2021-08-02
|
No data
|
GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
VAULT CONSTRUCTION OR ALTERATION
|
2021-06-27
|
No data
|
GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O Building #55 Granite sidewalk/curb is in compliance.
|
2021-06-06
|
No data
|
GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O Building #55 granite curb installed and in compliance.
|
2021-06-03
|
No data
|
GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O Building #55 Sidewalk has been repaired with no defects and in compliace.
|
2021-04-21
|
No data
|
GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Granite curb sealed and in compliance.
|
2021-03-24
|
No data
|
GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O #321 permanent gas installation on sidewalk flag around gas valve is acceptable.
|
2019-05-02
|
No data
|
GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
At the time of inspection, there were no defects found to the sidewalk flags where the vault work was done underneath sidewalk.
|
2019-02-25
|
No data
|
GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s.w repair acceptable
|
2019-02-20
|
No data
|
STATE STREET, FROM STREET BOND STREET TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD OCCUPIED/BLOCKED/CLOSED OFF 60 FEET BY 8 FEET OF ROADWAY-WITHOUT A VALID DOT PERMIT TO DO SO. PARTIAL STREET CLOSURE-NO PERMIT. NYC DEPT OF BUILDINGS PERMIT#321
|
2019-02-13
|
No data
|
STATE STREET, FROM STREET BOND STREET TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD OCCUPIED/BLOCKED/CLOSED OFF 60 FEET BY 8 FEET OF ROADWAY-WITHOUT A VALID DOT PERMIT TO DO SO. PARTIAL STREET CLOSURE-NO PERMIT. NYC DEPT OF BUILDINGS PERMIT#32
|
2019-01-25
|
No data
|
GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb work ongoing IFO #55 - refer to active permit M012019011B33.
|
2019-01-13
|
No data
|
STATE STREET, FROM STREET BOND STREET TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD 6 PLASTIC BARRICADES ON STREET(ROADWAY&SIDEWALK)-WITHOUT A VALID DOT PERMIT TO DO SO.CONSTRUCTION EQUIPMENT ON STREET-NO PERMIT. NYC DEPT OF BUILDINGS PERMIT#321402558-
|
2019-01-08
|
No data
|
STATE STREET, FROM STREET BOND STREET TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
TALKED TO GENERAL CONTRACTOR TO RENEW PERMITS - 2 NOV'S PREVIOUSLY WRITTEN
|
2019-01-04
|
No data
|
STATE STREET, FROM STREET BOND STREET TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD OCCUPIED/BLOCKED/CLOSED OFF 45 FEET BY 8 FEET OF ROADWAY-WITHOUT A VALID DOT PERMIT TO DO SO. PARTIAL STREET CLOSURE-NO PERMIT. NYC DEPT OF BUILDINGS PERMIT#321402558-01-EW-OT
|
2018-12-06
|
No data
|
GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NOV was issued to permit#M012018292A44 for VAULT CONSTRUCTION OR ALTERATION including CURB work also.
|
2018-12-04
|
No data
|
GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
A/T/P/O I observed respondent with a Open Excavation on the sidewalk, without a Valid DOT permit on file to do so. Permittee was identified through above permit, which expired on 12/2/2018.
|
2018-11-03
|
No data
|
GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
work to continue under permit#M012018292A44
|
2018-11-03
|
No data
|
GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work to continue under permit#M012018292A44
|
2018-09-26
|
No data
|
GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sidewalk currently fenced
|
2018-09-22
|
No data
|
GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work to continue under permit#M012018240C57
|
2018-09-21
|
No data
|
STATE STREET, FROM STREET BOND STREET TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
port o sans not visible
|
2018-08-11
|
No data
|
GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Vault Construction/Alteration in Progress, acceptable
|
2018-07-27
|
No data
|
STATE STREET, FROM STREET BOND STREET TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
signs ok
|
2018-04-20
|
No data
|
STATE STREET, FROM STREET BOND STREET TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
I observed the above respondent equipment 4 port-o-san on the roadway without a valid NYC DOT permit on file.Permit#B022018052B63 use for id purpose only
|
2018-04-20
|
No data
|
STATE STREET, FROM STREET BOND STREET TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
0211 - OCCUPANCY OF ROADWAY AS STIPULATED/ ROADWAY IN USE 8' ADJACENT TO CURB
|
2018-04-19
|
No data
|
STATE STREET, FROM STREET BOND STREET TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CONSTRUCTION OFFICE TRAILER ON STREET
|
2018-04-12
|
No data
|
STATE STREET, FROM STREET BOND STREET TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
I Observed the respondent occupying the roadway with equipment "4 port-o-san " without a valid NYC DOT permit on file .Permit B022018052B63 use for id purpose only.
|
2018-04-12
|
No data
|
STATE STREET, FROM STREET BOND STREET TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
0201 - PLACE MATERIAL ON STREET/MATERIAL CONCRETE BLOCKS ON ROADWAY
|
2018-03-07
|
No data
|
GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Fence occupying sidewalk,5' open for ped traffic acceptable.
|
2018-01-30
|
No data
|
STATE STREET, FROM STREET BOND STREET TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ATPO I observed the above respondent occupying 8ft of the roadway with equipment waterfill barriers lighting or proper reflectors which is capable of producing a warning glow when struck by the headlamps of a vehicle or other source of illuminations
|
2018-01-11
|
No data
|
GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temp const signs acceptable.
|
2017-12-08
|
No data
|
STATE STREET, FROM STREET BOND STREET TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
A/T/P/O I OBSERVED THE ABOVE RESPONDENT/ RESPONDENT'S SUB-CONTRACTOR WORKING WITH A BOOM TRUCK AT 8:15 AM ON FRIDAY MORNING; FAILED TO START WORKING AFTER 9:00 AM,FAILED TO ADHERE TO TERMS&CONDITIONS OF STIPULATION 083 OF DOT PERMIT#B02201
|
2017-12-06
|
No data
|
STATE STREET, FROM STREET BOND STREET TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
A/T/P/O I OBSERVED THE ABOVE RESPONDENT WITH PLASTIC BARRIERS ON THE ROADWAY WITHOUT A VAILD DOT PERMIT TO DO SO. DOB PERMIT 321299812-01-AL USED FOR ID
|
2017-12-05
|
No data
|
WEST 60 STREET, FROM STREET BROADWAY TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Multiple areas of Sidewalk were restored in and around Con-Ed Transformer Vaults to add slip resistance, Work was done I/F/O 60-80 Columbus Circle, opposite 11 West 60th Street.. Address is specified location was an error
|
2017-11-30
|
No data
|
STATE STREET, FROM STREET BOND STREET TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
NOV issued due to MINI containers stored on location with out valid permit on file
|
2017-11-30
|
No data
|
STATE STREET, FROM STREET BOND STREET TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
- Roadway occupancy in compliance.
|
2017-11-29
|
No data
|
STATE STREET, FROM STREET BOND STREET TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Material along parking lane behind plastic barriers.
|
2017-10-07
|
No data
|
WEST 60 STREET, FROM STREET BROADWAY TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR SIDEWALK
|
2017-09-29
|
No data
|
STATE STREET, FROM STREET BOND STREET TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD CLOSED 60 FEET OF ENTIRE SIDEWALK-WITHOUT A VALID DOT PERMIT TO DO SO. PARTIAL SIDEWALK STREET CLOSING. NYC DEPT OF BUILDINGS PERMIT#32199812-01-AL EXP 2/1/18 WAS USED FOR ID.
|
2017-08-10
|
No data
|
WEST 60 STREET, FROM STREET BROADWAY TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway occupied with temporary pedestrian walkway, Respondent is in compliance.
|
2017-08-10
|
No data
|
WEST 60 STREET, FROM STREET BROADWAY TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Crew on site at time of inspection, working with new permit on file for repair sidewalk IFO 80 COLUMBUS CIRCLE. M042017209A02
|
2017-08-03
|
No data
|
GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
-Fence occupying sidewalk (10â clear walkway).
|
2017-07-14
|
No data
|
WEST 60 STREET, FROM STREET BROADWAY TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
TEMP WALKWAY IN THE R/W IS IN COMPLIANCE
|
2017-06-12
|
No data
|
GANSEVOORT STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Green wood fence place on sidewalk acceptable.
|
2016-12-22
|
No data
|
WEST 58 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no defect
|
2016-11-10
|
No data
|
WEST 58 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
r/w open
|
2016-10-22
|
No data
|
WEST 58 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Welding Machine removed
|
2016-10-22
|
No data
|
WEST 58 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ped/ walk removed
|
2016-09-13
|
No data
|
WEST 58 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
INSTALL FENCE
|
2016-07-29
|
No data
|
WEST 60 STREET, FROM STREET BROADWAY TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
2016-06-01
|
No data
|
WEST 60 STREET, FROM STREET BROADWAY TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Maintain Fence
|
2016-05-20
|
No data
|
WEST 60 STREET, FROM STREET BROADWAY TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
2015-10-10
|
No data
|
COLUMBUS CIRCLE, FROM STREET 8 AVENUE TO STREET BEND
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
eq. Maintain Fence
|
2015-10-10
|
No data
|
WEST 58 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
OCCUPANCY OF SIDEWALK
|
2012-07-21
|
No data
|
FULTON STREET, FROM STREET BRIDGE STREET TO STREET HOYT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2012-02-08
|
No data
|
DUFFIELD STREET, FROM STREET FULTON STREET TO STREET WILLOUGHBY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2012-01-28
|
No data
|
BRIDGE STREET, FROM STREET FULTON STREET TO STREET WILLOUGHBY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2012-01-22
|
No data
|
BRIDGE STREET, FROM STREET FULTON STREET TO STREET WILLOUGHBY STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
No data
|
2012-01-14
|
No data
|
BRIDGE STREET, FROM STREET FULTON STREET TO STREET WILLOUGHBY STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2012-01-03
|
No data
|
BRUSH AVENUE, FROM STREET JAY PLACE TO STREET YZNAGA PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2011-11-05
|
No data
|
BRIDGE STREET, FROM STREET FULTON STREET TO STREET WILLOUGHBY STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
temp ped walkway
|
2011-06-29
|
No data
|
DUFFIELD STREET, FROM STREET FULTON STREET TO STREET WILLOUGHBY STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2011-06-29
|
No data
|
FULTON STREET, FROM STREET BRIDGE STREET TO STREET HOYT STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2011-06-28
|
No data
|
BRIDGE STREET, FROM STREET FULTON STREET TO STREET WILLOUGHBY STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2011-06-28
|
No data
|
BRIDGE STREET, FROM STREET FULTON STREET TO STREET WILLOUGHBY STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Plastic barriers on s.w underneath fence w/o permit
|
2011-06-27
|
No data
|
BRUSH AVENUE, FROM STREET JAY PLACE TO STREET YZNAGA PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2009-12-31
|
No data
|
BRUSH AVENUE, FROM STREET JAY PLACE TO STREET YZNAGA PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2009-12-28
|
No data
|
BRUSH AVENUE, FROM STREET JAY PLACE TO STREET YZNAGA PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2009-12-23
|
No data
|
BRUSH AVENUE, FROM STREET JAY PLACE TO STREET YZNAGA PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2009-12-03
|
No data
|
BRUSH AVENUE, FROM STREET JAY PLACE TO STREET YZNAGA PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2009-12-01
|
No data
|
BRUSH AVENUE, FROM STREET JAY PLACE TO STREET YZNAGA PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2009-11-20
|
No data
|
BRUSH AVENUE, FROM STREET JAY PLACE TO STREET YZNAGA PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2009-10-29
|
No data
|
BRUSH AVENUE, FROM STREET JAY PLACE TO STREET YZNAGA PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2009-10-28
|
No data
|
BRUSH AVENUE, FROM STREET JAY PLACE TO STREET YZNAGA PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2009-10-14
|
No data
|
BRUSH AVENUE, FROM STREET JAY PLACE TO STREET YZNAGA PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2009-08-22
|
No data
|
BRUSH AVENUE, FROM STREET JAY PLACE TO STREET YZNAGA PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2009-07-29
|
No data
|
WEST 190 STREET, FROM STREET DAVIDSON AVENUE TO STREET EAST 190 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2009-03-31
|
No data
|
BRUSH AVENUE, FROM STREET JAY PLACE TO STREET YZNAGA PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2009-03-10
|
No data
|
HUTCHINSON RIVER PARKWAY, FROM STREET RAMP TO STREET SENGER PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2009-01-07
|
No data
|
BRUSH AVENUE, FROM STREET JAY PLACE TO STREET YZNAGA PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2008-12-27
|
No data
|
BRUSH AVENUE, FROM STREET JAY PLACE TO STREET YZNAGA PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2008-10-20
|
No data
|
BRUSH AVENUE, FROM STREET JAY PLACE TO STREET YZNAGA PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2008-10-14
|
No data
|
BRUSH AVENUE, FROM STREET JAY PLACE TO STREET YZNAGA PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2008-09-01
|
No data
|
BRUSH AVENUE, FROM STREET JAY PLACE TO STREET YZNAGA PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2008-08-12
|
No data
|
HUTCHINSON RIV PARKWAY, FROM STREET SCHLEY AVENUE TO STREET HUTCHINSON RIV EXIT SB
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2008-07-27
|
No data
|
HUTCHINSON RIV PARKWAY, FROM STREET SCHLEY AVENUE TO STREET HUTCHINSON RIV EXIT SB
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2008-07-16
|
No data
|
BRUSH AVENUE, FROM STREET JAY PLACE TO STREET YZNAGA PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2008-07-16
|
No data
|
HUTCHINSON RIVER PARKWAY, FROM STREET RAMP TO STREET SENGER PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2008-07-16
|
No data
|
HUTCHINSON RIV PARKWAY, FROM STREET SCHLEY AVENUE TO STREET HUTCHINSON RIV EXIT SB
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2008-07-08
|
No data
|
BRUSH AVENUE, FROM STREET JAY PLACE TO STREET YZNAGA PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2008-04-28
|
No data
|
BRUSH AVENUE, FROM STREET JAY PLACE TO STREET YZNAGA PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2008-04-22
|
No data
|
HUTCHINSON RIV PARKWAY, FROM STREET SCHLEY AVENUE TO STREET HUTCHINSON RIV EXIT SB
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2008-01-11
|
No data
|
BRUSH AVENUE, FROM STREET JAY PLACE TO STREET YZNAGA PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|