2024-10-17
|
No data
|
SAULL STREET, FROM STREET AVERY AVENUE TO STREET BLOSSOM AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Concrete curb restored expansion joints sealed I/F/O 42-61 Saull Street
|
2024-07-30
|
No data
|
72 AVENUE, FROM STREET 160 STREET TO STREET 161 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb in compliance.
|
2024-07-05
|
No data
|
POWELL AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET CROSS BRONX EXPRESSWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk restoration did not enter corner quadrant. No ped ramp permit required at this time
|
2024-05-29
|
No data
|
CROSS BRONX EXPRESSWAY, FROM STREET POWELL AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
permittee on hold
|
2024-02-16
|
No data
|
7 AVENUE, FROM STREET 52 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the SE4 corner quadrant are non Ada compliant , (however ramp running and cross are in tactic due to the date issued 6/23/2022). Measured and collected in prism on 2/16/24.
|
2024-02-15
|
No data
|
7 AVENUE, FROM STREET 52 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Inspector will return to location to measure and collect corner quad.
|
2024-02-07
|
No data
|
GRAND CONCOURSE, FROM STREET EAST 206 STREET TO STREET ST GEORGE'S CRESCENT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Portion of roadway found newly repaved
|
2023-12-19
|
No data
|
POWELL AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET CROSS BRONX EXPRESSWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk restoration did not enter corner quadrant. No ped ramp permit required at this time
|
2023-12-17
|
No data
|
GOBLE PLACE, FROM STREET INWOOD AVENUE TO STREET JEROME AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New steel face curb in place adjacent corner property 45 Goble Pl
|
2023-12-17
|
No data
|
MACOMBS ROAD, FROM STREET GOBLE PLACE TO STREET WEST MT EDEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New steel face curb in place adjacent corner property 45 Goble Pl
|
2023-12-05
|
No data
|
64 AVENUE, FROM STREET 181 STREET TO STREET 182 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb in place.
|
2023-11-03
|
No data
|
TOPPING AVENUE, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk sealed & in place
|
2023-10-15
|
No data
|
LINCOLN AVENUE, FROM STREET LIBERTY AVENUE TO STREET MC KINLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Street repaved by bpp
|
2023-09-04
|
No data
|
6 AVENUE, FROM STREET 21 STREET TO STREET 22 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway milled and paved, found resurfaced.
|
2023-08-23
|
No data
|
GRAND CONCOURSE, FROM STREET EAST 206 STREET TO STREET ST GEORGE'S CRESCENT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass work done in compliance
|
2023-07-07
|
No data
|
SAULL STREET, FROM STREET AVERY AVENUE TO STREET BLOSSOM AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP Passed. 32'5" x 20'. Only inspected paved portion of BPP at time of inspection.
|
2023-06-25
|
No data
|
LABURNUM AVENUE, FROM STREET COLDEN STREET TO STREET KISSENA BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb in compliance
|
2023-06-13
|
No data
|
GOBLE PLACE, FROM STREET INWOOD AVENUE TO STREET JEROME AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk flags in place.
|
2023-05-30
|
No data
|
POWELL AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET CROSS BRONX EXPRESSWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk restoration did not enter corner quadrant. No ped ramp permit required at this time
|
2023-05-23
|
No data
|
57 AVENUE, FROM STREET 96 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps within the NE3 corner quadrant was found to be non Ada compliant. Measured and collected in prism on the 1/14/2021.
|
2023-05-23
|
No data
|
56 STREET, FROM STREET 39 AVENUE TO STREET WOODSIDE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway found resurfaced at the time of inspection.
|
2023-05-10
|
No data
|
DE SALES PLACE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Expansion joints were sealed at tape removed. In compliance.
|
2023-04-27
|
No data
|
WILLOUGHBY AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No address in this segment
|
2023-04-23
|
No data
|
52 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway BPP done in compliance.
|
2023-04-11
|
No data
|
DE SALES PLACE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
CAR closed as per policy to limit sidewalk permit NOVs. Contractor placed on hold.
|
2023-04-10
|
No data
|
7 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
the roadway was resurfaced by DOT.
|
2023-04-05
|
No data
|
CROSS BRONX EXPRESSWAY, FROM STREET POWELL AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Completed single ramp in the SE4 corner quadrant was found not to be Ada compliant, Ramp was measured and collected in prism on 11/4/21. ( No 410 permit on file. )
|
2023-03-18
|
No data
|
DE SALES PLACE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I OBSERVED UNSEALED EXPLANSION JOINT AT THE PROPERTY LINES AND CURB LINE IN FRONT OF PROPERTY #37. CAR #20227870383 ISSUED 12/2/2022. RESPONDENT FAILED SEAL ALL EXPANSION JOINTS AT THE PROPERTY LINES AND CURB LINE. CITED PERMIT USED FOR ID.
|
2023-03-17
|
No data
|
241 STREET, FROM STREET ALAMEDA AVENUE TO STREET RUSHMORE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP to grade
|
2023-02-22
|
No data
|
7 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
the roadway was resurfaced by DOT.
|
2023-02-08
|
No data
|
PRINCE STREET, FROM STREET 35 AVENUE TO STREET NORTHERN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel face curb installed.
|
2023-02-07
|
No data
|
LINCOLN AVENUE, FROM STREET LIBERTY AVENUE TO STREET MC KINLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB INSTALLED
|
2023-02-01
|
No data
|
LABURNUM AVENUE, FROM STREET COLDEN STREET TO STREET KISSENA BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP paving done in front of 137-37.
|
2023-01-24
|
No data
|
LINCOLN AVENUE, FROM STREET LIBERTY AVENUE TO STREET MC KINLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY PAVED BY BPP
|
2023-01-18
|
No data
|
NICHOLS AVENUE, FROM STREET ETNA STREET TO STREET JAMAICA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Multiple sidewalk flags SEALED in compliance IFO PROPERTY 48 NICOLS AVENUE
|
2023-01-10
|
No data
|
204 STREET, FROM STREET 43 AVENUE TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP to grade
|
2022-12-19
|
No data
|
6 AVENUE, FROM STREET 21 STREET TO STREET 22 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb reset and acceptable
|
2022-12-18
|
No data
|
241 STREET, FROM STREET ALAMEDA AVENUE TO STREET RUSHMORE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
concrete curb installed
|
2022-12-09
|
No data
|
BAY RIDGE PARKWAY, FROM STREET 6 AVENUE TO STREET 7 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No swk restoration for property. Conventional bike lane is clear.
|
2022-12-05
|
No data
|
241 STREET, FROM STREET ALAMEDA AVENUE TO STREET RUSHMORE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
90’x18’x3” bpp milled
|
2022-12-02
|
No data
|
DE SALES PLACE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Seal expansion joints IFO #37
|
2022-11-29
|
No data
|
STRAUSS STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Swk flags sealed and in compliance
|
2022-11-28
|
No data
|
MORENCI LANE, FROM STREET BEND TO STREET CAMBRIA AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
curb saw cut, expansion joint sealed
|
2022-11-23
|
No data
|
POWELL AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET CROSS BRONX EXPRESSWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk restoration did not enter corner quadrant. No ped ramp permit required at this time
|
2022-11-23
|
No data
|
SEIGEL STREET, FROM STREET MC KIBBIN COURT TO STREET SEIGEL COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk flags.
|
2022-11-22
|
No data
|
MORENCI LANE, FROM STREET BEND TO STREET CAMBRIA AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
A/T/P/O I observed the respondent installed 70 linear feet of curb without permit. Permit # Q042021207A25 allows for the installation of 20 linear feet of curb only.
|
2022-11-21
|
No data
|
HENRY STREET, FROM STREET JORALEMON STREET TO STREET STATE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Several swk flags restored on right side of property. Curb side bike lane is clear.
|
2022-11-17
|
No data
|
MORENCI LANE, FROM STREET BEND TO STREET CAMBRIA AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Defects remain but CAR is defective and needs to be reissued
|
2022-11-12
|
No data
|
89 AVENUE, FROM STREET 184 PLACE TO STREET 184 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed,
|
2022-11-10
|
No data
|
CROSS BRONX EXPRESSWAY, FROM STREET POWELL AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
No 410 permit on file. Newly completed tangent ramps in the SE4 corner quadrant arenon ADA compliant. Previously measured and collected in Prism on 11/4/21.
|
2022-10-18
|
No data
|
57 AVENUE, FROM STREET 96 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps within the NE3 corner quadrant was found to be non Ada compliant. Measured and collected in prism on the 1/14/2021.
|
2022-10-12
|
No data
|
MORENCI LANE, FROM STREET BEND TO STREET CAMBRIA AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion joints in curb require saw-cut and sealing down to the roadway.
|
2022-09-27
|
No data
|
CROSS BRONX EXPRESSWAY, FROM STREET POWELL AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Completed single ramp in the SE4 corner quadrant was found not to be Ada compliant, Ramp was measured and collected in prism on 11/4/21. ( No 410 permit on file. )
|
2022-09-23
|
No data
|
LINCOLN AVENUE, FROM STREET LIBERTY AVENUE TO STREET MC KINLEY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Contractor has milled a 25’x20 area to roadway to a depth of 3” in compliance, roadway measures to be 29’ from curb to curb
|
2022-08-25
|
No data
|
7 AVENUE, FROM STREET 52 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps within SW1 corner quadrant are non ada compliant, ramps are functional and accessible. Measured and collected in prism on 8/25/22.
|
2022-08-23
|
No data
|
MORENCI LANE, FROM STREET BEND TO STREET CAMBRIA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Expansion joints in curb require saw-cut and sealing down to the roadway. Another section of curb at adjacent property saw curb done to roadway then seal IFO 50-43
|
2022-08-23
|
No data
|
MORENCI LANE, FROM STREET BEND TO STREET CAMBRIA AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Condition remains. Expansion joints at the curb need to be saw-cut down to roadway and sealed. New CAR issued.
|
2022-08-22
|
No data
|
7 AVENUE, FROM STREET 52 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Old tangent ramps within the SE4 corner quadrant are non Ada compliant, however, ramps are functional and accessible. Will measure and collect when completed properly.
|
2022-08-12
|
No data
|
52 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
street curb to curb 3ft mill 20ft by 105ft down 3in
|
2022-08-12
|
No data
|
7 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
street curb to curb 42ft mill 26ft by 40ft down 3in
|
2022-08-11
|
No data
|
98 STREET, FROM STREET 31 AVENUE TO STREET ASTORIA BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored in compliance
|
2022-08-11
|
No data
|
ASTORIA BOULEVARD, FROM STREET 98 STREET TO STREET 99 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored in compliance
|
2022-08-09
|
No data
|
MORENCI LANE, FROM STREET BEND TO STREET CAMBRIA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Expansion joints in curb require sealing down to the roadway. Another section of curb at adjacent property saw curb done to roadway then seal.
|
2022-07-20
|
No data
|
CROSS BRONX EXPRESSWAY, FROM STREET POWELL AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Completed single ramp in the SE4 corner quadrant was found not to be Ada compliant, Ramp is accessible and functional measured and collected in prism on 11/4/21. ( No 410 permit on file. )
|
2022-07-12
|
No data
|
94 STREET, FROM STREET 35 AVENUE TO STREET 37 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb restored in kind
|
2022-06-25
|
No data
|
7 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok
|
2022-06-15
|
No data
|
UNION STREET, FROM STREET COLUMBIA STREET TO STREET VAN BRUNT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New Sidewalk in front of FDNY Facility .
|
2022-06-15
|
No data
|
SACKETT STREET, FROM STREET COLUMBIA STREET TO STREET VAN BRUNT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk installation
|
2022-06-07
|
No data
|
EAST 9 STREET, FROM STREET AVENUE C TO STREET BEVERLY ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk restored in kind
|
2022-06-02
|
No data
|
88 STREET, FROM STREET DONGAN AVENUE TO STREET ST JAMES AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP in front of 46-25 completed and acceptable. Curb to curb - 29' 7", milled area - 19' 9" x 31' 2", depth - 3".
|
2022-05-30
|
No data
|
89 AVENUE, FROM STREET 184 PLACE TO STREET 184 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk replaced and sealed.
|
2022-05-29
|
No data
|
CROSS BRONX EXPRESSWAY, FROM STREET POWELL AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Completed single ramp in the SE4 corner quadrant was found not to be Ada compliant, Ramp is accessible and functional measured and collected in prism on 11/4/21.
|
2022-05-20
|
No data
|
UNION STREET, FROM STREET COLUMBIA STREET TO STREET VAN BRUNT STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk repaired in front of red door garage.
|
2022-05-12
|
No data
|
LABURNUM AVENUE, FROM STREET COLDEN STREET TO STREET KISSENA BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP roadway pavement work completed. Inspected by Clive Surdine under permit # Q012022074B42 (BPP completed and acceptable. • Curb to Curb width – 25’ • Milled area – 18’ x 60' • Depth of milled area – 3’’)
|
2022-05-12
|
No data
|
SACKETT STREET, FROM STREET COLUMBIA STREET TO STREET VAN BRUNT STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Full swk restoration for large property. Missing sealer over expansion joints & conventional bike lane is clear.
|
2022-05-10
|
No data
|
WILLOUGHBY AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Work not started.
|
2022-05-08
|
No data
|
SACKETT STREET, FROM STREET COLUMBIA STREET TO STREET VAN BRUNT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Swk excavated/broken out, expired permit.
|
2022-05-04
|
No data
|
CROSS BRONX EXPRESSWAY, FROM STREET POWELL AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
No 410 permit on file. Newly completed tangent ramps in the SE4 corner quadrant are functional and accessible. Non ADA compliant. Previously measured and collected in Prism on 11/4/21.
|
2022-05-04
|
No data
|
UNION STREET, FROM STREET COLUMBIA STREET TO STREET VAN BRUNT STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Full swk restoration for property, missing sealer on all expansion joints. No impaction to opp conventional bike lane.
|
2022-04-22
|
No data
|
64 AVENUE, FROM STREET 181 STREET TO STREET 182 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work started. No work done. No inspection found at this time.
|
2022-04-21
|
No data
|
CROSS BRONX EXPRESSWAY, FROM STREET POWELL AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
No 410 permit on file. Newly completed tangent ramps in the SE4 corner quadrant are functional and accessible. Non ADA compliant. Previously measured and collected in Prism on 11/4/21.
|
2022-04-20
|
No data
|
SACKETT STREET, FROM STREET COLUMBIA STREET TO STREET VAN BRUNT STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work has been started at this time.
|
2022-04-09
|
No data
|
13 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
expansion joint sealed
|
2022-04-07
|
No data
|
LABURNUM AVENUE, FROM STREET COLDEN STREET TO STREET KISSENA BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP completed and acceptable. • Curb to Curb width – 25’• Milled area – 18’ x 60'• Depth of milled area – 3’’
|
2022-03-30
|
No data
|
130 AVENUE, FROM STREET 236 STREET TO STREET 237 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Concrete curb installed in front of 236-17.
|
2022-03-30
|
No data
|
LABURNUM AVENUE, FROM STREET COLDEN STREET TO STREET KISSENA BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active worksite in compliance
|
2022-03-30
|
No data
|
237 STREET, FROM STREET 129 AVENUE TO STREET 130 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Concrete curb installed. Roadway resurfaced.
|
2022-03-24
|
No data
|
57 AVENUE, FROM STREET 96 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps within the NE3 corner quadrant was found to be non Ada compliant. Measured in prism on the 1/14/2021.
|
2022-02-09
|
No data
|
102 STREET, FROM STREET 87 AVENUE TO STREET JAMAICA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Full sidewalk replaced and sealed.
|
2021-11-24
|
No data
|
56 STREET, FROM STREET 39 AVENUE TO STREET WOODSIDE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Concrete curb installed in front of 39-56 56th Street.
|
2021-11-12
|
No data
|
98 STREET, FROM STREET 31 AVENUE TO STREET ASTORIA BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Prior condition do not exist at the time of inspection. Sidewalk flags and expansion joints installed in front of 26-26.
|
2021-11-12
|
No data
|
SEIGEL STREET, FROM STREET MC KIBBIN COURT TO STREET SEIGEL COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New flags IFO property #225.
|
2021-11-04
|
No data
|
CROSS BRONX EXPRESSWAY, FROM STREET POWELL AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Newly completed single tangent ramp in the SE4 corner quadrant was found not to be Ada compliant, Ramp is accessible and functional measured and collected in prism on 11/4/21.
|
2021-10-30
|
No data
|
13 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed the above respondent failed to install expansion joint between curb and new sidewalk. respondent was previously notified on 7/16/2021 by CAR #20214570136. permit# used to I.D contractor.
|
2021-09-29
|
No data
|
98 STREET, FROM STREET 31 AVENUE TO STREET ASTORIA BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Ifo 26-26, Remove all plastic capping underneath seal, & recess and re-seal expansion joints to multiple restored sidewalk flags.
|
2021-09-25
|
No data
|
170 STREET, FROM STREET 35 AVENUE TO STREET CROCHERON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed in front of property #35-11 170 STREET in compliance
|
2021-09-20
|
No data
|
13 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
respondent failed to install expansion joint between curb and new sidewalk. respondent was previously notified on 7/16/2021 by CAR #20214570136. permit# used to I.D contractor.
|
2021-08-29
|
No data
|
RYERSON STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no work done
|
2021-08-13
|
No data
|
CROSS BRONX EXPRESSWAY, FROM STREET POWELL AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
No 410 permit on file for the newly installed ramp in the SE4 corner quadrant. Ramp is accessible and functional will measure and collected at a later date due to blitz.
|
2021-08-12
|
No data
|
57 AVENUE, FROM STREET 96 STREET TO STREET 97 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIRED PERM SIDEWALK
|
2021-08-05
|
No data
|
57 AVENUE, FROM STREET 96 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps within the NE3 corner quadrant was found to be non Ada compliant. Measured in prism on the 1/14/2021.
|
2021-07-16
|
No data
|
13 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
failed to install/maintain expansion joint between curb & sidewalk
|
2021-06-29
|
No data
|
WARWICK STREET, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new sidewalk installed
|
2021-06-22
|
No data
|
64 AVENUE, FROM STREET 181 STREET TO STREET 182 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work started at this time. Will reinspect at a later date.
|
2021-06-09
|
No data
|
CROSS BRONX EXPRESSWAY, FROM STREET POWELL AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
No 410 permit on file for the newly installed ramp in the SE4 corner quadrant. Ramp is accessible and functional will measure and collected at a later date due to blitz.
|
2021-06-02
|
No data
|
64 AVENUE, FROM STREET 181 STREET TO STREET 182 STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Not Verified. New sidewalk restored in kind at time of inspection. Valid permit on file.
|
2021-05-11
|
No data
|
169 STREET, FROM STREET 41 AVENUE TO STREET NORTHERN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w repaired
|
2021-05-05
|
No data
|
21 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed
|
2021-04-20
|
No data
|
204 STREET, FROM STREET 43 AVENUE TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb restored expansion joints sealed at 43-16
|
2021-04-16
|
No data
|
BROADWAY, FROM STREET MELROSE STREET TO STREET STOCKTON STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
PASS
|
2021-04-14
|
No data
|
CROSS BRONX EXPRESSWAY, FROM STREET POWELL AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
No 410 permit on file in the SE4 corner quadrant. Ramp is accessible and functional will measure and collected at a later date.
|
2021-03-25
|
No data
|
204 STREET, FROM STREET 43 AVENUE TO STREET BEND
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
The below BPP is complete and acceptable.Curb to Curb width – 30'0", Milled area – 20'0", Depth of milled area – 3", ½ +5’ milled – Yes.
|
2021-03-04
|
No data
|
RYERSON STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb (Concrete) found to be in compliance
|
2021-01-26
|
No data
|
165 STREET, FROM STREET 67 AVENUE TO STREET 69 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk replaced
|
2021-01-24
|
No data
|
VAN SICLEN AVENUE, FROM STREET BEND TO STREET HEGEMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass, sidewalk....
|
2021-01-19
|
No data
|
57 AVENUE, FROM STREET 96 STREET TO STREET 97 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SWK flags restored, expansion joints sealed
|
2021-01-14
|
No data
|
57 AVENUE, FROM STREET 96 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps within the NE3 corner quadrant was found to be non Ada compliant. Measured in prism on the 1/14/2021.
|
2021-01-05
|
No data
|
57 AVENUE, FROM STREET 96 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner found to be functional and accessible. Unable to measure due to time. We’ll reinspect at later date .
|
2020-12-16
|
No data
|
94 STREET, FROM STREET 35 AVENUE TO STREET 37 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb restored expansion joints sealed i/f/o 35-20 94st
|
2020-11-06
|
No data
|
BROADWAY, FROM STREET MELROSE STREET TO STREET STOCKTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Upon arrival at time of inspection MAYANCELA'S HOME IMPROVEMENT INC has seal the expansion joints in between the sidewalk, curb & end of the property line in front of property #926 in compliance
|
2020-11-06
|
No data
|
MYRTLE AVENUE, FROM STREET BROADWAY TO STREET LEWIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Upon arrival at time of inspection MAYANCELA'S HOME IMPROVEMENT INChas seal the expansion joints in between the sidewalk, curb & end of the 2-sided property line adjacent to property #926 BROADWAY IN COMPLIANCE
|
2020-10-29
|
No data
|
CROSS BRONX EXPRESSWAY, FROM STREET POWELL AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Respondent constructed a new pedestrian ramp in the southeast corner without the correct 410 ped ramp permit.Respondent was notified on 05/01/2020, C.A.R 20205730106. Upon re inspection no ped ramp permit on file.
|
2020-10-01
|
No data
|
BEECH AVENUE, FROM STREET 147 STREET TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDEWALK OK.
|
2020-09-28
|
No data
|
130 AVENUE, FROM STREET 236 STREET TO STREET 237 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags restored expansion joints sealed
|
2020-09-28
|
No data
|
237 STREET, FROM STREET 129 AVENUE TO STREET 130 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags restored expansion joints sealed
|
2020-09-17
|
No data
|
MYRTLE AVENUE, FROM STREET BROADWAY TO STREET LEWIS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
As per policy, limit NOV’s issued for this defect. Permittee placed on hold.
|
2020-09-17
|
No data
|
BROADWAY, FROM STREET MELROSE STREET TO STREET STOCKTON STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
As per policy, limit NOV’s issued for this defect. Permittee placed on hold.
|
2020-09-14
|
No data
|
143 PLACE, FROM STREET HILL COURT
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Paving dimension up to standard.
|
2020-09-14
|
No data
|
143 PLACE, FROM STREET 11 AVENUE TO STREET HILL COURT
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Paving dimensions up to standard.
|
2020-09-13
|
No data
|
BERGEN STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP Plus5 in the Roadway in Compliance
|
2020-09-09
|
No data
|
MARATHON PARKWAY, FROM STREET 52 AVENUE TO STREET THORNHILL AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
expansion joints sealed sidewalk flag restored in kind
|
2020-09-04
|
No data
|
BROADWAY, FROM STREET MELROSE STREET TO STREET STOCKTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
EXPANSION JOINTS NOT SEALED
|
2020-09-04
|
No data
|
MYRTLE AVENUE, FROM STREET BROADWAY TO STREET LEWIS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
EXPANSION JOINTS NOT SEALED
|
2020-09-04
|
No data
|
BROADWAY, FROM STREET MELROSE STREET TO STREET STOCKTON STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
EXPANSION JOINTS NOT SEALED
|
2020-09-04
|
No data
|
HOLLYWOOD AVENUE, FROM STREET BARKLEY AVENUE TO STREET OTIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2020-08-29
|
No data
|
POWELL AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET CROSS BRONX EXPRESSWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Gas trench in compliance
|
2020-08-12
|
No data
|
205 STREET, FROM STREET 23 AVENUE TO STREET 26 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP acceptable46'9" x 20'4" x 3"
|
2020-08-08
|
No data
|
MYRTLE AVENUE, FROM STREET BROADWAY TO STREET LEWIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new sidewalk
|
2020-07-25
|
No data
|
RYERSON STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NO WORK OBSERVED.
|
2020-07-22
|
No data
|
BROADWAY, FROM STREET MELROSE STREET TO STREET STOCKTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new sidewalk
|
2020-07-04
|
No data
|
RYERSON STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW CURB OK
|
2020-05-01
|
No data
|
CROSS BRONX EXPRESSWAY, FROM STREET POWELL AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
No 410 permit on file. Will issue another C.A.R.
|
2020-05-01
|
No data
|
CROSS BRONX EXPRESSWAY, FROM STREET POWELL AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
No 410 permit on file within SE4 corner quadrant. Ramp is accessible and functional unable to measured due to weather ( rain ) .
|
2020-04-30
|
No data
|
IRVING AVENUE, FROM STREET BLEECKER STREET TO STREET MENAHAN STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Condition has been repaired, expansion joints found sealed on sidewalk after installation of new flags ifo property# 264
|
2020-04-17
|
No data
|
BROADWAY, FROM STREET MELROSE STREET TO STREET STOCKTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
expansion joints around new sidewalk flags and curb line needs to be sealed plastic cover needs to be removed
|
2020-04-17
|
No data
|
MYRTLE AVENUE, FROM STREET BROADWAY TO STREET LEWIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
expansion joints around new sidewalk flags installed and curb line needs to be sealed plastic cover removed
|
2020-04-15
|
No data
|
IRVING AVENUE, FROM STREET BLEECKER STREET TO STREET MENAHAN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new sidewalk
|
2020-03-25
|
No data
|
94 STREET, FROM STREET 35 AVENUE TO STREET 37 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/w replaced and joints sealed
|
2020-03-21
|
No data
|
130 AVENUE, FROM STREET 236 STREET TO STREET 237 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed, in compliance.
|
2020-03-13
|
No data
|
MARATHON PARKWAY, FROM STREET 52 AVENUE TO STREET THORNHILL AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Complaint not verified - no work on the intersection.New s/w work f/o 52-10 Marathon pkwy - work done,nobody on site - s/w not blocked -clear for the pedestrians,no cones or other equipment on s/w or r/w at this time.
|
2020-03-07
|
No data
|
IRVING AVENUE, FROM STREET BLEECKER STREET TO STREET MENAHAN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk expansion joint not sealed
|
2020-02-23
|
No data
|
165 STREET, FROM STREET 67 AVENUE TO STREET 69 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new sidewalk repaired ,expansion joints sealed.
|
2020-01-23
|
No data
|
LEFFERTS PLACE, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk in compliance and was just sealed. at the moment tissue is covering seal and respondent was told to make sure covering is removed after seal is dry.
|
2020-01-17
|
No data
|
85 AVENUE, FROM STREET 112 STREET TO STREET MYRTLE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Brand new sidewalk flags installed in front of property #111-07 in compliance
|
2020-01-07
|
No data
|
VAN SICLEN AVENUE, FROM STREET BEND TO STREET HEGEMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDE WALK FLAGS INSTALLED AND SEALED
|
2019-12-14
|
No data
|
94 STREET, FROM STREET 35 AVENUE TO STREET 37 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
S/w not occ. at this time.
|
2019-11-12
|
No data
|
237 STREET, FROM STREET 129 AVENUE TO STREET 130 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w repaired
|
2019-11-12
|
No data
|
130 AVENUE, FROM STREET 236 STREET TO STREET 237 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w repaired
|
2019-10-27
|
No data
|
DEAN STREET, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Brand new sidewalk flags installed in front of property #908 in compliance
|
2019-10-24
|
No data
|
CROSS BRONX EXPRESSWAY, FROM STREET POWELL AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Newly constructed ramp on the SE corner quadrant is accessible and functional. Collected on 10-24-19. Unable to measure due to time.
|
2019-10-24
|
No data
|
POWELL AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET CROSS BRONX EXPRESSWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
A/T/P/O I observed the respondent failed to comply with the terms of their DOT permit stip 1/2+5 ft by paving roadway without contacting the NYC DOT HIQA Bronx borough office 4hrs in advance.
|
2019-10-24
|
No data
|
CROSS BRONX EXPRESSWAY, FROM STREET CASTLE HILL AVENUE TO STREET HAVILAND AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
A/T/P/O I observed the respondent failed to comply with the terms of their DOT permit stip 1/2+5 ft by paving roadway without contacting the NYC DOT HIQA Bronx borough office 4hrs in advance.
|
2019-09-15
|
No data
|
POWELL AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET CROSS BRONX EXPRESSWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
steel faced curb installed
|
2019-09-07
|
No data
|
POWELL AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET CROSS BRONX EXPRESSWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
The above respondent failed to notice nyc dot hiqa brough office within 4 hour prey to paving. As per stipulation 1/2 + 5.
|
2019-09-07
|
No data
|
CROSS BRONX EXPRESSWAY, FROM STREET CASTLE HILL AVENUE TO STREET HAVILAND AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP street pave has not started , work not started and Home constructed.
|
2019-08-30
|
No data
|
DEAN STREET, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
The above respondent place a construction debris container on roadway without a valid NYC DOT permit to do so.
|
2019-08-23
|
No data
|
NICHOLS AVENUE, FROM STREET ETNA STREET TO STREET JAMAICA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk repaired, in compliance
|
2019-07-17
|
No data
|
RYERSON STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Bpp paved street, work not started
|
2019-06-29
|
No data
|
165 STREET, FROM STREET 67 AVENUE TO STREET 69 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk repaired ,expansion joints sealed .
|
2019-06-19
|
No data
|
VAN CORTLANDT PARK SOUTH, FROM STREET MDE NB EXIT 11 TO STREET MAJOR DEEGAN EXPRESSWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk repaired
|
2019-06-19
|
No data
|
HOLLYWOOD AVENUE, FROM STREET BARKLEY AVENUE TO STREET OTIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new sidewalk flags in front of house # 2996
|