Name: | PREFERRED GC GROUP INC. |
Jurisdiction: | New York |
Legal type: | DOMESTIC BUSINESS CORPORATION |
Status: | Active |
Date of registration: | 05 Nov 2018 (6 years ago) |
Entity Number: | 5437835 |
ZIP code: | 10314 |
County: | Richmond |
Place of Formation: | New York |
Address: | 168 SHERADEN AVENUE, STATEN ISLAND, NY, United States, 10314 |
Shares Details
Shares issued 200
Share Par Value 0
Type NO PAR VALUE
Name | Role | Address |
---|---|---|
THE CORPORATION | DOS Process Agent | 168 SHERADEN AVENUE, STATEN ISLAND, NY, United States, 10314 |
Number | Date | End date | Type | Address |
---|---|---|---|---|
B022024311B25 | 2024-11-06 | 2025-02-03 | CROSSING SIDEWALK | WALTON STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET UNION AVENUE |
B022024311B31 | 2024-11-06 | 2025-02-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALTON STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET UNION AVENUE |
B022024311B32 | 2024-11-06 | 2025-02-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALTON STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET UNION AVENUE |
B022024311B30 | 2024-11-06 | 2025-02-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALTON STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET UNION AVENUE |
B022024311B29 | 2024-11-06 | 2025-02-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALTON STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET UNION AVENUE |
B022024311B28 | 2024-11-06 | 2025-02-03 | TEMP. CONST. SIGNS/MARKINGS | WALTON STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET UNION AVENUE |
B022024311B27 | 2024-11-06 | 2025-02-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | WALTON STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET UNION AVENUE |
B022024311B24 | 2024-11-06 | 2025-02-03 | PLACE MATERIAL ON STREET | WALTON STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET UNION AVENUE |
B022024311B23 | 2024-11-06 | 2025-02-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MARCY AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET WALTON STREET |
B022024311B22 | 2024-11-06 | 2025-02-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MARCY AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET WALTON STREET |
B022024311B21 | 2024-11-06 | 2025-02-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MARCY AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET WALTON STREET |
B022024311B20 | 2024-11-06 | 2025-02-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MARCY AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET WALTON STREET |
B022024311B19 | 2024-11-06 | 2025-02-03 | TEMP. CONST. SIGNS/MARKINGS | MARCY AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET WALTON STREET |
B022024311B18 | 2024-11-06 | 2025-02-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | MARCY AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET WALTON STREET |
B022024311B17 | 2024-11-06 | 2025-02-03 | OCCUPANCY OF ROADWAY AS STIPULATED | MARCY AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET WALTON STREET |
B022024311B16 | 2024-11-06 | 2025-02-03 | CROSSING SIDEWALK | MARCY AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET WALTON STREET |
B022024311B15 | 2024-11-06 | 2025-02-03 | PLACE MATERIAL ON STREET | MARCY AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET WALTON STREET |
B022024311B26 | 2024-11-06 | 2025-02-03 | OCCUPANCY OF ROADWAY AS STIPULATED | WALTON STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET UNION AVENUE |
B022024303C19 | 2024-10-29 | 2024-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B022024271C58 | 2024-09-27 | 2024-11-13 | CROSSING SIDEWALK | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024271C74 | 2024-09-27 | 2024-11-13 | CROSSING SIDEWALK | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024271C73 | 2024-09-27 | 2024-11-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024271C72 | 2024-09-27 | 2024-11-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024271C71 | 2024-09-27 | 2024-11-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024271C70 | 2024-09-27 | 2024-11-13 | TEMP. CONST. SIGNS/MARKINGS | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024271C69 | 2024-09-27 | 2024-11-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024271C68 | 2024-09-27 | 2024-11-13 | OCCUPANCY OF ROADWAY AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024271C64 | 2024-09-27 | 2024-11-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024271C63 | 2024-09-27 | 2024-11-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024271C62 | 2024-09-27 | 2024-11-13 | TEMP. CONST. SIGNS/MARKINGS | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024271C61 | 2024-09-27 | 2024-11-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024271C60 | 2024-09-27 | 2024-11-13 | OCCUPANCY OF ROADWAY AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024271C59 | 2024-09-27 | 2024-11-13 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024271C57 | 2024-09-27 | 2024-11-13 | PLACE MATERIAL ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024270C87 | 2024-09-26 | 2024-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024270C91 | 2024-09-26 | 2024-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024270C90 | 2024-09-26 | 2024-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024270C89 | 2024-09-26 | 2024-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024270C88 | 2024-09-26 | 2024-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024270C86 | 2024-09-26 | 2024-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024270C85 | 2024-09-26 | 2024-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024270C84 | 2024-09-26 | 2024-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024270C83 | 2024-09-26 | 2024-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024270C82 | 2024-09-26 | 2024-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024270C81 | 2024-09-26 | 2024-11-23 | TEMP. CONST. SIGNS/MARKINGS | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024270C80 | 2024-09-26 | 2024-11-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024270C79 | 2024-09-26 | 2024-11-23 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024270C78 | 2024-09-26 | 2024-11-23 | OCCUPANCY OF ROADWAY AS STIPULATED | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024270C77 | 2024-09-26 | 2024-11-23 | TEMPORARY PEDESTRIAN WALK | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024270C76 | 2024-09-26 | 2024-11-23 | CROSSING SIDEWALK | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024270C75 | 2024-09-26 | 2024-11-23 | PLACE MATERIAL ON STREET | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024270C74 | 2024-09-26 | 2024-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B022024270C73 | 2024-09-26 | 2024-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B022024270C72 | 2024-09-26 | 2024-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B022024270C71 | 2024-09-26 | 2024-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B022024270C70 | 2024-09-26 | 2024-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B022024270C69 | 2024-09-26 | 2024-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B022024270C68 | 2024-09-26 | 2024-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B022024270C67 | 2024-09-26 | 2024-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B022024270C66 | 2024-09-26 | 2024-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B022024270C65 | 2024-09-26 | 2024-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B022024270C64 | 2024-09-26 | 2024-11-23 | TEMP. CONST. SIGNS/MARKINGS | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B022024270C63 | 2024-09-26 | 2024-11-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B022024270C62 | 2024-09-26 | 2024-11-23 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B022024270C61 | 2024-09-26 | 2024-11-23 | OCCUPANCY OF ROADWAY AS STIPULATED | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B022024270C60 | 2024-09-26 | 2024-11-23 | CROSSING SIDEWALK | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B022024270C59 | 2024-09-26 | 2024-11-23 | PLACE MATERIAL ON STREET | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
M002024262A01 | 2024-09-18 | No data | MISCELLANEOUS - BUILDER'S PAVEMENT | CENTRAL PARK WEST, MANHATTAN, FROM STREET WEST 76 STREET TO STREET WEST 77 STREET |
B022024241F07 | 2024-08-28 | 2024-10-26 | OCCUPANCY OF ROADWAY AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024241F08 | 2024-08-28 | 2024-10-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024241F09 | 2024-08-28 | 2024-10-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024241F10 | 2024-08-28 | 2024-10-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024241F11 | 2024-08-28 | 2024-09-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024241F12 | 2024-08-28 | 2024-11-19 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024240C53 | 2024-08-27 | 2024-11-19 | TEMP. CONST. SIGNS/MARKINGS | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024240C52 | 2024-08-27 | 2024-11-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024240C51 | 2024-08-27 | 2024-11-19 | OCCUPANCY OF ROADWAY AS STIPULATED | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024240C48 | 2024-08-27 | 2024-11-19 | PLACE MATERIAL ON STREET | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024240C50 | 2024-08-27 | 2024-11-19 | TEMPORARY PEDESTRIAN WALK | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024240C49 | 2024-08-27 | 2024-11-19 | CROSSING SIDEWALK | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024240C60 | 2024-08-27 | 2024-11-19 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024240C59 | 2024-08-27 | 2024-11-19 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024240C58 | 2024-08-27 | 2024-11-19 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024240C57 | 2024-08-27 | 2024-11-19 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024240C56 | 2024-08-27 | 2024-11-19 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024240C55 | 2024-08-27 | 2024-11-19 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024240C54 | 2024-08-27 | 2024-11-19 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024240C65 | 2024-08-27 | 2024-11-19 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024240C64 | 2024-08-27 | 2024-11-19 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024240C63 | 2024-08-27 | 2024-11-19 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024240C62 | 2024-08-27 | 2024-11-19 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024240C61 | 2024-08-27 | 2024-11-19 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B152024235A08 | 2024-08-22 | 2024-12-10 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024221B93 | 2024-08-08 | 2024-11-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024221B92 | 2024-08-08 | 2024-11-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024221B88 | 2024-08-08 | 2024-11-18 | OCCUPANCY OF ROADWAY AS STIPULATED | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024221B89 | 2024-08-08 | 2024-11-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024221B90 | 2024-08-08 | 2024-11-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024221B91 | 2024-08-08 | 2024-11-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B152024220A26 | 2024-08-07 | 2024-11-22 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024206B09 | 2024-07-24 | 2024-09-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B022024206B10 | 2024-07-24 | 2024-09-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B022024206B08 | 2024-07-24 | 2024-09-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B022024206B07 | 2024-07-24 | 2024-09-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B022024205C64 | 2024-07-23 | 2024-09-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024185B90 | 2024-07-03 | 2024-09-29 | TEMP. CONST. SIGNS/MARKINGS | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B012024185B39 | 2024-07-03 | 2024-08-01 | INSTALL FENCE - PROTECTED | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B012024185B40 | 2024-07-03 | 2024-08-01 | INSTALL FENCE - PROTECTED | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024185C12 | 2024-07-03 | 2024-09-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024185C11 | 2024-07-03 | 2024-09-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024185C10 | 2024-07-03 | 2024-09-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024185C09 | 2024-07-03 | 2024-09-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024185C08 | 2024-07-03 | 2024-09-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024185C07 | 2024-07-03 | 2024-09-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024185C06 | 2024-07-03 | 2024-09-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024185C05 | 2024-07-03 | 2024-09-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024185C04 | 2024-07-03 | 2024-09-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024185C03 | 2024-07-03 | 2024-09-29 | TEMP. CONST. SIGNS/MARKINGS | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024185C02 | 2024-07-03 | 2024-09-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024185C01 | 2024-07-03 | 2024-09-29 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024185B99 | 2024-07-03 | 2024-09-29 | TEMPORARY PEDESTRIAN WALK | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024185B98 | 2024-07-03 | 2024-09-29 | CROSSING SIDEWALK | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024185B97 | 2024-07-03 | 2024-09-29 | PLACE MATERIAL ON STREET | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024185B96 | 2024-07-03 | 2024-09-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B022024185B95 | 2024-07-03 | 2024-09-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B022024185B94 | 2024-07-03 | 2024-09-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B022024185B93 | 2024-07-03 | 2024-09-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B022024185B92 | 2024-07-03 | 2024-09-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B022024185B91 | 2024-07-03 | 2024-09-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B022024185B89 | 2024-07-03 | 2024-09-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B022024185B88 | 2024-07-03 | 2024-09-29 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B022024185B87 | 2024-07-03 | 2024-09-29 | OCCUPANCY OF ROADWAY AS STIPULATED | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B022024185B86 | 2024-07-03 | 2024-09-29 | CROSSING SIDEWALK | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B022024185B85 | 2024-07-03 | 2024-09-29 | PLACE MATERIAL ON STREET | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B022024185C00 | 2024-07-03 | 2024-09-29 | OCCUPANCY OF ROADWAY AS STIPULATED | WILSON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE |
B022024183A86 | 2024-07-01 | 2024-09-28 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024183A85 | 2024-07-01 | 2024-09-28 | CROSSING SIDEWALK | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024183A84 | 2024-07-01 | 2024-09-28 | PLACE MATERIAL ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024183A97 | 2024-07-01 | 2024-09-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024183A96 | 2024-07-01 | 2024-09-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024183A95 | 2024-07-01 | 2024-09-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024183A94 | 2024-07-01 | 2024-09-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024183A93 | 2024-07-01 | 2024-09-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024183A92 | 2024-07-01 | 2024-09-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024183A91 | 2024-07-01 | 2024-09-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024183A90 | 2024-07-01 | 2024-09-28 | TEMP. CONST. SIGNS/MARKINGS | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024183A89 | 2024-07-01 | 2024-09-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024183A88 | 2024-07-01 | 2024-09-28 | OCCUPANCY OF ROADWAY AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024183A87 | 2024-07-01 | 2024-09-28 | TEMPORARY PEDESTRIAN WALK | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024180B25 | 2024-06-28 | 2024-09-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024180B23 | 2024-06-28 | 2024-09-28 | TEMPORARY PEDESTRIAN WALK | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024180B22 | 2024-06-28 | 2024-09-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024180B24 | 2024-06-28 | 2024-09-28 | OCCUPANCY OF ROADWAY AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024180B32 | 2024-06-28 | 2024-09-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024180B31 | 2024-06-28 | 2024-09-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024180B30 | 2024-06-28 | 2024-09-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024180B29 | 2024-06-28 | 2024-09-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024180B28 | 2024-06-28 | 2024-09-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024180B27 | 2024-06-28 | 2024-09-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024180B26 | 2024-06-28 | 2024-09-28 | TEMP. CONST. SIGNS/MARKINGS | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024157B64 | 2024-06-05 | 2024-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024157B62 | 2024-06-05 | 2024-09-02 | OCCUPANCY OF ROADWAY AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024157B63 | 2024-06-05 | 2024-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024157B65 | 2024-06-05 | 2024-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024156E09 | 2024-06-04 | 2024-09-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B152024156A29 | 2024-06-04 | 2024-09-10 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B012024156C59 | 2024-06-04 | 2024-09-05 | OPEN SIDEWALK TO INSTALL FOUNDATION | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024156E14 | 2024-06-04 | 2024-09-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024156E02 | 2024-06-04 | 2024-09-05 | PLACE MATERIAL ON STREET | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024156E03 | 2024-06-04 | 2024-09-05 | CROSSING SIDEWALK | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024156E04 | 2024-06-04 | 2024-09-05 | TEMPORARY PEDESTRIAN WALK | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024156E05 | 2024-06-04 | 2024-09-05 | OCCUPANCY OF ROADWAY AS STIPULATED | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024156E06 | 2024-06-04 | 2024-09-05 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024156E07 | 2024-06-04 | 2024-09-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024156E17 | 2024-06-04 | 2024-09-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024156E16 | 2024-06-04 | 2024-09-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024156E15 | 2024-06-04 | 2024-09-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024156E13 | 2024-06-04 | 2024-09-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024156E12 | 2024-06-04 | 2024-09-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024156E11 | 2024-06-04 | 2024-09-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024156E10 | 2024-06-04 | 2024-09-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024156E08 | 2024-06-04 | 2024-09-05 | TEMP. CONST. SIGNS/MARKINGS | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024156E21 | 2024-06-04 | 2024-09-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024156E20 | 2024-06-04 | 2024-09-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024156E19 | 2024-06-04 | 2024-09-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024156E18 | 2024-06-04 | 2024-09-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024137B63 | 2024-05-16 | 2024-08-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024137B62 | 2024-05-16 | 2024-08-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024137B61 | 2024-05-16 | 2024-08-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024137B60 | 2024-05-16 | 2024-08-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024137B59 | 2024-05-16 | 2024-08-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024137B58 | 2024-05-16 | 2024-08-20 | OCCUPANCY OF ROADWAY AS STIPULATED | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B152024134A17 | 2024-05-13 | 2024-08-23 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024093B46 | 2024-04-02 | 2024-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022024092H60 | 2024-04-01 | 2024-06-30 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022024092H65 | 2024-04-01 | 2024-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022024092H64 | 2024-04-01 | 2024-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022024092H63 | 2024-04-01 | 2024-06-30 | TEMP. CONST. SIGNS/MARKINGS | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022024092H62 | 2024-04-01 | 2024-06-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022024092H61 | 2024-04-01 | 2024-06-30 | OCCUPANCY OF ROADWAY AS STIPULATED | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022024092H59 | 2024-04-01 | 2024-06-30 | CROSSING SIDEWALK | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022024092H58 | 2024-04-01 | 2024-06-30 | PLACE MATERIAL ON STREET | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022024092H57 | 2024-04-01 | 2024-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022024092H56 | 2024-04-01 | 2024-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022024092H55 | 2024-04-01 | 2024-06-30 | TEMP. CONST. SIGNS/MARKINGS | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022024092H54 | 2024-04-01 | 2024-06-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022024092H53 | 2024-04-01 | 2024-06-30 | OCCUPANCY OF ROADWAY AS STIPULATED | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022024092H52 | 2024-04-01 | 2024-06-30 | CROSSING SIDEWALK | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022024092H51 | 2024-04-01 | 2024-06-30 | PLACE MATERIAL ON STREET | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022024088E93 | 2024-03-28 | 2024-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024088E92 | 2024-03-28 | 2024-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024088E91 | 2024-03-28 | 2024-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024088E90 | 2024-03-28 | 2024-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024088E89 | 2024-03-28 | 2024-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024088E88 | 2024-03-28 | 2024-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024088E87 | 2024-03-28 | 2024-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024088E86 | 2024-03-28 | 2024-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024088E79 | 2024-03-28 | 2024-06-30 | PLACE MATERIAL ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024088E82 | 2024-03-28 | 2024-06-30 | TEMPORARY PEDESTRIAN WALK | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024088E83 | 2024-03-28 | 2024-06-30 | OCCUPANCY OF ROADWAY AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024088E80 | 2024-03-28 | 2024-06-30 | CROSSING SIDEWALK | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024088E81 | 2024-03-28 | 2024-06-30 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024088E84 | 2024-03-28 | 2024-06-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024088E85 | 2024-03-28 | 2024-06-30 | TEMP. CONST. SIGNS/MARKINGS | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024088F03 | 2024-03-28 | 2024-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024088F02 | 2024-03-28 | 2024-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024088F01 | 2024-03-28 | 2024-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024088F00 | 2024-03-28 | 2024-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024088E99 | 2024-03-28 | 2024-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024088E98 | 2024-03-28 | 2024-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024088E97 | 2024-03-28 | 2024-06-30 | TEMP. CONST. SIGNS/MARKINGS | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024088E96 | 2024-03-28 | 2024-06-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024088E95 | 2024-03-28 | 2024-06-30 | OCCUPANCY OF ROADWAY AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024088E94 | 2024-03-28 | 2024-06-30 | TEMPORARY PEDESTRIAN WALK | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024066C49 | 2024-03-06 | 2024-06-07 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024066C54 | 2024-03-06 | 2024-06-07 | TEMP. CONST. SIGNS/MARKINGS | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024066C53 | 2024-03-06 | 2024-06-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024066C52 | 2024-03-06 | 2024-06-07 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024066C51 | 2024-03-06 | 2024-06-07 | OCCUPANCY OF ROADWAY AS STIPULATED | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024066C50 | 2024-03-06 | 2024-06-07 | TEMPORARY PEDESTRIAN WALK | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024066C48 | 2024-03-06 | 2024-06-07 | CROSSING SIDEWALK | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024066C47 | 2024-03-06 | 2024-06-07 | PLACE MATERIAL ON STREET | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024066C71 | 2024-03-06 | 2024-06-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024066C70 | 2024-03-06 | 2024-06-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024066C69 | 2024-03-06 | 2024-06-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024066C68 | 2024-03-06 | 2024-06-04 | OCCUPANCY OF ROADWAY AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024066C67 | 2024-03-06 | 2024-06-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024066C66 | 2024-03-06 | 2024-06-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024066C65 | 2024-03-06 | 2024-06-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024066C64 | 2024-03-06 | 2024-06-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024066C63 | 2024-03-06 | 2024-06-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024066C62 | 2024-03-06 | 2024-06-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024066C61 | 2024-03-06 | 2024-06-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024066C60 | 2024-03-06 | 2024-06-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024066C59 | 2024-03-06 | 2024-06-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024066C58 | 2024-03-06 | 2024-06-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024066C57 | 2024-03-06 | 2024-06-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024066C56 | 2024-03-06 | 2024-06-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022024066C55 | 2024-03-06 | 2024-06-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B012024066D28 | 2024-03-06 | 2024-06-07 | OPEN SIDEWALK TO INSTALL FOUNDATION | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B152024066A00 | 2024-03-06 | 2024-06-11 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024047A66 | 2024-02-16 | 2024-04-01 | TEMPORARY PEDESTRIAN WALK | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024047A72 | 2024-02-16 | 2024-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024047A73 | 2024-02-16 | 2024-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024047A70 | 2024-02-16 | 2024-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024047A67 | 2024-02-16 | 2024-04-01 | OCCUPANCY OF ROADWAY AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024047A75 | 2024-02-16 | 2024-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024047A76 | 2024-02-16 | 2024-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024047A68 | 2024-02-16 | 2024-04-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024047A74 | 2024-02-16 | 2024-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024047A71 | 2024-02-16 | 2024-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024047A69 | 2024-02-16 | 2024-04-01 | TEMP. CONST. SIGNS/MARKINGS | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024047A65 | 2024-02-16 | 2024-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024031B45 | 2024-01-31 | 2024-04-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022024031B54 | 2024-01-31 | 2024-04-01 | CROSSING SIDEWALK | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022024031B56 | 2024-01-31 | 2024-04-01 | OCCUPANCY OF ROADWAY AS STIPULATED | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022024031B57 | 2024-01-31 | 2024-04-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022024031B58 | 2024-01-31 | 2024-04-01 | TEMP. CONST. SIGNS/MARKINGS | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022024031B59 | 2024-01-31 | 2024-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022024031B60 | 2024-01-31 | 2024-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022024031B61 | 2024-01-31 | 2024-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022024031B53 | 2024-01-31 | 2024-04-01 | PLACE MATERIAL ON STREET | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022024031B47 | 2024-01-31 | 2024-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022024031B46 | 2024-01-31 | 2024-04-01 | TEMP. CONST. SIGNS/MARKINGS | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022024031B48 | 2024-01-31 | 2024-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022024031B44 | 2024-01-31 | 2024-04-01 | OCCUPANCY OF ROADWAY AS STIPULATED | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022024031B55 | 2024-01-31 | 2024-04-01 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022024031B42 | 2024-01-31 | 2024-04-01 | PLACE MATERIAL ON STREET | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022024031B43 | 2024-01-31 | 2024-04-01 | CROSSING SIDEWALK | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022024031B49 | 2024-01-31 | 2024-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022024031B50 | 2024-01-31 | 2024-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022024031B51 | 2024-01-31 | 2024-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022024031B52 | 2024-01-31 | 2024-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022024030B28 | 2024-01-30 | 2024-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024030B59 | 2024-01-30 | 2024-03-06 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024030B58 | 2024-01-30 | 2024-03-06 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024030B57 | 2024-01-30 | 2024-03-06 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024030B56 | 2024-01-30 | 2024-03-06 | OCCUPANCY OF ROADWAY AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022024030B34 | 2024-01-30 | 2024-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024030B33 | 2024-01-30 | 2024-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024030B32 | 2024-01-30 | 2024-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024030B31 | 2024-01-30 | 2024-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024030B30 | 2024-01-30 | 2024-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024030B29 | 2024-01-30 | 2024-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024030B27 | 2024-01-30 | 2024-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024030B26 | 2024-01-30 | 2024-04-01 | TEMP. CONST. SIGNS/MARKINGS | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024030B25 | 2024-01-30 | 2024-04-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024030B24 | 2024-01-30 | 2024-04-01 | OCCUPANCY OF ROADWAY AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024030B23 | 2024-01-30 | 2024-04-01 | TEMPORARY PEDESTRIAN WALK | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024030B22 | 2024-01-30 | 2024-04-01 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024030B21 | 2024-01-30 | 2024-04-01 | CROSSING SIDEWALK | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022024030B20 | 2024-01-30 | 2024-04-01 | PLACE MATERIAL ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023362I44 | 2023-12-28 | 2024-02-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023362I43 | 2023-12-28 | 2024-02-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023347C96 | 2023-12-13 | 2024-03-09 | TEMPORARY PEDESTRIAN WALK | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022023347C93 | 2023-12-13 | 2024-03-09 | PLACE MATERIAL ON STREET | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022023347C94 | 2023-12-13 | 2024-03-09 | CROSSING SIDEWALK | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022023347C95 | 2023-12-13 | 2024-03-09 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B012023347B65 | 2023-12-13 | 2024-03-09 | OPEN SIDEWALK TO INSTALL FOUNDATION | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B012023347B66 | 2023-12-13 | 2024-01-10 | INSTALL FENCE | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022023347C97 | 2023-12-13 | 2024-03-09 | OCCUPANCY OF ROADWAY AS STIPULATED | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022023347C98 | 2023-12-13 | 2024-03-09 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022023347C99 | 2023-12-13 | 2024-03-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022023347D00 | 2023-12-13 | 2024-03-09 | TEMP. CONST. SIGNS/MARKINGS | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022023347D01 | 2023-12-13 | 2024-03-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022023347D13 | 2023-12-13 | 2024-03-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022023347D12 | 2023-12-13 | 2024-03-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022023347D11 | 2023-12-13 | 2024-03-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022023347D10 | 2023-12-13 | 2024-03-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022023347D09 | 2023-12-13 | 2024-03-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022023347D08 | 2023-12-13 | 2024-03-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022023347D07 | 2023-12-13 | 2024-03-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022023347D06 | 2023-12-13 | 2024-03-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022023347D05 | 2023-12-13 | 2024-03-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022023347D03 | 2023-12-13 | 2024-03-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022023347D04 | 2023-12-13 | 2024-03-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022023347D02 | 2023-12-13 | 2024-03-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | RUTLEDGE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET HARRISON AVENUE |
B022023331C38 | 2023-11-27 | 2024-02-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023331C36 | 2023-11-27 | 2024-02-02 | OCCUPANCY OF ROADWAY AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023331C39 | 2023-11-27 | 2024-02-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023331C37 | 2023-11-27 | 2024-02-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023328A39 | 2023-11-24 | 2024-02-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023328A40 | 2023-11-24 | 2024-02-02 | TEMP. CONST. SIGNS/MARKINGS | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023328A41 | 2023-11-24 | 2024-02-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B152023328A00 | 2023-11-24 | 2024-03-06 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023328A42 | 2023-11-24 | 2024-02-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023328A43 | 2023-11-24 | 2024-02-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023328A44 | 2023-11-24 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023328A36 | 2023-11-24 | 2024-02-02 | PLACE MATERIAL ON STREET | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023328A45 | 2023-11-24 | 2024-02-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023328A46 | 2023-11-24 | 2024-02-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023328A37 | 2023-11-24 | 2024-02-02 | CROSSING SIDEWALK | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023328A38 | 2023-11-24 | 2024-02-02 | OCCUPANCY OF ROADWAY AS STIPULATED | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023327A14 | 2023-11-23 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023327A13 | 2023-11-23 | 2024-02-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023327A12 | 2023-11-23 | 2024-02-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023327A11 | 2023-11-23 | 2024-02-02 | TEMP. CONST. SIGNS/MARKINGS | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023327A08 | 2023-11-23 | 2024-02-02 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023327A07 | 2023-11-23 | 2024-02-02 | CROSSING SIDEWALK | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023327A06 | 2023-11-23 | 2024-02-02 | PLACE MATERIAL ON STREET | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023327A10 | 2023-11-23 | 2024-02-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023327A09 | 2023-11-23 | 2024-02-02 | OCCUPANCY OF ROADWAY AS STIPULATED | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023326B81 | 2023-11-22 | 2024-02-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023326B96 | 2023-11-22 | 2024-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023326B95 | 2023-11-22 | 2024-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023326B94 | 2023-11-22 | 2024-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023326B93 | 2023-11-22 | 2024-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023326B92 | 2023-11-22 | 2024-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023326B91 | 2023-11-22 | 2024-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023326B90 | 2023-11-22 | 2024-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023326B89 | 2023-11-22 | 2024-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023326B88 | 2023-11-22 | 2024-02-21 | TEMP. CONST. SIGNS/MARKINGS | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023326B87 | 2023-11-22 | 2024-02-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023326B86 | 2023-11-22 | 2024-02-21 | OCCUPANCY OF ROADWAY AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023326B85 | 2023-11-22 | 2024-02-21 | TEMPORARY PEDESTRIAN WALK | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023326B84 | 2023-11-22 | 2024-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023326B82 | 2023-11-22 | 2024-02-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023326B80 | 2023-11-22 | 2024-02-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023326B79 | 2023-11-22 | 2024-02-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023326B78 | 2023-11-22 | 2024-02-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023326B77 | 2023-11-22 | 2024-02-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023326B76 | 2023-11-22 | 2024-02-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023326B75 | 2023-11-22 | 2024-02-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023326B74 | 2023-11-22 | 2024-02-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023326B73 | 2023-11-22 | 2024-02-02 | TEMP. CONST. SIGNS/MARKINGS | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023326B72 | 2023-11-22 | 2024-02-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023326B71 | 2023-11-22 | 2024-02-02 | OCCUPANCY OF ROADWAY AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023326B70 | 2023-11-22 | 2024-02-02 | TEMPORARY PEDESTRIAN WALK | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023326B69 | 2023-11-22 | 2024-02-02 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023326B68 | 2023-11-22 | 2024-02-02 | CROSSING SIDEWALK | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023326B67 | 2023-11-22 | 2024-02-02 | PLACE MATERIAL ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023299D10 | 2023-10-26 | 2023-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023299D07 | 2023-10-26 | 2023-11-23 | OCCUPANCY OF ROADWAY AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023299D08 | 2023-10-26 | 2023-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023299D09 | 2023-10-26 | 2023-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023269E67 | 2023-09-26 | 2023-11-23 | CROSSING SIDEWALK | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023269E75 | 2023-09-26 | 2023-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023269E74 | 2023-09-26 | 2023-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023269E73 | 2023-09-26 | 2023-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023269E72 | 2023-09-26 | 2023-11-23 | TEMP. CONST. SIGNS/MARKINGS | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023269E71 | 2023-09-26 | 2023-11-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023269E70 | 2023-09-26 | 2023-11-23 | OCCUPANCY OF ROADWAY AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023269E69 | 2023-09-26 | 2023-11-23 | TEMPORARY PEDESTRIAN WALK | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023269E68 | 2023-09-26 | 2023-11-23 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023269E66 | 2023-09-26 | 2023-11-23 | PLACE MATERIAL ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023269F00 | 2023-09-26 | 2023-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023269E99 | 2023-09-26 | 2023-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023269E98 | 2023-09-26 | 2023-10-27 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023269E97 | 2023-09-26 | 2023-10-27 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023269E96 | 2023-09-26 | 2023-10-27 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023269E95 | 2023-09-26 | 2023-10-27 | OCCUPANCY OF ROADWAY AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023269E94 | 2023-09-26 | 2023-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023269E92 | 2023-09-26 | 2023-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023269E91 | 2023-09-26 | 2023-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023269E90 | 2023-09-26 | 2023-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023269E89 | 2023-09-26 | 2023-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023269E88 | 2023-09-26 | 2023-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023269E87 | 2023-09-26 | 2023-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023269E86 | 2023-09-26 | 2023-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023269E85 | 2023-09-26 | 2023-11-23 | TEMP. CONST. SIGNS/MARKINGS | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023269E84 | 2023-09-26 | 2023-11-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023269E83 | 2023-09-26 | 2023-11-23 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023269E82 | 2023-09-26 | 2023-11-23 | OCCUPANCY OF ROADWAY AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023269E81 | 2023-09-26 | 2023-11-23 | TEMPORARY PEDESTRIAN WALK | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023269E80 | 2023-09-26 | 2023-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023269E79 | 2023-09-26 | 2023-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023269E78 | 2023-09-26 | 2023-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023269E77 | 2023-09-26 | 2023-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023269E76 | 2023-09-26 | 2023-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023266A25 | 2023-09-23 | 2023-11-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023266A26 | 2023-09-23 | 2023-11-23 | TEMP. CONST. SIGNS/MARKINGS | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023266A27 | 2023-09-23 | 2023-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023266A28 | 2023-09-23 | 2023-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023266A29 | 2023-09-23 | 2023-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023266A24 | 2023-09-23 | 2023-11-23 | OCCUPANCY OF ROADWAY AS STIPULATED | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023266A23 | 2023-09-23 | 2023-11-23 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023266A22 | 2023-09-23 | 2023-11-23 | CROSSING SIDEWALK | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023266A21 | 2023-09-23 | 2023-11-23 | PLACE MATERIAL ON STREET | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023265B23 | 2023-09-22 | 2023-11-23 | PLACE MATERIAL ON STREET | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023265B33 | 2023-09-22 | 2023-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023265B32 | 2023-09-22 | 2023-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023265B31 | 2023-09-22 | 2023-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023265B30 | 2023-09-22 | 2023-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023265B29 | 2023-09-22 | 2023-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023265B28 | 2023-09-22 | 2023-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023265B27 | 2023-09-22 | 2023-11-23 | TEMP. CONST. SIGNS/MARKINGS | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023265B26 | 2023-09-22 | 2023-11-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023265B25 | 2023-09-22 | 2023-11-23 | OCCUPANCY OF ROADWAY AS STIPULATED | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023265B24 | 2023-09-22 | 2023-11-23 | CROSSING SIDEWALK | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B152023264A05 | 2023-09-21 | 2023-12-06 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023263C53 | 2023-09-20 | 2023-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023263C52 | 2023-09-20 | 2023-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023263C51 | 2023-09-20 | 2023-11-23 | TEMP. CONST. SIGNS/MARKINGS | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023263C50 | 2023-09-20 | 2023-11-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023263C49 | 2023-09-20 | 2023-11-23 | OCCUPANCY OF ROADWAY AS STIPULATED | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023263C48 | 2023-09-20 | 2023-11-23 | CROSSING SIDEWALK | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023263C47 | 2023-09-20 | 2023-11-23 | PLACE MATERIAL ON STREET | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023263E00 | 2023-09-20 | 2023-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023263E01 | 2023-09-20 | 2023-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023228C31 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023228C26 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023228C25 | 2023-08-16 | 2023-09-02 | TEMP. CONST. SIGNS/MARKINGS | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023228C24 | 2023-08-16 | 2023-09-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023228C23 | 2023-08-16 | 2023-09-02 | OCCUPANCY OF ROADWAY AS STIPULATED | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023228C22 | 2023-08-16 | 2023-09-02 | CROSSING SIDEWALK | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023228C21 | 2023-08-16 | 2023-09-02 | PLACE MATERIAL ON STREET | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023228C20 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023228C19 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023228C18 | 2023-08-16 | 2023-09-02 | TEMP. CONST. SIGNS/MARKINGS | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023228C17 | 2023-08-16 | 2023-09-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023228C16 | 2023-08-16 | 2023-09-02 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023228C15 | 2023-08-16 | 2023-09-02 | OCCUPANCY OF ROADWAY AS STIPULATED | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023228C14 | 2023-08-16 | 2023-09-02 | CROSSING SIDEWALK | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023228C13 | 2023-08-16 | 2023-09-02 | PLACE MATERIAL ON STREET | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023228C08 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023228C07 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023228C06 | 2023-08-16 | 2023-09-02 | TEMP. CONST. SIGNS/MARKINGS | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023228C05 | 2023-08-16 | 2023-09-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023228C04 | 2023-08-16 | 2023-09-02 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023228C03 | 2023-08-16 | 2023-09-02 | OCCUPANCY OF ROADWAY AS STIPULATED | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023228C02 | 2023-08-16 | 2023-09-02 | CROSSING SIDEWALK | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023228C01 | 2023-08-16 | 2023-09-02 | PLACE MATERIAL ON STREET | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023228C80 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023228C79 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023228C78 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023228C77 | 2023-08-16 | 2023-09-02 | OCCUPANCY OF ROADWAY AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023228C76 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023228C75 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023228C74 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023228C73 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023228C72 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023228C71 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023228C70 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023228C69 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023228C68 | 2023-08-16 | 2023-09-02 | TEMP. CONST. SIGNS/MARKINGS | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023228C67 | 2023-08-16 | 2023-09-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023228C66 | 2023-08-16 | 2023-09-02 | OCCUPANCY OF ROADWAY AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023228C65 | 2023-08-16 | 2023-09-02 | TEMPORARY PEDESTRIAN WALK | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023228C64 | 2023-08-16 | 2023-09-02 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023228C63 | 2023-08-16 | 2023-09-02 | CROSSING SIDEWALK | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023228C62 | 2023-08-16 | 2023-09-02 | PLACE MATERIAL ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023228C61 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023228C60 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023228C59 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023228C58 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023228C57 | 2023-08-16 | 2023-09-02 | TEMP. CONST. SIGNS/MARKINGS | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023228C56 | 2023-08-16 | 2023-09-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023228C55 | 2023-08-16 | 2023-09-02 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023228C54 | 2023-08-16 | 2023-09-02 | OCCUPANCY OF ROADWAY AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023228C53 | 2023-08-16 | 2023-09-02 | TEMPORARY PEDESTRIAN WALK | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023228C52 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023228C51 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023228C50 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023228C49 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023228C48 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023228C47 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023228C46 | 2023-08-16 | 2023-09-02 | TEMP. CONST. SIGNS/MARKINGS | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023228C45 | 2023-08-16 | 2023-09-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023228C44 | 2023-08-16 | 2023-09-02 | OCCUPANCY OF ROADWAY AS STIPULATED | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023228C42 | 2023-08-16 | 2023-09-02 | PLACE MATERIAL ON STREET | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023228C41 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023228C40 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023228C39 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023228C38 | 2023-08-16 | 2023-09-02 | TEMP. CONST. SIGNS/MARKINGS | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023228C37 | 2023-08-16 | 2023-09-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023228C36 | 2023-08-16 | 2023-09-02 | OCCUPANCY OF ROADWAY AS STIPULATED | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023228C35 | 2023-08-16 | 2023-09-02 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023228C34 | 2023-08-16 | 2023-09-02 | CROSSING SIDEWALK | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023228C33 | 2023-08-16 | 2023-09-02 | PLACE MATERIAL ON STREET | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023228C32 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023228C30 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023228C29 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023228C28 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023228C43 | 2023-08-16 | 2023-09-02 | CROSSING SIDEWALK | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023228C27 | 2023-08-16 | 2023-09-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023180C40 | 2023-06-29 | 2023-07-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023180C41 | 2023-06-29 | 2023-07-28 | TEMPORARY PEDESTRIAN WALK | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022023180C42 | 2023-06-29 | 2023-07-28 | OCCUPANCY OF ROADWAY AS STIPULATED | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022023180C43 | 2023-06-29 | 2023-07-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B012023180B29 | 2023-06-29 | 2023-07-28 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B012023180B28 | 2023-06-29 | 2023-07-28 | RESET, REPAIR OR REPLACE CURB-PROTECTED | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B012023180B27 | 2023-06-29 | 2023-07-28 | PAVE STREET-W/ ENGINEERING & INSP FEE | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B012023180B26 | 2023-06-29 | 2023-07-28 | RESET, REPAIR OR REPLACE CURB | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023180C38 | 2023-06-29 | 2023-07-28 | TEMPORARY PEDESTRIAN WALK | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B042023180A15 | 2023-06-29 | 2023-07-28 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B042023180A16 | 2023-06-29 | 2023-07-28 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022023180C39 | 2023-06-29 | 2023-07-28 | OCCUPANCY OF ROADWAY AS STIPULATED | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023158C86 | 2023-06-07 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023158C89 | 2023-06-07 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023158C88 | 2023-06-07 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023158C87 | 2023-06-07 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023145A86 | 2023-05-25 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023145A87 | 2023-05-25 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023138C37 | 2023-05-18 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023138C36 | 2023-05-18 | 2023-08-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023138C35 | 2023-05-18 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023138C34 | 2023-05-18 | 2023-08-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023137B22 | 2023-05-17 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023137D35 | 2023-05-17 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023137D33 | 2023-05-17 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023137D31 | 2023-05-17 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023137D29 | 2023-05-17 | 2023-08-15 | OCCUPANCY OF ROADWAY AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023137C54 | 2023-05-17 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023137C53 | 2023-05-17 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023137C52 | 2023-05-17 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023137C51 | 2023-05-17 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023137C50 | 2023-05-17 | 2023-08-15 | TEMP. CONST. SIGNS/MARKINGS | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023137C49 | 2023-05-17 | 2023-08-15 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023137C48 | 2023-05-17 | 2023-08-15 | OCCUPANCY OF ROADWAY AS STIPULATED | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023137C47 | 2023-05-17 | 2023-08-15 | CROSSING SIDEWALK | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023137C46 | 2023-05-17 | 2023-08-15 | PLACE MATERIAL ON STREET | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023137C45 | 2023-05-17 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023137C44 | 2023-05-17 | 2023-08-15 | TEMP. CONST. SIGNS/MARKINGS | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023137C43 | 2023-05-17 | 2023-08-15 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023137C42 | 2023-05-17 | 2023-08-15 | OCCUPANCY OF ROADWAY AS STIPULATED | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023137C41 | 2023-05-17 | 2023-08-15 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023137C40 | 2023-05-17 | 2023-08-15 | CROSSING SIDEWALK | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023137C39 | 2023-05-17 | 2023-08-15 | PLACE MATERIAL ON STREET | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023137C38 | 2023-05-17 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023137C37 | 2023-05-17 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023137C36 | 2023-05-17 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023137C35 | 2023-05-17 | 2023-08-15 | TEMP. CONST. SIGNS/MARKINGS | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023137C34 | 2023-05-17 | 2023-08-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023137C33 | 2023-05-17 | 2023-08-15 | OCCUPANCY OF ROADWAY AS STIPULATED | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023137C32 | 2023-05-17 | 2023-08-15 | CROSSING SIDEWALK | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023137C31 | 2023-05-17 | 2023-08-15 | PLACE MATERIAL ON STREET | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023137C30 | 2023-05-17 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022023137C29 | 2023-05-17 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022023137C28 | 2023-05-17 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022023137C27 | 2023-05-17 | 2023-08-15 | TEMP. CONST. SIGNS/MARKINGS | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022023137C26 | 2023-05-17 | 2023-08-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022023137C25 | 2023-05-17 | 2023-08-15 | OCCUPANCY OF ROADWAY AS STIPULATED | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022023137C24 | 2023-05-17 | 2023-08-15 | CROSSING SIDEWALK | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022023137C23 | 2023-05-17 | 2023-08-15 | PLACE MATERIAL ON STREET | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022023137C17 | 2023-05-17 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023137C16 | 2023-05-17 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023137C15 | 2023-05-17 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023137C14 | 2023-05-17 | 2023-08-15 | TEMP. CONST. SIGNS/MARKINGS | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023137C13 | 2023-05-17 | 2023-08-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023137C12 | 2023-05-17 | 2023-08-15 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023137C11 | 2023-05-17 | 2023-08-15 | OCCUPANCY OF ROADWAY AS STIPULATED | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023137C10 | 2023-05-17 | 2023-08-15 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023137C09 | 2023-05-17 | 2023-08-15 | CROSSING SIDEWALK | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023137C08 | 2023-05-17 | 2023-08-15 | PLACE MATERIAL ON STREET | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023137C07 | 2023-05-17 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023137C06 | 2023-05-17 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023137C05 | 2023-05-17 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023137C04 | 2023-05-17 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023137C03 | 2023-05-17 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023137C02 | 2023-05-17 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023137C01 | 2023-05-17 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023137C00 | 2023-05-17 | 2023-08-15 | TEMP. CONST. SIGNS/MARKINGS | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023137B99 | 2023-05-17 | 2023-08-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023137B98 | 2023-05-17 | 2023-08-15 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023137B97 | 2023-05-17 | 2023-08-15 | OCCUPANCY OF ROADWAY AS STIPULATED | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023137B96 | 2023-05-17 | 2023-08-15 | CROSSING SIDEWALK | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023137B95 | 2023-05-17 | 2023-08-15 | PLACE MATERIAL ON STREET | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023137B87 | 2023-05-17 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023137B86 | 2023-05-17 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023137B85 | 2023-05-17 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023137B84 | 2023-05-17 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023137B83 | 2023-05-17 | 2023-08-15 | TEMP. CONST. SIGNS/MARKINGS | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023137B82 | 2023-05-17 | 2023-08-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023137B81 | 2023-05-17 | 2023-08-15 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023137B80 | 2023-05-17 | 2023-08-15 | OCCUPANCY OF ROADWAY AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023137B79 | 2023-05-17 | 2023-08-15 | TEMPORARY PEDESTRIAN WALK | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023137B21 | 2023-05-17 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023137B20 | 2023-05-17 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023137B19 | 2023-05-17 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023137B18 | 2023-05-17 | 2023-08-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023137B17 | 2023-05-17 | 2023-08-15 | TEMP. CONST. SIGNS/MARKINGS | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023137B16 | 2023-05-17 | 2023-08-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023137B15 | 2023-05-17 | 2023-08-15 | OCCUPANCY OF ROADWAY AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023137B14 | 2023-05-17 | 2023-08-15 | TEMPORARY PEDESTRIAN WALK | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023137B13 | 2023-05-17 | 2023-08-15 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023137B12 | 2023-05-17 | 2023-08-15 | CROSSING SIDEWALK | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023137B11 | 2023-05-17 | 2023-08-15 | PLACE MATERIAL ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B152023137A04 | 2023-05-17 | 2023-09-05 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023128B91 | 2023-05-08 | 2023-05-17 | OCCUPANCY OF ROADWAY AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023128B94 | 2023-05-08 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023128B93 | 2023-05-08 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023128B92 | 2023-05-08 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B012023116B27 | 2023-04-26 | 2023-05-24 | RESET, REPAIR OR REPLACE CURB | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023107C37 | 2023-04-17 | 2023-05-07 | OCCUPANCY OF ROADWAY AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023107C40 | 2023-04-17 | 2023-05-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023107C39 | 2023-04-17 | 2023-05-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023107C38 | 2023-04-17 | 2023-05-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023095B25 | 2023-04-05 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022023095B24 | 2023-04-05 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022023095B23 | 2023-04-05 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022023095B22 | 2023-04-05 | 2023-05-17 | TEMP. CONST. SIGNS/MARKINGS | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022023095B21 | 2023-04-05 | 2023-05-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022023095B20 | 2023-04-05 | 2023-05-17 | OCCUPANCY OF ROADWAY AS STIPULATED | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022023095B19 | 2023-04-05 | 2023-05-17 | CROSSING SIDEWALK | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022023095B18 | 2023-04-05 | 2023-05-17 | PLACE MATERIAL ON STREET | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022023095B16 | 2023-04-05 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023095B15 | 2023-04-05 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023095B14 | 2023-04-05 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023095B13 | 2023-04-05 | 2023-05-17 | TEMP. CONST. SIGNS/MARKINGS | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023095B12 | 2023-04-05 | 2023-05-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023095B11 | 2023-04-05 | 2023-05-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023095B10 | 2023-04-05 | 2023-05-17 | OCCUPANCY OF ROADWAY AS STIPULATED | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023095B09 | 2023-04-05 | 2023-05-17 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023095B08 | 2023-04-05 | 2023-05-17 | CROSSING SIDEWALK | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023095B07 | 2023-04-05 | 2023-05-17 | PLACE MATERIAL ON STREET | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023095B06 | 2023-04-05 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023095B05 | 2023-04-05 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023095B04 | 2023-04-05 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023095B03 | 2023-04-05 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023095B02 | 2023-04-05 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023095B01 | 2023-04-05 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023095B00 | 2023-04-05 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023095A99 | 2023-04-05 | 2023-05-17 | TEMP. CONST. SIGNS/MARKINGS | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023095A98 | 2023-04-05 | 2023-05-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023095A97 | 2023-04-05 | 2023-05-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023095A96 | 2023-04-05 | 2023-05-17 | OCCUPANCY OF ROADWAY AS STIPULATED | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023095A95 | 2023-04-05 | 2023-05-17 | CROSSING SIDEWALK | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023095A94 | 2023-04-05 | 2023-05-17 | PLACE MATERIAL ON STREET | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023095A93 | 2023-04-05 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023095A92 | 2023-04-05 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023095A91 | 2023-04-05 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023095A90 | 2023-04-05 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023095A89 | 2023-04-05 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023095A83 | 2023-04-05 | 2023-05-17 | PLACE MATERIAL ON STREET | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023095A84 | 2023-04-05 | 2023-05-17 | CROSSING SIDEWALK | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023095A88 | 2023-04-05 | 2023-05-17 | TEMP. CONST. SIGNS/MARKINGS | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023095A87 | 2023-04-05 | 2023-05-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023095A85 | 2023-04-05 | 2023-05-17 | OCCUPANCY OF ROADWAY AS STIPULATED | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023095A86 | 2023-04-05 | 2023-05-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023095B33 | 2023-04-05 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023095B32 | 2023-04-05 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023095B31 | 2023-04-05 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023095B30 | 2023-04-05 | 2023-05-17 | TEMP. CONST. SIGNS/MARKINGS | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023095B29 | 2023-04-05 | 2023-05-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023095B28 | 2023-04-05 | 2023-05-17 | OCCUPANCY OF ROADWAY AS STIPULATED | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023095B27 | 2023-04-05 | 2023-05-17 | CROSSING SIDEWALK | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023095B26 | 2023-04-05 | 2023-05-17 | PLACE MATERIAL ON STREET | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023094C14 | 2023-04-04 | 2023-05-17 | CROSSING SIDEWALK | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023094C35 | 2023-04-04 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023094C34 | 2023-04-04 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023094C33 | 2023-04-04 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023094C32 | 2023-04-04 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023094C31 | 2023-04-04 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023094C30 | 2023-04-04 | 2023-05-17 | TEMP. CONST. SIGNS/MARKINGS | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023094C29 | 2023-04-04 | 2023-05-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023094C28 | 2023-04-04 | 2023-05-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023094C27 | 2023-04-04 | 2023-05-17 | OCCUPANCY OF ROADWAY AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023094C26 | 2023-04-04 | 2023-05-17 | TEMPORARY PEDESTRIAN WALK | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023094C25 | 2023-04-04 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023094C24 | 2023-04-04 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023094C23 | 2023-04-04 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023094C22 | 2023-04-04 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023094C21 | 2023-04-04 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023094C20 | 2023-04-04 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023094C19 | 2023-04-04 | 2023-05-17 | TEMP. CONST. SIGNS/MARKINGS | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023094C18 | 2023-04-04 | 2023-05-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023094C17 | 2023-04-04 | 2023-05-17 | OCCUPANCY OF ROADWAY AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023094C16 | 2023-04-04 | 2023-05-17 | TEMPORARY PEDESTRIAN WALK | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023094C15 | 2023-04-04 | 2023-05-17 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023094C13 | 2023-04-04 | 2023-05-17 | PLACE MATERIAL ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023094C12 | 2023-04-04 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023094C11 | 2023-04-04 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023094C10 | 2023-04-04 | 2023-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023094C09 | 2023-04-04 | 2023-05-17 | TEMP. CONST. SIGNS/MARKINGS | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023094C08 | 2023-04-04 | 2023-05-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023094C07 | 2023-04-04 | 2023-05-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023094C06 | 2023-04-04 | 2023-05-17 | OCCUPANCY OF ROADWAY AS STIPULATED | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023094C05 | 2023-04-04 | 2023-05-17 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023094C03 | 2023-04-04 | 2023-05-17 | PLACE MATERIAL ON STREET | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023094C04 | 2023-04-04 | 2023-05-17 | CROSSING SIDEWALK | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023072F12 | 2023-03-13 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023069B11 | 2023-03-10 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023069B05 | 2023-03-10 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023069B04 | 2023-03-10 | 2023-04-01 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023069B06 | 2023-03-10 | 2023-04-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023069B03 | 2023-03-10 | 2023-04-01 | PLACE MATERIAL ON STREET | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023069B02 | 2023-03-10 | 2023-04-01 | PLACE MATERIAL ON STREET | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023069B10 | 2023-03-10 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023069B09 | 2023-03-10 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023069B08 | 2023-03-10 | 2023-04-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023069B07 | 2023-03-10 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023065D24 | 2023-03-06 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023061C25 | 2023-03-02 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023061C24 | 2023-03-02 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023058B09 | 2023-02-27 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023058B08 | 2023-02-27 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023058B07 | 2023-02-27 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023058B06 | 2023-02-27 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023058B05 | 2023-02-27 | 2023-04-01 | OCCUPANCY OF ROADWAY AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023058B10 | 2023-02-27 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023054D96 | 2023-02-23 | 2023-04-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023054D94 | 2023-02-23 | 2023-04-01 | OCCUPANCY OF ROADWAY AS STIPULATED | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023054D95 | 2023-02-23 | 2023-04-01 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023054D79 | 2023-02-23 | 2023-04-01 | PLACE MATERIAL ON STREET | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023054D93 | 2023-02-23 | 2023-04-01 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023054D81 | 2023-02-23 | 2023-04-01 | OCCUPANCY OF ROADWAY AS STIPULATED | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023054D80 | 2023-02-23 | 2023-04-01 | CROSSING SIDEWALK | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023054D82 | 2023-02-23 | 2023-04-01 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023054D83 | 2023-02-23 | 2023-04-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023054D90 | 2023-02-23 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023054D84 | 2023-02-23 | 2023-04-01 | TEMP. CONST. SIGNS/MARKINGS | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023054D85 | 2023-02-23 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023054D86 | 2023-02-23 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023054D87 | 2023-02-23 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023054D88 | 2023-02-23 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023054D91 | 2023-02-23 | 2023-04-01 | PLACE MATERIAL ON STREET | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023054D92 | 2023-02-23 | 2023-04-01 | CROSSING SIDEWALK | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023054D89 | 2023-02-23 | 2023-03-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022023054E00 | 2023-02-23 | 2023-03-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023054D99 | 2023-02-23 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023054D98 | 2023-02-23 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023054D97 | 2023-02-23 | 2023-04-01 | TEMP. CONST. SIGNS/MARKINGS | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022023053B55 | 2023-02-22 | 2023-04-01 | TEMP. CONST. SIGNS/MARKINGS | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023053B48 | 2023-02-22 | 2023-04-01 | PLACE MATERIAL ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023053B49 | 2023-02-22 | 2023-04-01 | CROSSING SIDEWALK | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023053B50 | 2023-02-22 | 2023-04-01 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023053B51 | 2023-02-22 | 2023-04-01 | TEMPORARY PEDESTRIAN WALK | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023053B52 | 2023-02-22 | 2023-04-01 | OCCUPANCY OF ROADWAY AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023053B53 | 2023-02-22 | 2023-04-01 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023053B54 | 2023-02-22 | 2023-04-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023053B56 | 2023-02-22 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023053B57 | 2023-02-22 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023053B58 | 2023-02-22 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023053B59 | 2023-02-22 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023053B60 | 2023-02-22 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023053B61 | 2023-02-22 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023053B62 | 2023-02-22 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023053B63 | 2023-02-22 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022023053B65 | 2023-02-22 | 2023-04-01 | PLACE MATERIAL ON STREET | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023053B66 | 2023-02-22 | 2023-04-01 | CROSSING SIDEWALK | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023053B67 | 2023-02-22 | 2023-04-01 | TEMPORARY PEDESTRIAN WALK | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023053B68 | 2023-02-22 | 2023-04-01 | OCCUPANCY OF ROADWAY AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023053B69 | 2023-02-22 | 2023-04-01 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023053B70 | 2023-02-22 | 2023-04-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023053B71 | 2023-02-22 | 2023-04-01 | TEMP. CONST. SIGNS/MARKINGS | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023053B72 | 2023-02-22 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023053B73 | 2023-02-22 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023053B74 | 2023-02-22 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023053B75 | 2023-02-22 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023053B76 | 2023-02-22 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023053B77 | 2023-02-22 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023053B78 | 2023-02-22 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023053B79 | 2023-02-22 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022023053B86 | 2023-02-22 | 2023-04-01 | PLACE MATERIAL ON STREET | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023053B87 | 2023-02-22 | 2023-04-01 | CROSSING SIDEWALK | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023053B88 | 2023-02-22 | 2023-04-01 | OCCUPANCY OF ROADWAY AS STIPULATED | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023053B89 | 2023-02-22 | 2023-04-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023053B90 | 2023-02-22 | 2023-04-01 | TEMP. CONST. SIGNS/MARKINGS | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023053B91 | 2023-02-22 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023053B92 | 2023-02-22 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023053B93 | 2023-02-22 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022023053B94 | 2023-02-22 | 2023-04-01 | PLACE MATERIAL ON STREET | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022023053B95 | 2023-02-22 | 2023-04-01 | CROSSING SIDEWALK | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022023053B96 | 2023-02-22 | 2023-04-01 | OCCUPANCY OF ROADWAY AS STIPULATED | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022023053B97 | 2023-02-22 | 2023-04-01 | TEMP. CONST. SIGNS/MARKINGS | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022023053B98 | 2023-02-22 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022023053B99 | 2023-02-22 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022023053C00 | 2023-02-22 | 2023-04-01 | CROSSING SIDEWALK | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023053C01 | 2023-02-22 | 2023-04-01 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023053C02 | 2023-02-22 | 2023-04-01 | OCCUPANCY OF ROADWAY AS STIPULATED | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023053C03 | 2023-02-22 | 2023-04-01 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023053C04 | 2023-02-22 | 2023-04-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023053C05 | 2023-02-22 | 2023-04-01 | TEMP. CONST. SIGNS/MARKINGS | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023053C06 | 2023-02-22 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023053C07 | 2023-02-22 | 2023-04-01 | CROSSING SIDEWALK | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023053C08 | 2023-02-22 | 2023-04-01 | OCCUPANCY OF ROADWAY AS STIPULATED | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023053C09 | 2023-02-22 | 2023-04-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023053C10 | 2023-02-22 | 2023-04-01 | TEMP. CONST. SIGNS/MARKINGS | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023053C11 | 2023-02-22 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023053C12 | 2023-02-22 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023053C13 | 2023-02-22 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B152023052A02 | 2023-02-21 | 2023-06-05 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022365A07 | 2022-12-31 | 2023-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022365A04 | 2022-12-31 | 2023-03-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022365A08 | 2022-12-31 | 2023-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022365A09 | 2022-12-31 | 2023-03-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022365A10 | 2022-12-31 | 2023-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022365A06 | 2022-12-31 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022365A05 | 2022-12-31 | 2023-03-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022343B21 | 2022-12-09 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022343B22 | 2022-12-09 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022341C53 | 2022-12-07 | 2023-02-21 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022341C52 | 2022-12-07 | 2023-02-21 | PLACE MATERIAL ON STREET | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022341C51 | 2022-12-07 | 2023-02-21 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022341C50 | 2022-12-07 | 2023-02-21 | PLACE MATERIAL ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022333B23 | 2022-11-29 | 2023-02-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022333C90 | 2022-11-29 | 2023-02-26 | OCCUPANCY OF ROADWAY AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022333B33 | 2022-11-29 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022333B32 | 2022-11-29 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022333B22 | 2022-11-29 | 2023-02-20 | OCCUPANCY OF ROADWAY AS STIPULATED | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022333B31 | 2022-11-29 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022333B21 | 2022-11-29 | 2023-02-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022333B20 | 2022-11-29 | 2023-02-20 | OCCUPANCY OF ROADWAY AS STIPULATED | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022333B19 | 2022-11-29 | 2023-02-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022333C95 | 2022-11-29 | 2023-02-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022333C94 | 2022-11-29 | 2023-02-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022333C93 | 2022-11-29 | 2023-02-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022333C92 | 2022-11-29 | 2023-02-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022333C91 | 2022-11-29 | 2023-02-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022333B17 | 2022-11-29 | 2023-02-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022333B16 | 2022-11-29 | 2023-02-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022333B28 | 2022-11-29 | 2023-02-21 | TEMP. CONST. SIGNS/MARKINGS | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022333B26 | 2022-11-29 | 2023-02-21 | OCCUPANCY OF ROADWAY AS STIPULATED | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022333B18 | 2022-11-29 | 2023-02-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B152022333A05 | 2022-11-29 | 2023-03-05 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022333B25 | 2022-11-29 | 2023-02-21 | CROSSING SIDEWALK | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022333B24 | 2022-11-29 | 2023-02-21 | PLACE MATERIAL ON STREET | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022333B27 | 2022-11-29 | 2022-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022333B30 | 2022-11-29 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022333B29 | 2022-11-29 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022332B23 | 2022-11-28 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022329B94 | 2022-11-25 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022329B93 | 2022-11-25 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022329B92 | 2022-11-25 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022329B91 | 2022-11-25 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022329B90 | 2022-11-25 | 2023-02-21 | TEMP. CONST. SIGNS/MARKINGS | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022329B46 | 2022-11-25 | 2023-02-22 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022329B45 | 2022-11-25 | 2023-02-22 | OCCUPANCY OF ROADWAY AS STIPULATED | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022329B44 | 2022-11-25 | 2023-02-22 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022329B43 | 2022-11-25 | 2023-02-22 | CROSSING SIDEWALK | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022329B42 | 2022-11-25 | 2023-02-22 | PLACE MATERIAL ON STREET | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022329B41 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022329B40 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022329B39 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022329B38 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022329B37 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022329B36 | 2022-11-25 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022329B35 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022329B34 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022329B33 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022329B32 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022329B31 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022329B30 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022329B29 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022329B28 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022329B27 | 2022-11-25 | 2023-02-22 | TEMP. CONST. SIGNS/MARKINGS | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022329B56 | 2022-11-25 | 2023-02-22 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022329B26 | 2022-11-25 | 2023-02-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022329B25 | 2022-11-25 | 2023-02-22 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022329B24 | 2022-11-25 | 2023-02-22 | OCCUPANCY OF ROADWAY AS STIPULATED | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022329B23 | 2022-11-25 | 2023-02-22 | CROSSING SIDEWALK | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022329B22 | 2022-11-25 | 2023-02-22 | PLACE MATERIAL ON STREET | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022329B52 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022329B89 | 2022-11-25 | 2023-02-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022329B88 | 2022-11-25 | 2023-02-21 | OCCUPANCY OF ROADWAY AS STIPULATED | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022329B87 | 2022-11-25 | 2023-02-21 | CROSSING SIDEWALK | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022329B86 | 2022-11-25 | 2023-02-21 | PLACE MATERIAL ON STREET | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022329B85 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022329B84 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022329B83 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022329B82 | 2022-11-25 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022329B81 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022329B80 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022329B79 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022329B78 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022329B77 | 2022-11-25 | 2023-02-22 | TEMP. CONST. SIGNS/MARKINGS | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022329B76 | 2022-11-25 | 2023-02-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022329B75 | 2022-11-25 | 2023-02-22 | OCCUPANCY OF ROADWAY AS STIPULATED | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022329B74 | 2022-11-25 | 2023-02-22 | CROSSING SIDEWALK | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022329B73 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022329B72 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022329B71 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022329B69 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022329B68 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022329B67 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022329B66 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022329B65 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022329B64 | 2022-11-25 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022329B63 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022329B62 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022329B61 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022329B60 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022329B59 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022329B58 | 2022-11-25 | 2023-02-22 | TEMP. CONST. SIGNS/MARKINGS | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022329B55 | 2022-11-25 | 2023-02-22 | OCCUPANCY OF ROADWAY AS STIPULATED | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022329B54 | 2022-11-25 | 2023-02-22 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022329B53 | 2022-11-25 | 2023-02-22 | CROSSING SIDEWALK | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022329B51 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022329B50 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022329B49 | 2022-11-25 | 2023-02-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022329B48 | 2022-11-25 | 2023-02-22 | TEMP. CONST. SIGNS/MARKINGS | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022329B47 | 2022-11-25 | 2023-02-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022329B57 | 2022-11-25 | 2023-02-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022327C75 | 2022-11-23 | 2023-02-21 | CROSSING SIDEWALK | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022327C90 | 2022-11-23 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022327C89 | 2022-11-23 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022327C88 | 2022-11-23 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022327C87 | 2022-11-23 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022327C86 | 2022-11-23 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022327C85 | 2022-11-23 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022327C84 | 2022-11-23 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022327C83 | 2022-11-23 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022327C82 | 2022-11-23 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022327C81 | 2022-11-23 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022327C80 | 2022-11-23 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022327C79 | 2022-11-23 | 2023-02-21 | TEMP. CONST. SIGNS/MARKINGS | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022327C78 | 2022-11-23 | 2023-02-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022327C77 | 2022-11-23 | 2023-02-21 | OCCUPANCY OF ROADWAY AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022327C76 | 2022-11-23 | 2023-02-21 | TEMPORARY PEDESTRIAN WALK | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022327C91 | 2022-11-23 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022327C74 | 2022-11-23 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022327C73 | 2022-11-23 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022327C72 | 2022-11-23 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022327C71 | 2022-11-23 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022327C70 | 2022-11-23 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022327C69 | 2022-11-23 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022327C68 | 2022-11-23 | 2022-12-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022327C67 | 2022-11-23 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022327C66 | 2022-11-23 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022327C65 | 2022-11-23 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022327C64 | 2022-11-23 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022327C63 | 2022-11-23 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022327C62 | 2022-11-23 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022327C61 | 2022-11-23 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022327C60 | 2022-11-23 | 2023-02-21 | TEMP. CONST. SIGNS/MARKINGS | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022327C58 | 2022-11-23 | 2023-02-21 | OCCUPANCY OF ROADWAY AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022327C57 | 2022-11-23 | 2023-02-21 | TEMPORARY PEDESTRIAN WALK | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022327C56 | 2022-11-23 | 2023-02-21 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022327C55 | 2022-11-23 | 2023-02-21 | CROSSING SIDEWALK | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022327C59 | 2022-11-23 | 2023-02-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022327C93 | 2022-11-23 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022327C92 | 2022-11-23 | 2023-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022307C45 | 2022-11-03 | 2022-11-23 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022306C08 | 2022-11-02 | 2022-11-23 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022280A40 | 2022-10-07 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022280A39 | 2022-10-07 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022280E54 | 2022-10-07 | 2022-11-23 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022258E10 | 2022-09-15 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022258E08 | 2022-09-15 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022258E04 | 2022-09-15 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022258E03 | 2022-09-15 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022258E02 | 2022-09-15 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022258E01 | 2022-09-15 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022258E00 | 2022-09-15 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022258D99 | 2022-09-15 | 2022-11-23 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022258E07 | 2022-09-15 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022258E06 | 2022-09-15 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022258E05 | 2022-09-15 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B012022258D61 | 2022-09-15 | 2022-11-23 | OPEN SIDEWALK TO INSTALL FOUNDATION | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B012022258D62 | 2022-09-15 | 2022-11-23 | OPEN SIDEWALK TO INSTALL FOUNDATION | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022258E09 | 2022-09-15 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022255C15 | 2022-09-12 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022255C13 | 2022-09-12 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022255C12 | 2022-09-12 | 2022-11-23 | OCCUPANCY OF ROADWAY AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022255C14 | 2022-09-12 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022255C17 | 2022-09-12 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022255C16 | 2022-09-12 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B152022250A01 | 2022-09-07 | 2022-12-05 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022249B43 | 2022-09-06 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B012022249A46 | 2022-09-06 | 2022-11-23 | OPEN SIDEWALK TO INSTALL FOUNDATION | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022249B60 | 2022-09-06 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022249B59 | 2022-09-06 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022249B58 | 2022-09-06 | 2022-11-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022249B57 | 2022-09-06 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022249B56 | 2022-09-06 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022249B55 | 2022-09-06 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022249B54 | 2022-09-06 | 2022-11-23 | TEMP. CONST. SIGNS/MARKINGS | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022249B53 | 2022-09-06 | 2022-11-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022249B52 | 2022-09-06 | 2022-11-23 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022249B51 | 2022-09-06 | 2022-11-23 | OCCUPANCY OF ROADWAY AS STIPULATED | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022249B50 | 2022-09-06 | 2022-11-23 | TEMPORARY PEDESTRIAN WALK | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022249B49 | 2022-09-06 | 2022-11-23 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022249B48 | 2022-09-06 | 2022-11-23 | CROSSING SIDEWALK | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022249B47 | 2022-09-06 | 2022-11-23 | PLACE MATERIAL ON STREET | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022249B46 | 2022-09-06 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022249B45 | 2022-09-06 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022249B44 | 2022-09-06 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022249B42 | 2022-09-06 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022249B41 | 2022-09-06 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022249B40 | 2022-09-06 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022249B39 | 2022-09-06 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022249B38 | 2022-09-06 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022249B36 | 2022-09-06 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022249B35 | 2022-09-06 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022249B34 | 2022-09-06 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022249B33 | 2022-09-06 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022249B32 | 2022-09-06 | 2022-11-23 | TEMP. CONST. SIGNS/MARKINGS | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022249B31 | 2022-09-06 | 2022-11-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022249B30 | 2022-09-06 | 2022-11-23 | OCCUPANCY OF ROADWAY AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022249B29 | 2022-09-06 | 2022-11-23 | TEMPORARY PEDESTRIAN WALK | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022249B28 | 2022-09-06 | 2022-11-23 | CROSSING SIDEWALK | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022249B27 | 2022-09-06 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022249B26 | 2022-09-06 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022249B25 | 2022-09-06 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022249B24 | 2022-09-06 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022249B23 | 2022-09-06 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022249B37 | 2022-09-06 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022249B22 | 2022-09-06 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022249B21 | 2022-09-06 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022249B20 | 2022-09-06 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022249B19 | 2022-09-06 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022249B18 | 2022-09-06 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022249B17 | 2022-09-06 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022249B16 | 2022-09-06 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022249B15 | 2022-09-06 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022249B14 | 2022-09-06 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022249B13 | 2022-09-06 | 2022-11-23 | TEMP. CONST. SIGNS/MARKINGS | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022249B12 | 2022-09-06 | 2022-11-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022249B11 | 2022-09-06 | 2022-11-23 | OCCUPANCY OF ROADWAY AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022249B10 | 2022-09-06 | 2022-11-23 | TEMPORARY PEDESTRIAN WALK | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022249B09 | 2022-09-06 | 2022-11-23 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022249B08 | 2022-09-06 | 2022-11-23 | CROSSING SIDEWALK | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B012022249A45 | 2022-09-06 | 2022-11-23 | OPEN SIDEWALK TO INSTALL FOUNDATION | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022247A41 | 2022-09-04 | 2022-11-23 | OCCUPANCY OF ROADWAY AS STIPULATED | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022247A76 | 2022-09-04 | 2022-11-23 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022247A75 | 2022-09-04 | 2022-11-23 | OCCUPANCY OF ROADWAY AS STIPULATED | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022247A73 | 2022-09-04 | 2022-11-23 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022247A72 | 2022-09-04 | 2022-11-23 | CROSSING SIDEWALK | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022247A71 | 2022-09-04 | 2022-11-23 | PLACE MATERIAL ON STREET | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022247A70 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022247A69 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022247A68 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022247A67 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022247A66 | 2022-09-04 | 2022-11-23 | TEMP. CONST. SIGNS/MARKINGS | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022247A65 | 2022-09-04 | 2022-11-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022247A64 | 2022-09-04 | 2022-11-23 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022247A63 | 2022-09-04 | 2022-11-23 | OCCUPANCY OF ROADWAY AS STIPULATED | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022247A62 | 2022-09-04 | 2022-11-23 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022247A61 | 2022-09-04 | 2022-11-23 | CROSSING SIDEWALK | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022247A60 | 2022-09-04 | 2022-11-23 | PLACE MATERIAL ON STREET | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022247A59 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022247A74 | 2022-09-04 | 2022-11-23 | TEMPORARY PEDESTRIAN WALK | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022247A58 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022247A57 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022247A56 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022247A55 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022247A54 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022247A53 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022247A52 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022247A51 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022247A50 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022247A49 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022247A48 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022247A47 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022247A46 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022247A45 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022247A44 | 2022-09-04 | 2022-11-23 | TEMP. CONST. SIGNS/MARKINGS | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022247A43 | 2022-09-04 | 2022-11-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022247A42 | 2022-09-04 | 2022-11-23 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022247A77 | 2022-09-04 | 2022-11-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022247A40 | 2022-09-04 | 2022-11-23 | CROSSING SIDEWALK | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022247A39 | 2022-09-04 | 2022-11-23 | PLACE MATERIAL ON STREET | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022247A38 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022247A37 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022247A36 | 2022-09-04 | 2022-11-23 | TEMP. CONST. SIGNS/MARKINGS | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022247A35 | 2022-09-04 | 2022-11-23 | OCCUPANCY OF ROADWAY AS STIPULATED | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022247A34 | 2022-09-04 | 2022-11-23 | PLACE MATERIAL ON STREET | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022247A33 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022247A32 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022247A31 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022247A30 | 2022-09-04 | 2022-11-23 | TEMP. CONST. SIGNS/MARKINGS | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022247A29 | 2022-09-04 | 2022-11-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022247A28 | 2022-09-04 | 2022-11-23 | OCCUPANCY OF ROADWAY AS STIPULATED | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022247A27 | 2022-09-04 | 2022-11-23 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022247A26 | 2022-09-04 | 2022-11-23 | CROSSING SIDEWALK | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022247A25 | 2022-09-04 | 2022-11-23 | PLACE MATERIAL ON STREET | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022247A24 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022247A23 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022247A22 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022247A21 | 2022-09-04 | 2022-11-23 | TEMP. CONST. SIGNS/MARKINGS | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022247A20 | 2022-09-04 | 2022-11-23 | OCCUPANCY OF ROADWAY AS STIPULATED | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022247A19 | 2022-09-04 | 2022-11-23 | CROSSING SIDEWALK | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022247A18 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022247A17 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022247A16 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022247A15 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022247A14 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022247A13 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022247A12 | 2022-09-04 | 2022-11-23 | TEMP. CONST. SIGNS/MARKINGS | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022247A11 | 2022-09-04 | 2022-11-23 | OCCUPANCY OF ROADWAY AS STIPULATED | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022247A10 | 2022-09-04 | 2022-11-23 | CROSSING SIDEWALK | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022247A07 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022247A06 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022247A05 | 2022-09-04 | 2022-11-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022247A04 | 2022-09-04 | 2022-11-23 | TEMPORARY PEDESTRIAN WALK | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022247A03 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022247A02 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022247A00 | 2022-09-04 | 2022-11-23 | TEMPORARY PEDESTRIAN WALK | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022247A01 | 2022-09-04 | 2022-11-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022247A83 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022247A84 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B012022247A01 | 2022-09-04 | 2022-11-23 | OPEN SIDEWALK TO INSTALL FOUNDATION | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022247A80 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022247A81 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022247A82 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022247A79 | 2022-09-04 | 2022-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022247A78 | 2022-09-04 | 2022-11-23 | TEMP. CONST. SIGNS/MARKINGS | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022236D10 | 2022-08-24 | 2022-09-04 | TEMP. CONST. SIGNS/MARKINGS | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022236A62 | 2022-08-24 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022236A63 | 2022-08-24 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022236A61 | 2022-08-24 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022230A87 | 2022-08-18 | 2022-09-04 | CROSSING SIDEWALK | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022230A86 | 2022-08-18 | 2022-09-04 | PLACE MATERIAL ON STREET | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022230A97 | 2022-08-18 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022230A90 | 2022-08-18 | 2022-09-04 | OCCUPANCY OF ROADWAY AS STIPULATED | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022230A89 | 2022-08-18 | 2022-09-04 | TEMPORARY PEDESTRIAN WALK | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022230A88 | 2022-08-18 | 2022-09-04 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022230A93 | 2022-08-18 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022230A94 | 2022-08-18 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022230A92 | 2022-08-18 | 2022-09-04 | TEMP. CONST. SIGNS/MARKINGS | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022230A91 | 2022-08-18 | 2022-09-04 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022230A95 | 2022-08-18 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022230A96 | 2022-08-18 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022229B91 | 2022-08-17 | 2022-09-04 | OCCUPANCY OF ROADWAY AS STIPULATED | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022229B90 | 2022-08-17 | 2022-09-04 | TEMPORARY PEDESTRIAN WALK | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022229B89 | 2022-08-17 | 2022-09-04 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022229B88 | 2022-08-17 | 2022-09-04 | CROSSING SIDEWALK | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022229B87 | 2022-08-17 | 2022-09-04 | PLACE MATERIAL ON STREET | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022229B98 | 2022-08-17 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022229B97 | 2022-08-17 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022229B96 | 2022-08-17 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022229B95 | 2022-08-17 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022229B94 | 2022-08-17 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022229B93 | 2022-08-17 | 2022-09-04 | TEMP. CONST. SIGNS/MARKINGS | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022229B92 | 2022-08-17 | 2022-09-04 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022181E01 | 2022-06-30 | 2022-09-04 | CROSSING SIDEWALK | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022181E00 | 2022-06-30 | 2022-09-04 | PLACE MATERIAL ON STREET | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022181D99 | 2022-06-30 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022181E08 | 2022-06-30 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022181E07 | 2022-06-30 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022181E06 | 2022-06-30 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022181E05 | 2022-06-30 | 2022-09-04 | TEMP. CONST. SIGNS/MARKINGS | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022181E04 | 2022-06-30 | 2022-09-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022181E03 | 2022-06-30 | 2022-09-04 | OCCUPANCY OF ROADWAY AS STIPULATED | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022181E02 | 2022-06-30 | 2022-09-04 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022179D48 | 2022-06-28 | 2022-09-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022179D49 | 2022-06-28 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022179D32 | 2022-06-28 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022179D31 | 2022-06-28 | 2022-09-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022175B51 | 2022-06-24 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022175B50 | 2022-06-24 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022175B49 | 2022-06-24 | 2022-09-04 | TEMP. CONST. SIGNS/MARKINGS | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022175B47 | 2022-06-24 | 2022-09-04 | CROSSING SIDEWALK | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022175B48 | 2022-06-24 | 2022-09-04 | OCCUPANCY OF ROADWAY AS STIPULATED | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022175B52 | 2022-06-24 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022175B53 | 2022-06-24 | 2022-09-04 | CROSSING SIDEWALK | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022175B54 | 2022-06-24 | 2022-09-04 | OCCUPANCY OF ROADWAY AS STIPULATED | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022175B55 | 2022-06-24 | 2022-09-04 | TEMP. CONST. SIGNS/MARKINGS | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022175B56 | 2022-06-24 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022175B57 | 2022-06-24 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022175B58 | 2022-06-24 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022164A28 | 2022-06-13 | 2022-08-31 | TEMPORARY PEDESTRIAN WALK | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B012022164A41 | 2022-06-13 | 2022-07-02 | INSTALL FENCE | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B012022164A42 | 2022-06-13 | 2022-07-02 | INSTALL FENCE | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022164A35 | 2022-06-13 | 2022-08-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022164A34 | 2022-06-13 | 2022-08-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022164A33 | 2022-06-13 | 2022-08-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022164A32 | 2022-06-13 | 2022-08-31 | TEMPORARY PEDESTRIAN WALK | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022022164A31 | 2022-06-13 | 2022-08-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022164A30 | 2022-06-13 | 2022-08-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022164A29 | 2022-06-13 | 2022-08-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022022161C02 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B012022161A73 | 2022-06-10 | 2022-09-04 | OPEN SIDEWALK TO INSTALL FOUNDATION | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B012022161A71 | 2022-06-10 | 2022-09-04 | OPEN SIDEWALK TO INSTALL FOUNDATION | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B012022161A72 | 2022-06-10 | 2022-09-04 | OPEN SIDEWALK TO INSTALL FOUNDATION | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022161C39 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022161C38 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022161C37 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022161C36 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022161C35 | 2022-06-10 | 2022-09-04 | TEMP. CONST. SIGNS/MARKINGS | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022161C34 | 2022-06-10 | 2022-09-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022161C33 | 2022-06-10 | 2022-09-04 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022161C32 | 2022-06-10 | 2022-09-04 | OCCUPANCY OF ROADWAY AS STIPULATED | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022161C31 | 2022-06-10 | 2022-09-04 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022161C30 | 2022-06-10 | 2022-09-04 | CROSSING SIDEWALK | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022161C29 | 2022-06-10 | 2022-09-04 | PLACE MATERIAL ON STREET | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022161C28 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022161C27 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022161C26 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022161C25 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022161C24 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022161C23 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022161C22 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022161C21 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022161C20 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022161C19 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022161C18 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022161C17 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022161C16 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022161C15 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022161C14 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022161C13 | 2022-06-10 | 2022-09-04 | TEMP. CONST. SIGNS/MARKINGS | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022161C12 | 2022-06-10 | 2022-09-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022161C11 | 2022-06-10 | 2022-09-04 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022161C10 | 2022-06-10 | 2022-09-04 | OCCUPANCY OF ROADWAY AS STIPULATED | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022161C09 | 2022-06-10 | 2022-09-04 | CROSSING SIDEWALK | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022161C08 | 2022-06-10 | 2022-09-04 | PLACE MATERIAL ON STREET | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022161C07 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022161C06 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022161C05 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022161C04 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022161C03 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022161C01 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022161C00 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022161B99 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022161B98 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022161B97 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022161B96 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022161B95 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022161B94 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022161B93 | 2022-06-10 | 2022-09-04 | TEMP. CONST. SIGNS/MARKINGS | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022161B92 | 2022-06-10 | 2022-09-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022161B91 | 2022-06-10 | 2022-09-04 | OCCUPANCY OF ROADWAY AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022161B90 | 2022-06-10 | 2022-09-04 | TEMPORARY PEDESTRIAN WALK | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022161B89 | 2022-06-10 | 2022-09-04 | CROSSING SIDEWALK | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022161B88 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022161B87 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022161B86 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022161B85 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022161B84 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022161B83 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022161B82 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022161B81 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022161B80 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022161B79 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022161B78 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022161B77 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022161B76 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022161B75 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022161B74 | 2022-06-10 | 2022-09-04 | TEMP. CONST. SIGNS/MARKINGS | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022161B73 | 2022-06-10 | 2022-09-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022161B72 | 2022-06-10 | 2022-09-04 | OCCUPANCY OF ROADWAY AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022161B71 | 2022-06-10 | 2022-09-04 | TEMPORARY PEDESTRIAN WALK | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022161B70 | 2022-06-10 | 2022-09-04 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022161B69 | 2022-06-10 | 2022-09-04 | CROSSING SIDEWALK | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022161B31 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022161B30 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022161B29 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022161B28 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022161B27 | 2022-06-10 | 2022-09-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022161B26 | 2022-06-10 | 2022-09-04 | TEMP. CONST. SIGNS/MARKINGS | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022161B25 | 2022-06-10 | 2022-09-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022161B24 | 2022-06-10 | 2022-09-04 | OCCUPANCY OF ROADWAY AS STIPULATED | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022161B23 | 2022-06-10 | 2022-09-04 | CROSSING SIDEWALK | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022161B22 | 2022-06-10 | 2022-09-04 | PLACE MATERIAL ON STREET | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022132B88 | 2022-05-12 | 2022-08-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022132C06 | 2022-05-12 | 2022-08-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022132C05 | 2022-05-12 | 2022-08-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022132C04 | 2022-05-12 | 2022-08-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022132C03 | 2022-05-12 | 2022-08-11 | TEMP. CONST. SIGNS/MARKINGS | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022132C02 | 2022-05-12 | 2022-08-11 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022132C01 | 2022-05-12 | 2022-08-11 | OCCUPANCY OF ROADWAY AS STIPULATED | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022132C00 | 2022-05-12 | 2022-08-11 | TEMPORARY PEDESTRIAN WALK | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022132B99 | 2022-05-12 | 2022-08-11 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022132B98 | 2022-05-12 | 2022-08-11 | CROSSING SIDEWALK | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022132B97 | 2022-05-12 | 2022-08-11 | PLACE MATERIAL ON STREET | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022132B91 | 2022-05-12 | 2022-08-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022132B85 | 2022-05-12 | 2022-08-11 | OCCUPANCY OF ROADWAY AS STIPULATED | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022132B86 | 2022-05-12 | 2022-08-11 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022132B87 | 2022-05-12 | 2022-08-11 | TEMP. CONST. SIGNS/MARKINGS | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022132B89 | 2022-05-12 | 2022-08-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022132B90 | 2022-05-12 | 2022-08-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022132B25 | 2022-05-12 | 2022-08-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022132B30 | 2022-05-12 | 2022-08-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022132B81 | 2022-05-12 | 2022-08-11 | PLACE MATERIAL ON STREET | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022132B82 | 2022-05-12 | 2022-08-11 | CROSSING SIDEWALK | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022132B83 | 2022-05-12 | 2022-08-11 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022132B84 | 2022-05-12 | 2022-08-11 | TEMPORARY PEDESTRIAN WALK | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022132C07 | 2022-05-12 | 2022-08-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022090C24 | 2022-03-31 | 2022-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022090B56 | 2022-03-31 | 2022-06-30 | CROSSING SIDEWALK | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022090B55 | 2022-03-31 | 2022-06-30 | PLACE MATERIAL ON STREET | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022090B48 | 2022-03-31 | 2022-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022090B57 | 2022-03-31 | 2022-06-30 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022090B61 | 2022-03-31 | 2022-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022090B60 | 2022-03-31 | 2022-06-30 | TEMP. CONST. SIGNS/MARKINGS | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022090B59 | 2022-03-31 | 2022-06-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022090B58 | 2022-03-31 | 2022-06-30 | OCCUPANCY OF ROADWAY AS STIPULATED | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022090B63 | 2022-03-31 | 2022-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022090B85 | 2022-03-31 | 2022-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022090B62 | 2022-03-31 | 2022-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022090B84 | 2022-03-31 | 2022-06-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022090C23 | 2022-03-31 | 2022-06-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022084C96 | 2022-03-25 | 2022-06-12 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B012022075D11 | 2022-03-16 | 2022-06-13 | OPEN SIDEWALK TO INSTALL FOUNDATION | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022075D44 | 2022-03-16 | 2022-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022075D43 | 2022-03-16 | 2022-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022075D42 | 2022-03-16 | 2022-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022075D41 | 2022-03-16 | 2022-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022075D40 | 2022-03-16 | 2022-06-13 | TEMP. CONST. SIGNS/MARKINGS | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022075D39 | 2022-03-16 | 2022-06-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022075D38 | 2022-03-16 | 2022-06-13 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022075D37 | 2022-03-16 | 2022-06-13 | OCCUPANCY OF ROADWAY AS STIPULATED | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022075D36 | 2022-03-16 | 2022-06-13 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022075D35 | 2022-03-16 | 2022-06-13 | CROSSING SIDEWALK | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022075D34 | 2022-03-16 | 2022-06-13 | PLACE MATERIAL ON STREET | WALLABOUT STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET |
B022022075D33 | 2022-03-16 | 2022-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022075D32 | 2022-03-16 | 2022-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022075D31 | 2022-03-16 | 2022-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022075D30 | 2022-03-16 | 2022-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022075D29 | 2022-03-16 | 2022-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022075D28 | 2022-03-16 | 2022-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022075D27 | 2022-03-16 | 2022-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022075D26 | 2022-03-16 | 2022-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022075D25 | 2022-03-16 | 2022-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022075D24 | 2022-03-16 | 2022-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022075D23 | 2022-03-16 | 2022-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022075D22 | 2022-03-16 | 2022-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022075D21 | 2022-03-16 | 2022-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022075D20 | 2022-03-16 | 2022-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022075D19 | 2022-03-16 | 2022-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022075D18 | 2022-03-16 | 2022-06-13 | TEMP. CONST. SIGNS/MARKINGS | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022075D17 | 2022-03-16 | 2022-06-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022075D16 | 2022-03-16 | 2022-06-13 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022075D15 | 2022-03-16 | 2022-06-13 | OCCUPANCY OF ROADWAY AS STIPULATED | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022075D14 | 2022-03-16 | 2022-06-13 | CROSSING SIDEWALK | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022075D13 | 2022-03-16 | 2022-06-13 | PLACE MATERIAL ON STREET | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B012022075C15 | 2022-03-16 | 2022-04-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | ATLANTIC AVENUE, BROOKLYN, FROM STREET PRESCOTT PLACE |
B012022075C99 | 2022-03-16 | 2022-04-16 | PAVE STREET-W/ ENGINEERING & INSP FEE | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B012022075D00 | 2022-03-16 | 2022-04-16 | PAVE STREET-W/ ENGINEERING & INSP FEE | ATLANTIC AVENUE, BROOKLYN, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE |
B012022075D12 | 2022-03-16 | 2022-04-14 | INSTALL FENCE | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022022074B48 | 2022-03-15 | 2022-06-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022074B62 | 2022-03-15 | 2022-06-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022074B61 | 2022-03-15 | 2022-06-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022074B60 | 2022-03-15 | 2022-06-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022074B59 | 2022-03-15 | 2022-06-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022074B58 | 2022-03-15 | 2022-06-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022074B57 | 2022-03-15 | 2022-06-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022074B55 | 2022-03-15 | 2022-06-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022074B54 | 2022-03-15 | 2022-06-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022074B53 | 2022-03-15 | 2022-06-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022074B52 | 2022-03-15 | 2022-06-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022074B51 | 2022-03-15 | 2022-06-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022074B50 | 2022-03-15 | 2022-06-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022074B49 | 2022-03-15 | 2022-06-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022074B47 | 2022-03-15 | 2022-06-11 | TEMP. CONST. SIGNS/MARKINGS | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022074B46 | 2022-03-15 | 2022-06-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022074B45 | 2022-03-15 | 2022-06-11 | OCCUPANCY OF ROADWAY AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022074B44 | 2022-03-15 | 2022-06-11 | TEMPORARY PEDESTRIAN WALK | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022074B43 | 2022-03-15 | 2022-06-11 | CROSSING SIDEWALK | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022074B42 | 2022-03-15 | 2022-06-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022074B41 | 2022-03-15 | 2022-06-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022074B40 | 2022-03-15 | 2022-06-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022074B39 | 2022-03-15 | 2022-06-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022074B38 | 2022-03-15 | 2022-06-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022074B37 | 2022-03-15 | 2022-06-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022074B36 | 2022-03-15 | 2022-06-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022074B35 | 2022-03-15 | 2022-06-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022074B34 | 2022-03-15 | 2022-06-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022074B33 | 2022-03-15 | 2022-06-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022074B32 | 2022-03-15 | 2022-06-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022074B31 | 2022-03-15 | 2022-06-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022074B30 | 2022-03-15 | 2022-06-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022074B29 | 2022-03-15 | 2022-06-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022074B28 | 2022-03-15 | 2022-06-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022074B27 | 2022-03-15 | 2022-06-11 | TEMP. CONST. SIGNS/MARKINGS | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022074B26 | 2022-03-15 | 2022-06-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022074B56 | 2022-03-15 | 2022-06-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022074B25 | 2022-03-15 | 2022-06-11 | OCCUPANCY OF ROADWAY AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022074B24 | 2022-03-15 | 2022-06-11 | TEMPORARY PEDESTRIAN WALK | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022074B23 | 2022-03-15 | 2022-06-11 | CROSSING SIDEWALK | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B012022074D39 | 2022-03-15 | 2022-04-13 | INSTALL FENCE | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B012022074D38 | 2022-03-15 | 2022-06-12 | OPEN SIDEWALK TO INSTALL FOUNDATION | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B012022074D37 | 2022-03-15 | 2022-04-13 | INSTALL FENCE | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B012022074D36 | 2022-03-15 | 2022-06-12 | OPEN SIDEWALK TO INSTALL FOUNDATION | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022066B00 | 2022-03-07 | 2022-04-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022066B03 | 2022-03-07 | 2022-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022066B02 | 2022-03-07 | 2022-04-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022066B01 | 2022-03-07 | 2022-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022049A73 | 2022-02-18 | 2022-05-22 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022022049A80 | 2022-02-18 | 2022-05-22 | OCCUPANCY OF ROADWAY AS STIPULATED | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022022049A81 | 2022-02-18 | 2022-05-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022022049A82 | 2022-02-18 | 2022-05-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022022049A89 | 2022-02-18 | 2022-05-22 | OCCUPANCY OF ROADWAY AS STIPULATED | ATLANTIC AVENUE, BROOKLYN, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE |
B022022049A90 | 2022-02-18 | 2022-05-22 | TEMP. CONST. SIGNS/MARKINGS | ATLANTIC AVENUE, BROOKLYN, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE |
B022022049A91 | 2022-02-18 | 2022-05-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ATLANTIC AVENUE, BROOKLYN, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE |
B022022049A92 | 2022-02-18 | 2022-05-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ATLANTIC AVENUE, BROOKLYN, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE |
B022022049A70 | 2022-02-18 | 2022-05-22 | CROSSING SIDEWALK | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022022049A71 | 2022-02-18 | 2022-05-22 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022022049A72 | 2022-02-18 | 2022-05-22 | OCCUPANCY OF ROADWAY AS STIPULATED | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022022049A69 | 2022-02-18 | 2022-05-22 | PLACE MATERIAL ON STREET | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022022049A74 | 2022-02-18 | 2022-05-22 | TEMP. CONST. SIGNS/MARKINGS | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022022049A75 | 2022-02-18 | 2022-05-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022022049A76 | 2022-02-18 | 2022-05-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022022049A77 | 2022-02-18 | 2022-05-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022022049A78 | 2022-02-18 | 2022-05-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022022049A79 | 2022-02-18 | 2022-05-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022022047C11 | 2022-02-16 | 2022-03-17 | TEMPORARY PEDESTRIAN WALK | ATLANTIC AVENUE, BROOKLYN, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE |
B042022047A17 | 2022-02-16 | 2022-03-17 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B042022047A18 | 2022-02-16 | 2022-03-17 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | ATLANTIC AVENUE, BROOKLYN, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE |
B012022047B50 | 2022-02-16 | 2022-03-17 | RESET, REPAIR OR REPLACE CURB | ATLANTIC AVENUE, BROOKLYN, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE |
B022022047C12 | 2022-02-16 | 2022-03-17 | OCCUPANCY OF ROADWAY AS STIPULATED | ATLANTIC AVENUE, BROOKLYN, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE |
B022022047C13 | 2022-02-16 | 2022-03-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | ATLANTIC AVENUE, BROOKLYN, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE |
B022022047C14 | 2022-02-16 | 2022-03-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ATLANTIC AVENUE, BROOKLYN, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE |
B022022047C15 | 2022-02-16 | 2022-03-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ATLANTIC AVENUE, BROOKLYN, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE |
B012022047B49 | 2022-02-16 | 2022-03-17 | PAVE STREET-W/ ENGINEERING & INSP FEE | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B012022047B48 | 2022-02-16 | 2022-03-17 | RESET, REPAIR OR REPLACE CURB | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B012022047B51 | 2022-02-16 | 2022-03-17 | PAVE STREET-W/ ENGINEERING & INSP FEE | ATLANTIC AVENUE, BROOKLYN, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE |
B022022046A80 | 2022-02-15 | 2022-05-13 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022046A79 | 2022-02-15 | 2022-05-13 | CROSSING SIDEWALK | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022046A78 | 2022-02-15 | 2022-05-13 | PLACE MATERIAL ON STREET | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022046A83 | 2022-02-15 | 2022-05-13 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022046B13 | 2022-02-15 | 2022-05-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022046B12 | 2022-02-15 | 2022-05-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022046B11 | 2022-02-15 | 2022-05-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022046B10 | 2022-02-15 | 2022-05-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022046B09 | 2022-02-15 | 2022-05-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022046B08 | 2022-02-15 | 2022-05-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022046B07 | 2022-02-15 | 2022-05-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022046B06 | 2022-02-15 | 2022-05-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022046B05 | 2022-02-15 | 2022-05-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022046B04 | 2022-02-15 | 2022-05-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022046B03 | 2022-02-15 | 2022-05-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022046B02 | 2022-02-15 | 2022-05-13 | TEMP. CONST. SIGNS/MARKINGS | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022046B01 | 2022-02-15 | 2022-05-13 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022046B00 | 2022-02-15 | 2022-05-13 | OCCUPANCY OF ROADWAY AS STIPULATED | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022046A99 | 2022-02-15 | 2022-05-13 | TEMPORARY PEDESTRIAN WALK | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022046A98 | 2022-02-15 | 2022-05-13 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022046A97 | 2022-02-15 | 2022-05-13 | CROSSING SIDEWALK | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022046A96 | 2022-02-15 | 2022-05-13 | PLACE MATERIAL ON STREET | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022046A95 | 2022-02-15 | 2022-05-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022046A94 | 2022-02-15 | 2022-05-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022046A93 | 2022-02-15 | 2022-05-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022046A92 | 2022-02-15 | 2022-05-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022046A91 | 2022-02-15 | 2022-05-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022046A90 | 2022-02-15 | 2022-05-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022046A89 | 2022-02-15 | 2022-05-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022046A88 | 2022-02-15 | 2022-05-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022046A87 | 2022-02-15 | 2022-05-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022046A86 | 2022-02-15 | 2022-05-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022046A85 | 2022-02-15 | 2022-05-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022046A84 | 2022-02-15 | 2022-05-13 | TEMP. CONST. SIGNS/MARKINGS | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022046A82 | 2022-02-15 | 2022-05-13 | OCCUPANCY OF ROADWAY AS STIPULATED | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022046A81 | 2022-02-15 | 2022-05-13 | TEMPORARY PEDESTRIAN WALK | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B012022041B19 | 2022-02-10 | 2022-03-10 | PAVE STREET-W/ ENGINEERING & INSP FEE | ATLANTIC AVENUE, BROOKLYN, FROM STREET PRESCOTT PLACE |
B042022041A12 | 2022-02-10 | 2022-03-10 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | ATLANTIC AVENUE, BROOKLYN, FROM STREET PRESCOTT PLACE |
B042022041A11 | 2022-02-10 | 2022-03-10 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | ATLANTIC AVENUE, BROOKLYN, FROM STREET PRESCOTT PLACE |
B022022039B08 | 2022-02-08 | 2022-05-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022039B22 | 2022-02-08 | 2022-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022039B21 | 2022-02-08 | 2022-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022039B20 | 2022-02-08 | 2022-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022039B19 | 2022-02-08 | 2022-04-01 | TEMP. CONST. SIGNS/MARKINGS | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022039B18 | 2022-02-08 | 2022-04-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022039B17 | 2022-02-08 | 2022-04-01 | OCCUPANCY OF ROADWAY AS STIPULATED | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022039B16 | 2022-02-08 | 2022-04-01 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022039B15 | 2022-02-08 | 2022-04-01 | CROSSING SIDEWALK | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022039B14 | 2022-02-08 | 2022-04-01 | PLACE MATERIAL ON STREET | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022039B13 | 2022-02-08 | 2022-05-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022039B12 | 2022-02-08 | 2022-05-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022039B11 | 2022-02-08 | 2022-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022039B10 | 2022-02-08 | 2022-05-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022039B09 | 2022-02-08 | 2022-05-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022039B07 | 2022-02-08 | 2022-05-09 | TEMP. CONST. SIGNS/MARKINGS | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022039B06 | 2022-02-08 | 2022-05-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022039B05 | 2022-02-08 | 2022-05-09 | OCCUPANCY OF ROADWAY AS STIPULATED | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022039B03 | 2022-02-08 | 2022-05-09 | PLACE MATERIAL ON STREET | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022039B04 | 2022-02-08 | 2022-05-09 | CROSSING SIDEWALK | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022038B53 | 2022-02-07 | 2022-05-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ATLANTIC AVENUE, BROOKLYN, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE |
B022022038B52 | 2022-02-07 | 2022-05-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022022021A59 | 2022-01-21 | 2022-04-19 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022021A58 | 2022-01-21 | 2022-04-19 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022011B85 | 2022-01-11 | 2022-02-08 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022011B84 | 2022-01-11 | 2022-02-08 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022005B23 | 2022-01-05 | 2022-04-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022022005B22 | 2022-01-05 | 2022-04-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022022005B21 | 2022-01-05 | 2022-04-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ATLANTIC AVENUE, BROOKLYN, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE |
B022022005B20 | 2022-01-05 | 2022-04-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | ATLANTIC AVENUE, BROOKLYN, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE |
B022022003E72 | 2022-01-03 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022003E71 | 2022-01-03 | 2022-03-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022003E73 | 2022-01-03 | 2022-03-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022003E74 | 2022-01-03 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022021356F60 | 2021-12-22 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022021356F59 | 2021-12-22 | 2021-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022021355B86 | 2021-12-21 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022021351A64 | 2021-12-17 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ATLANTIC AVENUE, BROOKLYN, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE |
B022021350B48 | 2021-12-16 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022021340A99 | 2021-12-06 | 2022-03-02 | PLACE MATERIAL ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022021340B01 | 2021-12-06 | 2022-03-02 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B012021340G52 | 2021-12-06 | 2022-01-04 | INSTALL FENCE | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B012021340G49 | 2021-12-06 | 2022-01-01 | INSTALL FENCE | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022021340B05 | 2021-12-06 | 2022-03-02 | OCCUPANCY OF ROADWAY AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022021340B04 | 2021-12-06 | 2022-03-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022021340B03 | 2021-12-06 | 2022-03-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022021340B02 | 2021-12-06 | 2022-03-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022021340A97 | 2021-12-06 | 2022-03-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022021340A98 | 2021-12-06 | 2022-03-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022021340B00 | 2021-12-06 | 2022-03-02 | CROSSING SIDEWALK | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022021328B94 | 2021-11-24 | 2022-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ATLANTIC AVENUE, BROOKLYN, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE |
B022021328B93 | 2021-11-24 | 2022-02-21 | TEMP. CONST. SIGNS/MARKINGS | ATLANTIC AVENUE, BROOKLYN, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE |
B022021328B92 | 2021-11-24 | 2021-12-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | ATLANTIC AVENUE, BROOKLYN, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE |
B022021328B91 | 2021-11-24 | 2022-02-21 | OCCUPANCY OF ROADWAY AS STIPULATED | ATLANTIC AVENUE, BROOKLYN, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE |
B022021328B90 | 2021-11-24 | 2022-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022021328B89 | 2021-11-24 | 2022-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022021328B88 | 2021-11-24 | 2022-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022021328B86 | 2021-11-24 | 2022-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022021328B85 | 2021-11-24 | 2022-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022021328B84 | 2021-11-24 | 2022-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022021328B83 | 2021-11-24 | 2022-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022021328B82 | 2021-11-24 | 2022-02-21 | TEMP. CONST. SIGNS/MARKINGS | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022021328B80 | 2021-11-24 | 2022-02-21 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022021328B79 | 2021-11-24 | 2022-02-21 | OCCUPANCY OF ROADWAY AS STIPULATED | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022021328B78 | 2021-11-24 | 2022-02-21 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022021328B76 | 2021-11-24 | 2022-02-21 | PLACE MATERIAL ON STREET | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022021328B37 | 2021-11-24 | 2022-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022021328B77 | 2021-11-24 | 2022-02-21 | CROSSING SIDEWALK | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022021328B36 | 2021-11-24 | 2022-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022021328B35 | 2021-11-24 | 2022-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022021328B34 | 2021-11-24 | 2022-02-21 | OCCUPANCY OF ROADWAY AS STIPULATED | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022021328B96 | 2021-11-24 | 2022-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ATLANTIC AVENUE, BROOKLYN, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE |
B022021328B97 | 2021-11-24 | 2022-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ATLANTIC AVENUE, BROOKLYN, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE |
B022021328B95 | 2021-11-24 | 2022-02-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ATLANTIC AVENUE, BROOKLYN, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE |
B022021326C04 | 2021-11-22 | 2022-02-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022021326C03 | 2021-11-22 | 2022-02-15 | OCCUPANCY OF ROADWAY AS STIPULATED | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022021326C02 | 2021-11-22 | 2022-02-15 | PLACE CRANE OR SHOVEL ON STREET | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022021326C07 | 2021-11-22 | 2022-02-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022021326C06 | 2021-11-22 | 2022-02-15 | OCCUPANCY OF ROADWAY AS STIPULATED | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022021326C05 | 2021-11-22 | 2022-02-15 | PLACE CRANE OR SHOVEL ON STREET | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022021320B28 | 2021-11-16 | 2022-02-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022021320B27 | 2021-11-16 | 2022-02-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022021320B26 | 2021-11-16 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022021320B25 | 2021-11-16 | 2022-02-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022021320B24 | 2021-11-16 | 2022-02-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022021320B23 | 2021-11-16 | 2022-02-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022021320B22 | 2021-11-16 | 2022-02-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022021320B21 | 2021-11-16 | 2022-02-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022021320B20 | 2021-11-16 | 2022-02-12 | TEMP. CONST. SIGNS/MARKINGS | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022021320B19 | 2021-11-16 | 2021-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022021320B18 | 2021-11-16 | 2022-02-12 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022021320B17 | 2021-11-16 | 2022-02-12 | OCCUPANCY OF ROADWAY AS STIPULATED | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022021320B16 | 2021-11-16 | 2022-02-12 | TEMPORARY PEDESTRIAN WALK | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022021320B15 | 2021-11-16 | 2022-02-12 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022021320B34 | 2021-11-16 | 2022-02-12 | CROSSING SIDEWALK | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022021320B13 | 2021-11-16 | 2022-02-12 | PLACE MATERIAL ON STREET | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022021320B36 | 2021-11-16 | 2022-02-12 | TEMPORARY PEDESTRIAN WALK | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022021320B37 | 2021-11-16 | 2022-02-12 | OCCUPANCY OF ROADWAY AS STIPULATED | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022021320B38 | 2021-11-16 | 2022-02-12 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022021320B39 | 2021-11-16 | 2021-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022021320B40 | 2021-11-16 | 2022-02-12 | TEMP. CONST. SIGNS/MARKINGS | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022021320B41 | 2021-11-16 | 2022-02-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022021320B42 | 2021-11-16 | 2022-02-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022021320B43 | 2021-11-16 | 2022-02-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022021320B44 | 2021-11-16 | 2022-02-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022021320B14 | 2021-11-16 | 2022-02-12 | CROSSING SIDEWALK | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022021320B33 | 2021-11-16 | 2022-02-12 | PLACE MATERIAL ON STREET | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022021320B32 | 2021-11-16 | 2022-02-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022021320B31 | 2021-11-16 | 2022-02-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022021320B30 | 2021-11-16 | 2022-02-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022021320B29 | 2021-11-16 | 2022-02-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022021320B45 | 2021-11-16 | 2022-02-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022021320B46 | 2021-11-16 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022021320B47 | 2021-11-16 | 2022-02-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022021320B48 | 2021-11-16 | 2022-02-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022021320B49 | 2021-11-16 | 2022-02-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022021320B50 | 2021-11-16 | 2022-02-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022021320B51 | 2021-11-16 | 2022-02-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022021320B52 | 2021-11-16 | 2022-02-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022021320B35 | 2021-11-16 | 2022-02-12 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022021316A66 | 2021-11-12 | 2022-02-08 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022021316A60 | 2021-11-12 | 2022-02-08 | CROSSING SIDEWALK | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022021316A59 | 2021-11-12 | 2022-02-08 | PLACE MATERIAL ON STREET | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022021316A72 | 2021-11-12 | 2022-02-08 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022021316A73 | 2021-11-12 | 2022-02-08 | OCCUPANCY OF ROADWAY AS STIPULATED | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022021316A74 | 2021-11-12 | 2022-02-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022021316A75 | 2021-11-12 | 2022-02-08 | TEMP. CONST. SIGNS/MARKINGS | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022021316A76 | 2021-11-12 | 2022-02-08 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022021316A71 | 2021-11-12 | 2022-02-08 | CROSSING SIDEWALK | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022021316A70 | 2021-11-12 | 2022-02-08 | PLACE MATERIAL ON STREET | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022021316A69 | 2021-11-12 | 2022-02-08 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022021316A68 | 2021-11-12 | 2022-02-08 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022021316A65 | 2021-11-12 | 2022-02-08 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022021316A64 | 2021-11-12 | 2022-02-08 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022021316A77 | 2021-11-12 | 2022-02-08 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022021316A63 | 2021-11-12 | 2022-02-08 | TEMP. CONST. SIGNS/MARKINGS | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022021316A62 | 2021-11-12 | 2022-02-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022021316A61 | 2021-11-12 | 2022-02-08 | OCCUPANCY OF ROADWAY AS STIPULATED | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B152021253A05 | 2021-09-10 | 2021-12-31 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B012021182B64 | 2021-07-01 | 2021-09-28 | OPEN SIDEWALK TO INSTALL FOUNDATION | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B012021182B65 | 2021-07-01 | 2021-09-28 | OPEN SIDEWALK TO INSTALL FOUNDATION | ATLANTIC AVENUE, BROOKLYN, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE |
B012021083B32 | 2021-03-24 | 2021-06-29 | OPEN SIDEWALK TO INSTALL FOUNDATION | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B012021083B33 | 2021-03-24 | 2021-06-29 | OPEN SIDEWALK TO INSTALL FOUNDATION | ATLANTIC AVENUE, BROOKLYN, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE |
B012020364B18 | 2020-12-29 | 2021-03-31 | OPEN SIDEWALK TO INSTALL FOUNDATION | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B012020364B19 | 2020-12-29 | 2021-03-31 | OPEN SIDEWALK TO INSTALL FOUNDATION | ATLANTIC AVENUE, BROOKLYN, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE |
B012020364B20 | 2020-12-29 | 2021-03-31 | OPEN SIDEWALK TO INSTALL FOUNDATION | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B012020364B14 | 2020-12-29 | 2021-03-31 | OPEN SIDEWALK TO INSTALL FOUNDATION | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B042020357A03 | 2020-12-22 | 2021-01-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | ALBANY AVENUE, BROOKLYN, FROM STREET MIDWOOD STREET TO STREET RUTLAND ROAD |
B012020288B41 | 2020-10-14 | 2020-12-31 | OPEN SIDEWALK TO INSTALL FOUNDATION | ATLANTIC AVENUE, BROOKLYN, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE |
B012020288B40 | 2020-10-14 | 2020-12-31 | OPEN SIDEWALK TO INSTALL FOUNDATION | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B012020287B95 | 2020-10-13 | 2020-12-31 | OPEN SIDEWALK TO INSTALL FOUNDATION | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B012020287B96 | 2020-10-13 | 2020-12-31 | OPEN SIDEWALK TO INSTALL FOUNDATION | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B012020210B85 | 2020-07-28 | 2020-10-24 | OPEN SIDEWALK TO INSTALL FOUNDATION | ATLANTIC AVENUE, BROOKLYN, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE |
B012020210B84 | 2020-07-28 | 2020-10-24 | OPEN SIDEWALK TO INSTALL FOUNDATION | PRESCOTT PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B012020198A48 | 2020-07-16 | 2020-10-12 | OPEN SIDEWALK TO INSTALL FOUNDATION | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B012020198A49 | 2020-07-16 | 2020-10-12 | OPEN SIDEWALK TO INSTALL FOUNDATION | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B012020196A54 | 2020-07-14 | 2020-08-11 | INSTALL FENCE | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B012020196A55 | 2020-07-14 | 2020-08-11 | INSTALL FENCE | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B012020163A43 | 2020-06-11 | 2020-07-08 | INSTALL FENCE | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B012020163A44 | 2020-06-11 | 2020-07-08 | INSTALL FENCE | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
Start date | End date | Type | Value |
---|---|---|---|
2023-10-02 | 2024-01-24 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-07-31 | 2023-10-02 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-07-31 | 2023-07-31 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-07-28 | 2023-07-31 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-07-18 | 2023-07-28 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-06-03 | 2023-06-03 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-06-03 | 2023-07-18 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-05-09 | 2023-06-03 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-04-24 | 2023-04-24 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-04-24 | 2023-05-09 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-04-15 | 2023-04-24 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-04-14 | 2023-04-14 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-04-14 | 2023-04-15 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-02-02 | 2023-04-14 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-01-19 | 2023-01-19 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-01-19 | 2023-02-02 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-01-18 | 2023-01-19 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-01-06 | 2023-01-18 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-01-03 | 2023-01-06 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-12-01 | 2023-01-03 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-30 | 2022-12-01 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-24 | 2022-08-30 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-24 | 2022-08-24 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-23 | 2022-08-24 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-07-25 | 2022-08-23 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-06-16 | 2022-07-25 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-05-31 | 2022-06-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-05-27 | 2022-05-31 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-03-29 | 2022-05-27 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-03-29 | 2022-03-29 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-03-11 | 2022-03-29 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-02-15 | 2022-03-11 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-02-08 | 2022-02-15 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-10-28 | 2022-02-08 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-07-06 | 2021-10-28 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2018-11-05 | 2021-07-06 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
181105010308 | 2018-11-05 | CERTIFICATE OF INCORPORATION | 2018-11-05 |
Date | Inspection Object | Address | Grade | Type | Institution | Desctiption |
---|---|---|---|---|---|---|
2024-09-11 | No data | WILSON STREET, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE | No data | Street Construction Inspections: Active | Department of Transportation | OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET, pass |
2024-09-10 | No data | WILSON STREET, FROM STREET BEDFORD AVENUE TO STREET WYTHE PLACE | No data | Street Construction Inspections: Active | Department of Transportation | CROSSING SIDEWALK, pass |
2024-08-25 | No data | BARTLETT STREET, FROM STREET BROADWAY TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF ROADWAY AS STIPULATED, pass |
2024-08-23 | No data | THROOP AVENUE, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Forlift, pass |
2024-08-23 | No data | BARTLETT STREET, FROM STREET BROADWAY TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Barriers, pass |
2024-08-22 | No data | THROOP AVENUE, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF ROADWAY AS STIPULATED, pass |
2024-07-11 | No data | MIDDLETON STREET, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permit expired |
2024-07-10 | No data | RUTLEDGE STREET, FROM STREET BROADWAY TO STREET HARRISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CROSSING SIDEWALK, pass |
2024-07-10 | No data | RUTLEDGE STREET, FROM STREET BROADWAY TO STREET HARRISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | INSTALL FENCE, pass |
2024-07-09 | No data | WALLABOUT STREET, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permit expired |
2024-07-05 | No data | RUTLEDGE STREET, FROM STREET BROADWAY TO STREET HARRISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent has a permit to place a boom truck but failed to place a sign at the entrance of the street to notify the public of the upcoming roadway closure. In violation of stipulation 111. ID by permit. |
2024-07-05 | No data | BARTLETT STREET, FROM STREET BROADWAY TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent has a permit to place a boom truck but failed to place a sign at the entrance of the street to notify the public of the upcoming roadway closure. In violation of stipulation 111. ID by permit. |
2024-06-11 | No data | BARTLETT STREET, FROM STREET BROADWAY TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF ROADWAY AS STIPULATED, pass |
2024-06-11 | No data | BARTLETT STREET, FROM STREET BROADWAY TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work to continue under permit#B022024088E95, pass |
2024-05-22 | No data | THROOP AVENUE, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF ROADWAY AS STIPULATED, pass |
2024-03-29 | No data | RUTLEDGE STREET, FROM STREET BROADWAY TO STREET HARRISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Green construction fence installed on sidewalk for construction site 316 |
2024-02-17 | No data | WALLABOUT STREET, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET | No data | Street Construction Inspections: Active | Department of Transportation | permittee number on sign |
2024-02-17 | No data | THROOP AVENUE, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET | No data | Street Construction Inspections: Active | Department of Transportation | no sign at site |
2024-02-17 | No data | MIDDLETON STREET, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET | No data | Street Construction Inspections: Active | Department of Transportation | permittee number on sign |
2024-01-04 | No data | BARTLETT STREET, FROM STREET BROADWAY TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Tim construction sign posted on drive rail with no affixed five digit code. |
2024-01-04 | No data | RUTLEDGE STREET, FROM STREET BROADWAY TO STREET HARRISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp construction signs posted on green construction fence |
2024-01-04 | No data | MIDDLETON STREET, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET | No data | Street Construction Inspections: Active | Department of Transportation | temp construction sign posted on drive rail in compliance |
2024-01-04 | No data | THROOP AVENUE, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Signs posted on green construction fence |
2024-01-03 | No data | WALLABOUT STREET, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Temp sign posted on green construction fence |
2023-09-18 | No data | THROOP AVENUE, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Fence installed |
2023-09-18 | No data | BARTLETT STREET, FROM STREET BROADWAY TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Fence is installed |
2023-08-25 | No data | BEDFORD AVENUE, FROM STREET CLYMER STREET TO STREET TAYLOR STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started new permit on file |
2023-08-17 | No data | BAY PARKWAY, FROM STREET 59 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Active | Department of Transportation | I observed two containers in the roadway with a permit specifying authorization for only one container. Respondent failed to obtain a valid DOT permit for the second container. Respondent ID by cited permit . |
2023-08-15 | No data | BEDFORD AVENUE, FROM STREET CLYMER STREET TO STREET TAYLOR STREET | No data | Street Construction Inspections: Active | Department of Transportation | material not visible |
2023-08-04 | No data | BEDFORD AVENUE, FROM STREET CLYMER STREET TO STREET TAYLOR STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New steel faced curb installed for new sidewalk ifo 491 Bedford in compliance |
2023-07-28 | No data | CLYMER STREET, FROM STREET BEDFORD AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | No work started. No work done. No inspection found at this time. |
2023-07-28 | No data | BEDFORD AVENUE, FROM STREET CLYMER STREET TO STREET TAYLOR STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started. No work done. No inspection found at this time. |
2023-07-22 | No data | BEDFORD AVENUE, FROM STREET CLYMER STREET TO STREET TAYLOR STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk installed behind green construction fence for construction site 491 |
2023-07-22 | No data | CLYMER STREET, FROM STREET BEDFORD AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Foundation installed for new sidewalk for new building 142 |
2023-07-18 | No data | BEDFORD AVENUE, FROM STREET CLYMER STREET TO STREET TAYLOR STREET | No data | Street Construction Inspections: Active | Department of Transportation | ped/walk not visible |
2023-07-18 | No data | CLYMER STREET, FROM STREET BEDFORD AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | material not visible |
2023-07-13 | No data | BEDFORD AVENUE, FROM STREET CLYMER STREET TO STREET TAYLOR STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed for new sidewalk new building 144 clymer in compliance |
2023-07-12 | No data | WALLABOUT STREET, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET | No data | Street Construction Inspections: Active | Department of Transportation | no x s/w |
2023-07-06 | No data | BAY PARKWAY, FROM STREET 59 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Jersey barriers in compliance. |
2023-06-25 | No data | 60 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | No containers found at this time. |
2023-06-24 | No data | BAY PARKWAY, FROM STREET 59 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Signs posted under scaffolding. |
2023-06-23 | No data | MIDDLETON STREET, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET | No data | Street Construction Inspections: Active | Department of Transportation | material r/w |
2023-06-23 | No data | WALLABOUT STREET, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET | No data | Street Construction Inspections: Active | Department of Transportation | material not visible |
2023-06-22 | No data | BARTLETT STREET, FROM STREET BROADWAY TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | knuckle boom not visible |
2023-06-22 | No data | THROOP AVENUE, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET | No data | Street Construction Inspections: Active | Department of Transportation | boom truck not visible |
2023-06-21 | No data | THROOP AVENUE, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET | No data | Street Construction Inspections: Active | Department of Transportation | no x s/w |
2023-06-16 | No data | BEDFORD AVENUE, FROM STREET CLYMER STREET TO STREET TAYLOR STREET | No data | Street Construction Inspections: Active | Department of Transportation | Fence on sige |
2023-06-15 | No data | BEDFORD AVENUE, FROM STREET CLYMER STREET TO STREET TAYLOR STREET | No data | Street Construction Inspections: Active | Department of Transportation | No sidewalk crosswalk |
2023-06-03 | No data | 60 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | I observed Jersey barriers in the parking lane opposite of property. Respondent failed to comply with OCMC stipulation 039 to occupy 8 feet adjacent to the curb in front of property. Respondent ID by cited permit and “preferred builders” on barriers. |
2023-05-30 | No data | CLYMER STREET, FROM STREET BEDFORD AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk open behind green construction fence |
2023-05-30 | No data | BEDFORD AVENUE, FROM STREET CLYMER STREET TO STREET TAYLOR STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk open behind green construction fence |
2023-05-26 | No data | BARTLETT STREET, FROM STREET BROADWAY TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | s/w occupied |
2023-05-26 | No data | 60 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | I observed Jersey barriers in the parking lane opposite of property. Respondent failed to comply with OCMC stipulation 039 to occupy 8 feet adjacent to the curb in front of property. Respondent ID by cited permit and “preferred builders” on barriers. |
2023-05-18 | No data | BARTLETT STREET, FROM STREET BROADWAY TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CONSTRUCTION FENCE COVERING THE SIDEWALK IFO PROPERTY #89 THROOP AV. |
2023-05-16 | No data | BARTLETT STREET, FROM STREET BROADWAY TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ped/ walk not visible |
2023-05-16 | No data | THROOP AVENUE, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET | No data | Street Construction Inspections: Active | Department of Transportation | office trailer r/w |
2023-05-16 | No data | BARTLETT STREET, FROM STREET BROADWAY TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | flatbed not visible |
2023-05-15 | No data | THROOP AVENUE, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET | No data | Street Construction Inspections: Active | Department of Transportation | no x s/w |
2023-05-14 | No data | BAY PARKWAY, FROM STREET 59 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Fencing in compliance at this time |
2023-05-09 | No data | CLYMER STREET, FROM STREET BEDFORD AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | material not visible |
2023-05-09 | No data | BEDFORD AVENUE, FROM STREET CLYMER STREET TO STREET TAYLOR STREET | No data | Street Construction Inspections: Active | Department of Transportation | no x s/w |
2023-05-07 | No data | ATLANTIC AVENUE, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk is in compliance |
2023-04-10 | No data | MIDDLETON STREET, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Fence installed. |
2023-04-01 | No data | ATLANTIC AVENUE, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | THE PERM RESTORATTION IN THE DRIVING LANE CURRENTL HAS NO DEFECTS. |
2023-04-01 | No data | ATLANTIC AVENUE, FROM STREET PRESCOTT PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | THE PERM RESTORATION IN THE INTERSECTION CURRENTLY HAS NO DEFECTS. |
2023-03-15 | No data | 60 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Fence maintained |
2023-03-15 | No data | BAY PARKWAY, FROM STREET 59 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Active | Department of Transportation | In compliance |
2023-03-04 | No data | PRESCOTT PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESURFACED BY BPP FOR 1911 ATLANTIC AV. |
2023-02-27 | No data | PRESCOTT PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESURFACED BY BPP FOR PROPERTY #1911. |
2023-02-26 | No data | THROOP AVENUE, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Fence installed. |
2023-02-26 | No data | BARTLETT STREET, FROM STREET BROADWAY TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent with temporary regulatory signs posted. AKA 89 Throop Avenue. Respondent failed to affix their Department issued five-digit identification number using a waterproof label or sticker on all temporary signs. |
2023-02-22 | No data | MIDDLETON STREET, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent with an unprotected DEP infiltration basin. Respondent failed to adhere to stipulation BIOSW1 - “the Permittee must follow NYC DEPs Green infrastructure protection requirements.” Permit #B022022329B22 used for ID. |
2023-02-22 | No data | BARTLETT STREET, FROM STREET BROADWAY TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent with an unprotected DEP infiltration basin. Respondent failed to adhere to stipulation BIOSW1 - “the Permittee must follow NYC DEPs Green infrastructure protection requirements.” Property AKA 89 Throop Ave. |
2023-02-14 | No data | 60 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | office trailer on the roadway in compliance |
2023-01-19 | No data | BEDFORD AVENUE, FROM STREET CLYMER STREET TO STREET TAYLOR STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Fence not installed. Duplicate. |
2023-01-14 | No data | 60 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | the fence was installed and maintained on a newer active permit. |
2023-01-14 | No data | 60 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | fence maintained in compliance |
2023-01-14 | No data | BAY PARKWAY, FROM STREET 59 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | the fence was installed and maintained on a newer active permit. |
2023-01-14 | No data | BAY PARKWAY, FROM STREET 59 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Active | Department of Transportation | fence maintained in compliance. |
2022-12-23 | No data | 60 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Shanty placed on street |
2022-12-20 | No data | THROOP AVENUE, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent had the entire roadway closed off to vehicle traffic in front of 89 Throop avenue. Respondent failed maintain 11 foot lane for traffic. Respondent ID by DOT PERMIT # B022022327C72 |
2022-12-06 | No data | 60 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | no crossing sidewalk down no crew on site. |
2022-12-06 | No data | BAY PARKWAY, FROM STREET 59 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Active | Department of Transportation | no knuckle boom truck on site. |
2022-12-03 | No data | 60 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Office trailer stored on the roadway behind the jersey barriers. |
2022-12-03 | No data | BAY PARKWAY, FROM STREET 59 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Jersey barriers stored on the roadway in compliance. |
2022-12-01 | No data | CLYMER STREET, FROM STREET BEDFORD AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | no x s/w |
2022-12-01 | No data | BEDFORD AVENUE, FROM STREET CLYMER STREET TO STREET TAYLOR STREET | No data | Street Construction Inspections: Active | Department of Transportation | material r/w |
2022-11-30 | No data | WILLOUGHBY AVENUE, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET | No data | Street Construction Inspections: Active | Department of Transportation | JERSEY BARRIERS IN THE PARKING LANE. |
2022-11-30 | No data | NOSTRAND AVENUE, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | THERE IS NO CRANE ON THE STREET. |
2022-11-26 | No data | THROOP AVENUE, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on the sidewalk |
2022-11-26 | No data | BAY PARKWAY, FROM STREET 59 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done behind the fence. |
2022-11-26 | No data | 60 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The work was done behind the fence. |
2022-11-14 | No data | 60 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Office trailer on the roadway |
2022-11-14 | No data | BAY PARKWAY, FROM STREET 59 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Office trailer stored on the roadway on 60th Street. |
2022-11-05 | No data | 60 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Container placed on the roadway in compliance |
2022-10-01 | No data | BAY PARKWAY, FROM STREET 59 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No boom truck on site |
2022-10-01 | No data | 60 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Office trailer on Bay Pkwy, this is a corner property. |
2022-09-29 | No data | THROOP AVENUE, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street camera installed |
2022-09-17 | No data | MIDDLETON STREET, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on the sidewalk |
2022-09-15 | No data | BAY PARKWAY, FROM STREET 59 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Active | Department of Transportation | OCMC stip 014 was being violated. |
2022-09-07 | No data | 60 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | temp signs posted |
2022-09-07 | No data | BAY PARKWAY, FROM STREET 59 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Active | Department of Transportation | s/w occupied |
2022-09-06 | No data | 60 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | s/w occupied |
2022-08-24 | No data | 60 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | barriers r/w |
2022-08-24 | No data | BAY PARKWAY, FROM STREET 59 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Active | Department of Transportation | s/w occupied |
2022-08-15 | No data | ATLANTIC AVENUE, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flags. Duplicate. |
2022-08-15 | No data | PRESCOTT PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flags. Duplicate. |
2022-08-13 | No data | BEDFORD AVENUE, FROM STREET CLYMER STREET TO STREET TAYLOR STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | THE SIDEWALK IS OPEN TO PEDESTRIANS. |
2022-08-09 | No data | BARTLETT STREET, FROM STREET BROADWAY TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | THE SIDEWALK IS CURRENTLY COVERED BY THE CONSTRUCTION FENCE. |
2022-08-09 | No data | THROOP AVENUE, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | THE SIDEWALK IS CURRENTLY COVERED BY THE CONSTRUCTION FENCE. |
2022-08-09 | No data | MIDDLETON STREET, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The sidewalk is currently open to pedestrians. |
2022-07-21 | No data | BEDFORD AVENUE, FROM STREET CLYMER STREET TO STREET TAYLOR STREET | No data | Street Construction Inspections: Active | Department of Transportation | Barriers, acceptable |
2022-07-07 | No data | WILLOUGHBY AVENUE, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plywood fence on sidewalk |
2022-06-27 | No data | 60 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | excavator behind fence |
2022-06-08 | No data | WILLOUGHBY AVENUE, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET | No data | Street Construction Inspections: Active | Department of Transportation | Port o San is not on site. |
2022-05-07 | No data | PRESCOTT PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | Not on site |
2022-05-07 | No data | ATLANTIC AVENUE, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work not started |
2022-04-28 | No data | ATLANTIC AVENUE, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | EXPANSION JOINTS ARE SEALED |
2022-04-21 | No data | WILLOUGHBY AVENUE, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET | No data | Street Construction Inspections: Active | Department of Transportation | fence meets DOT standards |
2022-04-21 | No data | NOSTRAND AVENUE, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | jersey barriers and office trailer found in parking lane |
2022-04-01 | No data | WILLOUGHBY AVENUE, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET | No data | Street Construction Inspections: Active | Department of Transportation | Construction materials placed on rwy IFO BO site. Bike lane is clear. |
2022-04-01 | No data | MIDDLETON STREET, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET | No data | Street Construction Inspections: Active | Department of Transportation | material not visible |
2022-04-01 | No data | WALLABOUT STREET, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET | No data | Street Construction Inspections: Active | Department of Transportation | forklift not visible |
2022-03-30 | No data | BARTLETT STREET, FROM STREET BROADWAY TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Backhoe not visible |
2022-03-29 | No data | THROOP AVENUE, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET | No data | Street Construction Inspections: Active | Department of Transportation | fence s/w |
2022-03-29 | No data | ATLANTIC AVENUE, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Equipment stored |
2022-03-29 | No data | BARTLETT STREET, FROM STREET BROADWAY TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | bobcat not visible |
2022-03-22 | No data | ATLANTIC AVENUE, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL FACED CURB INSTALLED |
2022-03-22 | No data | ATLANTIC AVENUE, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ROADWAY PAVED HALF +5 BPP MILLED UNDER LAST PERMIT AND INSPECTED NO SUMMONS WARRANTED. BUT LANE MARKINGS NOT ADDED YET |
2022-03-19 | No data | BEDFORD AVENUE, FROM STREET CLYMER STREET TO STREET TAYLOR STREET | No data | Street Construction Inspections: Active | Department of Transportation | material not visible |
2022-03-16 | No data | PRESCOTT PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | ROADWAY CURB TO CURB 29FT MILLED ROADWAY IS 165FT X 22FT WITH DEPTH OF 3INCHS |
2022-03-16 | No data | ATLANTIC AVENUE, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ROADWAY CURB TO CURB 32FT 8IN MILLED ROADWAY IS 62FT 10IN X 22FT 10IN WITH A DEPTH OF 3 INCHES |
2022-03-14 | No data | ATLANTIC AVENUE, FROM STREET PRESCOTT PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No new work done in the NE3 corner quadrant, non Ada compliant active building operation at this time. Collected in prism on 3/14/22 permit expired. |
2022-03-08 | No data | BEDFORD AVENUE, FROM STREET CLYMER STREET TO STREET TAYLOR STREET | No data | Street Construction Inspections: Active | Department of Transportation | Office trailer stored in the parking lane |
2022-02-22 | No data | ATLANTIC AVENUE, FROM STREET PRESCOTT PLACE | No data | Street Construction Inspections: Active | Department of Transportation | No work started within the NE3 corner quadrant at the time of inspection. Active permit on file. |
2022-02-14 | No data | NOSTRAND AVENUE, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk open to public |
2022-02-13 | No data | CLYMER STREET, FROM STREET BEDFORD AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | No material onsite at time of inspection |
2022-02-13 | No data | BEDFORD AVENUE, FROM STREET CLYMER STREET TO STREET TAYLOR STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plywood fence on sidewalk |
2022-02-08 | No data | WILLOUGHBY AVENUE, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET | No data | Street Construction Inspections: Active | Department of Transportation | Barriers on parking lane, IFO BO site. Corner property. Bike lane is clear. |
2022-02-04 | No data | NOSTRAND AVENUE, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | fence installed on the sidewalk |
2022-02-03 | No data | WILLOUGHBY AVENUE, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET | No data | Street Construction Inspections: Active | Department of Transportation | fence installed on the sidewalk |
2022-02-03 | No data | NOSTRAND AVENUE, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Generator |
2022-02-02 | No data | PRESCOTT PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | Parking lane being occupied by yodocks, fence & equipment. Bike lane is clear. |
2022-01-31 | No data | ATLANTIC AVENUE, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF SIDEWALK |
2022-01-11 | No data | NOSTRAND AVENUE, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Occupancy of sidewalk permit is in compliance at this time of inspection. |
2022-01-11 | No data | WILLOUGHBY AVENUE, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET | No data | Street Construction Inspections: Active | Department of Transportation | Maintain Fence permit is in compliance at this time of inspection. |
2022-01-10 | No data | PRESCOTT PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | Trailer not observed. |
2022-01-09 | No data | PRESCOTT PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | Rw occupied in compliance |
2022-01-09 | No data | ATLANTIC AVENUE, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No visible mixer. |
2022-01-07 | No data | ATLANTIC AVENUE, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF SIDEWALK |
2022-01-07 | No data | PRESCOTT PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | FENCE MAINTAINED |
2021-12-16 | No data | PRESCOTT PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | Occupancy of roadway permit is in compliance at this time of inspection. |
2021-12-16 | No data | ATLANTIC AVENUE, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No bobcat visible on site at this time of inspection. |
2021-11-08 | No data | ATLANTIC AVENUE, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No Concrete Mixer Visible On Site At Time Of Inspection |
2021-11-08 | No data | PRESCOTT PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | No Flatbed Visible On Site At Time Of Inspection |
2021-11-05 | No data | PRESCOTT PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | Materials On Site Behind Fence At Time Of Inspection |
2021-10-30 | No data | CLYMER STREET, FROM STREET BEDFORD AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | temporary signs posted on fence |
2021-10-30 | No data | NOSTRAND AVENUE, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NO BOBCAT |
2021-10-29 | No data | WILLOUGHBY AVENUE, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET | No data | Street Construction Inspections: Active | Department of Transportation | No parking anytime sign posted on fence |
2021-10-29 | No data | NOSTRAND AVENUE, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No concrete truck |
2021-10-27 | No data | NOSTRAND AVENUE, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | JERSEY BARRIERS PLACED ALONG PARKING LANE IN COMPLIANCE |
2021-10-25 | No data | BEDFORD AVENUE, FROM STREET CLYMER STREET TO STREET TAYLOR STREET | No data | Street Construction Inspections: Active | Department of Transportation | No material on street |
2021-09-27 | No data | ATLANTIC AVENUE, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk Occupied At Time Of Inspection |
2021-09-23 | No data | PRESCOTT PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | Materials On Site Behind Fence At Time Of Inspection |
2021-09-15 | No data | WILLOUGHBY AVENUE, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET | No data | Street Construction Inspections: Active | Department of Transportation | Green plywood fence is being maintained on SWK NCL OF Willoughby Avenue. Conventional bike lane clear. |
2021-08-09 | No data | BEDFORD AVENUE, FROM STREET CLYMER STREET TO STREET TAYLOR STREET | No data | Street Construction Inspections: Active | Department of Transportation | Green plywood fence is being maintained on SWK IFO house 493. |
2021-07-27 | No data | PRESCOTT PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | Boom Truck |
2021-07-19 | No data | CLYMER STREET, FROM STREET BEDFORD AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | occupancy of sidewalk in use at this time. |
2021-07-19 | No data | BEDFORD AVENUE, FROM STREET CLYMER STREET TO STREET TAYLOR STREET | No data | Street Construction Inspections: Active | Department of Transportation | material placed on street behind fence at this time. |
2021-07-19 | No data | PRESCOTT PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | Knuckle Boom /No knuckle boom on site |
2021-07-18 | No data | CLYMER STREET, FROM STREET BEDFORD AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | No knuckle boom on location at time of inspection. |
2021-07-16 | No data | CLYMER STREET, FROM STREET BEDFORD AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK BEHIND FENCE |
2021-07-08 | No data | ATLANTIC AVENUE, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | occupancy roadway in compliance |
2021-07-07 | No data | PRESCOTT PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | pass, barriers .... on street .... |
2021-06-22 | No data | ATLANTIC AVENUE, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | s/w occupancy in compliance |
2021-06-18 | No data | PRESCOTT PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | Port-o-San not visible |
2021-06-07 | No data | PRESCOTT PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | No boom truck on site at this time of inspection. |
2021-05-23 | No data | BEDFORD AVENUE, FROM STREET CLYMER STREET TO STREET TAYLOR STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMP RESTORATION IN SWK 100 FT EAST OF CLYMER ST OFF NCL |
2021-05-19 | No data | CLYMER STREET, FROM STREET BEDFORD AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | RWY CLOSED BY SCOOL -STEEL PLATED SWK |
2021-05-05 | No data | PRESCOTT PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF ROADWAY |
2021-05-04 | No data | CLYMER STREET, FROM STREET BEDFORD AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | CRANE ON ROADWAY- FLAGGERS ON SITE& ROADWAY OPEN FOR VEHICLES & BICYCLES - SWK CLOSED AROUND CRANE FLAGGERS ON SITE FOR PEDESTRIANS |
2021-04-06 | No data | PRESCOTT PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | Jersey Barrier |
2021-04-06 | No data | ATLANTIC AVENUE, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF SIDEWALK AS STIPULATED |
2021-03-27 | No data | ALBANY AVENUE, FROM STREET MIDWOOD STREET TO STREET RUTLAND ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB IS OK. |
2021-03-18 | No data | BEDFORD AVENUE, FROM STREET CLYMER STREET TO STREET TAYLOR STREET | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF SIDEWALK AS STIPULATED, acceptable |
2021-03-17 | No data | CLYMER STREET, FROM STREET BEDFORD AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF ROADWAY AS STIPULATED, acceptable |
2021-02-22 | No data | BEDFORD AVENUE, FROM STREET CLYMER STREET TO STREET TAYLOR STREET | No data | Street Construction Inspections: Active | Department of Transportation | NO CONCRETE WASHOUT BOX ON THE ROADWAY |
2021-02-22 | No data | CLYMER STREET, FROM STREET BEDFORD AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | NO CONCRETE TRUCK ON THE ROADWAY |
2021-02-19 | No data | ATLANTIC AVENUE, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Roadway occupied |
2021-02-19 | No data | ALBANY AVENUE, FROM STREET MIDWOOD STREET TO STREET RUTLAND ROAD | No data | Street Construction Inspections: Active | Department of Transportation | NO CONTAINER OBSERVED. |
2021-02-18 | No data | ATLANTIC AVENUE, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Equipment place on the street |
2021-02-17 | No data | PRESCOTT PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | Equipment on the street |
2021-02-10 | No data | CLYMER STREET, FROM STREET BEDFORD AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | forklift not on site |
2021-02-09 | No data | CLYMER STREET, FROM STREET BEDFORD AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | material acceptable |
2021-02-05 | No data | ATLANTIC AVENUE, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Port-o-San |
2021-02-05 | No data | PRESCOTT PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | Port-o-San |
2021-02-04 | No data | PRESCOTT PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | MATERIAL ON STREET |
2021-01-14 | No data | ALBANY AVENUE, FROM STREET MIDWOOD STREET TO STREET RUTLAND ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Full width of the roadway44’0Cut size L51’0 W 27’1 D0’4 Complete |
2020-11-05 | No data | CLYMER STREET, FROM STREET BEDFORD AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | Temp signs |
2020-11-04 | No data | CLYMER STREET, FROM STREET BEDFORD AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | No Sw crossing |
2020-11-02 | No data | ALBANY AVENUE, FROM STREET MIDWOOD STREET TO STREET RUTLAND ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work to continue under permit#B022020303C12 |
2020-11-02 | No data | ALBANY AVENUE, FROM STREET MIDWOOD STREET TO STREET RUTLAND ROAD | No data | Street Construction Inspections: Active | Department of Transportation | CROSSING SIDEWALK, acceptable |
2020-11-02 | No data | ALBANY AVENUE, FROM STREET MIDWOOD STREET TO STREET RUTLAND ROAD | No data | Street Construction Inspections: Pick-Up | Department of Transportation | A/T/P/O I observed Respondent with Construction Equipment(FENCE) stored on street without a Valid DOT permit on File to do so. Permittee was identified through DOB permit#321383230-01-NB, used for ID Purposes only. |
2020-10-31 | No data | CLYMER STREET, FROM STREET BEDFORD AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | FENCE OCCUPYING SWK- 5 FT CLEAR |
2020-10-31 | No data | CLYMER STREET, FROM STREET BEDFORD AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | FENCE INSTALLED IN SWK |
2020-10-30 | No data | ATLANTIC AVENUE, FROM STREET PRESCOTT PLACE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Bobcat |
2020-10-22 | No data | BEDFORD AVENUE, FROM STREET CLYMER STREET TO STREET TAYLOR STREET | No data | Street Construction Inspections: Active | Department of Transportation | Fence on site |
2020-10-22 | No data | CLYMER STREET, FROM STREET BEDFORD AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | N/a at time |
2020-10-21 | No data | BEDFORD AVENUE, FROM STREET CLYMER STREET TO STREET TAYLOR STREET | No data | Street Construction Inspections: Active | Department of Transportation | Barriers on site at time |
2020-08-26 | No data | ALBANY AVENUE, FROM STREET MIDWOOD STREET TO STREET RUTLAND ROAD | No data | Street Construction Inspections: Active | Department of Transportation | No Concrete Pump on site. |
2020-08-25 | No data | ALBANY AVENUE, FROM STREET MIDWOOD STREET TO STREET RUTLAND ROAD | No data | Street Construction Inspections: Active | Department of Transportation | No material on street. |
THE CORPORATION
ARSHIA DESIGNS INC. AAA VACUUM CORP. ATLANTICA TELECOM, INC. MISTY SPORTSWEAR, INC. INRACKS, INC. FAT JAMS ELECTRONICS INC. CROQUEMBOUCHE, INC. LONG BEACH PEDIATRIC GROUP, P.C. LAW OFFICES OF JOSEPH A. GRECO, P.C. TEREZ, INC.No related companies by address
Date of last update: 22 Nov 2024
Sources: New York Secretary of State
© 2024 nycompanysearch.com, Part of Big Data Integrated