STREET WEST 100 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Area around street light post has been properly sealed plastic has been removed off of red dws Mets. |
2020-09-15 | No data | 2 AVENUE, FROM STREET EAST 74 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Patch work on SE4 corner quadrant is unacceptable. Full quadrant need to be restored. Ramps are accessible and functional. Updated collector on 12-21-19. |
2020-09-14 | No data | FULTON STREET, FROM STREET ASHLAND PLACE TO STREET ROCKWELL PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2020-09-14 | No data | KING STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Active | Department of Transportation | No new work done on the roadway, permit still active |
2020-09-14 | No data | CHARLTON STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Active | Department of Transportation | No new work done on the roadway, permit still active |
2020-09-14 | No data | WEST 79 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012020226A34-updated permit |
2020-09-13 | No data | WEST 78 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012020226A36-updated permit |
2020-09-08 | No data | PARK AVENUE, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No sidewalk/vault work done; active permit on file. M042020237A10 |
2020-09-08 | No data | EAST 87 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No vault work done at this time; active permit on file. M012020237B32 |
2020-09-07 | No data | FULTON STREET, FROM STREET ASHLAND PLACE TO STREET ROCKWELL PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2020-09-02 | No data | STERLING PLACE, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY PAVED |
2020-08-31 | No data | EAST 87 STREET, FROM STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps in the NE3 corner quadrant are functional and accessible. Previously measured and collected in Prism on 8/3/20, found to be non Ada compliant. |
2020-08-30 | No data | MAC KAY PLACE, FROM STREET NARROWS AVENUE TO STREET SHORE ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Several sidewalk flags were repaired, AKA 7100 Shore Road |
2020-08-30 | No data | FLEET PLACE, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Active | Department of Transportation | NEW SWK & CURB WORK NOT SEALED |
2020-08-30 | No data | FLEET PLACE, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW SWK & CURB WORK NOT SEALED -NP |
2020-08-28 | No data | 3 AVENUE, FROM STREET EAST 21 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No new work done on the roadway, permit still active. |
2020-08-26 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | No sidewalk work observed at this time.( behind BO) |
2020-08-26 | No data | 2 AVENUE, FROM STREET EAST 81 STREET TO STREET EAST 82 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb okay |
2020-08-26 | No data | SOUNDVIEW AVENUE, FROM STREET DEAD END TO STREET HORIZON LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on Parks Dept property |
2020-08-25 | No data | CONVENT AVENUE, FROM STREET WEST 130 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Mill and paving within intersection has been completed. 189 ft x 20ft x 3” down. |
2020-08-25 | No data | CONVENT AVENUE, FROM STREET WEST 128 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work was paved. Borough office was notified |
2020-08-23 | No data | EAST 19 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I found the sidewalk restored. |
2020-08-23 | No data | BRONX RIVER AVENUE, FROM STREET BRUCKNER EXPRESSWAY EXIT 51 WB TO STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb repaired |
2020-08-23 | No data | BRONXDALE AVENUE, FROM STREET AMTRAK RR TO STREET POPLAR STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass sidewalk is to grade and sealed |
2020-08-19 | No data | WILLOUGHBY STREET, FROM STREET ASHLAND PLACE TO STREET FLEET STREET | No data | Street Construction Inspections: Active | Department of Transportation | TALKED TO FOREMAN CUTTING SWK & CURB 500 FEET FROM 175 TO 191 WILLOUGHBY STREET- NEW PERMITS NEED TO BE TAKEN OUT AT 191- 1 EXCEEDS 300 FEET ALLOWED ON PERMIT & NYC DOB 2 DIFFERENT ADDRESSES |
2020-08-18 | No data | WILLOUGHBY STREET, FROM STREET ASHLAND PLACE TO STREET FLEET STREET | No data | Street Construction Inspections: Active | Department of Transportation | NEW SIDEWALK & CURB WORK-CREW ON SITE -NP |
2020-08-18 | No data | DESBROSSES STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Near aka 205 Hudson, curb installed is acceptable. |
2020-08-18 | No data | 2 AVENUE, FROM STREET EAST 74 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Open CAR on file |
2020-08-18 | No data | WILLOUGHBY STREET, FROM STREET ASHLAND PLACE TO STREET FLEET STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW SIDEWALK & CURB WORK-CREW ON SITE -NP |
2020-08-16 | No data | WEST 78 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w is flush with sealed expansion joints |
2020-08-16 | No data | WEST 79 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w is flush with sealed expansion joints |
2020-08-16 | No data | FLEET PLACE, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Active | Department of Transportation | NEW SWK FLAGS ON CORNER PROPERTY NOT SEALED |
2020-08-14 | No data | EAST 137 STREET, FROM STREET ST ANNS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints sealed. |
2020-08-13 | No data | 2 AVENUE, FROM STREET EAST 93 STREET TO STREET EAST 94 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No new work done in the roadway, permit still active, |
2020-08-12 | No data | 1 AVENUE, FROM STREET EAST 117 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the SW1 corner quadrant are functional and accessible. Non Ada compliant. Measured and collected on 5/21/19 |
2020-08-11 | No data | AMSTERDAM AVENUE, FROM STREET WEST 100 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Open car on file. |
2020-08-09 | No data | PARK AVENUE, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit M042020204A10 on file. |
2020-08-08 | No data | EAST 87 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit M012020204B03 on file |
2020-08-05 | No data | GANSEVOORT STREET, FROM STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2020-08-04 | No data | 2 AVENUE, FROM STREET EAST 81 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant are functional and accessible. Unable to measure due storm. |
2020-08-04 | No data | CONVENT AVENUE, FROM STREET MORNINGSIDE AVENUE TO STREET WEST 128 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time. Permit still active |
2020-08-04 | No data | WEST 128 STREET, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS TERRACE | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time. Permit still active |
2020-08-03 | No data | AMSTERDAM AVENUE, FROM STREET WEST 78 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit M042020198A26 for inspection remarks |
2020-08-03 | No data | EAST 87 STREET, FROM STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit M042020204A18 for inspection remarks |
2020-08-03 | No data | AMSTERDAM AVENUE, FROM STREET WEST 78 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Old existing tangent ramps within the NW2 corner quadrant. Permit is currently active. No further action taken |
2020-08-03 | No data | AMSTERDAM AVENUE, FROM STREET WEST 79 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Old existing tangent ramps within the SW1 corner quadrant. Permit is currently active. No further action taken |
2020-08-03 | No data | EAST 87 STREET, FROM STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Newly installed tangent ramps within the NE3 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 8/3/20 |
2020-08-03 | No data | AMSTERDAM AVENUE, FROM STREET WEST 79 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit M042020198A25 for inspection remarks |
2020-08-01 | No data | AMSTERDAM AVENUE, FROM STREET WEST 99 STREET TO STREET WEST 100 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb reset in compliance. |
2020-07-31 | No data | EAST 21 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O 200 East 21st Street ( BPP Inspection ), milling was 90’L x 20’W x 3” D throughout. Existing width of roadway = 29’1”. |
2020-07-31 | No data | 3 AVENUE, FROM STREET EAST 20 STREET TO STREET EAST 21 STREET | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O aka 200 East 21st Street ( BPP Inspection ), WAIVER presented to me prior to inspection for approval of milling less than ½ Roadway + 5'. Milling was 114’L x 20’W x 3”D throughout. Existing width of roadway = 69’3”. |
2020-07-29 | No data | STERLING PLACE, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO NOTIFY THE NYC DOT HIQA BOROUGH OFFICE WITHIN 4 HOURS PRIOR TO PAVING STREET. ROADWAY WAS PAVED, HOWEVER NO NOTIFICATION WAS MADE AS PER 1/2 + 5' STIP. |
2020-07-29 | No data | 2 AVENUE, FROM STREET EAST 81 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Duplicate permit |
2020-07-29 | No data | AMSTERDAM AVENUE, FROM STREET WEST 78 STREET TO STREET WEST 79 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway has been paved |
2020-07-29 | No data | DESBROSSES STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | AKA 205 Hudson, curb installed is acceptable. |
2020-07-27 | No data | CONVENT AVENUE, FROM STREET WEST 129 STREET TO STREET WEST 130 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Ifo 17 Convent mill and paved 55ft.7 x 25ft.4 X 3” down |
2020-07-27 | No data | WEST 130 STREET, FROM STREET AMSTERDAM AVENUE TO STREET CONVENT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 189 ft x 20ft x 3” down. Mill and pave inspection |
2020-07-27 | No data | EAST 87 STREET, FROM STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant are functional and accessible. Non Ada compliant. Measured and collected in prism on 6/19/20 |
2020-07-27 | No data | 2 AVENUE, FROM STREET EAST 81 STREET TO STREET EAST 82 STREET | No data | Street Construction Inspections: Active | Department of Transportation | TEMPORARY PEDESTRIAN WALK, acceptable |
2020-07-25 | No data | PLATT STREET, FROM STREET GOLD STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O aka 215 Pearl St ( BPP Inspection ), 79’5”L x 17’10”x 3”D throughout milling. Existing width of Roadway = 17’10” ( milling was curb to curb ). |
2020-07-25 | No data | WEST 100 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway in compliance with BPP. |
2020-07-25 | No data | PEARL STREET, FROM STREET PLATT STREET | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O aka 215 Pearl Street ( BPP Inspection ), 28’11”L x 19’7”W x 3”D throughout milling. Existing width of Roadway = 28’2”. |
2020-07-25 | No data | PEARL STREET, FROM STREET FLETCHER STREET TO STREET PLATT STREET | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O 215 ( BPP Inspection ), 131’7”L x 16’3”W x 3”D throughout milling. Existing Width of Roadway = 22’2”. |
2020-07-23 | No data | 2 AVENUE, FROM STREET EAST 81 STREET TO STREET EAST 82 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb okay |
2020-07-23 | No data | 2 AVENUE, FROM STREET EAST 73 STREET TO STREET EAST 74 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb okay |
2020-07-22 | No data | AMSTERDAM AVENUE, FROM STREET WEST 99 STREET TO STREET WEST 100 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paving in compliance. |
2020-07-22 | No data | EAST 81 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb okay |
2020-07-21 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel faced curb in compliance. |
2020-07-21 | No data | EAST 87 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit M012020177B20 on file |
2020-07-21 | No data | MAC KAY PLACE, FROM STREET NARROWS AVENUE TO STREET SHORE ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Several sidewalk flags were repaired, AKA 7100 Shore Road. |
2020-07-17 | No data | PARK AVENUE, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags near crosswalk of east 87 street have been fully replaced. No defects to report |
2020-07-14 | No data | 2 AVENUE, FROM STREET EAST 93 STREET TO STREET EAST 94 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time. Permit active |
2020-07-14 | No data | 1 AVENUE, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB IN COMPLIANCE |
2020-07-11 | No data | 2 AVENUE, FROM STREET EAST 81 STREET TO STREET EAST 82 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP Inspection - 66'L x 305"W x 3"D milled at this time. Existing width of roadway is 60'5". Frank Movaglio ( owner of Paving company ) on site. Milling is at East 81st St ( corner property ) East Side. |
2020-07-11 | No data | EAST 81 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP Inspection - 119'9"L x 20'W x 3"D milled at this time. Existing width of roadway is 29'8". Frank Movaglio ( owner of Paving company ) on site. Milling is at 2nd Ave ( corner property ). |
2020-07-11 | No data | FLEET PLACE, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Active | Department of Transportation | NO NEW SIDEWALK OBSERVED. |
2020-07-11 | No data | FLEET PLACE, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW CURB OBSERVED, AKA 175 WILLOUGHBY STREET |
2020-07-11 | No data | WILLOUGHBY STREET, FROM STREET ASHLAND PLACE TO STREET FLEET STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK OBSERVED. |
2020-07-10 | No data | EAST 99 STREET, FROM STREET 1 AVENUE TO STREET F D R DRIVE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest accepted, permittee has a BPP waiver to pave the parking lane only. |
2020-07-10 | No data | WEST 125 STREET, FROM STREET 8 AVENUE TO STREET ST NICHOLAS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street found milled down and ready for resurfacing at time of inspection |
2020-07-10 | No data | WEST 25 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 540, roadway paved as per BPP and is flush to grade at this time. |
2020-07-08 | No data | CROPSEY AVENUE, FROM STREET BAY 52 STREET TO STREET CANAL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced by DOT on permit #B152019186A88 |
2020-07-08 | No data | BAY 53 STREET, FROM STREET CROPSEY AVENUE TO STREET WEST 22 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway repaired under a DDC contract |
2020-07-08 | No data | FLEET PLACE, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Active | Department of Transportation | HAD FOREMAN STOP WORK TILL 9 AM START TIME- CURB BEING EXCAVATED 1 FT NORTH OF ASHLAND ON ECL |
2020-07-08 | No data | WILLOUGHBY STREET, FROM STREET ASHLAND PLACE TO STREET FLEET STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO NEW CURB STARTED |
2020-07-07 | No data | 30 STREET, FROM STREET 47 AVENUE TO STREET THOMSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started. No work done. No inspection found at this time. |
2020-07-07 | No data | WEST 130 STREET, FROM STREET AMSTERDAM AVENUE TO STREET CONVENT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No BPP street pave work started |
2020-07-07 | No data | CONVENT AVENUE, FROM STREET WEST 129 STREET TO STREET WEST 130 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No BPP street pave work started |
2020-07-07 | No data | FRONT STREET, FROM STREET CADMAN PLAZA EAST TO STREET MAIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RWY RESURFACED BY DDC HALCYON WORK |
2020-07-07 | No data | DESBROSSES STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Near aka 205 Hudson, curb installed is acceptable. |
2020-07-07 | No data | BALTIC STREET, FROM STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly installed tangent ramps in the SE4 corner quadrant are functional and accessible. Previously measured and collected on 4/1/2019, found to be non Ada compliant. |
2020-07-06 | No data | TIEBOUT AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2020-07-06 | No data | FLEET PLACE, FROM STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Disregard previous inspection remarks. No work was done on corner quad |
2020-07-05 | No data | BERRY STREET, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW CURB OK AT NEW BUILDING |
2020-07-04 | No data | F D R DRIVE, FROM STREET FDR DRIVE SB EXIT 14 TO STREET EAST 97 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been paved |
2020-07-04 | No data | SOUTH 5 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RWY RESURFACED BY DOT |
2020-07-02 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Curb installed hasn't been started at this time. Permit remains active. |
2020-07-02 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No BPP not done at this time. New permit application is one file. |
2020-06-30 | No data | KENT AVENUE, FROM STREET GRAND STREET TO STREET NORTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WRONG CROSS STREETS- RE-PAVED AT 262 KENT AVENUE OK ON NEWER PERMITS |
2020-06-29 | No data | FLEET PLACE, FROM STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started. |
2020-06-29 | No data | AMSTERDAM AVENUE, FROM STREET WEST 79 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Old existing tangent ramps within the SW1 corner quadrant. Permit is currently active. No further action taken |
2020-06-29 | No data | AMSTERDAM AVENUE, FROM STREET WEST 78 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Old existing tangent ramps within the NW2 corner quadrant. Permit is currently active. No further action taken |
2020-06-28 | No data | EAST 139 STREET, FROM STREET ALEXANDER AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade. |
2020-06-27 | No data | ST NICHOLAS AVENUE, FROM STREET MANHATTAN AVENUE TO STREET WEST 125 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp restoration flushed to grade |
2020-06-26 | No data | WEST 58 STREET, FROM STREET 7 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent failed to call the NYC DOT HIQA borough office within 4 hours prior to work being done. A violation of stipulation 1/2+5” of above DOT permit used for I.D. |
2020-06-26 | No data | GRAND STREET, FROM STREET KENT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SW1 corner was found to be non Ada compliant ,however, Ramps are functional and accessible.Previously Measured and collected on 10/14/2019. Newer permit B042019240A32 on file |
2020-06-25 | No data | CLINTON STREET, FROM STREET BROOME STREET TO STREET DELANCEY ST SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done. |
2020-06-25 | No data | 2 AVENUE, FROM STREET EAST 74 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit M042019333A06 for inspection remarks |
2020-06-25 | No data | WEST 59 STREET, FROM STREET 7 AVENUE TO STREET COLUMBUS CIRCLE | No data | Street Construction Inspections: Active | Department of Transportation | 200' x 23' x3" BBP Incompliance |
2020-06-25 | No data | EAST 21 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No BPP street pave work started |
2020-06-25 | No data | WEST HOUSTON STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O AKA 225, installed curb is acceptable. |
2020-06-25 | No data | 3 AVENUE, FROM STREET EAST 20 STREET TO STREET EAST 21 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No BPP street pave work started |
2020-06-24 | No data | EAST 46 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP, found 2 paved lanes. |
2020-06-24 | No data | WEST 31 STREET, FROM STREET 10 AVENUE TO STREET LINCOLN TNNL APPROACH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP complete for AKA 450 West 33rd St. |
2020-06-24 | No data | EAST 24 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The BBP has completed as per DOT requirements. |
2020-06-23 | No data | FULTON STREET, FROM STREET ASHLAND PLACE TO STREET ROCKWELL PLACE | No data | Street Construction Inspections: Active | Department of Transportation | No work started in roadway. |
2020-06-23 | No data | ROGERS PLACE, FROM STREET BEND TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street repaved |
2020-06-23 | No data | WESTCHESTER AVENUE, FROM STREET EAST 162 STREET TO STREET ROGERS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street repaved |
2020-06-23 | No data | MADISON AVENUE, FROM STREET EAST 46 STREET TO STREET EAST 47 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found 29' of Roadway paved. |
2020-06-23 | No data | EAST 99 STREET, FROM STREET 1 AVENUE TO STREET F D R DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP not properly completed. |
2020-06-22 | No data | EAST 99 STREET, FROM STREET 1 AVENUE TO STREET F D R DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP not done |
2020-06-22 | No data | FULTON STREET, FROM STREET ASHLAND PLACE TO STREET ROCKWELL PLACE | No data | Street Construction Inspections: Active | Department of Transportation | No BPP work started at the time of inspection. |
2020-06-22 | No data | 1 AVENUE, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags have been fully replaced. No defects to report |
2020-06-22 | No data | 7 AVENUE SOUTH, FROM STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SW1 corner quadrant non Ada compliant, Ramps are accessible and functional measured and collected on 6/14/19. Update in prism on 6/22/20. |
2020-06-22 | No data | 1 AVENUE, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | condition remains the same. |
2020-06-22 | No data | HUDSON STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit # M042019301A25. |
2020-06-20 | No data | HUDSON STREET, FROM STREET MORTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed Apex ramp in the SW1 corner found not to be Ada compliant, Ramp is accessible, functional measured and collected on 11/1/19. Refer to permit #M042019301A26. |
2020-06-20 | No data | CANAL STREET, FROM STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single tangent ramp in the SW1 corner found not to be Ada compliant, Ramp is accessible, functional measured and collected on 2/25/19. Update in prism on 6/20/20. |
2020-06-20 | No data | VARICK STREET, FROM STREET WEST HOUSTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NW2 corner quadrant was found not to be Ada compliant, Ramps are accessible and functional measured and collected in prism on 6/20/20. |
2020-06-19 | No data | EAST 87 STREET, FROM STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps in the south east corner quadrant was found not to be Ada compliant, Ramps are accessible and functional, measured and collected in prism on 6/19/20. Newer permit #M042019322A01. On file . |
2020-06-18 | No data | FLEET PLACE, FROM STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Completed off-set tangent ramp in the NE3 corner quadrant is functional and accessible, the ramp is also Ada compliant. Measured and collected on Prism 6/18/2020. |
2020-06-18 | No data | PLATT STREET, FROM STREET GOLD STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work done, permit still active. |
2020-06-17 | No data | ROGERS PLACE, FROM STREET EAST 165 STREET TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel faced curb installed |
2020-06-16 | No data | EAST 117 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB IN COMPLIANCE |
2020-06-16 | No data | EAST 19 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a steel face curb has been installed. |
2020-06-12 | No data | KENT AVENUE, FROM STREET GRAND STREET TO STREET SOUTH 1 STREET | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE ON ROADWAY COMPLETING RE-PAVE |
2020-06-12 | No data | GRAND STREET, FROM STREET KENT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE ON ROADWAY COMPLETING RE-PAVE |
2020-06-11 | No data | KENT AVENUE, FROM STREET GRAND STREET TO STREET SOUTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP- REPAVE; ENTIRE WIDTH OF ROADWAY- 40 FT(MILLED & 1 PAVED DUE TO WEATHER RAIN FORCAST) (L) 227 FEET X (W) 25 FT X (2-3 INCHES)- PAVE WILL BE COMPLETED ON 6/12/20. PERMITTEE ON SITE-NEW PERMIT ON FILE |
2020-06-11 | No data | GRAND STREET, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP- REPAVE; ENTIRE WIDTH OF ROADWAY- 40 FT(MILLED & 1 INCH PAVED DUE TO WEATHER RAIN FORCAST) (L) 194 FEET X (W) 25 FT X (D) 2-3 INCHES- PAVE WILL BE COMPLETED ON 6/12/20. PERMITTEE ON SITE-NEW PERMIT ON FILE |
2020-06-11 | No data | DUFFIELD STREET, FROM STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Old existing tangent ramps within SW1 corner quadrant is non Ada compliant , however, ramps are functional and accessible. |
2020-06-11 | No data | F D R DRIVE, FROM STREET FDR DRIVE SB EXIT 14 TO STREET EAST 97 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work has been done |
2020-06-11 | No data | KENT AVENUE, FROM STREET GRAND STREET TO STREET SOUTH 1 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP- REPAVE; ENTIRE WIDTH OF ROADWAY- 40 FT(MILLED & 1 PAVED DUE TO WEATHER RAIN FORCAST) (L) 227 FEET X (W) 25 FT X (2-3 INCHES)- PAVE WILL BE COMPLETED ON 6/12/20. PERMITTEE ON SITE |
2020-06-11 | No data | GRAND STREET, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP- REPAVE; ENTIRE WIDTH OF ROADWAY- 40 FT(MILLED & 1 INCH PAVED DUE TO WEATHER RAIN FORCAST) (L) 194 FEET X (W) 25 FT X (D) 2-3 INCHES- PAVE WILL BE COMPLETED ON 6/12/20. PERMITTEE ON SITE-NEW PERMIT ON FILE |
2020-06-10 | No data | GRAND STREET, FROM STREET RIVER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started within the SE4 corner quadrant, truck and men actively working within quadrant, Barricades block corner. |
2020-06-09 | No data | DUFFIELD STREET, FROM STREET FULTON STREET TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW SWK FLAGS BY PARK OFF WILLOUGHBY STREET |
2020-06-09 | No data | WILLOUGHBY STREET, FROM STREET DUFFIELD STREET TO STREET GOLD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW SWK FLAGS AT PARK |
2020-06-08 | No data | 1 AVENUE, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags have been fully replaced. No defects to report |
2020-06-05 | No data | ROGERS PLACE, FROM STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NW2 found to be non Ada compliant, Ramps are accessible, functional and measured on 6/16/19. Collected on 6/13/19 Update in prism on 6/5/20. |
2020-06-02 | No data | LAFAYETTE AVENUE, FROM STREET GRAND AVENUE TO STREET ST JAMES PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb replaced |
2020-05-29 | No data | KENT AVENUE, FROM STREET GRAND STREET TO STREET SOUTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb (Steel face) found in compliance |
2020-05-29 | No data | GRAND STREET, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb (Steel face) found to be in compliance |
2020-05-27 | No data | SMITH STREET, FROM STREET BALTIC STREET TO STREET BUTLER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s\w cut ok |
2020-05-22 | No data | 1 AVENUE, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb okay |
2020-05-19 | No data | EAST 137 STREET, FROM STREET ST ANNS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Duplicate permit any new action should be taken out on newer permit # X042020092A32. Updated in prism on 3/27/2020."KERRY - THIS PERMIT IS FOR THE SE CORNER" |
2020-05-07 | No data | ST ANNS AVENUE, FROM STREET EAST 135 STREET TO STREET EAST 137 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel faced curb installed |
2020-04-29 | No data | AMSTERDAM AVENUE, FROM STREET WEST 155 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plastic cap has been removed and metal traffic pole is probably sealed within the SW1 corner quadrant. |
2020-04-29 | No data | AMSTERDAM AVENUE, FROM STREET WEST 153 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Metal traffic control device within the NW2 corner quadrant has been properly sealed. |
2020-04-24 | No data | ST ANNS AVENUE, FROM STREET EAST 135 STREET TO STREET EAST 137 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | install new curb in compliance |
2020-04-24 | No data | ST ANNS AVENUE, FROM STREET EAST 135 STREET TO STREET EAST 137 STREET | No data | Street Construction Inspections: Active | Department of Transportation | in compliance construct new sidewalk |
2020-04-23 | No data | EAST 24 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | - RESET, REPAIR OR REPLACE CURB: expansion joints have been sealed at the curb. |
2020-04-23 | No data | EAST 19 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | - REPAIR SIDEWALK: EXPANSION JOINTS HAVE BEEN SEALED. |
2020-04-19 | No data | GRAND STREET, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RE-PAVE NOT DONE-WORK NOT STARTED |
2020-04-12 | No data | 2 AVENUE, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | active building op |
2020-04-11 | No data | GREENWICH STREET, FROM STREET CARLISLE STREET TO STREET RECTOR STREET | No data | Street Construction Inspections: Active | Department of Transportation | curb to curb milled 30 feet in width down 2 inches |
2020-04-11 | No data | TRINITY PLACE, FROM STREET RECTOR STREET TO STREET THAMES STREET | No data | Street Construction Inspections: Active | Department of Transportation | curb to curb milled 41 feet in width and down 3 inches . |
2020-04-05 | No data | AMSTERDAM AVENUE, FROM STREET WEST 99 STREET TO STREET WEST 100 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb found in compliance IFO 814 |
2020-04-05 | No data | WEST 128 STREET, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS TERRACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w is flush with sealed expansion joints |
2020-03-28 | No data | BALTIC STREET, FROM STREET HOYT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags installed in front of property AKA 209 SMITH STREET IN COMPLIANCE |
2020-03-27 | No data | BAY 53 STREET, FROM STREET CROPSEY AVENUE TO STREET WEST 22 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDEWALK CURB |
2020-03-27 | No data | EAST 137 STREET, FROM STREET ST ANNS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Duplicate permit any new action should be taken out on newer permit# X042020058A06."KERRY - THIS PERMIT IS FOR THE SE CORNER" |
2020-03-26 | No data | GRAND STREET, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not started- new permit on file |
2020-03-21 | No data | BAY 52 STREET, FROM STREET BEND TO STREET SHORE PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Installation of Curb in Compliance |
2020-03-19 | No data | GRAND STREET, FROM STREET RIVER STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started within the SE4 corner quadrant, Barricades block corner. |
2020-03-18 | No data | CROPSEY AVENUE, FROM STREET BAY 52 STREET TO STREET CANAL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Installation of Curb in Compliance |
2020-03-18 | No data | GRAND STREET, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed. |
2020-03-18 | No data | KENT AVENUE, FROM STREET GRAND STREET TO STREET SOUTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed. |
2020-03-17 | No data | GRAND STREET, FROM STREET RIVER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started within the SE4 corner quadrant, barricades block pedestrian walk way. |
2020-03-16 | No data | CANAL STREET, FROM STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit M042019088A19 for inspection remarks |
2020-03-16 | No data | WESTCHESTER AVENUE, FROM STREET EAST 162 STREET TO STREET ROGERS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel faced curb installed |
2020-03-16 | No data | CANAL STREET, FROM STREET WATTS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit M042018261A18 for inspection remarks |
2020-03-16 | No data | DESBROSSES STREET, FROM STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit M042018261A17 for inspection remarks |
2020-03-13 | No data | ST ANNS AVENUE, FROM STREET EAST 135 STREET TO STREET EAST 137 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete curb flush, no defects. |
2020-03-13 | No data | EAST 137 STREET, FROM STREET ST ANNS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Tangents ramps installed. Construction drums covering sidewalk for Building operation ongoing. Will return to measure at a later date. "KERRY - THIS PERMIT IS FOR THE SE CORNER" |
2020-03-13 | No data | EAST 137 STREET, FROM STREET ST ANNS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Tangent ramps completed. However measuring will be done at a later date. Weather prohibited."KERRY - THIS PERMIT IS FOR THE NE CORNER" |
2020-03-12 | No data | KENT AVENUE, FROM STREET GRAND STREET TO STREET SOUTH 1 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No Bpp paving work started during the time of inspection , Barricades In parking lane in front. |
2020-03-12 | No data | F D R DRIVE, FROM STREET FDR DRIVE SB EXIT 14 TO STREET EAST 97 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012020051A18-updated permit |
2020-03-12 | No data | EAST 99 STREET, FROM STREET 1 AVENUE TO STREET F D R DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb okay |
2020-03-12 | No data | GRAND STREET, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Active | Department of Transportation | No Bpp paving work started during the time of inspection. |
2020-03-10 | No data | 1 AVENUE, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012020051A22-updated permit |
2020-03-06 | No data | EAST 137 STREET, FROM STREET CYPRESS AVENUE TO STREET ST ANNS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp pedestrian ramp ok |
2020-03-02 | No data | EAST 137 STREET, FROM STREET ST ANNS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work done in the SW1 corner quadrant, permit still active collected on 3/2/20. |
2020-02-23 | No data | 175 STREET, FROM STREET 82 AVENUE TO STREET GRAND CENTRL PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done at time of my inspection . |
2020-02-23 | No data | EAST 138 STREET, FROM STREET ALEXANDER AVENUE TO STREET LINCOLN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk currently has barriers along curb, unable to inspect. |
2020-02-21 | No data | WEST 44 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found Street resurface. ( Inspector H. Salovic ) |
2020-02-19 | No data | BEACH 108 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET ROCKAWAY FREEWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel face curb (steel) not painted, primer only. Broken seal along curb trench. |
2020-02-14 | No data | VARICK STREET, FROM STREET 7 AVENUE SOUTH TO STREET DOWNING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 225 Varick, portion of new steel face curb installed. |
2020-02-14 | No data | CLARKSON STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O aka 225 Varick on Clarkson St, new steel face curb installed. |
2020-02-12 | No data | WEST 31 STREET, FROM STREET 10 AVENUE TO STREET LINCOLN TNNL APPROACH | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed and pass. 45' X 34' X 4'' Started at 20:00hr end at 00:20am |
2020-02-12 | No data | WEST 100 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Complaint | Department of Transportation | Area measuring 14' by 14', in the roadway IFO 206 has asphalt broken out and down up to 2 1/2" below roadway surface. |
2020-02-12 | No data | WEST 66 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags restored. Curb reset in compliance. |
2020-02-09 | No data | WILLOUGHBY STREET, FROM STREET ASHLAND PLACE TO STREET FLEET STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDEWALK REPAIRED |
2020-02-08 | No data | EAST 137 STREET, FROM STREET ST ANNS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No ped ramp work started within the SE4 corner quadrant. Ramps are accessible and functional. Collected on 2-8-20. Duplicate permit #’s X042020034A08 and X042020034A10 on file. "KERRY - THIS PERMIT IS FOR THE NE CORNER" |
2020-02-05 | No data | EAST 24 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Sidewalk expansion joints need to be sealed at the curb. |
2020-02-04 | No data | AMSTERDAM AVENUE, FROM STREET WEST 153 STREET TO STREET WEST 154 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel place curb in compliance. |
2020-02-03 | No data | KENT AVENUE, FROM STREET GRAND STREET TO STREET SOUTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete sidewalk restoration found to be in compliance |
2020-02-03 | No data | TIEBOUT AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: Active | Department of Transportation | walkway in roadway |
2020-02-03 | No data | GRAND STREET, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb (Steel face) found to be in compliance |
2020-02-03 | No data | TIEBOUT AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | work in progress |
2020-01-31 | No data | TIEBOUT AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: Active | Department of Transportation | curb re set |
2020-01-29 | No data | TIEBOUT AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Barricades in the parking lane and also on areas of the sidewalk, Active permit on file. located opposite 2259 -2269. in compliance |
2020-01-26 | No data | SMITH STREET, FROM STREET BALTIC STREET TO STREET BUTLER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Brand new sidewalk flags installed in front of property #209 in compliance |
2020-01-26 | No data | BALTIC STREET, FROM STREET HOYT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb reveal installed in front of property #209 SMITH STREET in compliance |
2020-01-25 | No data | F D R DRIVE, FROM STREET FDR DRIVE SB EXIT 14 TO STREET EAST 97 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No ped ramp work started at time of inspection |
2020-01-25 | No data | BEARD STREET, FROM STREET CONOVER STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb reveal installed in front of property #156 in compliance |
2020-01-25 | No data | 1 AVENUE, FROM STREET EAST 117 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly constructed tangent ramps in the SW1 corner quadrant is accessible and functional. Measured. Updated collector on 1-25-20. Condition was repaired. |
2020-01-25 | No data | 1 AVENUE, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No BPP work started at time of inspection. |
2020-01-24 | No data | 1 AVENUE, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work done, permit still active. |
2020-01-24 | No data | EAST 99 STREET, FROM STREET 1 AVENUE TO STREET F D R DRIVE | No data | Street Construction Inspections: Active | Department of Transportation | No work done, permit still active. |
2020-01-16 | No data | EAST 19 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SIDEWALK |
2020-01-15 | No data | GOLD STREET, FROM STREET FULTON STREET TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW SIDEWALK FLAGS ON WCL OF WILLOUGHBY ST |
2020-01-15 | No data | AMSTERDAM AVENUE, FROM STREET WEST 99 STREET TO STREET WEST 100 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb replaced IFO 814 amsterdam (West side corner property at W100 street) |
2020-01-14 | No data | F D R DRIVE, FROM STREET FDR DRIVE SB EXIT 14 TO STREET EAST 97 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012020002B13-updated permit |
2020-01-14 | No data | 1 AVENUE, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET | No data | Street Construction Inspections: Active | Department of Transportation | okay |
2020-01-12 | No data | ASHLAND PLACE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk repaired |
2020-01-10 | No data | EAST 24 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Active | Department of Transportation | wearing course complete asphalt laid r.w acceptable |
2020-01-09 | No data | HUDSON STREET, FROM STREET LEROY STREET TO STREET MORTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 435 ( West Sidewalk ), entire width of sidewalk fully restored ( note: nicely done ). Flags scored and expansion joints properly installed / sealed ( at curb, property line & 20' intervals ). |
2020-01-09 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O aka 435 Hudson ( corner property ), new steel face curb installed ( joints for curb sealed ) and cobble stone roadway restored in Kind for cutback. |
2020-01-09 | No data | 1 AVENUE, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel face curb installed. |
2020-01-08 | No data | 3 AVENUE, FROM STREET EAST 138 STREET TO STREET EAST 139 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk is in compliance with DOT Rule |
2020-01-08 | No data | 1 AVENUE, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012020002B11-Updated permit |
2020-01-07 | No data | AMSTERDAM AVENUE, FROM STREET WEST 100 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Respondent milled and paved over on a protected roadway without an active dot permit on file. |
2020-01-07 | No data | WEST 100 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | Roadway measures 29.5feet from curb to curb. Contractor milled 20.6 feet of the roadway adjacent to the property with a depth of 3 inches. In compliance with BPP required measurements. |
2020-01-07 | No data | AMSTERDAM AVENUE, FROM STREET WEST 99 STREET TO STREET WEST 100 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Roadway measures 60 feet from curb to curb. Contractor milled 35.1 feet of the roadway adjacent to the property with a depth of 3 inches. In compliance with BPP required measurements. |
2020-01-04 | No data | AMSTERDAM AVENUE, FROM STREET WEST 100 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Condition remains the same. Plastic still needs to be removed from DWS in the SW1 corner quadrant. Ramps are accessible and functional. |
2020-01-04 | No data | 2 AVENUE, FROM STREET EAST 74 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Patch work on SE4 corner quadrant is unacceptable. Full quadrant need to be restored. Ramps are accessible and functional. Unable to Update collector due to collector being down. |
2020-01-02 | No data | 2 AVENUE, FROM STREET EAST 73 STREET TO STREET EAST 74 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk fully replaced at time of inspection. |
2020-01-02 | No data | EAST 74 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Curb replaced and in compliance at time of inspection. |
2020-01-02 | No data | GRAND STREET, FROM STREET RIVER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started. Ramps in SE4 corner is not accessible or functional due to building operations and barricades on site. Collector app not functional. Active work on site. |
2020-01-02 | No data | AMSTERDAM AVENUE, FROM STREET WEST 100 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plastic needs to be removed from DWS and expansion joints need to be sealed. Newly installed tangent ramps within the sw1 corner quadrant are functional and accessible. Unable to update collector. |
2019-12-29 | No data | EAST 19 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Remove the plastic caps then recess and seal all the expansion joints around the restored sidewalk as required, I/F/O 222 |
2019-12-27 | No data | HUDSON STREET, FROM STREET BEND TO STREET DESBROSSES STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to correct permit # M042018261A17 for this location |
2019-12-27 | No data | DESBROSSES STREET, FROM STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly constructed ramp on the NW corner quadrant is accessible and functional. Measured. Updated collector on 12-27-19. |
2019-12-27 | No data | CANAL STREET, FROM STREET HUDSON STREET TO STREET WATTS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to correct permit # M042018261A16 for this location. |
2019-12-27 | No data | WATTS STREET, FROM STREET GREENWICH STREET TO STREET HOLLAND TUNNEL EXIT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to correct permit # M042018261A18 for this location. |
2019-12-27 | No data | CANAL STREET, FROM STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed Apex ramp on the SW1 corner quadrant is accessible and functional, however, ramp is non Ada compliant. Measured. Updated collector on 12-27-19. |
2019-12-27 | No data | CANAL STREET, FROM STREET WATTS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed ramp on the SE4 corner quadrant is accessible and functional, however, ramp is non Ada compliant. Measured. Updated collector on 12-27-19. |
2019-12-26 | No data | EAST 99 STREET, FROM STREET 1 AVENUE TO STREET F D R DRIVE | No data | Street Construction Inspections: Active | Department of Transportation | No work done, permit still active |
2019-12-26 | No data | 1 AVENUE, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work done, permit still active |
2019-12-26 | No data | EAST 74 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags fully replaced at this time. |
2019-12-26 | No data | GRAND STREET, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Active | Department of Transportation | No Bpp paving work started, Plastic barricades in parking. |
2019-12-26 | No data | KENT AVENUE, FROM STREET GRAND STREET TO STREET NORTH 1 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No Bpp paving work started, Plastic barricades in parking. |
2019-12-26 | No data | 2 AVENUE, FROM STREET EAST 73 STREET TO STREET EAST 74 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb reset. |
2019-12-26 | No data | F D R DRIVE, FROM STREET FDR DRIVE SB EXIT 14 TO STREET EAST 97 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work done, permit still active. |
2019-12-24 | No data | GRAND STREET, FROM STREET RIVER STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work not started in SE4 corner. Ramps are not functional or accessible. Will measure at a later date when ramps are completed. Updated collector on 12/24/19. |
2019-12-24 | No data | GRAND STREET, FROM STREET RIVER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to newest permit # B042019325A01 for inspection remarks. |
2019-12-21 | No data | 2 AVENUE, FROM STREET EAST 74 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Patch work on SE4 corner quadrant is unacceptable. Full quadrant need to be restored. Ramps are accessible and functional. Updated collector on 12-21-19. |
2019-12-21 | No data | 2 AVENUE, FROM STREET EAST 74 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Patch work on SE4 corner quadrant is unacceptable. Full quadrant need to be restored. Ramps are accessible and functional. Updated collector on 12-21-19. Active permit # M042019333A06 on file. |
2019-12-14 | No data | WEST HOUSTON STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Portion of sidewalk repaired; expansion joints sealed. |
2019-11-26 | No data | AMSTERDAM AVENUE, FROM STREET WEST 153 STREET TO STREET WEST 154 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints have been recessed and sealed. No defects to report |
2019-11-26 | No data | GRAND STREET, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Active | Department of Transportation | No bpp Street pavement work has started at time of inspection |
2019-11-26 | No data | EAST 138 STREET, FROM STREET ALEXANDER AVENUE TO STREET LINCOLN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SIDEWALK |
2019-11-25 | No data | GRAND STREET, FROM STREET RIVER STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started within the SE4 corner quadrant, Old existing tangent ramps are accessible and functional. Active permit on file and men on site/ |
2019-11-25 | No data | DESBROSSES STREET, FROM STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly constructed ramp on the NW corner quadrant is accessible and functional. Measured. Updated collector on 11-25-19. |
2019-11-25 | No data | MORTON STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk restored in kind. |
2019-11-25 | No data | CANAL STREET, FROM STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single tangent ramp in the SW1 corner found not to be Ada compliant, Ramp is accessible, functional measured and collected on 2/25/19. |
2019-11-24 | No data | LAFAYETTE AVENUE, FROM STREET GRAND AVENUE TO STREET ST JAMES PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb reveal installed in front of property #333 in compliance |
2019-11-21 | No data | AMSTERDAM AVENUE, FROM STREET WEST 99 STREET TO STREET WEST 100 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done, permit expired. |
2019-11-20 | No data | AMSTERDAM AVENUE, FROM STREET WEST 99 STREET TO STREET WEST 100 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Green plywood fence is currently on s/w, extending into curb. Active fence permit on file. M022019284C21 |
2019-11-20 | No data | SMITH STREET, FROM STREET BALTIC STREET TO STREET BUTLER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb work in compliance |
2019-11-18 | No data | HUDSON STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NW2 corner found not to be Ada compliant, Ramp is accessible and functional measured and collected on 11/6/19. |
2019-11-18 | No data | HUDSON STREET, FROM STREET MORTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed Apex ramp in the SW1 corner found not to be Ada compliant, Ramp is accessible, functional measured and collected on 11/1/19. |
2019-11-14 | No data | BALTIC STREET, FROM STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly installed tangent ramps in the SE4 corner quadrant are functional and accessible, however non Ada compliant. Previously measured and collected on 4/1/2019. 2nd C.A.R#[#20196870052] on file. |
2019-11-14 | No data | EAST 24 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Active | Department of Transportation | No work done, permit still active. |
2019-11-13 | No data | EAST 137 STREET, FROM STREET CYPRESS AVENUE TO STREET ST ANNS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV |
2019-11-12 | No data | GRAND STREET, FROM STREET RIVER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started within the SE4 , permit expired. |
2019-11-11 | No data | 2 AVENUE, FROM STREET EAST 73 STREET TO STREET EAST 74 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work started. New permit on file. |
2019-11-11 | No data | GRAND STREET, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new sidewalk installed in front of 262 kent avenue |
2019-11-10 | No data | EAST 19 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Portion of curb excavated, work at site ongoing active permit maintained on file...(M012019295A17) |
2019-11-09 | No data | 2 AVENUE, FROM STREET EAST 74 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done in the SE4 corner, permit expired. new permit # M042019301A23. On file. |
2019-11-09 | No data | AMSTERDAM AVENUE, FROM STREET WEST 100 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started in the SW1 corner quadrant. Ramps are accessible and functional. Wooden fence erected on sidewalk for Active BO. Collected on 10-15-19. |
2019-11-09 | No data | EAST 74 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started. Construction on 2nd Ave. |
2019-11-09 | No data | 2 AVENUE, FROM STREET EAST 74 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work done, permit still active. |
2019-11-06 | No data | HUDSON STREET, FROM STREET MORTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed Apex ramp in the SW1 corner found not to be Ada compliant, Ramp is accessible, functional measured and collected on 11/1/19. |
2019-11-06 | No data | HUDSON STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed apex ramp in the NW2 corner found not to be Ada compliant, Ramp is accessible, functional measured and collected on 11/6/19. |
2019-11-06 | No data | HUDSON STREET, FROM STREET MORTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed Apex ramp in the SW1 corner found not to be Ada compliant, Ramp is accessible, functional measured and collected on 11/1/19. New active permit # M042019301A26. |
2019-11-06 | No data | WEST 100 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | No work done, permit still active, |
2019-11-01 | No data | HUDSON STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Active | Department of Transportation | NW corner quadrant is excavated. Updated collector on 11-1-19. |
2019-11-01 | No data | CANAL STREET, FROM STREET WATTS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed ramp on the SE4 corner quadrant is accessible and functional, however, ramp is non Ada compliant. Measured. Updated collector on 11-1-19. |
2019-11-01 | No data | HUDSON STREET, FROM STREET MORTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Newly constructed Apex ramp on the SW corner quadrant is accessible and functional, however ramp is non Ada compliant. Measured and collected on 11-1-19. |
2019-10-31 | No data | WEST 76 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk in compliance no defects |
2019-10-30 | No data | DUFFIELD STREET, FROM STREET WILLOUGHBY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest accepted contractor correct. Not their work. This work was done prior to 2018. |
2019-10-28 | No data | GEORGE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, walk ... 09/77 |
2019-10-27 | No data | KENT AVENUE, FROM STREET GRAND STREET TO STREET NORTH 1 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plastic barricades in parking. No work started. |
2019-10-27 | No data | BRONX RIVER AVENUE, FROM STREET BRUCKNER EXPRESSWAY EXIT 51 WB TO STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced |
2019-10-27 | No data | GRAND STREET, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plastic barricades in parking. No work started. |
2019-10-25 | No data | VARICK STREET, FROM STREET 7 AVENUE SOUTH TO STREET DOWNING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work was possibly done under M042019262A16. Sidewalk restored is for loading dock area. |
2019-10-25 | No data | HUDSON STREET, FROM STREET LEROY STREET TO STREET MORTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working on sidewalk. Permit is still active. |
2019-10-25 | No data | HUDSON STREET, FROM STREET LEROY STREET TO STREET MORTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit on file M042019277A06. |
2019-10-25 | No data | VARICK STREET, FROM STREET 7 AVENUE SOUTH TO STREET DOWNING STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm active loading dock sidewalk restored in kind. Photos submitted are for loading dock sidewalk. |
2019-10-25 | No data | EAST 117 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New steel face curb ifo of new public school 85 |
2019-10-24 | No data | SOUNDVIEW AVENUE, FROM STREET DEAD END TO STREET HORIZON LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on parks dept property |
2019-10-23 | No data | DUFFIELD STREET, FROM STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Old existing tangent ramps within SW1 corner quadrant is non Ada compliant , however, ramps are functional and accessible. |
2019-10-23 | No data | KENT AVENUE, FROM STREET GRAND STREET TO STREET NORTH 1 STREET | No data | Street Construction Inspections: Active | Department of Transportation | SIGNS REMOVED - NO WORK STARTED |
2019-10-21 | No data | 2 AVENUE, FROM STREET EAST 74 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started on the SE corner quadrant. Ramps are accessible and functional. Collected on 10-21-19. |
2019-10-21 | No data | WEST HOUSTON STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb replaced and acceptable |
2019-10-17 | No data | AMSTERDAM AVENUE, FROM STREET WEST 153 STREET TO STREET WEST 154 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joints not properly recessed and sealed. |
2019-10-16 | No data | KENT AVENUE, FROM STREET GRAND STREET TO STREET SOUTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW CURB INSTALLED |
2019-10-16 | No data | AMSTERDAM AVENUE, FROM STREET WEST 155 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly constructed tangent ramps are accessible and functional, however ramps are non Ada compliant. Measured on and updated collector on 10-16-19. |
2019-10-15 | No data | AMSTERDAM AVENUE, FROM STREET WEST 100 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started on the SW corner quadrant. Ramps are accessible and functional. Wooden fence erected on sidewalk for Active BO. Collected on 10-15-19. |
2019-10-14 | No data | GRAND STREET, FROM STREET KENT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SW1 corner was found to be non Ada compliant ,however, Ramps are functional and accessible. Measured and collected on 10/14/2019. |
2019-10-13 | No data | EAST 138 STREET, FROM STREET ALEXANDER AVENUE TO STREET LINCOLN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESET, REPAIR OR REPLACE CURB |
2019-10-11 | No data | ROGERS PLACE, FROM STREET BEND TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | work done |
2019-10-11 | No data | AMSTERDAM AVENUE, FROM STREET WEST 153 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly constructed tangent ramps are accessible and functional, however, ramps are non Ada compliant. Measured and updated collector on 10-11-19. |
2019-10-10 | No data | HUDSON STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started on the NW corner quadrant. Apex ramp is accessible and functional. Updated collector on 10-10-19. Active permit # M042019277A07 on file. |
2019-10-10 | No data | HUDSON STREET, FROM STREET MORTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started on the SW corner quadrant. Ramp is accessible and functional. Collected on 10-10-19. |
2019-10-10 | No data | HUDSON STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started on the NW corner quadrant. Apex ramp is accessible and functional. Updated collector on 10-10-19. |
2019-10-08 | No data | GRAND STREET, FROM STREET RIVER STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work done, permit still active. |
2019-10-08 | No data | GOLD STREET, FROM STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Old existing tangent ramps tangent ramps in the SW1 corner quadrant are functional and accessible. Grey mats installed prior to 1/1/18. Collected but not measured |
2019-10-03 | No data | VARICK STREET, FROM STREET WEST HOUSTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly constructed tangent ramps on the NW2 corner quadrant is accessible and functional. Updated collector on 10-3-19. Scoring was installed. Unable to measure due to weather (rain). |
2019-10-01 | No data | 7 AVENUE SOUTH, FROM STREET VARICK STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints around Structures was sealed. Ramps are accessible and functional on the SW1 corner quadrant. Measured. Updated collector on 10-1-19. |
2019-09-30 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Patch work has been done to sidewalk and white plastic caps are in expansion joints. However active permit is on file.M042019246A08. |
2019-09-30 | No data | 3 AVENUE, FROM STREET EAST 138 STREET TO STREET EAST 139 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | worek done |
2019-09-30 | No data | ROGERS PLACE, FROM STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Isolation corrected |
2019-09-30 | No data | HUDSON STREET, FROM STREET LEROY STREET TO STREET MORTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk being restored at the aka with active permit on file. M042019246A07. |
2019-09-30 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | White caps in expansion joints and patch work observed on sidewalk. Perm still active. |
2019-09-27 | No data | KENT AVENUE, FROM STREET GRAND STREET TO STREET NORTH 1 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No bpp Street pavement work has started at time of inspection |
2019-09-27 | No data | GRAND STREET, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Active | Department of Transportation | No bpp Street pavement work has started at time of inspection |
2019-09-26 | No data | GRAND STREET, FROM STREET KENT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active work on site. Newly completed tangent ramps are not functional or accessible due to barricades and gates around ramps We’ll measure and reinspect at a later date. |
2019-09-26 | No data | AMSTERDAM AVENUE, FROM STREET WEST 155 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started on the SW corner quadrant at the time of inspection. Ramps are accessible and functional. Updated collector on 9-26-19. |
2019-09-25 | No data | AMSTERDAM AVENUE, FROM STREET WEST 153 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at time of inspection on the NW corner quadrant. Ramps are accessible and functional. Updated collector on 9-25-19. |
2019-09-21 | No data | AMSTERDAM AVENUE, FROM STREET WEST 153 STREET TO STREET WEST 154 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags repaired and flush. Plastic caps on expansion joints but new permit on file. |
2019-09-19 | No data | VARICK STREET, FROM STREET 7 AVENUE SOUTH TO STREET DOWNING STREET | No data | Street Construction Inspections: Active | Department of Transportation | Half of steel face curb has been restored. Clarkson St & Varick St from there to NY Sports club is where the steel curb has been installed. Perm still active. |
2019-09-19 | No data | AMSTERDAM AVENUE, FROM STREET WEST 155 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started on the SW1 corner quadrant. Ramps are accessible and functional. Collected on 9-19-19. |
2019-09-19 | No data | VARICK STREET, FROM STREET 7 AVENUE SOUTH TO STREET DOWNING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Half of steel face curb has been restored. Clarkson St & Varick St from there to NY Sports club is where the steel curb has been installed. Work will be finished under active permit M012019232B64. |
2019-09-18 | No data | HUDSON STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started . Apex ramp is accessible and functional. Collected on 9-18-19. Permit is still active active. |
2019-09-18 | No data | KENT AVENUE, FROM STREET GRAND STREET TO STREET SOUTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new curb installed with new permit |
2019-09-18 | No data | KENT AVENUE, FROM STREET GRAND STREET TO STREET SOUTH 1 STREET | No data | Street Construction Inspections: Active | Department of Transportation | new sidewalk installed behind fence |
2019-09-17 | No data | AMSTERDAM AVENUE, FROM STREET WEST 153 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done on the NW2 corner quadrant. Ramps are accessible and functional. Collected on 9-17-19. |
2019-09-17 | No data | WEST HOUSTON STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Active | Department of Transportation | s/w not occupied |
2019-09-16 | No data | 1 AVENUE, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No defects |
2019-09-11 | No data | HUDSON STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done, permit expired found active permit M042019246A09 on file |
2019-09-10 | No data | WEST 25 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Respondent failed to comply with the terms of their DOT permit stip 1/2+5 ft by paving roadway without contacting the NYC DOT HIQA Manhattan borough office 4hrs in advance. |
2019-09-10 | No data | EAST 65 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new sidewalk is in compliance |
2019-09-06 | No data | HUDSON STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Active | Department of Transportation | No ped ramp work done |
2019-09-06 | No data | AMSTERDAM AVENUE, FROM STREET WEST 99 STREET TO STREET WEST 100 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active B.O |
2019-09-05 | No data | AMSTERDAM AVENUE, FROM STREET WEST 153 STREET TO STREET WEST 154 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At time of inspection work not started. Permit expired. |
2019-09-03 | No data | VARICK STREET, FROM STREET WEST HOUSTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Collector was updated and corner will be measured at a later date , DWS installed however no flares installed and no sidewalk scoring. Expansion joints need to be sealed but no action taken at this time permit is active. |
2019-09-03 | No data | VARICK STREET, FROM STREET WEST HOUSTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Above permit expired found active permit M042019232A13 on file , see for inspection results |
2019-08-29 | No data | 1 AVENUE, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Metal steel faced curb reset in compliance. |
2019-08-27 | No data | DUFFIELD STREET, FROM STREET FULTON STREET TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Brand new sidewalk flags installed in front of property #110 in compliance. |
2019-08-27 | No data | ROGERS PLACE, FROM STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly completed tangent ramps in the NW2 found to be non Ada compliant due to excessive landing running slopes. Ramps are accessible, functional and measured on 6/16/19. Collected on 6/13/19 |
2019-08-26 | No data | CANAL STREET, FROM STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Later permit M042019088A19 on file, see for inspection remarks |
2019-08-26 | No data | CANAL STREET, FROM STREET WATTS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Later permit M042018261A18 on file, see for inspection remarks |
2019-08-26 | No data | DESBROSSES STREET, FROM STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Later permit M042018261A17 on file, see for inspection remarks |
2019-08-25 | No data | METROPOLITAN AVENUE, FROM STREET BENEDICT AVENUE TO STREET HUGH J GRANT CIRCLE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk repaired |
2019-08-23 | No data | EAST 99 STREET, FROM STREET 1 AVENUE TO STREET F D R DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Metal face curb reset is in compliance. |
2019-08-21 | No data | 7 AVENUE SOUTH, FROM STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Corner previously measured and collected |
2019-08-21 | No data | HUDSON STREET, FROM STREET LEROY STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started in this corner at time of inspection |
2019-08-20 | No data | GRAND STREET, FROM STREET KENT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Pedestrian ramps behind active building operation. Will return once ramps are restored. |
2019-08-20 | No data | WEST 100 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | No BPP street pave work started |
2019-08-20 | No data | AMSTERDAM AVENUE, FROM STREET WEST 99 STREET TO STREET WEST 100 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No BPP street pave work started |
2019-08-20 | No data | GRAND STREET, FROM STREET KENT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to active permit #B042019212A32 |
2019-08-19 | No data | AMSTERDAM AVENUE, FROM STREET WEST 153 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work obseverd at time of inspection |
2019-08-19 | No data | AMSTERDAM AVENUE, FROM STREET WEST 155 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at time of inspection |
2019-08-19 | No data | VARICK STREET, FROM STREET 7 AVENUE SOUTH TO STREET DOWNING STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | upon arrival the contractor was not in violation of their DOT permit. respondent was also providing protection when chipping away sidewalk. |
2019-08-16 | No data | AMSTERDAM AVENUE, FROM STREET WEST 153 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work was done, permit expired. |
2019-08-16 | No data | AMSTERDAM AVENUE, FROM STREET WEST 155 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work was done, permit expired. |
2019-08-15 | No data | EAST 47 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the respondent failed to comply with the terms of their DOT permit by paving 1/2+5 ft of the roadway without contacting the NYC DOT HIQA Manhattan borough office 4hrs in advance. Upon inspection paved roadway was completed. |
2019-08-15 | No data | EAST 46 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the respondent failed to comply with the terms of their DOT permit by paving 1/2+5 ft of the roadway without contacting the NYC DOT HIQA Manhattan borough office 4hrs in advance. Upon inspection paved roadway was completed. |
2019-08-14 | No data | BRONXDALE AVENUE, FROM STREET AMTRAK RR TO STREET POPLAR STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | expansion joints installed and sealed |
2019-08-13 | No data | WEST 43 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb in compliance. |
2019-08-12 | No data | WILLOUGHBY STREET, FROM STREET DUFFIELD STREET TO STREET GOLD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW SIDEWALK WITH NATIONAL GRID & NEW YORK PAVING DIGGING & RESTORING SIDEWALK FLAGS AT SAME ADDRESS 110 WILLOUGHBY STREET |
2019-08-10 | No data | VARICK STREET, FROM STREET WEST HOUSTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started. Old existing tangent ramps are accessible and functional |
2019-08-10 | No data | VARICK STREET, FROM STREET WEST HOUSTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work was done on nw2 corner permit expired. |
2019-08-09 | No data | WEST 44 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb in compliance. |
2019-08-08 | No data | WEST 44 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb in compliance. |
2019-08-07 | No data | WATTS STREET, FROM STREET GREENWICH STREET TO STREET HOLLAND TUNNEL EXIT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new sidewalk is in compliance |
2019-08-07 | No data | WEST 100 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk occupied with fence at this time. |
2019-08-07 | No data | METROPOLITAN AVENUE, FROM STREET BENEDICT AVENUE TO STREET HUGH J GRANT CIRCLE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk repaired |
2019-08-07 | No data | BRONXDALE AVENUE, FROM STREET AMTRAK RR TO STREET POPLAR STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk repaired |
2019-08-07 | No data | HUDSON STREET, FROM STREET BEND TO STREET DESBROSSES STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new sidewalk is in compliance |
2019-08-07 | No data | DESBROSSES STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new sidewalk is in compliance |
2019-08-07 | No data | CANAL STREET, FROM STREET HUDSON STREET TO STREET WATTS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new sidewalk is in compliance |
2019-08-06 | No data | WEST 43 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done. Permit expired. |
2019-08-06 | No data | WEST 66 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk repair in compliance. |
2019-08-04 | No data | VARICK STREET, FROM STREET 7 AVENUE SOUTH TO STREET DOWNING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I found multiple sidewalk flags has been restored. |
2019-08-03 | No data | KENT AVENUE, FROM STREET GRAND STREET TO STREET SOUTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW CURB INSTALLED NOT SEALED WITH NEW PERMIT ON FILE |
2019-08-03 | No data | GRAND STREET, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW PERMIT BEING INSTALLED WITH NEW PERMIT |
2019-08-03 | No data | GRAND STREET, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Active | Department of Transportation | NEW CURB BEING INSTALLED NEW PERMIT ON FILE |
2019-08-03 | No data | KENT AVENUE, FROM STREET GRAND STREET TO STREET SOUTH 1 STREET | No data | Street Construction Inspections: Active | Department of Transportation | NEW SWK BEHIND FENCE NOT SEALED NEW PERMIT ON FILE |
2019-08-02 | No data | WEST HOUSTON STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done active permit on file |
2019-07-31 | No data | WESTCHESTER AVENUE, FROM STREET EAST 162 STREET TO STREET ROGERS PLACE | No data | Street Construction Inspections: Active | Department of Transportation | PAVE STREET-W/ ENGINEERING & INSP FEE |
2019-07-31 | No data | ST NICHOLAS AVENUE, FROM STREET MANHATTAN AVENUE TO STREET WEST 125 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Respondent failed to notify NYC DOT HIQA borough ( Manhattan ) office within four hours prior to paving. As per stipulation 1/2+ 5. |
2019-07-31 | No data | WEST 125 STREET, FROM STREET 8 AVENUE TO STREET ST NICHOLAS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work was done, permit still active |
2019-07-31 | No data | MADISON AVENUE, FROM STREET EAST 46 STREET TO STREET EAST 47 STREET | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent failed to notify NYC DOT HIQA borough (Manhattan) office within four hours prior to Paving. As per stipulation 1/2 + 5. Street was paved. |
2019-07-31 | No data | ROGERS PLACE, FROM STREET BEND TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Active | Department of Transportation | PAVE STREET-W/ ENGINEERING & INSP FEE |
2019-07-28 | No data | AMSTERDAM AVENUE, FROM STREET WEST 153 STREET TO STREET WEST 154 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel face curb installed and remains in acceptable condition. |
2019-07-28 | No data | EAST 65 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk in compliance. |
2019-07-27 | No data | ROGERS PLACE, FROM STREET BEND TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed two sidewalk flags not fully restored in kind having concrete patchwork. Full flag restorations needed as per CAR #20192380157 Issued 6/17/2019. |
2019-07-26 | No data | BEDFORD AVENUE, FROM STREET NORTH 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired and no work started on the NE3 corner quadrant. Collected on 7-26-19. |
2019-07-26 | No data | WEST 66 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk shed over sidewalk flags. Flags aren't in kind with surrounding pigment. |
2019-07-25 | No data | GRAND STREET, FROM STREET KENT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Tangent ramps in the SW1 corner quadrant is behind active B.O. fence. Updated collector on 7-25-19. Active permit # B042019184A23 on file. |
2019-07-25 | No data | GRAND STREET, FROM STREET KENT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Tangent ramps in the SW1 corner quadrant is behind active B.O. fence. Updated collector on 7-25-19. |
2019-07-23 | No data | EAST 117 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site. Milling has yet to be done so contractor was informed to call for confirmation to have an inspector properly monitor paving 3 inches. |
2019-07-22 | No data | EAST 117 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work was done at time of inspection. |
2019-07-21 | No data | DUFFIELD STREET, FROM STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps are accessible, functional and collected on 7/21/19 and we’ll measure at a later date. |
2019-07-21 | No data | GOLD STREET, FROM STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work was done, permit expired. |
2019-07-20 | No data | ROGERS PLACE, FROM STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent constructed a pedestrian in the northwest corner and failed to install expansion joints around traffic street light structure according to the H-1011 specs note#8. Respondent was notified 6/13/19 by C.A.R 20195730334. |
2019-07-19 | No data | KENT AVENUE, FROM STREET GRAND STREET TO STREET SOUTH 1 STREET | No data | Street Construction Inspections: Active | Department of Transportation | INSTALLING NEW SWK |
2019-07-19 | No data | WATTS STREET, FROM STREET VARICK STREET TO STREET HOLLAND TUNNEL APPROACH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new curb is in compliance |
2019-07-18 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Review permit M012019105C87 for previous inspection. Condition remains with Half roadway barriceded |
2019-07-18 | No data | WILLOUGHBY STREET, FROM STREET DUFFIELD STREET TO STREET GOLD STREET | No data | Street Construction Inspections: Active | Department of Transportation | no walkway |
2019-07-18 | No data | WESTCHESTER AVENUE, FROM STREET EAST 162 STREET TO STREET ROGERS PLACE | No data | Street Construction Inspections: Active | Department of Transportation | BPP pave street work not started. |
2019-07-18 | No data | ROGERS PLACE, FROM STREET BEND TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Active | Department of Transportation | Bpp pave street work not started. |
2019-07-18 | No data | DUFFIELD STREET, FROM STREET FULTON STREET TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Active | Department of Transportation | WALKWAY REMOVED |
2019-07-16 | No data | 1 AVENUE, FROM STREET EAST 117 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition remains the same. N.O.V previously issued. |
2019-07-16 | No data | EAST 65 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No pedestrian walkway on location |
2019-07-15 | No data | EAST 65 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No roadway occupancy at this time. |
2019-07-09 | No data | VARICK STREET, FROM STREET GRAND STREET TO STREET WATTS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new curb is in compliance |
2019-07-05 | No data | GEORGE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk repaired. |
2019-07-03 | No data | 1 AVENUE, FROM STREET EAST 117 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent constructed a pedestrian ramp in the southwest corner and failed to install expansion joints around traffic light pole structure according to H-1011 note #8. Respondent was notified via CAR #20194600168 on 5/21/19 of this condition. |
2019-07-03 | No data | CLARKSON STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The sidewalk has been restored for the length and width of the property. |
2019-07-03 | No data | VARICK STREET, FROM STREET 7 AVENUE SOUTH TO STREET DOWNING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I found a steel face curb installed with a later permit on file. |
2019-07-01 | No data | KENT AVENUE, FROM STREET GRAND STREET TO STREET SOUTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW CURB INSTALLED BEHIND FENCE BUILDING OPERATION |
2019-07-01 | No data | GRAND STREET, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO NEW CURB INSTALLED AT BUILDING OPERATION BEHIND FENCE |
2019-07-01 | No data | WEST HOUSTON STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done with an active permit on file |
2019-06-30 | No data | VARICK STREET, FROM STREET 7 AVENUE SOUTH TO STREET DOWNING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I found approximately 20' portion of a steel face curb has been installed. |
2019-06-25 | No data | BALTIC STREET, FROM STREET HOYT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | TRENCH SEALED |
2019-06-25 | No data | CLARKSON STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | side walk acceptable (new permit on file (M042019137A11) |
2019-06-21 | No data | WEST HOUSTON STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Active | Department of Transportation | no occupancy of sidewalk |
2019-06-20 | No data | GRAND STREET, FROM STREET KENT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Tangent ramps in the SW1 corner quadrant is behind active B.O. fence. Collected on 6/20/19 will measured at a later date. |
2019-06-18 | No data | 1 AVENUE, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET | No data | Street Construction Inspections: Active | Department of Transportation | After you paved street with concrete adjacent to new curb for new building permittee failed to restored green paint lan e making for bike lane. As per 1042 C of standard details of construction |
2019-06-17 | No data | ROGERS PLACE, FROM STREET BEND TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O 917 Full flag restoration needed |
2019-06-17 | No data | WESTCHESTER AVENUE, FROM STREET EAST 162 STREET TO STREET ROGERS PLACE | No data | Street Construction Inspections: Active | Department of Transportation | No Builders Paving Plan was done upon my inspection |
2019-06-16 | No data | ROGERS PLACE, FROM STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Condition previously reported; however ramps are found to be non Ada compliant due to excessive landing running slopes. Ramps are accessible, functional and measured on 6/16/19. Collected on 6/13/19 |
2019-06-14 | No data | WATTS STREET, FROM STREET GREENWICH STREET TO STREET HOLLAND TUNNEL EXIT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed ramp on the SE4 corner quadrant is accessible and functional, however ramp is non Ada compliant. Measured on 8-27-18 and updated collector on 6-14-19. Current permit # M042018261A18 on file. |
2019-06-14 | No data | HUDSON STREET, FROM STREET BEND TO STREET DESBROSSES STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed ramp on the NW2 corner quadrant is accessible and functional, however ramp is non Ada compliant. Measured on 2-25-19 and updated collector on 6-14-19. Refer to permit # M042018261A17 on file. |
2019-06-14 | No data | CANAL STREET, FROM STREET HUDSON STREET TO STREET WATTS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed ramp is accessible and functional, however ramp is non Ada compliant. Refer to permit # M042018261A16 on file. |
2019-06-14 | No data | VARICK STREET, FROM STREET WEST HOUSTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this location. Collected on 6-14-19. Will measure at a later time |
2019-06-14 | No data | 7 AVENUE SOUTH, FROM STREET VARICK STREET | No data | Street Construction Inspections: Active | Department of Transportation | Completed tangent ramp on the SW1 corner quadrant is accessible and functional, however ramps are non Ada compliant. Measured and collected on 6-14-19. Isolated hydrant, pole & expansion joints need to be sealed. |
2019-06-13 | No data | ROGERS PLACE, FROM STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NW2 corner, Ramps are accessible, functional will measured at a later date due rain was collected on 6/13/19. |
2019-06-09 | No data | 7 AVENUE SOUTH, FROM STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly constructed tangent ramps completed, however a new permit M042019137A10 on file. Refer to new permit for more information. |
2019-06-05 | No data | WEST HOUSTON STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done with an active permit on file |
2019-06-05 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Met with Frankie from City and CountyPaving Corp. Crew on side cleaning pre-existing concrete base. Will level base and replace cobble stones on half roadway opposite premises. Acceptable. |
2019-06-04 | No data | ROGERS PLACE, FROM STREET EAST 165 STREET TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel faced curb installed |
2019-06-04 | No data | WESTCHESTER AVENUE, FROM STREET EAST 162 STREET TO STREET ROGERS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel faced curb installed |
2019-06-04 | No data | CANAL STREET, FROM STREET HUDSON STREET TO STREET WATTS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Curb installation on roadway sealed |
2019-06-03 | No data | BRISTOL STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been repaved by DOT. |
2019-06-03 | No data | BRISTOL STREET, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway repaved. |
2019-05-30 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | About 30% of roadway restored. Cobble stones grout curing. Acceptable. |
2019-05-30 | No data | VARICK STREET, FROM STREET WEST HOUSTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found at address given |
2019-05-28 | No data | GRAND STREET, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW CURB WITH NEW PERMIT AT BUILDING OPERATION |
2019-05-23 | No data | KENT AVENUE, FROM STREET GRAND STREET TO STREET SOUTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curbs behind fence. |
2019-05-23 | No data | WEST 181 STREET, FROM STREET CABRINI BOULEVARD TO STREET PINEHURST AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel face curb installed. |
2019-05-23 | No data | WEST HOUSTON STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Active | Department of Transportation | work not in the segment |
2019-05-23 | No data | KENT AVENUE, FROM STREET GRAND STREET TO STREET SOUTH 1 STREET | No data | Street Construction Inspections: Active | Department of Transportation | excavated swk behind fence |
2019-05-21 | No data | 1 AVENUE, FROM STREET EAST 117 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly constructed tangent ramps found to be Ada compliant, accessible,functional,measured and collected on 5/21/19 |
2019-05-21 | No data | CANAL STREET, FROM STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW1 Corner newly completed offset one ramp found to be non Ada compliant. Ramp is functional and accessible. Previously measured and collected.Training Insp. 689 |
2019-05-20 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Building pavement plan: Cobble stones roadway is being restore at this time on half of the street. Acceptable. |
2019-05-19 | No data | WESTCHESTER AVENUE, FROM STREET EAST 162 STREET TO STREET ROGERS PLACE | No data | Street Construction Inspections: Active | Department of Transportation | no milling or paving done |
2019-05-19 | No data | ROGERS PLACE, FROM STREET BEND TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Active | Department of Transportation | no milling or paving done |
2019-05-14 | No data | CANAL STREET, FROM STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed ramp / BBP blitz as per Kerry |
2019-05-14 | No data | DESBROSSES STREET, FROM STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work completed at this location/ BBP blitz as per Kerry |
2019-05-12 | No data | CLARKSON STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Active | Department of Transportation | At the time of inspection, I found multiple barricades aligned along the parking lane which are being used as a temporary pedestrian walkway. |
2019-05-11 | No data | GRAND STREET, FROM STREET KENT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started within SW1 corner quadrant. |
2019-05-11 | No data | CABRINI BOULEVARD, FROM STREET WEST 180 STREET TO STREET WEST 181 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel face curb installed. |
2019-05-10 | No data | ROGERS PLACE, FROM STREET EAST 165 STREET TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel faced curb installed |
2019-05-10 | No data | WESTCHESTER AVENUE, FROM STREET EAST 162 STREET TO STREET ROGERS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel faced curb installed |
2019-05-09 | No data | BEDFORD AVENUE, FROM STREET NORTH 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Will come back on later date to measure. Due to active construction on site. |
2019-05-08 | No data | BALTIC STREET, FROM STREET SMITH STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Light post was isolated. |
2019-05-08 | No data | GEORGE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB IS IN COMPLIANCE |
2019-05-08 | No data | EAST 138 STREET, FROM STREET ALEXANDER AVENUE TO STREET LINCOLN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb was replaced |
2019-05-08 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Met with Frankie and Nuno from City and County Paving Corp. Cobble stones on half the roadway removed. We inspected the current base and concluded that a new base need to be pour. Half roadway barricaded. |
2019-05-08 | No data | 1 AVENUE, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb reset in compliance with new sidewalk flags with sealed expansion joints. |
2019-05-01 | No data | ROGERS PLACE, FROM STREET EAST 165 STREET TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done |
2019-05-01 | No data | WEST 44 STREET, FROM STREET 8 AVENUE TO STREET SHUBERT ALLEY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done and no active permit on file. |
2019-05-01 | No data | WESTCHESTER AVENUE, FROM STREET EAST 162 STREET TO STREET ROGERS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done. |
2019-04-30 | No data | 31 STREET, FROM STREET 49 AVENUE TO STREET BORDEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb restored |
2019-04-30 | No data | 31 PLACE, FROM STREET 49 AVENUE TO STREET BORDEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb restored |
2019-04-24 | No data | EAST 139 STREET, FROM STREET ALEXANDER AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb in compliance |
2019-04-24 | No data | BALTIC STREET, FROM STREET HOYT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk complete. |
2019-04-24 | No data | CANAL STREET, FROM STREET HUDSON STREET TO STREET WATTS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O aka 205 Hudson on Canal St, street opening joint for steel face curb installation needs to be permanently sealed. |
2019-04-24 | No data | 31 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk flags restored expansion joints sealed |
2019-04-23 | No data | CANAL STREET, FROM STREET WATTS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Red DWS was installed. |
2019-04-23 | No data | CANAL STREET, FROM STREET HUDSON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Light post was isolated and pavement key installed. Ramp is accessible and functional. |
2019-04-19 | No data | GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | No evidence of work at location. Current permit M012019084C86 on file |
2019-04-19 | No data | ROGERS PLACE, FROM STREET BEND TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Active | Department of Transportation | Work has not started yet, active building operation on site with materials and equipment in roadway. D.O.T will be notified before paving process begins. |
2019-04-19 | No data | WESTCHESTER AVENUE, FROM STREET EAST 162 STREET TO STREET ROGERS PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Work has not started yet, active building operation on site with materials and equipment in roadway. D.O.T will be notified before paving process begins. |
2019-04-14 | No data | EAST 138 STREET, FROM STREET ALEXANDER AVENUE TO STREET LINCOLN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no curb replaced |
2019-04-14 | No data | GEORGE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | swk flags in compliance |
2019-04-14 | No data | GEORGE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT HAD FAILED TO RAMP THE PEDESTRIAN WALKWAY AT ENTRY. A VIOLATION TO THE TERMS & CONDITIONS OF STIPULATION 014 OF ABOVE DOT PERMIT# B022019093E32 WHICH WAS FOR ID |
2019-04-11 | No data | EAST 117 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW is flushed and expansion joints sealed |
2019-04-11 | No data | 1 AVENUE, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW is flushed with sealed expansion joints |
2019-04-10 | No data | BALTIC STREET, FROM STREET HOYT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | reseal trench adjacent to curb after installation. |
2019-04-10 | No data | EAST 138 STREET, FROM STREET ALEXANDER AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Street has been properly milled |
2019-04-10 | No data | EAST 139 STREET, FROM STREET ALEXANDER AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Street has been milled |
2019-04-10 | No data | 1 AVENUE, FROM STREET 43 STREET TO STREET 44 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s\w ok |
2019-04-10 | No data | SMITH STREET, FROM STREET BALTIC STREET TO STREET BUTLER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new sidewalk installed. |
2019-04-09 | No data | BERRY STREET, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | SEALED OK |
2019-04-04 | No data | WEST 44 STREET, FROM STREET 8 AVENUE TO STREET SHUBERT ALLEY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No sidewalk repairs done. |
2019-04-04 | No data | SHERMAN AVENUE, FROM STREET ACADEMY STREET TO STREET WEST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site milling following all DOT requirements. Photos sent to office. |
2019-04-03 | No data | 1 AVENUE, FROM STREET EAST 117 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit renewed M042019084a25. New tangent ramp found to be barricaded during inspection. Refer to new permit inspection remarks for further information. |
2019-04-03 | No data | 1 AVENUE, FROM STREET EAST 117 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Newly constructed tangent ramps found to be barricaded during inspection.Unable to measure due barriers. Ramp is not assessable or functional at this time. We’ll reinspect at a later; however ramps were collected on 4/3/19. |
2019-04-02 | No data | WEST 56 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk flags IFO Building 12 are defect free at time of inspection. |
2019-04-01 | No data | BALTIC STREET, FROM STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly installed tangent ramps in the SE4 corner quadrant are functional and accessible, however non Ada compliant. Measured and collected on 4/1/2019 |
2019-03-28 | No data | CANAL STREET, FROM STREET HUDSON STREET TO STREET WATTS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O aka 205 Hudson, steel face curb installed. |
2019-03-27 | No data | DESBROSSES STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O aka 205 Hudson, steel face curb installed. |
2019-03-26 | No data | DESBROSSES STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O aka 205 Hudson, steel face curb installed. |
2019-03-25 | No data | EAST 138 STREET, FROM STREET ALEXANDER AVENUE TO STREET LINCOLN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site. 5ft open to pedestrians on the sidewalk |
2019-03-25 | No data | EAST 138 STREET, FROM STREET ALEXANDER AVENUE TO STREET LINCOLN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permit updated X012019060B12 |
2019-03-21 | No data | 35 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb installed |
2019-03-21 | No data | WEST 76 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel face curb in compliance. |
2019-03-21 | No data | 31 PLACE, FROM STREET 49 AVENUE TO STREET BORDEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/W replaced. |
2019-03-21 | No data | 31 STREET, FROM STREET 49 AVENUE TO STREET BORDEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/W replaced. |
2019-02-27 | No data | 1 AVENUE, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW is flushed and expansion joints are sealed |
2019-02-25 | No data | CANAL STREET, FROM STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed Apex ramp on the SW1 corner quadrant is accessible and functional, however, ramp is non Ada compliant. Measured and collected on 2-25-19. |
2019-02-25 | No data | CANAL STREET, FROM STREET WATTS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed ramp on the SE4 corner quadrant is accessible and functional, however, ramp is non Ada compliant. Measured and collected on 8-27-18. |
2019-02-25 | No data | DESBROSSES STREET, FROM STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed Apex ramp on the NW2 corner quadrant is accessible and functional, however, ramp is non Ada compliant. Measured and collected on 2-25-19. |
2019-02-15 | No data | BEARD STREET, FROM STREET CONOVER STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new curb |
2019-01-24 | No data | BERRY STREET, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB SEALED |
2019-01-24 | No data | BEARD STREET, FROM STREET CONOVER STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDEWALK GOOD. |
2019-01-16 | No data | BROADWAY, FROM STREET WEST 66 STREET TO STREET WEST 67 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No recent work done. |
2019-01-14 | No data | BRONXDALE AVENUE, FROM STREET AMTRAK RR TO STREET POPLAR STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PROTEST ACCEPTED DUE TO WORK WAS DONE FOR THE PROPERTY WHERE THE OLD "BRONX GRILL" IS AND CITY & COUNTY PAVED INSIDE THE PROPERTY FOR NEW BUSINESS ON THE SOUTH SIDE OF BRONXDALE. |
2019-01-14 | No data | YORK STREET, FROM STREET BEND TO STREET CADMAN PLAZA EAST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RE-SURFACED HALF ROADWAY PLUS 5 FT |
2019-01-08 | No data | BEACH 108 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET ROCKAWAY FREEWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair sidewalk , expansion joints and sealer applied. |
2019-01-04 | No data | BEARD STREET, FROM STREET CONOVER STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Active | Department of Transportation | cobblestont reset 1\2 5 |
2019-01-03 | No data | BRONXDALE AVENUE, FROM STREET AMTRAK RR TO STREET POPLAR STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joint needs to be installed, between the curb and sidewalk flags. |
2018-12-30 | No data | WEST 67 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Entire Sidewalk I/F/O 27 has been restored and is free of defects. |
2018-12-20 | No data | WEST 127 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW flushed and sealed AKA 2056 |
2018-12-18 | No data | 5 AVENUE, FROM STREET EAST 126 STREET TO STREET EAST 127 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk in compliance |
2018-12-17 | No data | JEROME AVENUE, FROM STREET EAST KINGSBRIDGE ROAD TO STREET WEST 195 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 193’x15’ paved. Paver will reach out during final repaving |
2018-12-01 | No data | BRONXDALE AVENUE, FROM STREET AMTRAK RR TO STREET POPLAR STREET | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk occupied |
2018-11-28 | No data | BERRY STREET, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | expansion joint on sidewalk not sealed. |
2018-11-28 | No data | CANAL STREET, FROM STREET HUDSON STREET TO STREET WATTS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I/F/O aka 205 Hudson St, installed sidewalk expansion joints have been permanently sealed. |
2018-11-27 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RWY RE-PAVED HALF PLUS 5 FEET - OK |
2018-11-13 | No data | BERRY STREET, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: Active | Department of Transportation | (L) 50 feet x (W) 22 feet x (D) 3 inches.. |
2018-11-13 | No data | SOUTH 5 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new sidewalk ok. |
2018-11-13 | No data | SOUTH 5 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Active | Department of Transportation | (L) 126 feet x (W) 25 feet x (D) 3 inches. |
2018-11-07 | No data | WEST 125 STREET, FROM STREET 8 AVENUE TO STREET ST NICHOLAS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | The respondent failed to maintain a 5ft clear pedestrian walk open on the sidewalk by fully closing sidewalk with fresh poured concrete surrounded with plastic barriers, violating stipulation #013 in permit. |
2018-11-07 | No data | ST NICHOLAS AVENUE, FROM STREET MANHATTAN AVENUE TO STREET WEST 125 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plastic caps need to be removed from sidewalk expansion joints however, permit in active status so no action taken |
2018-10-16 | No data | CANAL STREET, FROM STREET HUDSON STREET TO STREET WATTS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O aka 205 Hudson St ( corner property ), steel face curb installed. |
2018-10-16 | No data | WATTS STREET, FROM STREET GREENWICH STREET TO STREET HOLLAND TUNNEL EXIT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O aka 205 Hudson ( corner property ), full new sidewalk installed and expansion joints permanently sealed. |
2018-10-09 | No data | METROPOLITAN AVENUE, FROM STREET BENEDICT AVENUE TO STREET HUGH J GRANT CIRCLE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk in compliance. |
2018-10-04 | No data | CABRINI BOULEVARD, FROM STREET WEST 180 STREET TO STREET WEST 181 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel face curb found. |
2018-10-01 | No data | WEST 181 STREET, FROM STREET CABRINI BOULEVARD TO STREET PINEHURST AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | updated permit was found. |
2018-09-25 | No data | SOUNDVIEW AVENUE, FROM STREET DEAD END TO STREET HORIZON LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel face curb installed near area of ferry/park. |
2018-09-22 | No data | I 678, FROM STREET 14 AVENUE TO STREET WHITESTONE EXPRESSWAY ET 15 SB | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/w replace |
2018-09-19 | No data | WEST 56 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done under this permit |
2018-09-14 | No data | HUDSON STREET, FROM STREET BEND TO STREET DESBROSSES STREET | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O 205, sidewalk work complete ( expansion joints not permanently sealed ) Permit is active and no CAR issued at this time. |
2018-09-14 | No data | HUDSON STREET, FROM STREET BEND TO STREET DESBROSSES STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 205, sidewalk has been replaced ( expansion joints missing seal ). Active permit M042018243A03 on file and no CAR issued at this time. |
2018-09-14 | No data | DESBROSSES STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O aka 205 Hudson, curb work ongoing. Portion of roadway within parking lane occupied with barrels around cobble stones. Permit is active. |
2018-09-14 | No data | DESBROSSES STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O aka 205 Hudson, curb work ongoing under active permit M012018243A16. Portion of roadway within parking lane occupied with barrels around cobble stones. |
2018-09-10 | No data | DESBROSSES STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk replacement ongoing. Refer to permit M042018243A04. |
2018-09-10 | No data | DESBROSSES STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Failure to notify DOT HIQA as per stip. 105. NOV issued. |
2018-09-08 | No data | 132 STREET, FROM STREET 15 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb in compliance |
2018-09-01 | No data | 1 AVENUE, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | New tangent ramp functional and accessible. collected and inspected on 8/10/18. |
2018-09-01 | No data | CONEY ISLAND AVENUE, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb ok ifo post office. |
2018-08-27 | No data | DESBROSSES STREET, FROM STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work not started previously collected 8/20/14 |
2018-08-27 | No data | CANAL STREET, FROM STREET WATTS STREET | No data | Street Construction Inspections: Active | Department of Transportation | Collected and inspected on 8/27/2018. Gray DWS need to be changed to red. Also, white plastic cap around expansion joints need to be removed and joints need to be sealed. |
2018-08-27 | No data | CANAL STREET, FROM STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started : Last Collected 11/2016 |
2018-08-18 | No data | WEST 76 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Reset curb and multiple sidewalk flags are in compliance with sealed expansion joints. |
2018-08-16 | No data | DESBROSSES STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk occupied as stipulated. ( steel face curb stored on sidewalk with clear path for pedestrians ) |
2018-08-15 | No data | HUDSON STREET, FROM STREET CANAL STREET TO STREET HOLLAND TUNNEL EXIT | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Failure to obtain a materials permit type 0201 for storage of steel face curb on sidewalk. NOV issued. |
2018-08-12 | No data | SOUTH 5 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb work done |
2018-08-09 | No data | 52 STREET, FROM STREET 39 DRIVE TO STREET SKILLMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/W flags repaired, joints sealed. |
2018-08-08 | No data | HUDSON STREET, FROM STREET BEND TO STREET DESBROSSES STREET | No data | Street Construction Inspections: Active | Department of Transportation | No new sidewalk work observed at this time. Permit expired. |
2018-08-08 | No data | WATTS STREET, FROM STREET GREENWICH STREET TO STREET HOLLAND TUNNEL EXIT | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O aka 205 Hudson, sidewalk expansion joints not sealed at this time. Active permit on file and no CAR issued. |
2018-08-08 | No data | CANAL STREET, FROM STREET HUDSON STREET TO STREET WATTS STREET | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O aka 205 Hudson, steel face curb installed and cutback from curb is temp in roadway. Active permit on file and no CAR issued at this time. |
2018-08-08 | No data | DESBROSSES STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | No new curb installation observed at this time. Permit expired. |
2018-08-04 | No data | 132 STREET, FROM STREET 15 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done at time of inspection, permit expired |
2018-08-01 | No data | LAFAYETTE AVENUE, FROM STREET GRAND AVENUE TO STREET ST JAMES PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | swk flags are in compliance |
2018-07-28 | No data | WATTS STREET, FROM STREET GREENWICH STREET TO STREET HOLLAND TUNNEL EXIT | No data | Street Construction Inspections: Active | Department of Transportation | wrong permit segment location not required |
2018-07-28 | No data | CANAL STREET, FROM STREET WATTS STREET | No data | Street Construction Inspections: Active | Department of Transportation | work not started |
2018-07-28 | No data | CANAL STREET, FROM STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | work not started |
2018-07-28 | No data | CANAL STREET, FROM STREET HUDSON STREET TO STREET WATTS STREET | No data | Street Construction Inspections: Active | Department of Transportation | work not started |
2018-07-25 | No data | SOUTH 5 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | open excavation to replace curb newer permit on file |
2018-07-25 | No data | SOUTH 5 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Active | Department of Transportation | open excavation on the r/w to replace curb |
2018-07-25 | No data | BERRY STREET, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2018-07-22 | No data | 39 DRIVE, FROM STREET 52 STREET TO STREET 54 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk replaced, joints sealed. |
2018-07-21 | No data | LORIMER STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | permittee did work & finalize it 50'x23' x3'' was paved |
2018-07-21 | No data | MANHATTAN AVENUE, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | permittee did work & finalized it 50'x23' x3'' was paved |
2018-07-20 | No data | EAST 139 STREET, FROM STREET ALEXANDER AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | section of concrete curb installed |
2018-07-08 | No data | SOUTH 5 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb in compliance |
2018-07-06 | No data | SOUTH 5 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk accessible |
2018-06-29 | No data | WEST 76 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ped/ walk r/w |
2018-06-29 | No data | WEST 76 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | wooden fence on top of barriers in the sidewalk without a permit. Permit number M022018157C18 is used for ID. |
2018-06-26 | No data | BEACH 108 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET ROCKAWAY FREEWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb replaced. |
2018-06-25 | No data | COLUMBUS AVENUE, FROM STREET WEST 76 STREET TO STREET WEST 77 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site and maintaining 5ft clear walkway |
2018-06-25 | No data | WEST 76 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk occupied with plastic barriers |
2018-06-25 | No data | WEST 76 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Above permit expired found active permit M042018157A29 on file |
2018-06-25 | No data | COLUMBUS AVENUE, FROM STREET WEST 76 STREET TO STREET WEST 77 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Above permit expired found active permit M042018157A28 on file |
2018-06-22 | No data | WEST 76 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on location following stips |
2018-06-22 | No data | COLUMBUS AVENUE, FROM STREET WEST 76 STREET TO STREET WEST 77 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on location working on sidewalk and maintaining 5ft clear walkway |
2018-06-22 | No data | COLUMBUS AVENUE, FROM STREET WEST 76 STREET TO STREET WEST 77 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sidewalk is being repaired with active permit M042018157A28 on file |
2018-05-29 | No data | 1 AVENUE, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 1918 PLEASE REPLACE THE PEDESTRIAN RAMP QUADRANT AS PER STANDARD SPECIFICATIONS H-1011 |
2018-05-29 | No data | SOUTH 5 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk in complince |
2018-05-13 | No data | DELANCEY STREET, FROM STREET ATTORNEY STREET TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w repaved |
2018-05-05 | No data | EAST 80 STREET, FROM STREET EAST END AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 204' X 25' of Builders paving plan applied. |
2018-05-05 | No data | EAST END AVENUE, FROM STREET EAST 80 STREET TO STREET EAST 81 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 140' X 35' of Builders paving plan applied. |
2018-05-01 | No data | WEST 43 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk free of defects |
2018-04-29 | No data | SOUTH STREET, FROM STREET BROAD STREET TO STREET WHITEHALL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No Work Done, I/F/O 10 Governors Island Ferry |
2018-04-29 | No data | WEST 44 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk free of defects. |
2018-04-28 | No data | 35 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STONE CURB |
2018-04-09 | No data | EAST 17 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Confusing address - permit has an a.k.a 1605 avenue k - inspector wrote: opposite 1441 ave k |
2018-04-05 | No data | AMSTERDAM AVENUE, FROM STREET WEST 153 STREET TO STREET WEST 154 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel face curb found. |
2018-04-05 | No data | EAST 99 STREET, FROM STREET 1 AVENUE TO STREET F D R DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Metal face curb has been repaired, reset, & replaced. Curb restoration flush in the p/l. |
2018-03-31 | No data | WEST 66 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | few flags restored free of defect |
2018-03-26 | No data | COLUMBUS AVENUE, FROM STREET WEST 76 STREET TO STREET WEST 77 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please fully replace multiple concrete sidewalk flags where patch work has been done. Patch work is not acceptable, full flag restoration must be made. |
2018-03-26 | No data | COLUMBUS AVENUE, FROM STREET WEST 76 STREET TO STREET WEST 77 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Please fully replace multiple concrete sidewalk flags where patch work has been done. Patch work is not acceptable, full flag restoration must be made. |
2018-03-16 | No data | 132 STREET, FROM STREET 15 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk flags restored joints sealed |
2018-03-15 | No data | BRISTOL STREET, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | trench |
2018-03-14 | No data | BEACH 108 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET ROCKAWAY FREEWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | replace curb |
2018-03-14 | No data | BRISTOL STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | resurfaced |
2018-03-14 | No data | CHESTER STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | trench |
2018-03-06 | No data | RIVERDALE AVENUE, FROM STREET BRISTOL STREET TO STREET CHESTER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | trench |
2018-03-05 | No data | DUMONT AVENUE, FROM STREET BRISTOL STREET TO STREET CHESTER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | trench s/w |
2018-02-27 | No data | WEST 66 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewallk free of defect |
2018-01-30 | No data | WEST 66 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | No temp. pedestrian walkway observed in the roadway. |
2018-01-26 | No data | 31 PLACE, FROM STREET 49 AVENUE TO STREET BORDEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2018-01-24 | No data | 31 STREET, FROM STREET 49 AVENUE TO STREET BORDEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w replace |
2018-01-23 | No data | METROPOLITAN AVENUE, FROM STREET BENEDICT AVENUE TO STREET HUGH J GRANT CIRCLE | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk clear |
2018-01-23 | No data | BURKE AVENUE, FROM STREET OLINVILLE AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb in place |
2018-01-23 | No data | WHITE PLAINS ROAD, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2018-01-23 | No data | OLINVILLE AVENUE, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb in place |
2018-01-23 | No data | WEST 169 STREET, FROM STREET BROADWAY TO STREET FT WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass steel face curb ifo 600 |
2018-01-10 | No data | METROPOLITAN AVENUE, FROM STREET BENEDICT AVENUE TO STREET HUGH J GRANT CIRCLE | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk bridge occupy sidewalk |
2017-12-21 | No data | COLUMBUS AVENUE, FROM STREET WEST 76 STREET TO STREET WEST 77 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | contractor states that work is incomplete and will resume in march. this is not a valid protest. protest denied. |
2017-12-20 | No data | EAST 17 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Seal expansion joints. |
2017-12-14 | No data | EAST 18 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb acceptable |
2017-12-13 | No data | EAST 17 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Active | Department of Transportation | No ped walkway on site. |
2017-12-12 | No data | WEST END AVENUE, FROM STREET WEST 66 STREET TO STREET WEST 70 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 13 Sidewalk Flags have been restored between the 150 & 160 address markers just north of the Driveway entrance, Flags are free of defects. |
2017-12-10 | No data | ASHLAND PLACE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEWLY INSTALLED SIDEWALK, HAS EXPANSION SEAL AROUND JOINTS IN GOOD CONDITION |
2017-12-08 | No data | WEST 76 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done, s/w done over on Columbus Ave. CAR was issued for patchwork on Columbus Ave which will cut into W76st btw Columbus & CPW. |
2017-12-08 | No data | COLUMBUS AVENUE, FROM STREET WEST 76 STREET TO STREET WEST 77 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | patchwork, install & seal expansion joints. |
2017-11-30 | No data | 1 AVENUE, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Ongoing building Opp with active permits for this location. However sidewalk flags have been replaced and are in compliance. |
2017-11-30 | No data | WEST 44 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 605 WEST 44 STREET, NEWLY INSTALLED STEEL FACED CURB IS IN COMPLIANCE |
2017-11-28 | No data | WEST 66 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No Curb work done. |
2017-11-28 | No data | BROADWAY, FROM STREET WEST 66 STREET TO STREET WEST 67 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No Work Done. |
2017-11-26 | No data | 31 PLACE, FROM STREET 49 AVENUE TO STREET BORDEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w replace |
2017-11-26 | No data | 31 STREET, FROM STREET 49 AVENUE TO STREET BORDEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w and d/w replace |
2017-11-17 | No data | WEST 23 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk replaced free of defects |
2017-11-17 | No data | WILLOUGHBY STREET, FROM STREET ASHLAND PLACE TO STREET FLEET STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEWLY INSTALLED STEEL FACED CURB, HAS EXPANSION SEAL AROUND JOINTS IN GOOD CONDITION |
2017-11-17 | No data | FLEET PLACE, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK DONE AT THIS LOCATION |
2017-11-15 | No data | BRONX RIVER AVENUE, FROM STREET BRUCKNER EXPRESSWAY EXIT 51 WB TO STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Portions of curb was repaired O.K. |
2017-11-14 | No data | HUDSON STREET, FROM STREET DESBROSSES STREET TO STREET VESTRY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest denied. Flags in question were not part of WiFi kiosk installation but have have since been sealed. All sealed at this time. |
2017-11-14 | No data | WEST 76 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M042017290A04-New Permit |
2017-11-09 | No data | HUDSON STREET, FROM STREET DESBROSSES STREET TO STREET VESTRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 200 please seal the expose expansion joints on sidewalk. |
2017-11-08 | No data | CLINTON STREET, FROM STREET BROOME STREET TO STREET DELANCEY ST SOUTH | No data | Street Construction Inspections: Active | Department of Transportation | crew at site working within stipulations |
2017-11-06 | No data | 1 AVENUE, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Temp walkway closed sidewalk is open to pedestrians at this time. |
2017-11-02 | No data | 1 AVENUE, FROM STREET EAST 97 STREET TO STREET EAST 99 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active pemit M022017214B76 on file. Expires 11-11-17 spoke with site supervisor in regards to the graffiti markings on newly replaced sidewalk flags in regard to making sure sidewalk flags are free of any defects prior to the expiration of permit. |
2017-10-27 | No data | WOODHAVEN BOULEVARD, FROM STREET 62 AVENUE TO STREET 62 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new s/w repaired |
2017-10-26 | No data | WEST 23 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | The entire sidewalk has been restored and portion of the sidewalk expansion remains unsealed, however permit still active at this time of inspection. |
2017-10-24 | No data | LAFAYETTE AVENUE, FROM STREET GRAND AVENUE TO STREET ST JAMES PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb is in compliance |
2017-10-22 | No data | WEST 66 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Rebar has been removed from the Tree Pit, I/F/O 155... (Condition Resolved) |
2017-10-14 | No data | BRONX RIVER AVENUE, FROM STREET BRUCKNER EXPRESSWAY EXIT 51 WB TO STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass curb |
2017-10-11 | No data | HUDSON STREET, FROM STREET DESBROSSES STREET TO STREET VESTRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk acceptable |
2017-10-08 | No data | WEST 76 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk in compliance |
2017-10-07 | No data | WEST 23 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work In progress I/F/O 135 Active permit on file at time of inspection. |
2017-10-02 | No data | COLUMBUS AVENUE, FROM STREET WEST 76 STREET TO STREET WEST 77 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M042017268A02-New permit |
2017-10-02 | No data | EAST 99 STREET, FROM STREET 1 AVENUE TO STREET F D R DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb is in compliance. |
2017-10-02 | No data | WEST 76 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012017268B24-New Permit |
2017-10-02 | No data | COLUMBUS AVENUE, FROM STREET WEST 76 STREET TO STREET WEST 77 STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site working, with more than a 5ft walkway on s/w. |
2017-09-25 | No data | LAFAYETTE AVENUE, FROM STREET GRAND AVENUE TO STREET ST JAMES PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk must be replaced in kind as per stipulation 206 on permit, sidewalk currently is paved with concrete |
2017-09-21 | No data | AMSTERDAM AVENUE, FROM STREET WEST 153 STREET TO STREET WEST 154 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No defect to curb |
2017-09-12 | No data | BROADWAY, FROM STREET WEST 66 STREET TO STREET WEST 67 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Multiple Sidewalk Flags have been restored all along the W/S of Broadway and are free of defects, also the Tree Pits along the Segment have been enlarged to 10' |
2017-09-04 | No data | ASHLAND PLACE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb |
2017-08-24 | No data | WEST 67 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags repaired, aka 1965 amsterdam avenue. sidewalk in compliance. |
2017-08-19 | No data | WEST 66 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REMOVE THE RE-BAR IN THE TREE PIT AREA LEFT BEHIND |
2017-08-16 | No data | WEST 67 STREET, FROM STREET BROADWAY TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB REPLACED AND IN COMPLIANCE |
2017-08-04 | No data | WEST 66 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site actively working on excavated sidewalk. signs are posted and flag men a present. respondent is in compliance with stipulation. |
2017-07-25 | No data | WEST 127 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair SW incompliance. |
2017-07-25 | No data | 5 AVENUE, FROM STREET EAST 126 STREET TO STREET EAST 127 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | completed in compliance |
2017-07-25 | No data | WEST END AVENUE, FROM STREET WEST 66 STREET TO STREET WEST 70 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SEVERAL NEW S/W FLAGS |
2017-07-19 | No data | 5 AVENUE, FROM STREET EAST 126 STREET TO STREET EAST 127 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | all in compliance upon inspection |
2017-07-12 | No data | WEST 181 STREET, FROM STREET CABRINI BOULEVARD TO STREET PINEHURST AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Meta face curb repaied, replaced & rest |
2017-07-06 | No data | CABRINI BOULEVARD, FROM STREET WEST 180 STREET TO STREET WEST 181 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Metal face curb repaired, replaced, reset. |
2017-07-02 | No data | BEACH STREET, FROM STREET UNION PLACE TO STREET VAN DUZER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb |
2017-06-23 | No data | WEST 181 STREET, FROM STREET CABRINI BOULEVARD TO STREET PINEHURST AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass sidewalk |
2017-06-21 | No data | 8 AVENUE, FROM STREET WEST 45 STREET TO STREET WEST 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no sidewalk repair done ifo 725 |
2017-06-21 | No data | WEST END AVENUE, FROM STREET WEST 66 STREET TO STREET WEST 70 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/W REPAIRS ARE IN COMPLIANCE |
2017-06-20 | No data | CROPSEY AVENUE, FROM STREET BAY 52 STREET TO STREET CANAL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new curb incompliance |
2017-06-20 | No data | BAY 52 STREET, FROM STREET BEND TO STREET SHORE PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk incompliance |
2017-06-20 | No data | BAY 53 STREET, FROM STREET CROPSEY AVENUE TO STREET WEST 22 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk in compliance (side walk of chipole) |
2017-06-15 | No data | WEST 46 STREET, FROM STREET 11 AVENUE TO STREET PEDESTRIAN OVERPASS | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb free of defect IFO 639 |
2017-06-14 | No data | CORNELL AVENUE, FROM STREET HUSSON AVENUE TO STREET PUGSLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street repaved. |
2017-05-15 | No data | BEACH 108 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET ROCKAWAY FREEWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPLACE CURB |
2017-05-07 | No data | WEST 44 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk I/F/O UPS Trailer Parking Lot Entrance on the N/S of the Street has been restored. Caps remain in Joints Check upon Permit expiration |
2017-05-01 | No data | ASHLAND PLACE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Active | Department of Transportation | CITY PAVING REPAIRING SWK ON WCL BY MYRTLE AVE |
2017-04-19 | No data | BURKE AVENUE, FROM STREET OLINVILLE AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb in place |
2017-04-14 | No data | BEACH 108 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET ROCKAWAY FREEWAY | No data | Street Construction Inspections: Complaint | Department of Transportation | PERMIT SET UP - TEMPORARY PEDESTRIAN WALK |
2017-03-30 | No data | WEST 169 STREET, FROM STREET BROADWAY TO STREET FT WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb replaced |
2017-03-23 | No data | BAY 53 STREET, FROM STREET CROPSEY AVENUE TO STREET WEST 22 STREET | No data | Street Construction Inspections: Active | Department of Transportation | curb |
2017-03-16 | No data | 35 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | snow on location |
2017-03-15 | No data | CROPSEY AVENUE, FROM STREET BAY 52 STREET TO STREET CANAL AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no work started |
2017-03-15 | No data | BAY 52 STREET, FROM STREET BEND TO STREET SHORE PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | no work started |
2017-03-15 | No data | BAY 53 STREET, FROM STREET CROPSEY AVENUE TO STREET WEST 22 STREET | No data | Street Construction Inspections: Active | Department of Transportation | work not started |
2017-03-02 | No data | ATLANTIC AVENUE, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s\w ok |
2017-02-27 | No data | WHITE PLAINS ROAD, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb in place |
2017-02-26 | No data | 132 STREET, FROM STREET 15 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w repaired in compliance |
2017-02-26 | No data | LACONIA AVENUE, FROM STREET EAST 213 STREET TO STREET EAST 214 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 1/2 + 5ft of rd/w was done. |
2017-02-20 | No data | LACONIA AVENUE, FROM STREET EAST 213 STREET TO STREET EAST 214 STREET | No data | Street Construction Inspections: Active | Department of Transportation | work in progress, r/w milled half plus five |
2017-02-07 | No data | 23 AVENUE, FROM STREET 90 STREET TO STREET 91 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel face curb |
2017-02-03 | No data | EAST 32 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SIDEWALK. |
2017-02-03 | No data | WHITE PLAINS ROAD, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK DONE |
2017-02-02 | No data | OLINVILLE AVENUE, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb in place |
2017-01-30 | No data | MORRISON AVENUE, FROM STREET HARROD PLACE TO STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDEWALK FLAGS CURB SIDE REPAIRED/RESTORED AT 1183-A. |
2017-01-26 | No data | LAFAYETTE AVENUE, FROM STREET NEWMAN AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk flags repaired/restored. |
2017-01-26 | No data | WHITE PLAINS ROAD, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk flags repaired/restored near post office, corner property of 1950 lafayette Ave. |
2017-01-24 | No data | SOUTH 5 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW CURB. |
2017-01-19 | No data | WEST 67 STREET, FROM STREET BROADWAY TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Reset, repair, or replace curb. |
2017-01-19 | No data | WEST 24 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Multiple Distinctive 2 1/2' X 2 1/2' Sidewalk Flags have been restored along the entire N/S of the Segment at varied locations, Flags have been found Free of Defects. |
2017-01-16 | No data | AMSTERDAM AVENUE, FROM STREET WEST 153 STREET TO STREET WEST 154 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Updated permit on file M042016328A09. |
2017-01-04 | No data | ATLANTIC AVENUE, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s\w ok joints sealed |
2016-12-30 | No data | ATLANTIC AVENUE, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk Not Occupied At Time Of Inspection |
2016-12-29 | No data | ATLANTIC AVENUE, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp Ped Walkway On Site At Time Of Inspection |
2016-12-27 | No data | EAST 167 STREET, FROM STREET GRANT AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk restored |
2016-12-22 | No data | WEST 181 STREET, FROM STREET CABRINI BOULEVARD TO STREET PINEHURST AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No defect to s/w |
2016-12-22 | No data | CABRINI BOULEVARD, FROM STREET WEST 180 STREET TO STREET WEST 181 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb replaced no defects |
2016-12-19 | No data | WEST 24 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Various sidewalk flags replaced through out the segment of 11 and 12. NORTHSIDE SIDEWALK. |
2016-12-08 | No data | ATLANTIC AVENUE, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | active site new permit b042016336a22 |
2016-12-07 | No data | ATLANTIC AVENUE, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp pedestrian s/w. |
2016-12-02 | No data | WEST 24 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Various sidewalk flags replaced IFO, AKA 201. IN COMPLIANCE. |
2016-12-02 | No data | WEST 57 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk sealed and free of defects. |
2016-11-28 | No data | CONEY ISLAND AVENUE, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2016-11-25 | No data | WEST END AVENUE, FROM STREET WEST 66 STREET TO STREET WEST 70 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk sealed and free of defects |
2016-11-25 | No data | EAST 18 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass curb |
2016-11-23 | No data | WATTS STREET, FROM STREET VARICK STREET TO STREET HOLLAND TUNNEL APPROACH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb |
2016-11-23 | No data | AMSTERDAM AVENUE, FROM STREET WEST 69 STREET TO STREET WEST 70 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk sealed and free of defects. |
2016-11-18 | No data | DUMONT AVENUE, FROM STREET BRISTOL STREET TO STREET CHESTER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | trench , s/w |
2016-11-18 | No data | CHESTER STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | trench |
2016-11-18 | No data | RIVERDALE AVENUE, FROM STREET BRISTOL STREET TO STREET CHESTER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | trench |
2016-11-18 | No data | BRISTOL STREET, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | trench |
2016-11-18 | No data | BRISTOL STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | trench |
2016-11-16 | No data | AMSTERDAM AVENUE, FROM STREET WEST 69 STREET TO STREET WEST 70 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repaired sidewalk sealed and free of defects I/F/O 170 |
2016-11-14 | No data | EAST 70 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags in compliance. |
2016-11-14 | No data | 11 AVENUE, FROM STREET WEST 24 STREET TO STREET WEST 25 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working, multiple flags opened up to replace, respondent foreman: Mike, in compliance. |
2016-11-13 | No data | EAST 71 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags in compliance. |
2016-11-11 | No data | 23 AVENUE, FROM STREET 90 STREET TO STREET 91 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restored curb |
2016-11-11 | No data | 90 STREET, FROM STREET 23 AVENUE TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb restored |
2016-11-08 | No data | VANDAM STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w |
2016-11-03 | No data | 90 STREET, FROM STREET 23 AVENUE TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no new curbs in segment |
2016-10-13 | No data | 3 AVENUE, FROM STREET EAST 71 STREET TO STREET EAST 72 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SIDEWALK |
2016-10-08 | No data | SOUNDVIEW AVENUE, FROM STREET DEAD END TO STREET PUGSLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street resurfaced. |
2016-10-07 | No data | BURKE AVENUE, FROM STREET OLINVILLE AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TRENCH RESTORATION IN ROADWAY IS GOOD. |
2016-10-05 | No data | CABRINI BOULEVARD, FROM STREET WEST 180 STREET TO STREET WEST 181 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Temporary pedestrian walkway in r/w at time of inspection |
2016-10-03 | No data | VANDAM STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w ok |
2016-09-30 | No data | WRIGHT STREET, FROM STREET BOYD STREET TO STREET CANAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb |
2016-09-25 | No data | CONEY ISLAND AVENUE, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed. |
2016-09-25 | No data | 1 AVENUE, FROM STREET 49 STREET TO STREET 50 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No Work found on the Existing Sidewalk. |
2016-09-21 | No data | WEST 169 STREET, FROM STREET BROADWAY TO STREET FT WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | in compliance- Steel face curb |
2016-09-20 | No data | SOUNDVIEW AVENUE, FROM STREET DEAD END TO STREET PUGSLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STRIP PAVING, entire length of roadway,permanent restoration flush, sealed,new building plan north side of roadway |
2016-09-20 | No data | PUGSLEY AVENUE, FROM STREET CORNELL AVENUE TO STREET SOUNDVIEW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STRIP PAVING flush sealed |
2016-09-20 | No data | WEST 181 STREET, FROM STREET CABRINI BOULEVARD TO STREET PINEHURST AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | roadway and sidewalk clear |
2016-09-20 | No data | CABRINI BOULEVARD, FROM STREET WEST 180 STREET TO STREET WEST 181 STREET | No data | Street Construction Inspections: Active | Department of Transportation | roadway clear, no pedestrian walkway |
2016-09-19 | No data | ROSEDALE AVENUE, FROM STREET LACOMBE AVENUE TO STREET RANDALL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ON Lacombe Ave.btw. Rosedale Ave & Dead End entire length of new sidewalk flush,sealed New buildings |
2016-09-17 | No data | CANAL STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass s/w |
2016-09-12 | No data | 62 AVENUE, FROM STREET ALDERTON STREET TO STREET WOODHAVEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w restored |
2016-09-12 | No data | WOODHAVEN BOULEVARD, FROM STREET 62 AVENUE TO STREET 62 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w restored |
2016-09-11 | No data | 1 AVENUE, FROM STREET 49 STREET TO STREET 50 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No Installation of Curb found. |
2016-09-09 | No data | KING STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass s/w |
2016-09-09 | No data | CHARLTON STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass s/w |
2016-09-09 | No data | VARICK STREET, FROM STREET GRAND STREET TO STREET WATTS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass curb |
2016-09-07 | No data | HUDSON STREET, FROM STREET CHARLTON STREET TO STREET KING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, s/w restored |
2016-09-01 | No data | UTOPIA PARKWAY, FROM STREET 80 ROAD TO STREET UNION TURNPIKE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDEWALK FLAGS REPAIRED KIND. EXPANSION JOINTS SEALED |
2016-08-22 | No data | WHITE PLAINS ROAD, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB IN PLACE OK |
2016-08-16 | No data | EAST 167 STREET, FROM STREET GRANT AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | pass out car, place hold summon issued |
2016-08-13 | No data | EAST 167 STREET, FROM STREET GRANT AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO I observed the respondents failure to seal sidewalk expansion joints as per subsection. This oversight was reported in CAR 20161380085 but ws not corrected afterwards. |
2016-08-05 | No data | BERRY STREET, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w |
2016-07-30 | No data | 23 AVENUE, FROM STREET 90 STREET TO STREET 91 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel faced curb installed |
2016-07-28 | No data | VARICK STREET, FROM STREET GRAND STREET TO STREET WATTS STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | repair sdwk in compliance to there stips |
2016-07-28 | No data | VARICK STREET, FROM STREET GRAND STREET TO STREET WATTS STREET | No data | Street Construction Inspections: Active | Department of Transportation | occ sdwk with plastic baariers |
2016-07-26 | No data | WEST 46 STREET, FROM STREET 11 AVENUE TO STREET PEDESTRIAN OVERPASS | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW CURB |
2016-07-25 | No data | VARICK STREET, FROM STREET SPRING STREET TO STREET VANDAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sdwk accept |
2016-07-22 | No data | EAST 79 STREET, FROM STREET 1 AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SWK IN COMPLIANCE. |
2016-07-16 | No data | BEACH STREET, FROM STREET UNION PLACE TO STREET VAN DUZER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb |
2016-07-15 | No data | SPRING STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sdwk near fire museum is acceptable |
2016-07-15 | No data | WHITE PLAINS ROAD, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PAVING DONE |
2016-07-15 | No data | BURKE AVENUE, FROM STREET OLINVILLE AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Active | Department of Transportation | bbp paving is completed |
2016-07-15 | No data | 8 AVENUE, FROM STREET WEST 45 STREET TO STREET WEST 46 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | contractor encountered an old abandoned vault and had to stop work and they are working with an engineer to take next steps to abandon the old vault. They will make vault filing w/DOB as needed so we may complete the sidewalk replacement. SWk safe no |
2016-07-14 | No data | WEST 67 STREET, FROM STREET BROADWAY TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb repair |
2016-07-13 | No data | OLINVILLE AVENUE, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CONTRACTOR ON SITE PAVING |
2016-07-10 | No data | BERRY STREET, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW SIDEWALK GOOD. |
2016-07-09 | No data | UNION TURNPIKE, FROM STREET 176 STREET TO STREET UTOPIA PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDEWALK FLAGS REPAIRED IN KIND |
2016-07-08 | No data | BROADWAY, FROM STREET EAST 9 STREET TO STREET EAST 10 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb acceptable...sealer on street opening joints starting to fade |
2016-07-05 | No data | EAST 18 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w acceptable |
2016-07-02 | No data | EAST 167 STREET, FROM STREET GRANT AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO I observed the respondents failure to seal sidewalk expansion joints as per subsection. Respondent notified of unsealed joints in CAR 20161380085 but failed to make the repair. |
2016-06-30 | No data | WRIGHT STREET, FROM STREET BOYD STREET TO STREET CANAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk |
2016-06-30 | No data | BEACH STREET, FROM STREET UNION PLACE TO STREET VAN DUZER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk |
2016-06-28 | No data | SOUTH 5 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk work completed at time of inspection. |
2016-06-27 | No data | WRIGHT STREET, FROM STREET BOYD STREET TO STREET CANAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb |
2016-06-24 | No data | 8 AVENUE, FROM STREET WEST 45 STREET TO STREET WEST 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDEWALK PATCH WORK IS UNACCEPTABLE, REPAIR 4 FLAGS THAT WERE TOUCHED NEED TO BE RESTORED IN THEIR ENTIRETY & SEAL THE EXPAONSION JOINTS |
2016-06-21 | No data | 35 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done new permit on file |
2016-06-18 | No data | BURKE AVENUE, FROM STREET OLINVILLE AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | tape remove and card board |
2016-05-23 | No data | EAST 167 STREET, FROM STREET GRANT AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk restored |
2016-05-21 | No data | UTOPIA PARKWAY, FROM STREET 80 ROAD TO STREET UNION TURNPIKE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | no work done by this contractor. CAR was for concrete that is to old for it to be the work. no work done |
2016-05-21 | No data | UNION TURNPIKE, FROM STREET 176 STREET TO STREET UTOPIA PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | no work for this contractor visible for this location. Location given for CAR is old and not work done for this contractor, no work done. |
2016-05-20 | No data | BEACH STREET, FROM STREET UNION PLACE TO STREET VAN DUZER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w repaired |
2016-05-12 | No data | SOUTH 5 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w |
2016-05-12 | No data | 35 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | s/w done ar |
2016-05-11 | No data | 90 STREET, FROM STREET 23 AVENUE TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel faced curb (& sidewalk) restored to grade (at Courtyard Marriot/ The Parking Spot lot). All expansion joints sealed. |
2016-05-11 | No data | 23 AVENUE, FROM STREET 90 STREET TO STREET 91 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel faced curb (& sidewalk) restored to grade (at Courtyard Marriot/ The Parking Spot lot). All expansion joints sealed. |
2016-04-28 | No data | 90 STREET, FROM STREET 23 AVENUE TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel faced curb (& sidewalk) restored to grade ( at Courtyard Marriot/ The Parking Spot lot ). All expansion joints sealed. |
2016-04-22 | No data | EAST 18 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb |
2016-04-21 | No data | BURKE AVENUE, FROM STREET OLINVILLE AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Active | Department of Transportation | NEW PED RAMP OK |
2016-04-16 | No data | UTOPIA PARKWAY, FROM STREET 80 ROAD TO STREET UNION TURNPIKE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sporadic flags restored / Capping not removed from expansion joints. |
2016-04-16 | No data | UNION TURNPIKE, FROM STREET 176 STREET TO STREET UTOPIA PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sporadic flags restored / Capping not removed from expansion joints |
2016-04-13 | No data | OLINVILLE AVENUE, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | SIDEWALK REPAIR OK |
2016-04-13 | No data | 35 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no container at this time |
2016-04-06 | No data | OLINVILLE AVENUE, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | SEALED IN PLACE |
2016-04-05 | No data | WEST END AVENUE, FROM STREET WEST 66 STREET TO STREET WEST 70 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | plastic removed |
2016-04-02 | No data | 3 AVENUE, FROM STREET EAST 71 STREET TO STREET EAST 72 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w replaced along front of corner building expansion joints trimmed and sealed |
2016-04-02 | No data | EAST 71 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w replaced along front of corner building expansion joints trimmed and sealed |
2016-03-29 | No data | BURKE AVENUE, FROM STREET OLINVILLE AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Active | Department of Transportation | ACTIVE SITE CONTRACTOR ON SITE |
2016-03-29 | No data | BURKE AVENUE, FROM STREET BARKER AVENUE TO STREET OLINVILLE AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | A/T/P/O I OBSERVED THAT THE RESPONDENT IS REPAIRING THE NORTHWEST CORNER PED RAMP OF BURKE AVE( OLINVILLE AVE & BARKER AVE) WITHOUT A DOT PERMIT. ID BY PERMIT ABOVE |
2016-03-19 | No data | WRIGHT STREET, FROM STREET BOYD STREET TO STREET CANAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb |
2016-03-19 | No data | WEST 169 STREET, FROM STREET BROADWAY TO STREET FT WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No defect to curb installation. |
2016-03-10 | No data | BURKE AVENUE, FROM STREET OLINVILLE AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW CURB IN PLACE |
2016-03-10 | No data | OLINVILLE AVENUE, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk ok |
2016-03-07 | No data | BURKE AVENUE, FROM STREET OLINVILLE AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | AREA CLEAR OF DEFECT |
2016-03-06 | No data | SOUTH 5 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new sidewalk complete. |
2016-03-03 | No data | OLINVILLE AVENUE, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/W OK |
2016-03-03 | No data | WESTCHESTER AVENUE, FROM STREET OLMSTEAD AVENUE TO STREET PUGSLEY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ACTIVE SITE. |
2016-02-29 | No data | SOUTH 5 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW SIDEWALK GOOD. |
2016-02-19 | No data | WHITE PLAINS ROAD, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDEWALK REPAIR |
2016-02-17 | No data | BURKE AVENUE, FROM STREET OLINVILLE AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Active | Department of Transportation | active contractor on site |
2016-02-16 | No data | BURKE AVENUE, FROM STREET OLINVILLE AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Active | Department of Transportation | ACTIVE PERMIT SIDEWALK OPEN |
2016-02-16 | No data | OLINVILLE AVENUE, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Sidewalk expansion joints need to be sealed REMOVE CAPS |
2016-02-16 | No data | WHITE PLAINS ROAD, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | SIDEWALK IS OPEN OK |
2016-02-16 | No data | WHITE PLAINS ROAD, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB IN PLACE OK |
2016-02-16 | No data | BERRY STREET, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 5 feet clear sidewalk remain |
2016-02-16 | No data | SOUTH 5 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | new curb. |
2016-02-16 | No data | BURKE AVENUE, FROM STREET OLINVILLE AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB IN PLACE |
2016-02-13 | No data | MORRISON AVENUE, FROM STREET HARROD PLACE TO STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done on this permit (DEP repaired catch basin new flag. ONLY without a permit on file) at this time |
2016-02-11 | No data | BERRY STREET, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: Active | Department of Transportation | NEW SIDEWALK INSTALLED.. EXP JOINTS ON S.W NOT SEALED. |
2016-02-03 | No data | WHITE PLAINS ROAD, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Partial roadway enclosure |
2016-02-01 | No data | CONEY ISLAND AVENUE, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb repaired. |
2016-01-30 | No data | CONEY ISLAND AVENUE, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Replaced curb ifo US Post Offfice |
2016-01-20 | No data | 23 AVENUE, FROM STREET 90 STREET TO STREET 91 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel face curb |
2016-01-19 | No data | BERRY STREET, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE RESPONDENT INSTALLING NEW SIDEWALK WITHOUT VALID PERMIT TO DO SO. PERMIT EXPIRED ON 12/15/15. |
2016-01-18 | No data | WEST 46 STREET, FROM STREET 11 AVENUE TO STREET PEDESTRIAN OVERPASS | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/p curb |
2016-01-15 | No data | BEACH STREET, FROM STREET UNION PLACE TO STREET VAN DUZER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb replaced |
2015-12-29 | No data | BROADWAY, FROM STREET EAST 9 STREET TO STREET EAST 10 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon inspection, curb replacement acceptable. Only 12" width roadway repaved. Street opening joints sealer starting to come off. Latest permit M012014209A05 kept on file for future inspections. |
2015-12-23 | No data | WRIGHT STREET, FROM STREET BOYD STREET TO STREET CANAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w -ok |
2015-12-23 | No data | WEST END AVENUE, FROM STREET WEST 66 STREET TO STREET WEST 70 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Remove plastic from expansion joint and seal on sidewalk. |
2015-12-19 | No data | OLINVILLE AVENUE, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | occ sw active |
2015-12-17 | No data | WEST 67 STREET, FROM STREET BROADWAY TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/p s/w |
2015-12-16 | No data | CANAL STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb acceptable |
2015-12-15 | No data | EAST 18 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Upon inspection, unsafe condition previously reported & summons issued yesterday, 12/14/15. Spoke with Donald (foreman at location) & made him aware of the inadequate protection at work site & that he needs a construction/alteration for the vault. |
2015-12-14 | No data | EAST 18 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/t/p/o I observed the above respondent failed to provide adequate protection at ongoing vault construction/alteration & sidewalk replacement. Temporary walk had no protection against north curb, just caution tape. Debris is falling onto walkway. |
2015-12-12 | No data | EAST 18 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | A/t/p/o I observed the above respondent having an ongoing vault construction or alteration at location without a valid NYC DOT permit type 0117 for such work. Above repair sidewalk permit M042015329A03 used to identify respondent. |
2015-12-12 | No data | EAST 18 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon inspection, ongoing sidewalk repairs in compliance. However, NOV issued for ongoing vault alterations without a type 0117 permit to do such work. |
2015-12-09 | No data | EAST 18 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon inspection, ongoing sidewalk repairs acceptable. North sidewalk fully closed. Temporary pedestrian walkway provided. |
2015-12-04 | No data | WATTS STREET, FROM STREET VARICK STREET TO STREET HOLLAND TUNNEL APPROACH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w acceptable |
2015-12-04 | No data | BEACH STREET, FROM STREET UNION PLACE TO STREET VAN DUZER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w installed |
2015-12-03 | No data | DOMINICK STREET, FROM STREET 6 AVENUE TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb acceptable no defects |
2015-11-24 | No data | CONEY ISLAND AVENUE, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Active | Department of Transportation | NY Paving on site working on the sidealk. |
2015-11-19 | No data | WEST END AVENUE, FROM STREET WEST 66 STREET TO STREET WEST 70 STREET | No data | Street Construction Inspections: Active | Department of Transportation | R/p Sidewalk respondent on sidewalk repairing area. |
2015-11-07 | No data | BEACH STREET, FROM STREET UNION PLACE TO STREET VAN DUZER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb installed |
2015-11-07 | No data | WRIGHT STREET, FROM STREET BOYD STREET TO STREET CANAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb installed |
2015-11-04 | No data | EAST 79 STREET, FROM STREET 1 AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | SW REPAIRS COMPLETE. |
2015-11-04 | No data | EAST 79 STREET, FROM STREET 1 AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW REPAIRS DONE |
2015-10-18 | No data | UNION TURNPIKE, FROM STREET 176 STREET TO STREET UTOPIA PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk in kind |
2015-10-07 | No data | 6 AVENUE, FROM STREET DOMINICK STREET TO STREET SPRING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w ok |
2015-10-07 | No data | UTOPIA PARKWAY, FROM STREET 80 ROAD TO STREET UNION TURNPIKE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w occupied |
2015-10-07 | No data | UTOPIA PARKWAY, FROM STREET 80 ROAD TO STREET UNION TURNPIKE | No data | Street Construction Inspections: Active | Department of Transportation | s/w |
2015-10-07 | No data | SPRING STREET, FROM STREET 6 AVENUE TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w okay |
2015-09-30 | No data | EAST 70 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM SIDEWALK SEALED |
2015-09-30 | No data | UNION TURNPIKE, FROM STREET 176 STREET TO STREET UTOPIA PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | work not started |
2015-09-23 | No data | EAST 32 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | SIDEWALK REPAIRED. NO DEFECTIVE CONDITION FOUND |
2015-09-22 | No data | EAST 18 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new curb in compliance |
2015-09-21 | No data | EAST 18 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Whole sidewalk from one end of building to other ok expansion joints sealed. |
2015-09-17 | No data | LEXINGTON AVENUE, FROM STREET EAST 103 STREET TO STREET EAST 104 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW flushed & sealed |
2015-09-11 | No data | 6 AVENUE, FROM STREET DOMINICK STREET TO STREET SPRING STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | DEFECTIVE PED RAMP IN QUESTION DONE BY DOTSIM.NOT THIS PERMITTEE. |
2015-09-02 | No data | WRIGHT STREET, FROM STREET BOYD STREET TO STREET CANAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w repaired to kind |
2015-08-31 | No data | 6 AVENUE, FROM STREET DOMINICK STREET TO STREET SPRING STREET | No data | Street Construction Inspections: Active | Department of Transportation | fence |
2015-08-23 | No data | SPRING STREET, FROM STREET 6 AVENUE TO STREET VARICK STREET | No data | Street Construction Inspections: Active | Department of Transportation | s/w accceprable |
2015-08-23 | No data | 6 AVENUE, FROM STREET DOMINICK STREET TO STREET SPRING STREET | No data | Street Construction Inspections: Active | Department of Transportation | NO TEMPORARY PEDESTRIAN WALK |
2015-08-06 | No data | EAST 167 STREET, FROM STREET GRANT AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work completed under later permit |
2015-07-28 | No data | CONEY ISLAND AVENUE, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Active | Department of Transportation | pedestrain walk way |
2015-07-16 | No data | CONEY ISLAND AVENUE, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Active | Department of Transportation | occ s/w |
2015-07-16 | No data | CONEY ISLAND AVENUE, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit exist. |
2015-07-07 | No data | BEACH STREET, FROM STREET UNION PLACE TO STREET VAN DUZER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/w repair in bus stop for parking lot. |
2015-06-30 | No data | CONEY ISLAND AVENUE, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Active | Department of Transportation | S/w clear |
2015-05-31 | No data | 23 AVENUE, FROM STREET 90 STREET TO STREET 91 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel face curb at driveway cut in good condition |
2015-05-28 | No data | HUDSON STREET, FROM STREET LEROY STREET TO STREET MORTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SIDEWALK |
2015-05-27 | No data | 90 STREET, FROM STREET 23 AVENUE TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | at drivway east side at car rental place |
2015-05-23 | No data | WEST 169 STREET, FROM STREET BROADWAY TO STREET FT WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm final |
2015-05-14 | No data | SPRING STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass s/w |
2015-05-13 | No data | MORTON STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SIDEWALK WAS DONE |
2015-05-06 | No data | CANAL STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass curb |
2015-05-04 | No data | DOMINICK STREET, FROM STREET 6 AVENUE TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass curb |
2015-05-04 | No data | 23 AVENUE, FROM STREET 90 STREET TO STREET 91 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel face curb installed |
2015-05-03 | No data | 90 STREET, FROM STREET 23 AVENUE TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel face curb other newer permit on file for some repair work on curb also |
2015-04-30 | No data | WATTS STREET, FROM STREET VARICK STREET TO STREET HOLLAND TUNNEL APPROACH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass curb |
2015-04-30 | No data | CHARLTON STREET, FROM STREET 6 AVENUE TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass curb |
2015-04-29 | No data | BEACH STREET, FROM STREET UNION PLACE TO STREET VAN DUZER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb installed |
2015-04-29 | No data | 90 STREET, FROM STREET 23 AVENUE TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | joints sealed corner property |
2015-04-29 | No data | WRIGHT STREET, FROM STREET BOYD STREET TO STREET CANAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb installed around the block at 40 beach street |
2015-04-20 | No data | 90 STREET, FROM STREET 23 AVENUE TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel face curb |
2015-04-20 | No data | 23 AVENUE, FROM STREET 90 STREET TO STREET 91 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel face curb |
2015-04-04 | No data | WEST 46 STREET, FROM STREET 11 AVENUE TO STREET PEDESTRIAN OVERPASS | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Reset curb |
2015-02-26 | No data | WEST 45 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Pass White Plastic caps were not removed no new car issued. |
2015-01-17 | No data | VESTRY STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Upon inspection, condition acceptable. No LM pigmented concrete standard stipulation on permit. Sidewalk replacement acceptable. |
2015-01-17 | No data | HUDSON STREET, FROM STREET DESBROSSES STREET TO STREET VESTRY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Upon inspection, sidewalk replacement acceptable. No LM pigmented concrete standard stipulation mention on permit. |
2015-01-17 | No data | SPRING STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | SUMMONS ISSUED - HOLD PLACED |
2015-01-14 | No data | SPRING STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk repaired and in compliance |
2015-01-09 | No data | MORTON STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR OF SIDEWALK |
2015-01-06 | No data | HUDSON STREET, FROM STREET LEROY STREET TO STREET MORTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SIDEWALK |
2015-01-03 | No data | EAST 18 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPLACE SIDEWALK |
2014-12-17 | No data | BEACH STREET, FROM STREET UNION PLACE TO STREET VAN DUZER STREET | No data | Street Construction Inspections: Active | Department of Transportation | temp walk way being maintained and open to public |
2014-12-16 | No data | EAST 18 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE | No data | Street Construction Inspections: Active | Department of Transportation | TEMPORARY PEDESTRIAN WALK |
2014-12-15 | No data | WRIGHT STREET, FROM STREET BOYD STREET TO STREET CANAL STREET | No data | Street Construction Inspections: Active | Department of Transportation | temp walk way provided |
2014-12-12 | No data | BLEECKER STREET, FROM STREET CHARLES STREET TO STREET PERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SIDEWALK |
2014-12-12 | No data | MORTON STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR SIDEWALK |
2014-12-08 | No data | 3 AVENUE, FROM STREET EAST 29 STREET TO STREET EAST 30 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | found in final state |
2014-12-04 | No data | LEXINGTON AVENUE, FROM STREET EAST 103 STREET TO STREET EAST 104 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | reztoration sidewalk pass |
2014-12-04 | No data | HUDSON STREET, FROM STREET LEROY STREET TO STREET MORTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR OF SIDEWALK |
2014-12-03 | No data | MORTON STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/walk flags around area of transformer vault |
2014-12-03 | No data | VANDAM STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk complete But olsons creative installed new tree pits and they still need to complete with stone decore or wood chip decore. |
2014-12-02 | No data | VESTRY STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk |
2014-11-27 | No data | WEST 45 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please remove the plastic caps and install,recess and seal expansion joints on newly replaced sidewalk flags. |
2014-11-20 | No data | EAST 29 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/W |
2014-11-19 | No data | VANDAM STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | having construction equipment-PLASTIC BARRIERS obstructing the roadway and sidewalk without a NYC DOT permit for equipment. |
2014-11-19 | No data | VANDAM STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Active | Department of Transportation | having the sidewalk excavated, and providing a three foot ten inch clear sidewalk in between excavated sidewalk and step at property. Failure to comply with the terms and conditions of DOT permitsMAINTAIN MINIMUM 5 FOOT CLEAR SIDEWALK |
2014-11-12 | No data | SPRING STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon inspection, found 2 sidewalk flags not fully restored as required. It's located 85' WWC of Varick st. 10' NNC of Spring st. (aka 137 Varick st.). Please fully restore sidewalk flags (2). |
2014-11-12 | No data | VESTRY STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon inspection, found sidewalk replacement Not "RESTORE SIDEWALK IN-KIND" as per lower Manhattan concrete pigmented standards (grey tint color) as required. sidewalk currently moist (wet). It's located on Vestry st. (aka 200 Hudson st.) |
2014-11-12 | No data | HUDSON STREET, FROM STREET DESBROSSES STREET TO STREET VESTRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon inspection, found sidewalk replacement Not "RESTORE SIDEWALK IN-KIND" as per lower Manhattan concrete pigmented standards (grey tint color) as required. sidewalk currently moist (wet). landmark area (stip. 206). IFO 200 Hudson st. |
2014-11-06 | No data | EAST 18 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF SIDEWALK |
2014-11-05 | No data | EAST 33 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | seal observed on sidewalk |
2014-10-31 | No data | HUDSON STREET, FROM STREET DESBROSSES STREET TO STREET VESTRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sdwk acceptable no defects corner property |
2014-10-30 | No data | VESTRY STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | corner property sdwk is acceptable |
2014-10-24 | No data | VANDAM STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sdwk acceptable no defect |
2014-10-20 | No data | 7 AVENUE, FROM STREET WEST 47 STREET TO STREET WEST 48 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | VAULT CONSTRUCTION OR ALTERATION |
2014-10-18 | No data | EAST 30 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New ped ramp at I Ave. and E. 30St. |
2014-10-16 | No data | HUDSON STREET, FROM STREET DESBROSSES STREET TO STREET VESTRY STREET | No data | Street Construction Inspections: Active | Department of Transportation | occ rdwy |
2014-10-15 | No data | VESTRY STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SDWK STILL BEING DONE M042014288A02 IS THE NEWER PERMIT SDK NOT YET COMPLETE |
2014-10-15 | No data | SPRING STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SDWK ACCEPTABLE |
2014-09-30 | No data | QUEENS BOULEVARD, FROM STREET 59 PLACE TO STREET 59 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | pass out car, exp joints sealed, car issued in error |
2014-09-30 | No data | CHARLTON STREET, FROM STREET 6 AVENUE TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | swk in compliance |
2014-09-26 | No data | EAST 9 STREET, FROM STREET BROADWAY TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair of S/walk was done. Expansion Joints added and Sealed. N/S |
2014-09-25 | No data | HUDSON STREET, FROM STREET DESBROSSES STREET TO STREET VESTRY STREET | No data | Street Construction Inspections: Active | Department of Transportation | work not started. |
2014-09-23 | No data | EAST 10 STREET, FROM STREET 4 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair of S/walk was done. |
2014-09-19 | No data | OXFORD AVENUE, FROM STREET CAMBRIDGE AVENUE TO STREET WEST 235 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street closed due to DOT Roadway maintanance milling the street. |
2014-09-18 | No data | BROADWAY, FROM STREET EAST 9 STREET TO STREET EAST 10 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair of S/walk was done. Expansion Joints added and sealed. |
2014-09-18 | No data | 47 AVENUE, FROM STREET 60 STREET TO STREET BROOKLYN QUEENS EXPRESSWAY EN SB | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk is final |
2014-09-17 | No data | 61 STREET, FROM STREET 44 AVENUE TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk is final |
2014-09-17 | No data | 47 AVENUE, FROM STREET 59 PLACE TO STREET 60 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk is final |
2014-09-17 | No data | 47 AVENUE, FROM STREET 59 PLACE TO STREET 59 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new permit |
2014-09-13 | No data | QUEENS PLAZA NORTH, FROM STREET 22 STREET TO STREET 23 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w in compliance |
2014-09-10 | No data | EAST 9 STREET, FROM STREET BROADWAY TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair of S/walk was done. @ 770 Broadway on e9st |
2014-09-08 | No data | QUEENS BOULEVARD, FROM STREET 59 PLACE TO STREET 59 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PRO. DENIED. AT TIME OF INSPECTION S/W EXPANSION JOINTS ARE NOT SEALED ON 59 ST SIDE. ATTACHED PHOTOS ARE NOT DATE OR TIME STAMPED. ABOVE PERMITTED TOOK OUT S/W REPAIR PERMITS FOR ABOVE ADDRESS & SURROUNDING PROPERTY. NO OTHER PERMITS CONTRACTORS |
2014-09-08 | No data | EAST 33 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | FAILED TO INSTALL THE EXPANSION JOINT TO THE REPLACE SIDEWALK FLAG AT THE CURB.- 90FT FROM 2 AVE ON THE S/S OF E33 ST. |
2014-09-07 | No data | 23 STREET, FROM STREET 39 AVENUE TO STREET 40 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk repair in kind ,joints sealed |
2014-09-02 | No data | EAST 9 STREET, FROM STREET BROADWAY TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Active | Department of Transportation | OCC of S/walk |
2014-08-29 | No data | EAST 10 STREET, FROM STREET 4 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Additional Permit # M042014192A01 on file and valid from 07/17/2014 to 08/15/2014. |
2014-08-29 | No data | BROADWAY, FROM STREET EAST 9 STREET TO STREET EAST 10 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Additional Permit # M042014209A00 on file and valid from 07/28/2014 to 08/25/2014. |
2014-08-26 | No data | 23 AVENUE, FROM STREET 90 STREET TO STREET 91 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass |
2014-08-25 | No data | 90 STREET, FROM STREET 23 AVENUE TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass |
2014-08-18 | No data | WEST 116 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | new building plan strip paving roadway in progress |
2014-08-15 | No data | 4 AVENUE, FROM STREET EAST 9 STREET TO STREET EAST 10 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | swk ok |
2014-08-14 | No data | EAST 30 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SIDEWALK |
2014-08-14 | No data | EAST 33 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SIDEWALK |
2014-08-14 | No data | BROADWAY, FROM STREET EAST 9 STREET TO STREET EAST 10 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | please remove all plastic and seal all exp joints on sidewalk betw E 10 and E 9 str |
2014-08-14 | No data | EAST 10 STREET, FROM STREET 4 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | please remove all plastic and seal all exp joints on sidewalk |
2014-08-09 | No data | BROADWAY, FROM STREET EAST 9 STREET TO STREET EAST 10 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | reset curb final |
2014-08-08 | No data | QUEENS BOULEVARD, FROM STREET 59 PLACE TO STREET 59 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new permit |
2014-08-08 | No data | 59 STREET, FROM STREET 47 AVENUE TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk is final |
2014-08-06 | No data | WATTS STREET, FROM STREET VARICK STREET TO STREET HOLLAND TUNNEL APPROACH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new curbs |
2014-08-05 | No data | 47 AVENUE, FROM STREET 59 PLACE TO STREET 59 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk is final |
2014-08-05 | No data | 47 AVENUE, FROM STREET 60 STREET TO STREET BROOKLYN QUEENS EXPRESSWAY EN SB | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk is final |
2014-08-05 | No data | 47 AVENUE, FROM STREET 59 PLACE TO STREET 60 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk is final |
2014-07-30 | No data | WEST 46 STREET, FROM STREET 11 AVENUE TO STREET PEDESTRIAN OVERPASS | No data | Street Construction Inspections: Active | Department of Transportation | RESET, REPAIR OR REPLACE CURB / ON SITE WORKING |
2014-07-22 | No data | LOUISIANA AVENUE, FROM STREET FLATLANDS AVENUE TO STREET VANDALIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w ok |
2014-07-14 | No data | EAST 167 STREET, FROM STREET GRANT AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk ok |
2014-07-12 | No data | CANAL STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass curb |
2014-07-11 | No data | EAST 167 STREET, FROM STREET GRANT AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk ok |
2014-06-30 | No data | LAIGHT STREET, FROM STREET COLLISTER STREET TO STREET GREENWICH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair sidewalk is acceptable |
2014-06-27 | No data | HUBERT STREET, FROM STREET COLLISTER STREET TO STREET GREENWICH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk repair acceptable |
2014-06-24 | No data | BARNES AVENUE, FROM STREET BARNETT PLACE TO STREET MORRIS PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2014-06-16 | No data | LOUISIANA AVENUE, FROM STREET FLATLANDS AVENUE TO STREET VANDALIA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk okay |
2014-06-04 | No data | CLINTONVILLE STREET, FROM STREET 14 ROAD TO STREET CROSS ISLAND PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb replaced |
2014-06-04 | No data | HUBERT STREET, FROM STREET COLLISTER STREET TO STREET GREENWICH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon inspection, no sidewalk restoration work done on side of 415 Greenwich st. on Hubert st. |
2014-06-04 | No data | GREENWICH STREET, FROM STREET HUBERT STREET TO STREET LAIGHT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon inspection, s/w replacement in progress with new permit M042014141001. s/w expansion joints sealer pending. in compliance. |
2014-06-04 | No data | LAIGHT STREET, FROM STREET COLLISTER STREET TO STREET GREENWICH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon inspection, found s/w replacement in progress with new permit M042014141002. S/w flags concrete currently curing at site. |
2014-05-27 | No data | GREENWICH STREET, FROM STREET HUBERT STREET TO STREET LAIGHT STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | respondent actively working on sidewalk opening , all in compliance |
2014-04-30 | No data | EAST 175 STREET, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2014-04-30 | No data | GREENWICH STREET, FROM STREET HUBERT STREET TO STREET LAIGHT STREET | No data | Street Construction Inspections: Active | Department of Transportation | work has not started |
2014-04-27 | No data | DOMINICK STREET, FROM STREET 6 AVENUE TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w acceptable |
2014-04-26 | No data | EAST 9 STREET, FROM STREET BROADWAY TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk repaired |
2014-04-22 | No data | CROTONA AVENUE, FROM STREET GROTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2014-04-22 | No data | CROTONA AVENUE, FROM STREET EAST 183 STREET TO STREET GROTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2014-04-19 | No data | PONTON AVENUE, FROM STREET BLONDELL AVENUE TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2014-04-14 | No data | BOSTON ROAD, FROM STREET MC OWEN AVENUE TO STREET ROPES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2014-04-12 | No data | ATLANTIC AVENUE, FROM STREET 132 STREET TO STREET 133 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb reset |
2014-04-08 | No data | HIGH STREET, FROM STREET RAMP TO STREET PEARL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new curb ok |
2014-04-05 | No data | EAST 10 STREET, FROM STREET 4 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk repaired |
2014-04-04 | No data | WEST 36 STREET, FROM STREET 10 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SIDEWALK |
2014-03-26 | No data | BRYANT AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2014-03-26 | No data | PONTON AVENUE, FROM STREET BLONDELL AVENUE TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2014-03-21 | No data | EAST 80 STREET, FROM STREET 1 AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk restored |
2014-03-19 | No data | JOHNSON AVENUE, FROM STREET CAMBRIDGE AVENUE TO STREET WEST 235 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2014-03-18 | No data | EAST 31 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SIDEWALK |
2014-03-17 | No data | WEST 55 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2014-03-17 | No data | WEST 36 STREET, FROM STREET 10 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPLACE SIDEWALK |
2014-03-17 | No data | LEXINGTON AVENUE, FROM STREET EAST 103 STREET TO STREET EAST 104 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | metal curbs & sidewalk flags flush |
2014-03-15 | No data | CHARLTON STREET, FROM STREET 6 AVENUE TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb sidewalk done |
2014-03-15 | No data | AMSTERDAM AVENUE, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk ok. |
2014-03-06 | No data | BROADWAY, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new sidewalk concrete flags flush & sealed |
2014-03-04 | No data | EAST 2 STREET, FROM STREET 2 AVENUE TO STREET BOND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK DONE |
2014-03-03 | No data | JAY STREET, FROM STREET RAMP TO STREET MANHATTAN BRIDGE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new swk flags ok |
2014-03-03 | No data | HIGH STREET, FROM STREET RAMP TO STREET PEARL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new swk fags ok |
2014-03-02 | No data | WATTS STREET, FROM STREET VARICK STREET TO STREET HOLLAND TUNNEL APPROACH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass s/w |
2014-02-27 | No data | WEST 165 STREET, FROM STREET AMSTERDAM AVENUE TO STREET AUDUBON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb okay. |
2014-02-02 | No data | WATTS STREET, FROM STREET VARICK STREET TO STREET HOLLAND TUNNEL APPROACH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass s/w |
2014-01-20 | No data | CROMWELL AVENUE, FROM STREET HENRY PLACE TO STREET HYLAN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb is good |
2014-01-19 | No data | 164 STREET, FROM STREET 69 AVENUE TO STREET JEWEL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w in kind |
2014-01-19 | No data | 161 STREET, FROM STREET 160 STREET TO STREET JEWEL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w in kind |
2014-01-19 | No data | JEWEL AVENUE, FROM STREET 161 STREET TO STREET 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w in kind |
2014-01-19 | No data | 164 STREET, FROM STREET 67 AVENUE TO STREET 69 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w in kind |
2014-01-19 | No data | 162 STREET, FROM STREET 65 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w in kind |
2014-01-19 | No data | 164 STREET, FROM STREET 65 AVENUE TO STREET 67 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w in kind |
2014-01-18 | No data | OXFORD AVENUE, FROM STREET CAMBRIDGE AVENUE TO STREET WEST 235 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2014-01-18 | No data | EAST 53 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | found in final state. |
2014-01-09 | No data | WEST 35 STREET, FROM STREET 10 AVENUE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPLACE SIDEWALK |
2014-01-05 | No data | EAST 10 STREET, FROM STREET 4 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no placement of equipment on site |
2013-12-12 | No data | DOMINICK STREET, FROM STREET 6 AVENUE TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair sidewalk acceptable |
2013-12-11 | No data | EAST 2 STREET, FROM STREET 2 AVENUE TO STREET BOND STREET | No data | Street Construction Inspections: Active | Department of Transportation | NO WORK STARTED |
2013-12-08 | No data | 23 AVENUE, FROM STREET 90 STREET TO STREET 91 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb done |
2013-12-08 | No data | 90 STREET, FROM STREET 23 AVENUE TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb done |
2013-12-05 | No data | 164 STREET, FROM STREET 69 AVENUE TO STREET JEWEL AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp s/w |
2013-12-05 | No data | 164 STREET, FROM STREET 65 AVENUE TO STREET 67 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp s/w |
2013-12-05 | No data | JEWEL AVENUE, FROM STREET 161 STREET TO STREET 164 STREET | No data | Street Construction Inspections: Active | Department of Transportation | temp s/w |
2013-12-05 | No data | 164 STREET, FROM STREET 67 AVENUE TO STREET 69 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | fence |
2013-12-04 | No data | DESBROSSES STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR SIDEWALK ACCEPTABLE |
2013-11-30 | No data | 164 STREET, FROM STREET 67 AVENUE TO STREET 69 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp s/w |
2013-11-30 | No data | 164 STREET, FROM STREET 65 AVENUE TO STREET 67 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp ped s/w |
2013-11-20 | No data | 23 AVENUE, FROM STREET 90 STREET TO STREET 91 STREET | No data | Street Construction Inspections: Active | Department of Transportation | not at this time |
2013-11-20 | No data | JEWEL AVENUE, FROM STREET 161 STREET TO STREET 164 STREET | No data | Street Construction Inspections: Active | Department of Transportation | perm cut |
2013-11-20 | No data | 164 STREET, FROM STREET 65 AVENUE TO STREET 67 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp ped w/w |
2013-11-20 | No data | 164 STREET, FROM STREET 69 AVENUE TO STREET JEWEL AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | fence |
2013-11-20 | No data | 164 STREET, FROM STREET 67 AVENUE TO STREET 69 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | fence |
2013-11-12 | No data | EAST 2 STREET, FROM STREET 2 AVENUE TO STREET BOND STREET | No data | Street Construction Inspections: Active | Department of Transportation | work not started |
2013-11-05 | No data | CHARLTON STREET, FROM STREET 6 AVENUE TO STREET VARICK STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | joints have been installed |
2013-11-02 | No data | SOUTH 5 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-10-17 | No data | 7 AVENUE, FROM STREET WEST 47 STREET TO STREET WEST 48 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | VAULT CONSTRUCTION OR ALTERATION |
2013-10-17 | No data | DOMINICK STREET, FROM STREET 6 AVENUE TO STREET VARICK STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk complete. Sealer will be needed. Car Will be issued upon |
2013-10-10 | No data | CANAL STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sealed sidewalk repaired |
2013-10-10 | No data | CHARLTON STREET, FROM STREET 6 AVENUE TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sealed |
2013-10-09 | No data | 61 STREET, FROM STREET 44 AVENUE TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2013-10-08 | No data | VARICK STREET, FROM STREET BROOME STREET TO STREET DOMINICK STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk complete. Will reinspect for installing sealer as per,it is stilk valud and permitee has time to return and place required sealer. |
2013-10-04 | No data | DOMINICK STREET, FROM STREET 6 AVENUE TO STREET VARICK STREET | No data | Street Construction Inspections: Active | Department of Transportation | no one on ste not started |
2013-10-04 | No data | CEDAR AVENUE, FROM STREET MDE NB EXIT 8 TO STREET WEST TREMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-09-25 | No data | VARICK STREET, FROM STREET GRAND STREET TO STREET WATTS STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon inspection, test pit on sidewalk in progress on 2 sidewalk flags, in compliance. |
2013-09-24 | No data | EAST 10 STREET, FROM STREET 4 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | no work being performed at site in compliance |
2013-09-21 | No data | HIGH STREET, FROM STREET RAMP TO STREET PEARL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb ok |
2013-09-21 | No data | RIVER AVENUE, FROM STREET EAST 149 STREET TO STREET EAST 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb installed |
2013-09-14 | No data | WEST 75 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair sw |
2013-09-14 | No data | AMSTERDAM AVENUE, FROM STREET WEST 74 STREET TO STREET WEST 75 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair sw |
2013-09-14 | No data | CHARLTON STREET, FROM STREET 6 AVENUE TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass s/w, CAR previously issued to seal expansion joints |
2013-09-11 | No data | CLINTONVILLE STREET, FROM STREET 14 ROAD TO STREET CROSS ISLAND PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm curb |
2013-09-08 | No data | VARICK STREET, FROM STREET BROOME STREET TO STREET DOMINICK STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2013-09-05 | No data | 47 AVENUE, FROM STREET 59 PLACE TO STREET 60 STREET | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk clear |
2013-09-05 | No data | 47 AVENUE, FROM STREET 59 PLACE TO STREET 59 STREET | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk repaired |
2013-09-04 | No data | DOMINICK STREET, FROM STREET 6 AVENUE TO STREET VARICK STREET | No data | Street Construction Inspections: Active | Department of Transportation | no temp w/w erected |
2013-08-30 | No data | VARICK STREET, FROM STREET BROOME STREET TO STREET DOMINICK STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon inspection, work not started on sidewalk repairs. |
2013-08-21 | No data | LEXINGTON AVENUE, FROM STREET EAST 103 STREET TO STREET EAST 104 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-08-14 | No data | JOHNSON AVENUE, FROM STREET CAMBRIDGE AVENUE TO STREET WEST 235 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-08-14 | No data | WEST 165 STREET, FROM STREET AMSTERDAM AVENUE TO STREET AUDUBON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb repleced and sealed |
2013-08-07 | No data | CROTONA AVENUE, FROM STREET EAST 183 STREET TO STREET GROTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-08-07 | No data | CROTONA AVENUE, FROM STREET GROTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-08-06 | No data | 47 AVENUE, FROM STREET 59 PLACE TO STREET 60 STREET | No data | Street Construction Inspections: Active | Department of Transportation | full width of s/w open at time of inspection |
2013-08-06 | No data | QUEENS BOULEVARD, FROM STREET 59 PLACE TO STREET 59 STREET | No data | Street Construction Inspections: Active | Department of Transportation | s/w closed replacing s/w |
2013-08-06 | No data | 47 AVENUE, FROM STREET 59 PLACE TO STREET 59 STREET | No data | Street Construction Inspections: Active | Department of Transportation | full width of s/w open at time of inspection |
2013-07-29 | No data | QUEENS BOULEVARD, FROM STREET 59 PLACE TO STREET 59 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk accessible. |
2013-07-29 | No data | 47 AVENUE, FROM STREET 59 PLACE TO STREET 60 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work found on Existing Sidewalks. |
2013-07-29 | No data | 47 AVENUE, FROM STREET 59 PLACE TO STREET 59 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work found on Existing Sidewalks. |
2013-07-29 | No data | 61 STREET, FROM STREET 44 AVENUE TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | occupancy of sidewalk |
2013-07-25 | No data | JOHNSON AVENUE, FROM STREET CAMBRIDGE AVENUE TO STREET WEST 235 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB OK |
2013-07-22 | No data | 47 AVENUE, FROM STREET 59 PLACE TO STREET 60 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk acessible. |
2013-07-22 | No data | 59 STREET, FROM STREET 47 AVENUE TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk accessible. |
2013-07-22 | No data | QUEENS BOULEVARD, FROM STREET 59 PLACE TO STREET 59 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk accessible. |
2013-07-22 | No data | 47 AVENUE, FROM STREET 59 PLACE TO STREET 59 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk accessible. |
2013-07-17 | No data | WEST 165 STREET, FROM STREET AMSTERDAM AVENUE TO STREET AUDUBON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | as per policy limit NOV's issued for this defect |
2013-07-16 | No data | QUEENS BOULEVARD, FROM STREET 59 PLACE TO STREET 59 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2013-07-16 | No data | MASPETH AVENUE, FROM STREET 49 LANE TO STREET PAGE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-07-16 | No data | PAGE PLACE, FROM STREET GRAND AVENUE TO STREET MASPETH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-07-15 | No data | ATLANTIC AVENUE, FROM STREET 132 STREET TO STREET 133 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB INSTALLED |
2013-07-12 | No data | 47 AVENUE, FROM STREET 59 PLACE TO STREET 60 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work in progress. |
2013-07-12 | No data | 47 AVENUE, FROM STREET 59 PLACE TO STREET 59 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work in progress. |
2013-07-11 | No data | 61 STREET, FROM STREET 44 AVENUE TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | occupancy of sidewalk |
2013-07-08 | No data | 59 STREET, FROM STREET 47 AVENUE TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk occupancy. |
2013-07-06 | No data | 47 AVENUE, FROM STREET 59 PLACE TO STREET 59 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2013-07-06 | No data | 47 AVENUE, FROM STREET 59 PLACE TO STREET 60 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2013-07-06 | No data | WEST 165 STREET, FROM STREET AMSTERDAM AVENUE TO STREET AUDUBON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sidewalk expansion joints need to be sealed. |
2013-07-03 | No data | WYTHE AVENUE, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Paved Roadway Ok |
2013-07-03 | No data | WYTHE AVENUE, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb and S/w Ok |
2013-07-01 | No data | QUEENS BOULEVARD, FROM STREET 59 PLACE TO STREET 59 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2013-06-30 | No data | LEXINGTON AVENUE, FROM STREET EAST 31 STREET TO STREET EAST 32 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | reset repair or replace curb |
2013-06-29 | No data | 59 STREET, FROM STREET 47 AVENUE TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2013-06-29 | No data | 47 AVENUE, FROM STREET 59 PLACE TO STREET 60 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2013-06-29 | No data | 47 AVENUE, FROM STREET 59 PLACE TO STREET 59 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2013-06-28 | No data | WEST 235 STREET, FROM STREET JOHNSON AVENUE TO STREET OXFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-06-28 | No data | OXFORD AVENUE, FROM STREET CAMBRIDGE AVENUE TO STREET WEST 235 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-06-26 | No data | CANAL STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon inspection, sidewalk flags restoration on north side of street segment in compliance, no defects found. |
2013-06-25 | No data | QUEENS PLAZA NORTH, FROM STREET 22 STREET TO STREET 23 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Fully closed s/w for repair,failed to comply with stip # 013 to maintain minimum 5 foot clear s/w. |
2013-06-23 | No data | CANAL STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-06-19 | No data | 59 STREET, FROM STREET 47 AVENUE TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk accessible, no work found on existing Sidewalks. |
2013-06-18 | No data | 47 AVENUE, FROM STREET 59 PLACE TO STREET 60 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk accessible, no work found on existing Sidewalks. |
2013-06-18 | No data | QUEENS BOULEVARD, FROM STREET 59 PLACE TO STREET 59 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No Temp Pedestrian walkway in place. |
2013-06-18 | No data | 47 AVENUE, FROM STREET 59 PLACE TO STREET 59 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk accessible, No work found on existing Sidewalks. |
2013-06-12 | No data | LEXINGTON AVENUE, FROM STREET EAST 31 STREET TO STREET EAST 32 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Reset, Repair and Replace curb |
2013-06-12 | No data | WYTHE AVENUE, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: Active | Department of Transportation | pedestrian walk |
2013-06-12 | No data | SOUTH 5 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk |
2013-06-10 | No data | 47 AVENUE, FROM STREET 59 PLACE TO STREET 60 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No Sidewalk work found on Existing Sidewalk. |
2013-06-10 | No data | 47 AVENUE, FROM STREET 59 PLACE TO STREET 59 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk accessible. No Construction activity found. |
2013-06-10 | No data | 59 STREET, FROM STREET 47 AVENUE TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk accessible, No Construction activity found. |
2013-06-05 | No data | OXFORD AVENUE, FROM STREET CAMBRIDGE AVENUE TO STREET WEST 235 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-06-04 | No data | QUEENS BOULEVARD, FROM STREET 59 PLACE TO STREET 59 STREET | No data | Street Construction Inspections: Active | Department of Transportation | TEMPORARY PEDESTRIAN WALK |
2013-06-02 | No data | QUEENS BOULEVARD, FROM STREET 59 PLACE TO STREET 59 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2013-05-24 | No data | HIGH STREET, FROM STREET RAMP TO STREET PEARL STREET | No data | Street Construction Inspections: Active | Department of Transportation | occupy sidewalk |
2013-05-24 | No data | 61 STREET, FROM STREET 44 AVENUE TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | temp ped walk |
2013-05-22 | No data | WEST 165 STREET, FROM STREET AMSTERDAM AVENUE TO STREET AUDUBON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-04-29 | No data | HAVEMEYER STREET, FROM STREET NORTH 7 STREET TO STREET NORTH 8 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | expansion not sealed |
2013-04-29 | No data | SPRINGFIELD BOULEVARD, FROM STREET 97 AVENUE TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm p/l |
2013-04-28 | No data | CROMWELL AVENUE, FROM STREET HENRY PLACE TO STREET HYLAN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb installed . Area is good. |
2013-04-20 | No data | 49 STREET, FROM STREET 57 AVENUE TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb |
2013-04-15 | No data | CANAL STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2013-04-14 | No data | WATTS STREET, FROM STREET VARICK STREET TO STREET HOLLAND TUNNEL APPROACH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | reset replace curb |
2013-04-13 | No data | WATTS STREET, FROM STREET VARICK STREET TO STREET HOLLAND TUNNEL APPROACH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair sidewalk |
2013-04-10 | No data | CANAL STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Active | Department of Transportation | no concrete truck. sidewalk curing |
2013-03-22 | No data | BOSTON ROAD, FROM STREET MC OWEN AVENUE TO STREET ROPES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-03-21 | No data | BOSTON ROAD, FROM STREET MC OWEN AVENUE TO STREET ROPES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-02-28 | No data | OXFORD AVENUE, FROM STREET CAMBRIDGE AVENUE TO STREET WEST 235 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-02-15 | No data | LEXINGTON AVENUE, FROM STREET EAST 103 STREET TO STREET EAST 104 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2013-02-11 | No data | SARATOGA AVENUE, FROM STREET EAST NEW YORK AVENUE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-02-11 | No data | EAST 53 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | TEMPORARY PEDESTRIAN WALKWAY |
2013-02-02 | No data | RIVER AVENUE, FROM STREET EAST 149 STREET TO STREET EAST 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2013-01-30 | No data | LEXINGTON AVENUE, FROM STREET EAST 103 STREET TO STREET EAST 104 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-01-22 | No data | CLINTONVILLE STREET, FROM STREET 14 ROAD TO STREET CROSS ISLAND PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL FACED CURB OK |
2013-01-22 | No data | RIVER AVENUE, FROM STREET EAST 149 STREET TO STREET EAST 150 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut backs made |
2013-01-12 | No data | JOHNSON AVENUE, FROM STREET CAMBRIDGE AVENUE TO STREET WEST 235 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-01-12 | No data | WEST 165 STREET, FROM STREET AMSTERDAM AVENUE TO STREET AUDUBON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-12-12 | No data | JAY STREET, FROM STREET RAMP TO STREET MANHATTAN BRIDGE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2012-12-10 | No data | JAY STREET, FROM STREET RAMP TO STREET MANHATTAN BRIDGE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2012-11-16 | No data | RIVER AVENUE, FROM STREET EAST 149 STREET TO STREET EAST 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb installation requires a 1 ft cut back of the roadway. Cut back 1 ft of roadway adjacent to curb as per spec's/ |
2012-11-13 | No data | 7 AVENUE, FROM STREET WEST 47 STREET TO STREET WEST 48 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-10-12 | No data | WEST 165 STREET, FROM STREET AMSTERDAM AVENUE TO STREET AUDUBON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-10-07 | No data | WEST 235 STREET, FROM STREET JOHNSON AVENUE TO STREET OXFORD AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | No data |
2012-10-05 | No data | AUSTIN STREET, FROM STREET 82 DRIVE TO STREET LEFFERTS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW CURB OPPOSITE 82-74 OK |
2012-09-21 | No data | 41 STREET, FROM STREET 34 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | reset repair replace curb |
2012-09-16 | No data | WEST 35 STREET, FROM STREET 10 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-09-15 | No data | CHARLTON STREET, FROM STREET 6 AVENUE TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-08-28 | No data | ATLANTIC AVENUE, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new s/w |
2012-08-25 | No data | SPRINGFIELD BOULEVARD, FROM STREET 97 AVENUE TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no defects found |
2012-08-24 | No data | CROTONA AVENUE, FROM STREET GROTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-08-24 | No data | CROTONA AVENUE, FROM STREET EAST 183 STREET TO STREET GROTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-08-21 | No data | WEST 165 STREET, FROM STREET AMSTERDAM AVENUE TO STREET AUDUBON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-08-11 | No data | CHARLTON STREET, FROM STREET 6 AVENUE TO STREET VARICK STREET | No data | Street Construction Inspections: Active | Department of Transportation | stip violation |
2012-07-18 | No data | AUSTIN STREET, FROM STREET 82 DRIVE TO STREET LEFFERTS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no related defects found |
2012-07-14 | No data | HEMPSTEAD AVENUE, FROM STREET 218 PLACE TO STREET SPRINGFIELD BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-06-15 | No data | WEST 165 STREET, FROM STREET AMSTERDAM AVENUE TO STREET AUDUBON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-06-13 | No data | RIVER AVENUE, FROM STREET EAST 149 STREET TO STREET EAST 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-06-05 | No data | MELROSE AVENUE, FROM STREET EAST 160 STREET TO STREET EAST 161 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-05-31 | No data | EAST NEW YORK AVENUE, FROM STREET LEGION STREET TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-05-29 | No data | MARATHON PARKWAY, FROM STREET CAMBRIA AVENUE TO STREET DEEPDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk violation pass, sidewalk reconstructed |
2012-05-10 | No data | EAST 175 STREET, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-05-02 | No data | CROMWELL AVENUE, FROM STREET HENRY PLACE TO STREET HYLAN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb installed |
2012-04-19 | No data | WEST 235 STREET, FROM STREET JOHNSON AVENUE TO STREET OXFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no activity |
2012-04-06 | No data | CROMWELL AVENUE, FROM STREET HENRY PLACE TO STREET HYLAN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb |
2012-03-14 | No data | 15 AVENUE, FROM STREET 139 STREET TO STREET 140 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | paved street |
2012-02-17 | No data | ST JOHNS PLACE, FROM STREET EASTERN PARKWAY TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-02-16 | No data | SPRINGFIELD BOULEVARD, FROM STREET 97 AVENUE TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 perm cut p/l f/o 9643 |
2012-02-15 | No data | JOHNSON AVENUE, FROM STREET CAMBRIDGE AVENUE TO STREET WEST 235 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-02-15 | No data | WEST 235 STREET, FROM STREET JOHNSON AVENUE TO STREET OXFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-02-15 | No data | JOHNSON AVENUE, FROM STREET CAMBRIDGE AVENUE TO STREET WEST 235 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2012-02-15 | No data | OXFORD AVENUE, FROM STREET CAMBRIDGE AVENUE TO STREET WEST 235 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2012-02-15 | No data | WEST 235 STREET, FROM STREET JOHNSON AVENUE TO STREET OXFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2012-02-15 | No data | OXFORD AVENUE, FROM STREET CAMBRIDGE AVENUE TO STREET WEST 235 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2011-12-24 | No data | BARNES AVENUE, FROM STREET BARNETT PLACE TO STREET MORRIS PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2011-12-15 | No data | CROTONA AVENUE, FROM STREET GROTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2011-12-15 | No data | CROTONA AVENUE, FROM STREET EAST 183 STREET TO STREET GROTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2011-12-06 | No data | CROTONA AVENUE, FROM STREET GROTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2011-12-06 | No data | CROTONA AVENUE, FROM STREET EAST 183 STREET TO STREET GROTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2011-11-20 | No data | ATLANTIC AVENUE, FROM STREET 132 STREET TO STREET 133 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2011-11-14 | No data | 34 AVENUE, FROM STREET 41 STREET TO STREET STEINWAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Str paved |
2011-11-07 | No data | ATLANTIC AVENUE, FROM STREET 132 STREET TO STREET 133 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w opened during time of inspection |
2011-11-05 | No data | EAST 175 STREET, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2011-10-24 | No data | 15 AVENUE, FROM STREET 139 STREET TO STREET 140 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb reset, repaired |
2011-09-26 | No data | BROAD STREET, FROM STREET CEDAR STREET TO STREET GORDON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw |
2011-09-23 | No data | BROAD STREET, FROM STREET CEDAR STREET TO STREET GORDON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw |
2011-09-08 | No data | PONTON AVENUE, FROM STREET BLONDELL AVENUE TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2011-08-24 | No data | EAST 80 STREET, FROM STREET 1 AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent failed to seal joints.Issued D69-NOV#179980323 |
2011-08-20 | No data | AUDLEY STREET, FROM STREET BEND TO STREET GRENFELL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2011-08-20 | No data | AUDLEY STREET, FROM STREET 83 AVENUE TO STREET GRENFELL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2011-08-18 | No data | PONTON AVENUE, FROM STREET BLONDELL AVENUE TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | No data |
2011-08-16 | No data | PONTON AVENUE, FROM STREET BLONDELL AVENUE TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2011-07-06 | No data | EAST 80 STREET, FROM STREET 1 AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No Expansion Joints Seal around Sidewalk Flags. |
2011-06-30 | No data | SPRINGFIELD BOULEVARD, FROM STREET 97 AVENUE TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | not visible |
2011-05-21 | No data | WEST 165 STREET, FROM STREET FT WASHINGTON AVENUE TO STREET RIVERSIDE DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pave street okay |
2011-05-21 | No data | FT WASHINGTON AVENUE, FROM STREET WEST 165 STREET TO STREET WEST 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pave street okay |
2011-05-21 | No data | CEDAR AVENUE, FROM STREET MDE NB EXIT 8 TO STREET WEST TREMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2011-05-07 | No data | 49 STREET, FROM STREET 57 AVENUE TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2011-04-30 | No data | 15 AVENUE, FROM STREET 139 STREET TO STREET 140 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R/W PAVED-OK |
2011-04-30 | No data | EAST 31 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2011-04-20 | No data | WEST 165 STREET, FROM STREET AMSTERDAM AVENUE TO STREET AUDUBON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2011-03-21 | No data | HAVEMEYER STREET, FROM STREET NORTH 7 STREET TO STREET NORTH 8 STREET | No data | Street Construction Inspections: Active | Department of Transportation | curb |
2011-03-16 | No data | CROMWELL AVENUE, FROM STREET HENRY PLACE TO STREET HYLAN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb ok, spoke to Nick about issue in regard to sidewalk and curb. |
2011-03-13 | No data | MOTHER GASTON BOULEVARD, FROM STREET LOTT AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair s/w |
2011-02-12 | No data | HAVEMEYER STREET, FROM STREET NORTH 7 STREET TO STREET NORTH 8 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no wk done |
2011-02-05 | No data | HAVEMEYER STREET, FROM STREET NORTH 7 STREET TO STREET NORTH 8 STREET | No data | Street Construction Inspections: Active | Department of Transportation | reset replace or repair curb |
2011-01-05 | No data | BRUCKNER BOULEVARD, FROM STREET COUNTRY CLUB ROAD TO STREET MIDDLETOWN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2010-12-05 | No data | WEST 165 STREET, FROM STREET AMSTERDAM AVENUE TO STREET AUDUBON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2010-11-29 | No data | BROAD STREET, FROM STREET CEDAR STREET TO STREET GORDON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2010-11-13 | No data | ROCHELLE STREET, FROM STREET CITY ISLAND AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2010-11-07 | No data | 49 STREET, FROM STREET 57 AVENUE TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w pavement completed |
2010-10-21 | No data | 5 AVENUE, FROM STREET SOUNDVIEW LANE TO STREET COLLEGE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2010-10-21 | No data | RIVER AVENUE, FROM STREET EAST 149 STREET TO STREET EAST 150 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2010-10-13 | No data | RIVER AVENUE, FROM STREET EAST 149 STREET TO STREET EAST 150 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2010-10-13 | No data | HEMPSTEAD AVENUE, FROM STREET 218 PLACE TO STREET SPRINGFIELD BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | builder's paved restoration is acceptable. |
2010-10-13 | No data | SPRINGFIELD BOULEVARD, FROM STREET 101 AVENUE TO STREET HEMPSTEAD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway has been resurfaced. |
2010-10-13 | No data | RIVER AVENUE, FROM STREET EAST 149 STREET TO STREET EAST 150 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | No data |
2010-09-29 | No data | JARVIS AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET ZULETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2010-09-28 | No data | BRUCKNER BOULEVARD, FROM STREET MIDDLETOWN ROAD TO STREET ROBERTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2010-09-18 | No data | 15 AVENUE, FROM STREET 139 STREET TO STREET 140 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2010-09-11 | No data | 49 STREET, FROM STREET 57 AVENUE TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2010-09-09 | No data | BATES ROAD, FROM STREET BEND TO STREET CONCORD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2010-08-23 | No data | MIDDLETOWN ROAD, FROM STREET JARVIS AVENUE TO STREET JARVIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2010-07-14 | No data | BROADWAY, FROM STREET WEST 234 STREET TO STREET WEST 236 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2010-07-12 | No data | 15 AVENUE, FROM STREET 139 STREET TO STREET 140 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2010-07-01 | No data | 15 AVENUE, FROM STREET 139 STREET TO STREET 140 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2010-06-25 | No data | 49 STREET, FROM STREET 57 AVENUE TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2010-06-16 | No data | SUYDAM PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2010-06-02 | No data | WEST 231 STREET, FROM STREET GODWIN TERRACE TO STREET KINGSBRIDGE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2010-05-25 | No data | BROADWAY, FROM STREET WEST 234 STREET TO STREET WEST 236 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2010-05-15 | No data | WEST 256 STREET, FROM STREET ARLINGTON AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2010-05-15 | No data | 47 AVENUE, FROM STREET 60 STREET TO STREET 61 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2010-05-10 | No data | 15 AVENUE, FROM STREET 139 STREET TO STREET 140 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | debris left by trench |
2010-05-05 | No data | 15 AVENUE, FROM STREET 139 STREET TO STREET 140 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | 226'x3x2 deep trench from 141 - 142 streets |
2010-04-30 | No data | 47 AVENUE, FROM STREET 60 STREET TO STREET 61 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2010-04-27 | No data | 15 AVENUE, FROM STREET 139 STREET TO STREET 140 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | major reconstruction refer to EEC for futher question |
2010-04-24 | No data | 11 AVENUE, FROM STREET 150 STREET TO STREET CLINTONVILLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | paving done |
2010-04-24 | No data | BROADWAY, FROM STREET WEST 234 STREET TO STREET WEST 236 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2010-04-24 | No data | 12 AVENUE, FROM STREET 150 STREET TO STREET CLINTONVILLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | paving done |
2010-04-21 | No data | 15 AVENUE, FROM STREET 139 STREET TO STREET 140 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | portasan, barricades & const. debris left on r/w & s/w took photos |
2010-04-20 | No data | BROADWAY, FROM STREET WEST 234 STREET TO STREET WEST 236 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2010-04-15 | No data | 15 AVENUE, FROM STREET 139 STREET TO STREET 140 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK |
2010-04-06 | No data | WEST 256 STREET, FROM STREET ARLINGTON AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2010-04-04 | No data | 15 AVENUE, FROM STREET 139 STREET TO STREET 140 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2010-03-27 | No data | BROADWAY, FROM STREET WEST 234 STREET TO STREET WEST 236 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2010-03-24 | No data | 15 AVENUE, FROM STREET 139 STREET TO STREET 140 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2010-03-13 | No data | WEST 256 STREET, FROM STREET ARLINGTON AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2010-03-13 | No data | WEST 256 STREET, FROM STREET ARLINGTON AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2010-03-03 | No data | CROMWELL AVENUE, FROM STREET HENRY PLACE TO STREET HYLAN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb replaced expansion joints sealed. |
2010-02-23 | No data | BROADWAY, FROM STREET WEST 234 STREET TO STREET WEST 236 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2010-02-20 | No data | SUYDAM PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2010-02-13 | No data | WEST 256 STREET, FROM STREET ARLINGTON AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2010-02-09 | No data | WEST 256 STREET, FROM STREET ARLINGTON AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2010-01-30 | No data | WEST 256 STREET, FROM STREET ARLINGTON AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2010-01-13 | No data | WEST 66 STREET, FROM STREET FREEDOM PLACE TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2010-01-12 | No data | WEST 256 STREET, FROM STREET ARLINGTON AVENUE TO STREET BEND | No data | Street Construction Inspections: Complaint | Department of Transportation | commissioners complaint |
2010-01-12 | No data | FREEDOM PLACE, FROM STREET WEST 66 STREET TO STREET WEST 68 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2010-01-09 | No data | 47 AVENUE, FROM STREET 60 STREET TO STREET 61 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2010-01-09 | No data | WEST 256 STREET, FROM STREET ARLINGTON AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2010-01-06 | No data | WEST 256 STREET, FROM STREET ARLINGTON AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2009-12-17 | No data | WEST 256 STREET, FROM STREET ARLINGTON AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2009-12-01 | No data | 41 STREET, FROM STREET 34 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2009-11-28 | No data | 41 STREET, FROM STREET 34 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2009-11-19 | No data | MYRTLE AVENUE, FROM STREET HUDSON WALK TO STREET PRINCE STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2009-11-14 | No data | 41 STREET, FROM STREET 34 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w repair |
2009-11-10 | No data | EAST 161 STREET, FROM STREET ELTON AVENUE TO STREET MELROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2009-10-29 | No data | EAST 161 STREET, FROM STREET ELTON AVENUE TO STREET MELROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2009-10-22 | No data | JAMAICA AVENUE, FROM STREET MILLER AVENUE TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2009-10-10 | No data | MYRTLE AVENUE, FROM STREET HUDSON WALK TO STREET PRINCE STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2009-10-08 | No data | JAMAICA AVENUE, FROM STREET MILLER AVENUE TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2009-10-01 | No data | 34 AVENUE, FROM STREET 41 STREET TO STREET STEINWAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2009-09-19 | No data | 211 STREET, FROM STREET 32 AVENUE TO STREET 33 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street paved |
2009-09-11 | No data | ATLANTIC AVENUE, FROM STREET BUFFALO AVENUE TO STREET SUYDAM PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2009-08-26 | No data | 41 STREET, FROM STREET 34 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2009-08-20 | No data | BROADWAY, FROM STREET WEST 234 STREET TO STREET WEST 236 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2009-08-12 | No data | CROMWELL AVENUE, FROM STREET HENRY PLACE TO STREET HYLAN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2009-08-01 | No data | BROADWAY, FROM STREET WEST 234 STREET TO STREET WEST 236 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2009-07-19 | No data | LITTLE NECK PARKWAY, FROM STREET 52 ROAD TO STREET BATES ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2009-07-17 | No data | WEST END AVENUE, FROM STREET WEST 66 STREET TO STREET WEST 70 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2009-05-26 | No data | HYLAN BOULEVARD, FROM STREET ALTER AVENUE TO STREET CROMWELL AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | S/W INSTALED OK |
2009-05-26 | No data | CROMWELL AVENUE, FROM STREET HENRY PLACE TO STREET HYLAN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | CURB INSTALLED NOT SEALED |
2009-05-24 | No data | SUYDAM PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | eq |
2009-05-15 | No data | BATES ROAD, FROM STREET BEND TO STREET CONCORD STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2009-05-15 | No data | LITTLE NECK PARKWAY, FROM STREET 52 ROAD TO STREET BATES ROAD | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2009-05-13 | No data | CROMWELL AVENUE, FROM STREET HENRY PLACE TO STREET HYLAN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2009-05-08 | No data | SUYDAM PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2009-04-17 | No data | SUYDAM PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2009-04-17 | No data | ATLANTIC AVENUE, FROM STREET BUFFALO AVENUE TO STREET SUYDAM PLACE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2009-04-02 | No data | ATLANTIC AVENUE, FROM STREET BUFFALO AVENUE TO STREET SUYDAM PLACE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2009-03-27 | No data | BRUNER AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2009-03-17 | No data | EAST 29 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | No data |
2009-03-03 | No data | MELROSE AVENUE, FROM STREET EAST 160 STREET TO STREET EAST 161 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2009-01-26 | No data | WEST 235 STREET, FROM STREET JOHNSON AVENUE TO STREET OXFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2008-11-12 | No data | EAST 29 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk expansion joints need to be sealed. |
2008-11-02 | No data | BROADWAY, FROM STREET WEST 234 STREET TO STREET WEST 236 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2008-11-01 | No data | 75 STREET, FROM STREET 35 AVENUE TO STREET 37 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2008-11-01 | No data | 74 STREET, FROM STREET 35 AVENUE TO STREET 37 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2008-11-01 | No data | 75 STREET, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2008-10-24 | No data | DITMARS BOULEVARD, FROM STREET 23 ROAD TO STREET 27 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2008-10-17 | No data | 37 AVENUE, FROM STREET 74 STREET TO STREET 75 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2008-10-15 | No data | WEST 64 STREET, FROM STREET BROADWAY TO STREET CENTRAL PARK WEST | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2008-10-12 | No data | BROADWAY, FROM STREET WEST 234 STREET TO STREET WEST 236 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2008-10-10 | No data | BROADWAY, FROM STREET WEST 234 STREET TO STREET WEST 236 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2008-09-11 | No data | 211 STREET, FROM STREET 32 AVENUE TO STREET 33 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2008-09-10 | No data | ATLANTIC AVENUE, FROM STREET ALICE COURT TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2008-08-23 | No data | EAST 96 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | r/p s/w |
2008-08-10 | No data | EAST 96 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Repair s/w walk |
2008-07-17 | No data | NEW LOTS AVENUE, FROM STREET HEGEMAN AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2008-06-19 | No data | MIDDLETOWN ROAD, FROM STREET JARVIS AVENUE TO STREET JARVIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2008-06-14 | No data | EAST 161 STREET, FROM STREET ELTON AVENUE TO STREET MELROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2008-06-14 | No data | COURTLANDT AVENUE, FROM STREET EAST 159 STREET TO STREET EAST 160 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2008-06-14 | No data | MELROSE AVENUE, FROM STREET EAST 160 STREET TO STREET EAST 161 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2008-06-14 | No data | EAST 159 STREET, FROM STREET COURTLANDT AVENUE TO STREET MELROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2008-06-11 | No data | MIDDLETOWN ROAD, FROM STREET JARVIS AVENUE TO STREET JARVIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2008-06-06 | No data | EAST 161 STREET, FROM STREET ELTON AVENUE TO STREET MELROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2008-06-06 | No data | EAST 159 STREET, FROM STREET COURTLANDT AVENUE TO STREET MELROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2008-06-06 | No data | COURTLANDT AVENUE, FROM STREET EAST 159 STREET TO STREET EAST 160 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2008-05-24 | No data | AMSTERDAM AVENUE, FROM STREET LA SALLE STREET TO STREET WEST 123 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2008-05-19 | No data | EAST 96 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | No data |
2008-05-15 | No data | BRUCKNER BOULEVARD, FROM STREET MIDDLETOWN ROAD TO STREET ROBERTS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2008-05-15 | No data | BRUCKNER BOULEVARD, FROM STREET COUNTRY CLUB ROAD TO STREET MIDDLETOWN ROAD | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2008-04-28 | No data | MIDDLETOWN ROAD, FROM STREET JARVIS AVENUE TO STREET JARVIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2008-04-28 | No data | BRUCKNER BOULEVARD, FROM STREET COUNTRY CLUB ROAD TO STREET MIDDLETOWN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2008-04-28 | No data | BRUCKNER BOULEVARD, FROM STREET MIDDLETOWN ROAD TO STREET ROBERTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2008-04-25 | No data | EAST 159 STREET, FROM STREET COURTLANDT AVENUE TO STREET MELROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2008-01-15 | No data | 12 AVENUE, FROM STREET 150 STREET TO STREET CLINTONVILLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2008-01-15 | No data | 11 AVENUE, FROM STREET 150 STREET TO STREET CLINTONVILLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2007-12-21 | No data | EAST 96 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2007-11-29 | No data | EAST 96 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2007-11-21 | No data | EAST 96 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR SIDEWALK |
2007-10-22 | No data | FRONT STREET, FROM STREET FLETCHER STREET TO STREET MAIDEN LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2007-10-22 | No data | FLETCHER STREET, FROM STREET FRONT STREET TO STREET SOUTH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2007-10-11 | No data | SEAGIRT BOULEVARD, FROM STREET BEACH 31 STREET TO STREET BAY 32 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2007-10-06 | No data | MAIDEN LANE, FROM STREET FRONT STREET TO STREET SOUTH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SIDEWALK |
2007-09-28 | No data | MIDDLETOWN ROAD, FROM STREET JARVIS AVENUE TO STREET JARVIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2007-09-13 | No data | MIDDLETOWN ROAD, FROM STREET JARVIS AVENUE TO STREET JARVIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2007-08-13 | No data | WEST 64 STREET, FROM STREET BROADWAY TO STREET CENTRAL PARK WEST | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2007-08-04 | No data | EAST 42 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2007-08-02 | No data | EAST 41 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair s/w |
2007-05-18 | No data | 3 AVENUE, FROM STREET EAST 95 STREET TO STREET EAST 96 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2007-05-16 | No data | BRUNER AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2007-05-12 | No data | 3 AVENUE, FROM STREET EAST 95 STREET TO STREET EAST 96 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2007-05-07 | No data | EAST 95 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2007-05-02 | No data | EAST 173 STREET, FROM STREET GRAND CONCOURSE TO STREET SELWYN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2007-04-27 | No data | WHITE PLAINS ROAD, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2007-04-26 | No data | 108 STREET, FROM STREET 39 AVENUE TO STREET ROOSEVELT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2007-04-24 | No data | JARVIS AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET ZULETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2007-03-08 | No data | WEST 167 STREET, FROM STREET SEDGWICK AVENUE TO STREET WEST 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2007-02-01 | No data | GANSEVOORT BOULEVARD, FROM STREET PURDY AVENUE TO STREET VICTORY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | EXPANSION JOINTS NEED TO BE SEALED |
2007-01-24 | No data | 111 STREET, FROM STREET 34 AVENUE TO STREET 37 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2007-01-24 | No data | EAST 170 STREET, FROM STREET WALTON AVENUE TO STREET WYTHE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
Number | Adjudicates | Phase | Disposition | Date | Fine amount | Date fine paid | description |
---|---|---|---|---|---|---|---|
TWC-229122 | Office of Administrative Trials and Hearings | Issued | Settled | 2024-04-17 | 2500 | 2024-05-14 | (e) A trade waste vehicle must not be operated unless such vehicle is in safe operating condition and has passed an inspection conducted by a qualified inspector demonstrating compliance with the terms of this section at least once during the preceding six months. (1) Each such inspection must be recorded on an inspection report form prescribed by the Commission. Such inspection report must identify any safety defects discovered during the inspection and cover at a minimum, the following parts and accessories: service and parking brakes, steering mechanism, tires, wheels and rims, side guards, coupling devices, mirrors, lighting devices and reflectors, horn, windshield wipers, and emergency equipment. (2) Following an inspection, such vehicle may not be operated unless a qualified inspector certifies on the inspection report that all necessary repairs have been made and that such vehicle has passed the inspection. (3) Copies of the most recent inspection report must be kept in the corresponding vehicle in accordance with the requirements of subdivision (e) of 17 RCNY ? 7-06. |
TWC-222095 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-07-08 | 250 | 2021-10-13 | Registrant failed to maintain clean and unobstructed sidewalk, flagging curbstone or roadway or failed to comply with section 5-08 or 5-11 of this chapter |
TWC-221419 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-04-14 | 500 | 2021-06-09 | An applicant for registration and a registrant must notify the Commission within ten (10) business days of all vehicle traffic summonses issued to the applicant for registration or registrant as the lessee or owner of the vehicle or to any person while operating a vehicle on behalf of such applicant or registrant. |
THE CORPORATION
ARSHIA DESIGNS INC. AAA VACUUM CORP. ATLANTICA TELECOM, INC. MISTY SPORTSWEAR, INC. INRACKS, INC. FAT JAMS ELECTRONICS INC. CROQUEMBOUCHE, INC. LONG BEACH PEDIATRIC GROUP, P.C. LAW OFFICES OF JOSEPH A. GRECO, P.C. TEREZ, INC.1475 EAST 222ND STREET, BRONX, NY, United States, 10469
SCIENTIFIC ELECTRIC COMPANY, INC. NEW YORK FIRE & SECURITY, LLCDate of last update: 30 Oct 2024
Sources: New York Secretary of State
© 2024 nycompanysearch.com, Part of Big Data Integrated