Name: | J&J DESIGNS INC. |
Jurisdiction: | New York |
Legal type: | DOMESTIC BUSINESS CORPORATION |
Status: | Active |
Date of registration: | 28 Jan 2020 (5 years ago) (Companies founded in January 2020) |
Entity Number: | 5697613 |
ZIP code: | 11581 (Companies in Suffolk, 11581) |
County: | Suffolk |
Place of Formation: | New York |
Address: | 1091 FURTH ROAD, VALLEY STREAM, NY, United States, 11581 |
Shares Details
Shares issued 200
Share Par Value 0
Type NO PAR VALUE
Name | Role | Address |
---|---|---|
THE CORPORATION | DOS Process Agent | 1091 FURTH ROAD, VALLEY STREAM, NY, United States, 11581 |
Number | Date | End date | Type | Address |
---|---|---|---|---|
Q012022327B14 | 2022-11-23 | 2022-12-21 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 107 STREET, QUEENS, FROM STREET 93 AVENUE TO STREET ATLANTIC AVENUE |
Q012022327B12 | 2022-11-23 | 2022-12-21 | PAVE STREET-W/ ENGINEERING & INSP FEE | ATLANTIC AVENUE, QUEENS, FROM STREET 104 STREET TO STREET 106 STREET |
Q012022327B13 | 2022-11-23 | 2022-12-21 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 107 STREET, QUEENS, FROM STREET 93 AVENUE TO STREET ATLANTIC AVENUE |
Q042022327A14 | 2022-11-23 | 2022-12-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 107 STREET, QUEENS, FROM STREET 93 AVENUE TO STREET ATLANTIC AVENUE |
Q042022327A13 | 2022-11-23 | 2022-12-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | ATLANTIC AVENUE, QUEENS, FROM STREET 104 STREET TO STREET 106 STREET |
Q012022327B11 | 2022-11-23 | 2022-12-21 | RESET, REPAIR OR REPLACE CURB | ATLANTIC AVENUE, QUEENS, FROM STREET 104 STREET TO STREET 106 STREET |
Q012022326C33 | 2022-11-22 | 2022-12-21 | RESET, REPAIR OR REPLACE CURB-PROTECTED | BEACH 68 STREET, QUEENS, FROM STREET ALMEDA AVENUE TO STREET BAYFIELD AVENUE |
Q012022326C34 | 2022-11-22 | 2022-12-21 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | BEACH 68 STREET, QUEENS, FROM STREET ALMEDA AVENUE TO STREET BAYFIELD AVENUE |
Q042022326A18 | 2022-11-22 | 2022-12-21 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BEACH 68 STREET, QUEENS, FROM STREET ALMEDA AVENUE TO STREET BAYFIELD AVENUE |
B042022311A50 | 2022-11-07 | 2022-11-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | UTICA AVENUE, BROOKLYN, FROM STREET AVENUE D TO STREET FOSTER AVENUE |
B012022311B27 | 2022-11-07 | 2022-11-14 | RESET, REPAIR OR REPLACE CURB | UTICA AVENUE, BROOKLYN, FROM STREET AVENUE D TO STREET FOSTER AVENUE |
Q042022308A37 | 2022-11-04 | 2022-12-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MERRICK BOULEVARD, QUEENS, FROM STREET 116 AVENUE TO STREET FOCH BOULEVARD |
Q012022308B16 | 2022-11-04 | 2022-12-14 | RESET, REPAIR OR REPLACE CURB | MERRICK BOULEVARD, QUEENS, FROM STREET 116 AVENUE TO STREET FOCH BOULEVARD |
X022022307A77 | 2022-11-03 | 2022-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | LORILLARD PLACE, BRONX, FROM STREET EAST 187 STREET TO STREET 3 AVENUE |
X022022307A76 | 2022-11-03 | 2022-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | LORILLARD PLACE, BRONX, FROM STREET EAST 187 STREET TO STREET 3 AVENUE |
M012022307B53 | 2022-11-03 | 2022-12-01 | RESET, REPAIR OR REPLACE CURB | WEST 136 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET LENOX AVENUE |
M012022307B54 | 2022-11-03 | 2022-12-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 136 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET LENOX AVENUE |
X022022307A75 | 2022-11-03 | 2022-12-31 | TEMPORARY PEDESTRIAN WALK | LORILLARD PLACE, BRONX, FROM STREET EAST 187 STREET TO STREET 3 AVENUE |
X022022307A74 | 2022-11-03 | 2022-12-31 | PLACE MATERIAL ON STREET | LORILLARD PLACE, BRONX, FROM STREET EAST 187 STREET TO STREET 3 AVENUE |
X022022307A79 | 2022-11-03 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | LORILLARD PLACE, BRONX, FROM STREET EAST 187 STREET TO STREET 3 AVENUE |
X022022307A78 | 2022-11-03 | 2022-12-31 | TEMP. CONST. SIGNS/MARKINGS | LORILLARD PLACE, BRONX, FROM STREET EAST 187 STREET TO STREET 3 AVENUE |
M042022307A12 | 2022-11-03 | 2022-12-01 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEST 136 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET LENOX AVENUE |
Q042022287A19 | 2022-10-14 | 2022-11-15 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 165 STREET, QUEENS, FROM STREET 107 AVENUE TO STREET SOUTH ROAD |
Q012022287A96 | 2022-10-14 | 2022-11-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | 165 STREET, QUEENS, FROM STREET 107 AVENUE TO STREET SOUTH ROAD |
Q012022287A95 | 2022-10-14 | 2022-11-15 | RESET, REPAIR OR REPLACE CURB | 165 STREET, QUEENS, FROM STREET 107 AVENUE TO STREET SOUTH ROAD |
Q012022285C60 | 2022-10-12 | 2022-11-09 | RESET, REPAIR OR REPLACE CURB-PROTECTED | GUY R BREWER BOULEVARD, QUEENS, FROM STREET 109 AVENUE TO STREET BRINKERHOFF AVENUE |
Q042022285A55 | 2022-10-12 | 2022-11-09 | REPLACE SIDEWALK | GUY R BREWER BOULEVARD, QUEENS, FROM STREET 109 AVENUE TO STREET BRINKERHOFF AVENUE |
Q042022279A25 | 2022-10-06 | 2022-10-29 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | ALMEDA AVENUE, QUEENS, FROM STREET BARBADOES DRIVE |
Q042022279A24 | 2022-10-06 | 2022-10-29 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | ALMEDA AVENUE, QUEENS, FROM STREET BARBADOES DRIVE |
B022022279A80 | 2022-10-06 | 2022-10-21 | CROSSING SIDEWALK | DEAN STREET, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE |
Q042022279A23 | 2022-10-06 | 2022-10-29 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BARBADOES DRIVE, QUEENS, FROM STREET HILLMEYER AVENUE |
B012022272C48 | 2022-09-29 | 2022-10-28 | PAVE STREET-W/ ENGINEERING & INSP FEE | BEDFORD AVENUE, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE |
B042022272A29 | 2022-09-29 | 2022-10-28 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BEDFORD AVENUE, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE |
B012022272C47 | 2022-09-29 | 2022-10-28 | RESET, REPAIR OR REPLACE CURB | BEDFORD AVENUE, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE |
Q012022266D33 | 2022-09-23 | 2022-10-21 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 117 ROAD, QUEENS, FROM STREET 190 STREET TO STREET BAISLEY BOULEVARD |
Q022022265A58 | 2022-09-22 | 2022-10-21 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 35 STREET, QUEENS, FROM STREET 21 AVENUE TO STREET DITMARS BOULEVARD |
Q012022263C89 | 2022-09-20 | 2022-10-19 | INSTALL FENCE | BROADWAY, QUEENS, FROM STREET 14 STREET TO STREET 21 STREET |
B022022263A92 | 2022-09-20 | 2022-10-19 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | DEWEY PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022022263A93 | 2022-09-20 | 2022-10-18 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | LEXINGTON AVENUE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE |
Q022022263A34 | 2022-09-20 | 2022-12-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | BROADWAY, QUEENS, FROM STREET 14 STREET TO STREET 21 STREET |
Q022022262A89 | 2022-09-19 | 2022-10-18 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | PARK DRIVE EAST, QUEENS, FROM STREET VWE NB EXIT 11 TO STREET 73 TERRACE |
Q022022262B69 | 2022-09-19 | 2022-10-18 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 209 STREET, QUEENS, FROM STREET 82 AVENUE TO STREET 85 AVENUE |
Q022022262A56 | 2022-09-19 | 2022-10-18 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | AVON STREET, QUEENS, FROM STREET 188 STREET TO STREET CHEVY CHASE STREET |
X022022259A80 | 2022-09-16 | 2022-10-15 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | BROWN PLACE, BRONX, FROM STREET EAST 135 STREET TO STREET EAST 136 STREET |
Q022022259B73 | 2022-09-16 | 2022-10-16 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 35 STREET, QUEENS, FROM STREET 21 AVENUE TO STREET DITMARS BOULEVARD |
B022022259D11 | 2022-09-16 | 2022-10-16 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | JEFFERSON AVENUE, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022022259D12 | 2022-09-16 | 2022-10-16 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | JEFFERSON AVENUE, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022022259D13 | 2022-09-16 | 2022-10-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | BURNETT STREET, BROOKLYN, FROM STREET AVENUE V TO STREET WHITNEY AVENUE |
B022022259D14 | 2022-09-16 | 2022-10-16 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE C TO STREET CORTELYOU ROAD |
B022022259D15 | 2022-09-16 | 2022-10-16 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE TO STREET METROPOLITAN AVENUE |
B022022259D16 | 2022-09-16 | 2022-10-15 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 76 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022259A83 | 2022-09-16 | 2022-10-15 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | POWELL STREET, BROOKLYN, FROM STREET LOTT AVENUE TO STREET NEW LOTS AVENUE |
Q022022259B75 | 2022-09-16 | 2022-10-16 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 105 STREET, QUEENS, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD |
M022022259E11 | 2022-09-16 | 2022-10-16 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WEST 150 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET CONVENT AVENUE |
B022022259A84 | 2022-09-16 | 2022-10-15 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | FARRAGUT ROAD, BROOKLYN, FROM STREET AMERSFORT PLACE TO STREET KENILWORTH PLACE |
B022022259D09 | 2022-09-16 | 2022-10-16 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | KINGSLAND AVENUE, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET MEEKER AVENUE |
B042022258A28 | 2022-09-15 | 2022-10-07 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | FRANKLIN AVENUE, BROOKLYN, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE |
B012022258C36 | 2022-09-15 | 2022-10-07 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | FRANKLIN AVENUE, BROOKLYN, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE |
B012022258C35 | 2022-09-15 | 2022-10-07 | RESET, REPAIR OR REPLACE CURB-PROTECTED | FRANKLIN AVENUE, BROOKLYN, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE |
B022022258A84 | 2022-09-15 | 2022-09-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE C TO STREET CORTELYOU ROAD |
B022022258A81 | 2022-09-15 | 2022-10-14 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 15 AVENUE, BROOKLYN, FROM STREET 41 STREET TO STREET 42 STREET |
B022022257B47 | 2022-09-14 | 2022-09-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 76 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
Q022022257A20 | 2022-09-14 | 2022-09-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 35 STREET, QUEENS, FROM STREET 21 AVENUE TO STREET DITMARS BOULEVARD |
Q022022257A19 | 2022-09-14 | 2022-09-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 33 STREET, QUEENS, FROM STREET 21 AVENUE TO STREET DITMARS BOULEVARD |
M022022256A87 | 2022-09-13 | 2022-09-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | MERCER STREET, MANHATTAN, FROM STREET BLEECKER STREET TO STREET WEST HOUSTON STREET |
X022022255A59 | 2022-09-12 | 2022-09-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | BROWN PLACE, BRONX, FROM STREET EAST 135 STREET TO STREET EAST 136 STREET |
Q022022255A91 | 2022-09-12 | 2022-09-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 41 AVENUE, QUEENS, FROM STREET QUEENS PLAZA NORTH TO STREET DEAD END |
Q022022252B26 | 2022-09-09 | 2022-09-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | PARK DRIVE EAST, QUEENS, FROM STREET VWE NB EXIT 11 TO STREET 73 TERRACE |
B022022252B51 | 2022-09-09 | 2022-09-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | EAST 94 STREET, BROOKLYN, FROM STREET AVENUE A TO STREET AVENUE B |
B022022252B52 | 2022-09-09 | 2022-09-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | BURNETT STREET, BROOKLYN, FROM STREET AVENUE V TO STREET WHITNEY AVENUE |
B022022252B60 | 2022-09-09 | 2022-09-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 57 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
B022022250C22 | 2022-09-07 | 2022-09-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | JEFFERSON AVENUE, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022022250C23 | 2022-09-07 | 2022-09-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | LEXINGTON AVENUE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE |
Q022022250B09 | 2022-09-07 | 2022-09-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 42 AVENUE, QUEENS, FROM STREET 205 STREET TO STREET CLEARVIEW EXPRESSWAY |
Q022022250C11 | 2022-09-07 | 2022-09-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 35 STREET, QUEENS, FROM STREET 21 AVENUE TO STREET DITMARS BOULEVARD |
B022022245B63 | 2022-09-02 | 2022-09-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | HULL STREET, BROOKLYN, FROM STREET ROCKAWAY AVENUE TO STREET MOTHER GASTON BOULEVARD |
Q022022244A17 | 2022-09-01 | 2022-09-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 140 AVENUE, QUEENS, FROM STREET 219 STREET TO STREET SPRINGFIELD BOULEVARD |
Q022022244A16 | 2022-09-01 | 2022-09-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 42 AVENUE, QUEENS, FROM STREET 201 STREET TO STREET 202 STREET |
B022022244C88 | 2022-09-01 | 2022-09-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | KINGSLAND AVENUE, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET MEEKER AVENUE |
B022022243A87 | 2022-08-31 | 2022-09-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | ST MARKS AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
B022022243A86 | 2022-08-31 | 2022-09-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | VAN BUREN STREET, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
Q042022242A33 | 2022-08-30 | 2022-09-17 | REPLACE SIDEWALK | GUY R BREWER BOULEVARD, QUEENS, FROM STREET 109 AVENUE TO STREET BRINKERHOFF AVENUE |
X022022242B21 | 2022-08-30 | 2022-09-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | LORILLARD PLACE, BRONX, FROM STREET EAST 187 STREET TO STREET 3 AVENUE |
X022022242B20 | 2022-08-30 | 2022-09-17 | TEMP. CONST. SIGNS/MARKINGS | LORILLARD PLACE, BRONX, FROM STREET EAST 187 STREET TO STREET 3 AVENUE |
X022022242B19 | 2022-08-30 | 2022-09-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | LORILLARD PLACE, BRONX, FROM STREET EAST 187 STREET TO STREET 3 AVENUE |
X022022242B18 | 2022-08-30 | 2022-09-17 | OCCUPANCY OF ROADWAY AS STIPULATED | LORILLARD PLACE, BRONX, FROM STREET EAST 187 STREET TO STREET 3 AVENUE |
X022022242B17 | 2022-08-30 | 2022-09-17 | PLACE MATERIAL ON STREET | LORILLARD PLACE, BRONX, FROM STREET EAST 187 STREET TO STREET 3 AVENUE |
Q012022242C09 | 2022-08-30 | 2022-09-17 | RESET, REPAIR OR REPLACE CURB-PROTECTED | GUY R BREWER BOULEVARD, QUEENS, FROM STREET 109 AVENUE TO STREET BRINKERHOFF AVENUE |
Q022022241A24 | 2022-08-29 | 2022-09-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | DORMANS ROAD, QUEENS, FROM STREET NEWBURG STREET TO STREET OVID PLACE |
X022022237A99 | 2022-08-25 | 2022-09-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | MULINER AVENUE, BRONX, FROM STREET DELANCEY PLACE TO STREET MORRIS PARK AVENUE |
B022022237B11 | 2022-08-25 | 2022-09-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE C TO STREET CORTELYOU ROAD |
B022022237B32 | 2022-08-25 | 2022-09-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | JEFFERSON AVENUE, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
Q022022229A70 | 2022-08-17 | 2022-09-16 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | AVON STREET, QUEENS, FROM STREET 188 STREET TO STREET CHEVY CHASE STREET |
B022022229B04 | 2022-08-17 | 2022-09-15 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | KINGSLAND AVENUE, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET MEEKER AVENUE |
B022022229B03 | 2022-08-17 | 2022-09-16 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WARWICK STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET |
B022022229B02 | 2022-08-17 | 2022-09-16 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE TO STREET METROPOLITAN AVENUE |
X022022229B70 | 2022-08-17 | 2022-09-16 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | BASSFORD AVENUE, BRONX, FROM STREET EAST 182 STREET TO STREET FLETCHER PLACE |
Q022022228A69 | 2022-08-16 | 2022-09-16 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 209 STREET, QUEENS, FROM STREET 82 AVENUE TO STREET 85 AVENUE |
Q022022228A68 | 2022-08-16 | 2022-09-16 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 80 ROAD, QUEENS, FROM STREET 188 STREET TO STREET CHEVY CHASE STREET |
B022022228A70 | 2022-08-16 | 2022-09-14 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | BEDFORD AVENUE, BROOKLYN, FROM STREET LEXINGTON AVENUE TO STREET QUINCY STREET |
Q022022228A71 | 2022-08-16 | 2022-09-16 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 105 STREET, QUEENS, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD |
B022022228A77 | 2022-08-16 | 2022-09-13 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | CLASSON AVENUE, BROOKLYN, FROM STREET CLIFTON PLACE TO STREET GREENE AVENUE |
Q022022228A70 | 2022-08-16 | 2022-09-16 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | AVON STREET, QUEENS, FROM STREET 188 STREET TO STREET CHEVY CHASE STREET |
B022022227A79 | 2022-08-15 | 2022-09-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | NORTH 8 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
M022022222B03 | 2022-08-10 | 2022-09-12 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | MERCER STREET, MANHATTAN, FROM STREET BLEECKER STREET TO STREET WEST HOUSTON STREET |
Q022022222A84 | 2022-08-10 | 2022-09-09 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 73 TERRACE, QUEENS, FROM STREET 136 STREET TO STREET PARK DRIVE EAST |
B022022217A70 | 2022-08-05 | 2022-09-03 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | HENRY STREET, BROOKLYN, FROM STREET BALTIC STREET TO STREET WARREN STREET |
B022022216B07 | 2022-08-04 | 2022-09-05 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | LEXINGTON AVENUE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE |
Q022022215A78 | 2022-08-03 | 2022-09-02 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WEST 11 ROAD, QUEENS, FROM STREET CROSS BAY BOULEVARD TO STREET BODY OF WATER |
X012022213A79 | 2022-08-01 | 2022-09-02 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 226 STREET, BRONX, FROM STREET LACONIA AVENUE TO STREET PAULDING AVENUE |
X012022213A78 | 2022-08-01 | 2022-09-02 | RESET, REPAIR OR REPLACE CURB | EAST 226 STREET, BRONX, FROM STREET LACONIA AVENUE TO STREET PAULDING AVENUE |
M022022213B49 | 2022-08-01 | 2022-08-30 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | BEACH STREET, MANHATTAN, FROM STREET VARICK STREET TO STREET WALKER STREET |
X042022213A14 | 2022-08-01 | 2022-09-02 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 226 STREET, BRONX, FROM STREET LACONIA AVENUE TO STREET PAULDING AVENUE |
B022022208B49 | 2022-07-27 | 2022-08-23 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WARWICK STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET |
Q042022208A17 | 2022-07-27 | 2022-08-24 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 117 ROAD, QUEENS, FROM STREET 190 STREET TO STREET BAISLEY BOULEVARD |
Q012022208B71 | 2022-07-27 | 2022-08-24 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 117 ROAD, QUEENS, FROM STREET 190 STREET TO STREET BAISLEY BOULEVARD |
Q022022207A50 | 2022-07-26 | 2022-08-19 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 73 AVENUE, QUEENS, FROM STREET 267 STREET TO STREET LANGSTON AVENUE |
Q022022207A51 | 2022-07-26 | 2022-08-19 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 87 STREET, QUEENS, FROM STREET 133 AVENUE TO STREET SUTTER AVENUE |
B022022203B00 | 2022-07-22 | 2022-08-21 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | BEDFORD AVENUE, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
Q022022202B09 | 2022-07-21 | 2022-08-20 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | AVON STREET, QUEENS, FROM STREET 188 STREET TO STREET CHEVY CHASE STREET |
Q022022202B07 | 2022-07-21 | 2022-08-20 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 80 ROAD, QUEENS, FROM STREET SURREY PLACE TO STREET UTOPIA PARKWAY |
Q022022202B08 | 2022-07-21 | 2022-08-20 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 87 STREET, QUEENS, FROM STREET ATLANTIC AVENUE TO STREET BEND |
B022022199B43 | 2022-07-18 | 2022-08-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | KINGSLAND AVENUE, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET MEEKER AVENUE |
Q012022199A86 | 2022-07-18 | 2022-07-19 | RESET, REPAIR OR REPLACE CURB | 86 STREET, QUEENS, FROM STREET 31 AVENUE TO STREET 32 AVENUE |
B022022199B47 | 2022-07-18 | 2022-08-15 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | UNION STREET, BROOKLYN, FROM STREET ROCHESTER AVENUE TO STREET UTICA AVENUE |
Q022022199A50 | 2022-07-18 | 2022-08-17 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 125 STREET, QUEENS, FROM STREET 7 AVENUE TO STREET 9 AVENUE |
B022022195B06 | 2022-07-14 | 2022-08-18 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE TO STREET METROPOLITAN AVENUE |
Q022022195A95 | 2022-07-14 | 2022-08-18 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 105 STREET, QUEENS, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD |
Q022022195A96 | 2022-07-14 | 2022-08-18 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 209 STREET, QUEENS, FROM STREET 82 AVENUE TO STREET 85 AVENUE |
B022022195B07 | 2022-07-14 | 2022-08-12 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WEST 5 STREET, BROOKLYN, FROM STREET KINGS HIGHWAY TO STREET QUENTIN ROAD |
B022022195B05 | 2022-07-14 | 2022-08-18 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | VAN BUREN STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE |
B002022193A00 | 2022-07-12 | No data | MISCELLANEOUS - MINOR SALES | No data |
Q012022193D19 | 2022-07-12 | 2022-08-10 | PAVE STREET-W/ ENGINEERING & INSP FEE | 145 DRIVE, QUEENS, FROM STREET 176 STREET TO STREET 177 STREET |
Q042022193A31 | 2022-07-12 | 2022-08-10 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 145 DRIVE, QUEENS, FROM STREET 176 STREET TO STREET 177 STREET |
Q012022193D18 | 2022-07-12 | 2022-08-10 | RESET, REPAIR OR REPLACE CURB | 145 DRIVE, QUEENS, FROM STREET 176 STREET TO STREET 177 STREET |
Q002022193A00 | 2022-07-12 | No data | MISCELLANEOUS - MINOR SALES | No data |
B002022186A02 | 2022-07-05 | No data | MISCELLANEOUS - MINOR SALES | No data |
Q042022180A59 | 2022-06-29 | 2022-07-29 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | ALMEDA AVENUE, QUEENS, FROM STREET BARBADOES DRIVE TO STREET DEAD END |
Q012022180D37 | 2022-06-29 | 2022-07-29 | RESET, REPAIR OR REPLACE CURB | ALMEDA AVENUE, QUEENS, FROM STREET BARBADOES DRIVE TO STREET DEAD END |
Q012022180D38 | 2022-06-29 | 2022-07-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | ALMEDA AVENUE, QUEENS, FROM STREET BARBADOES DRIVE TO STREET DEAD END |
Q012022180D33 | 2022-06-29 | 2022-07-29 | RESET, REPAIR OR REPLACE CURB | BARBADOES DRIVE, QUEENS, FROM STREET ALMEDA AVENUE TO STREET HILLMEYER AVENUE |
Q012022180D34 | 2022-06-29 | 2022-07-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | BARBADOES DRIVE, QUEENS, FROM STREET ALMEDA AVENUE TO STREET HILLMEYER AVENUE |
Q012022180D35 | 2022-06-29 | 2022-07-29 | RESET, REPAIR OR REPLACE CURB | HILLMEYER AVENUE, QUEENS, FROM STREET BARBADOES DRIVE TO STREET DEAD END |
Q012022180D36 | 2022-06-29 | 2022-07-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | HILLMEYER AVENUE, QUEENS, FROM STREET BARBADOES DRIVE TO STREET DEAD END |
Q042022180A57 | 2022-06-29 | 2022-07-29 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BARBADOES DRIVE, QUEENS, FROM STREET ALMEDA AVENUE TO STREET HILLMEYER AVENUE |
Q042022180A58 | 2022-06-29 | 2022-07-29 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | HILLMEYER AVENUE, QUEENS, FROM STREET BARBADOES DRIVE TO STREET DEAD END |
B012022168A83 | 2022-06-17 | 2022-07-16 | PAVE STREET-W/ ENGINEERING & INSP FEE | HANCOCK STREET, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B012022167B38 | 2022-06-16 | 2022-07-13 | PAVE STREET-W/ ENGINEERING & INSP FEE | HART STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B022022159C26 | 2022-06-08 | 2022-07-07 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET HART STREET TO STREET PULASKI STREET |
M022022153D58 | 2022-06-02 | 2022-07-02 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | SULLIVAN STREET, MANHATTAN, FROM STREET PRINCE STREET TO STREET WEST HOUSTON STREET |
Q022022152A95 | 2022-06-01 | 2022-06-30 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | SUTPHIN BOULEVARD, QUEENS, FROM STREET 108 AVENUE TO STREET YATES ROAD |
B022022152A94 | 2022-06-01 | 2022-06-30 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE TO STREET METROPOLITAN AVENUE |
Q022022152A94 | 2022-06-01 | 2022-06-30 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 105 STREET, QUEENS, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD |
B022022145C16 | 2022-05-25 | 2022-06-17 | CROSSING SIDEWALK | DEAN STREET, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE |
Q012022122D70 | 2022-05-02 | 2022-05-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | KENO AVENUE, QUEENS, FROM STREET BEND TO STREET MARENGO STREET |
Q012022122D69 | 2022-05-02 | 2022-05-31 | RESET, REPAIR OR REPLACE CURB | KENO AVENUE, QUEENS, FROM STREET BEND TO STREET MARENGO STREET |
B022022110A65 | 2022-04-20 | 2022-05-19 | CROSSING SIDEWALK | DEAN STREET, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE |
Q022022109A16 | 2022-04-19 | 2022-05-20 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 65 PLACE, QUEENS, FROM STREET 70 AVENUE TO STREET CENTRAL AVENUE |
X042022105A04 | 2022-04-15 | 2022-05-17 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | LELAND AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET WATSON AVENUE |
X012022105A42 | 2022-04-15 | 2022-05-17 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | LELAND AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET WATSON AVENUE |
X012022105A41 | 2022-04-15 | 2022-05-17 | RESET, REPAIR OR REPLACE CURB-PROTECTED | LELAND AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET WATSON AVENUE |
X042022098A04 | 2022-04-08 | 2022-05-07 | REPLACE SIDEWALK | LONGWOOD AVENUE, BRONX, FROM STREET BARRY STREET TO STREET GARRISON AVENUE |
Q012022090B36 | 2022-03-31 | 2022-04-28 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 117 ROAD, QUEENS, FROM STREET 190 STREET TO STREET BAISLEY BOULEVARD |
Q012022081B62 | 2022-03-22 | 2022-04-16 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 117 ROAD, QUEENS, FROM STREET 190 STREET TO STREET BAISLEY BOULEVARD |
B012022069J85 | 2022-03-10 | 2022-04-08 | RESET, REPAIR OR REPLACE CURB | SHERIDAN AVENUE, BROOKLYN, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE |
B012022069J86 | 2022-03-10 | 2022-04-08 | PAVE STREET-W/ ENGINEERING & INSP FEE | SHERIDAN AVENUE, BROOKLYN, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE |
B042022069A30 | 2022-03-10 | 2022-04-08 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | SHERIDAN AVENUE, BROOKLYN, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE |
Q042022062A18 | 2022-03-03 | 2022-04-02 | REPLACE SIDEWALK | CANEY ROAD, QUEENS, FROM STREET 249 STREET TO STREET CANEY LANE |
Q042022062A17 | 2022-03-03 | 2022-04-02 | REPLACE SIDEWALK | 249 STREET, QUEENS, FROM STREET 144 AVENUE TO STREET CANEY ROAD |
M022022059A83 | 2022-02-28 | 2022-03-23 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | CROSBY STREET, MANHATTAN, FROM STREET BLEECKER STREET TO STREET EAST HOUSTON STREET |
Q012022053C38 | 2022-02-22 | 2022-03-22 | RESET, REPAIR OR REPLACE CURB | CANEY ROAD, QUEENS, FROM STREET 249 STREET TO STREET CANEY LANE |
Q022022048A72 | 2022-02-17 | 2022-03-16 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | SENECA AVENUE, QUEENS, FROM STREET GATES AVENUE TO STREET LINDEN STREET |
Q022022048A24 | 2022-02-17 | 2022-03-16 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | AVON STREET, QUEENS, FROM STREET 188 STREET TO STREET CHEVY CHASE STREET |
Q022022047A05 | 2022-02-16 | 2022-03-16 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | AVON STREET, QUEENS, FROM STREET 188 STREET TO STREET CHEVY CHASE STREET |
B022022047A30 | 2022-02-16 | 2022-05-15 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | JACKSON STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET |
B022022045A81 | 2022-02-14 | 2022-03-14 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | JEFFERSON AVENUE, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
M022022042B77 | 2022-02-11 | 2022-03-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 48 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET AMTRAK RR |
M012022042A69 | 2022-02-11 | 2022-03-14 | RESET, REPAIR OR REPLACE CURB | WEST 48 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET AMTRAK RR |
M022022042B76 | 2022-02-11 | 2022-03-14 | TEMPORARY PEDESTRIAN WALK | WEST 48 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET AMTRAK RR |
M042022042A03 | 2022-02-11 | 2022-03-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEST 48 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET AMTRAK RR |
Q012022041B71 | 2022-02-10 | 2022-03-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | 75 STREET, QUEENS, FROM STREET 88 ROAD TO STREET 90 AVENUE |
B022022040A23 | 2022-02-09 | 2022-03-12 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE TO STREET METROPOLITAN AVENUE |
B022022040A18 | 2022-02-09 | 2022-03-13 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | FRANKLIN STREET, BROOKLYN, FROM STREET EAGLE STREET TO STREET FREEMAN STREET |
Q012022038C68 | 2022-02-07 | 2022-03-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | 88 AVENUE, QUEENS, FROM STREET 75 STREET TO STREET 76 STREET |
X022022035A08 | 2022-02-04 | 2022-03-04 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | MORRIS AVENUE, BRONX, FROM STREET EAST 179 STREET TO STREET EAST TREMONT AVENUE |
B022022034B71 | 2022-02-03 | 2022-02-27 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | ST MARKS AVENUE, BROOKLYN, FROM STREET CARLTON AVENUE TO STREET FLATBUSH AVENUE |
B022022034B70 | 2022-02-03 | 2022-03-04 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | BURNETT STREET, BROOKLYN, FROM STREET AVENUE V TO STREET WHITNEY AVENUE |
B022022033A55 | 2022-02-02 | 2022-03-01 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | FT HAMILTON PARKWAY, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET |
Q022022033A72 | 2022-02-02 | 2022-03-03 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | BROADWAY, QUEENS, FROM STREET 14 STREET TO STREET 21 STREET |
B022022033A05 | 2022-02-02 | 2022-03-02 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | DORCHESTER ROAD, BROOKLYN, FROM STREET EAST 21 STREET TO STREET FLATBUSH AVENUE |
M022022032A38 | 2022-02-01 | 2022-02-27 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | HUDSON STREET, MANHATTAN, FROM STREET CHARLES STREET TO STREET PERRY STREET |
B022022025B02 | 2022-01-25 | 2022-02-22 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | RYERSON STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B022022024C35 | 2022-01-24 | 2022-02-21 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | STERLING PLACE, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET ROCHESTER AVENUE |
B022022024C34 | 2022-01-24 | 2022-02-25 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | ELTON STREET, BROOKLYN, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE |
B022022024A97 | 2022-01-24 | 2022-02-23 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | TILDEN AVENUE, BROOKLYN, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET |
Q022022024A65 | 2022-01-24 | 2022-02-25 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 73 AVENUE, QUEENS, FROM STREET 267 STREET TO STREET LANGSTON AVENUE |
M022022021B56 | 2022-01-21 | 2022-02-21 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | MERCER STREET, MANHATTAN, FROM STREET BLEECKER STREET TO STREET WEST HOUSTON STREET |
Q042022020A06 | 2022-01-20 | 2022-02-18 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 75 STREET, QUEENS, FROM STREET 88 AVENUE |
Q042022020A05 | 2022-01-20 | 2022-02-18 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 88 AVENUE, QUEENS, FROM STREET 75 STREET TO STREET 76 STREET |
Q012022020B22 | 2022-01-20 | 2022-02-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | 88 AVENUE, QUEENS, FROM STREET 75 STREET TO STREET 76 STREET |
Q012022020B21 | 2022-01-20 | 2022-02-18 | RESET, REPAIR OR REPLACE CURB | 88 AVENUE, QUEENS, FROM STREET 75 STREET TO STREET 76 STREET |
Q022022020A48 | 2022-01-20 | 2022-02-21 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 106 STREET, QUEENS, FROM STREET 103 AVENUE TO STREET LIBERTY AVENUE |
Q042022020A08 | 2022-01-20 | 2022-02-18 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 75 STREET, QUEENS, FROM STREET 88 AVENUE |
Q042022020A07 | 2022-01-20 | 2022-02-18 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 75 STREET, QUEENS, FROM STREET 88 AVENUE |
Q022022019A67 | 2022-01-19 | 2022-02-19 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 94 STREET, QUEENS, FROM STREET 35 AVENUE TO STREET 37 AVENUE |
B022022019A82 | 2022-01-19 | 2022-02-14 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | STERLING PLACE, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET ROCHESTER AVENUE |
M012022014B03 | 2022-01-14 | 2022-02-12 | RESET, REPAIR OR REPLACE CURB | WEST 48 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET AMTRAK RR |
M022022014C99 | 2022-01-14 | 2022-02-12 | TEMPORARY PEDESTRIAN WALK | WEST 48 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET AMTRAK RR |
M022022014D00 | 2022-01-14 | 2022-02-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 48 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET AMTRAK RR |
B022022014A78 | 2022-01-14 | 2022-02-12 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 45 STREET, BROOKLYN, FROM STREET 10 AVENUE TO STREET FT HAMILTON PARKWAY |
M042022014A13 | 2022-01-14 | 2022-02-12 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEST 48 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET AMTRAK RR |
B022022013A43 | 2022-01-13 | 2022-02-11 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | VERNON AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
Q012022012C43 | 2022-01-12 | 2022-02-08 | RESET, REPAIR OR REPLACE CURB | NORTHERN BOULEVARD, QUEENS, FROM STREET CORP KENNEDY STREET TO STREET OCEANIA STREET |
Q042022012A07 | 2022-01-12 | 2022-02-08 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | NORTHERN BOULEVARD, QUEENS, FROM STREET CORP KENNEDY STREET TO STREET OCEANIA STREET |
B022022012C57 | 2022-01-12 | 2022-02-10 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | FRANKLIN STREET, BROOKLYN, FROM STREET EAGLE STREET TO STREET FREEMAN STREET |
B022022012C56 | 2022-01-12 | 2022-02-10 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE TO STREET METROPOLITAN AVENUE |
Q042022011A03 | 2022-01-11 | 2022-02-08 | REPLACE SIDEWALK | HILLSIDE AVENUE, QUEENS, FROM STREET 175 STREET TO STREET 178 STREET |
B022022011B83 | 2022-01-11 | 2022-02-09 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WEST 7 STREET, BROOKLYN, FROM STREET AVENUE W TO STREET BOYNTON PLACE |
B022022011B82 | 2022-01-11 | 2022-02-09 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | JORALEMON STREET, BROOKLYN, FROM STREET BROOKLYN QNS EXPRESSWAY TO STREET COLUMBIA PLACE |
B022022007B16 | 2022-01-07 | 2022-02-08 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | EAST 12 STREET, BROOKLYN, FROM STREET AVENUE O TO STREET AVENUE P |
B022022007A56 | 2022-01-07 | 2022-02-05 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 45 STREET, BROOKLYN, FROM STREET 10 AVENUE TO STREET FT HAMILTON PARKWAY |
B022022007B15 | 2022-01-07 | 2022-02-08 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | DE KALB AVENUE, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
B022022006B47 | 2022-01-06 | 2022-02-04 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE C TO STREET CORTELYOU ROAD |
B022022006B46 | 2022-01-06 | 2022-02-04 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | EMMONS AVENUE, BROOKLYN, FROM STREET HARING STREET TO STREET LAKE AVENUE |
Q022021363C65 | 2021-12-29 | 2022-01-28 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 73 AVENUE, QUEENS, FROM STREET 267 STREET TO STREET LANGSTON AVENUE |
B022021363F09 | 2021-12-29 | 2022-01-27 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | HEGEMAN AVENUE, BROOKLYN, FROM STREET GEORGIA AVENUE TO STREET SHEFFIELD AVENUE |
B022021362B97 | 2021-12-28 | 2022-01-26 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 79 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
Q042021362A02 | 2021-12-28 | 2022-02-01 | REPLACE SIDEWALK | 131 STREET, QUEENS, FROM STREET BEND TO STREET VAN SICLEN STREET |
Q012021362A89 | 2021-12-28 | 2022-02-01 | RESET, REPAIR OR REPLACE CURB | 131 STREET, QUEENS, FROM STREET BEND TO STREET VAN SICLEN STREET |
X022021362A69 | 2021-12-28 | 2022-01-28 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | FOX STREET, BRONX, FROM STREET BARRETTO STREET TO STREET EAST 163 STREET |
Q012021362A90 | 2021-12-28 | 2022-02-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | 131 STREET, QUEENS, FROM STREET BEND TO STREET VAN SICLEN STREET |
B012021357C27 | 2021-12-23 | 2022-01-18 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | WEIRFIELD STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022021357B52 | 2021-12-23 | 2022-01-18 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | COLONIAL ROAD, BROOKLYN, FROM STREET 91 STREET TO STREET 92 STREET |
B022021357B56 | 2021-12-23 | 2022-01-25 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | PACIFIC STREET, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE |
B022021354C57 | 2021-12-20 | 2022-01-21 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | NEW YORK AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B022021354B56 | 2021-12-20 | 2022-01-19 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | EAST 35 STREET, BROOKLYN, FROM STREET BEVERLY ROAD TO STREET TILDEN AVENUE |
B022021354A72 | 2021-12-20 | 2022-01-21 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | TILDEN AVENUE, BROOKLYN, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET |
B022021354C56 | 2021-12-20 | 2022-01-20 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | PULASKI STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B022021350B11 | 2021-12-16 | 2022-01-14 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | CONEY ISLAND AVENUE, BROOKLYN, FROM STREET AVENUE K TO STREET AVENUE L |
B022021350B71 | 2021-12-16 | 2022-01-21 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | JEFFERSON AVENUE, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022021347C35 | 2021-12-13 | 2022-01-10 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE TO STREET METROPOLITAN AVENUE |
B022021347C34 | 2021-12-13 | 2022-01-10 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | FRANKLIN STREET, BROOKLYN, FROM STREET EAGLE STREET TO STREET FREEMAN STREET |
B022021344C08 | 2021-12-10 | 2022-01-08 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | EAST 12 STREET, BROOKLYN, FROM STREET AVENUE O TO STREET AVENUE P |
M022021344A36 | 2021-12-10 | 2022-01-09 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | BANK STREET, MANHATTAN, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET |
X022021344A26 | 2021-12-10 | 2022-01-10 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | EAST 133 STREET, BRONX, FROM STREET CYPRESS AVENUE TO STREET WILLOW AVENUE |
B022021343B74 | 2021-12-09 | 2022-01-10 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | BURNETT STREET, BROOKLYN, FROM STREET AVENUE V TO STREET WHITNEY AVENUE |
B022021343B62 | 2021-12-09 | 2022-01-10 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | DE KALB AVENUE, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
Q022021343B55 | 2021-12-09 | 2022-01-10 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 67 ROAD, QUEENS, FROM STREET 110 STREET TO STREET 112 STREET |
Q022021343B56 | 2021-12-09 | 2022-01-07 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 30 DRIVE, QUEENS, FROM STREET 12 STREET TO STREET VERNON BOULEVARD |
Q042021319A15 | 2021-11-15 | 2021-12-10 | REPAIR SIDEWALK | LINDEN BOULEVARD, QUEENS, FROM STREET 192 STREET TO STREET 193 STREET |
B042021302A13 | 2021-10-29 | 2021-11-30 | REPLACE SIDEWALK | HART STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
Q042021293A30 | 2021-10-20 | 2021-11-23 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 10 AVENUE, QUEENS, FROM STREET 150 STREET TO STREET CLINTONVILLE STREET |
Q042021291A02 | 2021-10-18 | 2021-11-14 | REPLACE SIDEWALK | QUEENS BOULEVARD, QUEENS, FROM STREET 87 AVENUE TO STREET HILLSIDE AVENUE |
B012021256H76 | 2021-09-13 | 2021-09-19 | RESET, REPAIR OR REPLACE CURB | HANCOCK STREET, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B042021256A36 | 2021-09-13 | 2021-09-19 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | HANCOCK STREET, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B012021256H77 | 2021-09-13 | 2021-09-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | HANCOCK STREET, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
X042021231A03 | 2021-08-19 | 2021-09-17 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | HOFFMAN STREET, BRONX, FROM STREET EAST 184 STREET TO STREET EAST 187 STREET |
X042021231A04 | 2021-08-19 | 2021-09-17 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | HOFFMAN STREET, BRONX, FROM STREET EAST 184 STREET TO STREET EAST 187 STREET |
X012021231A63 | 2021-08-19 | 2021-09-17 | PAVE STREET-W/ ENGINEERING & INSP FEE | HOFFMAN STREET, BRONX, FROM STREET EAST 184 STREET TO STREET EAST 187 STREET |
X012021231A61 | 2021-08-19 | 2021-09-17 | PAVE STREET-W/ ENGINEERING & INSP FEE | HOFFMAN STREET, BRONX, FROM STREET EAST 184 STREET TO STREET EAST 187 STREET |
X012021231A62 | 2021-08-19 | 2021-09-17 | RESET, REPAIR OR REPLACE CURB | HOFFMAN STREET, BRONX, FROM STREET EAST 184 STREET TO STREET EAST 187 STREET |
X012021231A60 | 2021-08-19 | 2021-09-17 | RESET, REPAIR OR REPLACE CURB | HOFFMAN STREET, BRONX, FROM STREET EAST 184 STREET TO STREET EAST 187 STREET |
B042021222A21 | 2021-08-10 | 2021-09-07 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WYONA STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET |
Q042021209B31 | 2021-07-28 | 2021-08-27 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 132 AVENUE, QUEENS, FROM STREET ROCKAWAY BOULEVARD |
Q042021209B30 | 2021-07-28 | 2021-08-27 | REPLACE SIDEWALK | ROCKAWAY BOULEVARD, QUEENS, FROM STREET 132 AVENUE TO STREET BAISLEY BOULEVARD |
Q042021208A27 | 2021-07-27 | 2021-08-27 | REPLACE SIDEWALK | ROCKAWAY BOULEVARD, QUEENS, FROM STREET 132 AVENUE TO STREET BAISLEY BOULEVARD |
Q012021202B39 | 2021-07-21 | 2021-09-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | 249 STREET, QUEENS, FROM STREET BEND TO STREET MEMPHIS AVENUE |
Q012021202B38 | 2021-07-21 | 2021-09-01 | RESET, REPAIR OR REPLACE CURB | 249 STREET, QUEENS, FROM STREET BEND TO STREET MEMPHIS AVENUE |
Q042021202A20 | 2021-07-21 | 2021-09-01 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 249 STREET, QUEENS, FROM STREET BEND TO STREET MEMPHIS AVENUE |
B042021165A08 | 2021-06-14 | 2021-07-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 28 STREET, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
Start date | End date | Type | Value |
---|---|---|---|
2024-06-18 | 2024-06-18 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-05-06 | 2024-06-18 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-03-01 | 2024-05-06 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-02-05 | 2024-03-01 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-02-05 | 2024-02-05 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-01-24 | 2024-02-05 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-01-16 | 2024-01-24 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-12-20 | 2023-12-20 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-12-20 | 2024-01-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-12-18 | 2023-12-20 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-11-14 | 2023-12-18 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-11-14 | 2023-11-14 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-11-03 | 2023-11-14 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-10-03 | 2023-11-03 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-10-02 | 2023-10-03 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-09-29 | 2023-10-02 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-08-22 | 2023-09-29 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-07-31 | 2023-07-31 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-07-31 | 2023-08-22 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-07-18 | 2023-07-31 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-07-11 | 2023-07-18 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-07-10 | 2023-07-11 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-07-09 | 2023-07-10 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-07-09 | 2023-07-09 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-06-03 | 2023-07-09 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-04-17 | 2023-06-03 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-02-23 | 2023-04-17 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-02-23 | 2023-02-23 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-02-21 | 2023-02-23 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-01-12 | 2023-02-21 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-01-12 | 2023-01-12 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-29 | 2022-08-29 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-29 | 2023-01-12 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-07-26 | 2022-08-29 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-07-14 | 2022-07-26 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-07-14 | 2022-07-14 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-06-18 | 2022-07-14 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-06-18 | 2022-06-18 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-06-17 | 2022-06-18 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-06-17 | 2022-06-17 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-06-16 | 2022-06-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-06-16 | 2022-06-17 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-05-31 | 2022-06-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-05-18 | 2022-05-18 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-05-18 | 2022-05-31 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2020-01-28 | 2022-05-18 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
200128010443 | 2020-01-28 | CERTIFICATE OF INCORPORATION | 2020-01-28 |
Date | Inspection Object | Address | Grade | Type | Institution | Desctiption |
---|---|---|---|---|---|---|
2024-10-30 | No data | BARBADOES DRIVE, FROM STREET HILLMEYER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed single ramp within the SW1 corner quadrant was found to be non ADA compliant, due to 2” curb reveal. Ramp re measured and collected in prism on 5/19/23. Condition remains. |
2024-09-11 | No data | BARBADOES DRIVE, FROM STREET HILLMEYER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp within the SW1 corner quadrant was found to be non ADA compliant, due to 2” curb reveal. Ramp re measured and collected in prism on 5/19/23. |
2024-09-03 | No data | 75 STREET, FROM STREET 88 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SE4 corner quadrant was found to be non ADA compliant. Measured and collected in Prism on 2/11/22. |
2024-08-02 | No data | ATLANTIC AVENUE, FROM STREET 104 STREET TO STREET 106 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work on permit. |
2024-07-14 | No data | 165 STREET, FROM STREET 107 AVENUE TO STREET SOUTH ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paving done in front of 104-74 |
2024-05-29 | No data | ALMEDA AVENUE, FROM STREET BARBADOES DRIVE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | permittee on hold |
2024-05-29 | No data | 132 AVENUE, FROM STREET ROCKAWAY BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | permittee on hold |
2024-05-29 | No data | 88 AVENUE, FROM STREET 75 STREET TO STREET 76 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | permittee on hold |
2024-04-29 | No data | UTICA AVENUE, FROM STREET AVENUE D TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb in compliance |
2024-04-20 | No data | WEIRFIELD STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration to grade with gas cuts within it. |
2024-04-08 | No data | BARBADOES DRIVE, FROM STREET ALMEDA AVENUE TO STREET HILLMEYER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | concrete curb installed |
2024-03-27 | No data | ALMEDA AVENUE, FROM STREET BARBADOES DRIVE TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced |
2024-03-27 | No data | HILLMEYER AVENUE, FROM STREET BARBADOES DRIVE TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP installed |
2024-01-31 | No data | 75 STREET, FROM STREET 88 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SE4 corner quadrant was found to be non ADA compliant. Measured and collected in Prism on 2/11/22. |
2024-01-26 | No data | 145 DRIVE, FROM STREET 176 STREET TO STREET 177 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb is reset and restored in front of 176-06. |
2024-01-18 | No data | BARBADOES DRIVE, FROM STREET HILLMEYER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp within the SW1 corner quadrant was found to be non ADA compliant, due to 1”) curb reveal, 8.4% ramp running slope and 5.3 roadway counter slope. Ramp re measured and collected in prism on 5/19/23. C.A.R will be issued |
2024-01-17 | No data | 79 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | I observed the above respondent has a construction container placed on the roadway, without a valid DOT permit on file. DOB permit, #B00721790-I1-GC, used for ID. |
2024-01-10 | No data | 249 STREET, FROM STREET BEND TO STREET MEMPHIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent gas restoration flushed and sealed IFO 142-15. Also I observed a BPP was completed here |
2023-11-11 | No data | 165 STREET, FROM STREET 107 AVENUE TO STREET SOUTH ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flag broken then patched at adjacent property, during excavating permitted sidewalk. Replace full sidewalk flag. |
2023-11-10 | No data | HANCOCK STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY PAVED HALF +5 |
2023-11-02 | No data | SHERIDAN AVENUE, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb in compliance |
2023-10-31 | No data | LINDEN BOULEVARD, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the respondent open the full sidewalk without active permit on file IFO 205-16 Linden Blvd. All the concrete has been removed. At time of inspection. I ID by the builders attached DOB permits. |
2023-10-28 | No data | KENO AVENUE, FROM STREET BEND TO STREET MARENGO STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb is reset & restored in front of 199-37. |
2023-10-20 | No data | 131 STREET, FROM STREET BEND TO STREET VAN SICLEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection. Permit expired. |
2023-10-07 | No data | UTICA AVENUE, FROM STREET AVENUE D TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb in place and in compliance |
2023-09-02 | No data | HANCOCK STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cut was resealed |
2023-08-26 | No data | GATES AVENUE, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | I observed 91 feet of construction material and equipment stored in the parking lane in front of property #292 without a valid DOT permit. Respondent ID #52030 failed to obtain a DOT permit to store material/equipment on the street. Used posted DOB p |
2023-08-12 | No data | 88 AVENUE, FROM STREET 75 STREET TO STREET 76 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the respondent has a newly constructed sidewalk however failed to seal the expansion joints as required. The respondent was notified VIA CAR# 20236200151 issued on 4/30/23. |
2023-07-30 | No data | HANCOCK STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to properly seal & maintain the wearing course. CAR#(20237720108) was issued on 3/28/2023. Permit# B012021256H77 was use for ID. |
2023-07-29 | No data | SHERIDAN AVENUE, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no builder paver plan (BPP) conducted, as per permit 1/2 + 5' should be conducted , mill and pave as per stipulated 1/2 + 5' of the roadway |
2023-07-29 | No data | SHERIDAN AVENUE, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | no builder paver plan (BPP) conducted, as per permit 1/2 + 5' should be conducted , mill and pave as per stipulated 1/2 + 5' of the roadway |
2023-06-28 | No data | ALMEDA AVENUE, FROM STREET BARBADOES DRIVE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed single ramp within the NW2 corner quadrant was found to be non Ada compliant. Pavement key need to be install, ramp running slope and both flares slope need to be corrected. Measured and collected in prism on 11/7/22 . |
2023-06-28 | No data | BARBADOES DRIVE, FROM STREET HILLMEYER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Single DWS mat has been installed within the SW1 corner quadrant. |
2023-06-24 | No data | 88 AVENUE, FROM STREET 75 STREET TO STREET 76 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent failed to recess and sealed the expansion joint of its newly installed sidewalk. Respondent was notified by CAR# 20236200151 on 04/30/23. Permit# Q042022020A05 for sidewalk job at location was used to identify respondent. |
2023-06-17 | No data | 132 AVENUE, FROM STREET ROCKAWAY BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps within the NW2 corner quadrant with sprayed painted red DWS and excessive ramp running slope. Will reinspect at a later date. |
2023-06-16 | No data | HANCOCK STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to properly seal & maintain the wearing course. CAR#(20237870108) was issued 3/28/2023. Permit# B012021256H77 was used for ID. |
2023-06-15 | No data | SHERIDAN AVENUE, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no builder paver plan (BPP) conducted, as per permit 1/2 + 5' should be conducted , mill and pave as per stipulated 1/2 + 5' of the roadway |
2023-06-09 | No data | BARBADOES DRIVE, FROM STREET ALMEDA AVENUE TO STREET HILLMEYER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R/w paved |
2023-06-01 | No data | HILLMEYER AVENUE, FROM STREET BARBADOES DRIVE TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R/w paved |
2023-05-24 | No data | 112 AVENUE, FROM STREET 219 STREET TO STREET 221 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the respondent storing a full construction container in the parking lane without a active NYC DOT permit on file. Respondent was ID by active DOB permit posted onsite. |
2023-05-19 | No data | BARBADOES DRIVE, FROM STREET HILLMEYER AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Newly completed single ramp within the SW1 corner quadrant was found to be non ADA compliant, due to excessive (1”) curb reveal, 8.4% ramp running slope and 5.3 roadway counter slope. Ramp measured and collected in prism on 5/19/23. |
2023-05-19 | No data | BARBADOES DRIVE, FROM STREET HILLMEYER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Correct DWS mat has been installed. |
2023-05-04 | No data | HANCOCK STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to seal & maintain the wearing course. CAR#(20237720108) was issued on 3/28/2023. Permit#B012021256H77 was used for ID. |
2023-04-30 | No data | 88 AVENUE, FROM STREET 75 STREET TO STREET 76 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR - to recess by 1/2" and seal with caulk, all expansion joints of restored/replaced sidewalk. |
2023-04-19 | No data | HANCOCK STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | THE PERM RESTORATION HAS BEEN SEALED. |
2023-04-14 | No data | ALMEDA AVENUE, FROM STREET BARBADOES DRIVE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed single ramp within the NW2 corner quadrant was found to be non Ada compliant. Pavement key need to be install, ramp running slope and both flares slope need to be corrected. Measured and collected in prism on 11/7/22. |
2023-03-29 | No data | 112 AVENUE, FROM STREET 219 STREET TO STREET 221 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | RESPONDENT HAS STORED A CONSTUCTION CONTAINER ON THE ROADWAY I/F/O THEIR ACTIVE BUILDING OPERATION (DOB PERMIT Q00792665-1-GC-CX EXP. 09/17/2023) WITHOUT AN ACTIVE DOT PERMIT ON FILE. RESPONDENT ID THRU PERMIT CITED. NO ACTIVE PERMIT |
2023-03-28 | No data | HANCOCK STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED IMPROPERLY SEALED PERMANENT RESTORATION IN FRONT OF PROPERTY #674. CAR #20237720108 ISSUED 2/20/2023. RESPONDENT FAILED TO PROPERLY SEAL AND MAINTAIN THE WEARING COURSE. |
2023-03-17 | No data | BEDFORD AVENUE, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints sealed |
2023-03-11 | No data | GUY R BREWER BOULEVARD, FROM STREET 109 AVENUE TO STREET BRINKERHOFF AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE RESPONDENT HAS FAIL TO SEAL THEIR EXPANSION JOINTS AFTER BEING NOTIFIED. CONDITIONS REMAINS THE SAME. RESPONDENT WAS NOTIFIED THRU CAR [#20220320784] ISSUED ON 11/12/2022 AT 10:53:55 AM. |
2023-03-08 | No data | HANCOCK STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED UNSEALED PERM RESTORATION ON THE ROADWAY. CAR# 20237720040 ISSUED 1/23/2023. RESPONDENT FAILED TO PROPERLY SEAL AND MAINTAIN THE WEARING COURSE. CITED PERMIT USED FOR ID. |
2023-02-25 | No data | 145 DRIVE, FROM STREET 176 STREET TO STREET 177 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builder's pave is perm to grade & sealed in front of 176-06 145th Drive |
2023-02-20 | No data | HANCOCK STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESEAL THE PERM RESTORATION IN THE DRIVING LANE IFO PROPERTY #674. |
2023-02-07 | No data | SHERIDAN AVENUE, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR closed as per policy to limit sidewalk permit NOVs. Contractor placed on hold. |
2023-02-01 | No data | NORTHERN BOULEVARD, FROM STREET CORP KENNEDY STREET TO STREET OCEANIA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel faced curb installed, joints sealed |
2023-01-27 | No data | WEST 48 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESET, REPAIR OR REPLACE CURB STEEL FACED CURB FREE OF DEFECTS AND IN COMPLIANCE |
2023-01-26 | No data | KENO AVENUE, FROM STREET BEND TO STREET MARENGO STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP 1/2 + 5’ in compliance in the RDWY. |
2023-01-24 | No data | SHERIDAN AVENUE, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK DONE PERMIT EXPIRED |
2023-01-20 | No data | EAST 226 STREET, FROM STREET LACONIA AVENUE TO STREET PAULDING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No new roadway paving for new building |
2023-01-20 | No data | MERRICK BOULEVARD, FROM STREET 116 AVENUE TO STREET FOCH BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESET, REPAIR OR REPLACE CURB-PERM |
2023-01-18 | No data | HART STREET, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP is in compliance |
2023-01-18 | No data | 10 AVENUE, FROM STREET 150 STREET TO STREET CLINTONVILLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP restoration to grade in the roadway. |
2023-01-15 | No data | BEDFORD AVENUE, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Rw half plus 5 done in compliance |
2023-01-10 | No data | HANCOCK STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESEAL THE PERM RESTORATION IFO PROPERTY #674. |
2023-01-08 | No data | HART STREET, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP in in compliance |
2023-01-03 | No data | WEST 136 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP in compliance |
2022-12-10 | No data | WEST 136 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW has been repaired and and sealed . |
2022-12-08 | No data | ATLANTIC AVENUE, FROM STREET 104 STREET TO STREET 106 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started. |
2022-12-04 | No data | CANEY ROAD, FROM STREET 249 STREET TO STREET CANEY LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESET, REPAIR OR REPLACE CURB-PERM |
2022-12-01 | No data | WEST 136 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No street pave work started |
2022-11-24 | No data | SHERIDAN AVENUE, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to seal expansion joints after being notified in previous CAR #20221660147 issued 8/23/2022. Permit #b042022069A30 expired 4/8/2022 used for ID |
2022-11-23 | No data | FRANKLIN AVENUE, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flags with expansion joints |
2022-11-22 | No data | ALMEDA AVENUE, FROM STREET BARBADOES DRIVE TO STREET DEAD END | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Lane markings applied. Area in compliance. |
2022-11-20 | No data | UTICA AVENUE, FROM STREET AVENUE D TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb reset in front of 1298 Utica avenue |
2022-11-17 | No data | 132 AVENUE, FROM STREET ROCKAWAY BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps within the NW2 corner quadrant with sprayed painted red DWS and excessive ramp running slope. Will reinspect at a later date. |
2022-11-15 | No data | ALMEDA AVENUE, FROM STREET BARBADOES DRIVE TO STREET DEAD END | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent repaired the condition on CAR #20226150500 issued on 9/1/2022 without the noted permit listed as required. |
2022-11-12 | No data | GUY R BREWER BOULEVARD, FROM STREET 109 AVENUE TO STREET BRINKERHOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Recess 1/2" all expansion joints on sidewalk then seal. |
2022-11-07 | No data | CANEY ROAD, FROM STREET 249 STREET TO STREET CANEY LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sections of sidewalk replaced and sealed. |
2022-11-07 | No data | BARBADOES DRIVE, FROM STREET HILLMEYER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SW1 corner quadrant is non Ada compliant. Measured and collected in prism on 11/7/22. |
2022-11-07 | No data | ALMEDA AVENUE, FROM STREET BARBADOES DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp within the NW2 corner quadrant was found to be non Ada compliant. Measured and collected in prism on 11/7/22. |
2022-11-07 | No data | 249 STREET, FROM STREET 144 AVENUE TO STREET CANEY ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Section of sidewalk and curb replaced and sealed. |
2022-11-06 | No data | BEDFORD AVENUE, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joint on sidewalk & curb need to be sealed in front of 2675 Bedford Ave & permit expired on 10/28/2022 |
2022-10-18 | No data | 131 STREET, FROM STREET BEND TO STREET VAN SICLEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed, joints sealed |
2022-10-18 | No data | 86 STREET, FROM STREET 31 AVENUE TO STREET 32 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb replaced, joint sealed. |
2022-10-17 | No data | GUY R BREWER BOULEVARD, FROM STREET 109 AVENUE TO STREET BRINKERHOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work on permit. |
2022-10-14 | No data | POWELL STREET, FROM STREET LOTT AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No container on street |
2022-10-14 | No data | SHERIDAN AVENUE, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to seal expansion joints after being notified in previous CAR #20221660147 issued 8/23/2022. Permit #b012022069A30 expired 4/8/2022 used for ID |
2022-10-13 | No data | ALMEDA AVENUE, FROM STREET BARBADOES DRIVE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit on file. No ped ramp work visible at this time of inspection within the NE3 corner quadrant. We’ll reinspect at a later date. |
2022-10-13 | No data | BARBADOES DRIVE, FROM STREET HILLMEYER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit on file. Newly completed single ramp within the SW1 corner quadrant is functional and accessible, we’ll measure at later date due to rain. |
2022-10-12 | No data | 132 AVENUE, FROM STREET ROCKAWAY BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expired permit on file. Completed tangent ramps within the NW2 corner quadrant with gray DWS and excessive ramp running slope. Ramps are functional and accessible. We’ll reinspect at a later date. |
2022-10-12 | No data | 132 AVENUE, FROM STREET ROCKAWAY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expired permit on file. Completed tangent ramps within the NW2 corner quadrant with gray DWS and excessive ramp running slope. Ramps are functional and accessible. We’ll reinspect at a later date. |
2022-10-06 | No data | FRANKLIN AVENUE, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | W OF RDWY 40FT, W MILLED 25FT,L MILLED 43FT, D MILLED 3in. |
2022-10-06 | No data | ALMEDA AVENUE, FROM STREET BARBADOES DRIVE TO STREET DEAD END | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent repaired the condition on CAR# (20226150500) on 9/1/2022 without the noted permit listed as required. |
2022-10-06 | No data | SHERIDAN AVENUE, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | EXPANSION JOINTS NOT SEALED IN NEWLY INSTALLED SIDEWALK |
2022-10-01 | No data | JEFFERSON AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No container on site |
2022-09-30 | No data | BURNETT STREET, FROM STREET AVENUE V TO STREET WHITNEY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Container is placed on street - in compliance |
2022-09-29 | No data | 75 STREET, FROM STREET 88 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the SE4 corner quadrant was found to be non ADA compliant. Measured and collected in Prism on 2/11/22. |
2022-09-27 | No data | AVON STREET, FROM STREET 188 STREET TO STREET CHEVY CHASE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Container stored on street |
2022-09-20 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Construction container on site. No impaction to bike lane. |
2022-09-19 | No data | EAST 226 STREET, FROM STREET LACONIA AVENUE TO STREET PAULDING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon my inspection and determination I/F/O 1048 the installed expansion joints are typically placed at 20 feet (4 5x5 sidewalk flags) intervals at the lot line. Expansion joints filler material shall be placed to full depth of sidewalk. |
2022-09-09 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Container placed down in front. |
2022-09-07 | No data | JEFFERSON AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Container is on site |
2022-09-06 | No data | MULINER AVENUE, FROM STREET DELANCEY PLACE TO STREET MORRIS PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Container off the street |
2022-09-06 | No data | CLASSON AVENUE, FROM STREET CLIFTON PLACE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Container placed down in front. |
2022-09-02 | No data | HILLMEYER AVENUE, FROM STREET BARBADOES DRIVE TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb joints sealed at this time. |
2022-09-02 | No data | ALMEDA AVENUE, FROM STREET BARBADOES DRIVE TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb in compliance at this time. |
2022-09-02 | No data | EAST 226 STREET, FROM STREET LACONIA AVENUE TO STREET PAULDING AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No new work done on the roadway, permit still active. |
2022-09-02 | No data | BARBADOES DRIVE, FROM STREET ALMEDA AVENUE TO STREET HILLMEYER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Ifo address's 603, 605, 607, 611, & 615, There are multiple sidewalk flags, that need to be restored 5' x 5' when feasible along the driveway. Restore flags in "FULL" 5' x 5' restoration on ALL five driveways. |
2022-09-01 | No data | ALMEDA AVENUE, FROM STREET BARBADOES DRIVE TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 5' From Almeda Ave & Barbados Drive, apply missing lane markings, adjacent to builders pave, in the driving lane. |
2022-09-01 | No data | 140 AVENUE, FROM STREET 219 STREET TO STREET SPRINGFIELD BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | OPEN CONSTRUCTION DEBRIS CONTAINER ON THE STREET |
2022-08-30 | No data | BEDFORD AVENUE, FROM STREET LEXINGTON AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Construction debris container on Quincy Street in the parking lane while in compliance. |
2022-08-23 | No data | SHERIDAN AVENUE, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Sidewalk expansion joints need to be sealed, after new install .. |
2022-08-23 | No data | SHERIDAN AVENUE, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | pass, c-a-r issued ... |
2022-08-17 | No data | AVON STREET, FROM STREET 188 STREET TO STREET CHEVY CHASE STREET | No data | Street Construction Inspections: Active | Department of Transportation | OPEN CONSTRUCTION DEBRIS CONTAINER ON THE STREET |
2022-08-17 | No data | 87 STREET, FROM STREET ATLANTIC AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | No visible open container on location |
2022-08-10 | No data | 105 STREET, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | container r/w |
2022-08-03 | No data | 132 AVENUE, FROM STREET ROCKAWAY BOULEVARD | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Expired permit on file. Completed tangent ramps within the NW2 corner quadrant with gray DWS and excessive ramp running slope. Ramps are functional and accessible. We’ll reinspect at a later date. |
2022-08-03 | No data | 132 AVENUE, FROM STREET ROCKAWAY BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition remains the same within the NW2 corner quadrant. We’ll pass this one out and issue another C.A.R. |
2022-07-29 | No data | ALMEDA AVENUE, FROM STREET BARBADOES DRIVE TO STREET DEAD END | No data | Street Construction Inspections: Active | Department of Transportation | Active permit on file. No BBP work observed at this time of inspection. |
2022-07-29 | No data | HILLMEYER AVENUE, FROM STREET BARBADOES DRIVE TO STREET DEAD END | No data | Street Construction Inspections: Active | Department of Transportation | Active permit on file. No BBP work observed at this time of inspection. |
2022-07-29 | No data | BARBADOES DRIVE, FROM STREET ALMEDA AVENUE TO STREET HILLMEYER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit on file. No BBP work observed at this time of inspection. |
2022-07-27 | No data | 132 AVENUE, FROM STREET ROCKAWAY BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expired permit on file. Completed tangent ramps within the NW2 corner quadrant with gray DWS and excessive ramp running slope. Ramps are functional and accessible. We’ll reinspect at a later date. |
2022-07-19 | No data | 145 DRIVE, FROM STREET 176 STREET TO STREET 177 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP passed. 49'8" x 27'3" x 3" |
2022-06-29 | No data | SHERIDAN AVENUE, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | expansion joints on sidewalk need to be sealed. plus remove wood from tree pit |
2022-06-29 | No data | EAST 28 STREET, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb sealed and in compliance |
2022-06-24 | No data | HANCOCK STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Full roadway Width:34'0Cut size:L30'0 W22'0 D0'3 |
2022-06-23 | No data | SUTPHIN BOULEVARD, FROM STREET 108 AVENUE TO STREET YATES ROAD | No data | Street Construction Inspections: Active | Department of Transportation | No container on street at this time |
2022-06-17 | No data | HART STREET, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Width of Roadway: 33ft 6inWidth of milled area: 21ft 11inLength of milled area: 20ft 4inDepth of milled area: 3fin down |
2022-06-06 | No data | SHERIDAN AVENUE, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | . curb |
2022-05-31 | No data | KENO AVENUE, FROM STREET BEND TO STREET MARENGO STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No work started. No work done. No inspection found at this time. |
2022-05-27 | No data | DEAN STREET, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Crossing sidewalk is not active at this time. |
2022-05-27 | No data | WYONA STREET, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, bpp .... |
2022-05-24 | No data | 132 AVENUE, FROM STREET ROCKAWAY BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expired permit on file. Completed tangent ramps within the NW2 corner quadrant with gray DWS and excessive ramp running slope. Ramps are functional and accessible. We’ll reinspect at a later date. |
2022-05-23 | No data | ROCKAWAY BOULEVARD, FROM STREET 132 AVENUE TO STREET BAISLEY BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints on sidewalk sealed also at curb. |
2022-04-30 | No data | 117 ROAD, FROM STREET 190 STREET TO STREET BAISLEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB WAS RESET |
2022-04-22 | No data | 132 AVENUE, FROM STREET ROCKAWAY BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expired permit on file. Completed tangent ramps within the NW2 corner quadrant with gray DWS and excessive ramp running slope. Ramps are functional and accessible. We’ll reinspect at a later date. |
2022-04-15 | No data | LONGWOOD AVENUE, FROM STREET BARRY STREET TO STREET GARRISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon inspection I found the above respondent with a full width sidewalk closed with barricades. Respondent failed to comply with the terms and condition of DOT permit stipulation 015 maintain a 8 clear walk on sidewalk. therefore NOV was issued. |
2022-04-13 | No data | HILLSIDE AVENUE, FROM STREET 175 STREET TO STREET 178 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No new work on location. |
2022-04-04 | No data | 88 AVENUE, FROM STREET 75 STREET TO STREET 76 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb replaced, joints sealed on the 75 Street side of property. |
2022-04-04 | No data | 132 AVENUE, FROM STREET ROCKAWAY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expired permit on file. Completed tangent ramps within the NW2 corner quadrant with gray DWS and excessive ramp running slope. Ramps are functional and accessible. We’ll reinspect at a later date. |
2022-03-11 | No data | 75 STREET, FROM STREET 88 ROAD TO STREET 90 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed and acceptable. Curb to curb 29' 8", milled area 61' 6" x 20' 0", depth 3". Inspection completed by Jarrell Mack on 2/4/22 under permit # Q012022020B22. |
2022-03-09 | No data | JEFFERSON AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Container in compliance. |
2022-03-08 | No data | QUEENS BOULEVARD, FROM STREET 87 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work on permit. |
2022-03-08 | No data | WEST 48 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Active | Department of Transportation | ongoing curb restoration is in compliance |
2022-03-07 | No data | WEST 48 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Active | Department of Transportation | temporary pedestrian walkway is in compliance |
2022-03-04 | No data | 131 STREET, FROM STREET BEND TO STREET VAN SICLEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 4 flags replaced and sealed. |
2022-03-01 | No data | 75 STREET, FROM STREET 88 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the SE4 corner found to be non ADA compliant due to right flare & landing running slopes exceeds the acceptable ADA standards. Ramps are functional and accessible. Previously M/C on Prism on 2/11/22. |
2022-03-01 | No data | 88 AVENUE, FROM STREET 75 STREET TO STREET 76 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed and acceptable. Curb to curb 29' 8", milled area 61' 6" x 20' 0", depth 3". Inspection completed by Jarrell Mack on 2/4/22 under permit # Q012022020B22. |
2022-02-25 | No data | BURNETT STREET, FROM STREET AVENUE V TO STREET WHITNEY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | container on rw in compliance |
2022-02-15 | No data | FRANKLIN STREET, FROM STREET EAGLE STREET TO STREET FREEMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | No container onsite at time of inspection |
2022-02-15 | No data | FRANKLIN STREET, FROM STREET EAGLE STREET TO STREET FREEMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No container onsite at time of inspection |
2022-02-11 | No data | 75 STREET, FROM STREET 88 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps within the SE4 corner found to be non ADA compliant due to right flare & landing running slopes exceeds the acceptable ADA standards. Ramps are functional and accessible. M/C 2/11/22. |
2022-02-07 | No data | FT HAMILTON PARKWAY, FROM STREET 54 STREET TO STREET 55 STREET | No data | Street Construction Inspections: Active | Department of Transportation | container placed on the roadway in compliance |
2022-02-04 | No data | 75 STREET, FROM STREET 88 AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the intersection of 75th st & 88th Ave for the corner property of 75-04 88th Ave milled without a permit. Respondent failed to apply for a permit prior to milling the roadway. ID by permit number Q012022020B22. |
2022-02-04 | No data | 88 AVENUE, FROM STREET 75 STREET TO STREET 76 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed and acceptable. Curb to curb 29' 8", milled area 61' 6" x 20' 0", depth 3". |
2022-02-04 | No data | TILDEN AVENUE, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Debris container not found to be on roadway at this time |
2022-02-04 | No data | 75 STREET, FROM STREET 88 AVENUE TO STREET 88 ROAD | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the roadway on 75th st between 88th Ave & 88th Rd for the corner property of 75-04 88th Ave milled without a permit. Respondent failed to apply for a permit prior to milling the roadway. ID by permit number Q012022020B22. |
2022-02-03 | No data | HUDSON STREET, FROM STREET CHARLES STREET TO STREET PERRY STREET | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O 548½, 1 open debris container placed within East parking lane. |
2022-02-03 | No data | NORTHERN BOULEVARD, FROM STREET CORP KENNEDY STREET TO STREET OCEANIA STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work found |
2022-02-01 | No data | STERLING PLACE, FROM STREET BUFFALO AVENUE TO STREET ROCHESTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CONSTRUCTION CONTAINER ON THE ROADWAY |
2022-01-31 | No data | STERLING PLACE, FROM STREET BUFFALO AVENUE TO STREET ROCHESTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CONTAINER ON THE ROADWAY |
2022-01-31 | No data | FRANKLIN STREET, FROM STREET EAGLE STREET TO STREET FREEMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | Yellow container stored in the parking lane |
2022-01-28 | No data | WEST 48 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Active | Department of Transportation | temporary pedestrian walkway is in compliance |
2022-01-25 | No data | 45 STREET, FROM STREET 10 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | container placed on the roadway |
2022-01-25 | No data | ELTON STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | DEBRIS CONTAINER |
2022-01-23 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Container on street. |
2022-01-19 | No data | WEST 48 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Active | Department of Transportation | new curb is in compliance |
2022-01-19 | No data | HANCOCK STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK DONE PERMIT EXPIRED |
2022-01-15 | No data | HEGEMAN AVENUE, FROM STREET GEORGIA AVENUE TO STREET SHEFFIELD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Guard Booth |
2022-01-11 | No data | 79 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No container on street |
2022-01-11 | No data | ROCKAWAY BOULEVARD, FROM STREET 132 AVENUE TO STREET BAISLEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Recess 1/2" and seal all expansion joints on sidewalk also at curb. |
2022-01-10 | No data | JEFFERSON AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No Open Construction Debris Container Visible On Site At Time Of Inspection |
2022-01-08 | No data | 73 AVENUE, FROM STREET 267 STREET TO STREET LANGSTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | container r/w |
2022-01-05 | No data | PULASKI STREET, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Container on site. |
2022-01-05 | No data | 30 DRIVE, FROM STREET 12 STREET TO STREET VERNON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No open container on location at this time |
2022-01-04 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Container on site |
2022-01-02 | No data | EAST 133 STREET, FROM STREET CYPRESS AVENUE TO STREET WILLOW AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No container on site. |
2021-12-29 | No data | NEW YORK AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | CONSTRUCTION CONTAINER ON THE ROADWAY |
2021-12-24 | No data | 67 ROAD, FROM STREET 110 STREET TO STREET 112 STREET | No data | Street Construction Inspections: Active | Department of Transportation | NO OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET |
2021-12-21 | No data | PULASKI STREET, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CONSTRUCTION CONTAINER ON THE ROADWAY |
2021-12-18 | No data | LINDEN BOULEVARD, FROM STREET 192 STREET TO STREET 193 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK DONE |
2021-12-12 | No data | HART STREET, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK DONE PERMIT EXPIRED |
2021-12-08 | No data | 10 AVENUE, FROM STREET 150 STREET TO STREET CLINTONVILLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR - to recess and seal expansion joints of new sidewalk. |
2021-12-01 | No data | QUEENS BOULEVARD, FROM STREET 87 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No folk lift visible on site at this time of inspection. |
2021-11-17 | No data | EAST 28 STREET, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Contractor has responded to this request tape has been removed from sidewalk restoration, in compliance. |
2021-11-03 | No data | 10 AVENUE, FROM STREET 150 STREET TO STREET CLINTONVILLE STREET | No data | Street Construction Inspections: Active | Department of Transportation | The below BPP is completed and acceptable. Curb to Curb width – 32’0”, Milled area – 22’0” x 61’0”, Depth of milled area – 3”, ½ +5’ milled (yes/no) – Yes. |
2021-10-31 | No data | HOFFMAN STREET, FROM STREET EAST 184 STREET TO STREET EAST 187 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk and curb in compliance. New Building |
2021-10-28 | No data | WYONA STREET, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Whole street: 26ft 1inWidth: 57ft 7in Down 3in |
2021-10-05 | No data | EAST 28 STREET, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Tape removal needed from sidewalk sealer expansion joints in front of #332. |
2021-09-27 | No data | 249 STREET, FROM STREET BEND TO STREET MEMPHIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb not replaced. |
2021-09-21 | No data | WYONA STREET, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK DONE PERMIT EXPIRED |
2021-09-18 | No data | 132 AVENUE, FROM STREET ROCKAWAY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | DDC contractor major reconstruction/roadway resurface |
2021-09-17 | No data | HOFFMAN STREET, FROM STREET EAST 184 STREET TO STREET EAST 187 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No new work done on the roadway, permit still active. |
2021-09-07 | No data | WYONA STREET, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work was done on roadway during inspection. |
2021-09-02 | No data | 132 AVENUE, FROM STREET ROCKAWAY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the NW2 corner quadrant. Ramps are functional and accessible, gray DWS mats need to be change to red. Unable to measure at this. |
2021-08-02 | No data | 132 AVENUE, FROM STREET ROCKAWAY BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No ped ramp work started at this time. Excavation within the NW2 corner quadrant. Ramps are not functional or accessible due to excavation. Will reinspect at a later date. |
2021-07-17 | No data | EAST 28 STREET, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Brand new sidewalk flags installed in front of property #332 EAST 28 STREET expansion joints sealed in between the sidewalk, curb & end of the property line in compliance |
THE CORPORATION
ARSHIA DESIGNS INC. AAA VACUUM CORP. ATLANTICA TELECOM, INC. MISTY SPORTSWEAR, INC. INRACKS, INC. FAT JAMS ELECTRONICS INC. CROQUEMBOUCHE, INC. LONG BEACH PEDIATRIC GROUP, P.C. LAW OFFICES OF JOSEPH A. GRECO, P.C. TEREZ, INC.1091 FURTH ROAD, VALLEY STREAM, NY, United States, 11581
101 ORIENTAL BLVD, LLC 1026 BROOKSIDE CORP. 138 LANDER CORP 150 NEW YORK AVE CORP. 1828 FOREST CORP. 250 LOCUST ST INC. 314 MCKINLEY STREET CORP. 3238 OLINVILLE AVE INC. A AND S FAMILY LLC AATAAR HOMES INC.Date of last update: 21 Nov 2024
Sources: New York Secretary of State
© 2024 nycompanysearch.com, Part of Big Data Integrated