Name: | CENTRAL CONCRETE INC. |
Jurisdiction: | New York |
Legal type: | DOMESTIC BUSINESS CORPORATION |
Status: | Active |
Date of registration: | 29 Jan 2019 (6 years ago) |
Entity Number: | 5484571 |
County: | Kings |
Place of Formation: | New York |
Address: | 152 SKILLMAN STREET, #5, BROOKLYN, NY, United States, 11205 |
Address ZIP Code: | 11205 |
Principal Address: | 152 Skillman Street, #5, Brooklyn, NY, United States, 11205 |
Principal Address ZIP Code: | 11205 |
Shares Details
Shares issued 200
Share Par Value 0
Type NO PAR VALUE
Name | Role | Address |
---|---|---|
CENTRAL CONCRETE | DOS Process Agent | 152 SKILLMAN STREET, #5, BROOKLYN, NY, United States, 11205 |
Name | Role | Address |
---|---|---|
MESHILEM LANDAU | Chief Executive Officer | 152 SKILLMAN STREET, #5, BROOKLYN, NY, United States, 11205 |
Number | Date | End date | Type | Address |
---|---|---|---|---|
X012024313B09 | 2024-11-08 | 2024-11-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | RYER AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET |
X012024313B10 | 2024-11-08 | 2024-11-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | VALENTINE AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET |
Q022024310A12 | 2024-11-05 | 2024-11-20 | TEMPORARY PEDESTRIAN WALK | 168 STREET, QUEENS, FROM STREET 90 AVENUE TO STREET 91 AVENUE |
X012024310A09 | 2024-11-05 | 2024-11-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
Q042024310A00 | 2024-11-05 | 2024-11-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 168 STREET, QUEENS, FROM STREET 90 AVENUE TO STREET 91 AVENUE |
M012024310A13 | 2024-11-05 | 2024-11-06 | RESET, REPAIR OR REPLACE CURB | WEST 152 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET RIVERSIDE DRIVE |
M042024310A06 | 2024-11-05 | 2024-11-06 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEST 152 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET RIVERSIDE DRIVE |
Q022024310A13 | 2024-11-05 | 2024-11-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | 168 STREET, QUEENS, FROM STREET 90 AVENUE TO STREET 91 AVENUE |
Q012024310A19 | 2024-11-05 | 2024-11-20 | RESET, REPAIR OR REPLACE CURB | 168 STREET, QUEENS, FROM STREET 90 AVENUE TO STREET 91 AVENUE |
X012024310A13 | 2024-11-05 | 2024-11-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 144 STREET, BRONX, FROM STREET WALTON AVENUE |
X012024310A12 | 2024-11-05 | 2024-11-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE |
X012024310A11 | 2024-11-05 | 2024-11-20 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | WALTON AVENUE, BRONX, FROM STREET EAST 140 STREET TO STREET EAST 144 STREET |
X012024310A10 | 2024-11-05 | 2024-11-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | GERARD AVENUE, BRONX, FROM STREET EXTERIOR STREET TO STREET EAST 144 STREET |
B012024309A94 | 2024-11-04 | 2024-11-20 | RESET, REPAIR OR REPLACE CURB | VERONICA PLACE, BROOKLYN, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE |
B042024309A13 | 2024-11-04 | 2024-11-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | SNYDER AVENUE, BROOKLYN, FROM STREET ROGERS AVENUE TO STREET VERONICA PLACE |
B012024309A95 | 2024-11-04 | 2024-11-20 | RESET, REPAIR OR REPLACE CURB | SNYDER AVENUE, BROOKLYN, FROM STREET ROGERS AVENUE TO STREET VERONICA PLACE |
B022024309B21 | 2024-11-04 | 2024-11-20 | TEMPORARY PEDESTRIAN WALK | SNYDER AVENUE, BROOKLYN, FROM STREET ROGERS AVENUE TO STREET VERONICA PLACE |
B042024309A12 | 2024-11-04 | 2024-11-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | VERONICA PLACE, BROOKLYN, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE |
B022024309B22 | 2024-11-04 | 2024-11-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | SNYDER AVENUE, BROOKLYN, FROM STREET ROGERS AVENUE TO STREET VERONICA PLACE |
X022024305A06 | 2024-10-31 | 2024-11-20 | TEMPORARY PEDESTRIAN WALK | VALENTINE AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET |
X042024305A02 | 2024-10-31 | 2024-11-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | GODWIN TERRACE, BRONX, FROM STREET KIMBERLY PLACE TO STREET WEST 231 STREET |
X042024305A01 | 2024-10-31 | 2024-11-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | VALENTINE AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET |
X042024305A00 | 2024-10-31 | 2024-11-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | RYER AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET |
X022024305A09 | 2024-10-31 | 2024-11-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | GODWIN TERRACE, BRONX, FROM STREET KIMBERLY PLACE TO STREET WEST 231 STREET |
X022024305A08 | 2024-10-31 | 2024-11-20 | TEMPORARY PEDESTRIAN WALK | GODWIN TERRACE, BRONX, FROM STREET KIMBERLY PLACE TO STREET WEST 231 STREET |
X022024305A07 | 2024-10-31 | 2024-11-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | VALENTINE AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET |
X022024305A05 | 2024-10-31 | 2024-11-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | RYER AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET |
X022024305A04 | 2024-10-31 | 2024-11-20 | TEMPORARY PEDESTRIAN WALK | RYER AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET |
X012024305A24 | 2024-10-31 | 2024-11-20 | RESET, REPAIR OR REPLACE CURB | GODWIN TERRACE, BRONX, FROM STREET KIMBERLY PLACE TO STREET WEST 231 STREET |
X012024305A23 | 2024-10-31 | 2024-11-20 | RESET, REPAIR OR REPLACE CURB | VALENTINE AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET |
X012024305A21 | 2024-10-31 | 2024-11-20 | RESET, REPAIR OR REPLACE CURB | RYER AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET |
X012024304A33 | 2024-10-30 | 2024-11-08 | RESET, REPAIR OR REPLACE CURB | GERARD AVENUE, BRONX, FROM STREET EXTERIOR STREET TO STREET EAST 144 STREET |
X042024304A11 | 2024-10-30 | 2024-11-08 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | GERARD AVENUE, BRONX, FROM STREET EXTERIOR STREET TO STREET EAST 144 STREET |
M042024303A03 | 2024-10-29 | 2024-11-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEST 207 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET 10 AVENUE |
M022024303A94 | 2024-10-29 | 2024-11-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | 9 AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 207 STREET |
M022024303A92 | 2024-10-29 | 2024-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 207 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET 10 AVENUE |
M022024303A91 | 2024-10-29 | 2024-11-14 | TEMPORARY PEDESTRIAN WALK | WEST 207 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET 10 AVENUE |
M012024303A86 | 2024-10-29 | 2024-11-08 | RESET, REPAIR OR REPLACE CURB | 9 AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 207 STREET |
M012024303A85 | 2024-10-29 | 2024-11-14 | RESET, REPAIR OR REPLACE CURB | WEST 207 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET 10 AVENUE |
B042024303A21 | 2024-10-29 | 2024-11-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CROPSEY AVENUE, BROOKLYN, FROM STREET BAY 31 STREET TO STREET BAY PARKWAY |
B022024303B62 | 2024-10-29 | 2024-11-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | CROPSEY AVENUE, BROOKLYN, FROM STREET BAY 31 STREET TO STREET BAY PARKWAY |
B022024303B61 | 2024-10-29 | 2024-11-20 | TEMPORARY PEDESTRIAN WALK | CROPSEY AVENUE, BROOKLYN, FROM STREET BAY 31 STREET TO STREET BAY PARKWAY |
B012024303B20 | 2024-10-29 | 2024-11-20 | RESET, REPAIR OR REPLACE CURB | CROPSEY AVENUE, BROOKLYN, FROM STREET BAY 31 STREET TO STREET BAY PARKWAY |
M022024303A93 | 2024-10-29 | 2024-11-08 | TEMPORARY PEDESTRIAN WALK | 9 AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 207 STREET |
M042024303A05 | 2024-10-29 | 2024-11-13 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 9 AVENUE, MANHATTAN, FROM STREET WEST 207 STREET |
M042024303A04 | 2024-10-29 | 2024-11-08 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 9 AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 207 STREET |
B022024302F76 | 2024-10-28 | 2024-11-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | FRANKLIN AVENUE, BROOKLYN, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET |
B042024302A32 | 2024-10-28 | 2024-11-09 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | CHURCH AVENUE, BROOKLYN, FROM STREET ROGERS AVENUE |
B042024302A31 | 2024-10-28 | 2024-11-09 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | CHURCH AVENUE, BROOKLYN, FROM STREET ROGERS AVENUE |
B042024302A30 | 2024-10-28 | 2024-11-09 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | CHURCH AVENUE, BROOKLYN, FROM STREET ROGERS AVENUE |
B042024302A01 | 2024-10-28 | 2024-11-07 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | FRANKLIN AVENUE, BROOKLYN, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET |
B022024302F75 | 2024-10-28 | 2024-11-07 | TEMPORARY PEDESTRIAN WALK | FRANKLIN AVENUE, BROOKLYN, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET |
B012024302A92 | 2024-10-28 | 2024-11-07 | RESET, REPAIR OR REPLACE CURB | FRANKLIN AVENUE, BROOKLYN, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET |
Q022024290C30 | 2024-10-16 | 2024-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | 90 AVENUE, QUEENS, FROM STREET 168 STREET TO STREET MERRICK BOULEVARD |
Q012024290C00 | 2024-10-16 | 2024-11-13 | RESET, REPAIR OR REPLACE CURB | 168 STREET, QUEENS, FROM STREET 91 AVENUE TO STREET JAMAICA AVENUE |
Q012024290B38 | 2024-10-16 | 2024-11-14 | RESET, REPAIR OR REPLACE CURB | 90 AVENUE, QUEENS, FROM STREET 168 STREET TO STREET MERRICK BOULEVARD |
Q042024290A15 | 2024-10-16 | 2024-11-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 90 AVENUE, QUEENS, FROM STREET 168 STREET TO STREET MERRICK BOULEVARD |
Q042024290A57 | 2024-10-16 | 2024-11-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 168 STREET, QUEENS, FROM STREET 91 AVENUE TO STREET JAMAICA AVENUE |
Q022024290D93 | 2024-10-16 | 2024-11-20 | TEMPORARY PEDESTRIAN WALK | 168 STREET, QUEENS, FROM STREET 91 AVENUE TO STREET JAMAICA AVENUE |
Q022024290C29 | 2024-10-16 | 2024-11-14 | TEMPORARY PEDESTRIAN WALK | 90 AVENUE, QUEENS, FROM STREET 168 STREET TO STREET MERRICK BOULEVARD |
Q022024290D94 | 2024-10-16 | 2024-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | 168 STREET, QUEENS, FROM STREET 91 AVENUE TO STREET JAMAICA AVENUE |
M042024289A17 | 2024-10-15 | 2024-11-01 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | GRAND STREET, MANHATTAN, FROM STREET LUDLOW STREET TO STREET ORCHARD STREET |
M012024289A99 | 2024-10-15 | 2024-11-01 | RESET, REPAIR OR REPLACE CURB | GRAND STREET, MANHATTAN, FROM STREET LUDLOW STREET TO STREET ORCHARD STREET |
M022024289B85 | 2024-10-15 | 2024-11-01 | TEMPORARY PEDESTRIAN WALK | GRAND STREET, MANHATTAN, FROM STREET LUDLOW STREET TO STREET ORCHARD STREET |
M022024289B86 | 2024-10-15 | 2024-11-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | GRAND STREET, MANHATTAN, FROM STREET LUDLOW STREET TO STREET ORCHARD STREET |
X012024288A11 | 2024-10-14 | 2024-11-08 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 194 STREET, BRONX, FROM STREET DECATUR AVENUE TO STREET MARION AVENUE |
M012024287A18 | 2024-10-13 | 2024-11-06 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 153 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET RIVERSIDE DRIVE |
M012024287A19 | 2024-10-13 | 2024-11-06 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 152 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET RIVERSIDE DRIVE |
B022024284A51 | 2024-10-10 | 2024-11-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | 62 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
X042024284A19 | 2024-10-10 | 2024-11-08 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST 144 STREET, BRONX, FROM STREET WALTON AVENUE |
X042024284A18 | 2024-10-10 | 2024-11-08 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST 144 STREET, BRONX, FROM STREET WALTON AVENUE |
X042024284A17 | 2024-10-10 | 2024-11-08 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE |
B042024284A19 | 2024-10-10 | 2024-11-05 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 14 AVENUE, BROOKLYN, FROM STREET 62 STREET |
B042024284A18 | 2024-10-10 | 2024-11-05 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 14 AVENUE, BROOKLYN, FROM STREET 62 STREET |
B042024284A17 | 2024-10-10 | 2024-11-05 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 14 AVENUE, BROOKLYN, FROM STREET 62 STREET |
B042024284A16 | 2024-10-10 | 2024-11-05 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 14 AVENUE, BROOKLYN, FROM STREET 62 STREET |
B042024284A15 | 2024-10-10 | 2024-11-08 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 14 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET 63 STREET |
B042024284A14 | 2024-10-10 | 2024-11-05 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 62 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
B022024284A50 | 2024-10-10 | 2024-11-05 | TEMPORARY PEDESTRIAN WALK | 62 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
B022024284A53 | 2024-10-10 | 2024-11-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | 14 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET 63 STREET |
B022024284A52 | 2024-10-10 | 2024-11-08 | TEMPORARY PEDESTRIAN WALK | 14 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET 63 STREET |
B012024284B53 | 2024-10-10 | 2024-11-08 | RESET, REPAIR OR REPLACE CURB | 14 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET 63 STREET |
B012024284B52 | 2024-10-10 | 2024-11-05 | RESET, REPAIR OR REPLACE CURB | 62 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
B012024283C32 | 2024-10-09 | 2024-10-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | CEDAR STREET, BROOKLYN, FROM STREET EVERGREEN AVENUE TO STREET MYRTLE AVENUE |
X022024283A75 | 2024-10-09 | 2024-10-16 | TEMPORARY PEDESTRIAN WALK | JEROME AVENUE, BRONX, FROM STREET MARCY PLACE TO STREET WEST 170 STREET |
X022024283A76 | 2024-10-09 | 2024-10-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | JEROME AVENUE, BRONX, FROM STREET MARCY PLACE TO STREET WEST 170 STREET |
X042024283A26 | 2024-10-09 | 2024-10-16 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | JEROME AVENUE, BRONX, FROM STREET MARCY PLACE TO STREET WEST 170 STREET |
X012024283B01 | 2024-10-09 | 2024-10-16 | RESET, REPAIR OR REPLACE CURB | JEROME AVENUE, BRONX, FROM STREET MARCY PLACE TO STREET WEST 170 STREET |
B042024283A94 | 2024-10-09 | 2024-10-29 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | ROGERS AVENUE, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET ERASMUS STREET |
B042024283A93 | 2024-10-09 | 2024-10-29 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CHURCH AVENUE, BROOKLYN, FROM STREET LLOYD STREET TO STREET ROGERS AVENUE |
Q022024282B19 | 2024-10-08 | 2024-11-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | 168 STREET, QUEENS, FROM STREET 90 AVENUE TO STREET 91 AVENUE |
Q012024282B54 | 2024-10-08 | 2024-11-06 | RESET, REPAIR OR REPLACE CURB | 168 STREET, QUEENS, FROM STREET 90 AVENUE TO STREET 91 AVENUE |
Q042024282A44 | 2024-10-08 | 2024-11-06 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 168 STREET, QUEENS, FROM STREET 90 AVENUE TO STREET 91 AVENUE |
Q022024282B18 | 2024-10-08 | 2024-11-06 | TEMPORARY PEDESTRIAN WALK | 168 STREET, QUEENS, FROM STREET 90 AVENUE TO STREET 91 AVENUE |
Q022024281A00 | 2024-10-07 | 2024-10-15 | TEMPORARY PEDESTRIAN WALK | 90 AVENUE, QUEENS, FROM STREET 168 STREET TO STREET MERRICK BOULEVARD |
Q012024281A07 | 2024-10-07 | 2024-10-15 | RESET, REPAIR OR REPLACE CURB | 90 AVENUE, QUEENS, FROM STREET 168 STREET TO STREET MERRICK BOULEVARD |
Q042024281A02 | 2024-10-07 | 2024-10-15 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 90 AVENUE, QUEENS, FROM STREET 168 STREET TO STREET MERRICK BOULEVARD |
Q022024281A01 | 2024-10-07 | 2024-10-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | 90 AVENUE, QUEENS, FROM STREET 168 STREET TO STREET MERRICK BOULEVARD |
B012024280A01 | 2024-10-06 | 2024-10-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | CHURCH AVENUE, BROOKLYN, FROM STREET LLOYD STREET TO STREET ROGERS AVENUE |
B012024280A03 | 2024-10-06 | 2024-10-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | CHURCH AVENUE, BROOKLYN, FROM STREET ROGERS AVENUE |
B012024280A02 | 2024-10-06 | 2024-10-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | ROGERS AVENUE, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET ERASMUS STREET |
X042024274A12 | 2024-09-30 | 2024-10-25 | REPLACE SIDEWALK | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
X022024274A83 | 2024-09-30 | 2024-10-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
X022024274A82 | 2024-09-30 | 2024-10-25 | TEMPORARY PEDESTRIAN WALK | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
X012024274A93 | 2024-09-30 | 2024-10-25 | RESET, REPAIR OR REPLACE CURB | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
B042024268A72 | 2024-09-24 | 2024-10-18 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | BELMONT AVENUE, BROOKLYN, FROM STREET ROCKAWAY AVENUE |
B012024266A02 | 2024-09-22 | 2024-10-22 | PAVE STREET-W/ ENGINEERING & INSP FEE | MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD |
B012024266A05 | 2024-09-22 | 2024-10-16 | PAVE STREET-W/ ENGINEERING & INSP FEE | YORK STREET, BROOKLYN, FROM STREET BRIDGE STREET TO STREET GOLD STREET |
B012024266A04 | 2024-09-22 | 2024-10-16 | PAVE STREET-W/ ENGINEERING & INSP FEE | FRONT STREET, BROOKLYN, FROM STREET BRIDGE STREET TO STREET GOLD STREET |
B012024266A03 | 2024-09-22 | 2024-10-22 | PAVE STREET-W/ ENGINEERING & INSP FEE | MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD |
B012024263C95 | 2024-09-19 | 2024-09-27 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
B012024263C31 | 2024-09-19 | 2024-10-15 | RESET, REPAIR OR REPLACE CURB-PROTECTED | PENNSYLVANIA AVENUE, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE |
B012024263C45 | 2024-09-19 | 2024-10-16 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | PENNSYLVANIA AVENUE, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE |
B042024263A19 | 2024-09-19 | 2024-10-15 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | PENNSYLVANIA AVENUE, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE |
B022024263B61 | 2024-09-19 | 2024-10-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | PENNSYLVANIA AVENUE, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE |
B022024263B60 | 2024-09-19 | 2024-10-15 | TEMPORARY PEDESTRIAN WALK | PENNSYLVANIA AVENUE, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE |
X022024262B03 | 2024-09-18 | 2024-10-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | WALTON AVENUE, BRONX, FROM STREET EAST 140 STREET TO STREET EAST 144 STREET |
X012024262B35 | 2024-09-18 | 2024-10-16 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WALTON AVENUE, BRONX, FROM STREET EAST 140 STREET TO STREET EAST 144 STREET |
X022024262B02 | 2024-09-18 | 2024-10-16 | TEMPORARY PEDESTRIAN WALK | WALTON AVENUE, BRONX, FROM STREET EAST 140 STREET TO STREET EAST 144 STREET |
X042024262A04 | 2024-09-18 | 2024-10-16 | REPLACE SIDEWALK | WALTON AVENUE, BRONX, FROM STREET EAST 140 STREET TO STREET EAST 144 STREET |
B012024261C59 | 2024-09-17 | 2024-10-11 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | RALPH AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B012024261C60 | 2024-09-17 | 2024-10-11 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | ATLANTIC AVENUE, BROOKLYN, FROM STREET RALPH AVENUE |
B012024261C58 | 2024-09-17 | 2024-10-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | ATLANTIC AVENUE, BROOKLYN, FROM STREET COLUMBUS PLACE TO STREET RALPH AVENUE |
B022024260C46 | 2024-09-16 | 2024-10-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | MARTENSE STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET MARTENSE COURT |
B042024260A45 | 2024-09-16 | 2024-10-09 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MARTENSE STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET MARTENSE COURT |
B022024260C45 | 2024-09-16 | 2024-10-09 | TEMPORARY PEDESTRIAN WALK | MARTENSE STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET MARTENSE COURT |
B012024260C95 | 2024-09-16 | 2024-10-09 | RESET, REPAIR OR REPLACE CURB-PROTECTED | MARTENSE STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET MARTENSE COURT |
B012024260C96 | 2024-09-16 | 2024-10-15 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | MARTENSE STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET MARTENSE COURT |
B022024255E21 | 2024-09-11 | 2024-10-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | ROGERS AVENUE, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET ERASMUS STREET |
B042024255A52 | 2024-09-11 | 2024-10-04 | REPLACE SIDEWALK | CHURCH AVENUE, BROOKLYN, FROM STREET LLOYD STREET TO STREET ROGERS AVENUE |
B042024255A53 | 2024-09-11 | 2024-10-04 | REPLACE SIDEWALK | ROGERS AVENUE, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET ERASMUS STREET |
B022024255E20 | 2024-09-11 | 2024-10-04 | TEMPORARY PEDESTRIAN WALK | ROGERS AVENUE, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET ERASMUS STREET |
B022024255E19 | 2024-09-11 | 2024-10-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | CHURCH AVENUE, BROOKLYN, FROM STREET LLOYD STREET TO STREET ROGERS AVENUE |
B022024255E18 | 2024-09-11 | 2024-10-04 | TEMPORARY PEDESTRIAN WALK | CHURCH AVENUE, BROOKLYN, FROM STREET LLOYD STREET TO STREET ROGERS AVENUE |
B012024255B32 | 2024-09-11 | 2024-10-04 | RESET, REPAIR OR REPLACE CURB | ROGERS AVENUE, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET ERASMUS STREET |
B012024255B31 | 2024-09-11 | 2024-10-04 | RESET, REPAIR OR REPLACE CURB | CHURCH AVENUE, BROOKLYN, FROM STREET LLOYD STREET TO STREET ROGERS AVENUE |
B042024254A26 | 2024-09-10 | 2024-09-26 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CROPSEY AVENUE, BROOKLYN, FROM STREET BAY 31 STREET TO STREET BAY PARKWAY |
X012024254B11 | 2024-09-10 | 2024-10-09 | RESET, REPAIR OR REPLACE CURB-PROTECTED | JESUP AVENUE, BRONX, FROM STREET EDWARD L GRANT HIGHWAY TO STREET JESUP PLACE |
B022024254D78 | 2024-09-10 | 2024-09-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | CROPSEY AVENUE, BROOKLYN, FROM STREET BAY 31 STREET TO STREET BAY PARKWAY |
X042024254A13 | 2024-09-10 | 2024-10-09 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | JESUP AVENUE, BRONX, FROM STREET EDWARD L GRANT HIGHWAY TO STREET JESUP PLACE |
X012024254A75 | 2024-09-10 | 2024-10-03 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | JESUP AVENUE, BRONX, FROM STREET EDWARD L GRANT HIGHWAY TO STREET JESUP PLACE |
B012024254B84 | 2024-09-10 | 2024-09-26 | RESET, REPAIR OR REPLACE CURB | CROPSEY AVENUE, BROOKLYN, FROM STREET BAY 31 STREET TO STREET BAY PARKWAY |
B022024254D77 | 2024-09-10 | 2024-09-26 | TEMPORARY PEDESTRIAN WALK | CROPSEY AVENUE, BROOKLYN, FROM STREET BAY 31 STREET TO STREET BAY PARKWAY |
B012024253C30 | 2024-09-09 | 2024-10-03 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | MARCY AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET |
X012024250A41 | 2024-09-06 | 2024-09-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 163 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE |
X012024250A43 | 2024-09-06 | 2024-09-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 163 STREET, BRONX, FROM STREET SHERIDAN AVENUE |
X012024250A42 | 2024-09-06 | 2024-09-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | SHERIDAN AVENUE, BRONX, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET |
Q042024249A11 | 2024-09-05 | 2024-10-01 | REPLACE SIDEWALK | JAMAICA AVENUE, QUEENS, FROM STREET 89 STREET TO STREET 90 STREET |
Q012024249A87 | 2024-09-05 | 2024-10-01 | RESET, REPAIR OR REPLACE CURB-PROTECTED | JAMAICA AVENUE, QUEENS, FROM STREET 89 STREET TO STREET 90 STREET |
B042024247A27 | 2024-09-03 | 2024-09-17 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | METROPOLITAN AVENUE, BROOKLYN, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE |
X012024247B72 | 2024-09-03 | 2024-09-27 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 179 STREET, BRONX, FROM STREET DALY AVENUE TO STREET HONEYWELL AVENUE |
X012024247B71 | 2024-09-03 | 2024-09-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | HONEYWELL AVENUE, BRONX, FROM STREET EAST 178 STREET TO STREET EAST 179 STREET |
B012024247B65 | 2024-09-03 | 2024-09-17 | RESET, REPAIR OR REPLACE CURB-PROTECTED | METROPOLITAN AVENUE, BROOKLYN, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE |
B022024247D50 | 2024-09-03 | 2024-09-17 | TEMPORARY PEDESTRIAN WALK | METROPOLITAN AVENUE, BROOKLYN, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE |
B022024247D51 | 2024-09-03 | 2024-09-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | METROPOLITAN AVENUE, BROOKLYN, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE |
X012024247B73 | 2024-09-03 | 2024-09-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 179 STREET, BRONX, FROM STREET HONEYWELL AVENUE |
B012024241C26 | 2024-08-28 | 2024-09-13 | RESET, REPAIR OR REPLACE CURB | PENN STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE |
B022024241F18 | 2024-08-28 | 2024-09-13 | TEMPORARY PEDESTRIAN WALK | PENN STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE |
B022024241F19 | 2024-08-28 | 2024-09-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | PENN STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE |
B042024241A13 | 2024-08-28 | 2024-09-13 | REPLACE SIDEWALK | PENN STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE |
X042024241A09 | 2024-08-28 | 2024-09-17 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEST FARMS ROAD, BRONX, FROM STREET CROSS BRONX EXPWY NB ET 4 A TO STREET EAST 174 STREET |
X012024241B19 | 2024-08-28 | 2024-09-17 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST FARMS ROAD, BRONX, FROM STREET CROSS BRONX EXPWY NB ET 4 A TO STREET EAST 174 STREET |
X012024241B18 | 2024-08-28 | 2024-09-17 | RESET, REPAIR OR REPLACE CURB | WEST FARMS ROAD, BRONX, FROM STREET CROSS BRONX EXPWY NB ET 4 A TO STREET EAST 174 STREET |
Q042024241A08 | 2024-08-28 | 2024-09-26 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 44 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 35 AVENUE |
Q012024241C02 | 2024-08-28 | 2024-09-26 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 44 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 35 AVENUE |
Q042024239A38 | 2024-08-26 | 2024-09-20 | REPLACE SIDEWALK | 30 STREET, QUEENS, FROM STREET 31 AVENUE TO STREET BROADWAY |
B042024239A41 | 2024-08-26 | 2024-09-24 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD |
B042024239A42 | 2024-08-26 | 2024-09-19 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD |
Q012024239C08 | 2024-08-26 | 2024-09-20 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 30 STREET, QUEENS, FROM STREET 31 AVENUE TO STREET BROADWAY |
Q022024239A53 | 2024-08-26 | 2024-09-20 | TEMPORARY PEDESTRIAN WALK | 30 STREET, QUEENS, FROM STREET 31 AVENUE TO STREET BROADWAY |
Q022024239A54 | 2024-08-26 | 2024-09-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | 30 STREET, QUEENS, FROM STREET 31 AVENUE TO STREET BROADWAY |
B012024234B91 | 2024-08-21 | 2024-09-05 | PAVE STREET-W/ ENGINEERING & INSP FEE | BROADWAY, BROOKLYN, FROM STREET MIDDLETON STREET TO STREET THROOP AVENUE |
B012024234B90 | 2024-08-21 | 2024-09-05 | PAVE STREET-W/ ENGINEERING & INSP FEE | BOERUM STREET, BROOKLYN, FROM STREET BROADWAY TO STREET LORIMER STREET |
B012024234B92 | 2024-08-21 | 2024-09-05 | PAVE STREET-W/ ENGINEERING & INSP FEE | BROADWAY, BROOKLYN, FROM STREET MC KIBBIN STREET TO STREET THROOP AVENUE |
B042024234A08 | 2024-08-21 | 2024-09-04 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | BROADWAY, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD |
B012024234B93 | 2024-08-21 | 2024-08-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | BROADWAY, BROOKLYN, FROM STREET MC KIBBIN STREET |
Q012024233B16 | 2024-08-20 | 2024-08-28 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 31 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q012024232B76 | 2024-08-19 | 2024-09-03 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 44 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 35 AVENUE |
X022024232A49 | 2024-08-19 | 2024-09-04 | TEMPORARY PEDESTRIAN WALK | BARKER AVENUE, BRONX, FROM STREET THWAITES PLACE TO STREET WARING AVENUE |
X042024232A09 | 2024-08-19 | 2024-09-04 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BARKER AVENUE, BRONX, FROM STREET THWAITES PLACE TO STREET WARING AVENUE |
X022024232A50 | 2024-08-19 | 2024-09-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | BARKER AVENUE, BRONX, FROM STREET THWAITES PLACE TO STREET WARING AVENUE |
X012024232A64 | 2024-08-19 | 2024-09-04 | RESET, REPAIR OR REPLACE CURB | BARKER AVENUE, BRONX, FROM STREET THWAITES PLACE TO STREET WARING AVENUE |
X012024232A65 | 2024-08-19 | 2024-09-06 | PAVE STREET-W/ ENGINEERING & INSP FEE | BARKER AVENUE, BRONX, FROM STREET THWAITES PLACE TO STREET WARING AVENUE |
Q012024231A07 | 2024-08-18 | 2024-09-10 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | FOAM PLACE, QUEENS, FROM STREET SMITH PLACE |
Q012024231A05 | 2024-08-18 | 2024-09-10 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | FOAM PLACE, QUEENS, FROM STREET BEACH 18 STREET TO STREET SMITH PLACE |
Q012024231A06 | 2024-08-18 | 2024-09-10 | PAVE STREET-W/ ENGINEERING & INSP FEE | SMITH PLACE, QUEENS, FROM STREET FOAM PLACE TO STREET MOTT AVENUE |
B042024228A23 | 2024-08-15 | 2024-09-05 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | JEROME AVENUE, BROOKLYN, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET |
B012024228C21 | 2024-08-15 | 2024-09-12 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | PACIFIC STREET, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE |
B012024228C20 | 2024-08-15 | 2024-09-12 | PAVE STREET-W/ ENGINEERING & INSP FEE | GRAND AVENUE, BROOKLYN, FROM STREET DEAN STREET TO STREET PACIFIC STREET |
B012024228C19 | 2024-08-15 | 2024-09-05 | RESET, REPAIR OR REPLACE CURB | JEROME AVENUE, BROOKLYN, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET |
B012024228C22 | 2024-08-15 | 2024-09-12 | PAVE STREET-W/ ENGINEERING & INSP FEE | GRAND AVENUE, BROOKLYN, FROM STREET PACIFIC STREET |
B022024228C18 | 2024-08-15 | 2024-09-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | JEROME AVENUE, BROOKLYN, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET |
B022024228C17 | 2024-08-15 | 2024-09-05 | TEMPORARY PEDESTRIAN WALK | JEROME AVENUE, BROOKLYN, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET |
Q042024225A09 | 2024-08-12 | 2024-08-29 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 44 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 35 AVENUE |
Q012024225A96 | 2024-08-12 | 2024-08-20 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 44 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 35 AVENUE |
B012024221A53 | 2024-08-08 | 2024-09-06 | RESET, REPAIR OR REPLACE CURB-PROTECTED | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
B042024221A03 | 2024-08-08 | 2024-09-06 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
Q012024219B34 | 2024-08-06 | 2024-08-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | 39 AVENUE, QUEENS, FROM STREET 32 STREET TO STREET HONEYWELL STREET |
Q012024219B35 | 2024-08-06 | 2024-08-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | 32 STREET, QUEENS, FROM STREET 39 AVENUE |
Q012024219B38 | 2024-08-06 | 2024-08-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | 32 STREET, QUEENS, FROM STREET 39 AVENUE |
Q012024219B37 | 2024-08-06 | 2024-08-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | 39 AVENUE, QUEENS, FROM STREET 31 STREET TO STREET 32 STREET |
Q012024219B36 | 2024-08-06 | 2024-08-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | 32 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q012024219B33 | 2024-08-06 | 2024-08-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | 32 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
B012024218B97 | 2024-08-05 | 2024-08-29 | RESET, REPAIR OR REPLACE CURB | MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD |
B042024218A67 | 2024-08-05 | 2024-08-29 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD |
B042024218A62 | 2024-08-05 | 2024-08-29 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | ECKFORD STREET, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ENGERT AVENUE |
B022024218B41 | 2024-08-05 | 2024-08-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD |
B022024218B40 | 2024-08-05 | 2024-08-29 | TEMPORARY PEDESTRIAN WALK | MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD |
B022024218A31 | 2024-08-05 | 2024-08-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | ECKFORD STREET, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ENGERT AVENUE |
B022024218A30 | 2024-08-05 | 2024-08-29 | TEMPORARY PEDESTRIAN WALK | ECKFORD STREET, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ENGERT AVENUE |
B012024218C09 | 2024-08-05 | 2024-08-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | SKILLMAN STREET, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE |
B012024218B05 | 2024-08-05 | 2024-08-29 | RESET, REPAIR OR REPLACE CURB | ECKFORD STREET, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ENGERT AVENUE |
B042024214A57 | 2024-08-01 | 2024-08-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MARCY AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET |
B042024214A58 | 2024-08-01 | 2024-08-29 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE |
B012024214D16 | 2024-08-01 | 2024-08-14 | RESET, REPAIR OR REPLACE CURB-PROTECTED | MARCY AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET |
B022024214D53 | 2024-08-01 | 2024-08-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | MARCY AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET |
B012024214D39 | 2024-08-01 | 2024-08-29 | RESET, REPAIR OR REPLACE CURB | QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE |
B022024214D80 | 2024-08-01 | 2024-08-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE |
B022024214D79 | 2024-08-01 | 2024-08-29 | TEMPORARY PEDESTRIAN WALK | QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE |
B022024214D52 | 2024-08-01 | 2024-08-14 | TEMPORARY PEDESTRIAN WALK | MARCY AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET |
B022024213A72 | 2024-07-31 | 2024-08-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | SKILLMAN STREET, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE |
B022024213C50 | 2024-07-31 | 2024-08-27 | TEMPORARY PEDESTRIAN WALK | PACIFIC STREET, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE |
B022024213C51 | 2024-07-31 | 2024-08-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | PACIFIC STREET, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE |
B042024213A03 | 2024-07-31 | 2024-08-27 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CEDAR STREET, BROOKLYN, FROM STREET EVERGREEN AVENUE TO STREET MYRTLE AVENUE |
B042024213A11 | 2024-07-31 | 2024-08-22 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | SKILLMAN STREET, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE |
B042024213A27 | 2024-07-31 | 2024-08-27 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | PACIFIC STREET, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE |
B042024213A28 | 2024-07-31 | 2024-08-27 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | GRAND AVENUE, BROOKLYN, FROM STREET PACIFIC STREET |
B042024213A29 | 2024-07-31 | 2024-08-27 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | GRAND AVENUE, BROOKLYN, FROM STREET PACIFIC STREET |
B022024213A06 | 2024-07-31 | 2024-08-27 | TEMPORARY PEDESTRIAN WALK | CEDAR STREET, BROOKLYN, FROM STREET EVERGREEN AVENUE TO STREET MYRTLE AVENUE |
B022024213A07 | 2024-07-31 | 2024-08-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | CEDAR STREET, BROOKLYN, FROM STREET EVERGREEN AVENUE TO STREET MYRTLE AVENUE |
B022024213A71 | 2024-07-31 | 2024-08-22 | TEMPORARY PEDESTRIAN WALK | SKILLMAN STREET, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE |
B012024213C48 | 2024-07-31 | 2024-08-21 | PAVE STREET-W/ ENGINEERING & INSP FEE | BERGEN STREET, BROOKLYN, FROM STREET FRANKLIN AVENUE |
B012024213C47 | 2024-07-31 | 2024-08-21 | PAVE STREET-W/ ENGINEERING & INSP FEE | FRANKLIN AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE |
B012024213C46 | 2024-07-31 | 2024-08-21 | PAVE STREET-W/ ENGINEERING & INSP FEE | BERGEN STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
B012024213C45 | 2024-07-31 | 2024-08-27 | RESET, REPAIR OR REPLACE CURB-PROTECTED | PACIFIC STREET, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE |
B012024213B38 | 2024-07-31 | 2024-08-22 | RESET, REPAIR OR REPLACE CURB | SKILLMAN STREET, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE |
B012024213A95 | 2024-07-31 | 2024-08-27 | RESET, REPAIR OR REPLACE CURB | CEDAR STREET, BROOKLYN, FROM STREET EVERGREEN AVENUE TO STREET MYRTLE AVENUE |
M012024212B16 | 2024-07-30 | 2024-08-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 116 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR |
Q022024212A22 | 2024-07-30 | 2024-08-27 | TEMPORARY PEDESTRIAN WALK | 31 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q022024212A23 | 2024-07-30 | 2024-08-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | 31 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q012024212A55 | 2024-07-30 | 2024-08-27 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 31 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
B012024212C30 | 2024-07-30 | 2024-08-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | ST JOHN'S PLACE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY |
Q042024212A11 | 2024-07-30 | 2024-08-27 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 31 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
M012024212B18 | 2024-07-30 | 2024-08-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 116 STREET, MANHATTAN, FROM STREET PARK AVENUE |
M012024212B17 | 2024-07-30 | 2024-08-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | PARK AVENUE, MANHATTAN, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET |
Q042024207A73 | 2024-07-25 | 2024-08-23 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | FOAM PLACE, QUEENS, FROM STREET BEACH 18 STREET TO STREET SMITH PLACE |
Q012024207D05 | 2024-07-25 | 2024-08-23 | RESET, REPAIR OR REPLACE CURB-PROTECTED | FOAM PLACE, QUEENS, FROM STREET BEACH 18 STREET TO STREET SMITH PLACE |
Q042024206A59 | 2024-07-24 | 2024-08-20 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | FOAM PLACE, QUEENS, FROM STREET SMITH PLACE |
Q042024206A57 | 2024-07-24 | 2024-08-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | SMITH PLACE, QUEENS, FROM STREET FOAM PLACE TO STREET MOTT AVENUE |
Q042024206A58 | 2024-07-24 | 2024-08-20 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | FOAM PLACE, QUEENS, FROM STREET SMITH PLACE |
Q012024206B38 | 2024-07-24 | 2024-08-08 | RESET, REPAIR OR REPLACE CURB | 4 STREET, QUEENS, FROM STREET 26 AVENUE TO STREET 27 AVENUE |
Q022024206C29 | 2024-07-24 | 2024-08-08 | TEMPORARY PEDESTRIAN WALK | 4 STREET, QUEENS, FROM STREET 26 AVENUE TO STREET 27 AVENUE |
Q042024206A82 | 2024-07-24 | 2024-08-08 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 4 STREET, QUEENS, FROM STREET 26 AVENUE TO STREET 27 AVENUE |
Q022024206C30 | 2024-07-24 | 2024-08-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | 4 STREET, QUEENS, FROM STREET 26 AVENUE TO STREET 27 AVENUE |
Q012024206B05 | 2024-07-24 | 2024-08-20 | RESET, REPAIR OR REPLACE CURB | SMITH PLACE, QUEENS, FROM STREET FOAM PLACE TO STREET MOTT AVENUE |
B022024200B38 | 2024-07-18 | 2024-07-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | ST JOHN'S PLACE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY |
B012024200D07 | 2024-07-18 | 2024-08-13 | RESET, REPAIR OR REPLACE CURB | CARROLL STREET, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET PEDESTRIAN OVERPASS |
B042024200B34 | 2024-07-18 | 2024-08-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CARROLL STREET, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET PEDESTRIAN OVERPASS |
B012024200D08 | 2024-07-18 | 2024-07-18 | RESET, REPAIR OR REPLACE CURB | ST JOHN'S PLACE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY |
B042024200B35 | 2024-07-18 | 2024-07-18 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | ST JOHN'S PLACE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY |
B022024200B37 | 2024-07-18 | 2024-07-18 | TEMPORARY PEDESTRIAN WALK | ST JOHN'S PLACE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY |
B022024198C46 | 2024-07-16 | 2024-08-13 | TEMPORARY PEDESTRIAN WALK | GRAND AVENUE, BROOKLYN, FROM STREET DEAN STREET TO STREET PACIFIC STREET |
B012024198B63 | 2024-07-16 | 2024-08-13 | RESET, REPAIR OR REPLACE CURB | GRAND AVENUE, BROOKLYN, FROM STREET DEAN STREET TO STREET PACIFIC STREET |
B042024198A36 | 2024-07-16 | 2024-08-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | GRAND AVENUE, BROOKLYN, FROM STREET DEAN STREET TO STREET PACIFIC STREET |
B042024198A06 | 2024-07-16 | 2024-07-20 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | GRAND AVENUE, BROOKLYN, FROM STREET PACIFIC STREET |
B022024198C47 | 2024-07-16 | 2024-08-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | GRAND AVENUE, BROOKLYN, FROM STREET DEAN STREET TO STREET PACIFIC STREET |
B042024197A35 | 2024-07-15 | 2024-07-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BERGEN STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
B042024197A36 | 2024-07-15 | 2024-07-26 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | FRANKLIN AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE |
B042024197A40 | 2024-07-15 | 2024-07-24 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | BERGEN STREET, BROOKLYN, FROM STREET FRANKLIN AVENUE |
B042024197A41 | 2024-07-15 | 2024-07-24 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | BERGEN STREET, BROOKLYN, FROM STREET FRANKLIN AVENUE |
B042024197A42 | 2024-07-15 | 2024-07-24 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | BERGEN STREET, BROOKLYN, FROM STREET FRANKLIN AVENUE |
B012024197C26 | 2024-07-15 | 2024-07-26 | RESET, REPAIR OR REPLACE CURB | FRANKLIN AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE |
B012024197C25 | 2024-07-15 | 2024-07-20 | RESET, REPAIR OR REPLACE CURB | BERGEN STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
B022024197C87 | 2024-07-15 | 2024-07-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | FRANKLIN AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE |
B022024197C86 | 2024-07-15 | 2024-07-26 | TEMPORARY PEDESTRIAN WALK | FRANKLIN AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE |
B022024197C85 | 2024-07-15 | 2024-07-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | BERGEN STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
B022024197C84 | 2024-07-15 | 2024-07-20 | TEMPORARY PEDESTRIAN WALK | BERGEN STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
B012024193B71 | 2024-07-11 | 2024-07-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | MOTHER GASTON BOULEVARD, BROOKLYN, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE |
B012024193B72 | 2024-07-11 | 2024-07-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | BELMONT AVENUE, BROOKLYN, FROM STREET MOTHER GASTON BOULEVARD TO STREET WATKINS STREET |
B012024193B73 | 2024-07-11 | 2024-07-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | BELMONT AVENUE, BROOKLYN, FROM STREET MOTHER GASTON BOULEVARD |
M012024190B67 | 2024-07-08 | 2024-08-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 125 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BEND |
M012024190B76 | 2024-07-08 | 2024-07-30 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 116 STREET, MANHATTAN, FROM STREET PARK AVENUE |
M012024190B74 | 2024-07-08 | 2024-07-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 116 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR |
M012024190B75 | 2024-07-08 | 2024-07-23 | PAVE STREET-W/ ENGINEERING & INSP FEE | PARK AVENUE, MANHATTAN, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET |
Q042024187A03 | 2024-07-05 | 2024-07-31 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 148 STREET, QUEENS, FROM STREET 94 AVENUE TO STREET 95 AVENUE |
Q042024187A02 | 2024-07-05 | 2024-07-31 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 95 AVENUE, QUEENS, FROM STREET 148 STREET |
Q042024187A01 | 2024-07-05 | 2024-07-31 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 95 AVENUE, QUEENS, FROM STREET 148 STREET |
Q022024187A34 | 2024-07-05 | 2024-07-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | 148 STREET, QUEENS, FROM STREET 94 AVENUE TO STREET 95 AVENUE |
Q022024187A33 | 2024-07-05 | 2024-07-31 | TEMPORARY PEDESTRIAN WALK | 148 STREET, QUEENS, FROM STREET 94 AVENUE TO STREET 95 AVENUE |
B012024185A53 | 2024-07-03 | 2024-07-30 | PAVE STREET-W/ ENGINEERING & INSP FEE | CONEY ISLAND AVENUE, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET FRIEL PLACE |
B012024185A52 | 2024-07-03 | 2024-07-30 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 10 STREET, BROOKLYN, FROM STREET CATON AVENUE TO STREET CHURCH AVENUE |
Q012024185A48 | 2024-07-03 | 2024-07-17 | RESET, REPAIR OR REPLACE CURB | 148 STREET, QUEENS, FROM STREET 94 AVENUE TO STREET 95 AVENUE |
B012024184E83 | 2024-07-02 | 2024-07-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | BROADWAY, BROOKLYN, FROM STREET MC KIBBIN STREET TO STREET THROOP AVENUE |
B012024184E82 | 2024-07-02 | 2024-07-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | LORIMER STREET, BROOKLYN, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET |
B042024184A01 | 2024-07-02 | 2024-07-18 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | BOERUM STREET, BROOKLYN, FROM STREET LORIMER STREET |
Q042024183A50 | 2024-07-01 | 2024-07-20 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 32 STREET, QUEENS, FROM STREET 39 AVENUE |
X042024183A13 | 2024-07-01 | 2024-07-30 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST 179 STREET, BRONX, FROM STREET HONEYWELL AVENUE |
X042024183A14 | 2024-07-01 | 2024-07-30 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST 179 STREET, BRONX, FROM STREET HONEYWELL AVENUE |
X042024183A15 | 2024-07-01 | 2024-07-30 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST 179 STREET, BRONX, FROM STREET HONEYWELL AVENUE |
Q042024183A49 | 2024-07-01 | 2024-07-20 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 32 STREET, QUEENS, FROM STREET 39 AVENUE |
B022024178D69 | 2024-06-26 | 2024-07-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | FRONT STREET, BROOKLYN, FROM STREET BRIDGE STREET TO STREET GOLD STREET |
B012024178B79 | 2024-06-26 | 2024-07-17 | RESET, REPAIR OR REPLACE CURB | FRONT STREET, BROOKLYN, FROM STREET BRIDGE STREET TO STREET GOLD STREET |
B042024178A65 | 2024-06-26 | 2024-07-17 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | FRONT STREET, BROOKLYN, FROM STREET BRIDGE STREET TO STREET GOLD STREET |
B022024178D68 | 2024-06-26 | 2024-07-17 | TEMPORARY PEDESTRIAN WALK | FRONT STREET, BROOKLYN, FROM STREET BRIDGE STREET TO STREET GOLD STREET |
B022024177C22 | 2024-06-25 | 2024-07-20 | TEMPORARY PEDESTRIAN WALK | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE |
B022024177C23 | 2024-06-25 | 2024-07-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE |
B012024177B91 | 2024-06-25 | 2024-07-20 | RESET, REPAIR OR REPLACE CURB | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE |
B042024177A66 | 2024-06-25 | 2024-07-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE |
B012024176C49 | 2024-06-24 | 2024-07-20 | RESET, REPAIR OR REPLACE CURB-PROTECTED | MARCY AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B042024176A55 | 2024-06-24 | 2024-07-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | VERNON AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B042024176A48 | 2024-06-24 | 2024-07-06 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | FULTON STREET, BROOKLYN, FROM STREET NEW JERSEY AVENUE |
B042024176A54 | 2024-06-24 | 2024-07-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MARCY AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022024176C65 | 2024-06-24 | 2024-07-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | VERNON AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B012024176C50 | 2024-06-24 | 2024-07-20 | RESET, REPAIR OR REPLACE CURB | VERNON AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B022024176C63 | 2024-06-24 | 2024-07-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | MARCY AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022024176C62 | 2024-06-24 | 2024-07-20 | TEMPORARY PEDESTRIAN WALK | MARCY AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022024176C64 | 2024-06-24 | 2024-07-20 | TEMPORARY PEDESTRIAN WALK | VERNON AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B042024176A46 | 2024-06-24 | 2024-07-06 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | FULTON STREET, BROOKLYN, FROM STREET NEW JERSEY AVENUE |
B042024176A47 | 2024-06-24 | 2024-07-06 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | FULTON STREET, BROOKLYN, FROM STREET NEW JERSEY AVENUE |
B042024176A53 | 2024-06-24 | 2024-07-16 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | MARCY AVENUE, BROOKLYN, FROM STREET VERNON AVENUE |
B012024175A05 | 2024-06-23 | 2024-07-12 | PAVE STREET-W/ ENGINEERING & INSP FEE | BUSHWICK AVENUE, BROOKLYN, FROM STREET METROPOLITAN AVENUE |
B012024175A03 | 2024-06-23 | 2024-07-12 | PAVE STREET-W/ ENGINEERING & INSP FEE | BUSHWICK AVENUE, BROOKLYN, FROM STREET DEVOE STREET TO STREET METROPOLITAN AVENUE |
B012024175A04 | 2024-06-23 | 2024-07-12 | PAVE STREET-W/ ENGINEERING & INSP FEE | METROPOLITAN AVENUE, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET |
B042024173A09 | 2024-06-21 | 2024-07-18 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 39 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY |
B012024173D94 | 2024-06-21 | 2024-07-18 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 39 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY |
B022024173B15 | 2024-06-21 | 2024-07-19 | TEMPORARY PEDESTRIAN WALK | CEDAR STREET, BROOKLYN, FROM STREET EVERGREEN AVENUE TO STREET MYRTLE AVENUE |
B022024173B16 | 2024-06-21 | 2024-07-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | CEDAR STREET, BROOKLYN, FROM STREET EVERGREEN AVENUE TO STREET MYRTLE AVENUE |
B012024173D93 | 2024-06-21 | 2024-07-19 | RESET, REPAIR OR REPLACE CURB | CEDAR STREET, BROOKLYN, FROM STREET EVERGREEN AVENUE TO STREET MYRTLE AVENUE |
B042024173A08 | 2024-06-21 | 2024-07-19 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CEDAR STREET, BROOKLYN, FROM STREET EVERGREEN AVENUE TO STREET MYRTLE AVENUE |
B022024172B82 | 2024-06-20 | 2024-07-04 | TEMPORARY PEDESTRIAN WALK | GREENE AVENUE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE |
B012024172D08 | 2024-06-20 | 2024-07-04 | RESET, REPAIR OR REPLACE CURB-PROTECTED | GREENE AVENUE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE |
B022024172B83 | 2024-06-20 | 2024-07-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | GREENE AVENUE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE |
B042024172B25 | 2024-06-20 | 2024-07-04 | REPLACE SIDEWALK | GREENE AVENUE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE |
B042024171C23 | 2024-06-19 | 2024-07-03 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | COVERT STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE |
B012024171B50 | 2024-06-19 | 2024-07-03 | RESET, REPAIR OR REPLACE CURB | COVERT STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE |
B012024171B51 | 2024-06-19 | 2024-07-05 | RESET, REPAIR OR REPLACE CURB | COVERT STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE |
B042024171C24 | 2024-06-19 | 2024-07-05 | REPLACE SIDEWALK | COVERT STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE |
B022024171A77 | 2024-06-19 | 2024-07-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | COVERT STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE |
B022024171A76 | 2024-06-19 | 2024-07-03 | TEMPORARY PEDESTRIAN WALK | COVERT STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE |
B042024169A03 | 2024-06-17 | 2024-07-09 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | RALPH AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B042024169A17 | 2024-06-17 | 2024-07-16 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | BUSHWICK AVENUE, BROOKLYN, FROM STREET METROPOLITAN AVENUE |
B042024169A02 | 2024-06-17 | 2024-07-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | ATLANTIC AVENUE, BROOKLYN, FROM STREET COLUMBUS PLACE TO STREET RALPH AVENUE |
B012024169A72 | 2024-06-17 | 2024-07-09 | RESET, REPAIR OR REPLACE CURB-PROTECTED | RALPH AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B012024169A71 | 2024-06-17 | 2024-07-11 | RESET, REPAIR OR REPLACE CURB | ATLANTIC AVENUE, BROOKLYN, FROM STREET COLUMBUS PLACE TO STREET RALPH AVENUE |
B042024169A16 | 2024-06-17 | 2024-07-16 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | BUSHWICK AVENUE, BROOKLYN, FROM STREET METROPOLITAN AVENUE |
Q042024166A07 | 2024-06-14 | 2024-07-03 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 95 AVENUE, QUEENS, FROM STREET 148 STREET |
Q042024166A06 | 2024-06-14 | 2024-07-03 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 95 AVENUE, QUEENS, FROM STREET 148 STREET |
Q042024166A05 | 2024-06-14 | 2024-07-03 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 95 AVENUE, QUEENS, FROM STREET 147 PLACE TO STREET 148 STREET |
Q022024166A26 | 2024-06-14 | 2024-07-03 | TEMPORARY PEDESTRIAN WALK | 148 STREET, QUEENS, FROM STREET 94 AVENUE TO STREET 95 AVENUE |
Q022024166A25 | 2024-06-14 | 2024-07-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | 95 AVENUE, QUEENS, FROM STREET 147 PLACE TO STREET 148 STREET |
Q012024166B18 | 2024-06-14 | 2024-07-03 | RESET, REPAIR OR REPLACE CURB | 148 STREET, QUEENS, FROM STREET 94 AVENUE TO STREET 95 AVENUE |
Q012024166B17 | 2024-06-14 | 2024-07-03 | RESET, REPAIR OR REPLACE CURB | 95 AVENUE, QUEENS, FROM STREET 147 PLACE TO STREET 148 STREET |
X042024166A00 | 2024-06-14 | 2024-07-04 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 203 STREET, BRONX, FROM STREET BRIGGS AVENUE TO STREET VALENTINE AVENUE |
X022024166A11 | 2024-06-14 | 2024-07-04 | TEMPORARY PEDESTRIAN WALK | EAST 203 STREET, BRONX, FROM STREET BRIGGS AVENUE TO STREET VALENTINE AVENUE |
X012024166A00 | 2024-06-14 | 2024-07-04 | RESET, REPAIR OR REPLACE CURB-PROTECTED | EAST 203 STREET, BRONX, FROM STREET BRIGGS AVENUE TO STREET VALENTINE AVENUE |
Q042024166A09 | 2024-06-14 | 2024-07-03 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 148 STREET, QUEENS, FROM STREET 94 AVENUE TO STREET 95 AVENUE |
X022024166A12 | 2024-06-14 | 2024-07-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 203 STREET, BRONX, FROM STREET BRIGGS AVENUE TO STREET VALENTINE AVENUE |
Q042024166A08 | 2024-06-14 | 2024-07-03 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 95 AVENUE, QUEENS, FROM STREET 148 STREET |
Q022024166A27 | 2024-06-14 | 2024-07-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | 148 STREET, QUEENS, FROM STREET 94 AVENUE TO STREET 95 AVENUE |
Q022024166A24 | 2024-06-14 | 2024-07-03 | TEMPORARY PEDESTRIAN WALK | 95 AVENUE, QUEENS, FROM STREET 147 PLACE TO STREET 148 STREET |
X012024162B25 | 2024-06-10 | 2024-06-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | BERGEN AVENUE, BRONX, FROM STREET EAST 149 STREET TO STREET WESTCHESTER AVENUE |
X022024162A16 | 2024-06-10 | 2024-06-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | BOLTON AVENUE, BRONX, FROM STREET LACOMBE AVENUE TO STREET PATTERSON AVENUE |
X022024162A15 | 2024-06-10 | 2024-06-28 | TEMPORARY PEDESTRIAN WALK | BOLTON AVENUE, BRONX, FROM STREET LACOMBE AVENUE TO STREET PATTERSON AVENUE |
X012024162B26 | 2024-06-10 | 2024-06-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | WESTCHESTER AVENUE, BRONX, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE |
X012024162B27 | 2024-06-10 | 2024-06-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | WESTCHESTER AVENUE, BRONX, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE |
X012024162B28 | 2024-06-10 | 2024-06-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | BERGEN AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE |
X012024162B29 | 2024-06-10 | 2024-06-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | BROOK AVENUE, BRONX, FROM STREET EAST 152 STREET TO STREET NYCTA SUBWAY |
X012024162B30 | 2024-06-10 | 2024-06-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | BERGEN AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE |
X012024162B31 | 2024-06-10 | 2024-06-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | BROOK AVENUE, BRONX, FROM STREET NYCTA SUBWAY |
X012024162A30 | 2024-06-10 | 2024-06-28 | RESET, REPAIR OR REPLACE CURB | BOLTON AVENUE, BRONX, FROM STREET LACOMBE AVENUE TO STREET PATTERSON AVENUE |
X022024162A17 | 2024-06-10 | 2024-06-28 | TEMPORARY PEDESTRIAN WALK | SOUNDVIEW AVENUE, BRONX, FROM STREET MURRAY COURT TO STREET PATTERSON AVENUE |
X012024162A31 | 2024-06-10 | 2024-06-28 | RESET, REPAIR OR REPLACE CURB | SOUNDVIEW AVENUE, BRONX, FROM STREET MURRAY COURT TO STREET PATTERSON AVENUE |
X042024162A04 | 2024-06-10 | 2024-06-28 | REPLACE SIDEWALK | SOUNDVIEW AVENUE, BRONX, FROM STREET MURRAY COURT TO STREET PATTERSON AVENUE |
X042024162A03 | 2024-06-10 | 2024-06-28 | REPLACE SIDEWALK | BOLTON AVENUE, BRONX, FROM STREET LACOMBE AVENUE TO STREET PATTERSON AVENUE |
B012024162B51 | 2024-06-10 | 2024-07-04 | PAVE STREET-W/ ENGINEERING & INSP FEE | FRANKLIN AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
X022024162A18 | 2024-06-10 | 2024-06-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | SOUNDVIEW AVENUE, BRONX, FROM STREET MURRAY COURT TO STREET PATTERSON AVENUE |
B012024161A18 | 2024-06-09 | 2024-07-04 | PAVE STREET-W/ ENGINEERING & INSP FEE | TAAFFE PLACE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
X042024158A10 | 2024-06-06 | 2024-07-03 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 163 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE |
X042024158A11 | 2024-06-06 | 2024-07-02 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST 163 STREET, BRONX, FROM STREET SHERIDAN AVENUE |
X042024158A09 | 2024-06-06 | 2024-07-03 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | SHERIDAN AVENUE, BRONX, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET |
X012024158A56 | 2024-06-06 | 2024-07-03 | RESET, REPAIR OR REPLACE CURB | EAST 163 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE |
X022024158A85 | 2024-06-06 | 2024-07-03 | TEMPORARY PEDESTRIAN WALK | SHERIDAN AVENUE, BRONX, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET |
X022024158A86 | 2024-06-06 | 2024-07-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | SHERIDAN AVENUE, BRONX, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET |
X022024158A87 | 2024-06-06 | 2024-07-03 | TEMPORARY PEDESTRIAN WALK | EAST 163 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE |
X022024158A88 | 2024-06-06 | 2024-07-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 163 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE |
X012024158A55 | 2024-06-06 | 2024-07-03 | RESET, REPAIR OR REPLACE CURB | SHERIDAN AVENUE, BRONX, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET |
X042024158A14 | 2024-06-06 | 2024-07-02 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST 163 STREET, BRONX, FROM STREET SHERIDAN AVENUE |
X042024158A12 | 2024-06-06 | 2024-07-02 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST 163 STREET, BRONX, FROM STREET SHERIDAN AVENUE |
X042024158A13 | 2024-06-06 | 2024-07-02 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST 163 STREET, BRONX, FROM STREET SHERIDAN AVENUE |
X022024157A58 | 2024-06-05 | 2024-07-02 | TEMPORARY PEDESTRIAN WALK | EAST 179 STREET, BRONX, FROM STREET DALY AVENUE TO STREET HONEYWELL AVENUE |
X042024157A08 | 2024-06-05 | 2024-07-02 | REPLACE SIDEWALK | EAST 179 STREET, BRONX, FROM STREET DALY AVENUE TO STREET HONEYWELL AVENUE |
X042024157A14 | 2024-06-05 | 2024-07-04 | REPLACE SIDEWALK | HONEYWELL AVENUE, BRONX, FROM STREET EAST 178 STREET TO STREET EAST 179 STREET |
X022024157B09 | 2024-06-05 | 2024-07-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | HONEYWELL AVENUE, BRONX, FROM STREET EAST 178 STREET TO STREET EAST 179 STREET |
X022024157B08 | 2024-06-05 | 2024-07-04 | TEMPORARY PEDESTRIAN WALK | HONEYWELL AVENUE, BRONX, FROM STREET EAST 178 STREET TO STREET EAST 179 STREET |
X022024157A59 | 2024-06-05 | 2024-07-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 179 STREET, BRONX, FROM STREET DALY AVENUE TO STREET HONEYWELL AVENUE |
X012024157A27 | 2024-06-05 | 2024-07-02 | RESET, REPAIR OR REPLACE CURB-PROTECTED | EAST 179 STREET, BRONX, FROM STREET DALY AVENUE TO STREET HONEYWELL AVENUE |
X012024157A56 | 2024-06-05 | 2024-07-04 | RESET, REPAIR OR REPLACE CURB | HONEYWELL AVENUE, BRONX, FROM STREET EAST 178 STREET TO STREET EAST 179 STREET |
B012024155B00 | 2024-06-03 | 2024-06-21 | RESET, REPAIR OR REPLACE CURB | FRANKLIN AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B042024155A26 | 2024-06-03 | 2024-06-21 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | FRANKLIN AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B022024155B74 | 2024-06-03 | 2024-06-21 | TEMPORARY PEDESTRIAN WALK | TAAFFE PLACE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B022024155B75 | 2024-06-03 | 2024-06-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | TAAFFE PLACE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B022024155B76 | 2024-06-03 | 2024-06-21 | TEMPORARY PEDESTRIAN WALK | FRANKLIN AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B022024155B77 | 2024-06-03 | 2024-06-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | FRANKLIN AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B042024155A25 | 2024-06-03 | 2024-06-21 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | TAAFFE PLACE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
M042024155A01 | 2024-06-03 | 2024-06-13 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST 116 STREET, MANHATTAN, FROM STREET PARK AVENUE |
M042024155A07 | 2024-06-03 | 2024-06-19 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | CONVENT AVENUE, MANHATTAN, FROM STREET WEST 150 STREET |
B012024155A98 | 2024-06-03 | 2024-06-21 | RESET, REPAIR OR REPLACE CURB | TAAFFE PLACE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B012024152B17 | 2024-05-31 | 2024-06-26 | RESET, REPAIR OR REPLACE CURB | BUSHWICK AVENUE, BROOKLYN, FROM STREET DEVOE STREET TO STREET METROPOLITAN AVENUE |
B042024152A09 | 2024-05-31 | 2024-06-26 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BUSHWICK AVENUE, BROOKLYN, FROM STREET DEVOE STREET TO STREET METROPOLITAN AVENUE |
B022024152A45 | 2024-05-31 | 2024-06-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | BUSHWICK AVENUE, BROOKLYN, FROM STREET DEVOE STREET TO STREET METROPOLITAN AVENUE |
B022024152A46 | 2024-05-31 | 2024-06-26 | TEMPORARY PEDESTRIAN WALK | METROPOLITAN AVENUE, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET ORIENT AVENUE |
B022024152A47 | 2024-05-31 | 2024-06-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | METROPOLITAN AVENUE, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET ORIENT AVENUE |
B012024152B20 | 2024-05-31 | 2024-06-26 | RESET, REPAIR OR REPLACE CURB | METROPOLITAN AVENUE, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET ORIENT AVENUE |
B042024152A10 | 2024-05-31 | 2024-06-26 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | METROPOLITAN AVENUE, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET ORIENT AVENUE |
B022024152A44 | 2024-05-31 | 2024-06-26 | TEMPORARY PEDESTRIAN WALK | BUSHWICK AVENUE, BROOKLYN, FROM STREET DEVOE STREET TO STREET METROPOLITAN AVENUE |
B042024151A13 | 2024-05-30 | 2024-06-14 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | ATLANTIC AVENUE, BROOKLYN, FROM STREET RALPH AVENUE |
B042024151A15 | 2024-05-30 | 2024-06-14 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | ATLANTIC AVENUE, BROOKLYN, FROM STREET RALPH AVENUE |
B042024151A14 | 2024-05-30 | 2024-06-14 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | ATLANTIC AVENUE, BROOKLYN, FROM STREET RALPH AVENUE |
X012024151A57 | 2024-05-30 | 2024-06-12 | PAVE STREET-W/ ENGINEERING & INSP FEE | SAXON AVENUE, BRONX, FROM STREET BEND TO STREET VAN CORTLANDT PARK SOUTH |
X012024150A51 | 2024-05-29 | 2024-06-12 | PAVE STREET-W/ ENGINEERING & INSP FEE | SAXON AVENUE, BRONX, FROM STREET BEND TO STREET VAN CORTLANDT PARK SOUTH |
Q012024149A58 | 2024-05-28 | 2024-06-22 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | ARCHER AVENUE, QUEENS, FROM STREET GUY R BREWER BOULEVARD |
Q012024149A56 | 2024-05-28 | 2024-06-22 | PAVE STREET-W/ ENGINEERING & INSP FEE | GUY R BREWER BOULEVARD, QUEENS, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE |
Q012024149A57 | 2024-05-28 | 2024-06-22 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | ARCHER AVENUE, QUEENS, FROM STREET 165 STREET TO STREET GUY R BREWER BOULEVARD |
B012024148A08 | 2024-05-27 | 2024-06-20 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | ATLANTIC AVENUE, BROOKLYN, FROM STREET JEROME STREET |
B012024148A04 | 2024-05-27 | 2024-06-20 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | ATLANTIC AVENUE, BROOKLYN, FROM STREET BARBEY STREET TO STREET JEROME STREET |
B012024148A05 | 2024-05-27 | 2024-06-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | BARBEY STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
B012024148A06 | 2024-05-27 | 2024-06-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | JEROME STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
B012024148A07 | 2024-05-27 | 2024-06-20 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | ATLANTIC AVENUE, BROOKLYN, FROM STREET BARBEY STREET |
B022024143A85 | 2024-05-22 | 2024-06-12 | TEMPORARY PEDESTRIAN WALK | NEW JERSEY AVENUE, BROOKLYN, FROM STREET FULTON STREET TO STREET JAMAICA AVENUE |
B022024143A86 | 2024-05-22 | 2024-06-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | NEW JERSEY AVENUE, BROOKLYN, FROM STREET FULTON STREET TO STREET JAMAICA AVENUE |
B012024143A88 | 2024-05-22 | 2024-06-12 | RESET, REPAIR OR REPLACE CURB-PROTECTED | NEW JERSEY AVENUE, BROOKLYN, FROM STREET FULTON STREET TO STREET JAMAICA AVENUE |
B022024143A83 | 2024-05-22 | 2024-06-11 | TEMPORARY PEDESTRIAN WALK | FULTON STREET, BROOKLYN, FROM STREET NEW JERSEY AVENUE TO STREET VERMONT STREET |
B012024143A87 | 2024-05-22 | 2024-06-11 | RESET, REPAIR OR REPLACE CURB-PROTECTED | FULTON STREET, BROOKLYN, FROM STREET NEW JERSEY AVENUE TO STREET VERMONT STREET |
B042024143A12 | 2024-05-22 | 2024-06-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | FULTON STREET, BROOKLYN, FROM STREET NEW JERSEY AVENUE TO STREET VERMONT STREET |
B042024143A13 | 2024-05-22 | 2024-06-12 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | NEW JERSEY AVENUE, BROOKLYN, FROM STREET FULTON STREET TO STREET JAMAICA AVENUE |
B022024143A84 | 2024-05-22 | 2024-06-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | FULTON STREET, BROOKLYN, FROM STREET NEW JERSEY AVENUE TO STREET VERMONT STREET |
B022024142C97 | 2024-05-21 | 2024-06-14 | TEMPORARY PEDESTRIAN WALK | EAST 10 STREET, BROOKLYN, FROM STREET CATON AVENUE TO STREET CHURCH AVENUE |
B012024142B43 | 2024-05-21 | 2024-06-14 | RESET, REPAIR OR REPLACE CURB | EAST 10 STREET, BROOKLYN, FROM STREET CATON AVENUE TO STREET CHURCH AVENUE |
X012024142A92 | 2024-05-21 | 2024-06-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 152 STREET, BRONX, FROM STREET MELROSE AVENUE TO STREET 3 AVENUE |
B022024142C98 | 2024-05-21 | 2024-06-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 10 STREET, BROOKLYN, FROM STREET CATON AVENUE TO STREET CHURCH AVENUE |
B042024142A34 | 2024-05-21 | 2024-06-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 10 STREET, BROOKLYN, FROM STREET CATON AVENUE TO STREET CHURCH AVENUE |
B042024141A30 | 2024-05-20 | 2024-06-14 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | BELMONT AVENUE, BROOKLYN, FROM STREET MOTHER GASTON BOULEVARD |
B042024141A29 | 2024-05-20 | 2024-06-14 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | BELMONT AVENUE, BROOKLYN, FROM STREET MOTHER GASTON BOULEVARD |
B042024141A31 | 2024-05-20 | 2024-06-14 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | BELMONT AVENUE, BROOKLYN, FROM STREET MOTHER GASTON BOULEVARD |
B042024138A18 | 2024-05-17 | 2024-06-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | YORK STREET, BROOKLYN, FROM STREET BRIDGE STREET TO STREET GOLD STREET |
X012024138B71 | 2024-05-17 | 2024-06-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | BROOK AVENUE, BRONX, FROM STREET NYCTA SUBWAY |
X012024138B70 | 2024-05-17 | 2024-06-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | BERGEN AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE |
X012024138B69 | 2024-05-17 | 2024-06-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | BROOK AVENUE, BRONX, FROM STREET EAST 152 STREET TO STREET NYCTA SUBWAY |
X012024138B68 | 2024-05-17 | 2024-06-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | WESTCHESTER AVENUE, BRONX, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE |
B012024138B85 | 2024-05-17 | 2024-06-11 | RESET, REPAIR OR REPLACE CURB-PROTECTED | YORK STREET, BROOKLYN, FROM STREET BRIDGE STREET TO STREET GOLD STREET |
B012024135B20 | 2024-05-14 | 2024-06-11 | RESET, REPAIR OR REPLACE CURB | BROADWAY, BROOKLYN, FROM STREET MC KIBBIN STREET TO STREET THROOP AVENUE |
X042024135A01 | 2024-05-14 | 2024-06-07 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 203 STREET, BRONX, FROM STREET BRIGGS AVENUE TO STREET VALENTINE AVENUE |
B022024135B06 | 2024-05-14 | 2024-06-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | BROADWAY, BROOKLYN, FROM STREET MC KIBBIN STREET TO STREET THROOP AVENUE |
B022024135B05 | 2024-05-14 | 2024-06-11 | TEMPORARY PEDESTRIAN WALK | BROADWAY, BROOKLYN, FROM STREET MC KIBBIN STREET TO STREET THROOP AVENUE |
X022024135A26 | 2024-05-14 | 2024-06-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 203 STREET, BRONX, FROM STREET BRIGGS AVENUE TO STREET VALENTINE AVENUE |
B042024135A08 | 2024-05-14 | 2024-06-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BROADWAY, BROOKLYN, FROM STREET MC KIBBIN STREET TO STREET THROOP AVENUE |
B042024135A09 | 2024-05-14 | 2024-06-11 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | BROADWAY, BROOKLYN, FROM STREET MC KIBBIN STREET |
X022024135A25 | 2024-05-14 | 2024-06-07 | TEMPORARY PEDESTRIAN WALK | EAST 203 STREET, BRONX, FROM STREET BRIGGS AVENUE TO STREET VALENTINE AVENUE |
X012024135A17 | 2024-05-14 | 2024-06-07 | RESET, REPAIR OR REPLACE CURB-PROTECTED | EAST 203 STREET, BRONX, FROM STREET BRIGGS AVENUE TO STREET VALENTINE AVENUE |
B042024135A10 | 2024-05-14 | 2024-06-11 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | BROADWAY, BROOKLYN, FROM STREET MC KIBBIN STREET |
X012024134B21 | 2024-05-13 | 2024-06-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | BERGEN AVENUE, BRONX, FROM STREET EAST 149 STREET TO STREET WESTCHESTER AVENUE |
X012024134B23 | 2024-05-13 | 2024-06-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | BERGEN AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE |
X012024134B22 | 2024-05-13 | 2024-06-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | WESTCHESTER AVENUE, BRONX, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE |
B012024133A02 | 2024-05-12 | 2024-06-06 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | LENOX ROAD, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE |
X042024130A17 | 2024-05-09 | 2024-06-01 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 223 STREET, BRONX, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD |
X042024130A06 | 2024-05-09 | 2024-05-29 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEST FARMS ROAD, BRONX, FROM STREET CROSS BRONX EXPWY NB ET 4 A TO STREET EAST 174 STREET |
X012024130B17 | 2024-05-09 | 2024-05-29 | RESET, REPAIR OR REPLACE CURB | WEST FARMS ROAD, BRONX, FROM STREET CROSS BRONX EXPWY NB ET 4 A TO STREET EAST 174 STREET |
X012024130B80 | 2024-05-09 | 2024-06-01 | RESET, REPAIR OR REPLACE CURB | EAST 223 STREET, BRONX, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD |
X012024130B81 | 2024-05-09 | 2024-06-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 223 STREET, BRONX, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD |
B012024129B02 | 2024-05-08 | 2024-05-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | ALBEMARLE ROAD, BROOKLYN, FROM STREET EAST 29 STREET TO STREET NOSTRAND AVENUE |
B012024129B03 | 2024-05-08 | 2024-05-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | NOSTRAND AVENUE, BROOKLYN, FROM STREET ALBEMARLE ROAD TO STREET SNYDER AVENUE |
B012024129B04 | 2024-05-08 | 2024-05-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | ALBEMARLE ROAD, BROOKLYN, FROM STREET NOSTRAND AVENUE |
B042024128A68 | 2024-05-07 | 2024-05-15 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | BOERUM STREET, BROOKLYN, FROM STREET LORIMER STREET |
B022024128B10 | 2024-05-07 | 2024-06-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | LORIMER STREET, BROOKLYN, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET |
B022024128B09 | 2024-05-07 | 2024-06-04 | TEMPORARY PEDESTRIAN WALK | LORIMER STREET, BROOKLYN, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET |
B012024128B40 | 2024-05-07 | 2024-06-04 | RESET, REPAIR OR REPLACE CURB | LORIMER STREET, BROOKLYN, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET |
B042024128A90 | 2024-05-07 | 2024-06-04 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | LORIMER STREET, BROOKLYN, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET |
B042024128A67 | 2024-05-07 | 2024-05-15 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | BOERUM STREET, BROOKLYN, FROM STREET LORIMER STREET |
B012024127A38 | 2024-05-06 | 2024-05-29 | RESET, REPAIR OR REPLACE CURB | WASHINGTON AVENUE, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET LINCOLN PLACE |
B042024127A06 | 2024-05-06 | 2024-05-29 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WASHINGTON AVENUE, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET LINCOLN PLACE |
B022024122B35 | 2024-05-01 | 2024-05-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | CONEY ISLAND AVENUE, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET FRIEL PLACE |
X012024122A26 | 2024-05-01 | 2024-05-24 | RESET, REPAIR OR REPLACE CURB | SAXON AVENUE, BRONX, FROM STREET BEND TO STREET VAN CORTLANDT PARK SOUTH |
B012024122A87 | 2024-05-01 | 2024-05-29 | RESET, REPAIR OR REPLACE CURB | CONEY ISLAND AVENUE, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET FRIEL PLACE |
B042024122A23 | 2024-05-01 | 2024-05-29 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CONEY ISLAND AVENUE, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET FRIEL PLACE |
X042024122A07 | 2024-05-01 | 2024-05-24 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | SAXON AVENUE, BRONX, FROM STREET BEND TO STREET VAN CORTLANDT PARK SOUTH |
X022024122A06 | 2024-05-01 | 2024-05-24 | TEMPORARY PEDESTRIAN WALK | SAXON AVENUE, BRONX, FROM STREET BEND TO STREET VAN CORTLANDT PARK SOUTH |
X022024122A07 | 2024-05-01 | 2024-05-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | SAXON AVENUE, BRONX, FROM STREET BEND TO STREET VAN CORTLANDT PARK SOUTH |
B022024122B34 | 2024-05-01 | 2024-05-29 | TEMPORARY PEDESTRIAN WALK | CONEY ISLAND AVENUE, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET FRIEL PLACE |
B022024109A81 | 2024-04-18 | 2024-05-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | 50 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B042024109A10 | 2024-04-18 | 2024-05-17 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 50 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B012024109B24 | 2024-04-18 | 2024-05-17 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 50 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B022024109A80 | 2024-04-18 | 2024-05-17 | TEMPORARY PEDESTRIAN WALK | 50 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
X022024107A03 | 2024-04-16 | 2024-05-15 | TEMPORARY PEDESTRIAN WALK | EAST 194 STREET, BRONX, FROM STREET DECATUR AVENUE TO STREET MARION AVENUE |
X022024107A04 | 2024-04-16 | 2024-05-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 194 STREET, BRONX, FROM STREET DECATUR AVENUE TO STREET MARION AVENUE |
B042024107A11 | 2024-04-16 | 2024-05-15 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BROADWAY, BROOKLYN, FROM STREET MIDDLETON STREET TO STREET THROOP AVENUE |
B022024107B15 | 2024-04-16 | 2024-05-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | BROADWAY, BROOKLYN, FROM STREET MIDDLETON STREET TO STREET THROOP AVENUE |
B022024107B14 | 2024-04-16 | 2024-05-15 | TEMPORARY PEDESTRIAN WALK | BROADWAY, BROOKLYN, FROM STREET MIDDLETON STREET TO STREET THROOP AVENUE |
B022024107B13 | 2024-04-16 | 2024-05-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | BROADWAY, BROOKLYN, FROM STREET MC KIBBIN STREET TO STREET THROOP AVENUE |
B022024107B12 | 2024-04-16 | 2024-05-15 | TEMPORARY PEDESTRIAN WALK | BROADWAY, BROOKLYN, FROM STREET MC KIBBIN STREET TO STREET THROOP AVENUE |
B042024107A10 | 2024-04-16 | 2024-05-15 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BROADWAY, BROOKLYN, FROM STREET MC KIBBIN STREET TO STREET THROOP AVENUE |
B012024107B28 | 2024-04-16 | 2024-05-15 | RESET, REPAIR OR REPLACE CURB | BROADWAY, BROOKLYN, FROM STREET MC KIBBIN STREET TO STREET THROOP AVENUE |
B012024107B29 | 2024-04-16 | 2024-05-15 | RESET, REPAIR OR REPLACE CURB | BROADWAY, BROOKLYN, FROM STREET MIDDLETON STREET TO STREET THROOP AVENUE |
X042024107A00 | 2024-04-16 | 2024-05-15 | REPLACE SIDEWALK | EAST 194 STREET, BRONX, FROM STREET DECATUR AVENUE TO STREET MARION AVENUE |
X012024107A08 | 2024-04-16 | 2024-05-15 | RESET, REPAIR OR REPLACE CURB | EAST 194 STREET, BRONX, FROM STREET DECATUR AVENUE TO STREET MARION AVENUE |
Q012024106C18 | 2024-04-15 | 2024-05-09 | RESET, REPAIR OR REPLACE CURB | 39 AVENUE, QUEENS, FROM STREET 31 STREET TO STREET 32 STREET |
X022024106A95 | 2024-04-15 | 2024-04-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | VYSE AVENUE, BRONX, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET |
Q042024106A15 | 2024-04-15 | 2024-05-10 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 39 AVENUE, QUEENS, FROM STREET 31 STREET TO STREET 32 STREET |
Q042024106A14 | 2024-04-15 | 2024-05-09 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 32 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
X012024106C68 | 2024-04-15 | 2024-04-30 | PAVE STREET-W/ ENGINEERING & INSP FEE | DECATUR AVENUE, BRONX, FROM STREET EAST 195 STREET TO STREET EAST 197 STREET |
X012024106C82 | 2024-04-15 | 2024-04-25 | RESET, REPAIR OR REPLACE CURB | VYSE AVENUE, BRONX, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET |
X022024106A94 | 2024-04-15 | 2024-04-25 | TEMPORARY PEDESTRIAN WALK | VYSE AVENUE, BRONX, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET |
Q022024106A17 | 2024-04-15 | 2024-05-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | 32 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q022024106A16 | 2024-04-15 | 2024-05-10 | TEMPORARY PEDESTRIAN WALK | 32 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
X042024106A57 | 2024-04-15 | 2024-04-25 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | VYSE AVENUE, BRONX, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET |
Q012024106C17 | 2024-04-15 | 2024-05-09 | RESET, REPAIR OR REPLACE CURB | 32 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
X012024102D96 | 2024-04-11 | 2024-05-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | VYSE AVENUE, BRONX, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET |
B012024101C09 | 2024-04-10 | 2024-05-01 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | LENOX ROAD, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
B012024100B28 | 2024-04-09 | 2024-05-03 | PAVE STREET-W/ ENGINEERING & INSP FEE | 60 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B012024096B82 | 2024-04-05 | 2024-04-30 | PAVE STREET-W/ ENGINEERING & INSP FEE | MYRTLE AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET |
X022024092A70 | 2024-04-01 | 2024-04-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | DECATUR AVENUE, BRONX, FROM STREET EAST 195 STREET TO STREET EAST 197 STREET |
B022024092E11 | 2024-04-01 | 2024-04-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | MYRTLE AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET |
X012024092A41 | 2024-04-01 | 2024-04-27 | RESET, REPAIR OR REPLACE CURB | DECATUR AVENUE, BRONX, FROM STREET EAST 195 STREET TO STREET EAST 197 STREET |
B042024092A49 | 2024-04-01 | 2024-04-05 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MYRTLE AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET |
B012024092E90 | 2024-04-01 | 2024-04-12 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | MAPLE STREET, BROOKLYN, FROM STREET EAST 48 STREET TO STREET UTICA AVENUE |
B012024092C16 | 2024-04-01 | 2024-04-05 | RESET, REPAIR OR REPLACE CURB | MYRTLE AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET |
X022024092A69 | 2024-04-01 | 2024-04-27 | TEMPORARY PEDESTRIAN WALK | DECATUR AVENUE, BRONX, FROM STREET EAST 195 STREET TO STREET EAST 197 STREET |
X042024092A02 | 2024-04-01 | 2024-04-27 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | DECATUR AVENUE, BRONX, FROM STREET EAST 195 STREET TO STREET EAST 197 STREET |
B022024092E10 | 2024-04-01 | 2024-04-05 | TEMPORARY PEDESTRIAN WALK | MYRTLE AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET |
B022024087A63 | 2024-03-27 | 2024-04-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | LENOX ROAD, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE |
B022024087A62 | 2024-03-27 | 2024-04-11 | TEMPORARY PEDESTRIAN WALK | LENOX ROAD, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE |
B042024087A29 | 2024-03-27 | 2024-04-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | LENOX ROAD, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE |
B012024087A61 | 2024-03-27 | 2024-04-11 | RESET, REPAIR OR REPLACE CURB-PROTECTED | LENOX ROAD, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE |
Q012024087C42 | 2024-03-27 | 2024-04-23 | PAVE STREET-W/ ENGINEERING & INSP FEE | 36 STREET, QUEENS, FROM STREET 28 AVENUE TO STREET ASTORIA BOULEVARD |
M022024086B79 | 2024-03-26 | 2024-03-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | PARK AVENUE, MANHATTAN, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET |
M012024086B08 | 2024-03-26 | 2024-03-27 | RESET, REPAIR OR REPLACE CURB | PARK AVENUE, MANHATTAN, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET |
M022024086B78 | 2024-03-26 | 2024-03-27 | TEMPORARY PEDESTRIAN WALK | PARK AVENUE, MANHATTAN, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET |
M042024086A05 | 2024-03-26 | 2024-04-10 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST 116 STREET, MANHATTAN, FROM STREET PARK AVENUE |
M042024086A06 | 2024-03-26 | 2024-04-10 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST 116 STREET, MANHATTAN, FROM STREET PARK AVENUE |
M042024086A07 | 2024-03-26 | 2024-03-27 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | PARK AVENUE, MANHATTAN, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET |
B042024086A53 | 2024-03-26 | 2024-04-12 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | ATLANTIC AVENUE, BROOKLYN, FROM STREET BARBEY STREET |
B042024086A54 | 2024-03-26 | 2024-04-12 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | ATLANTIC AVENUE, BROOKLYN, FROM STREET BARBEY STREET |
X012024085A76 | 2024-03-25 | 2024-04-17 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 215 STREET, BRONX, FROM STREET HOLLAND AVENUE TO STREET WHITE PLAINS ROAD |
B022024082A83 | 2024-03-22 | 2024-04-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | GROVE STREET, BROOKLYN, FROM STREET BEND TO STREET BUSHWICK AVENUE |
B042024082A05 | 2024-03-22 | 2024-04-19 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | GROVE STREET, BROOKLYN, FROM STREET BEND TO STREET BUSHWICK AVENUE |
B022024082A82 | 2024-03-22 | 2024-04-19 | TEMPORARY PEDESTRIAN WALK | GROVE STREET, BROOKLYN, FROM STREET BEND TO STREET BUSHWICK AVENUE |
B012024082A83 | 2024-03-22 | 2024-04-19 | RESET, REPAIR OR REPLACE CURB | GROVE STREET, BROOKLYN, FROM STREET BEND TO STREET BUSHWICK AVENUE |
B012024082A08 | 2024-03-22 | 2024-04-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | GROVE STREET, BROOKLYN, FROM STREET BEND TO STREET BUSHWICK AVENUE |
B012024077A05 | 2024-03-17 | 2024-04-12 | PAVE STREET-W/ ENGINEERING & INSP FEE | NEW MONTROSE AVENUE, BROOKLYN, FROM STREET BROADWAY TO STREET MONTROSE AVENUE |
B042024074A28 | 2024-03-14 | 2024-04-10 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | ATLANTIC AVENUE, BROOKLYN, FROM STREET JEROME STREET |
B042024074A30 | 2024-03-14 | 2024-04-02 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | NEW MONTROSE AVENUE, BROOKLYN, FROM STREET BROADWAY TO STREET MONTROSE AVENUE |
B042024074A31 | 2024-03-14 | 2024-04-05 | REPLACE SIDEWALK | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
B012024074C35 | 2024-03-14 | 2024-04-11 | RESET, REPAIR OR REPLACE CURB | JEROME STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
B022024074A53 | 2024-03-14 | 2024-04-11 | TEMPORARY PEDESTRIAN WALK | JEROME STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
B022024074A55 | 2024-03-14 | 2024-04-11 | TEMPORARY PEDESTRIAN WALK | BARBEY STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
B012024074C36 | 2024-03-14 | 2024-04-11 | RESET, REPAIR OR REPLACE CURB | BARBEY STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
B042024074A24 | 2024-03-14 | 2024-04-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | JEROME STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
B042024074A25 | 2024-03-14 | 2024-04-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BARBEY STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
B042024074A26 | 2024-03-14 | 2024-04-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | ATLANTIC AVENUE, BROOKLYN, FROM STREET BARBEY STREET TO STREET JEROME STREET |
B042024074A27 | 2024-03-14 | 2024-04-10 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | ATLANTIC AVENUE, BROOKLYN, FROM STREET JEROME STREET |
B012024074C37 | 2024-03-14 | 2024-04-11 | RESET, REPAIR OR REPLACE CURB-PROTECTED | ATLANTIC AVENUE, BROOKLYN, FROM STREET BARBEY STREET TO STREET JEROME STREET |
B012024074C47 | 2024-03-14 | 2024-04-02 | RESET, REPAIR OR REPLACE CURB | NEW MONTROSE AVENUE, BROOKLYN, FROM STREET BROADWAY TO STREET MONTROSE AVENUE |
B012024074C48 | 2024-03-14 | 2024-04-05 | RESET, REPAIR OR REPLACE CURB | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
B022024074A76 | 2024-03-14 | 2024-04-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
B022024074A75 | 2024-03-14 | 2024-04-05 | TEMPORARY PEDESTRIAN WALK | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
B022024074A74 | 2024-03-14 | 2024-04-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | NEW MONTROSE AVENUE, BROOKLYN, FROM STREET BROADWAY TO STREET MONTROSE AVENUE |
B022024074A73 | 2024-03-14 | 2024-04-02 | TEMPORARY PEDESTRIAN WALK | NEW MONTROSE AVENUE, BROOKLYN, FROM STREET BROADWAY TO STREET MONTROSE AVENUE |
B022024074A58 | 2024-03-14 | 2024-04-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | ATLANTIC AVENUE, BROOKLYN, FROM STREET BARBEY STREET TO STREET JEROME STREET |
B022024074A57 | 2024-03-14 | 2024-04-11 | TEMPORARY PEDESTRIAN WALK | ATLANTIC AVENUE, BROOKLYN, FROM STREET BARBEY STREET TO STREET JEROME STREET |
B022024074A56 | 2024-03-14 | 2024-04-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | BARBEY STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
B022024074A54 | 2024-03-14 | 2024-04-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | JEROME STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
Q012024073B00 | 2024-03-13 | 2024-04-09 | RESET, REPAIR OR REPLACE CURB | 36 STREET, QUEENS, FROM STREET 28 AVENUE TO STREET ASTORIA BOULEVARD |
Q022024073B14 | 2024-03-13 | 2024-04-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | 36 STREET, QUEENS, FROM STREET 28 AVENUE TO STREET ASTORIA BOULEVARD |
Q022024073B13 | 2024-03-13 | 2024-04-09 | TEMPORARY PEDESTRIAN WALK | 36 STREET, QUEENS, FROM STREET 28 AVENUE TO STREET ASTORIA BOULEVARD |
Q042024073A78 | 2024-03-13 | 2024-04-09 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 36 STREET, QUEENS, FROM STREET 28 AVENUE TO STREET ASTORIA BOULEVARD |
B042024072A23 | 2024-03-12 | 2024-03-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 60 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B012024072C49 | 2024-03-12 | 2024-03-20 | RESET, REPAIR OR REPLACE CURB | 60 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B022024072C21 | 2024-03-12 | 2024-03-20 | TEMPORARY PEDESTRIAN WALK | 60 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B022024072C22 | 2024-03-12 | 2024-03-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | 60 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B012024065B49 | 2024-03-05 | 2024-03-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | CLERMONT AVENUE, BROOKLYN, FROM STREET PARK AVENUE |
B012024065B50 | 2024-03-05 | 2024-03-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | PARK AVENUE, BROOKLYN, FROM STREET VANDERBILT AVENUE |
B012024065B47 | 2024-03-05 | 2024-03-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | PARK AVENUE, BROOKLYN, FROM STREET CLERMONT AVENUE TO STREET VANDERBILT AVENUE |
B012024065B48 | 2024-03-05 | 2024-03-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | CLERMONT AVENUE, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE |
B012024065B46 | 2024-03-05 | 2024-03-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | VANDERBILT AVENUE, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE |
X012024060B20 | 2024-02-29 | 2024-03-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | NELSON AVENUE, BRONX, FROM STREET WEST 164 STREET TO STREET WEST 165 STREET |
X012024060B19 | 2024-02-29 | 2024-03-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | NELSON AVENUE, BRONX, FROM STREET WEST 166 STREET TO STREET WEST 167 STREET |
Q012024059C32 | 2024-02-28 | 2024-03-26 | RESET, REPAIR OR REPLACE CURB | GUY R BREWER BOULEVARD, QUEENS, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE |
B012024059B76 | 2024-02-28 | 2024-03-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE |
Q022024059A20 | 2024-02-28 | 2024-03-26 | TEMPORARY PEDESTRIAN WALK | GUY R BREWER BOULEVARD, QUEENS, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE |
Q022024059A21 | 2024-02-28 | 2024-03-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | GUY R BREWER BOULEVARD, QUEENS, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE |
Q042024059A64 | 2024-02-28 | 2024-03-26 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | GUY R BREWER BOULEVARD, QUEENS, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE |
Q042024059A65 | 2024-02-28 | 2024-03-26 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | GUY R BREWER BOULEVARD, QUEENS, FROM STREET ARCHER AVENUE |
Q042024059A66 | 2024-02-28 | 2024-03-26 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | GUY R BREWER BOULEVARD, QUEENS, FROM STREET ARCHER AVENUE |
Q042024059A67 | 2024-02-28 | 2024-03-26 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | GUY R BREWER BOULEVARD, QUEENS, FROM STREET ARCHER AVENUE |
Q012024058A91 | 2024-02-27 | 2024-03-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | NEW HAVEN AVENUE, QUEENS, FROM STREET BEACH 22 STREET TO STREET GRASSMERE TERRACE |
B042024058A01 | 2024-02-27 | 2024-03-26 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BOERUM STREET, BROOKLYN, FROM STREET BROADWAY TO STREET LORIMER STREET |
B012024058B31 | 2024-02-27 | 2024-03-26 | RESET, REPAIR OR REPLACE CURB | LORIMER STREET, BROOKLYN, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET |
B012024058B30 | 2024-02-27 | 2024-03-26 | RESET, REPAIR OR REPLACE CURB | BOERUM STREET, BROOKLYN, FROM STREET BROADWAY TO STREET LORIMER STREET |
B022024058A33 | 2024-02-27 | 2024-03-26 | TEMPORARY PEDESTRIAN WALK | BOERUM STREET, BROOKLYN, FROM STREET BROADWAY TO STREET LORIMER STREET |
B022024058A34 | 2024-02-27 | 2024-03-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | BOERUM STREET, BROOKLYN, FROM STREET BROADWAY TO STREET LORIMER STREET |
B022024058A35 | 2024-02-27 | 2024-03-26 | TEMPORARY PEDESTRIAN WALK | LORIMER STREET, BROOKLYN, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET |
B022024058A36 | 2024-02-27 | 2024-03-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | LORIMER STREET, BROOKLYN, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET |
B042024058A02 | 2024-02-27 | 2024-03-26 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | LORIMER STREET, BROOKLYN, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET |
B012024057A62 | 2024-02-26 | 2024-03-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | OCEAN PARKWAY, BROOKLYN, FROM STREET LAWRENCE AVENUE TO STREET PARKVILLE AVENUE |
B012024054A91 | 2024-02-23 | 2024-03-20 | RESET, REPAIR OR REPLACE CURB | BELMONT AVENUE, BROOKLYN, FROM STREET MOTHER GASTON BOULEVARD TO STREET WATKINS STREET |
B022024054A38 | 2024-02-23 | 2024-03-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | NOSTRAND AVENUE, BROOKLYN, FROM STREET ALBEMARLE ROAD TO STREET SNYDER AVENUE |
B022024054A37 | 2024-02-23 | 2024-03-20 | TEMPORARY PEDESTRIAN WALK | NOSTRAND AVENUE, BROOKLYN, FROM STREET ALBEMARLE ROAD TO STREET SNYDER AVENUE |
B042024054A05 | 2024-02-23 | 2024-03-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | NOSTRAND AVENUE, BROOKLYN, FROM STREET ALBEMARLE ROAD TO STREET SNYDER AVENUE |
B012024054A92 | 2024-02-23 | 2024-03-20 | RESET, REPAIR OR REPLACE CURB | MOTHER GASTON BOULEVARD, BROOKLYN, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE |
B022024054A71 | 2024-02-23 | 2024-03-20 | TEMPORARY PEDESTRIAN WALK | BELMONT AVENUE, BROOKLYN, FROM STREET MOTHER GASTON BOULEVARD TO STREET WATKINS STREET |
B012024054A39 | 2024-02-23 | 2024-03-20 | RESET, REPAIR OR REPLACE CURB | NOSTRAND AVENUE, BROOKLYN, FROM STREET ALBEMARLE ROAD TO STREET SNYDER AVENUE |
B042024054A07 | 2024-02-23 | 2024-03-20 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | ALBEMARLE ROAD, BROOKLYN, FROM STREET NOSTRAND AVENUE |
B042024054A09 | 2024-02-23 | 2024-03-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BELMONT AVENUE, BROOKLYN, FROM STREET MOTHER GASTON BOULEVARD TO STREET WATKINS STREET |
B042024054A10 | 2024-02-23 | 2024-03-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MOTHER GASTON BOULEVARD, BROOKLYN, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE |
B042024054A06 | 2024-02-23 | 2024-03-20 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | ALBEMARLE ROAD, BROOKLYN, FROM STREET NOSTRAND AVENUE |
B022024054A74 | 2024-02-23 | 2024-03-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | MOTHER GASTON BOULEVARD, BROOKLYN, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE |
B022024054A73 | 2024-02-23 | 2024-03-20 | TEMPORARY PEDESTRIAN WALK | MOTHER GASTON BOULEVARD, BROOKLYN, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE |
B022024054A72 | 2024-02-23 | 2024-03-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | BELMONT AVENUE, BROOKLYN, FROM STREET MOTHER GASTON BOULEVARD TO STREET WATKINS STREET |
B042024053B26 | 2024-02-22 | 2024-03-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | ALBEMARLE ROAD, BROOKLYN, FROM STREET EAST 29 STREET TO STREET NOSTRAND AVENUE |
B012024053B99 | 2024-02-22 | 2024-03-20 | RESET, REPAIR OR REPLACE CURB | ALBEMARLE ROAD, BROOKLYN, FROM STREET EAST 29 STREET TO STREET NOSTRAND AVENUE |
B012024051B30 | 2024-02-20 | 2024-02-25 | RESET, REPAIR OR REPLACE CURB | MADISON STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
B022024051B06 | 2024-02-20 | 2024-02-25 | TEMPORARY PEDESTRIAN WALK | MADISON STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
B022024051B09 | 2024-02-20 | 2024-02-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | LENOX ROAD, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
B042024051A61 | 2024-02-20 | 2024-02-25 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MADISON STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
X012024051B30 | 2024-02-20 | 2024-02-23 | PAVE STREET-W/ ENGINEERING & INSP FEE | GRAND CONCOURSE, BRONX, FROM STREET EAST 192 STREET TO STREET EAST FORDHAM ROAD |
X012024051B34 | 2024-02-20 | 2024-02-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST FORDHAM ROAD, BRONX, FROM STREET GRAND CONCOURSE |
B012024051B31 | 2024-02-20 | 2024-02-25 | RESET, REPAIR OR REPLACE CURB-PROTECTED | LENOX ROAD, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
X012024051B31 | 2024-02-20 | 2024-02-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST FORDHAM ROAD, BRONX, FROM STREET GRAND CONCOURSE TO STREET VALENTINE AVENUE |
B042024051A62 | 2024-02-20 | 2024-02-25 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | LENOX ROAD, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
B022024051B08 | 2024-02-20 | 2024-02-25 | TEMPORARY PEDESTRIAN WALK | LENOX ROAD, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
X012024051B40 | 2024-02-20 | 2024-02-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | SHERIDAN AVENUE, BRONX, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET |
B022024051B07 | 2024-02-20 | 2024-02-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | MADISON STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
B022024050A18 | 2024-02-19 | 2024-02-25 | TEMPORARY PEDESTRIAN WALK | CROPSEY AVENUE, BROOKLYN, FROM STREET BAY 31 STREET TO STREET BAY 32 STREET |
B012024050A19 | 2024-02-19 | 2024-02-25 | RESET, REPAIR OR REPLACE CURB | CROPSEY AVENUE, BROOKLYN, FROM STREET BAY 31 STREET TO STREET BAY 32 STREET |
B022024050A19 | 2024-02-19 | 2024-02-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | CROPSEY AVENUE, BROOKLYN, FROM STREET BAY 31 STREET TO STREET BAY 32 STREET |
B042024050A07 | 2024-02-19 | 2024-02-25 | REPLACE SIDEWALK | CROPSEY AVENUE, BROOKLYN, FROM STREET BAY 31 STREET TO STREET BAY 32 STREET |
Q022024046A42 | 2024-02-15 | 2024-02-25 | TEMPORARY PEDESTRIAN WALK | NEW HAVEN AVENUE, QUEENS, FROM STREET BEACH 22 STREET TO STREET GRASSMERE TERRACE |
Q042024046A09 | 2024-02-15 | 2024-02-25 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | NEW HAVEN AVENUE, QUEENS, FROM STREET BEACH 22 STREET TO STREET GRASSMERE TERRACE |
Q022024046A43 | 2024-02-15 | 2024-02-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | NEW HAVEN AVENUE, QUEENS, FROM STREET BEACH 22 STREET TO STREET GRASSMERE TERRACE |
Q012024046B24 | 2024-02-15 | 2024-02-25 | RESET, REPAIR OR REPLACE CURB | NEW HAVEN AVENUE, QUEENS, FROM STREET BEACH 22 STREET TO STREET GRASSMERE TERRACE |
Q042024043A11 | 2024-02-12 | 2024-02-25 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | ARCHER AVENUE, QUEENS, FROM STREET GUY R BREWER BOULEVARD |
Q042024043A10 | 2024-02-12 | 2024-02-25 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | ARCHER AVENUE, QUEENS, FROM STREET GUY R BREWER BOULEVARD |
Q042024043A09 | 2024-02-12 | 2024-02-25 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | ARCHER AVENUE, QUEENS, FROM STREET GUY R BREWER BOULEVARD |
X022024038A14 | 2024-02-07 | 2024-02-21 | TEMPORARY PEDESTRIAN WALK | OGDEN AVENUE, BRONX, FROM STREET WEST 164 STREET TO STREET WEST 165 STREET |
X022024038A12 | 2024-02-07 | 2024-02-21 | TEMPORARY PEDESTRIAN WALK | NELSON AVENUE, BRONX, FROM STREET WEST 164 STREET TO STREET WEST 165 STREET |
X022024038A13 | 2024-02-07 | 2024-02-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | NELSON AVENUE, BRONX, FROM STREET WEST 164 STREET TO STREET WEST 165 STREET |
X012024038A21 | 2024-02-07 | 2024-02-21 | RESET, REPAIR OR REPLACE CURB | OGDEN AVENUE, BRONX, FROM STREET WEST 164 STREET TO STREET WEST 165 STREET |
X012024038A20 | 2024-02-07 | 2024-02-21 | RESET, REPAIR OR REPLACE CURB | NELSON AVENUE, BRONX, FROM STREET WEST 164 STREET TO STREET WEST 165 STREET |
X022024038A18 | 2024-02-07 | 2024-02-25 | TEMPORARY PEDESTRIAN WALK | SHERIDAN AVENUE, BRONX, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET |
X022024038A19 | 2024-02-07 | 2024-02-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | SHERIDAN AVENUE, BRONX, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET |
X022024038A17 | 2024-02-07 | 2024-02-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | NELSON AVENUE, BRONX, FROM STREET WEST 166 STREET TO STREET WEST 167 STREET |
X042024038A00 | 2024-02-07 | 2024-02-21 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | NELSON AVENUE, BRONX, FROM STREET WEST 164 STREET TO STREET WEST 165 STREET |
X042024038A01 | 2024-02-07 | 2024-02-21 | REPLACE SIDEWALK | OGDEN AVENUE, BRONX, FROM STREET WEST 164 STREET TO STREET WEST 165 STREET |
X012024038A23 | 2024-02-07 | 2024-02-25 | RESET, REPAIR OR REPLACE CURB | SHERIDAN AVENUE, BRONX, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET |
X012024038A22 | 2024-02-07 | 2024-02-25 | RESET, REPAIR OR REPLACE CURB | NELSON AVENUE, BRONX, FROM STREET WEST 166 STREET TO STREET WEST 167 STREET |
X042024038A02 | 2024-02-07 | 2024-02-25 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | NELSON AVENUE, BRONX, FROM STREET WEST 166 STREET TO STREET WEST 167 STREET |
X022024038A16 | 2024-02-07 | 2024-02-25 | TEMPORARY PEDESTRIAN WALK | NELSON AVENUE, BRONX, FROM STREET WEST 166 STREET TO STREET WEST 167 STREET |
X022024038A15 | 2024-02-07 | 2024-02-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | OGDEN AVENUE, BRONX, FROM STREET WEST 164 STREET TO STREET WEST 165 STREET |
X042024038A06 | 2024-02-07 | 2024-02-25 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | SHERIDAN AVENUE, BRONX, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET |
B012024036B33 | 2024-02-05 | 2024-02-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | STOCKTON STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
B042024036A33 | 2024-02-05 | 2024-02-25 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | STOCKTON STREET, BROOKLYN, FROM STREET TOMPKINS AVENUE |
B042024036A34 | 2024-02-05 | 2024-02-25 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | STOCKTON STREET, BROOKLYN, FROM STREET TOMPKINS AVENUE |
B042024036A35 | 2024-02-05 | 2024-02-25 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | STOCKTON STREET, BROOKLYN, FROM STREET TOMPKINS AVENUE |
B012024036B32 | 2024-02-05 | 2024-02-25 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | TOMPKINS AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET STOCKTON STREET |
B012024036B34 | 2024-02-05 | 2024-02-25 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | STOCKTON STREET, BROOKLYN, FROM STREET TOMPKINS AVENUE |
B022024032A13 | 2024-02-01 | 2024-02-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | MADISON STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
B042024032A04 | 2024-02-01 | 2024-02-16 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MADISON STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
B012024032B26 | 2024-02-01 | 2024-02-16 | RESET, REPAIR OR REPLACE CURB | MADISON STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
B022024032A12 | 2024-02-01 | 2024-02-16 | TEMPORARY PEDESTRIAN WALK | MADISON STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
X012024031B20 | 2024-01-31 | 2024-02-15 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 203 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET VALENTINE AVENUE |
X042024029A04 | 2024-01-29 | 2024-02-25 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST FORDHAM ROAD, BRONX, FROM STREET GRAND CONCOURSE TO STREET VALENTINE AVENUE |
Q012024029B62 | 2024-01-29 | 2024-02-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | COOPER AVENUE, QUEENS, FROM STREET 72 PLACE TO STREET 73 STREET |
X022024029A67 | 2024-01-29 | 2024-02-25 | TEMPORARY PEDESTRIAN WALK | EAST FORDHAM ROAD, BRONX, FROM STREET GRAND CONCOURSE TO STREET VALENTINE AVENUE |
X022024029A68 | 2024-01-29 | 2024-02-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST FORDHAM ROAD, BRONX, FROM STREET GRAND CONCOURSE TO STREET VALENTINE AVENUE |
X042024025A06 | 2024-01-25 | 2024-02-23 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 215 STREET, BRONX, FROM STREET HOLLAND AVENUE TO STREET WHITE PLAINS ROAD |
X022024025A58 | 2024-01-25 | 2024-02-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 215 STREET, BRONX, FROM STREET HOLLAND AVENUE TO STREET WHITE PLAINS ROAD |
X022024025A57 | 2024-01-25 | 2024-02-23 | TEMPORARY PEDESTRIAN WALK | EAST 215 STREET, BRONX, FROM STREET HOLLAND AVENUE TO STREET WHITE PLAINS ROAD |
X012024025A62 | 2024-01-25 | 2024-02-23 | RESET, REPAIR OR REPLACE CURB | EAST 215 STREET, BRONX, FROM STREET HOLLAND AVENUE TO STREET WHITE PLAINS ROAD |
B012024024B67 | 2024-01-24 | 2024-02-16 | RESET, REPAIR OR REPLACE CURB | RUTLEDGE STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B022024024B04 | 2024-01-24 | 2024-02-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | RUTLEDGE STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B042024024A39 | 2024-01-24 | 2024-02-16 | REPLACE SIDEWALK | RUTLEDGE STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
B022024024B03 | 2024-01-24 | 2024-02-16 | TEMPORARY PEDESTRIAN WALK | RUTLEDGE STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
Q042024024A15 | 2024-01-24 | 2024-01-30 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | COOPER AVENUE, QUEENS, FROM STREET 72 PLACE TO STREET 73 STREET |
Q012024024C89 | 2024-01-24 | 2024-01-30 | RESET, REPAIR OR REPLACE CURB | COOPER AVENUE, QUEENS, FROM STREET 72 PLACE TO STREET 73 STREET |
X012024023A28 | 2024-01-23 | 2024-02-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | CLINTON PLACE, BRONX, FROM STREET DAVIDSON AVENUE TO STREET GRAND AVENUE |
X012024023A27 | 2024-01-23 | 2024-02-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | DAVIDSON AVENUE, BRONX, FROM STREET CLINTON PLACE TO STREET WEST 182 STREET |
X012024023A29 | 2024-01-23 | 2024-02-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | CLINTON PLACE, BRONX, FROM STREET DAVIDSON AVENUE |
Q022024022A41 | 2024-01-22 | 2024-02-06 | TEMPORARY PEDESTRIAN WALK | 31 DRIVE, QUEENS, FROM STREET 12 STREET TO STREET 14 STREET |
Q022024022A42 | 2024-01-22 | 2024-02-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | 31 DRIVE, QUEENS, FROM STREET 12 STREET TO STREET 14 STREET |
Q012024022A76 | 2024-01-22 | 2024-02-06 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 31 DRIVE, QUEENS, FROM STREET 12 STREET TO STREET 14 STREET |
X042024022A10 | 2024-01-22 | 2024-02-15 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST FORDHAM ROAD, BRONX, FROM STREET GRAND CONCOURSE |
X012024022A52 | 2024-01-22 | 2024-02-15 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 230 STREET, BRONX, FROM STREET CARPENTER AVENUE TO STREET LOWERRE PLACE |
X042024022A07 | 2024-01-22 | 2024-02-15 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST FORDHAM ROAD, BRONX, FROM STREET GRAND CONCOURSE |
X042024022A09 | 2024-01-22 | 2024-02-15 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST FORDHAM ROAD, BRONX, FROM STREET GRAND CONCOURSE |
Q042024022A04 | 2024-01-22 | 2024-02-06 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 31 DRIVE, QUEENS, FROM STREET 12 STREET TO STREET 14 STREET |
Q012024021A00 | 2024-01-21 | 2024-02-13 | PAVE STREET-W/ ENGINEERING & INSP FEE | 255 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
X042024017A04 | 2024-01-17 | 2024-01-25 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | ANTHONY AVENUE, BRONX, FROM STREET EAST 180 STREET |
B022024017A73 | 2024-01-17 | 2024-02-14 | TEMPORARY PEDESTRIAN WALK | EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE |
B022024017A74 | 2024-01-17 | 2024-02-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE |
B012024017B89 | 2024-01-17 | 2024-02-14 | RESET, REPAIR OR REPLACE CURB | EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE |
B042024017A13 | 2024-01-17 | 2024-02-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE |
X012024017A53 | 2024-01-17 | 2024-01-25 | RESET, REPAIR OR REPLACE CURB | ANTHONY AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET |
X012024017A54 | 2024-01-17 | 2024-01-25 | RESET, REPAIR OR REPLACE CURB | EAST 180 STREET, BRONX, FROM STREET ANTHONY AVENUE TO STREET GRAND CONCOURSE |
X042024017A03 | 2024-01-17 | 2024-01-25 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | ANTHONY AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET |
X042024017A05 | 2024-01-17 | 2024-01-25 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | ANTHONY AVENUE, BRONX, FROM STREET EAST 180 STREET |
X042024017A06 | 2024-01-17 | 2024-01-25 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | ANTHONY AVENUE, BRONX, FROM STREET EAST 180 STREET |
X042024017A07 | 2024-01-17 | 2024-01-25 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 180 STREET, BRONX, FROM STREET ANTHONY AVENUE TO STREET GRAND CONCOURSE |
Q012024010B66 | 2024-01-10 | 2024-02-07 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 49 AVENUE, QUEENS, FROM STREET 5 STREET TO STREET VERNON BOULEVARD |
X022024010B34 | 2024-01-10 | 2024-02-02 | TEMPORARY PEDESTRIAN WALK | EAST 230 STREET, BRONX, FROM STREET CARPENTER AVENUE TO STREET LOWERRE PLACE |
X042024010A20 | 2024-01-10 | 2024-02-02 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 230 STREET, BRONX, FROM STREET CARPENTER AVENUE TO STREET LOWERRE PLACE |
B012024010A91 | 2024-01-10 | 2024-01-12 | RESET, REPAIR OR REPLACE CURB-PROTECTED | TOMPKINS AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET STOCKTON STREET |
X022024010B35 | 2024-01-10 | 2024-02-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 230 STREET, BRONX, FROM STREET CARPENTER AVENUE TO STREET LOWERRE PLACE |
B022024010A47 | 2024-01-10 | 2024-01-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | STOCKTON STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
Q012024010B58 | 2024-01-10 | 2024-02-08 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 49 AVENUE, QUEENS, FROM STREET 5 STREET TO STREET VERNON BOULEVARD |
B042024010A11 | 2024-01-10 | 2024-01-12 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | TOMPKINS AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET STOCKTON STREET |
B042024010A10 | 2024-01-10 | 2024-01-19 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | STOCKTON STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
B012024010A90 | 2024-01-10 | 2024-01-19 | RESET, REPAIR OR REPLACE CURB | STOCKTON STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
X012024010B37 | 2024-01-10 | 2024-02-02 | RESET, REPAIR OR REPLACE CURB-PROTECTED | EAST 230 STREET, BRONX, FROM STREET CARPENTER AVENUE TO STREET LOWERRE PLACE |
B022024010A46 | 2024-01-10 | 2024-01-19 | TEMPORARY PEDESTRIAN WALK | STOCKTON STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
Q042024010A23 | 2024-01-10 | 2024-02-07 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 49 AVENUE, QUEENS, FROM STREET 5 STREET TO STREET VERNON BOULEVARD |
B022024010A49 | 2024-01-10 | 2024-01-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | TOMPKINS AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET STOCKTON STREET |
B022024010A48 | 2024-01-10 | 2024-01-12 | TEMPORARY PEDESTRIAN WALK | TOMPKINS AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET STOCKTON STREET |
B012024009B64 | 2024-01-09 | 2024-02-08 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | LENOX ROAD, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B012024005C32 | 2024-01-05 | 2024-02-01 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 13 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B012024003C19 | 2024-01-03 | 2024-01-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | BEDFORD AVENUE, BROOKLYN, FROM STREET LINDEN BOULEVARD |
B012024003C18 | 2024-01-03 | 2024-01-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | BEDFORD AVENUE, BROOKLYN, FROM STREET CATON AVENUE TO STREET MARTENSE STREET |
B012024003C17 | 2024-01-03 | 2024-01-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | LINDEN BOULEVARD, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
B022024002B38 | 2024-01-02 | 2024-01-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | CLERMONT AVENUE, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE |
B042024002A10 | 2024-01-02 | 2024-01-30 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CLERMONT AVENUE, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE |
B012024002B01 | 2024-01-02 | 2024-01-30 | RESET, REPAIR OR REPLACE CURB | CLERMONT AVENUE, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE |
B022024002B37 | 2024-01-02 | 2024-01-31 | TEMPORARY PEDESTRIAN WALK | CLERMONT AVENUE, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE |
B042023363A04 | 2023-12-29 | 2024-01-26 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | ESSEX STREET, BROOKLYN, FROM STREET FOLSOM PLACE TO STREET FULTON STREET |
B012023363C14 | 2023-12-29 | 2024-01-26 | RESET, REPAIR OR REPLACE CURB | ESSEX STREET, BROOKLYN, FROM STREET FOLSOM PLACE TO STREET FULTON STREET |
X022023362B38 | 2023-12-28 | 2024-01-26 | TEMPORARY PEDESTRIAN WALK | GRAND CONCOURSE, BRONX, FROM STREET EAST 192 STREET TO STREET EAST FORDHAM ROAD |
X012023362A34 | 2023-12-28 | 2024-01-26 | RESET, REPAIR OR REPLACE CURB | GRAND CONCOURSE, BRONX, FROM STREET EAST 192 STREET TO STREET EAST FORDHAM ROAD |
X042023362A11 | 2023-12-28 | 2024-01-26 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | GRAND CONCOURSE, BRONX, FROM STREET EAST 192 STREET TO STREET EAST FORDHAM ROAD |
X042023362A18 | 2023-12-28 | 2024-01-13 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST FORDHAM ROAD, BRONX, FROM STREET GRAND CONCOURSE |
X042023362A19 | 2023-12-28 | 2024-01-13 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST FORDHAM ROAD, BRONX, FROM STREET GRAND CONCOURSE |
X042023362A20 | 2023-12-28 | 2024-01-13 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | EAST FORDHAM ROAD, BRONX, FROM STREET GRAND CONCOURSE |
B012023362B24 | 2023-12-28 | 2024-01-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | 43 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY |
X022023362B39 | 2023-12-28 | 2024-01-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | GRAND CONCOURSE, BRONX, FROM STREET EAST 192 STREET TO STREET EAST FORDHAM ROAD |
B012023360B49 | 2023-12-26 | 2024-01-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | MILLER AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET |
B042023360A17 | 2023-12-26 | 2024-02-01 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | GRAHAM AVENUE, BROOKLYN, FROM STREET VARET STREET |
B012023360B50 | 2023-12-26 | 2024-01-18 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | ATLANTIC AVENUE, BROOKLYN, FROM STREET MILLER AVENUE |
B022023360C81 | 2023-12-26 | 2024-01-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | 43 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B022023360C80 | 2023-12-26 | 2024-01-18 | TEMPORARY PEDESTRIAN WALK | 43 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B012023360B48 | 2023-12-26 | 2024-01-18 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | ATLANTIC AVENUE, BROOKLYN, FROM STREET MILLER AVENUE TO STREET VAN SICLEN AVENUE |
B042023360A18 | 2023-12-26 | 2024-01-20 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | GRAHAM AVENUE, BROOKLYN, FROM STREET VARET STREET |
B042023360A24 | 2023-12-26 | 2024-01-18 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 43 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B012023356B19 | 2023-12-22 | 2024-01-19 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WYONA STREET, BROOKLYN, FROM STREET HEGEMAN AVENUE TO STREET LINDEN BOULEVARD |
B042023356A08 | 2023-12-22 | 2024-01-19 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WYONA STREET, BROOKLYN, FROM STREET HEGEMAN AVENUE TO STREET LINDEN BOULEVARD |
B042023356A14 | 2023-12-22 | 2024-01-20 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | CLERMONT AVENUE, BROOKLYN, FROM STREET PARK AVENUE |
B042023356A13 | 2023-12-22 | 2024-01-20 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | CLERMONT AVENUE, BROOKLYN, FROM STREET PARK AVENUE |
B042023356A11 | 2023-12-22 | 2024-01-20 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | PARK AVENUE, BROOKLYN, FROM STREET VANDERBILT AVENUE |
B042023356A10 | 2023-12-22 | 2024-01-20 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | PARK AVENUE, BROOKLYN, FROM STREET VANDERBILT AVENUE |
X042023354A12 | 2023-12-20 | 2024-01-18 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 152 STREET, BRONX, FROM STREET MELROSE AVENUE TO STREET 3 AVENUE |
X022023354B77 | 2023-12-20 | 2024-01-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 152 STREET, BRONX, FROM STREET MELROSE AVENUE TO STREET 3 AVENUE |
X022023354B76 | 2023-12-20 | 2024-01-18 | TEMPORARY PEDESTRIAN WALK | EAST 152 STREET, BRONX, FROM STREET MELROSE AVENUE TO STREET 3 AVENUE |
X012023354A60 | 2023-12-20 | 2024-01-18 | RESET, REPAIR OR REPLACE CURB | EAST 152 STREET, BRONX, FROM STREET MELROSE AVENUE TO STREET 3 AVENUE |
B012023353C60 | 2023-12-19 | 2024-01-13 | PAVE STREET-W/ ENGINEERING & INSP FEE | VERNON AVENUE, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE |
B022023348D20 | 2023-12-14 | 2024-01-09 | TEMPORARY PEDESTRIAN WALK | MAPLE STREET, BROOKLYN, FROM STREET EAST 48 STREET TO STREET UTICA AVENUE |
B042023348A41 | 2023-12-14 | 2024-01-09 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MAPLE STREET, BROOKLYN, FROM STREET EAST 48 STREET TO STREET UTICA AVENUE |
B012023348B90 | 2023-12-14 | 2024-01-09 | RESET, REPAIR OR REPLACE CURB-PROTECTED | MAPLE STREET, BROOKLYN, FROM STREET EAST 48 STREET TO STREET UTICA AVENUE |
B022023348D21 | 2023-12-14 | 2024-01-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | MAPLE STREET, BROOKLYN, FROM STREET EAST 48 STREET TO STREET UTICA AVENUE |
X002023347A00 | 2023-12-13 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
B012023346B20 | 2023-12-12 | 2023-12-30 | PAVE STREET-W/ ENGINEERING & INSP FEE | PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B042023345A16 | 2023-12-11 | 2024-01-09 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | LINDEN BOULEVARD, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
B042023345A17 | 2023-12-11 | 2024-01-09 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | BEDFORD AVENUE, BROOKLYN, FROM STREET LINDEN BOULEVARD |
B042023345A67 | 2023-12-11 | 2023-12-30 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B012023345B02 | 2023-12-11 | 2023-12-30 | RESET, REPAIR OR REPLACE CURB | PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022023345A23 | 2023-12-11 | 2024-01-09 | TEMPORARY PEDESTRIAN WALK | LINDEN BOULEVARD, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
B022023345D74 | 2023-12-11 | 2023-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022023345D73 | 2023-12-11 | 2023-12-31 | TEMPORARY PEDESTRIAN WALK | PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022023345A24 | 2023-12-11 | 2024-01-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | LINDEN BOULEVARD, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
B042023345A18 | 2023-12-11 | 2024-01-09 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | BEDFORD AVENUE, BROOKLYN, FROM STREET LINDEN BOULEVARD |
B012023345A52 | 2023-12-11 | 2024-01-09 | RESET, REPAIR OR REPLACE CURB | LINDEN BOULEVARD, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
B042023342A10 | 2023-12-08 | 2024-01-02 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | BEDFORD AVENUE, BROOKLYN, FROM STREET LINDEN BOULEVARD |
B012023342A80 | 2023-12-08 | 2023-12-20 | RESET, REPAIR OR REPLACE CURB | VERNON AVENUE, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE |
B012023342A81 | 2023-12-08 | 2023-12-31 | RESET, REPAIR OR REPLACE CURB | BEDFORD AVENUE, BROOKLYN, FROM STREET CATON AVENUE TO STREET MARTENSE STREET |
B012023342A83 | 2023-12-08 | 2023-12-15 | RESET, REPAIR OR REPLACE CURB-PROTECTED | VANDERBILT AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B042023342A09 | 2023-12-08 | 2023-12-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | VERNON AVENUE, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE |
B022023342A71 | 2023-12-08 | 2023-12-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | VANDERBILT AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B022023342A70 | 2023-12-08 | 2023-12-15 | TEMPORARY PEDESTRIAN WALK | VANDERBILT AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B022023342A61 | 2023-12-08 | 2023-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEDFORD AVENUE, BROOKLYN, FROM STREET CATON AVENUE TO STREET MARTENSE STREET |
B022023342A60 | 2023-12-08 | 2023-12-31 | TEMPORARY PEDESTRIAN WALK | BEDFORD AVENUE, BROOKLYN, FROM STREET CATON AVENUE TO STREET MARTENSE STREET |
B022023342A59 | 2023-12-08 | 2023-12-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | VERNON AVENUE, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE |
B022023342A58 | 2023-12-08 | 2023-12-20 | TEMPORARY PEDESTRIAN WALK | VERNON AVENUE, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE |
B042023342A13 | 2023-12-08 | 2023-12-15 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | VANDERBILT AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B042023342A11 | 2023-12-08 | 2024-01-02 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BEDFORD AVENUE, BROOKLYN, FROM STREET CATON AVENUE TO STREET MARTENSE STREET |
X012023340A69 | 2023-12-06 | 2023-12-16 | PAVE STREET-W/ ENGINEERING & INSP FEE | REV JAMES POLITE AVENUE, BRONX, FROM STREET CHISHOLM STREET TO STREET FREEMAN STREET |
X002023340A00 | 2023-12-06 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
X002023340A01 | 2023-12-06 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
X002023340A02 | 2023-12-06 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
X002023340A03 | 2023-12-06 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
X012023340A70 | 2023-12-06 | 2023-12-16 | PAVE STREET-W/ ENGINEERING & INSP FEE | CHISHOLM STREET, BRONX, FROM STREET REV JAMES POLITE AVENUE |
X012023340A68 | 2023-12-06 | 2023-12-16 | PAVE STREET-W/ ENGINEERING & INSP FEE | CHISHOLM STREET, BRONX, FROM STREET INTERVALE AVENUE TO STREET REV JAMES POLITE AVENUE |
B012023337A00 | 2023-12-03 | 2023-12-16 | PAVE STREET-W/ ENGINEERING & INSP FEE | 10 AVENUE, BROOKLYN, FROM STREET 43 STREET TO STREET 44 STREET |
M042023334A00 | 2023-11-30 | 2023-12-29 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEST 150 STREET, MANHATTAN, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS AVENUE |
M012023334A22 | 2023-11-30 | 2023-12-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 150 STREET, MANHATTAN, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS AVENUE |
B002023332A07 | 2023-11-28 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
Q042023331A06 | 2023-11-27 | 2023-12-19 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 65 ROAD, QUEENS, FROM STREET QUEENS BOULEVARD |
Q042023331A04 | 2023-11-27 | 2023-12-19 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 65 ROAD, QUEENS, FROM STREET QUEENS BOULEVARD |
Q042023331A05 | 2023-11-27 | 2023-12-19 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 65 ROAD, QUEENS, FROM STREET QUEENS BOULEVARD |
Q002023324A02 | 2023-11-20 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
Q002023321A06 | 2023-11-17 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
B012023321B22 | 2023-11-17 | 2023-12-15 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | VANDERBILT AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B042023321A10 | 2023-11-17 | 2023-12-16 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | WITHERS STREET, BROOKLYN, FROM STREET MEEKER AVENUE |
B022023320A71 | 2023-11-16 | 2023-11-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | LENOX ROAD, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B042023320A37 | 2023-11-16 | 2023-12-15 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | PARK AVENUE, BROOKLYN, FROM STREET CLERMONT AVENUE TO STREET VANDERBILT AVENUE |
B042023320A17 | 2023-11-16 | 2023-11-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | LENOX ROAD, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B022023320D34 | 2023-11-16 | 2023-12-15 | TEMPORARY PEDESTRIAN WALK | PARK AVENUE, BROOKLYN, FROM STREET CLERMONT AVENUE TO STREET VANDERBILT AVENUE |
B012023320C02 | 2023-11-16 | 2023-12-15 | RESET, REPAIR OR REPLACE CURB | PARK AVENUE, BROOKLYN, FROM STREET CLERMONT AVENUE TO STREET VANDERBILT AVENUE |
B022023320A70 | 2023-11-16 | 2023-11-20 | TEMPORARY PEDESTRIAN WALK | LENOX ROAD, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B022023320D35 | 2023-11-16 | 2023-12-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | PARK AVENUE, BROOKLYN, FROM STREET CLERMONT AVENUE TO STREET VANDERBILT AVENUE |
B012023320A78 | 2023-11-16 | 2023-11-20 | RESET, REPAIR OR REPLACE CURB-PROTECTED | LENOX ROAD, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B002023319A06 | 2023-11-15 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
B012023319B66 | 2023-11-15 | 2023-11-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | 59 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B002023318A14 | 2023-11-14 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
B042023313A31 | 2023-11-09 | 2023-11-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 13 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B012023313C64 | 2023-11-09 | 2023-11-20 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 13 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
Q002023313A14 | 2023-11-09 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
B002023311A13 | 2023-11-07 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
B022023310B43 | 2023-11-06 | 2023-11-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | MC GUINNESS BOULEVARD, BROOKLYN, FROM STREET CALYER STREET TO STREET MESEROLE AVENUE |
B022023310B42 | 2023-11-06 | 2023-11-10 | TEMPORARY PEDESTRIAN WALK | MC GUINNESS BOULEVARD, BROOKLYN, FROM STREET CALYER STREET TO STREET MESEROLE AVENUE |
B042023310A20 | 2023-11-06 | 2023-11-10 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MC GUINNESS BOULEVARD, BROOKLYN, FROM STREET CALYER STREET TO STREET MESEROLE AVENUE |
B012023310A73 | 2023-11-06 | 2023-11-20 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | CLARKSON AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012023310B78 | 2023-11-06 | 2023-11-10 | RESET, REPAIR OR REPLACE CURB-PROTECTED | MC GUINNESS BOULEVARD, BROOKLYN, FROM STREET CALYER STREET TO STREET MESEROLE AVENUE |
B012023310A75 | 2023-11-06 | 2023-11-20 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | CLARKSON AVENUE, BROOKLYN, FROM STREET ROGERS AVENUE |
B012023310A74 | 2023-11-06 | 2023-11-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | ROGERS AVENUE, BROOKLYN, FROM STREET CLARKSON AVENUE TO STREET LENOX ROAD |
B012023306B05 | 2023-11-02 | 2023-11-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | BEDFORD AVENUE, BROOKLYN, FROM STREET ST JOHNS PLACE |
M022023306C70 | 2023-11-02 | 2023-11-20 | TEMPORARY PEDESTRIAN WALK | EAST 116 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR |
M022023306C71 | 2023-11-02 | 2023-11-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 116 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR |
M042023306A23 | 2023-11-02 | 2023-11-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 116 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR |
Q012023306B77 | 2023-11-02 | 2023-11-20 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 30 DRIVE, QUEENS, FROM STREET 21 STREET TO STREET 23 STREET |
M012023306B49 | 2023-11-02 | 2023-11-20 | RESET, REPAIR OR REPLACE CURB | EAST 116 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR |
B012023306B04 | 2023-11-02 | 2023-11-20 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | ST JOHNS PLACE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
B042023304A08 | 2023-10-31 | 2023-11-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | GRAHAM AVENUE, BROOKLYN, FROM STREET COOK STREET TO STREET VARET STREET |
B022023304A91 | 2023-10-31 | 2023-11-14 | TEMPORARY PEDESTRIAN WALK | GRAHAM AVENUE, BROOKLYN, FROM STREET COOK STREET TO STREET VARET STREET |
B022023304A92 | 2023-10-31 | 2023-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | GRAHAM AVENUE, BROOKLYN, FROM STREET COOK STREET TO STREET VARET STREET |
B012023304B11 | 2023-10-31 | 2023-11-14 | RESET, REPAIR OR REPLACE CURB | GRAHAM AVENUE, BROOKLYN, FROM STREET COOK STREET TO STREET VARET STREET |
B002023303A10 | 2023-10-30 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
B002023303A11 | 2023-10-30 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
Q012023297A99 | 2023-10-24 | 2023-11-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | BARCLAY AVENUE, QUEENS, FROM STREET BEND TO STREET UNION STREET |
B012023297B25 | 2023-10-24 | 2023-11-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | 22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
Q002023296A06 | 2023-10-23 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
Q012023292A36 | 2023-10-19 | 2023-11-09 | PAVE STREET-W/ ENGINEERING & INSP FEE | 89 AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET |
X012023291A86 | 2023-10-18 | 2023-10-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | PROSPECT AVENUE, BRONX, FROM STREET EAST 175 STREET TO STREET EAST 176 STREET |
Q022023291B83 | 2023-10-18 | 2023-11-14 | TEMPORARY PEDESTRIAN WALK | BARCLAY AVENUE, QUEENS, FROM STREET BEND TO STREET UNION STREET |
Q022023291B84 | 2023-10-18 | 2023-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | BARCLAY AVENUE, QUEENS, FROM STREET BEND TO STREET UNION STREET |
B022023291C88 | 2023-10-18 | 2023-11-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | ST JOHNS PLACE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
B022023291C87 | 2023-10-18 | 2023-11-08 | TEMPORARY PEDESTRIAN WALK | ST JOHNS PLACE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
Q012023291C15 | 2023-10-18 | 2023-11-14 | RESET, REPAIR OR REPLACE CURB | BARCLAY AVENUE, QUEENS, FROM STREET BEND TO STREET UNION STREET |
B012023291B50 | 2023-10-18 | 2023-11-08 | RESET, REPAIR OR REPLACE CURB-PROTECTED | ST JOHNS PLACE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
B042023291A34 | 2023-10-18 | 2023-11-11 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | BEDFORD AVENUE, BROOKLYN, FROM STREET ST JOHNS PLACE |
B042023291A35 | 2023-10-18 | 2023-11-11 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | BEDFORD AVENUE, BROOKLYN, FROM STREET ST JOHNS PLACE |
B042023291A36 | 2023-10-18 | 2023-11-11 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | BEDFORD AVENUE, BROOKLYN, FROM STREET ST JOHNS PLACE |
B042023291A37 | 2023-10-18 | 2023-11-08 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | ST JOHNS PLACE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
Q042023291A59 | 2023-10-18 | 2023-11-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BARCLAY AVENUE, QUEENS, FROM STREET BEND TO STREET UNION STREET |
B012023284C51 | 2023-10-11 | 2023-10-24 | RESET, REPAIR OR REPLACE CURB | VANDERBILT AVENUE, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE |
B022023284E22 | 2023-10-11 | 2023-10-24 | TEMPORARY PEDESTRIAN WALK | VANDERBILT AVENUE, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE |
B022023284E23 | 2023-10-11 | 2023-10-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | VANDERBILT AVENUE, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE |
B022023284A20 | 2023-10-11 | 2023-11-01 | TEMPORARY PEDESTRIAN WALK | VARET STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
X012023284C11 | 2023-10-11 | 2023-11-07 | PAVE STREET-W/ ENGINEERING & INSP FEE | WARD AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET WATSON AVENUE |
B042023284A47 | 2023-10-11 | 2023-11-01 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | VARET STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
B042023284B74 | 2023-10-11 | 2023-10-24 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | VANDERBILT AVENUE, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE |
B022023284A21 | 2023-10-11 | 2023-11-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | VARET STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
X012023284C10 | 2023-10-11 | 2023-11-07 | PAVE STREET-W/ ENGINEERING & INSP FEE | NELSON AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET FEATHERBED LANE |
B012023284A37 | 2023-10-11 | 2023-11-01 | RESET, REPAIR OR REPLACE CURB-PROTECTED | VARET STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
Q012023283B23 | 2023-10-10 | 2023-11-08 | RESET, REPAIR OR REPLACE CURB-PROTECTED | ARCHER AVENUE, QUEENS, FROM STREET 165 STREET TO STREET GUY R BREWER BOULEVARD |
Q042023283A09 | 2023-10-10 | 2023-11-08 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | ARCHER AVENUE, QUEENS, FROM STREET 165 STREET TO STREET GUY R BREWER BOULEVARD |
X022023282A12 | 2023-10-09 | 2023-10-21 | TEMPORARY PEDESTRIAN WALK | WARD AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET WATSON AVENUE |
X042023282A01 | 2023-10-09 | 2023-10-21 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WARD AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET WATSON AVENUE |
X042023282A00 | 2023-10-09 | 2023-10-18 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | NELSON AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET FEATHERBED LANE |
X022023282A13 | 2023-10-09 | 2023-10-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | WARD AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET WATSON AVENUE |
B012023282A20 | 2023-10-09 | 2023-10-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | CONOVER STREET, BROOKLYN, FROM STREET DIKEMAN STREET |
X022023282A10 | 2023-10-09 | 2023-10-18 | TEMPORARY PEDESTRIAN WALK | NELSON AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET FEATHERBED LANE |
B012023282A19 | 2023-10-09 | 2023-10-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | DIKEMAN STREET, BROOKLYN, FROM STREET CONOVER STREET TO STREET VAN BRUNT STREET |
X012023282A08 | 2023-10-09 | 2023-10-21 | RESET, REPAIR OR REPLACE CURB | WARD AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET WATSON AVENUE |
X022023282A11 | 2023-10-09 | 2023-10-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | NELSON AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET FEATHERBED LANE |
X012023282A07 | 2023-10-09 | 2023-10-18 | RESET, REPAIR OR REPLACE CURB | NELSON AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET FEATHERBED LANE |
Q012023269C71 | 2023-09-26 | 2023-09-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | 65 ROAD, QUEENS, FROM STREET SAUNDERS STREET TO STREET 65 AVENUE |
Q012023269C73 | 2023-09-26 | 2023-09-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | 65 ROAD, QUEENS, FROM STREET QUEENS BOULEVARD |
Q012023269D57 | 2023-09-26 | 2023-10-21 | RESET, REPAIR OR REPLACE CURB | 65 ROAD, QUEENS, FROM STREET SAUNDERS STREET TO STREET 65 AVENUE |
M012023269A98 | 2023-09-26 | 2023-10-24 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | AVENUE C, MANHATTAN, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET |
M012023269A96 | 2023-09-26 | 2023-10-24 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 6 STREET, MANHATTAN, FROM STREET AVENUE B TO STREET AVENUE C |
M012023269A97 | 2023-09-26 | 2023-10-24 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | AVENUE C, MANHATTAN, FROM STREET EAST 6 STREET |
Q042023269A75 | 2023-09-26 | 2023-10-21 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 65 ROAD, QUEENS, FROM STREET SAUNDERS STREET TO STREET 65 AVENUE |
Q012023269C72 | 2023-09-26 | 2023-09-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | QUEENS BOULEVARD, QUEENS, FROM STREET 65 ROAD TO STREET 66 AVENUE |
Q042023265A19 | 2023-09-22 | 2023-10-19 | REPLACE SIDEWALK | 54 PLACE, QUEENS, FROM STREET ARNOLD AVENUE TO STREET NURGE AVENUE |
Q022023265A44 | 2023-09-22 | 2023-10-19 | TEMPORARY PEDESTRIAN WALK | 54 PLACE, QUEENS, FROM STREET ARNOLD AVENUE TO STREET NURGE AVENUE |
Q012023265B16 | 2023-09-22 | 2023-10-19 | RESET, REPAIR OR REPLACE CURB | 54 PLACE, QUEENS, FROM STREET ARNOLD AVENUE TO STREET NURGE AVENUE |
Q022023265A45 | 2023-09-22 | 2023-10-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | 54 PLACE, QUEENS, FROM STREET ARNOLD AVENUE TO STREET NURGE AVENUE |
B022023262A26 | 2023-09-19 | 2023-10-14 | TEMPORARY PEDESTRIAN WALK | 16 AVENUE, BROOKLYN, FROM STREET 50 STREET TO STREET 51 STREET |
B022023262A27 | 2023-09-19 | 2023-10-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | 16 AVENUE, BROOKLYN, FROM STREET 50 STREET TO STREET 51 STREET |
B042023262A18 | 2023-09-19 | 2023-10-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 16 AVENUE, BROOKLYN, FROM STREET 50 STREET TO STREET 51 STREET |
B012023262A92 | 2023-09-19 | 2023-10-14 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 16 AVENUE, BROOKLYN, FROM STREET 50 STREET TO STREET 51 STREET |
B022023257D16 | 2023-09-14 | 2023-10-13 | TEMPORARY PEDESTRIAN WALK | BEDFORD AVENUE, BROOKLYN, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE |
B022023257D17 | 2023-09-14 | 2023-10-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEDFORD AVENUE, BROOKLYN, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE |
B042023257B07 | 2023-09-14 | 2023-10-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | ST JOHNS PLACE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
B022023257D14 | 2023-09-14 | 2023-10-13 | TEMPORARY PEDESTRIAN WALK | ST JOHNS PLACE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
B022023257D15 | 2023-09-14 | 2023-10-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | ST JOHNS PLACE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
B042023257B08 | 2023-09-14 | 2023-10-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BEDFORD AVENUE, BROOKLYN, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE |
B042023257B09 | 2023-09-14 | 2023-10-13 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | BEDFORD AVENUE, BROOKLYN, FROM STREET ST JOHNS PLACE |
B042023257B10 | 2023-09-14 | 2023-10-13 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | BEDFORD AVENUE, BROOKLYN, FROM STREET ST JOHNS PLACE |
B012023257C23 | 2023-09-14 | 2023-09-20 | RESET, REPAIR OR REPLACE CURB | BEDFORD AVENUE, BROOKLYN, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE |
B012023257C22 | 2023-09-14 | 2023-10-13 | RESET, REPAIR OR REPLACE CURB-PROTECTED | ST JOHNS PLACE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
B042023257B11 | 2023-09-14 | 2023-10-13 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | BEDFORD AVENUE, BROOKLYN, FROM STREET ST JOHNS PLACE |
M042023255A29 | 2023-09-12 | 2023-09-29 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | AVENUE C, MANHATTAN, FROM STREET EAST 6 STREET |
M042023255A28 | 2023-09-12 | 2023-09-29 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | AVENUE C, MANHATTAN, FROM STREET EAST 6 STREET |
M042023255A27 | 2023-09-12 | 2023-09-29 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | AVENUE C, MANHATTAN, FROM STREET EAST 6 STREET |
B022023255A55 | 2023-09-12 | 2023-09-28 | TEMPORARY PEDESTRIAN WALK | NORTH 6 STREET, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET |
B022023255A56 | 2023-09-12 | 2023-09-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | NORTH 6 STREET, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET |
X012023255C07 | 2023-09-12 | 2023-09-26 | RESET, REPAIR OR REPLACE CURB | PROSPECT AVENUE, BRONX, FROM STREET EAST 175 STREET TO STREET EAST 176 STREET |
X012023255C08 | 2023-09-12 | 2023-09-13 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | WEST 190 STREET, BRONX, FROM STREET DEVOE TERRACE TO STREET UNIVERSITY AVENUE |
X012023255D31 | 2023-09-12 | 2023-09-26 | RESET, REPAIR OR REPLACE CURB | ELM PLACE, BRONX, FROM STREET EAST 188 STREET TO STREET EAST FORDHAM ROAD |
B012023255A72 | 2023-09-12 | 2023-09-28 | RESET, REPAIR OR REPLACE CURB | NORTH 6 STREET, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET |
X022023255C18 | 2023-09-12 | 2023-09-26 | TEMPORARY PEDESTRIAN WALK | ELM PLACE, BRONX, FROM STREET EAST 188 STREET TO STREET EAST FORDHAM ROAD |
B042023255A36 | 2023-09-12 | 2023-09-28 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | NORTH 6 STREET, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET |
X022023255C19 | 2023-09-12 | 2023-09-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | ELM PLACE, BRONX, FROM STREET EAST 188 STREET TO STREET EAST FORDHAM ROAD |
X042023255A65 | 2023-09-12 | 2023-09-26 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | ELM PLACE, BRONX, FROM STREET EAST 188 STREET TO STREET EAST FORDHAM ROAD |
X042023255A22 | 2023-09-12 | 2023-09-26 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | PROSPECT AVENUE, BRONX, FROM STREET EAST 175 STREET TO STREET EAST 176 STREET |
X022023255B57 | 2023-09-12 | 2023-09-26 | TEMPORARY PEDESTRIAN WALK | PROSPECT AVENUE, BRONX, FROM STREET EAST 175 STREET TO STREET EAST 176 STREET |
X022023255B58 | 2023-09-12 | 2023-09-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | PROSPECT AVENUE, BRONX, FROM STREET EAST 175 STREET TO STREET EAST 176 STREET |
B012023254C88 | 2023-09-11 | 2023-10-10 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | MADISON STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
X012023254A79 | 2023-09-11 | 2023-09-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | ELM PLACE, BRONX, FROM STREET EAST 188 STREET TO STREET EAST FORDHAM ROAD |
B012023253A02 | 2023-09-10 | 2023-09-30 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N |
Q022023248A75 | 2023-09-05 | 2023-09-23 | TEMPORARY PEDESTRIAN WALK | 65 ROAD, QUEENS, FROM STREET SAUNDERS STREET TO STREET 65 AVENUE |
Q042023248A37 | 2023-09-05 | 2023-09-21 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | QUEENS BOULEVARD, QUEENS, FROM STREET 65 ROAD TO STREET 66 AVENUE |
Q022023248A92 | 2023-09-05 | 2023-09-21 | TEMPORARY PEDESTRIAN WALK | QUEENS BOULEVARD, QUEENS, FROM STREET 65 ROAD TO STREET 66 AVENUE |
Q042023248A33 | 2023-09-05 | 2023-09-23 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 65 ROAD, QUEENS, FROM STREET SAUNDERS STREET TO STREET 65 AVENUE |
Q042023248A34 | 2023-09-05 | 2023-09-21 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 65 ROAD, QUEENS, FROM STREET QUEENS BOULEVARD |
Q022023248A76 | 2023-09-05 | 2023-09-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | 65 ROAD, QUEENS, FROM STREET SAUNDERS STREET TO STREET 65 AVENUE |
Q012023248D41 | 2023-09-05 | 2023-09-23 | RESET, REPAIR OR REPLACE CURB | 65 ROAD, QUEENS, FROM STREET SAUNDERS STREET TO STREET 65 AVENUE |
Q022023248A93 | 2023-09-05 | 2023-09-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | QUEENS BOULEVARD, QUEENS, FROM STREET 65 ROAD TO STREET 66 AVENUE |
Q012023248D80 | 2023-09-05 | 2023-09-21 | RESET, REPAIR OR REPLACE CURB | QUEENS BOULEVARD, QUEENS, FROM STREET 65 ROAD TO STREET 66 AVENUE |
M022023244C80 | 2023-09-01 | 2023-09-15 | TEMPORARY PEDESTRIAN WALK | EAST 6 STREET, MANHATTAN, FROM STREET AVENUE B TO STREET AVENUE C |
M022023244C82 | 2023-09-01 | 2023-09-15 | TEMPORARY PEDESTRIAN WALK | AVENUE C, MANHATTAN, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET |
M022023244C83 | 2023-09-01 | 2023-09-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | AVENUE C, MANHATTAN, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET |
M042023244A05 | 2023-09-01 | 2023-09-15 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 6 STREET, MANHATTAN, FROM STREET AVENUE B TO STREET AVENUE C |
M012023244A59 | 2023-09-01 | 2023-09-15 | RESET, REPAIR OR REPLACE CURB-PROTECTED | AVENUE C, MANHATTAN, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET |
M012023244A58 | 2023-09-01 | 2023-09-15 | RESET, REPAIR OR REPLACE CURB-PROTECTED | EAST 6 STREET, MANHATTAN, FROM STREET AVENUE B TO STREET AVENUE C |
M042023244A06 | 2023-09-01 | 2023-09-15 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | AVENUE C, MANHATTAN, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET |
M022023244C81 | 2023-09-01 | 2023-09-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 6 STREET, MANHATTAN, FROM STREET AVENUE B TO STREET AVENUE C |
B022023243B76 | 2023-08-31 | 2023-09-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | 10 AVENUE, BROOKLYN, FROM STREET 43 STREET TO STREET 44 STREET |
Q012023243D17 | 2023-08-31 | 2023-09-26 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 21 STREET, QUEENS, FROM STREET 27 AVENUE TO STREET 27 ROAD |
B012023243C85 | 2023-08-31 | 2023-09-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | 60 STREET, BROOKLYN, FROM STREET BAY PARKWAY |
B022023243A28 | 2023-08-31 | 2023-09-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | 43 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B012023243B62 | 2023-08-31 | 2023-09-27 | RESET, REPAIR OR REPLACE CURB | 10 AVENUE, BROOKLYN, FROM STREET 43 STREET TO STREET 44 STREET |
B012023243C84 | 2023-08-31 | 2023-09-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B012023243C83 | 2023-08-31 | 2023-09-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B012023243A80 | 2023-08-31 | 2023-09-29 | RESET, REPAIR OR REPLACE CURB | 43 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B022023243A27 | 2023-08-31 | 2023-09-29 | TEMPORARY PEDESTRIAN WALK | 43 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B042023243C15 | 2023-08-31 | 2023-09-29 | REPLACE SIDEWALK | 43 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B042023243C20 | 2023-08-31 | 2023-09-27 | REPLACE SIDEWALK | 10 AVENUE, BROOKLYN, FROM STREET 43 STREET TO STREET 44 STREET |
B022023243B75 | 2023-08-31 | 2023-09-27 | TEMPORARY PEDESTRIAN WALK | 10 AVENUE, BROOKLYN, FROM STREET 43 STREET TO STREET 44 STREET |
Q022023240A47 | 2023-08-28 | 2023-09-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | 21 STREET, QUEENS, FROM STREET 27 AVENUE TO STREET 27 ROAD |
Q022023240A46 | 2023-08-28 | 2023-09-21 | TEMPORARY PEDESTRIAN WALK | 21 STREET, QUEENS, FROM STREET 27 AVENUE TO STREET 27 ROAD |
B042023240A07 | 2023-08-28 | 2023-09-22 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | CLARKSON AVENUE, BROOKLYN, FROM STREET ROGERS AVENUE |
B042023240A08 | 2023-08-28 | 2023-09-22 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | CLARKSON AVENUE, BROOKLYN, FROM STREET ROGERS AVENUE |
B042023240A09 | 2023-08-28 | 2023-09-22 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | CLARKSON AVENUE, BROOKLYN, FROM STREET ROGERS AVENUE |
Q042023240A27 | 2023-08-28 | 2023-09-21 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 21 STREET, QUEENS, FROM STREET 27 AVENUE TO STREET 27 ROAD |
Q012023240C00 | 2023-08-28 | 2023-09-21 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 21 STREET, QUEENS, FROM STREET 27 AVENUE TO STREET 27 ROAD |
X012023235A72 | 2023-08-23 | 2023-09-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | MOHEGAN AVENUE, BRONX, FROM STREET EAST 179 STREET TO STREET EAST 180 STREET |
X012023230A16 | 2023-08-18 | 2023-09-13 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WEST 190 STREET, BRONX, FROM STREET DEVOE TERRACE TO STREET UNIVERSITY AVENUE |
X042023229A02 | 2023-08-17 | 2023-09-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEST 190 STREET, BRONX, FROM STREET DEVOE TERRACE TO STREET UNIVERSITY AVENUE |
X022023229A42 | 2023-08-17 | 2023-09-13 | TEMPORARY PEDESTRIAN WALK | WEST 190 STREET, BRONX, FROM STREET DEVOE TERRACE TO STREET UNIVERSITY AVENUE |
X022023229A43 | 2023-08-17 | 2023-09-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 190 STREET, BRONX, FROM STREET DEVOE TERRACE TO STREET UNIVERSITY AVENUE |
B042023228A57 | 2023-08-16 | 2023-09-05 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 60 STREET, BROOKLYN, FROM STREET BAY PARKWAY |
B042023228A58 | 2023-08-16 | 2023-09-05 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 60 STREET, BROOKLYN, FROM STREET BAY PARKWAY |
B022023228C12 | 2023-08-16 | 2023-09-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023228C11 | 2023-08-16 | 2023-09-05 | TEMPORARY PEDESTRIAN WALK | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023228C10 | 2023-08-16 | 2023-09-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B022023228C09 | 2023-08-16 | 2023-09-05 | TEMPORARY PEDESTRIAN WALK | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B042023228A60 | 2023-08-16 | 2023-09-05 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B042023228A61 | 2023-08-16 | 2023-09-05 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B012023228C70 | 2023-08-16 | 2023-09-10 | PAVE STREET-W/ ENGINEERING & INSP FEE | VERMONT STREET, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE |
B012023228C65 | 2023-08-16 | 2023-09-05 | RESET, REPAIR OR REPLACE CURB | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B012023228C64 | 2023-08-16 | 2023-09-05 | RESET, REPAIR OR REPLACE CURB | BAY PARKWAY, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B042023228A59 | 2023-08-16 | 2023-09-05 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 60 STREET, BROOKLYN, FROM STREET BAY PARKWAY |
B012023227B24 | 2023-08-15 | 2023-09-05 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 32 STREET, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B012023227B58 | 2023-08-15 | 2023-09-12 | PAVE STREET-W/ ENGINEERING & INSP FEE | 46 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE |
X022023222A17 | 2023-08-10 | 2023-08-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | MARION AVENUE, BRONX, FROM STREET EAST 188 STREET TO STREET EAST FORDHAM ROAD |
X042023222A14 | 2023-08-10 | 2023-08-29 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MARION AVENUE, BRONX, FROM STREET EAST 188 STREET TO STREET EAST FORDHAM ROAD |
X022023222A16 | 2023-08-10 | 2023-08-29 | TEMPORARY PEDESTRIAN WALK | MARION AVENUE, BRONX, FROM STREET EAST 188 STREET TO STREET EAST FORDHAM ROAD |
X012023222A66 | 2023-08-10 | 2023-08-29 | RESET, REPAIR OR REPLACE CURB | MARION AVENUE, BRONX, FROM STREET EAST 188 STREET TO STREET EAST FORDHAM ROAD |
X022023221A66 | 2023-08-09 | 2023-08-26 | TEMPORARY PEDESTRIAN WALK | BATHGATE AVENUE, BRONX, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET |
X022023221A68 | 2023-08-09 | 2023-08-26 | TEMPORARY PEDESTRIAN WALK | EAST 183 STREET, BRONX, FROM STREET BATHGATE AVENUE TO STREET 3 AVENUE |
X012023221A89 | 2023-08-09 | 2023-09-05 | PAVE STREET-W/ ENGINEERING & INSP FEE | MARION AVENUE, BRONX, FROM STREET EAST 188 STREET TO STREET EAST FORDHAM ROAD |
X012023221A90 | 2023-08-09 | 2023-08-26 | RESET, REPAIR OR REPLACE CURB | BATHGATE AVENUE, BRONX, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET |
X012023221A91 | 2023-08-09 | 2023-08-26 | RESET, REPAIR OR REPLACE CURB-PROTECTED | EAST 183 STREET, BRONX, FROM STREET BATHGATE AVENUE TO STREET 3 AVENUE |
X042023221A04 | 2023-08-09 | 2023-08-26 | REPLACE SIDEWALK | EAST 183 STREET, BRONX, FROM STREET BATHGATE AVENUE TO STREET 3 AVENUE |
X042023221A03 | 2023-08-09 | 2023-08-26 | REPLACE SIDEWALK | BATHGATE AVENUE, BRONX, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET |
X022023221A69 | 2023-08-09 | 2023-08-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 183 STREET, BRONX, FROM STREET BATHGATE AVENUE TO STREET 3 AVENUE |
X022023221A67 | 2023-08-09 | 2023-08-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | BATHGATE AVENUE, BRONX, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET |
B042023220A01 | 2023-08-08 | 2023-09-05 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | GRAND AVENUE, BROOKLYN, FROM STREET PACIFIC STREET |
B012023220A52 | 2023-08-08 | 2023-09-02 | PAVE STREET-W/ ENGINEERING & INSP FEE | SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE |
B042023219A56 | 2023-08-07 | 2023-08-15 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 32 STREET, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B022023219B85 | 2023-08-07 | 2023-08-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 32 STREET, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B022023219B84 | 2023-08-07 | 2023-08-15 | TEMPORARY PEDESTRIAN WALK | EAST 32 STREET, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B012023219B99 | 2023-08-07 | 2023-08-15 | RESET, REPAIR OR REPLACE CURB | EAST 32 STREET, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
X012023214B19 | 2023-08-02 | 2023-08-23 | RESET, REPAIR OR REPLACE CURB | DECATUR AVENUE, BRONX, FROM STREET EAST 194 STREET TO STREET EAST 195 STREET |
X042023214A20 | 2023-08-02 | 2023-08-23 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | DECATUR AVENUE, BRONX, FROM STREET EAST 194 STREET TO STREET EAST 195 STREET |
Q012023214B82 | 2023-08-02 | 2023-08-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | FAIRVIEW AVENUE, QUEENS, FROM STREET BLEECKER STREET TO STREET GREENE AVENUE |
M012023214B45 | 2023-08-02 | 2023-08-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 79 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
B012023214C58 | 2023-08-02 | 2023-08-23 | PAVE STREET-W/ ENGINEERING & INSP FEE | ESSEX STREET, BROOKLYN, FROM STREET FOLSOM PLACE TO STREET FULTON STREET |
B012023212B82 | 2023-07-31 | 2023-08-23 | PAVE STREET-W/ ENGINEERING & INSP FEE | ELDERT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B012023212B81 | 2023-07-31 | 2023-08-23 | PAVE STREET-W/ ENGINEERING & INSP FEE | ELDERT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B022023209A25 | 2023-07-28 | 2023-08-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | CLARKSON AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B042023209A22 | 2023-07-28 | 2023-08-23 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | CLARKSON AVENUE, BROOKLYN, FROM STREET ROGERS AVENUE |
B042023209A21 | 2023-07-28 | 2023-08-23 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | CLARKSON AVENUE, BROOKLYN, FROM STREET ROGERS AVENUE |
B022023209A22 | 2023-07-28 | 2023-08-23 | TEMPORARY PEDESTRIAN WALK | ROGERS AVENUE, BROOKLYN, FROM STREET CLARKSON AVENUE TO STREET LENOX ROAD |
B042023209A07 | 2023-07-28 | 2023-08-23 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CLARKSON AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012023209A57 | 2023-07-28 | 2023-08-23 | RESET, REPAIR OR REPLACE CURB | ROGERS AVENUE, BROOKLYN, FROM STREET CLARKSON AVENUE TO STREET LENOX ROAD |
B012023209A58 | 2023-07-28 | 2023-08-23 | RESET, REPAIR OR REPLACE CURB-PROTECTED | CLARKSON AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B022023209A23 | 2023-07-28 | 2023-08-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | ROGERS AVENUE, BROOKLYN, FROM STREET CLARKSON AVENUE TO STREET LENOX ROAD |
B042023209A06 | 2023-07-28 | 2023-08-23 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | ROGERS AVENUE, BROOKLYN, FROM STREET CLARKSON AVENUE TO STREET LENOX ROAD |
B042023209A23 | 2023-07-28 | 2023-08-23 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | CLARKSON AVENUE, BROOKLYN, FROM STREET ROGERS AVENUE |
B022023209A24 | 2023-07-28 | 2023-08-23 | TEMPORARY PEDESTRIAN WALK | CLARKSON AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
X042023206A03 | 2023-07-25 | 2023-08-18 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | CHISHOLM STREET, BRONX, FROM STREET REV JAMES POLITE AVENUE |
B042023206A05 | 2023-07-25 | 2023-08-15 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | WITHERS STREET, BROOKLYN, FROM STREET MEEKER AVENUE |
X042023206A01 | 2023-07-25 | 2023-08-18 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | CHISHOLM STREET, BRONX, FROM STREET REV JAMES POLITE AVENUE |
X042023206A02 | 2023-07-25 | 2023-08-18 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | CHISHOLM STREET, BRONX, FROM STREET REV JAMES POLITE AVENUE |
Q022023205A07 | 2023-07-24 | 2023-08-22 | TEMPORARY PEDESTRIAN WALK | 30 DRIVE, QUEENS, FROM STREET 21 STREET TO STREET 23 STREET |
Q022023205A08 | 2023-07-24 | 2023-08-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | 30 DRIVE, QUEENS, FROM STREET 21 STREET TO STREET 23 STREET |
Q012023205A40 | 2023-07-24 | 2023-08-22 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 30 DRIVE, QUEENS, FROM STREET 21 STREET TO STREET 23 STREET |
Q042023205A04 | 2023-07-24 | 2023-08-22 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 30 DRIVE, QUEENS, FROM STREET 21 STREET TO STREET 23 STREET |
B012023201B26 | 2023-07-20 | 2023-08-16 | RESET, REPAIR OR REPLACE CURB-PROTECTED | MADISON STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
M042023201A19 | 2023-07-20 | 2023-08-18 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 79 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
B022023201A50 | 2023-07-20 | 2023-08-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | MADISON STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
B042023201A16 | 2023-07-20 | 2023-08-16 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MADISON STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
M012023201C01 | 2023-07-20 | 2023-08-18 | RESET, REPAIR OR REPLACE CURB | EAST 79 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
B022023201A49 | 2023-07-20 | 2023-08-16 | TEMPORARY PEDESTRIAN WALK | MADISON STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
B012023201B39 | 2023-07-20 | 2023-08-10 | RESET, REPAIR OR REPLACE CURB | SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE |
B022023201A52 | 2023-07-20 | 2023-08-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE |
B022023201A51 | 2023-07-20 | 2023-08-10 | TEMPORARY PEDESTRIAN WALK | SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE |
B042023201A17 | 2023-07-20 | 2023-08-10 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE |
M022023201C54 | 2023-07-20 | 2023-08-18 | TEMPORARY PEDESTRIAN WALK | EAST 79 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M022023201C55 | 2023-07-20 | 2023-08-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 79 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
Q042023194A04 | 2023-07-13 | 2023-08-10 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 89 AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET |
Q012023194B24 | 2023-07-13 | 2023-08-10 | RESET, REPAIR OR REPLACE CURB | 89 AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET |
Q022023194A41 | 2023-07-13 | 2023-08-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | 89 AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET |
Q022023194A40 | 2023-07-13 | 2023-08-10 | TEMPORARY PEDESTRIAN WALK | 89 AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET |
Q022023193B14 | 2023-07-12 | 2023-08-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | FAIRVIEW AVENUE, QUEENS, FROM STREET BLEECKER STREET TO STREET GREENE AVENUE |
Q012023193C57 | 2023-07-12 | 2023-08-03 | RESET, REPAIR OR REPLACE CURB | FAIRVIEW AVENUE, QUEENS, FROM STREET BLEECKER STREET TO STREET GREENE AVENUE |
B012023193A97 | 2023-07-12 | 2023-08-04 | RESET, REPAIR OR REPLACE CURB-PROTECTED | VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE |
B022023193B28 | 2023-07-12 | 2023-08-04 | TEMPORARY PEDESTRIAN WALK | VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE |
B022023193B29 | 2023-07-12 | 2023-08-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE |
B042023193A46 | 2023-07-12 | 2023-08-04 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE |
Q022023193B13 | 2023-07-12 | 2023-08-03 | TEMPORARY PEDESTRIAN WALK | FAIRVIEW AVENUE, QUEENS, FROM STREET BLEECKER STREET TO STREET GREENE AVENUE |
B012023193A98 | 2023-07-12 | 2023-08-04 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE |
Q042023193A94 | 2023-07-12 | 2023-08-03 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | FAIRVIEW AVENUE, QUEENS, FROM STREET BLEECKER STREET TO STREET GREENE AVENUE |
X012023178A51 | 2023-06-27 | 2023-07-22 | PAVE STREET-W/ ENGINEERING & INSP FEE | GRAND CONCOURSE, BRONX, FROM STREET MDE NORTHBOUND EXIT 3 TO STREET EAST 138 STREET |
M012023178A83 | 2023-06-27 | 2023-07-26 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WEST 19 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET 10 AVENUE |
B042023177A04 | 2023-06-26 | 2023-07-22 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BROADWAY, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD |
B012023173D23 | 2023-06-22 | 2023-07-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | LINCOLN PLACE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012023172A93 | 2023-06-21 | 2023-07-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | SCHAEFER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
X042023171A12 | 2023-06-20 | 2023-06-30 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | CHISHOLM STREET, BRONX, FROM STREET REV JAMES POLITE AVENUE |
X042023171A14 | 2023-06-20 | 2023-06-30 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | CHISHOLM STREET, BRONX, FROM STREET REV JAMES POLITE AVENUE |
X042023171A13 | 2023-06-20 | 2023-06-30 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | CHISHOLM STREET, BRONX, FROM STREET REV JAMES POLITE AVENUE |
Q012023167B44 | 2023-06-16 | 2023-07-12 | PAVE STREET-W/ ENGINEERING & INSP FEE | WOODWARD AVENUE, QUEENS, FROM STREET HARMAN STREET TO STREET HIMROD STREET |
Q012023167B43 | 2023-06-16 | 2023-07-12 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | HARMAN STREET, QUEENS, FROM STREET FAIRVIEW AVENUE TO STREET WOODWARD AVENUE |
Q012023167B45 | 2023-06-16 | 2023-07-12 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | HARMAN STREET, QUEENS, FROM STREET WOODWARD AVENUE |
M042023166A18 | 2023-06-15 | 2023-07-14 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | MACOMBS PLACE, MANHATTAN, FROM STREET WEST 154 STREET |
M042023166A19 | 2023-06-15 | 2023-07-14 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | MACOMBS PLACE, MANHATTAN, FROM STREET WEST 154 STREET |
X042023165A04 | 2023-06-14 | 2023-07-05 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MOHEGAN AVENUE, BRONX, FROM STREET EAST 179 STREET TO STREET EAST 180 STREET |
X022023165A47 | 2023-06-14 | 2023-07-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | MOHEGAN AVENUE, BRONX, FROM STREET EAST 179 STREET TO STREET EAST 180 STREET |
X022023165A46 | 2023-06-14 | 2023-07-05 | TEMPORARY PEDESTRIAN WALK | MOHEGAN AVENUE, BRONX, FROM STREET EAST 179 STREET TO STREET EAST 180 STREET |
X012023165A90 | 2023-06-14 | 2023-07-05 | RESET, REPAIR OR REPLACE CURB | MOHEGAN AVENUE, BRONX, FROM STREET EAST 179 STREET TO STREET EAST 180 STREET |
B022023165B78 | 2023-06-14 | 2023-07-07 | TEMPORARY PEDESTRIAN WALK | LINCOLN PLACE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012023165C23 | 2023-06-14 | 2023-07-07 | RESET, REPAIR OR REPLACE CURB | LINCOLN PLACE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012023165A68 | 2023-06-14 | 2023-07-06 | PAVE STREET-W/ ENGINEERING & INSP FEE | BEDFORD AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET |
B022023165B79 | 2023-06-14 | 2023-07-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | LINCOLN PLACE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B042023165A65 | 2023-06-14 | 2023-07-07 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | LINCOLN PLACE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B042023165A32 | 2023-06-14 | 2023-07-11 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | CONOVER STREET, BROOKLYN, FROM STREET DIKEMAN STREET |
B042023165A31 | 2023-06-14 | 2023-07-11 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | CONOVER STREET, BROOKLYN, FROM STREET DIKEMAN STREET |
B042023165A30 | 2023-06-14 | 2023-07-11 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | CONOVER STREET, BROOKLYN, FROM STREET DIKEMAN STREET |
B042023164A11 | 2023-06-13 | 2023-07-12 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | DURYEA PLACE, BROOKLYN, FROM STREET EAST 22 STREET |
B012023164E51 | 2023-06-13 | 2023-07-06 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | MEEKER AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET WITHERS STREET |
B012023164E50 | 2023-06-13 | 2023-07-06 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | WITHERS STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MEEKER AVENUE |
B012023164E49 | 2023-06-13 | 2023-07-06 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | MEEKER AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET WITHERS STREET |
B042023164A12 | 2023-06-13 | 2023-07-11 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 38 STREET, BROOKLYN, FROM STREET FT HAMILTON PARKWAY |
Q022023163A71 | 2023-06-12 | 2023-07-08 | TEMPORARY PEDESTRIAN WALK | 4 STREET, QUEENS, FROM STREET 26 AVENUE TO STREET 27 AVENUE |
Q042023163A27 | 2023-06-12 | 2023-07-08 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 4 STREET, QUEENS, FROM STREET 26 AVENUE TO STREET 27 AVENUE |
B012023163A23 | 2023-06-12 | 2023-07-06 | PAVE STREET-W/ ENGINEERING & INSP FEE | POWELL STREET, BROOKLYN, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE |
Q012023163B40 | 2023-06-12 | 2023-07-08 | PAVE STREET-W/ ENGINEERING & INSP FEE | 4 STREET, QUEENS, FROM STREET 26 AVENUE TO STREET 27 AVENUE |
Q012023163B41 | 2023-06-12 | 2023-07-08 | RESET, REPAIR OR REPLACE CURB | 4 STREET, QUEENS, FROM STREET 26 AVENUE TO STREET 27 AVENUE |
Q012023163B45 | 2023-06-12 | 2023-07-08 | PAVE STREET-W/ ENGINEERING & INSP FEE | 4 STREET, QUEENS, FROM STREET 26 AVENUE TO STREET 27 AVENUE |
Q022023163A72 | 2023-06-12 | 2023-07-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | 4 STREET, QUEENS, FROM STREET 26 AVENUE TO STREET 27 AVENUE |
B022023160A33 | 2023-06-09 | 2023-07-06 | TEMPORARY PEDESTRIAN WALK | BEDFORD AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET |
B012023160A48 | 2023-06-09 | 2023-07-06 | RESET, REPAIR OR REPLACE CURB | BEDFORD AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET |
B022023160A34 | 2023-06-09 | 2023-07-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEDFORD AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET |
B042023160A06 | 2023-06-09 | 2023-07-06 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BEDFORD AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET |
B012023159B43 | 2023-06-08 | 2023-07-06 | PAVE STREET-W/ ENGINEERING & INSP FEE | KINGSTON AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B012023158C07 | 2023-06-07 | 2023-07-06 | PAVE STREET-W/ ENGINEERING & INSP FEE | NORTH 12 STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE |
B012023158C06 | 2023-06-07 | 2023-07-06 | PAVE STREET-W/ ENGINEERING & INSP FEE | NORTH 11 STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE |
B012023157C36 | 2023-06-06 | 2023-06-23 | RESET, REPAIR OR REPLACE CURB | VERMONT STREET, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE |
B042023157A49 | 2023-06-06 | 2023-06-23 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | VERMONT STREET, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE |
X022023153B12 | 2023-06-02 | 2023-06-30 | TEMPORARY PEDESTRIAN WALK | CHISHOLM STREET, BRONX, FROM STREET INTERVALE AVENUE TO STREET REV JAMES POLITE AVENUE |
X042023153A03 | 2023-06-02 | 2023-06-30 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CHISHOLM STREET, BRONX, FROM STREET INTERVALE AVENUE TO STREET REV JAMES POLITE AVENUE |
X022023153B15 | 2023-06-02 | 2023-06-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | REV JAMES POLITE AVENUE, BRONX, FROM STREET CHISHOLM STREET TO STREET FREEMAN STREET |
X042023153A04 | 2023-06-02 | 2023-06-30 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | REV JAMES POLITE AVENUE, BRONX, FROM STREET CHISHOLM STREET TO STREET FREEMAN STREET |
X012023153A51 | 2023-06-02 | 2023-06-30 | RESET, REPAIR OR REPLACE CURB | CHISHOLM STREET, BRONX, FROM STREET INTERVALE AVENUE TO STREET REV JAMES POLITE AVENUE |
X012023153A52 | 2023-06-02 | 2023-06-30 | RESET, REPAIR OR REPLACE CURB | REV JAMES POLITE AVENUE, BRONX, FROM STREET CHISHOLM STREET TO STREET FREEMAN STREET |
X022023153B13 | 2023-06-02 | 2023-06-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | CHISHOLM STREET, BRONX, FROM STREET INTERVALE AVENUE TO STREET REV JAMES POLITE AVENUE |
X022023153B14 | 2023-06-02 | 2023-06-30 | TEMPORARY PEDESTRIAN WALK | REV JAMES POLITE AVENUE, BRONX, FROM STREET CHISHOLM STREET TO STREET FREEMAN STREET |
B022023152D25 | 2023-06-01 | 2023-06-22 | TEMPORARY PEDESTRIAN WALK | 22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B042023152A26 | 2023-06-01 | 2023-06-15 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | NORTH 1 STREET, BROOKLYN, FROM STREET WYTHE AVENUE |
B042023152A25 | 2023-06-01 | 2023-06-22 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B042023152A24 | 2023-06-01 | 2023-06-15 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GRAND STREET, BROOKLYN, FROM STREET WYTHE AVENUE |
B022023152D26 | 2023-06-01 | 2023-06-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | 22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012023152C27 | 2023-06-01 | 2023-06-22 | RESET, REPAIR OR REPLACE CURB | 22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B042023151A28 | 2023-05-31 | 2023-06-23 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | POWELL STREET, BROOKLYN, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE |
B012023151C52 | 2023-05-31 | 2023-06-23 | RESET, REPAIR OR REPLACE CURB | POWELL STREET, BROOKLYN, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE |
B042023150A37 | 2023-05-30 | 2023-06-23 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 46 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE |
B012023150D74 | 2023-05-30 | 2023-06-23 | RESET, REPAIR OR REPLACE CURB | 46 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE |
B022023150D14 | 2023-05-30 | 2023-06-23 | TEMPORARY PEDESTRIAN WALK | 46 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE |
B022023150D15 | 2023-05-30 | 2023-06-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | 46 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE |
B042023145A28 | 2023-05-25 | 2023-06-08 | REPAIR SIDEWALK | FLATBUSH AVENUE, BROOKLYN, FROM STREET EAST 28 STREET TO STREET GLENWOOD ROAD |
B042023144A04 | 2023-05-24 | 2023-06-08 | REPAIR SIDEWALK | EAST 28 STREET, BROOKLYN, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE |
B012023144A32 | 2023-05-24 | 2023-06-14 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | NEW YORK AVENUE, BROOKLYN, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD |
M012023144A35 | 2023-05-24 | 2023-06-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | GRAND STREET, MANHATTAN, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET |
B042023144A03 | 2023-05-24 | 2023-06-08 | REPAIR SIDEWALK | NEW YORK AVENUE, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE |
B012023143C05 | 2023-05-23 | 2023-06-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | GRAND AVENUE, BROOKLYN, FROM STREET PACIFIC STREET |
B012023142C97 | 2023-05-22 | 2023-06-15 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | GRAND AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET |
B012023142C96 | 2023-05-22 | 2023-06-16 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | PACIFIC STREET, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE |
M002023142A01 | 2023-05-22 | No data | MISCELLANEOUS - MINOR SALES | No data |
B012023138A96 | 2023-05-18 | 2023-06-15 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 53 STREET, BROOKLYN, FROM STREET BEND TO STREET WINTHROP STREET |
B022023136A39 | 2023-05-16 | 2023-05-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | NEW YORK AVENUE, BROOKLYN, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD |
X012023136A51 | 2023-05-16 | 2023-06-07 | PAVE STREET-W/ ENGINEERING & INSP FEE | COLLEGE AVENUE, BRONX, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET |
X012023136A52 | 2023-05-16 | 2023-06-07 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | COLLEGE AVENUE, BRONX, FROM STREET EAST 169 STREET |
B022023136A38 | 2023-05-16 | 2023-05-27 | TEMPORARY PEDESTRIAN WALK | NEW YORK AVENUE, BROOKLYN, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD |
B042023136A03 | 2023-05-16 | 2023-05-27 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | NEW YORK AVENUE, BROOKLYN, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD |
B042023136A05 | 2023-05-16 | 2023-06-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | FRANKLIN AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET DEAN STREET |
B012023136A49 | 2023-05-16 | 2023-05-27 | RESET, REPAIR OR REPLACE CURB-PROTECTED | NEW YORK AVENUE, BROOKLYN, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD |
B012023136A63 | 2023-05-16 | 2023-06-13 | RESET, REPAIR OR REPLACE CURB | FRANKLIN AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET DEAN STREET |
X012023136A50 | 2023-05-16 | 2023-06-07 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 169 STREET, BRONX, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE |
B042023135A05 | 2023-05-15 | 2023-06-07 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | WITHERS STREET, BROOKLYN, FROM STREET MEEKER AVENUE |
B042023135A04 | 2023-05-15 | 2023-06-07 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | WITHERS STREET, BROOKLYN, FROM STREET MEEKER AVENUE |
B042023135A03 | 2023-05-15 | 2023-06-07 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MEEKER AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET WITHERS STREET |
B042023135A01 | 2023-05-15 | 2023-06-07 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WITHERS STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MEEKER AVENUE |
M012023135A47 | 2023-05-15 | 2023-06-14 | RESET, REPAIR OR REPLACE CURB | GRAND STREET, MANHATTAN, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET |
M012023135A53 | 2023-05-15 | 2023-06-13 | RESET, REPAIR OR REPLACE CURB | GRAND STREET, MANHATTAN, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET |
M022023135A58 | 2023-05-15 | 2023-06-14 | TEMPORARY PEDESTRIAN WALK | GRAND STREET, MANHATTAN, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET |
M022023135A59 | 2023-05-15 | 2023-06-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | GRAND STREET, MANHATTAN, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET |
M042023135A00 | 2023-05-15 | 2023-06-14 | REPLACE SIDEWALK | GRAND STREET, MANHATTAN, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET |
M042023135A06 | 2023-05-15 | 2023-06-13 | REPLACE SIDEWALK | GRAND STREET, MANHATTAN, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET |
B022023135A40 | 2023-05-15 | 2023-06-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | MEEKER AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET WITHERS STREET |
B022023135A39 | 2023-05-15 | 2023-06-07 | TEMPORARY PEDESTRIAN WALK | MEEKER AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET WITHERS STREET |
B022023135A38 | 2023-05-15 | 2023-06-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | WITHERS STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MEEKER AVENUE |
B022023135A37 | 2023-05-15 | 2023-06-07 | TEMPORARY PEDESTRIAN WALK | WITHERS STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MEEKER AVENUE |
B012023135B28 | 2023-05-15 | 2023-06-07 | RESET, REPAIR OR REPLACE CURB-PROTECTED | MEEKER AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET WITHERS STREET |
B012023135B26 | 2023-05-15 | 2023-06-07 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WITHERS STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MEEKER AVENUE |
X012023134A01 | 2023-05-14 | 2023-06-07 | PAVE STREET-W/ ENGINEERING & INSP FEE | PROSPECT AVENUE, BRONX, FROM STREET BECK STREET TO STREET EAST 150 STREET |
Q042023132A17 | 2023-05-12 | 2023-06-08 | REPLACE SIDEWALK | 33 AVENUE, QUEENS, FROM STREET 11 STREET TO STREET 12 STREET |
Q022023132A18 | 2023-05-12 | 2023-06-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | 33 AVENUE, QUEENS, FROM STREET 11 STREET TO STREET 12 STREET |
Q022023132A17 | 2023-05-12 | 2023-06-08 | TEMPORARY PEDESTRIAN WALK | 33 AVENUE, QUEENS, FROM STREET 11 STREET TO STREET 12 STREET |
B022023131A15 | 2023-05-11 | 2023-06-06 | TEMPORARY PEDESTRIAN WALK | NORTH 11 STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE |
B022023131A16 | 2023-05-11 | 2023-06-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | NORTH 11 STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE |
B022023131A18 | 2023-05-11 | 2023-06-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | NORTH 12 STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE |
B022023131A17 | 2023-05-11 | 2023-06-06 | TEMPORARY PEDESTRIAN WALK | NORTH 12 STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE |
B012023131B06 | 2023-05-11 | 2023-06-06 | RESET, REPAIR OR REPLACE CURB | NORTH 11 STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE |
B042023131A02 | 2023-05-11 | 2023-06-06 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | NORTH 11 STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE |
B042023131A03 | 2023-05-11 | 2023-06-06 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | NORTH 12 STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE |
B012023131B09 | 2023-05-11 | 2023-06-06 | RESET, REPAIR OR REPLACE CURB | NORTH 12 STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE |
M022023130A53 | 2023-05-10 | 2023-05-26 | TEMPORARY PEDESTRIAN WALK | GRAND STREET, MANHATTAN, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET |
M042023130A01 | 2023-05-10 | 2023-05-26 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | GRAND STREET, MANHATTAN, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET |
M012023130A44 | 2023-05-10 | 2023-05-26 | RESET, REPAIR OR REPLACE CURB | GRAND STREET, MANHATTAN, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET |
M022023130A54 | 2023-05-10 | 2023-05-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | GRAND STREET, MANHATTAN, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET |
X022023129C11 | 2023-05-09 | 2023-05-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | PROSPECT AVENUE, BRONX, FROM STREET BECK STREET TO STREET EAST 150 STREET |
X042023129A04 | 2023-05-09 | 2023-05-18 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | PROSPECT AVENUE, BRONX, FROM STREET BECK STREET TO STREET EAST 150 STREET |
X012023129A70 | 2023-05-09 | 2023-05-18 | RESET, REPAIR OR REPLACE CURB | PROSPECT AVENUE, BRONX, FROM STREET BECK STREET TO STREET EAST 150 STREET |
X042023129A07 | 2023-05-09 | 2023-05-31 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | COLLEGE AVENUE, BRONX, FROM STREET EAST 169 STREET |
X042023129A06 | 2023-05-09 | 2023-05-31 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | COLLEGE AVENUE, BRONX, FROM STREET EAST 169 STREET |
X022023129C10 | 2023-05-09 | 2023-05-17 | TEMPORARY PEDESTRIAN WALK | PROSPECT AVENUE, BRONX, FROM STREET BECK STREET TO STREET EAST 150 STREET |
X042023129A05 | 2023-05-09 | 2023-05-31 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | COLLEGE AVENUE, BRONX, FROM STREET EAST 169 STREET |
X022023124A63 | 2023-05-04 | 2023-05-31 | TEMPORARY PEDESTRIAN WALK | COLLEGE AVENUE, BRONX, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET |
X022023124A64 | 2023-05-04 | 2023-05-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | COLLEGE AVENUE, BRONX, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET |
X022023124A61 | 2023-05-04 | 2023-05-31 | TEMPORARY PEDESTRIAN WALK | EAST 169 STREET, BRONX, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE |
X012023124A27 | 2023-05-04 | 2023-05-31 | RESET, REPAIR OR REPLACE CURB-PROTECTED | EAST 169 STREET, BRONX, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE |
X012023124A29 | 2023-05-04 | 2023-05-31 | RESET, REPAIR OR REPLACE CURB | COLLEGE AVENUE, BRONX, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET |
X042023124A03 | 2023-05-04 | 2023-05-31 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 169 STREET, BRONX, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE |
X042023124A04 | 2023-05-04 | 2023-05-31 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | COLLEGE AVENUE, BRONX, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET |
X022023124A62 | 2023-05-04 | 2023-05-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 169 STREET, BRONX, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE |
B042023123A06 | 2023-05-03 | 2023-06-01 | REPLACE SIDEWALK | ROCKAWAY AVENUE, BROOKLYN, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE |
B022023123A62 | 2023-05-03 | 2023-06-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | ROCKAWAY AVENUE, BROOKLYN, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE |
B022023123A61 | 2023-05-03 | 2023-06-01 | TEMPORARY PEDESTRIAN WALK | ROCKAWAY AVENUE, BROOKLYN, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE |
B042023122A08 | 2023-05-02 | 2023-05-27 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BELMONT AVENUE, BROOKLYN, FROM STREET ROCKAWAY AVENUE |
B042023122A07 | 2023-05-02 | 2023-05-27 | REPLACE SIDEWALK | BELMONT AVENUE, BROOKLYN, FROM STREET ROCKAWAY AVENUE TO STREET THATFORD AVENUE |
B022023122A25 | 2023-05-02 | 2023-05-27 | TEMPORARY PEDESTRIAN WALK | BELMONT AVENUE, BROOKLYN, FROM STREET ROCKAWAY AVENUE TO STREET THATFORD AVENUE |
B022023122A26 | 2023-05-02 | 2023-05-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | BELMONT AVENUE, BROOKLYN, FROM STREET ROCKAWAY AVENUE TO STREET THATFORD AVENUE |
Q042023118A13 | 2023-04-28 | 2023-05-26 | REPLACE SIDEWALK | 169 STREET, QUEENS, FROM STREET 45 AVENUE TO STREET 46 AVENUE |
Q012023118C40 | 2023-04-28 | 2023-05-26 | RESET, REPAIR OR REPLACE CURB | 169 STREET, QUEENS, FROM STREET 45 AVENUE TO STREET 46 AVENUE |
B042023116A19 | 2023-04-26 | 2023-05-23 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GRAND AVENUE, BROOKLYN, FROM STREET PACIFIC STREET |
B042023116A18 | 2023-04-26 | 2023-05-23 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GRAND AVENUE, BROOKLYN, FROM STREET PACIFIC STREET |
B012023115C69 | 2023-04-25 | 2023-05-23 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | GERRY STREET, BROOKLYN, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE |
B022023111A85 | 2023-04-21 | 2023-05-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | GRAND AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET |
B012023111B21 | 2023-04-21 | 2023-05-16 | RESET, REPAIR OR REPLACE CURB-PROTECTED | PACIFIC STREET, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE |
B012023111B22 | 2023-04-21 | 2023-05-16 | RESET, REPAIR OR REPLACE CURB-PROTECTED | GRAND AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET |
B042023111A15 | 2023-04-21 | 2023-05-16 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | GRAND AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET |
B042023111A14 | 2023-04-21 | 2023-05-16 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | PACIFIC STREET, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE |
B022023111A82 | 2023-04-21 | 2023-05-16 | TEMPORARY PEDESTRIAN WALK | PACIFIC STREET, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE |
B022023111A83 | 2023-04-21 | 2023-05-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | PACIFIC STREET, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE |
B022023111A84 | 2023-04-21 | 2023-05-16 | TEMPORARY PEDESTRIAN WALK | GRAND AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET |
X012023109D44 | 2023-04-19 | 2023-05-18 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | MT HOPE PLACE, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
X012023109C89 | 2023-04-19 | 2023-05-17 | RESET, REPAIR OR REPLACE CURB | PROSPECT AVENUE, BRONX, FROM STREET EAST 175 STREET TO STREET EAST 176 STREET |
M042023109A05 | 2023-04-19 | 2023-05-17 | REPAIR SIDEWALK | SUFFOLK STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET GRAND STREET |
M042023109A06 | 2023-04-19 | 2023-05-18 | REPAIR SIDEWALK | CLINTON STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET GRAND STREET |
X042023109A09 | 2023-04-19 | 2023-05-17 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | PROSPECT AVENUE, BRONX, FROM STREET EAST 175 STREET TO STREET EAST 176 STREET |
X022023109B64 | 2023-04-19 | 2023-05-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | PROSPECT AVENUE, BRONX, FROM STREET EAST 175 STREET TO STREET EAST 176 STREET |
X022023109B63 | 2023-04-19 | 2023-05-17 | TEMPORARY PEDESTRIAN WALK | PROSPECT AVENUE, BRONX, FROM STREET EAST 175 STREET TO STREET EAST 176 STREET |
B012023104A73 | 2023-04-14 | 2023-05-02 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | NORTH 1 STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE |
B012023104A74 | 2023-04-14 | 2023-05-02 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | WYTHE AVENUE, BROOKLYN, FROM STREET GRAND STREET TO STREET NORTH 1 STREET |
B012023104A77 | 2023-04-14 | 2023-05-02 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | GRAND STREET, BROOKLYN, FROM STREET WYTHE AVENUE |
B012023104A75 | 2023-04-14 | 2023-05-02 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | GRAND STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE |
B012023104A76 | 2023-04-14 | 2023-05-02 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | NORTH 1 STREET, BROOKLYN, FROM STREET WYTHE AVENUE |
B042023093A20 | 2023-04-03 | 2023-04-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | NORTH 1 STREET, BROOKLYN, FROM STREET WYTHE AVENUE |
B042023093A19 | 2023-04-03 | 2023-04-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | NORTH 1 STREET, BROOKLYN, FROM STREET WYTHE AVENUE |
B022023093C83 | 2023-04-03 | 2023-04-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | DIKEMAN STREET, BROOKLYN, FROM STREET CONOVER STREET TO STREET VAN BRUNT STREET |
B022023093C82 | 2023-04-03 | 2023-04-27 | TEMPORARY PEDESTRIAN WALK | DIKEMAN STREET, BROOKLYN, FROM STREET CONOVER STREET TO STREET VAN BRUNT STREET |
B042023093A21 | 2023-04-03 | 2023-04-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | NORTH 1 STREET, BROOKLYN, FROM STREET WYTHE AVENUE |
B042023093A22 | 2023-04-03 | 2023-04-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GRAND STREET, BROOKLYN, FROM STREET WYTHE AVENUE |
B042023093A23 | 2023-04-03 | 2023-04-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GRAND STREET, BROOKLYN, FROM STREET WYTHE AVENUE |
B042023093A24 | 2023-04-03 | 2023-04-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GRAND STREET, BROOKLYN, FROM STREET WYTHE AVENUE |
B042023093A37 | 2023-04-03 | 2023-04-28 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | DIKEMAN STREET, BROOKLYN, FROM STREET CONOVER STREET TO STREET VAN BRUNT STREET |
B012023093C60 | 2023-04-03 | 2023-04-21 | PAVE STREET-W/ ENGINEERING & INSP FEE | NOSTRAND AVENUE, BROOKLYN, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD |
B012023093C59 | 2023-04-03 | 2023-04-28 | RESET, REPAIR OR REPLACE CURB | DIKEMAN STREET, BROOKLYN, FROM STREET CONOVER STREET TO STREET VAN BRUNT STREET |
Q012023090A96 | 2023-03-31 | 2023-04-29 | RESET, REPAIR OR REPLACE CURB | 4 STREET, QUEENS, FROM STREET 26 AVENUE TO STREET 27 AVENUE |
Q022023090B20 | 2023-03-31 | 2023-04-29 | TEMPORARY PEDESTRIAN WALK | 4 STREET, QUEENS, FROM STREET 26 AVENUE TO STREET 27 AVENUE |
Q022023090B21 | 2023-03-31 | 2023-04-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | 4 STREET, QUEENS, FROM STREET 26 AVENUE TO STREET 27 AVENUE |
Q042023090A23 | 2023-03-31 | 2023-04-29 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 4 STREET, QUEENS, FROM STREET 26 AVENUE TO STREET 27 AVENUE |
X022023089B07 | 2023-03-30 | 2023-04-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | MT HOPE PLACE, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
X042023089A08 | 2023-03-30 | 2023-03-31 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | JEROME AVENUE, BRONX, FROM STREET MT HOPE PLACE |
X042023089A07 | 2023-03-30 | 2023-03-31 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | JEROME AVENUE, BRONX, FROM STREET MT HOPE PLACE |
X042023089A06 | 2023-03-30 | 2023-03-31 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | JEROME AVENUE, BRONX, FROM STREET MT HOPE PLACE |
X022023089B06 | 2023-03-30 | 2023-04-25 | TEMPORARY PEDESTRIAN WALK | MT HOPE PLACE, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
X042023089A05 | 2023-03-30 | 2023-04-25 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MT HOPE PLACE, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
X012023089A43 | 2023-03-30 | 2023-04-25 | RESET, REPAIR OR REPLACE CURB-PROTECTED | MT HOPE PLACE, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
B022023088H38 | 2023-03-29 | 2023-04-26 | TEMPORARY PEDESTRIAN WALK | TILDEN AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET EAST 22 STREET |
B012023088D75 | 2023-03-29 | 2023-04-26 | RESET, REPAIR OR REPLACE CURB | TILDEN AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET EAST 22 STREET |
B042023088A74 | 2023-03-29 | 2023-04-26 | REPLACE SIDEWALK | TILDEN AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET EAST 22 STREET |
B022023088H39 | 2023-03-29 | 2023-04-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | TILDEN AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET EAST 22 STREET |
B042023087A29 | 2023-03-28 | 2023-04-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | NOSTRAND AVENUE, BROOKLYN, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD |
B042023087A04 | 2023-03-28 | 2023-04-25 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | LEFFERTS AVENUE, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B012023087C35 | 2023-03-28 | 2023-04-20 | RESET, REPAIR OR REPLACE CURB | NOSTRAND AVENUE, BROOKLYN, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD |
B012023087D40 | 2023-03-28 | 2023-04-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | LEFFERTS AVENUE, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
X042023086A16 | 2023-03-27 | 2023-04-18 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 140 STREET, BRONX, FROM STREET GRAND CONCOURSE |
X022023086B91 | 2023-03-27 | 2023-04-18 | TEMPORARY PEDESTRIAN WALK | GRAND CONCOURSE, BRONX, FROM STREET MDE NORTHBOUND EXIT 3 TO STREET EAST 138 STREET |
B012023086B99 | 2023-03-27 | 2023-04-25 | RESET, REPAIR OR REPLACE CURB | LEFFERTS AVENUE, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
X012023086A91 | 2023-03-27 | 2023-04-18 | RESET, REPAIR OR REPLACE CURB | GRAND CONCOURSE, BRONX, FROM STREET MDE NORTHBOUND EXIT 3 TO STREET EAST 138 STREET |
X042023086A14 | 2023-03-27 | 2023-04-18 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | GRAND CONCOURSE, BRONX, FROM STREET MDE NORTHBOUND EXIT 3 TO STREET EAST 138 STREET |
X042023086A17 | 2023-03-27 | 2023-04-18 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 140 STREET, BRONX, FROM STREET GRAND CONCOURSE |
B012023086B96 | 2023-03-27 | 2023-04-25 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | FRANKLIN AVENUE, BROOKLYN, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE |
X022023086B92 | 2023-03-27 | 2023-04-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | GRAND CONCOURSE, BRONX, FROM STREET MDE NORTHBOUND EXIT 3 TO STREET EAST 138 STREET |
B022023082A58 | 2023-03-23 | 2023-04-15 | TEMPORARY PEDESTRIAN WALK | FRANKLIN AVENUE, BROOKLYN, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE |
B042023082A06 | 2023-03-23 | 2023-04-15 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | FRANKLIN AVENUE, BROOKLYN, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE |
B042023082A05 | 2023-03-23 | 2023-04-20 | REPLACE SIDEWALK | UTICA AVENUE, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET UNION STREET |
B012023082A38 | 2023-03-23 | 2023-04-15 | RESET, REPAIR OR REPLACE CURB-PROTECTED | FRANKLIN AVENUE, BROOKLYN, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE |
B022023082A59 | 2023-03-23 | 2023-04-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | FRANKLIN AVENUE, BROOKLYN, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE |
B042023080A29 | 2023-03-21 | 2023-04-13 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | DURYEA PLACE, BROOKLYN, FROM STREET EAST 22 STREET |
B042023080A28 | 2023-03-21 | 2023-04-13 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | DURYEA PLACE, BROOKLYN, FROM STREET EAST 22 STREET |
B042023080A27 | 2023-03-21 | 2023-04-13 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | DURYEA PLACE, BROOKLYN, FROM STREET EAST 22 STREET |
B042023079A19 | 2023-03-20 | 2023-04-12 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 38 STREET, BROOKLYN, FROM STREET FT HAMILTON PARKWAY |
B012023079B81 | 2023-03-20 | 2023-04-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 28 STREET, BROOKLYN, FROM STREET FLATBUSH AVENUE |
B042023079A17 | 2023-03-20 | 2023-04-12 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 38 STREET, BROOKLYN, FROM STREET FT HAMILTON PARKWAY |
B042023079A18 | 2023-03-20 | 2023-04-12 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 38 STREET, BROOKLYN, FROM STREET FT HAMILTON PARKWAY |
B012023079B80 | 2023-03-20 | 2023-04-14 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 28 STREET, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FLATBUSH AVENUE |
B012023079B79 | 2023-03-20 | 2023-04-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | FLATBUSH AVENUE, BROOKLYN, FROM STREET EAST 28 STREET TO STREET GLENWOOD ROAD |
B042023075A11 | 2023-03-16 | 2023-03-31 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EVERGREEN AVENUE, BROOKLYN, FROM STREET LINDEN STREET |
B042023075A12 | 2023-03-16 | 2023-03-31 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EVERGREEN AVENUE, BROOKLYN, FROM STREET LINDEN STREET |
B012023074C07 | 2023-03-15 | 2023-04-13 | PAVE STREET-W/ ENGINEERING & INSP FEE | SULLIVAN PLACE, BROOKLYN, FROM STREET WASHINGTON AVENUE |
B012023074C06 | 2023-03-15 | 2023-04-13 | PAVE STREET-W/ ENGINEERING & INSP FEE | WASHINGTON AVENUE, BROOKLYN, FROM STREET NYCTA SUBWAY TO STREET SULLIVAN PLACE |
B012023074C05 | 2023-03-15 | 2023-04-13 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | SULLIVAN PLACE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET WASHINGTON AVENUE |
B042023074A04 | 2023-03-15 | 2023-03-31 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | MARCY AVENUE, BROOKLYN, FROM STREET METROPOLITAN AVENUE |
B042023074A05 | 2023-03-15 | 2023-03-31 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | MARCY AVENUE, BROOKLYN, FROM STREET METROPOLITAN AVENUE |
B042023065A70 | 2023-03-06 | 2023-03-30 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | CONOVER STREET, BROOKLYN, FROM STREET DIKEMAN STREET |
B042023065A68 | 2023-03-06 | 2023-03-30 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | CONOVER STREET, BROOKLYN, FROM STREET DIKEMAN STREET |
B042023065A69 | 2023-03-06 | 2023-03-30 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | CONOVER STREET, BROOKLYN, FROM STREET DIKEMAN STREET |
Q012023060B84 | 2023-03-01 | 2023-03-30 | PAVE STREET-W/ ENGINEERING & INSP FEE | BEACH 96 STREET, QUEENS, FROM STREET ROCKAWAY BEACH BOULEVARD TO STREET WOODROW COTTAGES |
B042023058A07 | 2023-02-27 | 2023-03-24 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | FLATBUSH AVENUE, BROOKLYN, FROM STREET GLENWOOD ROAD |
B042023055A03 | 2023-02-24 | 2023-03-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 28 STREET, BROOKLYN, FROM STREET FLATBUSH AVENUE |
B042023055A02 | 2023-02-24 | 2023-03-21 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 28 STREET, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FLATBUSH AVENUE |
B022023055A48 | 2023-02-24 | 2023-03-21 | TEMPORARY PEDESTRIAN WALK | EAST 28 STREET, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FLATBUSH AVENUE |
B022023055A49 | 2023-02-24 | 2023-03-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 28 STREET, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FLATBUSH AVENUE |
B012023055B13 | 2023-02-24 | 2023-03-21 | RESET, REPAIR OR REPLACE CURB-PROTECTED | EAST 28 STREET, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FLATBUSH AVENUE |
B042023055A04 | 2023-02-24 | 2023-03-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EAST 28 STREET, BROOKLYN, FROM STREET FLATBUSH AVENUE |
B042023054A05 | 2023-02-23 | 2023-03-20 | REPLACE SIDEWALK | 86 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET GELSTON AVENUE |
B042023054A08 | 2023-02-23 | 2023-03-24 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | FLATBUSH AVENUE, BROOKLYN, FROM STREET GLENWOOD ROAD |
B022023054C39 | 2023-02-23 | 2023-03-20 | TEMPORARY PEDESTRIAN WALK | 86 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET GELSTON AVENUE |
B022023054C40 | 2023-02-23 | 2023-03-20 | TEMPORARY PEDESTRIAN WALK | FLATBUSH AVENUE, BROOKLYN, FROM STREET EAST 28 STREET TO STREET GLENWOOD ROAD |
B022023054C41 | 2023-02-23 | 2023-03-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | 86 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET GELSTON AVENUE |
B022023054C42 | 2023-02-23 | 2023-03-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | FLATBUSH AVENUE, BROOKLYN, FROM STREET EAST 28 STREET TO STREET GLENWOOD ROAD |
B012023054B44 | 2023-02-23 | 2023-03-20 | RESET, REPAIR OR REPLACE CURB | FLATBUSH AVENUE, BROOKLYN, FROM STREET EAST 28 STREET TO STREET GLENWOOD ROAD |
B042023054A06 | 2023-02-23 | 2023-03-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | FLATBUSH AVENUE, BROOKLYN, FROM STREET EAST 28 STREET TO STREET GLENWOOD ROAD |
M042023053A02 | 2023-02-22 | 2023-03-18 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | MACOMBS PLACE, MANHATTAN, FROM STREET WEST 154 STREET |
M042023053A03 | 2023-02-22 | 2023-03-18 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | MACOMBS PLACE, MANHATTAN, FROM STREET WEST 154 STREET |
B012023052C63 | 2023-02-21 | 2023-03-22 | RESET, REPAIR OR REPLACE CURB-PROTECTED | UNION STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
M042023052A02 | 2023-02-21 | 2023-03-18 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MACOMBS PLACE, MANHATTAN, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET |
M042023052A01 | 2023-02-21 | 2023-03-18 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEST 154 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET MACOMBS PLACE |
M022023052A95 | 2023-02-21 | 2023-03-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | MACOMBS PLACE, MANHATTAN, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET |
M022023052A94 | 2023-02-21 | 2023-03-18 | TEMPORARY PEDESTRIAN WALK | MACOMBS PLACE, MANHATTAN, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET |
M022023052A92 | 2023-02-21 | 2023-03-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 154 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET MACOMBS PLACE |
M022023052A91 | 2023-02-21 | 2023-03-18 | TEMPORARY PEDESTRIAN WALK | WEST 154 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET MACOMBS PLACE |
M012023052A93 | 2023-02-21 | 2023-03-18 | RESET, REPAIR OR REPLACE CURB | MACOMBS PLACE, MANHATTAN, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET |
M012023052A92 | 2023-02-21 | 2023-03-18 | RESET, REPAIR OR REPLACE CURB | WEST 154 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET MACOMBS PLACE |
B042023052A17 | 2023-02-21 | 2023-03-22 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | PRESIDENT STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
B042023052A18 | 2023-02-21 | 2023-03-22 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | UNION STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
B012023052C54 | 2023-02-21 | 2023-03-22 | RESET, REPAIR OR REPLACE CURB | PRESIDENT STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
Q022023051A06 | 2023-02-20 | 2023-03-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEACH 96 STREET, QUEENS, FROM STREET ROCKAWAY BEACH BOULEVARD TO STREET WOODROW COTTAGES |
Q022023051A05 | 2023-02-20 | 2023-03-17 | TEMPORARY PEDESTRIAN WALK | BEACH 96 STREET, QUEENS, FROM STREET ROCKAWAY BEACH BOULEVARD TO STREET WOODROW COTTAGES |
Q012023051A20 | 2023-02-20 | 2023-03-17 | RESET, REPAIR OR REPLACE CURB | BEACH 96 STREET, QUEENS, FROM STREET ROCKAWAY BEACH BOULEVARD TO STREET WOODROW COTTAGES |
Q042023051A05 | 2023-02-20 | 2023-03-17 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BEACH 96 STREET, QUEENS, FROM STREET ROCKAWAY BEACH BOULEVARD TO STREET WOODROW COTTAGES |
B012023048A50 | 2023-02-17 | 2023-02-25 | RESET, REPAIR OR REPLACE CURB | FLATBUSH AVENUE, BROOKLYN, FROM STREET EAST 28 STREET TO STREET GLENWOOD ROAD |
B042023048A03 | 2023-02-17 | 2023-02-25 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | FLATBUSH AVENUE, BROOKLYN, FROM STREET GLENWOOD ROAD |
B042023048A04 | 2023-02-17 | 2023-02-25 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | FLATBUSH AVENUE, BROOKLYN, FROM STREET GLENWOOD ROAD |
B042023048A05 | 2023-02-17 | 2023-02-25 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | FLATBUSH AVENUE, BROOKLYN, FROM STREET EAST 28 STREET TO STREET GLENWOOD ROAD |
B022023048A20 | 2023-02-17 | 2023-02-25 | TEMPORARY PEDESTRIAN WALK | FLATBUSH AVENUE, BROOKLYN, FROM STREET EAST 28 STREET TO STREET GLENWOOD ROAD |
B022023048A21 | 2023-02-17 | 2023-02-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | FLATBUSH AVENUE, BROOKLYN, FROM STREET EAST 28 STREET TO STREET GLENWOOD ROAD |
B012023045A99 | 2023-02-14 | 2023-02-25 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | GERRY STREET, BROOKLYN, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE |
B022023045B58 | 2023-02-14 | 2023-02-25 | TEMPORARY PEDESTRIAN WALK | GERRY STREET, BROOKLYN, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE |
B042023045A13 | 2023-02-14 | 2023-02-25 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WASHINGTON AVENUE, BROOKLYN, FROM STREET NYCTA SUBWAY TO STREET SULLIVAN PLACE |
B012023045A55 | 2023-02-14 | 2023-02-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | BUSHWICK AVENUE, BROOKLYN, FROM STREET HIMROD STREET TO STREET KOSSUTH PLACE |
B012023045A56 | 2023-02-14 | 2023-02-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | KOSSUTH PLACE, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B012023045A57 | 2023-02-14 | 2023-02-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | BUSHWICK AVENUE, BROOKLYN, FROM STREET KOSSUTH PLACE |
B012023045A85 | 2023-02-14 | 2023-02-25 | RESET, REPAIR OR REPLACE CURB | WASHINGTON AVENUE, BROOKLYN, FROM STREET NYCTA SUBWAY TO STREET SULLIVAN PLACE |
B012023045A98 | 2023-02-14 | 2023-02-25 | RESET, REPAIR OR REPLACE CURB-PROTECTED | GERRY STREET, BROOKLYN, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE |
B022023045B59 | 2023-02-14 | 2023-02-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | GERRY STREET, BROOKLYN, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE |
B022023045B25 | 2023-02-14 | 2023-02-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | WASHINGTON AVENUE, BROOKLYN, FROM STREET NYCTA SUBWAY TO STREET SULLIVAN PLACE |
B022023045B24 | 2023-02-14 | 2023-02-25 | TEMPORARY PEDESTRIAN WALK | WASHINGTON AVENUE, BROOKLYN, FROM STREET NYCTA SUBWAY TO STREET SULLIVAN PLACE |
B042023045A18 | 2023-02-14 | 2023-02-25 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | GERRY STREET, BROOKLYN, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE |
B012023044B64 | 2023-02-13 | 2023-02-25 | RESET, REPAIR OR REPLACE CURB-PROTECTED | SULLIVAN PLACE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET WASHINGTON AVENUE |
B042023044A21 | 2023-02-13 | 2023-02-25 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | SULLIVAN PLACE, BROOKLYN, FROM STREET WASHINGTON AVENUE |
B022023044B19 | 2023-02-13 | 2023-02-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | SULLIVAN PLACE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET WASHINGTON AVENUE |
B042023044A20 | 2023-02-13 | 2023-02-25 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | SULLIVAN PLACE, BROOKLYN, FROM STREET WASHINGTON AVENUE |
B042023044A19 | 2023-02-13 | 2023-02-25 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | SULLIVAN PLACE, BROOKLYN, FROM STREET WASHINGTON AVENUE |
B042023044A18 | 2023-02-13 | 2023-02-25 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | SULLIVAN PLACE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET WASHINGTON AVENUE |
B022023044B18 | 2023-02-13 | 2023-02-25 | TEMPORARY PEDESTRIAN WALK | SULLIVAN PLACE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET WASHINGTON AVENUE |
B022023039A84 | 2023-02-08 | 2023-02-25 | TEMPORARY PEDESTRIAN WALK | KEAP STREET, BROOKLYN, FROM STREET AINSLIE STREET TO STREET HOPE STREET |
B042023039A06 | 2023-02-08 | 2023-02-25 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | KEAP STREET, BROOKLYN, FROM STREET AINSLIE STREET TO STREET HOPE STREET |
B042023039A07 | 2023-02-08 | 2023-02-25 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | HOPE STREET, BROOKLYN, FROM STREET KEAP STREET |
B042023039A08 | 2023-02-08 | 2023-02-25 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | HOPE STREET, BROOKLYN, FROM STREET KEAP STREET |
B042023039A09 | 2023-02-08 | 2023-02-25 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | HOPE STREET, BROOKLYN, FROM STREET KEAP STREET |
B022023039A85 | 2023-02-08 | 2023-02-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | KEAP STREET, BROOKLYN, FROM STREET AINSLIE STREET TO STREET HOPE STREET |
B012023039B85 | 2023-02-08 | 2023-02-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | HOPE STREET, BROOKLYN, FROM STREET RODNEY STREET |
B012023039B84 | 2023-02-08 | 2023-02-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | HOPE STREET, BROOKLYN, FROM STREET KEAP STREET |
B012023039B83 | 2023-02-08 | 2023-02-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | RODNEY STREET, BROOKLYN, FROM STREET AINSLIE STREET TO STREET HOPE STREET |
B012023039B82 | 2023-02-08 | 2023-02-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | KEAP STREET, BROOKLYN, FROM STREET AINSLIE STREET TO STREET HOPE STREET |
B012023039B81 | 2023-02-08 | 2023-02-25 | RESET, REPAIR OR REPLACE CURB | KEAP STREET, BROOKLYN, FROM STREET AINSLIE STREET TO STREET HOPE STREET |
B012023039B80 | 2023-02-08 | 2023-02-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | HOPE STREET, BROOKLYN, FROM STREET BQE EASTBOUND EXIT 32 TO STREET KEAP STREET |
B042023038A09 | 2023-02-07 | 2023-02-22 | REPAIR SIDEWALK | MIDDLETON STREET, BROOKLYN, FROM STREET HARRISON AVENUE TO STREET MARCY AVENUE |
Q042023038A06 | 2023-02-07 | 2023-02-25 | REPAIR SIDEWALK | JAMAICA AVENUE, QUEENS, FROM STREET 162 STREET TO STREET GUY R BREWER BOULEVARD |
B012023038A89 | 2023-02-07 | 2023-02-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | ATLANTIC AVENUE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE |
B012023033B27 | 2023-02-02 | 2023-02-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | HURON STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD |
B012023031C58 | 2023-01-31 | 2023-02-22 | PAVE STREET-W/ ENGINEERING & INSP FEE | VERNON AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B042023031A88 | 2023-01-31 | 2023-02-25 | REPLACE SIDEWALK | 86 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET GELSTON AVENUE |
B022023031B61 | 2023-01-31 | 2023-02-25 | TEMPORARY PEDESTRIAN WALK | 86 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET GELSTON AVENUE |
B022023031B62 | 2023-01-31 | 2023-02-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | 86 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET GELSTON AVENUE |
B012023031C59 | 2023-01-31 | 2023-02-22 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | MARCY AVENUE, BROOKLYN, FROM STREET VERNON AVENUE |
B012023031B88 | 2023-01-31 | 2023-02-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | 12 AVENUE, BROOKLYN, FROM STREET 57 STREET TO STREET 58 STREET |
B012023031C57 | 2023-01-31 | 2023-02-22 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | MARCY AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET VERNON AVENUE |
B012023029A04 | 2023-01-29 | 2023-02-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | BERRIMAN STREET, BROOKLYN, FROM STREET LINDEN BOULEVARD TO STREET STANLEY AVENUE |
B022023026A31 | 2023-01-26 | 2023-02-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | BERRIMAN STREET, BROOKLYN, FROM STREET LINDEN BOULEVARD TO STREET STANLEY AVENUE |
B022023026A30 | 2023-01-26 | 2023-02-22 | TEMPORARY PEDESTRIAN WALK | BERRIMAN STREET, BROOKLYN, FROM STREET LINDEN BOULEVARD TO STREET STANLEY AVENUE |
B012023026A42 | 2023-01-26 | 2023-02-22 | RESET, REPAIR OR REPLACE CURB | BERRIMAN STREET, BROOKLYN, FROM STREET LINDEN BOULEVARD TO STREET STANLEY AVENUE |
B042023026A02 | 2023-01-26 | 2023-02-22 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BERRIMAN STREET, BROOKLYN, FROM STREET LINDEN BOULEVARD TO STREET STANLEY AVENUE |
M022023025A34 | 2023-01-25 | 2023-02-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 31 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE SOUTH |
M012023025A38 | 2023-01-25 | 2023-02-16 | RESET, REPAIR OR REPLACE CURB-PROTECTED | EAST 31 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE SOUTH |
M042023025A00 | 2023-01-25 | 2023-02-16 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 31 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE SOUTH |
M022023025A33 | 2023-01-25 | 2023-02-16 | TEMPORARY PEDESTRIAN WALK | EAST 31 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE SOUTH |
X012023024A63 | 2023-01-24 | 2023-02-16 | RESET, REPAIR OR REPLACE CURB | GRAND CONCOURSE, BRONX, FROM STREET MDE NORTHBOUND EXIT 3 TO STREET EAST 138 STREET |
X042023024A02 | 2023-01-24 | 2023-02-16 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | GRAND CONCOURSE, BRONX, FROM STREET MDE NORTHBOUND EXIT 3 TO STREET EAST 138 STREET |
X022023024A24 | 2023-01-24 | 2023-02-16 | TEMPORARY PEDESTRIAN WALK | GRAND CONCOURSE, BRONX, FROM STREET MDE NORTHBOUND EXIT 3 TO STREET EAST 138 STREET |
X022023024A25 | 2023-01-24 | 2023-02-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | GRAND CONCOURSE, BRONX, FROM STREET MDE NORTHBOUND EXIT 3 TO STREET EAST 138 STREET |
B022023020A69 | 2023-01-20 | 2023-02-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | 86 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET GELSTON AVENUE |
B022023020A68 | 2023-01-20 | 2023-02-02 | TEMPORARY PEDESTRIAN WALK | 86 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET GELSTON AVENUE |
B042023020A05 | 2023-01-20 | 2023-02-02 | REPLACE SIDEWALK | 86 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET GELSTON AVENUE |
B022023019B69 | 2023-01-19 | 2023-02-16 | TEMPORARY PEDESTRIAN WALK | FT HAMILTON PARKWAY, BROOKLYN, FROM STREET 38 STREET TO STREET 39 STREET |
B042023019A09 | 2023-01-19 | 2023-02-07 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 38 STREET, BROOKLYN, FROM STREET FT HAMILTON PARKWAY |
B042023019A06 | 2023-01-19 | 2023-02-16 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | FT HAMILTON PARKWAY, BROOKLYN, FROM STREET 38 STREET TO STREET 39 STREET |
B042023019A07 | 2023-01-19 | 2023-02-07 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 38 STREET, BROOKLYN, FROM STREET FT HAMILTON PARKWAY |
B042023019A08 | 2023-01-19 | 2023-02-07 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 38 STREET, BROOKLYN, FROM STREET FT HAMILTON PARKWAY |
B012023019A76 | 2023-01-19 | 2023-02-16 | RESET, REPAIR OR REPLACE CURB-PROTECTED | FT HAMILTON PARKWAY, BROOKLYN, FROM STREET 38 STREET TO STREET 39 STREET |
B022023019B70 | 2023-01-19 | 2023-02-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | FT HAMILTON PARKWAY, BROOKLYN, FROM STREET 38 STREET TO STREET 39 STREET |
B012023017B30 | 2023-01-17 | 2023-02-10 | RESET, REPAIR OR REPLACE CURB | KOSSUTH PLACE, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B012023017B32 | 2023-01-17 | 2023-02-10 | RESET, REPAIR OR REPLACE CURB | BUSHWICK AVENUE, BROOKLYN, FROM STREET HIMROD STREET TO STREET KOSSUTH PLACE |
B042023017A20 | 2023-01-17 | 2023-02-14 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BUSHWICK AVENUE, BROOKLYN, FROM STREET KOSSUTH PLACE |
B042023017A19 | 2023-01-17 | 2023-02-14 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BUSHWICK AVENUE, BROOKLYN, FROM STREET KOSSUTH PLACE |
B042023017A18 | 2023-01-17 | 2023-02-14 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BUSHWICK AVENUE, BROOKLYN, FROM STREET KOSSUTH PLACE |
B042023017A10 | 2023-01-17 | 2023-02-10 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | KOSSUTH PLACE, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B022023017B94 | 2023-01-17 | 2023-02-10 | TEMPORARY PEDESTRIAN WALK | KOSSUTH PLACE, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B022023017B95 | 2023-01-17 | 2023-02-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | KOSSUTH PLACE, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B042023017A11 | 2023-01-17 | 2023-02-10 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BUSHWICK AVENUE, BROOKLYN, FROM STREET HIMROD STREET TO STREET KOSSUTH PLACE |
B022023017B97 | 2023-01-17 | 2023-02-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | BUSHWICK AVENUE, BROOKLYN, FROM STREET HIMROD STREET TO STREET KOSSUTH PLACE |
B022023017B96 | 2023-01-17 | 2023-02-10 | TEMPORARY PEDESTRIAN WALK | BUSHWICK AVENUE, BROOKLYN, FROM STREET HIMROD STREET TO STREET KOSSUTH PLACE |
B012023012A37 | 2023-01-12 | 2023-02-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | LEWIS AVENUE, BROOKLYN, FROM STREET BROADWAY TO STREET STOCKTON STREET |
B042023011A28 | 2023-01-11 | 2023-02-07 | REPAIR SIDEWALK | MONTROSE AVENUE, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
B012023009B29 | 2023-01-09 | 2023-02-07 | PAVE STREET-W/ ENGINEERING & INSP FEE | PRESIDENT STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
B042023006A03 | 2023-01-06 | 2023-02-01 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | HURON STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE |
B042023006A05 | 2023-01-06 | 2023-02-01 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | NOSTRAND AVENUE, BROOKLYN, FROM STREET WILLOUGHBY AVENUE |
B042023006A04 | 2023-01-06 | 2023-02-01 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | HURON STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE |
B042023006A02 | 2023-01-06 | 2023-02-01 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | HURON STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE |
B012023005A95 | 2023-01-05 | 2023-02-01 | RESET, REPAIR OR REPLACE CURB | LEWIS AVENUE, BROOKLYN, FROM STREET BROADWAY TO STREET STOCKTON STREET |
B022023005A64 | 2023-01-05 | 2023-02-01 | TEMPORARY PEDESTRIAN WALK | LEWIS AVENUE, BROOKLYN, FROM STREET BROADWAY TO STREET STOCKTON STREET |
B022023005A65 | 2023-01-05 | 2023-02-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | LEWIS AVENUE, BROOKLYN, FROM STREET BROADWAY TO STREET STOCKTON STREET |
B042023005A62 | 2023-01-05 | 2023-02-01 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | LEWIS AVENUE, BROOKLYN, FROM STREET BROADWAY TO STREET STOCKTON STREET |
B042023004A02 | 2023-01-04 | 2023-02-02 | REPAIR SIDEWALK | SOUTH 4 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE |
B042023004A18 | 2023-01-04 | 2023-02-01 | REPAIR SIDEWALK | KEAP STREET, BROOKLYN, FROM STREET GRAND STREET TO STREET HOPE STREET |
B012023004B96 | 2023-01-04 | 2023-02-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | PRESIDENT STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
B042023004A01 | 2023-01-04 | 2023-02-02 | REPAIR SIDEWALK | SOUTH 5 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE |
B012023004B97 | 2023-01-04 | 2023-02-01 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | UNION STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
B042023004A17 | 2023-01-04 | 2023-02-02 | REPAIR SIDEWALK | HOPE STREET, BROOKLYN, FROM STREET BEND TO STREET KEAP STREET |
B012023004A51 | 2023-01-04 | 2023-02-02 | RESET, REPAIR OR REPLACE CURB-PROTECTED | SOUTH 5 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE |
X012023003B08 | 2023-01-03 | 2023-01-17 | PAVE STREET-W/ ENGINEERING & INSP FEE | FAIRMOUNT PLACE, BRONX, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE |
X012022363A13 | 2022-12-29 | 2023-01-17 | RESET, REPAIR OR REPLACE CURB | FAIRMOUNT PLACE, BRONX, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE |
X022022363B36 | 2022-12-29 | 2023-01-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | FAIRMOUNT PLACE, BRONX, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE |
X022022363B35 | 2022-12-29 | 2023-01-17 | TEMPORARY PEDESTRIAN WALK | FAIRMOUNT PLACE, BRONX, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE |
X042022363A01 | 2022-12-29 | 2023-01-17 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | FAIRMOUNT PLACE, BRONX, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE |
B042022362A03 | 2022-12-28 | 2023-01-24 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | ATLANTIC AVENUE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE |
B022022362A95 | 2022-12-28 | 2023-01-24 | TEMPORARY PEDESTRIAN WALK | ATLANTIC AVENUE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE |
B022022362A96 | 2022-12-28 | 2023-01-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | ATLANTIC AVENUE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE |
B012022362A38 | 2022-12-28 | 2023-01-24 | RESET, REPAIR OR REPLACE CURB | ATLANTIC AVENUE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE |
B022022355B69 | 2022-12-21 | 2022-12-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | GOLD STREET, BROOKLYN, FROM STREET PLYMOUTH STREET TO STREET WATER STREET |
B042022355A05 | 2022-12-21 | 2022-12-29 | REPLACE SIDEWALK | GOLD STREET, BROOKLYN, FROM STREET PLYMOUTH STREET TO STREET WATER STREET |
B022022355B68 | 2022-12-21 | 2022-12-29 | TEMPORARY PEDESTRIAN WALK | GOLD STREET, BROOKLYN, FROM STREET PLYMOUTH STREET TO STREET WATER STREET |
B012022355C18 | 2022-12-21 | 2022-12-29 | RESET, REPAIR OR REPLACE CURB-PROTECTED | GOLD STREET, BROOKLYN, FROM STREET PLYMOUTH STREET TO STREET WATER STREET |
B012022354A45 | 2022-12-20 | 2022-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | MARCY AVENUE, BROOKLYN, FROM STREET HOPE STREET TO STREET METROPOLITAN AVENUE |
B012022354A46 | 2022-12-20 | 2022-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | MARCY AVENUE, BROOKLYN, FROM STREET METROPOLITAN AVENUE |
B012022354A42 | 2022-12-20 | 2023-01-18 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | NEW YORK AVENUE, BROOKLYN, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD |
B012022354A44 | 2022-12-20 | 2022-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | METROPOLITAN AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NORTH 5 STREET |
B012022349C40 | 2022-12-15 | 2022-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
X012022347A12 | 2022-12-13 | 2022-12-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | CROTONA AVENUE, BRONX, FROM STREET EAST 187 STREET TO STREET EAST 189 STREET |
B042022347A01 | 2022-12-13 | 2022-12-31 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | HOPE STREET, BROOKLYN, FROM STREET BQE EASTBOUND EXIT 32 TO STREET KEAP STREET |
B042022347A02 | 2022-12-13 | 2022-12-31 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | RODNEY STREET, BROOKLYN, FROM STREET AINSLIE STREET TO STREET HOPE STREET |
B042022347A03 | 2022-12-13 | 2023-01-06 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | HOPE STREET, BROOKLYN, FROM STREET RODNEY STREET |
B012022347A45 | 2022-12-13 | 2022-12-31 | RESET, REPAIR OR REPLACE CURB | HOPE STREET, BROOKLYN, FROM STREET BQE EASTBOUND EXIT 32 TO STREET KEAP STREET |
B042022347A04 | 2022-12-13 | 2023-01-06 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | HOPE STREET, BROOKLYN, FROM STREET RODNEY STREET |
B022022347A13 | 2022-12-13 | 2022-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | RODNEY STREET, BROOKLYN, FROM STREET AINSLIE STREET TO STREET HOPE STREET |
B022022347A12 | 2022-12-13 | 2022-12-31 | TEMPORARY PEDESTRIAN WALK | RODNEY STREET, BROOKLYN, FROM STREET AINSLIE STREET TO STREET HOPE STREET |
B022022347A11 | 2022-12-13 | 2022-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | HOPE STREET, BROOKLYN, FROM STREET BQE EASTBOUND EXIT 32 TO STREET KEAP STREET |
B022022347A10 | 2022-12-13 | 2022-12-31 | TEMPORARY PEDESTRIAN WALK | HOPE STREET, BROOKLYN, FROM STREET BQE EASTBOUND EXIT 32 TO STREET KEAP STREET |
B012022347A46 | 2022-12-13 | 2022-12-31 | RESET, REPAIR OR REPLACE CURB | RODNEY STREET, BROOKLYN, FROM STREET AINSLIE STREET TO STREET HOPE STREET |
B042022343A02 | 2022-12-09 | 2022-12-20 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | MARCY AVENUE, BROOKLYN, FROM STREET METROPOLITAN AVENUE |
B042022343A01 | 2022-12-09 | 2022-12-27 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | MARCY AVENUE, BROOKLYN, FROM STREET METROPOLITAN AVENUE |
B042022343A00 | 2022-12-09 | 2022-12-27 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | METROPOLITAN AVENUE, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET NORTH 5 STREET |
B012022343A00 | 2022-12-09 | 2022-12-27 | RESET, REPAIR OR REPLACE CURB | METROPOLITAN AVENUE, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET NORTH 5 STREET |
B042022343A03 | 2022-12-09 | 2022-12-20 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | MARCY AVENUE, BROOKLYN, FROM STREET METROPOLITAN AVENUE |
B022022340A03 | 2022-12-06 | 2022-12-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | MARCY AVENUE, BROOKLYN, FROM STREET HOPE STREET TO STREET METROPOLITAN AVENUE |
B022022340A02 | 2022-12-06 | 2022-12-27 | TEMPORARY PEDESTRIAN WALK | MARCY AVENUE, BROOKLYN, FROM STREET HOPE STREET TO STREET METROPOLITAN AVENUE |
B042022340A02 | 2022-12-06 | 2022-12-27 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | LIVONIA AVENUE, BROOKLYN, FROM STREET VAN SINDEREN AVENUE |
B042022340A03 | 2022-12-06 | 2022-12-27 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | LIVONIA AVENUE, BROOKLYN, FROM STREET VAN SINDEREN AVENUE |
B042022340A04 | 2022-12-06 | 2022-12-27 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MARCY AVENUE, BROOKLYN, FROM STREET HOPE STREET TO STREET METROPOLITAN AVENUE |
B012022340A05 | 2022-12-06 | 2022-12-27 | RESET, REPAIR OR REPLACE CURB | MARCY AVENUE, BROOKLYN, FROM STREET HOPE STREET TO STREET METROPOLITAN AVENUE |
B022022339A36 | 2022-12-05 | 2022-12-27 | TEMPORARY PEDESTRIAN WALK | JOHNSON AVENUE, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
B012022339A85 | 2022-12-05 | 2022-12-27 | RESET, REPAIR OR REPLACE CURB | JOHNSON AVENUE, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
B022022339A37 | 2022-12-05 | 2022-12-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | JOHNSON AVENUE, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
B042022339A05 | 2022-12-05 | 2022-12-27 | REPLACE SIDEWALK | JOHNSON AVENUE, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
X012022338A00 | 2022-12-04 | 2022-12-30 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | MT HOPE PLACE, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
X012022338A02 | 2022-12-04 | 2022-12-30 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | JEROME AVENUE, BRONX, FROM STREET MT HOPE PLACE |
X012022338A01 | 2022-12-04 | 2022-12-30 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | JEROME AVENUE, BRONX, FROM STREET MT HOPE PLACE TO STREET WEST 177 STREET |
B022022336A17 | 2022-12-02 | 2022-12-23 | TEMPORARY PEDESTRIAN WALK | GRAND STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE |
B042022336A01 | 2022-12-02 | 2022-12-23 | REPLACE SIDEWALK | WYTHE AVENUE, BROOKLYN, FROM STREET GRAND STREET TO STREET NORTH 1 STREET |
B042022336A02 | 2022-12-02 | 2022-12-23 | REPLACE SIDEWALK | NORTH 1 STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE |
B042022336A03 | 2022-12-02 | 2022-12-23 | REPLACE SIDEWALK | GRAND STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE |
B022022336A18 | 2022-12-02 | 2022-12-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | GRAND STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE |
B022022336A16 | 2022-12-02 | 2022-12-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | NORTH 1 STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE |
B022022336A15 | 2022-12-02 | 2022-12-23 | TEMPORARY PEDESTRIAN WALK | NORTH 1 STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE |
B022022336A14 | 2022-12-02 | 2022-12-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | WYTHE AVENUE, BROOKLYN, FROM STREET GRAND STREET TO STREET NORTH 1 STREET |
B022022336A13 | 2022-12-02 | 2022-12-23 | TEMPORARY PEDESTRIAN WALK | WYTHE AVENUE, BROOKLYN, FROM STREET GRAND STREET TO STREET NORTH 1 STREET |
B012022336A06 | 2022-12-02 | 2022-12-23 | RESET, REPAIR OR REPLACE CURB-PROTECTED | GRAND STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE |
B012022336A05 | 2022-12-02 | 2022-12-23 | RESET, REPAIR OR REPLACE CURB-PROTECTED | NORTH 1 STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE |
B012022336A04 | 2022-12-02 | 2022-12-23 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WYTHE AVENUE, BROOKLYN, FROM STREET GRAND STREET TO STREET NORTH 1 STREET |
X012022336A08 | 2022-12-02 | 2022-12-27 | RESET, REPAIR OR REPLACE CURB | CROTONA AVENUE, BRONX, FROM STREET EAST 187 STREET TO STREET EAST 189 STREET |
X022022336A03 | 2022-12-02 | 2022-12-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | CROTONA AVENUE, BRONX, FROM STREET EAST 187 STREET TO STREET EAST 189 STREET |
X042022336A00 | 2022-12-02 | 2022-12-27 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CROTONA AVENUE, BRONX, FROM STREET EAST 187 STREET TO STREET EAST 189 STREET |
X022022336A02 | 2022-12-02 | 2022-12-27 | TEMPORARY PEDESTRIAN WALK | CROTONA AVENUE, BRONX, FROM STREET EAST 187 STREET TO STREET EAST 189 STREET |
B012022335C72 | 2022-12-01 | 2022-12-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | CHRISTOPHER AVENUE, BROOKLYN, FROM STREET LIBERTY AVENUE |
B012022335C71 | 2022-12-01 | 2022-12-27 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | CHRISTOPHER AVENUE, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET LIBERTY AVENUE |
B012022335C70 | 2022-12-01 | 2022-12-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | LIBERTY AVENUE, BROOKLYN, FROM STREET CHRISTOPHER AVENUE TO STREET MOTHER GASTON BOULEVARD |
X042022335A04 | 2022-12-01 | 2022-12-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | JEROME AVENUE, BRONX, FROM STREET MT HOPE PLACE |
X042022335A03 | 2022-12-01 | 2022-12-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | JEROME AVENUE, BRONX, FROM STREET MT HOPE PLACE |
X042022335A02 | 2022-12-01 | 2022-12-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | JEROME AVENUE, BRONX, FROM STREET MT HOPE PLACE |
Q012022333A17 | 2022-11-29 | 2022-12-21 | PAVE STREET-W/ ENGINEERING & INSP FEE | KENO AVENUE, QUEENS, FROM STREET BEND TO STREET MARENGO STREET |
Q012022329A01 | 2022-11-25 | 2022-12-20 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | WELLING COURT, QUEENS, FROM STREET 8 STREET TO STREET BEND |
Q012022329A02 | 2022-11-25 | 2022-12-20 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 8 STREET, QUEENS, FROM STREET MAIN AVENUE |
X012022329A00 | 2022-11-25 | 2022-12-20 | RESET, REPAIR OR REPLACE CURB-PROTECTED | MT HOPE PLACE, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
Q012022329A00 | 2022-11-25 | 2022-12-20 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | MAIN AVENUE, QUEENS, FROM STREET 8 STREET TO STREET 30 AVENUE |
B012022327C72 | 2022-11-23 | 2022-12-21 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | PACIFIC STREET, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE |
Q012022327B55 | 2022-11-23 | 2022-12-21 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | HANCOCK STREET, QUEENS, FROM STREET CYPRESS AVENUE TO STREET MYRTLE AVENUE |
X042022325A17 | 2022-11-21 | 2022-12-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MT HOPE PLACE, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
B012022325C45 | 2022-11-21 | 2022-12-20 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | TAAFFE PLACE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
X022022325B04 | 2022-11-21 | 2022-12-20 | TEMPORARY PEDESTRIAN WALK | MT HOPE PLACE, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
X022022325B05 | 2022-11-21 | 2022-12-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | MT HOPE PLACE, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
X022022325B06 | 2022-11-21 | 2022-12-20 | TEMPORARY PEDESTRIAN WALK | JEROME AVENUE, BRONX, FROM STREET EAST 176 STREET TO STREET MT HOPE PLACE |
X022022325B07 | 2022-11-21 | 2022-12-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | JEROME AVENUE, BRONX, FROM STREET EAST 176 STREET TO STREET MT HOPE PLACE |
X042022325A18 | 2022-11-21 | 2022-12-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | JEROME AVENUE, BRONX, FROM STREET EAST 176 STREET TO STREET MT HOPE PLACE |
X012022325B48 | 2022-11-21 | 2022-12-20 | RESET, REPAIR OR REPLACE CURB-PROTECTED | JEROME AVENUE, BRONX, FROM STREET EAST 176 STREET TO STREET MT HOPE PLACE |
B012022321C49 | 2022-11-17 | 2022-12-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | ROGERS AVENUE, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
X012022320A63 | 2022-11-16 | 2022-11-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAGLE AVENUE, BRONX, FROM STREET EAST 149 STREET TO STREET TERRACE PLACE |
X042022320A04 | 2022-11-16 | 2022-11-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAGLE AVENUE, BRONX, FROM STREET EAST 149 STREET TO STREET TERRACE PLACE |
X022022320A63 | 2022-11-16 | 2022-11-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAGLE AVENUE, BRONX, FROM STREET EAST 149 STREET TO STREET TERRACE PLACE |
X022022320A62 | 2022-11-16 | 2022-11-20 | TEMPORARY PEDESTRIAN WALK | EAGLE AVENUE, BRONX, FROM STREET EAST 149 STREET TO STREET TERRACE PLACE |
X012022320A62 | 2022-11-16 | 2022-11-20 | RESET, REPAIR OR REPLACE CURB | EAGLE AVENUE, BRONX, FROM STREET EAST 149 STREET TO STREET TERRACE PLACE |
B012022319B16 | 2022-11-15 | 2022-11-20 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | TAAFFE PLACE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
Q042022318A50 | 2022-11-14 | 2022-11-20 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 8 STREET, QUEENS, FROM STREET MAIN AVENUE |
Q042022318A49 | 2022-11-14 | 2022-11-20 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 8 STREET, QUEENS, FROM STREET MAIN AVENUE |
Q042022318A48 | 2022-11-14 | 2022-11-20 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 8 STREET, QUEENS, FROM STREET MAIN AVENUE |
B012022314B69 | 2022-11-10 | 2022-11-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | NOSTRAND AVENUE, BROOKLYN, FROM STREET WILLOUGHBY AVENUE |
B012022314B67 | 2022-11-10 | 2022-11-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B012022314B68 | 2022-11-10 | 2022-11-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B012022314B72 | 2022-11-10 | 2022-11-20 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | DURYEA PLACE, BROOKLYN, FROM STREET EAST 22 STREET TO STREET FLATBUSH AVENUE |
B022022313A69 | 2022-11-09 | 2022-11-20 | TEMPORARY PEDESTRIAN WALK | ROGERS AVENUE, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B042022313A16 | 2022-11-09 | 2022-11-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | ROGERS AVENUE, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B022022313A70 | 2022-11-09 | 2022-11-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | ROGERS AVENUE, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B042022313A15 | 2022-11-09 | 2022-11-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | HEYWARD STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE |
B012022313A78 | 2022-11-09 | 2022-11-20 | RESET, REPAIR OR REPLACE CURB | ROGERS AVENUE, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B022022311A35 | 2022-11-07 | 2022-11-20 | TEMPORARY PEDESTRIAN WALK | SANDFORD STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
M012022311A56 | 2022-11-07 | 2022-11-20 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | WEST 150 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET CONVENT AVENUE |
M012022311A55 | 2022-11-07 | 2022-11-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | CONVENT AVENUE, MANHATTAN, FROM STREET WEST 150 STREET TO STREET WEST 151 STREET |
M012022311A57 | 2022-11-07 | 2022-11-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | CONVENT AVENUE, MANHATTAN, FROM STREET WEST 150 STREET |
B042022311A07 | 2022-11-07 | 2022-11-20 | REPLACE SIDEWALK | 13 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B042022311A08 | 2022-11-07 | 2022-11-20 | REPLACE SIDEWALK | SANDFORD STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B022022311A36 | 2022-11-07 | 2022-11-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | SANDFORD STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B022022311A34 | 2022-11-07 | 2022-11-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | 13 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B022022311A33 | 2022-11-07 | 2022-11-20 | TEMPORARY PEDESTRIAN WALK | 13 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
M042022311A04 | 2022-11-07 | 2022-11-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CONVENT AVENUE, MANHATTAN, FROM STREET WEST 150 STREET TO STREET WEST 151 STREET |
M042022311A05 | 2022-11-07 | 2022-11-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEST 150 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET CONVENT AVENUE |
B012022311A29 | 2022-11-07 | 2022-11-20 | RESET, REPAIR OR REPLACE CURB | SANDFORD STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B012022311A27 | 2022-11-07 | 2022-11-20 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 13 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B042022306A00 | 2022-11-02 | 2022-11-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B042022306A01 | 2022-11-02 | 2022-11-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022306A20 | 2022-11-02 | 2022-11-20 | TEMPORARY PEDESTRIAN WALK | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022306A21 | 2022-11-02 | 2022-11-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B012022306A15 | 2022-11-02 | 2022-11-20 | RESET, REPAIR OR REPLACE CURB | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022306A22 | 2022-11-02 | 2022-11-20 | TEMPORARY PEDESTRIAN WALK | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022306A23 | 2022-11-02 | 2022-11-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B042022306A04 | 2022-11-02 | 2022-11-20 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | NOSTRAND AVENUE, BROOKLYN, FROM STREET WILLOUGHBY AVENUE |
B042022306A03 | 2022-11-02 | 2022-11-20 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | NOSTRAND AVENUE, BROOKLYN, FROM STREET WILLOUGHBY AVENUE |
B042022306A02 | 2022-11-02 | 2022-11-20 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | NOSTRAND AVENUE, BROOKLYN, FROM STREET WILLOUGHBY AVENUE |
B012022306A14 | 2022-11-02 | 2022-11-20 | RESET, REPAIR OR REPLACE CURB | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022305B03 | 2022-11-01 | 2022-11-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | TROY AVENUE, BROOKLYN, FROM STREET FENIMORE STREET TO STREET HAWTHORNE STREET |
B042022305A11 | 2022-11-01 | 2022-11-20 | REPLACE SIDEWALK | TROY AVENUE, BROOKLYN, FROM STREET FENIMORE STREET TO STREET HAWTHORNE STREET |
B012022305A85 | 2022-11-01 | 2022-11-20 | RESET, REPAIR OR REPLACE CURB-PROTECTED | TROY AVENUE, BROOKLYN, FROM STREET FENIMORE STREET TO STREET HAWTHORNE STREET |
B022022305B02 | 2022-11-01 | 2022-11-20 | TEMPORARY PEDESTRIAN WALK | TROY AVENUE, BROOKLYN, FROM STREET FENIMORE STREET TO STREET HAWTHORNE STREET |
Q022022301B24 | 2022-10-28 | 2022-11-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | MAIN AVENUE, QUEENS, FROM STREET 8 STREET TO STREET 30 AVENUE |
Q022022301B25 | 2022-10-28 | 2022-11-20 | TEMPORARY PEDESTRIAN WALK | WELLING COURT, QUEENS, FROM STREET 8 STREET TO STREET BEND |
Q042022301A16 | 2022-10-28 | 2022-11-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WELLING COURT, QUEENS, FROM STREET 8 STREET TO STREET BEND |
Q022022301B26 | 2022-10-28 | 2022-11-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | WELLING COURT, QUEENS, FROM STREET 8 STREET TO STREET BEND |
Q042022301A15 | 2022-10-28 | 2022-11-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MAIN AVENUE, QUEENS, FROM STREET 8 STREET TO STREET 30 AVENUE |
Q012022301C37 | 2022-10-28 | 2022-11-20 | RESET, REPAIR OR REPLACE CURB-PROTECTED | MAIN AVENUE, QUEENS, FROM STREET 8 STREET TO STREET 30 AVENUE |
Q012022301C38 | 2022-10-28 | 2022-11-20 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WELLING COURT, QUEENS, FROM STREET 8 STREET TO STREET BEND |
Q022022301B23 | 2022-10-28 | 2022-11-20 | TEMPORARY PEDESTRIAN WALK | MAIN AVENUE, QUEENS, FROM STREET 8 STREET TO STREET 30 AVENUE |
B022022289A03 | 2022-10-16 | 2022-11-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | TAAFFE PLACE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B042022289A02 | 2022-10-16 | 2022-11-09 | REPLACE SIDEWALK | SANDFORD STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B042022289A01 | 2022-10-16 | 2022-11-17 | REPLACE SIDEWALK | TAAFFE PLACE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B022022289A05 | 2022-10-16 | 2022-11-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | SANDFORD STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B022022289A04 | 2022-10-16 | 2022-11-10 | TEMPORARY PEDESTRIAN WALK | SANDFORD STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B022022289A02 | 2022-10-16 | 2022-11-17 | TEMPORARY PEDESTRIAN WALK | TAAFFE PLACE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B022022289A01 | 2022-10-16 | 2022-11-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | DURYEA PLACE, BROOKLYN, FROM STREET EAST 22 STREET TO STREET FLATBUSH AVENUE |
B022022289A00 | 2022-10-16 | 2022-11-17 | TEMPORARY PEDESTRIAN WALK | DURYEA PLACE, BROOKLYN, FROM STREET EAST 22 STREET TO STREET FLATBUSH AVENUE |
B042022289A00 | 2022-10-16 | 2022-11-17 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | DURYEA PLACE, BROOKLYN, FROM STREET EAST 22 STREET TO STREET FLATBUSH AVENUE |
B012022289A06 | 2022-10-16 | 2022-11-09 | RESET, REPAIR OR REPLACE CURB | SANDFORD STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B012022289A05 | 2022-10-16 | 2022-11-17 | RESET, REPAIR OR REPLACE CURB-PROTECTED | TAAFFE PLACE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B012022289A04 | 2022-10-16 | 2022-11-17 | RESET, REPAIR OR REPLACE CURB-PROTECTED | DURYEA PLACE, BROOKLYN, FROM STREET EAST 22 STREET TO STREET FLATBUSH AVENUE |
B012022278B62 | 2022-10-05 | 2022-11-01 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 28 STREET, BROOKLYN, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE |
B012022278B61 | 2022-10-05 | 2022-10-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | NEW YORK AVENUE, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE |
B022022277N15 | 2022-10-04 | 2022-11-01 | TEMPORARY PEDESTRIAN WALK | EAST 28 STREET, BROOKLYN, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE |
B042022277A10 | 2022-10-04 | 2022-11-01 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 28 STREET, BROOKLYN, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE |
B012022277B84 | 2022-10-04 | 2022-11-01 | RESET, REPAIR OR REPLACE CURB-PROTECTED | EAST 28 STREET, BROOKLYN, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE |
B022022277N16 | 2022-10-04 | 2022-11-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 28 STREET, BROOKLYN, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE |
B042022275A00 | 2022-10-02 | 2022-10-27 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | CHRISTOPHER AVENUE, BROOKLYN, FROM STREET LIBERTY AVENUE |
Q012022275A02 | 2022-10-02 | 2022-10-28 | PAVE STREET-W/ ENGINEERING & INSP FEE | PURVIS STREET, QUEENS, FROM STREET DEAD END TO STREET JACKSON AVENUE |
Q012022275A03 | 2022-10-02 | 2022-10-28 | PAVE STREET-W/ ENGINEERING & INSP FEE | THOMSON AVENUE, QUEENS, FROM STREET 44 DRIVE TO STREET QNSBO BR UP RY APPROACH |
B042022272A04 | 2022-09-29 | 2022-10-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CHRISTOPHER AVENUE, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET LIBERTY AVENUE |
B012022272A10 | 2022-09-29 | 2022-10-11 | RESET, REPAIR OR REPLACE CURB-PROTECTED | CHRISTOPHER AVENUE, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET LIBERTY AVENUE |
B042022272A03 | 2022-09-29 | 2022-10-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | LIBERTY AVENUE, BROOKLYN, FROM STREET CHRISTOPHER AVENUE TO STREET MOTHER GASTON BOULEVARD |
B022022272A20 | 2022-09-29 | 2022-10-11 | TEMPORARY PEDESTRIAN WALK | CHRISTOPHER AVENUE, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET LIBERTY AVENUE |
B022022272A21 | 2022-09-29 | 2022-10-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | CHRISTOPHER AVENUE, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET LIBERTY AVENUE |
B012022272A09 | 2022-09-29 | 2022-10-11 | RESET, REPAIR OR REPLACE CURB | LIBERTY AVENUE, BROOKLYN, FROM STREET CHRISTOPHER AVENUE TO STREET MOTHER GASTON BOULEVARD |
B022022272A19 | 2022-09-29 | 2022-10-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | LIBERTY AVENUE, BROOKLYN, FROM STREET CHRISTOPHER AVENUE TO STREET MOTHER GASTON BOULEVARD |
B022022272A18 | 2022-09-29 | 2022-10-11 | TEMPORARY PEDESTRIAN WALK | LIBERTY AVENUE, BROOKLYN, FROM STREET CHRISTOPHER AVENUE TO STREET MOTHER GASTON BOULEVARD |
B042022271A02 | 2022-09-28 | 2022-10-22 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | HURON STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE |
B042022271A00 | 2022-09-28 | 2022-10-22 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | HURON STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE |
B042022271A01 | 2022-09-28 | 2022-10-22 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | HURON STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE |
B012022268A08 | 2022-09-25 | 2022-10-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | METROPOLITAN AVENUE, BROOKLYN, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE |
B012022268A07 | 2022-09-25 | 2022-10-26 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | NORTH 3 STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE |
B012022268A06 | 2022-09-25 | 2022-10-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | KENT AVENUE, BROOKLYN, FROM STREET METROPOLITAN AVENUE TO STREET NORTH 3 STREET |
B012022268A10 | 2022-09-25 | 2022-10-26 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | KENT AVENUE, BROOKLYN, FROM STREET METROPOLITAN AVENUE |
B012022268A09 | 2022-09-25 | 2022-10-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | KENT AVENUE, BROOKLYN, FROM STREET NORTH 3 STREET |
B012022266A54 | 2022-09-23 | 2022-10-13 | PAVE STREET-W/ ENGINEERING & INSP FEE | LIVONIA AVENUE, BROOKLYN, FROM STREET PEDESTRIAN OVERPASS TO STREET SNEDIKER AVENUE |
B022022264A39 | 2022-09-21 | 2022-10-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | NEW YORK AVENUE, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE |
B012022264A10 | 2022-09-21 | 2022-10-06 | RESET, REPAIR OR REPLACE CURB | NEW YORK AVENUE, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE |
B042022264A01 | 2022-09-21 | 2022-10-06 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | NEW YORK AVENUE, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE |
B022022264A38 | 2022-09-21 | 2022-10-06 | TEMPORARY PEDESTRIAN WALK | NEW YORK AVENUE, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE |
Q022022263A21 | 2022-09-20 | 2022-10-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | THOMSON AVENUE, QUEENS, FROM STREET 44 DRIVE TO STREET QNSBO BR UP RY APPROACH |
Q022022263A20 | 2022-09-20 | 2022-10-18 | TEMPORARY PEDESTRIAN WALK | THOMSON AVENUE, QUEENS, FROM STREET 44 DRIVE TO STREET QNSBO BR UP RY APPROACH |
Q042022263A17 | 2022-09-20 | 2022-10-18 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | PURVIS STREET, QUEENS, FROM STREET DEAD END TO STREET JACKSON AVENUE |
Q042022263A18 | 2022-09-20 | 2022-10-18 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | THOMSON AVENUE, QUEENS, FROM STREET 44 DRIVE TO STREET QNSBO BR UP RY APPROACH |
Q012022263B11 | 2022-09-20 | 2022-10-18 | RESET, REPAIR OR REPLACE CURB | THOMSON AVENUE, QUEENS, FROM STREET 44 DRIVE TO STREET QNSBO BR UP RY APPROACH |
X012022263A97 | 2022-09-20 | 2022-10-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | MANIDA STREET, BRONX, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE |
Q012022263B10 | 2022-09-20 | 2022-10-18 | RESET, REPAIR OR REPLACE CURB | PURVIS STREET, QUEENS, FROM STREET DEAD END TO STREET JACKSON AVENUE |
B012022261A02 | 2022-09-18 | 2022-10-05 | PAVE STREET-W/ ENGINEERING & INSP FEE | GOLD STREET, BROOKLYN, FROM STREET FRONT STREET TO STREET WATER STREET |
B012022261A03 | 2022-09-18 | 2022-10-05 | PAVE STREET-W/ ENGINEERING & INSP FEE | WATER STREET, BROOKLYN, FROM STREET BRIDGE STREET TO STREET GOLD STREET |
B012022261A04 | 2022-09-18 | 2022-10-05 | PAVE STREET-W/ ENGINEERING & INSP FEE | FRONT STREET, BROOKLYN, FROM STREET BRIDGE STREET TO STREET GOLD STREET |
B012022261A06 | 2022-09-18 | 2022-10-05 | PAVE STREET-W/ ENGINEERING & INSP FEE | FRONT STREET, BROOKLYN, FROM STREET GOLD STREET |
B012022261A05 | 2022-09-18 | 2022-10-05 | PAVE STREET-W/ ENGINEERING & INSP FEE | GOLD STREET, BROOKLYN, FROM STREET WATER STREET |
B022022257D25 | 2022-09-14 | 2022-10-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | 38 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY |
B012022257E18 | 2022-09-14 | 2022-10-13 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 38 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY |
B042022257A15 | 2022-09-14 | 2022-10-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 38 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY |
B022022257D24 | 2022-09-14 | 2022-10-13 | TEMPORARY PEDESTRIAN WALK | 38 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY |
B012022256B75 | 2022-09-13 | 2022-10-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | LENOX ROAD, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B042022255A00 | 2022-09-12 | 2022-09-27 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | LIVONIA AVENUE, BROOKLYN, FROM STREET VAN SINDEREN AVENUE |
B012022255A05 | 2022-09-12 | 2022-10-06 | RESET, REPAIR OR REPLACE CURB | 13 AVENUE, BROOKLYN, FROM STREET 48 STREET TO STREET 49 STREET |
B042022255A01 | 2022-09-12 | 2022-09-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | LIVONIA AVENUE, BROOKLYN, FROM STREET VAN SINDEREN AVENUE |
B042022255A02 | 2022-09-12 | 2022-09-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | LIVONIA AVENUE, BROOKLYN, FROM STREET VAN SINDEREN AVENUE |
B042022255A03 | 2022-09-12 | 2022-09-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | LIVONIA AVENUE, BROOKLYN, FROM STREET VAN SINDEREN AVENUE |
B042022255A04 | 2022-09-12 | 2022-10-06 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 13 AVENUE, BROOKLYN, FROM STREET 48 STREET TO STREET 49 STREET |
B022022255A05 | 2022-09-12 | 2022-10-06 | TEMPORARY PEDESTRIAN WALK | 13 AVENUE, BROOKLYN, FROM STREET 48 STREET TO STREET 49 STREET |
B022022255A06 | 2022-09-12 | 2022-10-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | 13 AVENUE, BROOKLYN, FROM STREET 48 STREET TO STREET 49 STREET |
M042022249A11 | 2022-09-06 | 2022-09-29 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEST 37 STREET, MANHATTAN, FROM STREET 10 AVENUE TO STREET DYER AVENUE |
M022022249D16 | 2022-09-06 | 2022-09-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 37 STREET, MANHATTAN, FROM STREET 10 AVENUE TO STREET DYER AVENUE |
M022022249D15 | 2022-09-06 | 2022-09-29 | TEMPORARY PEDESTRIAN WALK | WEST 37 STREET, MANHATTAN, FROM STREET 10 AVENUE TO STREET DYER AVENUE |
M012022249B29 | 2022-09-06 | 2022-09-29 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WEST 37 STREET, MANHATTAN, FROM STREET 10 AVENUE TO STREET DYER AVENUE |
B022022248A20 | 2022-09-05 | 2022-09-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | PULASKI STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B012022248A01 | 2022-09-05 | 2022-09-28 | RESET, REPAIR OR REPLACE CURB-PROTECTED | PULASKI STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B022022248A19 | 2022-09-05 | 2022-09-28 | TEMPORARY PEDESTRIAN WALK | PULASKI STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B042022248A00 | 2022-09-05 | 2022-09-28 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | PULASKI STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B012022244A85 | 2022-09-01 | 2022-09-15 | RESET, REPAIR OR REPLACE CURB | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022244A21 | 2022-09-01 | 2022-11-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B022022244A20 | 2022-09-01 | 2022-11-13 | TEMPORARY PEDESTRIAN WALK | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B042022244A17 | 2022-09-01 | 2022-09-15 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B012022237A11 | 2022-08-25 | 2022-09-13 | RESET, REPAIR OR REPLACE CURB | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022237A05 | 2022-08-25 | 2022-09-14 | TEMPORARY PEDESTRIAN WALK | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B012022237A12 | 2022-08-25 | 2022-09-13 | RESET, REPAIR OR REPLACE CURB-PROTECTED | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022237A06 | 2022-08-25 | 2022-09-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B022022237A03 | 2022-08-25 | 2022-09-14 | TEMPORARY PEDESTRIAN WALK | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B022022237A04 | 2022-08-25 | 2022-09-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B042022237A05 | 2022-08-25 | 2022-09-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BEDFORD AVENUE, BROOKLYN, FROM STREET CLYMER STREET TO STREET TAYLOR STREET |
B042022237A06 | 2022-08-25 | 2022-09-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CLYMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BEND |
B042022233A00 | 2022-08-21 | 2022-09-16 | REPLACE SIDEWALK | LYNCH STREET, BROOKLYN, FROM STREET HARRISON AVENUE TO STREET MARCY AVENUE |
B012022233A01 | 2022-08-21 | 2022-09-16 | RESET, REPAIR OR REPLACE CURB | KENT AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B022022233A04 | 2022-08-21 | 2022-09-16 | TEMPORARY PEDESTRIAN WALK | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022233A03 | 2022-08-21 | 2022-09-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | KENT AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B022022233A02 | 2022-08-21 | 2022-09-16 | TEMPORARY PEDESTRIAN WALK | KENT AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B012022233A02 | 2022-08-21 | 2022-09-15 | RESET, REPAIR OR REPLACE CURB | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022233A00 | 2022-08-21 | 2022-09-16 | TEMPORARY PEDESTRIAN WALK | LYNCH STREET, BROOKLYN, FROM STREET HARRISON AVENUE TO STREET MARCY AVENUE |
B042022233A01 | 2022-08-21 | 2022-09-16 | REPLACE SIDEWALK | KENT AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B042022233A02 | 2022-08-21 | 2022-09-15 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET |
B022022233A01 | 2022-08-21 | 2022-09-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | LYNCH STREET, BROOKLYN, FROM STREET HARRISON AVENUE TO STREET MARCY AVENUE |
M012022228A93 | 2022-08-16 | 2022-09-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | CHRYSTIE STREET, MANHATTAN, FROM STREET DELANCEY STREET TO STREET RIVINGTON STREET |
B012022227A61 | 2022-08-15 | 2022-09-09 | RESET, REPAIR OR REPLACE CURB-PROTECTED | STANHOPE STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILSON AVENUE |
B012022227A60 | 2022-08-15 | 2022-09-02 | PAVE STREET-W/ ENGINEERING & INSP FEE | ERASMUS STREET, BROOKLYN, FROM STREET LLOYD STREET TO STREET NOSTRAND AVENUE |
B042022227A19 | 2022-08-15 | 2022-09-09 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | STANHOPE STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILSON AVENUE |
B022022227A86 | 2022-08-15 | 2022-09-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | STANHOPE STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILSON AVENUE |
B022022227A85 | 2022-08-15 | 2022-09-09 | TEMPORARY PEDESTRIAN WALK | STANHOPE STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILSON AVENUE |
B042022226A00 | 2022-08-14 | 2022-09-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | PACIFIC STREET, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE |
B012022226A02 | 2022-08-14 | 2022-09-13 | RESET, REPAIR OR REPLACE CURB-PROTECTED | PACIFIC STREET, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE |
B022022226A01 | 2022-08-14 | 2022-11-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | PACIFIC STREET, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE |
B022022226A00 | 2022-08-14 | 2022-11-12 | TEMPORARY PEDESTRIAN WALK | PACIFIC STREET, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE |
B022022224A27 | 2022-08-12 | 2022-09-02 | TEMPORARY PEDESTRIAN WALK | HURON STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD |
B042022224A09 | 2022-08-12 | 2022-09-02 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | HURON STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD |
B042022224A08 | 2022-08-12 | 2022-09-02 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MANHATTAN AVENUE, BROOKLYN, FROM STREET GREEN STREET TO STREET HURON STREET |
B012022224A42 | 2022-08-12 | 2022-09-02 | RESET, REPAIR OR REPLACE CURB | HURON STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD |
B012022224A41 | 2022-08-12 | 2022-09-02 | RESET, REPAIR OR REPLACE CURB-PROTECTED | MANHATTAN AVENUE, BROOKLYN, FROM STREET GREEN STREET TO STREET HURON STREET |
B022022224A25 | 2022-08-12 | 2022-09-02 | TEMPORARY PEDESTRIAN WALK | MANHATTAN AVENUE, BROOKLYN, FROM STREET GREEN STREET TO STREET HURON STREET |
B022022224A26 | 2022-08-12 | 2022-09-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | MANHATTAN AVENUE, BROOKLYN, FROM STREET GREEN STREET TO STREET HURON STREET |
B022022224A28 | 2022-08-12 | 2022-09-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | HURON STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD |
M042022220A01 | 2022-08-08 | 2022-09-03 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | CONVENT AVENUE, MANHATTAN, FROM STREET WEST 150 STREET |
M042022220A03 | 2022-08-08 | 2022-09-03 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | CONVENT AVENUE, MANHATTAN, FROM STREET WEST 150 STREET |
M042022220A02 | 2022-08-08 | 2022-09-03 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | CONVENT AVENUE, MANHATTAN, FROM STREET WEST 150 STREET |
X042022178A12 | 2022-06-27 | 2022-07-25 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MANIDA STREET, BRONX, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE |
X012022178A86 | 2022-06-27 | 2022-07-25 | RESET, REPAIR OR REPLACE CURB-PROTECTED | MANIDA STREET, BRONX, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE |
X022022178A49 | 2022-06-27 | 2022-07-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | MANIDA STREET, BRONX, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE |
X022022178A48 | 2022-06-27 | 2022-07-25 | TEMPORARY PEDESTRIAN WALK | MANIDA STREET, BRONX, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE |
X012022173A69 | 2022-06-22 | 2022-07-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | GRAND CONCOURSE, BRONX, FROM STREET MDE NORTHBOUND EXIT 3 TO STREET EAST 138 STREET |
B012022171A09 | 2022-06-20 | 2022-07-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | HERKIMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B012022171A08 | 2022-06-20 | 2022-07-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | BEDFORD AVENUE, BROOKLYN, FROM STREET BREVOORT PLACE TO STREET HERKIMER STREET |
B012022171A10 | 2022-06-20 | 2022-07-13 | PAVE STREET-W/ ENGINEERING & INSP FEE | BEDFORD AVENUE, BROOKLYN, FROM STREET HERKIMER STREET |
B012022163A00 | 2022-06-12 | 2022-07-07 | PAVE STREET-W/ ENGINEERING & INSP FEE | ERASMUS STREET, BROOKLYN, FROM STREET LLOYD STREET TO STREET NOSTRAND AVENUE |
B012022158A00 | 2022-06-07 | 2022-07-01 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | MYRTLE AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
B012022144B48 | 2022-05-24 | 2022-06-15 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | CLARKSON AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
X012022135A02 | 2022-05-15 | 2022-06-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | JACKSON AVENUE, BRONX, FROM STREET EAST 149 STREET TO STREET PONTIAC PLACE |
X012022135A01 | 2022-05-15 | 2022-06-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | TRINITY AVENUE, BRONX, FROM STREET EAST 149 STREET TO STREET PONTIAC PLACE |
Q012022119D24 | 2022-04-29 | 2022-05-28 | PAVE STREET-W/ ENGINEERING & INSP FEE | 21 STREET, QUEENS, FROM STREET 31 AVENUE TO STREET 31 ROAD |
B012022066B47 | 2022-03-07 | 2022-04-06 | PAVE STREET-W/ ENGINEERING & INSP FEE | CONEY ISLAND AVENUE, BROOKLYN, FROM STREET FOSTER AVENUE TO STREET PARKVILLE AVENUE |
B012022066B48 | 2022-03-07 | 2022-04-06 | PAVE STREET-W/ ENGINEERING & INSP FEE | FOSTER AVENUE, BROOKLYN, FROM STREET CONEY ISLAND AVENUE TO STREET CORBIN COURT |
B012022066B49 | 2022-03-07 | 2022-04-06 | PAVE STREET-W/ ENGINEERING & INSP FEE | CONEY ISLAND AVENUE, BROOKLYN, FROM STREET FOSTER AVENUE |
B012022040B70 | 2022-02-09 | 2022-02-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | DE KALB AVENUE, BROOKLYN, FROM STREET BROADWAY TO STREET MALCOLM X BOULEVARD |
B012022040B69 | 2022-02-09 | 2022-02-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | MILLER AVENUE, BROOKLYN, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE |
B012022013B02 | 2022-01-13 | 2022-02-02 | PAVE STREET-W/ ENGINEERING & INSP FEE | HANCOCK STREET, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B012022009A01 | 2022-01-09 | 2022-01-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | KENT AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B012022003C72 | 2022-01-03 | 2022-02-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | LORIMER STREET, BROOKLYN, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE |
B012021363E79 | 2021-12-29 | 2021-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | HARRISON AVENUE, BROOKLYN, FROM STREET LYNCH STREET TO STREET MIDDLETON STREET |
B012021363E78 | 2021-12-29 | 2021-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | LORIMER STREET, BROOKLYN, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE |
B012021363E80 | 2021-12-29 | 2022-01-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | HARRISON AVENUE, BROOKLYN, FROM STREET LYNCH STREET TO STREET MIDDLETON STREET |
B042021304A00 | 2021-10-31 | 2021-11-12 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 13 AVENUE, BROOKLYN, FROM STREET 42 STREET TO STREET 43 STREET |
B042021257A07 | 2021-09-14 | 2021-09-29 | REPLACE SIDEWALK | 46 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B042021257A08 | 2021-09-14 | 2021-09-29 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 16 AVENUE, BROOKLYN, FROM STREET 46 STREET |
B012021238B94 | 2021-08-26 | 2021-09-10 | PAVE STREET-W/ ENGINEERING & INSP FEE | 60 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE |
B042021237A00 | 2021-08-25 | 2021-09-03 | REPLACE SIDEWALK | AINSLIE STREET, BROOKLYN, FROM STREET KEAP STREET TO STREET RODNEY STREET |
M012021234A03 | 2021-08-22 | 2021-09-11 | RESET, REPAIR OR REPLACE CURB | WEST 29 STREET, MANHATTAN, FROM STREET HIGH LINE TO STREET 11 AVENUE |
M042021234A00 | 2021-08-22 | 2021-09-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEST 29 STREET, MANHATTAN, FROM STREET HIGH LINE TO STREET 11 AVENUE |
B042021220A05 | 2021-08-08 | 2021-09-02 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BROADWAY, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD |
B042021220A04 | 2021-08-08 | 2021-09-02 | REPLACE SIDEWALK | BROADWAY, BROOKLYN, FROM STREET FAYETTE STREET TO STREET MARCUS GARVEY BOULEVARD |
B012021215A02 | 2021-08-03 | 2021-08-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | GATES AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B042021215A02 | 2021-08-03 | 2021-09-02 | REPLACE SIDEWALK | SUMNER PLACE, BROOKLYN, FROM STREET BROADWAY TO STREET FLUSHING AVENUE |
B012021214B34 | 2021-08-02 | 2021-08-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | NEW YORK AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET GLENWOOD ROAD |
B012021188B07 | 2021-07-07 | 2021-08-04 | PAVE STREET-W/ ENGINEERING & INSP FEE | 50 STREET, BROOKLYN, FROM STREET 9 AVENUE TO STREET 10 AVENUE |
B012021183B00 | 2021-07-02 | 2021-07-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | VANDERBILT AVENUE, BROOKLYN, FROM STREET GATES AVENUE TO STREET GREENE AVENUE |
B012021144C28 | 2021-05-24 | 2021-06-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | 38 STREET, BROOKLYN, FROM STREET 10 AVENUE TO STREET FT HAMILTON PARKWAY |
B012021140A34 | 2021-05-20 | 2021-06-10 | PAVE STREET-W/ ENGINEERING & INSP FEE | KEAP STREET, BROOKLYN, FROM STREET GRAND STREET EXTENSION TO STREET SOUTH 2 STREET |
B012021140A36 | 2021-05-20 | 2021-06-10 | PAVE STREET-W/ ENGINEERING & INSP FEE | KEAP STREET, BROOKLYN, FROM STREET SOUTH 2 STREET |
B012021131B39 | 2021-05-11 | 2021-06-08 | PAVE STREET-W/ ENGINEERING & INSP FEE | SANDFORD STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
X012021130A87 | 2021-05-10 | 2021-06-09 | PAVE STREET-W/ ENGINEERING & INSP FEE | CHISHOLM STREET, BRONX, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET |
B042021049A05 | 2021-02-18 | 2021-02-25 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | DE SALES PLACE, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET DEAD END |
B042021046A02 | 2021-02-15 | 2021-02-25 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | FRANKLIN AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B042020300A31 | 2020-10-26 | 2020-11-18 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EVERGREEN AVENUE, BROOKLYN, FROM STREET LINDEN STREET |
B042020300A16 | 2020-10-26 | 2020-11-18 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 55 STREET, BROOKLYN, FROM STREET NEW UTRECHT AVENUE |
B012020297B88 | 2020-10-23 | 2020-11-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | 13 AVENUE, BROOKLYN, FROM STREET 42 STREET |
B012020297B87 | 2020-10-23 | 2020-11-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | 13 AVENUE, BROOKLYN, FROM STREET 42 STREET TO STREET 43 STREET |
B012020297B85 | 2020-10-23 | 2020-11-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | 42 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B012020273B09 | 2020-09-29 | 2020-10-28 | PAVE STREET-W/ ENGINEERING & INSP FEE | MYRTLE AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
B012020273B12 | 2020-09-29 | 2020-10-28 | PAVE STREET-W/ ENGINEERING & INSP FEE | GROVE STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B012020259C37 | 2020-09-15 | 2020-10-09 | RESET, REPAIR OR REPLACE CURB | 42 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B042020259A01 | 2020-09-15 | 2020-10-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MYRTLE AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
B042020259A02 | 2020-09-15 | 2020-10-09 | REPLACE SIDEWALK | 13 AVENUE, BROOKLYN, FROM STREET 42 STREET TO STREET 43 STREET |
B042020259A03 | 2020-09-15 | 2020-10-09 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 13 AVENUE, BROOKLYN, FROM STREET 42 STREET |
B042020259A04 | 2020-09-15 | 2020-10-09 | REPLACE SIDEWALK | 42 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B012020259C34 | 2020-09-15 | 2020-10-09 | RESET, REPAIR OR REPLACE CURB | 13 AVENUE, BROOKLYN, FROM STREET 42 STREET TO STREET 43 STREET |
B012020259C33 | 2020-09-15 | 2020-10-13 | RESET, REPAIR OR REPLACE CURB | MYRTLE AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
B042020250A01 | 2020-09-06 | 2020-09-30 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 55 STREET, BROOKLYN, FROM STREET NEW UTRECHT AVENUE |
B042020250A00 | 2020-09-06 | 2020-09-30 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 55 STREET, BROOKLYN, FROM STREET NEW UTRECHT AVENUE |
B012020250A02 | 2020-09-06 | 2020-10-03 | PAVE STREET-W/ ENGINEERING & INSP FEE | 55 STREET, BROOKLYN, FROM STREET NEW UTRECHT AVENUE |
B012020250A00 | 2020-09-06 | 2020-10-03 | PAVE STREET-W/ ENGINEERING & INSP FEE | NEW UTRECHT AVENUE, BROOKLYN, FROM STREET 55 STREET TO STREET 56 STREET |
B042020250A02 | 2020-09-06 | 2020-09-30 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 55 STREET, BROOKLYN, FROM STREET NEW UTRECHT AVENUE |
Q012020247B65 | 2020-09-03 | 2020-10-02 | PAVE STREET-W/ ENGINEERING & INSP FEE | 188 STREET, QUEENS, FROM STREET 48 AVENUE TO STREET 50 AVENUE |
B012020240B59 | 2020-08-27 | 2020-09-23 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 51 STREET, BROOKLYN, FROM STREET RUTLAND ROAD TO STREET WINTHROP STREET |
B012020239B77 | 2020-08-26 | 2020-09-24 | RESET, REPAIR OR REPLACE CURB | GROVE STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B042020239A25 | 2020-08-26 | 2020-09-24 | REPLACE SIDEWALK | GROVE STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B042020237A12 | 2020-08-24 | 2020-09-22 | REPLACE SIDEWALK | FRANKLIN AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B012020233B02 | 2020-08-20 | 2020-09-17 | PAVE STREET-W/ ENGINEERING & INSP FEE | LINDEN STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012020233B05 | 2020-08-20 | 2020-09-17 | PAVE STREET-W/ ENGINEERING & INSP FEE | EVERGREEN AVENUE, BROOKLYN, FROM STREET LINDEN STREET |
B012020233B04 | 2020-08-20 | 2020-09-17 | PAVE STREET-W/ ENGINEERING & INSP FEE | GROVE STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012020233B03 | 2020-08-20 | 2020-09-17 | PAVE STREET-W/ ENGINEERING & INSP FEE | EVERGREEN AVENUE, BROOKLYN, FROM STREET GROVE STREET TO STREET LINDEN STREET |
X042020233A04 | 2020-08-20 | 2020-09-18 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BROWN PLACE, BRONX, FROM STREET MDE SOUTHBOUND EXIT 1 TO STREET BRUCKNER BOULEVARD |
B042020230A01 | 2020-08-17 | 2020-09-10 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EVERGREEN AVENUE, BROOKLYN, FROM STREET LINDEN STREET |
B042020230A03 | 2020-08-17 | 2020-09-10 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EVERGREEN AVENUE, BROOKLYN, FROM STREET LINDEN STREET |
B042020230A02 | 2020-08-17 | 2020-09-10 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EVERGREEN AVENUE, BROOKLYN, FROM STREET LINDEN STREET |
B042020230A00 | 2020-08-17 | 2020-09-10 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | EVERGREEN AVENUE, BROOKLYN, FROM STREET LINDEN STREET |
B042020225A03 | 2020-08-12 | 2020-09-06 | REPLACE SIDEWALK | GERRY STREET, BROOKLYN, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE |
B012020225A03 | 2020-08-12 | 2020-09-06 | RESET, REPAIR OR REPLACE CURB | GERRY STREET, BROOKLYN, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE |
B012020199A33 | 2020-07-17 | 2020-08-13 | RESET, REPAIR OR REPLACE CURB | ERASMUS STREET, BROOKLYN, FROM STREET LLOYD STREET TO STREET NOSTRAND AVENUE |
B042020199A14 | 2020-07-17 | 2020-08-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | ERASMUS STREET, BROOKLYN, FROM STREET LLOYD STREET TO STREET NOSTRAND AVENUE |
Start date | End date | Type | Value |
---|---|---|---|
2024-10-16 | 2024-10-28 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-09-23 | 2024-10-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-08-06 | 2024-09-23 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-08-06 | 2024-08-06 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-07-15 | 2024-08-06 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-06-18 | 2024-06-18 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-06-18 | 2024-07-15 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-05-09 | 2024-06-18 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-04-16 | 2024-05-09 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-01-04 | 2024-04-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-07-13 | 2024-01-04 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-06-20 | 2023-07-13 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-06-16 | 2023-06-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-06-16 | 2023-06-20 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-06-02 | 2023-06-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-04-17 | 2023-06-02 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-04-10 | 2023-04-17 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-02-23 | 2023-04-10 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-02-22 | 2023-02-23 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-02-17 | 2023-02-22 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-02-13 | 2023-02-17 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-01-12 | 2023-01-12 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-01-12 | 2023-02-13 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-10-25 | 2023-01-12 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-10 | 2022-10-25 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-02-28 | 2022-02-28 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-02-28 | 2022-08-10 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-07-10 | 2022-02-28 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2019-01-29 | 2023-02-13 | Address | 152 SKILLMAN STREET #5, BROOKLYN, NY, 11205, USA (Type of address: Service of Process) |
2019-01-29 | 2021-07-10 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
230213003864 | 2023-02-13 | BIENNIAL STATEMENT | 2023-01-01 |
190129010371 | 2019-01-29 | CERTIFICATE OF INCORPORATION | 2019-01-29 |
Date | Inspection Object | Address | Grade | Type | Institution | Desctiption |
---|---|---|---|---|---|---|
2024-10-30 | No data | EAGLE AVENUE, FROM STREET EAST 149 STREET TO STREET TERRACE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found resurfaced under DOT permit number X152024191A01 work started on July 9, 2024/ Work End on August 30, 2024 |
2024-10-29 | No data | BEDFORD AVENUE, FROM STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SW1 corner found to be ADA compliant. Measured & collected in Prism on 1/23/24. |
2024-10-25 | No data | 32 STREET, FROM STREET 39 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permittee obtained permit #Q042024183A49 for the NW corner quadrant. |
2024-10-25 | No data | LINDEN BOULEVARD, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway repaved for new building |
2024-10-25 | No data | EAST 79 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w paved |
2024-10-23 | No data | EAST 144 STREET, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel faced curb installed |
2024-10-23 | No data | SULLIVAN PLACE, FROM STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single tangent ramp within the NW2 corner quadrant is Ada compliant. Measured and collected in prism on 10/23/24 |
2024-10-23 | No data | WEST FARMS ROAD, FROM STREET CROSS BRONX EXPWY NB ET 4 A TO STREET EAST 174 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done in compliance |
2024-10-22 | No data | FOAM PLACE, FROM STREET SMITH PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly completed single ramp within the SW1 corner quadrant was found to be Ada compliant. Plastic on DWS mat has been removed and expansion joints are sealed. Measured and collected in prism on 8/27/24. |
2024-10-22 | No data | DURYEA PLACE, FROM STREET EAST 22 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NW2 corner quadrant are Ada compliant. Measured and collected in prism on 3/24/23. |
2024-10-22 | No data | FLATBUSH AVENUE, FROM STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent single tangent ramp within the NE3 corner quadrant is ada compliant. Previously Measured and collected in prism on 3/16/23 and updated on 3/30/23. |
2024-10-22 | No data | ATLANTIC AVENUE, FROM STREET COLUMBUS PLACE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway paved by BPP in compliance. |
2024-10-22 | No data | EAST 28 STREET, FROM STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed Single tangent ramp in the NE3 corner quadrant is ada compliant. Measured and collected in prism on 3/27/23. |
2024-10-22 | No data | NEW JERSEY AVENUE, FROM STREET FULTON STREET TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joints around street light need to be sealed |
2024-10-21 | No data | EAST 215 STREET, FROM STREET HOLLAND AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1/2 Plus 5 of the roadway paved |
2024-10-19 | No data | BEDFORD AVENUE, FROM STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street repaved for new building |
2024-10-19 | No data | SKILLMAN STREET, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb installed |
2024-10-19 | No data | PENN STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb installed |
2024-10-19 | No data | BEDFORD AVENUE, FROM STREET CATON AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street repaved for new building |
2024-10-18 | No data | BELMONT AVENUE, FROM STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | completed tangent ramps within the NE3 corner quadrant are Ada compliant. Previously Measure and collected in prism on 6/11/24. No tiff on file roadway counter slope is excessive. Roadway fixed |
2024-10-16 | No data | 168 STREET, FROM STREET 91 AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I OBSERVED THE RESPONDENT HAS EXCAVATED THE SIDEWALK AND FAILED TO MAINTAIN A 5 FOOT CLEAR PROTECTED PEDESTRIAN WALKWAY IN THE ROADWAY. STIPULATON (014) WAS VIOLATED. RESPONDENT ID THRU PERMT CITED. . |
2024-10-16 | No data | HONEYWELL AVENUE, FROM STREET EAST 178 STREET TO STREET EAST 179 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done in compliance |
2024-10-16 | No data | EAST 179 STREET, FROM STREET DALY AVENUE TO STREET HONEYWELL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done in roadway in compliance |
2024-10-16 | No data | EAST 179 STREET, FROM STREET HONEYWELL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done in compliance |
2024-10-16 | No data | MOHEGAN AVENUE, FROM STREET EAST 179 STREET TO STREET EAST 180 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP Half plus 5 done, in compliance |
2024-10-15 | No data | EAST 194 STREET, FROM STREET DECATUR AVENUE TO STREET MARION AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 1/2+5' and 3'' down I/F/O 364,368,372 E 194 St. Was told to sweep the area clean again. BPP Passes. |
2024-10-15 | No data | WALTON AVENUE, FROM STREET EAST 140 STREET TO STREET EAST 144 STREET | No data | Street Construction Inspections: Active | Department of Transportation | i found the respondent with a 5' walk in the roadway with water filled barriers. Respondent failed to comply with terms and conditions of DOT permit stipulation 014 walkway must be ramped at the re-entry to the sidewalk for handicapped accessibility. |
2024-10-15 | No data | BELMONT AVENUE, FROM STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permittee failed to correct excessive ramp running slopes in the NE3 corner. Previously M&C in Prism on 10/17/23. |
2024-10-15 | No data | GRAND AVENUE, FROM STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner found to be ADA compliant. Remeasured & collected in Prism 9/4/24. |
2024-10-15 | No data | BEDFORD AVENUE, FROM STREET ST JOHNS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner found not to be ADA compliant. Measured & collected in Prism on 11/16/23. |
2024-10-14 | No data | EAST 144 STREET, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 5 FOOT CLEAR PROTECTED PEDESTRIAN WALKWAY IN THE ROADWAY. |
2024-10-14 | No data | BELMONT AVENUE, FROM STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Roadway counter fixed Completed tangent ramps within SW1 corner quadrant non Ada compliant. Previously Measured and collected in prism on 6/8/24. |
2024-10-12 | No data | WARD AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done in roadway in compliance |
2024-10-11 | No data | MC DONALD AVENUE, FROM STREET AVENUE P TO STREET QUENTIN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk/curb reset for property #369 Quentin Rd done in compliance |
2024-10-11 | No data | QUENTIN ROAD, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk/curb reset for property In compliance |
2024-10-11 | No data | NOSTRAND AVENUE, FROM STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the NW2 corner found to be ADA compliant. Measured & collected in Prism on 12/6/22 and re measured on 2/22/23 due to changes on the landing. |
2024-10-11 | No data | MC DONALD AVENUE, FROM STREET QUENTIN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner found to be ADA compliant. Measured & collected in Prism on 10/11/24. |
2024-10-11 | No data | STOCKTON STREET, FROM STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the NW2 corner found to be ADA compliant. Previously Measured & collected in Prism on 2/16/24. |
2024-10-10 | No data | ST JOHN'S PLACE, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please restore lane markings to bike lane that were removed by BPP. |
2024-10-10 | No data | FRONT STREET, FROM STREET BRIDGE STREET TO STREET GOLD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb replaced IFO property 218 |
2024-10-10 | No data | CONOVER STREET, FROM STREET DIKEMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SW1 corner found to be ADA compliant. Measured & collected in Prism on 7/20/23. |
2024-10-10 | No data | CLERMONT AVENUE, FROM STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NW2 corner quadrant are ADA compliant. Measured and collected in Prism on 2/16/24. |
2024-10-10 | No data | CEDAR STREET, FROM STREET EVERGREEN AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Width of roadway: 29'6'' x Width of milled area: 19'8'' x Length of milled area: 166'0'' x Depth of milled area: 0'3'' located i/f/o 60. |
2024-10-09 | No data | BERGEN STREET, FROM STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly Completed tangent ramps within the SE4 corner quadrant are Ada compliant. Measured and collected in prism on 10/9/24. |
2024-10-09 | No data | NEW JERSEY AVENUE, FROM STREET FULTON STREET TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW flags installed, expansion joints sealed |
2024-10-09 | No data | EAST 10 STREET, FROM STREET CATON AVENUE TO STREET CHURCH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done. Only on Coney Island Ave. |
2024-10-07 | No data | CHURCH AVENUE, FROM STREET LLOYD STREET TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site roadway milled half+5’ in compliance with BPP specifications for NB 2718 |
2024-10-07 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET ERASMUS STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site roadway milled half+5’ in compliance with BPP specifications for NB 2718 |
2024-10-07 | No data | CONEY ISLAND AVENUE, FROM STREET CHURCH AVENUE TO STREET FRIEL PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Major perm in roadway. All lane markings restored in kind. |
2024-10-07 | No data | BROADWAY, FROM STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner previously found not to be ADA compliant due to excessive roadway which has been paved. M&C in Prism on 9/4/24. |
2024-10-07 | No data | CHURCH AVENUE, FROM STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site roadway milled half+5’ in compliance with BPP specifications for NB 2718 |
2024-10-04 | No data | CONVENT AVENUE, FROM STREET WEST 150 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | New measurements added under permit M042024155A07 |
2024-10-03 | No data | MADISON STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CONCRETE CURB INSTALLED |
2024-10-02 | No data | EAST 116 STREET, FROM STREET METRO-NORTH RR | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permit #M042024155A01 was obtained for the NW2 Corner quadrant. |
2024-09-30 | No data | ATLANTIC AVENUE, FROM STREET COLUMBUS PLACE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW CURB INSTALLED |
2024-09-30 | No data | ATLANTIC AVENUE, FROM STREET RALPH AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly completed tangent ramps in the NE3 corner found not to be ADA compliant. Measured & collected in Prism on 6/10/24. scoring done at the time of inspection. |
2024-09-30 | No data | FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w installed & sealed |
2024-09-30 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET ERASMUS STREET | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF SIDEWALK AS STIPULATED, pass |
2024-09-28 | No data | NOSTRAND AVENUE, FROM STREET ALBEMARLE ROAD TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Re-saved roadway completed at the corner of Albemarle Rd |
2024-09-26 | No data | CHURCH AVENUE, FROM STREET ROGERS AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | No 410 permit on file. Newly completed tangent ramps in the SE4 corner found not to be ADA compliant due to excessive curb reveal and roadway counter slope. Measured & collected in Prism on 9/26/24. |
2024-09-25 | No data | HOPE STREET, FROM STREET RODNEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Condition resolved. Ramps were completed under permit B042022347A03, paving completed under permit B012023039B85. No further actions taken at this time. |
2024-09-25 | No data | GRAND AVENUE, FROM STREET PACIFIC STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition repaired. Ramp running slope is ADA compliant. Remeasured & collected in Prism 9/4/24. |
2024-09-24 | No data | QUEENS PLAZA EAST, FROM STREET 39 AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Newly completed single ramp within the NE3 corner quadrant was found to be non Ada compliant. Measured and collected in prism on 9/24/24. |
2024-09-24 | No data | 32 STREET, FROM STREET 39 AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant was found to be non Ada compliant. Meanwhile and collected in prism on 9/24/24. |
2024-09-24 | No data | YORK STREET, FROM STREET BRIDGE STREET TO STREET GOLD STREET | No data | Street Construction Inspections: Active | Department of Transportation | Width of R/W: 46'2'' x Width of milled area: 28'2'' x Length of milled area: 157'8'' x Depth of milled area: 0'3'' on York St. between Gold St. and Bridge St. |
2024-09-24 | No data | FRONT STREET, FROM STREET BRIDGE STREET TO STREET GOLD STREET | No data | Street Construction Inspections: Active | Department of Transportation | Width of R/w: 28'2'' x Width of milled area: 20'4'' x Length of milled area: 176'4'' x Depth of milled area: 0'3'' i/f/o 218 Front St. |
2024-09-23 | No data | MC DONALD AVENUE, FROM STREET AVENUE P TO STREET QUENTIN ROAD | No data | Street Construction Inspections: Active | Department of Transportation | BPP Pass - 1/2 +5 in compliance. L123ft W36ft of 60ft milled. |
2024-09-23 | No data | GRAND AVENUE, FROM STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SW1 corner quadrant are Ada compliant, Ramps was previously measured and collected in prism on 8/7/24. |
2024-09-23 | No data | MC DONALD AVENUE, FROM STREET QUENTIN ROAD | No data | Street Construction Inspections: Active | Department of Transportation | BPP Pass - 1/2 +5 in compliance - L36ft W36 D3in |
2024-09-20 | No data | PENNSYLVANIA AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site milling the roadway |
2024-09-20 | No data | FLEET PLACE, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Before milling the width of roadway is 26’ 3” & 40’ Width milled is 20’ & 25’ & Length milled is 137' 8” & Depth is 2.5" before reaching the concrete base. Foreman on site. |
2024-09-19 | No data | 255 STREET, FROM STREET 38 AVENUE TO STREET 39 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP restoration paving done in front of 38-11. |
2024-09-18 | No data | ATLANTIC AVENUE, FROM STREET COLUMBUS PLACE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ROADWAY CURB TO CURB IS 34FT MILLED ROADWAY IS 137FT X 22FT WITH A DEPTH OF 3 INCHES |
2024-09-18 | No data | ATLANTIC AVENUE, FROM STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | UPIN INSPECTION INTERSECTION IS MILLED 21FT X 22FT WITH A DEPTH OF 3 INCHES |
2024-09-18 | No data | HURON STREET, FROM STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner quadrant were reconstructed. ADA compliant. Re-measured and collected in Prism on 1/29/24. |
2024-09-18 | No data | RALPH AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | ROADWAY CURB TO CURB IS 34FT MILLED ROADWAY IS 109FT X 22FT WITH A DEPTH OF 3 INCHES |
2024-09-18 | No data | EAST 116 STREET, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved in compliance |
2024-09-17 | No data | GRAND AVENUE, FROM STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SE4 corner quadrant are Ada compliant, ramps was previously measured and collected in prism on 8/5/24. |
2024-09-17 | No data | EVERGREEN AVENUE, FROM STREET LINDEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SW1 corner quadrant are non ADA compliant. Previously measured and collected in Prism on 4/07/23. |
2024-09-17 | No data | MARTENSE STREET, FROM STREET BEDFORD AVENUE TO STREET MARTENSE COURT | No data | Street Construction Inspections: Active | Department of Transportation | Width of Roadway: 33ft 10in Width of milled area: 22ft 4inLength of milled area: 44ft 7in Depth of milled area: 3in down |
2024-09-17 | No data | BUSHWICK AVENUE, FROM STREET KOSSUTH PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SW1 corner found to be ADA compliant. Measured & collected in Prism on 1/24/23 |
2024-09-15 | No data | SMITH PLACE, FROM STREET FOAM PLACE TO STREET MOTT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed at time of my inspection . |
2024-09-15 | No data | FOAM PLACE, FROM STREET SMITH PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | measured paved areas only 22’ x 19’ 1/2/+5 paved at time of my inspection. |
2024-09-15 | No data | FOAM PLACE, FROM STREET BEACH 18 STREET TO STREET SMITH PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New Steel face curb installed at time of my inspection. |
2024-09-13 | No data | EAST FORDHAM ROAD, FROM STREET GRAND CONCOURSE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE corner quadrant are ADA compliant. Measured and collected in Prism on 6/11/24. |
2024-09-13 | No data | EAST 116 STREET, FROM STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done. |
2024-09-13 | No data | 65 ROAD, FROM STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builder's pavement restoration maintain to grade. |
2024-09-12 | No data | CONVENT AVENUE, FROM STREET WEST 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the NE3 corner quadrant are ADA. Measured in prism 9/12/24 |
2024-09-12 | No data | CHISHOLM STREET, FROM STREET REV JAMES POLITE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SE4 corner quadrant are ADA compliant. Previously measured and collected in Prism on 7/6/23. |
2024-09-11 | No data | MACOMBS PLACE, FROM STREET WEST 154 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed single ramp in the NE3 corner quadrant Ada compliant. Ramp was measured and collected in prism on 5/10/23 |
2024-09-11 | No data | JEROME STREET, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW paved by BPP |
2024-09-11 | No data | MARCY AVENUE, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP pass width of roadway 28FT, width of milled area, 21FT length of milled area 60FT, depth of milled area 3IN. |
2024-09-11 | No data | MADISON STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY PAVED HALF +5 |
2024-09-10 | No data | MARCY AVENUE, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP was inspected. Before milling the width of roadway was 39’ Width milled is 24’ 5" & Length milled is 34' 9” & Depth is 3". Foreman on site. |
2024-09-09 | No data | EAST 163 STREET, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP passed 1/2 +5 down 3”. |
2024-09-07 | No data | 8 STREET, FROM STREET MAIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SE4 corner quadrant was found to be ADA compliant. Measured and collected in prism on 12/2/2022. |
2024-09-05 | No data | EAST 179 STREET, FROM STREET HONEYWELL AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Pass |
2024-09-05 | No data | HONEYWELL AVENUE, FROM STREET EAST 178 STREET TO STREET EAST 179 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP is in compliance DOT rules and regulations |
2024-09-05 | No data | HONEYWELL AVENUE, FROM STREET EAST 178 STREET TO STREET EAST 179 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESET, REPAIR OR REPLACE CURB |
2024-09-05 | No data | EAST 116 STREET, FROM STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SW1 corner quadrant are Ada compliant. Measured in prism on 7/19/24 |
2024-09-05 | No data | EAST 179 STREET, FROM STREET DALY AVENUE TO STREET HONEYWELL AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O 2026 BPP down 3 inches full width 29’ 1” of roadway paving 19’6 inch’s in compliance with DOT rules and regulations |
2024-09-04 | No data | BROADWAY, FROM STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed updated work done in the NE3 corner quadrant are non Ada compliant. Measured and collected in prism on 9/4/24. |
2024-09-04 | No data | GRAND AVENUE, FROM STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner found not to be ADA compliant. Measured & collected in Prism on 2/21/24. Updated ram running slopes in Prism ADA but roadway remains excessive. Open CAR on permit # B042023116A18 |
2024-08-31 | No data | ATLANTIC AVENUE, FROM STREET BARBEY STREET TO STREET JEROME STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY PAVED HALF +5 |
2024-08-30 | No data | 36 STREET, FROM STREET 28 AVENUE TO STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp work was done. |
2024-08-29 | No data | ATLANTIC AVENUE, FROM STREET BARBEY STREET TO STREET JEROME STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL FACED INSTALLED |
2024-08-29 | No data | BERGEN STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb repaired IFO corner property 948. |
2024-08-29 | No data | GRAND AVENUE, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb repaired IFO property 527 |
2024-08-29 | No data | WASHINGTON AVENUE, FROM STREET EASTERN PARKWAY TO STREET LINCOLN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb repaired IFO property 807 |
2024-08-29 | No data | ST JOHN'S PLACE, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb repaired IFO property 557 |
2024-08-29 | No data | ATLANTIC AVENUE, FROM STREET BARBEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | INTERSECTION HAS BEEN PAVED |
2024-08-29 | No data | FRANKLIN AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb repaired IFO corner property 948. |
2024-08-29 | No data | ATLANTIC AVENUE, FROM STREET JEROME STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | INTERSECTION PAVED HALF +5 |
2024-08-28 | No data | CEDAR STREET, FROM STREET EVERGREEN AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed. |
2024-08-28 | No data | ANTHONY AVENUE, FROM STREET EAST 180 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SW1 corner quadrant. Unable to measure and collect due to active roadway construction and jersey barriers still blocking corner quadrant as of 8/28/24. |
2024-08-27 | No data | MARCY AVENUE, FROM STREET VERNON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SW1 corner quadrant are non Ada compliant. Previously Measured and collected in prism on 7/13/24. No scoring done on site. |
2024-08-27 | No data | BOERUM STREET, FROM STREET LORIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the NW2 corner quadrant are Ada compliant. Previously Measured and collected in prism on 7/12/24. |
2024-08-27 | No data | FOAM PLACE, FROM STREET SMITH PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp within the SW1 corner quadrant was found to be non Ada due to plastic on DWS mat and expansion joints not sealed. Measured and collected in prism on 8/27/24. |
2024-08-24 | No data | AVENUE C, FROM STREET EAST 6 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the NE3 corner quadrant are ADA. Measured prism 11/16/23. |
2024-08-22 | No data | BOERUM STREET, FROM STREET BROADWAY TO STREET LORIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | Bpp pass for new building 28 boerum st roadway milled & paved half+5’ in compliance with BPP specifications |
2024-08-22 | No data | BROADWAY, FROM STREET MIDDLETON STREET TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Bpp pass for new building 28 boerum st roadway milled & paved half+5’ in compliance with BPP specifications |
2024-08-22 | No data | BROADWAY, FROM STREET MC KIBBIN STREET | No data | Street Construction Inspections: Active | Department of Transportation | Bpp pass for new building 28 boerum st roadway milled & paved half+5’ in compliance with BPP specifications |
2024-08-22 | No data | 31 STREET, FROM STREET 38 AVENUE TO STREET 39 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Q012024233B16 • Curb to Curb width – 60’ • Milled area – 37’x35’• Depth of milled area – n/a not on site• ½ +5’ milled (yes/no) – yes• Waiver (yes/no)-no |
2024-08-22 | No data | BROADWAY, FROM STREET MC KIBBIN STREET TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Bpp pass for new building 28 boerum st roadway milled & paved half+5’ in compliance with BPP specifications |
2024-08-21 | No data | FOAM PLACE, FROM STREET SMITH PLACE | No data | Street Construction Inspections: Active | Department of Transportation | measured paved areas only 22’ x 19’ |
2024-08-21 | No data | SMITH PLACE, FROM STREET FOAM PLACE TO STREET MOTT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | measured paved areas only 166’ x 19' |
2024-08-21 | No data | FOAM PLACE, FROM STREET BEACH 18 STREET TO STREET SMITH PLACE | No data | Street Construction Inspections: Active | Department of Transportation | measured paved areas only 84' x 20' |
2024-08-21 | No data | EAST 116 STREET, FROM STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the NE3 corner quadrant are ADA. Measured in prism 8/21/24 |
2024-08-19 | No data | PACIFIC STREET, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | width of roadway -33' width of milled area- 22' length of milled area- 45' depth of milled area-4" |
2024-08-19 | No data | GRAND AVENUE, FROM STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | width of roadway -33' width of milled area-22' length of milled area- 25' depth of milled area- 3" |
2024-08-19 | No data | GRAND AVENUE, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | width of roadway- 33' width of milled area-22' length of milled area- 131' depth of milled area- 3" |
2024-08-18 | No data | BUSHWICK AVENUE, FROM STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SE4 corner quadrant are Ada compliant. Previously Measured and collected in prism on 7/11/24. |
2024-08-10 | No data | ESSEX STREET, FROM STREET FOLSOM PLACE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB INSTALLED |
2024-08-10 | No data | WILLOUGHBY AVENUE, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new curb and sidewalk installed |
2024-08-09 | No data | BELMONT AVENUE, FROM STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp in compliance at this time |
2024-08-09 | No data | MOTHER GASTON BOULEVARD, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP IN COMPLIANCE |
2024-08-09 | No data | BELMONT AVENUE, FROM STREET MOTHER GASTON BOULEVARD TO STREET WATKINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP appears in compliance at this time |
2024-08-08 | No data | 39 AVENUE, FROM STREET 32 STREET TO STREET HONEYWELL STREET | No data | Street Construction Inspections: Active | Department of Transportation | 107' x 26' area milled 3" |
2024-08-08 | No data | 32 STREET, FROM STREET 39 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 30' x 21' area milled 3" |
2024-08-08 | No data | 39 AVENUE, FROM STREET 31 STREET TO STREET 32 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 110' x 20' area milled 3" |
2024-08-08 | No data | 32 STREET, FROM STREET 38 AVENUE TO STREET 39 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 122' x 30' area milled 3" |
2024-08-07 | No data | 95 AVENUE, FROM STREET 148 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the SW1 corner quadrant are functional and accessible. Unable to measure at this time due to rain. We’ll measure at a later date. |
2024-08-07 | No data | ALBEMARLE ROAD, FROM STREET EAST 29 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP DONE ON SEGMENT .. IN COMPLIANCE |
2024-08-07 | No data | VERNON AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb at corner property of Marcy in compliance |
2024-08-07 | No data | ALBEMARLE ROAD, FROM STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PAVE ST DONE .. IN COMPLIANCE |
2024-08-07 | No data | GRAND AVENUE, FROM STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps in the SW1 corner quadrant are Ada compliant, Ramps was measured and collected in prism on 8/7/24. |
2024-08-07 | No data | GRAND AVENUE, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | temp pedestrian walk found |
2024-08-07 | No data | BERGEN STREET, FROM STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SW1 corner quadrant ( unable to measure and collect due to rain . |
2024-08-06 | No data | PACIFIC STREET, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp pedestrian walk found on sidewalk |
2024-08-06 | No data | 32 STREET, FROM STREET 39 AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | NOV: Re-inspection passed. Permittee has obtain permit #Q042024183A50 for ped ramp. |
2024-08-06 | No data | SKILLMAN STREET, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Arrived for bpp inspection |
2024-08-05 | No data | GRAND AVENUE, FROM STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps in the SE4 corner quadrant are Ada compliant, ramps was measured and collected in prism on 8/5/24. |
2024-08-05 | No data | EAST 179 STREET, FROM STREET HONEYWELL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the SW1 corner quadrant are ADA. Measured in Prism on 8/5/24. |
2024-08-04 | No data | HOPE STREET, FROM STREET RODNEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp in the NE3 corner found to be ADA compliant. Measured & collected in Prism on 6/29/23. |
2024-08-04 | No data | HOPE STREET, FROM STREET KEAP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SW1 corner found to be ADA compliant. Measured & collected in Prism on 2/20/23. |
2024-08-04 | No data | WITHERS STREET, FROM STREET MEEKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp in the NE3 corner quadrant is ADA compliant. Measured and collected in Prism on 7/6/23. |
2024-08-02 | No data | BERGEN STREET, FROM STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site roadway intersection paved half+5’ in compliance with BPP requirements for new building 948 |
2024-08-02 | No data | BERGEN STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site with roadway milled half+5’ in compliance with bpp specifications for new building 948 bergan st |
2024-08-02 | No data | FRANKLIN AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site roadway paved half+5’ in compliance with BPP requirements for new building 948 |
2024-07-31 | No data | ST JOHN'S PLACE, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Active | Department of Transportation | Location: 557 St John’s PlacePermit: B012024212C30Width of Roadway: 33’Width of milled area: 22’Length of milled area: 29’Depth of milled area:3” |
2024-07-31 | No data | BROADWAY, FROM STREET MC KIBBIN STREET TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started. No work done. No inspection found at this time. |
2024-07-31 | No data | LORIMER STREET, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started. No work done . No inspection found at this time. |
2024-07-30 | No data | EAST 116 STREET, FROM STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No new work done on the roadway, permit still active. |
2024-07-30 | No data | TAAFFE PLACE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb in compliance |
2024-07-29 | No data | GREENE AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done |
2024-07-27 | No data | 32 STREET, FROM STREET 39 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp within the SW1 corner quadrant was found to be non Ada compliant. Measured and collected in prism on 7/27/24. |
2024-07-25 | No data | WITHERS STREET, FROM STREET MEEKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp found to be ADA compliant SE4 corner. Remeasured & collected in Prism on 11/27/23. |
2024-07-25 | No data | BERGEN STREET, FROM STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | SE corner quad is in compliance new corner quad construction. No blocked construction at this time |
2024-07-25 | No data | 32 STREET, FROM STREET 39 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the NW2 corner quadrant was found to be non Ada compliant due to roadway slopes. Contractor has not yet done BPP. Measured and collected in prism on 6/6/24. |
2024-07-24 | No data | YORK STREET, FROM STREET BRIDGE STREET TO STREET GOLD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed on the sidewalk IFO #218 |
2024-07-24 | No data | 32 STREET, FROM STREET 39 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the NW2 corner quadrant was found to be non Ada compliant due to roadway slopes. Contractor has not yet done BPP. Measured and collected in prism on 6/6/24. |
2024-07-23 | No data | EAST 179 STREET, FROM STREET HONEYWELL AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No new ped ramp work started at time of inspection |
2024-07-23 | No data | 39 AVENUE, FROM STREET 31 STREET TO STREET 32 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition was not repaired but the CAR will be closed and the permittee placed on hold until they correct the condition as per DOT specifications. |
2024-07-23 | No data | PARK AVENUE, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at time of inspection |
2024-07-21 | No data | FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp done in compliance |
2024-07-20 | No data | BELMONT AVENUE, FROM STREET MOTHER GASTON BOULEVARD TO STREET WATKINS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints sealed, in compliance |
2024-07-20 | No data | CONOVER STREET, FROM STREET DIKEMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The intersection has been repaved and incompliance. |
2024-07-20 | No data | 39 AVENUE, FROM STREET 31 STREET TO STREET 32 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the respondent failed to restore roadway adjacent to new curb installed at 39th Avenue between 31st Street & 32nd Street. The respondent was notified by CAR #20244580021 on 6/6/2024 but condition remains |
2024-07-20 | No data | FAIRVIEW AVENUE, FROM STREET BLEECKER STREET TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | • Curb to Curb width: 30 Feet • Milled area: 40'x20' • Depth of milled area: 3 inches • ½ +5’ milled: Yes • Waiver: |
2024-07-19 | No data | EAST 116 STREET, FROM STREET METRO-NORTH RR | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Newly completed tangent ramps in the NW2 Corner quadrant are Ada compliant, ramps was measured and collected in prism on 7/19/24. |
2024-07-19 | No data | 50 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk/curb reset for property in compliance |
2024-07-19 | No data | EAST 116 STREET, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Active | Department of Transportation | No new work done on the roadway, permit still active. |
2024-07-18 | No data | 65 ROAD, FROM STREET QUEENS BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sunken portion of pavement key has been corrected in the SW corner quadrant. Will pass this one out and re issue CAR due to missing crosswalk lane markings. |
2024-07-18 | No data | 65 ROAD, FROM STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SW corner quadrant was found to be ADA compliant. Missing crosswalk lane markings on Queens Blvd ramp. Measured and collected in Prism on 5/17/24. |
2024-07-17 | No data | EAST 10 STREET, FROM STREET CATON AVENUE TO STREET CHURCH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed |
2024-07-17 | No data | FULTON STREET, FROM STREET NEW JERSEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner found not to be ADA compliant due to excessive curb reveal. Measured & collected in Prism on 6/26/24. Added photos with roadway paved Now ADA complaint 7/17/24. |
2024-07-17 | No data | 60 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway was milled and paved in front of the new building. All roadway markings were restored. |
2024-07-16 | No data | LORIMER STREET, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New steel curb is installed |
2024-07-16 | No data | FULTON STREET, FROM STREET NEW JERSEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp in the NW2 corner found not to be ADA compliant due to excessive roadway and curb reveal. Measured & collected in Prism on 6/26/24. Added photos after roadway paved now ADA complaint 7/16/24. |
2024-07-15 | No data | 95 AVENUE, FROM STREET 148 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the NW2 corner quadrant are functional and accessible, unable to measure at this time due to active construction within the area. |
2024-07-15 | No data | EAST 163 STREET, FROM STREET SHERIDAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NW2 Corner quadrant are Ada compliant, Ramps was measured and collected in prism on 7/15/24. |
2024-07-13 | No data | MARCY AVENUE, FROM STREET VERNON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps within the SW1 corner quadrant are non Ada compliant. Measured and collected in prism on 7/13/24. No scoring done on site. |
2024-07-12 | No data | BOERUM STREET, FROM STREET LORIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps within the NW2 corner quadrant are Ada compliant. Measured and collected in prism on 7/12/24. |
2024-07-12 | No data | BELMONT AVENUE, FROM STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Width of Roadway: 55’Width Milled: 33’Length Milled: 23’Depth 3” |
2024-07-12 | No data | MOTHER GASTON BOULEVARD, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Width of Roadway: 55’Width Milled: 33’Length Milled: 40’Depth Milled: 3” |
2024-07-12 | No data | BELMONT AVENUE, FROM STREET MOTHER GASTON BOULEVARD TO STREET WATKINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | Width of Roadway: 30’Width Milled: 20’Length Milled: 116’3Depth Milled: 3” |
2024-07-11 | No data | JEROME STREET, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY PAVED BY BPP |
2024-07-11 | No data | BARBEY STREET, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY PAVED BY BPP |
2024-07-11 | No data | CHRYSTIE STREET, FROM STREET DELANCEY STREET TO STREET RIVINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a BPP Restoration. |
2024-07-11 | No data | BUSHWICK AVENUE, FROM STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps within the SE4 corner quadrant are Ada compliant. Measured and collected in prism on 7/11/24. |
2024-07-09 | No data | WEST 125 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | NOV issued for failure to comply with terms and conditions of DOT permit. |
2024-07-07 | No data | COOPER AVENUE, FROM STREET 72 PLACE TO STREET 73 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | installed new curb expansion joints and sealer applied. |
2024-07-05 | No data | DURYEA PLACE, FROM STREET EAST 22 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newer permit B042023164A11 on file and ramps found to be Ada compliant |
2024-07-05 | No data | BROADWAY, FROM STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the NE3 corner found not to be ADA compliant. Measured & collected in Prism on 7/6/23. |
2024-07-04 | No data | FULTON STREET, FROM STREET NEW JERSEY AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL FACED CURB INSTALLED |
2024-07-04 | No data | ATLANTIC AVENUE, FROM STREET MILLER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | INTERSECTION PAVED BY BPP |
2024-07-02 | No data | JEROME AVENUE, FROM STREET MT HOPE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed single ramp in the SW corner quadrant is ADA compliant. Landing area was corrected. Updated Prism on 4/10/23. |
2024-07-02 | No data | NOSTRAND AVENUE, FROM STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the NE3 corner found to be ADA compliant. Ramps was previously measured & collected in Prism on 12/6/22. |
2024-07-01 | No data | ATLANTIC AVENUE, FROM STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started. |
2024-07-01 | No data | NORTH 1 STREET, FROM STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | completed ramps within the NW2 corner quadrant are ada compliant. Previously Measured and collected in prism on 4.30.23. |
2024-07-01 | No data | MARCY AVENUE, FROM STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed single ramp in the NW2 corner quadrant Ada compliant. Ramp was previously measured and collected in prism on 1/25/23. |
2024-06-30 | No data | CLERMONT AVENUE, FROM STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp done in compliance |
2024-06-30 | No data | VANDERBILT AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb in compliance |
2024-06-30 | No data | PARK AVENUE, FROM STREET CLERMONT AVENUE TO STREET VANDERBILT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp done in compliance |
2024-06-28 | No data | WITHERS STREET, FROM STREET MEEKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed single ramp found to be ADA compliant SE4 corner. Remeasured & collected in Prism on 11/27/23. |
2024-06-26 | No data | VERNON AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Failed to provide a protected ped walkway |
2024-06-26 | No data | MARCY AVENUE, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No water filled barriers in r.w |
2024-06-26 | No data | BELMONT AVENUE, FROM STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within NW2 corner quadrant Ada compliant. Previously Measured and collected in prism on 6/8/24 |
2024-06-26 | No data | FULTON STREET, FROM STREET NEW JERSEY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. Newly completed single ramp in the NW2 corner found not to be ADA compliant due to excessive roadway and curb reveal. Measured & collected in Prism on 6/26/24. |
2024-06-26 | No data | ALBEMARLE ROAD, FROM STREET EAST 29 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL FACE CURB INSTALLED .. IN COMPLIANCE |
2024-06-25 | No data | EAST 163 STREET, FROM STREET SHERIDAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit, no new ped ramp work started at time of inspection |
2024-06-25 | No data | JEROME AVENUE, FROM STREET MT HOPE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SE4 corner quadrant are ADA compliant. Previously measured and collected in Prism on 2/6/23 & update on 4/10/23. |
2024-06-24 | No data | 38 STREET, FROM STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SE4 corner quadrant are Ada compliant. Measured and collected in prism on 7/19/23.newer permit #B042023164A12 on file. |
2024-06-24 | No data | METROPOLITAN AVENUE, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site upon arrival with roadway milled in compliance with BPP specifications half+5’ for new building 9 Bushwick Ave. |
2024-06-24 | No data | BUSHWICK AVENUE, FROM STREET DEVOE STREET TO STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site upon arrival with roadway milled in compliance with BPP specifications half+5’ for new building 9 Bushwick Ave. |
2024-06-24 | No data | BUSHWICK AVENUE, FROM STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site upon arrival with roadway milled in compliance with BPP specifications half+5’ for new building 9 Bushwick Ave. |
2024-06-23 | No data | ATLANTIC AVENUE, FROM STREET BARBEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started at the time of inspection, scaffolding in quadrant. |
2024-06-23 | No data | ATLANTIC AVENUE, FROM STREET JEROME STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed single tangent ramp within the SW1 corner quadrant is Ada compliant. Previously Measure and collected in prism on 4/1/24. |
2024-06-22 | No data | FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | New curb in compliance |
2024-06-22 | No data | WYONA STREET, FROM STREET HEGEMAN AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW flags installed, expansion joints have been sealed |
2024-06-22 | No data | WEST FARMS ROAD, FROM STREET CROSS BRONX EXPWY NB ET 4 A TO STREET EAST 174 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel face curb in place |
2024-06-21 | No data | NELSON AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET FEATHERBED LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp in place at time of inspection. |
2024-06-20 | No data | BROADWAY, FROM STREET MC KIBBIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp in the NE3 corner found to be ADA compliant. Measured & collected in Prism on 6/11/24. |
2024-06-18 | No data | 16 AVENUE, FROM STREET 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the NW2 corner quadrant are non Ada compliant, Ramps was previously measured and collected in prism on 10/14/21. |
2024-06-17 | No data | BOERUM STREET, FROM STREET LORIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within SE4 corner quadrant are Ada compliant. Measured and collected in prism on 6/17/24. |
2024-06-16 | No data | CLERMONT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp done in compliance |
2024-06-15 | No data | EAST 223 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb in place |
2024-06-15 | No data | EAST 230 STREET, FROM STREET CARPENTER AVENUE TO STREET LOWERRE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb installed |
2024-06-14 | No data | BELMONT AVENUE, FROM STREET MOTHER GASTON BOULEVARD TO STREET WATKINS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed a sidewalk flag restoration with unsealed expansion joints. Respondent failed to seal expansion joints upon completion of restoration. CAR # 20246620074 issued 3/30/24 Respondent ID by cited permit. |
2024-06-14 | No data | 60 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done for property in compliance |
2024-06-13 | No data | VYSE AVENUE, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Portion of roadway found newly repaved for new building, BPP in place |
2024-06-12 | No data | EAST NEW YORK AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP in compliance. No Corrective Action Request. Permit expired. |
2024-06-11 | No data | GROVE STREET, FROM STREET BEND TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1/2 +5 perm restoration sealed IFO property #57. |
2024-06-11 | No data | EAST FORDHAM ROAD, FROM STREET GRAND CONCOURSE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner quadrant are ADA compliant. Measured and collected in Prism on 6/11/24. |
2024-06-11 | No data | BROADWAY, FROM STREET MC KIBBIN STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. Newly completed single ramp in the NE3 corner found to be ADA compliant. Measured & collected in Prism on 6/11/24. Permittee must remove concrete restoration and install a pave key. |
2024-06-11 | No data | BELMONT AVENUE, FROM STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant are non Ada compliant. Measure and collected in prism on 6/11/24. No tiff on file roadway counter slope is excessive. |
2024-06-11 | No data | BROOK AVENUE, FROM STREET NYCTA SUBWAY | No data | Street Construction Inspections: Active | Department of Transportation | No new work done on the roadway, permit still active. |
2024-06-11 | No data | BERGEN AVENUE, FROM STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No new work done on the roadway, permit still active. |
2024-06-11 | No data | BERGEN AVENUE, FROM STREET EAST 149 STREET TO STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No new work done on the roadway, permit still active. |
2024-06-11 | No data | WESTCHESTER AVENUE, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No new work done on the roadway, permit still active. |
2024-06-11 | No data | FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Location: 139 Franklin avenue Permit: B012024162B51Width of Roadway: 30’Width of milled area: 20’Length of milled area: 34’Depth of milled area: 3” |
2024-06-10 | No data | 43 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk/curb reset for property in compliance |
2024-06-10 | No data | BAY PARKWAY, FROM STREET 59 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb/sidewalk reset for corner property #2177 60 Street |
2024-06-10 | No data | BOLTON AVENUE, FROM STREET LACOMBE AVENUE TO STREET PATTERSON AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Upon my arrival no orange barricades found at this time, foreman Nelson & Central concrete crew on site for sidewalk repair. In compliance |
2024-06-10 | No data | TAAFFE PLACE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Location: 121 Taaffe Place Permit: B012024161A18Width of Roadway: 35’Width of milled area: 23’Length of milled area: 35’Depth of milled area:3’ |
2024-06-10 | No data | ATLANTIC AVENUE, FROM STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps in the NW2 corner quadrant are Ada compliant. Measured and collected in prism on 6/10/24. No scoring done at the time of inspection. |
2024-06-10 | No data | METROPOLITAN AVENUE, FROM STREET BUSHWICK AVENUE TO STREET ORIENT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF SIDEWALK AS STIPULATED, pass |
2024-06-09 | No data | VANDERBILT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp done in compliance |
2024-06-09 | No data | MYRTLE AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp done in compliance |
2024-06-09 | No data | JEROME STREET, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDE WALK FLAGS INSTALLED AND SEALED |
2024-06-09 | No data | PARK AVENUE, FROM STREET VANDERBILT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp done in compliance |
2024-06-08 | No data | BELMONT AVENUE, FROM STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps within NW2 corner quadrant Ada compliant. Measured and collected in prism on 6/8/24 |
2024-06-06 | No data | 39 AVENUE, FROM STREET 31 STREET TO STREET 32 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | THE ROADWAY ASPHALT ADJACENT TO THE NEW CURB INSTALLED IS BROKEN / CRACK DOWN 3 INCHES THE ENTIRE ROADWAY AREA ADJACENT TO THE NEW CURB NEEDS TO BE MILLED AND PAVED |
2024-06-06 | No data | 32 STREET, FROM STREET 39 AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Newly completed tangent ramps within the NW2 corner quadrant was found to be non Ada compliant due to roadway slopes. Contractor has not yet done BPP. Measured and collected in prism on 6/6/24. |
2024-06-05 | No data | NEW HAVEN AVENUE, FROM STREET BEACH 22 STREET TO STREET GRASSMERE TERRACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | paving complete |
2024-06-04 | No data | STOCKTON STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp paved in compliance |
2024-05-30 | No data | SAXON AVENUE, FROM STREET BEND TO STREET VAN CORTLANDT PARK SOUTH | No data | Street Construction Inspections: Active | Department of Transportation | Bryan foreman on site has Stip# 1/2+5'. BPP 50''x20''x3'' I/F/O 3991 Saxon Ave. |
2024-05-29 | No data | GUY R BREWER BOULEVARD, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP milled area completed and acceptable. • Curb to Curb width – 40• Milled area – 25’• Depth of milled area – 3’’ |
2024-05-29 | No data | EAST 203 STREET, FROM STREET BRIGGS AVENUE TO STREET VALENTINE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Has half the s/w with concrete s/w flag. Block off with steel gates, port-o-sans on the s/w. |
2024-05-29 | No data | EAST 10 STREET, FROM STREET CATON AVENUE TO STREET CHURCH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Ped walkway in the parking lane |
2024-05-29 | No data | WEST FARMS ROAD, FROM STREET CROSS BRONX EXPWY NB ET 4 A TO STREET EAST 174 STREET | No data | Street Construction Inspections: Active | Department of Transportation | New curb work in progress |
2024-05-29 | No data | ARCHER AVENUE, FROM STREET GUY R BREWER BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | BPP milled area completed and acceptable. • Curb to Curb width – 70• Milled area – 38’• Depth of milled area – 3’’ |
2024-05-29 | No data | ARCHER AVENUE, FROM STREET 165 STREET TO STREET GUY R BREWER BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | BPP milled area completed and acceptable. • Curb to Curb width – 65’• Milled area – 37’5’’• Depth of milled area – 3’’ |
2024-05-29 | No data | GUY R BREWER BOULEVARD, FROM STREET ARCHER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant was found to be non Ada compliant. No scoring. Measured and collected in prism on 3/8/24. Active construction work is going on at this time. |
2024-05-28 | No data | ATLANTIC AVENUE, FROM STREET BARBEY STREET | No data | Street Construction Inspections: Active | Department of Transportation | UPON INSPECTION INTERSECTION IS MILLED 25FT X 20FT WITH A DEPTH OF 4 INCHES |
2024-05-28 | No data | ATLANTIC AVENUE, FROM STREET JEROME STREET | No data | Street Construction Inspections: Active | Department of Transportation | UPON INSPECTION INTERSECTION IS CURRENTLY MILLED 25FT X 20FT WITH A DEPTH 4 INCHES |
2024-05-28 | No data | JEROME STREET, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ROADWAY IS CURRENTLY MILLED 125FT X 20FT WITH A DEPTH OF 4 INCHES |
2024-05-28 | No data | CHISHOLM STREET, FROM STREET REV JAMES POLITE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NW2 corner quadrant are ADA compliant. Previously measured and collected in Prism on 7/6/23. |
2024-05-28 | No data | BARBEY STREET, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | UPON INSPECTION ROADWAY IS CURRENTLY MILLED 100FT X 20FT WITH DEPTH 4 INCHES |
2024-05-28 | No data | ATLANTIC AVENUE, FROM STREET BARBEY STREET TO STREET JEROME STREET | No data | Street Construction Inspections: Active | Department of Transportation | UPON INSPECTION ROADWAY IS CURRENTLY MILLED 228FT X 30FT WITH A DEPTH OF 4 INCHES |
2024-05-22 | No data | BERRIMAN STREET, FROM STREET LINDEN BOULEVARD TO STREET STANLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW flags installed, expasnsion joints sealed |
2024-05-22 | No data | NORTH 1 STREET, FROM STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent within SE4 corner quadrant are ADA compliant. Measured and collected on 5/22/24. |
2024-05-22 | No data | PARK AVENUE, FROM STREET VANDERBILT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps in the NE3 corner is functional & accessible but not ADA compliant. Measured and collected in prism on 5/22/24. Curb reveal fixed. |
2024-05-21 | No data | GRAND AVENUE, FROM STREET PACIFIC STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permittee failed to correct excessive ramp running slope in the NE3 corner. M&C in Prism on 5/2/23. |
2024-05-21 | No data | SNEDIKER AVENUE, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW flags installed, expansion joints sealed |
2024-05-20 | No data | NORTH 1 STREET, FROM STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed ramps within the NW2 corner quadrant are ada compliant. Measured and collected in prism on 4.30.23. Newer permit B042023152A26 on file |
2024-05-20 | No data | GRAND STREET, FROM STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newer permit B042023152A24 and remarks on file |
2024-05-20 | No data | NEW MONTROSE AVENUE, FROM STREET BROADWAY TO STREET MONTROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New steel face curb installed |
2024-05-19 | No data | GRAND STREET, FROM STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner found to be ADA compliant. M&C in Prism on 10/13/23 |
2024-05-19 | No data | MARCY AVENUE, FROM STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single tangent in the SE4 corner found to be ADA compliant. Measured & collected in Prism on 6/15/23. |
2024-05-17 | No data | 65 ROAD, FROM STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Contractor restored sunken portion of pavement key in the SW corner quadrant. Awaiting NOV rejection to issue new CAR for roadway pavement crosswalk lane markings. Prism updated on 5/27/24. |
2024-05-16 | No data | MYRTLE AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb in compliance |
2024-05-14 | No data | LORIMER STREET, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel face curb is in compliance IFO #28 boerum |
2024-05-14 | No data | OCEAN PARKWAY, FROM STREET LAWRENCE AVENUE TO STREET PARKVILLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done for property in compliance |
2024-05-13 | No data | CLARKSON AVENUE, FROM STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SE4 corner found to be ADA compliant. Measured & collected in Prism on 3/8/24. Newly permit #B042023240A07 on file. |
2024-05-13 | No data | LENOX ROAD, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site roadway milled ifo property 45 half+5’ in compliance with BPP |
2024-05-13 | No data | GRAND STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found roadway repaved. No Corrective Action Request. Permit expired. |
2024-05-11 | No data | BARBEY STREET, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL FACED INSTALLED |
2024-05-11 | No data | CROPSEY AVENUE, FROM STREET BAY 31 STREET TO STREET BAY 32 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints have been sealed and 2X4 around tree pit removed. |
2024-05-11 | No data | 60 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New steel face curb installed, in front of 1271 60 Street. |
2024-05-10 | No data | 22 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1/2 + 5 feet of the roadway was milled and paved, pass. |
2024-05-09 | No data | NOSTRAND AVENUE, FROM STREET ALBEMARLE ROAD TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP PASS IN COMPLIANCE FOR PROPERTY 2915 Albemarle Rd roadway milled 1/2 +5’ |
2024-05-09 | No data | ALBEMARLE ROAD, FROM STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP IN COMPLIANCE FOR PROPERTY 2915 ROADWAY MILLED 1/2+5’ |
2024-05-09 | No data | ALBEMARLE ROAD, FROM STREET EAST 29 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP in compliance for property 2915 Albemarle Rd roadway milled 1/2 +5’ |
2024-05-08 | No data | BELMONT AVENUE, FROM STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permittee failed to correct excessive ramp running slopes in the NE3 corner. M&C in Prism on 10/17/23. |
2024-05-07 | No data | GRAND STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Multiple Sidewalk Flags restored with Expansion Joints sealed. |
2024-05-07 | No data | JEROME STREET, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL FACED CURB INSTALLED |
2024-05-06 | No data | 38 STREET, FROM STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SE4 corner quadrant are Ada compliant. Measured and collected in prism on 7/19/23. |
2024-05-05 | No data | BELMONT AVENUE, FROM STREET MOTHER GASTON BOULEVARD TO STREET WATKINS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed a sidewalk flag restoration with unsealed expansion joints. Respondent failed to seal expansion joints upon completion of restoration. CAR # 20246620074 issued 3/30/24 Respondent ID by cited permit |
2024-05-02 | No data | CONEY ISLAND AVENUE, FROM STREET CHURCH AVENUE TO STREET FRIEL PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Site/Location was inspected 5/1/24. Compliance was established plastic jersey barriers on the rw sw foundation being done and proper signage |
2024-05-02 | No data | GROVE STREET, FROM STREET BEND TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed IFO property #57. |
2024-05-02 | No data | WYONA STREET, FROM STREET HEGEMAN AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW flags installed, expansion joints sealed |
2024-05-02 | No data | NOSTRAND AVENUE, FROM STREET ALBEMARLE ROAD TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w curb installed (steel faced) |
2024-05-01 | No data | WILLOUGHBY AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb in compliance |
2024-04-30 | No data | 65 ROAD, FROM STREET QUEENS BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps in the SW corner quadrant was found to be non ADA compliant due to pavement key on Queens Blvd not providing a smooth transition to walking pedestrians. Prism updated on 3/14/24. |
2024-04-28 | No data | ROGERS AVENUE, FROM STREET CLARKSON AVENUE TO STREET LENOX ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Bus lane has been painted in compliance |
2024-04-21 | No data | 38 STREET, FROM STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newer permit on file B042023164A12 with an open CAR for the SE4 corner quad. |
2024-04-21 | No data | CHRISTOPHER AVENUE, FROM STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | completed tangent ramps in the NW2 corner found to be ADA compliant. Previously Measured & collected in Prism on 7/5/23. After remeasuring ramps are ADA compliant. |
2024-04-19 | No data | BEDFORD AVENUE, FROM STREET ST JOHNS PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition repaired. Permittee properly installed and sealed full width of the SE4 corner. |
2024-04-19 | No data | 38 STREET, FROM STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the NE3 corner quadrant are Ada compliant. Previously measured and collected in prism on 2/06/23 And re Measured on 5/8/23 |
2024-04-16 | No data | CONVENT AVENUE, FROM STREET WEST 150 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly completed tangent ramps in the NE3 corner quadrant are non ADA compliant. Ramps was previously measured on 8/19/2. Updated on 9/22/23 in Prism. |
2024-04-12 | No data | CHISHOLM STREET, FROM STREET REV JAMES POLITE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR has been answered. Re-measured in Prism on 4/12/24. All elements are ADA compliant. |
2024-04-11 | No data | LENOX ROAD, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP was inspected. Before milling the width of roadway is 34’ 11” Width milled is 22’ 5" & Length milled is 59' 2” & Depth is 2.5" before reaching the concrete base. Foreman on site. |
2024-04-10 | No data | WARD AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in compliance |
2024-04-10 | No data | GROVE STREET, FROM STREET BEND TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work not started |
2024-04-10 | No data | 60 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Width of Roadway: 44 feetWidth of milled area: 27 feetLength of milled area: 90 feetDepth of milled area: 3 inchesContractor is in compliance with required BPP measurements, pass. |
2024-04-09 | No data | NELSON AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET FEATHERBED LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sw replaced. |
2024-04-09 | No data | MAIN AVENUE, FROM STREET 8 STREET TO STREET 30 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb in place around corner property 924 new building. |
2024-04-08 | No data | BROADWAY, FROM STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner found not to be ADA complaint. M&C in Prism on 7/6/23. Inspector will be returning to location to re issue C.A.R |
2024-04-08 | No data | MYRTLE AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site upon arrival with roadway milled half+5’ in compliance with bpp for NB 676 Myrtle |
2024-04-06 | No data | NOSTRAND AVENUE, FROM STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the NW2 corner found to be ADA compliant. Measured & collected in Prism on 2/22/23. Newer permit on file B042023006A05 |
2024-04-06 | No data | 89 AVENUE, FROM STREET 148 STREET TO STREET 150 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration resurfaced by excavated open sewer trench. |
2024-04-06 | No data | SULLIVAN PLACE, FROM STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done |
2024-04-04 | No data | EAST 116 STREET, FROM STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No new ped ramp work started at time of inspection |
2024-04-04 | No data | PRESIDENT STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w installed & sealed |
2024-04-02 | No data | MAPLE STREET, FROM STREET EAST 48 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Full roadway with:30’0Cut size:L74’0 W20’0 D0’3Pass |
2024-04-02 | No data | VERMONT STREET, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb in place and in compliance |
2024-04-02 | No data | ATLANTIC AVENUE, FROM STREET BARBEY STREET TO STREET JEROME STREET | No data | Street Construction Inspections: Active | Department of Transportation | No TEMPORARY PEDESTRIAN WALK at the time of inspection. |
2024-04-01 | No data | ATLANTIC AVENUE, FROM STREET JEROME STREET | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed single tangent ramp curing in the SE4 corner quadrant at the time of inspection. |
2024-04-01 | No data | ATLANTIC AVENUE, FROM STREET BARBEY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work started but corner quadrant is blocked off with truck and active work being done. |
2024-04-01 | No data | RUTLEDGE STREET, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb and sidewalk installed ifo 99 in compliance |
2024-03-31 | No data | NORTH 6 STREET, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found new granite curb installed, Permit expired. |
2024-03-30 | No data | BELMONT AVENUE, FROM STREET MOTHER GASTON BOULEVARD TO STREET WATKINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | EXPANSION JOINTS NOT SEALED |
2024-03-30 | No data | 10 AVENUE, FROM STREET 43 STREET TO STREET 44 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced by BPP. |
2024-03-29 | No data | MOTHER GASTON BOULEVARD, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK DONE NEW PERMIT ON FILE |
2024-03-28 | No data | 36 STREET, FROM STREET 28 AVENUE TO STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site starting to mill roadway. Measurements in compliance. Will return when roadway is fully milled for photos. |
2024-03-28 | No data | CONOVER STREET, FROM STREET DIKEMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SE4 found to be ADA compliant. Measured & collected in Prism. |
2024-03-28 | No data | ALBEMARLE ROAD, FROM STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NW2 corner are functional & accessible. Unable to measure due to weather conditions (rain) We’ll return at a later date. |
2024-03-28 | No data | EAST 24 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk restored in kind |
2024-03-26 | No data | EAST 116 STREET, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The above respondent was doing sidewalk repairs in front of 1638 park avenue and working on the corner quadrant opposite 1638 park avenue. Respondent does not have any valid DOT permits on file. |
2024-03-26 | No data | EAST 116 STREET, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Crew on site making area safe. |
2024-03-25 | No data | EAST 116 STREET, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1638 park ave patched up sidewalk work at curb where pedestrian crossing is cracking not flush with surrounding area. |
2024-03-25 | No data | EAST 116 STREET, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to repair broken and cracked concrete not flush with surrounding area. |
2024-03-25 | No data | EAST 116 STREET, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Complaint | Department of Transportation | Sidewalk at pedestrian crossing has patched up concrete cracking up not flush with surrounding area creating a trip hazard |
2024-03-24 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp in compliance |
2024-03-23 | No data | BARBEY STREET, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel faced Curb in place and in compliance |
2024-03-22 | No data | GROVE STREET, FROM STREET BEND TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Location: 57 Grove StreetPermit: B012024082A08Width of Roadway: 29ft 6inWidth of milled area: 19ft 8inLength of milled area: 50ft 2in Depth of milled area: 3in down |
2024-03-22 | No data | BEACH 96 STREET, FROM STREET ROCKAWAY BEACH BOULEVARD TO STREET WOODROW COTTAGES | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP installed |
2024-03-22 | No data | BELMONT AVENUE, FROM STREET MOTHER GASTON BOULEVARD TO STREET WATKINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CONCRETE CURB INSTALLED |
2024-03-22 | No data | DIKEMAN STREET, FROM STREET CONOVER STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb reset OPP property #142. |
2024-03-20 | No data | CROPSEY AVENUE, FROM STREET BAY 31 STREET TO STREET BAY 32 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly installed sidewalk flags need to be sealed and wooden 2x4 around tree pits needs to be removed. |
2024-03-18 | No data | NEW MONTROSE AVENUE, FROM STREET BROADWAY TO STREET MONTROSE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site milling RW |
2024-03-16 | No data | BARBEY STREET, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the full width of the sidewalk closed with no temporary pedestrian walkway. Respondent failed to maintain a 5 foot clear protected walkway in the roadway. Respondent ID by cited permit. |
2024-03-14 | No data | ATLANTIC AVENUE, FROM STREET BARBEY STREET TO STREET JEROME STREET | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF SIDEWALK AS STIPULATED, pass |
2024-03-14 | No data | BOERUM STREET, FROM STREET BROADWAY TO STREET LORIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | TEMPORARY PEDESTRIAN WALK, pass |
2024-03-14 | No data | 65 ROAD, FROM STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SE corner quadrant was found to be ADA compliant. Measured and collected in Prism on 3/14/24. |
2024-03-13 | No data | CLERMONT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No sidewalk and curb install for new building project 58 Vanderbilt corner of Park Avenue |
2024-03-13 | No data | CLARKSON AVENUE, FROM STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SW1 corner found to be ADA compliant. Remeasured & collected in Prism on 3/13/24. |
2024-03-13 | No data | PARK AVENUE, FROM STREET CLERMONT AVENUE TO STREET VANDERBILT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New Sidewalk and curb installed the new building 58 Vanderbilt. |
2024-03-11 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb in compliance |
2024-03-10 | No data | EAST 32 STREET, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb in compliance |
2024-03-09 | No data | DURYEA PLACE, FROM STREET EAST 22 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SW1 corner quadrant are Ada compliant. Previously Measured and collected in prism on 3/24/23. New flags done in quadrant. |
2024-03-09 | No data | LEWIS AVENUE, FROM STREET BROADWAY TO STREET STOCKTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP is in compliance |
2024-03-08 | No data | CHISHOLM STREET, FROM STREET REV JAMES POLITE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SE4 corner quadrant are Ada compliant, Ramps was previously measured and collected in prism on 7/6/23. |
2024-03-08 | No data | ARCHER AVENUE, FROM STREET GUY R BREWER BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit Q042024059A66 for inspection remarks. |
2024-03-08 | No data | GUY R BREWER BOULEVARD, FROM STREET ARCHER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps within the NW2 corner quadrant was found to be non Ada compliant. No scoring. Measured and collected in prism on 3/8/24. |
2024-03-08 | No data | CLARKSON AVENUE, FROM STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SE4 corner found to be ADA compliant. Measured & collected in Prism on 3/8/24. |
2024-03-08 | No data | DURYEA PLACE, FROM STREET EAST 22 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NW2 corner quadrant are Ada compliant. Measured and collected in prism on 3/24/23. |
2024-03-07 | No data | VANDERBILT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival crew on site roadway milled half+5 BPP for property 58 in compliance |
2024-03-07 | No data | PARK AVENUE, FROM STREET CLERMONT AVENUE TO STREET VANDERBILT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site upon arrival roadway milled half +5’ for bpp NB project property 58 in compliance |
2024-03-07 | No data | CLERMONT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site upon arrival with roadway milled half +5’ for BPP NB project in compliance. Property 58 |
2024-03-07 | No data | CLERMONT AVENUE, FROM STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site upon arrival with Rodeway Mill, half +5 feet for BPP NB project in compliance for property 58 Vanderbilt Ave. |
2024-03-07 | No data | PARK AVENUE, FROM STREET VANDERBILT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site Rodeway Milled in compliance with BPP inspection half +5 feet for new building project 58 Vanderbilt Ave.. |
2024-03-07 | No data | NEW HAVEN AVENUE, FROM STREET BEACH 22 STREET TO STREET GRASSMERE TERRACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new concrete curb installed |
2024-03-05 | No data | EAST FORDHAM ROAD, FROM STREET GRAND CONCOURSE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SE4 corner quadrant. Unable to measure and collect due to rain. |
2024-03-04 | No data | TOMPKINS AVENUE, FROM STREET MYRTLE AVENUE TO STREET STOCKTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP found done on the roadway. Permit expired. |
2024-03-04 | No data | STOCKTON STREET, FROM STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP found done in the intersection. |
2024-03-04 | No data | GRAND AVENUE, FROM STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed ramps within the NW2 corner quadrant are Ada compliant. Measured and collected in prism on 7/13/23. |
2024-03-03 | No data | STOCKTON STREET, FROM STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SW1 corner found to be ADA compliant. Previously Measured & collected in Prism on 2/16/24. |
2024-03-02 | No data | BOERUM STREET, FROM STREET BROADWAY TO STREET LORIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | steel face curb |
2024-03-02 | No data | BELMONT AVENUE, FROM STREET MOTHER GASTON BOULEVARD TO STREET WATKINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | JERSEY BARRIERS STORED NO PERMIT |
2024-03-02 | No data | MOTHER GASTON BOULEVARD, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF THE SIDE WALK |
2024-02-29 | No data | BEDFORD AVENUE, FROM STREET ST JOHNS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP was done |
2024-02-29 | No data | EAST NEW YORK AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Full roadway width 40ftCutL120’0 W27’0 D0’3 |
2024-02-29 | No data | EAST NEW YORK AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb installed |
2024-02-28 | No data | GUY R BREWER BOULEVARD, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work not started |
2024-02-28 | No data | NEW HAVEN AVENUE, FROM STREET BEACH 22 STREET TO STREET GRASSMERE TERRACE | No data | Street Construction Inspections: Active | Department of Transportation | • Curb to Curb width – 29’• Milled area – 96’ x 20’• Depth of milled area – 4’’• ½ +5’ milled (yes/no) – yes• Waiver (yes/no)- no |
2024-02-27 | No data | OCEAN PARKWAY, FROM STREET LAWRENCE AVENUE TO STREET PARKVILLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | roadway in compliance with the required measurements, BPP inspection pass. |
2024-02-25 | No data | POWELL STREET, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CONCRETE CURB INSTALLED |
2024-02-24 | No data | CROPSEY AVENUE, FROM STREET BAY 31 STREET TO STREET BAY 32 STREET | No data | Street Construction Inspections: Active | Department of Transportation | I observed respondent has Jersey barriers on the roadway and failed to fill barriers with water. Respondent violated stipulation 014 THE WALKWAY MUST MEET NYCDOT SPECIFICATIONS AND MUST BE PROTECTED BY TIMBER BARRIER,WATER-FILLED BARRIER. |
2024-02-23 | No data | LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SE4 corner quadrant was found to be non ADA compliant. Previously measured in prism on 6/16/22 updated on 1/17/23. second ramp on van sinderen was installed by MTA,GC only installed ramp on Livonia |
2024-02-22 | No data | 49 AVENUE, FROM STREET 5 STREET TO STREET VERNON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb in front of 5-22. |
2024-02-21 | No data | GRAND AVENUE, FROM STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner found not to be ADA compliant. Remeasured & collected in Prism on 2/22/24. Open CAr on permit # B042023116A18 for Ramp Running slope |
2024-02-21 | No data | EVERGREEN AVENUE, FROM STREET LINDEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SW1 corner quadrant are non ADA compliant. Previously measured and collected in Prism on 4/07/23. |
2024-02-21 | No data | SHERIDAN AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Bpp passed (1/2 + 5) |
2024-02-21 | No data | ANTHONY AVENUE, FROM STREET EAST 180 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NW2 corner quadrant. Unable to measure and collect due to active roadway construction and jersey barriers blocking corner quadrant. |
2024-02-20 | No data | 8 STREET, FROM STREET MAIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed single ramp within the NE3 corner quadrant was found to be ADA compliant. Measured in prism on 12/2/2022. |
2024-02-19 | No data | POWELL STREET, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY PAVED HALF +5 |
2024-02-19 | No data | GRAHAM AVENUE, FROM STREET VARET STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired. No new ped ramp work started at time of inspection |
2024-02-18 | No data | LIBERTY AVENUE, FROM STREET CHRISTOPHER AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB INSTALLED |
2024-02-16 | No data | MACOMBS PLACE, FROM STREET WEST 154 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Asphalt repairs where the markings are missing were done by the electricity/Plumbing company LLG PLUMBING,HEATING,TRIUMPH CONSTRUCTION, JT. VENT., LLC |
2024-02-16 | No data | SNEDIKER AVENUE, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CONCRETE CURB INSTALLED |
2024-02-16 | No data | STOCKTON STREET, FROM STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. Newly completed single ramp in the SE4 corner found to be ADA compliant. Measured & collected in Prism on 2/16/24. |
2024-02-16 | No data | CLERMONT AVENUE, FROM STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner quadrant are ADA compliant. Measured and collected in Prism on 2/16/24. |
2024-02-16 | No data | BUSHWICK AVENUE, FROM STREET KOSSUTH PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SW1 corner found to be ADA compliant. Measured & collected in Prism on 1/24/23 |
2024-02-16 | No data | GRAND CONCOURSE, FROM STREET MDE NORTHBOUND EXIT 3 TO STREET EAST 138 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk in place at time of inspection. |
2024-02-11 | No data | LIBERTY AVENUE, FROM STREET CHRISTOPHER AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDE WALK FLAGS INSTALLED AND SEALED |
2024-02-11 | No data | VERNON AVENUE, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP is in compliance |
2024-02-09 | No data | VERNON AVENUE, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | EXPANSION JOINTS HAVE BEEN SEALED |
2024-02-08 | No data | ESSEX STREET, FROM STREET FOLSOM PLACE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB REPLACED .. IN COMPLIANCE |
2024-02-07 | No data | TOMPKINS AVENUE, FROM STREET MYRTLE AVENUE TO STREET STOCKTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site upon arrival roadway milled half +5’ in compliance for new building 88 Tompkins Av |
2024-02-07 | No data | STOCKTON STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site upon arrival roadway milled half +5’ in compliance for new building 88 Tompkins Av |
2024-02-07 | No data | STOCKTON STREET, FROM STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site upon arrival roadway milled half +5’ in compliance for new building 88 Tompkins Av |
2024-02-05 | No data | CLERMONT AVENUE, FROM STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE corner quadrant. Unable to measure and collect due to active BPP construction at time of inspection. |
2024-02-04 | No data | BEACH 96 STREET, FROM STREET ROCKAWAY BEACH BOULEVARD TO STREET WOODROW COTTAGES | No data | Street Construction Inspections: Post-Audit | Department of Transportation | concrete curb installed |
2024-02-03 | No data | GRAND AVENUE, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w installed & sealed |
2024-02-03 | No data | PACIFIC STREET, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w installed & sealed |
2024-02-02 | No data | LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the NE3 corner quadrant was found to be ADA compliant. Only the ramp on Van Sinderen was upgraded and remeasured to correct excessive slopes and change ramp location. Measured & collected in Prism on 12/29/22. |
2024-02-02 | No data | ST JOHNS PLACE, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb installed |
2024-02-01 | No data | COOPER AVENUE, FROM STREET 72 PLACE TO STREET 73 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Milled area: 36'08" x 20'07". Crew on site to begin paving. |
2024-01-31 | No data | WITHERS STREET, FROM STREET MEEKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp in the NE3 corner quadrant is ADA compliant. Measured and collected in Prism on 7/6/23. |
2024-01-31 | No data | HOPE STREET, FROM STREET KEAP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SW1 corner found to be ADA compliant. Measured & collected in Prism on 2/20/23. |
2024-01-31 | No data | HOPE STREET, FROM STREET RODNEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp in the NE3 corner found to be ADA compliant. Measured & collected in Prism on 6/29/23. |
2024-01-31 | No data | FLATBUSH AVENUE, FROM STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the NW2 corner found to be ADA compliant. Previously measured & collected in Prism on 3/16/23. |
2024-01-29 | No data | HURON STREET, FROM STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner quadrant were reconstructed. ADA compliant. Re-measured and collected in Prism on 1/29/24. |
2024-01-29 | No data | 49 AVENUE, FROM STREET 5 STREET TO STREET VERNON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | BPP was recently done. Permit expired. |
2024-01-29 | No data | MACOMBS PLACE, FROM STREET WEST 154 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed single ramp in the NE3 corner quadrant Ada compliant. Ramp was measured and collected in prism on 5/10/23 |
2024-01-26 | No data | 60 STREET, FROM STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in SW1 corner are functional & accessible. Unable to measure due to weather conditions (rain). We’ll measure & reinspect at a later date. |
2024-01-25 | No data | PARK AVENUE, FROM STREET VANDERBILT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Exp permit. Newly completed tangent ramps in the NW2 corner is functional & accessible but not ADA compliant due to excessive curb reveal. We’ll measure & reinspect at a later date due to weather conditions (rain) |
2024-01-24 | No data | STOCKTON STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New steel faced curb installed for new building 88 tompkins |
2024-01-24 | No data | MILLER AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pave st conducted.. in compliance |
2024-01-23 | No data | BEDFORD AVENUE, FROM STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner found to be ADA compliant. Measured & collected in Prism on 1/23/24. |
2024-01-23 | No data | ANTHONY AVENUE, FROM STREET EAST 180 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No new Ped ramp work done in the NE3 corner quadrant permit still active.m |
2024-01-22 | No data | EAST FORDHAM ROAD, FROM STREET GRAND CONCOURSE | No data | Street Construction Inspections: Active | Department of Transportation | Crews on site in the SE4 corner quadrant permit still active. |
2024-01-22 | No data | 255 STREET, FROM STREET 38 AVENUE TO STREET 39 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP in front of 38-11 completed and acceptable. curb to curb - 29' 10", milled - 20' 10" x 59' 6", depth - 3". |
2024-01-22 | No data | EAST FORDHAM ROAD, FROM STREET GRAND CONCOURSE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No new Ped ramps work done in the SE4 corner quadrant permit expired newer permit #X042024022A10 on file. |
2024-01-20 | No data | LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permittee correct defects. Ramp on Livonia was reconstructed and remeasured in Prim and found to be ADA compliant. Newer permit B042022340A03 on file |
2024-01-19 | No data | WOODWARD AVENUE, FROM STREET HARMAN STREET TO STREET HIMROD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PAVE STREET-W/ ENGINEERING & INSP -PERM ROADWAY |
2024-01-18 | No data | NOSTRAND AVENUE, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb (Steel face) found to be in compliance |
2024-01-18 | No data | EAST 230 STREET, FROM STREET CARPENTER AVENUE TO STREET LOWERRE PLACE | No data | Street Construction Inspections: Active | Department of Transportation | New sidewalk installed. Expansion joints need to be sealed. |
2024-01-17 | No data | STOCKTON STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Side walk is clear at this time |
2024-01-16 | No data | LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found resurfaced. Newly completed tangent ramps in the NE3 corner found to be ADA compliant. Only the ramp on Van Sinderen was upgraded and remeasured to correct excessive slopes and change ramp location. Measured & collected in Prism on 12/29/22. |
2024-01-15 | No data | 13 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | 5 digit codes should be placed on signage on back of sign ( once in front and Two in back) |
2024-01-11 | No data | 49 AVENUE, FROM STREET 5 STREET TO STREET VERNON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | B.P.P. milling in compliance within roadway at 5-22 49th Avenue • Curb to Curb width – 29'6" • Milled area – 107' x 20' • Depth of milled area – 3"• ½ +5’ milled (yes) • Waiver (no)- |
2024-01-11 | No data | WITHERS STREET, FROM STREET MEEKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp found to be ADA compliant SE4 corner. Remeasured & collected in Prism on 11/27/23 |
2024-01-10 | No data | PRESIDENT STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane IFO property #529. |
2024-01-10 | No data | LENOX ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Full Roadway Width 35'0Cut L64'0 W22'6 D0'3 |
2024-01-09 | No data | EAST 28 STREET, FROM STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed Single tangent ramp in the SE4 corner quadrant is ada compliant. Measured and collected in prism on 3/27/23. |
2024-01-05 | No data | BEDFORD AVENUE, FROM STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Complaint | Department of Transportation | Use/opening of street without DOT permit |
2024-01-04 | No data | BEDFORD AVENUE, FROM STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Contractor has milled a 33’x27’ area of roadway to a depth of 3”, Intersection is 59’x50’ in diameter |
2024-01-04 | No data | BEDFORD AVENUE, FROM STREET CATON AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Contractor has milled a 140’x27’ area of roadway to a depth of 3” in compliance, Roadway is 43’ from curb to curb |
2024-01-04 | No data | LINDEN BOULEVARD, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Contractor has milled a 65’x33’ area of roadway to a depth of 3” in compliance, Roadway is 55’ from curb to curb |
2024-01-04 | No data | CONVENT AVENUE, FROM STREET WEST 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Ramps were previously upgraded by OLIVEIRA CONTRACTING under contract HWPR19M |
2024-01-02 | No data | WEST 150 STREET, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Refer to permit #M012023334A22 on file. |
2023-12-31 | No data | VERNON AVENUE, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL FACED CURB INSTALLED |
2023-12-30 | No data | KINGSTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1/2 + 5 perm restoration in the driving lane IFO property #35. |
2023-12-29 | No data | 43 STREET, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | BPP done for property #1140 43 street in compliance. Width of roadway 30ft. Width of milled area 20ft. Length of milled area 47ft. Depth of milled area 3in. |
2023-12-29 | No data | WEST 150 STREET, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Respondent failed to notify NYC DOT HIQA borough ( Manhattan ) office within four hours prior to paving. As per stipulation 1/2+ 5. And roadway was paved, |
2023-12-28 | No data | ATLANTIC AVENUE, FROM STREET MILLER AVENUE TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Location: Atlantic Ave/Miller Ave & Van Siclen Ave Permit: B012023330B48 Width of Roadway: 40’ Width of milled area: 25’ Length of milled area: 102’ Depth of milled area:3” |
2023-12-28 | No data | MILLER AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Location: Miller Ave / Atlantic Ave & Fulton Street Permit: B012023330B49 Width of Roadway: 30’ Width of milled area: 15’ Length of milled area: 114’ Depth of milled area:3” |
2023-12-28 | No data | ATLANTIC AVENUE, FROM STREET MILLER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Location: Atlantic Ave & Miller Ave Permit: B012023360B50 Width of Roadway: 40’ Width of milled area: 25’ Length of milled area: 28’ Depth of milled area:3” |
2023-12-27 | No data | 4 STREET, FROM STREET 26 AVENUE TO STREET 27 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | B.P.P. restoration found resurfaced |
2023-12-27 | No data | MILLER AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Contractor had street closed, instructed him to open the roadway which was done immediately. |
2023-12-27 | No data | JEROME AVENUE, FROM STREET MT HOPE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp in the NE3 corner quadrant is non ADA compliant. Permittee constructed new landing area with higher dimensions. Previously measured and collected in Prism on 2/6/23. |
2023-12-26 | No data | GRAHAM AVENUE, FROM STREET COOK STREET TO STREET VARET STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new curb reset |
2023-12-26 | No data | 50 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced. |
2023-12-22 | No data | PRESIDENT STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | W of RDWY 30ft, W milled 20ft, L mille3d 175ft, D3-inches |
2023-12-22 | No data | EAST 79 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #323 Steel faced curb 30 linear ft free of defects and in compliance. |
2023-12-20 | No data | VERNON AVENUE, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | UPON INSPECTION ROADWAY CURB TO CURB IS 33FT 11IN. MILLED ROAD IS 103FT X 22FT WITH A DEPTH OF 3 1/2 INCHES |
2023-12-19 | No data | ROGERS AVENUE, FROM STREET CLARKSON AVENUE TO STREET LENOX ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please restore “Red” Bus lane markings to Bus lane. |
2023-12-17 | No data | VANDERBILT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk is in compliance |
2023-12-16 | No data | NORTH 6 STREET, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk curb new |
2023-12-12 | No data | WARD AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPLACE CURB good I/F/O 1045 |
2023-12-12 | No data | EAST 116 STREET, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk in compliance |
2023-12-07 | No data | 65 ROAD, FROM STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | New completed tangent ramps in the SW corner quadrant was found to be non ADA compliant due to temp concrete pavement key , curb reveal , expansion joints not sealed and sidewalk grade break not scored. M&C in Prism on 12/7/23 , Active permit. |
2023-12-06 | No data | LINCOLN PLACE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced B152023265B37. |
2023-12-04 | No data | MT HOPE PLACE, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flags in place |
2023-12-04 | No data | 10 AVENUE, FROM STREET 43 STREET TO STREET 44 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Width of Roadway: 42 feetWidth of milled area: 26 feetLength of milled area: 90 feetDepth of milled area: 3 inchesContractor is in compliance with required BPP measurements, pass. |
2023-11-30 | No data | DIKEMAN STREET, FROM STREET CONOVER STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done in compliance |
2023-11-30 | No data | 38 STREET, FROM STREET 10 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced. |
2023-11-28 | No data | 59 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP completed |
2023-11-28 | No data | WITHERS STREET, FROM STREET MEEKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed single ramp found to be ADA compliant SE4 corner. Remeasured & collected in Prism on 11/27/23 permit # B042023206A05. |
2023-11-27 | No data | WITHERS STREET, FROM STREET MEEKER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition repaired. Permittee corrected ramp running slopes in the SE4 corner. M&C 7/6/23 in Prism. Newer permit B042023321A10 on file |
2023-11-27 | No data | CLARKSON AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP complete |
2023-11-25 | No data | ELM PLACE, FROM STREET EAST 188 STREET TO STREET EAST FORDHAM ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb in place |
2023-11-22 | No data | WEST 150 STREET, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | NOV issued for the Respondent failed to obtain a DOT Street opening permit for having a permanent BPP Restoration in the Roadway. Permit # M012022311A55 is for a different segment and used as ID only. |
2023-11-18 | No data | 89 AVENUE, FROM STREET 148 STREET TO STREET 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW CURB INSTALLED |
2023-11-18 | No data | PROSPECT AVENUE, FROM STREET EAST 175 STREET TO STREET EAST 176 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints sealed between curb and sidewalk flags |
2023-11-17 | No data | DURYEA PLACE, FROM STREET EAST 22 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newer permit B042023164A11 on file |
2023-11-17 | No data | CONOVER STREET, FROM STREET DIKEMAN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newer permit B042023165A32 on file |
2023-11-17 | No data | 38 STREET, FROM STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newer permit B042023164A12 on file |
2023-11-17 | No data | VANDERBILT AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Job 1Location: 228 Vanderbilt Avenue Permit:B012023321B22Width of Roadway: 41ft 10inWidth of milled area: 26ft 1in Length of milled area: 54ft 2in Depth of milled area: 3fin down |
2023-11-17 | No data | BROADWAY, FROM STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newer permit B042023177A04 on file |
2023-11-16 | No data | BEDFORD AVENUE, FROM STREET ST JOHNS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner found not to be ADA compliant. Measured & collected in Prism on 11/16/23. |
2023-11-16 | No data | AVENUE C, FROM STREET EAST 6 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired. No new ped ramp work started at time of inspection. |
2023-11-16 | No data | EAST 32 STREET, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP in place and in compliance |
2023-11-16 | No data | 59 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Full roadway width 29’0Cut L50’0 W20’0 D0’4 |
2023-11-14 | No data | JAMAICA AVENUE, FROM STREET 162 STREET TO STREET GUY R BREWER BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Section of sidewalk replaced with concrete. |
2023-11-14 | No data | EAST 116 STREET, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Active | Department of Transportation | Pedestrian walk in compliance |
2023-11-11 | No data | FRANKLIN AVENUE, FROM STREET BERGEN STREET TO STREET DEAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed IFO property #627. |
2023-11-11 | No data | 60 STREET, FROM STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP completed |
2023-11-11 | No data | BAY PARKWAY, FROM STREET 59 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done on the roadway |
2023-11-11 | No data | 60 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP completed |
2023-11-08 | No data | ST JOHNS PLACE, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Width of roadway 33ft, W milled 23ft, L milled 130ft |
2023-11-08 | No data | BEDFORD AVENUE, FROM STREET ST JOHNS PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Intersection L55ft, W32ft. L milled 32ft, W milled 23ft. |
2023-11-07 | No data | BEDFORD AVENUE, FROM STREET ST JOHNS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started. New permit # B042023291A35 obtained for the SW1 corner. We’ll measure on active permit when paving key is completed. |
2023-11-06 | No data | MILLER AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp paved in compliance |
2023-11-03 | No data | JEROME AVENUE, FROM STREET MT HOPE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SE4 corner quadrant are ada compliant, Ramps was previously measured and collected in prism on 2/6/23 & update on 4/10/23. Newer permit #X042023089A08 on file. |
2023-11-03 | No data | MT HOPE PLACE, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No concrete curb in place |
2023-11-01 | No data | SCHAEFER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway repaved by BPP |
2023-11-01 | No data | AVENUE C, FROM STREET EAST 6 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired. No new ped ramp work started at time of inspection |
2023-10-28 | No data | KENO AVENUE, FROM STREET BEND TO STREET MARENGO STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP completed, Curb to curb is 25’, Milled Area is 19’, Depth is 3”, 1/2 +5 completed. |
2023-10-26 | No data | TILDEN AVENUE, FROM STREET BEDFORD AVENUE TO STREET EAST 22 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb in place and in compliance |
2023-10-25 | No data | BAY PARKWAY, FROM STREET 59 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed |
2023-10-25 | No data | 60 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb installed |
2023-10-24 | No data | 43 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed |
2023-10-24 | No data | VANDERBILT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Fence on sidewalk area. |
2023-10-23 | No data | CHRISTOPHER AVENUE, FROM STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Intersection paved by BPP for new building project 103 |
2023-10-23 | No data | LIBERTY AVENUE, FROM STREET CHRISTOPHER AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved half +5’ in compliance for bpp property 103 |
2023-10-23 | No data | 89 AVENUE, FROM STREET 148 STREET TO STREET 150 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed, Curb to curb is 29’, Milled Area is 20’ 3”, Depth is 3”. |
2023-10-21 | No data | GRAND AVENUE, FROM STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration ion the intersection. |
2023-10-21 | No data | BEDFORD AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb reset |
2023-10-20 | No data | 65 ROAD, FROM STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Contractor excavated the SE corner quadrant after 410 permit expired. Action was taken outside of this permit , reference new non permit # QNP2023293A11 for further information. |
2023-10-20 | No data | 65 ROAD, FROM STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Contractor has excavated portion of the SE corner without active 410 Ped Ramp permit. Corner is not functional or accessible due to barricades open excavation. Will re inspect at later date once work is completed. |
2023-10-19 | No data | VANDERBILT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | New sidewalk flags installed. |
2023-10-17 | No data | BELMONT AVENUE, FROM STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant are Ada compliant. Measured and collected in prism on 10/17/23. |
2023-10-13 | No data | GRAND STREET, FROM STREET WYTHE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Gutter flow is compliant at this time in the NE3 corner. Remeasured in Prism on 10/13/23. |
2023-10-12 | No data | NELSON AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET FEATHERBED LANE | No data | Street Construction Inspections: Active | Department of Transportation | 35x20’ down 3’ portion in roadway awaiting to be paved, foreman Lenny & crew on site & in compliance |
2023-10-12 | No data | WARD AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET WATSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Stip# 1/2+5' THE PERMITTEE IS RESPONSIBLE FOR MILLING AND PAVING 1/2 + 5 FEET OF THE ROADWAY TO A DEPTH OF 3 INCHES AS A MINIMUM RESTORATION REQUIREMENT. 17'+5' = 22'x18'x3'' Was told to sweep the trench clean. R/W (34'x18') |
2023-10-11 | No data | DIKEMAN STREET, FROM STREET CONOVER STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP done in complianceWidth of roadway:30ftWidth of roadway milled area :20ftLength of milled area:200ftDepth of milled area :3in |
2023-10-08 | No data | PROSPECT AVENUE, FROM STREET EAST 175 STREET TO STREET EAST 176 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joints need to be sealed with sealer. |
2023-10-05 | No data | WITHERS STREET, FROM STREET MEEKER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly completed single ramp in the SE4 corner found not to be ADA compliant. Measured & collected in Prism on 7/6/23. Excessive ramp running remains. |
2023-10-05 | No data | WEST 150 STREET, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | perm. rest. on r/w w/o permit on file. |
2023-10-05 | No data | MACOMBS PLACE, FROM STREET WEST 154 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | curb reveal was made to zero. Newer permit M042023166A19 on file |
2023-10-03 | No data | CHISHOLM STREET, FROM STREET REV JAMES POLITE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | All slope was corrected & curb reveal was made to zero, plastic was removed from the DWS. Newer permit X042023206A01 on file |
2023-10-03 | No data | CHRISTOPHER AVENUE, FROM STREET LIBERTY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Issue resolved completed tangent ramps in the NW2 corner found to be ADA compliant. Previously Measured & collected in Prism on 7/5/23. After remeasuring ramps are ADA compliant. |
2023-10-01 | No data | VERMONT STREET, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp done and in compliance |
2023-10-01 | No data | EAST 32 STREET, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sidewalk flags in compliance at this time |
2023-09-30 | No data | MOHEGAN AVENUE, FROM STREET EAST 179 STREET TO STREET EAST 180 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sidewalk expansion joints were sealed. I/F/O 2085. |
2023-09-29 | No data | BEDFORD AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Active | Department of Transportation | temporary walk in roadway |
2023-09-28 | No data | CLARKSON AVENUE, FROM STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started. No work done in the NE3 corner. |
2023-09-28 | No data | KEAP STREET, FROM STREET GRAND STREET EXTENSION TO STREET SOUTH 2 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2023-09-28 | No data | KEAP STREET, FROM STREET SOUTH 2 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2023-09-27 | No data | HARRISON AVENUE, FROM STREET LYNCH STREET TO STREET MIDDLETON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP is in compliance |
2023-09-27 | No data | MARION AVENUE, FROM STREET EAST 188 STREET TO STREET EAST FORDHAM ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb in place |
2023-09-23 | No data | BERRIMAN STREET, FROM STREET LINDEN BOULEVARD TO STREET STANLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk and curb insta In compliance ifo property 616 |
2023-09-23 | No data | SNEDIKER AVENUE, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | bpp has been paved and in compliance |
2023-09-22 | No data | CONVENT AVENUE, FROM STREET WEST 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner quadrant are non Ada compliant. Ramps was previously measured on 8/19/2 updated on 9/22/23 in prism ( landing -cross running slopes,). |
2023-09-22 | No data | BEDFORD AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Active | Department of Transportation | NO NEW SIDEWALK BLG. PAVEMENT |
2023-09-22 | No data | CLARKSON AVENUE, FROM STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Duplicate permit on file. Action taken on newer permit # B042023240A08. M&C in Prism on 9/20/23. |
2023-09-20 | No data | CLARKSON AVENUE, FROM STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed ramps within the SW1 corner quadrant are Non Ada compliant. Measured and collected in prism on 9/20/23. |
2023-09-20 | No data | DECATUR AVENUE, FROM STREET EAST 194 STREET TO STREET EAST 195 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb in place |
2023-09-20 | No data | LORIMER STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP is in compliance |
2023-09-19 | No data | ELDERT STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced by BPP |
2023-09-18 | No data | MADISON STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | UPON INSPECTION ROADWAY CURB TO CURB IS 34FT. MILLED ROADWAY IS 142FT X 22FT WITHA DEPTH OF 4 INCHES |
2023-09-18 | No data | CLARKSON AVENUE, FROM STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started. No work done in the NE3 corner. |
2023-09-17 | No data | PROSPECT AVENUE, FROM STREET EAST 175 STREET TO STREET EAST 176 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New steel face curb in place |
2023-09-15 | No data | 21 STREET, FROM STREET 27 AVENUE TO STREET 27 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | no temp pedestrian walk found |
2023-09-15 | No data | BATHGATE AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb in place |
2023-09-14 | No data | ROGERS AVENUE, FROM STREET CLARKSON AVENUE TO STREET LENOX ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel curb in stand in compliance |
2023-09-14 | No data | 65 ROAD, FROM STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No pedestrian ramp work started. Old existing ramps in the SE corner quadrant are accessible and non fully functional due to active building construction and scaffolding on site. Will re inspect at later date once work is completed. |
2023-09-13 | No data | WEST 190 STREET, FROM STREET DEVOE TERRACE TO STREET UNIVERSITY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Email notification was sent |
2023-09-11 | No data | FAIRMOUNT PLACE, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New concrete curb in place |
2023-09-11 | No data | EAST 24 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: Active | Department of Transportation | Width of Roadway: 29'5Width Milled: 20'6Length Milled: 49'5Depth Milled: 3" |
2023-09-09 | No data | QUEENS BOULEVARD, FROM STREET 65 ROAD TO STREET 66 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | TEMPORARY PEDESTRIAN WALK, pass |
2023-09-07 | No data | BAY PARKWAY, FROM STREET 59 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP pass |
2023-09-07 | No data | 60 STREET, FROM STREET BAY PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | BPP pass |
2023-09-07 | No data | 60 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | BPP pass |
2023-09-07 | No data | QUEENS BOULEVARD, FROM STREET 65 ROAD TO STREET 66 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Not verified the building operation has proper signs posted at all location advising sidewalk close. They are directed to use the walkway. No action required at this time. |
2023-09-07 | No data | KOSSUTH PLACE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Cement face curb installed |
2023-09-06 | No data | 10 AVENUE, FROM STREET 43 STREET TO STREET 44 STREET | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent closed the entire sidewalk without providing a PROTECTED WALKWAY IN ROADWAY.ID BY permit on file. FAILED TO comply with stipulation 014,Protected WALKWAY MUST MEET NYCDOT SPECIFICATIONS & MUST BE PROTECTED BY TIMBER. |
2023-09-05 | No data | 21 STREET, FROM STREET 27 AVENUE TO STREET 27 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | B.P.P. milling in compliance within the roadway in front of 27-16 21st Street. • Curb to Curb width – 58’6” /• Milled area – 94’(L) x 34’6”(W) /• Depth of milled area – 3” /• ½ +5’ milled (yes/no) – YES • Waiver (yes/no)- NO |
2023-09-04 | No data | 22 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb repaired in front of 289 22 Street. |
2023-08-31 | No data | EVERGREEN AVENUE, FROM STREET LINDEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner quadrant are functional and accessible. ADA compliant. Previously measured and collected in Prism on 10/5/20. |
2023-08-29 | No data | CHISHOLM STREET, FROM STREET REV JAMES POLITE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No new work done in the NW2 Corner quadrant, permit expired, open C.A.R #20235730186 on file. |
2023-08-28 | No data | CHISHOLM STREET, FROM STREET REV JAMES POLITE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SE4 corner quadrant are Ada compliant, Ramps was previously measured and collected in prism on 7/6/23. |
2023-08-27 | No data | ESSEX STREET, FROM STREET FOLSOM PLACE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Half plus 5 done and in compliance |
2023-08-26 | No data | LEWIS AVENUE, FROM STREET BROADWAY TO STREET STOCKTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP is in compliance |
2023-08-25 | No data | SCHAEFER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new roadway resurface for new building |
2023-08-24 | No data | WEST 190 STREET, FROM STREET DEVOE TERRACE TO STREET UNIVERSITY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | New concrete s/w. |
2023-08-24 | No data | MOHEGAN AVENUE, FROM STREET EAST 179 STREET TO STREET EAST 180 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 53’x22’x3” portion of roadway was milled. Total roadway width is 33’. Half+5 in compliance. Paving about to begin. Kandos Paving Carlos on site. |
2023-08-24 | No data | MOHEGAN AVENUE, FROM STREET EAST 179 STREET TO STREET EAST 180 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk expansion joints must be sealed. I/F/O 2085. |
2023-08-23 | No data | BEDFORD AVENUE, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb reset IFO property #987. |
2023-08-23 | No data | COLLEGE AVENUE, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb in place at 285 new building corner property. |
2023-08-23 | No data | EAST 32 STREET, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb (Concrete) found in compliance |
2023-08-22 | No data | 30 DRIVE, FROM STREET 21 STREET TO STREET 23 STREET | No data | Street Construction Inspections: Active | Department of Transportation | no temp pedestrian walk found |
2023-08-21 | No data | VERMONT STREET, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Location: 221 Vermont StreetPermit: B012023228C70Width of Roadway: 30’Width of milled area: 20’Length of milled area: 85’Depth of milled area:3” |
2023-08-21 | No data | WITHERS STREET, FROM STREET MEEKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramp within the SE4 corner quadrant are non Ada compliant. Previously measured and collected in prism on 7/6/23. |
2023-08-21 | No data | MARION AVENUE, FROM STREET EAST 188 STREET TO STREET EAST FORDHAM ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Pass work done |
2023-08-20 | No data | CHISHOLM STREET, FROM STREET INTERVALE AVENUE TO STREET REV JAMES POLITE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints has been sealed |
2023-08-18 | No data | 46 STREET, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Width of Roadway: 30 feetWidth of milled area: 20 feetLength of milled area: 50 feetDepth of milled area: 3 inchesIn compliance with required BPP measurements, pass. |
2023-08-18 | No data | BAY PARKWAY, FROM STREET 59 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk curing at this time. In compliance. |
2023-08-17 | No data | TRINITY AVENUE, FROM STREET EAST 149 STREET TO STREET PONTIAC PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP in place for for new building |
2023-08-17 | No data | GRAND AVENUE, FROM STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. Newly completed tangent ramps with the new construction of ramp work done on NE3 ( Grand Ave ). We’ll measure & reinspect when concrete is done curing and rescored. |
2023-08-17 | No data | 60 STREET, FROM STREET BAY PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Active work being done in the NW2 corner quadrant, Active permit on file. |
2023-08-17 | No data | SNEDIKER AVENUE, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new curb installed in compliance |
2023-08-17 | No data | EAST 32 STREET, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Full roadway width 30’0Cut:L51’0 W 21’0 D 0’3Pass |
2023-08-16 | No data | MARION AVENUE, FROM STREET EAST 188 STREET TO STREET EAST FORDHAM ROAD | No data | Street Construction Inspections: Active | Department of Transportation | On site for BPP as per BC RWilliams. Portion of roadway milled and paved 85’ length x 20’ width x 3” depth. Total roadway width is 30’, half + 5 stipulation in compliance. On site, Kandos Paving (917) 891-5252. BPP pass. I/F/O 2511. |
2023-08-11 | No data | LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SE4 corner quadrant was found to be non ADA compliant. Previously measured in prism on 6/16/22 updated on 1/17/23. Doesn’t apply due second ramp on van sinderen was installed by MTA,GC only installed ramp on Livonia |
2023-08-10 | No data | NORTH 12 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway currently being milled by in house for paving |
2023-08-10 | No data | MARION AVENUE, FROM STREET EAST 188 STREET TO STREET EAST FORDHAM ROAD | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO COMPLY WITH THE TERMS AND AGREEMENT OF THIS PERMIT BY VIOLATING STIPULATION 019 , RESPONDENT FAILED TO MAINTAIN A 5FT CLEAR TEMPORARY PEDESTRIAN WALKWAY IN THE ROADWAY WHILE WORKING ON THE |
2023-08-10 | No data | NORTH 11 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp in compliance for property 61 |
2023-08-09 | No data | SNEDIKER AVENUE, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Location: 482 Snediker AvenuePermit: B012023220A52Width of Roadway: 29’Width of milled area: 20’Length of milled area: 56’Depth of milled area:3’ |
2023-08-09 | No data | BEDFORD AVENUE, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane IFO property #987. |
2023-08-09 | No data | GOLD STREET, FROM STREET WATER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp in compliance for property 86 |
2023-08-07 | No data | CLARKSON AVENUE, FROM STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No ped ramp work started in the SE4 corner. Barricades around the ramps from BO work at this time. We’ll measure & reinspect when ramp is completed. |
2023-08-05 | No data | POWELL STREET, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY PAVED HALF +5 |
2023-08-04 | No data | EAST 79 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP, Half of the Street + 5 feet milled for paving. Measurements from the North to the South Curbs is 55 feet. Area milled, 36’ x 32’ down 3”. |
2023-08-03 | No data | ESSEX STREET, FROM STREET FOLSOM PLACE TO STREET FULTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Location: 190 ESSEX ST BTWN FOLSOM PL & FULTON ST Permit: B012023214C58Width of Roadway: 30’ Width of milled area: 20’Length of milled area: 60’ Depth of milled area: 3’ Foreman on site. |
2023-08-03 | No data | FAIRVIEW AVENUE, FROM STREET BLEECKER STREET TO STREET GREENE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | • Curb to Curb width: 30 Feet• Milled area: 40'x20'• Depth of milled area: 3 inches• ½ +5’ milled: Yes• Waiver: No |
2023-08-02 | No data | ELDERT STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Width of Roadway: 29ft 7inWidth of milled area: 19ft 11inLength of milled area: 63ft 7in Depth of milled area: 3fin down |
2023-08-02 | No data | WITHERS STREET, FROM STREET MEEKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No work started. No new ped ramp work done. Excessive slope remain the SE4 corner. Previously M&C in Prism on 7/6/23. |
2023-08-01 | No data | SNEDIKER AVENUE, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ped /walk not visible |
2023-07-31 | No data | GRAND STREET, FROM STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Exp permit. Newly completed tangent ramps in the NE3 corner found not to be ADA compliant. M&C in Prism on 6/16/23. |
2023-07-31 | No data | LINCOLN PLACE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest Accepted. Patchwork at 726 Lincoln not 729 Lincoln Place. Protest Accepted, going forward be mindful when patching adjacent house it can become your responsibility for full flag restoration |
2023-07-31 | No data | BROADWAY, FROM STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner found not to be ADA complaint. M&C in Prism on 7/6/23. |
2023-07-31 | No data | GRAND CONCOURSE, FROM STREET MDE NORTHBOUND EXIT 3 TO STREET EAST 138 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel face curb in place |
2023-07-28 | No data | VANDERBILT AVENUE, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no temporary pedestrian walk found |
2023-07-28 | No data | SNEDIKER AVENUE, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF SIDEWALK AS STIPULATED In compliance. |
2023-07-25 | No data | MOHEGAN AVENUE, FROM STREET EAST 179 STREET TO STREET EAST 180 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb in place |
2023-07-22 | No data | EAST 79 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Respondent is in violation of stipulation 013 & 047 & failed to provide adequate protection to persons and/or property at worksite. The pedestrian walkway is missing jersey barriers. The respondent was identified by permit located at #323. |
2023-07-20 | No data | CONOVER STREET, FROM STREET DIKEMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SE4 found to be ADA compliant. Measured & collected in Prism. |
2023-07-20 | No data | LINCOLN PLACE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There is patch work on the sidewalk in front of residence 729 Lincoln Pl, that is unacceptable, and needs to be restored. Permit expired on 7/7/2023. |
2023-07-19 | No data | VERMONT STREET, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb installed in compliance |
2023-07-19 | No data | VANDERBILT AVENUE, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Bpp in compliance |
2023-07-19 | No data | 38 STREET, FROM STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SE4 corner quadrant are Ada compliant. Measured and collected in prism on 7/19/23. |
2023-07-19 | No data | DURYEA PLACE, FROM STREET EAST 22 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed single tangent ramp within NE3 corner quadrant are Ada compliant. Measured and collected in prism on 7/19/23. |
2023-07-18 | No data | MACOMBS PLACE, FROM STREET WEST 154 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp in the NE3 corner quadrant. Unable to measure and collect due to rain at time of inspection. |
2023-07-18 | No data | VANDERBILT AVENUE, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP in compliance |
2023-07-17 | No data | NORTH 1 STREET, FROM STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed ramps within the NW2 corner quadrant are ada compliant. Measured and collected in prism on 4.30.23. |
2023-07-16 | No data | LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work was done. MTA upgraded corner.. |
2023-07-15 | No data | REV JAMES POLITE AVENUE, FROM STREET CHISHOLM STREET TO STREET FREEMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb in place. |
2023-07-14 | No data | COLLEGE AVENUE, FROM STREET EAST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired. No ped ramp work started at time of inspection. |
2023-07-13 | No data | FLATBUSH AVENUE, FROM STREET EAST 28 STREET TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done on the sw |
2023-07-13 | No data | GRAND AVENUE, FROM STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed ramps within the NW2 corner quadrant are Ada compliant. Measured and collected in prism on 7/13/23. |
2023-07-13 | No data | GRAND STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a newly installed steel face curb. |
2023-07-12 | No data | SUFFOLK STREET, FROM STREET BROOME STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The respondent has restored the sidewalk in kind. |
2023-07-12 | No data | NORTH 12 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New steel faced curb installed for new sidewalk ifo property 61 |
2023-07-11 | No data | DURYEA PLACE, FROM STREET EAST 22 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No work started. No new ped ramp work done. Ramp conditions are the same as picture shown in the CAR. We’ll measured & reinspect when ramps are completed. |
2023-07-08 | No data | CHISHOLM STREET, FROM STREET INTERVALE AVENUE TO STREET REV JAMES POLITE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | All unsealed sidewalk expansion joints must be sealed and also sidewalk wood forms must be removed from curb. |
2023-07-06 | No data | NORTH 11 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New steel faced curb installed for new sidewalk ifo No.61 |
2023-07-06 | No data | BROADWAY, FROM STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed ramps within the NE3 corner quadrant are non Ada compliant. Measure and collected in prism 7/6/23. |
2023-07-06 | No data | WITHERS STREET, FROM STREET MEEKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp in the SE4 corner found not to be ADA compliant. Measured & collected in Prism on 7/6/23. |
2023-07-06 | No data | CHISHOLM STREET, FROM STREET REV JAMES POLITE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NW2 corner quadrant are non Ada compliant, Ramps was measured and collected in prism on 7/6/23 ( ramp running slopes, ramp cross slopes). |
2023-07-05 | No data | CHRISTOPHER AVENUE, FROM STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NW2 corner found to be ADA compliant. Measured & collected in Prism on 7/5/23. After remeasuring ramps are ADA compliant. |
2023-07-03 | No data | POWELL STREET, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CONCRETE CURB INSTALLED |
2023-06-30 | No data | 46 STREET, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb was installed in front of 1155 46 Street. |
2023-06-29 | No data | HOPE STREET, FROM STREET RODNEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp in the NE3 corner found to be ADA compliant. Measured & collected in Prism on 6/29/23. |
2023-06-28 | No data | LIBERTY AVENUE, FROM STREET CHRISTOPHER AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB INSTALLED |
2023-06-28 | No data | PROSPECT AVENUE, FROM STREET BECK STREET TO STREET EAST 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found newly paved IFO 599 for new building |
2023-06-27 | No data | LINCOLN PLACE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | BPP was done and asphalt flushed to grade. |
2023-06-26 | No data | LINCOLN PLACE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP COMPLETE Width Milled: 22'3Width of Roadway: 33'4Length Milled: 93'1Depth Milled: 4" |
2023-06-26 | No data | EAST 28 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete sidewalk restoration found to be in compliance |
2023-06-24 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete sidewalk restoration found to be in compliance |
2023-06-24 | No data | PROSPECT AVENUE, FROM STREET BECK STREET TO STREET EAST 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb and sidewalk of new building in compliannce |
2023-06-22 | No data | 38 STREET, FROM STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Permit taken out to address CAR issues on permit B042023079A17. No work started at this time to resolve issues. |
2023-06-21 | No data | WEST 37 STREET, FROM STREET 10 AVENUE TO STREET DYER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk restored in kind. |
2023-06-21 | No data | SCHAEFER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP complete Curb to curb- 30ftLength- 38ftWidth- 21ftDepth- 3 inches |
2023-06-20 | No data | CHISHOLM STREET, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street was paved bpp work done. |
2023-06-20 | No data | HARMAN STREET, FROM STREET FAIRVIEW AVENUE TO STREET WOODWARD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed. Curb to curb - 29' 10", milled - 20' 3" x 117' 4", depth - 3". |
2023-06-20 | No data | HARMAN STREET, FROM STREET WOODWARD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP complete. Curb to curb - 37' 7", milled - 23' 3" x 22', depth - 3". |
2023-06-20 | No data | WOODWARD AVENUE, FROM STREET HARMAN STREET TO STREET HIMROD STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP complete. Curb to curb - 29' 9", milled - 20' 4" x 42' 4", depth - 3". |
2023-06-20 | No data | SULLIVAN PLACE, FROM STREET WASHINGTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed single ramp in the NW2 corner found to be ADA compliant. Previously Measured & collected in Prism on 2/24/23. Concrete removed paving key installed. |
2023-06-16 | No data | NORTH 1 STREET, FROM STREET WYTHE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Roadway counter slope has been addressed and is in compliance. Completed tangent ramps within the NW2 corner quadrant are non ada compliant. Previously measured and collected in prism on 4.30.23 Newer permit B042023152A26 on file |
2023-06-16 | No data | 4 STREET, FROM STREET 26 AVENUE TO STREET 27 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Paving check only: Roadway: 45', Paved Area 61', 1/2 +5' Yes: 28' |
2023-06-16 | No data | 46 STREET, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF SIDEWALK AS STIPULATED |
2023-06-16 | No data | GRAND STREET, FROM STREET WYTHE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Active permit B042023152A24 on file. Issues has been addressed. Will inspect in prism on active permit. |
2023-06-16 | No data | GRAND STREET, FROM STREET WYTHE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps in the NE3 corner quad are accessible and functional but not Ada compliant due to the roadway gutter flow(2.8%) only, on ramp 1. Measured and collected in prism on 6/16/23. |
2023-06-16 | No data | LINCOLN PLACE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Respondent failed to comply with stipulation 014 |
2023-06-16 | No data | MARCY AVENUE, FROM STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | As per inspection on permit B042023074A04 and spot check in the SW1 corner quad, it is now in compliance. Previously measured and collected in prism on 1/25/23. Re-measured in prism on 4/30/23. Newer permit B042023074A04 on file |
2023-06-15 | No data | MARCY AVENUE, FROM STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly completed tangent ramps in the SW1 corner found not to be ADA compliant. Measured & collected in Prism on 1/25/23. ( landing cross, running slopes). |
2023-06-15 | No data | NORTH 1 STREET, FROM STREET WYTHE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No new work done in the NW2 Corner quadrant, Completed ramps in the NW2 corner quadrant are non ada compliant. Ramps was previously measured and collected in prism on 4.30.23 |
2023-06-15 | No data | MEEKER AVENUE, FROM STREET LORIMER STREET TO STREET WITHERS STREET | No data | Street Construction Inspections: Active | Department of Transportation | Whole Street: 39ft 10in Half plus 5 : 25ft Width: 249ft 5in Down: 3in |
2023-06-15 | No data | WITHERS STREET, FROM STREET LEONARD STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Whole street: 39ft 10in Half plus 5: 25ft Width: 25ft Down: 3in |
2023-06-15 | No data | NOSTRAND AVENUE, FROM STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the NE3 corner found to be ADA compliant. Ramps was previously measured and collected in Prism on 12/6/22. |
2023-06-15 | No data | MARCY AVENUE, FROM STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single tangent in the SE4 corner found to be ADA compliant. Measured & collected in Prism on 7/15/23. |
2023-06-14 | No data | BEDFORD AVENUE, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site roadway milled 31’x27’x4” full width of roadway 51’ for property 987 |
2023-06-14 | No data | FRANKLIN AVENUE, FROM STREET BERGEN STREET TO STREET DEAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | i seen a new curb |
2023-06-13 | No data | HOPE STREET, FROM STREET RODNEY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition resolved. Ramps were completed under permit B042022347A03, paving completed under permit B012023039B85. No further actions taken at this time. |
2023-06-13 | No data | KINGSTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | Roadway milled half plus 5 |
2023-06-12 | No data | CHRISTOPHER AVENUE, FROM STREET LIBERTY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permittee failed to correct excessive landing cross slope in the NW2 corner. Previously Measured &Collected in Prism on 11/7/22. |
2023-06-12 | No data | CHRYSTIE STREET, FROM STREET DELANCEY STREET TO STREET RIVINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The respondent restored 1/2+5 of the roadway for the BPP restoration. |
2023-06-12 | No data | GRAND STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: Active | Department of Transportation | Occupancy of sidewalk as stipulated in front. |
2023-06-09 | No data | NORTH 11 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Whole street: 29ft 6in Half plus 5: 20ft 5inWidth: 123ft 6in Down: 3in |
2023-06-09 | No data | NORTH 12 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Whole street: 29ft 10in Half plus 5: 20ft 2in Width: 111ft 6inDown: 3in |
2023-06-06 | No data | POWELL STREET, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NEW CONCRETE CURB INSTALLED |
2023-06-05 | No data | 38 STREET, FROM STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newer permit on file B042023079A17 with an open CAR for the SE4 corner quad. Reference permit B042023079A17. |
2023-06-03 | No data | CHISHOLM STREET, FROM STREET INTERVALE AVENUE TO STREET REV JAMES POLITE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | The above respondent has a Temporary pedestrian walkway in the roadway, failed to maintain 5’ clear. Walkway is obstructed by excavator parked in the walkway. Violated permit stipulation #014. |
2023-05-31 | No data | POWELL STREET, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | STIP VIOLATION CLOSED SIDE WALK |
2023-05-31 | No data | GRAND STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk is occupied with construction fence. |
2023-05-30 | No data | BROADWAY, FROM STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the NE3 corner quadrant are functional and accessible. Non Ada compliant. Previously Measured in prism on 9/3/21. |
2023-05-28 | No data | MONTROSE AVENUE, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | sealed |
2023-05-27 | No data | PROSPECT AVENUE, FROM STREET BECK STREET TO STREET EAST 150 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work not started. |
2023-05-25 | No data | COLLEGE AVENUE, FROM STREET EAST 169 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No new ped ramp work started in the NW2 corner quadrant at time of inspection |
2023-05-25 | No data | NEW YORK AVENUE, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | UPON INSPECTION ROADWAY CURB TO CURB IS 42FT. MILLED ROADWAY IS 58FT X 27FT WITH A DEPTH OF 3 INCHES |
2023-05-25 | No data | MANIDA STREET, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1/2 plus 5 of the roadway paved |
2023-05-24 | No data | BEACH 96 STREET, FROM STREET ROCKAWAY BEACH BOULEVARD TO STREET WOODROW COTTAGES | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1/2+5' width of r/w paved |
2023-05-24 | No data | GRAND AVENUE, FROM STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP inspected |
2023-05-24 | No data | PACIFIC STREET, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP inspected |
2023-05-24 | No data | GRAND AVENUE, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP inspected |
2023-05-24 | No data | 21 STREET, FROM STREET 31 AVENUE TO STREET 31 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced |
2023-05-23 | No data | FAIRMOUNT PLACE, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New building sidewalk flags I/F/O # 785. |
2023-05-23 | No data | GRAND AVENUE, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Central concrete has an active permit on file to pave the segment & it expires on 6/15/2023 |
2023-05-22 | No data | NOSTRAND AVENUE, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb (Steel face) found in compliance |
2023-05-19 | No data | EAST 53 STREET, FROM STREET BEND TO STREET WINTHROP STREET | No data | Street Construction Inspections: Active | Department of Transportation | UPON INSPECTION ROADWAY CURB TO CURB IS 44FT MILLED ROADWAY IS 27FT X 57FT WITH A DEPTH OF 3 INCHES |
2023-05-19 | No data | WATER STREET, FROM STREET BRIDGE STREET TO STREET GOLD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved for new building BPP |
2023-05-19 | No data | GOLD STREET, FROM STREET FRONT STREET TO STREET WATER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved for bpp |
2023-05-19 | No data | WITHERS STREET, FROM STREET MEEKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Pedramp work is in progress….concrete is being poured. Will inspect at a later date. |
2023-05-18 | No data | EAST 169 STREET, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O #285 corner property. Roadway milled on two sides: On E196St: Existing roadway total width 41’ of which a 80’x26’x3” portion is milled. On College Av: existing roadway total width 29’, of which a 110’x19’8”x3” is milled. BPP milling pass. |
2023-05-13 | No data | UNION STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP was done i/f/o 1101 |
2023-05-12 | No data | DURYEA PLACE, FROM STREET EAST 22 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SW1 corner quadrant are Ada compliant. Previously Measured and collected in prism on 3/24/23. New flags done in quadrant. |
2023-05-11 | No data | LEFFERTS AVENUE, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Contractors BPP roadway restoration found in compliance |
2023-05-11 | No data | CONOVER STREET, FROM STREET DIKEMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed ramps within the NE3 corner quadrant are non Ada compliant. Measured and collected in prism on 5/11/23. |
2023-05-10 | No data | MACOMBS PLACE, FROM STREET WEST 154 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp in the NW2 corner quadrant non Ada compliant, Ramp was measured and collected in prism on 5/10/23. ( curb reveal, roadway gutter flow). |
2023-05-10 | No data | EAST 28 STREET, FROM STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP has been completed |
2023-05-09 | No data | JEROME AVENUE, FROM STREET MT HOPE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR has been issued on new permit X042023089A07 as per Kerry. |
2023-05-08 | No data | 38 STREET, FROM STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SE4 corner quadrant are non Ada compliant. Previously measured and collected in prism on 2/25/23 |
2023-05-05 | No data | BELMONT AVENUE, FROM STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed ramps within the NE3 corner quadrant. Will measure and collect on later date due to active work being done. |
2023-05-05 | No data | TILDEN AVENUE, FROM STREET BEDFORD AVENUE TO STREET EAST 22 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Drop curb (Steel face) found to be in compliance (Sears Parking lot) |
2023-05-05 | No data | GRAND AVENUE, FROM STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. Newly completed tangent ramps in the NW2 corner found not to be ADA compliant. Measured & collected in Prism. Permittee must correct excessive cub reveal & roadway. |
2023-05-05 | No data | ROCKAWAY AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | New sidewalk being installed and sidewalk closed. |
2023-05-04 | No data | JEROME AVENUE, FROM STREET MT HOPE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp in the SW corner quadrant is ADA compliant. Landing area was corrected. Updated Prism on 4/10/23. |
2023-05-03 | No data | EVERGREEN AVENUE, FROM STREET LINDEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the NW2 corner quadrant are Ada compliant. Previously Measured and collected in prism on 4/07/23. |
2023-05-02 | No data | GRAND AVENUE, FROM STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed ramps within the NE3 corner quadrant are non Ada compliant. Measured and collected in prism on 5/2/23. |
2023-05-02 | No data | EAST 140 STREET, FROM STREET GRAND CONCOURSE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No new work done in the S6 Median, permit expired. |
2023-05-01 | No data | DIKEMAN STREET, FROM STREET CONOVER STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk installed around new building construction |
2023-04-30 | No data | LEFFERTS AVENUE, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w installed |
2023-04-30 | No data | MARCY AVENUE, FROM STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed single ramp in the SE4 corner quadrant non Ada compliant , Ramp was measured and collected in prism on 1/25/23 ( gutter flow slopes ) |
2023-04-30 | No data | NORTH 1 STREET, FROM STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed ramps within the SE4 corner quadrant seems to completed, will measure and collect on a later date due to heavy rain. |
2023-04-30 | No data | GRAND STREET, FROM STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed ramps within the NW2 corner quadrant are Ada compliant. Measured and collected in prism on 4/30/23. |
2023-04-28 | No data | CLINTON STREET, FROM STREET BROOME STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk repairs made in front of 145. |
2023-04-26 | No data | MONTROSE AVENUE, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flags. |
2023-04-26 | No data | GERRY STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | W OF RDWY 33FT, W MILLED 22FT, L MILLED 36FT, D MILLED 3 INCHES. |
2023-04-24 | No data | MIDDLETON STREET, FROM STREET HARRISON AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flags. |
2023-04-23 | No data | SULLIVAN PLACE, FROM STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | bpp completed withi intersection in front of 1 Sulivan place |
2023-04-22 | No data | BEDFORD AVENUE, FROM STREET BREVOORT PLACE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Contractors BPP roadway restoration found in compliance |
2023-04-22 | No data | BEDFORD AVENUE, FROM STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Contractors BPP roadway restoration is found to be in compliance |
2023-04-21 | No data | HURON STREET, FROM STREET MANHATTAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Please issue CAR on new permit B042023006A03 |
2023-04-21 | No data | FLATBUSH AVENUE, FROM STREET EAST 28 STREET TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp sealed and in compliance |
2023-04-21 | No data | JEROME AVENUE, FROM STREET MT HOPE PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | area has been reconstructed, please pass out and issue new CAR on new permit X042023089A07 |
2023-04-20 | No data | CHRISTOPHER AVENUE, FROM STREET LIBERTY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permittee failed to correct excessive landing cross slope in the NW2 corner. M&C in Prism on 11/7/22. |
2023-04-20 | No data | SOUTH 5 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flags in front of 155. |
2023-04-20 | No data | SOUTH 4 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flags. |
2023-04-20 | No data | LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permittee correct defects. Ramp on Livonia was reconstructed and remeasured in Prim and found to be ADA compliant. Newer permit B042022340A03 on file |
2023-04-17 | No data | BUSHWICK AVENUE, FROM STREET KOSSUTH PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved for BPP |
2023-04-17 | No data | WASHINGTON AVENUE, FROM STREET NYCTA SUBWAY TO STREET SULLIVAN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | bpp completed on roadway in front of 1 sulivan place |
2023-04-17 | No data | BUSHWICK AVENUE, FROM STREET HIMROD STREET TO STREET KOSSUTH PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cement face curb |
2023-04-14 | No data | HOPE STREET, FROM STREET BEND TO STREET KEAP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW flags installed In compliance |
2023-04-14 | No data | JEROME AVENUE, FROM STREET MT HOPE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SE4 corner quadrant are ada compliant, Ramps was previously measured and collected in prism on 2/6/23 & update on 4/10/23. |
2023-04-14 | No data | NOSTRAND AVENUE, FROM STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps in the NW2 corner found to be ADA compliant. Previously Measured & collected in Prism on 12/6/22 and re measured on 2/22/23 due to changes on the landing. Newer permit on file B042023006A05 |
2023-04-14 | No data | LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permittee obtained permit B042022340A02 and reconstructed ramp on Van Sinderen and excessive ramp ADA compliant in the NW2 corner, |
2023-04-14 | No data | KEAP STREET, FROM STREET GRAND STREET TO STREET HOPE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | DW flags installed, in compliance |
2023-04-13 | No data | EAST 140 STREET, FROM STREET GRAND CONCOURSE | No data | Street Construction Inspections: Active | Department of Transportation | No new work done in the S6 medium, permit still active . |
2023-04-13 | No data | EAST 22 STREET, FROM STREET DURYEA PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permittee obtained a new permit # B042023080A27 for the partially completed tangent ramps in the NW2 corner. Permittee must restore ramps as per H-1011-1 standard details. |
2023-04-11 | No data | HOPE STREET, FROM STREET RODNEY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Exp permit on file. Completed single ramp in the SE4 corner found not to be ADA compliant. Previously Measured & collected in Prism on 12/27/22. |
2023-04-11 | No data | EAST 140 STREET, FROM STREET GRAND CONCOURSE | No data | Street Construction Inspections: Active | Department of Transportation | No new work done in the SE4 corner quadrant, permit still active. |
2023-04-11 | No data | GRAND CONCOURSE, FROM STREET MDE NORTHBOUND EXIT 3 TO STREET EAST 138 STREET | No data | Street Construction Inspections: Active | Department of Transportation | In compliance |
2023-04-11 | No data | HURON STREET, FROM STREET MANHATTAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps within NW2 corner quadrant are non Ada compliant, however, previously measured and collected in prism on 10/27/22 and re-measured on 4/11/23. Ramps are now ada compliant. Newer permit B042023006A02 on file |
2023-04-10 | No data | JEROME AVENUE, FROM STREET MT HOPE PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | New permit #X042023089A06 for SW corner. Landing area was corrected. Updated Prism on 4/10/23. |
2023-04-08 | No data | 12 AVENUE, FROM STREET 57 STREET TO STREET 58 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done in compliance |
2023-04-07 | No data | EVERGREEN AVENUE, FROM STREET LINDEN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly Completed tangent ramps in the NW2 corner quadrant are ADA compliant. Ramps was measured and collected in Prism on 4/7/23. Newer active permit B042023075A12 on file |
2023-04-07 | No data | EVERGREEN AVENUE, FROM STREET LINDEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SW1 corner quadrant are Non ADA compliant. Ramps was previously measured and collected in Prism on 10/5/20. Re-measured as non ada compliant 4/7/23. Newer active permit B042023075A11 on file |
2023-04-07 | No data | FRONT STREET, FROM STREET BRIDGE STREET TO STREET GOLD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved by BPP. Property AKA 68 Gold St. |
2023-04-07 | No data | FRONT STREET, FROM STREET GOLD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved by BPP. Active DDC work being done. |
2023-04-04 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb replaced in front of 1089 President street |
2023-04-04 | No data | NOSTRAND AVENUE, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | BPP inspected. Length 34' 5" Before Milling width 43' after milling 27' Depth 3". Foreman on site |
2023-04-03 | No data | KOSSUTH PLACE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved by BPP |
2023-04-02 | No data | MACOMBS PLACE, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk in compliance |
2023-04-02 | No data | WEST 154 STREET, FROM STREET 8 AVENUE TO STREET MACOMBS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags in compliance |
2023-04-01 | No data | CROTONA AVENUE, FROM STREET EAST 187 STREET TO STREET EAST 189 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk and curb in compliance |
2023-03-31 | No data | 4 STREET, FROM STREET 26 AVENUE TO STREET 27 AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Respondent actively excavating the sidewalk in front og 26-12 4th Street without a permit on file to do so. |
2023-03-30 | No data | FLATBUSH AVENUE, FROM STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent single tangent ramp within the NE3 corner quadrant is ada compliant. Previously Measured and collected in prism on 3/16/23 and updated on 3/30/23. |
2023-03-29 | No data | MACOMBS PLACE, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway clear |
2023-03-29 | No data | LEFFERTS AVENUE, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP was inspected. Length 58' Width 45' Depth 2.5" before reaching the concrete base. Foreman on site |
2023-03-29 | No data | WEST 154 STREET, FROM STREET 8 AVENUE TO STREET MACOMBS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk clear |
2023-03-29 | No data | KENT AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed |
2023-03-28 | No data | FRANKLIN AVENUE, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP complete Curb to Curb- 40ftLength- 36ftWidth: 25.7ftDepth: 3 inches |
2023-03-27 | No data | EAST 28 STREET, FROM STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed Single tangent ramp in the NE3 corner quadrant is ada compliant. Measured and collected in prism on 3/27/23. |
2023-03-27 | No data | FLATBUSH AVENUE, FROM STREET EAST 28 STREET TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Location:1457 Flatbush Avenue Permit: B012023079B79, B012023079B80, & B012023079B81Width of Roadway: 63’Width of milled area: 36’Length of milled area: 172’Depth of milled area:3” |
2023-03-27 | No data | EAST 28 STREET, FROM STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Location:1457 Flatbush Avenue Permit: B012023079B79, B012023079B80, & B012023079B81Width of Roadway: 63’Width of milled area: 36’Length of milled area: 172’Depth of milled area:3” |
2023-03-26 | No data | 38 STREET, FROM STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Completed tangent ramps in the SE4 corner quadrant are non Ada compliant. Previously measured and collected in prism on 2/25/23 |
2023-03-26 | No data | WASHINGTON AVENUE, FROM STREET NYCTA SUBWAY TO STREET SULLIVAN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb replaced in front of 1Sulivan place |
2023-03-24 | No data | DURYEA PLACE, FROM STREET EAST 22 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed single tangent ramp in the NE3 corner quadrant are non Ada compliant. Measured and collected in prism on 3/24/23. |
2023-03-23 | No data | FLATBUSH AVENUE, FROM STREET EAST 28 STREET TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW STEEL FACE CURB INSTALLED FOR NEW SIDEWALK |
2023-03-21 | No data | EVERGREEN AVENUE, FROM STREET LINDEN STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. Newly completed tangent ramps in the SW1 corner are functional & accessible unable to measure due to barricades around ramps. We’ll measure & reinspect at a later date. |
2023-03-20 | No data | CONVENT AVENUE, FROM STREET WEST 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Ramps were previously upgraded by OLIVEIRA CONTRACTING under contract HWPR19M |
2023-03-18 | No data | CONOVER STREET, FROM STREET DIKEMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps within the SW1 corner quadrant seem to be non ada compliant. Will measure and collect when completed, ramp covered at the time of inspection. |
2023-03-18 | No data | MARCY AVENUE, FROM STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed single ramp in the SE4 corner quadrant non Ada compliant , Ramp was measured and collected in prism on 1/25/23 ( landing running slopes active permit on file.. ) |
2023-03-17 | No data | TAAFFE PLACE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joint was sealed |
2023-03-17 | No data | 13 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | All expansion joints, in sidewalk flags and at the curb, were sealed. Condition corrected, pass. |
2023-03-16 | No data | SULLIVAN PLACE, FROM STREET FRANKLIN AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP complete Curb to Curb- 33ftLength- 142ftWidth- 22.5ft Depth- 3.5inches |
2023-03-16 | No data | FLATBUSH AVENUE, FROM STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. Newly completed tangent ramps in the NW2 corner found to be ADA compliant. Measured & collected in Prism on 3/16/23. Permittee must remove plastic off DWS and properly score corner. |
2023-03-16 | No data | FLATBUSH AVENUE, FROM STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Duplicate permit on file. No work started. Active Permit # B042023054A08 obtained for newly completed work done in NW2 corner. |
2023-03-16 | No data | SULLIVAN PLACE, FROM STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner found not to be ADA compliant due to not being able to measure roadway at this time. Zeros are being placed in prism we’ll return to accurately input slope measurements when paving is completed. |
2023-03-16 | No data | WEST 150 STREET, FROM STREET AMSTERDAM AVENUE TO STREET CONVENT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Inspection for PedRamp use. Ramp work done |
2023-03-16 | No data | CONVENT AVENUE, FROM STREET WEST 150 STREET TO STREET WEST 151 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Inspection for PedRamp use. ramp work done |
2023-03-15 | No data | LORIMER STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway was paved. BPP. |
2023-03-15 | No data | HARRISON AVENUE, FROM STREET LYNCH STREET TO STREET MIDDLETON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved. |
2023-03-13 | No data | SULLIVAN PLACE, FROM STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner are functional & accessible. We’ll reinspect at later date due to weather conditions (rain). |
2023-03-11 | No data | FLATBUSH AVENUE, FROM STREET EAST 28 STREET TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb in compliance |
2023-03-11 | No data | 86 STREET, FROM STREET 5 AVENUE TO STREET GELSTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk occupancy acceptable |
2023-03-11 | No data | VERNON AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP is in compliance |
2023-03-09 | No data | SULLIVAN PLACE, FROM STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Duplicate permit on file. Action taken on permit # B042022108A04 For the SE4 corner. |
2023-03-09 | No data | BERRIMAN STREET, FROM STREET LINDEN BOULEVARD TO STREET STANLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP in compliance. Perm in roadway |
2023-03-09 | No data | ATLANTIC AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work completed on roadway in front of 963 Atlantic avenue |
2023-03-08 | No data | HOPE STREET, FROM STREET KEAP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SW1 corner found to be ADA compliant. Measured & collected in Prism on 2/20/23. |
2023-03-08 | No data | HURON STREET, FROM STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SE4 corner found not to be ADA compliant. Measured & collected in Prism on 10/5/22. Open CAR on permit #B042022271A01. |
2023-03-03 | No data | BUSHWICK AVENUE, FROM STREET KOSSUTH PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SW1 corner found to be ADA compliant. Measured & collected in Prism on 1/24/23. Concrete patch repaired at this time. |
2023-03-02 | No data | HOPE STREET, FROM STREET RODNEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW resurfaced by BPP |
2023-03-02 | No data | HOPE STREET, FROM STREET BQE EASTBOUND EXIT 32 TO STREET KEAP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW flags installed, In compliance |
2023-03-02 | No data | HURON STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved. |
2023-03-02 | No data | BEACH 96 STREET, FROM STREET ROCKAWAY BEACH BOULEVARD TO STREET WOODROW COTTAGES | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed and acceptable, Curb to curb - 27' 7" , milled - 20' 1" x 62' 2" , depth - 3". |
2023-03-02 | No data | MACOMBS PLACE, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk in compliance |
2023-03-02 | No data | RODNEY STREET, FROM STREET AINSLIE STREET TO STREET HOPE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced by BPP |
2023-03-01 | No data | BERRIMAN STREET, FROM STREET LINDEN BOULEVARD TO STREET STANLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Metal curb and drop curb install IFO 616, sealed. In compliance |
2023-03-01 | No data | HOPE STREET, FROM STREET KEAP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Intersection paved by BPP |
2023-03-01 | No data | KEAP STREET, FROM STREET AINSLIE STREET TO STREET HOPE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved by BPP for property |
2023-02-28 | No data | 86 STREET, FROM STREET 5 AVENUE TO STREET GELSTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no active work on going |
2023-02-28 | No data | BEACH 96 STREET, FROM STREET ROCKAWAY BEACH BOULEVARD TO STREET WOODROW COTTAGES | No data | Street Construction Inspections: Active | Department of Transportation | Temporary pedestrian walkway is clear and is in compliance at this time of inspection. |
2023-02-27 | No data | FLATBUSH AVENUE, FROM STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Work started in the NW2 corner quadrant, open broken corner quadrant. |
2023-02-27 | No data | EAST 28 STREET, FROM STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started in the SE4 corner quadrant at the time of inspection. |
2023-02-26 | No data | MACOMBS PLACE, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET | No data | Street Construction Inspections: Active | Department of Transportation | The above respondent has a temporary walk way in front of 101 macombs place. The respondent failed to provide or place a ramp at entry as stated in stipulation (014) for handicap accessibility. |
2023-02-26 | No data | THOMSON AVENUE, FROM STREET 44 DRIVE TO STREET QNSBO BR UP RY APPROACH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP flush to grade in the roadway. |
2023-02-25 | No data | GERRY STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Barricades in parking lane, No BPP paving work started at the time of inspection. |
2023-02-25 | No data | 38 STREET, FROM STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SE4 corner quadrant is non ada compliant. Previously measured and collected in prism on 2/6/23. scoring within quadrant was done , high slopes. |
2023-02-24 | No data | MACOMBS PLACE, FROM STREET WEST 154 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active construction. Ramps located behind barriers |
2023-02-24 | No data | SULLIVAN PLACE, FROM STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. Newly completed single ramp in the NW2 corner found to be ADA compliant. Measured & collected in Prism on 2/24/23. Permittee must remove concrete restoration near ramp which not an acceptable pavement key. |
2023-02-22 | No data | MACOMBS PLACE, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active crew on site |
2023-02-22 | No data | NOSTRAND AVENUE, FROM STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the NW2 corner found to be ADA compliant. Measured & collected in Prism on 12/6/22 and re measured on 2/22/23 due to changes on the landing. |
2023-02-22 | No data | WEST 154 STREET, FROM STREET 8 AVENUE TO STREET MACOMBS PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Active crew on site |
2023-02-20 | No data | HOPE STREET, FROM STREET KEAP STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. Newly completed tangent ramps in the SW1 corner found to be ADA compliant. Measured & collected in Prism on 2/20/23. |
2023-02-16 | No data | KOSSUTH PLACE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | B012023045A56 W OF RDWY 30FT, W MILLED 20FT, L MILLED 114FT,D MILLED 3 INCHES. |
2023-02-16 | No data | BUSHWICK AVENUE, FROM STREET KOSSUTH PLACE | No data | Street Construction Inspections: Active | Department of Transportation | B012023045A57 INTERSECTION 44FT X 30FT, INTERSECTION MILLED 28FT X 20FT, D 3 INCHES. |
2023-02-16 | No data | BUSHWICK AVENUE, FROM STREET HIMROD STREET TO STREET KOSSUTH PLACE | No data | Street Construction Inspections: Active | Department of Transportation | B012023045A55 W OF RDWY 42FT, W MILLED 26FT, L MILLED 64FT,D MILLED 3 INCHES. |
2023-02-16 | No data | ATLANTIC AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB REPLACED IN FRONT OF 963 ATLANTIC AVENUE |
2023-02-15 | No data | HERKIMER STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP COMPLETED ON ROADWAY FOR NEW BULDING AKA 1259 BEDFORD AVENUE |
2023-02-15 | No data | BUSHWICK AVENUE, FROM STREET HIMROD STREET TO STREET KOSSUTH PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Crew still on site, machine are away. Making corner quad safe for wheelchair access |
2023-02-14 | No data | WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done under M012021291A00. |
2023-02-14 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP completed on roadway in front of 1089 President street |
2023-02-11 | No data | LEWIS AVENUE, FROM STREET BROADWAY TO STREET STOCKTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESEAL THE PERM RESTORATION IFO PROPERTY #11. |
2023-02-10 | No data | ATLANTIC AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Width of Roadway: 50 feetWidth of milled area: 30 feetLength of milled area: 178 feetDepth of milled area: 3 inchesIn compliance with required BPP measurements, pass. |
2023-02-09 | No data | LEWIS AVENUE, FROM STREET BROADWAY TO STREET STOCKTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb not replaced |
2023-02-08 | No data | 188 STREET, FROM STREET 48 AVENUE TO STREET 50 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP to grade |
2023-02-07 | No data | MARCY AVENUE, FROM STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved. |
2023-02-07 | No data | METROPOLITAN AVENUE, FROM STREET MARCY AVENUE TO STREET NORTH 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved. |
2023-02-07 | No data | LINDEN STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW paved by BPP |
2023-02-07 | No data | METROPOLITAN AVENUE, FROM STREET HAVEMEYER STREET TO STREET NORTH 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed. |
2023-02-07 | No data | LIVONIA AVENUE, FROM STREET PEDESTRIAN OVERPASS TO STREET SNEDIKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK DONE UNDER THIS PERMIT |
2023-02-07 | No data | MARCY AVENUE, FROM STREET HOPE STREET TO STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed. |
2023-02-06 | No data | 38 STREET, FROM STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps within the SW1 corner quadrant is non ada compliant. Measured and collected in prism on 2/6/23. High curb reveal |
2023-02-06 | No data | JEROME AVENUE, FROM STREET MT HOPE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SE4 corner quadrant non Ada compliant, Ramps was measured and collected in prism on 2/6/23 ( landing cross slopes). |
2023-02-03 | No data | HURON STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Width of Roadway:30’Width of milled area:20’Length of milled area:116’Depth of milled area:3’ |
2023-02-02 | No data | EAGLE AVENUE, FROM STREET EAST 149 STREET TO STREET TERRACE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk in compliance |
2023-02-02 | No data | 12 AVENUE, FROM STREET 57 STREET TO STREET 58 STREET | No data | Street Construction Inspections: Active | Department of Transportation | The BPP was done in compliance with DOT Specs. |
2023-02-02 | No data | MARCY AVENUE, FROM STREET VERNON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP complete Curb to curb- 40ftLength- 41.5ftWidth- 23ftDepth- 3.5 inches |
2023-02-02 | No data | WILLOUGHBY AVENUE, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed |
2023-02-02 | No data | MARCY AVENUE, FROM STREET MYRTLE AVENUE TO STREET VERNON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP complete Curb to curb- 40ftLength- 42ftWidth: 23ftDepth: 3.5inches |
2023-02-02 | No data | VERNON AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP complete Curb to curb- 30ft Length- 140ft Width- 22ftDepth- 3.5inches |
2023-02-01 | No data | KENT AVENUE, FROM STREET METROPOLITAN AVENUE TO STREET NORTH 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved. |
2023-02-01 | No data | KENT AVENUE, FROM STREET NORTH 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved. |
2023-01-31 | No data | EVERGREEN AVENUE, FROM STREET LINDEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the NW2 corner quadrant are Non ADA compliant. Ramps was previously measured and collected in Prism on 10/5/20.( left flare slopes) |
2023-01-31 | No data | 86 STREET, FROM STREET 5 AVENUE TO STREET GELSTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp walkway |
2023-01-30 | No data | BERRIMAN STREET, FROM STREET LINDEN BOULEVARD TO STREET STANLEY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP in compliance - - Milled W22ft of 33ft of roadway W31ft D3in - - Pave work to be done later today. |
2023-01-30 | No data | EAST 22 STREET, FROM STREET DURYEA PLACE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Respondent constructed landing area of previously constructed pedestrian ramps within the northwest corner without a valid 410 Pedestrian Ramp Modify/Install permit on file. Rejected application #2022100600439963 for work used for ID only, no permit |
2023-01-29 | No data | 60 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP final restoration acceptable |
2023-01-28 | No data | MYRTLE AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP is in compliance |
2023-01-28 | No data | CONEY ISLAND AVENUE, FROM STREET FOSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp paved an in compliance |
2023-01-28 | No data | WILLOUGHBY AVENUE, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP is in compliance |
2023-01-28 | No data | CONEY ISLAND AVENUE, FROM STREET FOSTER AVENUE TO STREET PARKVILLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp sealed and in compliance |
2023-01-28 | No data | FOSTER AVENUE, FROM STREET CONEY ISLAND AVENUE TO STREET CORBIN COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street has been paved in compliance |
2023-01-27 | No data | EAST 31 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Active | Department of Transportation | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT |
2023-01-27 | No data | EAST 31 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Complaint | Department of Transportation | - OCCUPANCY OF SIDEWALK AS STIPULATED: At time of inspection CENTRAL CONCRETE INC. have active permits. the sidewalk was clear of debris. No action taken. |
2023-01-27 | No data | EAST 28 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP was done |
2023-01-26 | No data | METROPOLITAN AVENUE, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street paved. AKA 187 Kent Ave. |
2023-01-25 | No data | MARCY AVENUE, FROM STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp in the SE4 corner quadrant non Ada compliant , Ramp was measured and collected in prism on 1/25/23 ( landing running slopes. ) |
2023-01-24 | No data | BUSHWICK AVENUE, FROM STREET KOSSUTH PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps within the SW1 corner quadrant are Ada compliant. Measured and collected in prism on 1/24/23. |
2023-01-24 | No data | CLARKSON AVENUE, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP was done |
2023-01-22 | No data | RODNEY STREET, FROM STREET AINSLIE STREET TO STREET HOPE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB RESET ON THE SIDE OF PROPERTY #130 HOPE ST. |
2023-01-21 | No data | HOPE STREET, FROM STREET BQE EASTBOUND EXIT 32 TO STREET KEAP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB RESET |
2023-01-20 | No data | FT HAMILTON PARKWAY, FROM STREET 38 STREET TO STREET 39 STREET | No data | Street Construction Inspections: Active | Department of Transportation | FULL SIDEWALK EXCAVATED WITH PROTECTED PEDESTRIAN WALKWAY IN ROADWAY IN COMPLIANCE WITH DOT PERMIT STIPULATIONS |
2023-01-19 | No data | NOSTRAND AVENUE, FROM STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. Newly completed tangent ramps in the NW2 corner found not to be ADA compliant. Measured & collected in Prism on 12/6/22. Open Car on file permit # B042022306A02. |
2023-01-19 | No data | HURON STREET, FROM STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. Newly completed tangent ramps in the NW2 corner found not to be ADA compliant. Measured & collected in Prism on 10/27/22.Open CAR on permit # B042022271A02. Excessive curb reveal & landing slopes remain. |
2023-01-19 | No data | HOPE STREET, FROM STREET RODNEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Exp permit on file. Completed single ramp in the SE4 corner found not to be ADA compliant. Measured & collected in Prism on 12/27/22. |
2023-01-17 | No data | FAIRMOUNT PLACE, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started at time of inspection |
2023-01-17 | No data | GATES AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP is in compliance |
2023-01-17 | No data | LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the SE4 corner quadrant was found to be non ADA compliant. Previously measured in prism on 6/16/22 updated on 1/17/23. |
2023-01-12 | No data | LEWIS AVENUE, FROM STREET BROADWAY TO STREET STOCKTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | W OF RDWY: 50FT, W MILLED: 30FT, L MILLED: 40FT, D MILLED: 3 INCHES |
2023-01-12 | No data | CHRISTOPHER AVENUE, FROM STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP in compliance. Perm in roadway intersection. |
2023-01-11 | No data | ERASMUS STREET, FROM STREET LLOYD STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP was done |
2023-01-11 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | respondent currently had full width of roadway closed off to all vehicular traffic, failing to comply with 023 stipulation: having one 11 foot lane open |
2023-01-10 | No data | ROGERS AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP was done |
2023-01-10 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Width of roadway:34 feet Property line to property lin:284 feetMilled portion: 17+5=22Depth of roadway:3 inches |
2023-01-10 | No data | UNION STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Width of roadway:34 feet Property line to property lin:132 feetMilled portion: 17+5=22 feetDepth of roadway:3 inches |
2023-01-08 | No data | NOSTRAND AVENUE, FROM STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found |
2023-01-08 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP was done |
2023-01-08 | No data | NOSTRAND AVENUE, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP is in compliance |
2023-01-08 | No data | SANDFORD STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed |
2023-01-08 | No data | LENOX ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | DOT paved the segment |
2023-01-08 | No data | DE KALB AVENUE, FROM STREET BROADWAY TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | LANE MARKING RESTORED ON THE 1/2 + 5 PERM RESTORATION. |
2023-01-06 | No data | RUTLAND ROAD, FROM STREET ALBANY AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP was done |
2023-01-06 | No data | JOHNSON AVENUE, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb installed. |
2023-01-06 | No data | MILLER AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY PAVED HALF +5 |
2023-01-05 | No data | LIBERTY AVENUE, FROM STREET CHRISTOPHER AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP in roadway. Half plus five in compliance. |
2023-01-05 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP was done |
2023-01-02 | No data | NOSTRAND AVENUE, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB RESET |
2022-12-29 | No data | LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner found to be ADA compliant. Only the ramp on Van Sinderen was upgraded and remeasured to correct excessive slopes and change ramp location. Measured & collected in Prism on 12/29/22. |
2022-12-27 | No data | HOPE STREET, FROM STREET RODNEY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. Newly completed single ramp in the SE4 corner found not to be ADA compliant due to inability to measure complete ramps.Roadway & Curb Reveal. Measured & collected in Prism 12/27/22. |
2022-12-25 | No data | ROGERS AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb replaced in front of 1173 Rogers avenue |
2022-12-23 | No data | LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. Newly completed tangents ramps in the SE4 previously measured & collected in Prism. Reconstruction of ramp on (Livonia Ave) remeasured& after completion found ADA compliant. Also added a new upgrade to prism for the new work. |
2022-12-21 | No data | MARCY AVENUE, FROM STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Width of Roadway:46’Width of milled area:28’Length of milled area:28’Depth of milled area:3’ |
2022-12-21 | No data | MARCY AVENUE, FROM STREET HOPE STREET TO STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Width of Roadway:34’Width of milled area:22’Length of milled area:198’Depth of milled area:3’ |
2022-12-21 | No data | METROPOLITAN AVENUE, FROM STREET MARCY AVENUE TO STREET NORTH 5 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Width of Roadway:46’Width of milled area:28’Length of milled area:161’Depth of milled area:3’ |
2022-12-21 | No data | NEW YORK AVENUE, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Width of roadway: 40 feetProperty line to property line:50 feetMilled portion of roadway:25 feetDepth of roadway:3 inches |
2022-12-20 | No data | 56 STREET, FROM STREET 13 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | atpo i observed above respondent has jersey barriers on the roadway without an active DOT permit on file. permit on file expired on 12/29/20 and used for id only |
2022-12-19 | No data | CLYMER STREET, FROM STREET BEDFORD AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | Width of Roadway:33’Width of milled area:21Length of milled area:59’Depth of milled area:3’ |
2022-12-15 | No data | JEROME AVENUE, FROM STREET MT HOPE PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No ped ramp work started in the NE corner quadrant at time of inspection. |
2022-12-14 | No data | 13 AVENUE, FROM STREET 48 STREET TO STREET 49 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb reset and acceptable |
2022-12-14 | No data | GRAND STREET, FROM STREET WYTHE AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | No 411 permit on file. Partial permanent concrete restoration in the NW2. Old existing ramp is functional & accessible. We’ll measure and reinspect when ramp is completed. |
2022-12-13 | No data | TROY AVENUE, FROM STREET FENIMORE STREET TO STREET HAWTHORNE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB RESET IN FRONT OF 594 TROY AVENUE |
2022-12-13 | No data | MARCY AVENUE, FROM STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. Permittee is breaking up corner and preparation for the ped ramp reconstruction in the NW2 corner. Barricades are surrounding broken corner at this time. |
2022-12-12 | No data | LIBERTY AVENUE, FROM STREET CHRISTOPHER AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | pass, all lane markings restored ....n/w/c ... |
2022-12-12 | No data | CHRISTOPHER AVENUE, FROM STREET EAST NEW YORK AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | pass, all lane markings restored .... |
2022-12-06 | No data | CHRISTOPHER AVENUE, FROM STREET EAST NEW YORK AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 116x20x3" milled out ,due to bpp all lines to be restored the next business day weather permitting. |
2022-12-06 | No data | LIBERTY AVENUE, FROM STREET CHRISTOPHER AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | pass, street fully milled out .. 88x25x3" n/w/c ....due to bpp.... |
2022-12-06 | No data | WYTHE AVENUE, FROM STREET GRAND STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | No 411 permit on file. Newly completed tangent ramps in the SW1 corner are functional and accessible. We’ll measure and reinspect at a later date due to weather (rain). |
2022-12-06 | No data | NOSTRAND AVENUE, FROM STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SW1 corner found to be ADA compliant. Measured & collected in Prism on 12/6/22. |
2022-12-04 | No data | THOMSON AVENUE, FROM STREET 44 DRIVE TO STREET QNSBO BR UP RY APPROACH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel face curb installed. |
2022-12-02 | No data | 8 STREET, FROM STREET MAIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the SW1 corner quadrant was found to be non ADA compliant. Ramps are functional and accessible, measured in prism on 12/2/2022. |
2022-12-01 | No data | MT HOPE PLACE, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Crew on site, Ped ramp underway, NoV issued for failing to provide protected walkway |
2022-12-01 | No data | JEROME AVENUE, FROM STREET MT HOPE PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site, no walkway for pedestrians. nOV issued. |
2022-12-01 | No data | MT HOPE PLACE, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | crew on site, working without DOT permit. |
2022-11-29 | No data | HANCOCK STREET, FROM STREET CYPRESS AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 143' x 20' x 3" area milled within the parking/driving lane at 1711 Hancock Street |
2022-11-29 | No data | 13 AVENUE, FROM STREET 56 STREET TO STREET 57 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | atpo i observed above respondent has jersey barriers on the roadway without an active DOT permit on file. permit on file expired on 1/8/21 and used for id only |
2022-11-29 | No data | LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Condition repaired. Work was completed by the MTA as per Kerry. |
2022-11-28 | No data | 8 STREET, FROM STREET MAIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | The below BPP is completed and acceptable. Curb to Curb width – 45’, Milled area – 28’ x 35, Depth of milled area – 3”, ½ +5’ milled (yes/no) – Yes, Waiver (yes/no)- No. |
2022-11-28 | No data | LIBERTY AVENUE, FROM STREET CHRISTOPHER AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDE WALK FLAGS INSTALLED AND SEALED |
2022-11-28 | No data | WELLING COURT, FROM STREET 8 STREET TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | The below BPP is completed and acceptable. Curb to Curb width – 30’, Milled area – 20’ x 77, Depth of milled area – 3”, ½ +5’ milled (yes/no) – Yes, Waiver (yes/no)- No. |
2022-11-28 | No data | MAIN AVENUE, FROM STREET 8 STREET TO STREET 30 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | The below BPP is completed and acceptable. Curb to Curb width – 45’, Milled area – 28’ x 161, Depth of milled area – 3”, ½ +5’ milled (yes/no) – Yes, Waiver (yes/no)- No. |
2022-11-26 | No data | 13 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joints need to be sealed ifo 348 13th St |
2022-11-26 | No data | LIBERTY AVENUE, FROM STREET CHRISTOPHER AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | EXPANSION JOINTS ARE SEALED |
2022-11-23 | No data | DURYEA PLACE, FROM STREET EAST 22 STREET TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb replaced in front of 21 Duryea place |
2022-11-22 | No data | TAAFFE PLACE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New steel face curb installed |
2022-11-22 | No data | TAAFFE PLACE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | W OF RDWY 23FT, W MILLED 20FT, L MILLED 46FT, D MILLED 3.5in. |
2022-11-21 | No data | 13 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk expansion joint not seal |
2022-11-18 | No data | ROGERS AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Full roadway width 44’0CutL38’0 W28’0 D0’3 |
2022-11-17 | No data | PURVIS STREET, FROM STREET DEAD END TO STREET JACKSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel face curb installed in front of 44-46. |
2022-11-16 | No data | BEDFORD AVENUE, FROM STREET CLYMER STREET TO STREET TAYLOR STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new curb reset |
2022-11-15 | No data | TAAFFE PLACE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT WAS ACTIVELY MILLING THE ROADWAY AT 2:40PM ON TUESDAY. RESPONDENT VIOLATED STIPULANTION #083 WORK 9AM -2PM MON - FRI. ID BY PERMIT #B012022319B16 EXPIRES 11/20/2022. |
2022-11-14 | No data | NOSTRAND AVENUE, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Roadway measures 40 feet from curb to curb. Contractor has milled 25 feet, of the roadway, adjacent to the property, with a length of 185 feet, and a depth of 3 inches. In compliance with required BPP measurements. |
2022-11-14 | No data | LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | work completed by MTA |
2022-11-14 | No data | WILLOUGHBY AVENUE, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET | No data | Street Construction Inspections: Active | Department of Transportation | Roadway measures 34 feet from curb to curb. Contractor has milled 22 feet, of the roadway, adjacent to the property, with a length of 140 feet, and a depth of 3 inches. In compliance with required BPP measurements. |
2022-11-14 | No data | NOSTRAND AVENUE, FROM STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Contractor has milled the intersection in line with both adjacent segments and a depth of 3 inches. In compliance with required BPP measurements. |
2022-11-11 | No data | DURYEA PLACE, FROM STREET EAST 22 STREET TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Before milling the width of roadway is 29’ 6” Width milled is 20’ Length milled is 65' 8" & Depth is 2.5" before reaching the concrete base. Foreman on site. |
2022-11-08 | No data | EAST 28 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb repaired in front of 485 East 28 street |
2022-11-07 | No data | CHRISTOPHER AVENUE, FROM STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within NW2 are non ada compliant, Measured and collected in prism on 11/07/22. |
2022-11-07 | No data | LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Condition remains the same. We’ll pass this one out and reissue another CAR. |
2022-11-06 | No data | LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Pass out to issue new CAR with language including BPP ramp placement |
2022-11-05 | No data | 46 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk was installed in compliance. |
2022-11-02 | No data | CHRISTOPHER AVENUE, FROM STREET EAST NEW YORK AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL FACED CURB INSTALLED |
2022-10-27 | No data | HURON STREET, FROM STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within NW2 corner quadrant are non Ada compliant, however, Measured and collected in prism on 10/27/22. |
2022-10-22 | No data | PACIFIC STREET, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb installed |
2022-10-20 | No data | LIBERTY AVENUE, FROM STREET CHRISTOPHER AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags missing sealer for expansion joint at curb. |
2022-10-20 | No data | LYNCH STREET, FROM STREET HARRISON AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new sidewalk installed |
2022-10-18 | No data | WILLOUGHBY AVENUE, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB RESET ON THE SIDE OF PROPERTY #184 NOSTRAND AV. |
2022-10-16 | No data | CHRISTOPHER AVENUE, FROM STREET EAST NEW YORK AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb in compliance |
2022-10-15 | No data | STANHOPE STREET, FROM STREET MYRTLE AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed |
2022-10-13 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk restored in kind sealed and flush |
2022-10-11 | No data | LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SW1 corner found not to be ADA compliant. Measured & collected in Prism 9/16/22 |
2022-10-07 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP was inspected. Before milling the width of roadway is 34’ Milling length is 51’ 9” & Width milled is 22’ & Depth is 3". Foreman on site. |
2022-10-07 | No data | EAST 28 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP COMPLETEWidth of the roadway: 29'7Width milled: 20'4Length milled: 47"11Depth milled: 3" |
2022-10-05 | No data | HURON STREET, FROM STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps within the NW2 corner quadrant are non Ada compliant, high curb reveal, no scoring done within quadrant. Ramps are functional and accessible, barricades are in walk-in space. |
2022-10-03 | No data | THOMSON AVENUE, FROM STREET 44 DRIVE TO STREET QNSBO BR UP RY APPROACH | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed and acceptable. • Curb to Curb width – 60’• Milled area – 35’• Depth of milled area – 3’’ |
2022-10-03 | No data | CHRISTOPHER AVENUE, FROM STREET LIBERTY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Open quadrant within the NW2 corner, ramps are not functional and accessible. Will measure and collect when completed properly, active permit on file. |
2022-10-03 | No data | PURVIS STREET, FROM STREET DEAD END TO STREET JACKSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed and acceptable. • Curb to Curb width – 30’• Milled area – 21’• Depth of milled area – 3’’ |
2022-10-03 | No data | LIBERTY AVENUE, FROM STREET CHRISTOPHER AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Fence on swk ok |
2022-10-02 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk open at this time |
2022-09-30 | No data | CLYMER STREET, FROM STREET BEDFORD AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | reset curb |
2022-09-28 | No data | KENT AVENUE, FROM STREET METROPOLITAN AVENUE TO STREET NORTH 3 STREET | No data | Street Construction Inspections: Active | Department of Transportation | W OF RDWY 40FT, W MILLED 25FT, L MIILED 223FT, D MILLED 2.5 in |
2022-09-28 | No data | KENT AVENUE, FROM STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | INTERSECTION L44FT X W 41FT. L MILLED 26FT, W MILLED 25FT, D MILLED 2.5in. |
2022-09-28 | No data | KENT AVENUE, FROM STREET NORTH 3 STREET | No data | Street Construction Inspections: Active | Department of Transportation | INTERSECTION L41FT X W27FT. INTERSECTION MILLED L25FT, W MILLED 21FT. D2.5in. |
2022-09-28 | No data | METROPOLITAN AVENUE, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | W OF RDWY 42FT, W MILLED 25FT, L MILLED 96FT, D MIILED 2.5in. |
2022-09-28 | No data | NORTH 3 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent was actively milling the roadway at 4:05pm on a Wednesday. Respndent violated the 072 stipulation WORK 9AM-4PM, MONDAY TO FRIDAY. Respondent failed to adhere to stipulation 072. ID BY PERMIT B012022268A07 EXPIRES 10/26 |
2022-09-28 | No data | LIVONIA AVENUE, FROM STREET PEDESTRIAN OVERPASS TO STREET SNEDIKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site, in compliance |
2022-09-27 | No data | LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within NE3 corner quadrant are non Ada compliant, however , ramps are functional and accessible. Previously measured and collected in prism on 9/16/22. |
2022-09-22 | No data | MANHATTAN AVENUE, FROM STREET GREEN STREET TO STREET HURON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed. |
2022-09-22 | No data | KENT AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB RESET |
2022-09-20 | No data | WATER STREET, FROM STREET BRIDGE STREET TO STREET GOLD STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew excavating before work hours . |
2022-09-20 | No data | GOLD STREET, FROM STREET FRONT STREET TO STREET WATER STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP complete. Width of roadway 30ft , width of milled area 20 ft, length 221ft, depth 3 inches |
2022-09-18 | No data | NOSTRAND AVENUE, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL FACE CURB INSTALLED IFO PROPERTY #184. |
2022-09-16 | No data | CONVENT AVENUE, FROM STREET WEST 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Ramps were previously upgraded by OLIVEIRA CONTRACTING under contract HWPR19M |
2022-09-16 | No data | LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed single tangent ramp within the SE4 corner quadrant is non ada compliant, however, the ramp is functional and accessible. Measured and collected in prism on 9/16/22. High left flare slope and utility pole needs to be isolated. |
2022-09-14 | No data | LENOX ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Full rw width 35’0Cut size L55’0 W22’0 D0’3 |
2022-09-04 | No data | HURON STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb is in compliance |
2022-08-22 | No data | MANHATTAN AVENUE, FROM STREET GREEN STREET TO STREET HURON STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work has been started at this time. |
2022-08-22 | No data | CONVENT AVENUE, FROM STREET WEST 150 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Ramps were previously upgraded by OLIVEIRA CONTRACTING under contract HWPR19M |
2022-08-21 | No data | AINSLIE STREET, FROM STREET KEAP STREET TO STREET RODNEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed |
2022-08-19 | No data | CONVENT AVENUE, FROM STREET WEST 150 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant are functional and accessible. Non Ada. Measured in prism 8/19/22. |
2022-08-18 | No data | CHRYSTIE STREET, FROM STREET DELANCEY STREET TO STREET RIVINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | *BPP Inspection* I/F/O 173 - 175, existing RW width ( 67'4" ) and milled area to be paved was ( 47'3"L x 39'5"W x 3"D - measured Depth along edges & around access cover within milling ). V&D Paving Corp still milling at time of depart: 10:48am. |
2022-08-16 | No data | ERASMUS STREET, FROM STREET LLOYD STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Location: 153 Erasmus StreetPermit: B01202227A60Width of Roadway: 29ft 9inWidth of milled area: 19ft 11inLength of milled area: 59ft 8inDepth of milled area: 3fin down |
2022-07-08 | No data | MANIDA STREET, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No occupancy of sidewalk |
2022-06-21 | No data | BEDFORD AVENUE, FROM STREET HERKIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | Width of roadway:52 feetProperty line to property line:Milled portion: 31 feetDepth of roadway:3 inches |
2022-06-21 | No data | HERKIMER STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Width of roadway:32 feetProperty line to property line:100 feetMilled portion: 21 feetDepth of roadway:3 inches |
2022-06-21 | No data | BEDFORD AVENUE, FROM STREET BREVOORT PLACE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | Width of roadway:54 feetProperty line to property line:62 feetMilled portion: 32 feetDepth of roadway:3 inches |
2022-06-13 | No data | ERASMUS STREET, FROM STREET LLOYD STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Location:156 Erasmus Street Permit: B012022163A00Width of Roadway:30’ Width of milled area: 20’Length of milled area: 58’Depth of milled area: 3” |
2022-06-07 | No data | MYRTLE AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ROADWAY W41FT, MILLED W26FT, MILLED L180FT, MILLED D3in IFO PROPERTY #859. |
2022-05-27 | No data | CLARKSON AVENUE, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Full RW width 38'0Cut size:: L110'9 W24'2 D0'3 1/4 |
2022-05-03 | No data | 21 STREET, FROM STREET 31 AVENUE TO STREET 31 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed and acceptable in front of 31-05. Office was notified prior to the commencement of paving. Curb to curb - 59' 10", milled - 60' 2" x 35' 1", depth - N/A. |
2022-05-02 | No data | 21 STREET, FROM STREET 31 AVENUE TO STREET 31 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent CENTRAL CONCRETE INC failed to comply with terms & conditions of specific stipulation, during WORK-HOURS, flag personnel shall be provided at each end of the work-zone to direct vehicular traffic. Nov issued |
2022-05-02 | No data | 13 AVENUE, FROM STREET 42 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SW1 corner quadrant non Ada compliant ramps are accessible and functional. Measured and collected in Prism on 10/12/21.( gutter flow slope , right flare slope ). |
2022-04-27 | No data | SUMNER PLACE, FROM STREET BROADWAY TO STREET FLUSHING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk restored in kind sealed and flush. |
2022-04-21 | No data | 55 STREET, FROM STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Issues with pavement key resolved. Completed single ramp in the SW1 corner quad is accessible and functional but not ADA compliant. Previously measured and collected on 9/30/20 in Prism. |
2022-04-13 | No data | BROADWAY, FROM STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Pavement key was installed. |
2022-04-11 | No data | 16 AVENUE, FROM STREET 46 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR issues resolved corner has been sealed. Newly completed tangent ramps within the NW2 corner quadrant are non Ada compliant, however, ramps are functional and accessible. Previously measured and collected in prism on 10/14/21. |
2022-04-09 | No data | CHISHOLM STREET, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Depressed area has been made flush with surrounding restoration. |
2022-03-29 | No data | 55 STREET, FROM STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SE4 corner quadrant are functional and accessible. Non ADA compliant. Measured and collected in Prism on 9/30/20. |
2022-03-21 | No data | CONEY ISLAND AVENUE, FROM STREET FOSTER AVENUE TO STREET PARKVILLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Contractor has milled a 208’x40’ area of roadway to a depth of 3” in compliance, roadway measures to be 70’ wide from curb to curb. |
2022-03-21 | No data | CONEY ISLAND AVENUE, FROM STREET FOSTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Contractor has milled a 42’x28’ area of roadway to a depth of 3” in compliance, Intersection measures to be 73’x45’ in diameter |
2022-03-21 | No data | FOSTER AVENUE, FROM STREET CONEY ISLAND AVENUE TO STREET CORBIN COURT | No data | Street Construction Inspections: Active | Department of Transportation | Contractor has milled a 145’x26’ area of roadway to a depth of 3” in compliance, Roadway measures to be 43’ from curb to curb. |
2022-03-09 | No data | EVERGREEN AVENUE, FROM STREET LINDEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NW2 corner quadrant are functional and accessible. Non ADA compliant. Previously measured and collected in Prism on 10/5/20. |
2022-02-11 | No data | DE KALB AVENUE, FROM STREET BROADWAY TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | UPON INSPECTION ROADWAY CURB TO CURB 40FT 4IN. ROADWAY MILLED IS 60FT 9IN X 22FT 5IN WITH A DEPTH OF 4IN |
2022-02-10 | No data | MILLER AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | • Curb to Curb width – 30’• Milled area – 20’• Depth of milled area – 3” • ½ +5’ milled (yes/no) – yes 20’ • Waiver (yes/no) –NO |
2022-02-06 | No data | AINSLIE STREET, FROM STREET KEAP STREET TO STREET RODNEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete curb intact, no defects at this time |
2022-02-06 | No data | HANCOCK STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY PAVED HALF+5 |
2022-02-04 | No data | KENT AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP is in compliance |
2022-01-15 | No data | GERRY STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new sidewalk installed |
2022-01-14 | No data | HANCOCK STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | UPON INSPECTION ROADWAY IS CURRENTLY MILEED ROADWAY CURB TO CURB IS 33FT 10IN.MILEED ROADWAY IS 22FT 2IN X 34FT 4IN WITH A DEPTH OF 3 INCHES |
2022-01-12 | No data | FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Entire sidewalk was repaired in front of 91 Franklin Avenue, expansion joints are sealed. |
2022-01-12 | No data | KENT AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Roadway measures 30 feet from curb to curb. The contractor has milled 20 feet of the roadway adjacent to the property, with a width of 36 feet, and a depth of 3 inches. In compliance with required BPP milling measurements, pass. |
2022-01-04 | No data | HARRISON AVENUE, FROM STREET LYNCH STREET TO STREET MIDDLETON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Whole street: 39ft 8in Plus half 5: 25ft 3in Width: 32ft 7in Down 3in |
2022-01-04 | No data | LORIMER STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Whole street: 39ft 8in Plus half 5: 25ft 3in Width: 32ft 7in Down 3in |
2021-11-12 | No data | 55 STREET, FROM STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed single ramp in the SW1 corner quad is accessible and functional but not ADA compliant. Previously measured and collected on 9/30/20 in Prism. |
2021-11-10 | No data | BROADWAY, FROM STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant are functional and accessible. Non Ada compliant. Previously Measured in prism on 9/3/21. Excessive curb reveal still remains at this time of inspection. |
2021-11-06 | No data | WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work Not Started At Time Of Inspection. |
2021-11-05 | No data | CHISHOLM STREET, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | A 5' x 5' area of Bpp paving sunken 2" below grade, in the driving lane. |
2021-11-04 | No data | BRUCKNER BOULEVARD, FROM STREET BROWN PLACE TO STREET WILLIS AVENUE BRIDGE EXIT RAMP | No data | Street Construction Inspections: Active | Department of Transportation | V & D Paving foreman Luis milled a 1/2 plus 5 of the roadway ( 57' x 40' ) Awaiting 7f to complete restoration |
2021-11-01 | No data | 46 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The sidewalk was installed in compliance |
2021-10-21 | No data | RUTLAND ROAD, FROM STREET ALBANY AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP inspected. Before milling the width of roadway is 30' Width milled is 20’ & Length milled is 60' & Depth is 3". Foreman on site. |
2021-09-30 | No data | 5 AVENUE, FROM STREET EAST 128 STREET TO STREET EAST 129 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Half plus 5 in compliance, tack coat applied. |
2021-09-28 | No data | 16 AVENUE, FROM STREET 46 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. Newly completed tangent ramps in the NW2 corner are functional and accessible. We’ll measure and reinspect at a later date due to weather (rain). |
2021-09-23 | No data | 46 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ped /walk notvvisible |
2021-09-20 | No data | WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flags have been installed in front of 517. |
2021-09-15 | No data | GERRY STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed |
2021-09-14 | No data | 55 STREET, FROM STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp in the SW1 corner quad is accessible and functional but not ADA compliant. Previously measured and collected on 9/30/20 in Prism. |
2021-09-10 | No data | 60 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Contractor is currently in the middle of milling pavement but has not paved..no notifications made. |
2021-09-07 | No data | BROADWAY, FROM STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant are functional and accessible. Non Ada compliant. Previously Measured in prism on 9/3/21. Excessive curb reveal still remains at this time of inspection. |
2021-09-03 | No data | BROADWAY, FROM STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 9/3/21 |
2021-08-30 | No data | GROVE STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW paved by BPP in compliance for new building |
2021-08-25 | No data | EVERGREEN AVENUE, FROM STREET LINDEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SW1 corner found not to be ADA compliant. Ramps are functional and accessible. Measured & collected in Prism on 10/5/20. |
2021-08-20 | No data | EVERGREEN AVENUE, FROM STREET LINDEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New corner building, roadway repaved as per BPP, area in intersection outside the BPP by the telecom manhole is a bit broken up probably from winter shoveling and patchwork. |
2021-08-20 | No data | EVERGREEN AVENUE, FROM STREET GROVE STREET TO STREET LINDEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway repaved as per BPP from Linden St to end of new building property. Lane markings and bike lane restored. |
2021-08-19 | No data | GROVE STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW CURB INSTALLED I/F/O PROPERTY #380. |
2021-08-16 | No data | GROVE STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW flags installed. Expansion joints sealed, in compliance |
2021-08-12 | No data | 13 AVENUE, FROM STREET 42 STREET TO STREET 43 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sw cut ok |
2021-08-10 | No data | BROADWAY, FROM STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2021-08-07 | No data | VANDERBILT AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street paved half plus 5 feet |
2021-08-03 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Contractor has milled a 130’x22’ area of roadway to a depth of 3” in compliance, Roadway measures to be 34’ wide from curb to curb. |
2021-07-28 | No data | CLARENDON ROAD, FROM STREET EAST 31 STREET TO STREET EAST 32 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Contractors BPP roadway restoration found to be in compliance |
2021-07-28 | No data | FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work completed |
2021-07-12 | No data | VANDERBILT AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Rwy IFO PROPERTY, recently re-paved. All lane markings restored & no obstruction or impaction to conventional bike lane |
2021-07-08 | No data | 50 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP: PASS - Length of Milling: 81ft 4in Width of Milling: 20ft Full Width of Roadway: 30ft Depth: 4in |
2021-06-24 | No data | ERASMUS STREET, FROM STREET LLOYD STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb replaced in front of 146 erasmus street |
2021-06-20 | No data | MYRTLE AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street is paved |
2021-06-02 | No data | MYRTLE AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb is in compliance. |
2021-05-27 | No data | FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb work in compliance |
2021-05-25 | No data | 38 STREET, FROM STREET 10 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Roadway measures 30 feet from curb to curb. Contractor has milled 20 feet of the roadway adjacent to the roadway with a depth of 3 inches and a length of 90 feet. In compliance with BPP required measurements. |
2021-05-20 | No data | FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk repaired |
2021-05-14 | No data | CLARENDON ROAD, FROM STREET EAST 31 STREET TO STREET EAST 32 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Width of roadway - 50ftWidth of roadway after mil - 30ftLength of the roadway - 60ftDepth of roadway - 3in |
2021-05-12 | No data | SANDFORD STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP completedCurb to Curb- 25ft. Length- 70 ft.Width- 21ft Depth-3inches |
2021-05-11 | No data | CHISHOLM STREET, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET | No data | Street Construction Inspections: Active | Department of Transportation | 50' by 20' pass |
2021-04-26 | No data | 55 STREET, FROM STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Issues resolved. Newly completed single ramp in the SW1 corner quadrant is functional and accessible. Non ADA compliant. Measured and collected on 9/30/20 in Prism. |
2021-04-19 | No data | 42 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | expansion joints installed on s/w close to 13 ave |
2021-03-29 | No data | GROVE STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW SIDEWALK INSTALLED. |
2021-03-10 | No data | GROVE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY PAVED HALF +5 |
2021-03-09 | No data | EAST 51 STREET, FROM STREET RUTLAND ROAD TO STREET WINTHROP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW paved by BPP |
2021-03-04 | No data | 13 AVENUE, FROM STREET 56 STREET TO STREET 57 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | No valid permit for closing off 60' X 8' of roadway with plastic barriers on the roadway |
2021-02-16 | No data | 13 AVENUE, FROM STREET 56 STREET TO STREET 57 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent CENTRAL CONCRETE INC. failed to comply with terms & conditions of stipulation #014, maintain a 5 FOOT clear protected pedestrian walkway in the roadway to all ongoing pedestrians. Nov issued |
2021-02-04 | No data | 13 AVENUE, FROM STREET 56 STREET TO STREET 57 STREET | No data | Street Construction Inspections: Active | Department of Transportation | fence ok sw |
2021-01-24 | No data | 13 AVENUE, FROM STREET 56 STREET TO STREET 57 STREET | No data | Street Construction Inspections: Active | Department of Transportation | fence maintained |
2021-01-22 | No data | FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ROADWAY HAS BEEN MILLED. 50FT X 21FT, DOWN 3 INCHES IFO 91 FRANKLIN AVE. |
2021-01-16 | No data | 13 AVENUE, FROM STREET 56 STREET TO STREET 57 STREET | No data | Street Construction Inspections: Active | Department of Transportation | fence maintained |
2021-01-08 | No data | EAST 51 STREET, FROM STREET RUTLAND ROAD TO STREET WINTHROP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pave st conducted for location 1/2 +5 |
2020-11-30 | No data | 55 STREET, FROM STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW1 corner newly constructed single ramp. Must remove plastic cover on DWS. Ramp is functional and accessible. Previously measured and collected. |
2020-11-28 | No data | 13 AVENUE, FROM STREET 56 STREET TO STREET 57 STREET | No data | Street Construction Inspections: Active | Department of Transportation | pedestrian walk in compliance |
2020-11-28 | No data | 56 STREET, FROM STREET 13 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | material stored behind fence |
2020-11-27 | No data | 56 STREET, FROM STREET 13 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | the fence is maintained |
2020-11-27 | No data | 13 AVENUE, FROM STREET 56 STREET TO STREET 57 STREET | No data | Street Construction Inspections: Active | Department of Transportation | no signs posted on 13th Ave |
2020-11-23 | No data | EVERGREEN AVENUE, FROM STREET LINDEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NW2 corner found to be non ADA compliant, ramps are functional and accessible. Measured and collected on Prism on 10/5/20. |
2020-11-23 | No data | EVERGREEN AVENUE, FROM STREET LINDEN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Car has been answered |
2020-11-17 | No data | 55 STREET, FROM STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Slope issues has been resolved and in compliance. Newly completed single ramp in the SW1 corner quadrant is functional and accessible. Non ADA compliant. Measured and collected on 9/30/20 in Prism. Newer permit B042020300A16 on file |
2020-11-13 | No data | 13 AVENUE, FROM STREET 56 STREET TO STREET 57 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Fence maintained |
2020-11-04 | No data | 42 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | expansion joints not seal in 42st 12ave 13ave |
2020-10-30 | No data | MYRTLE AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PAVING DONE. ONE HALF, PLUS 5FT. |
2020-10-28 | No data | 13 AVENUE, FROM STREET 42 STREET TO STREET 43 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sw ok seal |
2020-10-26 | No data | 13 AVENUE, FROM STREET 42 STREET TO STREET 43 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 13th Ave between 42nd St & 43rd St. Roadway size 80’L x 44’W. BPP size 80’L x 30’W x 3.5”D |
2020-10-26 | No data | 42 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 42nd St between 12th Ave & 13th Ave… Property Length 103’L, Roadway Width Curb to Curb 30’, BPP size 103’L x 20’W x 3”D |
2020-10-26 | No data | 13 AVENUE, FROM STREET 42 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 13th Ave & 42rd Street. Roadway size 45’L x 30’W. BPP size 30’L x 30’W x3”D |
2020-10-21 | No data | MYRTLE AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB OK |
2020-10-19 | No data | MYRTLE AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site. 25ft width of 40ft wide roadway is milled for paving. Depth is >3inches. In compliance. |
2020-10-13 | No data | 55 STREET, FROM STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SE4 corner quadrant are functional and accessible. Non ADA compliant. Measured and collected in Prism on 9/30/20. |
2020-10-13 | No data | 13 AVENUE, FROM STREET 42 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly competed tangent ramps in the SW1 corner quadrant are functional and accessible. Unable to measure and collect due to weather conditions. Will measure and collect at a later date. |
2020-10-10 | No data | FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW CURB IFO 91. |
2020-10-05 | No data | EVERGREEN AVENUE, FROM STREET LINDEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SW1 corner quadrant found to be non ADA compliant, ramps are functional and accessible. Measured and collected on Prism on 10/5/20. |
2020-10-02 | No data | 13 AVENUE, FROM STREET 42 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started in the SW1 corner quadrant at time of inspection. Will reinspect at a later date. |
2020-10-02 | No data | 55 STREET, FROM STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner quadrant are functional and accessible. Non ADA compliant. Measured and collected on 9/30/20 in Prism. |
2020-10-01 | No data | GROVE STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Milled Depth- 3 InchesMilled Width- 20 FeetMilled Length- 117 Feet 9 InchesWidth of the Street- 29 Feet 3 Inches |
2020-10-01 | No data | 55 STREET, FROM STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps in the SE4 corner quadrant are functional and accessible. Non ADA compliant. Measured and collected in Prism on 9/30/20. |
2020-09-30 | No data | 55 STREET, FROM STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps in the SE4 corner quadrant are functional and accessible. Non ADA compliant. Measured and collected in Prism on 9/30/20. |
2020-09-14 | No data | GERRY STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb in compliance. |
2020-09-10 | No data | FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NO PEDESTRIAN WALKWAY ON THE SIDEWALK. |
2020-09-10 | No data | RUTLEDGE STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Paving in compliance. |
2020-09-08 | No data | 55 STREET, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP: PASS - Length: 86ft 4in Width of Milling: 20ft 10in Full Width of Roadway: 30ft 4in Depth: 4in |
2020-09-08 | No data | 55 STREET, FROM STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP: PASS - Length: 40ft 4in Width of Milling: 30ft 10in Full Width of Roadway: 44ft 6in Depth: 4in |
2020-09-08 | No data | NEW UTRECHT AVENUE, FROM STREET 55 STREET TO STREET 56 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP: PASS - Length: 120ft 4in Width of Milling: 27ft 10in Full Width of Roadway: 44ft 7in Depth: 4in |
2020-09-04 | No data | 188 STREET, FROM STREET 48 AVENUE TO STREET 50 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | B P P Inspection passed size : 50' x 28' x 3''. |
2020-08-28 | No data | GROVE STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk excavated and closed off walkway in roadway |
2020-08-26 | No data | ERASMUS STREET, FROM STREET LLOYD STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb replaced in front of 146 erasmus street |
2020-08-24 | No data | EVERGREEN AVENUE, FROM STREET LINDEN STREET | No data | Street Construction Inspections: Active | Department of Transportation | THE WIDTH OF THE INTERSECTION IS 34 FT THEY MILLED 25 FT X 25 FT DOWN 4 INCHES PASS |
2020-08-24 | No data | GROVE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | THE WIDTH OF THE ROADWAY IS 29.7 FT THE MILLED 20 FT X 28.2 DOWN 3 INCHES PASS |
2020-08-24 | No data | LINDEN STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | THERE IS A VALID PERMIT CONTRACTOR HAVE MILLED THE ROADWAY FOR B.P.P |
2020-08-24 | No data | EVERGREEN AVENUE, FROM STREET GROVE STREET TO STREET LINDEN STREET | No data | Street Construction Inspections: Active | Department of Transportation | there width of the roadway is 34'.6" the contractor milled 159 ft x 22.8 x 4 inches B.P.P requirements met. |
2020-08-24 | No data | LINDEN STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | the contractor milled 100 ft x 20.3 ft down 4 inches the width of the roadway is 34 ft PASS |
2020-08-20 | No data | OCEAN PARKWAY, FROM STREET AVENUE O TO STREET AVENUE P | No data | Street Construction Inspections: Active | Department of Transportation | BPP was inspected. Before milling the width of roadway is 24' 8" Milling length is 118' 3" & Width milled is 20' & Depth is 3". Foreman was on site. |
2020-07-31 | No data | RUTLEDGE STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | MILLED ROADWAY IFO 219 IS 44FT, 9 INCHES X 22FT, DOWN 3 INCHES. CURB TO CURB IS 33 1.2FT. |
No related officers
No related companies by address
Date of last update: 04 Nov 2024
Sources: New York Secretary of State
© 2024 nycompanysearch.com, Part of Big Data Integrated