2021-05-29
|
No data
|
77 STREET, FROM STREET 3 AVENUE TO STREET RIDGE BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk Repair in Compliance
|
2020-12-02
|
No data
|
WEST 20 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Warning was given to have flaggers on both sides of operation being that sidewalk has to be fully closed and to get permit amended to add Stip 11 for full sidewalk closure.
|
2020-09-24
|
No data
|
77 STREET, FROM STREET 3 AVENUE TO STREET RIDGE BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Entire sidewalk was repaired in front of 220 77 Street, expansion joints were sealed.
|
2020-09-20
|
No data
|
77 STREET, FROM STREET 3 AVENUE TO STREET RIDGE BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway was partially paved in front of 220 77 Street. However, work was not performed under this permit. Roadway paved under permit #B012020160C93 exp. 6/24/2020.
|
2020-09-09
|
No data
|
77 STREET, FROM STREET 3 AVENUE TO STREET RIDGE BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed in front of 220 77 Street, expansion joints in between sidewalk flags and curb sealed.
|
2020-02-25
|
No data
|
77 STREET, FROM STREET 3 AVENUE TO STREET RIDGE BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
New sidewalk flags.
|