2024-09-21
|
No data
|
LIBERTY AVENUE, FROM STREET 175 STREET TO STREET 177 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Recess 1/2" and seal expansion joint in sidewalk flag around base. Also remove the wooden form in tree pit area. Then fill with soil.
|
2024-09-21
|
No data
|
LIBERTY AVENUE, FROM STREET 175 STREET TO STREET 177 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Pass and re-issued another defect found.
|
2024-08-17
|
No data
|
LIBERTY AVENUE, FROM STREET 175 STREET TO STREET 177 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed the above respondent with a restored flag around light foundation, along the sidewalk. The respondent failed to seal expansion joint between the sidewalk and curb, at the base of light foundation.
|
2024-07-14
|
No data
|
LIBERTY AVENUE, FROM STREET 175 STREET TO STREET 177 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Condition previously reported. NOV issued on 7/7/24. Condition remains.
|
2024-07-07
|
No data
|
LIBERTY AVENUE, FROM STREET 175 STREET TO STREET 177 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed the respondent has failed to recess and seal the expansion joints between sidewalk flag and curb. Respondent was notified by CAR #20247840193 issued on 5/26/2024. ID by permit number
|
2024-05-26
|
No data
|
LIBERTY AVENUE, FROM STREET 175 STREET TO STREET 177 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Recess 1/2 and seal expansion joints between restored sidewalk flag and curb, nearest 175 St.
|
2024-02-23
|
No data
|
BEACH 87 STREET, FROM STREET DORMANS COURT TO STREET ROCKAWAY FREEWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
concrete curb installed
|
2024-02-20
|
No data
|
NEPONSIT AVENUE, FROM STREET BEACH 148 STREET TO STREET BEACH 149 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no sign of work done
|
2023-08-09
|
No data
|
BEACH 92 STREET, FROM STREET ROCKAWAY FREEWAY TO STREET UNNAMED STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb was replaced.
|
2023-07-27
|
No data
|
BEACH 127 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET CRONSTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
37'x15' width of r/w paved.
|
2022-10-02
|
No data
|
BEACH 87 STREET, FROM STREET DORMANS COURT TO STREET ROCKAWAY FREEWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk restored in kind.
|
2022-08-16
|
No data
|
COLUMBIA HEIGHTS, FROM STREET CLARK STREET TO STREET PIERREPONT STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NEW SWK FLAGS AT 200-OK
|
2022-01-23
|
No data
|
WEST 24 STREET, FROM STREET 5 AVENUE TO STREET AVENUE OF THE AMERICAS
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work not done.
|
2021-09-15
|
No data
|
BEACH 87 STREET, FROM STREET DORMANS COURT TO STREET ROCKAWAY FREEWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIRED PERM SIDEWALK JOINT SEALED
|
2021-09-10
|
No data
|
NOVA COURT, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new curb installed and acceptable
|
2021-08-09
|
No data
|
BEACH 149 STREET, FROM STREET NEPONSIT AVENUE TO STREET ROCKAWAY BEACH BOULEVARD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
RESET, REPAIR OR REPLACE CURB-EXPANSION JIONT SEALED.
|
2021-08-03
|
No data
|
BEACH 92 STREET, FROM STREET ROCKAWAY FREEWAY TO STREET UNNAMED STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
REPLACED SIDEWALK JOINTS SEALED
|
2021-06-23
|
No data
|
COLUMBIA HEIGHTS, FROM STREET CLARK STREET TO STREET PIERREPONT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW SWK OK
|
2021-06-17
|
No data
|
BEACH 149 STREET, FROM STREET NEPONSIT AVENUE TO STREET ROCKAWAY BEACH BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 240 B 149 street driveway area - expansion joints on the repaired curb not installed and sealed.
|
2021-06-17
|
No data
|
BEACH 149 STREET, FROM STREET NEPONSIT AVENUE TO STREET ROCKAWAY BEACH BOULEVARD
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
I observed above respondent repaired more than 25 square feet of sidewalk without DOT sidewalk repair permit.Permit # Q012020335C14 for curb repair not allow sidewalk repair and is used to identify the respondent.
|
2021-06-16
|
No data
|
BEACH 87 STREET, FROM STREET DORMANS COURT TO STREET ROCKAWAY FREEWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I observed above respondent open more than 25 square feet of sidewalk for repair with expired DOT permit. Above permit expired on 5/19/21 and active permit # Q012021146B76 for curb repair (crew on site,spoke with Alberto) used to identify respondent.
|
2021-06-16
|
No data
|
BEACH 87 STREET, FROM STREET DORMANS COURT TO STREET ROCKAWAY FREEWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Work in progress,crew on site.Contractor also repairing the sidewalk - sidewalk permit expired.Spoke to Alberto on site,NOV issued for the sidewalk repair.
|
2021-05-17
|
No data
|
BEACH 92 STREET, FROM STREET ROCKAWAY FREEWAY TO STREET UNNAMED STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Expansion joints on the curb - on one side joint not recessed and sealed,on the other side joint not installed.
|
2021-03-15
|
No data
|
NOEL AVENUE, FROM STREET NOVA COURT TO STREET SEBA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed
|
2021-01-09
|
No data
|
6 AVENUE, FROM STREET 53 STREET TO STREET 54 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk is in compliance.
|
2020-12-16
|
No data
|
BEACH 127 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET CRONSTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Arrived for BPP. The permittee is not ready to start, due to a broken machine part. Will re-schedule for another date. Valid permit on file.
|
2020-08-20
|
No data
|
NOEL AVENUE, FROM STREET NOVA COURT TO STREET SEBA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed at 39 Seba Ave.
|
2020-08-20
|
No data
|
NOVA COURT, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed.
|
2020-07-12
|
No data
|
NOVA COURT, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved.
|
2020-06-05
|
No data
|
CROSS BAY BOULEVARD, FROM STREET WEST 8 ROAD TO STREET WEST 9 ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed
|
2020-01-20
|
No data
|
6 AVENUE, FROM STREET 53 STREET TO STREET 54 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
4 sidewalk flags installed
|
2020-01-04
|
No data
|
LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
paved half plus 5 feet
|
2019-10-11
|
No data
|
NOVA COURT, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work started
|
2019-09-14
|
No data
|
LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved & re-surfaced restored in kind.
|
2019-08-18
|
No data
|
LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass, roadway paved ... under Bpp
|
2019-08-13
|
No data
|
LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway paved
|
2019-08-08
|
No data
|
NOVA COURT, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb replaced with expansion joints sealed. In compliance
|
2019-07-14
|
No data
|
LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
paved half plus 5 feet
|
2019-07-10
|
No data
|
AVENUE I, FROM STREET 20 AVENUE TO STREET DAHILL ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done; BO new building being built, predict half plus 5
|
2019-06-23
|
No data
|
LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street paved half plus 5 feet.
|
2019-06-15
|
No data
|
LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
roadway paved half plus 5 feet
|
2019-06-12
|
No data
|
NOSTRAND AVENUE, FROM STREET AVENUE U TO STREET GRAVESEND NECK ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done
|
2019-06-06
|
No data
|
LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no work started
|
2019-05-16
|
No data
|
CROSS BAY BOULEVARD, FROM STREET WEST 8 ROAD TO STREET WEST 9 ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w restored
|
2019-05-08
|
No data
|
BEACH 144 STREET, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w restored
|
2019-04-11
|
No data
|
NOEL AVENUE, FROM STREET NOVA COURT TO STREET SEBA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDEWALK CURB OK AKA 39 SEBA AVENUE
|
2019-02-21
|
No data
|
SEBA AVENUE, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDEWALK
|
2019-02-19
|
No data
|
SEBA AVENUE, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDEWALK OK
|
2019-02-05
|
No data
|
BEACH 130 STREET, FROM STREET NEWPORT AVENUE TO STREET ROCKAWAY BEACH BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
STONE CURB
|
2018-10-21
|
No data
|
BEACH 148 STREET, FROM STREET NEPONSIT AVENUE TO STREET NEWPORT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
swk repair
|
2018-06-25
|
No data
|
BEACH 149 STREET, FROM STREET NEPONSIT AVENUE TO STREET NEWPORT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work found, permit expired.
|
2018-05-23
|
No data
|
CROSS BAY BOULEVARD, FROM STREET WEST 8 ROAD TO STREET WEST 9 ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb replaced.
|
2018-05-14
|
No data
|
BEACH 130 STREET, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb replaced.
|
2018-03-14
|
No data
|
BEACH 130 STREET, FROM STREET NEWPORT AVENUE TO STREET ROCKAWAY BEACH BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new curb installed
|
2017-02-19
|
No data
|
AVENUE I, FROM STREET 20 AVENUE TO STREET DAHILL ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Installation of Curb in good condition.
|
2017-02-02
|
No data
|
CROSS BAY BOULEVARD, FROM STREET EAST SIXTH ROAD TO STREET EAST 7 ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk replaced
|
2016-12-01
|
No data
|
BEACH 130 STREET, FROM STREET NEWPORT AVENUE TO STREET ROCKAWAY BEACH BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk repair
|
2016-11-05
|
No data
|
BEACH 125 STREET, FROM STREET OCEAN PROMENADE TO STREET ROCKAWAY BEACH BOULEVARD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion joints sealed
|
2016-09-20
|
No data
|
BEACH 125 STREET, FROM STREET OCEAN PROMENADE TO STREET ROCKAWAY BEACH BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR SIDEWALK
|
2016-09-07
|
No data
|
KNAPP STREET, FROM STREET AVENUE Y TO STREET AVENUE Z
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk cut
|
2016-08-26
|
No data
|
BEACH 125 STREET, FROM STREET OCEAN PROMENADE TO STREET ROCKAWAY BEACH BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb restored, joints sealed
|
2016-07-11
|
No data
|
CROSS BAY BOULEVARD, FROM STREET EAST SIXTH ROAD TO STREET EAST 7 ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPLACE SIDEWALK
|
2016-04-12
|
No data
|
GRAVESEND NECK ROAD, FROM STREET EAST 29 STREET TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
As per policy, limit NOVâs issued for this defect. Permittee placed on hold.
|
2016-04-07
|
No data
|
GRAVESEND NECK ROAD, FROM STREET EAST 29 STREET TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Failure to seal expansion joints
|
2016-01-30
|
No data
|
ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 124 STREET TO STREET BEACH 125 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done
|
2015-12-06
|
No data
|
BEACH 127 STREET, FROM STREET OCEAN PROMENADE TO STREET ROCKAWAY BEACH BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR SIDEWALK
|
2015-12-03
|
No data
|
GRAVESEND NECK ROAD, FROM STREET EAST 29 STREET TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
11 concrete flag restorations in sidewalk, adjacent curb, - Sidewalk expansion between curb & concrete flags joints need to be sealed. (I/F/O Brennan's) 30'w/w/c of Nostrand ave.
|
2015-11-19
|
No data
|
CROSS BAY BOULEVARD, FROM STREET EAST SIXTH ROAD TO STREET EAST 7 ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
- REPLACE SIDEWALK
|
2015-11-05
|
No data
|
BEACH 125 STREET, FROM STREET OCEAN PROMENADE TO STREET ROCKAWAY BEACH BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb replaced
|
2015-10-29
|
No data
|
CROSS BAY BOULEVARD, FROM STREET EAST SIXTH ROAD TO STREET EAST 7 ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
TEMPORARY PEDESTRIAN WALK
|
2015-10-20
|
No data
|
BEACH 127 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET CRONSTON AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
THIS CONDITION IS NOT REPAIRED. THE PERMITTEE IS ON A STOP/HOLD FOR FAILURE TO CORRECT DEFECT. AN NOV WAS ISSUED.
|
2015-10-18
|
No data
|
BEACH 127 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET CRONSTON AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
a/t/p/o i observed that the above respondent has failed to seal sidewalk expansion joints as per subsection. prior notification by car #20154830207 on 9-11-2015 to correct condition and did not
|
2015-09-23
|
No data
|
MC DONALD AVENUE, FROM STREET 20 AVENUE TO STREET ELMWOOD AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sidewalk repair work not started
|
2015-09-11
|
No data
|
BEACH 127 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET CRONSTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk and curb needs to have expansion joints sealed
|
2015-08-16
|
No data
|
BEACH 128 STREET, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
expansion joints has been sealed.
|
2015-08-07
|
No data
|
KNAPP STREET, FROM STREET AVENUE Y TO STREET AVENUE Z
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NO S/W WORK DONE I/F/O # 2501 -**( NEW S/W IF/O DSNY YARD # 2509 EXPANSION JOINTS NOT YET TRIMMED AND SEALED - NO OTHER PERMIT FOUND)
|
2015-08-07
|
No data
|
KNAPP STREET, FROM STREET AVENUE Y TO STREET AVENUE Z
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
*( NEW S/W IF/O DSNY YARD # 2509 EXPANSION JOINTS NOT YET TRIMMED AND SEALED - NO OTHER PERMIT FOUND)
|
2015-07-09
|
No data
|
BEACH 128 STREET, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
expansion joints installed are not sealed
|
2015-07-02
|
No data
|
VIREO AVENUE, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2015-06-08
|
No data
|
BEACH 129 STREET, FROM STREET NEWPORT AVENUE TO STREET ROCKAWAY BEACH BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
active work site ; s/w operation in progress checked permit.
|
2015-05-02
|
No data
|
50 STREET, FROM STREET 19 AVENUE TO STREET DAHILL ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
swk
|
2015-03-19
|
No data
|
BEACH 125 STREET, FROM STREET OCEAN PROMENADE TO STREET ROCKAWAY BEACH BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
expansion joints installed are recessed and sealed
|
2015-03-19
|
No data
|
ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 124 STREET TO STREET BEACH 125 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
expansion joints installed are recessed and sealed
|
2015-01-14
|
No data
|
AVENUE I, FROM STREET 20 AVENUE TO STREET DAHILL ROAD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
swk sealed
|
2015-01-13
|
No data
|
ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 124 STREET TO STREET BEACH 125 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb replaced
|
2015-01-13
|
No data
|
BEACH 125 STREET, FROM STREET OCEAN PROMENADE TO STREET ROCKAWAY BEACH BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb replaced
|
2014-11-28
|
No data
|
AVENUE I, FROM STREET 20 AVENUE TO STREET DAHILL ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb okay
|
2014-10-25
|
No data
|
121 AVENUE, FROM STREET 201 PLACE TO STREET SPRINGFIELD BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 connecting swk flags and 1 separate swk flag adjacent to lot in good condition
|
2014-10-25
|
No data
|
122 AVENUE, FROM STREET 199 STREET TO STREET OLD SPRNGFLD CEMETERY BDY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 swk flags in good condition
|
2014-10-25
|
No data
|
SPRINGFIELD BOULEVARD, FROM STREET MONTEFIORE CEMETERY BOUNDARY TO STREET UNNAMED STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
separately installed 2 new swk flags
|
2014-10-25
|
No data
|
NASHVILLE BOULEVARD, FROM STREET 121 AVENUE TO STREET 201 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
several new swk flags installed along the large lot segment
|
2014-09-13
|
No data
|
19 AVENUE, FROM STREET 50 STREET TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pave str
|
2014-07-04
|
No data
|
19 AVENUE, FROM STREET 50 STREET TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2014-07-02
|
No data
|
50 STREET, FROM STREET 19 AVENUE TO STREET DAHILL ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk cut
|
2014-06-15
|
No data
|
VIREO AVENUE, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2014-05-29
|
No data
|
AVENUE I, FROM STREET 20 AVENUE TO STREET DAHILL ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw
|
2014-05-10
|
No data
|
19 AVENUE, FROM STREET 50 STREET TO STREET DEAD END
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
equipment removed
|
2014-03-12
|
No data
|
WEST 45 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR SIDEWALK
|
2014-02-02
|
No data
|
COLEMAN STREET, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw
|
2014-01-29
|
No data
|
HENDRICKSON STREET, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw
|
2014-01-15
|
No data
|
SPRINGFIELD BOULEVARD, FROM STREET MONTEFIORE CEMETERY BOUNDARY TO STREET UNNAMED STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w repaired
|
2013-12-13
|
No data
|
19 AVENUE, FROM STREET 50 STREET TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB REPAIRED
|
2013-12-02
|
No data
|
FLATLANDS AVENUE, FROM STREET FLATBUSH AVENUE TO STREET HENDRICKSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw
|
2013-11-24
|
No data
|
19 AVENUE, FROM STREET 50 STREET TO STREET DEAD END
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Construction equipment ( Plastic safety barriers ) on street - no permit
|
2013-08-21
|
No data
|
AVENUE I, FROM STREET 20 AVENUE TO STREET DAHILL ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW CURB
|
2013-08-06
|
No data
|
SPRINGFIELD BOULEVARD, FROM STREET MONTEFIORE CEMETERY BOUNDARY TO STREET UNNAMED STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
s/w closed waiting for concrete to be poured
|
2013-08-06
|
No data
|
122 AVENUE, FROM STREET 199 STREET TO STREET OLD SPRNGFLD CEMETERY BDY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
work in progress
|
2013-08-06
|
No data
|
121 AVENUE, FROM STREET 201 PLACE TO STREET SPRINGFIELD BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no expansion joints necessary on s/w
|
2013-08-06
|
No data
|
NASHVILLE BOULEVARD, FROM STREET 121 AVENUE TO STREET 201 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
1 flag
|
2013-07-28
|
No data
|
19 AVENUE, FROM STREET 50 STREET TO STREET DEAD END
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
pass re issue
|
2013-07-28
|
No data
|
19 AVENUE, FROM STREET 50 STREET TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2013-07-11
|
No data
|
FLATLANDS AVENUE, FROM STREET FLATBUSH AVENUE TO STREET HENDRICKSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw
|
2013-06-20
|
No data
|
WEST 45 STREET, FROM STREET 10 AVENUE TO STREET 11 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RESET, REPAIR OR REPLACE CURB
|
2013-06-18
|
No data
|
10 AVENUE, FROM STREET WEST 44 STREET TO STREET WEST 45 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2013-06-14
|
No data
|
19 AVENUE, FROM STREET 50 STREET TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Remove all barriers and other equipment serving no purpose 15 feet from 50 Street.
|
2013-05-05
|
No data
|
EAST 4 STREET, FROM STREET GREENWOOD AVENUE TO STREET VANDERBILT STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2013-04-27
|
No data
|
BELMONT AVENUE, FROM STREET EAST FORDHAM ROAD TO STREET FORDHAM UNIV BOUNDARY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2013-04-27
|
No data
|
EAST 4 STREET, FROM STREET GREENWOOD AVENUE TO STREET VANDERBILT STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Wokingg on a sat see stip #019
|
2013-04-27
|
No data
|
EAST 4 STREET, FROM STREET GREENWOOD AVENUE TO STREET VANDERBILT STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2013-04-20
|
No data
|
19 AVENUE, FROM STREET 50 STREET TO STREET DEAD END
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Paved street
|
2013-04-20
|
No data
|
19 AVENUE, FROM STREET 50 STREET TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new cub
|
2013-03-17
|
No data
|
19 AVENUE, FROM STREET 50 STREET TO STREET DEAD END
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2012-10-14
|
No data
|
FLATLANDS AVENUE, FROM STREET FLATBUSH AVENUE TO STREET HENDRICKSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2012-09-26
|
No data
|
HENDRICKSON STREET, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk repaired
|
2012-08-24
|
No data
|
BEACH 99 STREET, FROM STREET DEAD END TO STREET ROCKAWAY BEACH BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CREW ON WORKING REPLACE SIDEWALK
|
2012-08-24
|
No data
|
AMSTERDAM AVENUE, FROM STREET ST NICHOLAS AVENUE TO STREET WEST 163 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2012-08-23
|
No data
|
AMSTERDAM AVENUE, FROM STREET WEST 106 STREET TO STREET WEST 107 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Vault construction or alteration
|
2012-07-14
|
No data
|
HENDRICKSON STREET, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2012-04-28
|
No data
|
OCEAN AVENUE, FROM STREET KINGS HIGHWAY TO STREET QUENTIN ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2011-09-04
|
No data
|
FLATLANDS AVENUE, FROM STREET FLATBUSH AVENUE TO STREET HENDRICKSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2011-08-05
|
No data
|
ABERDEEN STREET, FROM STREET BROADWAY TO STREET LIRR BAY RIDGE DIV
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2011-04-16
|
No data
|
BEACH 91 STREET, FROM STREET NYCTA TO STREET BEACH CHANNEL DRIVE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2010-10-18
|
No data
|
WEST 45 STREET, FROM STREET 10 AVENUE TO STREET 11 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2010-02-14
|
No data
|
EDGEWATER PLAZA, FROM STREET CAMDEN STREET TO STREET WILLOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2010-02-14
|
No data
|
BAY STREET, FROM STREET WILLOW AVENUE TO STREET CAMDEN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2009-10-13
|
No data
|
BEACH 91 STREET, FROM STREET NYCTA TO STREET BEACH CHANNEL DRIVE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2009-09-16
|
No data
|
2 AVENUE, FROM STREET EAST 89 STREET TO STREET EAST 90 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2009-07-22
|
No data
|
AMSTERDAM AVENUE, FROM STREET WEST 106 STREET TO STREET WEST 107 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2009-06-06
|
No data
|
OCEAN AVENUE, FROM STREET KINGS HIGHWAY TO STREET QUENTIN ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
2009-05-09
|
No data
|
CAMDEN STREET, FROM STREET BAY STREET TO STREET EDGEWATER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb repaired.
|
2009-05-09
|
No data
|
BAY STREET, FROM STREET WILLOW AVENUE TO STREET CAMDEN STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
curb repaired
|
2009-04-28
|
No data
|
OCEAN AVENUE, FROM STREET KINGS HIGHWAY TO STREET QUENTIN ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2009-04-23
|
No data
|
BAY STREET, FROM STREET WILLOW AVENUE TO STREET CAMDEN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb is okay
|
2009-03-07
|
No data
|
OCEAN AVENUE, FROM STREET KINGS HIGHWAY TO STREET QUENTIN ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2008-12-08
|
No data
|
AUDLEY STREET, FROM STREET 116 STREET TO STREET ABINGDON ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2008-11-12
|
No data
|
GREENPOINT AVENUE, FROM STREET JEWELL STREET TO STREET MOULTRIE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2008-10-15
|
No data
|
OCEAN AVENUE, FROM STREET KINGS HIGHWAY TO STREET QUENTIN ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2008-09-15
|
No data
|
10 AVENUE, FROM STREET WEST 44 STREET TO STREET WEST 45 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2008-08-27
|
No data
|
OCEAN AVENUE, FROM STREET KINGS HIGHWAY TO STREET QUENTIN ROAD
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
No data
|
2008-08-06
|
No data
|
2 AVENUE, FROM STREET EAST 89 STREET TO STREET EAST 90 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Repair SW
|
2008-05-28
|
No data
|
OCEAN AVENUE, FROM STREET KINGS HIGHWAY TO STREET QUENTIN ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|