Name: | THC CONSTRUCTION INC |
Jurisdiction: | New York |
Legal type: | DOMESTIC BUSINESS CORPORATION |
Status: | Active |
Date of registration: | 14 Aug 2020 (4 years ago) |
Entity Number: | 5812752 |
ZIP code: | 11358 |
County: | Queens |
Place of Formation: | New York |
Address: | 29-06 JORDAN ST, FLUSHING, NY, United States, 11358 |
Shares Details
Shares issued 200
Share Par Value 0
Type NO PAR VALUE
Name | Role | Address |
---|---|---|
THE CORPORATION | DOS Process Agent | 29-06 JORDAN ST, FLUSHING, NY, United States, 11358 |
Number | Date | End date | Type | Address |
---|---|---|---|---|
Q012023349A51 | 2023-12-15 | 2023-12-31 | RESET, REPAIR OR REPLACE CURB | CLOVERDALE BOULEVARD, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q012023349A52 | 2023-12-15 | 2023-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | CLOVERDALE BOULEVARD, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q042023349A08 | 2023-12-15 | 2024-01-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CLOVERDALE BOULEVARD, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q042023348B07 | 2023-12-14 | 2024-01-03 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 165 STREET, QUEENS, FROM STREET 71 AVENUE TO STREET 72 AVENUE |
Q012023348B94 | 2023-12-14 | 2023-12-31 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 165 STREET, QUEENS, FROM STREET 71 AVENUE TO STREET 72 AVENUE |
Q012023310B33 | 2023-11-06 | 2023-12-02 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 24 AVENUE, QUEENS, FROM STREET 146 STREET TO STREET PARSONS BOULEVARD |
Q012023310B32 | 2023-11-06 | 2023-12-02 | RESET, REPAIR OR REPLACE CURB-PROTECTED | PARSONS BOULEVARD, QUEENS, FROM STREET 22 ROAD TO STREET 24 AVENUE |
Q042023310A14 | 2023-11-06 | 2023-12-02 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | PARSONS BOULEVARD, QUEENS, FROM STREET 22 ROAD TO STREET 24 AVENUE |
Q042023310A15 | 2023-11-06 | 2023-12-02 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 24 AVENUE, QUEENS, FROM STREET 146 STREET TO STREET PARSONS BOULEVARD |
Q042023299A05 | 2023-10-26 | 2023-11-23 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 40 AVENUE, QUEENS, FROM STREET 215 PLACE |
Q042023299A03 | 2023-10-26 | 2023-11-24 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 40 AVENUE, QUEENS, FROM STREET 215 PLACE |
Q042023299A04 | 2023-10-26 | 2023-11-23 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 40 AVENUE, QUEENS, FROM STREET 215 PLACE |
Q012023193A54 | 2023-07-12 | 2023-08-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | NEGUNDO AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
Q012023182A03 | 2023-07-01 | 2023-07-26 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 165 STREET, QUEENS, FROM STREET 71 AVENUE TO STREET 72 AVENUE |
Q022023175A03 | 2023-06-24 | 2023-07-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | 165 STREET, QUEENS, FROM STREET 71 AVENUE TO STREET 72 AVENUE |
Q042023175A00 | 2023-06-24 | 2023-07-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 165 STREET, QUEENS, FROM STREET 71 AVENUE TO STREET 72 AVENUE |
Q012023175A15 | 2023-06-24 | 2023-07-14 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 165 STREET, QUEENS, FROM STREET 71 AVENUE TO STREET 72 AVENUE |
Q022023175A02 | 2023-06-24 | 2023-07-14 | TEMPORARY PEDESTRIAN WALK | 165 STREET, QUEENS, FROM STREET 71 AVENUE TO STREET 72 AVENUE |
Q012023165D03 | 2023-06-14 | 2023-07-14 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 15 DRIVE, QUEENS, FROM STREET 149 STREET TO STREET 150 STREET |
Q042023165A97 | 2023-06-14 | 2023-07-14 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 15 DRIVE, QUEENS, FROM STREET 150 STREET |
Q042023165A96 | 2023-06-14 | 2023-07-14 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 15 DRIVE, QUEENS, FROM STREET 150 STREET |
Q042023165A95 | 2023-06-14 | 2023-07-14 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 15 DRIVE, QUEENS, FROM STREET 150 STREET |
Q042023165A94 | 2023-06-14 | 2023-07-14 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 15 DRIVE, QUEENS, FROM STREET 150 STREET |
Q042023165A93 | 2023-06-14 | 2023-07-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 15 DRIVE, QUEENS, FROM STREET 149 STREET TO STREET 150 STREET |
Q042023165A92 | 2023-06-14 | 2023-07-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 150 STREET, QUEENS, FROM STREET 15 DRIVE TO STREET 15 ROAD |
Q012023165D02 | 2023-06-14 | 2023-07-14 | RESET, REPAIR OR REPLACE CURB | 150 STREET, QUEENS, FROM STREET 15 DRIVE TO STREET 15 ROAD |
Q012023159A45 | 2023-06-08 | 2023-07-07 | PAVE STREET-W/ ENGINEERING & INSP FEE | 190 STREET, QUEENS, FROM STREET 42 AVENUE TO STREET STATION ROAD |
Q012023150B91 | 2023-05-30 | 2023-06-29 | RESET, REPAIR OR REPLACE CURB | NEGUNDO AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
Q042023150A25 | 2023-05-30 | 2023-06-29 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | NEGUNDO AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
Q042023142A06 | 2023-05-22 | 2023-06-10 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | CHERRY AVENUE, QUEENS, FROM STREET 156 STREET |
Q012023142A86 | 2023-05-22 | 2023-06-14 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 18 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET 149 STREET |
Q022023142A19 | 2023-05-22 | 2023-08-16 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 136 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET 57 ROAD |
Q042023114A18 | 2023-04-24 | 2023-05-23 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 55 AVENUE, QUEENS, FROM STREET 97 STREET |
Q012023114B02 | 2023-04-24 | 2023-05-23 | RESET, REPAIR OR REPLACE CURB | 55 AVENUE, QUEENS, FROM STREET 97 PLACE TO STREET 97 STREET |
Q012023114B03 | 2023-04-24 | 2023-05-23 | RESET, REPAIR OR REPLACE CURB | 97 STREET, QUEENS, FROM STREET 55 AVENUE TO STREET CHRISTIE AVENUE |
Q042023114A16 | 2023-04-24 | 2023-05-23 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 55 AVENUE, QUEENS, FROM STREET 97 PLACE TO STREET 97 STREET |
Q042023114A17 | 2023-04-24 | 2023-05-23 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 97 STREET, QUEENS, FROM STREET 55 AVENUE TO STREET CHRISTIE AVENUE |
Q042023114A19 | 2023-04-24 | 2023-05-23 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 55 AVENUE, QUEENS, FROM STREET 97 STREET |
Q042023114A20 | 2023-04-24 | 2023-05-23 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 55 AVENUE, QUEENS, FROM STREET 97 STREET |
Q042023114A21 | 2023-04-24 | 2023-05-23 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 55 AVENUE, QUEENS, FROM STREET 97 STREET |
Q042023111B78 | 2023-04-21 | 2023-05-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 18 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET 149 STREET |
Q022023111A84 | 2023-04-21 | 2023-05-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | 18 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET 149 STREET |
Q012023111C22 | 2023-04-21 | 2023-05-20 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 18 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET 149 STREET |
Q022023111A83 | 2023-04-21 | 2023-05-20 | TEMPORARY PEDESTRIAN WALK | 18 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET 149 STREET |
Q012023107B37 | 2023-04-17 | 2023-05-16 | PAVE STREET-W/ ENGINEERING & INSP FEE | 57 ROAD, QUEENS, FROM STREET 134 STREET TO STREET LAWRENCE STREET |
Q012023104B87 | 2023-04-14 | 2023-05-12 | RESET, REPAIR OR REPLACE CURB | 190 STREET, QUEENS, FROM STREET 42 AVENUE TO STREET STATION ROAD |
Q012023104B88 | 2023-04-14 | 2023-05-13 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 215 PLACE, QUEENS, FROM STREET 39 AVENUE TO STREET 40 AVENUE |
Q042023104A30 | 2023-04-14 | 2023-05-12 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 190 STREET, QUEENS, FROM STREET 42 AVENUE TO STREET STATION ROAD |
Q042023104A31 | 2023-04-14 | 2023-05-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 215 PLACE, QUEENS, FROM STREET 39 AVENUE TO STREET 40 AVENUE |
Q022023104B02 | 2023-04-14 | 2023-05-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | 215 PLACE, QUEENS, FROM STREET 39 AVENUE TO STREET 40 AVENUE |
Q022023104B01 | 2023-04-14 | 2023-05-13 | TEMPORARY PEDESTRIAN WALK | 215 PLACE, QUEENS, FROM STREET 39 AVENUE TO STREET 40 AVENUE |
Q022023104B00 | 2023-04-14 | 2023-04-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | 190 STREET, QUEENS, FROM STREET 42 AVENUE TO STREET STATION ROAD |
Q022023104A99 | 2023-04-14 | 2023-04-14 | TEMPORARY PEDESTRIAN WALK | 190 STREET, QUEENS, FROM STREET 42 AVENUE TO STREET STATION ROAD |
Q012023093D12 | 2023-04-03 | 2023-05-02 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 219 STREET, QUEENS, FROM STREET 56 AVENUE TO STREET 58 AVENUE |
Q042023091A01 | 2023-04-01 | 2023-04-29 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 14 STREET, QUEENS, FROM STREET 26 AVENUE TO STREET 27 AVENUE |
Q022023091A01 | 2023-04-01 | 2023-04-29 | TEMPORARY PEDESTRIAN WALK | 14 STREET, QUEENS, FROM STREET 26 AVENUE TO STREET 27 AVENUE |
Q022023091A02 | 2023-04-01 | 2023-04-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | 14 STREET, QUEENS, FROM STREET 26 AVENUE TO STREET 27 AVENUE |
Q012023091A04 | 2023-04-01 | 2023-04-29 | RESET, REPAIR OR REPLACE CURB | 14 STREET, QUEENS, FROM STREET 26 AVENUE TO STREET 27 AVENUE |
Q012023091A05 | 2023-04-01 | 2023-04-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | 14 STREET, QUEENS, FROM STREET 26 AVENUE TO STREET 27 AVENUE |
Q012023053A93 | 2023-02-22 | 2023-03-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | 60 AVENUE, QUEENS, FROM STREET 246 PLACE |
Q012023053A95 | 2023-02-22 | 2023-03-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | 60 AVENUE, QUEENS, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY |
Q012023053A91 | 2023-02-22 | 2023-03-18 | RESET, REPAIR OR REPLACE CURB | 246 PLACE, QUEENS, FROM STREET 60 AVENUE TO STREET DEAD END |
Q012023053A92 | 2023-02-22 | 2023-03-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | 246 PLACE, QUEENS, FROM STREET 60 AVENUE TO STREET DEAD END |
Q042023053A15 | 2023-02-22 | 2023-03-18 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 246 PLACE, QUEENS, FROM STREET 60 AVENUE TO STREET DEAD END |
Q042023053A16 | 2023-02-22 | 2023-03-18 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 60 AVENUE, QUEENS, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY |
Q012023053A94 | 2023-02-22 | 2023-03-18 | RESET, REPAIR OR REPLACE CURB | 60 AVENUE, QUEENS, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY |
Q012023045C13 | 2023-02-14 | 2023-03-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | 57 ROAD, QUEENS, FROM STREET 134 STREET TO STREET LAWRENCE STREET |
Q042023045A07 | 2023-02-14 | 2023-03-15 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 57 ROAD, QUEENS, FROM STREET 134 STREET TO STREET LAWRENCE STREET |
Q012023045C12 | 2023-02-14 | 2023-03-15 | RESET, REPAIR OR REPLACE CURB | 57 ROAD, QUEENS, FROM STREET 134 STREET TO STREET LAWRENCE STREET |
Q042023041A27 | 2023-02-10 | 2023-03-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 19 AVENUE, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
Q012023041A13 | 2023-02-10 | 2023-03-11 | RESET, REPAIR OR REPLACE CURB | 20 ROAD, QUEENS, FROM STREET 147 STREET TO STREET 149 STREET |
Q012023041A14 | 2023-02-10 | 2023-03-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | 20 ROAD, QUEENS, FROM STREET 147 STREET TO STREET 149 STREET |
Q012023041B90 | 2023-02-10 | 2023-03-11 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 19 AVENUE, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
Q012023041B91 | 2023-02-10 | 2023-03-11 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 19 AVENUE, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
Q042023041A03 | 2023-02-10 | 2023-03-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 20 ROAD, QUEENS, FROM STREET 147 STREET TO STREET 149 STREET |
Q012023030B03 | 2023-01-30 | 2023-02-28 | RESET, REPAIR OR REPLACE CURB | 188 STREET, QUEENS, FROM STREET 48 AVENUE TO STREET 50 AVENUE |
Q042023030A08 | 2023-01-30 | 2023-02-28 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 188 STREET, QUEENS, FROM STREET 48 AVENUE TO STREET 50 AVENUE |
Q012023030B04 | 2023-01-30 | 2023-02-28 | PAVE STREET-W/ ENGINEERING & INSP FEE | 188 STREET, QUEENS, FROM STREET 48 AVENUE TO STREET 50 AVENUE |
Q042023026A07 | 2023-01-26 | 2023-02-22 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 24 AVENUE, QUEENS, FROM STREET PARSONS BOULEVARD |
Q042023026A08 | 2023-01-26 | 2023-02-22 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 24 AVENUE, QUEENS, FROM STREET PARSONS BOULEVARD |
Q012023026B92 | 2023-01-26 | 2023-02-22 | PAVE STREET-W/ ENGINEERING & INSP FEE | 24 AVENUE, QUEENS, FROM STREET PARSONS BOULEVARD |
Q012023017C52 | 2023-01-17 | 2023-02-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | 40 AVENUE, QUEENS, FROM STREET 215 PLACE |
Q012023017C51 | 2023-01-17 | 2023-02-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | 40 AVENUE, QUEENS, FROM STREET 215 PLACE TO STREET 216 STREET |
Q012023017C53 | 2023-01-17 | 2023-02-14 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 215 PLACE, QUEENS, FROM STREET 39 AVENUE TO STREET 40 AVENUE |
Q012023006B77 | 2023-01-06 | 2023-02-05 | PAVE STREET-W/ ENGINEERING & INSP FEE | 153 STREET, QUEENS, FROM STREET 32 AVENUE TO STREET BAYSIDE AVENUE |
Q012023006B76 | 2023-01-06 | 2023-02-05 | RESET, REPAIR OR REPLACE CURB | 153 STREET, QUEENS, FROM STREET 32 AVENUE TO STREET BAYSIDE AVENUE |
Q042023006A13 | 2023-01-06 | 2023-02-05 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 153 STREET, QUEENS, FROM STREET 32 AVENUE TO STREET BAYSIDE AVENUE |
Q042022356A41 | 2022-12-22 | 2023-01-08 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 73 AVENUE, QUEENS, FROM STREET 225 STREET |
Q012022356C01 | 2022-12-22 | 2022-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | 73 AVENUE, QUEENS, FROM STREET 225 STREET |
Q042022356A40 | 2022-12-22 | 2023-01-08 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 73 AVENUE, QUEENS, FROM STREET 225 STREET |
Q012022341B42 | 2022-12-07 | 2022-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 162 STREET, QUEENS, FROM STREET 59 AVENUE TO STREET BOOTH MEMORIAL AVENUE |
Q012022336C22 | 2022-12-02 | 2022-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | 229 STREET, QUEENS, FROM STREET 69 AVENUE TO STREET 73 AVENUE |
Q012022333B47 | 2022-11-29 | 2022-12-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | 73 AVENUE, QUEENS, FROM STREET 225 STREET TO STREET 226 STREET |
Q012022333B46 | 2022-11-29 | 2022-12-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | 225 STREET, QUEENS, FROM STREET 69 AVENUE TO STREET 73 AVENUE |
Q012022320B93 | 2022-11-16 | 2022-12-11 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 154 STREET, QUEENS, FROM STREET 32 AVENUE TO STREET 33 AVENUE |
Q012022320C08 | 2022-11-16 | 2022-12-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | 50 AVENUE, QUEENS, FROM STREET 188 STREET TO STREET 189 STREET |
Q012022320B92 | 2022-11-16 | 2022-12-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | 158 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET SANFORD AVENUE |
Q012022320B96 | 2022-11-16 | 2022-12-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | 150 STREET, QUEENS, FROM STREET 15 DRIVE TO STREET 15 ROAD |
Q012022315A17 | 2022-11-11 | 2022-12-05 | PAVE STREET-W/ ENGINEERING & INSP FEE | 230 STREET, QUEENS, FROM STREET 69 AVENUE TO STREET 73 AVENUE |
Q012022312A13 | 2022-11-08 | 2022-12-06 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | SANFORD AVENUE, QUEENS, FROM STREET 155 STREET TO STREET BEND |
Q012022312A14 | 2022-11-08 | 2022-12-06 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | UNION STREET, QUEENS, FROM STREET 45 AVENUE TO STREET HOLLY AVENUE |
Q012022307A63 | 2022-11-03 | 2022-11-27 | RESET, REPAIR OR REPLACE CURB | 215 PLACE, QUEENS, FROM STREET 39 AVENUE TO STREET 40 AVENUE |
Q012022307B53 | 2022-11-03 | 2022-12-04 | PAVE STREET-W/ ENGINEERING & INSP FEE | 232 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET 67 AVENUE |
Q012022307A64 | 2022-11-03 | 2022-11-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | 215 PLACE, QUEENS, FROM STREET 39 AVENUE TO STREET 40 AVENUE |
Q042022307A26 | 2022-11-03 | 2022-11-27 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 215 PLACE, QUEENS, FROM STREET 39 AVENUE TO STREET 40 AVENUE |
Q042022307A25 | 2022-11-03 | 2022-11-27 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 40 AVENUE, QUEENS, FROM STREET 215 PLACE TO STREET 216 STREET |
Q012022307A61 | 2022-11-03 | 2022-11-27 | RESET, REPAIR OR REPLACE CURB | 40 AVENUE, QUEENS, FROM STREET 215 PLACE TO STREET 216 STREET |
Q012022307A62 | 2022-11-03 | 2022-11-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | 40 AVENUE, QUEENS, FROM STREET 215 PLACE TO STREET 216 STREET |
Q012022301C09 | 2022-10-28 | 2022-11-25 | RESET, REPAIR OR REPLACE CURB | 73 AVENUE, QUEENS, FROM STREET 225 STREET TO STREET 226 STREET |
Q042022301A08 | 2022-10-28 | 2022-11-25 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 225 STREET, QUEENS, FROM STREET 69 AVENUE TO STREET 73 AVENUE |
Q042022301A09 | 2022-10-28 | 2022-11-25 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 73 AVENUE, QUEENS, FROM STREET 225 STREET TO STREET 226 STREET |
Q042022301A10 | 2022-10-28 | 2022-11-25 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 73 AVENUE, QUEENS, FROM STREET 225 STREET |
Q042022301A11 | 2022-10-28 | 2022-11-25 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 73 AVENUE, QUEENS, FROM STREET 225 STREET |
Q012022301C07 | 2022-10-28 | 2022-11-25 | RESET, REPAIR OR REPLACE CURB | 225 STREET, QUEENS, FROM STREET 69 AVENUE TO STREET 73 AVENUE |
Q012022301C08 | 2022-10-28 | 2022-11-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | 225 STREET, QUEENS, FROM STREET 69 AVENUE TO STREET 73 AVENUE |
Q012022301C10 | 2022-10-28 | 2022-11-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | 73 AVENUE, QUEENS, FROM STREET 225 STREET TO STREET 226 STREET |
Q012022300B51 | 2022-10-27 | 2022-11-25 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 43 AVENUE, QUEENS, FROM STREET 219 STREET TO STREET 220 STREET |
Q012022300B52 | 2022-10-27 | 2022-11-25 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 219 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD |
Q042022300A26 | 2022-10-27 | 2022-11-25 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 162 STREET, QUEENS, FROM STREET 59 AVENUE TO STREET BOOTH MEMORIAL AVENUE |
Q012022300B49 | 2022-10-27 | 2022-11-25 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 162 STREET, QUEENS, FROM STREET 59 AVENUE TO STREET BOOTH MEMORIAL AVENUE |
Q012022300B50 | 2022-10-27 | 2022-11-25 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 43 AVENUE, QUEENS, FROM STREET 219 STREET |
Q012022290D95 | 2022-10-17 | 2022-11-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | 33 ROAD, QUEENS, FROM STREET 212 STREET TO STREET 213 STREET |
Q012022290D97 | 2022-10-17 | 2022-11-12 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 219 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD |
Q012022290D94 | 2022-10-17 | 2022-11-15 | RESET, REPAIR OR REPLACE CURB | 33 ROAD, QUEENS, FROM STREET 212 STREET TO STREET 213 STREET |
Q012022290D96 | 2022-10-17 | 2022-11-12 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 43 AVENUE, QUEENS, FROM STREET 219 STREET TO STREET 220 STREET |
Q042022290A41 | 2022-10-17 | 2022-11-15 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 33 ROAD, QUEENS, FROM STREET 212 STREET TO STREET 213 STREET |
Q042022290A42 | 2022-10-17 | 2022-11-12 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 43 AVENUE, QUEENS, FROM STREET 219 STREET TO STREET 220 STREET |
Q042022290A43 | 2022-10-17 | 2022-11-12 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 219 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD |
Q042022288A00 | 2022-10-15 | 2022-11-12 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 154 STREET, QUEENS, FROM STREET 32 AVENUE TO STREET 33 AVENUE |
Q012022288A08 | 2022-10-15 | 2022-11-12 | RESET, REPAIR OR REPLACE CURB | 154 STREET, QUEENS, FROM STREET 32 AVENUE TO STREET 33 AVENUE |
Q012022286C40 | 2022-10-13 | 2022-11-11 | RESET, REPAIR OR REPLACE CURB | 219 STREET, QUEENS, FROM STREET 56 AVENUE TO STREET 58 AVENUE |
Q042022286A28 | 2022-10-13 | 2022-11-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 50 AVENUE, QUEENS, FROM STREET 188 STREET TO STREET 189 STREET |
Q042022286A25 | 2022-10-13 | 2022-11-12 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 230 STREET, QUEENS, FROM STREET 69 AVENUE TO STREET 73 AVENUE |
Q042022286A26 | 2022-10-13 | 2022-11-12 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 229 STREET, QUEENS, FROM STREET 69 AVENUE TO STREET 73 AVENUE |
Q042022286A31 | 2022-10-13 | 2022-11-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 219 STREET, QUEENS, FROM STREET 56 AVENUE TO STREET 58 AVENUE |
Q042022286A33 | 2022-10-13 | 2022-11-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 150 STREET, QUEENS, FROM STREET 15 DRIVE TO STREET 15 ROAD |
Q012022286C43 | 2022-10-13 | 2022-11-11 | RESET, REPAIR OR REPLACE CURB | 150 STREET, QUEENS, FROM STREET 15 DRIVE TO STREET 15 ROAD |
Q042022286A27 | 2022-10-13 | 2022-11-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 158 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET SANFORD AVENUE |
Q012022286C36 | 2022-10-13 | 2022-11-11 | RESET, REPAIR OR REPLACE CURB | 50 AVENUE, QUEENS, FROM STREET 188 STREET TO STREET 189 STREET |
Q012022286C33 | 2022-10-13 | 2022-11-11 | RESET, REPAIR OR REPLACE CURB | 158 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET SANFORD AVENUE |
Q012022286C28 | 2022-10-13 | 2022-11-12 | RESET, REPAIR OR REPLACE CURB | 229 STREET, QUEENS, FROM STREET 69 AVENUE TO STREET 73 AVENUE |
Q012022286C25 | 2022-10-13 | 2022-11-12 | RESET, REPAIR OR REPLACE CURB | 230 STREET, QUEENS, FROM STREET 69 AVENUE TO STREET 73 AVENUE |
Q012022279D11 | 2022-10-06 | 2022-11-04 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | SANFORD AVENUE, QUEENS, FROM STREET 155 STREET TO STREET BEND |
Q042022279A33 | 2022-10-06 | 2022-11-04 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | UNION STREET, QUEENS, FROM STREET 45 AVENUE TO STREET HOLLY AVENUE |
Q042022279A32 | 2022-10-06 | 2022-11-04 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 203 STREET, QUEENS, FROM STREET 35 AVENUE TO STREET 36 AVENUE |
Q042022279A30 | 2022-10-06 | 2022-11-04 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | SANFORD AVENUE, QUEENS, FROM STREET 155 STREET TO STREET BEND |
Q012022279D13 | 2022-10-06 | 2022-11-04 | PAVE STREET-W/ ENGINEERING & INSP FEE | 203 STREET, QUEENS, FROM STREET 35 AVENUE TO STREET 36 AVENUE |
Q012022279D12 | 2022-10-06 | 2022-11-04 | RESET, REPAIR OR REPLACE CURB | 203 STREET, QUEENS, FROM STREET 35 AVENUE TO STREET 36 AVENUE |
Q042022279A34 | 2022-10-06 | 2022-11-04 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 232 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET 67 AVENUE |
Q012022279D18 | 2022-10-06 | 2022-11-04 | PAVE STREET-W/ ENGINEERING & INSP FEE | 232 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET 67 AVENUE |
Q012022279D17 | 2022-10-06 | 2022-11-04 | RESET, REPAIR OR REPLACE CURB | 232 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET 67 AVENUE |
Q012022279D16 | 2022-10-06 | 2022-11-04 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | UNION STREET, QUEENS, FROM STREET 45 AVENUE TO STREET HOLLY AVENUE |
Q012022279D10 | 2022-10-06 | 2022-11-04 | RESET, REPAIR OR REPLACE CURB-PROTECTED | SANFORD AVENUE, QUEENS, FROM STREET 155 STREET TO STREET BEND |
Q012022279D15 | 2022-10-06 | 2022-11-04 | RESET, REPAIR OR REPLACE CURB-PROTECTED | UNION STREET, QUEENS, FROM STREET 45 AVENUE TO STREET HOLLY AVENUE |
Q042022278A55 | 2022-10-05 | 2022-10-30 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 159 STREET, QUEENS, FROM STREET 46 AVENUE TO STREET LABURNUM AVENUE |
Q012022278D95 | 2022-10-05 | 2022-10-30 | PAVE STREET-W/ ENGINEERING & INSP FEE | 159 STREET, QUEENS, FROM STREET 46 AVENUE TO STREET LABURNUM AVENUE |
Q012022278D94 | 2022-10-05 | 2022-10-30 | RESET, REPAIR OR REPLACE CURB | 159 STREET, QUEENS, FROM STREET 46 AVENUE TO STREET LABURNUM AVENUE |
Start date | End date | Type | Value |
---|---|---|---|
2024-10-02 | 2024-10-03 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-09-26 | 2024-10-02 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-09-10 | 2024-09-26 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-08-14 | 2024-09-10 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-08-12 | 2024-08-12 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-08-12 | 2024-08-14 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-07-08 | 2024-08-12 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-06-20 | 2024-07-08 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-06-06 | 2024-06-20 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-06-06 | 2024-06-06 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-06-05 | 2024-06-06 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-05-08 | 2024-06-05 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-05-07 | 2024-05-08 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-04-30 | 2024-05-07 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-02-22 | 2024-04-30 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-01-12 | 2024-02-22 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-01-10 | 2024-01-12 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-12-20 | 2024-01-10 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-11-14 | 2023-12-20 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-11-14 | 2023-11-14 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-11-13 | 2023-11-14 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-10-02 | 2023-11-13 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-10-02 | 2023-10-02 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-08-21 | 2023-10-02 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-08-21 | 2023-08-21 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-07-25 | 2023-08-21 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-07-07 | 2023-07-25 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-10-12 | 2023-07-07 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2020-08-14 | 2022-10-12 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
200814010309 | 2020-08-14 | CERTIFICATE OF INCORPORATION | 2020-08-14 |
Date | Inspection Object | Address | Grade | Type | Institution | Desctiption |
---|---|---|---|---|---|---|
2024-10-26 | No data | 150 STREET, FROM STREET 15 DRIVE TO STREET 15 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb |
2024-10-21 | No data | CHERRY AVENUE, FROM STREET 156 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR his answered. Newly completed tangent ramps within the NE3 corner quadrant are non ADA. Measured in prism 10/21/24. No action taken on excessive curb reveal at this time. Curb reveal measurements will need to be updated once roadway is paved |
2024-10-21 | No data | 60 AVENUE, FROM STREET 246 PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | No 410 permit on file. Newly completed tangent ramps in the NE corner quadrant was found to be non ADA compliant. Measured and collected in Prism on 9/18/23. |
2024-10-16 | No data | UNION STREET, FROM STREET 45 AVENUE TO STREET HOLLY AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the respondent with jersey barriers & barricades obstructing the parking lane I/F/O 45-11 Union Street without a DOT permit on file. The respondent was ID by B.O. permit Q08028791-I1-GC |
2024-09-18 | No data | 150 STREET, FROM STREET 15 DRIVE TO STREET 15 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | At My Time Of Re-Inspection Condition Not Corrected Street Opening Joints Not Re-Sealed CAR Failed. |
2024-09-04 | No data | 57 ROAD, FROM STREET 134 STREET TO STREET LAWRENCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete curb restored expansion joints sealed I/F/O 132-28 57th Road |
2024-09-02 | No data | 50 AVENUE, FROM STREET 188 STREET TO STREET 189 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the respondent's new builder's pavement restoration along the roadway is mounded by 2" above the existing roadway's surface. Respondent was notified Via CAR #20231700198 on 08/01/23 to repair the condition and did not. |
2024-08-31 | No data | 18 AVENUE, FROM STREET 147 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Half plus 5' of roadway repaved. |
2024-08-21 | No data | 15 DRIVE, FROM STREET 149 STREET TO STREET 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent concrete curb restored to grade. |
2024-08-03 | No data | 150 STREET, FROM STREET 15 DRIVE TO STREET 15 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR- to reseal the sides of restoration along roadway. |
2024-07-31 | No data | 248 STREET, FROM STREET 43 AVENUE TO STREET DEPEW AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I OBSERVED THE RESPONDENT HAS STORED A CONSTRUCTION CONTAINER ON THE ROADWAY I/F/O THEIR ACTIVE BUILDING OPERATION (Permit Q08013020-I1-GC) WITHOUT AN ACTIVE PERMIT ON FILE. RESPONDENT ID THRU DOB PERMIT CITED. |
2024-07-20 | No data | 50 AVENUE, FROM STREET 188 STREET TO STREET 189 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration not flush with roadway. |
2024-07-08 | No data | 60 ROAD, FROM STREET 84 STREET TO STREET 85 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | I observed the above respondent obstructing the parking lane in front of 84-15 60 Rd with construction materials and barriers. The respondent was ID by DOB permit #Q00810030-I1-FO-EA. |
2024-07-07 | No data | 14 AVENUE, FROM STREET 117 STREET TO STREET 118 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Respondent store two barriers on the sidewalk at its worksite without a DOT permit to do so. DOB permit# Q00533054-I1-GC for building New Building at location and "THC" marked on barriers were used to identify respondent. |
2024-06-09 | No data | 50 AVENUE, FROM STREET 188 STREET TO STREET 189 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | new building paving along the roadway is mounded by 2" above the existing roadway's surface. Respondent was notified by CAR #20231700198 on 08/01/23 to make repairs but, failed to do so. Permit# Q012022320C08 for work was used to identify respondent |
2024-05-29 | No data | 248 STREET, FROM STREET 43 AVENUE TO STREET DEPEW AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I OBSERVED THE RESPONDENT HAS STORED A CONSTRUCTION CONTAINER ON THE ROADWAY I/F/O ACTIVE BUILDING OPERATION (Q08013020-I1-GC EXP. 8/25/24) WITHOUT AN ACTIVE DOT PERMIT ON FILE. RESPONDENT ID THRU BUILDING (DOB) PERMIT CITED. |
2024-05-05 | No data | 166 STREET, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the above respondent with a debris container stored in the parking lane, in front of an active building operation. The respondent failed to obtain an active DOT permit to store construction equipment. |
2024-04-29 | No data | 40 AVENUE, FROM STREET 215 PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permittee reconstructed corner. Will update Prism. |
2024-04-29 | No data | CHERRY AVENUE, FROM STREET 156 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant was found to be non ADA compliant. Measured and collected in Prism on 5/24/23. |
2024-04-29 | No data | 40 AVENUE, FROM STREET 215 PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner quadrant are ADA compliant. Re-measured and collected in Prism on 4/29/24. |
2024-04-27 | No data | 55 AVENUE, FROM STREET 97 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant was found to be Ada compliant. Remeasured and collected in prism on 4/27/24. |
2024-04-24 | No data | 73 AVENUE, FROM STREET 225 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Corner fully upgraded as per BPP specs. Will update Prism. Newer permit Q042022356A41 on file |
2024-04-23 | No data | 60 AVENUE, FROM STREET 246 PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | No 410 permit on file. Newly completed tangent ramps in the NE corner quadrant was found to be non ADA compliant. Measured and collected in Prism on 9/18/23. |
2024-04-10 | No data | 165 STREET, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete curb installed in front of 71-20. |
2024-04-07 | No data | 50 AVENUE, FROM STREET 188 STREET TO STREET 189 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent's new building paving along the roadway is mounded by 2" above the existing roadway's surface. Respondent was notified by CAR #20231700198 on 08/01/23. Permit# Q012022320C08 for work was used to identify respondent. |
2024-02-29 | No data | PARSONS BOULEVARD, FROM STREET 22 ROAD TO STREET 24 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete curb restored expansion joints sealed I/F/O 23-19 Parsons Blvd |
2024-02-29 | No data | 24 AVENUE, FROM STREET 146 STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete curb restored expansion joints sealed at Corner property 23-19 Parsons Blvd. |
2024-01-31 | No data | NEGUNDO AVENUE, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb replaced |
2024-01-25 | No data | CLOVERDALE BOULEVARD, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete curb installed in front of 61-22. |
2024-01-24 | No data | 150 STREET, FROM STREET 15 DRIVE TO STREET 15 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builder's pave perm to grade I/F/O 15-34 150th Street |
2024-01-12 | No data | 158 STREET, FROM STREET 43 AVENUE TO STREET SANFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builder's pave perm to grade & sealed I/F/O 42-36 158th Street |
2024-01-10 | No data | 159 STREET, FROM STREET 46 AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builder's pave perm to grade & sealed I/F/O 46-58 159th Street |
2023-12-27 | No data | 60 AVENUE, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete curb installed in front of 57-27. |
2023-12-27 | No data | 60 AVENUE, FROM STREET 246 PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP restoration to grade in the intersection. |
2023-12-27 | No data | 246 PLACE, FROM STREET 60 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete curb installed in front of 57-27 corner property. |
2023-12-14 | No data | 55 AVENUE, FROM STREET 97 PLACE TO STREET 97 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent concrete curb restored to grade in front of 9701 55 Ave. |
2023-12-11 | No data | 215 PLACE, FROM STREET 39 AVENUE TO STREET 40 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb in place. |
2023-12-07 | No data | 97 STREET, FROM STREET 55 AVENUE TO STREET CHRISTIE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent concrete curbs restored to grade. |
2023-12-05 | No data | 40 AVENUE, FROM STREET 215 PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No ped ramp work started at this time within the NW2 corner quadrant. Old existing single ramp is functional and accessible. |
2023-12-01 | No data | 219 STREET, FROM STREET 56 AVENUE TO STREET 58 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done permit expired. Roadway was recently paved but unable to determine exactly when. Possibly in October 2022. |
2023-11-24 | No data | 219 STREET, FROM STREET 56 AVENUE TO STREET 58 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New concrete curb in place. I/F/O 5626 new home. |
2023-11-17 | No data | 150 STREET, FROM STREET 15 DRIVE TO STREET 15 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB RESET |
2023-11-07 | No data | 40 AVENUE, FROM STREET 215 PLACE | No data | Street Construction Inspections: Active | Department of Transportation | No ped ramp work started at this time within the NW2 corner quadrant. Old existing single ramp is functional and accessible. We will re- inspect at a later date. |
2023-10-31 | No data | 219 STREET, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk in place around corner property 219-02 43 Ave. |
2023-10-21 | No data | 50 AVENUE, FROM STREET 188 STREET TO STREET 189 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the respondent's new building paving along the roadway is mounded by 2" above the existing roadway's surface. Respondent was notified by CAR #20231700198 on 08/01/23. Permit# Q012022320C08 for work was used to identify respondent. |
2023-10-15 | No data | 190 STREET, FROM STREET 42 AVENUE TO STREET STATION ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Entire expansion joint was sealed/resealed. |
2023-10-13 | No data | 73 AVENUE, FROM STREET 225 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Only red DWS mat has been installed within the the NW2 corner quadrant. Old existing ramp is functional and accessible. |
2023-10-11 | No data | CHERRY AVENUE, FROM STREET 156 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant was found to be non ADA compliant. Measured and collected in prism on 5/24/23. |
2023-10-05 | No data | 40 AVENUE, FROM STREET 215 PLACE TO STREET 216 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Building paving plan roadway was paved. |
2023-10-04 | No data | 20 ROAD, FROM STREET 147 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb replaced, joints sealed. |
2023-09-28 | No data | 230 STREET, FROM STREET 69 AVENUE TO STREET 73 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb is restored and reset in front of 69-58. |
2023-09-28 | No data | 232 STREET, FROM STREET 64 AVENUE TO STREET 67 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb is restored and reset in front of 64-42. |
2023-09-28 | No data | 229 STREET, FROM STREET 69 AVENUE TO STREET 73 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb is restored and reset in front of 69-65. |
2023-09-27 | No data | 73 AVENUE, FROM STREET 225 STREET TO STREET 226 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb is reset and restored in front of 69-42. |
2023-09-27 | No data | 73 AVENUE, FROM STREET 225 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP restoration in the intersection of 225th St for house 69-42. |
2023-09-27 | No data | 225 STREET, FROM STREET 69 AVENUE TO STREET 73 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb is restored and reset in front of 69-42. |
2023-09-22 | No data | 55 AVENUE, FROM STREET 97 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant was found to be non Ada compliant due to excessive 2.8% landing cross. Measured and collected in prism on 7/18/23. |
2023-09-18 | No data | 60 AVENUE, FROM STREET 246 PLACE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | No 410 permit on file. Newly completed tangent ramps in the NE corner quadrant was found to be non ADA compliant. Measured and collected in Prism on 9/18/23. |
2023-09-11 | No data | 73 AVENUE, FROM STREET 225 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Existing single ramp within the NW2 corner quadrant is functional and accessible. Only red DWS mat has been installed. "KM - PLEASE MEASURE SO THAT ANY NON-COMPLIANT ELEMENTS CAN BE CAPTURED AND WRITE CAR, THANK YOU" |
2023-09-10 | No data | 50 AVENUE, FROM STREET 188 STREET TO STREET 189 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent's new building paving along the roadway is mounded by 2.5" above the existing roadway's surface. Respondent was notified by CAR #20231700198 on 08/01/23. Permit# Q012022320C08 for work was used to identify respondent. |
2023-09-02 | No data | 190 STREET, FROM STREET 42 AVENUE TO STREET STATION ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR was inspected on 08/26/23. NOV was issued. |
2023-08-26 | No data | 190 STREET, FROM STREET 42 AVENUE TO STREET STATION ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the respondent has expansion joints along the curb line however failed to cut the expansion down the roadway along the driveway. CAR# 20238580012 was issued on 7/21/23. |
2023-08-19 | No data | 57 ROAD, FROM STREET 134 STREET TO STREET LAWRENCE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | New sidewalk in stalled at location. |
2023-08-01 | No data | 50 AVENUE, FROM STREET 188 STREET TO STREET 189 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | BPP restoration is mounded 2''- 3'' in driving lane in localized area. |
2023-07-24 | No data | 165 STREET, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | At time of inspection all BPP measurements are accurate. 21'4" X 49' 11" X 3". |
2023-07-21 | No data | 190 STREET, FROM STREET 42 AVENUE TO STREET STATION ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP 1/2 +5 in compliance and fully sealed. |
2023-07-18 | No data | 55 AVENUE, FROM STREET 97 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No ped ramp work started at this time for the SE4 corner quadrant. Old existing tangent ramps are functional and accessible. |
2023-07-17 | No data | NEGUNDO AVENUE, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET | No data | Street Construction Inspections: Active | Department of Transportation | 49’x20’x3” area of roadway milled |
2023-07-17 | No data | 15 DRIVE, FROM STREET 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No ped ramp work started at this time within the SW1 corner quadrant. Pre existing tangent ramps done by DOT Q152020156A37 are functional and accessible. Will reinspect at a later date. |
2023-07-14 | No data | CHERRY AVENUE, FROM STREET 156 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant was found to be non ADA compliant. Measured and collected in prism on 5/24/23. |
2023-07-14 | No data | 15 DRIVE, FROM STREET 150 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Completed tangent ramps within the SW1 corner quadrant are functional and accessible, unable to measure at this time due to rain. I will reinspect and measure at a later date. |
2023-07-05 | No data | 57 ROAD, FROM STREET 134 STREET TO STREET LAWRENCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP in compliance at this time. |
2023-06-23 | No data | 188 STREET, FROM STREET 48 AVENUE TO STREET 50 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joints in the curb saw-cut down to the roadway and sealed. |
2023-06-20 | No data | 73 AVENUE, FROM STREET 225 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Only red DWS mat has been installed within the the NW2 corner quadrant. Old existing ramp is functional and accessible. |
2023-06-16 | No data | 216 STREET, FROM STREET 28 ROAD TO STREET 29 AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the above respondent with multiple water filled barrier's & orange barricades, stored in the roadway and grass portion of the sidewalk. The respondent failed to obtain an active DOT permit to store equipment. |
2023-06-16 | No data | 188 STREET, FROM STREET 48 AVENUE TO STREET 50 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joints in the replaced curb need to be saw-cut down to the roadway, recessed and sealed. |
2023-06-12 | No data | 190 STREET, FROM STREET 42 AVENUE TO STREET STATION ROAD | No data | Street Construction Inspections: Active | Department of Transportation | BPP Passed and in compliance. (60' x 20' x 3") |
2023-06-11 | No data | 188 STREET, FROM STREET 48 AVENUE TO STREET 50 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Saw cut full depth to roadway, install, recess and seal expansion joints on new curb. |
2023-06-05 | No data | 73 AVENUE, FROM STREET 225 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permittee is responsible for upgrading the NW2 corner. Old existing single ramp is functional and accessible. Will reinspect at a later date once work is properly completed. |
2023-05-24 | No data | CHERRY AVENUE, FROM STREET 156 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant was found to be non ADA compliant. Measured and collected in prism on 5/24/23. |
2023-05-21 | No data | 24 AVENUE, FROM STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found Resurfaced. No old cuts in the roadway. Intersection repaved by DDC Major Construction. |
2023-05-18 | No data | 20 ROAD, FROM STREET 147 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP in compliance at this time. |
2023-05-06 | No data | 33 ROAD, FROM STREET 212 STREET TO STREET 213 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | expansion joints installed and sealed |
2023-04-27 | No data | 55 AVENUE, FROM STREET 97 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No ped ramp work started at this time for the SE4 corner quadrant. Old existing tangent ramps are functional and accessible. Will reinspect at a later date. |
2023-04-25 | No data | 18 AVENUE, FROM STREET 147 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Active | Department of Transportation | s/w occupied |
2023-04-21 | No data | 57 ROAD, FROM STREET 134 STREET TO STREET LAWRENCE STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP in front of 132-28 completed and acceptable. curb to curb - 29' 11", milled - 19' 11" x 50' 4", depth - 4". |
2023-04-11 | No data | 40 AVENUE, FROM STREET 215 PLACE TO STREET 216 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP to grade, 1/2 + 5' |
2023-04-11 | No data | 153 STREET, FROM STREET 32 AVENUE TO STREET BAYSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP restoration to grade in the roadway. |
2023-04-07 | No data | 40 AVENUE, FROM STREET 215 PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP grade, 1/2 + 5' |
2023-04-07 | No data | 215 PLACE, FROM STREET 39 AVENUE TO STREET 40 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done. |
2023-04-05 | No data | 14 STREET, FROM STREET 26 AVENUE TO STREET 27 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Respondent failed to abide by stipulation 014 by failing to provide a 5' clear pedestrian walkway protected by timber, water-filled or concrete jersey barriers as required in front of 26-11 14th Street. No protected walkway provided. |
2023-03-30 | No data | 232 STREET, FROM STREET 64 AVENUE TO STREET 67 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builder pave in compliance |
2023-03-29 | No data | 225 STREET, FROM STREET 69 AVENUE TO STREET 73 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builder pave in compliance |
2023-03-28 | No data | 229 STREET, FROM STREET 69 AVENUE TO STREET 73 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | builder pave in compliance |
2023-03-27 | No data | 33 ROAD, FROM STREET 212 STREET TO STREET 213 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP to grade |
2023-03-26 | No data | 57 ROAD, FROM STREET 134 STREET TO STREET LAWRENCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No BPP roadway pavement work found at this time. |
2023-03-24 | No data | 73 AVENUE, FROM STREET 225 STREET TO STREET 226 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | builder pave |
2023-03-24 | No data | 230 STREET, FROM STREET 69 AVENUE TO STREET 73 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | builder paved |
2023-03-20 | No data | 188 STREET, FROM STREET 48 AVENUE TO STREET 50 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP to grade |
2023-03-15 | No data | 57 ROAD, FROM STREET 134 STREET TO STREET LAWRENCE STREET | No data | Street Construction Inspections: Active | Department of Transportation | No BPP roadway pavement work started at this time of inspection. |
2023-03-11 | No data | 19 AVENUE, FROM STREET 154 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Active | Department of Transportation | No paving work has been done at this time |
2023-03-07 | No data | 188 STREET, FROM STREET 48 AVENUE TO STREET 50 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Saw cut full depth to roadway, install, recess and seal expansion joints on new curb |
2023-03-01 | No data | 24 AVENUE, FROM STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work was done within the NE3 corner quadrant by P&T II contractor corp under contract SE-810 |
2023-02-23 | No data | 24 AVENUE, FROM STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Work was done within the SE4 corner quadrant by DDC contractor P&T II contractor corp on permit # Q012022354C616. |
2023-02-22 | No data | 24 AVENUE, FROM STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Work done by DDC contractor. |
2023-02-21 | No data | 153 STREET, FROM STREET 32 AVENUE TO STREET BAYSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete curb installed in front of 30-31. |
2023-02-21 | No data | 20 ROAD, FROM STREET 147 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed and acceptable. • Curb to Curb width – 29’4’’• Milled area – 20’ x 44'• Depth of milled area – 3’’ |
2023-02-18 | No data | 154 STREET, FROM STREET 32 AVENUE TO STREET 33 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete curb restored in front of 32-24. |
2023-02-14 | No data | 188 STREET, FROM STREET 48 AVENUE TO STREET 50 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed and acceptable in front of 48-45. Curb to curb - 43' 11", milled - 26' 11" x 51' 4", depth - 3". |
2023-02-09 | No data | 24 AVENUE, FROM STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Work was done by DDC contractor P&T II contractor corp on permit # Q012022166B93. |
2023-02-06 | No data | 73 AVENUE, FROM STREET 225 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly installed DWS within NE3 old existing tangent ramps are functional and accessible. |
2023-02-02 | No data | 216 STREET, FROM STREET 28 ROAD TO STREET 29 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Complaint Verified: There are water filled barriers/bike rack type barriers stored within parking lane without a DOT permit. |
2023-01-30 | No data | 50 AVENUE, FROM STREET 188 STREET TO STREET 189 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new curb installed |
2023-01-27 | No data | 40 AVENUE, FROM STREET 215 PLACE TO STREET 216 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb installed |
2023-01-26 | No data | 215 PLACE, FROM STREET 39 AVENUE TO STREET 40 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP Completed: • Curb to Curb width – 30’• Milled area – 125’• Depth of milled area – 3”• ½ +5’ milled (yes/no) – 20’(yes)• Waiver (yes/no)- No |
2023-01-26 | No data | 40 AVENUE, FROM STREET 215 PLACE | No data | Street Construction Inspections: Active | Department of Transportation | BPP Completed: • Curb to Curb width – 30’• Milled area – 20’• Depth of milled area – 3”• ½ +5’ milled (yes/no) – 20’ (yes) • Waiver (yes/no)-No |
2023-01-26 | No data | 40 AVENUE, FROM STREET 215 PLACE TO STREET 216 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP Completed:• Curb to Curb width – 30’• Milled area – 80’• Depth of milled area – 3”• ½ +5’ milled (yes/no) – 20’ (yes)• Waiver (yes/no)- No |
2023-01-21 | No data | 150 STREET, FROM STREET 15 DRIVE TO STREET 15 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete curb restored and sealed in front of 15-34. |
2023-01-20 | No data | 153 STREET, FROM STREET 32 AVENUE TO STREET BAYSIDE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP in front of 30-31 completed and acceptable. Curb to curb - 29' 11", milled - 20' 4" x 59' 5", depth - 3". |
2023-01-11 | No data | 203 STREET, FROM STREET 35 AVENUE TO STREET 36 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No BPP work done |
2023-01-03 | No data | 73 AVENUE, FROM STREET 225 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Existing single ramp within the NE3 corner quadrant is functional and accessible. Only DWS mat has been restored, no action taken at this time due to active permit on file. |
2023-01-03 | No data | UNION STREET, FROM STREET 45 AVENUE TO STREET HOLLY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP completed Curb to Curb width – 30’• Milled area – 20’• Depth of milled area – 3’’ under tracking number (2023010300750343) submitted on 1/3/23. |
2022-12-28 | No data | 162 STREET, FROM STREET 59 AVENUE TO STREET BOOTH MEMORIAL AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 51’x20’x3” area of roadway miiled |
2022-12-21 | No data | 73 AVENUE, FROM STREET 225 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No active 410 permit on file. Permittee is responsible for upgrading the NW2 corner. Old existing single ramp is functional and accessible. Will reinspect at a later date. |
2022-12-14 | No data | 215 PLACE, FROM STREET 39 AVENUE TO STREET 40 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb replaced as well as the corner quadrant. |
2022-12-13 | No data | 73 AVENUE, FROM STREET 225 STREET TO STREET 226 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 147’x31’x3” area of bpp milled |
2022-12-13 | No data | 225 STREET, FROM STREET 69 AVENUE TO STREET 73 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 89’x31’x3” bpp area milled |
2022-12-10 | No data | 229 STREET, FROM STREET 69 AVENUE TO STREET 73 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | • Curb to Curb width – 30’ 3’’ • Milled area – 50’ 2’’ X 20 ‘• Depth of milled area – 3’’• ½ +5’ milled (yes/no) – yes• Waiver (yes/no)-no |
2022-12-08 | No data | 50 AVENUE, FROM STREET 188 STREET TO STREET 189 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP installed in kind |
2022-12-08 | No data | 158 STREET, FROM STREET 43 AVENUE TO STREET SANFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP measurements are accurate. |
2022-12-06 | No data | UNION STREET, FROM STREET 45 AVENUE TO STREET HOLLY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No BPP roadway pavement work observed at this time of inspection. |
2022-12-05 | No data | 230 STREET, FROM STREET 69 AVENUE TO STREET 73 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work started, roadway milled F\O 69-58 230 Street. |
2022-11-27 | No data | 50 AVENUE, FROM STREET 188 STREET TO STREET 189 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | (condition verified) new BPP is observed in progress in front address is milled at this time. |
2022-11-25 | No data | 50 AVENUE, FROM STREET 188 STREET TO STREET 189 STREET | No data | Street Construction Inspections: Active | Department of Transportation | All BPP measurements are accurate. |
2022-11-22 | No data | 43 AVENUE, FROM STREET 219 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 35’x20’ roadway milled |
2022-11-22 | No data | 43 AVENUE, FROM STREET 219 STREET TO STREET 220 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 65’x25’ roadway milled |
2022-11-22 | No data | 219 STREET, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | 122’x19’ roadway milled |
2022-11-20 | No data | 203 STREET, FROM STREET 35 AVENUE TO STREET 36 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb replaced, joints sealed. |
2022-11-17 | No data | SANFORD AVENUE, FROM STREET 155 STREET TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | Bpp 41’x25’x3” milled and ready for paving |
2022-11-13 | No data | 33 ROAD, FROM STREET 212 STREET TO STREET 213 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Curb replaced. |
2022-11-13 | No data | 219 STREET, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Curb replaced, joints sealed. |
2022-11-13 | No data | 43 AVENUE, FROM STREET 219 STREET TO STREET 220 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Curb replaced, joints sealed. |
2022-11-13 | No data | 215 PLACE, FROM STREET 39 AVENUE TO STREET 40 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | At time of inspection, no work observed. |
2022-11-11 | No data | 50 AVENUE, FROM STREET 188 STREET TO STREET 189 STREET | No data | Street Construction Inspections: Active | Department of Transportation | concrete curb installed |
2022-11-09 | No data | 73 AVENUE, FROM STREET 225 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active permit on file. No ped ramp work started at this time within the NE3 corner quadrant. Old existing single ramp is functional and accessible. We’ll reinspect at a later date. |
2022-11-07 | No data | 232 STREET, FROM STREET 64 AVENUE TO STREET 67 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP measurements are accurate. |
2022-11-04 | No data | UNION STREET, FROM STREET 45 AVENUE TO STREET HOLLY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit on file. No BPP work started at this time of inspection. |
2022-11-04 | No data | 203 STREET, FROM STREET 35 AVENUE TO STREET 36 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit on file. No BPP work started at this time of inspection. |
2022-11-04 | No data | 232 STREET, FROM STREET 64 AVENUE TO STREET 67 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No BPP paving roadway work started at this time of inspection. |
2022-11-04 | No data | SANFORD AVENUE, FROM STREET 155 STREET TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | No BPP paving roadway work started at this time of inspection. |
2022-10-26 | No data | 33 ROAD, FROM STREET 212 STREET TO STREET 213 STREET | No data | Street Construction Inspections: Active | Department of Transportation | milled area = 84' x 21' down 3'' |
2022-10-12 | No data | 159 STREET, FROM STREET 46 AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Due to equipment failure the crew is not ready; as per the foreman on site the BPP restoration has been re-scheduled at 1:00 pm. |
THE CORPORATION
ARSHIA DESIGNS INC. AAA VACUUM CORP. ATLANTICA TELECOM, INC. MISTY SPORTSWEAR, INC. INRACKS, INC. FAT JAMS ELECTRONICS INC. CROQUEMBOUCHE, INC. LONG BEACH PEDIATRIC GROUP, P.C. LAW OFFICES OF JOSEPH A. GRECO, P.C. TEREZ, INC.No related companies by address
Date of last update: 21 Nov 2024
Sources: New York Secretary of State
© 2024 nycompanysearch.com, Part of Big Data Integrated