2024-07-08
|
No data
|
172 STREET, FROM STREET 76 AVENUE TO STREET UNION TURNPIKE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Condition was not repaired, permittee is out of business. CAR closed and placed on hold.
|
2024-07-07
|
No data
|
172 STREET, FROM STREET 76 AVENUE TO STREET UNION TURNPIKE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed the respondent has a pave street restoration in the roadway with a broken seal along the edges of restoration in front of 76-25 172 Street. Respondent was given CAR# 20246150293 on 05/31/2024 and failed to correct the condition
|
2024-05-31
|
No data
|
172 STREET, FROM STREET 76 AVENUE TO STREET UNION TURNPIKE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
In front of 76-25, Re-seal BPP restoration due to edge cracking on the seal.
|
2023-04-03
|
No data
|
187 STREET, FROM STREET 75 AVENUE TO STREET UNION TURNPIKE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed the respondent failed to replace patched flag at adjacent property broking during repairs. A CAR was issued to make repairs on 12/1/22 CAR# 20220320804. There is one flag that requires replacing.
|
2023-03-29
|
No data
|
187 STREET, FROM STREET 75 AVENUE TO STREET UNION TURNPIKE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp in good shape.
|
2023-03-22
|
No data
|
190 STREET, FROM STREET 73 AVENUE TO STREET 75 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2023-03-19
|
No data
|
172 STREET, FROM STREET 76 AVENUE TO STREET UNION TURNPIKE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp done
|
2023-03-19
|
No data
|
77 ROAD, FROM STREET 164 STREET TO STREET 166 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp done
|
2022-12-01
|
No data
|
187 STREET, FROM STREET 75 AVENUE TO STREET UNION TURNPIKE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new curb installed.
|
2022-09-26
|
No data
|
187 STREET, FROM STREET 75 AVENUE TO STREET UNION TURNPIKE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP completed and acceptable. Curb to curb - 29' 7", milled - 20' 2" x 50', depth - 3".
|
2022-09-10
|
No data
|
166 STREET, FROM STREET 14 ROAD TO STREET CRYDERS LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
driveway restored
|
2022-07-27
|
No data
|
172 STREET, FROM STREET 76 AVENUE TO STREET UNION TURNPIKE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP acceptable. • Curb to Curb width – 29’6’’• Milled area – 20’• Depth of milled area – 4’’
|
2022-07-06
|
No data
|
ONDERDONK AVENUE, FROM STREET GROVE STREET TO STREET LINDEN STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
New sidewalk ifo #602 complete.
|
2022-07-02
|
No data
|
209 STREET, FROM STREET 38 AVENUE TO STREET 39 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored in compliance
|
2022-07-02
|
No data
|
38 AVENUE, FROM STREET 209 STREET TO STREET CORP KENNEDY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored in compliance
|
2022-06-19
|
No data
|
65 ROAD, FROM STREET 102 STREET TO STREET YELLOWSTONE BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
At this time , work not done permit Expired.
|
2022-05-15
|
No data
|
EASTERN PARKWAY, FROM STREET BEND TO STREET UNDERHILL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk replaced in front of 15-47 Eastern Parkway
|
2022-05-07
|
No data
|
58 STREET, FROM STREET 57 ROAD TO STREET MASPETH AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Upon arrival respondent CEMENTO CONTRACTING INC failed to comply with terms & conditions of stipulation #OCMC12, post signs meeting NYCDOT specs at the work-zone & at both intersections redirecting pedestrians. Nov issued
|
2022-04-06
|
No data
|
CROWN STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Open container in the parking lane.
|
2022-03-31
|
No data
|
NERO AVENUE, FROM STREET PALERMO STREET TO STREET SANCHO STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
work not started
|
2022-03-23
|
No data
|
75 AVENUE, FROM STREET UTOPIA PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Ped ramp replaced.
|
2022-03-20
|
No data
|
47 ROAD, FROM STREET 11 STREET TO STREET VERNON BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Respondent obstructed access to the fire hydrant by storing its container 10' away from it instead of 15' away as required by DOT''s rules {34RCNY: 2-05(8)(iii)}. Permit# Q022022070A41 for storing container at location was used to ID respondent.
|
2022-03-20
|
No data
|
NERO AVENUE, FROM STREET PALERMO STREET TO STREET SANCHO STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No container stored on street
|
2022-03-14
|
No data
|
176 STREET, FROM STREET 75 AVENUE TO STREET 76 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Full sidewalk replaced and sealed.
|
2022-03-14
|
No data
|
174 STREET, FROM STREET 76 AVENUE TO STREET UNION TURNPIKE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Full sidewalk replaced and sealed.
|
2022-03-11
|
No data
|
179 STREET, FROM STREET 69 AVENUE TO STREET JEWEL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Full sidewalk replaced and sealed.
|
2022-03-11
|
No data
|
184 STREET, FROM STREET 73 AVENUE TO STREET 75 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
OPEN CONSTRUCTION DEBRIS CONTAINER ON THE STREET
|
2022-03-09
|
No data
|
77 ROAD, FROM STREET 164 STREET TO STREET 166 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New concrete curb installed ifo #164-33.
|
2022-03-09
|
No data
|
68 AVENUE, FROM STREET 110 STREET TO STREET 112 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
container on roadway in compliance
|
2022-03-08
|
No data
|
47 ROAD, FROM STREET 11 STREET TO STREET VERNON BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
In compliance - container stored in the parking lane.
|
2022-03-08
|
No data
|
199 STREET, FROM STREET 69 AVENUE TO STREET 73 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Section of sidewalk replaced.
|
2022-02-25
|
No data
|
47 ROAD, FROM STREET 11 STREET TO STREET VERNON BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Container stored in the parking lane.
|
2022-02-23
|
No data
|
HILLSIDE AVENUE, FROM STREET 131 STREET TO STREET KEW GARDENS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sections of sidewalk replaced and sealed.
|
2022-02-23
|
No data
|
METROPOLITAN AVENUE, FROM STREET 131 STREET TO STREET 132 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work on permit.
|
2022-02-17
|
No data
|
67 ROAD, FROM STREET 79 STREET TO STREET 80 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags installed restored in kind adjacent to property AKA #67-19 79 STREET in front of property #79-09 67 ROAD expansion joints sealed in between the sidewalk, curb and both ends of the property line in compliance
|
2022-02-16
|
No data
|
68 AVENUE, FROM STREET 110 STREET TO STREET 112 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Open construction debris container on street at this time of inspection.
|
2022-02-11
|
No data
|
47 ROAD, FROM STREET 11 STREET TO STREET VERNON BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
OPEN CONSTRUCTION DEBRIS CONTAINER ON THE STREET
|
2022-02-10
|
No data
|
77 ROAD, FROM STREET 164 STREET TO STREET 166 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP in front of 166-33 completed and acceptable. Curb to curb - 31' 2"Milled area - 41' 3" x 20' 0"depth 3"
|
2022-02-09
|
No data
|
65 ROAD, FROM STREET POWER ROAD TO STREET 102 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags restored, joints sealed
|
2022-02-07
|
No data
|
179 STREET, FROM STREET 69 AVENUE TO STREET JEWEL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb replaced, joints sealed.
|
2022-02-04
|
No data
|
63 ROAD, FROM STREET 108 STREET TO STREET YELLOWSTONE BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no container on roadway
|
2022-01-19
|
No data
|
77 ROAD, FROM STREET 164 STREET TO STREET 166 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk flags and driveway complete, expansion joints installed and sealed.
|
2021-12-08
|
No data
|
EAST 34 STREET, FROM STREET BEVERLY ROAD TO STREET TILDEN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Container stored on the street
|
2021-11-12
|
No data
|
165 STREET, FROM STREET 71 AVENUE TO STREET 72 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Container is on street at this time of inspection.
|
2021-10-26
|
No data
|
CLIO STREET, FROM STREET BEND TO STREET KENO AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No container found on roadway, at time of inspection.
|
2021-10-26
|
No data
|
NERO AVENUE, FROM STREET PALERMO STREET TO STREET SANCHO STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Open Construction Debris Container placed on roadway.
|
2021-10-06
|
No data
|
77 AVENUE, FROM STREET 217 STREET TO STREET 220 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Commercial container in front of 217-66 in compliance.
|
2021-10-05
|
No data
|
181 STREET, FROM STREET 73 AVENUE TO STREET 75 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
commercial container in front of 73-18 in compliance.
|
2021-09-08
|
No data
|
166 STREET, FROM STREET 14 ROAD TO STREET CRYDERS LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Section of s/w (driveway) replaced
|
2021-08-23
|
No data
|
86 STREET, FROM STREET 157 AVENUE TO STREET 158 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
At time of inspection, container in compliance.
|
2021-08-01
|
No data
|
187 STREET, FROM STREET 75 AVENUE TO STREET UNION TURNPIKE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No container on r/w.
|
2021-07-31
|
No data
|
TRYON PLACE, FROM STREET 80 DRIVE TO STREET KILDARE ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed the above respondent stored container on roadway on a construction site without protection under the wheels at this time.
|
2021-07-19
|
No data
|
NERO AVENUE, FROM STREET PALERMO STREET TO STREET SANCHO STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Container on r/w.
|
2021-07-07
|
No data
|
172 STREET, FROM STREET 76 AVENUE TO STREET UNION TURNPIKE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Container in parking lane ifo 76-25, with protection.
|
2021-07-07
|
No data
|
77 ROAD, FROM STREET 164 STREET TO STREET 166 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway is clear, no container on the street.
|
2021-07-06
|
No data
|
190 STREET, FROM STREET 73 AVENUE TO STREET 75 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Curb installed at time of inspection. There are two infiltration basin's along the segment ifo 73-50 & 73-55, that are not affecting any active work at this time. Valid permit on file.
|
2021-06-29
|
No data
|
24 AVENUE, FROM STREET 166 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No Open Construction Debris Container Visible On Site At Time Of Inspection
|
2021-06-14
|
No data
|
63 DRIVE, FROM STREET ALDERTON STREET TO STREET LONG ISLAND RAILROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No construction container placed on street at this time of inspection.
|
2021-06-03
|
No data
|
TRYON PLACE, FROM STREET 80 DRIVE TO STREET KILDARE ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
2021-05-30
|
No data
|
BEACH 130 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET CRONSTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No container at this time.
|
2021-05-13
|
No data
|
80 DRIVE, FROM STREET TRYON PLACE TO STREET UTOPIA PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Place container on street
|
2021-04-22
|
No data
|
162 STREET, FROM STREET 89 AVENUE TO STREET JAMAICA AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No Open Construction Debris Container Visible On Site At Tim e Of Inspection
|
2021-04-06
|
No data
|
162 STREET, FROM STREET 89 AVENUE TO STREET JAMAICA AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No Open Construction Debris Container Visible On Site At Time Of Inspection
|